1. BACKGROUND AND SCOPE OF RESPONSIBILITY 
Argyll and Bute Council’s (the Council) governance framework includes the systems,
processes and culture by which the Council is controlled, engages with communities and
monitors the achievement of strategic objectives. The Council conducts its business in
accordance with the law and proper standards. The Council has a duty to make
arrangements to secure continuous improvement in the way in which its functions are
exercised, having regard to the economic, efficient and effective use of public money. 
The system of internal control is a key part of the framework and is designed to manage
risk to an acceptable level.   
In discharging these responsibilities, the Council has put in place proper arrangements
for the governance of its affairs and the stewardship of the resources at its disposal. The
Council has approved and adopted a Local Code of Corporate Governance (the Code)
which is consistent with the principles and requirements of the CIPFA/SOLACE revised
Framework for ‘Delivering Good Governance in Local Government. This Statement
explains how the Council has complied with the Code and meets the requirements of
current good practice. 
2. THE GOVERNANCE FRAMEWORK
The Code details how the Council will demonstrate compliance with the fundamental
principles of corporate governance for public sector bodies.  The seven key principles of
our governance arrangements in 2023/24 are described in the Code, along with our
supporting principles and key aspects of our arrangements to ensure compliance. 
1. Behaving with integrity, demonstrating strong commitment to ethical values,
and respecting the rule of law.
We have four values, which underpin all that we do and provide a sound basis to
achieve transformation to ensure we meet the challenges of the future and deliver
quality services. These values are that we have a workforce which is: 
Caring  Committed  Collaborative  Creative  
The Council has developed a change programme ‘Connect for Success’ with the seven
principles – One Council One Place Approach, Purpose and Mission Focus, Employee
Empowerment, Data and Evidence Driven Decision Making, Learning Council, Agile and
Maximise Opportunities that Technology Offers - Connect for Success 
We have developed and communicated an Ethical Framework within the Council's
Constitution, which defines standards of behaviour for Members and staff. Protocols for
Member/Officer relations are also detailed within the Constitution.   
The Councillors’ Code of Conduct is set out at a national level, applying to all members
in Scottish local authorities and is incorporated into the Council’s Constitution as part of
the ethical framework which also includes a protocol for the Monitoring Officer. Each
Members interests can be found in their respective profiles at Members Interests is
publically available for inspection. 
In addition, the Constitution has a section on conduct at meetings and meeting agendas
require declarations of interest to be made where appropriate. Standing orders for
meetings are included within the Council’s constitution and training and support is
provided to members on their role in Council committees. 
Anti-fraud and whistleblowing policies are in place and the Council has adopted the

Page 2

Scottish Public Services Ombudsman’s (SPSO’s) Model Complaints Handling
Procedure.
The Council complies with CIPFA’s Statement on the Role of the Chief Financial Officer
in Local Government. 
In addition, Professional advice on the discharge of statutory social work duties is
provided to the Council by the Chief Social Work (CSWO). 
A structure of governance and framework across our day to day activities and which
supports accountability, control, risk management and appropriate overview of the
Council are outlined in the diagram below: 
Constitution, Governance, Risk Management and Accountability

Page 3

2. Ensuring openness and comprehensive stakeholder engagement.
We have established clear channels of communication with the community and other
stakeholders through our Communication Strategy.  Key mechanisms include:
Consultation Diary 
The Council has developed a consultation section on its website which hosts all consultations
run by the Council and includes a section which publicises the results and/or outcome of the
Decision Making /
Procedural
Council and
Committee Structure
Council and
Committee Terms of
Reference
Council and
Committee Standing
Orders
Scheme of Delegated
Functions
Standing Orders
Relating to Contracts
Councillor's Code of
Conduct
Corporate Governance
Executive Leadership
Team and Senior
Management Team
Risk Management
Integrity
HR and Individual
Capability
Strategic Planning
Performance
Management
Framework
Community Planning
and Empowerment
Stakeholder
Engagement
Financial Governance
Internal Control
ALEO Governance
Scheme of Delegation
ALEO Governance
Framework
Risk and Governance
Reporting
Financial and
Operational
Performance
ALEO Risk Register
Asset Governance
Corporate Asset
Management Strategy
Corporate Asset
Managment Plan and
Capital Plan
Records Management
Information
Management and
Security
Local Development
Plan
ICT and Digital
Strategy
Major
Programmes/Projects
Capital Investment
Programme
Conservation Area
Regeneration Scheme
(CARS) Projects
Campbeltown,
Helensburgh, Oban,
Rothesay & Dunoon
(CHORD) Projects
Marine Asset
Management Plan
Rural Growth Deal
Annual Status and
Options Report
External and Internal Audit and other regulatory inspections

