Argyll and Bute Council
Comhairle Earra-Ghàidheal Agus Bhòid 
Customer  Services
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 605522
DX 599700 LOCHGILPHEAD
28 August 2025 
NOTICE OF MEETING 
A meeting of the AUDIT AND SCRUTINY COMMITTEE will be held ON A HYBRID BASIS IN
THE COUNCIL CHAMBERS, KILMORY, LOCHGILPHEAD AND BY MICROSOFT TEAMS on
THURSDAY, 4 SEPTEMBER 2025 at 2:00 PM, which you are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES 
2. DECLARATIONS OF INTEREST 
3. MINUTE OF PREVIOUS MEETING OF THE AUDIT AND SCRUTINY COMMITTEE,
HELD ON 12 JUNE 2025 (Pages 3 - 8) 
AUDIT ITEMS 
4. INTERNAL AUDIT AND COUNTER FRAUD SUMMARY OF ACTIVITIES (Pages 9 -
18)  
Report by Chief Internal Auditor 
5. INTERNAL AND EXTERNAL AUDIT REPORT FOLLOW UP 2025-26 (Pages 19 -
32)  
Report by Chief Internal Auditor 
6. INTERNAL AUDIT REPORTS TO AUDIT AND SCRUTINY COMMITTEE 2025/2026
(Pages 33 - 58)  
Report by Chief Internal Auditor 
• Education Maintenance Allowance
• Music Services 
7. EXTERNAL AUDIT PROGRESS REPORT 
Verbal Update by Forvis Mazars 
SCRUTINY ITEMS
Public Document Pack

Page 2

8. INTERNAL AUDIT - ANNUAL SELF-ASSESSMENT (Pages 59 - 62)  
Report by Chief Internal Auditor 
9. CORPORATE COMPLAINTS HANDLING - ANNUAL REPORT 2024/25 (Pages 63 -
102)  
Report by Executive Director with responsibility for Legal and Regulatory Support 
10. INFORMATION REQUESTS - ANNUAL REPORT 2024/25 (Pages 103 - 108)  
Report by Executive Director with responsibility for Legal and Regulatory Support 
11. AUDIT AND SCRUTINY COMMITTEE ANNUAL REPORT 2024/25 (Pages 109 -
118)  
Report by Chair 
12. STRATEGIC RISK ASSURANCE MAPPING (Pages 119 - 136)  
Report by Chief Internal Auditor 
13. STRATEGIC RISK REGISTER (Pages 137 - 144)  
Report by Chief Executive 
14. TREASURY MANAGEMENT UPDATE - QUARTER ENDED 30 JUNE 2025 (Pages
145 - 162)  
Report by Interim Head of Financial Services 
REPORT FOR NOTING 
15. WORKPLAN (Pages 163 - 164)  
For noting and updating 
Audit and Scrutiny Committee 
Janice Wason Hall (Chair) Councillor Daniel Hampsey
Councillor Graham Hardie Councillor Fiona Howard
Councillor Reeni Kennedy-Boyle Councillor Gary Mulvaney (Vice-Chair)
Councillor Andrew Vennard   
Contact: Lynsey Innis, Committee and Democratic Services Officer  Tel:  01546 604338

Page 3

MINUTES of MEETING of AUDIT AND SCRUTINY COMMITTEE held BY MICROSOFT TEAMS 
on THURSDAY, 12 JUNE 2025 
Present: Janice Wason Hall (Chair) 
Councillor Daniel Hampsey
Councillor Graham Hardie
Councillor Fiona Howard 
Councillor Reeni Kennedy-Boyle
Councillor Andrew Vennard 
Attending: Paul MacAskill, Chief Internal Auditor
Carolyn Earl, Interim Head of Financial Services
Shona Barton, Governance Manager
Mhairi Weldon, Senior Audit Assistant
Jane Fowler, Head of Customer and Support Services
Iain Jackson, Governance Risk and Safety Manager
Mark Outterside, Director, Forvis Mazars
Peter Hawkins, Manager, Forvis Mazars
James Gow, Head of Finance and Transformation, HSCP
Martin Caldwell, Chair of Complaints Scrutiny Panel 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were intimated on behalf of Councillor Gary Mulvaney. 
2. DECLARATIONS OF INTEREST 
Janice Wason Hall, Chair of the Audit and Scrutiny Committee declared a financial interest
in relation to item 7(a) (Internal Audit Report – Short - Term Lets) due to her being a Short
Term Let business owner. She advised that she would leave the meeting and take no part
in the consideration of this item. 
3. MINUTES 
The Minute of the previous meeting, held on 13 March 2025, were approved as a correct
record. 
4. ANNUAL AUDIT PLAN FOR YEAR ENDING 31 MARCH 2025 
The Committee gave consideration to a report which presented the Audit Strategy
Memorandum for Argyll and Bute Council for the year ending 31 March 2025.  The report
provided a summary of the audit approach taken by external auditors, Forvis Mazars LLP
and highlighted significant audit risks and areas of key judgements. 
Decision 
The Audit and Scrutiny Committee considered and noted the contents of the report. 
(Reference:  Report by Mazars LLP dated June 2025, submitted) 
5. INTERNAL AUDIT AND COUNTER FRAUD SUMMARY OF ACTIVITIES 
The Committee gave consideration to a report providing a summary of Internal Audit
activity and progress during quarter four of 2024 against the following areas:-
Page 3 Agenda Item 3

Page 4

Audits in Planning/in Progress
• 2024/25 Audit Plan progress
• 2024/25 Individual Audits undertaken
• 2025/26 Audit Plan progress
• Scrutiny
• Counter Fraud
• Continuous Monitoring Programme Testing
• Performance Indicators 
Decision 
The Audit and Scrutiny Committee reviewed and endorsed the Summary of Activities
report. 
(Reference: Report by Chief Internal Auditor, dated 12 June 2025, submitted) 
6. INTERNAL AND EXTERNAL AUDIT REPORT FOLLOW UP REPORT 2024-
2025 
Consideration was given to a report which provided an update on all open actions as at 31
March 2025. The report included information on actions where the agreed implementation
date had been rescheduled. 
Decision 
The Audit and Scrutiny Committee endorsed the contents of the report. 
(Reference: Report by Chief Internal Auditor dated 12 June 2025, submitted) 
Janice Wason Hall, having declared an interest in the Short-Term Lets report in the
following item of business, left the meeting and took no part in the consideration of that
report. 
The Committee agreed unanimously that Councillor Reeni Kennedy-Boyle take the
position of Chair for the consideration of the Short-Term Lets report only. 
On conclusion of the Short-Term Let report Janice Wason Hall returned to the
meeting and took the Chair. 
7. INTERNAL AUDIT REPORTS TO AUDIT AND SCRUTINY COMMITTEE
2025-26 
Consideration was given to a report containing the action plans in relation to the following
seven audits:- 
Short-Term Lets
Asbestos Management
Bridges Asset Management
Trading Standards
External Placements
IFRS 16 – Leasing
Disclosure Checks – PVG – LiveArgyll
Page 4

Page 5

Decision 
The Audit and Scrutiny Committee reviewed and endorsed the summary report and detail
within each individual report. 
(Reference: Report by Chief Internal Auditor dated 12 June 2025, submitted) 
8. INTERNAL AUDIT  ANNUAL REPORT 2024-2025 
The Committee gave consideration to a report which outlined the work undertaken by
Internal Audit in respect of the Annual Audit Plan 2024/25 and advised of the contents of
the Chief Internal Auditor’s (CIA) independent annual opinion on the effectiveness of the
Council’s risk management, internal control and governance processes.   
The Chair, on behalf of the Committee, took the opportunity to recognise the volume of
work undertaken by the Internal Audit team and thanked them for their continued hard
work and support.   
Decision 
The Audit and Scrutiny Committee endorsed the content of the report and the associated
annual opinion of the Chief Internal Auditor. 
(Reference:  Report by Chief Internal Auditor, dated 12 June 2025, submitted) 
9. SCRUTINY REPORT ON THE MONITORING AND MANAGING OF
COMPLAINTS 
The Committee gave consideration to a report which advised that the complaints scrutiny
review had been carried out as per the 2024/25 scrutiny plan agreed by Committee in
March 2024. The complaints process was chosen for inclusion in the scrutiny priorities for
2024/25 due to the importance of having a complaints process which met expected best
practice. 
The Chair on behalf of the Committee thanked Martin Caldwell for all his hard work and
involvement with the Audit and Scrutiny Committee over the years. 
Decision 
The Audit and Scrutiny Committee agreed:- 
1. the Draft Complaints Scrutiny Report; and 
2. to refer the report to the Council’s Executive Leadership Team to take forward the
recommendations in the report. 
(Reference:  Report by Chief Internal Auditor, dated 12 June 2025, submitted) 
The Chair announced, and the Committee agreed, to adjourn the meeting for a 10 minute
comfort break and re-convened at 12.30pm with all Members present with the exception of
Councillor Daniel Hampsey. 
Page 5

Page 6

10. VERBAL UPDATE BY CHAIR OF SCRUTINY PANEL 
The Chair advised that the new Panel had been established and the current review will be
commenced shortly. A more detailed update will be provided at the next meeting of the
Committee. 
11. LOCAL GOVERNMENT IN SCOTLAND - FINANCIAL BULLETIN 2023-24 
Consideration was given to a report which highlighted the key messages and
recommendations contained within the Accounts Commission report. Information on
Argyll and Bute Council’s position in respect of key facts and analysis across Scotland,
and an assessment of the authority’s current position in respect of compliance with the
report’s recommendations was also provided. 
Decision 
The Audit and Scrutiny Committee noted the contents of the report. 
(Reference: Report by Section 95 Officer dated 11 March 2025, submitted) 
12. TREASURY MANAGEMENT ANNUAL REPORT 2024-25 
Consideration was given to a report which advised that Local Government (Scotland) Act
2003, and supporting regulations, requires local authorities to have regard to the CIPFA
Code of Practice on Treasury Management (revised 2021) and that the code requires full
Council to receive an annual Treasury Management Strategy Statement, including the
Annual Investment Strategy for the year ahead. 
Decision 
The Audit and Scrutiny Committee:- 
1. Considered the Treasury Management Annual Report 2024/25 and noted the
technical breach to the bank deposit limit outlined at paragraph 5.2.5 of the
submitted report. 
2. noted a required amendment to the actual Capital Financing Requirement (CFR),
given within the report at paragraph 5.3.15, in respect of the actual 2024/25 Service
Concession Annual Gain.  This increases both the actual CFR movement during
the year and the balance as at 31 March 2025 by £5m.  The revised CFR as at 31
March 2025 is noted as £349m; and 
3. was content to note the detail and to refer the report, which will be updated on this
basis, to Council for noting. 
(Reference: Report by Section 95 Officer dated 4 June 2025, submitted) 
13. LOCAL GOVERNMENT BENCHMARKING FRAMEWORK (LGBF): 2023/24 
Consideration was given to a report which provided a high level summary of Argyll and
Bute Council’s performance as reported in the Local Government Benchmarking
Framework (LGBF) data.   
Decision
Page 6

Page 7

The Audit and Scrutiny Committee considered the contents of the report and noted the
trend of net improvement across the Council’s functions. 
(Reference:  Report by Executive Director with responsibility for Customer Support
Services, dated 16 May 2025, submitted) 
14. STATEMENT OF GOVERNANCE AND INTERNAL CONTROL 
Consideration was given to a report which advised that the statement of governance and
internal control for 2023/24 had been reviewed and updated which allowed the Council to
include a statement of governance and internal control in the Annual Accounts for
2024/25. 
Decision 
The Audit and Scrutiny Committee:- 
1. Noted the updates in the Action Plan for 2024/25. 
2. Considered and approved the content of the areas for further development for
2025/26; and 
3. Considered and approved the draft statement of governance and internal control for
2024/25. 
(Reference: Report by Section 95 Officer and Executive Director with responsibility for
Legal and Regulatory Support dated June 2025, submitted) 
15. DRAFT AUDIT AND SCRUTINY COMMITTEE WORKPLAN 
In order to facilitate forward planning of reports to the Audit and Scrutiny Committee,
Members considered the outline Audit and Scrutiny workplan. 
Decision 
The Audit and Scrutiny Committee agreed to note the outline workplan.   
(Reference:  Audit and Scrutiny Workplan, dated 12 June 2025, submitted) 
Page 7

Page 8

This page is intentionally left blank

Page 9

ARGYLL AND BUTE COUNCIL  AUDIT & SCRUTINY COMMITTEE   
FINANCIAL SERVICES  04 SEPTEMBER 2025  
INTERNAL AUDIT AND COUNTER FRAUD SUMMARY OF ACTIVITIES 
1. SUMMARY  
1.1 The objective of the report is to provide the Audit and Scrutiny Committee (the
Committee) with a summary of Internal Audit activity and progress during quarter
one of 2025/26.  
1.2 Core activities together with a progress update statement are shown below: 
• 2024/25 Audit Plan progress: The plan is complete and all items reported to
the Committee. 
• 2025/26 Individual Audits undertaken: Two audits have been completed
during the period, one has been assessed as providing high assurance and
one substantial assurance. In addition, two pieces of audit verification work
were undertaken relating to the SPT claim and Local Government
Benchmarking Framework (LGBF). (Where HSCP and LiveArgyll Audits are
included, these are provided for information only). 
• 2025/26 Audit Plan progress: The plan is currently on track. In the event that
this position was to change, we will flag it to the Committee as part of the
quarterly updates. 
• Scrutiny: Planned work for 2025/26 has been agreed by the Committee along
with those who will serve on the Panel, and work on this will commence later
in the calendar year. 
• Counter Fraud: The Counter Fraud Team (CFT) is continuing to rebill council
tax accounts and recovery of funds is underway.  All other aspects and
referrals are being considered, investigated and evaluated and the Counter
Fraud Team remain vigilant to protect our public purse. The established CFT
team member is on secondment to Housing for career and personal
development for a two year period.  The CFT have obtained a member of
staff, again on secondment for the same time period who has recently
completed the CIPFA Fraud Specialist Course. The team lead is currently
progressing toward the completion of year 3 of a Master in Accountancy
course.   
• Continuous Monitoring Programme Testing: A number of auditable units
are subject to continuous testing. There have been two new issues which we
have identified this quarter. 
• Performance indicators: Current status is green / on track.   
Page 9 Agenda Item 4

Page 10

2. RECOMMENDATIONS  
2.1 To review and endorse the Summary of Activities report.   
3. DETAIL  
3.1 Two audits have been completed since the previous Committee in June 2025. 
Audits Completed 
• Education Maintenance Allowance (EMA)
• Music Services 
Verification Audit Work Completed 
• SPT Annual Claim – See section 3.6 for further details
• Local Government Benchmarking Framework – See section 3.7 for further
details 
Audits in Planning / in Progress
reported to a future meeting of the Committee. 
• Self-Directed Support (Draft Report – awaiting management response)
• Payroll – iTrent
• ICT Disaster Recovery
• School Residential Trips
• Capital Programme – Management and Monitoring
• Building Cleaning
• Oban Airport
• HSCP Audits  
3.2 In addition to those already in progress, indicative audits planned for Q3 2025/26
are: 
• Street Lighting
• Performance Management Arrangements and Reporting   
2025/26 Audit Plan  
3.3 Work is ongoing and is currently on track at this point in time.   
Scrutiny  
3.4 It was agreed by the Committee that the chosen subject area for the 2025/26
scrutiny review would be on the Council’s preparedness for the Bio-Municipal
Waste (BMW) Landfill Ban.  A background and scoping document will be prepared
and issued to the Panel members for agreement in due course. We anticipate that
this will commence towards the end of the calendar year.   
Page 10

Page 11

Counter Fraud  
3.5 The CFT is progressing well with both team members fully CIPFA accredited fraud
investigators. The current investigator has taken on a 2 year secondment to empty
homes for further skills development and this is due to come to an end in
September 2025 with discussions ongoing regarding transitional arrangements. 
The backfill of the investigator post was again on a secondment basis which is also
coming to an end.  The seconded member of staff has completed and passed the
CIPFA Fraud Specialist course. Efforts are underway to maintain service delivery
for the terminations of both secondments. 
Routine work continues and is progressing to track the full income due and to be
recovered as part of this ongoing work. Based on the amount of additional billing,
even accounting for a degree of non-recovery, the indications are that the team are
anticipating exceeding their annual target. In addition, the team are raising
awareness of the Council’s zero tolerance to fraud and this will help act as a
deterrent to fraud being perpetrated in the first place. 
Visits continue to play a vital role in the CFTs proactive and reactive work.  Recent
visits have taken place in Islay, Dunoon, Tarbet and surrounding villages. 
Investigations and visits will take place in the outer islands toward the autumn. 
Both officers continue to be proactive and make visits when information is received
via the online portal and other islands will soon be visited. 
The CFT continue to link in with Internal Audit and Debt Recovery, and where
necessary to assist, trace persons and open communication to long term debts for
recovery. Several cases have resulted in large scale rebilling. 
Second homes and Non-Domestic Rates are playing larger roles in the CFT’s 
investigations with several claims already adjusted.  These will remain proactive
areas. 
The CFT now have an established referral system in place from council tax teams
and have already liaised with this team going forward into 2025 for the review of
the second and holiday home tax changes.  The aim is to assist with the single
person discount review within 2025. 
The CFT continue to work closely with the empty homes team to support each
other in our remits.  Work and communication between each department is key in
identifying and finding appropriate solutions to enable empty homes to return to
residency or open market. 
The NFI exercise continues to be a routine work area for the CFT.  The 2024/2025
exercise has extra data to be uploaded this September and work on this element
will commence when this has been matched and released.  The initial part of the
matching exercise is coming to a close.  Any remedial or conclusive work will be
completed when and where appropriate.  The system is reviewed periodically for
any updates 
Since the inception of the CFT a total of £1,514,262 has been rebilled and
£950,168 has been recovered. A recovery percentage of 62% has been achieved
Page 11

Page 12

at the last review of the figures. Recent large rebilling has been passed to other
agencies, and this takes time to process and progress payment plans. 
Additional Updates from Quarter Two  
3.6 The Strathclyde Concessionary Travel Scheme (SCTS) is founded on the
provision of the Transport Act 1985, which allows authorities to make
concessionary travel schemes in certain circumstances.  The SCTS is
administered by Strathclyde Partnership for Transport (SPT) on behalf of the
SCTS Joint Committee consisting of 12 local authorities to issue travel cards which
entitles the holder to discounted travel by reason of age or disability, and provide
reimbursement of fare reductions on rail, subway and ferry services.  Argyll and
Bute Council operates two ferry routes that qualify for concessionary fares within
the SCTS.  Internal Audit are required to provide a certificate of accuracy on an
annual basis to confirm that the details pertaining to the number of concessionary
passengers carried and the equivalent standard fares are consistent with the
quarterly claims for reimbursement of the difference between the concessionary
fare charged and the standard fare.  The data and supporting information for
quarter 4 2024/25 claim was provided to Internal Audit for review and found to
provide an accurate representation of the number of passengers and value of fares
charged, and the reimbursement value was found to have been calculated in
accordance with the SCTS requirements.  The certificate of accuracy was
therefore issued on 11 June 2025.  
3.7 A sample of data in respect of the Statutory Performance Indicators (SPI’s) that are
required to be returned by councils as part of the Local Government Benchmarking
Framework (LGBF) must be reviewed by Internal Audit for submission to the
Improvement Service by 31 August each year.  Internal audit carry out this work in
collaboration with colleagues in performance management.  Internal Audit was
provided with data from which to select indicators for review on 25 June and as
large variances were reported in ‘Other Local Government Employees – Sickness
Absence – including Covid, ‘Sport and Leisure Management’, and ‘Museum
Services’ these indicators were selected for review.  ‘Teachers – Sickness
Absence – including Covid’ was also reviewed alongside Teachers data due to
large numbers involved. ‘Council Tax Collection’ was selected as this has risen in
both the past two years and ‘Council Tax Income’, as this has slightly dipped this
year and both indicators use similar data sources. Some minor errors were
identified in the Sport and Leisure Management, and Museum Services, these
were immaterial and did not require to be amended prior to submission to the
Improvement Service. The supporting data were found to contain a known issue
and an incorrect calculation. The relevant officers are progressing with plans to
ensure this is not repeated in future.  Therefore, Internal Audit are offering a
substantial level of assurance for all 6 of the indicators reviewed.  
3.8 The Council has entered a ten-year programme to deliver the Rural Growth Deal
(RGD) for Argyll and Bute.  The Council, as the accountable body for this
programme is required to allocate and account for distribution of the funding to
partners, third parties and other bodies in accordance with the approved
governance arrangements.  The Council’s Chief Internal Auditor has been
appointed to coordinate audit activity throughout the programme, this will include
liaison with partner auditors to obtain annual confirmation of regular and planned
reviews of grant funded activities and a specific review of RGD within the
Council’s Annual Audit Plan at least every two years.  Discussions regarding the
audit input required have taken place and the first review will be included within
Page 12

Page 13

the 2025/26 Internal Audit Plan. We will closely monitor the additional work
associated with this appointment going forward and determine whether
additional resources may be required.  
3.9 Our work as the contracted Internal Auditors for the HSCP has been progressing
well and priority has been given in this area due to the availability of staff, work has
completed for 2024/25 and commenced for 2025/26. We will continue to monitor
and report progress to the HSCP’s Audit and Risk Committee in relation to the
implementation of recommendations made in previous reports. 
3.10 Internal Audit staff continue to increase their skills and ultimately aim to complete
appropriate professional qualifications at the end of their training programmes.
Internal Audit have two staff members who are undertaking formal professional
training; training is at differing stages but is progressing as expected at this time.
The aim is to develop and retain professional staff on the completion of the
qualifications and increase resilience within the service.   
Continuous Monitoring  
3.11 Our continuous monitoring programme is generally focused on transactional type
activity. Standard audit tests are applied which are relevant to each auditable unit.
Control design tests look at whether the controls in place adequately address the
potential risk event. There has been two new findings within the quarter that
require to be reported. 
Table 2: Continuous Monitoring Findings 
Auditable
Area
Areas Tested Issues Identified Management comment /
action
Budgeting Engagement
logs for cost
centres
Engagement records
not maintained 
Staff will ensure that an
appropriate record is
maintained going forward.
This is a minor issue but will
be rectified.
Payroll Overtime High levels of overtime Management have advised
that an error had been made
in the overtime payment and
details have now been
passed to Payroll who will
make arrangements to
recover the overpayment
element in full.   
3.12 A follow up process is in place whereby management are advised of continuous
monitoring findings and, where appropriate, requested to take remedial action. 
There are currently no outstanding follow-up points arising from previous testing. 
Due to the volume of continuous monitoring tests carried out the decision was
made to report by exception only.     
National Reports  
3.13 A follow up process for national reports is in place whereby management are
advised of national reports published and asked to confirm what, if any, action is
Page 13

Page 14

planned as a result of the report.  Table 2 details the national reports issued during
quarter four of 2024/25 due to be reported in quarter one of 2025/26.  
Table 3: National Reports 
National Report Issued To Detail Management response/
Action taken
Sustainable
Transport:
Reducing car
use
Executive
Director Kirsty
Flanagan
A lack of
leadership has
meant the Scottish
Government has
made minimal
progress towards
its challenging
climate change
goal of reducing
car use.
All councils in
Scotland have seen
an increase in car
kilometres driven.
The Council works closely with
Hi Trans and a new Regional
Transport Strategy has been
approved that promotes the use
of public transport and active
travel. The council is about to
consult on a new active travel
strategy to inform how new
active travel routes will be
delivered in future years.  At the
moment the majority of funding
to deliver active travel
improvements comes through
competitive bids and we have
been successful in relation to
projects in Kintyre, Roseneath
and Islay.  Further bids have
been made. The council has
also approved a further
consultation on transport issues
that will inform a new local
transport strategy.  The issue of
reducing car usage will be
examined through this however
given we are a predominately
rural authority with limited public
transport options reducing car
usage will be a challenging task
going forward. 
National Fraud Initiative (NFI)  
3.14 NFI data matching involves comparing computer records held by one body against
other computer records held by the same or another body to identify potentially
fraudulent claims and payments to be identified.  Note though that the inclusion of
personal data within a data matching exercise does not mean that any specific
individual is under suspicion. Where a match is found it indicates that there may be
an inconsistency which requires further investigation. No assumption can be made
as to whether there is fraud, error or other explanation until an investigation is
carried out.  A reminder process is in place to ensure that matches are reviewed
on a timely basis.  
3.15 The previous NFI exercise has been completed and results are being compiled by
Audit Scotland.  Any follow up matches will be addressed if necessary.
This exercise was conducted throughout the year by officers and matches checked
and closed accordingly.  NFI provided additional data releases over the course of
the exercise and matches are addressed when these become available.  
Page 14

Page 15

Existing users have been reviewed and new users added where requested, all
users have been and will continue to be informed that matches are available for
review and progress will be monitored monthly by the Counter Fraud team and
reported quarterly to the Audit and Scrutiny Committee.
New HMRC data has been uploaded and released back to us, and teams have
been contacted to start matching this data.    
3.16 The new NFI exercise for 2024/25 has commenced with the data uploads so far
submitted to the Cabinet office for review and therefore data matching when
released.  The new NFI matches will appear in the table below as and when they
have been released and checked. 
Table 4: National Fraud Initiative Progress at 03/08/2025
Operational
Area
Total
Matches
Recommended/Very
High / High/ Medium
Risk Matches
Matches
Complete 
*
WIP
Match Description
CT to Elect
Register 
2422 0 2422 0 CT records to Electoral
Register/ other data sets to
ensure discount awarded
to only those living alone
aged over 18, taking into
account disregarded
occupants.  (CT to other
Datasets will not be
progressed further due to
poor quality data)
CT rising
18s 
85 0 3 0
CT to HMRC
Household
Composition
1106 0 0 0
Housing
Benefits
13 9 9 0 HB records to records in
other authorities / other
datasets including student
loans, payroll and pensions
to identify undeclared
income and capital.
Payroll 300 107 51 0 Payroll records to other
datasets including other
payrolls and pensions to
ensure employee is not
receiving additional
income.
Blue Badges 200 200 183 0 Blue badge records to
DWP data to identify
deceased claimant with
valid badge.
Housing
Waiting list
262 259 199  0 Housing waiting list
records to other
organisations HBCTR and
tenant data to identify
undisclosed changes in
circs or false info.
Council Tax
Reduction
638 174  87 2 CTR records with records
in other authorities / other
datasets including; student
loans, payroll and pensions
to identify undeclared
income and capital
Creditors 2340 0 1126 0  Analyses Creditors data to
identify possible duplicate
vendors and payments,
VAT errors or fraud and
Page 15

Page 16

multiple vendors sharing a
bank account.
Procurement 67 0 14  0 Payroll records to
Companies House and
creditors’ data to identify
employees who appear to
have a personal interest in
a company that the
authority has traded with.
Business
Rates
154  0 154 0 Business rates records
within and between
authorities to identify
those fraudulently claiming
small business bonus
scheme and grants 
* Work in Progress
Overall Summary of Matches 
Matches
Complete
Work In
Progress
Cleared Frauds Errors Total
Value 
£
Recovering Recovering
Value 
£ 
4248  2 4173 0 75 58,756 0 0 
Internal Audit Development  
3.17 The table below details progress against the action points in our Internal Audit
development plan.  
Table 5: Internal Audit Development Key Actions: updated 31/3/25. 
Area For
Improvement
Agreed Action Progress
Update
Timescale
Review Continuous
Monitoring
Programme
The Continuous Monitoring
Programme will be reviewed to
assess value of existing tests carried
out and establish where these can be
enhanced with greater use of data
analytics .
In progress December
2025 
3.18 Internal Audit scorecard data provided below are aligned to those for internal audit
in the Financial Services service plan.  All indicators are shown as currently being
on track.   
Page 16

Page 17

Table 6: Internal Audit Team Scorecard  
Internal Audit Team Scorecard 2025– 26 – FQ1 25/26 (as at June 2025)
BO115 We Are Efficient and Cost Effective    
Internal Audit Level of Satisfaction
Actual  100% G 
Target 80%
Review of Strategic Risk register
Status Complete G 
Target Complete
Percentage of audit plan completed
Status 100% G 
Target 80%
Percentage of audit recommendations accepted by
management
Actual  100%
G
Target 100% 
4 CONCLUSION  
4.1 The 2025/26 audit plan is progressing as anticipated at this stage in the year,
together with the Counter Fraud Team continuing with visits and pro-active work
throughout Argyll and Bute.  
5 IMPLICATIONS
5.1 Policy – Internal Audit continues to adopt a risk based approach to activity
5.2 Financial – None
5.3 Legal – None
5.4 HR – None
5.5 Customer Service – None
5.6 Risk – None
5.7 Climate Change – None
5.8 Fairer Scotland Duty – None
5.9 Equalities – protected characteristics – None
5.10 Consumer Duty – None 
5.11 Island Communities – None
5.12 Children’s Rights and Wellbeing – None 
For further information please contact Internal Audit (01546 604108)
Paul Macaskill
Chief Internal Auditor
4 September 2025
Page 17

Page 18

This page is intentionally left blank

Page 19

ARGYLL AND BUTE COUNCIL  AUDIT AND SCRUTINY COMMITTEE                                                            
FINANCIAL SERVICES  4 September 2025 
INTERNAL AND EXTERNAL AUDIT REPORT FOLLOW UP 2025-26 
1.0 INTRODUCTION 
1.1 Internal and external audit reports include an action plan with a
management response establishing the agreed action, timescale and
responsible officer. Internal Audit record these in a database and, on a
quarterly basis, follow them up to ensure they are being progressed. 
1.2 This report updates the committee on all open actions as at 30 June 2025
including information on actions where the agreed implementation date
has been rescheduled.   
2.0 RECOMMENDATIONS 
2.1 To endorse the contents of the report. 
3.0 DETAIL 
3.1 The two tables below provide a numerical summary of open audit actions
with a split between actions due by and due after 30 June 2025. 
3.2 Appendix 1 provides further detail on actions that have been delayed and
rescheduled or superseded. 
Page 19 Agenda Item 5

Page 20

Table 1 – Actions due by 30 June 2025
SMT/Service
Complete
Delayed/
Rescheduled
Total
Internal Audit   
DH – Education Performance & Improvement 0 2 2
DH – Legal & Regulatory Support 0 1 1
KF – Development & Economic Growth 0 3 3
KF – Roads & Infrastructure Services 0 10 10
KF – Financial Services 2 0 2
H&SCP (SW) – Adult Services (Mental Health Learning
Disability, Addictions & Lifelong Conditions)
3 1 4
H&SCP (SW) – Children and Families and Criminal
Justice
2 0 2
LiveArgyll 1 0 1
External Audit   
Nil   
TOTAL 8 17 25 
Table 2 – Actions due after 30 June 2025
SMT/Service
Complete
Superseded
On Course
Total
Internal Audit    
DH – Commercial Services 0 0 2 2
DH – Education Performance & Improvement 0 0 5 5
DH – Legal & Regulatory Support 0 0 7 7
KF – Development & Economic Growth 0 0 1 1
KF – Roads & Infrastructure Services 1 0 3 4
KF – Financial Services 1 1 1 3
H&SCP (IJB) – Adult Services (Older Adults & Community
Hospitals
0 0 1 1
H&SCP (IJB) – Strategic Planning & Performance 0 0 8 8
H&SCP (SW) – Adult Services (Mental Health Learning
Disability, Addictions & Lifelong Conditions)
0 0 1 1
H&SCP (SW) – Adult Services (Older Adults & Community
Hospitals
1 0 1 2
H&SCP (SW) – Children and Families and Criminal
Justice
1 0 7 8
H&SCP (SW) – Finance/Transformation 0 0 3 3
H&SCP (SW) – Strategic Planning & Performance 0 0 2 2
LiveArgyll 0 0 1 1
External Audit    
Nil    
TOTAL 4 1 43 48
Page 20

