Democracy Spraffa

Agenda reports pack

Argyll and Bute Council · 5 October 2023
Back to Argyll and Bute Local Review Body — 5 October 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council 
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD 
28 September 2023 
NOTICE OF MEETING 
A meeting of the ARGYLL AND BUTE LOCAL REVIEW BODY will be held BY MICROSOFT
TEAMS on THURSDAY, 5 OCTOBER 2023 at 9:00 AM, which you are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. CONSIDER NOTICE OF REVIEW REQUEST: EILEAN LOCH OSCAIR, OFF ISLE
OF LISMORE (REF: 23/0006/LRB) 
(a) Notice of Review and Supporting Documentation (Pages 3 - 116)  
(b) Comments from Interested Parties   
 Planning (Pages 117 – 142)
 Oban Access Panel (Pages 143 – 144)  
(c) Comments from Applicant (Pages 145 - 146) 
Argyll and Bute Local Review Body 
Councillor Gordon Blair Councillor Amanda Hampsey (Chair)
Councillor Liz McCabe   
Contact: Fiona McCallum   Tel: 01546 604392
Public Document Pack

Page 2

This page is intentionally left blank

Page 3

Page 1 of 5
Central Validation Team at Argyll and Bute Council 1A Manse Brae Lochgilphead PA31 8RD  Tel: 01546 605518  Email:
planning.hq@argyll-bute.gov.uk
Applications cannot be validated until all the necessary documentation has been submitted and the required fee has been paid.
Thank you for completing this application form:
ONLINE REFERENCE 100577561-002
The online reference is the unique reference for your online form only. The  Planning Authority will allocate an Application Number when
your form is validated. Please quote this reference if you need to contact the planning Authority about this application.
Applicant or Agent Details
Are you an applicant or an agent? * (An agent is an architect, consultant or someone else acting
on behalf of the applicant in connection with this application)  Applicant  Agent
Agent Details
Please enter Agent details
Company/Organisation:
Ref. Number: You must enter a Building Name or Number, or both: *
First Name: * Building Name:
Last Name: * Building Number:
Address 1
Telephone Number: * (Street): *
Extension Number: Address 2:
Mobile Number: Town/City: *
Fax Number: Country: *
Postcode: *
Email Address: *
Is the applicant an individual or an organisation/corporate entity? *
  Individual    Organisation/Corporate entity
Houghton Planning Ltd
Paul
Houghton MRTPI
Whins Road
Alloa Business Centre
07780117708
FK10 3RF
Scotland
Clacks
Alloa
paul@houghtonplanning.co.uk
Page 3 Agenda Item 3a

Page 4

Page 2 of 5
Applicant Details
Please enter Applicant details
Title: You must enter a Building Name or Number, or both: *
Other Title: Building Name:
First Name: * Building Number:
Address 1
Last Name: * (Street): *
Company/Organisation Address 2:
Telephone Number: * Town/City: *
Extension Number: Country: *
Mobile Number: Postcode: *
Fax Number:
Email Address: *
Site Address Details
Planning Authority:
Full postal address of the site (including postcode where available):
Address 1: 
Address 2:
Address 3:
Address 4:
Address 5:
Town/City/Settlement:
Post Code:
Please identify/describe the location of the site or sites
Northing Easting
Mr
A
Argyll and Bute Council
MacGillivray Gibralter Street
c/o The Estates Office
PA34 4AY
Eilean Loch Oscair, Lismore, Argyll & Bute
Scotland
Oban
paul@houghtonplanning.co.uk
Page 4

Page 5

Page 3 of 5
Description of Proposal
Please provide a description of your proposal to which your review relates. The description should be the same as given in the
application form, or as amended with the agreement of the planning authority: *
(Max 500 characters)
Type of Application
What type of application did you submit to the planning authority? *
  Application for planning permission (including householder application but excluding application to work minerals).
  Application for planning permission in principle.
  Further application.
  Application for approval of matters specified in conditions.
What does your review relate to? *
  Refusal Notice.
 Grant of permission with Conditions imposed.
  No decision reached within the prescribed period (two months after validation date or any agreed extension) – deemed refusal.
Statement of reasons for seeking review
You must state in full, why you are a seeking a review of the planning authority’s decision (or failure to make a decision). Your statement
must set out all matters you consider require  to be taken into account in determining your review. If necessary this can be provided as a
separate document in the ‘Supporting Documents’ section: *  (Max 500 characters)
Note: you are unlikely to have a further opportunity to add to your statement of appeal at a later date, so it is essential that you produce
all of the information you want the decision-maker to take into account.
You should not however raise any new matter which was not before the planning authority at the time it decided your application (or at
the time expiry of the period of determination), unless you can demonstrate that the new matter could not have been raised before that
time or that it not being raised before that time is a consequence of exceptional circumstances.
Have you raised any matters which were not before the appointed officer  at the time the  Yes   No
Determination on your application was made? *
If yes, you should explain in the box below, why you are raising the new matter, why it was not raised with the appointed officer before
your application was determined and why you consider it should be considered in your review: * (Max 500 characters)
Erection of short-term holiday let accommodation, outbuilding and pontoon and installation of sewage treatment plant
See Local Review Statement
Page 5

Page 6

Page 4 of 5
Please provide a list of all supporting documents, materials and evidence which you wish to submit with your notice of review and intend
to rely on in support of your review. You can attach these documents electronically later in the process: * (Max 500 characters)
Application Details
Please provide the application reference no. given to you by your planning
authority for your previous application.
What date was the application submitted to the planning authority? *
What date was the decision issued by the planning authority? *
Review Procedure
The Local Review Body will decide on the procedure to be used to determine your review and may at any time during the review
process require that further information or representations be made to enable them to determine the review. Further information may be
required by one or a combination of procedures, such as: written submissions; the holding of one or more hearing sessions and/or
inspecting the land which is the subject of the review case.
Can this review continue to a conclusion, in your opinion, based on a review of the relevant information provided by yourself and other
parties only,  without any further procedures? For example, written submission, hearing session, site inspection. *
 Yes   No
Please indicate what procedure (or combination of procedures) you think is most appropriate for the handling of your review. You may
select more than one option if you wish the review to be a combination of procedures.
Please select a further procedure *
Please explain in detail in your own words why this further procedure is required and the matters set out in your statement of appeal it
will deal with?  (Max 500 characters)
In the event that the Local Review Body appointed to consider your application decides to inspect the site, in your opinion:
Can the site be clearly seen from a road or public land? *  Yes   No
Is it possible for the site to be accessed safely and without barriers to entry? *  Yes    No
If there are reasons why you think the local Review Body would be unable to undertake an unaccompanied site inspection, please
explain here.  (Max 500 characters)
Application as submitted Report of Handling Decision Notice Local Review Statement
22/02100/PP
18/07/2023
By means of inspection of the land to which the review relates
Island only accessible by boat.
18/10/2022
See Local Review Statement
Page 6

Page 7

Page 5 of 5
Checklist – Application for Notice of Review
Please complete the following checklist to make sure  you have provided all the necessary information in support of your appeal. Failure
to submit all this  information may result in your appeal  being deemed invalid.
Have you provided the name and address of the applicant?.  *  Yes   No
Have you provided the date and reference number of the application which is the subject of this  Yes   No
review? *
If you are the agent, acting on behalf of the applicant, have you provided details of your name  Yes   No   N/A
and address and indicated whether any notice or correspondence required in connection with the
review should be sent to you or the applicant? *
Have you provided a statement setting out your reasons for requiring a review and by what  Yes   No
procedure (or combination of procedures) you wish the review to be conducted? *
Note: You must state, in full, why you are seeking a review on your application. Your statement must set out all matters you consider
require to be taken into account in determining your review. You may not have a further opportunity to add to your statement of review
at a later date. It is therefore essential that you submit with your notice of review, all necessary information and evidence that you rely
on and wish the Local Review Body to consider as part of your review.
Please attach a copy of all documents, material and evidence which you intend to rely on  Yes   No
(e.g. plans and Drawings) which are now the subject of this review *
Note: Where the review relates to a further application e.g. renewal of planning permission or modification, variation or removal of a
planning condition or where it relates to an application for approval of matters specified in conditions, it is advisable to provide the
application reference number, approved plans and decision notice (if any) from the earlier consent.
Declare – Notice of Review
I/We the applicant/agent certify that this is an application for review on the grounds stated.
Declaration Name: Mr Paul Houghton MRTPI
Declaration Date: 22/08/2023
Page 7

Page 8

This page is intentionally left blank

Page 9

1 
Local Review Statement
Reference No: 22/02100/PP
Applicant: Mr A MacGillivray
Proposal: Erection of short-term holiday let accommodation,
outbuilding and pontoon and installation of sewage treatment
plant
Site Address: Eilean Loch Oscair, off Isle of Lismore 
Introduction
This Local Review Statement has been prepared on behalf of the Mr MacGillivray (hereafter the
Applicant) by Paul Houghton MRTPI of Houghton Planning Ltd. It responds to the reasons for refusal
for the Application as set out on the Decision Notice dated 18th July 2023.
The Applicant would like to make clear that this is a unique ‘one-off’ project, and one that will not only
help use the island for an innovative purpose supporting it as a croft, but has also been designed to
blend with the landscape, and to a very, very high standard, and has all the sustainability credentials
that can be mustered. The Applicant hopes it will eventually be award winning should councillors
support it. 
In the meantime, for the purposes of this local, the design quality is seen as a significant material
consideration in favour of this development being allowed, and on its own outweighs all the concerns
raised by the case officer in her Report of Handling.
The Applicant appreciates that building on this island will be novel, but the planning system has always
welcomed innovation, as indeed does National Planning Framework 4 (NPF4). It was perhaps
inevitable that it would be left to councillors to determine the appropriateness of this development,
and perhaps that is the right thing for something that is pushing the boundaries of what is possible in
design and constructional terms.
The Applicant would love the opportunity to show councillors the island at a site visit, although he
appreciates that this may be difficult to arrange, although he does have access to a boat that could be
used for the purpose. 
If the above is not considered possible, the Applicant is looking into commissioning a drone video of
the island, which will be forwarded as soon as it is available. Still photographs from that will also be
provided just in case a short video is not permitted to be shown at the Local Review Body.
Finally, before reading the rest of this Statement, it is requested that councillors read the entirety of
the Design Statement first because this sets out the vision for the island eloquently, as written by the
person who has designed the buildings. 
The remainder of this Statement now follows the same order as the Report of Handling for ease of
reference by councillors. 
Page 9

Page 10

2 
Representations
The Applicant welcomes the support of the Lismore Community Council who can see the many merits
of this proposal. This support is a further material consideration in favour of planning permission being
granted. 
As for the comments of Oban District Access Panel (ODAP), the building itself is fully disabled
accessible. Yes, disabled people will need a boat to get to the island, but that is also possible, and the
Access Panel have not raised that as an issue. 
Summary Assessment 
It is accepted that the development will have a visual impact on the Lynn of Lorn National Scenic Area.
However, that impact will be limited by virtue of the position, design, and materials proposed, for the
buildings. 
This is a small-scale and discreet intervention that will be visible from the sea as people pass, but will
be a thing of beauty and interest. If that is accepted, then the proposal complies with NPF4 Policy 4 c
because the “objectives of designation and the overall integrity of the area will not be compromised”. 
Furthermore, there is an economic benefit from adding a unique holiday experience to the island
supporting the Applicant and his croft whilst, if councillors are impressed with the design, then this
could be seen as being of ‘national importance’.
It is accepted that the development does not fall within one of the accepted categories under LDP
Policies LDP STRAT 1 and LDP DM 1, and thus is at odds with NPF4 Policy 9 b. It also fails to find favour
under NPF4 Policy 10. However, this is more than outweighed by the material considerations suggested
above, notably the exceptional quality of the design.
The comments the case officer makes regarding NPF4 Policy 14 such as the island being isolated, and
the development not being connected to an established settlement, development, or infrastructure,
are all correct, but detachment is the very point of the proposals. It’s about a sense of isolation for
those that will stay on the island that will be the unique selling point. This proposal is about introducing
a high quality, small holiday dwelling to this unique landscape. It cannot, therefore, be expected to
comply with every policy, or nuance of a policy, and needs to be considered for what it is. If councillors
see the wonderment in the design and concept, then that is enough to allow it. If they think it could
be award winning, and put Argyll on the map, that tips the scales massively in favour of approval. 
NPF4 Policy 17 is not considered relevant to this proposal. The building is not being proposed for
permanent occupation, which would clearly be difficult due to the position of the island, and adverse
weather to be expected during the winter months. It will likely only be used during the summer
months, and mothballed (winterised) once harsher weather sets in. 
NPF4 Policy 29 seeks to encourage rural economic activity, innovation, and diversification, which this
proposal meets in all respects. It is supported by the local community who provide the answer to the
concerns raised by the case officer in relation to this policy by underlining that the development
“would be a useful facility and diversification for a working croft, helping support the farming
enterprise of a local family”.
NPF4 Policy 30 seeks to encourage, promote, and facilitate, sustainable tourism development. This
development ticks all those boxes by providing a unique holiday offer in an amazing landscape setting
that is likely to attract people to Argyll from far and wide. Some will stay there; some may simply sail
Page 10

Page 11

3 
by to have a look. All of them will contribute money to the local economy, and will help support local
tourism-related jobs. 
Conclusion
For the reasons given above, there is a strong argument in favour of granting planning permission. It
is accepted that every policy requirement is not met. However, that is never going to happen for what
is a unique project in an awe inspiring landscape setting. 
If councillors like what they see, then that is enough to support the development, thereby setting aside
the concerns of the case officer who has, understandably, wanted the proposal to comply with every
policy, and every part of every policy. That is never going to happen where a proposal is pushing the
envelope, and testing the limits of the possible. 
As a final thought, a couple of examples of award winning houses are included with this local review.
Neither had an easy ride through the planning system, but the results are stunning, particularly the
Assynt house that sits is splendid isolation in the sparsely populated coastal area of Assynt in the North
West Highlands. That could happen here with Eilean Loch Oscair on the RIBA 2024 or 2024 shortlist. 
Page 11

Page 12

This page is intentionally left blank

Page 13

Eilean Loch Oscair
by Lismore
Design Statement
June 2022 (Original at A3)
Page 13

Page 14

June 2022
Preamble
We are pleased to submit this design statement
in support of an application to create a unique
and beautiful holiday home on Eilean Loch
Oscair; a small island situated at the north-
western edge of Lismore, on Loch Linnhe.
Having visited the island, we were struck
by the beauty of the site, and by the unique
opportunity, and challenges, that the project
presents.
We hope that the strategies we’ve developed -
in relation to the site, the architectural scheme,
and the technical realisation of those ideas,
does justice to the stunning beauty of this
amazing place.
We recognise and accept a profound
responsibility to approach the site with a
determined sense of respect and care - and
hope that the proposals described here express
that very clearly.
Page 14

Page 15

June 2022
Project Introduction
Furthermore, we have been keen to relish and enjoy the architectural opportunity
this project presents.  So, while going through that process of research on the
technical issues described above we have also focused on human aspects – ideas
about how people could enjoy the unique opportunity that visiting this building, and
this island, would present.  In other words we also want this project to be excellent
so that the people who visit it find themselves in a building that is beautiful and
joyous, so they can sit and enjoy the views up and down Loch Linnhe, and soak in
the stunning nature of the place.
There has been research carried out in relation to flood risk, which has identified the
areas on the island where a building could be located, and we have worked within
those parameters.  As mentioned above, we have discussed our proposals in principle
with a leading marine logistics operator, to make sure that the dimensions of the
scheme we have proposed could be readily delivered to the site in prefabricated
parts, and assembled on the island.
Our initial ideas focused on a contemporary building within a traditional / vernacular
form – it was a one-and-a-half storey, pitched roof scheme dressed in contemporary
cladding, with large picture windows so that the views around Loch Linnhe could be
fully enjoyed.  We were pleased with the scheme to a large extent, but in reviewing
these proposals we wondered whether it could be possible to create something
that responded more directly to the landscape and topography of the island; a
building which would sit lower in to the landscape.
Page 20 of the Argyll & Bute ‘Small Scale Housing Development / Sustainable Design
Guidance’ discusses preferred approaches to the siting of buildings, and specifically
mentions the traditional way in which rural buildings are often “grounded within the
landscape” and “work with the contours for shelter”.  These notions basically capture
the critical idea which led to the revisions we made to our design.  We started looking
at options for a single storey, low-lying scheme whose roof would sit much more
closely to the horizon of the island.  Early moves involved breaking up the mass
of the building in to two ‘fingers’ – so that each block could enjoy the views and
benefit from natural light in a way that a building with a deeper plan might not.
The final move was to ‘crank’ the main element of the plan.  This move was based on
creating a sense that the building was hugging the landscape as closely as possible. 
We have proposed a pair of linear elements, linked in the middle, and with a small
outbuilding.
We hope that the design moves which have led to this final proposal mean that
the building will be a much less prominent – so that the architecture can “minimise
[it’s] impact on [the] landscape setting” (Page 24, Argyll & Bute ‘Small Scale Housing
Development / Sustainable Design Guidance’).
We have proposed no formal / structural landscaping as part of this proposal.  Our
idea is that the building would sit gently on the landscape, and would not seek to
permanently alter it.  Therefore we’ve made are no proposals for fencing, planting,
paths etc.  We have included a modest pontoon so small boats can land people on
the island, but that’s all.  We would want the building to make a ‘light touch’ on the
ground.  We would propose screw piles instead of traditional foundations, and as
mentioned above the building would be largely prefabricated off-site.  This means
that effectively in the future the building could be deconstructed / demounted and
Introduction
This application relates to the proposed installation of a high quality building to
create a three-bedroom holiday accommodation unit, on Eilean Loch Oscair.  Our
aspiration is to design a building of excellent quality, so as to justify it’s presence on
this very special site, and to make a positive contribution to the visual quality of the
island.
Eilean Loch Oscair is a small island, located at the north-western edge of Lismore
on Loch Linnhe.  We are acutely aware of the landscape character of this place, and
have gone through a rigorous process, continually seeking to refine the design, so
that the final proposal is a sensitive, sustainable, and beautiful building.
We have visited Eilean Loch Oscair, travelling by small boat down Loch Linnhe. 
We have walked the island, making sure that we understand the constraints and
opportunities that the site presents.  We have recorded in sketches, photographs
and a model, key observations across the island.  That analysis has been absolutely
critical in our design process; in fact, the desire to create a scheme which is
appropriate to the island has guided our architecture – which has evolved to reach
the design which is submitted in this application.
Design Process
Throughout the design process we have continually referred to the Argyll & Bute
‘Small Scale Housing Development / Sustainable Design Guidance’ publication.  We
have intertwined that with our own research on small-scale ‘off-grid’ sustainable
architecture, as well as technical research in to pre-fabrication (particularly in relation
to marine-based delivery to site of prefabricated components).  All of this work has
been really important to us – so that we can be confident in the credentials of our
proposal in relation to preservation of the existing landscape, long-term / whole-
life sustainability, construction logistics, and climate awareness.
Ref: Argyll & Bute Council: Small Scale Housing Development, Sustainable Design Guidance (2006)
Page 15

Page 16

June 2022
Project Introductionremoved in sections, then the screw piles could be removed or capped, so that the
building would leave no trace on the island.
Technical Considerations
The design is expected to be ‘off-grid’ – following much of the advice offered on
pages 32-35 of the A&B Sustainable Design Guidance.  We have anticipated that
grey-water would be reused (this is the main reasons the WCs are grouped together
in the plan), that composting toilets would be provided, and that an array of solar
pv would be used to generate electricity – with capacity for battery storage of
power and a small generator to back-up that supply.  We would also anticipate a
bore hole would be used to provide water, as is the case at other locations along
Loch Linnhe.
The weather was good when we visited the island, but we’ve spent lots of time on
the west coast, and are fully aware that this isn’t always the case.  The desire to shelter
the building was part of our thinking with the low-lying massing we’ve proposed,
but at the same time we want to allow people to really enjoy the sensational
views – which is the reason we’ve proposed large areas of picture-windows.  The
compromise we’ve proposed is that all of those large openings would have slatted
timber external shutters which could run over the openings during winter – offering
protection from the elements, but still allowing for views out and for light to come
in.
We have proposed that the building would be clad in high quality, sustainably
sourced timber cladding (as described in pages 44-45 of the A&B Sustainable
Design Guidance).  We feel that this material would create a natural harmony with
the landscape, and would look very attractive.
Summary
The following pages will summarise the design process we’ve followed, and will
highlight all of the ideas described in this text which have been critical to our
architectural thinking. 
We feel privileged to have been able to work on this project, and are keenly aware of
the quality of the site we’re working on.  We hope that our proposal is an appropriate
response to that context. 
We think the scheme could be an exemplar in low-impact, sensitive, contemporary
rural architecture – a sustainable building which is befitting of it’s beautiful
location.
Approaching Eilean Loch Oscair from the north on Loch Linnhe.
Alongside the southern edge of Eilean Loch Oscair.
Page 16

Page 17

June 2022
Location
The site is Eilean Loch Oscair, which is a small
island located at the north-western edge of
Lismore, on Loch Linnhe. 
Page 17

Page 18

June 2022
Site Analysis
Having visited the island we carried out a
detailed site analysis exercise.  This included
items such as climate, sun path, prevailing
winds, aspect and outlook and landscape
character.
Physical model of Eilean Loch Oscair (orig scale 1:1,000)
Page 18

Page 19

June 2022
Site Analysis
This is a selction of the photographs taken
around and on Eilean Loch Oscair during our
visit.  We have continually referred to these
images throughout the design process.
On our approach to the island, showing the slight hollowing on the horizon.
This is where the proposed building has been located; in an attempt to hug the contours of the land, and
respect the integrity of the broader horizon.
Eilean Loch Oscair.
Looking east, back over towards Lismore.
Where the island meets the water.
The site is tucked in to the hollow in the centre of the image, with the horizon of Lismore behind.
Looking south from the site.Looking north from the site.
Page 19

Page 20

June 2022
Preliminary Analysis / Sketch Design
These sketches illustrate some initial thoughts
on site design and architectural strategy for
our initial options.
Page 20

Page 21

June 2022
Preliminary Analysis / Sketch Design
Having prepared massing studies for that initial
option we elected to revise our architectural
strategy, in favour of a scheme with reduced
massing and scale, which would attempt to hug
the landscape and sit lower to the horizon.
Page 21

Page 22

June 2022
Developed Proposal
These sketches illustrate some of our thinking
as we tested options for a scheme that would
sit lower to the ground, attempting to hug the
contours of the land.
The lower sketch shows some of our thinking
in relation to technical and environmental
issues.
Page 22