Page 4

consultation and the resultant decisions that have been taken, showing how they were
informed by the consultation process. This is part of our commitment to You Said, We Did
information sharing for the public. Consultations provide communities with an opportunity to
get involved with wide ranging aspects of the council’s work and life in Argyll and Bute. 
These include for example, play park funding, active travel routes, primary school
consultations, and the council’s customer service strategy. 
Keep in the Loop Service  
Over 14,000 customers currently subscribe to receive notifications across 22 different
subscription services. In 2024/25 386,303 email notifications, newsletters and alerts were
issued via the Keep in the Loop Service to its subscribers. 
'Myaccount' 
This is a secure sign-in service for accessing online public services in Scotland. It provides
the ability to set up an online account and use it to access a growing range of online public
services, Scotland-wide, including Argyll and Bute Council services. Currently 19,231
customers have linked their national Myaccount to the Argyll and Bute Council instance and
use it to access and personalise their interaction with the Council on a range of services e.g.
it gives authenticated access to our Council Tax and Benefits Portal.
Public Performance Reporting
The Council’s website makes all relevant performance information available to the public. This
includes information on performance scorecards, budgets and other service related
information. This promotes open accountability to the public for its performance against
agreed policies and standards. As part of phase two of the Performance Excellence Project
a review of the council's approach to public performance reporting is being undertaken. It also
includes all copies of the Council’s financial accounts and papers for all Council and
Committee Meetings, supplemented by webcasts of meetings.  
Accessibility
In 2024/5 77% of 528,606 customer interactions through the council’s Customer Engagement
Team were made using digital self-service. This very high proportion is because of the scope
and quality of the digital services provided. In order to ensure maximum accessibility for
everyone and meet our equalities responsibilities, the Council’s website is independently
assessed against the international WCAG2.2 standard and in April 2025 it scored 99% and
was the second highest ranked website in Scotland. The website had 4,501,450 page views
in 2,868,330 separate sessions in 2024/25, an increase of 5.4% on the previous year. A new
online service for all council employees called MyCouncilWorks was completed and it had
512,000 page views. In addition our 24/7 voice automated telephone service had 41,309 calls
and collected £2.2m in automated phone payments. The council also fully reviewed and
updated it Customer Service Strategy with a focus on inclusivity and accessibility.
Community Engagement   
To support strengthening communities, community empowerment and engagement, the
Council has in place: 
• An officer Community Engagement Strategy Group which has supported the
development and implementation of the Council’s Engagement Framework; advising
on best practice in engagement tools and techniques, and supporting skills
development and capacity within the Council to effectively engage with communities
which has included training for officers, elected members and communities. On this
group sit those officers with expertise in engagement from a range of services across
the Council, including those from Corporate Communications and the Communities &

Page 5

Partnership Team. The Council’s Communications Team has developed an
engagement app for services to use, and the Council’s Communities & Partnership
Team has resources and expertise to support hard-to-reach groups, community
organisations and remote communities, to have a voice in decision making. 
• A Community Development service, with a focus on improving active citizenship and
capacity building by delivering best practice in community development through a
responsive and effectively targeted programme of Community Development support,
internally to the Council and externally within communities across Argyll and Bute.  
• A range of training and resources to help build the knowledge, skills and confidence
of community organisations and development trusts, including publishing webinars
on key topics of relevance to community organisations.  
• Funding support to help empower community organisations to take forward priority
projects and activities in their area: Monthly funding alert | Argyll and Bute Council
(argyll-bute.gov.uk), hosting GrantNet for self-service funding searches, supporting
funding applications through the Community Funding Toolkit, and undertaking
tailored funding searches on request.  
• The annual delivery of a Supporting Communities Fund grant award scheme which
community groups can apply for (up to £1500 each), including offering advice and
support on applications and other funding routes. 
• Resourcing community council liaison activities, including training and support
activity, helping to build the capacity of community councils.  Delivering capacity
building to communities to increase the use of the Gaelic language and to make it
more accessible and visible.   
• Resourcing and supporting delivery of the statutory requirements under Part 3
(Participation requests) and Part 5 (Asset transfer requests) of the Community
Empowerment (Scotland) Act 2015. Council departments are also provided with
support in relation to Part 9 of the Act (Allotments). 
The Council also has a statutory lead role to ensure Community Learning and Development
provision in Argyll and Bute is set out in an Argyll and Bute Community Learning and
Development Strategic Plan, and this is delivered through collaboration with its Arms-length
External Organisation (ALEO) partner, Live Argyll, and the Argyll and Bute Third Sector
Interface (TSI). 
The Council continues to promote the Community-led action plan toolkit (developed in
partnership with Scottish Community Development Centre) to help support communities
interested in developing a local Community-led Action Plan. The Council also provides
support for communities interested in development a Place Plan: Local Place Plans | Argyll
and Bute Council (argyll-bute.gov.uk). 
The Council directly resources the management of the Community Planning Partnership
(CPP) to bring partners together, including the community, to deliver the statutory
requirements under Part 2 (Community Planning) of the Community Empowerment (Scotland)
Act 2015, including a Local Outcomes Improvement Plan.  Support is also provided to the four
Area Community Planning Groups   
The Community Planning Partnership seeks to ensure that young people are engaged in
community planning and has implemented the following:

Page 6

• The 3 local Members of the Scottish Youth Parliament (MSYPs) are invited to
attend the Community Planning Partnership Management Committee meetings on
a rotational basis.   
• The Area Community Planning Groups (ACPGs) invite members of local youth
forums to attend meetings when they are held in their local areas, with information
passed on to young people by youth workers who are kept updated on any
developments.  
• The revised Scheme of Establishment for Community Councils outlines the
requirement to encourage young people to attend and participate in community
council meetings and the age to become a community councillor was lowered to
be 16, to encourage more young people to become involved. 
The Council also provides opportunities for community organisations to engage with
Community Planning and Community Development through the following resources:
Community Development Bulletin, Community Planning Bulletin, Gaelic Newsletter,
Community Planning Podcast. 
Council/Committee Meetings
Meetings are always held in public, unless one of the statutory exemptions in the Local
Government (Scotland) Act 1973, schedule 7A applies to the content of the report. Agendas
for and minutes of meetings are detailed on the Council’s website. When schedule 7A applies
papers are adjusted to ensure that the maximum amount of content is in the public domain.
The Council’s Constitution defines the roles and responsibilities of the administration,
committees, scrutiny and officer functions, with clear delegation arrangements and protocols
for effective communication. 
The Standards Commission Advice Note for Councillors on Distinguishing between their
Strategic Role and any Operational Work has previously been included in an Elected Member
Seminar and is hosted on the Members Resource page on the Hub for ease of reference.
3. Defining outcomes in terms of sustainable economic, social, and environmental
benefits.
Our Corporate plan sets out our, and our community planning partner’s, vision for Argyll and
Bute’s economic success to be built on a growing population. It also defines our mission “To
make Argyll and Bute a place people choose to live, learn, work and do business” and
establishes our outcomes, priorities and approach to delivering on our shared ambition with
our community partners.
We have a Performance Improvement Framework (PIF) that ensures performance is integral
to the work of the Council.  The PIF is focused not just on measuring what we do but on
measuring the difference we make in terms of our outcomes.   
Asset management planning and capital investment is structured to consider and balance the
combined economic, social and environmental impact of policies and plans when taking
decisions about service provision. The Council has put arrangements in place to comply with
key elements of the Community Empowerment Act.
In determining how services and other courses of action should be planned and delivered the
Council is increasingly engaging with internal and external stakeholders. Community benefit
is an important consideration in the procurement of goods and services.
The Council has acknowledged the effects of the ‘Cost of Living’ within Argyll and Bute and
during 2024/2025 client gain achieved by the Flexible food and Fuel fund project reached
£5.2 million. This project, supporting the most vulnerable low income households and those
using foodbanks in our area to access short-term grants to cover the cost of food and fuel in
the short term. In the longer term support through the provision benefit maximisation, money