Page 21

4.0 CONCLUSION 
4.1 Satisfactory progress continues to be made implementing audit actions. 
5.0 IMPLICATIONS 
5.1 Policy – None
5.2 Financial – None
5.3 Legal – None
5.4 HR – None
5.5 Customer Service – None
5.6 Risk – None
5.7 Climate Change – None
5.8 Fairer Scotland Duty – None
5.9 Equalities – protected characteristics – None
5.10 Consumer Duty – None 
5.11 Island Communities – None
5.12 Children’s Rights and Wellbeing – None 
Paul MacAskill
Chief Internal Auditor
4 September 2025                                                  
For further information contact: Paul MacAskill, 01546 604108
Paul.macaskill@argyll-bute.gov.uk 
APPENDICES
Appendix 1 – Action Plan Points Delayed & Rescheduled or superseded
Page 21

Page 22

Appendix 1 - Action Plan Points - Delayed and Rescheduled or Superseded 
Action Plan Points due by 30th June 2025 
Service, Report, Plan no. & Finding Agreed Action Dates Management Comment Responsible Officer
Medium
EDUCATION PERFORMANCE & IMPROVEMENT 
SCHOOL FUNDS & MANAGEMENT OF FUNDS 
4. Practical Training   
With the exception of the LEON module, no
formal training programme or support is in
place for those involved in the management and
administration of school funds. This is in part
reflected in the inconsistent practices across
schools visited.  Practical training should be
developed and provided for head teachers,
committee members and clerical staff involved
in the management and administration of
school funds. 
Training on school fund procedures
will be carried out. Who will carry
out the training will be clarified as
part of the management circular
review. 
30/06/2025
31 Dec 2025 
The training will be developed
over the summer for
implementation with the new
School Fund Committees from
August. 
Delayed and Rescheduled 
School Services Support
Manager 
High
EDUCATION PERFORMANCE & IMPROVEMENT 
SCHOOL FUNDS & MANAGEMENT OF FUNDS 
5. Grants   
The Circular states that schools must ensure
that the Education Authority has knowledge of
any grant application for monies made to third
parties that involve the school fund.  There is no
established process for this.  
· The Circular should be updated to state that
AFAs must be consulted prior to grant
applications being submitted to ensure that the
applicant is the correct beneficiary and that
income and expenditure is accurately recorded.  
Circular will be updated to reflect
an instruction that AFAs must be
consulted prior to grant
applications being submitted. A
central grant register for grants
over £1,500, covering all schools,
will be created and maintained.
Any grants over £1,500 will have to
be reported to Finance and this will
be reflected in the updated
circular. 
30/04/2025
31 Dec 2025 
Whilst a template is in place for
a grant register, not all grants
are captured at this
stage.  Work is ongoing to
ensure all grants are registered
centrally. 
Delayed and Rescheduled 
School Services Support
Manager 
Page 22

Page 23

Medium
DEVELOPMENT & ECONOMIC GROWTH 
PLANNING 
1. Staff Training 
Once the incorporation of the IDOX
project is completed a training
schedule will be introduced
covering both the new system and
other relevant areas such as the
National planning for framework 4.
31/03/2024
31/12/2024
31/03/2025
30/06/2025
30 Sep 2025 
Planning staff have access to a
range of training opportunities
throughout the year.  We are
operating a flexible and
dynamic range of training
options which can be accessed
Process and
Productivity
Improvement Officer 
Service, Report, Plan no. & Finding Agreed Action Dates Management Comment Responsible Officer
· A central grant register for grants over £1,500,
covering all schools, should be created and
maintained. 
Low
LEGAL & REGULATORY SUPPORT 
Freedom of Information 
3. Publication Scheme   
The Council’s Publication scheme not updated
since May 2021, and the Council’s website was
updated in 2023.  A review of the Council’s
Publication scheme should be undertaken,
including checking that any links to information
are still working. 
Review and Update Publication
Scheme, publish on Website and
provide link to Audit. 
31/03/2025
30/06/2025
30 Sep 2025 
Report still to be considered by
ELT. Subject to approval, an
anticipated report will be
published by end of July. 
Delayed and Rescheduled 
Compliance &
Regulatory Officer 
Low
DEVELOPMENT & ECONOMIC GROWTH 
Private Sector Housing Grants & Adaptions 
3. Procedure Notes and Shared Documents
While the vast majority of requirements are
included there would be benefit to updating
these to reflect current working practices, which
have evolved due to hybrid working
arrangements and the digitalisation of records. 
Consideration should be given to creating a
checklist to ensure consistent application of
processes. 
Procedures and documents will be
reviewed and updated. Checklists
to be drawn up and introduced
when updating the procedures. 
31/12/2022
30/06/2023
31/03/2024
30/09/2024
30/12/2024
30/06/2025
31 Oct 2025 
Following approval of the
Revised Scheme of Assistance,
the documents and procedures
currently in the process of being
updated.  This is happening
slowly due to staff sickness. 
Delayed and Rescheduled 
Team Lead - Housing
Operations 
Page 23

Page 24

Planning do not currently have in place a
training schedule for 2023/24 for planning
officers. 
by staff, as and when is best
suited to their individual
learning needs, the needs of the
department, and individual
specific training needs that arise
as a requirement of new work
items.  Annual training events
are held that all planners are
requested to attend.  For
example, an internal Planning
conference was held focussing
on a number of topics such as
Biodiversity, the role of GIS in
Planning, Strategic
Development Frameworks, and
investment in the national grid
and its impacts on Argyll and
Bute. Staff can attend external
conferences if they wish to do
so such as the HPs’ conference
held in Kilmarnock this year. We
are also working with several
key stakeholders such as HES to
develop training modules for
Planning staff and we are
looking at how we can work
with the University of the West
of Scotland to enable staff to
access degree level Planning
courses.  In addition, staff can
access a range of digital course
specialising in Planning topics
and there is also a range of
internal courses available on
back-office systems, corporate
priorities, and other topics such
as cyber security and the use of
AI and digital tools such as
Page 24

Page 25

copilot etc.  Creating a training
schedule is further complicated
by a lack of available external
courses however when staff do
attend these they are also asked
to cascade learning to other
colleagues through notes taken.
Lastly the council is also
undertaking a transformational
process and planners attend an
increasing number of
workshops and seminars that
often involve a place-based
approach working with other
council services and external
partners.  This approach is likely
to increase in the future.   
Delayed and Rescheduled 
Medium
DEVELOPMENT & ECONOMIC GROWTH 
SHORT TERM LETS 
2. Oracle – Compulsory Fields   
A number of documents of supporting evidence
must be submitted with the licence application
prior to the issuing of the licence. Oracle
currently has a number of compulsory fields
which require to be completed, this does not
include the uploading of evidence. Applications
can be submitted without all the supporting
evidence attached resulting in time-consuming
delays contacting the applicants. 
1. Upgrade to be applied to Oracle
system to ensure that applications
made without all the necessary
certification and documentation,
cannot be submitted through the
on-line system. 
2. A similar approach will be
applied to paper-based
applications 
01/05/2025
30 Aug 2025 
1. IT system changes ongoing.
Revised application
forms/processes for both New
Applications and Renewals is
currently in the testing stage. 
2. The paper form cannot be
developed until the layout of
the electronic one is finalised as
they must be the same.
Currently we have contacted all
applicants who are due for
renewal advising of the
situation and further contact
will be made once the forms are
agreed. 
Delayed and Rescheduled
Regulatory Services and
Building Standards
Manager 
Page 25

Page 26

High
ROADS & INFRASTRUCTURE SERVICES 
BRIDGE ASSET MANAGEMENT PLAN 
1. Performance Reporting   
There are no regular performance reporting on
the following: · Structured reporting framework
to distribute performance reports to key
stakeholders on a regular basis. · Performance
reporting into Departmental Management Team
(DMT) meetings and other relevant forums to
improve monitoring, accountability, and
decision-making. · Specific regular performance
reports for late bridge inspections, accompanied
by formal action plans and follow-up measures
to address delays and ensure compliance with
inspection schedules. 
A report setting out key
performance information in
relation to the annual programme
of bridge inspections will be
produced for review by the RIS
senior management team on a
quarterly basis. The report will be
received by the RIS senior
management team by the end of
the month following quarter end at
the latest. The first of these reports
will be produced for review during
the month of April 2025 for Q4 of
2024. A Quarterly Report on
appropriate KPIs will be generated
by WDM and can be aligned
around ABC Reporting timescales.
Currently a QR is being
implemented to report on every
bridge’s most recent inspection.
The Quarterly Report will be
accompanied by the most recent
Late Inspections report. The overall
suite of performance measures
used by RIS is currently under
review. Until such time as this
review work is completed and a
refreshed approach to service
performance reporting is
implemented the Head of Service
will provide a by exception report
to the Departmental Management
Team on a quarterly basis setting
out key metrics and risks
associated with the annual bridge
inspection programme. This
reporting will commence for the
Q4 period of 2024 and will follow
30/06/2025
30 Sep 2025 
Bridge Inspection status report
defined, and report can be
submitted in draft form for
comments from Management /
Executive. Final report to be put
in place and reporting channel
confirmed. 
Delayed and Rescheduled 
Infrastructure Design
Manager 
Page 26

Page 27

reporting into the RIS senior
management team and will
therefore take place as early as
possible in the month 2 months
after quarter end i.e. commencing
in June 2025.
Low
ROADS & INFRASTRUCTURE SERVICES 
BRIDGE ASSET MANAGEMENT PLAN 
4. Audit Trail re Late Inspections   
The audit found that there is currently no audit
trail within the WebSMS sysytem (WDM) to
document late inspections, including reasons for
delay, actions taken and stakeholder
communication. 
Late Inspections are currently
being recorded manually via a
report infrastructure.  Design can
export on WDM as to which
reasons are added by the
Infrastructure Design team. An
automatic report is currently being
built within WDM that will send a
late inspections report.  Late
inspections and actions needed to
ensure they are undertaken will
form part of the quarterly
reporting to RIS senior
management team. This will enable
the Infrastructure Design Team to
highlight risks, articulate
mitigations and to seek support
where required to implement
these. 
31/03/2025
30 Sep 2025 
Previously identified errors have
been rectified, and
implementation of Late
Inspections functionality has
now been further developed.
Backlog of information held
externally from WDM system
now able to be
recorded.  Currently underway.
Actions requested from
auditable to be fulfilled at this
stage, despite ongoing
refinement of WDM and data
entry.
Full implementation on track for
September 2025. 
Delayed and Rescheduled 
Infrastructure Design
Manager 
Low
ROADS & INFRASTRUCTURE SERVICES 
Burial Records 
6. Historical Register Information   
Finding;  The Burial and Cremation (Scotland)
Act 2016 (The Act) requires information to be
retained electronically although this is not
currently in force it will be at a future date.  The
BACAS system has been partially updated with
historical information recorded in burial
The service will source temporary
assistance to update records
during Summer 2024. 
30/06/2024
31/12/2024
30/06/2025
30 Sep 2025 
Still looking to recruit however
resource has been identified
within the teams to get this
project underway with an
attempt to recruit and backfill
the administrative roles. 
Delayed and Rescheduled 
Operations Manager,
Roads and
Infrastructure Services 
Page 27

Page 28

registers, it has not been possible to update
with all information due to the volume of work
involved.   Recommendation; Source temporary
additional resource to update historical burial
records on BACAS.
Low
ROADS & INFRASTRUCTURE SERVICES 
PIERS & HARBOURS 
2. CalMac Charges 
Calmac, the main ferry operator uses the
Council’s Piers and Harbours on a daily basis,
with administratively intensive process in place
for charging. 
Have an agreement (financial) in
place by the end of the year. 
31/12/2023
31/03/2024
30/06/2024
30/11/2024
30/06/2025
31 Dec 2025 
Being progressed with senior
management within CalMac. 
High level options appraisal to
be carried out investigating
payment mechanisms that can
be incorporated into the new
Harbour Access Agreement
(HAA) 
The draft Harbour Access
Agreement will be ready for
review by legal representatives
by December 2025 
Delayed and Rescheduled 
Marine Operations
Manager 
High
ROADS & INFRASTRUCTURE SERVICES 
PIERS & HARBOURS 
3. SLAs 
A number of companies, including large fish
farming businesses, make use of our facilities on
a regular basis, however, there are no SLAs in
place. We were advised that work is currently
being undertaken to put Harbour Access
Agreements in place. 
Any agreement must be supported
by both parties and Argyll & Bute
Council legal department. May tie
in with No 2 above. Provide a
report to Head of Service and
Director with options. 
1. Identify potential partners 
2. Negotiation period 
3. Legal support in drafting
agreement 
31/12/2023
31/03/2024
30/06/2024
30/11/2024
30/06/2025
31 Dec 2025 
Work is ongoing to identify
bridging partners 
First batch of agreements is
being developed on a priority
basis in terms of value and risk,
and will be ready by end of
December 2025 
Delayed and Rescheduled 
Marine Operations
Manager 
Low
ROADS & INFRASTRUCTURE SERVICES 
PIERS & HARBOURS 
Actionable evidence and
enforcement will continue to be an
issue where there are no Argyll &
Bute Council personnel on site.
31/12/2023
31/03/2024
30/06/2024
App being developed by
supplier to allow Harbour
Masters to monitor and enforce
at priority sites via CCTV. Report
Marine Operations
Manager 
Page 28

Page 29

4. Remote Piers and Harbours  
Harbourmasters based at the main piers and
harbours are able to record the use of the
facilities where they are predominantly based,
however, a number of piers, slipways and
harbours are in remote locations and are
difficult to manage in terms of use. In addition,
there are no robust procedures in place to
identify commercial tour vessels using our
facilities potentially resulting in a loss of income
for the Council. 
Investigate issues and possible
solutions with Harbour Masters
and provide options for
consideration in report to DMT. 
30/09/2024
30/11/2024
30/06/2025
31 Dec 2025 
will be ready for DMT in
December 
Delayed and Rescheduled 
Low
ROADS & INFRASTRUCTURE SERVICES 
PIERS & HARBOURS 
5. Fishing Fleet   
Fees and charges for the fishing fleet within the
Council area are managed by the fishing fleet
whereby they advise us of the value of their
landings once the catch has been sold. There is
no back up information provided to substantiate
the value, and it is generally paid through cash
receipting or by cheque. 
Investigate issues and possible
solutions with Harbour Masters
and provide options for
consideration in report to DMT. 
31/12/2023
31/03/2024
30/06/2024
30/09/2024
30/11/2024
30/06/2025
31 Dec 2025 
Work is ongoing to develop
solution for verification of value
of catches and electronic
payment of fees. Report will be
ready for DMT in December 
Delayed and Rescheduled 
Marine Operations
Manager 
Low
ROADS & INFRASTRUCTURE SERVICES 
PIERS & HARBOURS
6. Management of Debt   
The outstanding debt owed to the Council at the
end of June in respect of Piers and Harbours
amounted to £143k.  There are a number of
long-term outstanding debts, and it was noted
that in some instances there is continued use of
our facilities by vessels who have outstanding
debts dating back to 2019.
Investigate with legal department
recovery or write-off options. 
Provide a report to Head of Service
and Director with options. 
31/12/2023
31/03/2024
30/06/2024
30/09/2024
30/11/2024
30/06/2025
31 Dec 2025 
Debt reviewed by Marine
Operations Management team
and Finance on a regular basis
and pursued where possible. 
Aged debt and ability to pursue
has been identified. Where
necessary, write off to be
identified by Marine Operations
Manager and processed in
terms of the Corporate Debt
Recovery Policy 2024
Marine Operations
Manager 
Page 29

Page 30

Report will be ready for DMT in
December 
Delayed and Rescheduled 
Low
ROADS & INFRASTRUCTURE SERVICES 
PIERS & HARBOURS 
8. Published Pier and Harbour Dues and Fees 
Harbour fees and dues are published on the
Council website on an annual basis following
being agreed and set at the Council’s budget
setting meeting, however, these are not in a
format that can be easily downloaded. 
Produce a ‘Schedule of Harbour
Charges’ for Harbour Board
approval. 
30/11/2024
30/06/2025
31 Dec 2025 
Work is ongoing to develop
schedule that is clear and easily
understood. 
Draft for approval will be
complete by end of December
2025 and ready for approval for
first Harbour Board of 2026 
Delayed and Rescheduled 
Marine Operations
Manager 
High
ROADS & INFRASTRUCTURE SERVICES 
WARDEN SERVICES 
3. Second Bin Service Verification   
Wardens are expected to verify the veracity of
applications from customers for a second
domestic bin service. This requires the warden
to confirm that information provided by the
customer is accurate and meets the defined
criteria. The information provided to
substantiate an application can be very personal
and sometimes of a sensitive medical nature.
Wardens have been asked to provide this
service but have received no formal training in
how to ensure a customer’s dignity is
maintained or to ensure they are aware of the
requirements of General Data Protection
Regulation (GDPR) in relation to personal data
Review the process for;   
Review the second bins that are in
place and the process for
rationalising. This review to also
give consideration to composition
and identify opportunity to
increase recycling and reduce
general waste. 
31/03 2022
30/09 2022
31/12/2022
31/03/2023
30/09/2023
31/12/2023
31/03/2024
31/03/2025
30/09/2025
30/06/2025
31 Mar 2026 
The second bin review will be
part of an overall waste delivery
project including wider aspects
of the service such as assisted
pullouts, service delivery on
private roads and commercial
refuse.  Project plan currently
being agreed and will be
communicated to the RIS
review board.  Timescales for
the project and implementation
plan will require to be agreed.
This is part of a bigger review on
commercial waste contracts and
self-catering establishments. 
Delayed and Rescheduled 
Operations Manager,
Roads & Infrastructure
Services 
Page 30

Page 31

for this specific process. 
Due to the sensitivity of this process, and the
potential risks associated with data protection it
is recommended that the current verification
process is reconsidered to determine if it is
appropriate to maintain it in its current form. If
it is decided, it should be retained then there
should be engagement with the Council’s
Governance and Risk Manager to ensure it is
being carried out in full compliance with GDPR. 
Medium
ADULT SERVICES (MENTAL HEALTH LEARNING
DISABILITY, ADDICTIONS & LIFELONG
CONDITIONS/CSWO) 
CLIENT FUNDS PROGRESS REVIEW 
2. Meeting service users financial needs   
Detail Restricted. 
Detail Restricted.  30/12/2024
31/03/2025
30/06/2025
30 Sep 2025 
Detail restricted. 
Delayed and Rescheduled 
SW Admin Manager 
Action Plan Points due after 30th June 2025 
Service, Report, Plan no. & Finding Agreed Action Dates Management Comment Responsible Officer
Medium
FINANCIAL SERVICES 
CAPITAL MONITORING 
1. Capital Programme Planning & Management
Guide   
The Council’s Capital Guide has not been revised
since 2018 and requires a review to ensure it
reflects current working practices and provides
appropriate support to officers involved in the
capital monitoring process. The Council is
Capital Planning and Management
Guide to be updated once the
Capital Strategy has been approved
to ensure the two are aligned and
provide clarity. 
31/03/2022
30/09/2022
31/12/2022
31/03/2023
30/09/2023
31/12/2023
31/03/2024
31/03/2025
30/09/2025 
This action has been
superseded by a wider ‘Review
of Capital Arrangements’
approved by members, as part
of the 2025/26 budget process. 
The review requires to be
progressed by ELT during
2025/26.  A discussion paper
was considered by ELT in May,
with next steps agreed and a
further report to be brought
back to ELT in September.    
Head of Commercial
Services/Finance
Manager 
Page 31

Page 32

Service, Report, Plan no. & Finding Agreed Action Dates Management Comment Responsible Officer
currently developing a new Capital Strategy
which is to be presented to the Policy and
Resources Committee in August 2021 and we
recognise that a review of the Guide should be
conducted after the Strategy has been finalised
to ensure the two documents complement each
other and. The Guide could also benefit from
being linked to, or referencing, other relevant
Council processes, in particular the Project
Management section on the Hub.   
Superseded 
Page 32

Page 33

ARGYLL AND BUTE COUNCIL  AUDIT AND SCRUTINY COMMITTEE 
FINANCIAL SERVICES  4 SEPTEMBER 2025 
INTERNAL AUDIT REPORTS TO AUDIT AND SCRUTINY COMMITTEE 2025/2026 
1. EXECUTIVE SUMMARY 
1.1 There are two audits being reported to the Audit and Scrutiny Committee.     
1.2 The table below provides a summary of the conclusions for the audits performed.
The full reports are included as appendices to this report. 
Audit Name Level of
Assurance
High
Actions
Medium
Actions
Low
Actions
VFM
Actions
Education Maintenance Allowance Substantial 0 2 0 0
Music Service High 0 0 0 0 
1.3 Internal Audit provides a level of assurance upon completion of audit work. A
definition for each assurance level is documented in each audit report. 
2. RECOMMENDATIONS 
2.1 Audit and Scrutiny Committee to review and endorse this summary report and
the detail within each individual report. 
3.  DETAIL 
3.1 A high level summary of each completed audit report is noted below: 
Education Maintenance Allowance: this audit provided a substantial level of
assurance.  This means that internal control, governance and the
management of risk is sound. However, there are minor areas of weakness
which put some system objectives at risk and specific elements of residual risk
that are slightly above an acceptable level and need to be addressed within a
reasonable timescale. Appropriate arrangements are in place to process
applications, payments and submit accurate monthly claims and year-end
schedules.  Awards of EMA payments were made appropriately following
submission of the required documentation in support of their formal
application, however, inaccuracies in maintaining attendance records resulted
in 2 errors, one payment was made and one withheld incorrectly.  All
payments and costs incurred were aligned with details held on the Council’s
general ledger and correctly reflected in the total value requested for
reimbursement from Scottish Government in accordance with the terms and
conditions of the offer of grant. 
Page 33 Agenda Item 6

Page 34

Music Services: this audit provided a high level of assurance.  This means that
internal control, governance and the management of risk are at a high standard.
Only marginal elements of residual risk have been identified with these either
being accepted or dealt with. A sound system of control designed to achieve the
system objectives is in place and being applied consistently. The Instrumental
Music Service in Argyll and Bute: Employee Induction / IMS Operational
Guidance is the overarching, document for the delivery of music services in
schools and includes details of standard forms to be used. The Procedural
Timeline supports the Operational Guidance document by providing details of
keys tasks, activities and the due by dates, throughout the academic year.
These documents and standard forms are available to all music instructors on
the google drive. There are plans in place to provide equitable access to music
services and piping tuition across all Council areas, these are reviewed and
adjusted annually. Instructor capacity and rurality can create gaps in provision
which are closely monitored by the Education Officer, who plans and priorities
Youth Music Initiative projects to cover these gaps, rotating the areas/ schools
and age groups, to provide as equitable provision as possible. Music services
across the Council areas receive funding from the Scottish Government, the
Youth Music Initiative funding via Creative Scotland and a donation from The
Argyllshire Gathering Trust (AGT). Checks of financial records, publicity and
copies of the required reports have been reviewed and confirm that all funding
requirements are being met and reported upon. 
4. CONCLUSION 
4.1 Management has accepted each of the reports submitted and have agreed
responses and timescales in the respective action plans. 
5. IMPLICATIONS 
5.1 Policy – None 
5.2 Financial – None 
5.3  Legal – None 
5.4  HR – None 
5.5 Customer Service – None 
5.6 Risk – The implementation of recommendations contained in audit reports
may help mitigate the risk to the Council  
5.7 Climate Change – None 
5.8  Fairer Scotland Duty – None 
5.9 Equalities - protected characteristics – None 
5.10 Consumer Duty – None 
5.11 Island Communities – None 
5.12 Children’s Rights and Wellbeing – None 
Paul Macaskill
Chief Internal Auditor
4 September 2025 
For further information contact: 
Paul Macaskill, Chief Internal Auditor
Tel:  01546 604108
Email: paul.macaskill@argyll-bute.gov.uk 
Page 34

Page 35

APPENDICES 
1. Education Maintenance Allowance
2. Music Service 
Page 35

Page 36

This page is intentionally left blank

Page 37

Argyll and Bute Council
Internal Audit Report
July 2025
FINAL 
High Medium Low VFM
Number of
Findings
0 2 0 0 
Education Maintenance
Allowance-Verification Audit
Audit Opinion: Substantial 
Page 37

Page 38

2 
Argyll and Bute Council – Internal Audit Report – EMA Verification audit, July 2025 
Contents 
1. Executive Summary ........................................................................................................................ 3
Introduction ............................................................................................................................................ 3
Background ............................................................................................................................................. 3
Scope ....................................................................................................................................................... 4
Risks ........................................................................................................................................................ 4
Audit Opinion ......................................................................................................................................... 4
2. Objectives and Summary Assessment ........................................................................................... 4
3. Detailed Findings ............................................................................................................................ 5
Appendix 1 – Audit Opinion ................................................................................................................... 9 
Contact Details 
Internal Auditor: Mhairi Weldon 
Telephone:  01546 604294 
e-mail:   Mhairi.weldon@argyll-bute.gov.uk 
www.argyll-bute.gov.uk
Page 38

Page 39

3 
Argyll and Bute Council – Internal Audit Report – EMA Verification audit, July 2025
1. Executive Summary
Introduction
1. As part of the 2025/26 internal audit plan, approved by the Audit & Scrutiny Committee in
March 2025, we have undertaken an audit of Argyll and Bute Council’s (the Council) system of
internal control and governance in relation to Education maintenance Allowance (EMA)
Verification.
2. The audit was conducted in accordance with the Global Internal Audit Standards (GIAS) with our
conclusions based on discussions with council officers and the information available at the time
the fieldwork was performed. The findings outlined in this report are only those which have
come to our attention during the course of our normal audit work and are not necessarily all the
issues which may exist.  It is the responsibility of management to determine the extent of the
internal control system appropriate to the Council.
3. The contents of this report have been agreed with the appropriate council officers to confirm
factual accuracy and appreciation is due for the cooperation and assistance received from all
officers over the course of the audit.
Background
4. Regulation 3 of the Education Maintenance Allowances (Scotland) Regulations 2007 (“the 2007
Regulations”) allows the Scottish Ministers to pay an education maintenance allowance (EMA) to
provide support for eligible 16 to 19 year olds who are engaged in full-time education in school;
undertaking a course of non-advanced education at home which has been approved by the
education authority; or undertaking a course of non-advanced education elsewhere under the
supervision of the education authority (including Learning Agreements/Action Plans). The 2007
Regulations form the basis of the EMA programme which aims to increase participation and
retention in post-compulsory education, thus increasing skills and life chances for this group.
EMA payments are made by the Council to eligible young people in school and other types of
learning within the local authority area in accordance with the 2007 Regulations, and the EMA
(Scotland) Guidance and Processes, provided that a young person is eligible for EMA, that a
young person qualifies based on the EMA eligibility criteria and a signed learning agreement is in
place.
5. The EMA programme offers means-tested financial support of £30 per week in arrears during
term-time to eligible young people from low income households who are planning to continue in
post-compulsory education.  Eligibility for EMA payments depends on the young person's age,
household income, residency, course validity and completion of a learning agreement detailing
targets and attendance requirements.  
6. The Scottish Government (SG) reimburses the Council for payments made to young people
following submission of monthly grant claims and a year-end statement confirming the total of
the monthly claims.  A standard allowance for the costs of administering the programme as well
as an additional £15 for each new application processed is also paid by the SG.
7. Audit Scotland published technical guidelines, TGN/EMA/21 in March 2021 and this was used to
support auditors in the verification of EMA claims.
Page 39

Page 40

4 
Argyll and Bute Council – Internal Audit Report – EMA Verification audit, July 2025
Scope 
8. The scope of the audit was to assess that the Council is fully compliant with requirements as set
out in the Offer of Grant for EMA 2024/25.
Risks
9.  The risks considered throughout the audit were:
• Audit Risk 1 – The Council fails to comply with the provisions set out in the Offer of grant
for EMA 2024-25
Audit Opinion
10. We provide an overall audit opinion for all the audits we conduct. This is based on our
judgement on the level of assurance which we can take over the established internal controls,
governance and management of risk as evidenced by our audit work.  Full details of the five
possible categories of audit opinion is provided in Appendix 2 to this report.
11. Our overall opinion for this audit is that we can take a substantial level of assurance.  This means
that, Internal control, governance and the management of risk is sound. However, there are
minor areas of weakness which put some system objectives at risk and specific elements of
residual risk that are slightly above an acceptable level and need to be addressed within a
reasonable timescale.
Recommendations
12. We have highlighted two medium priority recommendations where we believe there is scope to
strengthen the control and governance environment.  These are summarised below:
• Schools should ensure that EMA recipient’s attendance records are accurately
maintained to provide a clear indication of when EMA payments are due.  
• School teaching staff authorising EMA payments should be reminded of the attendance
criteria young people are required to meet to qualify for these payments.
13. Full details of the audit findings, recommendations and management responses can be found in
Section 3 of this report and in the action plan at Appendix 1.
2. Objectives and Summary Assessment
14. Exhibit 1 sets out the control objectives identified during the planning phase of the audit and our
assessment against each objective.   
Control Objective Link to Risk Assessment Summary Conclusion
1 The year-end
statement has been
completed in
accordance with
guidance.
Audit Risk 1 High Appropriate arrangements are in place
to process applications and payments
and prepare and submit accurate
monthly claims and year-end
schedules.  All payments and costs
were confirmed on the Council’s
general ledger and verified on the
claims submitted.
Page 40

Page 41

5 
Argyll and Bute Council – Internal Audit Report – EMA Verification audit, July 2025 
Control Objective Link to Risk Assessment Summary Conclusion
2 Young people have
been correctly
assessed for
eligibility.
Audit Risk 1 Substantial A detailed review of a sample of 10
young people confirmed that EMA was
appropriately awarded following
submission of the required evidence in
support of their applications, however,
attendance records were not always
accurate.  One payment for £30 was
found to have been incorrectly
authorised and one payment
incorrectly withheld.
3 Administration costs
have been
appropriately
applied.
Audit Risk 1 High The additional top-up administration
cost has been applied to the monthly
claims and correctly reflected in the
year-end claim.
4 Completion
procedures have
been appropriately
followed.
Audit Risk 1 High The claim forms submitted accurately
reflected payments made and costs
incurred in accordance with the terms
and conditions of the Offer of Grant. 
Claims and supporting evidence were
reviewed and confirmed to be correct. 
15. Further details of our conclusions against each control objective can be found in Section 3 of this
report.  
3. Detailed Findings
The year-end statement has been completed in accordance with guidance.
16. The Councils arrangements for the completion of the year end statement are adequate. All
relevant parts of the year end statement have been completed and signed by the Council’s
Executive Director/Section 95 Officer including schedules 4 to 6 as required in the Offer of Grant
for EMA 2024-25 letter.  
17. The entries on the year-end statement were reviewed and found to be consistent with the total
of the monthly claims submitted and also with entries lodged on the Council’s general ledger.
Young people have been correctly assessed for eligibility
18. A total of 177 young people were awarded EMA payments in 2024-25, from these, a random
sample of 10 was chosen for detailed review of supporting documentation to confirm they met
the eligibility criteria as set out below: 
• Proof of age to confirm young person is between 16 and 19 years of age
• Household income below £24,421 (one child) or £26,884 (more than one child)
• UK citizen or qualifying non-national who are resident in Argyll and Bute area
• Course(s) being undertaken is/are valid and require attendance of at least 21 hours per week
• An agreement has been completed detailing learning goals and level of attendance required 
• Attendance records confirming eligibility for each weekly payment made
• Back-payments were made in accordance with grant requirements 
Page 41

