ARGYLL AND BUTE COUNCIL  AUDIT & SCRUTINY COMMITTEE   
FINANCIAL SERVICES  13 MARCH 2025  
INTERNAL AUDIT AND COUNTER FRAUD SUMMARY OF ACTIVITIES 
1. SUMMARY  
1.1 The objective of the report is to provide the Audit and Scrutiny Committee (the
Committee) with a summary of Internal Audit activity and progress during quarter
four of 2024/25.  
1.2 Core activities together with a progress update statement are shown below: 
• 2024/25 Audit Plan progress: The plan is currently on track. In the event that
this position was to change, we will flag it to the Committee as part of the
quarterly updates. 
• 2024/25 Individual Audits undertaken: Two audits have been completed
during the period, one has been assessed as providing high assurance
and one substantial assurance. There were no reports concerning the
HSCP or LiveArgyll issued since the last Committee. (Where HSCP and
LiveArgyll Audits are included, these are provided for information only). 
• Scrutiny: Planned work for 2024/25 has commenced in relation to the
Council’s Complaints processes. The first meeting of the Panel took place on
29th November 2024, arrangements are being made for the second with a
date to be confirmed. 
• Counter Fraud: The Counter Fraud Team (CFT) is continuing to rebill council
tax accounts and recovery of funds is underway.  All other aspects and
referrals are being considered, investigated and evaluated and the Counter
Fraud Team remain vigilant to protect our public purse. The established CFT
team member is on secondment to Housing for career and personal
development for a two year period.  The CFT have obtained a member of
staff, again on secondment for the same time period who is progressing
through the CIPFA Fraud Specialsit Course. The team lead is currently
progressing through year 3 of a Master in Accountancy course.   
• Continuous Monitoring Programme Testing: A number of auditable units
are subject to continuous testing. There have been no new issues which we
have identified this quarter. 
• Performance indicators: Current status is green / on track.   
2. RECOMMENDATIONS  
2.1 To review and endorse the Summary of Activities report.

Page 2

3. DETAIL  
3.1 Two audits have been completed since the previous Committee in December
2024. In addition, visits were undertaken to Islay and Mull which are detailed in
section 5 of the report, together with our work undertaken for the HSCP. 
Audits Completed 
• Oban Airport 
• Data Security & Information Security 
Audits in Planning / in Progress
reported to a future meeting of the Committee. 
• Short-Term Lets
• Bridges Asset Management Plan and Inspection Regime – In draft
• Asbestos Management – In draft
• External Placements 
• Trading Standards 
• Leasing – Estates 
• Stores 
• Disclosure Checks - protecting vulnerable groups   
3.2 In addition to those already in progress, indicative audits planned for Q1 2025/26
are: 
• LGBF
• SPT Annual Claim
• Education Maintenane Allowance
• Payroll – iTrent
• Capital Programme    
2024/25 Audit Plan  
3.3 • Work is ongoing and is currently on track at this point in time. 
• A request has been made by senior management to cancel the planned
review of ‘New Roads and Street Works Coordination’ as a recent exercise,
as we understand, has been undertaken in this area. This will be noted as
an amendment to the approved plan for 2024/25. 
• A request has been received from senior management to postpone the review
of Eclipse post implementation review to the 2025-26 audit year and we have
scheduled this into the draft 2025/26 audit plan. This will be noted as an
amendment to the approved plan for 2024/25.