Page 7

advice and energy advice services is provided by third sector partner agencies. 
In addition, this year the Council has issued 1,300 Scotland Loves Local Gift Cards to low
income households in the year ensuring the £110,000 loaded onto the gift cards is spent in
Island based local businesses in Argyll and Bute. The Council and the Third Sector Interface
is supporting the Poverty Alliance on a project entitled “Taking Action on Rural Poverty”
which is looking at new ways of addressing rural poverty in Argyll and Bute by reducing the
rural poverty premium.   
The Council has also provided a one-stop-shop webpage where individuals and families can
access energy advice, money advice and links to the services the Council provides in this
area and those provided by third sector partner organisations. 
Throughout 2024/25, Argyll & Bute Council actively drove forward its commitment to
reducing carbon emissions, guided by our Decarbonisation Plan. We continued to deliver a
range of projects aimed at lowering our environmental impact. This included tangible
progress in enhancing energy efficiency within our buildings, advancing renewable
technology installations such as the solar PV system at Cardross Primary School, and
progressing the transition towards a lower-emission fleet. Efforts to minimise waste sent to
landfill also remained a key operational focus. 
A significant development in 2024/25 was commencing the adoption of the Scottish
Government's ClimateOS platform. This strategic tool is set to enhance our climate action
planning capabilities, a positive step being embraced by local authorities across Scotland.
These dedicated actions and project deliveries during the year reinforce our steadfast
commitment to achieving Scotland's net zero targets and ensuring a greener Argyll & Bute. 
4. Determining the interventions necessary to optimise the achievement of the
intended outcomes.
Decision makers receive detailed information indicating how intended outcomes would be
achieved together with the implications associated with the proposals covering financial,
risks and mitigations, integrated impact assessment, acting sustainably, carbon
management, island proofing, and changes to schemes, by way of the compulsory sections
of the Committee report.
The Council’s Executive Leadership Team (ELT) meet regularly with the administration to
discuss their key priorities and requirements for decision making in addition there is regular
survey and feedback on their needs and a regular review of governance arrangements to
ensure that decision making is fully supported.
In determining how services and other courses of action should be planned and delivered
the Council is increasingly engaging with internal and external stakeholders. Community
benefit is an important consideration in the procurement of goods and services.
The Council fosters effective relationships, collaborative working and contractual
arrangements with other public, private, and voluntary organisations in delivering services
that meet the needs of the local community as stated in the Council’s Corporate Plan 
5. Developing the entity’s capacity, including the capability of its leadership and the
individuals within it.
Elected Member Development
The Council has signed up to the Improvement Service’s Continuing Professional
Development Framework for Elected Members. All Elected Members are provided with
opportunities to progress personal development plans so that individual training needs and
aspirations are identified and support provided as appropriate. This is complemented by a

Page 8

comprehensive seminar and workshop programme which addresses a wide range of topics
and strategic issues. Additional training was undertaken by Elected Members in relation to
the technology, knowledge and skills necessary to support the transition to a virtual
environment including webcasting of strategic Committee meetings and the operation of
meetings on a hybrid basis, enabling a mixed attendance of members being physically or
virtually present.             
Officer Development
The Council has frameworks in place to support officer development. These underpinned by
our corporate behaviours and delivered through the corporate training programme and
leadership development programmes.  In 2024/25 these frameworks are being redesigned to
better reflect the principles of Connect for Success. During 2024/25 Executive Coaching for
Chief Officers was introduced. While the corporate behaviours and Argyll and Bute Manager
programme are being redesigned all content from the previous courses are available on
LEON (the Councils eLearning platform). A new coaching conversations training programme
has also been added to the corporate training programme to support managers with
empowering team members and having coaching conversations.
6. Managing risks and performance through robust internal control and strong
public financial management. 
Internal Financial Control
Our standing orders, financial instructions, scheme of delegation and supporting procedure
notes/manuals clearly define how decisions are taken and the processes and controls in place
to manage risks. These are reviewed and updated on an annual basis. We ensure compliance
with relevant laws and regulations, internal policies and procedures, and that expenditure is
lawful. The Council’s Monitoring Officer advises on compliance with our policy framework,
ensuring that decision making is lawful and fair. Furthermore, the Council has a designated
Data Protection Officer and all services have Information Asset Registers along with
appropriate guidance on how data should be managed.
Our financial management arrangements conform to the CIPFA Statement on the Role of the
Chief Financial Officer and we ensure that our independent Audit and Scrutiny Committee
undertakes the core functions identified in CIPFA’s Audit Committees – Practical Guidance
for Local Authorities. 
The Council has a proactive, holistic approach to tackling fraud, theft, corruption and crime,
as an integral part of protecting public finances, safeguarding assets, and delivering services
effectively. It is based upon the national counter fraud standard CIPFA’s Code of Practice on
‘Managing the Risk of Fraud and Corruption’.
The Council has a system of internal financial control designed to manage risk to a reasonable
level. It is based on a framework of regular management information, financial regulations,
administrative procedures (including segregation of duties), management supervision, and a
system of delegation and accountability. 
Development and maintenance of the system is undertaken by officers within the Council and
the named bodies mentioned below. 
Internal Financial Controls and Prevention  Are these in Place?
Comprehensive budget systems 
Financial and budget monitoring systems 
Financial and Performance reporting systems 
Clearly defined Capital Expenditure guidelines

