Page 1

Classification: OFFICIAL 
Argyll and Bute Council
Internal Audit Report
December 2024
FINAL 
High Medium Low VFM
Number of
Findings
0 0 1 0 
Community Education
Provision
Audit Opinion: High

Page 2

2 
Argyll and Bute Council – Internal Audit Report – Community Education Provision, December 2024
Classification: OFFICIAL 
Contents 
1. Executive Summary ........................................................................................................................ 3
Introduction ............................................................................................................................................ 3
Background ............................................................................................................................................. 3
Scope ....................................................................................................................................................... 4
Key Dates ................................................................................................................................................ 5
Risks ........................................................................................................................................................ 5
Audit Opinion ......................................................................................................................................... 5
Recommendations ................................................................................................................................. 5
2. Objectives and Summary Assessment ........................................................................................... 6
3. Detailed Findings ............................................................................................................................ 7
Appendix 1 – Action Plan ..................................................................................................................... 11
Appendix 2 – Audit Opinion ................................................................................................................. 13 
Contact Details 
Internal Auditor: Annemarie McLean 
Telephone:  01700 501354 
e-mail:   annemarie.mclean@argyll-bute.gov.uk 
www.argyll-bute.gov.uk

Page 3

3 
Argyll and Bute Council – Internal Audit Report – Community Education Provision, December 2024
Classification: OFFICIAL
1. Executive Summary
Introduction
1. As part of the 2024/25 internal audit plan, approved by the Audit & Scrutiny Committee in
March 2024, we have undertaken an audit of Argyll and Bute Council’s (the Council) system of
internal control and governance in relation to Community Education Provision.
2. The audit was conducted in accordance with the Public Sector Internal Audit Standards (PSIAS)
with our conclusions based on discussions with council officers and the information available at
the time the fieldwork was performed. The findings outlined in this report are only those which
have come to our attention during the course of our normal audit work and are not necessarily
all the issues which may exist. Appendix 1 to this report includes agreed actions to strengthen
internal control however it is the responsibility of management to determine the extent of the
internal control system appropriate to the Council.
3. The contents of this report have been agreed with the appropriate council officers to confirm
factual accuracy and appreciation is due for the cooperation and assistance received from all
officers over the course of the audit.
Background
4. Community Learning and Development (CLD) is a professional practice within education with
delivery stretching across all stages of lifelong learning. CLD is an essential means of delivering
Scottish Government priorities, in particular Curriculum for Excellence, GIRFEC and the
Government’s social policy frameworks for combating poverty, tackling health inequalities and
prioritising early years. 
5. The Government's National Performance Framework sets out the strategic objectives for all
public services, including those delivering CLD. Within this, CLD's specific focus should be: 
 improved life chances for people of all ages, including young people in particular,
through learning, personal development and active citizenship;
 stronger, more resilient, supportive, influential and inclusive communities. 
6. The purpose of CLD is to provide early intervention and prevention to those experiencing, or at
risk of experiencing, inequality of opportunity within the education and skills system. CLD is a
method of working with groups and individuals of all ages to engage in learning, personal
development and active citizenship. Support is focused on disadvantaged or vulnerable
individuals or groups with the aim of bringing about change in their lives and communities. 
7. CLD activity, refers to a distinctive process of engagement and support with content that is
negotiated with learners and has a strong focus on early intervention, prevention, tackling
inequalities and includes the following: 
 Community Development (building the capacity of communities to meet their own
needs, engaging with and influencing decision makers);
 Youth work, family learning and other early intervention work with children, young
people and families;

