Democracy Spraffa

Notice of Review and Supporting Documentation (Redacted)

Argyll and Bute Council · 16 May 2024
Back to Argyll and Bute Local Review Body — 16 May 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Page 1 of 5
Central Validation Team at Argyll and Bute Council 1A Manse Brae Lochgilphead PA31 8RD  Tel: 01546 605518  Email:
planning.hq@argyll-bute.gov.uk
Applications cannot be validated until all the necessary documentation has been submitted and the required fee has been paid.
Thank you for completing this application form:
ONLINE REFERENCE 100662999-001
The online reference is the unique reference for your online form only. The  Planning Authority will allocate an Application Number when
your form is validated. Please quote this reference if you need to contact the planning Authority about this application.
Applicant or Agent Details
Are you an applicant or an agent? * (An agent is an architect, consultant or someone else acting
on behalf of the applicant in connection with this application)  Applicant  Agent
Agent Details
Please enter Agent details
Company/Organisation:
Ref. Number: You must enter a Building Name or Number, or both: *
First Name: * Building Name:
Last Name: * Building Number:
Address 1
Telephone Number: * (Street): *
Extension Number: Address 2:
Mobile Number: Town/City: *
Fax Number: Country: *
Postcode: *
Anderson Strathern LLP
Chris
Devlin
Morrison Street
58
Capital Square
EH3 8BP
United Kingdom
Edinburgh
Email Address: *
Is the applicant an individual or an organisation/corporate entity?
*  Individual    Organisation/Corporate entity

Page 2

Page 2 of 5
Applicant Details
Please enter Applicant details
Title: You must enter a Building Name or Number, or both: *
Other Title: Building Name:
First Name: * Building Number:
Address 1
Last Name: * (Street): *
Company/Organisation Address 2:
Telephone Number: * Town/City: *
Extension Number: Country: *
Mobile Number: Postcode: *
Fax Number:
Email Address: *
Site Address Details
Planning Authority:
Full postal address of the site (including postcode where available):
Address 1:
Address 2:
Address 3:
Address 4:
Address 5:
Town/City/Settlement:
Post Code:
Please identify/describe the location of the site or sites
Northing Easting
Ms
50 CHARLOTTE STREET
Dawn
Argyll and Bute Council
Anderson Charlotte Street
50
HELENSBURGH
G84 7SR
G84 7SR
Scotland
683106
Helensburgh
230329

Page 3

Page 3 of 5
Description of Proposal
Please provide a description of your proposal to which your review relates. The description should be the same as given in the
application form, or as amended with the agreement of the planning authority: *
(Max 500 characters)
Type of Application
What type of application did you submit to the planning authority? *
  Application for planning permission (including householder application but excluding application to work minerals).
  Application for planning permission in principle.
  Further application.
  Application for approval of matters specified in conditions.
What does your review relate to? *
  Refusal Notice.
 Grant of permission with Conditions imposed.
  No decision reached within the prescribed period (two months after validation date or any agreed extension) – deemed refusal.
Statement of reasons for seeking review
You must state in full, why you are a seeking a review of the planning authority’s decision (or failure to make a decision). Your statement
must set out all matters you consider require  to be taken into account in determining your review. If necessary this can be provided as a
separate document in the ‘Supporting Documents’ section: *  (Max 500 characters)
Note: you are unlikely to have a further opportunity to add to your statement of appeal at a later date, so it is essential that you produce
all of the information you want the decision-maker to take into account.
You should not however raise any new matter which was not before the planning authority at the time it decided your application (or at
the time expiry of the period of determination), unless you can demonstrate that the new matter could not have been raised before that
time or that it not being raised before that time is a consequence of exceptional circumstances.
Have you raised any matters which were not before the appointed officer  at the time the  Yes   No
Determination on your application was made? *
If yes, you should explain in the box below, why you are raising the new matter, why it was not raised with the appointed officer before
your application was determined and why you consider it should be considered in your review: * (Max 500 characters)
Proposed alterations to widen driveway entrance at 50 Charlotte Street, Helensburgh, Argyll And Bute, G84 7SR
Please see Grounds of Appeal lodged in the supporting documentation.

Page 4

Page 4 of 5
Please provide a list of all supporting documents, materials and evidence which you wish to submit with your notice of review and intend
to rely on in support of your review. You can attach these documents electronically later in the process: * (Max 500 characters)
Application Details
Please provide the application reference no. given to you by your planning
authority for your previous application.
What date was the application submitted to the planning authority? *
What date was the decision issued by the planning authority? *
Review Procedure
The Local Review Body will decide on the procedure to be used to determine your review and may at any time during the review
process require that further information or representations be made to enable them to determine the review. Further information may be
required by one or a combination of procedures, such as: written submissions; the holding of one or more hearing sessions and/or
inspecting the land which is the subject of the review case.
Can this review continue to a conclusion, in your opinion, based on a review of the relevant information provided by yourself and other
parties only,  without any further procedures? For example, written submission, hearing session, site inspection. *
 Yes   No
Please indicate what procedure (or combination of procedures) you think is most appropriate for the handling of your review. You may
select more than one option if you wish the review to be a combination of procedures.
Please select a further procedure *
Please explain in detail in your own words why this further procedure is required and the matters set out in your statement of appeal it
will deal with?  (Max 500 characters)
In the event that the Local Review Body appointed to consider your application decides to inspect the site, in your opinion:
Can the site be clearly seen from a road or public land? *  Yes   No
Is it possible for the site to be accessed safely and without barriers to entry? *  Yes    No
Grounds of Appeal 7.1 Decision Notice and stamped plans 7.2 Letter to Argyll & Bute Council 7.3 National Planning Framework 4
7.4 Helensburgh Conservation Area Appraisal 7.5 Designing Streets 7.6 National Roads Development Guide (excerpts) 7.7 LDRA
Ltd v Sec State for Communities etc. 7.8 Report of Handling 7.9 Supporting Statement of Dawn Anderson
23/01046/PP
11/12/2023
By means of inspection of the land to which the review relates
30/05/2023
To let Members of the LRB see the nature of the development that is proposed, that it is modest in scale and in-keeping with the
character of the local area

Page 5

Page 5 of 5
Checklist – Application for Notice of Review
Please complete the following checklist to make sure  you have provided all the necessary information in support of your appeal. Failure
to submit all this  information may result in your appeal  being deemed invalid.
Have you provided the name and address of the applicant?.  *  Yes   No
Have you provided the date and reference number of the application which is the subject of this  Yes   No
review? *
If you are the agent, acting on behalf of the applicant, have you provided details of your name  Yes   No   N/A
and address and indicated whether any notice or correspondence required in connection with the
review should be sent to you or the applicant? *
Have you provided a statement setting out your reasons for requiring a review and by what  Yes   No
procedure (or combination of procedures) you wish the review to be conducted? *
Note: You must state, in full, why you are seeking a review on your application. Your statement must set out all matters you consider
require to be taken into account in determining your review. You may not have a further opportunity to add to your statement of review
at a later date. It is therefore essential that you submit with your notice of review, all necessary information and evidence that you rely
on and wish the Local Review Body to consider as part of your review.
Please attach a copy of all documents, material and evidence which you intend to rely on  Yes   No
(e.g. plans and Drawings) which are now the subject of this review *
Note: Where the review relates to a further application e.g. renewal of planning permission or modification, variation or removal of a
planning condition or where it relates to an application for approval of matters specified in conditions, it is advisable to provide the
application reference number, approved plans and decision notice (if any) from the earlier consent.
Declare – Notice of Review
I/We the applicant/agent certify that this is an application for review on the grounds stated.
Declaration Name: Mr Chris Devlin
Declaration Date: 10/03/2024

Page 6

Anderson Strathern LLP
58 Morrison Street
Edinburgh
EH3 8BP
Ref: AND0724.0001/CUD
Grounds of Appeal on behalf of
Dawn Anderson
in respect of
App Ref: 23/01046/PP

Page 7

Contents
Introduction ..................................................................................................................... 3
Nature of the Development .............................................................................................. 3
Grounds of Appeal ............................................................................................................ 4
Objector’s Comments ..................................................................................................... 13
Other Matters ................................................................................................................. 13
Conclusion ...................................................................................................................... 14
Appendix of documents .................................................................................................. 14

Page 8

Introduction
1.1. We act on behalf of Ms Dawn Anderson (“the Appellant”).
1.2. The Appellant wishes to appeal Decision Notice 23/01046/PP for proposed alterations to
widen driveway (the “Application”) at 50 Charlotte Street, Helensburgh (“the Property”).
1.3. Planning Permission was sought on the 30 May 2023 and Argyll & Bute Council’s resultant
refusal is dated 11 December 2023.
1.4. This document forms the basis of the grounds of appeal which the Appellant seeks to rely upon
at the Local Review Body (“LRB”) where matters will be determined. 
Nature of the Development
Existing arrangements
2.1. As can be seen from the screenshot below, the driveway at present can be utilised by vehicles
but it is challenging for pedestrian access to/egress from the Property.  The pedestrian
entrance/exit to the right of the screenshot is offset against the driveway, leading directly on
to a grassed area of road verge rather than a neatly tarmacked or cobbled path to the metalled
surface of Charlotte Street.  Members should be made aware that the lamppost in the
screenshot below has been removed.
The Proposed Development
2.2. Although the development description that is sought is “Proposed alterations to widen
driveway entrance”, in effect what the applicant is seeking is a ‘squaring off’ of the driveway.
This is consistent with other driveways on Charlotte Street; enabling vehicular access/egress
and, crucially, safe pedestrian access/egress.  We note below the existing and proposed plans.