Page 23

June 2022
Developed Proposal
These diagrams formalise the architectural
steps we followed in trying to understand and
clarify the revised scheme; they identify the
ideas that have been particularly important to
the design.
We hope that these diagrams can clearly
explain the method and critical ideas we’ve
followed through the design process, all of
which has been in an effort to ensure that the
architecture is dynamic and exciting, while
constantly pushing to ensure our intervention
is appropriate and sensitive to the landscape.
The geometry of the building is arranged with
two main ‘blocks’, elevated slightly off the ground
in order to minimise the impact on the island’s
surface.
The middle section, connecting the two main
blocks is reduced in size in order to provide clear
visual separation, and to frame views, as well as
naturally guide the user in to the building.
The larger block is ‘cranked’ around a nearby
outcrop which helps the building sit better witin
it’s environment, minimise the impact on it, and
allows the internal arrangement to focus on
opening up to the best views to the north and
south.
The building is orientated in a way which best
utilises the breathtaking views all around,
including sea views to the south, and views on to
Lismore towards the east and north-east.  Large
window openings help bring light deep in to the
plan as well as connect the building users with the
environment directly from the key internal spaces.
The building is settled in to the landscape in
an understated way; barely protuding over the
horizon when seen from the water.  This diagram
reflects the view shown in the photograph of
Page 7 (top left).
Page 23

Page 24

June 2022
Developed Proposal
These diagrams seek to demonstrate the
relationships and qualities of the internal spaces
which are created in the building, and show
how these work in synergy with the broader
architectural preoccupations described in the
previous pages.
We feel that these are great spaces, which
make the most of the stunning situation of the
building.
Page 24

Page 25

June 2022
Developed Proposal
Illustrative renders of our proposal.
The central circulation space, which feels deliberately enclosed, which connects the main spaces. The view upon entering the main living and dining area - giving a clear glimpse of the sea.
Page 25

Page 26

June 2022
Developed Proposal
Illustrative renders of our proposal.
Throughout the design process we’ve been focussed on creating internal spaces which connect with the landscape beyond in a poised and considered manner.
Page 26

Page 27

June 2022
Developed Proposal
Illustrative renders of our proposal.
An illustrative view of the approach to the building, showing the principle which was described in the diagram on Page 11.
The proposed building, resting gently on the landscape of the island.
Page 27

Page 28

Design Statement (June 2022)
www.movingstillarchitecture.com
jamie@movingstillarchitecture.com
Page 28

Page 29

House in Assynt by Mary Arnold-Forster Architects - Awards RIAS Award 2021 - Shortlisted for RIBA
House of the Year 2021
Page 29

Page 30

Cuddymoss, North Ayrshire - RIBA National Award winner 2023 - 2023 RIAS Award 
Page 30

Page 31

Houghton Planning Ltd, Alloa Business Centre, Whins Road, Alloa, Clackmannanshire, FK10 3SA 
Dear Sirs 
Eilean Loch Oscair 
Houghton Planning is instructed by Mr A MacGillivray to apply for Planning Permission for new
short-term let holiday accommodation, and a new pontoon, on Eilean Loch Oscair, off Lismore. 
The proposal has been the subject of a Pre Application Advice Report (5th March 2020) (ref:
20/00318/PREAPP), although that was for a dwelling whereas the decision has been taken to
apply for holiday accommodation instead, so that people can enjoy staying in a bespoke,
isolated, beautifully designed property that will blend seamlessly with the landscape. 
The planning application is accompanied by the following documents and information: - 
• (this) Covering Letter.
• Design Statement.
• Flood Risk Assessment.
• Planning Application Form.
• Relevant Certificate.
• Location Plan;
• Site Plan. 
• Elevations;
• Floor Plans;
• Sections; and
• Planning & Advertisement Fee, if necessary, which will be sent under separate cover. 
The application site is located on Eilean Loch Oscair island, which lies just off the north western
coast of Lismore. 
The site is located within Very Sensitive Countryside, and a designated National Scenic Area,
which is why so much care has been taken to design a building that will sit into the landscape,
will appear part of it, and will have limited visual and landscape impact. The design process is
explained in the Design Statement, which describes the design process in detail from
conception, to design, and also how the build can be delivered. 
Before starting the design process, a Flood Risk Assessment (FRA) was prepared to ensure that
the proposed building would sit above the flood level on the island, which is calculated as being
≥5.78 mAOD. The building has been sited well above that level. 
18th October 2022   
Argyll & Bute Council
Central Valuation Team
Planning and Regulatory Services
1a Manse Brae
Lochgilphead
Argyll
PA31 3RD 
Our Ref.: PH      
Page 31

Page 32

Houghton Planning Ltd, Alloa Business Centre, Whins Road, Alloa, Clackmannanshire, FK10 3SA
As the proposal is for tourist accommodation, the most relevant policy is SG LDP TOUR 1 ‘Tourist
Facilities and Accommodation, Including Static and Touring Caravans’, which provide additional
detail in support of policy LDP 5 ‘Supporting the Sustainable Growth of our Economy’. 
Policy SG LDP TOUR 1 states that “There is a presumption in favour of new or improved tourist
facilities and accommodation” provided it meets a number of criteria, which relate to the design
of the proposal; ensuring that there is no adverse impact on landscape character and amenity; it
is reasonable accessible; and there is a locational requirement for the tourist accommodation to
be sited where it is proposed. 
Dealing with each of these in turn, then the design is considered in detail in the Design
Statement. The building is a simple, bespoke and a beautifully proportioned structure that
respects, and sits into, its landscape setting, and will be potentially award winning. There will be
minimal landscape impact. The building is remote, deliberately so, but will be accessible by boat
from the proposed new pontoon. As for a locational requirement, then the landscape itself
provides that, with the proposal offering the opportunity for people to stay on the island in
absolute isolation in a sustainable, off-grid, building that suits its context, and will give people a
unique experience of the expansive landscape of which the island forms part. 
I trust that the above provides sufficient justification for the proposals to be validated. However,
if you do require any further information, then please contact me at
paul@houghtonplanning.co.uk or call me on 07780 117708. 
I look forward to receiving confirmation in due course that the planning application has been
validated. 
Yours faithfully 
Paul Houghton
Director on behalf of Houghton Planning Ltd 
Page 32

Page 33

Page 1 of 9
Central Validation Team at Argyll and Bute Council 1A Manse Brae Lochgilphead PA31 8RD  Tel: 01546 605518  Email:
planning.hq@argyll-bute.gov.uk
Applications cannot be validated until all the necessary documentation has been submitted and the required fee has been paid.
Thank you for completing this application form:
ONLINE REFERENCE 100577561-001
The online reference is the unique reference for your online form only. The  Planning Authority will allocate an Application Number when
your form is validated. Please quote this reference if you need to contact the planning Authority about this application.
Type of Application
What is this application for? Please select one of the following: *
  Application for planning permission (including changes of use and surface  mineral working).
  Application for planning permission in principle.
  Further application, (including renewal of planning permission, modification, variation or removal of a planning condition etc)
  Application for Approval of Matters specified in conditions.
Description of Proposal
Please describe the proposal including any change of use: *  (Max 500 characters)
Is this a temporary permission? *  Yes   No
If a change of use is to be included in the proposal has it already taken place?  Yes   No
(Answer ‘No’ if there is no change of use.) *
Has the work already been started and/or completed? *
 No   Yes – Started   Yes - Completed
Applicant or Agent Details
Are you an applicant or an agent? * (An agent is an architect, consultant or someone else acting
on behalf of the applicant in connection with this application)  Applicant  Agent
Short-term holiday let accommodation and pontoon.
Page 33

Page 34

Page 2 of 9
Agent Details
Please enter Agent details
Company/Organisation:
Ref. Number: You must enter a Building Name or Number, or both: *
First Name: * Building Name:
Last Name: * Building Number:
Address 1
Telephone Number: * (Street): *
Extension Number: Address 2:
Mobile Number: Town/City: *
Fax Number: Country: *
Postcode: *
Email Address: *
Is the applicant an individual or an organisation/corporate entity? *
  Individual    Organisation/Corporate entity
Applicant Details
Please enter Applicant details
Title: You must enter a Building Name or Number, or both: *
Other Title: Building Name:
First Name: * Building Number:
Address 1
Last Name: * (Street): *
Company/Organisation Address 2:
Telephone Number: * Town/City: *
Extension Number: Country: *
Mobile Number: Postcode: *
Fax Number:
Email Address: *
Houghton Planning Ltd
Mr
Paul
A
Houghton MRTPI
MacGillivray
Whins Road
Gibralter Street
Alloa Business Centre
c/o The Estates Office
07780117708
FK10 3RF
PA34 4AY
Scotland
Scotland
Clacks
Oban
Alloa
paul@houghtonplanning.co.uk
paul@houghtonplanning.co.uk
Page 34

Page 35

Page 3 of 9
Site Address Details
Planning Authority:
Full postal address of the site (including postcode where available):
Address 1: 
Address 2:
Address 3:
Address 4:
Address 5:
Town/City/Settlement:
Post Code:
Please identify/describe the location of the site or sites
Northing Easting
Pre-Application Discussion
Have you discussed your proposal with the planning authority? *  Yes   No
Pre-Application Discussion Details Cont.
In what format was the feedback given? *
 Meeting  Telephone  Letter  Email
Please provide a description of the feedback you were given and the name of the officer who provided this feedback. If a processing
agreement [note 1] is currently in place or if you are currently discussing a processing agreement with the planning authority, please
provide details of this. (This will help the authority to deal with this application more efficiently.) * (max 500 characters)
Title: Other title:
First Name: Last Name:
Correspondence Reference Date (dd/mm/yyyy):
Number:
Note 1. A Processing agreement involves setting out the key stages involved in determining a planning application, identifying what
information is required and from whom and setting timescales for the delivery of various stages of the process.
.
Argyll and Bute Council
Lesley
20/00318/PREAPP
Cuthbertson
05/03/2020
Eilean Loch Oscair, Lismore, Argyll & Bute
Page 35

Page 36

Page 4 of 9
Site Area
Please state the site area:
Please state the measurement type used:  Hectares (ha)   Square Metres (sq.m)
Existing Use
Please describe the current or most recent use: *  (Max 500 characters)
Access and Parking
Are you proposing a new altered vehicle access to or from a public road? *  Yes   No
If Yes please describe and show on your drawings the position of any existing. Altered or new access points, highlighting the changes
you propose to make. You should also show existing footpaths and note if there will be any impact on these.
Are you proposing any change to public paths, public rights of way or affecting any public right of access? *  Yes   No
If Yes please show on your drawings the position of any affected areas highlighting the changes you propose to make, including
arrangements for continuing or alternative public access.
How many vehicle parking spaces (garaging and open parking) currently exist on the application
Site?
How many vehicle parking spaces (garaging and open parking) do you propose on the site (i.e. the
Total of existing and any new spaces or a reduced number of spaces)? *
Please show on your drawings the position of existing and proposed parking spaces and identify if these are for the use of particular
types of vehicles (e.g. parking for disabled people, coaches, HGV vehicles, cycles spaces).
Water Supply and Drainage Arrangements
Will your proposal require new or altered water supply or drainage arrangements? *  Yes   No
Do your proposals make provision for sustainable drainage of surface water?? *  Yes   No
(e.g. SUDS arrangements) *
Note:-
Please include details of SUDS arrangements on your plans
Selecting ‘No’ to the above question means that you could be in breach of Environmental legislation.
Are you proposing to connect to the public water supply network? *
  Yes
  No, using a private water supply
  No connection required
If No, using a private water supply, please show on plans the supply and all works needed to provide it (on or off site).
4993.00
Uninhabited island
0
0
Page 36

Page 37

Page 5 of 9
Assessment of Flood Risk
Is the site within an area of known risk of flooding? *  Yes    No   Don’t Know
If the site is within an area of known risk of flooding you may need to submit a Flood Risk Assessment before your application can be
determined. You may wish to contact your Planning Authority or SEPA for advice on what information may be required.
Do you think your proposal may increase the flood risk elsewhere? *  Yes    No   Don’t Know
Trees
Are there any trees on or adjacent to the application site? *  Yes   No
If Yes, please mark on your drawings any trees, known protected trees and their canopy spread close to the proposal site and indicate if
any are to be cut back or felled.
Waste Storage and Collection
Do the plans incorporate areas to store and aid the collection of waste (including recycling)? *  Yes   No
If Yes or No, please provide further details: * (Max 500 characters)
Residential Units Including Conversion
Does your proposal include new or additional houses and/or flats? *  Yes   No
All Types of Non Housing Development – Proposed New Floorspace
Does your proposal alter or create non-residential floorspace? *  Yes   No
All Types of Non Housing Development – Proposed New Floorspace
Details
For planning permission in principle applications, if you are unaware of the exact proposed floorspace dimensions please provide an
estimate where necessary and provide a fuller explanation in the ‘Don’t Know’ text box below.
Please state the use type and proposed floorspace (or number of rooms if you are proposing a hotel or residential institution): *
Gross (proposed) floorspace (In square meters, sq.m) or number of new (additional)
Rooms (If class 7, 8 or 8a): *
If Class 1, please give details of internal floorspace:
Net trading spaces: Non-trading space:
Total:
If Class ‘Not in a use class’ or ‘Don’t know’ is selected, please give more details: (Max 500 characters)
Bin storage within building.
Not in a Use Class
Short-term holiday let
157
Page 37

Page 38

Page 6 of 9
Schedule 3 Development
Does the proposal involve a form of development listed in Schedule 3 of the Town and Country  Yes   No   Don’t Know
Planning (Development Management Procedure (Scotland) Regulations 2013 *
If yes, your proposal will additionally have to be advertised in a newspaper circulating in the area of the development. Your planning
authority will do this on your behalf but will charge you a fee. Please check the planning authority’s website for advice on the additional
fee and add this to your planning fee.
If you are unsure whether your proposal involves a form of development listed in Schedule 3, please check the Help Text and Guidance
notes before contacting your planning authority.
Planning Service Employee/Elected Member Interest
Is the applicant, or the applicant’s spouse/partner, either a member of staff within the planning service or an  Yes    No
elected member of the planning authority? *
Certificates and Notices
CERTIFICATE AND NOTICE UNDER REGULATION 15 – TOWN AND COUNTRY PLANNING (DEVELOPMENT MANAGEMENT
PROCEDURE) (SCOTLAND) REGULATION 2013
One Certificate must be completed and submitted along with the application form. This is most usually Certificate A, Form 1,
Certificate B, Certificate C or Certificate E.
Are you/the applicant the sole owner of ALL the land? *  Yes    No
Is any of the land part of an agricultural holding? *  Yes    No
Do you have any agricultural tenants? *  Yes    No
Certificate Required
The following Land Ownership Certificate is required to complete this section of the proposal:
Certificate E
Page 38

Page 39

Page 7 of 9
Land Ownership Certificate
Certificate and Notice under Regulation 15 of the Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013
Certificate E
I hereby certify that –
(1) – No person other than myself/the applicant was the owner of any part of the land to which the application relates at the beginning of
the period 21 days ending with the date of the application.
(2) - The land to which the application relates constitutes or forms part of an agricultural holding and there are no agricultural tenants
Or
(1) – No person other than myself/the applicant was the owner of any part of the land to which the application relates at the beginning of
the period 21 days ending with the date of the application.
(2) - The land to which the application relates constitutes or forms part of an agricultural holding and there are agricultural tenants.
Name:
Address:
Date of Service of Notice: *
(4) – I have/The applicant has taken reasonable steps, as listed below, to ascertain the names and addresses of the other owners or
agricultural tenants and *have/has been unable to do so –
Signed: Paul Houghton MRTPI
On behalf of: Mr A MacGillivray
Date: 18/10/2022
 Please tick here to certify this Certificate. *
Page 39

Page 40

Page 8 of 9
Checklist – Application for Planning Permission
Town and Country Planning (Scotland) Act 1997
The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013
Please take a few moments to complete the following checklist in order to ensure that you have provided all the necessary information
in support of your application. Failure to submit sufficient information with your application may result in your application being deemed
invalid. The planning authority will not start processing your application until it is valid.
a) If this is a further application where there is a variation of conditions attached to a previous consent, have you provided a statement to
that effect? *
 Yes   No   Not applicable to this application
b) If this is an application for planning permission or planning permission in principal where there is a crown interest in the land, have
you provided a statement to that effect? *
 Yes   No   Not applicable to this application
c) If this is an application for planning permission, planning permission in principle or a further application and the application is for
development belonging to the categories of national or major development (other than one under Section 42 of the planning Act), have
you provided a Pre-Application Consultation Report? *
 Yes   No   Not applicable to this application
Town and Country Planning (Scotland) Act 1997
The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013
d) If this is an application for planning permission and the application relates to development belonging to the categories of national or
major developments and you do not benefit from exemption under Regulation 13 of The Town and Country Planning (Development
Management Procedure) (Scotland) Regulations 2013, have you provided a Design and Access Statement? *
 Yes   No   Not applicable to this application
e) If this is an application for planning permission and relates to development belonging to the category of local developments (subject
to regulation 13. (2) and (3) of the Development Management Procedure (Scotland) Regulations 2013) have you provided a Design
Statement? *
 Yes   No   Not applicable to this application
f) If your application relates to installation of an antenna to be employed in an electronic communication network, have you provided an
ICNIRP Declaration? *
 Yes   No   Not applicable to this application
g) If this is an application for planning permission, planning permission in principle, an application for approval of matters specified in
conditions or an application for mineral development, have you provided any other plans or drawings as necessary:
  Site Layout Plan or Block plan.
  Elevations.
  Floor plans.
  Cross sections.
  Roof plan.
  Master Plan/Framework Plan.
  Landscape plan.
  Photographs and/or photomontages.
  Other.
If Other, please specify: *  (Max 500 characters)
Page 40

Page 41

Page 9 of 9
Provide copies of the following documents if applicable:
A copy of an Environmental Statement. *  Yes   N/A
A Design Statement or Design and Access Statement. *  Yes   N/A
A Flood Risk Assessment. *  Yes   N/A
A Drainage Impact Assessment (including proposals for Sustainable Drainage Systems). *  Yes   N/A
Drainage/SUDS layout. *  Yes   N/A
A Transport Assessment or Travel Plan  Yes   N/A
Contaminated Land Assessment. *  Yes   N/A
Habitat Survey. *  Yes   N/A
A Processing Agreement. *  Yes   N/A
Other Statements (please specify). (Max 500 characters)
Declare – For Application to Planning Authority
I, the applicant/agent certify that this is an application to the planning authority as described in this form. The accompanying
Plans/drawings and additional information are provided as a part of this application.
Declaration Name: Mr Paul Houghton MRTPI
Declaration Date: 18/10/2022
Payment Details
Pay Direct     
Created: 18/10/2022 14:41
Page 41

Page 42

This page is intentionally left blank

Page 43

Flood Risk Assessment (FRA) Checklist (SS-NFR-F-001 - Version 16 - Last updated 27/08/2019
Development Proposal Summary
Site Name:
Grid Reference: Easting: 186280 Northing: 745520
Local Authority:
Planning Reference number (if known):
Nature of the development: Recreational If residential, state type:
Size of the development site: Not known Ha
Identified Flood Risk: Source: Coastal Source name:
Land Use Planning
Is any of the site within the functional floodplain? (refer to
SPP para 255) No If yes, what is the net loss of storage? m3
Local Development Plan Name:
Allocation Number / Reference:
If yes, what is the proposed use for the site as identified in
the local plan? Other If Other please specify:
Does the local development plan and/or any pre-application
advice, identify any flood risk issues with or requirements for
the site.
No
If so, please specify:
What is the proposed land use vulnerability? Most Vulnerable
Supporting Information
Have clear maps / plans been provided within the FRA 
(including topographic and flood inundation plans)? Yes
Has sufficient supporting information, in line with our
Technical Guidance, been provided? For example: site
plans, photos, topographic information, structure information
and other site specific information.
Yes
Has a historic flood search been undertaken? Yes
Is a formal flood prevention scheme present? No
Current / historical site use:
Is the site considered vacant or derelict? Yes
Development Requirements
Freeboard on design water level: 0.6 m
Is safe / dry access and egress available? Neither Min access/egress level: n/a m AOD
Design levels: Ground level: ≥5.78 m AOD Min FFL: ≥6.38 mAOD mAOD
Mitigation
Can development be designed to avoid all areas at risk of
flooding? Yes
Is mitigation proposed? No
If yes, is compenstory storage necessary? No
Demonstration of compensatory storage on a "like for like"
basis? Select from List
Should water resistant materials and forms of construction
be used? No
PAGE 1 of 2
Year of Publication:Is the site identified within the local development plan? No
If known, state the standard of protection offered:
Uninhabited island
Settlement Zone
Do the proposals represent an increase in land use vulnerability? No
If flood records in vicinity of the site please provide details:
Loch Linnhe
This document must be attached within the front cover of any Flood Risk Assessments issued to Local Planning Authorities (LPA) in support of a development proposal which may be at risk of flooding. The document
will take only a few minutes to complete and will assist SEPA in reviewing FRAs, when consulted by LPAs.  This document should not be a substitute for a FRA.
Eilean Loch Oscair
Argyll and Bute Council
Bothy
Page 43

Page 44

Flood Risk Assessment (FRA) Checklist (SS-NFR-F-001 - Version 16 - Last updated 27/08/2019
Hydrology
Is there a requirement to consider fluvial flooding? No
Area of catchment: km2
Is a map of catchment area included in FRA?
Estimation method(s) used (please select all that apply): Pooled Analysis If Pooled analysis have group details been included?
Single Site Analysis
Enhanced Single Site
ReFH2
FEH RRM
Other If other (please specify methodology used):
Estimate of 200 year design flood flow: m3/s
Qmed estimate: m3/s Method: 
Statistical Distribution Selected: Reasons for selection:
Hydraulics
Software used:          
If other please specify:
Number of cross sections:
Source of data (i.e. topographic survey, LiDAR etc): Date obtained / surveyed:
Modelled reach length: m
Any changes to default simulation parameters? If yes please provide details:
Model timestep:
Model grid size:
Any structures within the modelled length? Specify, if combination:
Maximum observed velocity: m/s
Brief summary of sensitivity tests, and range:           
variation on flow (%) % Please specify climate change scenario considered:           
variation on channel roughness (%) %          
blockage of structure (range of % blocked) %          
boundary conditions: Upstream Downstream
(1)  type Flow
Specify if other Specify if other:
(2)  does it influence water levels at the site?
Has model been calibrated (gauge data / flood records)?
Is the hydraulic model available to SEPA?
Design flood levels: 200 year m AOD m AOD
Cross section results provided?
Long section results provided?
Cross section ratings provided?
Tabular output provided (i.e. levels, velocities)?
Mass balance error: %
Coastal
Is there a requirement to consider coastal / tidal flooding? Yes
Estimate of 1000 year design flood level: 4.16 m AOD
Estimation method(s) used: CFB If other please specify methodology used:
Allowance for climate change (m): 0.86 m
Allowance for wave action etc (m): 0.76 m
Overall design flood level: 5.78 m AOD
Comments
Any additional comments:
Approved by:
Organisation:
Date:
CLICK HERE
PAGE 2 of 2
Hydraulic modelling method:
Garret Macfarlane
TransTech Ltd
13/07/2021
Note: Further details and guidance is provided in 'Technical Flood Risk Guidance for Stakeholders' which can be accesssed here:-
200 year plus climate change
Page 44