Page 4

4 
Argyll and Bute Council – Internal Audit Report – Community Education Provision, December 2024
Classification: OFFICIAL
 Community Based Adult Learning including Adult Literacies and English for Speakers of
Other Languages (ESOL);
 Learning for disadvantaged and vulnerable groups and individuals, for example people
with disabilities, have care leaving experience or have a history of offending;
 Volunteer development, and
 Learning support and guidance in the community. 
8. CLD helps to develop the resilience and ambition needed to combat the effects of economic
factors which cause deprivation and inequality. It ensures that barriers to achieving better life
chances are identified, understood, overcome and that communities are full partners in
delivering practical and policy solutions. 
9. The Community Learning & Development (Scotland) Regulations 2013 place a statutory
requirement on local authorities to publish a plan every 3 years’ outlining how it will co-ordinate
and secure “adequate and efficient” Community Learning & Development (CLD) provision with
other sector partners. Whilst Argyll and Bute Council are required by legislation to lead on
meeting the requirements of the CLD Regulations, it is important to note that partners must also
be meaningfully involved, taking collective ownership and responsibility to produce, implement
and review the CLD Plan. 
10. The Council approved the transfer of its Community Learning and Development Service to
liveArgyll effective from 30th June 2021. The Council retain a governance role working alongside
liveArgyll. The existing service level agreement (SLA) between the Council and liveArgyll was
updated to include the ‘Transfer Agreement’ for CLD provision between the Council and the
Trust, setting out management and delivery responsibilities. At the point of transfer, staff were
restructured into two themes; adult and youth. 
11. The Argyll and Bute Community Learning and Development Strategic Partnership (the strategic
CLD group) is a multi-agency strategic group, led by liveArgyll, formed to co-ordinate planning of
CLD provision, maximising the synergies and contribution of partners across the sectors, in
delivering the identified outcomes for communities. 
12. The strategic CLD group is responsible for the development implementation, monitoring and
reporting of the Argyll and Bute CLD Plan. This will include the appropriate arrangements for risk
management and mitigations, given manpower and resources available. 
13. Community Learning is managed by liveArgyll on behalf of Argyll and Bute Council with
Community development managed through the Community Planning Partnership. This review
focuses on Community Learning only.
Scope 
14. The scope of the audit was to review the effectiveness and equity of service provision across
Argyll and Bute, as outlined in the Terms of Reference agreed with the Chief Education Officer/
Head of Education-Wellbeing, Inclusion and Achievement on 26 September 2024.

Page 5

5 
Argyll and Bute Council – Internal Audit Report – Community Education Provision, December 2024
Classification: OFFICIAL
Key Dates
15. The Terms of Reference provided provisional timescales for the review to take place, the actual
dates are noted below. 
Exhibit 1 – Key Dates
Stage Actual
Date
Terms of Reference agreed 26 September 2024
Fieldwork Commencement 01 October 2024
Draft Report issued 26 November 2024
Management Comments received 04 December 2024
Final Report issued 04 December 2024
Audit and Scrutiny Committee 17 December 2024
Risks
16.  The risks considered throughout the audit were:
 Audit Risk 1: Failure to comply with the Community Learning & Development (Scotland)
Regulations 2013.
 Audit Risk 2: Insufficient geographic and demographic coverage of key groups may lead
to inequitable provision.
 Audit Risk 3:  Evaluating the effectiveness of provision may be difficult if actions and
targets are not specific, measureable and contextual and performs reviews are not
timeous.
 Audit Risk 4: Monitoring and reporting arrangements may not be sufficient to
demonstrate that the Council is fulfilling its governance role.  
Audit Opinion
17. We provide an overall audit opinion for all the audits we conduct. This is based on our
judgement on the level of assurance which we can take over the established internal controls,
governance and management of risk as evidenced by our audit work.  Full details of the five
possible categories of audit opinion is provided in Appendix 2 to this report.
18. Our overall audit opinion for this audit is that we can take a high level of assurance.  This means
that internal control, governance and the management of risk are at a high standard. Only
marginal elements of residual risk have been identified with these either being accepted or dealt
with. A sound system of control designed to achieve the system objectives is in place and being
applied consistently.
Recommendations
19. We have highlighted one low priority recommendation where we believe there is scope to
strengthen the control and governance environment. These are summarised below:
 There should be consistent use of names throughout the new plan, and a check carried
out to determine if all appropriate logos are displayed.