Page 3

• A Request has been received by senior management to cancel the planned
review of Roads and Flood Prevention, due to what we are advised is a
national overview of this area and that staff will need to focus the resources on
this piece of work. This will be noted as an amendment to the approved plan
for 2024/25. 
• A request has been made to add a review onto the HSCP Audit Plan in
relation to Payroll Procedures which will be accommodated into our over all
resource envelope. 
Scrutiny  
3.4 It was agreed by the Committee that the chosen subject area for the 2024/25
scrutiny review would be on the Council’s complaints process. A report was
submitted to the September 2024 Committee outlining the suggested approach
and appointment of the Panel to undertake this work. The former Chairperson,
Martin Caldwell has delivered a brief training session which was particularly useful
for those new to the Committee but also increasing the resilience of the Committee
to have suitably experienced Panel members. A Background and scoping
document has been prepared and issued to the Panel members and it was agreed
at a meeting on 29 November to progress the review.  Officer input was provided
to take forward outstanding issues and prepare a draft report.  The draft report has
now been issued for review and arrangements are being put in place to hold a
meeting to discuss the content and reach final conclusions, a suitable date is to be
confirmed.   
Counter Fraud  
3.5 The CFT is progressing well with both team members fully CIPFA accredited fraud
investigators. The current investigator has taken on a 2 year secondment to empty
homes for further skills development.  The investigator post was filled again on a
secondment basis.  The new member of staff has commenced the CIPFA Fraud
specialist course with a view to finish by the middle of 2025. 
Both team members will revert to substantive post circa September 2025. 
Continued routine work is still progressing to track the full income recovered from
the team’s work, however, based on the amount of additional billing, even
accounting for a degree of non-recovery, the indications are that the team are still
exceeding their target. In addition, the team are raising awareness of the Council’s
zero tolerance to fraud and this will help act as a deterrent to fraud being
perpetrated in the first place. 
Visits continue to play a vital role in the CFTs proactive and reactive work.  Recent
visits have taken place in Islay, Helensburgh, Campbeltown, Rosneath, Cove,
Kilcreggan, and Arrochar. 
A review is to take place this year for Oban with both non-doemstic rates and
Council tax to fall under this visit. 
Partnership working with the DWP has resulted in several rebillings and
adjustments to Council tax reduction schemes.

Page 4

Both officers continue to be proactive and make visits  when information is
recieved via the online portal 
The CFT continue to link in with Internal Audit and Debt Recovery, and where
necessary to assist, trace persons and open communication to long term debts for
recovery. Several cases have resulted in large scale rebilling. 
Second homes and Non-Domestic Rates are playing larger roles in the CFT
team’s investigations with several claims already adjusted.  These will remain
proactive areas. 
The CFT now have an established referral system in place from council tax teams
and have already liaised with this team going forward into 2025 for the review of
the second and holiday home tax changes.  The information already shared in the
short space of time has resulted in rebilling and adjustments of accounts. 
Together we aim to keep accurate records and update accounts where error or
missing information is held. This approach will continue as the method of
collaborative and interdepartmental working has been helpful. 
The CFT continue to work closely with the empty homes team to support each
other in our remits.  Work and communication between each department is key in
identifying and finding appropriate solutions to enable empty homes to return to
residency or open market. 
The NFI exercise continues to be a routine work area for the CFT.  The 2022/23
exercise is now closed and the results are with Audit Scotland.  The 2024/2025
exercise has commenced with matches already being progressed. 
Since the inception of the CFT a total of £1,289,068 has been rebilled and
£915,286 has been recovered. A recovery percentage of 71% has been achieved
at the last review of the figures. Due to other commitments this quarter’s recovery
has still to be checked and updated.   
Additional Updates from Quarter Three  
3.6 A series of visits to Customer Service Points, Schools and Roads and Amenity
services was undertaken across Islay and Mull.   The premises visited were
assessed against our standard work programmes for facility responsibility, school
funds and general service provisions, both good practice and issues were
identified during these visits and discussed with the officers whilst on location.  A
number of issues were escalated to management as a result of these visits:   
• The Customer Service Points were found to be well managed in
accordance with the Council’s Customer Service Charter, minor issues
regarding absence of a health and safety poster in one area and no
appointed first aider in the other, the facility responsible officer, however, is
a retained firefighter who has completed extensive first aid training.   
• The Schools visited were assessed for compliance with Education
Management Circular (EMC) 1.10 School Funds Procedures. All funds were
found to be operating effectively with robust recording of transactions and
supporting information retained, there were, however some issues identified