Page 9

Existing layout Proposed layout
2.3. The proposed development does not suggest any new or materially different construction
associated with the driveway.  Fundamentally, the use of the land does not change.  The
Application may therefore alternatively be described as follows:
1. Resurfacing of the vehicular driveway to the Property; and
2. Installation of cobbled path for dedicated pedestrian access/egress to the Property.
2.4. The above is the basis on which we proceed below.
Grounds of Appeal
3.1. There are four grounds of refusal.  We comment on each of these in turn below.  Where a
matter is not noted as a ground of refusal we consider that it is accepted by the Council.  We
would respectfully request that we be permitted to make further submissions in respect of
any matter not referred to below should Members decide that alternative material
considerations may be relevant to the determination.
Development Plan
3.2. Since the decision to refuse planning permission on 11 December 2023, the Council has
adopted its new LDP2.  This means that the development plan now consists of the fourth
National Planning Framework and the Council’s LDP2, with LDP2 being the later document. 
We note that in the grounds of refusal various proposed policies of LDP2 are referred to. 
This is a material change in circumstances.
3.3. In our submissions below we have addressed the policies that were contained in the now
revoked Local Development Plan but since these policies no longer exist we consider that no
weight can be attached to them.  The section 25 and section 37 determination, per the Town

Page 10

and Country Planning (Scotland) Act 1997, must be undertaken in accordance with the up to
date and extant development plan.  
3.4. As at paragraph 3.1 above, in terms of the new LDP2, where a matter is not noted as a
ground of refusal we consider that it is accepted by the Council.  We would respectfully
request that we be permitted to make further submissions in respect of any matter not
referred to below should Members decide that alternative material considerations may be
relevant to its determination.
First Ground of Refusal
3.5. The first ground of refusal is as follows:
“The proposal does not accord with the Development Plan policies namely LDP 11 Improving
our Connectivity and Infrastructure and SG LDP TRAN 4 which sets out the construction
standards to be applied in relation to a private driveway on to a public road, given the
widening of the driveway is unnecessary and even though it is not proposed to be used for
parking, it will encourage vehicles to park here and they will have to reverse on to the street
near a bend where there is poor visibility. It would also be contrary to the Proposed LDP Policy
35 for the same reasons.”
3.6. This reason for refusal represents a misunderstanding of the nature of the proposed
alterations to the driveway.  As noted at section 2 above, the widening of the driveway is not
to accommodate further vehicles but rather to accommodate a more direct route for
pedestrian access to/egress from the Property.
3.7. The Council surmises that the additional cobbles will somehow encourage vehicles to park at
this location.  The additional cobbles will not cause sufficient additional width to be material
to the current driveway enabling two cars to park comfortably and pedestrians to access/exit. 
In any event, the Council is at liberty to introduce parking controls under the Road Traffic
Regulation Act 1984 should it consider that such controls are needed.  It is submitted that
regulation of parking at this location is not for the planning regime.
3.8. The Roads Authority in its consultation response to the Proposed Development states:
“On review of the proposed, the access opening within the wall does not correspondingly
increase in width. As such, the proposed widening would not support access or egress to the
property.
Any subsequent widening of the access over the verge could however be considered as an
approved location for off street parking, a function which is not supported due to its proximity
to a bend, limited visibility and the inability for a vehicle to enter and leave in a forward gear.
I therefore confirm Roads refuse the proposed.”
3.9. Respectfully, we consider that the above represents a misunderstanding of the Proposed
Development as described in section 2 above.
3.10. Insofar as vehicular access is concerned no material changes are proposed.  The driveway
element is not, in effect, being widened but simply resurfaced.  Although there will be an
extension (of sorts) to the cobbled area, this will be to accommodate direct pedestrian
access/exit from the Property.  It could not reasonably be utilised by vehicles, which would
block the direct route to be constructed.

Page 11

3.11. In terms of the comment regarding off street parking, it is noted that there are no parking
controls at this location.  We understand that this location is, however, part of the adopted
road per the Council’s list of adopted roads under section 1 of the Roads (Scotland) Act 1984.1 
As noted, the Council is therefore at liberty to introduce parking controls under the Road
Traffic Regulation Act 1984 should it consider that such controls are needed.  The Council could
also introduce signage regarding the bend if considered appropriate, or a convex traffic mirror.
3.12. Since the use of the driveway is not in any way changing, we consider that it is incorrect to
assess the application by reference to exit of the Property in a forward gear.  As noted above,
the driveway is in effect being resurfaced without the principal use of it changing in any
material way.  It is not new development in that sense.  The Proposed Development is largely
a cosmetic exercise.  We therefore do not consider that such a technical assessment is
appropriate since what is proposed is, in effect, a like for like replacement of the existing
driveway.
3.13. Policy 35 of LDP2 states:
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes
Street design for all new developments must consider place before movement and take
into account the principles regarding development setting, layout and design.
Acceptance of development utilising new and existing public roads, private roads and
private access regimes is subject to road safety and street design issues being addressed to
the satisfaction of the Roads Authority and the Planning Authority.
Developments shall be served by a public road (over which the public have right of access)
and maintainable at public expense unless the case has been made for a private access or
the further use of an existing private access or existing private road in accordance with the
policies below.
3.14. In our submission, the terms of Policy 35 above are complied with for the reasons already
noted above.  The first part of the policy refers to street design for all “new developments”. 
Our view is that this aspect of the policy refers to new housing sites or employment sites etc.
whereas this is, in effect, a modest reconfiguration of an existing driveway for an historic
residential dwelling.  We do not consider that it is relevant.
3.15. The second aspect of the policy is complied with on the basis that is, as stated, a modest
reconfiguration of an existing driveway for an historic residential dwelling.  Further, Designing
Streets notes at page 35:
Visibility along the street edge
Vehicle exits at the back edge of the footway mean that emerging drivers will have to take
account of people on the footway. The absence of wide visibility splays at private
driveways will encourage drivers to emerge more cautiously. Consideration should be
given to whether this will be appropriate, taking into account the following:
• the frequency of vehicle movements;
1 There is no indication in the adopted roads list that the verges are not also adopted, including the driveway

Page 12

• the amount of pedestrian activity; and
• the width of the footway.
(our emphasis)
3.16. Given that we are dealing with a private driveway, our view is that Designing Streets
acknowledges that in some circumstances there will not be a full visibility splay but that this is
not a bar to development.  Rather, it encourages the cautious emergence of traffic.
3.17. We do not consider that the third element of Policy 35 is relevant.
3.18. For completeness, notwithstanding that it has now been superseded, Policy LDP 11 states:
“7.2 Policy LDP 11 – Improving our Connectivity and Infrastructure
Argyll and Bute Council will support all development proposals that seek to maintain and
improve our internal and external connectivity and make best use of our existing
infrastructure by ensuring that:
• rights of way and public access are safeguarded;
• public access within the development is delivered, as appropriate, ensuring that any
special mobility and safety requirements are addressed;
• consideration is given to the promotion of access to adjoining areas, in particular to
the foreshore, core path network and green network;
• integration of the development with existing and potential public transport is taken
fully into account;
• the proposed development is accessible by a range of modes of transport, including
walking, cycling, public transport and car;
• an appropriate standard of access is delivered to serve new developments, including
off-site highway improvements where appropriate;
• maximum and minimum car parking standards are applied;
• the location and design of new infrastructure is appropriate;
• standards for drainage, sewage, waste water and water supply are applied;
• new telecommunication proposals are encouraged where they comply with the
criteria established in SG LDP TEL 1;
Further information and details will be provided in Supplementary Guidance in relation to
the following matters: transport, including core paths; telecommunications; and
infrastructure.
3.19. The vast majority of the criteria listed in this policy are not relevant to the determination of
the Proposed Development.  The reason for refusal refers to the widening of the driveway

Page 13

being unnecessary, that vehicles may park there, and the need to reverse on to a street near
a bend where there is poor visibility.
3.20. As above, the driveway should not be considered as being widened.  The driveway is being
resurfaced with a modest extension to it in order that pedestrians may easily access/exit the
Property.  In this context, the only element of the policy that may be relevant is that rights of
way are safeguarded.  Demonstrably that is the case in respect of the Proposed Development.
3.21. It is not clear to us if Policy TRAN 4 continues to apply under LDP2.  Policy TRAN 4 does set out
construction standards, but it is submitted that these are not relevant to the Proposed
Development as they refer to developments of between 6-10 units or connections with trunk
roads.  It is demonstrably the case that neither of these is relevant here.  We submit that the
remainder of TRAN 4 is not relevant in respect of this existing driveway and to any extent that
it is relevant its terms are complied with.
Second Ground of Refusal
3.22. The second ground of refusal is as follows:
“In addition the displacement of pedestrians from the grass verge on to the road, due to
parking on the widened driveway would present a potential conflict with vehicles. The current
pedestrian access to no 50 is adequate and meets Roads Authority guidelines and
requirements.”
3.23. The adequacy of the current pedestrian access to the Property is irrelevant in terms of the
decision making in this Planning Application.  The applicant seeks to improve it.
3.24. The displacement of pedestrians at this location is considered a red herring.  There is no
footway in place for pedestrians to use.  In times of bad weather, for example, pedestrians
may consider that it is unsafe to walk on the grass verge as it may be a slip hazard if
waterlogged.  The Proposed Development is therefore entirely neutral in this regard.
3.25. Further, in the unlikely event of a car being parked on the driveway area then pedestrians are
not being forced to deviate from their walking line on to the road.  The roads officer presumes
that all pedestrians would move towards the carriageway.  But pedestrians could just as easily
walk nearest to the boundary wall/driveway gates of the Property, thereby not being forced
on to the carriageway in the manner suggested by the roads officer.
3.26. Again, should the Council wish to restrain parking at this location then the Council could
introduce a Traffic Regulation Order doing so.
Third Ground of Refusal
3.27. The third ground of refusal is as follows:
“The widening of the driveway would encourage parking on the grass verge, which would be
out of character with the Conservation Area, where the grass verge is a dominant feature
and a crucial element of the character of the Conservation Area. The proposal is therefore
contrary to Policy 7 Historic Assets and Places part d which states that proposals in or
affecting conservation areas will only be supported where the character and appearance of
the conservation is preserved or enhanced. The proposal is also contrary to the relevant Local
Development Plan policies LDP3 and SG LDP ENV 17 and the proposed Local Development
Plan policy 15.”