Page 45

FLOOD RISK ASSESSMENT 
Proposed Bothy, Eilean Loch Oscair, off Isle of Lismore, Argyll 
Caerthann House 
Grosvenor Crescent
Connel
Argyll PA37 1PQ  
R e g i s t e r e d i n S c o t l a n d , N o : S C 1 7 5 0 8 7 Tel: +44 (0)1631 720699        E-mail: mail@transtechltd.com
TransTech Limited
www.transtechltd.com 
Prepared for: 
The Estates Office 
Gibraltar Street
Oban
Argyll
PA34 4AY
Page 45

Page 46

Coastal Flood Risk Assessment: Proposed Bothy, Eilean Loch Oscair p2/17
Quality Assurance 
The data used in this document and their input and reporting have undergone a quality assurance
review which follows established TransTech procedures. The information and results presented
herein constitute an accurate representation of the data collected and analysed. 
Indemnity 
All comments and opinions contained in this report, including any conclusions are based on
information available to TransTech during our investigations. The conclusions drawn by TransTech
could therefore differ if the information is found to be inaccurate, incomplete, or misleading.
TransTech accepts no liability should this prove to be the case, or, if additional information exists or
becomes available with respect to the potential development site to which this assessment applies. 
TransTech makes no representation whatsoever concerning the legal significance of its findings or
to any legal matters referred to in this document. 
Document Details 
Author: 
Garret Macfarlane 
PhD, BSc (hons) 
Issue Date: 13 July 2021 
Project Ref.:  ELO-0721-1 
Page 46

Page 47

Coastal Flood Risk Assessment: Proposed Bothy, Eilean Loch Oscair p3/17
CONTENTS 
EXECUTIVE SUMMARY ............................................................................................................................... 4
1.0 INTRODUCTION ................................................................................................................................. 5
2.0 REGULATORY GUIDANCE ................................................................................................................ 5
3.0 TOPOGRAPHY OF ISLAND ............................................................................................................... 5
4.0 INDICATIVE FLOOD INUNDATION & HISTORICAL FLOODING ..................................................... 7
5.0 METHODOLOGY & RESULTS ........................................................................................................... 7
5.1 Predicted 1:1000 Year Coastal Flood Level ............................................................................. 7
5.2 Predicted Effects of Climate Change on Sea Levels to 2100 ................................................... 9
5.3 Predicted Wave Height ............................................................................................................. 9
5.4 Joint Probability Analysis ........................................................................................................ 14
5.5 Predicted Funnelling & Bathymetric Effects ............................................................................ 15
6.0 DISCUSSION .................................................................................................................................... 16
6.1 Predicted Extreme Coastal Flood Level and its Implications to Development of the Bothy ... 16
6.2 Finished Floor Level ................................................................................................................ 16
6.3 Access and Egress ................................................................................................................. 16
7.0 CONCLUSIONS ................................................................................................................................ 16
FILES ACCOMPANYING THIS REPORT ................................................................................................... 17
REFERENCES ............................................................................................................................................ 17
BIBLIOGRAPHY .......................................................................................................................................... 17
List of Figures
Figure 1.  Topography of Eilean Loch Oscair. ........................................................................................................ 6
Figure 2.  1:1000 year Coastal Flood Boundary sea level at Eilean Loch Oscair. ................................................. 8
Figure 3.  Maximum uninterrupted wind fetch (16,691 m) towards the island. ..................................................... 11
Figure 4.  Closer view of maximum uninterrupted wind fetch at island. ............................................................... 12
Figure 5.  Correlation coefficients: all wave directions combined. ....................................................................... 14
Figure 6.  Admiralty chart extract showing Eilean Loch Oscair and the line of maximum fetch towards it. ......... 15 
List of Tables
Table 1.  Extreme sea levels at the potential development site. ........................................................................... 9
Table 2.  Factors used to calculate design wind speed (without wind speed climate change allowance). ......... 13
Table 3.  Design wave heights (without wind speed climate change allowance)................................................ 13
Table 4.  Design wave heights (with wind speed climate change allowance). .................................................... 14
Table 5.  Joint probability results: Joint exceedance return period of 1000 years. ............................................. 15 
List of Abbreviations
CFB Coastal Flood Boundary
CFBM Coastal Flood Boundary Method
DEFRA Department of Environment, Farming and Rural Affairs
DEM Digital Elevation Model
EA Environment Agency
FFL Finished Floor Level
FRMT Flood Risk Management Team
GIS Geographical Information System
LA Local Authority
mAOD Metres Above Ordnance Datum, Newlyn
SEPA Scottish Environment Protection Agency
UKHO United Kingdom Hydrographic Office
Page 47

Page 48

Coastal Flood Risk Assessment: Proposed Bothy, Eilean Loch Oscair p4/17
EXECUTIVE SUMMARY 
This flood risk assessment has been prepared for the erection of a bothy on Eilean Loch Oscair, a
small island situated in Loch Linnhe off the west coast of Isle of Lismore. At the time of this FRA, a
precise location for the bothy has not yet been chosen. 
Given that a bothy is proposed, according to SEPA guidance, this has to be assessed against a
1:1000 year (0.1% annual probability) flood event(1). 
The predicted 1:1000 year Coastal Flood Boundary sea level for the coastline adjacent to the island
was obtained from the most recent EA GIS datasets and is 4.16 mAOD(2). The CFB level is often
referred to as the “still water” level as it does not include an allowance for climate change nor does
it account for the potential effects of funnelling, local bathymetry and wave action raising flood levels.
SEPA’s flood map only provides an indication of where the “still water level” may lie according to the
maps underlying DEM which can often be inaccurate, particularly in rural locations. 
The most up to date climate change uplift prediction for the Argyll (West) river basin area within
which Lismore falls is a cumulative rise of 0.86 m from 2017 to 2100(3). 
Funnelling and bathymetry is not predicted to affect flood levels at the island due to the open
geometry of Loch Linnhe in its location and the lack of significant shoaling in the local near shore
bathymetry. 
In terms of wave effects, joint probability analysis of the likelihood of a 1:1000 year sea level and a
wave occurring simultaneously was carried out along the direction of maximum wind fetch (and
hence wave height) towards the island. The maximum fetch is from the SWbW and will result in the
highest expected wave heights as the strongest winds nearly always blow from a SW to NW
direction. The results of this analysis plus the allowance for climate change results in a peak
predicted water level of 5.78 mAOD. 
Topographical levels for the island suggest that it should be able to accommodate a bothy at ≥5.78
mAOD as areas between 6 to 10 mAOD are available. 
The Argyll and Bute Council FRMT and SEPA generally requires ≥600 mm FFL freeboard above the
predicted flood level. As such, for the bothy the FFL needs to be ≥6.38 mAOD. 
Our conclusion is that, with the location of the bothy on ground ≥5.78 mAOD, it will not be at risk of
coastal flooding and as such will be compliant with Argyll and Bute Local Plan Policy LP SERV 8:
Flooding and Land Erosion(4), SEPA’s Technical Flood Risk Guidance for Stakeholders(5) and
Scottish Planning Policy(6).  
Page 48

Page 49

Coastal Flood Risk Assessment: Proposed Bothy, Eilean Loch Oscair p5/17
1.0 INTRODUCTION 
1.1 The only identified potential flood risk to the proposed bothy comes from elevated water levels
in Loch Linnhe. This flood risk assessment has been prepared to determine an appropriate
land level for its location. 
1.2 This report is based on the following information: 
i) Topographical survey drawing provided by DM Hall, Chartered Surveyors.
ii) The extreme still water level at the island based on the Coastal Flood Boundary
Method(2).
iii) SEPA’s climate change allowances for flood risk assessment in land use planning(3). 
iv) Revetment Systems Against Wave Attack, A Design Manual, HR Wallingford(7).
v) British Standard 6399 1997, Loading for buildings - Part 2: Code of practice for wind
loads(8).
vi) Flood and Coastal Defence Appraisal Guidance(9). 
vii) SEPA indicative flood map(10).
viii) UKHO digital Admiralty chart.
ix) EA/DEFRA guidance on the use of joint probability methods in flood management(11). 
2.0 REGULATORY GUIDANCE 
2.1 Scottish Planning Policy - Managing Flood Risk and Drainage(6) provides the regulatory
framework and guidance for planning authorities in relation to flood issues for new
developments. Any application lodged with a local Planning Authority will be considered in
conjunction with this guidance, and dependant on the nature and location of the application,
the Planning Authority may request a flood risk assessment as part of the planning
application. 
2.2 The planning process requires that it be demonstrated that land proposed to be developed
can be done so with an acceptable risk of flooding and that any works needed to manage
flood risk are sustainable over the likely life of the development. 
2.3 The Planning Authority’s Flood Risk Management Team along with SEPA can be consultees
to planning applications in relation to flood risk. 
3.0 TOPOGRAPHY OF ISLAND 
3.1 The island is located at NM 86280 45520. 
3.2 Topographical levels indicate that land is available at 6 to 10 mAOD (figure 1). 
Page 49

Page 50

Coastal Flood Risk Assessment: Proposed Bothy, Eilean Loch Oscair p6/17 
Figure 1. Topography of Eilean Loch Oscair. 
Page 50

Page 51

Coastal Flood Risk Assessment: Proposed Bothy, Eilean Loch Oscair p7/17
4.0 INDICATIVE FLOOD INUNDATION & HISTORICAL FLOODING 
4.1  SEPA’s indicative flood maps provide an estimate of the areas of Scotland with a 0.1%, 0.5%
and 1% probability of being flooded in any given year (1:1000, 1:200 and 1:10 year events
respectively). Copyright restrictions do not permit the maps to be shown within this report but
they are available at: https://www.sepa.org.uk/environment/water/flooding/flood-maps/. 
4.2 The SEPA map indicates that much of the island is out with the 1:1000 year coastal flood
extent. However, the map is indicative in nature (not absolute) and as such could be over-
predicting or under-predicting the actual flood risk. It does not provide enough detail to
accurately estimate the flood risk associated with individual properties or specific point
locations. Importantly, the map also does not include the anticipated effects of climate change
on sea level rise and the potential effects of funnelling, local bathymetry, and wave action on
flood levels. 
4.3 No fluvial or surface water flood risk to the island is shown on the flood map. TransTech
concurs with this given that there are no watercourses on the island and the landform permits
rainfall to drain freely towards the sea. 
4.4 Details of historical flooding are not available particularly given that the island is uninhabited. 
5.0 METHODOLOGY & RESULTS 
5.1 Predicted 1:1000 Year Coastal Flood Level 
5.1.1 The Coastal Flood Boundary Method 1:1000 year coastal flood level for the island was
obtained from the most recent EA GIS datasets(2). The closest 1:1000 flood level is 4.16
mAOD which is located at 184925.5 E 746517.1 N, c. 1.7 km from the MHWS contours on
the island (figure 2). 
5.1.2 The CFBM is the result of research commissioned by the Environment Agency’s Evidence
Directorate and funded by the joint EA/DEFRA Flood and Coastal Erosion Risk Management
Research and Development Programme. This method was introduced in February 2011 and
significantly updated in 2018. 
5.1.3 It uses GIS software to determine extreme sea levels of annual exceedance probability
ranging from one in 1 year to one in 10000 years, around the UK coast, islands, and estuaries.
The CFB level does not consider the potential effects of climate change, wave action,
funnelling and local bathymetry but does include storm surge. 
5.1.4 The concept of return period is commonly used in assessing the severity of extreme natural
events such as a flood. Return period can be defined as the number of years on average
between the occurrence of events of a specified magnitude. Return period implies a long
length of time. It is important to note with the definition of return period that the 1000 year
event may occur or be exceeded more than once in any 1000 year period or may not occur
at all. It may also occur in successive years. 
5.1.5 Assessment against a 1:000 year flood return period needs to be undertaken for the bothy
as it falls under the ‘Most Vulnerable Use’ as defined by SEPA’s Land Use Vulnerability
Guidance(1). 
5.1.6 The 1:1000 year still water flood level of 4.16 mAOD is shown in figure 2. 
Page 51

Page 52

Coastal Flood Risk Assessment: Proposed Bothy, Eilean Loch Oscair p8/17 
Figure 2. 1:1000 year Coastal Flood Boundary sea level at Eilean Loch Oscair. 
Page 52

Page 53

Coastal Flood Risk Assessment: Proposed Bothy, Eilean Loch Oscair p9/17
5.2 Predicted Effects of Climate Change on Sea Levels to 2100 
5.2.1 The author has reviewed the latest climate change predictions. The projections indicate that
for Argyll there is going to be a significant rise in sea level over the next 80 years due to the
global heating and expansion of ocean water and melting of ice sheets and glaciers. In most
of Scotland the land surface is actually rising due to post-glacial rebound. However, this is
not rapid enough to negate sea level rise but it reduces the absolute amount. For the
proposed development’s location SEPA predicts a cumulative rise of 0.86 m to 2100(3). 
5.2.2 This figure differs significantly from past predictions which were often ≥50% lower. 
5.2.3 Table 1 provides the latest CFB(2) sea levels for a range of return periods up to the 1:1000
year event. 
Table 1. Extreme sea levels at the potential development site. 
Return Period
(Years)
Extreme Sea Level
(mAOD)
Extreme Sea Level + 0.86 m
Climate Change Uplift (mAOD)
1 2.89 3.75
2 3.00 3.86
5 3.16 4.02
10 3.28 4.14
20 3.40 4.26
50 3.57 4.43
100 3.70 4.56
200 3.83 4.69
1000 4.16 5.02 
5.3 Predicted Wave Height 
5.3.1 Wave heights have been calculated by TransTech for the wind fetch across Loch Linnhe
using an industry standard method outlined in the document Revetment Systems Against
Wave Attack - A Design Manual(7) by HR Wallingford. This method is based on work published
by Yarde et al(12) and was principally designed for application to wave estimation in dams and
inland reservoirs. However, the method is theoretically applicable to any wide stretch of water
sheltered from the open sea. 
5.3.2 The HR Wallingford method is preferred when hydrodynamic modelling can be avoided as
the latter incurs significant additional expense to the client. Indeed, the former is the
recommended approach by many LAs located on the west coast of Scotland. 
5.3.3 The Yarde method involves calculating an appropriate design wind speed and then equating
wave heights using this information. The method involves two principal steps as outlined
below: 
Page 53

Page 54

Coastal Flood Risk Assessment: Proposed Bothy, Eilean Loch Oscair p10/17
STEP A: Design wind speeds 
To calculate wave heights, one must first obtain an estimate of a return period wind speed
for the site of interest. 
The 1:50 year basic wind speed was obtained from British Standard 6399 1997, Loading for
buildings - Part 2: Code of practice for wind loads(8). This indicates a wind speed at the
potential development site of approximately 25.5 m/s. 
To convert the 50 year wind speed to other return period wind speeds, the Yarde approach
provides the following conversion equation: 
UD = Ub ∗ Sa ∗ Sd ∗ Sp ∗ Sf ∗ Sw
Where: 
UD  =  design wind speed (m/s) at subject site(s);
Ub  =  basic hourly wind speed (m/s) for design event;
Sa  =  an altitude factor;
Sd  =  a factor to account for the wind direction;
Sp  =  a factor to adjust for different return periods;
Sf  =  a factor to convert hourly wind speed to a more appropriate duration for the water body under
study, and
Sw  =  an over-water speed-up factor to account for the effect of reduced friction as wind travels over
water. This value is based on fetch. 
Appropriate values for the above parameters are chosen from tables given by McConnell(7).
As indicated by the equation, fetch, and wind direction, which are related variables, have a
significant impact on wave heights. 
The land proposed for development is sheltered from direct effects of ocean swells. Wind
waves could however be generated and cause localised wave effects. 
As Atlantic depressions pass by the UK the wind typically starts to blow from the SW, but
later comes from the W or NW as the depression moves away. The range of directions
between SW and NW accounts for the majority of occasions and the strongest winds nearly
always blow from these. 
For this study, the shoreline is most exposed to waves generated by a SWbW wind blowing
from 240.796° Grid North, and in order to provide a worst-case scenario, it is this direction
that has been used in the calculations (see figures 3 and 4) along with a maximum fetch
distance of 16,691 m. 
Page 54

Page 55

Coastal Flood Risk Assessment: Proposed Bothy, Eilean Loch Oscair p11/17 
Figure 3. Maximum uninterrupted wind fetch (16,691 m) towards the island. 
Page 55

Page 56

Coastal Flood Risk Assessment: Proposed Bothy, Eilean Loch Oscair p12/17 
Figure 4. Closer view of maximum uninterrupted wind fetch at island. 
Given the above, the parameters used for the wave height analysis are provided in table 2. 
Page 56

Page 57

Coastal Flood Risk Assessment: Proposed Bothy, Eilean Loch Oscair p13/17
Table 2. Factors used to calculate design wind speed (without wind speed climate change
allowance). 
Factor Correction Applied
Sa
1 (based on Sa=1+0.001*Δs, where Δs is altitude above mean sea level in metres), from
McConnell(7) p63
Sd 1.00  from table 7.1 of McConnell
Sp
Various (0.67 for 1 year wind speed, 1.00 for 50 year wind speed and 1.10 for the 1:200 year
wind speed), from McConnell p64
Sf 1.05 (based on a 15 min duration, UK recommended value), from table 7.3 of McConnell
Sw 1.31 from table 7.4 of McConnell 
STEP B: Design Wave Heights 
To calculate design wave heights from design wind speeds, McConnell(7) provides the
following equation:
𝐻𝐻𝑠𝑠 = 0.00178 ∗ UD ∗ √F
�g
Where: 
Hs  =  significant wave height (m). This is the mean wave height (trough to crest) of the highest
third of the waves;
UD  =  design wind speed (m/s);
F  =  fetch length (m); and
g  =  acceleration due to gravity (9.81 m/s²). 
Design wave heights for the water body based on this equation and the wind speeds
calculated above are given for a range of return periods in table 3. 
Table 3. Design wave heights (without wind speed climate change allowance). 
Return Period (years) Sp
Design Wind Speed UD
(m/s)
Significant Wave Height* Hs
(m)
1 0.67 23.50 1.73
2 Hs derived from wave height growth curve 2.01
5 0.83 29.11 2.14
10 0.88 30.87 2.27
20 0.93 32.62 2.40
50 1.00 35.08 2.58
100 1.05 36.83 2.70
200 1.10 38.58 2.83
1000** 1.19 41.74 3.06 
*  Significant wave height is the wave’s amplitude i.e. the distance from its trough to crest.
**  Derived from the Sp growth curve parameters (5 paramount logistic curve fit, r2 = 0.999). 
Note: The 50 year return period wind speed is greater than 25.5 m/s because the Yarde method directional factor
(Sd) has been applied. 
Consideration has been given to the potential for climate change to affect the local wind
speeds and hence wave heights. No specific SEPA guidance on the effects of climate change
on wind speed could be found. Therefore, the flood and coastal defence appraisal guidance(9)
Page 57

Page 58

Coastal Flood Risk Assessment: Proposed Bothy, Eilean Loch Oscair p14/17
which recommends a 10% increase in wind speeds for dates 2055 to 2110 was applied (table
4). 
Table 4. Design wave heights (with wind speed climate change allowance). 
Return Period (years) Sp
Design Wind Speed UD
(m/s)
Significant Wave Height Hs
(m)
1 0.67 25.85 1.90
2 Hs derived from wave height growth curve 2.01
5 0.83 32.02 2.35
10 0.88 33.95 2.49
20 0.93 35.88 2.63
50 1.00 38.58 2.83
100 1.05 40.51 2.97
200 1.10 42.44 3.12
1000 1.19 45.91 3.37 
5.4 Joint Probability Analysis 
5.4.1 For this appraisal, the joint probability of a high wind (and hence wave) and an extreme sea
level (including climate change uplift) occurring simultaneously has been calculated. This
analysis is based on the desktop method outlined in DEFRA Report FD2308/TR2, Use of
Joint Probability Methods in Flood Management(11). 
5.4.2 In figure 4.1 of FD2308/TR2 (reproduced in figure 5 below), Loch Linnhe solely falls within
the well correlated (Tobermory) levels of dependence between large waves and high sea
levels. Based on this, ρ was set to equal 0.39, representing the lower end of "well correlated". 
Figure 5. Correlation coefficients: all wave directions combined. 
5.4.3 The combination results of the probability analysis are presented in table 5.  
Page 58

Page 59

Coastal Flood Risk Assessment: Proposed Bothy, Eilean Loch Oscair p15/17
Table 5. Joint probability results: Joint exceedance return period of 1000 years. 
Variable 1: Sea Level 
(incl. climate change allowance)
Variable 2: Wave Conditions
(incl. climate change allowance)
Return Period
(Years)
Extreme Sea Level 
(mAOD)
Return Period
(Years)
Significant Wave Height* Hs
(m)
1 3.75 83.27 2.93
2 3.86 41.63 2.79
5 4.02 16.65 2.59
10 4.14 8.33 2.45
20 4.26 4.16 2.28
50 4.43 1.67 1.98
100 4.56 0.83 1.87
200 4.69 0.42 1.76
1000 5.02 0.08 1.51 
5.4.4 From the above calculation the joint probability of a 1:1000 year sea level and a wave
occurring simultaneously will result in a flood level of 5.78 mAOD i.e., 5.02 + (1.51 divided
by 2 as the significant wave height is from trough to crest). 
5.5 Predicted Funnelling & Bathymetric Effects 
5.5.1 TransTech deems that funnelling will not influence flood levels at Eilean Loch Oscair because
of the adjacent physical geometry of the part of Loch Linnhe within which the island is located. 
5.5.2 Given the lack of significant shoaling (figure 6), especially for a 1:1000 year sea level, in the
local near shore bathymetry there are no predicted effects of bathymetry on the 1:1000 year
flood level. 
Figure 6. Admiralty chart extract showing Eilean Loch Oscair and the line of maximum fetch towards
it.  
Page 59

Page 60

Coastal Flood Risk Assessment: Proposed Bothy, Eilean Loch Oscair p16/17
6.0 DISCUSSION 
6.1 Predicted Extreme Coastal Flood Level and its Implications to Development of
the Bothy 
6.1.1 The assessment of the joint probability of a high sea level and wave effects occurring
simultaneously produces a 1:1000 year extreme coastal flood level of 5.78 mAOD. Thus, the
bothy should be located on ground above this level. 
6.1.2 Topographical levels for the island suggest that it should be able to accommodate a bothy at
≥5.78 mAOD as areas between 6 to 10 mAOD are available (figure 1). 
6.2 Finished Floor Level 
6.2.1 The Argyll and Bute Council FRMT and SEPA generally requires ≥600 mm FFL freeboard
above the predicted flood level. As such, for the bothy the FFL needs to be ≥6.38 mAOD. 
6.3 Access and Egress 
6.3.1 Safe access to and egress from the development during extreme flood events needs to be
considered. As the FRMT notes in their advice provided via email on 06/07/2021, visiting
Eilean Loch Oscair will be similar to visiting other small islands such as Cramond Island in
the Firth of Forth. 
6.3.2 It is therefore recommended that appropriate signage be provided informing visitors of the
flood risk, with recommendations against accessing the island during extreme weather
events. 
7.0 CONCLUSIONS 
7.1 Our conclusion is that, with the location of the bothy on ground ≥5.78 mAOD, it will not be at
risk of coastal flooding and as such will be compliant with Argyll and Bute Local Plan Policy
LP SERV 8: Flooding and Land Erosion(4), SEPA’s Technical Flood Risk Guidance for
Stakeholders(5) and Scottish Planning Policy(6).  
Page 60

