STATEMENT OF CASE 
FOR 
ARGYLL AND BUTE COUNCIL 
LOCAL REVIEW BODY 
REFUSAL OF PLANNING PERMISSION IN
PRINCIPLE FOR ERECTION OF
DWELLINGHOUSE AT LAND NORTH OF
SWALLOWTALE, ACHNAGOUL, INVERARAY 
PLANNING PERMISSION IN PRINCIPLE
APPLICATION REFERENCE NUMBER
20/01901/PPP 
6th APRIL 2023

Page 2

STATEMENT OF CASE 
The planning authority is Argyll and Bute Council (‘the Council’). The
appellants are Mr and Mrs MacArthur (‘the appellants’). 
The planning permission in principle application, reference number
20/01901/PPP, for the erection of a dwellinghouse at Land North of
Swallowtale, Achnagoul, Inveraray (“the appeal site”) was refused under
delegated powers on the 17th February 2023. The planning application has
been appealed and is subject of referral to a Local Review Body. 
DESCRIPTION OF SITE 
The application site is located to the north of a small settlement of 5
dwellinghouses in a rural setting to the north of the A83 Trunk Road at
Achnagoul, Inveraray. Access to the site is via a private access from the A83
Trunk Road.           
SITE HISTORY 
The planning history of the site and locality is detailed in Section D of the
Report of Handling. It is noted that planning permission has previously been
refused for a dwellinghouse on this location. 
STATUTORY BASIS ON WHICH THE APPEAL SHOULD BE DECIDED
Section 25 of the Town & Country Planning (Scotland) Act 1997 provides
that where, in making any determination under the planning Acts, regard is
to be had to the development plan, the determination shall be made in
accordance with the plan unless material considerations indicate otherwise. 
This is the test for this application. 
STATEMENT OF CASE 
Argyll and Bute Council considers the determining issues in relation to the
case are as follows:- 
- Whether the proposed location, siting, design and finishes of the
proposed development have sufficient regard to the context of
their setting. 
- Whether the existing access arrangements serving the proposed
development are suitable to accommodate the intensification in
its use which would occur as a result of the development. 
The Report of Handling (attached) sets out the Council’s assessment of the
application in terms of Development Plan policy and other material
considerations.

Page 3

REQUIREMENT FOR ADDITIONAL INFORMATION AND A HEARING 
It is considered that no new information has been raised in the appellants’
submission. The issues raised were covered in the Report of Handling which
is contained in Appendix 1, including a summary of the representations
submitted from one household at Achnagoul. As such it is considered that
Members have all the information they need to determine the case. Given the
above and that the proposal is small-scale, has no complex or challenging
issues and has not been the subject of significant body of conflicting
representation, then it is considered that a Hearing is not required. 
COMMENT ON APPELLANTS’ SUBMISSION 
Having regard to the detailed reasons for requesting the review set out in part
(7) of the appellants’ submission the following points are noted: 
1. The application site falls within an area designated for Housing in
the Local Plan.
2. The site is brownfield redevelopment and should be supported as
it does not mean development in greenfield areas 
Whilst there is general support for the principle of small scale housing
development within defined ‘settlement area’ it is incorrect to imply that
the land is designated for housing development. This issue is
addressed in section P of the report of handling. 
The application site is located within the ‘settlement area’ of Achnagoul
as defined by the Argyll and Bute Local Development Plan 2015,
wherein the provisions of policy LDP DM 1, LDP 8 and SG LDP HOU 1
set out a general presumption in favour of ‘small scale’ housing
development on appropriate sites, and subject to compliance with all
other relevant provisions of the Development Plan. The current
proposal for a single dwelling would fall within the definition of ‘small
scale’. NPF4 Policy 9 sets out support in principle for the sustainable
reuse of brownfield land, including vacant and derelict land and
buildings subject to consideration of impact upon biodiversity and
potential contaminants from previous uses. 
3. Refusal reason is due to the current access which serves 5
properties. Transport Scotland refused permission even though in
their response to Jenni Minto, they clearly state the addition of
one housing unit will have little or no impact. 
4. The junction is deemed as safe with no recorded accidents. 
It is noted that Transport Scotland have formally objected to the
development in their consultation response; this matter is summarised
in sections C and G of the report of handling.

