Page 1

Classification: OFFICIAL 
Argyll and Bute Council
Internal Audit Report
November 2024
FINAL 
High Medium Low VFM
Number of
Findings
0 0 2 0 
IT Risk Register & 
Mitigation Processes
Audit Opinion: High

Page 2

2 
Argyll and Bute Council – Internal Audit Report – IT Risk Register and Mitigation Processes,
November 2024
Classification: OFFICIAL 
Contents 
1. Executive Summary ........................................................................................................................ 3
Introduction ............................................................................................................................................ 3
Background ............................................................................................................................................. 3
Scope ....................................................................................................................................................... 4
Key Dates ................................................................................................................................................ 4
Risks ........................................................................................................................................................ 4
Audit Opinion ......................................................................................................................................... 4
Recommendations ................................................................................................................................. 4
2. Objectives and Summary Assessment ........................................................................................... 5
3. Detailed Findings ............................................................................................................................ 6
Appendix 1 – Action Plan ..................................................................................................................... 10
Appendix 2 – Audit Opinion ................................................................................................................. 12 
Contact Details 
Internal Auditor: Mhairi Weldon 
Telephone:  01546 604294 
e-mail:   mhairi.weldon@argyll-bute.gov.uk 
www.argyll-bute.gov.uk

Page 3

3 
Argyll and Bute Council – Internal Audit Report – IT Risk Register and Mitigation Processes,
November 2024
Classification: OFFICIAL
1. Executive Summary
Introduction
1. As part of the 2024/25 internal audit plan, approved by the Audit & Scrutiny Committee in
March 2024, we have undertaken an audit of Argyll and Bute Council’s (the Council) system of
internal control and governance in relation to IT Risk Register and Mitigation Processes.
2. The audit was conducted in accordance with the Public Sector Internal Audit Standards (PSIAS)
with our conclusions based on discussions with council officers and the information available at
the time the fieldwork was performed. The findings outlined in this report are only those which
have come to our attention during the course of our normal audit work and are not necessarily
all the issues which may exist. Appendix 1 to this report includes agreed actions to strengthen
internal control however it is the responsibility of management to determine the extent of the
internal control system appropriate to the Council.
3. The contents of this report have been agreed with the appropriate council officers to confirm
factual accuracy and appreciation is due for the cooperation and assistance received from all
officers over the course of the audit.
Background
4. Risks are significant uncertainties that may affect the Council’s ability to achieve its strategic and
operational objectives.  Risk management is a key part of the Council's governance and internal
control arrangements, it is the planned and systematic, cyclical process by which key risks are
identified, evaluated and managed so as to maximise benefits and minimise potentially negative
consequences to the Council and its partners.  
5. The Council has prepared a Risk Management Manual to provide an overview of the risk
management process within the Council and give practical guidance for consistent and
proportionate management of risks across all service areas.  It is the responsibility of managers
to manage risks effectively within their operational areas and involve all employees in the risk
identification and management process by communicating any concerns or risks to their team’s
objectives.     
6. Risk registers provide an inventory of identified risks, their specific challenges and
consequences, mitigating actions to reduce the impact and likelihood and risk scoring.  The
resultant residual risk scores aid prioritisation of risks to ensure they are allocated sufficient
resources to meet operational requirements within the agreed risk appetite.
7. In accordance with the “digital by default” position adopted in the 2021-24 ICT and Digital
Strategy and the “Connect for Success” objective in the Data Strategy 2024-28, the Council
places significant reliance on the integrity and availability of its data to inform decision-making
and effectively deliver its services.  
8. The working environment is no longer restricted to Council buildings; flexible working and the
use of remote technologies provides numerous opportunities, however, this brings with it a
greater risk of Information security incidents.  Additionally, the Council continues to deliver
digital transformational changes leading to significant new risks.  
9. Operating within a landscape of changing risks and quickly evolving cyber threats means that
sound risk management practices are required within the IT environment to provide a positive