Page 42

6 
Argyll and Bute Council – Internal Audit Report – EMA Verification audit, July 2025
19. Documentation provided in support of applications made confirmed that all young people within
the sample selected for review were appropriately assessed as eligible for EMA payments.
20. EMA payments were routinely awarded or disallowed in accordance with attendance records,
however, a few anomalies were identified during the course of the audit.  Requests for
additional information revealed that attendance had been incorrectly recorded in some
instances where recipients had been marked as absent but later found to be in attendance in
other areas of the school premises e.g. study rooms or other classrooms and records were not
updated accordingly.  One payment for £30 was found to have been incorrectly authorised and
one payment incorrectly withheld.  
Action Plan 1 & 2
Administration costs have been appropriately applied
21. The Council is in receipt of a flat rate of £25k for administering the EMA programme, in addition
to this, an administration cost of £15 per new applicant in receipt of at least one payment of
EMA is available to claim.  The administration cost was correctly applied to monthly claims, a
total of £2,700 was recovered from the SG in respect of this element and was found to be
consistent with the documented requirements.
Completion procedures have been appropriately followed
22.  Testing carried out confirmed that, with the exception of the 2 errors noted at paragraph 20
above, payments were made in accordance with the grant terms and conditions.  As the value of
errors found totalled £0, there is no requirement to revise the grant claims submitted.    
Page 42

Page 43

Appendix 1 – Action Plan 
No Finding Risk Agreed Action Responsibility / Due
Date
Medium
1
Attendance Records 
Finding:  The audit identified that EMA payments
did not correspond with the recipient’s attendance
records in some instances due to updates not
being recorded.   
Recommendation:    Schools should ensure that
EMA recipient’s attendance records are accurately
maintained to provide clear evidence of EMA
payment entitlement.   
Attendance records do not
accurately support EMA
payment entitlement.
Updated guidance will be
issued to schools at the start
of the new session to ask
schools to ensure that
recipients attendance records
are accurately maintained.
School Services Support
Manager 
December 2025
Medium
2
EMA Payment Entitlement 
Finding:  One payment for £30 was found to have
been incorrectly authorised and one payment
incorrectly withheld.   
Recommendation:  School staff authorising EMA
payments should be reminded of the attendance
criteria young people are required to meet to
qualify for these payments. 
Failure to comply with EMA
grant terms and conditions. 
Incorrect payments may
result in additional work to
rectify. 
Updated guidance will be
issued to schools at the start
of the new session clarifying
the attendance criteria for
young people qualifying for
EMA payments.
School Services Support
Manager 
December 2025 
Page 43

Page 44

8 
Argyll and Bute Council – Internal Audit Report – EMA Verification audit, July 2025
In order to assist management in using our reports a system of grading audit findings has been adopted to allow the significance of findings to be ascertained. 
The definitions of each classification are as follows: 
Grading    Definition
High  A major observation on high level controls and other important internal controls or a significant matter relating to the critical success of the
objectives of the system.  The weakness may therefore give rise to loss or error. 
Medium 
Observations on less significant internal controls and/or improvements to the efficiency and effectiveness of controls which will assist in meeting
the objectives of the system.  The weakness is not necessarily substantial however the risk of error would be significantly reduced if corrective
action was taken.  
Low  Minor recommendations to improve the efficiency and effectiveness of controls or an isolated issue subsequently corrected.  The weakness does
not appear to significantly affect the ability of the system to meet its objectives. 
VFM  An observation which does not highlight an issue relating to internal controls but represents a possible opportunity for the council to achieve
better value for money (VFM). 
Page 44

Page 45

9 
Argyll and Bute Council – Internal Audit Report – EMA Verification audit, July 2025
Appendix 2 – Audit Opinion 
Level of Assurance  Definition 
High  Internal control, governance and the management of risk are at a high standard. Only marginal elements of residual risk have
been identified with these either being accepted or dealt with. A sound system of control designed to achieve the system
objectives is in place and being applied consistently. 
Substantial  Internal control, governance and the management of risk is sound. However, there are minor areas of weakness which put some
system objectives at risk and specific elements of residual risk that are slightly above an acceptable level and need to be
addressed within a reasonable timescale. 
Reasonable 
Internal control, governance and the management of risk are broadly reliable. However, whilst not displaying a general trend,
there are areas of concern which have been identified where elements of residual risk or weakness may put some of the system
objectives at risk. 
Limited  Internal control, governance and the management of risk are displaying a general trend of unacceptable residual risk above an
acceptable level and placing system objectives are at risk. Weakness must be addressed with a reasonable timescale with
management allocating appropriate resources to the issues raised. 
No Assurance  Internal control, governance and the management of risk is poor. Significant residual risk and/or significant non-compliance with
basic controls exists leaving the system open to error, loss or abuse. Residual risk must be addressed immediately with
management allocating appropriate resources to the issues. 
Page 45

Page 46

This page is intentionally left blank

Page 47

Classification: OFFICIAL 
Argyll and Bute Council
Internal Audit Report
August 2025/6
FINAL 
High Medium Low VFM
Number of
Findings
0 0 0 0 
Music Services
Audit Opinion: High 
Page 47

Page 48

2 
Argyll and Bute Council – Internal Audit Report – Music Services, August 2025
Classification: OFFICIAL 
Contents 
1. Executive Summary ........................................................................................................................ 3
Introduction ............................................................................................................................................ 3
Background ............................................................................................................................................. 3
Scope ....................................................................................................................................................... 4
Key Dates ................................................................................................................................................ 4
Risks ........................................................................................................................................................ 4
Audit Opinion ......................................................................................................................................... 4
Recommendations ................................................................................................................................. 5
2. Objectives and Summary Assessment ........................................................................................... 5
3. Detailed Findings ............................................................................................................................ 6
Appendix 1 – Audit Opinion ................................................................................................................. 11 
Contact Details 
Internal Auditor: Annemarie McLean 
Telephone:  01700 501354 
e-mail:   annemarie.mclean@argyll-bute.gov.uk 
www.argyll-bute.gov.uk
Page 48

Page 49

3 
Argyll and Bute Council – Internal Audit Report – Music Services, August 2025
Classification: OFFICIAL
1. Executive Summary
Introduction
1. As part of the 2025/26 internal audit plan, approved by the Audit & Scrutiny Committee in
March 2025, we have undertaken an audit of Argyll and Bute Council’s (the Council) system of
internal control and governance in relation to Music Services.
2. The audit was conducted in accordance with the Global Internal Audit Standards (GIAS) with our
conclusions based on discussions with council officers and the information available at the time
the fieldwork was performed. The findings outlined in this report are only those which have
come to our attention during the course of our normal audit work and are not necessarily all the
issues which may exist. Appendix 1 to this report includes agreed actions to strengthen internal
control however it is the responsibility of management to determine the extent of the internal
control system appropriate to the Council.
3. The contents of this report have been agreed with the appropriate council officers to confirm
factual accuracy, and appreciation is due for the cooperation and assistance received from all
officers over the course of the audit.
Background
1. Through music, Curriculum for Excellence recognises the value of singing and learning to play an
instrument, providing children and young people with opportunities to be creative and
imaginative, to experience inspiration and enjoyment, and to develop skills for learning, life and
work. 
2. There are many wider benefits of music education and musical experiences. These include
promoting healthy lives and cognitive benefits such as increasing attainment, improving levels of
literacy and numeracy and the emotional, social and physical wellbeing of our young people. 
3. Instrumental Music Instructors develop the vocal and instrumental skills of children and young
people, encouraging them to have a lifelong appreciation of music and its place in contributing
effectively to Scotland’s culture. Music services also support bands, orchestras, choirs, and other
extracurricular musical activities within schools. 
4. In Scotland, instrumental music tuition in schools is a core part of the curriculum, with the
Scottish Government committed to providing free tuition for all pupils. Local authorities manage
the delivery of these services, including providing instruments and lessons, often with support
from the Youth Music Initiative (YMI). 
5. Creative Scotland administers the Youth Music Initiative (YMI) – a music education programme,
funded by the Scottish Government, which aims to create access to high quality music making
opportunities for young people and support the development of the youth music sector. 
6. The Argyllshire Gathering Trust, via the Argyll and Bute Schools Piping Tuition Scheme (the
Scheme), is the primary sponsor of Schools Piping Tuition in Argyll and Bute in collaboration with
the Council and the Scottish Government. The provides funding to the Council to support the
teaching of the bagpipes in Argyll primary schools. 
Page 49

Page 50

4 
Argyll and Bute Council – Internal Audit Report – Music Services, August 2025
Classification: OFFICIAL 
7. The Scheme, in recent academic years, has supported piping tuition to the value of £50,000 in
primary and secondary schools in Oban, Mid Argyll, Islay, Mull, Kintyre, Cowal, Helensburgh and
Lower Argyll. Tuition is currently provided by 6 tutors, including two world class Argyll pipers.
Scope 
8. The scope of the audit was to assess the arrangements for the efficient delivery of music services
and that funding requirements have been met in relation to this provision, as outlined in the
Terms of Reference agreed with the Head of Education, Performance and Improvement on 03
July 2025. 
Key Dates
9. The Terms of Reference provided provisional timescales for the review to take place, the actual
dates are noted below. 
Exhibit 1 – Key Dates
Stage Actual
Date
Terms of Reference agreed 03 July 2025
Fieldwork Commencement 04 July 2025
Draft Report issued 01 August 2025
Management Comments received 20 August 2025
Final Report issued 20 August 2025
Audit and Scrutiny Committee 04 September 2025 
Risks
10.  The risks considered throughout the audit were:
• Audit Risk 1: Lack of standard policies and procedures may lead to inefficient and
unequitable music service delivery.
• Audit Risk 2: Inability to demonstrate that requirements of funding have been met may
impact future ability to secure funding.
Audit Opinion
11. We provide an overall audit opinion for all the audits we conduct. This is based on our
judgement on the level of assurance which we can take over the established internal controls,
governance and management of risk as evidenced by our audit work.  Full details of the five
possible categories of audit opinion is provided in Appendix 1 to this report.
12. Our overall audit opinion for this audit is that we can take a high level of assurance.  This means
that internal control, governance and the management of risk are at a high standard. Only
marginal elements of residual risk have been identified with these either being accepted or dealt
with. A sound system of control designed to achieve the system objectives is in place and being
applied consistently. 
Page 50

Page 51

5 
Argyll and Bute Council – Internal Audit Report – Music Services, August 2025
Classification: OFFICIAL
Recommendations
13. There are no recommendations.
2. Objectives and Summary Assessment
14. Exhibit 1 sets out the control objectives identified during the planning phase of the audit and our
assessment against each objective.
Exhibit 1 – Summary Assessment of Control Objectives 
Control Objective Link to Risk Assessment Summary Conclusion
1 The Council has
common
policies/procedures
for the delivery of
music services in
schools.
Audit Risk 1 High • The Instrumental Music Service in
Argyll and Bute: Employee
Induction / IMS Operational
Guidance is the overarching,
document for the delivery of
music services in schools and
includes details of standard forms
to be used. 
• The Procedural Timeline supports
the Operational Guidance
document by providing details of
keys tasks, activities and the due
by dates, throughout the
academic year.
• These documents and standard
forms are available to all music
instructors on the google drive. 
2 There is equitable
provision/ access to
music services across
all Council areas.
Audit Risk 1 High • There are plans in place to
provide equitable access to music
services and piping tuition across
all Council areas, these are
reviewed and adjusted annually.
• Instructor capacity and rurality
can create gaps in provision
which are closely monitored by
the Education Officer, who plans
and priorities Youth Music
Initiative projects to cover these
gaps, rotating the areas/ schools
and age groups, to provide as
equitable provision as possible.
3 Funding requirements
are met and reported
upon. 
Audit Risk 2 High • Music services across the Council
areas receive funding from the
Scottish Government, the Youth
Music Initiative funding via
Creative Scotland and a donation
from The Argyllshire Gathering
Trust (AGT). 
• Checks of financial records,
publicity and copies of the
Page 51

Page 52

6 
Argyll and Bute Council – Internal Audit Report – Music Services, August 2025
Classification: OFFICIAL
required reports have been
reviewed and confirm that all
funding requirements are being
met and reported upon.   
15. Further details of our conclusions against each control objective can be found in Section 3 of this
report.  
3. Detailed Findings
The Council has common policies/procedures for the delivery of music services in schools.
16. Within the Council, the Instrumental Music Service (IMS) in Argyll and Bute: Employee Induction
/ IMS Operational Guidance (Operational Guidance document) is the overarching document for
the delivery of music services in schools and takes cognisance of national guidance from the
Scottish Government, Education Scotland and the Scottish Qualifications Authority. 
17. The Operational Guidance document was created in consultation with Instrumental Music
Instructors (IMIs), by reviewing and collating previous guidance and procedure notes and
provides clear guidance for all instructors, both new and experienced, and includes details of: 
• General employment terms and conditions including, working hours, pupil contact,
activities and mandatory training etc.
• Scottish Education and SQA exams.  
• Reporting to parents and carers, The Argyllshire Gathering Trust and quality assurance
procedures
• Links to key documents, standard forms and templates to be used. 
18. To aid staff planning, the Procedural Timeline is emailed to all instructors at the start of each
academic year. This supports the Operational Guidance document by providing details of keys
tasks, activities and the due by dates, throughout the academic year, and contact details for
support and submission.  
19. Provision of instruments to pupils is monitored via loan agreements but due to the abolition of
tuition fees the term is open ended, with instruments to be returned when pupils no longer
engage with music services. Instructors keep a record of instruments issued and there is a
standing task on the Procedural Timeline for Instructors at the beginning of each academic
session and thereafter at the end of each term, to request new/replacement instruments. 
20. The Operational Guidance document, Procedural Timeline and standard forms, are stored on the
IMS google drive, which is accessible to all instructors.  These documents will be reviewed
annually in May at the team instructor meetings. Staff engagement with shaping and reviewing
the Operational Guidance aids collective ownership and ensures it will reflect current working
practices and that staff are kept informed of any changes.
21. At a national level, the draft “How Good is Our Instrumental Music Service” document is being
developed as a self-evaluation tool, incorporating peer observations, to support self-
development for IMIs. This has been discussed at IMI team meetings and there are plans to trial
this in the next academic session 2025/26.
Page 52

Page 53

7 
Argyll and Bute Council – Internal Audit Report – Music Services, August 2025
Classification: OFFICIAL
There is equitable provision/ access to music services across all Council areas. 
22. There are plans in place to provide equitable access to music services and piping tuition across
both primary and secondary schools in all Council areas, these are reviewed and adjusted
annually. The Education Officer (EO) – Curriculum (2-18) with Gaelic, Music and Culture,
maintains a list of the IMS distribution across all Council areas. This details the instructors in
each area, the hours they are contracted for, the schools’ they cover and the classification of the
instruments that they teach e.g. brass or strings etc. 
23. Like many Council services, provision and planning of music services is constrained by instructor
availability in the locality and their capacity to cover the geographical areas, while maximising
the time spent in the school’s providing instruction to pupils. Most instructors have a set
secondary school location and travel within those clusters. This can create gaps, which are
closely monitored by the EO who plans and prioritises Youth Music Initiative projects to cover
these gaps, rotating the areas/ schools and age groups, to provide as equitable provision as
possible.    
24. As the provision of music services is part of the curriculum for excellence monitoring and
reporting takes a variety of forms, for example, IMIs are required to monitor and record:
• Pupil attendance.
• Pupil progress and reporting to parents.
• Class registers.
• Instrumental Music Services IMS survey data (which feeds into the national statistics)
• 12 Hours data required by Creative Scotland 
• Piping reports provided to Argyllshire Gathering Trust as a condition of their donation. 
Funding requirements are met and reported upon. 
25. Music services across the Council areas receive funding from the Scottish Government, the
Youth Music Initiative funding via Creative Scotland and a donation from The Argyllshire
Gathering Trust (AGT) via the Argyll and Bute Schools Piping Tuition Scheme. Checks of financial
records, publicity and copies of the required reports have been reviewed and confirm that All
funding requirements are being met and reported upon.   
26. Financial monitoring follows the standard Council budget monitoring and year end processes for
Education budgets and funds. There is no requirement to record spend per Council area, so this
is not currently monitored, but could be readily ascertained as most costs are related to staffing,
in addition to travel, and the costs of instruments/education equipment. 
27. The Council are required by the Scottish Government to contribute to National Statistics and
report on costs including total spend for the academic session and any cost implications for
pupils. Using the IMS Survey template completed by instructors, data on Instrument Music
Services is collated and submitted to the Improvement Service who collate this and publish the
National IMS Survey results. The aim of the survey is to highlight the current state of
instrumental music services (IMS) in Scotland and to identify and share best practice. 
Page 53

Page 54

8 
Argyll and Bute Council – Internal Audit Report – Music Services, August 2025
Classification: OFFICIAL
28. The completion of the IMS survey is a key task detailed in the Procedural Timeline document. A
copy of the “Results from the IMS Survey 2024” was provided and confirms the Council’s
submission, and compliance with reporting requirements. 
29. Creative Scotland administers the Scottish Government’s Youth Music Initiative (YMI SG)
programme. The purpose of the YMI fund is to meet the Scottish Government commitment that:
“every school pupil in Scotland should be offered a year of free music tuition by the time they
leave primary school”, this is referred to as the 12 hours project and includes young people with
additional support needs, disabilities and those in non-mainstream settings. 
30. Local authorities apply to the YMI Formula funds providing details of the planned programme of
activities / projects, and the costs associated with these, that they aim deliver within the School
Based Music Making strand. Criteria for funding is set out in the YMI Formula Guidance for that
year, and all applications must state how the programme will deliver and track the 12 hours
project to meet the YMI SG commitment. 
31. Successful applications are issued with an Award of Funding from the Youth Music Initiative
Programme – Formula Funding letter by Creative Scotland. This sets out the conditions of
funding and the funding instalments. In addition to the YMI SG commitment 12 hours project,
other key conditions include: 
• Maintenance of financial records for the projects. 
• The use of set logos/wording in all publicity.
• The submission of an end of project evaluation report, including a final report and
evidence to support delivery of the agreed activities and projects. 
32. Creative Scotland does not stipulate when the 12 Hours project should be delivered.
Music Services, through discussion with the IMS team, agreed that the 12 hours project
would support the recruitment phase at the start of each year. This provides pupils with
free specialist tuition and examples of the types of instruments that are available and
gives them the opportunity to gain the enthusiasm to commit to practicing. 
33. YMI instructors and the schools in receipt of each project are asked to complete
evaluations. IMS instructors delivering 12 Hours projects submit pupil data and a brief
evaluation. This is collated by the EO who produces the End of Project evaluation which
is submitted to Creative Scotland and used to inform the following years’ application. 
34. Music services have a specific cost centre for YMI funding and financial records are
retained as per Council Standing Orders. The end of project evaluation for 2023-24 has
been provided along with copies of the 2024-25 application form, planned budget and
award of funding letter. The fact that Creative Scotland have approved the 2024-25
application demonstrates that they are satisfied that the Council continues to meet their
funding requirements. 
Page 54

Page 55

9 
Argyll and Bute Council – Internal Audit Report – Music Services, August 2025
Classification: OFFICIAL
35. The annual donation from the Argyllshire Gathering Trust (AGT) to support the Argyll and Bute
Schools Piping Tuition Scheme, is a long-standing arrangement. In return for the annual
donation, the AGT requires: 
• Monies are spent on subsidising piping and chanter instruction.
• Posters are displayed and flyers distributed in relevant schools i.e. those with piping
instructors, to publicise their support.
• Reports detailing the number of pupils, the type of instruction (pipes/chanter), details of
involvement with pipe bands and those showing exceptional promise. 
36. The Operational Guidance document provides instructors with guidance on the requirements of
AGT. An examination of Music Services budgets confirms that the full donation from the
Argyllshire Gathering Trust (AGT) is spent on subsidising piping and chanter instruction.
Examples of submitted reports, flyers and adverts were provided and these meet AGT’s
requirements.
Page 55

Page 56

Classification: OFFICIAL
In order to assist management in using our reports a system of grading audit findings has been adopted to allow the significance of findings to be ascertained.  The definitions
of each classification are as follows: 
Grading    Definition
High  A major observation on high level controls and other important internal controls or a significant matter relating to the critical success of the
objectives of the system.  The weakness may therefore give rise to loss or error. 
Medium 
Observations on less significant internal controls and/or improvements to the efficiency and effectiveness of controls which will assist in meeting
the objectives of the system.  The weakness is not necessarily substantial however the risk of error would be significantly reduced if corrective
action was taken.  
Low  Minor recommendations to improve the efficiency and effectiveness of controls or an isolated issue subsequently corrected.  The weakness does
not appear to significantly affect the ability of the system to meet its objectives. 
VFM  An observation which does not highlight an issue relating to internal controls but represents a possible opportunity for the council to achieve
better value for money (VFM). 
Page 56

Page 57

11 
Argyll and Bute Council – Internal Audit Report – Music Services, August 2025
Classification: OFFICIAL
Appendix 1 – Audit Opinion 
Level of Assurance  Definition 
High  Internal control, governance and the management of risk are at a high standard. Only marginal elements of residual risk have
been identified with these either being accepted or dealt with. A sound system of control designed to achieve the system
objectives is in place and being applied consistently. 
Substantial  Internal control, governance and the management of risk is sound. However, there are minor areas of weakness which put some
system objectives at risk and specific elements of residual risk that are slightly above an acceptable level and need to be
addressed within a reasonable timescale. 
Reasonable 
Internal control, governance and the management of risk are broadly reliable. However, whilst not displaying a general trend,
there are areas of concern which have been identified where elements of residual risk or weakness may put some of the system
objectives at risk. 
Limited  Internal control, governance and the management of risk are displaying a general trend of unacceptable residual risk above an
acceptable level and placing system objectives are at risk. Weakness must be addressed with a reasonable timescale with
management allocating appropriate resources to the issues raised. 
No Assurance  Internal control, governance and the management of risk is poor. Significant residual risk and/or significant non-compliance with
basic controls exists leaving the system open to error, loss or abuse. Residual risk must be addressed immediately with
management allocating appropriate resources to the issues. 
Page 57

Page 58

This page is intentionally left blank

Page 59

Classification: OFFICIAL 
ARGYLL AND BUTE COUNCIL  AUDIT AND SCRUTINY COMMITTEE 
FINANCIAL SERVICES 4 SEPTEMBER 2025 
INTERNAL AUDIT - ANNUAL SELF-ASSESSMENT 
1. EXECUTIVE SUMMARY 
1.1 This paper informs the Audit and Scrutiny Committee (the Committee) of the
findings from the recent internal self-assessment of the Council’s Internal Audit
service performed by a member of the Internal Audit team. 
2. RECOMMENDATIONS 
2.1 Members are requested to review and endorse the findings of the assessment
including the identified areas for improvement, where applicable. 
3. DETAIL 
3.1 The Public Sector Internal Audit Standards (PSIAS) require the Council’s Chief
Internal Auditor (CIA) to develop a Quality Assurance and Improvement
Programme (QAIP). The purpose of the QAIP is to enable the evaluation of
internal audit’s conformance to the PSIAS. The QAIP must include annual
internal self-assessments with a five yearly external assessment, carried out by
an independent assessor. 
3.2 The Council’s last external independent assessment was reported to the
Committee in March 2023 and concluded that internal audit demonstrated full
compliance with PSIAS in all 14 areas of criteria, along with identified good
practice. It also highlighted two minor areas for potential improvement which
now have been fully implemented. A further internal self-assessment has been
undertaken and again confirms compliance with all criteria. 
3.3 The 2025 self-assessment exercise has been completed and the table below
summarises the assessment of the service against each of the fourteen PSIAS
assessment areas. 
PSIAS Assessment Area Assessment
1 Mission of internal audit Fully Conforms
2 Definition of internal auditing Fully Conforms
3 Code of ethics Fully Conforms
4 Purpose, authority and responsibility Fully Conforms
5 Independence and objectivity Fully Conforms
6 Proficiency and due professional care Fully Conforms
7 Quality assurance and improvement programme Fully Conforms
8 Managing the internal audit activity Fully Conforms
9 Nature of work Fully Conforms
10 Engagement planning Fully Conforms
11 Performing the engagement Fully Conforms
12 Communicating results Fully Conforms
13 Monitoring progress Fully Conforms
14 Communicating the acceptance of risks Fully Conforms
Page 59 Agenda Item 8

Page 60

Classification: OFFICIAL 
3.4 The self-assessment identified a number of areas of good practice and no further
areas for improvement – these are summarised in the table below. 
Good Practice
Comprehensive Internal Audit Charter which is subject to annual review
and approval
Robust procedures for ensuring independence and objectivity
CIA has regular engagement with senior management
Experienced and qualified team focused on continuous improvement
Robust and structured audit planning
Clear link between identified risks and audit work
Strong audit engagement review and supervision
Full and transparent audit reporting to Senior Management and
Committee 
Comprehensive follow up process
Regular progress reporting to Committee
Annual assurance mapping 
Very positive feedback from services on audit approach and outputs
Area for Improvement
No actions outstanding.     
4. CONCLUSION 
4.1 The Internal Audit service has been self-assessed as fully conforming with
PSIAS in all of the 14 assessment areas. This assessment is consistent with
the opinions raised in the independent External Quality Assurance Assessment
(EQA) reported to the Audit and Scrutiny committee in March 2023.
4.2 Overall, the CIA is of the view that this is a positive self-assessment which
reflects well on the team and their ongoing commitment to improvement. This
process is one element of assessing and determining compliance with best
practice and mandatory requirements outlined by the relevant regulatory
bodies. There will always be opportunity for improvement and development
within the service and this will be reflected upon on a regular basis to improve
the service we provide to the Council.
4.3 The Internal Audit service will continue to monitor compliance on an annual
basis and also as part of the five yearly external quality assessment
programme and will be subject to a comprehensive review undertaken by
another local authority Chief Internal Auditor which is next scheduled for
2027/28 and will follow the new Global Internal Audit Standards. (GIAS)
5. IMPLICATIONS 
5.1 Policy – Internal Audit continues to adopt a risk-based approach to activity
5.2 Financial –None
5.3 Legal –None
5.4
5.5
HR – None
Customer Service - None
5.6 Risk – None
5.7 Climate Change – None
5.8 Fairer Scotland Duty – None
Page 60

Page 61

Classification: OFFICIAL
5.9
5.10
5.11
Equalities – protected characteristics – None
Consumer Duty – None
Island Communities - None
5.12 Children’s Rights and Wellbeing – None 
Paul Macaskill, 
Chief Internal Auditor
4 September 2025                                                  
For further information contact: 
Paul Macaskill, Chief Internal Auditor (01546 604108) 
Page 61

Page 62

This page is intentionally left blank

Page 63

Classification: OFFICIAL 
ARGYLL AND BUTE COUNCIL     AUDIT AND SCRUTINY COMMITTEE 
Legal and Regulatory Support         4 September 2025 
Corporate Complaints Handling – Annual Report 2024/25 
1.0 INTRODUCTION 
The report provides information on how the Council has dealt with complaints
during the period between 1 April 2024 and 31 March 2025, and performed
against the statutory indicators which have been agreed between the Scottish
Public Services Ombudsman (SPSO) and the Local Authorities Complaint
Handlers Network. 
2.0 RECOMMENDATIONS 
2.1. It is recommended that the Committee consider and note the content of this report. 
3.0 DETAIL 
3.1. All Council services follow the SPSO’s model Complaint Handling Procedure
(CHP). A requirement of this model procedure is that the Council report to the
SPSO on a standard set of statutory performance indicators and prepare an
annual report for consideration by Members.  The report attached at appendix 1
has been prepared in order to satisfy this requirement.   
3.2. The scope of this report includes complaints received in relation to Live Argyll,
and also includes complaints which relate to the Social Work service within Argyll
and Bute HSCP.   
3.3. The SPSO introduced a new model complaints handling procedure from 01 April
2021, which all local authorities were required to adopt. This updated procedure
incorporates complaints in relation to the Social Work service, which were
previously reported separately, and also introduced a new complaint outcome
where officers can conclude a complaint as “resolved”. 
3.4. A more detailed breakdown of performance by Service is attached at Appendix 2.
Details around the common themes of complaints, service areas and further
analysis of the root causes of complaints are provided within Appendix 3 to this
report. This additional information is provided following a previous request from
the Audit and Scrutiny committee. 
3.5. The corporate complaints procedure is administered centrally by the Compliance
and Regulatory team within Legal and Regulatory Support, and quarterly
performance reports are provided to departmental management. Performance
reports are published on the Council’s website:  Complaints | Argyll and Bute
Page 63 Agenda Item 9

Page 64

Classification: OFFICIAL
Council (argyll-bute.gov.uk) although some reports have not been uploaded
this year due to the website upgrade. 
3.6. The Compliance and Regulatory team produce monthly performance update
reports, which are circulated to all Heads of Service and Directors, to draw
attention to any areas where complaints performance may be falling. This
includes detailed information, including the ward area and reasons for late
response. 
4.0 CONCLUSION 
4.1. The Council has dealt with complaints it has received in accordance with the
requirements of the complaints handling procedure and has complied with the
obligation to prepare an annual report. Once it has been presented to the Audit
and Scrutiny Committee, the annual report will be published on the Council’s
website.   
5.0 IMPLICATIONS
5.1 Policy None
5.2 Financial None
5.3 Legal Statutory requirement to prepare report
5.4
5.5
HR
Customer Service
None
Responses to the satisfaction
questionnaire tend to reflect comments
based on the outcome of the complaint as
opposed to the complaint’s procedure.
5.6
5.7
5.8
5.9
Risk
Climate Change
Fairer Scotland Duty
Equalities – protected characteristics
None
None
None
None
5.10
5.11
Consumer Duty
Island Communities
None
None
5.12 Children’s Rights and Wellbeing The Complaints Handling Procedure
incorporates a Child Friendly Complaints
process 
Douglas Hendry
Executive Director with responsibility for Legal and Regulatory Support
Policy Lead - Councillor Mark Irvine
4 August 2025                                                  
For further information contact: Iain Jackson, Governance, Risk & Safety Manager,
01546 604188 
APPENDICES
Appendix 1 – Annual Complaints Report 2024-25
Page 64

Page 65

Classification: OFFICIAL
Appendix 2 – Service Breakdown
Appendix 3 – Themes of Complaints 
Page 65

Page 66

This page is intentionally left blank

Page 67

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL 
ANNUAL COMPLAINTS
ANNUAL COMPLAINTS
PERFORMANCE
REPORT 2024/25
Page 67

Page 68

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
Contents 
Chief Executive’s Foreword ........................................................................................ 3
Introduction................................................................................................................. 4
Complaints Process ................................................................................................... 5
Indicator 1 – Complaints Received per 1,000 of Population ...................................... 6
Indicator 2 – Number of Complaints ........................................................................... 7
Indicator 3 – Complaint Outcomes Stage 1 ................................................................ 8
Indicator 3 – Complaint Outcomes Stage 2 ................................................................ 8
Indicator 3 – Complaint Outcomes Escalated Complaints ....................................... 10
Indicator 4 – Average Times .................................................................................... 11
Indicator 5 – Performance Against Timescales ........................................................ 13
Indicator 6 – Extensions to Timescales .................................................................... 15
Indicator 7 – Customer Satisfaction ......................................................................... 16
Indicator 8 – Learning from Complaints – Reporting ................................................ 17
Indicator 8 – Learning from Complaints – Improvements ......................................... 18
Complaints Investigated by the SPSO ..................................................................... 19
Complaint Themes ................................................................................................... 20
Positive Feedback .................................................................................................... 22
Contact Us ................................................................................................................ 24 
Page 68