Page 4

Within their further response dated 22nd February 2021, Transport
Scotland note that whilst the traffic associated with a single
dwellinghouse is unlikely to be significant on its own, given the number
of existing properties which already utilise the access they remain of
the opinion that no further intensification should be permitted. It is
advised that visibility to the left is between 120-130m and 196-215 to
the right at set back distances of 4.5m and 2.4m. The visibility to the
left is consequently well below the desired standard of 215m and there
is little scope to improve this given the position of the access close to
the brow of a hill, It is also observed that the stopping distance of traffic
approaching the access is also well below the desirable minimum
standard set out in the Design Manual for Roads and Bridges. 
It is further observed by officers that there is also other pressure for
development off of this substandard access, as evidenced by another
application (21/02192/PPP) within the locality and identified in section
D of the report of handling; that application was subsequently
withdrawn prior to formal determination in light of objection raised by
Transport Scotland and ABC Roads in relation to the suitability of the
access arrangements. 
5. Transport Scotland approved the use of this access for slow
moving HGV vehicles for forestry and mining operations. This
shows a degree of hypocrisy. 
It is firstly noted that each planning application requires to be assessed
on its own merits. The applicant’s concerns in relation to the
consistency of approach by Transport Scotland are noted and
commented upon in detail under section G of the report of handling.
The issues raised have also been subject to review by Transport
Scotland and subject to detailed commentary dated 22nd February
2021. 
In relation to the borrow pit permission (19/01422/PP) Transport
Scotland have commented that this related to the extension of an
existing borrow pit and that a maximum of 10 low loader trips were
expected for the purpose of mobilisation and demobilisation, and that
all other trips were generated within the forest area. 
6. It has been established that Argyll and Bute Planning could have
over-ruled Transport Scotland's objection and granted Planning
Permission. A report was commissioned by Mr MacArthur to
compliment the application and assist in demonstrating the
access junction was safe, This was ignored by Transport Scotland
and Argyll & Bute Planning. 
The report commissioned by the applicant is detailed in section G of
the report of handling and has been subject to commentary by
Transport Scotland. It is incorrect to suggest that this information has

Page 5

either ignored or that it has not been afforded weighting in the
determination of the application. 
The applicant is correct in identifying that a planning authority is not
obliged to accept the advice of Transport Scotland as statutory
consultee. However, where a planning authority intended to go against
that advice it does not have the ability to grant planning permission
without first notifying the application to Scottish Ministers who in turn
may call the application in for their own determination. In this instance
officers advised the applicant that the supporting information presented
was not considered sufficient to demonstrate that the proposed
development would not give rise to adverse effects upon road safety
and accordingly a decision was made in line with the recommendation
of Transport Scotland. 
7. The length taken, and number of Planning Officers assigned to
this case has been extremely disconcerting and upsetting for my
client. It has taken the best part of 3 years to come the decision to
refuse. 
It is accepted that a timely determination was not reached in this matter
and explanation of the operational issues, including the pandemic, loss
of staff and subsequent issues with recruitment that impacted severely
upon the resources of the Development Management Service have
previously been provided to the applicant. 
Nonetheless, it is noted that the time taken to reach a determination is
not a material factor in the acceptability or otherwise of the proposed
development and as such is not a factor that should be afforded
weighting in the LRB process. 
CONCLUSION 
Section 25 of the Town and Country Planning Act 1997 requires that all
decisions be made in accordance with the development plan unless material
considerations indicate otherwise.   
The application site is located within ‘settlement area’ which pertains to an
existing group of five dwellinghouses at Achnagoul, by Inveraray as defined
by the Adopted ‘Argyll and Bute Local Development Plan’ 2015. Within this
zone policies STRAT DC 1, LDP 8 and SG LDP HOU 1 set out a general
presumption in support of ‘small’ scale residential development provided that
such development is appropriately sited, is of a scale and design which fits
within the context of the locale, is compatible with the character and amenity
of its surrounds and, does not give rise to adverse access or servicing
implications. NPF4 Policy 9 sets out support in principle for the sustainable
reuse of brownfield land, including vacant and derelict land and buildings
subject to consideration of impact upon biodiversity and potential
contaminants from previous uses.

Page 6

- Does the proposed location, siting, design and finishes of the
proposed development have sufficient regard to the context of
their setting? 
The application site relates to an area of 0.36 hectares which is currently
occupied by a derelict stone outbuilding, and native broadleaf woodland that
forms part of the setting for the wider settlement area. The submitted site plan
indicates that the proposed new dwellinghouse would be erected on the
footprint of the existing outbuilding, the existing site access would be
upgraded and car parking formed onsite. The applicant has claimed that the
stone outbuilding forms part of a registered agricultural unit however, at the
time of inspection by officers, there was no evidence to suggest that the site
area currently formed part of a working farm operation. 
The replacement of the existing outbuilding with a dwelling of modest
proportion and traditional design emphasis would be considered to be in
keeping with the existing settlement pattern, would not give rise to any
adverse landscape impact, and is sufficiently removed from neighbouring
property that there is reasonable prospect that any concerns relating to
privacy or amenity could be addressed through siting and design. The
development of the site would necessitate some removal of existing self-
seeded tree cover, it is however evident that trees have encroached upon the
previously developed area around the outbuilding and it is considered that,
subject to appropriate mitigation (tree survey and confirmation of minimal tree
removal to accommodate the development) that there would not be any
significant impact on the wider areas of woodland surrounding the site. It is
considered that the site is capable of being developed in a manner that would
be consistent with the relevant provisions of NPF4 Policy 6, LDP 3, LDP 9,
SG LDP ENV 6, SG LDP ENV 14, and SG LDP Sustainable Design. 
- Is the existing access arrangements serving the proposed
development suitable to accommodate the intensification in its
use which would occur as a result of the development? 
In this particular instance Transport Scotland has advised that the existing
junction with the A83 gives cause for concern in two respects: 
i) that the proposal will result in an increase in the number of vehicles
entering and leaving the traffic stream at a point where visibility is
restricted thus causing interference with the safety and free flow of
traffic on the trunk road, and; 
ii) that the proposal would result in an intensification of waiting and right
turning manoeuvres from the trunk road at a location where forward
visibility for approaching westbound traffic on the trunk road is
substandard thus creating interference with the safety and free flow of
traffic on the trunk road. 
The Council’s Roads Service has advised that the private access serving the
development already serves five dwellings and is considered to be unsuitable

