Democracy Spraffa

Item 7 f 2024_25_InternalAudit_PreparednessforIFRS16_FinalAuditReport

Argyll and Bute Council · 12 June 2025
Back to Audit and Scrutiny Committee — 12 June 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council
Internal Audit Report
May 2025
FINAL
High Medium Low VFM
Number of
Findings
0 0 1 0
Preparedness for IFRS16
Audit Opinion: Substantial

Page 2

2
Argyll and Bute Council – Internal Audit Report – Preparedness for IFRS16, May 2025
Contents
1. Executive Summary ........................................................................................................................ 3
Introduction ............................................................................................................................................ 3
Background ............................................................................................................................................. 3
Scope ....................................................................................................................................................... 4
Key Dates ................................................................................................................................................ 4
Risks ........................................................................................................................................................ 4
Audit Opinion ......................................................................................................................................... 4
Recommendations ................................................................................................................................. 4
2. Objectives and Summary Assessment ........................................................................................... 5
3. Detailed Findings ............................................................................................................................ 7
Appendix 1 – Action Plan ..................................................................................................................... 10
Appendix 2 – Audit Opinion ................................................................................................................. 12
Contact Details
Internal Auditor: Moira Weatherstone 
Telephone: 01546 604146 
e-mail: moira.weatherstone@argyll-bute.gov.uk
www.argyll-bute.gov.uk

Page 3

3
Argyll and Bute Council – Internal Audit Report – Preparedness for IFRS16, May 2025
1. Executive Summary
Introduction
1. As part of the 2024/25 internal audit plan, approved by the Audit & Scrutiny Committee in
March 2024, we have undertaken an audit of Argyll and Bute Council’s (the Council) system of
internal control and governance in relation to Preparedness for IFRS16.
2. The audit was conducted in accordance with the Global Internal Audit Standards (GIAS) with our
conclusions based on discussions with council officers and the information available at the time
the fieldwork was performed. The findings outlined in this report are only those which have
come to our attention during the course of our normal audit work and are not necessarily all the
issues which may exist. Appendix 1 to this report includes agreed actions to strengthen internal
control however it is the responsibility of management to determine the extent of the internal
control system appropriate to the Council.
3. The contents of this report have been agreed with the appropriate council officers to confirm
factual accuracy and appreciation is due for the cooperation and assistance received from all
officers over the course of the audit.
Background
4. Leasing is an important method of financing the acquisition of assets for many organisations, this
can include assets as diverse as buildings, vehicles, machinery, and computers. In a lease the
lessor owns the asset and leases it to the user, the lessee.  This is an agreement which is legally
binding and generally non-cancellable without early termination penalties.
5. Leases can be classified into finance leases and operating leases. A finance lease usually involves
repayment to the lessor by a lessee of the full cost of the asset together with a return on the
finance provided by the lessor. The lessee enjoys substantially all the risks and rewards of
ownership of an asset.  An operating lease is an agreement whereby the lessor retains the risks
and rewards of ownership and normally assumes responsibility for repairs, maintenance and
insurance.  The lessee pays a rental for the hire of an asset for a period of time which is normally
substantially less than its useful economic life.
6. Under IFRS 16 (International Financial Reporting Standard) a lease is defined as a ‘contract, or
part of a contract, that conveys the right to use an asset for a period of time in exchange for
consideration’.  IFRS 16 defines a lease term as the non-cancellable period for which the lessee
has the right to use an underlying asset, meeting the definition of capital expenditure.
7. The introduction of IFRS 16 requires all leases or lease type arrangements, including ‘embedded
leases’ to be recognised on the balance sheet through a ‘right to use’ asset, meeting the
requirements of capital expenditure and together with the associated lease liability and impacts
to income and expenditure. Local Authorities are required to implement IFRS 16 from 1st April
2024, first reporting in the financial accounts for the year ended March 2025.

Page 4

4
Argyll and Bute Council – Internal Audit Report – Preparedness for IFRS16, May 2025
Scope
8. The scope of the audit was to review and assess the arrangements for the compliance with
IFRS16 as outlined in the Terms of Reference agreed with the Interim Head of Financial Services
on 13 March 2025.
Key Dates
9. The Terms of Reference provided provisional timescales for the review to take place, the actual
dates are noted below.
Exhibit 1 – Key Dates
Stage Actual
Date
Terms of Reference agreed 13 March 2025
Fieldwork Commencement 14 March 2025
Draft Report issued 8 May 2025
Management Comments received 8 May 2025
Final Report issued 14 May 2025
Audit and Scrutiny Committee 12 June 2025
Risks
10. The risks considered throughout the audit were:
 Audit Risk 1 - failure to have procedures in place to ensure compliance with IFRS 16
 Audit risk 2 - Failure to account for all leases to be included within the scope of IFRS 16
 Audit Risk 3 - failure to implement the requirements of IFRS 16
Audit Opinion
11. We provide an overall audit opinion for all the audits we conduct. This is based on our
judgement on the level of assurance which we can take over the established internal controls,
governance and management of risk as evidenced by our audit work.  Full details of the five
possible categories of audit opinion is provided in Appendix 2 to this report.
12. Our overall audit opinion for this audit is that we can take a substantial level of assurance.  This
means that internal control, governance and the management of risk is sound. However, there
are minor areas of weakness which put some system objectives at risk and specific elements of
residual risk that are slightly above an acceptable level and need to be addressed within a
reasonable timescale.
Recommendations
13. We have highlighted one low priority recommendations where we believe there is scope to
strengthen the control and governance environment.  These are summarised below:
 Robust procedures should be established and circulated to departments to ensure the
lease database is maintained and kept up to date