Page 9

Project Management processes and disciplines 
An effective Internal Audit Section 
An effective Counter Fraud Team 
Internal controls cannot eliminate risk of failure to achieve policies, aims and objectives and
can therefore only provide reasonable and not absolute assurance of effectiveness. 
This annual review also covers the other bodies whose activities are incorporated into our
Group Accounts and reliance is placed on the formal audit opinion contained in the financial
statements of each individual body.
• Dunbartonshire and Argyll and Bute Valuation Board
• Live Argyll
• Argyll and Bute Integration Joint Board
The Council’s risk management processes are well developed. In particular the:
• Strategic Risk Register is updated twice a year and approved by the SMT
• Chief Executive presents the Strategic Risk Register to the Audit and Scrutiny
Committee on an annual basis
• Operational Risk Registers are updated quarterly by departmental management
teams.
• Internal Audit will perform an audit of compliance with risk management arrangements
every three years.
• The CIA performs an annual strategic risk assurance mapping exercise. 
7. Implementing good practices in transparency, reporting, and audit to deliver
effective accountability 
Internal Audit 
The Council and its Group bodies have internal audit functions, which operate to Public Sector
Internal Audit Standards. The work of internal audit is informed by an analysis of the risk to
which the Council and its Group bodies are exposed, with annual internal audit plans prepared
based on that analysis. The Council's Audit and Scrutiny Committee endorses the preparation
methodology and annual internal audit plan and monitors the performance of Internal Audit in
completing the plan. In addition, the Council has developed a hybrid meeting facility enabling
physical and virtual attendance at meetings with a public broadcast function so that members
of the public can see and hear meetings of the Council’s strategic committees’ live increasing
openness and transparency.
The Chief Internal Auditor (CIA) provides the Audit and Scrutiny Committee with an annual
report on internal audit activity in the Council and an opinion of the assurance can be taken
regarding the systems of governance and internal control and whether they are operating
effectively. This is an independent and objective opinion of the CIA based on work carried out
in conformance with the Public Sector Internal Audit Standards to fulfil statutory Internal Audit
provision.
Internal audit provides members and management of the Council with independent assurance
on risk management, internal control and corporate governance processes. External audit
has, and continues to, use the work of internal audit. 
The Annual Accounts and Report sets out the financial position in accordance with relevant
accounting regulations.

Page 10

Review of the Adequacy of Effectiveness of the Council’s Governance
Framework 
The Council has appropriate management and reporting arrangements to enable it to satisfy
itself that its approach to corporate governance is adequate and effective in practice. The
legislative framework of local government defines a number of posts which are primary to the
Council’s governance arrangements.  These include the Chief Executive, Pippa Milne fulfilling
the role of Head of Paid Service. As Monitoring Officer, the Executive Director Douglas
Hendry: 
• oversees the implementation of the Code and monitoring its operation
• reports annually to the Council on compliance with the Code and any changes
required to maintain it and ensure its effectiveness.
Specific responsibilities are assigned to the Executive Director Kirsty Flanagan as the
Council’s Chief Financial Officer (S95 Officer), to ensure that public funds are properly
accounted for.  In recognition of the significant role that the Chief Financial Officer has in
relation to financial performance and the financial control environment, CIPFA has set out key
principles that define the core activities and behaviours that belong to the role.  These include,
being a key member of the Leadership Team, being actively involved in and influencing
decision making, and leading the delivery of good financial management across the whole
organisation. The Council have appointed a Data Protection Officer in line with the
requirements of the UK-General Data Protection Regulations and the Data Protection Act
2018. 
FINANCIAL SUSTAINABILITY 
It is anticipated that the Scottish public sector will continue to face a very challenging short
and medium term financial outlook with uncertainty over the level of Scottish Government
funding. The current one year only financial settlements provide very little medium term
budget certainty.  Furthermore, the continued ring-fencing of monies and additional policy
commitments, which are not always fully funded, limit financial flexibility and create
additional budget pressures. 
In addition to uncertainty around future funding levels, there are also prevailing levels of
economic uncertainty, with continued volatility in financial markets.  Against a backdrop of
historic real terms standstill/reducing Local Government Finance Settlements and the global
economic climate, the management of budget pressures in respect of pay and other
inflationary cost increases, together with increasing demands for key services, will continue
to be challenging. 
The Council undertakes financial planning to provide a longer term view of its financial
position over future years.  Financial estimates are provided within its medium term financial
outlook over a five year period, to provide a longer term view of the Council’s estimated
budget gap. The financial outlook is underpinned by planning assumptions in respect of
available funding, cost and demand pressures, pay and non-pay inflation, together with
potential measures to balance the budget. These assumptions are reviewed and updated on
an ongoing basis, with the outlook prepared to reflect best case, worst case and mid-range
scenarios. 
The Council has a strong track record in effective financial management, as recognised by
previous years’ annual external audit reports, and is well placed to manage future financial
challenges. The annual audit report for the year ended 31 March 2024 also recognises that
the Council has effective financial planning arrangements in place to support financial
sustainability.  In addition to its revenue budget outlook, the Council provides regular update