Page 7

for further development due to the condition of the surface and insufficient
passing places. 
The provisions of NPF4 Policy 13(g) set out that development proposals that
have the potential to affect the operation and safety of the Strategic Transport
Network will be fully assessed to determine their impact. Where it is identified
that existing infrastructure does not have the capacity to accommodate a
development without adverse impact on safety or unacceptable impacts on
operational performance then the cost of the mitigation measures required to
ensure the continued safe and effective operation of the network should be
met by the developer. 
The provisions of policy LDP 11 and SG LDP TRAN 4 of the adopted ‘Argyll
and Bute Local Development Plan’ 2015 set out that the Council will seek to
resist development where an existing private access regime is considered to
be of such poor standard as to be unsuitable for vehicular traffic and is not
capable of commensurate improvements unless the private access is brought
up to a full adoptable road. 
The land necessary for the upgrade of the existing junction with the A83,
improvement of forward visibility to westbound traffic on the A83 and, the
improvement of the private access to adoptable standard is located both
outwith the application site boundary and land within the control of the
applicant and consequently the requisite offsite highway improvements cannot
be secured within the confines of the application as submitted and the
proposed development is consequently, in view of the above, considered
likely to have a significant adverse impact upon highway safety. 
The proposal is considered to be contrary to NPF4 Policy 13, and policy LDP
11 and SG LDP TRAN 4 of the Argyll and Bute Local Development Plan 2015,
and there are no other material considerations of sufficient significance to
indicate that it would be appropriate to grant planning permission in this
instance as a departure to the Development Plan having regard to s25 of the
Act. 
Taking account of the above, it is respectfully requested that the request for a
review be dismissed. 
Appended documents:
Report of Handling dated 17.02.2023
Further comments from Transport Scotland dated 22.02.2021

Page 8

Argyll and Bute Council
Development & Economic Growth   
Delegated Planning Application Report and Report of Handling as required by
Schedule 2 of the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013 relative to applications for Planning Permission or
Planning Permission in Principle 
Reference No: 20/01901/PPP
Planning Hierarchy: Local
Applicant: Mr I. MacArthur
Proposal: Demolition of outbuilding and site for the erection of a
dwellinghouse
Site Address:  Land North of Swallowtale, Achnagoul, Inveraray    
DECISION ROUTE 
Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission in Principle
 Site for the erection of one dwellinghouse (no details of siting, design,
submitted for approval at this time);
 Installation of bio-treatment plant and partial soakaway (no detail
submitted for approval at this time) 
(ii) Other specified operations
 Connection to public water supply 
(B) RECOMMENDATION: 
Recommend that planning permission be refused for the reasons attached. 
(C) CONSULTATIONS:   
Transport Scotland (28.01.2021, 22.02.2021) – Recommend refusal on road safety
grounds. It is noted that in the event that the planning authority was minded to grant
planning permission contrary to the advice of Transport Scotland then it would
require to notify the application to Scottish Ministers. 
ABC Roads (08.01.2021, 26.02.2021) – Recommend refusal. It is identified that the
development is served by an existing substandard private access, it is intimated that
further development would require the access to be brought up to an adoptable
standard.

Page 9

West of Scotland Archaeology Service (14.01.2021) – No objections subject to a
condition requiring an archaeological watching brief being imposed on any grant of
planning permission. 
Scottish Water (24.12.2020) – No objection raised to the proposal to connect to the
public water supply subject to a note to the applicant. Confirmation provided that
there is no public sewer system in the vicinity of the development. 
ABC Environmental Health – (05.12.2022) Notes potential for contamination of site
from previous land management activities. No objections subject to condition if
further info is not provided prior to determination. 
(D) HISTORY:   
Application Site: 
Planning permission has previously been refused for development of this location: 
09/00745/PP – Erection of a dwellinghouse and office – Refused 08.09.2009. This
decision was subsequently upheld by Local Review Board (09/0003/LRB) on
09.02.2010. 
The reasons for the  previous refusal of planning permission in relation to application
ref. 09/00745/PP were set out as follows: 
1. The proposed development would result in increasing the number of vehicles
entering and leaving the traffic stream on the A83(T) at a point where visibility is
restricted, thus creating interference with the safety and free flow of traffic on the
trunk road. 
2. The proposed development would result in an intensification of waiting and right
turning manoeuvres from the A83(T) trunk road at a location where forward
visibility for approaching westbound traffic on the trunk road is substandard thus
creating interference with the safety and free flow of traffic on the trunk road. 
3. The development conflicts with policy LP TRAN 4 of the adopted Argyll and Bute
Local Plan 2009 in so much as the lengthy substandard private access which
already serves 5 dwellings would need to be brought up to adoptable standard
to serve the development proposed; being suitably surfaced and provided with
appropriate passing places, and over which the applicant has no control, given
that land required for such improvement lies beyond the application site and
outside the ownership of the applicant. 
4. The proposal conflicts with LP BUS 1 of the adopted Argyll and Bute Local Plan
as the office element of the proposal would erode the residential character of the
area and adversely affect local residents and the amenity of the area through an
increase in traffic levels and the introduction of commercial activity, which would
be a source of nuisance and disturbance to residents contrary to the interests of
the residential amenity of the area. 
5. Having regard to the combined scale of the built development associated with
the provision of residential and office accommodation proposed along with the
associated parking area, their location and the consequential loss of some
mature trees which contribute to the setting of the settlement, together with