Page 69

Page 3  
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
Chief Executive’s Foreword 
I am pleased to present Argyll and Bute Council’s
Annual Complaints Report, which provides
information about our performance in handling
complaints from our customers between 1 April
2024 and 31 March 2025. 
In July 2024, we successfully implemented the
Scottish Public Services Ombudsman’s Child
Friendly Complaints Procedure following the
United Nations Convention on the Rights of the
Child (UNCRC) being incorporated into Scottish Law. Through this procedure, we
can ensure that Children’s rights and needs are central to policy and decision
making and ensure they are the primary decision makers on complaints (where they
have the capacity to do so). 
Argyll and Bute Council is committed to providing high quality services for residents,
businesses and visitors in our area and an important part of this commitment is to
ensure we have effective processes in place to resolve matters when things go
wrong. 
We strive to be thorough, transparent, objective and fair in our approach to
complaints, and to make it as easy as possible for customers to access our
complaints procedure through our website, by email, over the telephone or in
person. 
I understand it can be disappointing and frustrating when your expectations’ are not
met but we welcome and value complaints and feedback from our customers as it
allows us to learn from the issues reported to us to improve the quality of the
services we provide. 
Some examples of those improvements made are included within this report. 
It has been a challenging year and I thank all the staff in my organisation for doing
what they do best and going the extra distance to provide the best possible services
and support to the people of Argyll and Bute. 
Pippa Milne
Chief Executive – Argyll and Bute Council 
Page 69

Page 70

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
What is a complaint?
A complaint is ‘an expression of dissatisfaction about the Council’s action or lack
of action, or about the standard of service provided by or on behalf of the
Council’.   
Introduction 
Argyll and Bute Council, along with all other Scottish Local Authorities, follow a
model complaints handling procedure which is determined by the Scottish Public
Sector Ombudsman (SPSO). This report presents how Argyll and Bute Council has
performed against eight key performance indicators set by the SPSO that are used
by all 32 local authorities, and provides some details about improvements to our
services, along with some positive feedback from our customers. 
Complaints process 
Complaints can be either Stage 1, which are usually straightforward issues and
must be dealt within 5 days or less, or Stage 2, which are usually about more
complex or serious issues and can take up to 20 days for a response to be provided. 
If a customer is not happy with a Stage 2 response, they can refer their complaint on
to the SPSO, who will look at the issues raised and can investigate the matter. 
Stage 1       Stage 2     SPSO 
In most cases, a complaint will be made because the customer considers that the
Council has: 
• Done something wrong
• Failed to live up to expectations
• Treated someone badly or unfairly 
The process map on the following page outlines our process. 
Page 70

Page 71

Page 5  
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
Complaints Process 
Page 71

Page 72

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
INDICATOR 1 – COMPLAINTS RECEIVED PER 1,000 OF
POPULATION 
This section details the total number of complaints handled by Argyll and Bute
Council between 1 April 2024 and 31 March 2025. To allow a fair comparison to be
made across all 32 Scottish councils, this indicator looks at the figure of “complaints
per 1,000 of population”. 
This means there were 9.6 complaints per 1,000 population, or roughly 1 resident
in 104 made a complaint about our services. A comparison of this indicator over the
past 3 years is shown in the table below.  
Year No. of Complaints Complaints Per 1,000 Population 
2024/25 830 9.6
2023/24 781 9.1
2022/23 686 8.0  
In 2024/2025 Argyll and Bute
received, processed and closed
830 
complaints.   
The population of Argyll and Bute
is estimated at around 
86,220   
Page 72

Page 73

Page 7  
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
INDICATOR 2 – NUMBER OF COMPLAINTS 
This indicator provides information about the number of complaints received at
Stages 1 and 2, and the escalated complaints (when a customer is not satisfied with
a stage 1 response, and it goes on to be dealt with as stage 2).    
566* complaints were closed at Stage 1 – 70% 
184* complaints were closed at Stage 2 – 21% 
80 complaints were closed after escalation – 9% 
*7 complaints were not closed at Stage 1 within 10 days and were escalated to
Stage 2. 
*1 Complex Complaint at Stage 2 has not been closed at time of reporting due to an
extension being applied.  
The graph below shows a comparison between the number of complaints received
at each stage over the past 3 years. 
566
185
79
544
163
74
467
138
81
0 100 200 300 400 500 600
Stage 1
Stage 2
Escalated
No. of Complaints
2022/23 2023/24 2024/25
Page 73

Page 74

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
Upheld
34%
Partially
Upheld
21%
Not
Upheld
39%
Resolved
6%
2024/2025 Outcomes
192
148
131
115
130
101
218
197
172
34
57 49
2024/25 2023/24 2022/23
Stage 1 Outcomes - 3 Year Comparison
Upheld Partially Upheld Not Upheld Resolved
INDICATOR 3 – COMPLAINT OUTCOMES STAGE 1 
With every complaint, we contact the customer and explain what the outcome of
their complaint was — Upheld, Not Upheld or Partially Upheld — and provide details
about how this decision was made.  The charts below provide a comparison of the
outcomes for this year, and over the past 3 years.  The “resolved” outcome was
introduced with the new complaints handling procedure in April 2021, and is used
when positive action can be taken to resolve the issue for the customer.   
192 complaints were Upheld at
Stage 1 – 34%
115 complaints were Partially
Upheld at Stage 1 – 21%
218 complaints were Not Upheld
at Stage 1 – 39%
34 complaints were Resolved at
Stage 1 – 6% 
Page 74

Page 75

Page 9  
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
Upheld
18%
Partially
Upheld
30%
Not Upheld
50%
Resolved
2%
2024/2025 Outcomes
33
23 22
56
63
55
92
72
55
3 1 5
2024/25 2023/24 2022/23
Stage 2 Outcomes - 3 Year Comparison
Upheld Partially Upheld Not Upheld Resolved
INDICATOR 3 – COMPLAINT OUTCOMES STAGE 2 
33 Complaints were Upheld at
Stage 2 – 18%
56 Complaints were Partially
Upheld at Stage 2 – 30%
92 Complaints were Not Upheld
at Stage 2 – 50%
3 Complaints were Resolved at
Stage 2 – 2% 
Page 75

Page 76

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
Upheld
28%
Partially
Upheld
30%
Not Upheld
41%
Resolved
1%
2024/25 - Outcomes
22 22
2524
18 17
32 33
37
1 1 2
2024/25 2023/24 2022/23
Escalated Outcomes - 3 Year Comparison
Upheld Partially Upheld Not Upheld Resolved
INDICATOR 3 – COMPLAINT OUTCOMES ESCALATED
COMPLAINTS 
When a customer is not happy with a Stage 1 response, it is dealt with as a Stage 2
complaint — these are known as “Escalated Complaints”.   
22 complaints were Upheld after
escalation - 28%
24 complaints were Partially
Upheld after escalation – 30%
32 complaints were Not Upheld
after escalation – 41%
1 complaint was Resolved after
escalation – 1%
Page 76

Page 77

Page 11  
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
INDICATOR 4 – AVERAGE TIMES 
Stage 1 – We aim to respond to and close all Stage 1 complaints within 5 working
days. In 2024/2025, we closed 559 complaints at Stage 1, with a total sum of 2,505
working days used to close them. Our average time to close a Stage 1 complaint
was 4.5 working days. 
The figures for the last 3 years can be seen in the table below.  
Year No. of Complaints Closed Total Days  Average Time (days)
2024/25 559 2505 4.5
2023/24 532 2337 4.4
2022/23 453 1,995 4.4 
Stage 2 – We aim to respond to and close all Stage 2 complaints within 20 working
days. In 2024/2025, we closed 184 complaints at Stage 2, with a total sum of 4,087
working days used to close them. Our average time to close a Stage 2 complaint
was 22.2 working days. 
The figures for the last 3 years can be seen in the table below.  
Year No. of Complaints Closed Total Days  Average Time (days)
2024/25 184 4,087 22.2
2023/24 159 3,587 22.6
2022/23 137 2367 17.3 
Monthly performance reporting is provided to all Heads of Service, Directors and
Complaints Officers to allow them to take action with their Services if required. 
Page 77

Page 78

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
Indicator 4 – Average Times 
After Escalation – in 2024/2025, we closed 79 escalated complaints after
Escalation, with a total sum of 1,607 working days. Our average time to close a
complaint after Escalation was 20.3 working days. 
The last three year’s results can be seen below.  
Year No. of Complaints Closed Total Days  Average Time (days)
2024/25 79 1,607 20.3
2023/24 74 1,643 22.2
2022/23 81 1671 20.6 
Page 78

Page 79

Page 13  
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
INDICATOR 5 – PERFORMANCE AGAINST TIMESCALES 
Stage 1 – We aim to respond to and close all Stage 1 complaints within 5 working
days. In 2024/2025, we closed 559 complaints at Stage 1 with 465 of these within
timescale, or 83%. 35 (6%) were closed after an extension was agreed with the
customer.   
No. of Complaints Closed Within Timescale  % No. with Extension %
2024/25 559 465 83% 35 6%
2023/24 532 442 83% 37 7%
2022/23 453 370 82% 23 5% 
Stage 2 – we aim to respond to and close all Stage 2 complaints within 20 working
days. In 2024/2025, we closed 184 complaints at Stage 2, with 110 of these within
timescale, or 60%. 38 (21%) were closed after an extension was agreed with the
customer.   
No. of Complaints Closed Within Timescale  % No. with Extension %
2024/25 184 110 60% 38 21%
2023/24 159 100 63% 38 24%
2022/23 137 65 47% 33 24% 
Complaints with extensions agreed do not count as within timescale, these are 
reported as late responses. 
Page 79

Page 80

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
Indicator 5 – Performance Against Timescales 
After Escalation – in 2024/2025, we closed 79 complaints after Escalation, with 54
of these within timescale, or 68%. 12 (15%) were closed after an extension was
agree with the customer.   
No. of Complaints Closed Within Timescale  % No. with Extension %
2024/25 79 54 68% 12 15%
2023/24 74 44 59% 12 16%
2022/23 81 46 57% 23 28% 
Page 80

Page 81

Page 15  
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
INDICATOR 6 – EXTENSIONS TO TIMESCALES 
Part of the complaints handling procedure includes the option to seek an extension
to the usual 5 or 20 day timescale, which should be agreed with the customer. This
indicator reports the number and percentage of complaints at each stage which
were closed after an extension to the 5 or 20 day timeline was authorised. 
Stage 1
35 Extensions agreed
6% of total complaints   
Escalated complaints
12 extensions agreed
15% of total complaints     
Stage 2
38 extensions agreed
21% of total complaints     
Page 81

Page 82

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
INDICATOR 7 – CUSTOMER SATISFACTION 
Our customers are automatically issued with a short complaints process satisfaction
survey once their complaint has been closed. The survey asks for feedback about
the complaints process, and gives an opportunity to send us suggestions for
improvements.  The survey results are reviewed by the Complaints Co-ordinators
quarterly, and the feedback can be used to improve how we handle complaints. 
We received 91 responses to our survey during the year, which is just over 13% of
all complaints received. A low response rate makes it difficult to get an accurate
picture of how all of our customers feel about the complaints process. 
75% of customers indicated that they found it easy to make a complaint 
68% of customers indicated they were told if the response was going to take
longer than the set timescales 
77% of customers indicated that information about the complaints procedure was
easily accessible. 
64% of customers indicated that they were given the opportunity to fully explain
their complaint.   
From our review of the feedback provided through the surveys, we recognise that
customers are often frustrated when an ongoing issue is not resolved through the
complaints process.  
Page 82

Page 83

Page 17  
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
INDICATOR 8 – LEARNING FROM COMPLAINTS –
REPORTING 
Who looks at our complaints figures and trends? 
Information about complaints figures and corrective action taken is reported
regularly to senior managers and a quarterly report is submitted to the Strategic
Management Team. This process ensures the appropriate level of scrutiny takes
place.  
Quarterly performance against the performance indicators is reported to the Local
Authority Complaints Handlers Network (LACHN). 
We are also required to report our complaints figures to the Scottish Public Service
Ombudsman (SPSO) by publishing our annual report.    
How we report Complaints Performance and Trends to our Customers 
We publish the quarterly and annual reports on our website: Complaints | Argyll and
Bute Council (argyll-bute.gov.uk)   
Page 83

Page 84

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
INDICATOR 8 – LEARNING FROM COMPLAINTS –
IMPROVEMENTS 
By dealing with complaints on a day-to-day basis, our Officers are able to make
adjustments to processes when issues are raised. In general, no major policy or
procedural changes were required in response to complaints, however, a number of
minor changes or actions were taken in order to improve our services. Whilst these
improvements may have been minor in the overall scale of activities within the
Council, it is our hope that they have made significant changes to the quality of
service received by our customers. Examples of some of these changes are shown
below: 
Departmental Complaints Co-ordinators attend regular meetings where learning
points from the SPSO are shared and discussed. The feedback and suggestions
from customer satisfaction surveys are also reviewed, and any potential
improvement ideas are investigated and taken forward where appropriate.   
Customer wanted to make a complaint about the lack of response received following an email being
sent to a member of staff. Complaint Partially Upheld – Customer was advised that unfortunately the
member of staff that had been emailed was unexpectedly absent from work. It was identified that a
process was required to be implemented, whereby should a member of staff be absent unexpectedly,
arrangements should be made by the manager with IT colleagues to ensure either an Out of office
message with alternate contact details is placed on the account or the Manager is granted access to
access the absent staff members mailbox. This will ensure that any correspondence can be redirected
as appropriate. 
Customer complaint in relation to the use of acronyms in reports that were available for the public and
the lack of glossary included. Complaint Fully Upheld – While it is common practise when writing
reports that the relevant term is used in full when first referenced with the acronym defined before it is
then used within the remainder of the report, it was acknowledged that this does not always happen. It
was identified that there was no specific reference to the use of acronyms within report guidance. The
guidance was updated and issued to Officers involved in report writing to ensure this does not reoccur.
Customer wanted to make a complaint about being unable to report a Missed Bin on the website.
Complaint Resolved – It was identified that the issue stemmed from the Home Telephone Number
being a mandatory field within the Webform and the customer not having one. The Webform was
updated to remove the requirement for this information and the customer was advised that this had
been updated. This will ensure that no other customers are faced with the same problem. 
Page 84

Page 85

Page 19  
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
COMPLAINTS INVESTIGATED BY THE SPSO 
When a customer is not satisfied with our final response to a complaint, they can
take it to the Scottish Public Service Ombudsman (SPSO) and ask for the complaint
to be investigated. The SPSO is the final arbiter for complaints about public
services. 
Cases passed to SPSO during 2024/2025 
27 cases were received by the SPSO in relation to Argyll and Bute Council in
2024/2025.   
The SPSO publishes reports about all the organisations it has involvement with.
More information is available from Statistics 2024-25 | SPSO    
8 – Advice (not progressed) - 1 was
mature (complaint was out with the
time period for raising the
complaint), 5 were premature
(complainant contacted the SPSO
before progressing through full
complaints process) and 4 were
enquiries. 
27 - resolved early (not investigated) —
the SPSO asks the Council to provide
information in connection with the
complaint, from that the investigating
officer decides whether the complaint
should be pursued further. Some of the
reasons provided for not proceeding to
an investigation were “Good Complaint
Handling” and “Insufficient benefit would
be achieved”. 
0 – Investigations by the SPSO,
however, there was 1
investigation in which we
received an outcome of Fully
Upheld from a 2023/24
Complaint. 
Page 85

Page 86

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
COMPLAINT THEMES 
We record information about what type of complaints we receive, and have a standard set of
categories that complaints generally fall into. The chart below shows how the complaints
received have been classified during 2024-25. 
*Note – the total here does not directly correspond with the total number of complaints, due to how escalated
complaint categories are recorded 
23
42
26
155
34
311
172
0 50 100 150 200 250 300 350
Damage/Injury
Inadequate Information
Late Delivery
Non Delivery
Policy Restriction
Substandard Delivery
Unacceptable Behaviour
Number of Complaints
Page 86

Page 87

Page 21  
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
64
55
50
45
41
39
37
35
32
30
24
21
18
14
14
14
12
12
12
12
9
9
9
9
9
8
8
8
7
7
6
6
5
5
5
0 10 20 30 40 50 60 70
Staff Issue - Conduct
Domestic Refuse Collection
Staff Issue - Communication
Education - Other
Social Work Decisions
Missed Bin
Education - Treatment of Child
Parking Services
Council Tax Other
Planning Applications
Council Service Error
Council Decision
Ground Maintenance
Cemeteries
Street Lighting
Failure of Care
Winter Maintenance
Quality of Care
Public Conveniences
Pavements/Footpaths
Recycling
Public Transport
Road Closure
Staff Issue - Other
Traffic Management
Commercial Refuse
Enforcement
Council Payments
Road Works
Licensing
Social Work Reports
Play Parks
School Transport
Care Funding
Piers & Harbours
No. of Complaints
We have also captured information about what we believe the main theme of each
complaint to be. This information will be provided (along with other levels of
analysis) to our Elected Members and Senior Management to allow them to take this
into consideration when making policy and service decisions. The chart below
shows the main issues we have received complaints about. It includes all complaints
where we received 5 or more in connection with a particular issue.   
Page 87

Page 88

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
POSITIVE FEEDBACK 
Service was fantastic all dealt with in one phone call. Were very professional. A lot of
councils in the UK generally should take heed of the quality of service received today and a
credit to the ladies, that's all I’ve got to say.
Here is a short message to compliment the awesome professional conduct of the team - 
[1] was patient and understanding, took time to listen, [2] immediately understood the
situation and grasped the bigger picture [3] was genuinely considerate and showed
knowledge and expertise, [4] relieved my anxiety and stress. please commend team. 
The person I dealt with was very professional very kind and helped me very much with my
Council Tax query today and I'm very grateful for the assistance and you're very lucky to have
such nice people working for you. All the best for 2025 many thanks bye now. Fabulous. 
The lady I spoke to was extremely helpful which at this moment in time at the age we are it
was very rewarding to get this help. We are in our eighties and I got the help I needed the
girl was absolutely fantastic. Thank you
Here is just a small extract of the positive
feedback that we have received this year. It
is important to recognise that excellent
services are being delivered, often in very
challenging circumstances.   
For all the years I have dealt with Local Authorities, I have never received such excellent
customer service and felt compelled to send you an email. I contacted Building Control to
resolve an outstanding issue with a house we were about to purchase. The positive attitude,
engagement and problem solving were second to none in helping us resolve a complex
building warrant issue. Please kindly pass on my recommendation and appreciation! We are
delighted to be moving to such a "welcoming" local authority! 
Page 88

Page 89

Page 23  
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL 
The young lady the employee of yours in the bin collections department was very caring,
kind, respectful and gave me wonderful care and service she should be getting 11 out of 10
for customer care.  Many thanks for all your help dear 11 out of 10 for customer care,
wonderful. Thank you very much. 
The person I dealt with was very professional very kind and helped me very much with my
Council Tax query today and I'm very grateful for the assistance and you're very lucky to
have such nice people working for you. All the best for 2025 many thanks. Fabulous.
Just a quick email to pass on our sincere gratitude with all your help these past few days. You
have gone above and beyond and we can't thank you enough.  
A wee note of thanks for attending to all of the local government departments following the
death of my wife. Your kind attention to this removed a great deal of stress from my shoulders
at a time of loss. Thanks again. 
I spoke with the lady and she was really, really kind I get really worried when letters come in
and I can't do things online I can't manage it and she explained everything very quietly and
patiently and kindly so that's put my mind at ease and I'm very grateful to her so she's very
good employee so thank you very much. 
The representative that I spoke with today was absolutely 100% helpful, professional, a really,
really, nice person to deal with and I wouldn’t hesitate to call her back again if I had any
queries as such a nice person. A credit to Argyll & Bute Council. Thank you. 
Page 89

Page 90

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
CONTACT US 
Thank you for looking at our annual complaints report for 2024-25. If you would like
to know more about our complaints procedure, details can be found on our website:   
https://www.argyll-bute.gov.uk/my-council/complaints  
Or you can contact us using any of the methods below.  
Phone – 01546 605522 
Text – 07860023933 
Post – Argyll and Bute Council, Kilmory, Lochgilphead, Argyll, PA31 8RT 
Email - enquiries@argyll-bute.gov.uk  
Online - https://www.argyll-bute.gov.uk/my-council/how-contact-us   
Page 90

Page 91

Department Stage 1
complaints
Responded to
within
timescale
Upheld Partially
upheld
Not
upheld
Resolved Stage 2
complaints
Responded
to within
timescale
Upheld Partially
upheld
Not
upheld
Resolved
Chief Executives
Directorate 0 0 0 0 0 0 1 1 0 0 1 0
Community Development & Planning 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 1 1 0 0 1 0
% within timescale - 100%
Development & Infrastructure
Directorate 0 0 0 0 0 0 0 0 0 0 0 0
Financial Services 56 54 15 5 34 2 8 8 1 1 6 0
Development & Economic Growth 50 32 15 8 21 6 22 14 4 2 16 0
Roads and Infrastructure 309 266 132 71 101 3 100 85 34 17 47 2
Customer Support 7 7 3 0 2 2 1 1 0 0 1 0
Total 422 359 165 84 158 13 131 108 39 20 70 2
% within timescale 85% 82%
Customer Services
Directorate 1 1 0 0 1 0 1 1 0 0 1 0
Legal & Regulatory 10 9 4 0 4 2 11 8 3 1 7 0
Commercial Services 8 7 0 3 5 0 12 11 0 0 12 0
Education 43 40 8 16 18 1 50 35 5 29 16 0
Total 62 57 12 19 28 3 74 55 8 30 36 0
% within timescale 92% 74%
Health & Social Care Partnership
Adult Care - Health & Community Care 29 17 8 6 8 5 20 6 2 9 8 0
Adult Care - Acute & Complex Care 10 5 1 0 6 2 7 3 0 2 3 2
Children and Families & Criminal Justice 38 23 3 5 17 11 31 14 6 19 6 0
Total 77 45 12 11 31 18 58 23 8 30 17 2
% within timescale 58% 40%
Live Argyll
Live Argyll 5 4 3 1 0 0 0 0 0 0 0 0
Total 5 4 3 1 0 0 0 0 0 0 0 0
% within timescale 80% -
Overall totals 566 465 192 115 217 34 264 187 55 80 124 4
% within timescale 82% 71%
Annual complaints figures 2024/25
Page 91

Page 92

This page is intentionally left blank

Page 93

Page 1 Annual Complaints Report 2024-25 Appendix 3 
Annual Complaints Performance 2024-25 
This report provides additional details to accompany the full annual complaints report for 2024-25, which is based on
the 8 indicators set by the Scottish Public Service Ombudsman (SPSO). 
1. All Complaints listed by theme 
Complaint theme Number
Cost of Council Service 4
Civic Amenity 3
Street Sweeping 3
Benefits Other 3
Flooding 3
Projects, Renewables & Regeneration 3
Live Argyll - Other 2
Special Uplift 2
Council Property/Buildings 2
Respite 2
Litter 2
HR Policy/Process 2
Disabled Parking Bays 2
Payroll 2
Library Services 2
Noise Control 1
Dog Fouling 1
Public Health 1
Road Markings 1
Drainage 1
Leisure Services 1
Surfacing 1
Council Tax Portal 1
Benefit Payments 1
School Catering 1
Local Development Plan 1 
Table 1 provides a full breakdown of complaints into
relevant themes. From the data in the complaints
system, we have assigned each case a theme, based
on our understanding of the main issue raised in the
complaint. Where complaints have been in connection
with a number of issues, or could fall into various
themes, we have assigned it the theme we believe to
be the main issue. The larger themes are explored
further within this report.
Complaint theme Number
Staff Issue - Conduct 64
Domestic Refuse Collection 55
Staff Issue - Communication 50
Education - Other 45
Social Work Decisions 41
Missed Bin 39
Education - Treatment of Child 37
Parking Services 35
Council Tax Other 32
Planning Applications 30
Council Service Error 24
Council Decision 21
Ground Maintenance 18
Cemeteries 14
Street Lighting 14
Failure of Care 14
Winter Maintenance 12
Quality of Care 12
Public Conveniences 12
Pavements/Footpaths 12
Recycling 9
Public Transport 9
Road Closure 9
Staff Issue - Other 9
Traffic Management 9
Commercial Refuse 8
Enforcement 8
Council Payments 8
Road Works 7
Licensing 7
Social Work Reports 6
Play Parks 6
School Transport 5
Care Funding 5
Piers & Harbours 5
Homelessness Service 4
Non Domestic Rates 4
Data Protection 4
Committee/Governance 4
Road Signage 4
Page 93

Page 94

Page 2 Annual Complaints Report 2024-25 Appendix 3 
2. General breakdown by complaint category and department 
Details about some of the larger themes / areas of complaints are provided in this section.  A more in depth
breakdown within the main service areas is provided at section 4 below 
Table 1 – Categories of complaints by department  
Chief Executive’s Unit
& Community
Planning
Education,
Legal &
Regulatory &
Commercial
Customer Support,
Financial Services, Road
& Infrastructure and
Development &
Economic Growth
Health and
Social Care
Partnership
Live
Argyll
Damage/Injury  2 21  
Inadequate
Information 
7 26 8 1
Late Delivery  2 23 1 
Non Delivery  6 140 7 2
Policy Restriction  6 25 3 
Substandard
Delivery 
64 188 58 1
Unacceptable
Behaviour
1 39 85 46 1
Grand Total 1 126 508 123 5 
Table 2 – Number of complaints by area 
Details of complaint themes within ward areas are provided below. 
Area Count of Ward
Area
Bute and Cowal 155
Helensburgh and Lomond 285
Mid Argyll Kintyre and the Islands 148
Oban Lorn and the Isles 173
Area Not Identified 2
Grand Total 763 
Page 94

Page 95

Page 3 Annual Complaints Report 2024-25 Appendix 3 
Section 3 – Complaints themes by Area 
Table 3a Mid Argyll, Kintyre and Islands   
Theme Count of Ward Area
Staff Issue - Conduct 25
Education - Other 15
Education - Treatment of Child 11
Planning Applications 9
Council Service Error 8
Social Work Decisions 7
Public Conveniences 6
Staff Issue - Communication 6
Council Tax Other 6
Winter Maintenance 5
Cemeteries 4
Failure of Care 3
Council Decision 3
Quality of Care 3
School Transport 3
Enforcement 3
Missed Bin 3
Road Works 2
Data Protection 2
Commercial Refuse 2
Parking Services 2
Public Transport 2
Flooding 1
Benefits Other 1
Non Domestic Rates 1
Piers & Harbours 1
Social Work Reports 1
Benefit Payments 1
Payroll 1
Drainage 1
School Catering 1
Public Health 1
Civic Amenity 1
Ground Maintenance 1
Litter 1
Licensing 1
Street Lighting 1
Recycling 1
Road Closure 1
Committee/Governance 1
Grand Total 148    
Page 95

Page 96

Page 4 Annual Complaints Report 2024-25 Appendix 3 
3b Oban, Lorn and the Isles
Theme Count of Ward
Area
Social Work Decisions 12
Parking Services 12
Staff Issue - Communication 12
Council Decision 11
Staff Issue - Conduct 9
Council Tax Other 9
Domestic Refuse Collection 9
Education - Other 8
Missed Bin 8
Council Service Error 7
Planning Applications 6
Winter Maintenance 6
Failure of Care 6
Cemeteries 6
Staff Issue - Other 5
Ground Maintenance 4
Licensing 4
Piers & Harbours 4
Projects, Renewables & Regeneration 3
Public Transport 3
Quality of Care 3
Pavements/Footpaths 2
Education - Treatment of Child 2
Council Payments 2
Street Lighting 2
Commercial Refuse 2
School Transport 2
Care Funding 2
Pothole 1
Civic Amenity 1
Public Conveniences 1
Committee/Governance 1
Play Parks 1
Respite 1
Enforcement 1
Council Property/Buildings 1
Surfacing 1
Cost of Council Service 1
Special Uplift 1
Non Domestic Rates 1
Grand Total 173   
Page 96

Page 97

Page 5 Annual Complaints Report 2024-25 Appendix 3 
3c Bute and Cowal 
Theme Count of Ward Area  Theme Count of Ward Area
Staff Issue - Communication 15  Live Argyll - Other 1
Staff Issue - Conduct 12  Missed Bin 1
Social Work Decisions 11  Grand Total 155
Education - Treatment of Child 10   
Council Tax Other 9   
Traffic Management 9   
Road Closure 8   
Parking Services 7   
Pavements/Footpaths 7   
Domestic Refuse Collection 6   
Education - Other 5   
Quality of Care 5   
Planning Applications 4   
Ground Maintenance 4   
Public Conveniences 3   
Failure of Care 3   
Public Transport 3   
Council Decision 2   
Social Work Reports 2   
Library Services 2   
Council Service Error 2   
Cemeteries 2   
Street Lighting 2   
Street Sweeping 1   
Road Markings 1   
Data Protection 1   
Disabled Parking Bays 1   
Road Works 1   
Enforcement 1   
Care Funding 1   
Dog Fouling 1   
Licensing 1   
Council Tax Portal 1   
Road Signage 1   
Play Parks 1   
Council Payments 1   
Pothole 1   
Council Property/Buildings 1   
HR Policy/Process 1   
Staff Issue - Other 1   
Leisure Services 1   
Noise Control 1   
Non Domestic Rates 1   
Page 97

Page 98

Page 6 Annual Complaints Report 2024-25 Appendix 3 
3d Helensburgh and Lomond 
Theme Count of Ward
Area 
Payroll 1
Domestic Refuse Collection 40  Quality of Care 1
Missed Bin 27  Winter Maintenance 1
Staff Issue - Conduct 18  Local Development Plan 1
Education - Other 17  Special Uplift 1
Staff Issue - Communication 17  Respite 1
Education - Treatment of Child 14  HR Policy/Process 1
Parking Services 14  Disabled Parking Bays 1
Social Work Decisions 11  Litter 1
Planning Applications 11  Non Domestic Rates 1
Street Lighting 9  Public Transport 1
Ground Maintenance 9  Civic Amenity 1
Recycling 8  Live Argyll - Other 1
Council Tax Other 8  Grand Total 285
Council Service Error 7   
Council Payments 4   
Road Works 4   
Homelessness Service 4   
Commercial Refuse 4   
Council Decision 4   
Play Parks 4   
Social Work Reports 3   
Staff Issue - Other 3   
Cost of Council Service 3   
Pavements/Footpaths 3   
Enforcement 3   
Road Signage 3   
Care Funding 2   
Public Conveniences 2   
Committee/Governance 2   
Street Sweeping 2   
Flooding 2   
Cemeteries 2   
Failure of Care 2   
Pothole 2   
Benefits Other 2   
Data Protection 1   
Licensing 1   
Page 98

Page 99

Page 7 Annual Complaints Report 2024-25 Appendix 3 
3e Top 10 complaint themes, broken down by ward area 
Theme Bute and
Cowal
Helensburgh
and Lomond
Mid Argyll Kintyre
and the Islands
Oban Lorn
and the Isles
Grand
Total
Staff Issue - Conduct 12 18 25 9 64
Domestic Refuse Collection 6 40  9 55
Staff Issue - Communication 15 17 6 12 50
Education - Other 5 17 15 8 45
Social Work Decisions 11 11 7 12 41
Missed Bin 1 27 3 8 39
Education - Treatment of Child 10 14 11 2 37
Parking Services 7 14 2 12 35
Council Tax Other 9 8 6 9 32
Planning Applications 4 11 9 6 30
Grand Total 80 177 84 87 428 
Section 4 – Service breakdown by area and theme 
Table 4a – Chief Executives Unit 
Theme Bute and
Cowal
Helensburgh
and Lomond
Mid Argyll Kintyre
and the Islands
Oban Lorn
and the Isles
Grand
Total
Staff Issue - Other    1 1
Grand Total 0 0 0 1 1 
Table 4b – Education, Legal and Regulatory Support, Commercial Services 
Theme  Bute and
Cowal
Helensburgh
and Lomond
Mid Argyll
Kintyre and
the Islands
Oban
Lorn and
the Isles
Area Not
Identified
Grand Total
Committee/Governance  2 1 1  4
Council Decision 2 1 1 9 1 14
Council Property/Buildings 1   1  2
Council Service Error 1 1  1  3
Data Protection   2  2
Education - Other 5 17 15 8  45
Education - Treatment of
Child
10 14 11 2  37
Enforcement   1  1
Local Development Plan  1    1
Projects, Renewables &
Regeneration   
1  1
Quality of Care 1    1
School Catering   1   1
Staff Issue - Communication 2   3  5
Staff Issue - Conduct 4 2 1 1  8
Staff Issue - Other    1  1
Grand Total 26 38 33 28 1 126 
Page 99