Page 4

4 
Argyll and Bute Council – Internal Audit Report – IT Risk Register and Mitigation Processes,
November 2024
Classification: OFFICIAL
impact on the Council’s information assets by limiting risk exposure and exploiting potential
opportunities.
Scope 
10. The scope of the audit was to review and assess the ICT Service Risk Register, together with any
mitigations in place for day-to-day operational matters including cyber security as outlined in the
Terms of Reference agreed with the Head of Customer Services on 7 October 2024. 
Key Dates
11. The Terms of Reference provided provisional timescales for the review to take place, the actual
dates are noted below. 
Exhibit 1 – Key Dates
Stage Actual
Date
Terms of Reference agreed 7 October 2024
Fieldwork Commencement 10 October 2024
Draft Report issued 18 November 2024
Management Comments received 21 November 2024
Final Report issued XX November 2024
Audit and Scrutiny Committee 17 December 2024 
Risks
12.  The risks considered throughout the audit were:
• SRR10: Service Delivery – Cyber Security
• Audit Risk 1:  failure to identify appropriate risks to service delivery
• Audit Risk 2:  failure to adequately mitigate identified risks 
Audit Opinion
13. We provide an overall audit opinion for all the audits we conduct. This is based on our
judgement on the level of assurance which we can take over the established internal controls,
governance and management of risk as evidenced by our audit work.  Full details of the five
possible categories of audit opinion is provided in Appendix 2 to this report.
14. Our overall audit opinion for this audit is that we can take a high level of assurance.  This means
that Internal control, governance and the management of risk are at a high standard. Only
marginal elements of residual risk have been identified with these either being accepted or dealt
with. A sound system of control designed to achieve the system objectives is in place and being
applied consistently.
Recommendations
15. We have two low priority recommendations where we believe there is scope to strengthen the
control and governance environment.  These are summarised below:

Page 5

5 
Argyll and Bute Council – Internal Audit Report – IT Risk Register and Mitigation Processes,
November 2024
Classification: OFFICIAL
• Cyber Security Risk Register should be updated to reflect all current mitigating controls
and up-to-date scoring and prioritisation.
• Evidence of review of mitigating controls should be retained.  
16. Full details of the audit findings, recommendations and management responses can be found in
Section 3 of this report and in the action plan at Appendix 1. 
2. Objectives and Summary Assessment
17. Exhibit 1 sets out the control objectives identified during the planning phase of the audit and our
assessment against each objective. 
Exhibit 1 – Summary Assessment of Control Objectives 
Control Objective Link to Risk Assessment Summary Conclusion
1 Relevant risks are
identified,
considered and
included in ICT Risk
Register.
SRR10
Audit Risk 1
High The Council’s Risk Management
Manual has been followed in
preparation of the Cyber Security Risk
Register (CSRR).  The CSRR includes
risks identified via sound judgement of
officers involved and credible
information sources and are
appropriately detailed along with
evaluation and scoring.
2 Appropriate
mitigation activities
are identified and
implemented to
meet desired risk
appetite of
Council/Service.
SRR10
Audit Risk 2
Substantial The CSRR contains 51 risks, 20 of which
are now closed, all have been assessed,
scored and prioritised.  Current
mitigations are not in place for all risks,
however, key actions and deadlines
have been identified, additionally, six
risks were found to have residual
scores lower than gross scores despite
there being no current mitigations in
place.   Risks, mitigating controls and
key actions are identified by Officers
with appropriate technical knowledge
in collaboration with the ITC-CSO and
passed to Management for oversight
and approval purposes.
3 Mitigating activities
are monitored
regularly and
updated in
accordance with
changes in the risk
environment. 
SRR10
Audit Risk 2
Substantial All open risks are reviewed monthly
and reported to security, ITMT and
DMT meetings, any new insights
received are considered immediately
and escalated where required.  All
mitigating controls are reviewed and
assessed for effectiveness and
comments noted on the CSRR where
appropriate, however, evidence of
review is not always retained and
scoring is not regularly reassessed.