Page 11

reports on capital plans, reserves and balances, financial risks and treasury management
activity, in accordance with its approved strategies.   
The Council is taking a longer term approach to budget planning and recognises that
opportunities for budget savings will require to be delivered, whilst maintaining services, in
line with its key strategic objectives and within available budget resources.  Service
transformation, underpinned by robust financial planning, will continue to be a key focus, in
order to safeguard the financial sustainability of the council. 
HEALTH AND SOCIAL CARE INTEGRATION
The Argyll and Bute IJB has been established as a separate legal entity from Argyll and Bute
Council and NHS Highland, with its own board of governance.  The IJB comprises eight voting
members with four Elected Members nominated by Argyll and Bute Council and four Board
members from NHS Highland.  In addition, there are a number of non-voting appointees
representing other sectors and stakeholder groups, such as the Third Sector, Independent
Sector, Patients and Service Users, Carers and Staff.  
The arrangements for the operation, remit and governance of the IJB are set out in the Argyll
and Bute Integration Scheme which has been prepared and approved by Argyll and Bute
Council and NHS Highland. It has also been approved by the Scottish Government. The IJB,
via a process of delegation from the Health Board and Local Authority as outlined in the
Scheme of Integration has responsibility for the planning, resourcing and operational delivery
of all health and social care services within Argyll and Bute.
The Council places reliance on the IJB’s framework of internal controls and similarly the IJB
places reliance on the procedures, policies and operational systems of the Council and the
Health Board. The IJB operates within an established procedural framework. The roles and
responsibilities of board members and officers are defined within Standing Orders, the
Integration Scheme, Financial Regulations and Standing Financial Instructions.
The IJB has proportionate internal audit arrangements in place to provide independent
assurance on risk management, corporate governance and the system of internal control.   A
risk based internal audit plan developed and commissioned for 2024/25 and the IJB’s internal
auditor has issued a formal annual report providing their independent opinion on the
effectiveness of the IJB’s risk management, internal control and governance processes. The
overall conclusion of the Internal Auditor is to provide a reasonable level of assurance on the
adequacy of internal controls and governance arrangements within the IJB. 
During 2024-25 the IJB has progressed A number of areas for development in respect of
governance have been progressed and this has resulted in a marked improvement in the
way in which the IJB operates and is governed. The action plan is now fully implemented,
highlights included the development of the Workforce plan, the roll out of the Integrated
Performance Management System, the development of the engagement strategy and
training and development for IJB members. The IPMF is now subject to review. 
The operating environment going forward is very challenging as funding allocations have not
kept pace with cost and demand increases. The increase in the employer national insurance
rate and threshold is having a material impact on commissioned service providers is
increasing cost and service risk further. The impact of an increasing older population with on-
going recruitment constraints and workforce shortages is adding to the challenge. The HSCP
is working to address its workforce gaps throughout the area and across many professions in
a variety of ways. For example, it is seeking to address key worker accommodation shortages
in partnership with the Council, Shelter and the Social Housing Sector and is constantly trying
new approaches to attract workers from outside Argyll & Bute. The Health and Care Staffing
act is still in the early stages of its implementation and this will continue to impact upon staffing
models through 2025/26 along with reduction in the working week (NHS) and other