Page 6

6 
Argyll and Bute Council – Internal Audit Report – Community Education Provision, December 2024
Classification: OFFICIAL
20. Full details of the audit findings, recommendations and management responses can be found in
Section 3 of this report and in the action plan at Appendix 1.
2. Objectives and Summary Assessment
21. Exhibit 1 sets out the control objectives identified during the planning phase of the audit and our
assessment against each objective.  
Exhibit 1 – Summary Assessment of Control Objectives 
Control Objective Link to Risk Assessment Summary Conclusion
1 There is a 3 year
Strategic
Partnership
Community Learning
and Development
Plan in place for
Argyll and Bute
which covers 2024 –
2027.
All risks High As required by the Community
Learning & Development (Scotland)
Regulations 2013, the Argyll and Bute
Community Learning and Development
(CLD) Strategic Partnership Plan 2024-
2027 has been created and published
on the liveArgyll website in September
2024.
There should be consistent use of
names throughout the new plan, and a
check carried out to determine if all
appropriate logos are displayed.
2 There are
arrangements in
place for equitable
provision of CLD
across Argyll and
Bute and the
identified priority
age groups.
Audit Risk 1
Audit Risk 2
High There are arrangements in place for
the provision of CLD across all four of
Argyll and Bute Council areas for both
identified priority age groups - youth
and adult. 
It is recognised by the Scottish
Government that the ability to meet
the needs of learners is bound by
funding restrictions. The Adult
Numeracy and Literacy provision is
dependent on funding, which is due to
end March 2025. Alternative options
are being explored but there is a risk
that these may not be met once
funding ends.
3 Appropriate
monitoring and
reporting processes
are in place to allow
for evaluation of the
effectiveness of
provision.
All risks High The Council and liveArgyll via the SLA
have agreed monitoring and reporting
for arrangements to ensure that there
is appropriate strategic oversight and
scrutiny of the community learning
provision across Argyll and Bute and
progress towards the strategic
priorities and allows evaluation of the
effectiveness of CLD provision. 
22. Further details of our conclusions against each control objective can be found in Section 3 of this
report.

Page 7

7 
Argyll and Bute Council – Internal Audit Report – Community Education Provision, December 2024
Classification: OFFICIAL
3. Detailed Findings
There is a 3 year Strategic Partnership Community Learning and Development Plan in place for
Argyll and Bute which covers 2024 – 2027
23. The Community Learning & Development (Scotland) Regulations 2013 place a statutory
requirement on local authorities to publish a plan every three years’ outlining how it will co-
ordinate and secure “adequate and efficient” Community Learning & Development (CLD)
provision with other sector partners.  The legislation requires that new plans should be
published no later than each third year after the previous plan. 
24. The Argyll and Bute Community Learning and Development (CLD) Strategic Partnership Plan
2024-2027 (the Plan) has been created and was published on the liveArgyll website in
September 2024, this takes cognisance of the legislation and follows on from the 2021-2024
Strategic Partnership Plan, published in September 2021. There are no transitional arrangements
as provision of community learning is a continuous service. 
25. A review of the plan found a minor inconsistency in names. The Argyll and Bute Community
Learning and Development (CLD) Strategic Partnership (the strategic CLD group) is responsible
for the development implementation, monitoring and reporting of the Argyll and Bute CLD Plan.
This is recognised in the logo on the front page of the plan and in the Governance flow chart,
however, the full name is not used within the body of the plan. Additionally the Terms of
Reference (ToR) for the group, does not use the word “strategic” when referring to the
partnership. For the avoidance of doubt the plan and ToR should be updated to reflect the
consistent use of the full name of the Argyll and Bute Community Learning and Development
(CLD) Strategic Partnership and the plan should be reviewed to ensure that all appropriate logos
are displayed.
Action Plan 1 
26. In line with legislative requirements, to ensure that the views of local people are understood,
the formation of the new Plan involved extensive consultation and engagement across the
Council area. A timeline of programmed activities targeted specific leaners and wider community
groups, to establish what they considered to be the most important priorities for CLD in their
area. Feedback from consultation influences the allocation of resources to address issues that
are important locally and allowing the strategic CLD group to co-ordinate provision within Argyll
and Bute. 
27. Details of the relevant local and national strategies and plans, wider frameworks and
consultation data, that have been used to inform the development of the new three year plan,
are included in the section “Informing the New Plan 2024 -2027 “. This demonstrates that the
agreed/emerging priorities are aligned with other key strategic plans.   
28. In December 2023 the Scottish Government, as part of the wider education reform agenda,
instructed the Independent Review of Community Learning and Development (CLD) sector
across Scotland, seeking to better understand the extent to which CLD is delivering positive
outcomes for some of Scotland’s most vulnerable learners. The report, “The Future of CLD
Learning: For All. For Life.” was published in July 2024.