Page 14

3.28. There is no evidence that the widening of the driveway to include a pedestrian footpath would
encourage parking specifically on the grass verge.  We fail to see any connection in this regard
and the Council has not provided its basis for making such a claim.  There is no need for cars
to park on the grass verge because there are no parking restrictions on the carriageway.  Cars
may remain parked on the carriageway and it is submitted that most drivers are likely to utilise
this option rather than parking on grass.  Once again, should the Council wish to regulate
parking at this location then it may do so by means of a Traffic Regulation Order.
3.29. Significant importance is placed upon the presence of grass verges to the character of the
Conservation area as laid out in Helensburgh Conservation Area Appraisal.
“Helensburgh’s street layout, verges and tree plantings constitute a notable historic designed
landscape of exceptional conservation significance.” 
3.30. This is a cumulative list of design factors that work together to contribute to the overall
character of the Helensburgh area. However, when taken individually, they are not indicative
of the area’s special character. This is re-affirmed throughout the guidance which lists the “grid
pattern, regimented street tree planting…avenues of trees and foliages and the grass verges”
as incrementally creating a “country park feel” and “the contribution of the planting of street
trees in the grass verges, the broad grass verges themselves, the characteristics of plot
boundaries, private garden grounds and public green spaces area major aspects of the
townscape and crucial elements of its character”.
3.31. The listing of these qualities (which always appear in conjunction with one another)
throughout the guidance affirms that the character of the area is created by the presence of a
multitude of factors, taken cumulatively rather than individually. The proposed development
does not erode any of these factors because it is not a new driveway that is being installed but
rather the resurfacing of an existing driveway plus the modest addition of a pedestrian
footpath to and from the Property.
3.32. Further the guidance stipulates that:
“The Conservation Areas Management Plan should ensure coordinated management and
surfacing regimes for the many grass verges and footpaths (both un-made and surfaced) that
contribute so much to the special qualities of the Helensburgh Conservation Areas.” 
3.33. If grass verges were so instrumental to the character appraisal of the area, such Management
Plan would be widely publicised to discourage certain development. However, Argyll & Bute
Council have confirmed that such Management Plan was never drawn up. Consequently, it is
impossible to identify which grass verges are deemed so special to Helensburgh that they
contribute to the area’s character. In the absence of such document, it cannot be assumed
that the Property’s grass verge is of such significance as to impact the overall character
appraisal of upper Helensburgh. 
3.34. There is also mention of NPF4 Policy 7d, which states:
“Development proposals in or affecting conservation areas will only be supported where the
character and appearance of the conservation area and its setting is preserved or enhanced.
Relevant considerations include the:
i. architectural and historic character of the area;
ii. existing density, built form and layout; and

Page 15

iii. context and siting, quality of design and suitable materials.”
3.35. The Application both “preserves” and “enhances” the character and appearance of the
Conservation area. By resurfacing the driveway and integrating it with the surrounding
landscape, the transition between the existing driveway and the resurfaced area will be
seamless, maintaining the aesthetic continuity of the Conservation Area with suitably
considered materials. Its thoughtful design ensures that the driveway compliments the existing
architectural style and natural elements. Rather than eliminating the grass verge, the
resurfacing of the driveway allows for strategic preservation of green space. The grass verge
will not be materially changed and therefore the Application preserves the natural elements
of the Conservation Area. In doing so, it promotes a balance between a well-maintained
driveway with proper landscaping and enhances the overall appearance of the neighbourhood.
The Appellant also wishes to draw Members’ attention to the various surfaces used in the
neighbouring driveways on Charlotte Street, as demonstrated in the pictures below. These
photos evidence the lack of uniformity of design in the immediate vicinity of the Property.
Within such context and siting, the Application is therefore not unusual. 
3.36. The proposal is therefore not contrary to LDP2 policy 15, nor to the relevant Local
Development Plan policies LDP3 and SG LDP ENV 17 (despite these being revoked).
Fourth Ground of Refusal
3.37. The fourth ground for refusal is as follows:
“In addition, the proposal is contrary to Policy 14 of NPF4 alongside Local Development Plan
design policy 9, SG LDP Sustainable siting and design principles and the proposed LDP policies
05 and 10 given the proposal does not achieve a good quality place and erodes the quality of
the place.”

Page 16

3.38. Policy 14 of NPF4 relates to liveable places and focuses on promoting and encouraging well
designed developments. The Application is designed to improve the quality of the area by
enabling vehicular access/egress and, crucially, safe pedestrian access/egress to the Property.
The proposed development is “pleasant” and “distinctive” in its design as it incorporates
quality materials that are in keeping with the Conservation area and the listed building. This is
acknowledged in the Report of Handling. Further, Helensburgh Conservation Area Appraisal
acknowledges that “the distribution of footpaths around the streets is haphazard, with some
of the paths between the grass verges and the boundary walls of properties being surfaced and
clear of weeds, with others being allowed to grass over and others becoming wet and muddy.
This leads to many pedestrians (including dog-walkers and joggers) going along the middle of
the road.” Therefore, the Proposal actively contributes to improving the safety of the public
who will make use of the resurfaced driveway. This aligns with the “healthy”, “sustainable”
and “connected” indicators of successful places under Policy 14 of NPF4. As the driveway is
more easily maintained than the grass verge and can be re-instated to grass or its surface
altered at any time, the Application is “adaptable”. 
3.39. As far as the Local Development Plan Design Policy 9 is concerned with sustainable design and
construction which incorporates adaptability, the reasons why the Planning Application
satisfies the considerations of NPF4 are similarly mirrored. 
3.40. Policy 5 of the LDP2 states as below.  We have provided our own comments in bold against
those that we consider relevant to the Proposed Development.
Policy 05 – Design and Placemaking
To achieve good quality places proposals should endeavour to comply with all of the
following placemaking criteria:
• The proposed use should be compatible with surrounding land uses.  The Proposed
Development is the modest widening of an existing driveway to include spaced for direct
pedestrian access/egress to and from the Property.  It is therefore compatible with
surrounding land uses.
• The proposal should, where practicable, be resource efficient by utilising existing
infrastructure and facilities.
• The design should respect site topography and any surrounding important landmarks or
views.
• The design should create and improve connectivity within, and where practical, beyond
the site.
• Green and blue infrastructure should be an integral part of the design process from the
outset.
• The design should develop the area’s sense of identity by understanding and embracing
the existing distinctive characteristics, with the design respecting and complementing its
surroundings in terms of density, appearance, height, scale, massing, materials and
finishes.  The materials and finish cobbles.  These are of a type that are complimentary to
the surrounding area.
• Where the site contains existing buildings, structures and/or natural features that
contribute to the character and identity of the wider area, these should be retained and

Page 17

sensitively integrated into the design unless it has been clearly demonstrated to the
planning authority that it is not practicable.
• The siting and design should respond to the natural environment in a sustainable
manner.
• The proposal should consider the design of active frontages, and create welcoming,
inclusive places with a coherent structure of streets, spaces and buildings which are easy to
move around, prioritising the needs of pedestrians and cyclists above motor vehicles.  The
Proposed Development is specifically to make access to and egress from the Property
more straightforward for those with disabilities especially.
• The access to and orientation of buildings should reinforce the street or open space to
create safe and pleasant places.
The design should be sustainable in terms of materials and construction and should
consider future adaptability, and climate change mitigation measures.
3.41. The terms of Policy 5 of LDP2, as relevant, are complied with.
3.42. Policy 10 of LDP2 states: 
The design of any development must:
• Demonstrate an understanding of and appropriate response to the proposed
development site and wider context including consideration of character and, where
applicable, urban grain; and
• Acknowledge the scale, mass and spirit of nearby buildings but steer clear of mimicry and
pastiche; and
• Incorporate existing and enhancing features where applicable; and
• Avoid falsification of period details; and
• Use appropriate proportions for building elements and details including, where
applicable, massing and fenestration; and
• Use materials that are harmonious with the context but embody honesty and legibility of
contemporary design; and
• Consider the embodied energy and durability of proposed materials; and
• Incorporate the use of flood resistant and resilient materials and construction methods.
3.43. In our submission, many of the elements of this Policy 10 are not relevant to the Proposed
Development.  Clearly matters such as fenestration do not apply in this circumstance.  The
terms of this policy are complied with insofar as relevant because the Proposed Development
is to install cobbles in substitution of existing orange/yellow brick for the driveway and
proposed pedestrian access/egress regarding the Property.  These are entirely in-keeping with
the character of the area.

Page 18

Objector’s Comments
4.1. The Appellant has reviewed the comments of the objector to the Planning Application.  In
respect of the first and second dated objections, none of these comments are relevant to the
determination of the planning application.  None constitute a relevant planning concern, nor
a material consideration.
4.2. In respect of the third dated objection, we consider that these grounds of appeal address the
comments that have been made where those comments constitute relevant planning
considerations. 
Other Matters
Disabilities and Health & Safety
5.1. The applicant has spent many thousands of pounds to upgrade the wider Property to ensure
that it can be lived in and utilised by people with disabilities.  The resurfacing of the driveway
and its widening to provide easier pedestrian access/egress to the Property is part of this
ongoing project of renewal.  In this context we draw Members’ attention to section 149 of
the Equality Act 2010.
149 Public sector equality duty
(1) A public authority must, in the exercise of its functions, have due regard to the need
to—
(a) eliminate discrimination, harassment, victimisation and any other conduct that
is prohibited by or under this Act;
(b) advance equality of opportunity between persons who share a relevant
protected characteristic and persons who do not share it;
(c) foster good relations between persons who share a relevant protected
characteristic and persons who do not share it.
5.2. Disability is a protected characteristic.  Section 149 then continues:
(3) Having due regard to the need to advance equality of opportunity between persons
who share a relevant protected characteristic and persons who do not share it involves
having due regard, in particular, to the need to—
(a) remove or minimise disadvantages suffered by persons who share a relevant
protected characteristic that are connected to that characteristic;
(b) take steps to meet the needs of persons who share a relevant protected
characteristic that are different from the needs of persons who do not share it;
(c) encourage persons who share a relevant protected characteristic to participate
in public life or in any other activity in which participation by such persons is
disproportionately low.