Page 10

elements of the design and materials of the buildings which are uncharacteristic
of its surroundings, such as projecting glazed/timber extension to the dwelling
and the metal profiled roof of the office building, it is considered that the proposal
in its siting and design fails to accord with LP ENV 19 and Appendix A of the
Argyll and Bute Local Plan 2009. 
Locality: 
Application ref. ref. 21/02192/PPP: Recent application for development of land
adjoining the current application site– Site for Erection of Dwellinghouse - Withdrawn
prior to determination following objections raised by Transport Scotland and ABC
Roads. 
Application ref. 19/01422/MIN. Land west of Dalchenna Farm, Inveraray. Temporary
planning permission approved 27.11.2019. This permission provided for the
extension of an existing Forestry Commission borrow pit as a temporary mineral
working for the extraction of hardrock required to provide/improve access tracks and
construction requirements associated with the construction of a section of the
Inveraray-Crossaig Overhead Line by Scottish and Southern Electricity Networks.
This permission provided consent to temporarily extract material for use in the
immediate locality as a means of avoiding the need to transport large volumes of
hard rock over large distances on the road network. The borrow pit utilised the same
junction onto the A83(T) as the current application but is served by a forest access
that splits off from the private road some 280m east of the Auchnagoul ‘settlement
area’. 
(E) PUBLICITY:   
Regulation 20 Advert published 15th January 2021 – Expired 5th February 2021 
(F) REPRESENTATIONS:   
(i) Representations received from: 
Representations have been received from two third-parties raising objection: 
 Mr Knowles, Auchnagoul House, Inveraray (08.01.2021)
 Mrs Knowles Auchnagoul House, Inveraray (08.01.2021) 
Representations are published in full on the planning application file and are available
to view via the Public Access section of the Council’s website. 
(ii) Summary of issues raised: 
 Concern is raised that the proposed septic tank would be above the level
of the objectors property giving rise to potential impact upon a
watercourse, localised flooding and potential for odour nuisance arising
from the outfall. 
Comment: It is noted that the current application is for planning permission
in principle and does not include detail of the proposed means of foul

Page 11

drainage. The application indicates that foul drainage will be to a new bio-
treatment plant and partial soakaway however any detail in that respect
would require to be subject to an AMSC submission in the event of PPP
being granted. The foul drainage arrangements would also be subject to
separate controls under Building Regulations and CARS (SEPA) in relation
to its operation and impact on the water environment. 
 No detail is provided on how an electricity supply will be provided to the
site. Concern is raised that works by SSE may cause disruption to
residents. 
Comment: It is noted that the provision of an electrical connection would be
undertaken by SSE as a statutory undertaker utilising ‘permitted
development rights’. This is not a material planning consideration in the
determination of the current application. 
 The plan shows the removal of 5 trees which would detract from the
appearance of the settlement, and no provision appears to be made for
replacement planting. 
Comment: The current proposal provides an indicative footprint for a new
dwelling that would indicate that this could be accommodated in a manner
which would involve removal of a small number of trees that encroach on the
existing building and its immediate surrounds whilst allowing retention of the
majority of tree cover and thereby avoid any significant adverse impact upon
the setting of the existing settlement. It is noted that in the event that planning
permission in principle were to be granted it would however be appropriate
to secure further detail of proposals for tree retention/protection/felling for
assessment and approval. 
 Concern is raised that the existing access to Auchnagoul is by a rough
single track road with no passing places. The proposals do not include
any mention of upgrades to the road or permission of the land owner to
implement such works. 
Comment: This concern is noted. Further commentary on the suitability of
the access regime to serve further development is contained within the
assessment below. 
 Concern is raised that the proposal will impact upon the pressure of the
water main serving existing properties. Assurance is sought that the
water pressure will not be affected. 
Comment: It is noted that Scottish Water have not objected to the proposal.
It is further advised that the impact upon water pressure of existing users
would be a matter to be resolved directly with Scottish Water in the event
that they permitted a connection to a new development. This is not a material
planning consideration in the determination of the current application. 
(G) SUPPORTING INFORMATION 
Has the application been the subject of:

Page 12

(i) Environmental Statement: No  
(ii) An appropriate assessment under the
Conservation (Natural Habitats) Regulations
1994:   
No  
(iii) A design or design/access statement:    Yes  
Design Statement (09.12.2020) 
The document identifies that the application site contains an existing
stone built building which is assumed to have originally been utilised
as a croft house before subsequently being repurposed as a byre. 
It is contended that the proposed new dwelling would not create an
undue additional burden on the existing private access. It is
suggested that additional passing places could be provided along the
track to improve road safety. It is also intimated that the acceptance
of one additional dwelling should be accepted without requirement to
upgrade the road to adoption standard as no other development
would be permitted at this rural location. 
Officer Comment: It is noted that the assertion that there is no further
opportunity for development in this locality is incorrect as there are
further areas of ‘settlement area’ and rural opportunity served by the
private access which indicate potential capacity/demand for
development beyond the scope of the current application site. This is
directly evidenced by a recent application (ref. 21/02192/PPP) on
adjoining land within the ‘settlement area’. This was withdrawn prior
to determination following unresolvable objections raised by ABC
Roads and Transport Scotland. 
It is proposed to create a modest family home by demolishing the
existing stone built building and replacing this with a modest building
of design and finishes that reflect the vernacular design of the existing
settlement. It is suggested that the existing building forms the basis
of the development and is retained with minimal modifications. The
proposed palette of materials would likely incorporate natural stone,
timber windows and doors, metal down pipes and gutters, slate or
corrugated metal roofing, natural larch cladding. 
Officer Comment: It is noted that the Agent for the application clarified
elsewhere in correspondence dated 08.12.20 that the existing byre
would be demolished although this does not appear to have been
corrected in the Design Statement. 
Correspondence with Transport Scotland in Response to
Recommendation of Refusal (dated 03.02.2021) 
It is highlighted that Transport Scotland did not raise objection to
another application (19/01422/MIN) utilising the junction with the
A83(T) at this location. It is contended that Transport Scotland have
been inconsistent in raising objection to the current application but

Page 13

permitting a commercial use involving slow moving HGV and operator
vehicles to utilise the junction. 
It is suggested that Transport Scotland’s acceptance of the borrow pit
application indicates that circumstances have changed since their
previous recommendation to refuse application ref. 09/00745/PP in
2009 and clarification was requested on that issue. 
Transport Consultant Report (dated 05.02.2021)   
It is contended that the current application site forms part of an
agricultural holding and as such there is nothing impeding the
applicant from continuing to utilise the access for agricultural purposes
which would generate on average 2-2.5 two way trips on a daily basis.
It is suggested that the replacement of the existing agricultural activity
by the proposed dwellinghouse would not generate additional traffic
movements. It is also contended that agricultural vehicles are
generally cumbersome and slow moving compared to a private car
and as such the proposal could provide an improvement over existing
circumstances. It is contended that this position also addresses the
concerns raised by the Council’s Roads Officers. 
It is contended that previous acceptance of Transport Scotland of the
use of the junction with the A83(T) by HGV forestry related movements
on the basis that their increased height affords enhanced visibility over
that of other vehicles is erroneous as visibility splay standards are
regulated on the basis of visibility over 1.05m in height (i.e. aligned
private cars). It is also contended that HGV traffic is slower moving
and likely to give rise to greater risk of disruption to freeflow of traffic
and road safety than the movement of smaller vehicles. A similar
position is stated in relation to both Transport Scotland and ABC
Roads position relating to a borrow pit development (19/01422/MIN). 
Officer Comment: It is noted that this further information was subject
to additional consultation with both Transport Scotland and ABC
Roads; both provided further responses maintaining their objection to
the current application. 
Transport Scotland provided further commentary (22.02.21) accepting
that there is some usage associated with the existing byre that could
potentially cease or decrease if it were replaced by a dwellinghouse.
It was however noted that any such reduction could not be guaranteed
and as such their position remains that the development (in addition
to the existing 5 dwellinghouses served by the access) would be
expected to result in a potential intensification of use of a substandard
junction with the A83(T). 
Transport Scotland further note that whilst the traffic associated with a
single dwellinghouse is unlikely to be significant on its own, given the
number of existing properties which already utilise the access they
remain of the opinion that no further intensification should be
permitted. It is advised that visibility to the left is between 120-130m
and 196-215 to the right at set back distances of 4.5m and 2.4m. The
visibility to the left is consequently well below the desired standard of
215m and there is little scope to improve this given the position of the

Page 14

access close to the brow of a hill, It is also observed that the stopping
distance of traffic approaching the access is also well below the
desirable minimum standard set out in the Design Manual for Roads
and Bridges. 
In relation to the borrow pit permission (19/01422/PP) Transport
Scotland have commented that this related to the extension of an
existing borrow pit and that a maximum of 10 low loader trips were
expected for the purpose of mobilisation and demobilisation, and that
all other trips were generated within the forest area. 
Transport Scotland also confirm that the concerns relating to
09/00745/PP have not been alleviated by any material change in
circumstances of the access of the development site.
(iv) A report on the impact of the proposed
development eg. Retail impact, transport
impact, noise impact, flood risk, drainage
impact etc:  
No   
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:   No   
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  No    
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account
in assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023)
(delete as appropriate) 
Part 2 – National Planning Policy 
Sustainable Places
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 6 – Forestry, Woodland and Trees
NPF4 Policy 9 – Brownfield, Vacant and Derelict Land and Empty Buildings
NPF4 Policy 12 – Zero Waste
NPF4 Policy 13 – Sustainable Transport 
Liveable Places
NPF4 Policy 14 – Design, Quality and Place
NPF4 Policy 15 – Local Living and 20 Minute Neighbourhoods
NPF4 Policy 16 – Quality Homes
NPF4 Policy 17 – Rural Homes
NPF4 Policy 18 – Infrastructure First

