Democracy Spraffa

Planning Dept - draft conditions

Argyll and Bute Council · 8 December 2023
Back to Argyll and Bute Local Review Body — 8 December 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

SUGGESTED CONDITIONS 
FOR 
ARGYLL AND BUTE COUNCIL
LOCAL REVIEW BODY 
22/0007/LRB 
REFUSAL OF PLANNING PERMISSION 22/01001/PP 
USE OF LAND FOR THE SITING OF A GLAMPING POD 
GARDEN GROUND OF BROOM HILL, ARDCONNEL HILL, OBAN 
2 November 2023

Page 2

CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 22/01001/PP 
Standard Time Limit Condition: 
The development to which this permission relates must be begun not later than three
years from the date of this permission. 
Reason: In accordance with Section 58 of the Town and Country Planning (Scotland) Act
1997. 
Standard Soils Management Condition: 
Where the development involves ground breaking works, soil management should be
undertaken in compliance with the established best practice set out in the DEFRA
publication “Construction Code of Practice for the Sustainable Use of Soils on
Construction Sites 2009”, unless an alternative methodology for sustainable management
of soil is submitted to and approved in writing by the Planning Authority. 
Reason: In order to ensure that sustainable management of soils and compliance with the
requirements of NPF4 Policy 5A. 
Additional Conditions  
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on
the application form dated 16/05/22, supporting information and, the approved
drawings listed in the table below unless the prior written approval of the planning
authority is obtained for an amendment to the approved details under Section 64 of
the Town and Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Location Plan    07/10/22 
Proposed Site Layout  100  30/11/22 
Design Sketch 101  17/05/22
Proposed Site Sections  200  30/11/22 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
Note to Applicant 
Please note the comments contained in the consultation response from Scottish
Water which is available to view on the planning application file on the Public Access
section of the Council’s website.  
2. PP - Occupancy Restriction 
Notwithstanding the provisions of Class 9 of the Town and Country Planning (Use
Classes) (Scotland) Order 1997 the residential accommodation hereby approved
shall be used for short term holiday occupancy only and not as a main residence
and shall not be occupied by any family, group or individual for a cumulative period
of more than three calendar months in any one year. A register showing dates of

Page 3

arrivals and departures shall be maintained at the premises and shall be available at
all reasonable times for inspection by the Planning Authority. 
Reason: In order to define the permitted occupancy having regard to the fact that the
premises are unsuitable for permanent residential occupation. 
Note to Applicant 
 For the avoidance of doubt this permission only provides for the occupation of the
premises on a short term basis on the grounds that the development is unsuited
to full time residential occupation. Specifically the occupation of the premises as
a dwelling shall require the benefit of a separate planning permission. 
 The Civic Government (Scotland) Act 1982 (Licensing of Short-term Lets) Order
2022 will require the host of any new short-term let to apply to the Council for a
licence. Further information can be found on the Council’s website:
https://www.argyll-bute.gov.uk/licences/short-term-lets-licence.  
3. PP – Submission of Details of Materials 
Notwithstanding the effect of Condition 1, no development shall commence until
written details of the type and colour of materials to be used in the construction of the
glamping pod hereby approved have been submitted to and approved in writing by
the Planning Authority. The development shall thereafter be completed using the
approved materials or such alternatives as may be agreed in writing with the
Planning Authority. 
Reason: In order to integrate the development into its surroundings.  
4. PP - Biodiversity Enhancement Measures 
Notwithstanding the effect of Condition 1, no development shall commence until a
biodiversity statement has been submitted to and approved in writing by the Planning
Authority. The statement shall demonstrate how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these benefits will be
implemented and maintained for the lifetime of the development. 
All physical biodiversity enhancement measures (bird nesting boxes, ‘swift bricks’,
wildlife ponds, bat and insect boxes, hedgehog homes etc.) shall be implemented in
full before the development hereby approved is first brought into use. 
All biodiversity enhancement measures consisting of new or enhanced planting shall
be undertaken either in accordance with the approved scheme of implementation or
within the next available planting season following the development first being
brought into use. 
The biodiversity statement should refer to Developing with Nature guidance |
NatureScot as appropriate. 
Reason: To comply with the requirements of NPF4 Policy 3.  
5. PP – Surface Water Drainage – No further detail required 
Notwithstanding the effect of Condition 1, the development shall incorporate a

Page 4

surface water drainage system which is consistent with the principles of Sustainable
urban Drainage Systems (SuDS) compliant with the guidance set out in CIRIA’s
SuDS Manual C753. The requisite surface water drainage shall be operational prior
to the development being brought into use and shall be maintained as such
thereafter. 
Reason: To ensure the provision of an adequate surface water drainage system and
to prevent flooding. 
Note to Applicant 
Further advice on SuDS can be found in SEPA’s Standing Advice for Small Scale
Development – www.sepa.org.uk