Page 19

(4) The steps involved in meeting the needs of disabled persons that are different from
the needs of persons who are not disabled include, in particular, steps to take account of
disabled persons' disabilities.
5.3. In our submission, the appointed officer has failed to take into account that the Proposed
Development will remove or minimise disadvantages suffered by disabled persons.  Set
against this backdrop, the Appellant’s planning application aligns with these commitments
and should be positively encouraged by the LRB. The Property’s existing pedestrian access is,
in effect, a narrow mud slope that restricts unimpeded access to the Property and
disproportionately affects disabled path users. The Application attempts to neutralise this
inequality by upgrading the pedestrian path and providing surfaced access that can be
utilised in all weather. The Proposed Development will introduce a more appropriate surface
for the purposes of access/egress to the Property.  Further, the Proposed Development will
ensure that there is a more direct route for pedestrians who may be disabled, rather than a
slightly more circuitous route or, alternatively, a route that traverses a steep grassed verge
which, in the wet, may be difficult to navigate. The current pedestrian provisions are
outdated and the Council’s refusal to consent to a much-needed upgrade disadvantages the
disabled.2
5.4. Members should also note that the proposals will improve access to the Property overall,
consistent with the Building (Scotland) Regulations 2004:
2.12 Fire and rescue service access
Every building must be accessible to the fire and rescue service.3
and
4.1 Access to buildings
Every building must be designed and constructed in such a way that all occupants and
visitors are provided with safe, convenient and unassisted means of access to the building.4
Further Procedure
5.5. The applicant respectfully requests that the LRB undertakes a site visit to understand the
nature of the Proposed Development up close and first hand.
Conclusion
6.1. Pursuant to the above, the Planning Application is consistent with the LDP, there are a number
of material considerations in its favour, and therefore should be granted.
Appendix of documents
7.1. Decision Notice 23/01046/P (including plans)
2 We draw Members’ attention to the case of LDRA Ltd and others v Secretary of State for Communities and Local Government and
others ([2016] EWHC 950 (Admin)) in which the decision to grant planning permission affecting access to a riverside for disabled
persons was considered to fall under the section 149 duty.  Since construction of the consented development would
disproportionately impede access for disabled persons, the Court quashed the planning permission because of this protected
characteristic not having been properly taken into account
3 Part 2.12 of Schedule 5 to the Building (Scotland) Regulations 2004
4 Part 4.1 of Schedule 5 to the Building (Scotland) Regulations 2004

Page 20

7.2. Letter from Anderson Strathern LLP dated 14 November 2023
7.3. National Planning Framework 4
7.4. Helensburgh Conservation Area Appraisal
7.5. Designing Streets
7.6. SCOTS: National Roads Development Guidance
7.7. LDRA Ltd v Secretary of State for Communities and Local Government
7.8. Report of Handling for Planning Application
7.9. Supporting Statement of Dawn Anderson
Anderson Strathern LLP
8 March 2023

Page 21

38 East Clyde Street Helensburgh G84 7PG
TOWN AND COUNTRY PLANNING (SCOTLAND) ACT 1997 (AS AMENDED)
TOWN AND COUNTRY PLANNING (DEVELOPMENT MANAGEMENT PROCEDURE)
(SCOTLAND) REGULATIONS 2013
REFUSAL OF PLANNING PERMISSION
REFERENCE NUMBER: 23/01046/PP
Mrs Dawn Anderson
HMA Architects
19 Charlotte Street
Helensburgh
Argyll And Bute
G84 7EZ
I refer to your application dated 30th May 2023 for planning permission in respect of the following
development:
Proposed alterations to widen driveway entrance
AT:
50 Charlotte Street Helensburgh Argyll And Bute G84 7SR
Argyll and Bute Council in exercise of their powers under the above mentioned Act and
Regulations hereby refuse planning permission for the above development for the reasons(s)
contained in the attached appendix.
Dated: 11 December 2023
Fergus Murray
Head of Development and Economic Growth

Page 22

REASONS FOR REFUSAL RELATIVE TO APPLICATION NUMBER: 23/01046/PP 
1. The proposal does not accord with the Development Plan policies namely LDP 11 Improving our
Connectivity and Infrastructure and SG LDP TRAN 4 which sets out the construction standards to
be applied in relation to a private driveway on to a public road, given the widening of the driveway
is unnecessary and even though it is not proposed to be used for parking, it will encourage
vehicles to park here and they will have to reverse on to the street near a bend where there is poor
visibility. It would also be contrary to the Proposed LDP Policy 35 for the same reasons. 
2. In addition the displacement of pedestrians from the grass verge on to the road, due to parking
on the widened driveway would present a potential conflict with vehicles. The current pedestrian
access to no 50 is adequate and meets Roads Authority guidelines and requirements. 
3. The widening of the driveway would encourage parking on the grass verge, which would be out
of character with the Conservation Area, where the grass verge is a dominant feature and a crucial
element of the character of the Conservation Area. The proposal is therefore contrary to Policy 7
Historic Assets and Places part d which states that proposals in or affecting conservation areas will
only be supported where the character and appearance of the conservation is preserved or
enhanced. The proposal is also contrary to the relevant Local Development Plan policies LDP3
and SG LDP ENV 17 and the proposed Local Development Plan policy 15. 
4. In addition, the proposal is contrary to Policy 14 of NPF4 alongside Local Development Plan
design policy 9, SG LDP Sustainable siting and design principles and the proposed LDP policies
05 and 10 given the proposal does not achieve a good quality place and erodes the quality of the
place.

Page 23

NOTES TO APPLICANT (1) RELATIVE TO APPLICATION NUMBER 23/01046/PP 
1. If the applicant is aggrieved by the decision to refuse permission for or approval required by
a condition in respect of the proposed development, or to grant permission or approval
subject to conditions, the applicant may require the planning authority to review the case
under Section 43A of the Town and Country Planning (Scotland) Act 1997 (as amended)
within three months from the date of this notice. A Notice of Review request must be
submitted on an official form which can be obtained by contacting The Local Review Body,
Committee Services, Argyll and Bute Council, Kilmory, Lochgilphead, PA31 8RT or by
email to localreviewprocess@argyll-bute.gov.uk 
2. If permission to develop land is refused or granted subject to conditions and the owner of
the  land claims that the land has become incapable of reasonably beneficial use in its
existing state, and it cannot be rendered capable of reasonably beneficial use by the
carrying out of any development which has been or would be permitted, the owner of the
land may serve on the planning authority a purchase notice requiring the purchase of the
landowner’s interest in the land, in accordance with Part 5 of the Town and Country
Planning (Scotland) Act 1997 (as amended).

Page 24

APPENDIX TO DECISION REFUSAL NOTICE 
Appendix relative to application: 23/01046/PP 
A. Has the application been the subject of any “non-material” amendment in terms of Section
32A of the Town and Country Planning (Scotland) Act 1997 (as amended) to the initial
submitted plans during its processing. 
Yes/No (delete as appropriate) if yes, list amendments 
B.  Is the proposal a departure from the Development Plan: 
No 
If yes, state level of departure: 
No Departure 
C.  Summary justification statement for refusal of planning permission 
The proposal is considered to be contrary to policies 7 and 14 of NPF 4, and policies LDP3,
LDP 9, LDP 11, and SG LDP TRAN 4, SG LDP ENV 1, and SG LDP Sustainable Siting and
Design Guidance of the Argyll and Bute Local Development Plan 2015, and there are no
other material considerations of sufficient significance to indicate that it would be
appropriate to grant planning permission in this instance as a departure to the Development
Plan having regard to s25 of the Act. 
Furthermore, the proposal is also considered to be contrary to the provisions of draft
policies 05, 10, 15 and 35 of the proposed Local Development Plan 2.

Page 25

Argyll and Bute Council
REFUSED by the PLANNING AUTHORITY
Relative to Application No:
23/01046/PP
Fergus Murray
Head of Development and Economic Growth
11 December 2023

Page 26

Argyll and Bute Council
REFUSED by the PLANNING AUTHORITY
Relative to Application No:
23/01046/PP
Fergus Murray
Head of Development and Economic Growth
11 December 2023

Page 27

Marshalls Drivesys® Original Cobble
Marshalls Drivesys Original Cobble in Iron Grey
Share
Product Description
Drivesys® Original Cobble creates a realistic antique cobble stone look with all the benefits of an
easy to install engineered concrete driveway system. Cast from aged and timeworn cobbles,
Drivesys® Original Cobble can be used as single colour or blended using a variety of colours to
create a natural cobblestone effect and enhance the charm and elegance of any home.
Our Drivesys Range is supplied with our specially formulated Drivesys® Jointing compound,
making the installation of this driveway project hassle free and helps to reduce the amount of
unsightly weed growth between the blocks.
Co-ordinating Drivesys® Roundtop Edging is available to give a high end look to your completed
project.
• Realistic antique cobble stone look to add a natural charm to your home, with all of the
benefits of an engineered concrete driveway system
• Patented ‘bumper’ design provides a flexible and straightforward installation
• Blend different colours to create a truly unique look
• Use co-ordinating roundtop edges for a refined end result
• Enjoy ease of installation – every order comes with the required amount of Drivesys®
jointing compound
Argyll and Bute Council
REFUSED by the PLANNING AUTHORITY
Relative to Application No:
23/01046/PP
Fergus Murray
Head of Development and Economic Growth
11 December 2023

Page 28

Argyll and Bute Council
REFUSED by the PLANNING AUTHORITY
Relative to Application No:
23/01046/PP
Fergus Murray
Head of Development and Economic Growth
11 December 2023

Page 29

Anderson Strathern LLP
1 Rutland Court
Edinburgh EH3 8EY
T   +44 (0)131 270 7700
andersonstrathern.co.uk
BY EMAIL
FAO Kirsty Sweeney
Argyll and Bute Council
Development Management
Kilmory Castle
Lochgilphead
Argyll
PA31 8RT
E Chris.Devlin@
andersonstrathern.co.uk
DD  0131 270 5284
OUR REF  AND0724.0001
YOUR REF 23/01046/PP
14 November 2023
Dear Ms Sweeney,
Planning Application 23/01046/PP for proposed alterations to widen driveway (“Application”) by Dawn
Anderson (“Applicant”) at 50 Charlotte Street, Helensburgh, Argyll and Bute, G84 7SR (“Property”)
We refer to the above and write on behalf of the Applicant.
Existing arrangements
As can be seen from the screenshot below, the driveway at present can be utilised by vehicles but it is
challenging for pedestrian access to the Property.  The pedestrian entrance/exit to the right of the
screenshot is offset against the driveway, leading to a grassed area of verge rather than a neatly
tarmacked or cobbled path to the metalled surface of Charlotte Street.  The Council will be aware that the
lamppost in the screenshot has been removed.
The Proposed Development