Page 5

around establishment of School Fund Committees and associated
constitutions, and where a committee was in place, failure to hold regular
meetings and formal elections to office bearers’ posts.  There was limited
formal training in managing school funds, with administrators learning from
their predecessors in most instances, whilst accurate records are
maintained, these are not always in the format provided in EMC 1.10. 
Insufficient bank account signatories were established in one instance,
receipts are not always issued upon receipt of income, income received
was not always banked intact and it was unclear how long records were
being kept, in some instances this was in excess of the current plus five-
years requirement.   A reciprocal arrangement was in place for auditing
accounts of two primary schools, however, both schools are managed by
the same Headteacher and this arrangement is not considered to be
sufficiently independent.  Appropriate advice was given where required. 
• Roads and Amenity services office and depots were visited to assess
general administrative and operational procedures.  The general
environment on both islands visited was found to be clean and tidy with
grounds well maintained and no evidence of excess waste.  The depots and
waste amenity sites were maintained in an organised manner with
appropriate signage in place.  Work schedules were in place and
timesheets were regularly prepared and submitted by employees.  A
number of issues were also highlighted as a result of visits undertaken,
these include: depot security, diesel fuel accountability, purchase of petrol
for machinery, absence of fuel and other inventory records, recording of
driver hours, employee contractual arrangements, increased demand for
service not acknowledged in work schedules, holiday records, overtime
procedures and authorisation, access to burials system and usage of piers
and harbours.  
3.8 The Council has entered a ten-year programme to deliver the Rural Growth Deal
(RGD) for Argyll and Bute.  The Council, as the accountable body for this
programme is required to allocate and account for distribution of the funding to
partners, third parties and other bodies in accordance with the approved
governance arrangements.  The Council’s Chief Internal Auditor has been
appointed to coordinate audit activity throughout the programme, this will include
liaison with partner auditors to obtain annual confirmation of regular and planned
reviews of grant funded activities and a specific review of RGD within the
Council’s Annual Audit Plan at least every two years.  Discussions regarding the
audit input required have taken place and the first review will be included within
the 2025/26 Internal Audit Plan. We will closely monitor the additional work
associated with this appointment going forward and determine whether
additional resources may be required.  
3.09 Our work as the contracted Internal Auditors for the HSCP has been progressing
well and priority has been given in this area given the availability of staff and work
has now completed. We will continue to monitor progress to the HSCP’s Audit and
Risk Committee in relation to the implementation of recommendations made in
previous reports. 
3.10 Internal Audit staff continue to increase their skills and ultimately aim to complete
appropriate professional qualifications at the end of their training programmes.

Page 6

Internal Audit have two staff members who are undertaking formal professional
training; training is at differing stages but is progressing as expected at this time.
The aim is to develop and retain professional staff on the completion of the
qualifications and increase resilience within the service. 
Continuous Monitoring  
3.11 Our continuous monitoring programme is generally focused on transactional type
activity. Standard audit tests are applied which are relevant to each auditable unit.
Control design tests look at whether the controls in place adequately address the
potential risk event. There have been no new findings within the quarter that
require to be reported. 
Table 2: Continuous Monitoring Findings 
Auditable
Area
Areas Tested Issues Identified Management comment /
action  
No issues identified. 
3.12 A follow up process is in place whereby management are advised of continuous
monitoring findings and, where appropriate, requested to take remedial action. 
There are currently no outstanding follow-up points arising from previous testing. 
Due to the volume of continuous monitoring tests carried out the decision was
made to report by exception only.      
National Reports  
3.13 A follow up process for national reports is in place whereby management are
advised of national reports published and asked to confirm what, if any, action is
planned as a result of the report.  Table 2 details the national reports issued during
quarters two and three of 2024/25 due to be reported in quarter three 2024/25.   
Table 3: National Reports 
National Report Issued To Detail Management response/
Action taken
The 2023/24
audit of
Aberdeen City
Council 
Chief Internal
Auditor 
All Scottish councils
must learn from the
weaknesses that
allowed an
Aberdeen City
Council employee’s
£1.1 million fraud go
undetected over 17
years. 
The Chief Internal Aduitor has
been liaising with the Revenues
and Benefits Manager to assess
the Council’s position.  Findings
indicate that internal controls are
robust with strong segregation
of duties and reconciliations in
place, however, areas for
improvement were also
identified, including, improved
pre-payment monitoring and
reinforcement of the Counter-