Page 100

Page 8 Annual Complaints Report 2024-25 Appendix 3 
Table 4c – Customer & Support Services 
Theme Bute and Cowal Helensburgh and
Lomond
Mid Argyll
Kintyre and the
Islands
Oban Lorn
and the
Isles
Grand
Total
Council Decision   1  1
Council Service Error  1   1
Data Protection  1   1
HR Policy/Process 1 1   2
Missed Bin    1 1
Staff Issue - Communication  1   1
Grand Total 1 4 1 1 7 
Table 4d – Financial Services 
Theme Bute and
Cowal
Helensburgh
and Lomond
Mid Argyll Kintyre
and the Islands
Oban Lorn
and the Isles
Area Not
Identified
Grand
Total
Benefit Payments   1   1
Benefits Other  2 1   3
Care Funding  1    1
Cost of Council Service  1  1  2
Council Decision  1  1  2
Council Payments 1 4  2 1 8
Council Tax Other 9 8 6 9  32
Council Tax Portal 1     1
Non Domestic Rates 1 1 1 1  4
Payroll  1 1   2
Staff Issue -
Communication 
1    1
Staff Issue - Conduct 1     1
Grand Total 13 20 10 14 1 58 
Table 4e – Development and Economic Growth 
Row Labels Bute and
Cowal
Helensburgh and
Lomond
Mid Argyll Kintyre
and the Islands
Oban Lorn
and the Isles
Grand
Total
Cost of Council Service  1   1
Council Decision   1  1
Council Service Error    2 2
Drainage   1  1
Enforcement 1 3 1 1 6
Homelessness Service  3   3
Licensing 1 1 1 4 7
Planning Applications 4 11 9 6 30
Projects, Renewables &
Regeneration   
2 2
Public Health   1  1
Staff Issue - Communication 2 3  1 6
Staff Issue - Conduct 1 1   2
Staff Issue - Other 1 1  3 5
Grand Total 10 24 14 19 67
Page 100

Page 101

Page 9 Annual Complaints Report 2024-25 Appendix 3 
Table 4f – Roads & Infrastructure Services 
Theme Bute and
Cowal
Helensburgh
and Lomond
Mid Argyll Kintyre
and the Islands
Oban Lorn and
the Isles
Grand
Total
Cemeteries 2 2 4 6 14
Civic Amenity  1 1 1 3
Commercial Refuse  4 2 2 8
Cost of Council Service  1   1
Council Decision  2  1 3
Council Service Error 1 5 6 3 15
Data Protection 1    1
Disabled Parking Bays 1 1   2
Dog Fouling 1    1
Domestic Refuse
Collection
6 40  9 55
Enforcement   1  1
Flooding  2 1  3
Ground Maintenance 4 9 1 4 18
Litter  1 1  2
Missed Bin 1 27 3 7 38
Noise Control 1    1
Parking Services 7 14 2 12 35
Pavements/Footpaths 7 3  2 12
Piers & Harbours   1 4 5
Play Parks 1 4  1 6
Pothole 1 2  1 4
Public Conveniences 3 2 6 1 12
Public Transport 3 1 2 3 9
Recycling  8 1  9
Road Closure 8  1  9
Road Markings 1    1
Road Signage 1 3   4
Road Works 1 4 2  7
School Transport   3 2 5
Special Uplift  1  1 2
Staff Issue -
Communication
5 7 3 5 20
Staff Issue - Conduct 2 12 13 2 29
Staff Issue - Other  2   2
Street Lighting 2 9 1 2 14
Street Sweeping 1 2   3
Surfacing    1 1
Traffic Management 9    9
Winter Maintenance  1 5 6 12
Grand Total 70 170 60 76 376  
Page 101

Page 102

Page 10 Annual Complaints Report 2024-25 Appendix 3 
Health and Social Care Partnership
Table 5a – Area breakdown
Service Bute and
Cowal
Helensburgh
and Lomond
Mid Argyll Kintyre
and the Islands
Oban Lorn
and the Isles
Grand
Total
Children and Families 21 20 12 6 59
Complex Care and Registered Services 3 2 2 9 16
Criminal Justice 1 2  1 4
Hospital and Community Services 6 4 16 18 44
Grand Total 31 28 30 34 123 
Table 5b – Area & Theme breakdown 
Bute and
Cowal
Helensburgh
and Lomond
Mid Argyll Kintyre
and the Islands
Oban Lorn
and the Isles
Grand
Total
Children and Families 21 20 12 6 59
Care Funding 1 1   2
Failure of Care 3 1 2 1 7
Quality of Care 1 1   2
Respite  1  1 2
Social Work Decisions 7 8 5 3 23
Social Work Reports 2 2   4
Staff Issue - Communication 5 4 2 1 12
Staff Issue - Conduct 2 2 3  7
Complex Care and Registered
Services
3 2 2 9 16
Care Funding    1 1
Council Service Error    1 1
Social Work Decisions 2 1  2 5
Staff Issue - Communication  1 1 2 4
Staff Issue - Conduct 1  1 3 5
Criminal Justice 1 2  1 4
Homelessness Service  1   1
Social Work Decisions    1 1
Social Work Reports  1   1
Staff Issue - Conduct 1    1
Health and Community Services 6 4 16 18 44
Care Funding    1 1
Council Service Error   2  2
Failure of Care  1 1 5 7
Quality of Care 3  3 3 9
Social Work Decisions 2 2 2 6 12
Social Work Reports   1  1
Staff Issue - Communication 1    1
Staff Issue - Conduct  1 7 3 11
Grand Total 31 28 30 34 123 
Notes: The total number of complaints does not exactly relate to the total number of themes reported, as many of
the complaints escalated from stage 1 to stage 2 represent 1 theme.
Page 102

Page 103

ARGYLL AND BUTE COUNCIL  AUDIT AND SCRUTINY COMMITTEE
Legal and Regulatory Support  4 September 2025 
Information Requests – Annual Report 2024/25 
1.0 INTRODUCTION 
1.1 This report is to update the Committee on the position regarding the
recording, responding to, monitoring and reporting of requests for
information under the Freedom of Information (Scotland) Act 2002 (FOISA)
and the Environmental Information (Scotland) Regulations 2004 (EIR’s) for
the period between 01 April 2024 and 31 March 2025. 
2.0 RECOMMENDATIONS 
2.1 It is recommended that the Committee consider and note the content of this
report. 
3.0 DETAIL 
3.1 A total of 1,582 requests for information were received during the period -
1 April 2024 to 31 March 2025 which is an increase of 94 on the number
received in 2023-24. Overall, 90% of requests received this year (1,423)
were responded to within the statutory timescale of 20 working days and
159 requests were responded to after 20 working days. These totals
include requests for information from the Health and Social Care
Partnership (Social Work) and Live Argyll. 
3.2 A breakdown by Department and detail around late responses is
provided in Appendix 1. 
3.3 There were 38 requests for review made during this period, which
equates to less than 2% of the total number of requests. 26 were
responded to within the 20 working day statutory timescale (68%), and
the 12 issued late required more time to gather information and
investigate complex issues. 
3.4 The overall response rate within timescale has decreased slightly from
92% in 2023/24 to 90% in 2024/25. As the details provided in Appendix 1
show, many service areas achieved a high level of performance,
between 95-100%. It is helpful to note that 45 responses were sent out
on day 21 and 18 sent out on day 22, which if they had been issued on
time would have brought the response rate up to 94%. The team will
have an ongoing focus to try and assist services to avoid responses
issued late by only a day or so. In addition, while L&RS are showing as
92%, the bulk of those late responses relate to requests that were
Page 103 Agenda Item 10

Page 104

handled by L&RS but where the information requested related to other
services and sometimes multiple services where there has been a delay
in the provision of the information. More information in relation to these is
included within the Late Responses within Appendix 1. 
3.5 Three decisions have been received following investigations by Office of
the Scottish Information Commissioner (OSIC) in 2024/25. 2 decisions
were in agreement with the applicant, one of which found the Council had
considered a request under FOI instead of EIR and the other found that
Council had failed to carry out the appropriate searches. 1 decision was
in agreement with the Council, where OSIC agreed that the Council had
applied an exemption appropriately to withhold information.   
3.6 The Compliance and Regulatory team continues to work with
Departments to seek to improve response rates where required, and
deliver training and provide guidance to allow officers to appropriately
respond to information requests. 
3.7 The Compliance and Regulatory team provide monthly updates to the
Chief Executive, the Chief Officer, Directors, Heads of Service and the
departmental FOI reps. Quarterly reports are provided to all DMTs. 
4.0 CONCLUSION 
4.1 Many Services maintained an excellent performance level throughout
2024/25, and the overall result of 90% of responses issued within
timescale is very positive, given the pressures on some service areas
where high numbers of information requests were received. 
4.2 The Compliance and Regulatory team continues to work with
Departments to seek to improve response rates where required, and
deliver training and provide guidance to allow officers to appropriately
respond to information requests. 
5.0 IMPLICATIONS 
5.1 Policy None
5.2 Financial  None
5.3 Legal   Possible breach of statutory requirement to
respond to requests
5.4
5.5
HR
Customer Service
None
The relatively low number of requests for
review is indicative that we are responding
appropriately to requests and customers are
receiving the information they are looking for.
5.6
5.7
5.8
Risk
Climate Change
Fairer Scotland Duty 
None
None
None
5.9 
5.10
Equalities - protected
characteristics
Consumer Duty
None 
None 
Page 104

Page 105

5.11 Island Communities None
5.12 Children’s Rights and Wellbeing None 
Douglas Hendry
Executive Director with responsibility for Legal and Regulatory Support 
4 August 2025 
Policy Lead – Councillor Mark Irvine                                                  
For further information contact: Iain Jackson, Governance, Risk and Safety
Manager - 01546 604188 
APPENDICES  
Appendix 1 – Departmental/Service stats & Late Response Details 
Page 105

Page 106

This page is intentionally left blank

Page 107

Department / Service Total
requests
received
Responded
to in time
Responded
to late
Running
in time
Running
late
Overall % 2023/24 2022/23 2021/22
Chief Executives
CP&D 1 1 0 0 0 100% 0% 0% 100%
Customer Services
Education 179 166 13 0 0 93% 89% 99% 93%
L&RS 450 413 37 0 0 92% 92% 97% 98%
Commercial 57 57 0 0 0 100% 100% 100% 100%
Development and Infrastructure
Financial 93 92 1 0 0 99% 100% 99% 97%
D&EG 303 273 30 0 0 90% 90% 83% 85%
R&IS 250 219 31 0 0 88% 89% 89% 86%
Customer 113 80 33 0 0 71% 95% 98% 97%
Health and Social Care Partnership
IJB 1 1 0 0 0 100% - - -
Adult Care 67 64 3 0 0 96% 98% 97% 99%
C&F / CJ 52 46 6 0 0 88% 96% 95% 98%
Live Argyll
Live Argyll 16 11 5 0 0 69% 92% 80% 100%
Totals 1582 1423 159 0 0 90% 92% 94% 93%
FOISA and EIR Requests
Information Requests - Annual Figures - 1st April 2024 - 31st March 2025
Page 107

Page 108

Page 108

Page 109

Classification: OFFICIAL  
ARGYLL AND BUTE COUNCIL  AUDIT & SCRUTINY COMMITTEE   
FINANCIAL SERVICES  4 SEPTEMBER 2025  
AUDIT AND SCRUTINY COMMITTEE ANNUAL REPORT 2024/25 
1. SUMMARY 
1.1 The purpose of this report is to provide the Chair of the Audit and Scrutiny
Committee’s (the Committee) annual overview of the Committee’s activity
during the financial year 2024/25 and a summary of key developments
since the commencement of 2025/26.  It sets out how the Committee has
fulfilled its remit and provides assurances to the Council. 
2. RECOMMENDATIONS 
2.1 Review and endorse the Chair’s Annual Report. 
2.2 Agree that the Chair presents the report to a future meeting of the Council at
a date to be confirmed. 
3. DETAILS 
3.1 It is important that the Committee fully complies with best practice guidance  
on Audit Committees to ensure it can demonstrate its effectiveness as a
scrutiny body as a foundation for sound corporate governance for the
Council. The Chartered Institute of Public Finance and Accountancy
(CIPFA) issued an updated guidance note Audit Committees Practical
Guidance for Local Authorities and Police 2022 Edition which incorporates
CIPFA’s Position Statement: Audit Committees in Local Authorities and
Police. This sets out CIPFA’s view of the role and functions of an Audit
Committee. The CIPFA Audit Committees Guidance includes the
production of an annual report on the performance of the Audit Committee
against its remit for submission to the Council. 
4.  CONCLUSION 
4.1 The Audit and Scrutiny Committee Annual Report 2024/25, which is
appended to this report as Appendix 1, provides assurance to full Council
over the activity of the Committee. 
5.  IMPLICATIONS    
5.1 Policy: None  
5.2 Financial: None  
5.3 Legal: None 
5.4 HR: None 
5.5 Customer Service: None 
5.6 Risk: None 
5.7 Climate Change: None
Page 109 Agenda Item 11

Page 110

Classification: OFFICIAL  
5.8 Fairer Scotland Duty: None 
5.9 Equalities – protected characteristics: None 
5.10 Consumer Duty: None 
5.11 Island Communities: None 
5.12 Children’s Rights and Wellbeing: None    
For further information please contact Internal Audit (01546 604108) 
Paul Macaskill
Chief Internal Auditor
4 September 2025 
Appendices: 
1. Audit and Scrutiny Committee Chair Annual Report 2024/25
Page 110

Page 111

3 
Classification: OFFICIAL 
Appendix 1 - Audit and Scrutiny Committee Chair Annual Report 2024/25 
Introduction by the Chair of Audit and Scrutiny Committee 
This report provides an overview of the Audit and Scrutiny Committee’s (the
Committee) activity during the financial year 2024/25 and a summary of key
developments since the commencement of 2025/26. 
In 2024/25 the Committee met quarterly on a hybrid approach with the following as
appointed members: 
Janice Wason-Hall (Chair) Daniel Hampsey Reeni Kennedy-Boyle 
Graham Hardie Andrew Vennard
Gary Mulvaney (Vice Chair) Fiona Howard 
Committee meetings were also attended by appropriate representatives of the Council
including the Chief Internal Auditor (CIA) and our appointed External Auditors, Forvis
Mazars. Other Council Officers attend as and when appropriate including the Chief
Executive and the Head of Customer Support Services who attends regularly to advise
the Committee on issues relating to performance management. 
There has been progressive improvement in the service received from Forvis Mazars
after what had been a concerning start, due to recruiting difficulties which had caused
delays in the External Audit of our accounts and trust funds. However, since regular
meetings and updates between Finance staff and lead staff within Forvis Mazars have
occurred, this has resulted in an improvement in timelines for planned audit work and
we hope that such progress continues in the delivery of the Council’s audit. It is normal
for accounts to be signed off and submitted to the Accounts Commission by our
appointed external Auditors by 30 September each year, it is important that such
improvements focus on the restoration of this deadline going forward. 
Whilst the Committee has had changes since the inception of the Council in 2022, as a
result of both Council Leadership but also the retirement of the previous Committee
Chair; the Committee continues to operate effectively and efficiently in the discharge of
its responsibilities and offers appropriate overview and scrutiny. All members have been
trained in their specific role on the Committee and experienced support also provided
for those Members sitting on Scrutiny Panels set up to review specific areas of the
Council’s work.   
The Council’s Internal Audit section is subject to an independent External Quality
Assurance Assessment which is mandatory under the Public Sector Internal Audit
standards (PSIAS) every five years. I was pleased to note that the service was deemed
compliant in all 14 areas of assessment. This assessment is augmented with annual
reviews which are reported to the Committee, and I am again reassured that full
compliance has been maintained in 2024/25. It is important that the service provided by
Internal Audit maintains the highest standards which helps the Committee in receiving
high quality reports for its assurance purposes. Furthermore, this supports the wider
governance operating within the Council. I continued to work closely with the CIA and
have built up a good and productive relationship which is augmented with regular
scheduled meetings. 
There are a number of important developments which intend to have positive outcomes
for Argyll and Bute, the largest of which was the funding announcement relating to the
Page 111

Page 112

4 
Classification: OFFICIAL
Rural growth Deal. This includes a funding package of £70M over a 10-year period
aimed at creating opportunities for people living in Argyll and Bute and attract future
investment by increasing productivity, growing the working age population, addressing
key infrastructure and skills gaps. The Council’s Internal Audit service will be the lead
auditor for this programme of planned work and this will feature as a key area of review
in their Audit Plan covering the same period. 
In looking forward to 2025/26 and beyond, significant pressures continue as a result of
financial settlements, this has been particularly compounded as a result of inflationary
pressures, the risk of unfunded or partly funded pay settlements, and the lack of
opportunities to focus funding received to areas where resources may be best used due
to ring fencing of specific allocated resources which continues to present a complex
backdrop within local government. These pressures are likely to remain and will
continue to add an element of uncertainty in relation to the overall financial picture
affecting the Council. The Council continues to undertake appropriate medium to long
term financial planning using a scenario modelling approach which helps to provide
Members with a thorough overview of the implications of funding and cost pressures,
along with associated risks. I am however satisfied that the Council continues to
embrace these challenges in a strategic, capable, and productive manner. 
Janice Wason Hall – Chairperson 
1. Audit and Scrutiny Committee’s Effectiveness and Impact
1.1 The Committee’s role is to ensure that the Council’s internal control
framework and governance arrangements are operating effectively.  In order
to fulfil this role, a range of reports are provided to the Committee during the
year.  I am satisfied that the frequency, content and detail of reports provided
to the Committee allow myself and fellow members to adequately fulfil this
role.
1.2 In March 2024 Internal Audit presented their Annual Audit Plan setting out
their approach to the 2024/25 audit of the Council and in June 2024 Forvis
Mazars outlined their planned approach to their work reflecting their statutory
duties and risk-based approach. The respective audit plan and approach
were considered by the Committee and accepted. 
1.3 During 2024/25 the CIA has continued to develop our approach to audit and
scrutiny.  Particular developments which have furthered the effectiveness of
both Internal Audit and the Committee are:
• The continued and successful work of the Counter Fraud Team.
• The approach to Scrutiny continues to develop and work to complete the
‘Complaints’ review in 2024/25 was concluded.
• The CIA engaged with Members of the Committee as part of the planning
process for the 2024/25 audit plan.
• An external assessment has been undertaken during 2022/23 in terms of
compliance with the Public Sector Internal Audit Standards (PSIAS) after a
portfolio of evidence has been prepared and submitted. This independent
assessment identified that the Internal Audit service was in full compliance
with all 14 areas of criteria. This was supplemented by the annual self-
review in 2024/25 which confirmed that standards have been maintained to
these levels.
• A gap analysis for the implications of the new Global Internal Audit
Page 112

Page 113

5 
Classification: OFFICIAL
Standards (GIAS) and an action plan to address any gaps was undertaken
and agreed by the Committee and will be monitored until implemented. 
2. Assurances 
Internal Audit Assurance
2.1 Internal Audit is a key source of assurance for both Members and
management on the effectiveness of the control environment. The Committee
has a responsibility for ensuring that Internal Audit is effective in the provision
of this assurance.  I am content that the minor amendments made to the
2024/25 audit plan as a result of a variety of reasons from recent work having
been done internally, postponement to another financial year and a national
review to be undertaken in the specific area. Work within the Council will be
further risk assessed and considered as part of the future audit planning
process. I am content with the assurance provided by the CIA that sufficient
work has been undertaken to allow him to provide an opinion on the Council’s
systems of governance and internal control. Throughout the year, in my
opinion, clear assurance judgements are provided, underpinned by an
appropriate evidence base and, where appropriate, include sound
management advice and guidance. 
2.2 The Committee has received regular reports and information from the CIA
including:
• risk based internal audit annual plan
• regular progress reports
• annual report, in line with PSIAS, which provided the CIA’s independent
annual opinion on the effectiveness of the Council’s risk management,
internal control and governance processes. 
2.3 Exhibit 1 shows an analysis of assurance opinions provided by internal audit
in the three-year period 2022/23 – 2024/25. There have been minor
fluctuations year to year, the important trend identified is the low number in
audits issued that have been providing limited assurance. In addition, there
have been largely consistent trends in the number of audits classified as
providing a substantial and high levels of assurance in 2024/25. There was
one classified as being limited.  For these, and all other audit reports,
management have accepted 100% of audit recommendations and action
plans have been agreed.  A robust follow-up system is in place with progress
presented to the SMT on a quarterly basis and to the Committee as a
standard agenda item.
Exhibit 1 – Audit Assurances (2022/23-2024/25) 
Page 113

Page 114

6 
Classification: OFFICIAL 
2.4 The Committee has a clear role in relation to oversight of the Internal Audit
function; specifically in relation to overseeing its independence, objectivity,
performance and professionalism.  I am pleased to advise, as Chair of the
Committee, that I am satisfied that internal audit is effective and activity is
undertaken in accordance with relevant standards. 
External Audit Assurance
2.5 External Audit is an essential part of the process of accountability and
assurance for public funds, providing an independent opinion on the financial
statements, and reviewing aspects of governance and financial management.
Working closely with Internal Audit, the external audit programme ensures
that statutory responsibilities are delivered, without the duplication of audit
work. The Council’s appointed external auditors are Mazars.
2.6 The council’s audited annual accounts for the year ending 31 March 2024
were endorsed by the Audit and Scrutiny Committee and referred to Council
for approval in December 2024.  An ‘unqualified’ opinion has been provided
by the external auditors, Mazars in this respect.  Consequently, this provides
a basis of assurance which the Committee can take as part of its duty as
those charged with governance.  The regulatory environment requires the
authority to delegate responsibility for the monitoring and scrutiny of treasury
management activities, strategy and policies to a specific named body.  For
this authority, the appropriate delegation body is the Audit and Scrutiny
Committee.  Treasury management training was delivered to members of the
committee during October 2024, to support its scrutiny role.  This scrutiny
responsibility was discharged in respect of the 2024-25 Treasury
Management Mid-year Review Report in December 2024, a 2024-25
Treasury Management Update as at 31 December 2024 in March 2025 and
the 2025-26 Treasury Management Strategy and Annual Investment
Strategy, also in March 2025. 
2.7 The Council was last subject to a Best Value review reported in April 2025,
however, the period of this report will focus up to 31 March 2025 and relates
to the Best Value Review of 2019/20 which highlighted that good progress
was made by the Council since the previous inspection in 2015, specifically
the significantly improved relationships amongst elected members and
Page 114

Page 115

7 
Classification: OFFICIAL
between members and officers and the Council’s sound approach to financial
planning. All of these points and actions have now been addressed and a
final report was prepared and presented to the Audit and Scrutiny Committee
in March 2023. This should provide further assurance that these key issues
have been addressed by the Council. Regular updates on Performance are
presented to the Committee, including progress on the Performance
Excellence Project and updates on the Council’s performance in the LGBF.
The Annual Business Plan records progress against Corporate Outcome
Indicators and new Council Priorities, agreed in September 2024 are being
used to develop and new Corporate Plan and Corporate Outcome measures.
The Council also reported on thematic work on Digital Exclusion in 2024 and
carried out a self-assessment on Workforce Innovation as part of national
Audit Scotland Best Value work. Further development in performance and
reporting has been introduced and a seminar for the Committee has been
arranged in order that the latest position has been conveyed to the
Committee which has oversight. 
3. Risk Management 
3.1 The CIA performs an annual strategic risk register assurance mapping
exercise which enables the Committee to assess the levels of assurance it
can take over the activity undertaken by the Council to manage its strategic
risks. This is complemented by the Chief Executive presenting the Strategic
Risk Register to the Committee on an annual basis to allow the Committee to
further scrutinise the approaches being taken to manage risk. 
3.2 In 2023/24 a review of Risk Management was undertaken and this provided
an audit opinion that a high level of assurance can be taken. This is the
highest level of audit opinion and should further provide additional assurance
on the Risk Management arrangements within the Council. 
4. Independence 
4.1 To assist in preserving the Committee’s independence, measures are in place
including:
• the appointment of an independent chair 
• observation of the Internal Audit Charter which specifies the independence
of the CIA and the wider audit team 
• the non-political approach of the committee
• the active involvement of the external auditors
• clear terms of reference aligned to CIPFA’s Role of the Audit Committee
Guidance 
5. Scrutiny 
5.1 During 2024/25 the Committee undertook work on completing the
‘Complaints’ scrutiny review as part of our scrutiny plan. This report was
presented to the Audit and Scrutiny Committee in June 2025. These and
previous reports were well received by the Committee and widened the
understanding of the complexities and challenges faced by both staff and the
community in specific areas and where these reports will help allow
continuous improvement as a Council.
5.2 The benefits of scrutiny are twofold; helping to understand, what can often be
Page 115

Page 116

8 
Classification: OFFICIAL
multifaceted and procedurally complex issues due to legislation but also to
help consider ways to improve and develop to make any processes more
understandable and/or streamlined where that is at all possible.  
5.3 Scrutiny work will continue in 2025/26; it is anticipated that work will focus on
the Councils arrangements for the implementation of the Biodegradable
Municipal Waste Landfill Ban. This review will commence in late autumn of
2025, allowing operational resources to be balanced in the service area with
the planned scrutiny work. 
6. Counter Fraud Team (CFT) 
6.1 The Council has an effective CFT having been made permanent after a trial
period with both officers having completed the CIPFA (Chartered Institute of
Public Finance and Accountancy) Accredited Counter Fraud Specialist
Course meaning they are fully accredited counter fraud investigators.  This
further strengthens the Council’s commitment to protecting the public purse. 
6.2 Since the inception of the CFT, regular reporting to the Audit and Scrutiny
Committee takes place and latterly the CFT reported that proactive and
targeted work in this area has resulted in a cumulated £1.48M being rebilled
and that to date £928K has been recovered. The ongoing work of the CFT in
both recovery but also in its deterrent effect sends a strong message that the
Council will take all reasonable steps it can to identify error and fraud but also
take appropriate action to recover monies that are due. Regular reports are
presented to Committee each quarter in relation to the work of both Internal
Audit and the Counter Fraud function. 
6.3 Local visits throughout Argyll and Bute were undertaken in the year and this
will form part of a rolling programme of visits going forward, focusing on
maximising the income due to the Council. In addition, the CFT are raising
awareness of the Council’s zero tolerance to fraud and this will help act as a
deterrent to fraud being perpetrated in the first place. I expect further visits to
be equally successful and so far in 2025/26 this has proved to be the case. It
is pleasing to note that the ongoing work in relation to counter fraud clearly
demonstrates the Council both in its commitment to recovering sums of
revenue due through error or fraud but also in the wider context of good
governance. 
7. External Quality Assurance Assessment – Internal Audit
7.1 The mandatory Public Sector Internal Audit Standards (PSIAS), published in 
April 2013 and updated in March 2017, apply to all internal audit service 
providers in the UK public sector. To supplement the PSIAS, and provide 
specific guidance surrounding its application within a local government 
setting, the Chartered Institute of Public Finance and Accountancy (CIPFA) 
compiled a Local Government Application Note, (LGAN) which was updated 
in 2019. This requires all internal audit providers to have an independent
external assessment of these standards in application within their service
provision. New Global Standards came into effect on 1 April 2025, a gap
analysis was undertaken to identify any necessary changes that may be
required to be implemented, these were reported to the Committee in March
2025. 
Page 116

Page 117

9 
Classification: OFFICIAL
7.2 An independent report on the Council’s Internal Audit Service was prepared
and presented to the Audit and Scrutiny Committee in March 2023. It is
pleasing and reassuring to note that the assessor found that in all 14 areas of
assessment the Council’s Internal Audit Service fully conforms to the
standards.  The assessor also identified that the team are highly qualified with
a training plan in place to address any skills gaps and that they deliver a high-
quality service for the Council which is evident by the questionnaires returned
after the completion of each review. 
7.3 This was the first time the Council’s Internal Audit Service obtained a fully
conforms opinion in all 14 areas of assessment and the independent report
demonstrates the importance of having a fully resourced and functioning
service which provides assurance to senior management and to those
charged with governance responsibilities, specifically, the Audit and Scrutiny
Committee. This position should provide substantial assurance to the Council
and Members of the Audit and Scrutiny Committee. Annual internal
assessments will continue until the next scheduled external assessment in
2027/28. 
8. Looking Forward 
8.1 I have been in post as Chair for just over a year, I am impressed with the way
in which the Committee operates in the discharge of its audit and scrutiny
duties, whilst respectfully challenging where required but also with a mindset
of support. This approach is key to maintaining collective engagement,
improving controls and progressing the need for continuous improvement
within the Council. I would also like to thank the Vice-Chair, Cllr Gary
Mulvaney for his invaluable support and the experience he brings to the
Committee given his extensive financial background, as do all members of
the Committee in their respective personal and professional backgrounds.
Looking ahead, it is important that we develop our skills and knowledge so we
can add value and to that end an in-person meeting of the Committee was
scheduled in September 2025 which included development sessions to aid
that learning. These sessions focused on the new Global Internal Audit
Standards, key major frauds that occurred in other local authorities and the
learning that can be gleaned from what went wrong, along with an overview
of the work from our Counter Fraud Team. 
8.2 In 2025/26 and onwards the Committee will consider potential options/topics
for scrutiny reviews and as a Committee we will continue to implement and
further develop our scrutiny approach.  
8.3 This focus on continuous improvement is equally applicable to the audit
element of the Committee and we will continue to work with the CIA and,
where appropriate, our appointed External Auditors Forvis Mazars, to identify
opportunities to further develop the skillset and expertise of both the
Committee and the internal audit department to facilitate effective challenge
and scrutiny. 
8.4 The Counter Fraud Team will continue to focus their resources on specific
concerns across the local authority area seeking to recover monies owed and
due to the Council in accordance with its policies.
8.5 The Council continue to provide the audit services to the HSCP and were
Page 117

Page 118

10 
Classification: OFFICIAL
awarded the contract for a period of three years commencing 1 April 2024. A
formal service level agreement is in place to reflect the new contract. In
2024/25, a plan of audit coverage was agreed and presented to their Audit
and Risk Committee.
8.6 The Internal Audit team are focused, professional and work continues to
promote better resilience within the team through the opportunities of
professional training schemes and other forms of staff development. This
approach fits in well with the Council’s programme of ‘Growing our Own’ in
order that the Council has skilled workforce for the future and these are
retained locally where possible. 
8.7 We will continue to provide updates on progress of the CFT and reports will
be presented to the Committee as part of the quarterly and annual reporting
of the Internal Audit service. 
9. Conclusion 
9.1 Based on the reports received and reviewed by the Committee, I am in
agreement with the CIA’s annual audit report which confirms that reasonable
assurance can be placed upon the adequacy and effectiveness of the
Council’s internal control system in 2024/25. I am satisfied that active
monitoring and follow up are in place in respect of agreed management
actions. This follow up process is further enhanced by the continuous
monitoring programme carried out by internal audit which provides ongoing
assurance over the Council’s core transactional based systems. 
9.2 The pressures on the Council continue both in the need to balance delivering
the services required by our communities but also in the backdrop of
challenging financial settlements, economic and socio-demographic changes
which are likely to remain for the foreseeable future. The need for a continued
strong, independent, resourced and resilient Internal Audit team has never
been so important and will be critical going forward in helping the Council to
meet these challenges and provide the assurances that are required by the
Audit and Scrutiny Committee, senior management and the Council.
Page 118