Page 30

2 35051664_1 
Although the development description that is sought is “Proposed alterations to widen driveway
entrance”, in effect what the applicant is seeking is a “’squaring off’ of the driveway, consistent with other
driveways on Charlotte Street, to enable vehicular access/egress and, crucially, safe pedestrian
access/egress.  We note below the existing and proposed plans.  
Existing layout Proposed layout 
The proposed development does not suggest any new or materially different construction associated with
the driveway.  Fundamentally, the use of the land does not change.  The application may therefore
alternatively be described as follows: 
1. Resurfacing of the vehicular driveway to the Property; and
2. Installation of cobbled path for dedicated pedestrian access/egress to the Property.
The above is the basis on which we proceed below.
Access to the Property
Reference is made to the SCOTS National Roads Development Guide.  The Council, a signatory to the
Guide, will be aware that the application is in general supported by the Guide which states “private
vehicular access to developments will require to accommodate the numbers and types of vehicles using the
access in a safe manner”.1 In its current layout, the driveway falls short of this threshold, both in terms of
safety and access. The Application is therefore necessary to address these issues.
Specifically, paragraph 3.1.2 of the Guide states: 
1 P74 S3.1.2 of the SCOTS National Roads Development Guide

Page 31

3 35051664_1
Although there is no footway at this location to drop a kerb, the access to the driveway noted in the
diagram is square.  Our client’s proposal is therefore described as broadly consistent with this element of
the Guide.
The Application specifically provides for permanently unobstructed vehicular and pedestrian access to the
Property. This is consistent with the SCOTS National Roads Development Guide which specifies:
Paragraph 3.6.1 of the Guide may be principally directed at more significant parking than a single driveway
but we consider that the principles still apply.  The Application readily provides for this, by upgrading the
existing pedestrian access to the Property, which can currently only be taken via a grass verge. Such
informal arrangements disproportionately disadvantage disabled residents, who must utilise the grass
verge irrespective of its muddy condition. Therefore, the proposed driveway alteration rectifies this issue. 
Previously, the location of the lamppost to the right-hand side of the driveway hindered this proposition,
however, as this has since been relocated, the driveway can be accordingly extended to secure permanent
stable access to the Property, that is suitable for all users. 
The informatives associated with the parking standards for residential development are as follows:

Page 32

4 35051664_1
It is noted that visitor/unallocated vehicle parking can, subject to appropriate design, be located on or
near the road frontage.  The Application meets this standard.
Finally, the Application also is consistent with the SCOTS Guidance, and explicitly incorporates the good
practice example, as shown in the diagrams below. 
SCOTS Guide Applicant Visualisation
Although the driveway that is proposed does not have a footway associated with it, the driveway does
leave sufficient distance to the carriageway to be broadly consistent with the above standard.
Material Considerations
Whilst we acknowledge that each planning application is assessed on its own merits, precedent and
guidance does support the Applicant’s position.  We would like to draw the Council’s attention to the
Scottish Government’s Policy Statement “Designing Streets” which states “on-plot parking may be
suitable…when considered in terms of the overall street profile.”2 Upon review of neighbouring driveways
in East Rossdhu Drive, it appears that the proposed development in the Application mirrors existing
parking arrangements as highlighted in the pictures below. 
2 P41 Designing Streets

Page 33

5 35051664_1
The Application has considered the overall street profile when designing the on-site parking and the
proposal is not incongruous in the surrounding areas.
Further, we would like to highlight the favourable outcome in respect of other comparable applications in
Argyll and Bute. Particularly, Planning Reference 22/01825/PP, which sought to improve road safety and
access to the residential property, Allt Romain, Crossaig, Skipness, Tarbert, PA29 6YQ. There are
similarities in respect of this case and the Application.  We contend, however, that the Applicant’s
proposal is arguably more simplistic in its aims. Notably, despite its complexities no objection was received
by the Roads Authority. Rather the upgrades were retrospectively granted, and the report of handling
reveals that “The existing sub-standard access has been altered and widened; in order to widen the existing
access engineering works have been undertaken to the banks of the existing access. The development has
been undertaken to the satisfaction of the Roads Department who have raised no objections to the works
carried out and have noted that it a road safety improvement following the alterations.” In light of this
case, the Applicant, welcomes the opportunity for the Roads Authority to conduct a site visit.
Roads Authority Response
The Roads Authority in its consultation response to the Proposed Development states:
On review of the proposed, the access opening within the wall does not correspondingly increase
in width. As such, the proposed widening would not support access or egress to the property.
Any subsequent widening of the access over the verge could however be considered as an
approved location for off street parking, a function which is not supported due to its proximity to
a bend, limited visibility and the inability for a vehicle to enter and leave in a forward gear.
I therefore confirm Roads refuse the proposed.
Respectfully, we consider that the above represents a misunderstanding of the Proposed Development. 
As we have noted above, we consider that the Application may alternatively be described as follows:
1. Resurfacing of the vehicular driveway to the Property; and
2. Installation of cobbled path for dedicated pedestrian access/egress to the Property.
Insofar as vehicular access is concerned no material changes are proposed.  The driveway is not, in effect,
being widened but simply resurfaced.  Although there will be an extension of sorts to the cobbled area,
this will be to accommodate pedestrian access/exit from the Property.  It could not be utilised by vehicles.

Page 34

6 35051664_1
In terms of the comment regarding off street parking, it is noted that there are no parking controls at this
location.  We understand that this location is, however, part of the adopted road per the Council’s list of
adopted roads under section 1 of the Roads (Scotland) Act 1984.3  The Council is therefore at liberty to
introduce parking controls under the Road Traffic Regulation Act 1984 should it consider that such
controls are needed.  The Council could also introduce signage regarding the bend if considered
appropriate, or a convex traffic mirror.
Since the use of the driveway is not in any way changing, we consider that it is incorrect to assess the
application by reference to exit of the Property in a forward gear.  As noted above, the driveway is in
effect being resurfaced without the principal use of it changing in any material way.  We therefore do not
consider that such a technical assessment is appropriate.
Finally, we take this opportunity to enclose the opinion of Duncan Birrell, Roads Consultant of Modus
Transport Solutions Limited who considers that the Application can be supported by the Council.
We therefore respectfully request that the Council grants the Application as applied for.
Yours sincerely
Chris Devlin
Partner 
Anderson Strathern LLP
3 There is no indication in the adopted roads list that the verges are not also adopted, including the driveway

Page 35

Registered address:
6 Redheughs Rigg
South Gyle
Edinburgh
EH12 9DQ
T: 
E: duncan@modustransportsolutions.co.uk
W  :www.modustransportsolutions.co.uk
50 Charlotte Street Helensburgh
Page | 1
Argyll and Bute Council
Development Management
Kilmory Castle
Lochgilphead
Argyll
PA31 8RT 8th November 2023
F.A.O - Kirsty Sweeney
50 Charlotte Street, Helensburgh
Modus Transport Solutions Ltd has been appointed by Dawn Anderson to review the proposed minor alterations to
the existing driveway and pedestrian access into 50 Charlotte Street, Helensburgh. Modus Transport Solutions Ltd are
an independent transport consultancy with over 30 years of experience in providing traffic and transportation advice
to both public and private sector Clients.
We have taken the opportunity to review the proposed plans showing the driveway alterations and the various
supporting documentation and observations made by Argyll and Bute Council Development & Infrastructure Services.
We note that the alignment of the existing driveway relative to both the vehicle and pedestrian entrances to 50
Charlotte Street is poor and does not provide safe and convenient access for all users. The layout of the existing
driveway is historic and does not meet current requirements with respect to private residential driveways. The
proposals being put forward by our Client would seek to align the driveway with both the existing vehicular and
pedestrian-gated entrances to the property.
At present, the existing driveway does not provide sufficient space for access in and around a vehicle parked on the
driveway without the need to use the adjacent grassed area which more often than not is muddy and not suitable for
pushchairs or more importantly wheelchair access.  The driveway proposals would allow easier access to a parked
vehicle while at the same time allowing a safe and direct route to the pedestrian entrance to the property. The
proposals would see the driveway widened to the extent of the driveway pillars and this is in keeping with the adjacent
property at number 52 Charlotte Street and indeed all of the properties along the length of  East Rossdhu Drive. Our
Client is not seeking to undertake any work that is not in keeping with the other driveway accesses in the area and is
simply seeking to improve and formalise the existing driveway to make it fit for purpose and safe for all users.