Page 6

6 
Argyll and Bute Council – Internal Audit Report – IT Risk Register and Mitigation Processes,
November 2024
Classification: OFFICIAL 
Control Objective Link to Risk Assessment Summary Conclusion
4 Risks are reported
to appropriate
forums for
discussion and
passed to senior
management for
oversight and
escalation where
relevant and
required.
All Risks High Management is made aware of
progress in managing identified risks at
appropriate forums via formal
reporting mechanisms, the subsequent
minutes indicate that the contents
have been discussed, noted and
actions assigned where required. 
18. Further details of our conclusions against each control objective can be found in Section 3 of this
report.  
3. Detailed Findings
Relevant risks are identified, considered and included in ICT Risk Register
19. The Council’s Risk Management Manual has been communicated to the ICT Compliance and
Security Officer (ICT-CSO) who prepares the Cyber Security Risk Register (CSRR), a recently
appointed assistant, IT Engineer (ITE) will assist with maintenance of this register on a monthly
basis to provide resilience.  Both officers are familiar with the content of the manual and
maintain the CSRR in accordance with the guidance and template provided.
20. The ICT-Compliance and Security Team are appropriately positioned to undertake this role, they
hold suitable qualifications and have gained extensive experience in supporting IT infrastructure,
including assessment and management of risks.  
21. A comprehensive list of all Council systems and applications identified as critical has been
created for disaster recovery purposes and is updated periodically when changes or testing takes
place.  Links to the associated documentation and run books are in the process of being added. 
A further list has been developed to prioritise systems for restoration should an adverse cyber
event occur.
22. Risks pertaining to these critical systems and applications have been identified by a variety of
means, including:
• Participation in the Cyber Security Information Sharing Partnership (CISP) and Scottish
Local Authority Information Security Group (SLAISG) where discussions take place
concerning key risks, how they are managed, and sharing of insights and sources of new
information and resources
• Attendance at specific events or seminars and sharing important information with
colleagues upon return
• Reviewing details of relevant security incidents at other organisations.
• Daily reports covering emerging threats from CyberScotland, Scottish Cyber
Coordination Centre (SC3)
• Monthly and ad-hoc threat reports from our Security Operations Centre
• Alerts from National Cyber Security Centre
• Automated internal system alerts and scanning to detect vulnerabilities 
• Annual ICT Health Checks to comply with necessary and appropriate frameworks

Page 7

7 
Argyll and Bute Council – Internal Audit Report – IT Risk Register and Mitigation Processes,
November 2024
Classification: OFFICIAL
• Annual Penetration testing
23. Where risks cannot be fully addressed immediately upon identification, they are added to the
CSRR, this ensures that oversight is maintained while appropriate mitigating actions are
considered for implementation to reduce or remove the risk to the Council’s systems and
applications.     
24. The CSRR contains a considerable range of risks of varying degrees of concern, each with a brief
description, their relationship to service delivery, consequences should the risk occur, a gross
score taking into account the likelihood and impact of occurrence, current mitigations in place, a
residual score, key actions and deadlines to further manage the risks, review date, risk owner,
team assigned responsibility and whether the risk remains open or is closed.
25. The content of the CSRR is summarised to provide a high-level entry in both the Departmental
Operational Risk Register (ORR) and Strategic Risk Register (SRR) to provide oversight at senior
management levels.  
26. The likelihood and impact of risks occurring is assessed by the team assigned responsibility for
managing the risk, this is based on their knowledge and experience within their respective fields
of expertise.  Scores are appropriately applied in accordance with guidance provided within the
Risk Management Manual to aid prioritisation using Red, Amber and Green (RAG) ratings.
Appropriate mitigation activities are identified and implemented to meet desired risk appetite of
Council/Service
27. As at 7 November 2024, the CSRR contained 51 risks, all of which have been assessed, scored
and prioritised.  Of these risks, 20 have been either fully mitigated or sufficiently reduced to a
tolerable level and subsequently closed.  The 31 open risks are subject to regular review, a brief
analysis is provided in the tables below:  
Following reassessment or implementation of mitigating actions taken to date, 19 risks have
received a reduction in scoring whilst 12 have not changed:  
Risk Score 
and priority
No. of Risks with 
Gross Score
No. of Risks with 
Residual Score 
25 0 0
20 2 0
16 0 0
15 18 9
12 3 2
10 2 7
9 2 2
8 1 6
6 2 2
5 0 0
4 0 2
3 0 0
2 1 0
1 0 1
TOTAL 31 31