Page 119

Classification: OFFICIAL 
ARGYLL AND BUTE COUNCIL  AUDIT AND SCRUTINY COMMITTEE 
FINANCIAL SERVICES  4 SEPTEMBER 2025 
STRATEGIC RISK ASSURANCE MAPPING 
1. EXECUTIVE SUMMARY 
1.1 The purpose of this report is to set out Internal Audit's assessment of the sources
of assurance for the Audit and Scrutiny Committee (the Committee) on the
management of the Council's strategic risks. 
1.2 Appendix 1 highlights the overall assessment against each of the strategic risks.
It should be noted that the assessment is based on the level of assurance that the
Committee can rely on. A 'red' assessment therefore highlights where there are
gaps in evidence of active/targeted actions/activity rather than an assessment on
the management of that risk. 
2. RECOMMENDATIONS 
2.1 To note and consider the risk assurance map at appendix 1. 
3.  DETAIL   
3.1 Internal audit has a key role in relation to the Council’s governance to provide
assurance over the effective management of risk. 
3.2 The Chief Executive presents the Strategic Risk Register to the Committee on an
annual basis which provides the Committee the opportunity to scrutinise the
register and seek assurance from the Chief Executive that risks are being
managed appropriately.  
3.3 The CIA is of the view that the cumulative effect of these management
arrangements both contribute to positive risk management reporting within Argyll
and Bute Council but also maintaining an annual review in order to maintain
appropriate overview and update of key emerging issues which will be reported
to the Audit and Scrutiny Committee. 
3.4 The Global Internal Audit Standards (GIAS) require that Internal Audit evaluate
the effectiveness of the Council’s risk management process. However, it does
not state this needs to be an annual exercise. Furthermore, it states that Internal
Audit’s may gather the information to support an assessment of the effectiveness
of risk management processes ‘during multiple engagements ‘and further states
that ‘The results of these engagements, when viewed together, provide an
understanding of the organisation’s risk management processes and their
effectiveness.  As such PSIAS does not require a full risk management audit on
an annual basis. Furthermore, The CIPFA publication “Audit
Committees:  Practical Guidance for Local Authorities and Police” (2022 Edition)”
requires the Audit Committee to have the option to consider risk management on
a regular basis, regardless of who has operational responsibility for it. That option
is always available. 
Page 119 Agenda Item 12

Page 120

Classification: OFFICIAL
3.5 Appendix 1 provides a summary of the Council’s strategic risk assurance map
which is based on the ‘three lines model’ (formerly known as the ‘Three Lines of
Defence’). 
1. The first line is the ‘functions that own and manage risks’. It is the
control environment established by day-to-day business operations and
risk management processes. It is formed by managers and staff who
are responsible for identifying and managing risk as part of their
accountability for achieving objectives. This requires an understanding
of the Council, its objectives, the environment in which it operates, and
the risks it faces. It includes things such as: 
• identifying risks and improvement actions
• implementing controls
• reporting on progress 
2. The second line is the ‘functions that oversee or who specialise in
compliance or the management of risk’. This provides the policies,
frameworks, tools, techniques and support to enable risk and compliance
to be managed in the first line, conducts monitoring to judge how
effectively they are doing it, and helps ensure consistency of definitions
and measurement of risk. The Council’s various committees and Strategic
Management Team are key functions in delivering this element. 
3. The third line is the ‘functions that provide independent assurance’. This is
provided by internal and external audit and any other scrutiny or
regulatory body who offer independent challenge and provide an
evaluation, through a risk-based approach, on the effectiveness of the
Council’s governance, risk management, and internal control. 
Page 120

Page 121

Classification: OFFICIAL
3.6 The table below summarises the assessment against each Strategic Risk.
Strategic Risk Risk Score
(August 2025)
Assurance
Assessment
1. Population, external infrastructure and
economic decline
Red 16 Green
2. Condition and suitability of infrastructure and
asset base
Amber 12 Green
3. Financial sustainability Amber 12 Green
4. Governance & leadership Amber 8 Green
5. Engagement and understanding the needs of
the community
Amber 9 Green
6. Service delivery Amber 12 Green
7. Health & Social Care Partnership Amber 12   Green
8. Civil contingency and business continuity
arrangement are not effective
Green 6 Amber
9. Waste management Red 16 Amber
10. Service delivery – Cyber Security Red 15 Amber
11. Cost of living crisis Amber 12 Amber
12. Impact of climate change Amber 12 Green
13. Lack of housing availability Red 20 Amber
14. Compliance with ‘Prevent’ Amber 9 Amber 
3.7  The assurance map has not identified an area where there may be a concerning
mismatch between the level of risk identified and the assurance provided to
Committee. 
3.8 
3.9 
Waste Management has been subject to regular monitoring and update from
the service to the Council’s Audit and Scrutiny Committee, additional funding is
to be provided from the Scottish Government of £1.5M to support the
compliance with the BMW landfill ban. In addition, regular reports are being
submitted to and are being monitored by the relevant service Committee of the
Council. The Audit and Scrutiny Committee have identified the progress and
arrangements for the implementation of the BMW landfill ban as the subject
area which will be reviewed in 2025/26 as part of their scrutiny work. This will
provide the Committee with a comprehensive overview of the arrangements
relating to BMW. 
In relation to ‘Service Delivery – Cyber Security’ work has been undertaken in
this area as part of the 2022/23 plan which provided a substantial level of
assurance. Going forward, a planned review will be undertaken as part of the
2025/26 Internal audit plan putting additional audit resources into this area of
risk, specifically, ICT Disaster Recovery Arrangements. However, it is relevant
to note that work undertaken in 2022/23, 2023/24 and 2024/25 identified no
significant concerns in relation to Cyber Security, Cloud Computing, Data
Security and information Security and IT Risk Register and Mitigation
Processes. Whilst this is in part reassuring, there is always a heightened risk to
public bodies in relation to this critical area of business activity, together with
increasing evidence of sustained attempts on public bodies within Scotland
and the wider UK. 
The Council declared a Housing Emergency due to the risks associated with
the Council, partner agencies and communities being unable to attract and
retain working age people due to lack of housing and pricing. A housing
summit in collaboration with housing delivery partners was held in December
Page 121

Page 122

Classification: OFFICIAL 
3.10 
2023 in order to forge commitments aimed at tackling housing shortage which
maximise resources, pursue innovation, coordinate planning and target
delivery. A Housing Strategy and Investment Plan is being funded and
implemented, with a new housing delivery group established; Plans are
underway to approach this complex and difficult issue at both a national and
local level. 
The remaining areas where assurance has been assessed as “amber” either
have audit reviews already undertaken, scheduled or as part of the ongoing
audit planning process. All changes to the Strategic Risk Register from
September 2025 will be assessed in the 2026 Assurance Mapping Exercise. 
4. CONCLUSION
4.1 This exercise has again confirmed that for the majority of risks in the Council’s
strategic risk register there are either sufficient assurances in place or internal
audit have scheduled work to fill identified gaps. Nevertheless, it is important to
outline that such mitigations and assurances do not alone guarantee that an
adverse event or risk will not present itself or materialise. 
5. IMPLICATIONS 
5.1 Policy - None
5.2 Financial - None
5.3  Legal - None
5.4  HR - None
5.5 Customer Service - None
5.6 Risk – The assurance mapping exercise has provided a satisfactory level of
assurance that the Council is managing and monitoring its strategic risks
effectively.  
5.7 Climate Change - None
5.8  Fairer Scotland Duty - None
5.9 Equalities - protected characteristics - None
5.10 Consumer Duty - None
5.11 Island Communities - None
5.12 Children’s Rights and Wellbeing - None 
Paul Macaskill
Chief Internal Auditor
4 September 2025 
For further information contact: 
Paul Macaskill, Chief Internal Auditor, 01436 604108 
APPENDICES
Appendix 1 – Strategic Risk Assurance Map
Page 122

Page 123

APPENDIX 1: Strategic Risk Assurance Map 
N
o
Risk Risk
Score 
First Line of Defence  Second Line of
Defence
Third Line of Defence  Assessment
1 Population,
External
Infrastructure
and Economic
Decline 
Failure to identify
relevant factors
contributing to the
decline and
failure to develop
strategies and
actions targeting
these factors.
Red
16
• Service planning linked
to Corporate Outcomes
and the A&B Outcome
Improvement Plan
(ABOIP)
• Community and multi-
agency links through
Community Planning
Partnership
• Parliamentary forum
• Argyll, Lomond and
Islands Rural
Regeneration Initiative
• Argyll and the Isles
Strategic Tourism
Partnership
• Promotion and
marketing of Argyll &
Bute (ABplace2B
campaign)
• Business Gateway
Service focused on
helping local
businesses grow
• Council Leader
engaging with leaders
of other west coast
councils suffering
population decline 
• Economic
Strategy and
Action Plan
monitored by
ED&I Committee
• CPP report on the
progress being
made against the
outcomes and
vision of the
ABOIP and issue
annual reports.
• Monitoring of CPP
plan and
performance at
CPP Management
Committee.
• Area Community
Action Plans
progress reported
to Community
Planning Groups
• ABOIP targets
population and
economic
recovery
• Performance
reports
considered by
A&SC, strategic
committees and
area committees 
External Audit
• Best Value Assurance
Report (May 2020)
highlights Council’s and
CPP partners’ commitment
to a shared vision and that
they recognise the
challenges including the
declining and aging
population 
Internal Audit
• Planning 
(2023/24 – Substantial)
• Community Education
(2024/25 – High)
• Short Term Lets (2024/25 –
Substantial)
• Oban Airport (2024/25 –
High) 
Scrutiny
• Economic Strategy
(2019/20) 
Future
• Delivery of the Rural
Growth Deal 
• UK Shared Prosperity
Funding Investment Plan
is being actioned as per
plan.  
• Multi-agency approach to
refugee settlement
underway linking with
national processes and
There is a range
of assurance
sources across
the three lines.
Page 123

Page 124

agendas.
• The council will continue
as a partner of the
Highlands and Islands
Regional Economic
Partnership and lobby for
Government investment
to realise economic
opportunity and address
barriers to future
sustainable growth. 
• Internal Audit 
Rural Growth Deal
(2025/25) 
2 Condition and
suitability of
Infrastructure &
Asset Base 
Infrastructure and
asset base does not
meet current and
future requirements
and is not being used
or managed
efficiently and
effectively.
Amber
12  • R&A Control Hub and
Joint Operations Team
• Operational risks
monitored quarterly
• Strategic Asset Mgt
Board
• Corporate Asset
Management Strategy
and Corporate Asset
Management Plan
• Service Asset
Management Plans
• Community
Empowerment and
Community Asset
transfer
arrangements in
place
• Roads Asset
Management Plan
• One Council
Property Approach
• Routine inspections
of roads
infrastructure to
deal with potential
weak areas
• Revised capital
management
• D&I  performance
reporting to ED&I
Committee
• Asset Mgt Plans 
reviewed annually
by Council as part
of the budget
setting process
• Status and
Options reports to
ED&I Committee
Internal Audit
• Community Empowerment
Act (2018/19 – High)
• Capital Monitoring
(2020/21 – Substantial)
• Management of Property
Contracts (2020/21 –
Reasonable)
• Land & Asset Disposal
(2021/22 – Substantial)
• Internal Audit – Fixed Asset
Register (2021/22 –
Reasonable)
• Piers and Harbours
(2023/24 – Reasonable)
• Leasing - Estates (2024/25
– Substantial)
• Asbestos Management
(2024/25 – Reasonable)
• Bridges Asset Management
Plan and Inspection Regime
(2024/25 – Reasonable) 
Scrutiny
• Roads Maintenance
(2018/19)
• Scrutiny – Community Asset
There is a range
of assurance
sources across
the three lines. Page 124

Page 125

procedures 
Future 
• Modern Workspace
Programme to review
and rationalise property
portfolio for future needs
of the Council.  Changes
on phased and town by
town basis 
Transfers (2021/22) 
Future
• Internal Audit - Roads
Reconstruction
Programme (2025/26)
• Review of Capital
Arrangements in 2025/25
• Delivery of the Capital
Programme 20025/26 
3 Financial
Sustainability 
Insufficient resource
to meet current and
future service
requirement. 
Budget not aligned /
does not support
business outcomes.
Amber
12
• Budget preparation and
monitoring
• Medium term financial
strategy with worst case,
mid case and best case
scenario planning
• Treasury Mgt Policy
• 5 year budget outlook
updated quarterly
• Financial Services Team
aligned to service
delivery
• Regular engagement
between budget holders
and appointed finance
contact
• Reserve balances
monitored throughout the
year 
• Financial
monitoring and
financial risk
monitoring to
P&R/BCC
Committee
• Budget and
budget working
papers
considered by
full Council
• Financial Strategy
reported to P&R
Committee
• 5 year budget
outlook to P&R
Committee
• Treasury Mgt
Annual Report to
P&R Committee
and A&SC
• Joint SMT/Policy
Leads meetings
include
discussions
around financial
issues
Internal Audit
• Continuous Monitoring
• Financial Planning
(2018/19 - Substantial)
• Capital Monitoring
(2020/21 - Substantial)
• Fixed Asset Register
(2021/22 – Reasonable)
• Management of Debt and
Recovery (2022/23 –
Reasonable)
• Financial Ledger (2023/24-
Substantial)
• NDR (2024/25 - Substantial) 
External Audit
• Assessment of financial
management via annual
audit
• Best Value Report (April
2025) highlights the
Council has effective
financial planning
arrangements in place but
could take steps to
enhance its strategic
approach to considering a
range of savings options to
support difficult decisions.
There is a range
of assurance
sources across
the three lines.
Page 125

Page 126

(New medium – longer
terms budget approach
2025/26)
• Assessment of budget
monitoring arrangements 
Future
• Internal Audit – Payroll
(2025/26)
• Rural Growth Deal
(2025/26)
• Consider the implications
and opportunities from the
Visitor Levy (Scotland) Bill
which could generate
additional income from
2026/27. 
4 Governance and
Leadership 
Governance and
leadership
arrangements are
not conducive to
effective working and
lead to a lack of
strategic direction.
Amber
8
• Corporate
Governance
Improvement Plan
• Ongoing member
development
• Mentoring and
coaching for SMT
• Leadership
development
programme
• Chief Exec
Bilaterals
• A&B Manager’s
Course
• Established
partnership
governance
• Effective internal
audit function
• Scrutiny function
• Performance
Improvement
framework
• Council constitution
• Codes of conduct
• Oversight
provided by Audit
& Scrutiny
Committee
• Decision making
committees open
to public
• Constitution
updated and
approved
annually by
Council
• IA reports and
follow up to DMT
and SMT
• Annual assurance
statements
• Fortnightly DMTs
– weekly ELT and
monthly SMTs
Internal Audit
• Continuous Monitoring
• Organisational Culture
(2018/19)
• Performance Mgt (2018/19
– High)
• Member Support (2018/19
– Substantial)
• Risk Mgt 2018/19 –
Substantial)
• Following The Public
Pound (2019/20 –
Reasonable)
• Annual self-assessment of
PSIAS – external peer
review every 5 years
• Formal Induction of new
Audit and Scrutiny
Committee Members 2022
• Risk Management (2023/24
– Substantial) 
There is a range
of assurance
sources across
the three lines. 
Page 126

Page 127

for staff and
members
• Code of Corporate
Governance and
Annual Action Plan
• Scrutiny framework
and scrutiny plan
• Risk management
embedded
• Policy lead
meetings
• Area Committee
Business Days 
External Audit
• Ongoing independent
assurance reported in
AAR
• Best Value Report (March
2025) identified no
significant concerns. 
Future
• Scheduled reviews of Risk
Management every two to
three years.
• Connect for Success
priorities now form the
basis of new corporate
improvements and are
being delivered.
• New Corporate
Improvement Plan. 
5 Engagement and
Understanding the
needs of the
Community 
The Council fails to
understand service
user needs and
emerging
demographic trends
and does not align
service delivery to
meet these.
Amber
9
• Annual budget
consultation
• Complaints process
• Community
Engagement
Strategy
• Customer
Service Board
• Various user
feedback (i.e.
Refugee
Resettlement,
commissioned
services,
community
council surveys)
• Parental
engagement
strategy
• Outreach service
• Democracy
matters
• Community
Planning
Partnership
• Service
Committees
• Area Committees
• DMT and SMT 
Internal Audit
• Community Empowerment
Act (2018/19 – High)
• Complaints Handling
(2021/22 – High)
• Customer Service Centre
(2022/23 – High) 
Other Agencies
• Education Scotland and
Care Inspectorate seek
views of service users 
External Audit
• Best Value Report (March
2025) identified that - As
savings options become 
There is a range
of assurance
sources across
the three lines.
Page 127

Page 128

consultation
• Development Mgt
user forums 
more challenging to
identify, engaging with
communities is
increasingly important.
The council’s community
engagement strategy
should support this critical
dialogue and needs to be
embedded across the
organisation.
Scrutiny
• Scrutiny – Community Asset
Transfers (2021/22)
• Scrutiny – Community
Engagement (2022/23)
• Scrutiny – Complaints
(2024/25)
Future
• A working group was
established to review our
approach to Community
Engagement; the
Framework has now been
developed and was
approved by Policy and
Resources Committee in
December 2024.
• Here to Hear You events -
Programme of Here to
Hear You community
engagement events being
undertaken by Leader and
Chief Executive. (2025/26) 
6 Service Delivery 
Insufficient resources
to ensure effective
service delivery
Amber
12
• Performance
Improvement
Framework
• Rolling out programme
of service self-
assessment
• Service improvement
• Performance
reporting to A&SC,
Service
Committees and
Area Committees
• LGBF Review to
A&SC, Service
Internal Audit
• Performance Mgt (2018/19
– High)
• Complaints Handling
(2021/22 – High)
• IA annual plan is risk
There is a range
of assurance
sources across
the three lines. 
Page 128

Page 129

plans
• Workforce planning
• Complaints process
• Use of LGBF
• Strategic Plans with
Success Measures
aligned to Business
Outcomes
• Performance
Improvement Officers 
Committees and
Area Committees
• Self-Assessments
reported to SMT
and A&SC 
based but also designed to
provide annual coverage
of all Heads of Service
• Internal Audit review of
Human Resources
(2023/24 – Substantial)
External Audit
• Best Value Report (March
2025) highlights - The
council must now ensure
that its new corporate plan
maintains a clarity of
vision, that supporting
strategies and policies are
aligned to it, and that the
plan is underpinned by
more streamlined and
focused performance
reporting and key
performance indicators to
drive continuous
improvement. 
Future
• Internal Audit –
Performance Management
Arrangements and
Reporting (2025/26)
• Performance excellence
project being reported
regularly to Audit and
Scrutiny Committee and
SMT.
7 Health and Social
Care Partnership 
Failure of the HSCP
to deliver on its
Strategic Priorities
results in
deteriorating health
and wellbeing
outcomes for the
population and / or
Amber
12
• Strategic Plan
• Integration Scheme
• IJB has elected
member representation
including Council
Leader
• Elected member
representation on IJB
Audit Committee (inc
Vice Chair)
• Council’s CIA regularly
• Performance and
financial
monitoring and
reporting in place
and reported to
IJB Board
• HSCP Chief
Officer sits on
Council’s ELT
• Financial
Recovery Plan for
Internal Audit
• The IJB has their own IA
function provided by the
Council’s IA function
(Contract started 1 April
2021 and renewed 2024)
• Council’s IA function also
provide assurance over
social work services on an
annual basis 
There is a range
of assurance
sources across
the three lines.
Page 129

Page 130

reduced access to
appropriate health
and social care
services. This could
also result in
financial and
reputational risk to
the Council.
attends IJB Audit &
Risk Committee
• Regular engagement
between Council CFO
and HSCP CFO 
2025/26 in place
• Development of
options to deliver
sustainability in
future years is
ongoing 
• Internal Audit - Charging
for Non-Residential
Services (2020/21 –
Substantial) 
• Child Protective Services
(2021/22 – Substantial)
• Care Programme
Approach (2021/22 –
Limited)
• Complaints handling
(2021/22 – Limited)
• Workforce Planning
(2021/22 – Reasonable)
• Client Funds (2022/23 –
Limited)
• Learning and physical
Disabilities Care Packages
(2023/24 – Substantial)
• Client Funds (2023/24 –
Reasonable)
• SSSC Registration (2023/24
– Substantial)
• External Placements
(2024/25 – Reasonable) 
External Audit
• IJB’s external auditors are
Mazars. 
Future Internal Audits
• Directed Self Support
(2025/26)
• Eclipse System Post
Implementation (2025/26) 
8 Civil Contingency &
Business continuity
arrangements are
not effective.
Green
6
• Critical activity
recovery plans
• Emergency planning
test events
• West of Scotland local
• Emergency Mgt
Support Team
• EU tactical group
progress reported
to SMT
Internal Audit
• Business Continuity
(2019/20 – Reasonable)
• Disaster Recovery
Moderate third
line assurance at
current time. A
project has
Page 130

Page 131

resilience partnership
• Community resilience
plans
• EU withdrawal tactical
group 
Planning (2020/21 –
Limited)
• Civil Contingencies
(2021/22 – Substantial)
Future
• The new BCM system has
been procured and
configured and a pilot
project to test the system
and the process has been
completed within 3 service
areas, Procurement,
Customer Engagement
and Transformation
Management and
Residential (Care Home
Services). Roll out is
ongoing to other service
areas which will result in
business continuity plans
being in place for each
service. This is expected
to be completed by 31
March 2026. 
commenced to
implement
business
continuity
processes,
covering critical
activities and
testing of
CARPS. 
This is an area
that will merit a
follow up audit in
the medium term
future. 
However
assurance can be
taken from the
Council’s
response to
COVID which
was fast paced
and has proven
to be effective. 
9 Waste Management 
Waste disposal is
impacted by a
number of significant
risks which are 1) the
impact of the BMW
Landfill Ban, 2) the
end of the current
waste PPP contract
(September 2026), 3)
a fast moving
Scotland and UK
Policy context.    
Red
16
• Council rolling out new
waste strategy
• Using education and
publicity to increase
recycling 
• Performance
reporting to EDI
Committee
• Progress
monitoring by
DMT and SMT 
Internal Audit
• Waste Mgt (2018/19 –
Limited) 
Scrutiny
• Waste Mgt Strategy
(2020/21) - On 27 April
2021 the Head of Roads
and Infrastructure Services
provided a presentation to
the A&SC regarding the
Council’s Waste Strategy
followed by a question and
answer session. Following
the presentation the A&SC
members agreed they
were assured that
appropriate progress was
being made in relation to
Assurances over
this risk are
currently
moderate due to
the Council’s
Waste Strategy
being in its
infancy and prior
to the full
implementation of
the BMW landfill
ban. 
However full
implementation is
not untill 2026.
The A&SC
determined they
are content that
progress is
reported to the
Page 131

Page 132

the Council’s waste
strategy and that inclusion
of a specific scrutiny topic
focusing on the Strategy
would not add value at this
time.
• A briefing note was
requested by the A&SC in
June 2022 relating to
Waste Mgt and was
presented by the HoS in
September 2022.
• A briefing and update
report was presented to
the A&SC in December
2023 by the HoS. 
Future
• Confirmation received
from the Scottish
Government that £1.5m
has been made available
to support the compliance
with the BMW Landfill Ban. 
• Contract management
meetings are now taking
place with the PPP
provider chaired by the
HoS. 
• Determining and
mobilizing a plan for the
closure and restoration of
existing landfill sites
(within the PPP contract)
to ensure compliance with
regulatory requirements
prior to the implementation
of the BMW landfill ban.
Next stage in this is to gain
understanding from SEPA
of the timescales they will
require for restoration of
these sites.
Scrutiny Review of BMW
EDI Committee
and that the
A&SC will
maintain a
watching brief.
Page 132

Page 133

arrangements scheduled
for 2025/26.
10 Service Delivery -
Cyber Security 
Unable to deliver
services to
customers because
of failure of ICT
systems following
major cyber security
breach
Red
15
• ICT Security &
compliance officer in
post, producing weekly
threat analysis.
• Regular patching
regimes in place
• ICT Disaster recovery
plans tested regularly
• Critical activities have
recovery plans
developed (CARP’s) 
• Progress
monitoring by
DMT and SMT 
Internal Audit
• Business Continuity
(2019/20 – Reasonable)
• Disaster Recovery
Planning (2020/21 –
Limited)
• Internal Audit – Cyber
Security (2022/23 –
Substantial)
• Cloud Based Services
(2023/24 – Substantial)
• Data Security and
Information Security
(2024/25 – Substantial)
• IT Risk register and
Mitigation Processes
(2024/25 – Substantial) 
Other Agencies 
• PSN and Cyber Essentials
accreditations for
corporate network (doesn’t
cover education network) 
Future
• Internal Audit – ICT
Disaster Recovery
(2025/26) 
Moderate third
line assurance at
current time.  A
project has
commenced to
implement
business
continuity
processes,
covering critical
activities and
testing of CARPS 
This is an area
that will merit a
follow up audit in
the medium term
future. 
11 Cost of Living
Crisis 
The Council are
unable to respond to
the implications
Amber
12
• Financial stability and
support to HSCP.
• Social Welfare and
Poverty Funding
assistance.
• Focused support and
multi-agency approach
• Progress monitoring
by DMT and SMT
• WRWG report to
SMT
• SMT monitor of risk
and consider high
and medium
Internal Audit 
• HB & CTR (2018/19 –
Substantial)
• Internal Audit - Scottish
Welfare Fund (2020/21 –
There is a range
of assurance
sources across
the three lines of
assurance in
respect of welfare
reform. 
Page 133

Page 134

arising from the 'Cost
of Living' crisis 
Implementation of
welfare reform is not
managed well
resulting in increased
poverty and
deprivation or short
term crisis.
where risk is
highlighted.
• Monitoring of trends in
service use to highlight
any significant change
as a result of financial
hardship
• Targeted measures -
for example to those
receiving Council Tax
reductions - via Gift
Cards and Flexible
Food and Fuel Fund.
• Financial Inclusion and
Advice Group
established.
• Joint working with
DWP, CPP and other
agencies.
• Flexible Food Fund
created. Supporting
householders in our
area with funds and
advice to address food
and fuel insecurities.
• Child Poverty Planning
Group set up and
active.
• Joint initiative with
Argyll and Bute
Citizens Advice Bureau
(ABCAB), and Bute
Advice Centre to
proactively identify and
support vulnerable
individuals
experiencing mental
health challenges due
to the Cost of Living
Crisis.
hardship cases
• Anti-poverty strategy
approved by Council
• Child poverty action
planning monitored
by WRWG 
Substantial)
• Internal Audit - Welfare
Rights (2020/21 –
Substantial) 
Other Agencies
• Focused support and
multi-agency approach
where risk is highlighted 
Future Actions
• Extend flexible food and
fuel fund..
• Supporting the Poverty
Alliance in their Tackling
Rural Poverty project,
observing its progress and
considering outcomes as
they emerge. 
• Preloved School Clothing
Bank operating across
Argyll and Bute.
• Deliver Islands Cost Crisis
funding from the Scottish
Government in 2025/2026
supporting island based
foodbanks and further
targeted support to
mitigate fuel poverty on
our islands
• Provide £5,000 of LACER
funding to community food
organisations across Argyll
and Bute in 2025/2026
which was approved as
part of the budget process 
However, Limited
third tier
assurance in
respect of ‘Cost
of Living Crisis
but significant
evidence of pro-
active measures
and support. 
However
assurance can be
taken from the
Council’s
response to
COVID which
was fast paced
and has proven
to be effective. Page 134

Page 135

12 Impact of Climate
Change 
The Council or
communities are
overwhelmed by
severe or more
frequent flooding,
landslides, rainfall,
storms, sea level
changes or hot
weather events due
to changes in global
temperature caused
by climate change.
Amber
12
• Continued delivery of
Council De-
Carbonization Plan
• Civil Contingencies
Manager liaising/
collaborating with
Regional Resilience
Partnerships and other
resilience partners in
terms of storm event,
hot weather events, cut
off communities,
landslides etc.
• Development and
delivery of an
integrated approach to
decarbonisation and
adaptation of Argyll
and Bute as a Region
via Community
Planning Partnership.
• Roads & Amenity
Services continue to
develop asset
management plan and
address strategic risks
in terms of rising sea
levels, bridge repairs,
critical infrastructure
vulnerability. 
• Progress monitoring
by DMT and SMT 
Internal Audit
• Climate Change Act
(2021/22 – High)
• Internal Audit – Civil
Contingencies (2021/22 –
Substantial) 
Future Actions
• Review of De-Carbonisation
Plan.
• Review scoring of business
cases and pipeline of
strategic projects with
enhanced climate change
considerations. 
There is a range
of assurance
sources across
the three lines.
13 Lack of Housing
Availability 
The Council, partner
agencies and
communities are
unable to attract and
retain working age
people due to lack of
housing and pricing
Red
20
• The council has
declared a Housing
Emergency
• Housing Strategy and
Investment Plan
funded and
implemented/new
housing delivery group
established.
• Islands Programme
Award of Funding for
infrastructure for
worker accommodation
on Mull - this is for
• Progress monitoring
by DMT and SMT 
Future
• Housing summit and
Action Plan being
continually
monitored/updated.
• Local Housing Strategy
updated and approved
reflecting the Council's
Housing Action Plan
approved by Council in
November 2024 and
update presented to June
EDI Committee. 
Limited third line
assurance at
current time
However, pro-
active work is
with partner
agencies is
evident and
review of the
Housing Strategy
undertaken.
Page 135

Page 136

phase 1 site
infrastructure to enable
delivery of
accommodation for
workers and will meet
clearly evidenced
community need.
• Deliver key worker housing
pilots on Islay and Mull
using RGD funding. Mull
(Rockfield, Tobermory)
ground works now
completed utilising Island
Infrastructure funding and
Strategic Housing Fund. 
14 Compliance with
'Prevent' 
Response to the
Prevent duty is not
properly embedded in
the Council. 
Amber
9
• Council has nominated
Prevent Spoc – Ch Exec
has delegated authority to
make arrangements to
fulfil Council’s statutory
duties on TACT
• Prevent Multi Agency
Partnership panel
established and operating,
and training provided.
• External Training sessions
from Police Scotland
given to Education and
Social Work
• Participate in Prevent
multi agency meetings to
coordinate approach
across public sector
partners. 
• Progress monitoring
by SMT and ELT 
Future
• Complete development of
training and awareness
online module and
continue to review and
enhance training.
• Develop situational risk
assessment process with
Home Office to address
national and local risk and
mitigations. 
• Review training of PMAP
members and particular
Chair and Vice Chair when
these change from time to
time.
Limited third line
assurance at
current time
However,
comprehensive
processes and
approach in place
and pro-active
work with partner
agencies are
clear. 
Page 136

Page 137

Classification: OFFICIAL 
ARGYLL AND BUTE COUNCIL  AUDIT AND SCRUTINY COMMITTEE
CHIEF EXECUTIVE  4 SEPTEMBER 2025 
STRATEGIC RISK REGISTER 
1.0  INTRODUCTION 
1.1  This report provides members with an update on the Council’s Strategic Risk
Register (SRR). 
2.0 RECOMMENDATIONS 
2.1 It is recommended that the Audit and Scrutiny Committee endorse the updated
SRR (Appendix 1).  
3.0 DETAIL
3.1 The Council’s Constitution requires the Chief Executive to attend one meeting
of the Audit and Scrutiny Committee per annum to report on how the Council
is addressing its key strategic risks and other matters of interest. Paul
Macaskill, Chief Internal Auditor (CIA) will present the update on behalf of the
Chief Executive.   
3.2 The new format of the SRR and the Operational Risks Registers (ORR) and
the associated processes to monitor and update them were revised. These are
subject to regular internal audit review which has confirmed compliance with
these procedures. 
3.3  The Council’s SRR continues to be updated by the SMT on a bi-annual basis
on dates agreed with the CIA however it will also be updated if and when the
Strategic Management Team (SMT) feel there is a specific requirement. 
3.4 As required by the revised risk management manual, the SMT also review all
risks in the ORRs which have been classified as ‘red’ by the Departmental
Management Teams (DMT) to determine whether they should be escalated
to the SRR. 
3.5 The CIA performs an annual strategic risk register assurance mapping
exercise which enables the Committee to assess the levels of assurance it
can take over the activity undertaken by the Council to manage its strategic
risks.  This, alongside the annual Internal Audit plan including a three year
cycle providing audit coverage across all the identified risks, provides
assurance that the Council continues to proactively manage its risks.   
Page 137 Agenda Item 13