Page 36

50 Charlotte Street, Helensburgh 
Proposed Dirveway Alterations
50 Charlotte Street Helensburgh
Page | 2
The proposed driveway works are to be undertaken using Marshalls cobbled sets which will provide an attractive area
in keeping with the surrounding nature of Charlotte Street. 
It is the professional opinion of Modus Transport Solutions Ltd that the driveway proposals at 50 Charlotte Street,
Helensburgh, will provide a safe and modern driveway layout to meet the requirements of all users without
compromising road safety in the area.
We trust that our comments and views on the proposals at 50 Charlotte Street will be taken into consideration when
Argyle and Bute Planning Department make their determination on the Application.
Yours sincerely,
On behalf of Modus Transport Solutions
Duncan Birrell
Director
Phone:
E-mail: duncan@modustransportsolutions.co.uk

Page 37

50 Charlotte Street, Helensburgh 
Proposed Dirveway Alterations
50 Charlotte Street Helensburgh
Page | 3

Page 38

National Planning
Framework 4

Page 39

National Planning Framework 4
01
Contents
02 Ministerial Foreword
03 Part 1 – A National Spatial Strategy for Scotland 2045
Spatial Principles
Sustainable Places
Liveable Places
Productive Places
National Spatial Strategy Map
National Developments Map
Regional Spatial Priorities:
North and West Coast and Islands
North
North East
Central
South
36 Part 2 – National Planning Policy
Sustainable Places
1. Tackling the climate and nature crises
2. Climate mitigation and adaptation
3. Biodiversity
4. Natural places
5. Soils
6. Forestry, woodland and trees
7. Historic assets and places
8. Green belts
9. Brownfield, vacant and derelict land and empty buildings
10. Coastal development
11. Energy
12. Zero waste
13. Sustainable transport
Liveable Places
14. Design, quality and place
15. Local Living and 20 minute neighbourhoods
16. Quality homes
17. Rural homes
18. Infrastructure first
19. Heat and cooling
20. Blue and green infrastructure
21. Play, recreation and sport
22. Flood risk and water management
23. Health and safety
24. Digital infrastructure
Productive Places
25. Community wealth building
26. Business and industry
27. City, town, local and commercial centres
28. Retail
29. Rural development
30. Tourism
31. Culture and creativity
32. Aquaculture
33. Minerals
94 Part 3 – Annexes
A – How to use this document
B – National Developments Statements of Need
C – Spatial planning priorities
D – Six qualities of successful places
E – Minimum all-tenure housing land requirement
F – Glossary of definitions
G – Acronyms

Page 40

Ministerial Foreword
Ministerial Foreword
Tom Arthur MSP
Minister for Public Finance, 
Planning and Community Wealth
National Planning Framework 4 
02
I am delighted to publish Scotland’s fourth
National Planning Framework. I am proud that,
for the first time, we have brought together our
long-term spatial strategy with a comprehensive
set of national planning policies to form part of
the statutory development plan.
The world is changing, and so are Scotland’s
places. This strategy sets out how we will
work together in the coming years to improve
people’s lives by making sustainable, liveable
and productive places. This will play a key role
in delivering on the United Nations Sustainable
Development Goals, as well as our national
outcomes.
Planning carries great responsibility – decisions
about development will impact on generations
to come. Putting the twin global climate and
nature crises at the heart of our vision for a
future Scotland will ensure the decisions we
make today will be in the long-term interest of
our country.
As we recover from the pandemic we are
working towards achieving net zero in a way
which also tackles longstanding challenges and
inequalities. We live in challenging times, but
better places will be an important part of our
response to our strategic priorities of net zero,
child poverty and a wellbeing economy. Planning
will also play a critical role in delivering the
National Strategy for Economic Transformation
and in community wealth building.
Planning is already a fully devolved function of
the Scottish Government. Our global reputation
for excellence and expertise in this field
demonstrates what can be achieved when the
choices are in our own hands. We can build on
this. By securing a new future for Scotland as
an independent country, additional powers will
be available to support public and private sector
investment in development and infrastructure
across our country.
Changes to our places will not always be
easy. People care about their neighbourhoods
and rightly and reasonably expect that new
development should improve their lives, rather
than undermining what they value most. To
help deliver on this strategy I am committed to
involving a wider range of people in planning.
A fairer and more inclusive planning system
will ensure that everyone has an opportunity to
shape their future so that our places work for all
of us. I also recognise that planning authorities
across Scotland will need support and guidance
to put our proposals and policies into practice,
and will continue to work with the profession
and local government to ensure our system can
realise its full potential.
The process for preparing this strategy has
shown what can be achieved when we work
together. I greatly appreciate the ideas that
people and organisations have contributed. I
am also very grateful to the Scottish Parliament
for the time and energy they have put into their
scrutiny of the draft document. National Planning
Framework 4 has benefited considerably from
their thoughtful and constructive input.

Page 41

Part 1 – National Spatial Strategy
National Planning Framework 4
03
The world is facing unprecedented challenges.
The global climate emergency means that we
need to reduce greenhouse gas emissions
and adapt to the future impacts of climate
change. We will need to respond to a growing
nature crisis, and to work together to enable
development that addresses the social and
economic legacy of the coronavirus pandemic,
the cost crisis and longstanding inequality.
Scotland’s rich heritage, culture and outstanding
environment are national assets which support
our economy, identity, health and wellbeing.
Many communities benefit from great places with
excellent quality of life and quality, affordable
homes. Many people can easily access high
quality local greenspaces and neighbourhood
facilities, safe and welcoming streets and spaces
and buildings that reflect diverse cultures and
aspirations. Increasingly, communities have been
finding new ways to live sustainably, including
by taking control of their property or land.
However, people living in Scotland have very
different life chances, at least partly a result of
the places where they live.
Past industrial restructuring has had significant
impacts in some places and communities.
Disadvantage, child poverty and poor health
outcomes are concentrated in parts of Scotland
where life expectancy is significantly lower than
in more advantaged areas. Access to the natural
environment varies, and pollution and derelict
land is concentrated in some places. Population
change will bring further challenges in the future,
particularly in rural parts of Scotland. Many
people have limited access to opportunities
because of the way our places have been
designed in the past, and our city and town
centres have experienced accelerating change
in recent years.
We have already taken significant steps towards
decarbonising energy and land use, but choices
need to be made about how we can make
sustainable use of our natural assets in a way
which benefits communities.
Planning is a powerful tool for delivering change
on the ground in a way which brings together
competing interests so that decisions reflect
the long-term public interest. Past, present
and future challenges mean that we will
need to make the right choices about where
development should be located. We also need
to be clear about the types of infrastructure we
will need to build, and the assets that should
be protected to ensure they continue to benefit
future generations.
Part 1 –
A National Spatial Strategy for
Scotland 2045

Page 42

National Planning Framework 4
04
Part 1 – National Spatial Strategy
Spatial principles
We will plan our future places in line with six
overarching spatial principles:
• Just transition. We will empower people to
shape their places and ensure the transition to
net zero is fair and inclusive.
• Conserving and recycling assets. We will
make productive use of existing buildings,
places, infrastructure and services, locking
in carbon, minimising waste, and building a
circular economy.
• Local living. We will support local liveability
and improve community health and wellbeing
by ensuring people can easily access
services, greenspace, learning, work and
leisure locally.
• Compact urban growth. We will limit urban
expansion so we can optimise the use of land
to provide services and resources, including
carbon storage, flood risk management, blue
and green infrastructure and biodiversity.
• Rebalanced development. We will target
development to create opportunities for
communities and investment in areas of
past decline, and manage development
sustainably in areas of high demand.
• Rural revitalisation. We will encourage
sustainable development in rural areas,
recognising the need to grow and support
urban and rural communities together.
These principles will play a key role in delivering
on the United Nations (UN) Sustainable
Development Goals (SDGs) and our national
outcomes.
Applying these principles in practice
We want our future places to work for everyone.
Rather than compromise or trade-offs between
environmental, social and economic objectives,
this is an integrated strategy to bring together
cross-cutting priorities and achieve sustainable
development.
By applying these spatial principles, our national
spatial strategy will support the planning and
delivery of:
• sustainable places, where we reduce
emissions, restore and better connect
biodiversity;
• liveable places, where we can all live better,
healthier lives; and
• productive places, where we have a greener,
fairer and more inclusive wellbeing economy.
Eighteen national developments support
this strategy, including single large scale
projects and networks of several smaller
scale proposals that are collectively nationally
significant. National developments will be a
focus for delivery, as well as exemplars of the
Place Principle, placemaking and a Community
Wealth Building (CWB) approach to economic
development. Regional spatial strategies and
Local Development Plans (LDPs) should identify
and support national developments which are
relevant to their areas.
The strategy will be taken forward in different
ways across Scotland, reflecting the diverse
character, assets and challenges of our places.
To guide this, we have identified regional
spatial priorities for five broad regions of
Scotland which will inform the preparation of
regional spatial strategies (RSS) and LDPs by
planning authorities.

Page 43

National Planning Framework 4
05
Table 1 – National Planning Framework 4 Summary
Spatial principles National Developments Policies Key policy links Cross cutting policies
Sustainable places
SDGs: 7, 11, 12, 13
National outcomes:
Environment,
communities, economy
• Just transition
• Conserving and
recycling assets
• Energy Innovation Development
on the islands.
• Pumped Hydro Storage
• Strategic Renewable Electricity
Generation and Transmission
Infrastructure
• Circular Economy Materials
Management Facilities
• Urban Sustainable, Blue
and Green Surface Water
Management Solutions
• Urban Mass/Rapid Transit
Networks
• Tackling the climate and nature crises
• Climate mitigation and adaptation
• Biodiversity
• Natural places
• Soils
• Forestry, woodland and trees
• Historic assets and places
• Green belts
• Brownfield land, vacant and derelict land
and empty buildings
• Coastal development
• Energy
• Zero waste
• Sustainable transport
• Land Use – getting the best from
our land: strategy 2021 – 2026
• Making things last: a circular
economy strategy for Scotland
• Scotland’s Energy Strategy
• Scotland’s Environment Strategy
• Scotland’s Forestry Strategy
• Scottish Biodiversity Strategy
• Climate Change Plan
• Climate Change
Adaptation Programme
• Just Transition Plans
• National Transport
Strategy
• Infrastructure
Investment Plan
• Strategic Transport
Projects Review 2
• National Islands Plan
• National Marine Plan
• Tackling Child Poverty
Delivery Plan
Liveable places
SDGs: 3, 4, 5, 6, 10, 11
National outcomes:
Communities, culture,
human rights, children
and young people,
health
• Liveable places
• Compact urban
growth
• Central Scotland Green Network
• National Walking, Cycling and
Wheeling Network
• Edinburgh Waterfront
• Dundee Waterfront
• Stranraer Gateway
• A Digital Fibre Network
• Design, quality and place
• Local living and 20 minute neighbourhoods
• Quality homes
• Rural homes
• Infrastructure first
• Heat and cooling
• Blue and green infrastructure
• Play, recreation and sport
• Flood risk and water management
• Health and Safety
• Digital infrastructure
• A Connected Scotland
• A Healthier Future: Scotland’s diet
and healthy weight delivery plan
• Cleaner Air for Scotland 2
• Creating Places
• Culture Strategy
• Heat in Buildings Strategy
• Housing to 2040
• Learning Estate Strategy/Learning
Estate Investment Programme
• Public Health Priorities for Scotland
• Remote, Rural and Islands Housing
Action Plan (pub. Spring 2023)
• Scotland’s Population Strategy
Productive places
SDGs: 1, 2, 8, 9, 11, 14
National outcomes: Fair
work and business,
economy, poverty,
communities
• Rebalancing
development
• Rural revitalisation
• Clyde Mission
• Aberdeen Harbour
• Industrial Green Transition Zones
• Hunterston Strategic Asset
• Chapelcross Power Station
Redevelopment
• High Speed Rail
• Community wealth building
• Business and industry
• City, town, local and commercial centres
• Retail
• Rural development
• Tourism
• Culture and creativity
• Aquaculture
• Minerals
• National Strategy for Economic
Transformation
• Retail Strategy for Scotland
• Report of the City Centre Recovery
Taskforce
• Scottish land rights and
responsibilities statement
• Town Centre Action Plan 2