Page 15

‘Argyll and Bute Local Development Plan’ Adopted March 2015 
(delete as appropriate) 
LDP STRAT 1 – Sustainable Development 
LDP DM 1 – Development within the Development Management Zones 
LDP 3 – Supporting the Protection Conservation and Enhancement of our
Environment 
LDP 8 – Supporting the Strength of our Communities 
LDP 9 – Development Setting, Layout and Design 
LDP 10 – Maximising our Resources and Reducing our Consumption 
LDP 11 – Improving our Connectivity and Infrastructure 
Local Development Plan Schedules 
‘Supplementary Guidance to the Argyll and Bute Local Plan 2015’ (Adopted
March 2016 & December 2016) 
Natural Environment 
SG LDP ENV 1 – Impact on Habitats, Species and our Biodiversity
SG LDP ENV 6 – Impact on Trees / Woodland
SG LDP ENV 7 – Water Quality and the Environment 
Landscape and Design 
SG LDP ENV 14 – Landscape 
Historic Environment and Archaeology 
SG LDP ENV 20 – Impact on Sites of Archaeological Importance 
General Housing Development 
SG LDP HOU 1 – General Housing Development Including Affordable Housing
Provision 
Sustainable Siting and Design 
SG LDP Sustainable – Sustainable Siting and Design Principles 
Resources and Consumption 
SG LDP SERV 1 – Private Sewage Treatment Plants & Wastewater Systems
SG LDP SERV 2 – Incorporation of Natural Features / SuDS
SG LDP SERV 4 – Contaminated Land
SG LDP SERV 5(b) – Provision of Waste Storage & Collection Facilities within New
Development 
Transport (Including Core Paths) 
SG LDP TRAN 4 – New & Existing, Public Roads & Private Access Regimes
SG LDP TRAN 6 – Vehicle Parking Provision

Page 16

(ii)  List of all other material planning considerations taken into account in
the assessment of the application, having due regard to Annex A of
Circular 3/2013. (delete as appropriate) 
Chief Planner’s Letter 08.2.2023 – Transitional Arrangements for NPF4 
Argyll and Bute proposed Local Development Plan 2 (November 2019) – The reporters have
written to Argyll and Bute Council regarding the Proposed Local Development Plan 2, which
is currently at Examination. Due to the status of the revised draft National Planning
Framework 4 the reporters are currently determining what, if any, further processes are
required as a consequence. Although PLDP2 remains a material consideration it is now
subject to this further assessment against NPF4 policies. Therefore, it considered
appropriate not to attach significant weight to PLDP2 policies during this time, i.e. until the
consequences of NPF4 policies for the PLDP2 have been assessed by the reporters and
the Examination report is issued. Specific sites in PLDP2 that have not received
objections and are not being dealt with at the Examination may continue as strong
material considerations, e.g. allocations and potential development areas. 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment:  No    
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  No 
(M) Has a sustainability check list been submitted:  No 
(N) Does the Council have an interest in the site:  No 
(O) Requirement for a hearing: No    
(P) Assessment and summary of determining issues and material considerations 
The proposal seeks Planning Permission in Principle for a site for the erection of a
dwellinghouse on land to the North of Swallowtale, Achnagoul, Inveraray. Aside from
details of site access, only indicate detail of siting and services has been provided
for assessment at this time. The application site has previously been the subject of
an earlier application for planning permission (09/00745/DET) for the erection of a
dwellinghouse and an office which was refused due to concern about the suitability
of the access to serve the development. 
NPF4 Policy 1 seeks to prioritise the climate and nature crises in all decisions; it
requires to be applied together with other policies in NPF4. Guidance from the
Scottish Government advises that it is for the decision maker to determine whether
the significant weight to be applied tips the balance in favour for, or against a
proposal on the basis of its positive or negative contribution to climate and nature
crises.