Page 61

Coastal Flood Risk Assessment: Proposed Bothy, Eilean Loch Oscair p17/17
FILES ACCOMPANYING THIS REPORT 
The following file accompanies this report: 
• Eilean Loch Oscair flood risk assessment checklist.pdf
– SEPA Checklist 
REFERENCES 
(1) Flood Risk and Land Use Vulnerability Guidance. LUPS-GU24. Version 4. Scottish Environment Protection
Agency. 10 July 2018. Website link. 
(2) Coastal Design Sea Levels - Coastal Flood Boundary Extreme Sea Levels 2018 (March 2020 update). 
Website link. 
(3) Climate change allowances for flood risk assessment in land use planning. LUPS-CC1. Scottish Environment
Protection Agency. 26 April 2019. Website link. Accompanying map available here. 
(4) Argyll and Bute Local Development Plan SG LDP SERV 8 - Flooding and Land Erosion - The Risk Framework
for Development. Adopted March 2016. 
Website link. 
(5) Technical Flood Risk Guidance for Stakeholders. Version 12. Scottish Environment Protection Agency. May 2019.
Website link. 
(6) Scottish Planning Policy: Managing Flood Risk and Drainage. The Scottish Government. June 2014. 
Website link. 
(7) McConnell, K. W. and I. Allsop. Revetment Systems Against Wave Attack: A Design Manual. HR Wallingford,
Dept. of the Environment, Transport and the Regions, UK. 1998. 
(8) BS 6399 1997. Loading for buildings - Part 2: Code of practice for wind loads. British Standards Institution. Most
recent revision is 28 June 2002. 
(9) Flood and Coastal Defence Appraisal Guidance, FCDPAG3. Economic Appraisal Supplementary Note to
Operating Authorities - Climate Change Impacts. October 2006. 
Website link. 
(10) Indicative Flood Map. Scottish Environment Protection Agency. 
Website link. 
(11) Use of Joint Probability Methods in Flood Management. A Guide to Best Practice. R&D Technical Report
FD2308/TR2. Department of Environment, Farming and Rural Affairs/Environment Agency. Flood and Coastal
Defence R&D Programme. March 2005. 
Website link. 
(12) Yarde, A.J., Banyard, L.S. and Allsop, N.W.H. Reservoir dams: wave conditions, wave overtopping and slab
protection, Report SR 459, HR Wallingford, UK. 1996. 
BIBLIOGRAPHY 
• SEPA Flood Risk Standing Advice for Planning Authorities and Developers. November 2020.
Website link. 
• Development Plan Guidance on Flood Risk. Scottish Environment Protection Agency. 10 July 2018. 
Website link. 
• Planning Background Paper Flood Risk. LUPS-BP-GU2a. Scottish Environment Protection Agency. 10 July
2018. 
Website link. 
• Flood Risk Management (Scotland) Act 2009. 16 June 2009. 
Website link. 
NB: The website links above are current and may expire.
Page 61

Page 62

This page is intentionally left blank

Page 63

VAT No. 150 0797 27
Company Registration SC435394
1
Gavia Environmental Ltd
Auld Bond Road
Perth
PH1 3FX 
Tel: 01738 718 685    
E-mail: molly.turner@gavia-environmental.co.uk
29 March 2023 
NatureScot 
Cameron House 
Albany Street
Oban
Argyll
PA34 4AE 
Re: P23099 Eilean Loch Oscair Development: Review of Construction Notes for Harbour
Seal Mitigation   
Dear Whom it May Concern, 
Introduction
Gavia Environmental Ltd. (Gavia) was comissioned by The Estates Office (‘the Client’) to provide a
review of the construction notes to be submitted to planning for a proposed development on Eilean
Loch Oscair, Isle of Lismore, and recommend mitigation measures for the consideration of the
harbour seal population in the neighbouring Eileanan agus Sgeiran Lios mor Special Area of
Conservation (SAC). The information provided within this report will be used to support planning
application 22/02100/PP. 
Background Information
The proposed Site lies is located on Eilean Loch Oscair, c. 640m south-west of Port Aolnais in the
north-west of the Isle of Lismore, Argyll and Bute, approxiamte National Grid Reference NM 86273
45433. The proposed development incldues the erection of short-term holiday let accomodation,
outbuilding, pontoon and installation of a small sewage treatment plant. 
The Site is c. 250m north-east of the island of Dubh Sgeir and the Isle of Oronsay, both of which
are located within the Eileanan agus Sgeiran Lios mor SAC, designated for its population of harbour
seals Phoca vitulina (see Appendix A for legislation). Following consultation with NatureScot (Ref:
CDM169632; dated 14th February 2023) it has been recommended that further information regarding
constuction is supplied in order to determine whether the proposal is likely to have a significant
effect on the harbour seal qualifying interest of the SAC. The following information should be
obtained as recommended by NatureScot: 
“Further information regarding construction, i.e. timescales, anticipated duration of activity, vessel
activity (bringing material to the island), an indiciaton of in-air noise levels from drilling, digging,
mahcinery, equipment etc.” 
Mitigation Measures
Based on the the initial construction notes provided by the Client’s architect, Moving Still Architecture
(see Appendix B), and NatureScot’s consultation response, the following outline mitigation measures 
Page 63

Page 64

VAT No. 150 0797 27
Company Registration SC435394
2
should be taken into consideration when producing the final construction plan in order to minimise
disturbance to the local harbour seal population and qualifying feature of the Eileanan agus Sgeiran
Lios mor SAC. 
It is recommended that all construction acitivites occur outwith the pupping season between June
and July (inclusive) and the moult period in August. During the months of June-July females will
return to haul-out sites to give birth to pups, and their annual molt will occur between the end of
July and mid-August, during which seals need to spend the majority of time ashore. 
Piling Mitigation Measures
Piling and drilling activities or activities that involve a high level of in-air noise should only to be
undertaken between 8am and 5pm and duration of these activites should be minimised where
possible. 
A pre-piling watch for marine mammals should be undertaken following the standard JNCC ‘Statutory
nature conservation agency protocol for minimising the risk of injury to marine mammals from piling
noise’ (JNCC Protocol)1: 
• For a period of at least 30 minutes prior to piling
• To be undertaken by fully qualified and experienced Marine Mammal Observer (MMO) 
• Pre-piling monitoring zone of 250m should be monitored; 
• If marine mammals are detected within the monitoring zone, the commencement of piling
should be delayed until the marine mammal is outside of the monitoring zone for 20 minutes,
and the full 30 minute pre-piling watch has been completed. 
Soft-start protocol 
Each piling event shouldl commence with a hammer energy at as low as is reasonably practical,
followed by a gradual ramp-up to full hammer energy. 
If a marine mammal enters the monitoring zone during the soft-start and ramp-up procedure, then,
if possible, the piling energy will not increase until the marine mammal exits the monitoring zone.
The soft start procedure is only required where there has been no piling for the preceding 10 minutes
(i.e. if piling continues at a new location within 10 minutes of a pile being installed, as is expected,
then this soft-start and ramp-up protocol would not be required). 
Breaks in piling 
If piling activity is stopped for more than 10 minutes, the MMO will a check within the monitoring
zone for any marine mammal presence before piling can recommence. If a marine mammal is
present within the monitoring zone, the full mitigation procedure should be undertaken prior to
piling recommencing. 
In the event that piling activity is stopped for more than 10 minutes, the pre-piling watch, soft-start
and ramp-up procedure (if possible) is conducted prior to piling re-commencing. 
Vessels Management Measures 
The use of vessels will be required to transport construction equipment and materials to the island
and therefore the following good practice vessel measures should be taken into consideration during
transportation: 
• Within 300m of a marine mammal vessels will maintain a steady speed, and direction, at all
times, to allow any marine mammal to predict where the vessel may be headed, and to 
1 Statutory nature conservation agency protocol for minimising the risk of injury to marine mammals from piling noise, 2010
https://data.jncc.gov.uk/data/31662b6a-19ed-4918-9fab-8fbcff752046/JNCC-CNCB-Piling-protocol-August2010-Web.pdf
Page 64

Page 65

VAT No. 150 0797 27
Company Registration SC435394
3
move out of the way. Vessels should use the defined anchorage area and shipping channel
at all times.
• Vessels should not approach within 600m of known seal haul-out sites.
• Keep a well-maintained engine and propellor to minimise underwater noise.
• Vessels should turn off ‘noisy’ equipment when close to marine mammals (e.g. engines,
propellors (within the anchorage area), and echo sounders) if possible. 
It is considered that the implementation of the mitigation measures descirbed above will aid in the
reduction of any potential disturbance to the local harbour seal population as a result of the proposed
development. 
I hope that you find the information within this report acceptable. Please do not hesitate to contact
me if you require further information. 
Yours sincerely, 
Molly Turner
Senior Ecological Consultant 
Gavia Environmental Ltd 
Page 65

Page 66

VAT No. 150 0797 27
Company Registration SC435394
4
Appendix A Legislation 
Under the Marine (Scotland) Act 2010 is is and offence to intentionally or recklessly kill, injure or
take a seal at any time of the year except: 
• To alleviate suffering; 
• Where Marine Scotland has issued a licence to do so. 
The Conservation (Natural Habitats, &c.) Regulations 1994 (as amended) also prohibits certain
methods of catching or killing seals. 
It is also an offence to intentionally or recklessly harass seals at significant haul-out sites under the
Protection of Seals (Designation of Haul-out Sites) (Scotland) Order 2014. 
Appendix B Construction Notes 
“Timescales - It's likely a contractor would be required to really firm this up, but given the extent of
prefabrication / lightweight construction which is anticipated, I suspect the time on site would be relatively
short - perhaps two / three months - but that's just a very rough guess, and would depend on the final level
of prefabrication that was achieved within the detailed design.  
Logistics – I’ve spoken with Ferguson Shipping (they have experience in this area - both technically and
geographically and have carried out similar projects).  We didn't confirm the specification (size) of the vessel
that would be required, but did confirm that the principle of delivery of large prefabricated elements to the site
was feasible. 
Piling / Drilling - This would be kept to a minimum, and would be much less of an issue than on a conventional
build of similar scale.  This is a result of the proposed use of screw piles, which would remove the need for the
kind of mass excavations which would be required for conventional strip or slab foundations.  This would apply
across the full extent of the proposed building.  The exception would be the treatment plant (Klargester) which
is anticipated as the means of handling foul drainage; this would have to be located in a hole - which would
require digging of the ground - but this would likely be limited to a day or two in working time.  
Noise / Construction Method - The design is proposed on the basis of significant levels of prefabrication -
effectively meaning that pre-finished volumes would be delivered to site, leaving a minimum of time (and noise)
required on site to finish junctions in external cladding, and form the roof membrane etc on site.  As noted
above, these are relatively small amounts of work (including less need for larger, noisy equipment) to be carried
out on site when compared to a conventionally designed building.  The principles behind the architectural
design include a desire to minimise any impact on the landscape and wildlife on the island.” 
Page 66

Page 67

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Argyll and Bute Council
Development & Economic Growth   
Planning Application Report and Report of Handling as required by Schedule 2 of the
Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013 relative to applications for Planning Permission or Planning
Permission in Principle 
Reference No: 22/02100/PP
Planning Hierarchy: Local Development 
Applicant: Mr A MacGillivray
Proposal: Erection of short-term holiday let accommodation, outbuilding and
pontoon and installation of sewage treatment plant
Site Address:  Eilean Loch Oscair, off Isle of Lismore    
DECISION ROUTE 
☒Delegated - Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997 
☐Committee - Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission  
Erection of short-term holiday let accommodation  
Erection of outbuilding  
Erection of pontoon  
Installation of sewage treatment plant  
Connection to private water supply 
(ii) Other specified operations  
None 
(B) RECOMMENDATION: 
Having due regard to the Development Plan and all other material considerations, it
is recommended that planning permission be refused for the reasons appended to
this report. 
(C) CONSULTATIONS:   
NatureScot
Letter dated 14.02.2023 objecting to the proposal until further information is provided.
Further response dated 18.05.2023, following the receipt of additional information
from the applicant, removing the holding objection. 
Scottish Environment Protection Agency
Letter dated 03.02.2023 advising of no objections subject to conditions. 
Page 67

Page 68

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Environmental Health Service
Report dated 07.02.2023 advising of no objections to the application. Comment was
made regarding the requirement of the applicant to apply for a short-term let licence. 
Marine Scotland Licensing
No response at time of report and no request for an extension of time. 
The above represents a summary of the issues raised.  Full details of the consultation
responses are available to view via the Public Access section of the Council’s
website. 
(D) HISTORY:   
No relevant planning history. 
(E) PUBLICITY:   
The proposal has been advertised in terms of Regulation 20 procedures, overall
closing date 23.02.2023. 
(F) REPRESENTATIONS:   
(i) Representations received from: 
One email representation has been received from Lismore Community Council,
dated 01.02.2023, supporting the application. 
One email representation has been received from Oban District Access Panel, dated
27.01.2023, commenting on the application. 
Representations are published in full on the planning application file and are available
to view via the Public Access section of the Council’s website. 
(ii) Summary of issues raised: 
Lismore Community Council support the proposed development as it
would be a useful facility and diversification for a working croft, helping
support the farming enterprise of a local family.   
Comment: Whilst the support for the application is noted, there has been
no information submitted to suggest that the proposed development
would relate to the diversification of an existing croft.   
Oban District Access Panel (ODAP) outline that their remit is to
encourage developers and designers to create accessible buildings and
environments that provide disabled people with equal access and
facilities and enable them to participate and to thrive. 
In this respect the ODAP encourage the Applicant to consult with their
Architect with a view to adapting the proposed accommodation on
Page 68

Page 69

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023
Inclusive Design principles to enable it to be used and enjoyed by a
disabled people. This would involve providing a ramped access,
facilitating wheelchair access, adapting the bathroom, and the widening
of the pontoon bridge. 
The comments by the ODAP are noted and will be passed to the
Applicant for information/action should permission be granted. 
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Impact Assessment Report: ☐Yes ☒No  
(ii) An Appropriate Assessment under the
Conservation (Natural Habitats) Regulations
1994:   
☒Yes ☐No  
(iii) A Design or Design/Access statement:    ☒Yes ☐No 
A Design Statement has
been submitted with the
application. 
(iv) A report on the impact of the proposed
development eg. Retail impact, transport
impact, noise impact, flood risk, drainage
impact etc:  
☒Yes ☐No 
A Flood Risk
Assessment has been
submitted with the
application. 
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:   ☐Yes ☒No   
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  ☐Yes ☒No    
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account
in assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy 
Sustainable Places
Page 69

Page 70

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
NPF4 Policy 5 – Soils
NPF4 Policy 9 – Brownfield, Vacant and Derelict Land and Empty Buildings (includes
provisions relevant to Greenfield Sites)
NPF4 Policy 10 – Coastal Development
NPF4 Policy 12 – Zero Waste
NPF4 Policy 13 – Sustainable Transport 
Liveable Places
NPF4 Policy 14 – Design, Quality and Place
NPF4 Policy 17 – Rural Homes
NPF4 Policy 18 – Infrastructure First
NPF4 Policy 22 – Flood Risk and Water Management 
Productive Places
NPF4 Policy 29 – Rural Development
NPF4 Policy 30 – Tourism 
‘Argyll and Bute Local Development Plan’ Adopted March 2015 
LDP STRAT 1 – Sustainable Development 
LDP DM 1 – Development within the Development Management Zones 
LDP 3 – Supporting the Protection Conservation and Enhancement of our
Environment
LDP 4 – Supporting the Sustainable Development of our Coastal Zone 
LDP 5 –Supporting the Sustainable Growth of our Economy 
LDP 8 – Supporting the Strength of our Communities 
LDP 9 – Development Setting, Layout and Design 
LDP 10 – Maximising our Resources and Reducing our Consumption 
LDP 11 – Improving our Connectivity and Infrastructure 
‘Supplementary Guidance to the Argyll and Bute Local Plan 2015’ (Adopted
March 2016 & December 2016) 
Natural Environment 
SG LDP ENV 1 – Impact on Habitats, Species and our Biodiversity
SG LDP ENV 2 – Impact on European Sites
SG LDP ENV 11 – Protection of Soil and Peat Resources 
Landscape and Design 
SG LDP ENV 12 – Impact on National Scenic Areas (NSAs)
SG LDP ENV 14 – Landscape 
Support for Business & Industry: General 
SG LDP BUS 2 – Business & Industry Proposals in the Countryside Zones 
Support for Business & Industry: Main Potential Growth Sector: Tourism 
Page 70

Page 71

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023
SG LDP TOUR 1 – Tourist Facilities and Accommodation, including Static and
Touring Caravans 
Sustainable Siting and Design 
SG LDP Sustainable – Sustainable Siting and Design Principles 
Resources and Consumption 
SG LDP SERV 1 – Private Sewage Treatment Plants & Wastewater Systems
SG LDP SERV 2 – Incorporation of Natural Features / SuDS
SG LDP SERV 5(b) – Provision of Waste Storage & Collection Facilities within New
Development
SG LDP SERV 6 – Private Water Supplies and Water Conservation
SG LDP SERV 9 – Safeguarding Better Quality Agricultural Land 
Addressing Climate Change 
SG LDP SERV 7 – Flooding and Land Erosion – Risk Framework 
Transport (Including Core Paths) 
SG LDP TRAN 1 – Access to the Outdoors
SG LDP TRAN 2 – Development and Public Transport Accessibility
SG LDP TRAN 3 – Special Needs Access Provision
SG LDP TRAN 4 – New & Existing, Public Roads & Private Access Regimes
SG LDP TRAN 6 – Vehicle Parking Provision 
Coastal Development 
SG LDP CST 1 – Coastal Development 
(ii)  List of all other material planning considerations taken into account in
the assessment of the application, having due regard to Annex A of
Circular 3/2013. 
Third Party Representations  
Consultation Reponses  
Argyll and Bute Sustainable Design Guidance, 2006  
ABC Technical Note – Biodiversity (Feb 2017) 
Argyll and Bute proposed Local Development Plan 2 (November 2019) – The
Examination by Scottish Government Reporters to the Argyll and Bute Local
Development Plan 2 has now concluded and the Examination Report has been
published (13th June 2023). The Examination Report is a material consideration of
significant weight and may be used as such until the conclusion of the LDP2
Adoption Process. Consequently, the Proposed Local Development Plan 2 as
recommended to be modified by the Examination Report and the published Non
Notifiable Modifications is a material consideration in the determination of all
planning and related applications. 
Spatial and Settlement Strategy 
Policy 02 – Outwith Settlement Areas
Page 71

Page 72

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023
Policy 04 – Sustainable Development 
High Quality Places 
Policy 05 – Design and Placemaking
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 10 – Design – All Development 
Diverse and Sustainable Economy 
Policy 23 – Tourism Development, Accommodation, Infrastructure and Facilities 
Sustainable Communities 
Policy 55 – Flooding
Policy 58 – Private Water Supplies and Water Conservation
Policy 60 – Private Sewage Treatment Plants and Wastewater Drainage Systems
Policy 61 – Sustainable Urban Drainage Systems (SUDS)
Policy 63 – Waste Related Development and Waste Management 
High Quality Environment 
Policy 70 – Development Impact on National Scenic Areas (NSA’s)
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 74 – Development Impact of Sites International and National Importance
Policy 79 – Protection of Soil and Peat Resources
Policy 83 – Safeguarding Agricultural and Croft Land 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment:  ☐Yes ☒No    
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  ☐Yes ☒No 
(M) Has a Sustainability Checklist been submitted:  ☐Yes ☒No 
(N) Does the Council have an interest in the site:  ☐Yes ☒No 
(O) Requirement for a pre-determination hearing: ☐Yes ☒No    
(P)(i) Key Constraints/Designations Affected by the Development:  
Lynn of Lorn National Scenic Area  
SEPA Coastal Flood Risk Zone  
Eileanan agus Sgeiran Lios mor Special Area of Conservation 
(P)(ii) Soils
Agricultural Land Classification: Unclassified Land
Page 72

Page 73

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Peatland/Carbon Rich Soils Classification: ☐Class 1
☐Class 2
☐Class 3
☒N/A
Peat Depth Classification: N/A  
Does the development relate to croft land? ☐Yes ☒No
Would the development restrict access to croft
or better quality agricultural land?
☐Yes ☐No ☒N/A
Would the development result in
fragmentation of croft / better quality
agricultural land?
☐Yes ☐No ☒N/A 
(P)(iii) Woodland  
Will the proposal result in loss of
trees/woodland? 
☐Yes
☒No 
Does the proposal include any replacement or
compensatory planting?
☐Yes
☐No details to be secured by condition
☒N/A  
(P)(iv) Land Status / LDP Settlement Strategy
Status of Land within the Application  ☐Brownfield
☐Brownfield Reclaimed by Nature
☒Greenfield 
ABC LDP 2015 Settlement Strategy 
LDP DM 1 
☐Main Town Settlement Area
☐Key Rural Settlement Area
☐Village/Minor Settlement Area
☐Rural Opportunity Area
☐Countryside Zone
☒Very Sensitive Countryside Zone
☐Greenbelt
ABC pLDP2 Settlement Strategy 
☐Settlement Area
☐Countryside Area
☒Remote Countryside Area
☐Helensburgh & Lomond Greenbelt
ABC LDP 2015 Allocations/PDAs/AFAs
etc: 
N/A
ABC pLDP2 Allocations/PDAs/AFAs
etc: 
N/A 
(P)(v) Summary assessment and summary of determining issues and material
considerations 
This application seeks planning permission for the erection of a detached
dwellinghouse for short-term holiday letting purposes, an associated outbuilding and
pontoon, and the installation of a sewage treatment plant, at the site of Eilean Loch
Oscair, off the Isle of Lismore. 
Page 73