Page 44

National Planning Framework 4
06
Part 1 – National Spatial Strategy
Sustainable places
Our climate is changing, with increasing rainfall,
extreme weather events and higher temperatures
that will intensify in the coming years. This will
increase flood risk, water scarcity, environmental
change, coastal erosion, impact on forestry and
agriculture, and generate risks to health, food
security and safety. Impacts will not be equal
and communities who already face disadvantage
will be particularly affected.
Scotland’s high quality environment, and
the natural capital it supports, underpin our
approach to tackling climate change and the
economy and is fundamental to our health and
wellbeing. It provides the essentials we all need
to survive, including clean air, water and food.
However, the health of the planet’s ecosystems
is declining faster than at any point in human
history and our natural environment is facing
significant challenges, including ongoing loss
of biodiversity. Since the 1990s alone, wildlife
populations in Scotland have declined, on
average, by around a quarter. This threatens the
capacity of the natural environment to provide
the services we all rely on, and reduces our
resilience to the impacts of climate change.
Scotland’s Climate Change Plan, backed by
legislation, has set our approach to achieving
net zero emissions by 2045, and we must
make significant progress towards this by 2030
including by reducing car kilometres travelled
by 20% by reducing the need to travel and
promoting more sustainable transport.
Just Transition sector plans, designed and
delivered with those impacted, will play an
important role in delivering the change we need
to see. We must also adapt to the impacts of
climate change that are already locked in, by
delivering Scotland’s Climate Change Adaptation
Programme.
Scotland’s Climate Assembly set out
recommendations for how Scotland should
change to tackle the climate emergency and
gives us a key insight into the measures the
Scottish Public expect for a just transition to net
zero emissions by 2045.
Scotland’s Energy Strategy will set a new
agenda for the energy sector in anticipation
of continuing innovation and investment. The
interplay between land and sea will be critical,
given the scale of offshore renewable energy
resources. Our Infrastructure Investment Plan
and National Transport Strategy are clear that we
must work with our existing infrastructure assets
first, before investing in additional assets.
Scotland’s Environment Strategy sets out the
Scottish Government’s vision for tackling the
twin climate and nature crises. Building on this,
a new Scottish Biodiversity Strategy will set
targets for halting biodiversity loss by 2030 and
restoring and regenerating biodiversity by 2045.
Scotland’s Land Use Strategy aims to make
efficient use of our land by managing competing
activities in a sustainable way.

Page 45

National Planning Framework 4
07
Part 1 – National Spatial Strategy
National spatial strategy
Scotland’s future places will be net zero,
nature-positive places that are designed to
reduce emissions and adapt to the impacts of
climate change, whilst protecting, recovering
and restoring our environment.
Meeting our climate ambition will require a rapid
transformation across all sectors of our economy
and society. This means ensuring the right
development happens in the right place.
Every decision on our future development
must contribute to making Scotland a more
sustainable place. We will encourage low and
zero carbon design and energy efficiency,
development that is accessible by sustainable
travel, and expansion of renewable energy
generation. It is also crucial that we build
resilience to the future impacts of climate
change including water resources and assets
and development on our coasts. Our places
will also need to evolve to help us cope with
changing temperatures.
Our commitment to a just transition, means
that our journey to a net zero society and nature
recovery must involve, and be fair to, everyone.
We will grow a circular economy and make best
use of embodied carbon by conserving and
recycling assets, including by encouraging
sustainable design and the wise use of
resources.
To respond to the global biodiversity crisis,
nature recovery must be at the heart of future
places. We will secure positive effects for
biodiversity, create and strengthen nature
networks and invest in nature-based solutions to
benefit natural capital and contribute to net zero.
We will use our land wisely including through a
renewed focus on reusing vacant and derelict
land to help limit the new land that we build
on. We will protect and enhance our historic
environment, and safeguard our shared heritage
for future generations. We will also work together
to ensure that development onshore aligns with
national, sectoral and regional marine plans.
National developments
Six national developments support the delivery of
sustainable places:
• Energy Innovation Development on the
Islands provides infrastructure for low carbon
fuels for communities and commerce, as well
as for export. This will contribute to improved
energy security, unlock opportunities for
employment and business, and help to put
Scotland at the forefront of low carbon fuel
innovation.
• Pumped Hydro Storage extends hydro-
electricity capacity to support the transition
away from fossil fuels, whilst also providing
employment opportunities in rural areas.
• Strategic Renewable Electricity Generation
and Transmission Infrastructure supports
electricity generation and associated grid
infrastructure throughout Scotland, providing
employment and opportunities for community
benefit, helping to reduce emissions and
improve security of supply.
• Circular Economy Materials Management
Facilities facilitates delivery of zero waste
objectives by reducing the need for new
materials, resource use and emissions.
• Urban Sustainable, Blue and Green
Surface Water Management Solutions is an
exemplar of a nature based, infrastructure first
approach to catchment wide surface water
flood risk management to help our two largest
cities adapt to the future impacts of climate
change.
• Urban Mass/Rapid Transit Networks
facilitates a shift towards sustainable transport
in Glasgow, Edinburgh, and Aberdeen
and their wider regions, helping to reduce
transport related emissions and supporting
accessibility for all.

Page 46

National Planning Framework 4
08
Part 1 – National Spatial Strategy
CROSS-CUTTING OUTCOME AND POLICY LINKS:
REDUCING GREENHOUSE GAS EMISSIONS
Our strategy and policies support development that helps to meet greenhouse gas emissions
targets.
The global climate emergency and the nature crisis have formed the foundations for the spatial
strategy as a whole. The regional priorities share opportunities and challenges for reducing
emissions and adapting to the long-term impacts of climate change, in a way which protects
and enhances our natural environment.
Policy 1 gives significant weight to the global climate emergency in order to ensure that it is
recognised as a priority in all plans and decisions. Policy 2 will ensure that emissions from new
development are minimised as far as possible.
A healthy natural environment is key to reducing emissions. Policies 3 and 4 protect biodiversity
and natural assets, which in turn play a crucial role in carbon reduction. Policy 5 provides
significant protection for peatland and carbon rich soils and Policy 6 aims to protect and
expand forests, woodland and trees. Blue and green infrastructure is supported by Policy 20.
Policy 10 encourages the use of natural solutions to coastal protection. Policy 7 protects the
embodied carbon in the historic built environment, and Policy 9 makes better use of previously
used land and buildings, helping to lock in carbon.
By supporting the transition of key emissions generating activities, Policy 11 supports renewable
energy development, Policy 19 helps to decarbonise heat, alongside Policy 18 and its
encouragement of an infrastructure first approach. Policy 12 encourages sustainable waste
management, and Policy 13 will facilitate a transition towards more sustainable, lower emissions
travel including active travel and public transport.
Several policies support more local living and limit the use of additional land for development.
This includes Policy 8 which manages development in the greenbelt, Policy 15 which promotes
local living, including where feasible 20 minute neighbourhoods, and Policy 16 which focuses
on delivering new homes that are designed to a high standard and located in sustainable
places. Minimising and reducing emissions is also integral to the six qualities of successful
places, as set out in Policy 14. Policies 17 and 29 support rural development which is
compatible with climate change targets. Policy 24 facilitates the roll out of digital infrastructure,
helping to reduce the need to travel. Policy 27 promotes a town centre first approach to
development and Policy 28 restricts additional out of town retail development.
Policies relating to productive places are consistent with our ambition for green growth in
the futures. More specifically, Policy 33 is clear that fossil fuel exploration, development
and production (excluding unconventional oil and gas) will not be supported other than in
exceptional circumstances, and that the Scottish Government does not support the development
of unconventional oil and gas in Scotland.

Page 47

National Planning Framework 4
09
Part 1 – National Spatial Strategy
CROSS-CUTTING OUTCOME AND POLICY LINKS:
IMPROVING BIODIVERSITY
Our strategy and policies support development that helps to secure positive effects for
biodiversity.
The nature crisis, together with the global climate emergency, underpinned the spatial strategy
as a whole. The action areas include proposals which protect and enhance the natural
environment.
Policy 1 gives significant weight to the nature crisis to ensure that it is recognised as a priority
in all plans and decisions. Policy 4 protects and enhances natural heritage, and this is further
supported by Policy 5 on soils and Policy 6 on forests, woodland and trees. Policy 20 also
promotes the expansion and connectivity of blue and green infrastructure, whilst Policy 10
recognises the particular sensitivities of coastal areas.
Protection of the natural features of brownfield land is also highlighted in Policy 9, and
protection of the green belt in Policy 8 will ensure that biodiversity in these locations is
conserved and accessible to communities, bringing nature into the design and layout of our
cities, towns, streets and spaces in Policy 14.
Most significantly, Policy 3 plays a critical role in ensuring that development will secure positive
effects for biodiversity. It rebalances the planning system in favour of conserving, restoring and
enhancing biodiversity and promotes investment in nature-based solutions, benefiting people
and nature. The policy ensures that LDPs protect, conserve, restore and enhance biodiversity
and promote nature recovery and nature restoration. Proposals will be required to contribute
to the enhancement of biodiversity, including by restoring degraded habitats and building and
strengthening nature networks. Adverse impacts, including cumulative impacts, of development
proposals on the natural environment will be minimised through careful planning and design,
taking into account the need to reverse biodiversity loss. Development proposals for national,
major or Environmental Impact Assessment (EIA) development will only be supported where
it can be demonstrated that the proposal will conserve, restore and enhance biodiversity,
including nature networks, so they are in a demonstrably better state than without intervention.
Proposals for local development will include appropriate measures to conserve, restore and
enhance biodiversity.

