ARGYLL AND BUTE COUNCIL  AUDIT AND SCRUTINY COMMITTEE 
FINANCIAL SERVICES  13 MARCH 2025 
INTERNAL AUDIT REPORTS TO AUDIT AND SCRUTINY COMMITTEE 2024/2025 
1. EXECUTIVE SUMMARY 
1.1 There are two audits being reported to the Audit and Scrutiny Committee.     
1.2 The table below provides a summary of the conclusions for the audits performed.
The full reports are included as appendices to this report. 
Audit Name Level of
Assurance
High
Actions
Medium
Actions
Low
Actions
VFM
Actions
Oban Airport High 0 0 0 0
IT – Data Security and Information
Security  Substantial 0 1 0 0 
1.3 Internal Audit provides a level of assurance upon completion of audit work. A
definition for each assurance level is documented in each audit report. 
2. RECOMMENDATIONS 
2.1 Audit and Scrutiny Committee to review and endorse this summary report and
the detail within each individual report. 
3.  DETAIL 
3.1 A high level summary of each completed audit report is noted below: 
Oban Airport: Our overall audit opinion for this audit is that we can take a
high level of assurance. This means that internal control, governance and the
management of risk are at a high standard. Only marginal elements of residual
risk have been identified with these either being accepted or dealt with. A
sound system of control designed to achieve the system objectives is in place
and being applied consistently. The audit covered 6 of the 24 airport operating
instructions within the aerodrome operating manual and all were found to be
satisfactory. The Manual is updated on an annual basis and no audit issues
were raised. 
IT – Data Security and Information Security: this audit provided a 
substantial level of assurance. This means that internal control, governance
and the management of risk is sound. However, there are minor areas of
weakness which put some system objectives at risk and specific elements of
residual risk that are slightly above an acceptable level and need to be
addressed within a reasonable timescale. Contractual arrangements for the

Page 2

consultancy work are in place following a comprehensive procurement
exercise and include suitable details in terms of security and access
arrangements to both the platform and its data which is accessed on a read-
only basis using an analysis and reporting tool.  A data challenge proposal
must be completed demonstrating a sound business need for adding data to
the platform and this will only be uploaded upon approval of the Data Advisory
Group, Data Protection Impact Assessments may also be required where
personally identifiable information is included.  There is sufficient data storage
capacity to operate with large quantities of data and there are options for
expansion, however, these options will be at a cost.  There is provision to
remove personally identifiable information in compliance with GDPR, however,
removal of general data is not currently considered within the data challenge
proposal to help manage capacity and minimise potential future costs. Well-
established arrangements are in place to ensure business continuity and
disaster recovery. 
4. CONCLUSION 
4.1 Management has accepted each of the reports submitted and have agreed
responses and timescales in the respective action plans. 
5. IMPLICATIONS 
5.1 Policy – None 
5.2 Financial – None 
5.3 Legal – None 
5.4 HR – None
5.5 Fairer Scotland Duty – None 
5.5.1 Equalities – protected characteristics – None
5.5.2 Socio-Economic Duty – None
5.5.3 Islands – None
5.6 Climate Change – None 
5.7 Risk – The implementation of recommendations contained in audit reports
may help mitigate the risk to the Council. 
5.8 Customer Service – None
5.9 The Rights of the Child (UNCRC) – None 
Paul Macaskill
Chief Internal Auditor
13 March 2025 
For further information contact: 
Paul Macaskill, Chief Internal Auditor
Tel:  01546 604108
Email: paul.macaskill@argyll-bute.gov.uk 
APPENDICES 
1. Oban Airport
2. IT Data Security and Information Security