Page 74

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023
The application site, Eilean Loch Oscair, is a small island located approximately 250
metres off the northwest coast of Lismore within Loch Linnhe. The application site
comprises an area of land towards the southern end of the island, extending from
the west coast to the east coast of the island. The application site, and the wider
surroundings, form an uninhabited and undeveloped island comprising rough
grassland with a rocky foreshore. 
This application seeks planning permission for the erection of a dwellinghouse for
short-term holiday letting purposes, and an associated outbuilding and pontoon. The
proposed dwellinghouse would be set back from the coast, sited relatively centrally
within the plot. The dwelling would be single storey and would be formed of three
main blocks; a narrow linear block at the rear would facilitate two bedrooms which
would be connected to a circulation block which would facilitate the access within the
dwelling and would connect to the larger living and dining block which would be set
at an angle around an adjacent rocky outcrop. The total external footprint of the
dwellinghouse would be approximately 188 square metres. The flat roof of the
dwelling would predominantly have a height of 3.2 metres, with the circulation block
being set slightly lower than this at a height of 3 metres. The dwelling would include
contemporary glazing arrangements within each elevation which would feature
timber shutters. The facing material of the dwellinghouse would comprise vertically
aligned natural timber cladding. 
The proposed outbuilding would be sited immediately adjacent to the proposed
dwellinghouse and would comprise a rectangular building covering a footprint of
approximately 7.3 square metres. The building would be similar in design to the
dwelling, having a flat roof at a height of 3.2 metres and clad in vertically aligned
timber. 
The proposed pontoon would be sited at the eastern shore of the island, extending
approximately 38 metres from the shoreline to provide the access to the island and
the application site. 
NPF4 Policy 1 seeks to prioritise the climate and nature crises in all decisions; it
requires to be applied together with other policies in NPF4. Guidance from the
Scottish Government advises that it is for the decision maker to determine whether
the significant weight to be applied tips the balance in favour for, or against a
proposal on the basis of its positive or negative contribution to climate and nature
crises.   
NPF4 Policy 2 seeks to ensure that new development proposals will be sited to
minimise lifecycle greenhouse gas emissions as far as possible, and that proposals
will be sited and designed to adapt to current and future risks from climate change.
Guidance from the Scottish Government confirms that at present there is no single
accepted methodology for calculating and / or minimising emissions. The emphasis
is on minimising emissions as far as possible, rather than eliminating emissions. It is
noted that the provisions of the Settlement Strategy set out within Policy LDP DM 1
of the LDP promotes sustainable levels of growth by steering significant development
to our Main Towns and Settlements, rural growth is supported through identification
of Key Rural Settlements and safeguards more sensitive and vulnerable areas within
its various countryside designations. 
NPF4 Policy 3 seeks to protect biodiversity, reverse biodiversity loss and deliver
positive effects from development and strengthen nature networks. 
Page 74

Page 75

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023
The application site is located within close proximity to the Eileanan agus Sgeiran
Lios mor Special Area of Conservation, protected for its harbour seals. As a result of
the designation, comments were sought from NatureScot who, after the submission
of additional information from the applicant, advised that the proposal is likely to have
a significant effect on the harbour seal qualifying interests of the Special Area of
Conservation. However, the response from NatureScot concluded that whilst there
are natural heritage interest of international importance at the site, their advice is that
these would not be adversely affected. The status of the site means that the
requirements of the Conservation (Natural Habitats, &c.) Regulations 1994 as
amended (the “Habitats Regulations”) apply. Consequently NatureScot advised that
the Council is required to consider the effect of the proposal on the Special Area of
Conservation. NatureScot advised that, in their view, the proposal is likely to have a
significant effect on the harbour seal qualifying interests and accordingly, the
Council, as competent Authority, is required to carry out an Appropriate Assessment
(AA) in view of the site’s conservation objectives for its qualifying interests. 
An Appropriate Assessment has been undertaken which identifies that, subject to
conditions being imposed were planning permission to be granted, to ensure that the 
development would be undertaken in accordance with the mitigation set out within
Environmental Statement accompanying the application, any disturbance would be
minimised. Based on the likely short time period for construction, and the proposed
mitigation measures, there would be no adverse effect on the integrity of the Special
Area of Conservation. 
Whilst no specific proposals for biodiversity improvements have been submitted it is
considered that adequate and proportionate measures for biodiversity enhancement
and protection could be delivered by planning condition in the event that planning
permission were to be granted. The proposed development is therefore considered
to be in compliance with NPF4 Policy 3 as underpinned by LDP Policy LDP 3,
supplementary guidance SG LDP ENV 1, and Policies 73 and 74 of the proposed
Local Development Plan 2. 
NPF4 Policy 4 seeks to protect, restore and enhance natural assets making best
use of nature-based solutions. 
The site lies within the Lynn of Lorn National Scenic Area. The Lynn of Lorn is an
island-studded waterway at the confluence of the Sound of Mull with Loch Etive and
Loch Linnhe, from which it is separated by the island of Lismore. The Lynn follows
the north-westerly alignment of the prevailing relief in the area, which, set in the wider
context of sea lochs and mountains, is a small scale region of parallel limestone
ridges. The proposed development would introduce built development in an area of
undeveloped land, in an open and exposed location, and would therefore disturb the
unsettled character of the landscape and have an adverse effect on the integrity of
the area. In this regard, the development would fail to respect the existing character
and quality of the site and its surroundings. 
NPF Policy 4 c) states that development proposals that will affect a National Scenic
Area will only be supported where: 
i. The objectives of designation and the overall integrity of the area will not
be compromised; or
ii. Any significant adverse effects on the qualities for which the area has
been designated are clearly outweighed by social, environmental or
economic benefits of national importance. 
Page 75

Page 76

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023
In this case, it is the considered opinion of the planning authority that the proposed
development will be materially harmful to the designated qualities of the area and its
overall integrity and that this harm is not clearly outweighed by any social,
environmental or economic benefit, and certainly not of ‘national importance’. 
The proposed development is therefore considered to be in conflict with NPF4 Policy
4 as underpinned by Local Development Plan Policy LDP 3, supplementary guidance
SG LDP ENV 14, and Policies 04 and 70 of the proposed Local Development Plan
2.   
NPF4 Policy 5 seeks to protect carbon-rich soils, to restore peatlands and to
minimise disturbance to soils from development. 
The development proposed by the current planning application seeks to develop an
area of rough ground. The site has no agricultural land classification and is not within
an identified area of peatland, carbon-rich soils or priority peatland habitat. The
development proposed is therefore considered to be in accordance with NPF4 Policy
5 as underpinned by Local Development Plan Policy LDP 3, supplementary guidance
SG LDP ENV 11 and SG LDP SERV 9, and Policies 79 and 83 of the proposed Local
Development Plan 2. 
NPF4 Policy 9 seeks to encourage, promote and facilitate the reuse of brownfield,
vacant and derelict land and empty buildings, and to help reduce the need for
greenfield development. 
The development proposed by this planning application is on a greenfield site. The
site is located within the Very Sensitive Countryside Zone as defined within the Local
Development Plan, where LDP Policies LDP STRAT 1 and LDP DM 1 give
encouragement only to specific categories of development on appropriate sites.
These comprise renewable energy related development; telecommunication related
development; and development which would directly support agricultural,
aquaculture, nature conservation or other established activity. The proposed short-
term holiday letting dwellinghouse would not relate to any of the above categories of
development. There is no established activity on the undeveloped and uninhabited
island and no case has been presented to suggest otherwise. 
The proposed development, on a greenfield site, would therefore be contrary to
NPF4 Policy 9b, which requires development proposals on greenfield sites to be
explicitly supported by policies in the Local Development Plan. The development
would thereby fail to achieve the policy outcome aims which require development to
be sited within an appropriate location to maximise the use of existing assets and
minimise additional land take. 
With regard to the proposed Local Development Plan 2, the application site is located
within the Remote Countryside. This development management zone comprises
countryside and isolated coast which has extremely limited capacity to successfully
absorb development. Only limited categories of natural resource based development
is supported in these areas, limited to renewable energy related development,
telecommunications or other associated digital infrastructure, or development directly
supporting existing agricultural units, aquaculture, or other recognised countryside
activity. The proposed development would not relate to any of these categories of
development and in this regard would be contrary to Policy 02 of the proposed Local
Development Plan 2. 
Page 76

Page 77

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023
NPF4 Policy 10 seeks to protect coastal communities and assets and support
resilience to the impacts of climate change. 
The proposed development is considered to be a form of coastal development by
virtue of the development relying on the use of the coast to access and facilitate the
development. NPF4 Policy 10b states that development proposals in undeveloped
coastal areas will only be supported where they: 
i. are necessary to support the blue economy, net zero emissions or to
contribute to the economy or wellbeing of communities whose livelihood
depend on marine or coastal activities, or is for essential infrastructure,
where there is a specific locational need and no other suitable site;
ii. do not result in the need for further coastal protection measures taking
into account future sea level change; or increase the risk to people of
coastal flooding or coastal erosion, including through the loss of natural
coastal defences including dune systems; and
iii. are anticipated to be supportable in the long-term, taking into account
projected climate change; or 
iv. are designed to have a very short lifespan 
The proposed development would fail to meet the above criteria as it would not relate
to support of the blue economy or achieving net zero emissions, and neither would
the development contribute to the economy or wellbeing of a community dependent
on marine or coastal activities. Additionally, the development does not relate to the
provision of essential infrastructure. 
The isolated nature of the coastline within this area, designated as Very Sensitive
Countryside Zone, is unable to successfully absorb the proposed development. The
scale of the development, comprising a dwellinghouse with a large footprint, and the
associated outbuilding and pontoon would be of a scale that is inappropriate to the
characteristics of the undeveloped and isolated location and would therefore fail to
safeguard areas identified as being sensitive and vulnerable to development
impacts.   
The proposed development would therefore represent an unsustainable form of
coastal development that would conflict with the requirements of NPF4 Policy 10 as
underpinned by Local Development Plan Policies LDP DM1, LDP 8 and LDP 10, and
supplementary guidance SG LDP CST 1. 
NPF4 Policy 12 seeks to encourage, promote and facilitate development that is
consistent with the waste hierarchy as defined within the policy document. 
The development the subject of this planning application seeks permission for the
erection of a dwellinghouse for short-term letting purposes. This is a development
likely to generate waste when operational. Whilst no details have been provided
regarding the proposed management of waste from the site, such details could be
secured via condition in the event that planning permission were to be granted. In
this regard, the proposed development is considered to be in compliance with NPF
4 Policy 12(c) as underpinned by LDP Policy LDP 10, supplementary guidance SG
LDP SERV 5(b), and Policy 63 of the proposed Local Development Plan 2. 
NPF4 Policy 13 seeks to encourage, promote and facilitate developments that
prioritise walking, wheeling, cycling and public transport for everyday travel and
reduce the need to travel unsustainably. 
Page 77

Page 78

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023
This policy aims to provide more opportunities for improved and more inclusive active
and sustainable travel opportunities whilst ensuring that developments are in
locations which support sustainable travel. 
Due to the isolated and remote location of the site, access would be required to be
by boat, assisted by the proposed pontoon. This small scale development is not
considered to be a significant travel generating use or a proposal where it is
considered important to monitor travel patterns resulting from the development. 
Notwithstanding the small scale nature of the development, it is not considered that
the proposal adequately addresses the requirements of NPF4 Policy 13b, which
requires development proposals to demonstrate consideration of the transport
requirements generated and their adherence to sustainable travel and investment
hierarchies. There would be no direct or easy access to the site via sustainable
transport methods or public transport and no apparent consideration has been given
to the transport needs of different user groups, such as those with limited mobility.
Whilst the development would be small scale and access to the site could be
facilitated, it is not considered that the proposal would adhere to the requirements of
NPF4 Policy 13, which specifically requires development to be in a location that
supports sustainable travel. 
NPF4 Policy 14 seeks to encourage, promote and facilitate well designed
development that makes successful places by taking a design-led approach and
applying the ‘Place Principle’. 
NPF4 Policy 14c states that development proposals that are poorly designed,
detrimental to the amenity of the surrounding area or inconsistent with the six
qualities of successful place will not be supported. Whilst it is acknowledged that the
design of the dwelling has been given significant consideration, the siting of the
development within the exposed and sensitive landscape would fail to adhere to the
requirements of NPF4 Policy 14 by virtue of being inappropriately sited. The
development would not be well connected to any existing established settlement,
development or infrastructure, nor would the development safeguard the isolated and
undeveloped nature of the immediate and wider landscape surroundings. 
New development in this location would not be cohesive with the landscape or
settlement pattern and would not integrate with the character of the surrounding area.
The introduction of built development to an undeveloped island is considered
inappropriate and the development would have a significant adverse impact upon
the setting, and would unacceptably alter the character and appearance of the
surrounding landscape and seascape.   
In addition to the above, however, it is important to note that the impact of the
proposed development upon the landscape and character of the surrounding area is
not the sole determining factor in the consideration of this application. Regardless of
any interpretation of the impact of the proposed development upon the landscape,
the development does not meet the fundamental key planning policy test for the
Council’s established and adopted settlement strategy for the planned growth of
Argyll and Bute as set out within Policy LDP DM 1. Neither, therefore, does the
proposed development accord with the sustainable development aims of the Council
as established within adopted key planning Policy LDP STRAT 1 which underpins
NPF4 Policy 14. 
The proposed development fails to pay regard to the wider surroundings of the site
in terms of infrastructure, land uses, available facilities, connectivity, the existing
Page 78

Page 79

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023
character, scale and density, and views. The site is isolated and the proposed
development would be incompatible with the existing character of the area, and is
therefore contrary to Policies 05, 08, 09 and 10 of the proposed Local Development
Plan 2. 
NPF4 Policy 17 seeks to encourage, promote and facilitate the delivery of more high
quality, affordable and sustainable rural homes in the right locations. 
The development the subject of this planning application is located within a defined
‘remote rural area’ where Policy 17(c) offers support only where such proposals: 
i. Support and sustain existing fragile communities;
ii. Support identified local housing outcomes; and
iii. Are suitable in terms of location, access and environmental impact. 
The proposed development seeks consent for a dwellinghouse for use for short-term
holiday letting purposes. The proposed development would not therefore offer an
opportunity for occupation by persons within the local community. No supporting
evidence has been submitted to suggest that the development proposed would
provide support to an established fragile community. In addition, as outlined above,
the siting of the development is considered unsustainable due to its inaccessibility
and impact upon the sensitive and vulnerable isolated landscape and seascape. The
proposed development would therefore be contrary to the aims of NPF4 Policy 17 as
underpinned by Local Development Plan Policy LDP DM 1. 
NPF4 Policy 18 seeks to encourage, promote and facilitate an infrastructure first
approach to land use planning. 
The development the subject of this planning application proposes a private drainage
system comprising a sewage treatment plant, with water supply via connection to a
private water supply. The Council’s Building Standards Service would apply suitable
control over the detailed arrangements of the proposed sewage treatment plant at
Building Warrant stage in the event that planning permission were to be granted. 
The proposed water and drainage infrastructure to serve the proposed development
is considered to be consistent with the broad aims of NPF4 Policy 18 as underpinned
by LDP Policy LDP 11, supplementary guidance SG LDP SERV 1, and Policy 60 of
the proposed Local Development Plan 2. 
NPF4 Policy 22 seeks to strengthen resilience to flood risk and to ensure that water
resources are used efficiently and sustainably. 
The development the subject of this planning application proposes connection to a
private water supply. In the event that planning permission were to be granted, a
condition would be required to secure an appraisal of the wholesomeness and
sufficiency of the intended water supply. 
The application site is situated adjacent to the coastal functional floodplain, as
indicated on the SEPA Flood Maps. Given the proposed siting for the development
on a small undeveloped island, the proposed development falls within the Most
Vulnerable land use class. SEPA have been consulted on the application and have
stated that, based upon the Flood Risk Assessment submitted with the application,
there are no objections subject to a condition relating to development being sited
above 5.8mAOD. Should planning permission be granted and the relevant condition
attached, the proposed development would be complaint with NPF4 Policy 22 as
Page 79

Page 80

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023
underpinned by Local Development Plan Policies LDP 10 and LDP 11,
supplementary guidance SG LDP SERV 7, and Policies 55 and 58 of the proposed
Local Development Plan 2. 
NPF4 Policy 29 seeks to encourage rural economic activity, innovation and
diversification whilst ensuring that the distinctive character of the rural area and the
service function of small towns, natural assets and cultural heritage are safeguarded
and enhanced. 
NPF4 Policy 29a offers support to development proposals that contribute to the
viability, sustainability and diversity of rural communities and the local rural economy.
No information has been submitted with the application to suggest that the proposal
for a holiday let dwellinghouse on an otherwise uninhabited island would provide any
support to an existing rural community and its economy. 
With regard to NPF4 Policy 29c, development proposals in remote rural areas, where
new development can often help to sustain fragile communities, will be supported
where the proposal: 
i. will support local employment;
ii. supports and sustains existing communities, for example through
provision of digital infrastructure; and 
iii. is suitable in terms of location, access, siting, design and environmental
impact 
The proposed development would not relate to supporting local employment
opportunities and neither would it provide support to an existing community. As
previously outlined, the site is unsuitable for development in terms of location and
access due its isolated and undeveloped nature and its sensitivity to inappropriate
development that would fail to protect or conserve the important landscape
characteristics of the wider area. The proposed development would not therefore
adhere to the requirements of NPF4 Policy 29 as underpinned by Local Development
Plan Policies LDP 3, LDP 5, LDP 8 and LDP 9, and supplementary guidance SG
LDP BUS 5. 
NPF4 Policy 30 seeks to encourage, promote and facilitate sustainable tourism
development which benefits local people, is consistent with our net zero and nature
commitments, and inspires people to visit Scotland. 
The site the subject of the application is not in a location identified within the adopted
Local Development Plan as being appropriate for tourist facilities or accommodation,
and in this way fails to comply with the provisions of NPF4 Policy 30a. 
As stipulated by NPF4 Policy 30b, proposals for tourism related development must
take into account a number of factors, including the contribution made to the local
economy; compatibility with the surrounding area; impacts on communities;
opportunities for sustainable travel; accessibility for disabled people; measures taken
to minimise carbon emissions; and opportunities to provide access to the natural
environment. 
No information has been submitted with the application to suggest that the proposal
would be a diversification opportunity or such a related scheme to support the local
economy. The development would fail to be compatible with the surrounding area by
virtue of introducing significant built development that would lead to a significant
increase in activity level at an isolated and undeveloped location. Due to its isolated
Page 80

Page 81

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023
location, the development would present very limited opportunities in terms of
sustainable travel options and, as outlined within the representation received by the
Oban District Access Panel, adaptions would be required to take into account
accessibility for disabled people. 
The proposed development is not considered to represent an appropriately sited
tourism development. The proposal would fail to contribute to the community
economically, socially and culturally. In this way, the proposed development would
fail to meet the needs of the community, visitors and the environment, and would
therefore be contrary to NPF4 Policy 30 as underpinned by Local Development Plan
Policies LDP 3, LDP 5, LDP 8 and LDP 9, supplementary guidance SG LDP TOUR
1, and Policy 23 of the proposed Local Development Plan 2. 
Notwithstanding the above requirements of NPF4 Policy 30, the development of the
site with the erection of a dwellinghouse and associate services would represent an
inappropriate form of development within the Very Sensitive Countryside Zone
designation which would be detrimental to the character and appearance of the wider
landscape and contrary to the policies set out within the National Planning
Framework 4 and the adopted Local Development Plan and associated
supplementary guidance.   
There is sufficient alignment in the assessment of the proposal against both
provisions of the current Local Development Plan and the Proposed Local
Development Plan 2 (as modified) that a decision can be made under the current
development plan without giving rise to fundamental conflict with PLDP2 (as
modified). 
(Q) Is the proposal consistent with the Development Plan: ☐Yes ☒No 
(R) Reasons why Planning Permission or Planning Permission in Principle Should
be Granted: 
See reasons for refusal set out below. 
(S) Reasoned justification for a departure to the provisions of the Development
Plan 
N/A 
(T) Need for notification to Scottish Ministers or Historic Environment Scotland:
☐Yes ☒No 
Author of Report: Emma Shaw Date: 17.07.2023 
Reviewing Officer: Tim Williams Date: 18.07.2023 
Fergus Murray
Head of Development & Economic Growth 
Page 81

Page 82

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023
REASONS FOR REFUSAL OF PLANNING APPLICATION 22/02100/PP 
1. It is considered that the proposed development upon this small and uninhabited
island would be materially harmful to the landscape character and qualities of the
area, the importance of which is acknowledged by the designation of the site as part
of a wider National Scenic Area. The proposed development would be in direct
conflict with National Planning Policy NPF4 Policy 4. 
NPF4 Policy 4 c) states that development proposals that will affect a National Scenic
Area will only be supported where: 
i) The objectives of designation and the overall integrity of the area will not be
compromised; or 
ii) Any significant adverse effects on the qualities for which the area has been
designated are clearly outweighed by social, environmental or economic
benefits of national importance. 
In this case, it is the considered opinion of the planning authority that the proposed
development will be materially harmful to the designated qualities of the area and its
overall integrity and that this harm is not clearly outweighed by any social,
environmental or economic benefit, and certainly not of ‘national importance’. 
The proposed development is therefore considered to be in conflict with NPF4 Policy
4 as underpinned by Local Development Plan Policy LDP 3, supplementary
guidance SG LDP ENV 14, and Policies 04 and 70 of the proposed Local
Development Plan 2. 
2. Notwithstanding Reason 1 above, the proposed development on this greenfield site
conflicts with National Planning Policy NPF4 Policy 9. 
NPF4 Policy 9 b) states that proposals on greenfield sites will not be supported
unless the site has been allocated for development or the proposal is explicitly
supported in the LDP. 
In this case, the proposed development would constitute the introduction of a
significant built form onto an uninhabited and undeveloped small island, designated
as a ‘Very Sensitive Countryside Zone’ within the adopted Argyll and Bute Local
Development Plan 2015, and as a ‘Remote Countryside Area’ within the proposed
Argyll and Bute Local Development Plan 2. 
The proposed development site has no development allocation in either the current
or the proposed LDP. 
Adopted LDP Policies LDP STRAT 1 and LDP DM 1 give encouragement within the
Very Sensitive Countryside Zone only to specific categories of development on
appropriate sites. These comprise renewable energy related development;
telecommunication related development; and development which would directly
support agricultural, aquaculture, nature conservation or other established activity.
The proposed short-term holiday letting dwellinghouse would not relate to any of the
above categories of development. 
With regard to the proposed Local Development Plan 2, the application site is
located within the Remote Countryside Area. This development management zone
comprises countryside and isolated coast which has extremely limited capacity to
Page 82

Page 83

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023
successfully absorb development. Only limited categories of natural resource based
development is supported in these areas, limited to renewable energy related
development, telecommunications or other associated digital infrastructure, or
development directly supporting existing agricultural units, aquaculture, or other
recognised countryside activity. The proposed development would not relate to any
of these categories of development and in this regard would be contrary to Policy 02
of the proposed Local Development Plan 2. 
There is therefore no support for this type of development in this location within either
the adopted or proposed LDP and the development is therefore contrary to NPF4
Policy 9 as underpinned by LDP Policies LDP STRAT 1 and LDP DM 1 and LDP2
policy 02. 
Page 83

Page 84

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
APPENDIX TO DECISION REFUSAL NOTICE 
Appendix relative to application 22/02100/PP 
(A) Has the application been the subject of any “non-material”
amendment in terms of Section 32A of the Town and Country
Planning (Scotland) Act 1997 (as amended) to the initial
submitted plans during its processing:
☐Yes ☒No 
(B) The reason why planning permission has been approved: 
See reasons for refusal set out above. 
Page 84