Page 17

NPF4 Policy 2 seeks to ensure that new development proposals will be sited to
minimise lifecycle greenhouse gas emissions as far as possible, and that proposals
will be sited and designed to adapt to current and future risks from climate change.
Guidance from the Scottish Government confirms that at present there is no single
accepted methodology for calculating and / or minimising emissions. The emphasis
is on minimising emissions as far as possible, rather than eliminating emissions. It is
noted that the provisions of the Settlement Strategy set out within the Argyll and Bute
Local Development LDP DM 1 promotes sustainable levels of growth by steering
significant development to our Main Towns and Settlements, rural growth is
supported through identification of Key Rural Settlements and safeguards more
sensitive and vulnerable areas within its various countryside designations. 
The application site is located within the ‘settlement area’ of Achnagoul as defined
by the Argyll and Bute Local Development Plan 2015, wherein the provisions of policy
LDP DM 1, LDP 8 and SG LDP HOU 1 set out a general presumption in favour of
‘small scale’ housing development on appropriate sites, and subject to compliance
with all other relevant provisions of the Development Plan. The current proposal for
a single dwelling would fall within the definition of ‘small scale’. NPF4 Policy 9 sets
out support in principle for the sustainable reuse of brownfield land, including vacant
and derelict land and buildings subject to consideration of impact upon biodiversity
and potential contaminants from previous uses. 
The application site relates to an area of 0.36 hectares which is currently occupied
by a derelict stone outbuilding, and native broadleaf woodland that forms part of the
setting for the wider settlement area. The submitted site plan indicates that the
proposed new dwellinghouse would be erected on the footprint of the existing
outbuilding, the existing site access would be upgraded and car parking formed
onsite. The applicant has claimed that the stone outbuilding forms part of a registered
agricultural unit however, at the time of inspection by officers, there was no evidence
to suggest that the site area currently formed part of a working farm operation. 
The replacement of the existing outbuilding with a dwelling of modest proportion and
traditional design emphasis would be considered to be in keeping with the existing
settlement pattern, would not give rise to any adverse landscape impact, and is
sufficiently removed from neighbouring property that there is reasonable prospect
that any concerns relating to privacy or amenity could be addressed through siting
and design. The development of the site would necessitate some removal of existing
self-seeded tree cover, it is however evident that trees have encroached upon the
previously developed area around the outbuilding and it is considered that, subject
to appropriate mitigation (tree survey and confirmation of minimal tree removal to
accommodate the development) that there would not be any significant impact on
the wider areas of woodland surrounding the site. It is considered that the site is
capable of being developed in a manner that would be consistent with the relevant
provisions of NPF4 Policy 6, LDP 3, LDP 9, SG LDP ENV 6, SG LDP ENV 14, and
SG LDP Sustainable Design. 
The application site is not located within a conservation area or within the immediate
setting of any listed building or scheduled ancient monument. The West of Scotland
Archaeology Service have however identified that the application site is located
within a landscape that is populated with recorded archaeological sites and noted
that as the proposal would affect the upstanding remains the area of ground to be
disturbed has a good chance of unearthing visible or buried unrecorded remains that
may survive below ground level. WoSAS have advised that in the event that planning
permission were to be granted that development be subject of a programme of
archaeological works. Such mitigation measures would be consistent with the

Page 18

requirements of policy LDP 3 and SG LDP 20 and could readily be secured by
suspensive planning condition. 
The details accompanying the application identify that water would be by connection
to an existing water supply and foul drainage would be to a new package treatment
plant. Scottish Water have not raised objection to the proposed connection to the
public water supply. The application site is not located in an area served by public
drainage and accordingly the installation of a private drainage solution is, in principle,
consistent with the relevant provisions of policy LDP 10 and SG LDP SERV 1. 
The Council’s Contaminated land Officer has identified that the proposed
development involves the redevelopment of land where there is an indication that
previous use which may be contaminative. The land is associated with agricultural
buildings and has previously been occupied by a number of structures whose
relationship with nearby historic lime kilns is uncertain. It is advised that further
investigation of potential land contamination would be required, and in the event that
permission were to be granted this could be addressed by means of a suspensive
planning condition to ensure compliance with NPF Policy 9, policy LDP 10 and SG
LDP SERV 4. 
Access to the site would be off of an existing private access that connects to the
A83(T). The application site is located some 600m from the junction with A83(T)
when following the alignment of the private access. There is ample room within the
boundary of the application site to provide onsite parking and turning that would
comply with SG LDP TRAN 6. The proposal would also require to include appropriate
refuse collection facilities to comply with the requirements of NPF4 Policy 12, policy
LDP 10 and SG LDP SERV 5(b) although these could potentially be addressed by
means of planning condition. 
The provisions of NPF Policy 13(g) set out that development proposals that have the
potential to affect the operation and safety of the Strategic Transport Network will be
fully assessed to determine their impact. Where it is identified that existing
infrastructure does not have the capacity to accommodate a development without
adverse impact on safety or unacceptable impacts on operational performance then
the cost of the mitigation measures required to ensure the continued safe and
effective operation of the network should be met by the developer. 
In this instance the development has been identified to impact upon the safety and
free flow of traffic on the A83 Trunk Road, in addition to concern being raised about
the suitability of the private access regime serving the development to accommodate
additional traffic. 
The provisions of policy LDP 11 set out a requirement that an appropriate standard
of access is delivered to serve new developments, including off-site highway
improvements where appropriate. 
This requirement is specified in more detail within SG LDP TRAN 4 (2) which sets
out that further development that utilises an existing private access or private road
will only be accepted if: 
i) The access is capable of commensurate improvements considered by the
Roads Authority to be appropriate to the scale and nature of the proposed
new development and that takes into account the current access issues
(informed by an assessment of useage); AND the applicant can;