Page 5

5
Argyll and Bute Council – Internal Audit Report – Preparedness for IFRS16, May 2025
14. Full details of the audit findings, recommendations and management responses can be found in
Section 3 of this report and in the action plan at Appendix 1.
2. Objectives and Summary Assessment
15. Exhibit 1 sets out the control objectives identified during the planning phase of the audit and our
assessment against each objective.
Exhibit 1 – Summary Assessment of Control Objectives
Control Objective Link to Risk Assessment Summary Conclusion
1 Procedures and
systems have been
put in place to
ensure compliance
with IFRS 16
Audit Risk 1 Substantial Procedures and systems have been put
in place to ensure compliance with
IFRS 16. Initial work began in 2020 to
start the process of collating
information of leases within the
Council.  In June 2023 the Council’s
consultant agency commenced
preparation of a Decisions and Policies
draft paper and also an Action List to
assist with meeting our obligations
under IFRS 16. In February 2024 a new
Accounting Policies document was
finalised, this, applying to lease
arrangements where Argyll and Bute
Council is the lessee. In addition, in
April 2024, the Finance Manager
prepared an ‘Implementation of IFRS
16 Accounting for Leases’ document,
clearly outlining the requirements of
IFRS 16 are and what should be
included.  It also outlined what needs
to be done to meet our obligations
under IFRS 16. Although it was not
clear whether the ‘Implementation of
IFRS 16 Accounting for Leases’
document had been widely circulated
it formed part of the preparation for
the relevant Finance team. A
significant amount of work has been
undertaken from the end of 2024,
accelerating at the beginning of 2025
to ensure that we the Council has
captured all lease agreements which
fall within the scope of IFRS 16 and the
Code to provide assurance that
everything is accounted for in the
Councils Financial Statements or the
year end March 2025.
2 Communication
processes have been
put in place
Audit Risk 2 Substantial Systems and processes within the
Council over the years have resulted in
leases being arranged by departments,

Page 6

6
Argyll and Bute Council – Internal Audit Report – Preparedness for IFRS16, May 2025
between the
services and
Financial Services to
ensure all leases
within the scope of
IFRS 16 have been
accounted for
historical leases renewed and/or
carried forward, this has led to there
being no single complete register for
leases throughout the Council.  This
has resulted in the requirement to
gather and collate a significant amount
of information, setting up processes to
record the information gathered and
the necessity to analyse information
gathered to assess whether leases fall
within the scope of IFRS 16.  Extensive
communication and engagement with
Financial Service and the Departments
has been ongoing, with meetings
undertaken.  Communication process
were put in place, commencing in 2020
and continuing throughout the period
to 2025 in order to ensure all lease
information was gathered from
Departments, all third tier managers
being contacted in February 2025.  In
addition meetings were held
throughout 2025 with key officers,
contacts and in particular procurement
and estates.
3 Training has been
provided to relevant
staff members or
specialist services
procured in order to
ensure compliance
with  IFRS 16, with 
systems and
processes updated
accordingly
Audit Risk 3 Substantial Training has been provided to relevant
staff members to ensure there is a
clear understanding of IFS 16 and our
obligations on how to account for
lease agreements. Training has been
delivered by external providers and
has been provided internally to key
staff. Training commenced in 2020
with several sessions being delivered
by external providers and attended by,
predominantly, the Senior Business
Support Officer. These early training
events focussing mainly on introducing
and understanding IFRS 16.  In 2021 an
IFRS 16 Forum Webinar was attended
with further training and workshops
being delivered in 2023 and attended
by delegates for various department
within the Council.  Further training
was provided throughout 2024 and
2025.
16. Further details of our conclusions against each control objective can be found in Section 3 of this
report.