Page 85

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
APPENDIX A – APPRORIATE ASSESSMENT RELATIVE TO APPLICATION
22/02100/PP 
APPROPRIATE ASSESSMENT BY ARGYLL AND BUTE COUNCIL 
THE CONSERVATION (NATURAL HABITATS AND C.) REGULATIONS 1994 AS
AMENDED 
ERECTION OF SHORT-TERM HOLIDAY LET ACCOMMODATION, OUTBUILDING AND
PONTOON AND INSTALLATION OF SEWAGE TREATMENT PLANT 
The application site is close to the Eileanan agus Sgeiran Lios mor Special Area of
Conservation, classified for its harbour seal population. 
As a result of this designation, NatureScot advised that, in their view, the proposal is likely to
have a significant effect on the harbour seal qualifying interests of the Special Area of
Conservation. 
As a consequence Argyll and Bute Council is required to carry out an Appropriate Assessment
in view of the sites conservation objectives for the sites qualifying species.   
This assessment is detailed below. 
Characteristics of the Development 
The proposal involves the erection of a dwellinghouse for short-term holiday letting purposes,
an outbuilding and a pontoon and a sewage treatment plant. 
Location of the Development 
The development site is located on Eilean Loch Oscair, a small uninhabited and undeveloped
island located approximately 250 metres off the northwest coast of Lismore within Loch
Linnhe. The application site comprises an area of land towards the southern end of the island,
extending from the west coast to the east coast of the island. The development is located
close to the Eileanan agus Sgeiran Lios mor Special Area of Conservation, classified for its
harbour seal population. 
An appraisal was undertaken by NatureScot which considered the impact of the proposals on
the following factors: population of the species as a viable component of the site; distribution
of the species within the site; the distribution and extent of habitats supporting the species;
the structure, function and supporting processes of habitats supporting the species; and no
significant disturbance of the species. 
NatureScot advise that there is likely that there would be some disturbance to the population
of harbour seals belonging to the Eileanan agus Sgeiran Lios mor Special Area of
Conservation are therefore the conclusion is that the proposal would have Likely Significant
Effects. The proposed mitigation measures relate to the carrying out of construction activities
out with the pupping season piling mitigation, and vessel management measures. A pre-
construction survey would be required to assess the seal activity in the area and to identify
the mitigation zone required. Based on the likely short time period for construction and the
Page 85

Page 86

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023
proposed mitigation measures, there would be no effect on the site integrity of the Special
Area of Conservation. 
It is therefore concluded that, were planning permission to be granted and subject to a an
appropriately worded condition to secure a pre-construction survey and to ensure the works
were carried out in accordance with the proposed mitigation, the proposed development would
not have a significant adverse impact upon the integrity of the Eileanan agus Sgeiran Lios mor
Special Area of Conservation. 
Emma Shaw
Planning Officer
Oban, Lorn and the Isles 
17.07.2023
Page 86

Page 87

Municipal Buildings Albany Street Oban PA34 4AW 
TOWN AND COUNTRY PLANNING (SCOTLAND) ACT 1997 (AS AMENDED)
TOWN AND COUNTRY PLANNING (DEVELOPMENT MANAGEMENT PROCEDURE)
(SCOTLAND) REGULATIONS 2013 
REFUSAL OF PLANNING PERMISSION 
REFERENCE NUMBER: 22/02100/PP 
Mr A MacGillivray
Houghton Planning Ltd
Alloa Business Centre  
Whins Road
Alloa
Clacks
Scotland
FK10 3RF 
I refer to your application dated 19th October 2022 for planning permission in respect of the
following development: 
Erection of short-term holiday let accommodation, outbuilding and pontoon and installation
of sewage treatment plant
AT:
Eilean Loch Oscair Off Isle Of Lismore Argyll And Bute   
Argyll and Bute Council in exercise of their powers under the above mentioned Act and
Regulations hereby refuse planning permission for the above development for the reasons(s)
contained in the attached appendix. 
Dated: 18 July 2023 
Fergus Murray
Head of Development and Economic Growth 
Page 87

Page 88

REASONS FOR REFUSAL RELATIVE TO APPLICATION NUMBER: 22/02100/PP 
1. It is considered that the proposed development upon this small and uninhabited island
would be materially harmful to the landscape character and qualities of the area, the
importance of which is acknowledged by the designation of the site as part of a wider
National Scenic Area. The proposed development would be in direct conflict with National
Planning Policy NPF4 Policy 4. 
NPF4 Policy 4 c) states that development proposals that will affect a National Scenic Area
will only be supported where: 
i) The objectives of designation and the overall integrity of the area will not be
compromised; or 
ii) Any significant adverse effects on the qualities for which the area has been
designated are clearly outweighed by social, environmental or economic benefits of
national importance. 
In this case, it is the considered opinion of the planning authority that the proposed
development will be materially harmful to the designated qualities of the area and its overall
integrity and that this harm is not clearly outweighed by any social, environmental or
economic benefit, and certainly not of ‘national importance’. 
The proposed development is therefore considered to be in conflict with NPF4 Policy 4 as
underpinned by Local Development Plan Policy LDP 3, supplementary guidance SG LDP
ENV 14, and Policies 04 and 70 of the proposed Local Development Plan 2. 
2. Notwithstanding Reason 1 above, the proposed development on this greenfield site
conflicts with National Planning Policy NPF4 Policy 9. 
NPF4 Policy 9 b) states that proposals on greenfield sites will not be supported unless the
site has been allocated for development or the proposal is explicitly supported in the LDP. 
In this case, the proposed development would constitute the introduction of a significant
built form onto an uninhabited and undeveloped small island, designated as a ‘Very
Sensitive Countryside Zone’ within the adopted Argyll and Bute Local Development Plan
2015, and as a ‘Remote Countryside Area’ within the proposed Argyll and Bute Local
Development Plan 2. 
The proposed development site has no development allocation in either the current or the
proposed LDP. 
Adopted LDP Policies LDP STRAT 1 and LDP DM 1 give encouragement within the Very
Sensitive Countryside Zone only to specific categories of development on appropriate sites.
These comprise renewable energy related development; telecommunication related
development; and development which would directly support agricultural, aquaculture,
nature conservation or other established activity. The proposed short-term holiday letting
dwellinghouse would not relate to any of the above categories of development. 
Page 88

Page 89

With regard to the proposed Local Development Plan 2, the application site is located within
the Remote Countryside Area. This development management zone comprises countryside
and isolated coast which has extremely limited capacity to successfully absorb
development. Only limited categories of natural resource based development is supported
in these areas, limited to renewable energy related development, telecommunications or
other associated digital infrastructure, or development directly supporting existing
agricultural units, aquaculture, or other recognised countryside activity. The proposed
development would not relate to any of these categories of development and in this regard
would be contrary to Policy 02 of the proposed Local Development Plan 2. 
There is therefore no support for this type of development in this location within either the
adopted or proposed LDP and the development is therefore contrary to NPF4 Policy 9 as
underpinned by LDP Policies LDP STRAT 1 and LDP DM 1 and LDP2 policy 02. 
Page 89

Page 90

NOTES TO APPLICANT (1) RELATIVE TO APPLICATION NUMBER 22/02100/PP 
1. If the applicant is aggrieved by the decision to refuse permission for or approval required by
a condition in respect of the proposed development, or to grant permission or approval
subject to conditions, the applicant may require the planning authority to review the case
under Section 43A of the Town and Country Planning (Scotland) Act 1997 (as amended)
within three months from the date of this notice. A Notice of Review request must be
submitted on an official form which can be obtained by contacting The Local Review Body,
Committee Services, Argyll and Bute Council, Kilmory, Lochgilphead, PA31 8RT or by
email to localreviewprocess@argyll-bute.gov.uk 
2. If permission to develop land is refused or granted subject to conditions and the owner of
the  land claims that the land has become incapable of reasonably beneficial use in its
existing state, and it cannot be rendered capable of reasonably beneficial use by the
carrying out of any development which has been or would be permitted, the owner of the
land may serve on the planning authority a purchase notice requiring the purchase of the
landowner’s interest in the land, in accordance with Part 5 of the Town and Country
Planning (Scotland) Act 1997 (as amended). 
Page 90

Page 91

APPENDIX TO DECISION REFUSAL NOTICE 
Appendix relative to application: 22/02100/PP 
A. Has the application been the subject of any “non-material” amendment in terms of
Section 32A of the Town and Country Planning (Scotland) Act 1997 (as amended) to
the initial submitted plans during its processing. 
Yes/No (delete as appropriate) if yes, list amendments 
B.  Is the proposal a departure from the Development Plan: 
No 
If yes, state level of departure: 
No Departure 
C.  Summary justification statement for refusal of planning permission 
The proposal is considered to be contrary to National Planning Framework 4 Policies 4, 9, 10, 14,
17, 29 and 30, and Policies LDP 3, LDP 4, LDP 5, LDP 8, LDP 9, LDP 10 and LDP 11 and
Supplementary Guidance SG LDP ENV 12, SG LDP ENV 14, SG LDP BUS 2, and SG LDP TOUR
1 of the Argyll and Bute Local Development Plan 2015, and there are no other material
considerations of sufficient significance to indicate that it would be appropriate to grant planning
permission in this instance as a departure to the Development Plan having regard to Section 25 of
the Act. 
Page 91

Page 92

This page is intentionally left blank

Page 93

Argyll and Bute Council
REFUSED by the PLANNING AUTHORITY
Relative to Application No:
22/02100/PP
Fergus Murray
Head of Development and Economic Growth
18 July 2023
Page 93

Page 94

Argyll and Bute Council
REFUSED by the PLANNING AUTHORITY
Relative to Application No:
22/02100/PP
Fergus Murray
Head of Development and Economic Growth
18 July 2023
Page 94

Page 95

Eilean Loch Oscair
by Lismore
Design Statement
June 2022 (Original at A3)
Argyll and Bute Council
REFUSED by the PLANNING AUTHORITY
Relative to Application No:
22/02100/PP
Fergus Murray
Head of Development and Economic Growth
18 July 2023
Page 95

Page 96

June 2022
Preamble
We are pleased to submit this design statement
in support of an application to create a unique
and beautiful holiday home on Eilean Loch
Oscair; a small island situated at the north-
western edge of Lismore, on Loch Linnhe.
Having visited the island, we were struck
by the beauty of the site, and by the unique
opportunity, and challenges, that the project
presents.
We hope that the strategies we’ve developed -
in relation to the site, the architectural scheme,
and the technical realisation of those ideas,
does justice to the stunning beauty of this
amazing place.
We recognise and accept a profound
responsibility to approach the site with a
determined sense of respect and care - and
hope that the proposals described here express
that very clearly.
Argyll and Bute Council
REFUSED by the PLANNING AUTHORITY
Relative to Application No:
22/02100/PP
Fergus Murray
Head of Development and Economic Growth
18 July 2023
Page 96

Page 97

June 2022
Project Introduction
Furthermore, we have been keen to relish and enjoy the architectural opportunity
this project presents.  So, while going through that process of research on the
technical issues described above we have also focused on human aspects – ideas
about how people could enjoy the unique opportunity that visiting this building, and
this island, would present.  In other words we also want this project to be excellent
so that the people who visit it find themselves in a building that is beautiful and
joyous, so they can sit and enjoy the views up and down Loch Linnhe, and soak in
the stunning nature of the place.
There has been research carried out in relation to flood risk, which has identified the
areas on the island where a building could be located, and we have worked within
those parameters.  As mentioned above, we have discussed our proposals in principle
with a leading marine logistics operator, to make sure that the dimensions of the
scheme we have proposed could be readily delivered to the site in prefabricated
parts, and assembled on the island.
Our initial ideas focused on a contemporary building within a traditional / vernacular
form – it was a one-and-a-half storey, pitched roof scheme dressed in contemporary
cladding, with large picture windows so that the views around Loch Linnhe could be
fully enjoyed.  We were pleased with the scheme to a large extent, but in reviewing
these proposals we wondered whether it could be possible to create something
that responded more directly to the landscape and topography of the island; a
building which would sit lower in to the landscape.
Page 20 of the Argyll & Bute ‘Small Scale Housing Development / Sustainable Design
Guidance’ discusses preferred approaches to the siting of buildings, and specifically
mentions the traditional way in which rural buildings are often “grounded within the
landscape” and “work with the contours for shelter”.  These notions basically capture
the critical idea which led to the revisions we made to our design.  We started looking
at options for a single storey, low-lying scheme whose roof would sit much more
closely to the horizon of the island.  Early moves involved breaking up the mass
of the building in to two ‘fingers’ – so that each block could enjoy the views and
benefit from natural light in a way that a building with a deeper plan might not.
The final move was to ‘crank’ the main element of the plan.  This move was based on
creating a sense that the building was hugging the landscape as closely as possible. 
We have proposed a pair of linear elements, linked in the middle, and with a small
outbuilding.
We hope that the design moves which have led to this final proposal mean that
the building will be a much less prominent – so that the architecture can “minimise
[it’s] impact on [the] landscape setting” (Page 24, Argyll & Bute ‘Small Scale Housing
Development / Sustainable Design Guidance’).
We have proposed no formal / structural landscaping as part of this proposal.  Our
idea is that the building would sit gently on the landscape, and would not seek to
permanently alter it.  Therefore we’ve made are no proposals for fencing, planting,
paths etc.  We have included a modest pontoon so small boats can land people on
the island, but that’s all.  We would want the building to make a ‘light touch’ on the
ground.  We would propose screw piles instead of traditional foundations, and as
mentioned above the building would be largely prefabricated off-site.  This means
that effectively in the future the building could be deconstructed / demounted and
Introduction
This application relates to the proposed installation of a high quality building to
create a three-bedroom holiday accommodation unit, on Eilean Loch Oscair.  Our
aspiration is to design a building of excellent quality, so as to justify it’s presence on
this very special site, and to make a positive contribution to the visual quality of the
island.
Eilean Loch Oscair is a small island, located at the north-western edge of Lismore
on Loch Linnhe.  We are acutely aware of the landscape character of this place, and
have gone through a rigorous process, continually seeking to refine the design, so
that the final proposal is a sensitive, sustainable, and beautiful building.
We have visited Eilean Loch Oscair, travelling by small boat down Loch Linnhe. 
We have walked the island, making sure that we understand the constraints and
opportunities that the site presents.  We have recorded in sketches, photographs
and a model, key observations across the island.  That analysis has been absolutely
critical in our design process; in fact, the desire to create a scheme which is
appropriate to the island has guided our architecture – which has evolved to reach
the design which is submitted in this application.
Design Process
Throughout the design process we have continually referred to the Argyll & Bute
‘Small Scale Housing Development / Sustainable Design Guidance’ publication.  We
have intertwined that with our own research on small-scale ‘off-grid’ sustainable
architecture, as well as technical research in to pre-fabrication (particularly in relation
to marine-based delivery to site of prefabricated components).  All of this work has
been really important to us – so that we can be confident in the credentials of our
proposal in relation to preservation of the existing landscape, long-term / whole-
life sustainability, construction logistics, and climate awareness.
Ref: Argyll & Bute Council: Small Scale Housing Development, Sustainable Design Guidance (2006)
Argyll and Bute Council
REFUSED by the PLANNING AUTHORITY
Relative to Application No:
22/02100/PP
Fergus Murray
Head of Development and Economic Growth
18 July 2023
Page 97

Page 98

June 2022
Project Introductionremoved in sections, then the screw piles could be removed or capped, so that the
building would leave no trace on the island.
Technical Considerations
The design is expected to be ‘off-grid’ – following much of the advice offered on
pages 32-35 of the A&B Sustainable Design Guidance.  We have anticipated that
grey-water would be reused (this is the main reasons the WCs are grouped together
in the plan), that composting toilets would be provided, and that an array of solar
pv would be used to generate electricity – with capacity for battery storage of
power and a small generator to back-up that supply.  We would also anticipate a
bore hole would be used to provide water, as is the case at other locations along
Loch Linnhe.
The weather was good when we visited the island, but we’ve spent lots of time on
the west coast, and are fully aware that this isn’t always the case.  The desire to shelter
the building was part of our thinking with the low-lying massing we’ve proposed,
but at the same time we want to allow people to really enjoy the sensational
views – which is the reason we’ve proposed large areas of picture-windows.  The
compromise we’ve proposed is that all of those large openings would have slatted
timber external shutters which could run over the openings during winter – offering
protection from the elements, but still allowing for views out and for light to come
in.
We have proposed that the building would be clad in high quality, sustainably
sourced timber cladding (as described in pages 44-45 of the A&B Sustainable
Design Guidance).  We feel that this material would create a natural harmony with
the landscape, and would look very attractive.
Summary
The following pages will summarise the design process we’ve followed, and will
highlight all of the ideas described in this text which have been critical to our
architectural thinking. 
We feel privileged to have been able to work on this project, and are keenly aware of
the quality of the site we’re working on.  We hope that our proposal is an appropriate
response to that context. 
We think the scheme could be an exemplar in low-impact, sensitive, contemporary
rural architecture – a sustainable building which is befitting of it’s beautiful
location.
Approaching Eilean Loch Oscair from the north on Loch Linnhe.
Alongside the southern edge of Eilean Loch Oscair.
Argyll and Bute Council
REFUSED by the PLANNING AUTHORITY
Relative to Application No:
22/02100/PP
Fergus Murray
Head of Development and Economic Growth
18 July 2023
Page 98

Page 99

June 2022
Location
The site is Eilean Loch Oscair, which is a small
island located at the north-western edge of
Lismore, on Loch Linnhe. 
Argyll and Bute Council
REFUSED by the PLANNING AUTHORITY
Relative to Application No:
22/02100/PP
Fergus Murray
Head of Development and Economic Growth
18 July 2023
Page 99

Page 100

June 2022
Site Analysis
Having visited the island we carried out a
detailed site analysis exercise.  This included
items such as climate, sun path, prevailing
winds, aspect and outlook and landscape
character.
Physical model of Eilean Loch Oscair (orig scale 1:1,000)
Argyll and Bute Council
REFUSED by the PLANNING AUTHORITY
Relative to Application No:
22/02100/PP
Fergus Murray
Head of Development and Economic Growth
18 July 2023
Page 100

Page 101

June 2022
Site Analysis
This is a selction of the photographs taken
around and on Eilean Loch Oscair during our
visit.  We have continually referred to these
images throughout the design process.
On our approach to the island, showing the slight hollowing on the horizon.
This is where the proposed building has been located; in an attempt to hug the contours of the land, and
respect the integrity of the broader horizon.
Eilean Loch Oscair.
Looking east, back over towards Lismore.
Where the island meets the water.
The site is tucked in to the hollow in the centre of the image, with the horizon of Lismore behind.
Looking south from the site.Looking north from the site.
Argyll and Bute Council
REFUSED by the PLANNING AUTHORITY
Relative to Application No:
22/02100/PP
Fergus Murray
Head of Development and Economic Growth
18 July 2023
Page 101

Page 102

June 2022
Preliminary Analysis / Sketch Design
These sketches illustrate some initial thoughts
on site design and architectural strategy for
our initial options.
Argyll and Bute Council
REFUSED by the PLANNING AUTHORITY
Relative to Application No:
22/02100/PP
Fergus Murray
Head of Development and Economic Growth
18 July 2023
Page 102

Page 103

June 2022
Preliminary Analysis / Sketch Design
Having prepared massing studies for that initial
option we elected to revise our architectural
strategy, in favour of a scheme with reduced
massing and scale, which would attempt to hug
the landscape and sit lower to the horizon.
Argyll and Bute Council
REFUSED by the PLANNING AUTHORITY
Relative to Application No:
22/02100/PP
Fergus Murray
Head of Development and Economic Growth
18 July 2023
Page 103

Page 104

June 2022
Developed Proposal
These sketches illustrate some of our thinking
as we tested options for a scheme that would
sit lower to the ground, attempting to hug the
contours of the land.
The lower sketch shows some of our thinking
in relation to technical and environmental
issues.Argyll and Bute Council
REFUSED by the PLANNING AUTHORITY
Relative to Application No:
22/02100/PP
Fergus Murray
Head of Development and Economic Growth
18 July 2023
Page 104

Page 105

June 2022
Developed Proposal
These diagrams formalise the architectural
steps we followed in trying to understand and
clarify the revised scheme; they identify the
ideas that have been particularly important to
the design.
We hope that these diagrams can clearly
explain the method and critical ideas we’ve
followed through the design process, all of
which has been in an effort to ensure that the
architecture is dynamic and exciting, while
constantly pushing to ensure our intervention
is appropriate and sensitive to the landscape.
The geometry of the building is arranged with
two main ‘blocks’, elevated slightly off the ground
in order to minimise the impact on the island’s
surface.
The middle section, connecting the two main
blocks is reduced in size in order to provide clear
visual separation, and to frame views, as well as
naturally guide the user in to the building.
The larger block is ‘cranked’ around a nearby
outcrop which helps the building sit better witin
it’s environment, minimise the impact on it, and
allows the internal arrangement to focus on
opening up to the best views to the north and
south.
The building is orientated in a way which best
utilises the breathtaking views all around,
including sea views to the south, and views on to
Lismore towards the east and north-east.  Large
window openings help bring light deep in to the
plan as well as connect the building users with the
environment directly from the key internal spaces.
The building is settled in to the landscape in
an understated way; barely protuding over the
horizon when seen from the water.  This diagram
reflects the view shown in the photograph of
Page 7 (top left).
Argyll and Bute Council
REFUSED by the PLANNING AUTHORITY
Relative to Application No:
22/02100/PP
Fergus Murray
Head of Development and Economic Growth
18 July 2023
Page 105

Page 106

June 2022
Developed Proposal
These diagrams seek to demonstrate the
relationships and qualities of the internal spaces
which are created in the building, and show
how these work in synergy with the broader
architectural preoccupations described in the
previous pages.
We feel that these are great spaces, which
make the most of the stunning situation of the
building.
Argyll and Bute Council
REFUSED by the PLANNING AUTHORITY
Relative to Application No:
22/02100/PP
Fergus Murray
Head of Development and Economic Growth
18 July 2023
Page 106

Page 107

June 2022
Developed Proposal
Illustrative renders of our proposal.
The central circulation space, which feels deliberately enclosed, which connects the main spaces. The view upon entering the main living and dining area - giving a clear glimpse of the sea.
Argyll and Bute Council
REFUSED by the PLANNING AUTHORITY
Relative to Application No:
22/02100/PP
Fergus Murray
Head of Development and Economic Growth
18 July 2023
Page 107

Page 108

June 2022
Developed Proposal
Illustrative renders of our proposal.
Throughout the design process we’ve been focussed on creating internal spaces which connect with the landscape beyond in a poised and considered manner.
Argyll and Bute Council
REFUSED by the PLANNING AUTHORITY
Relative to Application No:
22/02100/PP
Fergus Murray
Head of Development and Economic Growth
18 July 2023
Page 108

Page 109

June 2022
Developed Proposal
Illustrative renders of our proposal.
An illustrative view of the approach to the building, showing the principle which was described in the diagram on Page 11.
The proposed building, resting gently on the landscape of the island.
Argyll and Bute Council
REFUSED by the PLANNING AUTHORITY
Relative to Application No:
22/02100/PP
Fergus Murray
Head of Development and Economic Growth
18 July 2023
Page 109

Page 110

Design Statement (June 2022)
www.movingstillarchitecture.com
jamie@movingstillarchitecture.com
Argyll and Bute Council
REFUSED by the PLANNING AUTHORITY
Relative to Application No:
22/02100/PP
Fergus Murray
Head of Development and Economic Growth
18 July 2023
Page 110

Page 111

Argyll and Bute Council
REFUSED by the PLANNING AUTHORITY
Relative to Application No:
22/02100/PP
Fergus Murray
Head of Development and Economic Growth
18 July 2023
Page 111