Page 8

8 
Argyll and Bute Council – Internal Audit Report – IT Risk Register and Mitigation Processes,
November 2024
Classification: OFFICIAL
In terms of RAG priority ratings, 12 have moved into lower ratings and 19 remain the same:
Gross RAG 
Priority Rating
Residual RAG 
Priority Rating
No. of Risks
Red Red 9
Red Amber 10
Red Green 1
Amber Amber 7
Amber Green 1
Green Green 3
TOTAL  31 
28. Within the CSRR, there is a column to enter ‘Current Mitigation’, this was completed in all
instances, however, 16 risks stated within this column, stated that there were either no current
mitigations in place or that there were none beside that provided by standard security
arrangements.  The ‘Key Actions and Deadlines’ column, however, has been populated for all
risks and this appears to contain some mitigating actions that have not been recorded in the
‘Current Mitigation’ column.
Action Plan 1
29.  Six risks were found to have residual scores stated that were lower than the gross risk scores
despite there being no current mitigations populated.
Action Plan 1
30. Mitigating controls, key actions and deadlines are identified and assessed by the technical leads
in each team allocated responsibility for managing risks in collaboration with the ICT-CSO and
discussed at monthly security meetings to assess effectiveness and whether further control
mechanisms are required.  
31. These Officers possess appropriate technical knowledge, skills and experience to identify risks
and associated mitigating controls, additional guidance may also be provided via compliance
frameworks adopted by the Council e.g. Public Sector Network (PSN) or Cyber Essentials Plus
(CE+), national alerts from recognised bodies e.g. NCSC or SC3, information sharing partnerships
and lessons learned from other organisations.
32. Mitigating controls and key actions stated within the CSRR are consistent with the risk identified
whilst taking cognisance of any financial constraints and service restrictions that may occur as a
result of implementation.  
33. A Security Highlight Report including a link to the CSRR is submitted monthly to the following
forums for oversight, review and approval purposes:
• Security Meetings attended by IT Managers, Senior IT Officers and the relevant technical
officers 
• Information Technology Management Team (ITMT) attended by the Head of Service, IT
Managers, the ICT-CSO and other officers as required and 
• Departmental Management Team (DMT) attended by the Executive Director, Heads of
Service and other officers as required

Page 9

9 
Argyll and Bute Council – Internal Audit Report – IT Risk Register and Mitigation Processes,
November 2024
Classification: OFFICIAL
Mitigating activities are monitored regularly and updated in accordance with changes in the risk
environment
34. All entries in the CSRR are reviewed and assessed on an individual basis either at the monthly
security meetings or immediately upon receipt of relevant insights by Officers.  A post-
implementation review takes place of all mitigating controls to ensure they are operating
effectively e.g. by re-running scans or checking tools.  Whilst comments are input to the ‘Key
Actions and Deadlines’ column of the CSRR confirming review, evidence is not always retained
for further reference.
Action Plan 2
35. New and additional actions may be identified as a result of IT Health Checks, updates to
compliance frameworks or via reliable information sources and sharing arrangements.
36. The CSRR is a live document which is reviewed monthly in alignment with security, ITMT and
DMT meetings and actions updated where any changes have occurred or are newly planned,
however, residual Risk scores are not reviewed regularly.
Action Plan 1 
Risks are reported to appropriate forums for discussion and passed to senior management for
oversight and escalation where relevant and required
37. As noted in paragraph 33 above, Management is made aware of new and escalating risks as well
as those that have been either fully mitigated or managed to a tolerable level via security
highlight reports and a link to the CSRR for review.  Additionally, as the CSRR informs the content
of the Department’s Operational Risk Register (ORR) and the Strategic Risk Register (SRR), the
Strategic Management Team (SMT) review the SRR and High Risks from the ORRs six-monthly
and an annual report is submitted to the Audit and Scrutiny Committee.    These reporting
mechanisms provide sufficient management oversight and opportunity for requesting further
information for approval and noting purposes.
38. The content of both reports to management and the risk registers indicate that progress has
been made in mitigating identified risks.  
39. Meeting minutes reviewed indicate that the content of reports submitted have been discussed,
noted and actions assigned where appropriate.