Page 138

Classification: OFFICIAL
3.6 Appendix 1 to this paper provides a copy of the current SRR and
demonstrates how the Council are treating the identified risks in terms of the
mitigations currently considered to be in place and the action being taken to
further reduce the residual risk. 
4.0 CONCLUSION 
4.1 The SRR is subject to regular review by the SMT as are the red risks
highlighted in ORRs by the DMTs. Risks are actively managed to reduce their
impact upon the Council and the likelihood of them being realised. 
5.0 
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
5.9  
5.10  
5.11  
5.12
IMPLICATIONS 
Policy – Internal Audit continues to adopt a risk based approach to activity
Financial – None
Legal – None
HR – None
Customer Service – None
Risk – None
Climate Change – None 
Fairer Scotland Duty – None 
Equalities - protected characteristics – None 
Consumer Duty – None 
Island Communities – None 
Children’s Rights and Wellbeing – None 
Pippa Milne
Chief Executive
4 September 2025 
For further information please contact: 
Paul Macaskill, Chief Internal Auditor (01546 604108) 
Appendices:
1. Strategic Risk Register 
Page 138

Page 139

Classification: OFFICIAL#
NEXT REVIEW DATE February
2026
Imp Like Sc Imp Like Sc
1
Population, External
Infrastructure and
Economic Decline
Failure to identify relevant
factors contributing to the
decline and failure to
develop strategies and
actions targeting these
factors.
Our Economy is
diverse and thriving
Population decline reduces available funding
impacting on Councils capacity to deliver services.
A circle of decline with reduced employment, lower
earning and failing businesses and poor perception
of the area.
Combined population and economic decline may
increase the need for and cost of services.
Insufficient people of working age with appropriate
skills and experience to fill vacancies across CPP.
Residual impact of withdrawal from EU. 
A continued trend of underinvestment in critical
economic infrastructure will make our area
increasingly uncompetitive as a place to live, work
and do business.  This includes transport and
infrastructure needs (physical and digital).
Without tackling infrastructure (including roads,
ports, ferries, grid, business space, utilities, housing
etc.) investments across Argyll and Bute, there are
significant barriers to growing the local economy,
attracting people, external investment and individual
entrepreneurship.
5 4 20
1. Local outcome improvement plan targets population,
infrastructure and economic recovery.
2. Maximise external funding opportunities.
3.  Refreshed Economic Strategy (2024-2034) approved at
the March 2024 EDI Committee.
4. Rural Growth Deal reaching full deal status in March
2025.
5. UK Shared Prosperity Funding Investment Plan agreed
covering 2022/23 to 2024/25.  
6. Abplace2b/Promote and Market Argyll and Bute.
7. Taking a place based approach to regeneration including
maximising social-eco benefits/community wellbeing via
effective procurement strategy, development of the
circular economy and partnership working across sectors.
8. Invest in Argyll and Bute website established.
4 4 16 Treat
1. Lobbying activity in pursuit of regional immigration policies and related strategies.
2. Rural Growth Deal Full Deal signed on 10th March 2025. Pavilion on site with final phases.
3.  Refreshed Economic Strategy, 2024-2034 approved at the March 2024 EDI Committee and
associated short-term Economic Strategy Action Plan, 2024-2027 (to be reviewed annually,
2025-2028 draft prepared) approved at the September 2024 EDI Committee. Delivery
requires partnership working with organisations such as HIE.
4. Community Regeneration Partnership projects up to the value of £20m agreed in principle
with UK Government for delivery in 2026/27. 
5. UK Shared Prosperity Funding Investment Plan, 2022-2025 has been delivered and a
revised one-year transition investment plan in place and being delivered for 2025/26.
6. Preparation of a pipeline of projects across Argyll and Bute in order to be able to react to
any other bid funding as and when it is announced.                                
7. Multi-agency approach to refugee settlement underway linking with national processes
and agendas.
8. The council will continue as a partner of the Highlands and Islands Regional Economic
Partnership and lobby for Government investment to realise economic opportunity and
address barriers to future sustainable growth.
9. Openreach are continuing to build their Full Fibre network across A&B through the SG R100
programme, they are also currently undertaking a scoping exercise for the UKG Project
Gigabit.  Current resource intensive procedures cannot continue as OR need to be allowed to
build at pace over the next 5 years, ensuring A&B are not left behind.  An initial meeting was
undertaken with Openreach to discuss progress with a follow up meeting planned for
October.     
10. It has been identified that the mobile networks across A&B do not have adequate
resilience built in, resulting in a catastrophic network failure.  With the imminent transition to
fully digital Jan 2027 it is imperative that action is taken to mitigate against prolonged
destructive weather events ensuring essential communications remain active.
Jul-25 Kirsty
Flanagan
2
Condition and suitability
of Infrastructure & Asset
Base
Infrastructure and asset
base does not meet
current and future
requirements and is not
being used or managed
efficiently and effectively.
Our Infrastructure
supports sustainable
growth
Infrastructure and asset base does not support
or is not aligned to business outcomes and does
not aid effective service delivery.
Infrastructure and asset base is allowed to
deteriorate resulting in cost, lost opportunities
and wasted resource.  Reductions in asset
maintenance capital budgets would be highly
likely to trigger this consequence. 5 5 25
1. Capital Investment Board oversight of implementation 
of Capital Investment Strategy.
2. Robust capital planning and monitoring.
3. Asset management work plan.
4. Business case modelling including sustainability,
development and strategic change.
5. Intelligence and best practice sharing via Heads of
Property Group.
6. Community Empowerment and Community Asset
Transfer – Arrangements in place to evaluate and
determine requests.
7. Roads Asset Management Plan and Status and Options
Report.
8. RIS Review Project Board.  
9. One Council Property Approach.
10. Continuing with successful bids for external funding. 
4 3 12 Treat
1. Review of capital arrangements undertaken during 2025/26.
2. 'Modern Workspace Programme' will review, engage and rationalise property
portfolio for future needs of the Council.  Changes will take place on phased and
town by town basis. Programme will be running for 3 years - April 2025
3. Project Manager from PPMS appointed to take forward development and
implementation of programme. Lochgilphead, Islay and Dunoon identified as
priorities. Interim solution for Lochgilphead will be in place in Q4 FY23/24 to provide
maintenance facility for larger vehicles).
4. Delivery of the Roads Capital Programme which was approved at Committee.
Jul-25 Kirsty
Flanagan
and Douglas
Hendry
3
Financial Sustainability
Insufficient resource to
meet current and future
service requirement.
Budget not aligned / does
not support business
outcomes.
Enablers Unable to deliver Local outcome improvement
plan.
Reduction in performance.
Reputational damage. 4 4 16
1. Longer term financial planning and financial strategy.
2. Income generation activity.
3. Robust budget preparation and budget monitoring
protocols.
4. Maintaining adequate contingency with reserves.
5. Digital transformation.
6. Effective workforce planning model.
7.  Financial Services resilience building project including
knowledge sharing and development of guidance notes.
4 3 12 Treat
1. Rural Growth Deal Outline Business Cases and Final Business Cases being worked
on.
2. Investment in professional training through Grow Our Own Activity continuing.
3. External reviews of major budget areas e.g. RIS, education.
4. Council to consider Visitor Levy consultation report at a Special Meeting in
September 2025.
5. A new medium-longer term budget approach was agreed by Council on 26 June
2025 - the approach has 4 themes (1) Empowering Communities (2) Increasing
Income (3) Right Sizing Council Asset Base and (4) Delivering Services Differently.
Jul-25 Kirsty
Flanagan
STRATEGIC RISK REGISTER
No Risk Corporate Outcome Consequences Gross Risk Current Mitigation Residual Risk Approach Key Actions and Deadlines Last
Reviewed
Risk Owner
Page 139

Page 140

Classification: OFFICIAL#
4
Governance and
Leadership
Governance and leadership
arrangements are not
conducive to effective
working and lead to a lack
of strategic direction.
All Corporate Outcomes Poor decision making, lack of strategic direction.
Lack of operational direction.
Confidence in, and reputation of, the Council
harmed.
Deterioration in performance.
4 4 16
1. New Council Administration in place with working
majority.
2. Development sessions for new Administration to cover
areas such as being effective leaders, strategic thinking
and working with officers.
3.  Working with Policy Leads to provide support and
development opportunities.
4. Continued programme of Member Seminars.
5. Progressing with programme of Member Development
including 1:1 conversations.
6. Revised Corporate Plan sets out objectives and
priorities.
7.  Performance Improvement Framework and Service
Planning.
8. Leadership development programme.
9. Council constitution regularly reviewed and updated.
10. Established partnership governance arrangements.
11. Scrutiny arrangements in respect of Police, Fire and
Health.
12. Governance arrangements for scrutiny established.
4 2 8 Treat
1. An updated BV Report was completed and published in April 2025.
2. New Corporate Improvement Plan agreed by Council June 2025
3. Connect for Success priorities.
4. Pilot self-assessments have been completed and proposals are being submitted to
SMT in October 2025 for consideration regarding self assessment.
5. The Performance Excellence Project Phase 1 is complete and phase 2 is underway,
and is trialling scorecards and developing the Performance and Improvement
Framework.
6. Leadership Development  Programme with the Chief Officers Group and new
cultural statements have been developed for consultation with management teams.
Jul-25 Pippa Milne
5
Engagement and
Understanding the needs
of the Community
The Council fails to
understand service user
needs and emerging
demographic trends and
does not align service
delivery to meet these.
People live active,
healthier and
independent lives
Enablers
Prioritisation of services may not be aligned to
community needs.
Gaps between community needs and Council
services.
Ineffective partnership working.
Services not configured to meet user/citizen
requirements.
3 4 12
1. Community Planning partnership has agreed new Argyll 
and Bute Outcome Improvement Plan  based on
demographically representative consultation exercise and
governance arrangements  are currently being refreshed
to ensure a focus on action with suitable representation
from partner organisations and Area Community Planning
Groups.
2. Community Engagement Strategy to be  supported by
clear framework and guidance as developed by the
Community Engagement Group.
3. Customer Service Board.
4. Operation and development of panels and forums.
Young people’s plan, citizens panel.
5. Budget Consultation .
6. Comprehensive Complaints Protocols.
7. Demographic and end user analysis.
3 3 9 Treat
1. A working group was established to review our approach to Community
Engagement, the Framework has now been developed and was approved by Policy
and Resources Committee in December 2024.  A collaborative space for sharing
engagement activity has been developed by the Communications Team and ICT in
the form of an App.  Learning content has been developed for the finalised
framework and presented to a Members Seminar. The end of project report was
presented to ELT in June 2025 along with recommendations for embedding as
business as usual. A joint DMT on engagement and consultation will take place in
August.
2. Approach to area plans currently being reviewed to reflect the priorities of the
new administration. 
3. Analysis of latest census data has been undertaken to inform future strategic
activity. Analysis has been presented to SLF, COG, ELT/Policy Leads and to a
Members Seminar. A new page has been set up on the Hub with links to a portal of
all the analysed data on population. This will continue to be refined and developed.
4. Officers are actively involved in national data analytics work with the
Improvement Service on Poverty in Remote, Rural and Island areas. This includes
work with Loughborough University on updating HIE's historic report on island
oncosts. 
5. Here to Hear You events - Programme of Here to Hear You community
engagement events being undertaken by Leader and Chief Executive.
Jul-25 Pippa Milne
6
Service Delivery
Insufficient resources to
ensure effective service
delivery.
Enablers Services fail to achieve agreed performance
levels and as a result are not contributing fully
to Council objectives.
Resources are poorly managed with result that
agreed outcomes and objectives are not fully
achieved.
Unable to achieve continuous improvement and
improve effectiveness and efficiency.
4 4 16
1. Performance Improvement Framework.
2. Service Improvement plans.
3. Argyll and Bute Manager programme.
4. Customer needs analysis Protocols.
5. Demographic and end user analysis.
6. Workforce Planning .
7. Internal and External Scrutiny Arrangements.
8. Complaints process.
4 3 12 Treat
1. Performance excellence project being reported regularly to Audit and Scrutiny
Committee and SMT. Stage 1 completed in  2023/24 and on track for completion of
next phase with corporate and operational scorecards.
2. Completion of external review of Roads and Infrastructure Services should
generate future year savings. 
3. A review of Education has commenced on a similar basis as the RIS review.  
4. Customer Service Strategy Action Plan 80% complete and digital self service
reached a new high of 77% of all interactions in 2024/25.
Jul-25 Kirsty
Flanagan
and Douglas
Hendry
Page 140

Page 141

Classification: OFFICIAL#
7
Health and Social Care
Partnership
Failure of the HSCP to
deliver on its Strategic
Priorities results in
deteriorating health and
wellbeing outcomes for the
population and / or
reduced access to
appropriate health and
social care services. This
could also result in
financial and reputational
risk to the Council.
People live active,
healthier and
independent lives
Partnership viewed as having failed or not
achieved strategic objectives.
Partnership Failure or weakness exposes Council
to significant Financial liability.
Confidence in, and reputation of, the Council
harmed.
Unclear repercussions of financial and staffing
effects of the implementation of the National
Care Service on the Council and HSCP.
Residual Covid-19 implications for ongoing
health and social care services.
5 4 20
1. HSCP integration scheme approved by Scottish
government.
2. Strategic Plan in place.
3. Performance and Financial reporting arrangements in
place.
4. Independent audit arrangements in place.
5. Integrated Joint board with elected member
representation including Council Leader.
6. Chief Officer member of ABC Senior Management Team
with co-location of officers.
7. Tripartite leadership agreement.
8. Monitoring and improvement of HSCP financial position.
9. Medium term Financial Plan in place.
10. Establishment of Strategic and Tactical Groups with
links to HSCP, NHS and national/regional resilience groups.
4 3 12 Treat
1. Develop options to deliver sustainability of future years budgets (ongoing).
2. Develop a longer term Financial plan and implement the value for money strategy.
3. Assessment of the financial implications on the Council of services transferring to
the NCS when plans are sufficiently developed to enable this.
4. Progression of Service Transformation work, Estates Strategy and long term
strategic service development with Hub North.
5. Implementation of the workforce strategy.
6. Remobilisation of services post Covid and improved performance management
and reporting processes.
7. Recovery plan for 25/26 reported to Council in June.
Jul-25 Evan
Beswick and 
Pippa Milne
8
Civil Contingency &
Business continuity
arrangements are not
effective.
People live in safer
and stronger
communities
Ineffective management of major emergencies
affecting Council services and communities in
Argyll and Bute.
Incident and recovery phase of an emergency
lead to greater inconvenience and hardship and
a longer timescale for return to normal.
Council unable to effectively deliver its own
services.
2 4 8
1. Emergency Planning Test events.
2. Critical Activity Recovery Plans.
3. Roll out of Community resilience partnership
programme.
4. Peer review of major exercises undertaken to provide
external validation of planning process.
5. West of Scotland local resilience partnership.
6. Cross sector expertise and partnership working.
7. Emergency Management Support Team (EMST)
meetings.
8. Training.
2 3 6 Treat
1. The Council’s critical activity recovery plans (Carps) are reviewed annually. The
project for the review of Business Continuity processes within the Council is
underway and will include a review of the Council’s critical activities and the
potential for a software solution which would automate processes and provide a
more efficient an effective service and ensure greater resilience for the Council.
When the project is completed in 23/24 it will include a programme of testing of the
updated Carps.  Date 31 March 2024.
2. Review of BC processes has resulted in introduction of new BCM system which will
allow more automation and oversight of plans and review of critical activities with an
enhanced ability to test these. The new system is expected to be procured by 31
March 2024. The new BCM system has been procured and configured and a pilot
project to test the system and the process is underway with 3 service areas,
Procurement, Customer Engagement and Transformation Management and
Residential (Care Home Services). Once the outputs form the pilot have been
reviewed and the system goes live, all services will be required to complete a
Business Impact Analysis, which will inform the basis for having a business continuity
plan in place. This is expected to be completed by  31 March 2025.
Jul-25 Douglas
Hendry
Page 141

Page 142

Classification: OFFICIAL#
9
Waste Management
Waste disposal is impacted
by a number of significant
risks which are 1) the
impact of the BMW  Ban,
2) the end of the current
waste PPP contract
(September 2026), 3) a fast
moving Scotland and UK
Policy context.   
Our Infrastructure
supports sustainable
growth
Alternative delivery models to respond to the
BMW Ban would be likely to be more expensive
than the current one which would result in cost
pressures having to be accommodated by other
services and service provision reduced. 
Alternative delivery models to replace the
current PPP contract along with commercial
matters relating to contract handback may
result in additional cost pressure to the Council.  
In addition service continuity is a risk due to the
compressed timescale for service redesign and
mobilisation.
Short to medium term strategic planning is
made more complex by changes in national
policy context. 
5 4 20
1. Helensburgh and Lomond waste solution available is in
place via third party off-takers, higher rates have been
accepted by the council and the contract is in place which
is capable of extension.
2. Following rejection by the Scottish Government to the
Council's request for a derogation of the BMW ban, the
Scottish Government confirmed financial support of £1.5m
to support the Council in the costs associated with BMW
ban compliance in the Council's unique circumstances (PPP
contract featuring landfill sites).
3. Development of an options appraisal to determine the
preferred future delivery model for those services
currently provided by the PPP contract has been
completed which has concluded that in the timescale
available to the Council the lowest risk option is to re-
procure the required waste disposal and civic amenity site
management services within the area currently provided
through the PPP contract.
4. Procurement of the services required to replace the PPP
contract has commenced within initial market testing
complete and development of detailed service
specification underway. Specialist external consultants
have been commissioned to support this activity.
5. Procurement of energy from waste services for the final
8-months of the PPP contract has commenced (the PPP
contract runs for 8 months after the bio-ban comes into
force).
6. A number of historic contractual matters between the          
4 4 16 Treat
1. Weekly contract management meetings are now taking place with the PPP
provider chaired by the HoS. These meetings have resulted in agreement of terms in
relation to the 2 significant historic contract matters (CLO and Indexation). These
matters will be finalised via signing of agreements as soon as pricing in relation to
the CLO disposal is confirmed by the PPP contractor - anticipated end July 2025.
2.  Determining and mobilising a plan for the closure and restoration of existing
landfill sites (within the PPP contract) to ensure compliance with regulatory
requirements prior to the implementation of the BMW ban. Next stage in this is to
gain understanding from SEPA of the timescales they will require for restoration of
these sites. Meeting being arranged with SEPA in July 2025.
Jul-25 Kirsty
Flanagan
10
Service Delivery - Cyber
Security
Unable to deliver services
to customers because of 
failure of ICT systems
following major cyber
security breach.
Our Economy is
diverse and thriving
Threat of ransomware attacks. Data corruption
of ICT system caused by malware and/or loss of
confidential data.
ICT Systems unavailable for considerable period
whilst recovery from uncorrupted backups takes
place.
Meanwhile Services fail to achieve agreed
performance levels and as a result are not
contributing fully to Council objectives.
Reputational damage to Council and potential
financial losses (fines, loss of income).
5 4 20
1. ICT Security & compliance officer in post, producing
weekly threat analyses, member of CiSP.
2. PSN and Cyber Essentials Plus accreditations for
corporate network.
3. Regular patching regimes in place.
4. ICT Disaster recovery plans tested regularly.
5. All critical activities have recovery plans developed
(CARP’s).
6. Mimecast monthly cyber security training videos for all
staff.
7. Enforce password changes when found to be weak.
8. Technical cyber exercise completed and Business
Continuity Planning exercise conducted with senior
management and other staff.
9. Internal Audit on Cyber Security completed with the
Audit Opinion as substantial.
5 3 15 Treat
1. Review will be ongoing on all contingency plans with updated knowledge from
SEPA, Western Isles Council and UHI Cyber Attacks.          
2. Continue to work with Scottish Government Cyber Resilience Team to test ICT
response.                  
3. Continued close review of disaster recovery plan and associated tests, finalise and
test incident response procedure, and review of mirroring between the 2 data
centres (monthly at ITMT) and backup.            
4. Now progressing requirements for ongoing security of Education Network.                
5. Mimecast has now been made mandatory across the Council and DMTs/HoS are
monitoring the uptake from staff.    
6. Corporate website migrated to cloud based resilient platform managed by
BIgBlueDoor.
Jul-25 Kirsty
Flanagan
Page 142

Page 143

Classification: OFFICIAL#
11
Cost of Living Crisis
The Council are unable to
respond to the implications
arising from the 'Cost of
Living' crisis.
Implementation of welfare
reform is not managed well
resulting in increased
poverty and deprivation or
short term crisis.
Our Economy is
diverse and thriving
People live active,
healthier and
independent lives
1. Unable to meet demands for assistance
stemming from financial hardship.
2. Increases on the demand for Council services
such as homelessness.
3. Financial implications for the Council as
revenue income could fall correlating to
financial hardship - Financial Sustainability.
4. Implications for staff, particularly those
working from home.
5. Adverse impact on workforce, communities
with regards to economy and demographic
statistics.
6. Financial Inclusion and Advice Group
established.
7. Joint working with DWP, CPP and other
agencies.
8. Child Poverty Planning Group set up and
active.
9.  Flexible Food Fund created. Supporting
householders in our area with funds and advice
to address food and fuel insecurities.
4 4 16
1. Financial stability and support to HSCP.
2. Social Welfare and Poverty Funding assistance.
3. Focused support and multi-agency approach where risk
is highlighted.
4. Monitoring of trends in service use to highlight any
significant change as a result of financial hardship.
5. Targeted measures  - for example to those receiving
Council Tax reductions - via Gift Cards and Flexible Food
and Fuel Fund.
6. Financial Inclusion and Advice Group established.
7. Joint working with DWP, CPP and other agencies.
8. Flexible Food Fund created. Supporting householders in
our area with funds and advice to address food and fuel
insecurities.
9. Child Poverty Planning Group set up and active. 4 3 12
Treat 1. Review and monitor changes in demand for key services which correlate to personal
effects arising from financial distress.
2. Seek external funding to sustain the Flexible Food and Fuel Fund beyond March 2026 as
part of a new project to included the legacy actions from the School Clothing Bank project
and other poverty mitigations including data riven intervention and closer collaborative
council tax collection.
3. Provision of welfare rights advice services in GP Surgeries in MAKI area via funding from SG
until March 2025.
4. Supporting the Poverty Alliance in their Tackling Rural Poverty project, observing its
progress and considering outcomes as they emerge.
5. Joint initiative with Argyll and Bute Citizens Advice Bureau (ABCAB), and Bute Advice
Centre to proactively identify and support vulnerable individuals experiencing mental health
challenges due to the Cost of Living Crisis. Provide targeted assistance to enable these
individuals to assess their financial circumstances and explore options for paying a
sustainable and reasonable rate of Council Tax. Implement a temporary moratorium of up to
3 months on the standard Council Tax recovery timetable to mitigate the risk of exacerbating
mental health crises, while ensuring ongoing engagement and tailored support plans for
affected individuals.
6. Maximise use of pilot authority status in new data-sharing project with HMRC to enhance
engagement, reduce arrears, and improve income recovery in respect of Council Tax. The
strategy aims to encourage non-engaged debtors to claim entitlements, make affordable
payments, and reduce overall indebtedness by considering write-offs for older debts tied to
compliance with current-year obligations. The pilot will also focus on income maximisation
for those entitled to support from benefits.
7. Deliver Islands Cost Crisis funding from the Scottish Government in 2025/2026 supporting
island based foodbanks and further targeted support to mitigate fuel poverty on our islands.
8. Provide £5,000 of LACER funding to community food organisations across Argyll and Bute
in 2025/2026 which was approved as part of the budget process.
Jul-25 Pippa Milne
and all ELT
12
Impact of Climate Change
The Council or
communities are
overwhelmed by severe or
more frequent flooding,
landslides, rainfall, storms,
sea level changes or hot
weather events due to
changes in global
temperature caused by
climate change.
Our Infrastructure
supports sustainable
growth
1. Unable to meet national and Scottish
Government guidance in terms of meeting
Climate Change Obligations - various
milestones.
2. Inability to deliver core services due to
failures in critical infrastructure - ferrys, roads,
bridges, landslides, fallen trees etc.
3. Human casualty, death and community
resilience if cut off or directly impacted by
severe storms, landslides, flash foods or failed
infrastructure.
4. Disruption of flow of goods, services and
supply chains.
5. Adverse impact on workforce, communities
with regards to economy and population. 
5 4 20
1. Continued delivery of Council De-Carbonisation Plan.
2.  Civil Contingencies Manager liaising/ collaborating with
Regional Resilience Partnerships and other resilience
partners in terms of storm event, hot weather events, cut
off communities, landslides etc.
3. Development and delivery of an integrated approach to
decarbonisation and adaptation of Argyll and Bute as a
Region via Community Planning Partnership.
4. Roads & Amenity Services continue to develop asset
management plan and address strategic risks in terms of
rising sea levels, bridge repairs, critical infrastructure
vulnerability.
5. A review of all critical transport routes in light of
October 2023 severe weather event to identify any
additional mitigations needed to maintain resilient routes.
4 3 12
Treat 1. Review of De-Carbonisation Plan December 2024.
2. Consideration of all Council Papers with climate change as consideration /
implications - ongoing.
3. Review scoring of business cases and pipeline of strategic projects with enhanced
climate change considerations.
Jul-25 Pippa Milne
/ Kirsty
Flanagan /
Douglas
Hendry
13
Lack of Housing
availability
The Council, partner
agencies and communities
are unable to attract and
retain working age people
due to lack of housing and
pricing.
All Corporate Outcomes Direct impact on property prices with
substantial increases in our area.
Lack of private rentals. 
Inability to attract working age people to live
and work in the area which therefore affects the
demographics of the area.  5 4 20
1. Council has declared a Housing Emergency.
2. Housing Strategy and Investment Plan funded and
implemented/new housing delivery group established.
3. Islands Programme Award of Funding for infrastructure
for worker accommodation on Mull - this is for phase 1 site
infrastructure to enable delivery of accommodation for
workers and will meet clearly evidenced community need.
5 4 20
Treat 1.  Continue to implement the Housing Emergency actions identified in the approved
Action Plan.
2. Address key barriers to housing.
3. Consider radical delivery models.
4. Local Housing Strategy updated and approved reflecting the Council's Housing
Action Plan approved by Council in November 2024.
5.  Deliver key worker housing pilots on Islay and Mull using RGD funding. Mull
(Rockfield, Tobermory) ground works now completed utilising Island Infrastructure
funding and Strategic Housing Fund.
6.  Local Housing Strategy annual update and Housing Emergency Plan update paper
reported to Council in November 2024. Update presented to June EDI Committee.
Jul-25 Pippa Milne
/ Kirsty
Flanagan /
Douglas
Hendry
Page 143

Page 144

Classification: OFFICIAL#
14
Compliance with 'Prevent'
Response to the Prevent
duty is not properly
embedded in the Council.
People live in safer and
stronger communities
Cases which have not been identified, referred
and managed can lead to escalation of
behaviour up to and including TACT (Terrorism
Act) offences.
• Failure of duty by Council could lead to
political censure.
• Negative publicity and perception that Council
is failing in its duty to protect both individuals at
risk and the wider population.
• Exposure of failings at public enquiry or as a
result of court proceedings could have wider
consequences for the Council.
5 4 20
Council has nominated Prevent Spoc – Ch Exec has
delegated authority to make arrangements to fulfil
councils statutory duties on TACT. Prevent Multi Agency
Partnership panel established and operating, and training
provided. External Training sessions from Police Scotland 
given to Education and Social Work. Participate in Prevent
multi agency meetings to coordinate approach across
public sector partners
3 3 9
Treat Complete development of training and awareness online module and continue to
review and enhance training; develop situational risk assessment process with Home
Office to address national and local risk and mitigations; review training of PMAP
members and particular Chair and Vice Chair when these change from time to time.
Jul-25 Douglas
Hendry
Page 144

Page 145

ARGYLL AND BUTE COUNCIL     AUDIT AND SCRUTINY COMMITTEE
FINANCIAL SERVICES     4 SEPTEMBER 2025 
TREASURY MANAGEMENT UPDATE – QUARTER ENDED 30 JUNE 2025 
1.0 EXECUTIVE SUMMARY
1.1 The Local Government in Scotland Act 2003 requires the council to have regard
to the CIPFA Code of Practice on Treasury Management (revised 2021), ‘the
Code’. The Code recommends that members be updated on treasury
management activities at least quarterly. This report demonstrates best practice
in accordance with the Code.
1.2 The report provides an update on the council’s treasury management activity
during the quarter 1 April to 30 June 2025 and the overall position as at 30 June
2025. This covers information on:
• Economic background
• Interest rate forecasts
• Borrowing
• Investments
• Compliance with Treasury and Prudential Limits
1.3 The report concludes that:
• The approved Treasury Management Strategy and Annual Investment
Strategy 2025-26 continues to be fit for purpose.  All borrowing and
investment activity during the quarter ended 30 June 2025 has been
undertaken in accordance with the approved strategy, and the authority
has operated within the approved treasury and prudential limits contained
therein; and,
• Short-term borrowing and investment activity has been undertaken to
manage day to day cashflow requirements.  In respect of long-term
capital financing requirements, the authority continues to maintain an
under-borrowed position.  The significant level of internal reserve
Page 145 Agenda Item 14

Page 146

balances has provided an opportunity to defer new external borrowing,
whilst also minimising exposure to investment risk.  However, new PWLB
borrowing of £20m was undertaken during the quarter, to provide an
element of certainty in respect of funding the underlying borrowing
requirement.
1.4 The Audit and Scrutiny Committee is requested to note and consider the
contents of the report and the treasury activity during the period 1 April to 30
June 2025. 
Page 146

Page 147

ARGYLL AND BUTE COUNCIL     AUDIT AND SCRUTINY COMMITTEE 
FINANCIAL SERVICES     4 SEPTEMBER 2025 
TREASURY MANAGEMENT UPDATE – QUARTER ENDED 30 JUNE 2025 
2.0 INTRODUCTION
2.1 The CIPFA (Chartered Institute of Public Finance and Accountancy) Code of
Practice for Treasury Management 2021, ‘the Code’ recommends that members
be updated on treasury management activities at least quarterly. This report
demonstrates best practice in accordance with the Code. 
2.2 The report provides an update on the council’s treasury management activity
during the quarter 1 April to 30 June 2025 and the overall position as at 30 June
2025.  This covers information on:
• Economic background
• Interest rate forecasts
• Borrowing
• Investments
• Compliance with Treasury and Prudential Limits
3.0 RECOMMENDATIONS
3.1 The Audit and Scrutiny committee is requested to note and consider the contents
of the report and the treasury activity during the period 1 April to 30 June 2025.
4.0 DETAIL
4.1 Economic Background 
4.1.1 During the quarter, there was a slight contraction in GDP growth, a decrease in
wage growth and an easing of CPI inflation to 3.5% in May.  There has been an
overall increase in gilt yields over the period, which underpin long-term
borrowing rates. During May, Bank Rate was cut from 4.50% to 4.25%, held
during June, with the Monetary Policy Committee taking the view that a ‘gradual
and careful’ approach to rate cuts remains appropriate.  A more detailed update
Page 147