Page 112

Argyll and Bute Council
REFUSED by the PLANNING AUTHORITY
Relative to Application No:
22/02100/PP
Fergus Murray
Head of Development and Economic Growth
18 July 2023
Page 112

Page 113

Argyll and Bute Council
REFUSED by the PLANNING AUTHORITY
Relative to Application No:
22/02100/PP
Fergus Murray
Head of Development and Economic Growth
18 July 2023
Page 113

Page 114

Argyll and Bute Council
REFUSED by the PLANNING AUTHORITY
Relative to Application No:
22/02100/PP
Fergus Murray
Head of Development and Economic Growth
18 July 2023
Page 114

Page 115

Argyll and Bute Council
REFUSED by the PLANNING AUTHORITY
Relative to Application No:
22/02100/PP
Fergus Murray
Head of Development and Economic Growth
18 July 2023
Page 115

Page 116

This page is intentionally left blank

Page 117

STATEMENT OF CASE 
FOR 
ARGYLL AND BUTE COUNCIL 
LOCAL REVIEW BODY 
23/0006/LRB 
REFUSAL OF PLANNING PERMISSION FOR
ERECTION OF SHORT-TERM HOLIDAY LET
ACCOMMODATION, OUTBUILDING AND PONTOON
AND INSTALLATION OF SEWAGE TREATMENT
PLANT – PLANNING APPLICATION REFERENCE
22/02100/PP 
EILEAN LOCH OSCAIR, ISLE OF LISMORE 
Page 117 Agenda Item 3b

Page 118

STATEMENT OF CASE 
The Planning Authority is Argyll and Bute Council (‘the Council’). The appellant is Mr A
MacGillivray (“the appellant”). 
Planning permission 22/02100/PP for the erection of short-term holiday let accommodation,
outbuilding and pontoon and installation of sewage treatment plant at Eilean Loch Oscair, Isle of
Lismore, Argyll and Bute (“the appeal site”) was refused by the Planning Service under delegated
powers on the 18th July 2023. 
This decision is the subject of referral to a Local Review Body. 
DESCRIPTION OF SITE 
The application site, Eilean Loch Oscair, is a small island located approximately 250 metres off
the northwest coast of Lismore within Loch Linnhe. The proposed development site comprises an
area of land towards the southern end of the island, extending from the west coast to the east
coast of the island. The application site, and the wider surroundings, form an uninhabited and
undeveloped island comprising rough grassland with a rocky foreshore. 
STATUTORY BASIS ON WHICH THE APPEAL SHOULD BE DECIDED 
Section 25 of the Town and Country Planning (Scotland) Act 1997 provides that where, in
making any determination under the Planning Act, regard is to be had to the development
plan, and all other material planning considerations and the determination shall be made in
accordance with the plan unless material considerations indicate otherwise. This is the test
for this application. 
STATEMENT OF CASE 
Argyll and Bute Council considers the determining issues in relation to the case are as follows: 
 Whether the proposed development is acceptable on a greenfield site within the ‘Very
Sensitive Countryside Zone’ where National Planning Framework 4 Policy 9(b) requires
development proposals on greenfield sites to be explicitly supported by policies in the
Local Development Plan, and where Local Development Plan Policies LDP STRAT 1 and
LDP DM 1 support only specific categories of development on appropriate sites, relating
to proposals for renewable energy, telecommunications, agriculture, aquaculture, or
nature conservation. 
 Notwithstanding the above, whether the development is considered to be materially
harmful to the landscape character and qualities of the area, the importance of which is
acknowledged by the designation of the site as part of a wider National Scenic Area and
is, therefore, contrary to National Planning Framework 4 Policy 4 as underpinned by Local
Development Plan Policies LDP 3 and LDP 9, supplementary guidance SG LDP ENV 14,
and Policies 04 and 70 of the proposed Local Development Plan 2.
Page 118

Page 119

The Report of Handing (Appendix A) sets out the Council’s full assessment of the application in
terms of these key determining issues and concludes that: 
Firstly, the proposal does not accord with NPF4 Policy 9 as underpinned by Local Development
Plan Policies LDP STRAT 1 and LDP DM 1 and Policy 02 of the proposed Local Development
Plan 2. The proposed development would be on a greenfield site within the ‘Very Sensitive
Countryside Zone’ as designated in the adopted Local Development Plan and within the ‘Remote
Countryside Area’ as designated in the proposed Local Development Plan 2, where support is
given to only specific categories of development on appropriate sites. These comprise renewable
energy related development; telecommunication related development; and development which
would directly support agricultural, aquaculture, nature conservation or other established activity.
The proposed short-term holiday letting dwellinghouse would not relate to any of the above
categories of development. 
Secondly, the proposed development would be sited on a small undeveloped and uninhabited
island and would be materially harmful to the landscape character and qualities of the area, the
importance of which is acknowledged by the designation of the site as part of a wider National
Scenic Area. The proposed development would be in direct conflict with National Planning
Framework Policy 4 which states that development proposals that will affect a National Scenic
Area will only be supported where the objectives of the designation and the overall integrity of the
area will not be compromised, or any significant adverse effects on the qualities for which the
area has been designated are clearly outweighed by social, environmental or economic benefits
of national importance. In this case, the scale, siting and nature of the proposed development will
be materially harmful to the designated qualities of the area and its overall integrity and this harm
is not clearly outweighed by any social, environmental or economic benefit, and certainly not of
‘national importance’. The proposed development is therefore in conflict with NPF4 Policy 4 as
underpinned by Local Development Plan Policies LDP 3 and LDP 9, supplementary guidance SG
LDP ENV 14, and Policies 04 and 70 of the proposed Local Development Plan 2. 
Furthermore, it is not considered that the highlighted unacceptable impacts of the proposed
development can be appropriately mitigated through the use of planning conditions. 
REQUIREMENT FOR ADDITIONAL INFORMATION AND A HEARING 
It is not considered that any additional information is required in light of the appellant’s submission. 
The issues raised were assessed in the Report of Handling which is contained in Appendix A.  As
such it is considered that Members have all the information they need to determine the case.
Given the above and that the proposal has no complex or challenging issues, and has not been
the subject of any significant public representation, it is not considered that a Hearing is required. 
COMMENT ON APPELLANT’S SUBMISSION 
The appellant’s Agent (“the Agent”) has submitted a supporting statement. The following
comments are made in relation to their submission: 
Page 119

Page 120

 The Agent states that ‘It is accepted that the development will have a visual impact on the
Lynn of Lorn National Scenic Area. However, that impact will be limited by virtue of the
position, design, and materials proposed, for the buildings’. 
Comment: The proposed development would introduce built development in an area of
undeveloped land, in an open and exposed location, and in this regard would undermine
the designation of the National Scenic Area, having an adverse effect on the integrity of
the area and failing to respect the undisturbed character and quality of the site and its
surroundings. The harm is clearly not outweighed by any social, environmental or
economic benefit, and certainly not of ‘national importance’, as required by NPF4 Policy
4. The development would be incompatible with and out of character in the context of the
undisturbed, undeveloped and unaltered application site. 
 The Agent states that ‘Furthermore, there is an economic benefit from adding a unique
holiday experience to the island supporting the Applicant and his croft whilst, if councillors
are impressed with the design, then this could be seen as being of ‘national importance’.’ 
Comment: The Applicant submitted no information to suggest that the proposed
development would relate to the diversification of an existing croft. The site does not
appear to be within a registered croft, as recorded on the Crofting Register. Additionally,
there has been no demonstration that the proposal would have any benefits to the wider
community or indeed the nation. In this regard, the proposal would further fail to meet the
requirements of NPF4 Policy 4 as underpinned by Local Development Plan Policies LDP
3 and LDP 9, supplementary guidance SG LDP ENV 14, and Policies 04 and 70 of the
proposed Local Development Plan 2.   
 The agent states that ‘It is accepted that the development does not fall within one of the
accepted categories under LDP Policies LDP STRAT 1 and LDP DM 1, and thus is at
odds with NPF4 Policy 9 b. It also fails to find favour under NPF4 Policy 10. However, this
is more than outweighed by the material considerations suggested above, notably the
exceptional quality of the design’. 
Comment: The development proposed is on a greenfield site and is located within the
‘Very Sensitive Countryside Zone’ as defined within the Local Development Plan, where
LDP Policies LDP STRAT 1 and LDP DM 1 give encouragement only to specific categories
of development on appropriate sites. These comprise renewable energy related
development; telecommunication related development; and development which would
directly support agricultural, aquaculture, nature conservation or other established activity.
The proposed short-term holiday letting dwellinghouse would not relate to any of the above
categories of development. There is no established activity on the undeveloped and
uninhabited island and no case has been presented to suggest otherwise. The design of
the proposed development would not be sufficient to override the key policies of NPF4
Policy 9 and LDP Policies LDP STRAT 1 and LDP DM 1, which set out to reduce the need
for greenfield development and set out the requirement for development proposals to
respect the surrounding environment. The site occupies a wild, remote and undeveloped
area valued for such qualities and the introduction of a significant form of built
development would be at complete odds with the existing nature of the site and would
Page 120

Page 121

undermine the key policies which seek to preserve, protect and maintain such sensitive
areas which have extremely limited capacity to successfully absorb development where
only limited categories of natural based development is supported in these areas. 
 The Agent seeks to highlight the provisions of NPF4 Policy 29, which seeks to encourage
rural economic activity, innovation and diversification. 
Comment: NPF4 Policy 29(a) offers support to development proposals that contribute to
the viability, sustainability and diversity of rural communities and the local rural economy.
The site is not linked to any existing community, settlement or other development and
there is no information to suggest that the proposal for a holiday let dwellinghouse on an
otherwise uninhabited island would provide any support to an existing rural community
and its economy. The site is isolated and disconnected such that there would be no
connection to the local community. Notwithstanding this, NPF4 Policy 29(c) requires
development proposals to be suitable in terms of location, access, siting, design and
environmental impact. In this instance, as previously outlined, the site is unsuitable for
development in terms of location and access due its isolated and undeveloped nature and
its sensitivity to inappropriate development that would fail to protect or conserve the
important landscape characteristics of the wider area. 
 The Agent also seeks to highlight the provisions of NPF4 Policy 30, which seeks to
encourage, promote and facilitate sustainable tourism development which benefits local
people, is consistent with our net zero and nature commitments, and inspires people to
visit Scotland. 
Comment: No supporting information was submitted to address the requirements of NPF4
Policy 30, however the site is not in a location identified within the adopted Local
Development Plan as being appropriate for tourist facilities or accommodation, and it
therefore fails to comply with the provisions of NPF4 Policy 30(a). No information has been
submitted with the application to suggest that the proposal would be a diversification
opportunity or would in any way support the local economy. The development would fail
to be compatible with the surrounding area by virtue of introducing significant built
development that would lead to a significant increase in activity level at an isolated,
undeveloped and sensitive location. As a result of the siting, the development would
present very limited opportunities in terms of sustainable travel options and, as outlined
within the representation received by the Oban District Access Panel, adaptions would be
required to take into account accessibility for disabled people. The proposed development
would not represent an appropriately sited tourism development. 
CONCLUSION 
Section 25 of the Town and Country Planning Act 1997 (as amended) requires that all decisions
be made in accordance with the development plan unless material considerations indicate
otherwise. 
Page 121

Page 122

In this case, as detailed in the Report of Handling appended to this submission, the development
does not represent an appropriate opportunity for the erection of a dwellinghouse for short-term
holiday let accommodation and associated outbuilding, pontoon and sewage treatment plant, and
there has been no sufficient or justifiable reason for the development to overcome the concerns
outlined above. The proposed development is therefore confirmed as being contrary to National
Planning Framework 4 Policies 4, 9, 10, 14, 17, 29 and 30, and Policies LDP 3, LDP 4, LDP 5,
LDP 8, LDP 9, LDP 10 and LDP 11 and Supplementary Guidance SG LDP ENV 12, SG LDP ENV
14, SG LDP BUS 2, and SG LDP TOUR 1 of the Argyll and Bute Local Development Plan 2015. 
Taking account of the above, it is respectfully submitted that the application for Review be
dismissed. 
Page 122

Page 123

APPENDIX A – REPORT OF HANDLING 
Argyll and Bute Council
Development & Economic Growth   
Planning Application Report and Report of Handling as required by Schedule 2 of the
Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013 relative to applications for Planning Permission or Planning
Permission in Principle 
Reference No: 22/02100/PP
Planning Hierarchy: Local Development 
Applicant: Mr A MacGillivray
Proposal: Erection of short-term holiday let accommodation, outbuilding and
pontoon and installation of sewage treatment plant
Site Address:  Eilean Loch Oscair, off Isle of Lismore    
DECISION ROUTE 
☒Delegated - Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997 
☐Committee - Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission
 Erection of short-term holiday let accommodation
 Erection of outbuilding
 Erection of pontoon
 Installation of sewage treatment plant
 Connection to private water supply 
(ii) Other specified operations
 None 
(B) RECOMMENDATION: 
Having due regard to the Development Plan and all other material considerations, it
is recommended that planning permission be refused for the reasons appended to
this report. 
(C) CONSULTATIONS:   
NatureScot
Page 123

Page 124

Letter dated 14.02.2023 objecting to the proposal until further information is provided.
Further response dated 18.05.2023, following the receipt of additional information
from the applicant, removing the holding objection. 
Scottish Environment Protection Agency
Letter dated 03.02.2023 advising of no objections subject to conditions. 
Environmental Health Service
Report dated 07.02.2023 advising of no objections to the application. Comment was
made regarding the requirement of the applicant to apply for a short-term let licence. 
Marine Scotland Licensing
No response at time of report and no request for an extension of time. 
The above represents a summary of the issues raised.  Full details of the consultation
responses are available to view via the Public Access section of the Council’s
website. 
(D) HISTORY:   
No relevant planning history. 
(E) PUBLICITY:   
The proposal has been advertised in terms of Regulation 20 procedures, overall
closing date 23.02.2023. 
(F) REPRESENTATIONS:   
(i) Representations received from: 
One email representation has been received from Lismore Community Council,
dated 01.02.2023, supporting the application. 
One email representation has been received from Oban District Access Panel, dated
27.01.2023, commenting on the application. 
Representations are published in full on the planning application file and are available
to view via the Public Access section of the Council’s website. 
(ii) Summary of issues raised: 
 Lismore Community Council support the proposed development as it
would be a useful facility and diversification for a working croft, helping
support the farming enterprise of a local family.   
Page 124

Page 125

Comment: Whilst the support for the application is noted, there has been
no information submitted to suggest that the proposed development
would relate to the diversification of an existing croft.   
 Oban District Access Panel (ODAP) outline that their remit is to
encourage developers and designers to create accessible buildings and
environments that provide disabled people with equal access and
facilities and enable them to participate and to thrive. 
In this respect the ODAP encourage the Applicant to consult with their
Architect with a view to adapting the proposed accommodation on
Inclusive Design principles to enable it to be used and enjoyed by a
disabled people. This would involve providing a ramped access,
facilitating wheelchair access, adapting the bathroom, and the widening
of the pontoon bridge. 
 The comments by the ODAP are noted and will be passed to the
Applicant for information/action should permission be granted. 
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Impact Assessment Report: ☐Yes ☒No  
(ii) An Appropriate Assessment under the
Conservation (Natural Habitats) Regulations
1994:   
☒Yes ☐No  
(iii) A Design or Design/Access statement:    ☒Yes ☐No 
A Design Statement has
been submitted with the
application. 
(iv) A report on the impact of the proposed
development eg. Retail impact, transport
impact, noise impact, flood risk, drainage
impact etc:  
☒Yes ☐No 
A Flood Risk
Assessment has been
submitted with the
application. 
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:   ☐Yes ☒No   
Page 125

Page 126

(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  ☐Yes ☒No    
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account
in assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy 
Sustainable Places
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
NPF4 Policy 5 – Soils
NPF4 Policy 9 – Brownfield, Vacant and Derelict Land and Empty Buildings (includes
provisions relevant to Greenfield Sites)
NPF4 Policy 10 – Coastal Development
NPF4 Policy 12 – Zero Waste
NPF4 Policy 13 – Sustainable Transport 
Liveable Places
NPF4 Policy 14 – Design, Quality and Place
NPF4 Policy 17 – Rural Homes
NPF4 Policy 18 – Infrastructure First
NPF4 Policy 22 – Flood Risk and Water Management 
Productive Places
NPF4 Policy 29 – Rural Development
NPF4 Policy 30 – Tourism 
‘Argyll and Bute Local Development Plan’ Adopted March 2015 
LDP STRAT 1 – Sustainable Development 
LDP DM 1 – Development within the Development Management Zones 
LDP 3 – Supporting the Protection Conservation and Enhancement of our
Environment
LDP 4 – Supporting the Sustainable Development of our Coastal Zone 
LDP 5 –Supporting the Sustainable Growth of our Economy 
LDP 8 – Supporting the Strength of our Communities 
LDP 9 – Development Setting, Layout and Design 
LDP 10 – Maximising our Resources and Reducing our Consumption 
LDP 11 – Improving our Connectivity and Infrastructure 
Page 126

Page 127

‘Supplementary Guidance to the Argyll and Bute Local Plan 2015’ (Adopted
March 2016 & December 2016) 
Natural Environment 
SG LDP ENV 1 – Impact on Habitats, Species and our Biodiversity
SG LDP ENV 2 – Impact on European Sites
SG LDP ENV 11 – Protection of Soil and Peat Resources 
Landscape and Design 
SG LDP ENV 12 – Impact on National Scenic Areas (NSAs)
SG LDP ENV 14 – Landscape 
Support for Business & Industry: General 
SG LDP BUS 2 – Business & Industry Proposals in the Countryside Zones 
Support for Business & Industry: Main Potential Growth Sector: Tourism 
SG LDP TOUR 1 – Tourist Facilities and Accommodation, including Static and
Touring Caravans 
Sustainable Siting and Design 
SG LDP Sustainable – Sustainable Siting and Design Principles 
Resources and Consumption 
SG LDP SERV 1 – Private Sewage Treatment Plants & Wastewater Systems
SG LDP SERV 2 – Incorporation of Natural Features / SuDS
SG LDP SERV 5(b) – Provision of Waste Storage & Collection Facilities within New
Development
SG LDP SERV 6 – Private Water Supplies and Water Conservation
SG LDP SERV 9 – Safeguarding Better Quality Agricultural Land 
Addressing Climate Change 
SG LDP SERV 7 – Flooding and Land Erosion – Risk Framework 
Transport (Including Core Paths) 
SG LDP TRAN 1 – Access to the Outdoors
SG LDP TRAN 2 – Development and Public Transport Accessibility
SG LDP TRAN 3 – Special Needs Access Provision
SG LDP TRAN 4 – New & Existing, Public Roads & Private Access Regimes
SG LDP TRAN 6 – Vehicle Parking Provision 
Coastal Development 
SG LDP CST 1 – Coastal Development
Page 127

Page 128

(ii)  List of all other material planning considerations taken into account in
the assessment of the application, having due regard to Annex A of
Circular 3/2013. 
 Third Party Representations
 Consultation Reponses
 Argyll and Bute Sustainable Design Guidance, 2006
 ABC Technical Note – Biodiversity (Feb 2017) 
Argyll and Bute proposed Local Development Plan 2 (November 2019) – The
Examination by Scottish Government Reporters to the Argyll and Bute Local
Development Plan 2 has now concluded and the Examination Report has been
published (13th June 2023). The Examination Report is a material consideration of
significant weight and may be used as such until the conclusion of the LDP2
Adoption Process. Consequently, the Proposed Local Development Plan 2 as
recommended to be modified by the Examination Report and the published Non
Notifiable Modifications is a material consideration in the determination of all
planning and related applications. 
Spatial and Settlement Strategy 
Policy 02 – Outwith Settlement Areas
Policy 04 – Sustainable Development 
High Quality Places 
Policy 05 – Design and Placemaking
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 10 – Design – All Development 
Diverse and Sustainable Economy 
Policy 23 – Tourism Development, Accommodation, Infrastructure and Facilities 
Sustainable Communities 
Policy 55 – Flooding
Policy 58 – Private Water Supplies and Water Conservation
Policy 60 – Private Sewage Treatment Plants and Wastewater Drainage Systems
Policy 61 – Sustainable Urban Drainage Systems (SUDS)
Policy 63 – Waste Related Development and Waste Management 
High Quality Environment 
Policy 70 – Development Impact on National Scenic Areas (NSA’s)
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 74 – Development Impact of Sites International and National Importance
Policy 79 – Protection of Soil and Peat Resources
Page 128

Page 129

Policy 83 – Safeguarding Agricultural and Croft Land 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment:  ☐Yes ☒No    
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  ☐Yes ☒No 
(M) Has a Sustainability Checklist been submitted:  ☐Yes ☒No 
(N) Does the Council have an interest in the site:  ☐Yes ☒No 
(O) Requirement for a pre-determination hearing: ☐Yes ☒No    
(P)(i) Key Constraints/Designations Affected by the Development:
 Lynn of Lorn National Scenic Area
 SEPA Coastal Flood Risk Zone
 Eileanan agus Sgeiran Lios mor Special Area of Conservation 
(P)(ii) Soils
Agricultural Land Classification:  Unclassified Land
Peatland/Carbon Rich Soils Classification: ☐Class 1
☐Class 2
☐Class 3
☒N/A
Peat Depth Classification: N/A  
Does the development relate to croft land? ☐Yes ☒No
Would the development restrict access to croft
or better quality agricultural land?
☐Yes ☐No ☒N/A
Would the development result in
fragmentation of croft / better quality
agricultural land?
☐Yes ☐No ☒N/A 
(P)(iii) Woodland  
Will the proposal result in loss of
trees/woodland? 
☐Yes
☒No 
Does the proposal include any replacement or
compensatory planting?
☐Yes
☐No details to be secured by condition
☒N/A
Page 129

Page 130

(P)(iv) Land Status / LDP Settlement Strategy
Status of Land within the Application  ☐Brownfield
☐Brownfield Reclaimed by Nature
☒Greenfield 
ABC LDP 2015 Settlement Strategy 
LDP DM 1 
☐Main Town Settlement Area
☐Key Rural Settlement Area
☐Village/Minor Settlement Area
☐Rural Opportunity Area
☐Countryside Zone
☒Very Sensitive Countryside Zone
☐Greenbelt
ABC pLDP2 Settlement Strategy 
☐Settlement Area
☐Countryside Area
☒Remote Countryside Area
☐Helensburgh & Lomond Greenbelt
ABC LDP 2015 Allocations/PDAs/AFAs
etc: 
N/A
ABC pLDP2 Allocations/PDAs/AFAs
etc: 
N/A 
(P)(v) Summary assessment and summary of determining issues and material
considerations 
This application seeks planning permission for the erection of a detached
dwellinghouse for short-term holiday letting purposes, an associated outbuilding and
pontoon, and the installation of a sewage treatment plant, at the site of Eilean Loch
Oscair, off the Isle of Lismore. 
The application site, Eilean Loch Oscair, is a small island located approximately 250
metres off the northwest coast of Lismore within Loch Linnhe. The application site
comprises an area of land towards the southern end of the island, extending from
the west coast to the east coast of the island. The application site, and the wider
surroundings, form an uninhabited and undeveloped island comprising rough
grassland with a rocky foreshore. 
This application seeks planning permission for the erection of a dwellinghouse for
short-term holiday letting purposes, and an associated outbuilding and pontoon. The
proposed dwellinghouse would be set back from the coast, sited relatively centrally
within the plot. The dwelling would be single storey and would be formed of three
main blocks; a narrow linear block at the rear would facilitate two bedrooms which
would be connected to a circulation block which would facilitate the access within the
dwelling and would connect to the larger living and dining block which would be set
at an angle around an adjacent rocky outcrop. The total external footprint of the
dwellinghouse would be approximately 188 square metres. The flat roof of the
dwelling would predominantly have a height of 3.2 metres, with the circulation block
being set slightly lower than this at a height of 3 metres. The dwelling would include
contemporary glazing arrangements within each elevation which would feature
Page 130