Page 12

implications from pay awards. The financial constraints are so severe that the HSCP will be
implementing its financial recovery plan and making reductions to its service offer. These risks
and challenges are particularly acute in many of our rural and island communities which are
experiencing increasing costs along with very small scale, lifeline services which are become
ever more difficult to sustain or operate in a financially efficient way. The HSCP will seek to
balance the financial pressures it, and its partners, are currently experiencing with the care
needs of the communities it serves. 
The IJB approved a budget for 2025/26 which indicates that financial recovery actions are
required to identify further savings in year and that additional funding from NHS Highland may
be required. The budget is also dependent upon the allocation of non-recurring pension fund
savings and use of remaining reserves, this approach means that the scale of the challenge
in 2026/27 is expected to be even more severe. The management of longer-term financial
sustainability is a priority and service change and transformation plans aimed at addressing
this require to be developed, consulted upon and implemented during the course of 2025/26.
The delivery of the short term savings and recovery plan is a priority for the HSCP particularly
as it seeks to manage down spend on expensive agency and locum staff whilst maintaining
the safety of services. 
UPDATE ON AREAS FOR DEVELOPMENT IDENTIFIED IN PREVIOUS ANNUAL
GOVERNANCE STATEMENTS
The 2023/24 Annual Governance Statement identified a number of areas for further
development. A summary update for each area is provided in the table below.
Area 2024/25 Update
Preparation for the implementation of
the Visitor Levy in 2026 - Work with
the Digital Office, improvement
Service, City of Edinburgh and
Highland Council on the development
of a new digital platform for the billing
and collection of the new levy. (Head
of Financial Services/Head of
Development and Economic Growth
– March 2025) 
The Council has completed its public consultation on the
visitor levy and is now analysing the 3300 responses
received prior to reporting back to the council for a
potential decision in August 2025 on whether to proceed or
not. Work also continues on creating a digital platform for
the billing and collection of the levy taking into account
issues raised through each councils’ respective
consultations with the public. A decision on whether or not
to proceed using this platform will be taken following
decision at Committee in August on the Visitor Levy.
Preparation for new processes being
implemented including the practice
around Initial Referral Discussions
relating to child protection, there will
be a need to audit and develop
practice further and the development
of an action plan based on the
findings will help improvement and
the need to consider the staffing
structures which support this vital
area of work. (Head of Children,
Families and Justice – March 2025)  
New IRD guidance has been developed and was
launched on 28th April 2025. Following this event on going
monitoring and auditing will be carried out to judge the
effectiveness of this new guidance.
.
Housing Emergency declared by the
Council in June 2023 - Utilise
outputs from the Housing Summit
held, to develop a multi-stakeholder
Action Plan, and synthesise the
relative elements of this into a
revised Local Housing Strategy
Action Programme. (Head of
A multi stakeholder action plan has been prepared and
approved by the council. This action planned has informed
a new housing strategy that has also been approved by the
council and forwarded to the Scottish Government. A new
housing delivery group has also been established to focus
on delivering the actions identified in the action plan.
Regular updates on progress are presented to the
Councils EDI Committee.

Page 13

Development and Economic Growth
– March 2025) 
The revaluation of properties for
building insurances purposes -
Estates will undertake a revaluation
programme for the general portfolio,
together with a programme of
recorded inspections of vacant
properties. (Head of Commercial
services March 2025
During 2024/25 Estates completed the revaluation of
general properties within MAKI and H&L areas and it is
intended to complete OLI and B&C areas in 2025/26.
Reports were also submitted to DMT in relation to vacant
property inspections and it was agreed on 24/3/25 that a
working group of officers would be set up to progress this
matter in conjunction with the council’s insurers
Publication of the Annual
Procurement Report for the Council
– This will promote our obligations
set out in the Procurement
Regulations. (Head of Legal and
Regulatory Support – March 2025) 
Complete – https://www.argyll-
bute.gov.uk/sites/default/files/2024-
08/Annual%20Procurement%20Report%202023-24.pdf 
The Licensing Board will undertake a
review of its Licensing Policy
statement as required in terms of the
Licensing (Scotland) Act 2005.
(Head of Legal and Regulatory
Support – March 2025) 
A review of the Licensing Policy is ongoing at the moment
with the intention of submitting a report to the meeting of
the Licensing Board in September on the outcome of the
review. Continued to March 26 – see below
The use of Cloud Storage –
Following results of the Internal
Audit, put in place actions to ensure
optimum, appropriate and secure
use of cloud storage is applied
across all applications. (Head of
Customer Support Services – March
2025)
The Audit of Cloud Computing Services was completed in
May 2024 with a substantial level of assurance. All actions
have been completed
Further enhance school engagement
with national programmes and
community partnership approaches
supporting young people to build
their confidence, increase mental
health awareness and promote
diversity. (Head of Education,
Performance & Improvement –
March 2025)
Education have engaged in a number of programmes and
approaches, e.g., Time for Inclusive Education (TIE), the
LGBT Youth Project Charter, the CORRA Foundation to
further develop an inclusive curriculum that celebrates
diversity, the Rights Respecting Schools programme which
raises the profile of rights across our schools, the Mentors
in Violence Prevention Programme (MVP) which is a peer
mentoring programme that uses and active bystander
approach to addressing gender based violence and the
ADP School Support Service to provide evidence based,
up to date Alcohol and Drugs education to pupils and
parents/carers. 
ISSUES FOR FURTHER DEVELOPMENT 
The review of governance and internal control has identified the following areas for
consideration during 2025/26, particularly in the context of continuous improvement within the
Council:
• An Internal Audit in Non-Domestic Rates (NDR) has identified that the current
appeal process needs to be improved to enhance independent decision making and
checking. A new independent panel of managers, separate from Finance, will be