Page 148

on the economic position, provided by the council’s treasury advisors, is given
within Appendix 1.
4.2 Interest Rate Forecasts
4.2.1 The latest forecast was provided on 10 February and has proved robust over the
period since February, setting out a central view that short and long-dated
interest rates will start to fall once it is evident that the Bank of England has been
successful in squeezing excess inflation out of the economy, despite a backdrop
of stubborn inflationary factors. Nonetheless, the longer dated part of the
forecast also reflects the increased level of Government borrowing over the term
of the current Parliament and the weakness in the public finances, with the
Government struggling to deliver on the efficiencies detailed in the October
Budget. 
Note: The PWLB rate forecasts are based on the Certainty Rate (the standard rate minus 20 bps)
which has been accessible to most authorities since 1 November 2012.  Rate forecasts for 3, 6,
12 month investments are averages - rates offered by individual banks may differ significantly from
these averages, reflecting their different needs for borrowing short-term cash at any point in time.
4.2.2 A comparison of current updated forecasts to the forecast position on Bank Rate
and PWLB interest rates, included within the Treasury Management Strategy and
Annual Investment Strategy 2025-26, is outlined in the table below.
Rate Forecast March 2026 March 2027 
Previous  Current Previous  Current
Short term borrowing:
Bank Rate 3.75% 3.75% 3.50% 3.50%
Long term PWLB borrowing:
5 Year  4.50% 4.60% 4.10% 4.30%
10 Year 4.70% 4.90% 4.30% 4.60%
25 Year 5.10% 5.40% 4.70% 5.00%
50 Year 4.90% 5.10% 4.50% 4.70% 
Page 148

Page 149

4.2.3 Long-term borrowing rates have not fallen as quickly as previously forecast and
remain elevated, largely as a result of continuing inflationary concerns. The longer
dated part of the forecast also reflects the increased level of Government
borrowing over the term of the current Parliament.
4.3 Borrowing 
Borrowing Strategy
4.3.1 As set out within the approved strategy, the council is maintaining an under-
borrowed position.  This means that the capital borrowing need, (the Capital
Financing Requirement), has not been fully funded with loan debt, as cash
supporting the authority’s reserve balances and cash flow has been used as a
temporary measure (internal borrowing). This strategy is prudent while medium
and longer dated borrowing rates are expected to fall from their current levels.
4.3.2 Given interest rate forecasts, it was anticipated that any new long-term
borrowing undertaken during the financial year would be taken on a relatively
short-term basis, with current high long-term interest rates forecast to fall over
future years.  This is a prudent and cost-effective approach in the current
economic climate but requires ongoing monitoring.  The capital plan and our use
of reserve balances continues to be kept under regular review, and as such, our
borrowing strategy will also be regularly reviewed, to achieve optimum value and
minimise risk exposure in the long term.  However, at this stage, the council’s
approved borrowing strategy for 2025-26 remains fit for purpose.   
Borrowing Activity
4.3.3 PWLB loan principal of £0.840m has been repaid during the quarter ended 30
June 2025.  This repayment of principal relates to a 12.5-year PWLB loan
(original principal £21m), which was taken on a fixed Equal Instalments of
Principal (EIP) basis.  All other PWLB loans will be repayable on maturity.  
4.3.4 No Maturity PWLB loans have matured during the quarter. Similarly, no other
debt repayments or rescheduling has been undertaken.
4.3.5 The authority has one outstanding market or LOBO loan for £5.255m, with an
interest rate of 4.75%, maturing 2048, with call dates every 6 months.  This loan
was not recalled at the 22 June 2025 call date.  There is potential for this loan to
be recalled before the end of the financial year, at the next call date of 22
December 2025.
4.3.6 New PWLB long-term borrowing of £20m was undertaken during the quarter, to
provide an element of certainty in respect of funding the underlying borrowing
requirement for capital.  With long-term borrowing rates relatively high but
forecast to steadily fall over the next few years, new borrowing has been taken
on a relatively short-term basis.  The new loans taken out during the quarter
were as follows:
Lender Principal Type Interest Rate Maturity
PWLB £20.000m Fixed 4.69% 07/04/2028
Page 149

Page 150

4.3.7 As at 30 June 2025, the council’s external loan debt totalled £148.913m, as
summarised in the table below.
Debt Amount
£000
Annual Average
Interest Rate
Share of Total
Debt
Public Works Loans Board 143,357 4.49% 96.26%
Market Loans (LOBO) 5,255 4.75% 3.53%
Temporary Loans* 321 3.96% 0.21%
Total Debt 148,913 4.44% 100.00% 
*Note: This represents short-term borrowing from various institutions
4.4 Investments 
Investment Strategy
4.4.1 In accordance with the CIPFA Treasury Management Code of Practice, the
council’s approved Annual Investment Strategy sets out the council’s investment
priorities as being:
• Security of capital
• Liquidity
• Yield 
4.4.2 The authority continues to aim to achieve the optimum return (yield) on its
investments, commensurate with proper levels of security and liquidity and within
the authority’s risk appetite. The risk appetite of the council is low, prioritising
security and liquidity.  In the current economic climate, it is considered appropriate
to keep investments short-term to cover cash flow needs, but also to seek out
value available in longer periods with high credit quality financial institutions, using
the Link suggested creditworthiness approach, including a minimum sovereign
credit rating and Credit Default Swap (CDS) overlay information.  
4.4.3 As shown within the interest rate forecasts given at paragraph 4.2.1, investment
rates were forecast to fall during the first quarter of 2025/26, which they did, and
expectations are that gradual but continuing reductions will follow over the next
two years. 
Creditworthiness
4.4.4 There have been few changes to credit ratings over the quarter under review.
However, officers continue to closely monitor these to ensure that only appropriate
counterparties are considered for investment purposes. 
Investment Counterparty Criteria
4.4.5 The current investment counterparty criteria selection, approved within the
Strategy, continues to meet the requirements of the treasury management
function. 
Investment Activity
Page 150

Page 151

4.4.6 The council’s Section 95 Officer confirms that the principles of the investment
strategy have been adhered to.  During the quarter ended 30 June 2025, all
investments have been made in line with the approved limits for specific
investment instruments, and in accordance with the creditworthiness approach.  
4.4.7 Details of the council’s investments held as at 30 June 2025, totalling £75.143m,
are summarised in the table below. 
Counterparty Maturity Amount
£000
Interest
Rate
Clydesdale Bank  Instant
Access
343 4.15%
Fixed Deposits:         
ANZ Banking Group 10/07/2025 15,000 4.67%   
Al Rayan Bank 20/11/2025 5,000 4.40%
Money Market Funds:      
Federated Call Account 12,500 4.31%
Insight Liquidity Fund  Call Account 10,800 4.31%
LGIM Stirling Liquidity fund Call Account 14,800 4.33%
Aviva Call Account 15,000 4.32%
Royal London Sterling Liquidity Fund Call Account 1,700 4.29%
Total   75,143  4.44% 
4.4.8 The weighted average rate of return on the above is 4.440%, with an average
investment duration of 11 days.  This compares to an average benchmark SONIA
overnight rate of 4.313% over the quarter, while Bank Rate was lowered during
the period from 4.50% to 4.25% in May.   
4.5 Compliance with Prudential and Treasury Limits
4.5.1 It is a statutory duty for the council to determine and keep under review the
affordable capital expenditure limits.  The revised Prudential and Treasury
Indicators for 2025-26, as approved by full Council on 27 February 2025, are
attached as Appendix 2.  During the quarter ended 30 June 2025, the council has
operated within the treasury and prudential indicators.  The council’s Section 95
Officer confirms that no difficulties are envisaged for the current or future years in
complying with these indicators.   
5.0 CONCLUSION
5.1 The approved Treasury Management Strategy and Annual Investment Strategy
2025-26 continues to be fit for purpose.  All borrowing and investment activity
during the quarter ended 30 June 2025 has been undertaken in accordance with
the approved strategy, and the authority has operated within the approved
treasury and prudential limits contained therein. 
5.2 Short-term borrowing and investment activity has been undertaken to manage
day to day cashflow requirements.  In respect of long-term capital financing
Page 151

Page 152

requirements, the authority continues to maintain an under-borrowed position. 
The significant level of internal reserve balances has provided an opportunity to
defer new external borrowing, whilst also minimising exposure to investment
risk.  However, new PWLB borrowing of £20m was undertaken during the
quarter, to provide an element of certainty in respect of funding the underlying
borrowing requirement.
6.0 IMPLICATIONS
6.1 Policy   None
6.2 Financial   Complies with Annual Treasury Strategy
6.3  Legal    None
6.4  HR    None
6.5 Customer Service None
6.6 Risk    None
6.7 Climate Change  None
6.8  Fairer Scotland Duty None
6.9 Equalities - protected characteristics None
6.10 Consumer Duty None
6.11 Island Communities None
6.12 Children’s Rights and Wellbeing None 
Kirsty Flanagan
Section 95 Officer / Executive Director with responsibility for Development and
Infrastructure Services
Policy Lead Councillor Ross Moreland
8 August 2025                                                  
For further information contact: Carolyn Earl, Head of Financial Services
carolyn.earl@argyll-bute.gov.uk 
APPENDICES
Appendix 1  Economic Background
Page 152

Page 153

Appendix 2  Interest Rate Forecast
Appendix 3  Prudential Indicators  
Appendix 1 – Economics Update 
• The first quarter of 2025/26 (1st April to 30th June) saw: 
- A 0.3% m/m fall in real GDP in April – the first fall since October 2024
- The 3myy rate of average earnings growth excluding bonuses fall from 5.5%
to 5.2% in May
- Core CPI inflation ease from 3.8% in April to 3.5% in May as temporary
Easter-related effects faded
- The Bank of England cut interest rates from 4.50% to 4.25% in May, holding
them steady in June
- The 10-year gilt yield fluctuate between 4.4% and 4.8%, and end the quarter
at 4.50%
• The 0.3% m/m fall in real GDP in April was the first fall since October 2024 and the
largest fall since October 2023. This is a significant shift from the 0.7% q/q rise in
Q1 2025, probably as a result of the boosts from net exports and business
investment unwinding. The decline in exports was mostly due to a reversal of US
tariff front-running with export values to the US falling by 31% m/m after rising 34%
in total in the five months to February. April’s GDP figures also showed
manufacturing output falling by 0.9% m/m along with the domestic economy
showing signs of weakness in April. Despite construction output growing by 0.9%
m/m, services output declined by 0.4% m/m, reversing all of March’s 0.4% m/m
rise. This weakness in services likely reflects higher labour costs from April’s rise
in National Insurance Contributions for employers. May’s GDP may have fallen a
bit further as the boosts in Q1 continued to unwind. Overall, GDP in Q2 is likely to
have flatlined and the economy will probably be hindered by subdued overseas
demand and domestic businesses cutting spending given a rise in costs due to
April’s increase in taxes. The Bank of England expects growth in 2025 to be around
0.8%. 
• Despite the rise in the composite Purchasing Managers Index (PMI) from 50.3 in
May to 50.7 in June, it is still below its level in March, prior to the rise in business
taxes and Trump’s Liberation Day tariffs. This rise was driven by increases in both
the services and manufacturing output balances. Although the services PMI rose
from 50.9 to 51.3, that is consistent with non-retail services output growth slowing
from 0.5% 3m/3m in April to 0.3% 3m/3m in June.
• The sharp 2.7% m/m drop back in retail sales volumes in May adds to other
evidence that the burst of economic growth in Q1 is over. The weakness was
widespread with sales falling in all seven of the major categories. This decline was
partly due to the unwinding of the previous boost from April’s unusually warm and
dry weather along with inflationary pressures prompting consumers to cut back.
The latter would be a more persistent drag on retail spending. Looking ahead, the
rise in the GfK measure of consumer confidence from -20 in May to -18 in June is
Page 153

Page 154

consistent with the annual rate of real retail sales growth accelerating from -1.3%
in May to around +0.5%.  
• While the £17.7bn of public sector borrowing in May was higher than the Office of
Budget responsibility (OBR) forecast of £17.1bn, borrowing was £2.9bn below the
OBR’s forecast in the first two months of the 2025/26 fiscal year. The current
budget deficit was £12.8bn in May, a touch below the OBR’s forecast of £13.0bn.
Within that, government spending surprised to the downside. Central government
expenditure was £0.5bn lower than the OBR’s forecast in May, leaving it £1.6bn
lower in April and May combined. That has been largely driven by debt interest
payments, which were £1.1bn below the OBR’s forecast in May. But if the rises in
gilt yields since the Spring Statement in March are sustained, the OBR will revise
up its forecast for debt interest payments in the years ahead. That of itself would
knock £1.0bn off the Chancellor’s £9.9bn of headroom against her fiscal mandate
and the subsequent Government U-turns on benefit and welfare spending and
higher borrowing costs may mean to maintain her current £9.9bn buffer, Reeves
has to raise upwards of £13bn later this year. And with the gilt market sensitive to
significant increases in borrowing, all this means substantial tax rises are looking
very likely. 
• The weakening in the jobs market is gathering pace. May’s 109,000 m/m fall in the
PAYE measure of employment was the largest decline (barring the pandemic)
since the data began and the seventh in as many months. The monthly change
was revised lower in five of the previous seven months too, with April’s 33,000 fall
revised down to a 55,000 drop. Overall, the payroll measure of employment has
now fallen by 276,000 since the announcement of the rise in payroll taxes and the
minimum wage in the October Budget. The job vacancies data also portrays a
rapidly weakening labour market. The number of job vacancies is now falling a bit
faster, dropping from 760,000 in the three months to April to 736,000 in May.
Capital Economics’ seasonally adjusted measure of single-month vacancies
declined sharply from 763,000 in April to 713,000 in May. 
• A looser labour market is driving softer wage pressures. The 3myy rate of average
earnings growth excluding bonuses fell from 5.5% to 5.2% in May. The rate for the
private sector slipped from 5.5% to 5.1%, putting it on track to undershoot the Bank
of England’s Q2 forecast of 5.2%. And after rising in April as the 6.7% rise in the
minimum wage took effect, the timelier PAYE median earnings measure fell back
from 6.2% y/y in April to 5.8% in May. Softer wage growth is feeding through to
lower services inflation, pointing to a slowdown from 4.7% in May to around 3.0%
by the end of the year. 
• CPI inflation fell slightly from 3.5% in April to 3.4% in May – close to consensus.
The sharp falls in services inflation from 5.4% to 4.7% and in core inflation from
3.8% to 3.5% confirmed that the previous month’s jumps partly reflected an Easter-
related blip. Services inflation is expected to continue to fall as wage growth slows,
supporting a view that CPI inflation will fall close to 2.0% by the start of 2027. An
upside risk, however, in the near term is that higher oil/gas and food prices could
trigger another bout of second-round effects on wages and inflation expectations,
meaning CPI inflation stays above 3.0% for longer and causes the Bank to shift to
an even slower rate cutting path. CPI is expected to peak at 3.8% in September.
• The yield on the 10-year gilt moved sideways in the second quarter of 2025. After
rising from 4.4% in early April to 4.8% in mid-April following wider global bond
Page 154

Page 155

market volatility stemming from the “Liberation Day” tariff announcement, gilt yields
eased back as trade tensions began to de-escalate. By the end of April, the 10-
year gilt yield had returned to 4.4%. In May, concerns about stickier inflation and
shifting expectations about the path for interest rates led to another rise, with the
10-year gilt yield fluctuating between 4.6% and 4.75% for most of May. Thereafter,
as trade tensions continued to ease and markets increasingly began to price in
looser monetary policy, the 10-year yield edged lower, and ended Q2 at 4.50%.
We expect this trend to continue over the next year. However, it is more difficult to
be confident that the longer part of the curve will also see falls in yields, although
that is still our central case, as that part of the curve is increasingly held by transient
investors, such as foreign investors and hedge funds.  Pension funds and
insurance companies have more appetite in the short to medium part of the curve
nowadays.
• The FTSE 100 fell sharply following the “Liberation Day” tariff announcement,
dropping by more than 10% in the first week of April - from 8,634 on 1st April to
7,702 on 7th April. However, the de-escalation of the trade war coupled with strong
corporate earnings led to a rapid rebound starting in late April. As a result, the
FTSE 100 closed Q2 at 8,761, around 2% higher than its value at the end of Q1
and more than 7% above its level at the start of 2025. 
PWLB maturity Certainty Rates 1st April to 30th June 2025
Heading into the second quarter of 2025/26 markets seem to be comfortable with
a central case of gradual monetary policy easing, leading to Bank Rate and gilt
yields out to c10 years trending downwards.  That part of the curve has broadly
acted in line with our forecasts, unchanged since February.
However, the Government’s difficulty in convincing the market that it can work
within its self-imposed fiscal parameters has meant there has continued to be a
somewhat fragile confidence in the medium to longer dated part of the curve.  The
worst of this sentiment was reflected on 21st May, but as recently as the first week
of July has provided a reminder that markets will be quick to sell off if they feel
there is anything to prejudice the Chancellor’s stated aim of not raising the
headline tax rates nor boost borrowing to greater than has already been reported. 
The markets have also indicated that they would prefer Chancellor Reeves to stay
in post even if the fiscal landscape has deteriorated since the Autumn.
The Bank of England has remained cautious in stating that any Bank Rate cuts
must be undertaken gradually, and the inflation outlook remains a little opaque
with the CPI measure of inflation not expected to peak until September (possibly
3.8%) before falling back towards 2% by the start of 2027.  Annual wage increases
also remain at 5% y/y, even though the seasonally adjusted job vacancies number
has fallen to 712k.  Nonetheless, both the 5-year and, albeit to a lesser extent, 10-
year PWLB Certainty Rates have trended lower through the quarter. 
Further out, however, rates have either finished close to their starting point for the
quarter, if not a little higher.  It remains problematic that historic buyers of longer-
dated gilts – pension funds and insurance companies – have preferred the shorter-
Page 155

Page 156

dated maturities of late, whilst there is anecdotal evidence that both foreign
investors and hedge funds, who are not natural long-term holders of long-dated
debt gilt issuance, as a rule, may be more active in this part of the market currently
than has previously been the case.  Their presence, arguably, adds even greater
volatility to the equation.  Consequently, pulling all these factors together, and it is
clear that any signs of public finance weakness could put even greater upward
pressure on medium and longer dated gilts and, therein, PWLB rates.
Additionally, US Treasury yields have also remained elevated because markets
are unclear as to the relative impact of President Trump’s tariffs, deportation and
tax-cutting policies. Given the effect US markets have globally, this is another
contributing factor to the stubbornness of medium to long-dated gilt yields to fall
back. 
MPC meetings: 8th May & 19th June 2025
• There were two Monetary Policy Committee (MPC) meetings this quarter.
In May, the Committee cut Bank Rate from 4.50% to 4.25%, while in June
policy was left unchanged. In June’s vote, three MPC members (Dhingra,
Ramsden and Taylor) voted for an immediate cut to 4.00%, citing loosening
labour market conditions. The other six members were more cautious, as
they highlighted the need to monitor for “signs of weak demand”, “supply-
side constraints” and higher “inflation expectations”, mainly from food prices
rising. By repeating the well-used phrase “gradual and careful”, the MPC
continued to suggest that rates will be reduced further. 
4.00%
4.50%
5.00%
5.50%
6.00%
6.50%
7.00%
PWLB Rates 01.04.25 - 30.06.25
1 Year 5 Year 10 Year 25 Year 50 Year 50 year target %
Page 156

Page 157

• At the start of June, amid escalating tensions between Israel and Iran, oil
prices surged to over $75 per barrel. However, following a ceasefire
agreement near the end of the month, oil prices eased back to levels prior
to the conflict. Given the drop back in energy prices and the relatively muted
reaction to fears of a ceasefire violation, along with a large drop in the
services PMI output prices balance, our central view is that once inflation
begins to trend downwards in the final months of 2025, Bank Rate
reductions can begin again from November (pause in August as inflation
remains close to its peak), falling to a low of 3.5% in May 2026. However, if
the conflict in the Middle East were to result in higher energy prices and/or
domestic inflationary pressures grow stronger, there is a risk the Bank of
England may skip cutting rates further. 
Page 157

Page 158

Appendix 2 – Interest Rate Forecast
The Council has appointed MUFG Corporate Markets as its treasury advisors and part
of their service is to assist the Council to formulate a view on interest rates. The PWLB
rate forecasts below are based on the Certainty Rate (the standard rate minus 20 bps)
which has been accessible to most authorities since 1st November 2012.  For Housing
Revenue Account authorities, the lower Housing Revenue Account (HRA) PWLB rate
has also been available since 15 June 2023 (standard rate minus 60 bps) but is
available for HRA borrowing only.
The latest forecast was provided on 10th February: 
• Money market yield forecasts are based on expected average earnings by local
authorities for 3 to 12 months.
• The MUFG Corporate Markets forecast for average earnings are averages i.e.,
rates offered by individual banks may differ significantly from these averages,
reflecting their different needs for borrowing short-term cash at any one point in
time. 
The forecast has proved robust over the period since February, setting out a central
view that short and long-dated interest rates will start to fall once it is evident that the
Bank of England has been successful in squeezing excess inflation out of the
economy, despite a backdrop of stubborn inflationary factors.  Nonetheless, the longer
dated part of the forecast also reflects the increased level of Government borrowing
over the term of the current Parliament and the weakness in the public finances, with
the Government struggling to deliver on the efficiencies detailed in the 30th of October
Budget. 
Moreover, there is still on-going debate as to when, and if, the Government’s policies
will lead to a material uptick in growth given their reliance on the logistics of fast-
tracking planning permissions, identifying sufficient skilled labour to undertake a
resurgence in building, and an increase in the employee participation rate within the
economy.
Overall, our central view is that monetary policy is sufficiently tight at present to cater
for some further moderate loosening, the extent of which, however, will continue to be
data dependent.  We forecast the next reduction in Bank Rate to be made in November
and for a pattern to evolve whereby rate cuts are made quarterly and in keeping with
the release of the Bank’s Quarterly Monetary Policy Reports (February, May, August
and November).  Any movement below a 4% Bank Rate will, nonetheless, be very
much dependent on inflation data releases in the coming months. 
MUFG Corporate Markets Interest Rate View 10.02.25
Mar-25 Jun-25 Sep-25 Dec-25 Mar-26 Jun-26 Sep-26 Dec-26 Mar-27 Jun-27 Sep-27 Dec-27 Mar-28
BANK RATE 4.50 4.25 4.25 4.00 3.75 3.75 3.75 3.50 3.50 3.50 3.50 3.50 3.50
3 month ave earnings 4.50 4.30 4.30 4.00 3.80 3.80 3.50 3.50 3.50 3.50 3.50 3.50 3.50
6 month ave earnings 4.40 4.20 4.20 3.90 3.70 3.70 3.50 3.50 3.50 3.50 3.50 3.50 3.50
12 month ave earnings 4.40 4.20 4.20 3.90 3.70 3.70 3.50 3.50 3.50 3.50 3.50 3.50 3.60
5 yr   PWLB 5.00 4.90 4.80 4.70 4.60 4.50 4.40 4.40 4.30 4.20 4.20 4.10 4.00
10 yr PWLB 5.30 5.20 5.10 5.00 4.90 4.80 4.70 4.70 4.60 4.50 4.50 4.40 4.40
25 yr PWLB 5.80 5.70 5.60 5.50 5.40 5.30 5.20 5.10 5.00 5.00 4.90 4.90 4.80
50 yr PWLB 5.50 5.40 5.30 5.20 5.10 5.00 4.90 4.80 4.70 4.70 4.60 4.60 4.50
Page 158

Page 159

International factors could also impact the prospect for longer dated gilt yield falls. 
President Trump’s “big, beautiful bill” has successfully made its way through the House
of Representatives in July and given that it will signal a continued large budget deficit
position in the US finances, any uptick in Treasury yields will likely impact other
developed economies markets too. There will also be a keen focus on whether US-
driven tariff policies result in upward pressures on inflation.    
Page 159

Page 160

Appendix 3 
2025-26 Prudential and Treasury Indicators as at Quarter 1 2025-26 
Original Forecast 
Estimate As at Qtr 1
Prudential Indicators for prudence  
1) Capital expenditure £m £m
Gross capital expenditure 71 75
Less Financing (26) (26)
Net financing need (in-year borrowing requirement) 45 49   
2) Capital financing requirement (CFR) £m £m
Total CFR at 1 April 360 354
Total CFR at 31 March 394 392
Movement in CFR 34 38
Represented by:     
Net in-year borrowing requirement (above) 45 49   
Less: 
principal repayments and other financing   
movements 
(11)  (11)   
Total 34 38   
3) Authorised limits £m £m
Authorised limit for borrowing 293 Within limit
Authorised limit for long-term liabilities 101 Within limit
Authorised limit for external debt 394 Within limit   
4) Operational boundaries £m £m
Operational boundary for borrowing 298 Within limit
Operational boundary for long-term liabilities 104 Within limit
Operational boundary for external debt 402 Within limit   
5) Gross debt and the CFR £m £m
Gross debt at 31 March 321 301
Total CFR at 31 March 394 392
Gross debt less the CFR at 31 March (73) (91)   
Prudential indicators for affordability   
% %
6) Ratio of financing costs to net revenue stream 4.9 No update   
Page 160

Page 161

Forecast  
As at Qtr 1       
Treasury indicators – borrowing limits
7) Maturity structure of fixed rate borrowing 
Upper Lower Upper Lower
Under 12 months 30% 0% Within limit
12 months and within 24 months 30% 0% Within limit
24 months and within 5 years 30% 0% Within limit
5 years and within 10 years 40% 0% Within limit
10 years and above 100% 0% Within Limit    
8) Limits on fixed rate and variable rate borrowing 
Upper Lower Upper Lower
Fixed rate 100% 0% Within limit
Variable rate 60% 0% Within limit    
Treasury indicator - investment   
9) Upper limit on principal sums invested for over 365 days 
£m £m
Upper limit 20 Within limit 
Notes to Prudential and Treasury Indicators
The authority’s capital expenditure plans are the key driver of treasury management
activity. The output of the capital expenditure plans is reflected in the prudential
indicators, which are designed to assist members’ overview and confirm capital
expenditure plans.
Prudential Indicators – Prudence
Indicators 1-5 above cover the overall capital and control of borrowing prudential
indicators.
Affordability Prudential Indicators
Within the overall framework, prudential indicators are required to assess the
affordability of the capital investment plans.   These provide an indication of the impact
of the capital investment plans on the authority’s overall finances.  
Ratio of Financing Costs to Net Revenue Stream
This indicator identifies the trend in the cost of capital (borrowing and other long term
obligation costs), against the net revenue stream.  The estimates of financing costs
include current commitments and the proposals in the 2025-26 Budget Pack.  
Maturity Structure of Borrowing
These gross limits are set to reduce the authority’s exposure to large, fixed rate sums
falling due for refinancing, and are required for upper and lower limits.
Page 161

Page 162

IFRS 16 Leases
It was not possible to account for leases on an IFRS16 compliant basis within the pre-
audit annual accounts for the year ending 31 March 2025.  Changes will require to be
made during the audit process, which are not yet quantifiable but will impact both the
CFR and Debt positions.  It is anticipated that Prudential and Treasury Indicators and
Limits will be reviewed and updated, as may be required, as part of the Mid-year
Review report.
Page 162

Page 163

Audit & Scrutiny Committee Work Plan 2025 
This is an outline plan to facilitate forward planning of reports to the Audit & Scrutiny Committee 
Report  Lead Service Regularity
4 September 2025 – Hybrid Meeting Reports to Committee Services by 11 August 2025
Internal Audit and Counter Fraud Summary of Activities Chief Internal Auditor Quarterly
Internal and External Audit Report Follow Up  Chief Internal Auditor Quarterly
Internal Audit Reports to Audit and Scrutiny Committee 2025/26 Chief Internal Auditor Quarterly
External Audit Progress Report Forvis Mazars – Mark Outterside Quarterly
2025-26 Treasury Management Update as at 30 June 2025 Interim Head of Financial Services Annual
PSIAS Self-Assessment  Chief Internal Auditor Annual
Corporate Complaints Annual Report 2024-25  Governance, Risk and Safety Manager Annual
Freedom of Information Annual Report 2024-25  Governance, Risk and Safety Manager Annual
Audit & Scrutiny Committee 2024/25 Annual Report  Audit & Scrutiny Committee Chair Annual
Strategic Risk Assurance Mapping Chief Internal Auditor Annual
Strategic Risk Register Update  Chief Executive Annual
16 December 2025 Reports to Committee Services by 21 November 2025
Internal Audit and Counter Fraud Summary of Activities Chief Internal Auditor Quarterly
Internal and External Audit Report Follow Up  Chief Internal Auditor Quarterly
Internal Audit Reports to Audit and Scrutiny Committee 2025/26 Chief Internal Auditor Quarterly
Verbal Update by Chair(s) of Scrutiny Panel Chair and Vice Chair of Audit & Scrutiny Committee   Quarterly
External Audit Progress Report Forvis Mazars – Mark Outterside Quarterly
Performance Reporting Update (to include reference to LGBF) Chief Executive/Head of Customer Support Services/HR
& OD Manager – Carolyn Cairns/Jennifer Coyle
Annual
Council Annual Report 2025/26 Head of Customer Support Services Annual
Annual Auditors Report Forvis Mazars – Mark Outterside Annual
Draft Thematic Review Forvis Mazars – Mark Outterside Annual
2024-25 Audited Annual Accounts Forvis Mazars – Mark Outterside/Section 95 Officer/Head
of Financial Services
Annual
Treasury Management Strategy and Annual Investment Strategy –
Mid-year Review Report 2025/26 
Head of Financial Services Annual
12 March 2026 Reports to Committee Services by 16 February 2026
Page 163
Agenda Item
15

Page 164

Audit & Scrutiny Committee Work Plan 2025 
Internal Audit and Counter Fraud Summary of Activities Chief Internal Auditor Quarterly
Internal and External Audit Report Follow Up Chief Internal Auditor Quarterly
Internal Audit Reports to Audit and Scrutiny Committee 2025/26 Chief Internal Auditor Quarterly
Verbal Update by Chair(s) of Scrutiny Panel Chair and Vice Chair of Audit & Scrutiny Committee   Quarterly
External Audit Progress Report Forvis Mazars – Mark Outterside Quarterly 
RIPSA Annual Report Governance and Risk Manager Annual
Internal Audit 2025/26 Plan and Internal Audit Strategy 2025-2028 Chief Internal Auditor Annual
2025/26 Unaudited Annual Accounts Preparation Plan and
Timetable
Head of Financial Services Annual
2025-26 Treasury Management Update as at 31 December 2025 Head of Financial Services Annual
2026-27 Treasury Management Strategy and Annual Investment
Strategy
Head of Financial Services Annual
Internal Audit Charter and Internal Audit Manual Chief Internal Auditor Annual
Scrutiny Manual and Framework Annual Review  Chief Internal Auditor Annual
11 June 2026 Reports to Committee Services by 18 May 2026
Internal Audit and Counter Fraud Summary of Activities Chief Internal Auditor Quarterly
Internal and External Audit Report Follow Up Chief Internal Auditor Quarterly
Internal Audit Reports to Audit and Scrutiny Committee 2026/27 Chief Internal Auditor Quarterly 
Verbal Update by Chair(s) of Scrutiny Panel Chair and Vice Chair of Audit & Scrutiny Committee   Quarterly
External Audit Progress Report Forvis Mazars – Mark Outterside Quarterly
Internal Audit 2025-26 Annual Report  Chief Internal Auditor Annual
Scrutiny report on the Monitoring and Managing of Complaints Chief Internal Auditor (Scrutiny Panel) from March A&SC Annual
Annual Audit Plan for year ending 31 March 2026 Forvis Mazars – Mark Outterside Annual
Local Government in Scotland – Financial Bulletin 2024/25 
(Accounts Commission publication – timing will be subject to change, as this is
dependent on publication date)
Head of Financial Services Annual
Local Government Benchmarking Framework Report Head of Customer Support Services/OD Project Manager
(Chris Carr)
Annual
Unaudited Annual Accounts for year ending 31 March 2026 Head of Financial Services Annual
Treasury Management Annual Report 2025/26 Head of Financial Services Annual
Statement of Governance and Internal Control Governance, Risk and Safety Manager Annual 
Page 164