Page 131

timber shutters. The facing material of the dwellinghouse would comprise vertically
aligned natural timber cladding. 
The proposed outbuilding would be sited immediately adjacent to the proposed
dwellinghouse and would comprise a rectangular building covering a footprint of
approximately 7.3 square metres. The building would be similar in design to the
dwelling, having a flat roof at a height of 3.2 metres and clad in vertically aligned
timber. 
The proposed pontoon would be sited at the eastern shore of the island, extending
approximately 38 metres from the shoreline to provide the access to the island and
the application site. 
NPF4 Policy 1 seeks to prioritise the climate and nature crises in all decisions; it
requires to be applied together with other policies in NPF4. Guidance from the
Scottish Government advises that it is for the decision maker to determine whether
the significant weight to be applied tips the balance in favour for, or against a
proposal on the basis of its positive or negative contribution to climate and nature
crises.   
NPF4 Policy 2 seeks to ensure that new development proposals will be sited to
minimise lifecycle greenhouse gas emissions as far as possible, and that proposals
will be sited and designed to adapt to current and future risks from climate change.
Guidance from the Scottish Government confirms that at present there is no single
accepted methodology for calculating and / or minimising emissions. The emphasis
is on minimising emissions as far as possible, rather than eliminating emissions. It is
noted that the provisions of the Settlement Strategy set out within Policy LDP DM 1
of the LDP promotes sustainable levels of growth by steering significant development
to our Main Towns and Settlements, rural growth is supported through identification
of Key Rural Settlements and safeguards more sensitive and vulnerable areas within
its various countryside designations. 
NPF4 Policy 3 seeks to protect biodiversity, reverse biodiversity loss and deliver
positive effects from development and strengthen nature networks. 
The application site is located within close proximity to the Eileanan agus Sgeiran
Lios mor Special Area of Conservation, protected for its harbour seals. As a result of
the designation, comments were sought from NatureScot who, after the submission
of additional information from the applicant, advised that the proposal is likely to have
a significant effect on the harbour seal qualifying interests of the Special Area of
Conservation. However, the response from NatureScot concluded that whilst there
are natural heritage interest of international importance at the site, their advice is that
these would not be adversely affected. The status of the site means that the
requirements of the Conservation (Natural Habitats, &c.) Regulations 1994 as
amended (the “Habitats Regulations”) apply. Consequently NatureScot advised that
the Council is required to consider the effect of the proposal on the Special Area of
Conservation. NatureScot advised that, in their view, the proposal is likely to have a
significant effect on the harbour seal qualifying interests and accordingly, the
Council, as competent Authority, is required to carry out an Appropriate Assessment
(AA) in view of the site’s conservation objectives for its qualifying interests. 
Page 131

Page 132

An Appropriate Assessment has been undertaken which identifies that, subject to
conditions being imposed were planning permission to be granted, to ensure that the 
development would be undertaken in accordance with the mitigation set out within
Environmental Statement accompanying the application, any disturbance would be
minimised. Based on the likely short time period for construction, and the proposed
mitigation measures, there would be no adverse effect on the integrity of the Special
Area of Conservation. 
Whilst no specific proposals for biodiversity improvements have been submitted it is
considered that adequate and proportionate measures for biodiversity enhancement
and protection could be delivered by planning condition in the event that planning
permission were to be granted. The proposed development is therefore considered
to be in compliance with NPF4 Policy 3 as underpinned by LDP Policy LDP 3,
supplementary guidance SG LDP ENV 1, and Policies 73 and 74 of the proposed
Local Development Plan 2. 
NPF4 Policy 4 seeks to protect, restore and enhance natural assets making best
use of nature-based solutions. 
The site lies within the Lynn of Lorn National Scenic Area. The Lynn of Lorn is an
island-studded waterway at the confluence of the Sound of Mull with Loch Etive and
Loch Linnhe, from which it is separated by the island of Lismore. The Lynn follows
the north-westerly alignment of the prevailing relief in the area, which, set in the wider
context of sea lochs and mountains, is a small scale region of parallel limestone
ridges. The proposed development would introduce built development in an area of
undeveloped land, in an open and exposed location, and would therefore disturb the
unsettled character of the landscape and have an adverse effect on the integrity of
the area. In this regard, the development would fail to respect the existing character
and quality of the site and its surroundings. 
NPF Policy 4 c) states that development proposals that will affect a National Scenic
Area will only be supported where: 
i. The objectives of designation and the overall integrity of the area will not
be compromised; or
ii. Any significant adverse effects on the qualities for which the area has
been designated are clearly outweighed by social, environmental or
economic benefits of national importance. 
In this case, it is the considered opinion of the planning authority that the proposed
development will be materially harmful to the designated qualities of the area and its
overall integrity and that this harm is not clearly outweighed by any social,
environmental or economic benefit, and certainly not of ‘national importance’. 
The proposed development is therefore considered to be in conflict with NPF4 Policy
4 as underpinned by Local Development Plan Policy LDP 3, supplementary guidance
SG LDP ENV 14, and Policies 04 and 70 of the proposed Local Development Plan
2.   
NPF4 Policy 5 seeks to protect carbon-rich soils, to restore peatlands and to
minimise disturbance to soils from development.
Page 132

Page 133

The development proposed by the current planning application seeks to develop an
area of rough ground. The site has no agricultural land classification and is not within
an identified area of peatland, carbon-rich soils or priority peatland habitat. The
development proposed is therefore considered to be in accordance with NPF4 Policy
5 as underpinned by Local Development Plan Policy LDP 3, supplementary guidance
SG LDP ENV 11 and SG LDP SERV 9, and Policies 79 and 83 of the proposed Local
Development Plan 2. 
NPF4 Policy 9 seeks to encourage, promote and facilitate the reuse of brownfield,
vacant and derelict land and empty buildings, and to help reduce the need for
greenfield development. 
The development proposed by this planning application is on a greenfield site. The
site is located within the Very Sensitive Countryside Zone as defined within the Local
Development Plan, where LDP Policies LDP STRAT 1 and LDP DM 1 give
encouragement only to specific categories of development on appropriate sites.
These comprise renewable energy related development; telecommunication related
development; and development which would directly support agricultural,
aquaculture, nature conservation or other established activity. The proposed short-
term holiday letting dwellinghouse would not relate to any of the above categories of
development. There is no established activity on the undeveloped and uninhabited
island and no case has been presented to suggest otherwise. 
The proposed development, on a greenfield site, would therefore be contrary to
NPF4 Policy 9b, which requires development proposals on greenfield sites to be
explicitly supported by policies in the Local Development Plan. The development
would thereby fail to achieve the policy outcome aims which require development to
be sited within an appropriate location to maximise the use of existing assets and
minimise additional land take. 
With regard to the proposed Local Development Plan 2, the application site is located
within the Remote Countryside. This development management zone comprises
countryside and isolated coast which has extremely limited capacity to successfully
absorb development. Only limited categories of natural resource based development
is supported in these areas, limited to renewable energy related development,
telecommunications or other associated digital infrastructure, or development directly
supporting existing agricultural units, aquaculture, or other recognised countryside
activity. The proposed development would not relate to any of these categories of
development and in this regard would be contrary to Policy 02 of the proposed Local
Development Plan 2. 
NPF4 Policy 10 seeks to protect coastal communities and assets and support
resilience to the impacts of climate change. 
The proposed development is considered to be a form of coastal development by
virtue of the development relying on the use of the coast to access and facilitate the
development. NPF4 Policy 10b states that development proposals in undeveloped
coastal areas will only be supported where they: 
Page 133

Page 134

i. are necessary to support the blue economy, net zero emissions or to
contribute to the economy or wellbeing of communities whose livelihood
depend on marine or coastal activities, or is for essential infrastructure,
where there is a specific locational need and no other suitable site;
ii. do not result in the need for further coastal protection measures taking
into account future sea level change; or increase the risk to people of
coastal flooding or coastal erosion, including through the loss of natural
coastal defences including dune systems; and
iii. are anticipated to be supportable in the long-term, taking into account
projected climate change; or 
iv. are designed to have a very short lifespan 
The proposed development would fail to meet the above criteria as it would not relate
to support of the blue economy or achieving net zero emissions, and neither would
the development contribute to the economy or wellbeing of a community dependent
on marine or coastal activities. Additionally, the development does not relate to the
provision of essential infrastructure. 
The isolated nature of the coastline within this area, designated as Very Sensitive
Countryside Zone, is unable to successfully absorb the proposed development. The
scale of the development, comprising a dwellinghouse with a large footprint, and the
associated outbuilding and pontoon would be of a scale that is inappropriate to the
characteristics of the undeveloped and isolated location and would therefore fail to
safeguard areas identified as being sensitive and vulnerable to development
impacts.   
The proposed development would therefore represent an unsustainable form of
coastal development that would conflict with the requirements of NPF4 Policy 10 as
underpinned by Local Development Plan Policies LDP DM1, LDP 8 and LDP 10, and
supplementary guidance SG LDP CST 1. 
NPF4 Policy 12 seeks to encourage, promote and facilitate development that is
consistent with the waste hierarchy as defined within the policy document. 
The development the subject of this planning application seeks permission for the
erection of a dwellinghouse for short-term letting purposes. This is a development
likely to generate waste when operational. Whilst no details have been provided
regarding the proposed management of waste from the site, such details could be
secured via condition in the event that planning permission were to be granted. In
this regard, the proposed development is considered to be in compliance with NPF
4 Policy 12(c) as underpinned by LDP Policy LDP 10, supplementary guidance SG
LDP SERV 5(b), and Policy 63 of the proposed Local Development Plan 2. 
NPF4 Policy 13 seeks to encourage, promote and facilitate developments that
prioritise walking, wheeling, cycling and public transport for everyday travel and
reduce the need to travel unsustainably. 
This policy aims to provide more opportunities for improved and more inclusive active
and sustainable travel opportunities whilst ensuring that developments are in
locations which support sustainable travel. 
Page 134

Page 135

Due to the isolated and remote location of the site, access would be required to be
by boat, assisted by the proposed pontoon. This small scale development is not
considered to be a significant travel generating use or a proposal where it is
considered important to monitor travel patterns resulting from the development. 
Notwithstanding the small scale nature of the development, it is not considered that
the proposal adequately addresses the requirements of NPF4 Policy 13b, which
requires development proposals to demonstrate consideration of the transport
requirements generated and their adherence to sustainable travel and investment
hierarchies. There would be no direct or easy access to the site via sustainable
transport methods or public transport and no apparent consideration has been given
to the transport needs of different user groups, such as those with limited mobility.
Whilst the development would be small scale and access to the site could be
facilitated, it is not considered that the proposal would adhere to the requirements of
NPF4 Policy 13, which specifically requires development to be in a location that
supports sustainable travel. 
NPF4 Policy 14 seeks to encourage, promote and facilitate well designed
development that makes successful places by taking a design-led approach and
applying the ‘Place Principle’. 
NPF4 Policy 14c states that development proposals that are poorly designed,
detrimental to the amenity of the surrounding area or inconsistent with the six
qualities of successful place will not be supported. Whilst it is acknowledged that the
design of the dwelling has been given significant consideration, the siting of the
development within the exposed and sensitive landscape would fail to adhere to the
requirements of NPF4 Policy 14 by virtue of being inappropriately sited. The
development would not be well connected to any existing established settlement,
development or infrastructure, nor would the development safeguard the isolated and
undeveloped nature of the immediate and wider landscape surroundings. 
New development in this location would not be cohesive with the landscape or
settlement pattern and would not integrate with the character of the surrounding area.
The introduction of built development to an undeveloped island is considered
inappropriate and the development would have a significant adverse impact upon
the setting, and would unacceptably alter the character and appearance of the
surrounding landscape and seascape.   
In addition to the above, however, it is important to note that the impact of the
proposed development upon the landscape and character of the surrounding area is
not the sole determining factor in the consideration of this application. Regardless of
any interpretation of the impact of the proposed development upon the landscape,
the development does not meet the fundamental key planning policy test for the
Council’s established and adopted settlement strategy for the planned growth of
Argyll and Bute as set out within Policy LDP DM 1. Neither, therefore, does the
proposed development accord with the sustainable development aims of the Council
as established within adopted key planning Policy LDP STRAT 1 which underpins
NPF4 Policy 14. 
The proposed development fails to pay regard to the wider surroundings of the site
in terms of infrastructure, land uses, available facilities, connectivity, the existing
Page 135

Page 136

character, scale and density, and views. The site is isolated and the proposed
development would be incompatible with the existing character of the area, and is
therefore contrary to Policies 05, 08, 09 and 10 of the proposed Local Development
Plan 2. 
NPF4 Policy 17 seeks to encourage, promote and facilitate the delivery of more high
quality, affordable and sustainable rural homes in the right locations. 
The development the subject of this planning application is located within a defined
‘remote rural area’ where Policy 17(c) offers support only where such proposals: 
i. Support and sustain existing fragile communities;
ii. Support identified local housing outcomes; and
iii. Are suitable in terms of location, access and environmental impact. 
The proposed development seeks consent for a dwellinghouse for use for short-term
holiday letting purposes. The proposed development would not therefore offer an
opportunity for occupation by persons within the local community. No supporting
evidence has been submitted to suggest that the development proposed would
provide support to an established fragile community. In addition, as outlined above,
the siting of the development is considered unsustainable due to its inaccessibility
and impact upon the sensitive and vulnerable isolated landscape and seascape. The
proposed development would therefore be contrary to the aims of NPF4 Policy 17 as
underpinned by Local Development Plan Policy LDP DM 1. 
NPF4 Policy 18 seeks to encourage, promote and facilitate an infrastructure first
approach to land use planning. 
The development the subject of this planning application proposes a private drainage
system comprising a sewage treatment plant, with water supply via connection to a
private water supply. The Council’s Building Standards Service would apply suitable
control over the detailed arrangements of the proposed sewage treatment plant at
Building Warrant stage in the event that planning permission were to be granted. 
The proposed water and drainage infrastructure to serve the proposed development
is considered to be consistent with the broad aims of NPF4 Policy 18 as underpinned
by LDP Policy LDP 11, supplementary guidance SG LDP SERV 1, and Policy 60 of
the proposed Local Development Plan 2. 
NPF4 Policy 22 seeks to strengthen resilience to flood risk and to ensure that water
resources are used efficiently and sustainably. 
The development the subject of this planning application proposes connection to a
private water supply. In the event that planning permission were to be granted, a
condition would be required to secure an appraisal of the wholesomeness and
sufficiency of the intended water supply. 
The application site is situated adjacent to the coastal functional floodplain, as
indicated on the SEPA Flood Maps. Given the proposed siting for the development
on a small undeveloped island, the proposed development falls within the Most
Vulnerable land use class. SEPA have been consulted on the application and have
Page 136

Page 137

stated that, based upon the Flood Risk Assessment submitted with the application,
there are no objections subject to a condition relating to development being sited
above 5.8mAOD. Should planning permission be granted and the relevant condition
attached, the proposed development would be complaint with NPF4 Policy 22 as
underpinned by Local Development Plan Policies LDP 10 and LDP 11,
supplementary guidance SG LDP SERV 7, and Policies 55 and 58 of the proposed
Local Development Plan 2. 
NPF4 Policy 29 seeks to encourage rural economic activity, innovation and
diversification whilst ensuring that the distinctive character of the rural area and the
service function of small towns, natural assets and cultural heritage are safeguarded
and enhanced. 
NPF4 Policy 29a offers support to development proposals that contribute to the
viability, sustainability and diversity of rural communities and the local rural economy.
No information has been submitted with the application to suggest that the proposal
for a holiday let dwellinghouse on an otherwise uninhabited island would provide any
support to an existing rural community and its economy. 
With regard to NPF4 Policy 29c, development proposals in remote rural areas, where
new development can often help to sustain fragile communities, will be supported
where the proposal: 
i. will support local employment;
ii. supports and sustains existing communities, for example through
provision of digital infrastructure; and 
iii. is suitable in terms of location, access, siting, design and environmental
impact 
The proposed development would not relate to supporting local employment
opportunities and neither would it provide support to an existing community. As
previously outlined, the site is unsuitable for development in terms of location and
access due its isolated and undeveloped nature and its sensitivity to inappropriate
development that would fail to protect or conserve the important landscape
characteristics of the wider area. The proposed development would not therefore
adhere to the requirements of NPF4 Policy 29 as underpinned by Local Development
Plan Policies LDP 3, LDP 5, LDP 8 and LDP 9, and supplementary guidance SG
LDP BUS 5. 
NPF4 Policy 30 seeks to encourage, promote and facilitate sustainable tourism
development which benefits local people, is consistent with our net zero and nature
commitments, and inspires people to visit Scotland. 
The site the subject of the application is not in a location identified within the adopted
Local Development Plan as being appropriate for tourist facilities or accommodation,
and in this way fails to comply with the provisions of NPF4 Policy 30a. 
As stipulated by NPF4 Policy 30b, proposals for tourism related development must
take into account a number of factors, including the contribution made to the local
economy; compatibility with the surrounding area; impacts on communities;
opportunities for sustainable travel; accessibility for disabled people; measures taken
Page 137

Page 138

to minimise carbon emissions; and opportunities to provide access to the natural
environment. 
No information has been submitted with the application to suggest that the proposal
would be a diversification opportunity or such a related scheme to support the local
economy. The development would fail to be compatible with the surrounding area by
virtue of introducing significant built development that would lead to a significant
increase in activity level at an isolated and undeveloped location. Due to its isolated
location, the development would present very limited opportunities in terms of
sustainable travel options and, as outlined within the representation received by the
Oban District Access Panel, adaptions would be required to take into account
accessibility for disabled people. 
The proposed development is not considered to represent an appropriately sited
tourism development. The proposal would fail to contribute to the community
economically, socially and culturally. In this way, the proposed development would
fail to meet the needs of the community, visitors and the environment, and would
therefore be contrary to NPF4 Policy 30 as underpinned by Local Development Plan
Policies LDP 3, LDP 5, LDP 8 and LDP 9, supplementary guidance SG LDP TOUR
1, and Policy 23 of the proposed Local Development Plan 2. 
Notwithstanding the above requirements of NPF4 Policy 30, the development of the
site with the erection of a dwellinghouse and associate services would represent an
inappropriate form of development within the Very Sensitive Countryside Zone
designation which would be detrimental to the character and appearance of the wider
landscape and contrary to the policies set out within the National Planning
Framework 4 and the adopted Local Development Plan and associated
supplementary guidance.   
There is sufficient alignment in the assessment of the proposal against both
provisions of the current Local Development Plan and the Proposed Local
Development Plan 2 (as modified) that a decision can be made under the current
development plan without giving rise to fundamental conflict with PLDP2 (as
modified). 
(Q) Is the proposal consistent with the Development Plan: ☐Yes ☒No 
(R) Reasons why Planning Permission or Planning Permission in Principle Should
be Granted: 
See reasons for refusal set out below. 
(S) Reasoned justification for a departure to the provisions of the Development
Plan 
N/A 
Page 138

Page 139

(T) Need for notification to Scottish Ministers or Historic Environment Scotland:
☐Yes ☒No 
Author of Report: Emma Shaw Date: 17.07.2023 
Reviewing Officer: Tim Williams Date: 18.07.2023 
Page 139

Page 140

This page is intentionally left blank

Page 141

Page 141

Page 142

This page is intentionally left blank

Page 143

Received from Oban Access Panel on 29 August 2023 
Good Morning, 
Thank you for notifying the Access Panel that this planning application, which
was refused on policy grounds, is now the subject of a Notice of Review. 
The Panel is appreciative that the Case Officer took cognisance in her report of
the potential difficulties of transport to the island, including boarding and
disembarking from a small boat. We had recognised this issue, but, had
concluded that, if a wheelchair user or other visitor with mobility difficulties was
holidaying on the island, special arrangements would be made for transport. 
We support the provisions of the Scottish Government's NPF4 Policy 30v that
proposals for tourism related developments should take into account accessibility
for disabled people. In addition, Quality 1 of the 6 "Qualities of Successful
Places"  in Annex D of the NPF4 advises that developments should be designed
having regard to "accessibility and inclusion for everyone regardless of gender,
sexual orientation, age, ability and culture" 
Ken Johnston
Access Auditor
Oban District Access Panel 
Page 143

Page 144

This page is intentionally left blank

Page 145

LOCAL REVIEW STATEMENT  - ADDENDUM
Reference No: 22/02100/PP 
Applicant: Mr A McGillivray 
Proposal: Erection of short-term holiday let accommodation, outbuilding and pontoon and
installation of sewage treatment plant 
Site Address: Eilean Loch Oscair, off Isle of Lismore 
Eilean Oscair is a working croft, owned by a Liosach farmer/crofter whose family have lived and
farmed on Lismore for generations. The croft is part of a farming enterprise on Lismore that
produces high quality sheep and cattle that win prizes at agricultural shows and command good
prices at market. The proposed house development will support farm diversification, thus increasing
sustainability of the business. This is also an important element in successional planning, which will
enable the applicant’s son to remain on Lismore and continue the farm enterprise into the future,
raising his own family here and providing a rare continuity in people and place that is increasingly
fragile in today’s society. Securing a sustainable future for his son and grandson on Lismore will help
address population decline and the aging demographic – contributing to delivery of national policies,
for example as outlined in the National Plan for Scotland’s Islands.
The building is a low impact, sustainable design that will fit in the landscape as a modern reflection
of the countless buildings that once existed on Lismore and its scatter of islands, in days when the
local population was much larger. Development, of its time, is nothing new to this environment and
in fact arguably, the building will have a positive impact in contrast to the backdrop of the Glensanda
quarry and the local fish farms. Although scenic, it is important to remember that this is a working
environment. The presence of summer residents and the related site management will help to
maintain the island’s environment, for example through beach/shore cleaning and vegetation
management. Studies commissioned for the application have demonstrated no negative impact on
designated features or protected species, for example the seal colonies in the locality. Use of the
island will bring much needed income to the community, not only the direct income from the
property but also through guests who stay longer, and do and spend more, which will benefit local
businesses, such as shops, restaurants, cafes, island taxi etc. as well as the wider Argyll economy.
Page 145 Agenda Item 3c

Page 146

This page is intentionally left blank