Page 19

ii) Secure ownership of the private road or access to allow for
commensurate improvements to be made to the satisfaction of the
Planning Authority; OR,
iii) Demonstrate that an appropriate agreement has been concluded with the
existing owner to allow for commensurate improvements to be made to
the satisfaction of the Planning Authority. 
The current application has been subject to objections from both Transport Scotland
and the Council’s Roads Service. 
In this particular instance Transport Scotland has advised that the existing junction
with the A83 gives cause for concern in two respects: 
i) that the proposal will result in an increase in the number of vehicles entering
and leaving the traffic stream at a point where visibility is restricted thus
causing interference with the safety and free flow of traffic on the trunk road,
and; 
ii) that the proposal would result in an intensification of waiting and right turning
manoeuvres from the trunk road at a location where forward visibility for
approaching westbound traffic on the trunk road is substandard thus creating
interference with the safety and free flow of traffic on the trunk road. 
The Council’s Roads Service has advised that the private access serving the
development already serves five dwellings and is considered to be unsuitable for
further development due to the condition of the surface and insufficient passing
places. It is noted that the land required for the provision of commensurate
improvements to provide additional passing places/improved road surface lies
outwith the land identified as being within the control of the applicant in this instance. 
The provisions of policy LDP 11 and SG LDP TRAN 4 of the ‘Argyll and Bute Local
Plan’ 2015 set out that the Council will seek to resist development where an existing
private access regime is considered to be of such poor standard as to be unsuitable
for vehicular traffic and is not capable of commensurate improvements unless the
private access is brought up to a full adoptable road. 
The land necessary for the upgrade of the existing junction with the A83,
improvement of forward visibility to westbound traffic on the A83 and, the
improvement of the private access to adoptable standard is located both outwith the
application site boundary and land within the control of the applicant and
consequently the requisite offsite highway improvements cannot be secured within
the confines of the application as submitted and the proposed development is
consequently, in view of the above, considered likely to have a significant adverse
impact upon highway safety. 
The applicant has submitted supporting information from a Transport Consultant
which has sought to contend both that Transport Scotland are inconsistent in their
approach citing their support for development involving forestry activity off of this
junction with the A83(T) and also that some allowance should be made in recognition
of claimed agricultural activity associated with the application site. A summary of the
supporting claims, further input from Transport Scotland, and officer comment on
these matters is set out in Section G above. 
(Q) Is the proposal consistent with the Development Plan: No

Page 20

(R) Reasons why Planning Permission or Planning Permission in Principle Should
be Granted: 
The proposal is considered to be contrary to NPF4 Policy 13, and policy LDP 11 and
SG LDP TRAN 4 of the Argyll and Bute Local Development Plan 2015, and there are
no other material considerations of sufficient significance to indicate that it would be
appropriate to grant planning permission in this instance as a departure to the
Development Plan having regard to s25 of the Act. 
(S) Reasoned justification for a departure to the provisions of the Development
Plan 
n/a 
(T) Need for notification to Scottish Ministers or Historic Environment Scotland:
None unless it were proposed to grant permission contrary to the recommendation
of Transport Scotland.   
Author of Report: Peter Bain Date: 10.02.2023 
Reviewing Officer: Sandra Davies Date: 17.02.2023 
Fergus Murray
Head of Development and Economic Growth

Page 21

REASONS FOR REFUSAL RELATIVE TO APPLICATION REF. NO. 20/01901/PPP 
1. The development conflicts with NPF4 Policy 13, and policy LDP 11 and SG LDP TRAN
4 of the adopted Argyll and Bute Local Plan 2015 as the proposed development would
result in increasing the number of vehicles entering and leaving the traffic stream on
the A83 (T) at a point where visibility is restricted, thus creating interference with the
safety and free flow of the traffic on the trunk road.  
2. The development conflicts with NPF4 Policy 13, and policy LDP 11 and SG LDP TRAN
4 of the adopted Argyll and Bute Local Plan 2015 as the proposed development would
result in an intensification of waiting and right turning manoeuvres from the A83 (T)
trunk road at a location where forward visibility for approaching westbound traffic on
the trunk road is substandard thus creating interference with the safety and free flow
of the traffic on the trunk road.  
3. The development conflicts with NPF4 Policy 13, and policy LDP 11 and SG LDP TRAN
4 of the adopted Argyll and Bute Local Plan 2015 in so much as the lengthy
substandard private access which already serves 5 dwellings would need to be
brought up to adoptable standard to serve the development proposed; being suitably
surfaced and provided with appropriate passing places, and over which the applicant
has no control, given that land required for such improvement lies beyond the
application site and outside the ownership of the applicant.

Page 22

APPENDIX TO DECISION REFUSAL NOTICE 
Appendix relative to application 20/01901/PPP 
(A) Has the application been the subject of any “non-material”
amendment in terms of Section 32A of the Town and Country
Planning (Scotland) Act 1997 (as amended) to the initial
submitted plans during its processing.
No 
(B) The reason why planning permission has been refused: 
The proposal is considered to be contrary to NPF4 Policy 13, and policy LDP
11 and SG LDP TRAN 4 of the Argyll and Bute Local Development Plan 2015,
and there are no other material considerations of sufficient significance to
indicate that it would be appropriate to grant planning permission in this
instance as a departure to the Development Plan having regard to s25 of the
Act.

Page 23

No embedded text on this page.

Page 24

No embedded text on this page.

Page 25

No embedded text on this page.

Page 26

No embedded text on this page.

Page 27

No embedded text on this page.

Page 28

No embedded text on this page.

Page 29

No embedded text on this page.