Page 14

established to adjudicate on NDR appeals, improving impartiality and robustness of
decisions. (Head of Financial Services – March 2026)
• The Internal audit of IR35-Off Payroll Working compliance reported assurance as
limited. A comprehensive Policy and Procedures drafted for approval.  To be
implemented 2025-26 in order to minimise any risk to the council. (Head of Financial
Services – March 2026)
• Further embedding good governance and information management in the MS365
project and the roll out of Teams - Once the business case has been approved for
the next stage of the MS365 project and the roll out of teams the service will ensure
appropriate governance and information management arrangements are in place.
(Head of Legal and Regulatory Support – March 2026)
• Financial Recovery – pressures deriving from increasing demand, workforce
shortages and reduced real terms funding in Health and Social Care. Plans under
development to reduce expenditure and service provision. (Chief Officer – March
2026)
• Reduce risk in long term housing supply by identifying long term strategic expansion
sites at scale which will create better economies of scale in terms of servicing
infrastructure and site de-risking. Produce Strategic Development Frameworks for
the two main population and commerce centres, Helensburgh and Oban. (Head of
Development and Economic Growth – March 2026)
• The Licensing Board will undertake a review of its Licensing Policy Statement as
required in terms of the Licensing (Scotland) Act 2005. This will ensure that the
Policy Statement continues to reflect the Board’s current practice and policy and is
updated as necessary to ensure compliance with the statutory licensing objectives.
The review will include an extensive consultation exercise with internal and external
partners, agencies and the public. (Head of Legal and Regulatory Support – March
2026)
• Ensure continuing improvement in the quality of LTA and pupil learning experiences
across all schools. Expanded programme of observation, feedback and support
relating to Learning, Teaching and Assessment by the central team for targeted
schools. (Head of Education, Performance & Improvement – March 2026).
• Strengthen professional learning opportunities for Head Teachers and the Education
Central Team in line with the new Leadership Progression Framework. Plan and
create a suite of Professional Learning sessions for Head Teachers and system
leaders, focusing on key local priorities and involving external partners where
possible. Continue to develop the Newly Appointed Head Teacher programme.
(Head of Education, Performance & Improvement – March 2026).
• Single Authority Model - Continue exploring the potential for a single authority model
including elements such health and social care. (Chief Executive March 2026)
• Budget Planning - Develop a longer term savings plan enabling a more strategic
approach to transformation and service redesign. (Chief Executive March 2026)
• Agree option for continuity of waste service following the end of the PPP Contract
(Head of Roads and Infrastructure - September 2026).
• External residential placements for children - Strengthening the governance
arrangements of external placements even further. Monitoring commissioning visits,
goals of placements and discharge planning. (Head of Children, Families and Justice
- March 2026).
• Stabilisation of staffing - Addressing absences and vacancies. (Head of Children,
Families and Justice - March 2026).
• The council’s Insurers identified an issue around the revaluation of properties for
building insurance purposes. A phased approach of revaluations was implemented
with General properties for the OLI and B&C areas to be completed in 2025/26 -
Estates will complete a revaluation programme for the General portfolio. (Head of
Commercial Services - March 2026)

Page 15

• Succession Planning - 28% of Property Service staff are 55 or over Succession
planning essential to ensure continuity of service provision. (Head of Commercial
Services - March 2026) 
CONCLUSION 
The conclusion from the review activity outlined above and our opinion is that reasonable
assurance can be placed upon the adequacy and effectiveness of Argyll and Bute Council’s
systems of internal control and governance. Although areas for further improvement have
been identified, the annual review demonstrates sufficient evidence that the Council’s Local
Code of Corporate Governance is operating effectively and that the Council complies with
that Local Code in all significant respects. Systems are in place to regularly review and
improve governance and systems of internal control.