Page 7

fraud message to employees.  A
report has been prepared and
submitted to ELT by the Head of
Financial Services. 
National Fraud Initiative (NFI)  
3.14 NFI data matching involves comparing computer records held by one body against
other computer records held by the same or another body to identify potentially
fraudulent claims and payments to be identified.  Note though that the inclusion of
personal data within a data matching exercise does not mean that any specific
individual is under suspicion. Where a match is found it indicates that there may be
an inconsistency which requires further investigation. No assumption can be made
as to whether there is fraud, error or other explanation until an investigation is
carried out.  A reminder process is in place to ensure that matches are reviewed
on a timely basis.  
3.15 The previous NFI exercise has been completed and results are being compiled by
Audit Scotland.  Any follow up matches will be addressed if necessary.
This exercise was conducted throughout the year by officers and matches checked
and closed accordingly.  NFI provided additional data releases over the course of
the exercise and matches are addressed when these become available.   
Existing users have been reviewed and new users added where requested, all
users have been and will continue to be informed that matches are available for
review and progress will be monitored monthly by the Counter Fraud team and
reported quarterly to the Audit and Scrutiny Committee.
New HMRC data has been uploaded and released back to us, and teams have
been contacted to start matching this data.    
3.16 The new NFI exercise for 2024/25 has commenced with the data uploads so far
submitted to the Cabinet office for review and therefore data matching when
released.  The new NFI matches will appear in the table below as and when they
have been released and checked. 
Table 4: National Fraud Initiative Progress at 03/02/2025
Operational
Area
Total
Matches
Recommended/Very
High / High/ Medium
Risk Matches
Matches
Complete 
*
WIP
Match Description
CT to Elect
Register 
2422 0 2 0 CT records to Electoral
Register/ other data sets to
ensure discount awarded
to only those living alone
aged over 18, taking into
account disregarded
occupants.  (CT to other
Datasets will not be
progressed further due to
poor quality data)
CT rising
18s 
85 0 0 0
CT to HMRC
Household
Composition
1112 0 0 0
Housing
Benefits
10 TBC 0 0 HB records to records in
other authorities / other
datasets including student
loans, payroll and pensions

Page 8

to identify undeclared
income and capital.
Payroll 298 TBC 0 0 Payroll records to other
datasets including other
payrolls and pensions to
ensure employee is not
receiving additional
income.
Blue Badges 200 TBC 0 0 Blue badge records to
DWP data to identify
deceased claimant with
valid badge.
Housing
Waiting list
260 TBC 0 0 Housing waiting list
records to other
organisations HBCTR and
tenant data to identify
undisclosed changes in
circs or false info.
Council Tax
Reduction
248 TBC 0 0 CTR records with records
in other authorities / other
datasets including; student
loans, payroll and pensions
to identify undeclared
income and capital
Creditors 2340 TBC 75 0 Analyses Creditors data to
identify possible duplicate
vendors and payments,
VAT errors or fraud and
multiple vendors sharing a
bank account.
Procurement 67 TBC 0 0 Payroll records to
Companies House and
creditors’ data to identify
employees who appear to
have a personal interest in
a company that the
authority has traded with.
Business
Rates
0 TBC 0 0 Business rates records
within and between
authorities to identify
those fraudulently claiming
small business bonus
scheme and grants 
* Work in Progress 
Overall Summary of Matches 
Matches
Complete
Work In
Progress
Cleared Frauds Errors Total
Value 
£
Recovering Recovering
Value 
£ 
77  0 77 0 0 0 0 0 
Internal Audit Development  
3.17 The table below details progress against the action points in our Internal Audit
development plan.

Page 9

Table 5: Internal Audit Development Key Actions: updated 31/1/25. 
Area For
Improvement
Agreed Action Progress
Update
Timescale
Review Continuous
Monitoring
Programme
Continuous monitoring tests will be
reviewed following audit of Debt
recovery to assess value of existing
tests carried out. 
Consider adding test to review date
taken to process invoices from date of
receipt within the Council (not at
Creditors)
In progress March 2025 
3.18 Internal Audit scorecard data provided below are aligned to those for internal audit
in the Financial Services service plan.  All indicators are shown as currently being
on track.   
Table 6: Internal Audit Team Scorecard  
Internal Audit Team Scorecard 2024– 25 – FQ3 24/25 (as at January  2025)
BO115 We Are Efficient and Cost Effective    
Internal Audit Level of Satisfaction
Actual  96% G 
Target 80%
Review of Strategic Risk register
Status Complete G 
Target Complete
Percentage of audit plan completed
Status 100% G 
Target 80%
Percentage of audit recommendations accepted by
management
Actual  100%
G
Target 100% 
4 CONCLUSION  
4.1 The 2024/25 audit plan is progressing as anticipated at this stage in the year,
together with the Counter Fraud Team continuing with visits and pro-active work
throughout Argyll and Bute.  
5 IMPLICATIONS
5.1 Policy – Internal Audit continues to adopt a risk based approach to activity
5.2 Financial –None
5.3 Legal –None
5.4 HR – None

Page 10

5.5 Fairer Scotland Duty – None
5.5.1 Equalities – protected characteristics – None
5.5.2 Socio-Economic Duty – None
5.5.3 Islands – None
5.6 Climate Change – None 
5.7 Risk – None
5.8 Customer Service – None
5.9 The Rights of the Child (UNCRC) – None 
For further information please contact Internal Audit (01546 604108)
Paul Macaskill
Chief Internal Auditor
13 March 2025