Page 8

8 
Argyll and Bute Council – Internal Audit Report – Community Education Provision, December 2024
Classification: OFFICIAL
29. In recognition of the impact of the review on both the strategic orientation of CLD and individual
education authority CLD plans, the Scottish Government issued guidance providing the
opportunity to carry forward much of the content of their existing plans. This has been
recognised in the plan “This CLD Partnership Plan will adapt and change its focus as we track
performance and review its impact. It will seek to build on the new recommendations outlined in
the report Learning: For All. For Life - Independent Review of Community Learning and
Development (CLD) 2024. New priorities will be incorporated into the three year Action Plan as
they emerge. 
30. The plan, Appendix 1 – Argyll and Bute CLD Partnership Action Plan specifies what actions
liveArgyll and other partner organisations within the strategic group, will be meaningfully
involved in the provision of community learning within Argyll and Bute, across the 6 identified
priorities/themes, over the 3 year period of the plan. This also demonstrates the collaborations
in place working towards delivering the CLD actions needed to achieve identified outcomes. 
31. It is recognised by the Scottish Government, in its guidance document that “the current financial
climate means, while there is increasing demand for CLD intervention and expertise, there is
limited current scope for additional investment.” This means that ability to meet the needs of
learners is bound by funding restrictions.
32. The unmet needs of CLD provision are defined as the barriers to adequate and efficient CLD
provision. The challenges encountered include workforce capacity, as well as the partners’
capacity to reassess and alter traditional practices; access to sufficient resources, the expanding
scope of CLD and working within funding restraints. To address some of these the plan states
that the partnership will continue to work together to maximise funding streams to help reduce
costs for targeted provision. 
33. In January 2024 HM Inspectors of Education (HMIE) undertook a progress visit for Argyll and
Bute Council’s CLD provision, areas covered included Governance arrangements, the Strategic
Partnership Plan 21-24 and the local authority and CLD partners’ self-evaluation and
performance data. For some areas of this review we have placed reliance on the HMIE
conclusions. 
34. The progress visit highlighted that CLD staff and partners are working together effectively in
supporting learners to access appropriate learning opportunities. Stating that an increasing use
of community hubs for CLD partners to deliver joint programmes helps to link service providers
with learners and communities and to remove barriers to participation. 
35. HMIe Inspectors recognised that liveArgyll and their CLD partners have made significant progress
in the delivery of the outcomes of the CLD Strategic Partnership and have indicated that they will
not need to return for the foreseeable future, which is a positive outcome and provides the
Council with a high level of assurance that statutory requirements are being met and that the
provision of CLD is effective.
There are arrangements in place for equitable provision of CLD across Argyll and Bute and the
identified priority age groups 
36. Resourcing the Plan section outlines how the Governance and reporting arrangements have
been implemented at both the strategic and operational levels, with a flow chart providing a
visual illustration which highlights the key internal/external relations.