Page 7

7
Argyll and Bute Council – Internal Audit Report – Preparedness for IFRS16, May 2025
3. Detailed Findings
Procedures and systems have been put in place to ensure compliance with IFRS 16
17. All local authorities require to account for leases in accordance with IFRS 16 Leases rom 1 April
2024, first reporting in the financial statements for the year ended 31 March 2025. This, with the
exception where adaptations to fit the public sector have been made in the Code of Practice on
Local Authority Accounting in the United Kingdom (the “Code”).
18. Systems and processes within the Council over the years have allowed lease agreements to be
arranged by departments, historical leases renewed and/or carried forward. This has resulted in
there being no single complete register or central overview of leases held throughout the
Council.  In order to comply with IFRS 16 Finance Staff have undertaken a significant amount of
work gathering and setting up a processes to record lease information, in addition to analysing
information gathered to assess whether leases fall within the scope of IFRS 16.
19. Policies, processes and systems have been implemented and the Council is on track to fulfil their
obligations to comply with IFRS 16 for the financial year end 2025, with extensive work being
undertaken to gather, collate, analyse and record lease information.
20. Work on the implementation of IFRS 16 began in 2020, with an initial email being sent from the
Senior Business Support Officer, to key staff, requesting the identification of all items currently
rented or leased by the Council.  An attached spreadsheet, based on a spreadsheet provided by
the Council’s leasing advisors, showed the information required to be kept for each item rented
or leased by the Council. Following the initial email being circulated in 2020, a lease template
was sent out at every subsequent year end.
21. June 2023 the Council’s consultant agency commenced preparation of a Decisions and Policies
draft paper and also an Action List to assist with meeting our obligations under IFRS 16.
22. In November 2023, an email was sent to all Finance contacts, Principal Accountants,
administration Finance contacts (schools AFAs), finance departmental contacts and
procurement, highlighting that the deadline was fast approaching to have a new database up
and running to comply with IFRS 16. It outlined that the Senior Accounting assistant had been
tasked with gathering as much information and copies of all hired, rental and leased agreements
for the whole of the Council whether these agreements were under or over 12 months, that this
information was required to enable finance to start populating the new database which was to
come in to effect from 1 April 2024. It also highlighted that it was extremely important to have
accurate and up to date information and the importance of finance being kept informed going
forward of any changes to leases, hires, and contracts. A lease template was attached for
completion.
23. In February 2024 a new Accounting Policies document was finalised, this, applying to lease
arrangements where Argyll and Bute Council is the lessee. In addition, in April 2024, the Finance
Manager prepared an ‘Implementation of IFRS 16 Accounting for Leases’ document, clearly
outlining the requirements of IFRS 16 are and what should be included.  It also outlined what
needed to be done to meet our obligations under IFRS 16. Although it was not clear whether the

Page 8

8
Argyll and Bute Council – Internal Audit Report – Preparedness for IFRS16, May 2025
‘Implementation of IFRS 16 Accounting for Leases’ document had been widely circulated it
formed part of the preparation for the relevant Finance team. 
24. Due to a combination of circumstances and staff changes little progress was made during 2024
until mid-February 2025 when the Executive Director and Section 95 Officer circulated an email
to all third tier managers and above explaining IFRS 16, how it affects the services, what’s
changing, describing what a lease is, outlining who will decide whether arrangements contain a
lease, key dates and what is being asked of the services.  The email also stressed that the
requirement to notify financial services of any future lease agreements, any changes to existing
lease arrangements was ongoing and provided a link to a corporate email address set up for the
specific purpose.  Importantly a deadline of 25 February 2025 was set for the gathering of
information.
25. The Council has entered into a contract to use cloud software, LS2, as its lease register. The LS2
database will store all information required to meet the accounting and disclosure requirements
of IFRS 16 on an ongoing basis.  The LS2 database was recommended as a solution for the
management of leases. By the end of the financial year the Council had obtained, from
departments, an extensive list of contract arrangements that may indicate a lease for a Right of
Use an asset as defined by IFRS 16 and adapted by the Code. As information was received,
Financial Services assessed the information and applied the requirements of the Code to
determine if the arrangement was within the scope of IFRS 16 and, if so, whether any
exemptions or practical expedients could be applied. In addition, by the end of the financial year
2024-2025, Financial Services had substantially completed the list ready for forwarding to the
lease register provider, the initial upload of data being carried out by the provider.  The provider
has confirmed they are operating on around 2-week turnaround which the Council deems to be
satisfactory in terms of not hindering the production of the annual financial statements.
26. Continuing to meet the requirements of IFRS 16 will rely on good communication with
departments and a clear understanding of the processes involved for updating Financial Services
with new lease arrangements or changes to existing lease arrangements.  In addition, a large
part of the future recording and maintenance of the data base will be important to ensure
continued compliance with IFRS 16.  The Council’s Financial Services department will operate the
database post-transition/implementation phase, adding and amending lease data. In addition to
lease information that is provided to the team as new leases are entered into or contract
variations occur, information will be sought from other Council departments to confirm that no
changes have occurred other than those notified to Financial Services.
Action Plan 1
Communication processes have been put in place between the services and Financial Services to
ensure all leases within the scope of IFRS 16 have been accounted for
27. The success of gathering information relied on robust communication across the Council in
particular with finance staff, procurement staff, budget holders, the HSCP, LiveArgyll and
departments.  Regular communication and support has been provided by our Treasury advisors.
28. Communication process were put in place, commencing in 2020 and continuing throughout the
period to 2025 in order to ensure all lease information was gathered from Departments, all third
tier managers being contacted in February 2025.  In addition meetings were held throughout
2025 with key officers, contacts and in particular procurement and estates.

