Auchnagoul House         
Inveraray,         
Argyll & Bute 
PA32 8XT
Argyll & Bute Council 
Development Management 
Kilmory Castle, 
Lochgilphead,
Argyll & Bute        Date: 11.04.2023     
Dear Sirs,
Re: Planning application No. 20/01901/PPP
I am writing to comment on the notice of review for the above planning at Auchnagoul.
My wife and I are the owners of Auchnagoul House and full-time residents. Ours is the
dwelling house next to Swallow tale Cottage on the site plans.
We have previously documented our objections in our letter dated 08.01.2021 and
these objections still stand as there has been no further detail regarding them given. 
Having read the documentation from Millard Consulting I would like to address a few
points which need clearing up. 
1. The comment has been made that the council gave SSE’s contractors permission to
access the quarry at the top of Auchnagoul. I would like to point out that the bulk of
the material, which was blasted and crushed on site, went to make roadways
further up Auchnagoul during the project and very little traffic left the site, using the
junction of the A83. 
Since the forestry finished their harvesting operation last year, there have been very
few logging lorries using the junction.
The problem of the junction could only ever be improved when turning right, by
reducing the blind summit or by traffic control in the form of lights. Both of which
are not financially practical.

Page 2

2. The comment by Mr. Pirie (Millard Consulting) regarding the decrease in traffic
resulting from the removal of the existing buildings use is a very strange one. I
would like to point out that the building is not being used for any purpose and there
is no Agricultural equipment currently being used anywhere in Auchnagoul.
Therefore, the construction of a house would by nature increase the traffic usage by
the number of car owners who would occupy the property. However, they would
still need to use the junction and be subject to the existing visibility issues. 
3. I notice that towards the end of Mr. Pirie comments he makes a statement about
the fact that his client would not need to bring the road up to council standard. I
have seen no evidence that Argyll Estates / Forestry Commission have been
consulted or there has been any feasibly study carried out by any party of who will
be paying for this. Mr. Pirie appears to think the imaginary farm traffic reduction will
negate any upgrading, other than a few passing places, which could encourage the
public to use them as parking areas for walking. 
4. I would also like to draw the council’s attention to the fact that Mr. Pirie did not
mention the increase in traffic, during any construction which could be up to a year
or more depending on the build progress or if the road would get its passing places
prior to the construction being started. This brings me to the next issue of parking of
site traffic. At no point during the process has this been brought up, the road to the
site is a rough surface single track with nowhere to park once you get to the top,
which involves crossing two burns. With heavy plant and vehicles bringing in
suppliers there is a real danger these will be damaged. Again, these are part of the
road owned by the Argyll Estates and there is no evidence that these have been
surveyed to identify if these are fit to take heavy and increased construction traffic. 
Should you require any points in this letter clarifying, please do not hesitate to contact me. 
Yours Sincerely
Mr. & Mrs. Knowles