Page 9

9 
Argyll and Bute Council – Internal Audit Report – Community Education Provision, December 2024
Classification: OFFICIAL
37. At the point of transfer from the Council to liveArgyll, staff were restructured into two themes;
adult and youth. As noted above, the allocation of resources is driven by locally identified needs
ensuring provision is consistent with the current plan. There are currently 19 staff, with
provision in each of the four Council areas for youth and adult services. 
38. The Scottish Government recognises the role of CLD across the public and third sectors in
providing invaluable support to Scotland’s learners and communities by developing new and
flexible ways to deliver key services for vulnerable and marginalised learners in community,
school and college settings. The plan provides details of how the provision of community
learning and development will be resourced and co-ordinated with other persons/groups that
provide community learning and development within the area of the education authority. 
39. HMIe outlined areas of positive progress, in particular, “a strategic approach to planning the
delivery of CLD services is leading to improved alignment of services to the CLD plan priorities.
CLD staff plan their work through individual Project Proposals and Cluster Plans. This approach is
ensuring that work is aligned to the six priorities and based on identified community need.” 
40. Currently funding has been secured from the UK Shared Prosperity Fund (UKSPF) and MULTIPLY
funding to enable the temporary recruitment of  Adult Literacy and Numeracy Workers (ALN)
whose,  primary objective is to bridge the provision gap for adults needing dedicated support in
various literacy areas, including reading, writing, numeracy, and digital literacy. 
41. The funding is currently in place until 31 March 2025 and it has been confirmed that it will not
extend beyond this date. It has been identified, and acknowledged within the Risk Register, that
there exists a considerable risk that literacy learners will experience regression rather than
continued progress in their studies. 
42. Current mitigation includes actively pursuing opportunities for additional funding to sustain this
critical work and are engaging with other partners and organisations to assess their capability to
further support learners/service users. The possibility of partner providers being able to
independently assume responsibility for this provision, as current practice is that partners
typically refer clients for this specific support. Should alternative provision not be found, this
would be an unmet need for adult learners within Argyll and Bute. 
43. There is a requirement to ensure that CLD workforce planning is an integral part of the CLD plan
and that the plan identifies the actions to be taken to support and develop the CLD workforce.
HMIe found there “is opportunity to build further on the enthusiasm of staff to share expertise
and plan workforce development in a more strategic way”. The need to improve the
understanding of the range of professional development and training opportunities and
pathways workforce can access is recognised as a key outcome within Theme 6 – Improve how
we work as a partnership, which identifies actions and measures of success to achieve this. 
Appropriate monitoring and reporting processes are in place to allow for evaluation of the
effectiveness of provision 
44. The Council and liveArgyll via the SLA have agreed monitoring and reporting for arrangements to
ensure that there is appropriate strategic oversight and scrutiny of the community learning

Page 10

10 
Argyll and Bute Council – Internal Audit Report – Community Education Provision, December 2024
Classification: OFFICIAL
provision across Argyll and Bute and progress towards the strategic priorities and allows
evaluation of the effectiveness of CLD provision. 
45. The new plan provides an overview of this framework in the Governance and reporting
arrangements section, which includes a diagram to highlight the linkages between the parties
and the flow of information.   
46. LiveArgyll use the Basecamp management information system to support collaboration, data
sharing and communication among various community groups and organisations. The system is
designed to ensure that the impact of initiatives can be measured and adjustments made as and
when necessary to achieve the desired outcomes and evidence that the delivered outcomes
align with national and local priorities. HMIe inspectors note that “outcomes are clearly
articulated, reviewed and reported through the management information system. “ 
47. Annually CLD leaders, managers and staff carry out a self-evaluation, to identify areas of
strengths and aid planning for improvement, this also considers progress being made against
identified priorities. The results are reported to Argyll and Bute Council and the Community
Planning Partnership. 
48. The liveArgyll Business Services and Support Manager prepares quarterly progress reports which
are submitted to the Business and Performance Sub Committee, the liveArgyll Board and the
Outcome 3 group within the Community Planning Partnership (CPP). This group holds the
responsibility for advancing priorities pertaining to education, skills, and training within the 10-
year Local Outcome Improvement Plan for Argyll and Bute. The Outcome 3 group directly
reports to the CPP Management Committee. 
49. Communication at a strategic level is maintained between liveArgyll and the Council’s Education
Service. The Education Manager – Learning, Teaching and Assessment and Pathways, is the
Council’s contact with liveArgyll, their role is to provide oversight and support across areas
which include: 
 Liaison between CLD and Secondary Schools;
 Training of staff in the setting of measurable outcomes;
 Dedicated evaluation of these to monitor effectiveness of delivery;
 Collaborating to inform annual progress reports. 
50. There is a close and effective working relationship between staff involved in the co-ordination
and delivery of CLD and the Education Manager, with regular meetings, usually monthly but
during development of the new plan this was fortnightly.  
51. Annual reports are presented to the Council’s Community Services Committee and at Area
Community Planning Group meetings.  The annual reports for Years 1 and 2 are interim
monitoring and performance reports with Year 3 being a final annual report.