Page 9

9
Argyll and Bute Council – Internal Audit Report – Preparedness for IFRS16, May 2025
29. Budget holders were contacted and provided with guidance on IFRS 16 in relation to leases and
the importance of providing information to Financial Services. In addition, DMT’s (Department
Management Teams) were presented with information on what is required in terms of IFRS.
Training has been provided to relevant staff members or specialist services procured in order to
ensure compliance with IFRS 16, with systems and processes updated accordingly
30. Training has been provided to relevant staff members to ensure there is a clear understanding of
IFS 16 and our obligations on how to account for lease agreements. Training has been delivered
by external providers and has been provided internally to key staff.
31. Training commenced in 2020 with several sessions being delivered by external providers and
attended by, predominantly, the Senior Business Support Officer. These early training events
focussing mainly on introducing and understanding IFRS 16.  In 2021 an IFRS 16 Forum Webinar
was attended with further training and workshops being delivered in 2023 and attended by
delegates for various department within the Council.
32. During 2024 and 2025 a number of training courses were delivered by our leasing advisors,
attended by a number of finance staff.  A further technical workshop was delivered by CIPFA in
2025 which was attended by the Finance Manager.

Page 10

Appendix 1 – Action Plan
No Finding Risk Agreed Action Responsibility / Due Date
Low 4
Database Maintenance
Continuing to meet the requirements of IFRS 16 will rely
on good communication with departments and a clear
understanding of the processes involved for updating
Financial Services with new lease arrangements or changes
to existing lease arrangements.  
Failure to maintain robust
lease arrangement records
Policy document and training will
be developed to provide a
framework for ongoing
compliance with IFRS 16 Leases,
and will be reviewed and updated
as appropriate. 
Year-end processes will be
developed to provide additional
checks and Heads of Service will
be provided with a current list of
leases for their sign off.
Finance Manager
31 December 2025
31 May 2026

Page 11

11
Argyll and Bute Council – Internal Audit Report – Preparedness for IFRS16, May 2025
In order to assist management in using our reports a system of grading audit findings has been adopted to allow the significance of findings to be ascertained.  The definitions
of each classification are as follows:
Grading Definition
High A major observation on high level controls and other important internal controls or a significant matter relating to the critical success of the
objectives of the system.  The weakness may therefore give rise to loss or error.
Medium
Observations on less significant internal controls and/or improvements to the efficiency and effectiveness of controls which will assist in meeting
the objectives of the system.  The weakness is not necessarily substantial however the risk of error would be significantly reduced if corrective
action was taken.
Low Minor recommendations to improve the efficiency and effectiveness of controls or an isolated issue subsequently corrected.  The weakness does
not appear to significantly affect the ability of the system to meet its objectives.
VFM An observation which does not highlight an issue relating to internal controls but represents a possible opportunity for the council to achieve
better value for money (VFM).

Page 12

12
Argyll and Bute Council – Internal Audit Report – Preparedness for IFRS16, May 2025
Appendix 2 – Audit Opinion
Level of Assurance Definition
High
Internal control, governance and the management of risk are at a high standard. Only marginal elements of residual risk have
been identified with these either being accepted or dealt with. A sound system of control designed to achieve the system
objectives is in place and being applied consistently.
Substantial
Internal control, governance and the management of risk is sound. However, there are minor areas of weakness which put some
system objectives at risk and specific elements of residual risk that are slightly above an acceptable level and need to be
addressed within a reasonable timescale.
Reasonable
Internal control, governance and the management of risk are broadly reliable. However, whilst not displaying a general trend,
there are areas of concern which have been identified where elements of residual risk or weakness may put some of the system
objectives at risk.
Limited
Internal control, governance and the management of risk are displaying a general trend of unacceptable residual risk above an
acceptable level and placing system objectives are at risk. Weakness must be addressed with a reasonable timescale with
management allocating appropriate resources to the issues raised.
No Assurance
Internal control, governance and the management of risk is poor. Significant residual risk and/or significant non-compliance with
basic controls exists leaving the system open to error, loss or abuse. Residual risk must be addressed immediately with
management allocating appropriate resources to the issues.