Page 10

Classification: OFFICIAL
Appendix 1 – Action Plan 
No Finding Risk Agreed Action Responsibility / Due Date
Low 1
Cyber Security Risk Register (CSRR) Maintenance 
Finding:  There were no current mitigations in place for 16
risks recorded, however, notes within the Key actions and
deadlines column indicate that mitigating actions had
been completed in some instances. 
Finding:  six risks were found to have residual scores lower
than gross scores despite there being no mitigating
controls recorded. 
Finding:  Residual scores are not reviewed regularly. 
Recommendation:  The CSRR is updated to reflect up-to-
date mitigating actions and scoring. 
The CSRR may not accurately
reflect current mitigating
controls and scoring resulting
in incorrect prioritisation.
The CSRR will be updated to
reflect up to date mitigating
actions and scoring and will be
maintained at that level
forthwith.
ICT and Digital Manager 
31 December 2024
Low 2
Review of Mitigating Controls 
Finding:  Comments are input to the CSRR indicating that
review has taken place, however, evidence is not always
retained for reference. 
Recommendation:  Evidence of post-implementation
review is retained. 
Mitigating controls may not
be operating effectively.
Any evidence of post-
implementation review will be
retained.
ICT and Digital Manager 
31 December 2024

Page 11

11 
Argyll and Bute Council – Internal Audit Report – IT Risk Register and Mitigation Processes, November 2024
Classification: OFFICIAL
In order to assist management in using our reports a system of grading audit findings has been adopted to allow the significance of findings to be ascertained.  The definitions
of each classification are as follows: 
Grading    Definition
High  A major observation on high level controls and other important internal controls or a significant matter relating to the critical success of the
objectives of the system.  The weakness may therefore give rise to loss or error. 
Medium 
Observations on less significant internal controls and/or improvements to the efficiency and effectiveness of controls which will assist in meeting
the objectives of the system.  The weakness is not necessarily substantial however the risk of error would be significantly reduced if corrective
action was taken.  
Low  Minor recommendations to improve the efficiency and effectiveness of controls or an isolated issue subsequently corrected.  The weakness does
not appear to significantly affect the ability of the system to meet its objectives. 
VFM  An observation which does not highlight an issue relating to internal controls but represents a possible opportunity for the council to achieve
better value for money (VFM).

Page 12

12 
Argyll and Bute Council – Internal Audit Report – IT Risk Register and Mitigation Processes, November 2024
Classification: OFFICIAL
Appendix 2 – Audit Opinion 
Level of Assurance  Definition 
High  Internal control, governance and the management of risk are at a high standard. Only marginal elements of residual risk have
been identified with these either being accepted or dealt with. A sound system of control designed to achieve the system
objectives is in place and being applied consistently. 
Substantial  Internal control, governance and the management of risk is sound. However, there are minor areas of weakness which put some
system objectives at risk and specific elements of residual risk that are slightly above an acceptable level and need to be
addressed within a reasonable timescale. 
Reasonable 
Internal control, governance and the management of risk are broadly reliable. However, whilst not displaying a general trend,
there are areas of concern which have been identified where elements of residual risk or weakness may put some of the system
objectives at risk. 
Limited  Internal control, governance and the management of risk are displaying a general trend of unacceptable residual risk above an
acceptable level and placing system objectives are at risk. Weakness must be addressed with a reasonable timescale with
management allocating appropriate resources to the issues raised. 
No Assurance  Internal control, governance and the management of risk is poor. Significant residual risk and/or significant non-compliance with
basic controls exists leaving the system open to error, loss or abuse. Residual risk must be addressed immediately with
management allocating appropriate resources to the issues.