Page 11

Classification: OFFICIAL
Appendix 1 – Action Plan 
No Finding Risk Agreed Action Responsibility / Due Date
Low 1
Names and recognition of key parties 
A review of the plan and Terms of Reference (ToR) found a
minor inconsistency in names. For the avoidance of doubt
the plan and ToR should be updated to reflect the
consistent use of the full name of the Argyll and Bute
Community Learning and Development (CLD) Strategic
Partnership and a check carried out to determine if all
appropriate logos are displayed. 
Organisations involved in the
delivery of Community
Learning and Development
within Argyll and Bute may
not receive adequate
recognition.
 The name will be changed
throughout the document to
remain consistent throughout
the document. 
 All relevant logos and
organisational names will be
added to the Plan. 
 The TOR will be updated to
reflect the above. 
Service and Support
Manager 
liveArgyll 
Date: 
30 March 2025

Page 12

12 
Argyll and Bute Council – Internal Audit Report – Community Education Provision, December 2024
Classification: OFFICIAL
In order to assist management in using our reports a system of grading audit findings has been adopted to allow the significance of findings to be ascertained.  The definitions
of each classification are as follows: 
Grading    Definition
High  A major observation on high level controls and other important internal controls or a significant matter relating to the critical success of the
objectives of the system.  The weakness may therefore give rise to loss or error. 
Medium 
Observations on less significant internal controls and/or improvements to the efficiency and effectiveness of controls which will assist in meeting
the objectives of the system.  The weakness is not necessarily substantial however the risk of error would be significantly reduced if corrective
action was taken.  
Low  Minor recommendations to improve the efficiency and effectiveness of controls or an isolated issue subsequently corrected.  The weakness does
not appear to significantly affect the ability of the system to meet its objectives. 
VFM  An observation which does not highlight an issue relating to internal controls but represents a possible opportunity for the council to achieve
better value for money (VFM).

Page 13

13 
Argyll and Bute Council – Internal Audit Report – Community Education Provision, December 2024
Classification: OFFICIAL
Appendix 2 – Audit Opinion 
Level of Assurance  Definition 
High 
Internal control, governance and the management of risk are at a high standard. Only marginal elements of residual risk have
been identified with these either being accepted or dealt with. A sound system of control designed to achieve the system
objectives is in place and being applied consistently. 
Substantial 
Internal control, governance and the management of risk is sound. However, there are minor areas of weakness which put some
system objectives at risk and specific elements of residual risk that are slightly above an acceptable level and need to be
addressed within a reasonable timescale. 
Reasonable 
Internal control, governance and the management of risk are broadly reliable. However, whilst not displaying a general trend,
there are areas of concern which have been identified where elements of residual risk or weakness may put some of the system
objectives at risk. 
Limited 
Internal control, governance and the management of risk are displaying a general trend of unacceptable residual risk above an
acceptable level and placing system objectives are at risk. Weakness must be addressed with a reasonable timescale with
management allocating appropriate resources to the issues raised. 
No Assurance 
Internal control, governance and the management of risk is poor. Significant residual risk and/or significant non-compliance with
basic controls exists leaving the system open to error, loss or abuse. Residual risk must be addressed immediately with
management allocating appropriate resources to the issues.