Page 48

National Planning Framework 4
10
Part 1 – National Spatial Strategy
Liveable places
The global pandemic has left a social legacy
that requires urgent, as well as long-term action.
Many people need better places to support their
lifelong health and wellbeing and build their
future resilience. In recent years communities
have found ways to work together to find local
solutions to shared challenges. However, the
cost crisis is again underlining the need for
our future buildings and places to do more to
support our long-term resilience.
There remain significant differences between the
healthy life expectancy of people living in the
most and least deprived parts of Scotland. More
people need to be involved in planning their
future places so that the built environment is safe
and welcoming to everyone, including women,
disabled people, children and young people and
black and ethnic minority groups.
Scotland’s Tackling Child Poverty Delivery
Plan sets out actions required to continue to
reduce the number of children living in poverty.
It recognises the importance of place and
continued investment in regeneration, targeted to
areas where the need is greatest.
Access to affordable, quality homes in better
places, as supported by Housing to 2040, will
make an important contribution to addressing the
impact of the cost crisis, particularly on younger
people who will also benefit from reduced
transport costs. The planning system has an
important role to play in supporting the delivery
of homes which meet our future needs.
Consistent with this, Scotland’s Population
Strategy reflects the need for planning to identify
the amount of land required for future homes
and to enable more balanced demographic
change including sustainable rural development.
Health policies, including Scotland’s diet
and healthy weight delivery plan reflect
the importance of places which provide
opportunities for exercise and access to healthy
food. Our strategy for tackling social isolation
and loneliness also recognises the importance
of providing quality, accessible and welcoming
places for everyone through placemaking and
regeneration.

Page 49

National Planning Framework 4
11
Part 1 – National Spatial Strategy
National spatial strategy
Scotland’s future places will have homes and
neighbourhoods that are healthier, affordable
and vibrant places to live.
We have an opportunity to significantly improve
our places, address longstanding inequality and
eliminate discrimination, helping to transform our
country for the better. Cleaner, safer and greener
places and improved open spaces will build
resilience and provide wider benefits for people,
health and biodiversity, in a balanced way.
We will plan our future places in a way that
improves local living, so that we live in
communities that are inclusive, empowered,
resilient, safe and provides opportunites for
learning. Quality homes will be better served
by local facilities and services by applying
the principles of local living to development
proposals. The concept of 20 minute
neighbourhoods will help to support this,
particularly in more urban areas. In rural areas
the approach to local living will be shaped by
local context.
Planning must also enable the delivery of good
quality, affordable homes by allocating enough
land in the right locations to meet current and
future needs and aspirations.
Recognising the need for liveable places to be
consistent with our ambition for net zero and
nature recovery, we will promote compact urban
growth. Higher density development which will
help to sustain public transport and support
local living. Virtual connectivity and continued
investment in active travel links will also be
important.
We want to make better use of our spaces to
support physical activity, relaxation and play,
to bring people together and to celebrate our
culture, diversity and heritage. Buildings and
other physical assets can also support activities
based on intangible cultural assets such as
Gaelic language.
We will improve green infrastructure to bring
nature into our towns and cities, connecting
people with nature, building resilience and
helping our biodiversity to recover and flourish.
We will ensure we work towards a stronger
infection-resilient society through adaptations to
our buidlings and the spaces around them.
Our strategy is to value, enhance, conserve
and celebrate our places and to build better
communities for future generations. A stronger
commitment to placemaking, through a design-
led approach and a focus on quality, will ensure
every new development improves the experience
of our places.
Underpinning this, everyone must have
an opportunity to help shape their local
neighbourhoods. We will continue to work to
broaden involvement in the planning system as a
whole.

Page 50

National Planning Framework 4
12
Part 1 – National Spatial Strategy
National developments
Six national developments support the delivery of
liveable places:
• Central Scotland Green Network restores
nature at scale and acts as an exemplar
of green infrastructure in placemaking
that provides benefits for communities
and supports a wellbeing economy. This
will provide multiple benefits for health,
biodiversity, and will help us to mitigate
and adapt to climate change. Action should
continue to focus on areas where community
wellbeing and resilience would benefit most.
• National Walking, Cycling and Wheeling
Network strengthens and extends a national
active travel network to reduce emissions
from transport, focusing on areas where
improvements to accessibility are most
needed.
• Edinburgh Waterfront creates a high quality,
mixed use, locally liveable place, contributing
to the sustainable future development of
Scotland’s capital city.
• Dundee Waterfront delivers a high
quality, mixed use, locally liveable place
demonstrating resilient waterfront regeneration
which anticipates and responds to climate
impacts.
• Stranraer Gateway acts as a hub for
surrounding communities. Regeneration will
help create a high quality, mixed use, locally
liveable place, optimising the area as a
national and international gateway.
• A Digital Fibre Network enhances the
connectivity of communities and help to
facilitate more sustainable ways of living
including in rural and island communities.

Page 51

National Planning Framework 4
13
Part 1 – National Spatial Strategy
CROSS-CUTTING OUTCOME AND POLICY LINKS:
A FAIR AND INCLUSIVE PLANNING SYSTEM
Our strategy and policies support development that helps to eliminate discrimination and
promote equality.
We expect everyone involved in planning to take steps to ensure that a wide range of people
are involved in shaping their future places. Planning authorities are required to respect, protect
and fulfil human rights in accordance with the Human Rights Act 1998. As per the Equality Act
2010, the Public Sector Equality duty is applicable and Equality Impact Assessments, Fairer
Scotland Duty Assessments and where applicable Island Communities Impact Assessments are
required for LDPs. The UN Convention of the Rights of the Child also means that young people
must be encouraged to play an active role in planning.
Throughout the planning system, opportunities are available to engage in development
planning and decisions about future development. Such engagement, undertaken in line with
statutory requirements, should be early, collaborative, meaningful and proportionate. Support or
concern expressed on matters material to planning must be given careful consideration in the
determination of development proposals.
Our places can only work for everyone if the views of all users are properly understood, but
experience shows that some people can find it more challenging to engage with planning.
There are opportunities to involve a wider range of people in the planning system. It is essential,
and a statutory requirement, that people with protected characteristics, including disability,
race, age, sex and sexual orientation, and including people from a range of socio-economic
backgrounds, are given particular support to express their views on plans and decisions, with
consultations designed to meet the communication needs of people.
The spatial strategy as a whole is clear that our future development must support a just
transition, and it highlights opportunities for development and regeneration that are designed
to tackle social, economic and health inequalities. Policy 14, focusing on the six qualities of
successful places recognises that diversity is an integral part of placemaking. Children and
young people will have an important contribution to make, given the long-term impacts of
planning for future generations. Women, as well as disabled people and their representatives,
can ensure that barriers and challenges of the design of our living and working environments
are tackled effectively. We have also provided clear support for development that will help to
ensure human rights are maintained, for example: Policy 16 on quality homes which addresses
the need for accommodation for Gypsy/Travellers and Travelling Showpeople yards, as well
as homes for older people and disabled people; and Policy 21 which supports and facilitates
spaces and opportunities for play, recreation and sport in our natural and built environments for
children and people for all ages.
Our impact assessment has demonstrated that there is potential for significant benefits from
more sustainable, liveable and productive places which will be delivered by these and other
policies. We recognise that delivery will also depend on fair and inclusive engagement with
people, and we will therefore continue to promote best practice and innovation, including in
guidance on effective community engagement.

Page 52

National Planning Framework 4
14
Part 1 – National Spatial Strategy
CROSS-CUTTING OUTCOME AND POLICY LINKS:
HOMES THAT MEET OUR DIVERSE NEEDS
Our strategy and policies support development that helps to meet the housing needs of people
living in Scotland including, in particular, the housing needs of older people and disabled
people.
The spatial strategy has taken into account future population and household projections, and
highlights areas where there will be particular challenges arising from an ageing population.
Spatial principles, including local living and just transition, will also help to ensure that the needs
of all people are reflected in our future places.
Policy 16 supports the delivery of high quality, sustainable homes that meet the needs of
people throughout their lives. In particular, it supports proposals for new homes that improve
affordability and choice by being adaptable to changing and diverse needs, and which
address identified gaps in provision. This could include: accessible, adaptable and wheelchair
accessible homes; homes that meet the needs of older people; a range of size of homes; and
other specialist groups.
The majority of older people want to remain in their home as they age, preferring mainstream
housing, and so accessible and adaptable homes can allow people to continue to live
independently. The close alignment of planning and housing delivery at the local level, through
LDPs and Local Housing Strategies, will help to deliver the right type and mix of homes in the
right locations. In addition Housing to 2040 sets out a commitment to Scottish Accessible Home
Standard in 2025/26.
Development that provides homes to meet the needs of older people and disabled people will
be further promoted by LDPs. Evidence reports will explain the action taken to support and
promote the construction and/ or adaptation of homes to meet their needs. Spatial strategies will
take into account housing needs and the availability of land for new homes, including for older
people and disabled people through the Accessible Home Standard, wheelchair housing targets
and the consideration of accessibility in design of the wider development and local amenity. The
planning authority must also keep their plan under review, and monitor any changes in this.
Placemaking and choices about the location of development will also help to meet the needs of
older people and disabled people. Policy 14 supports development that is consistent with the
six qualities of successful places, including health and wellbeing, and safe and pleasant places
for people to meet. Policy 15 supports development that is consistent with the principles of local
living and 20 minute neighbourhoods, helping to ensure our homes and wider neighbourhoods
meet all of our needs. As part of this, it recognises that affordable housing options, ability to
age in place and housing diversity are an integral part of more liveable places. Policy 13 is also
clear that the views of disabled people must be sought when seeking to reduce reliance on the
car including by managing car parking provision.

Page 53

National Planning Framework 4
15
Part 1 – National Spatial Strategy
Productive places
The economic performance of different parts of
Scotland varies considerably, with challenges
and opportunities for different places and
sectors. At present, some communities are
particularly affected by high rates of poverty, one
in five people of working age is economically
inactive, and there is significant scope to
improve our productivity and the scale and rate
of business development.
The unprecedented challenge of the pandemic
has created difficult conditions for some sectors
including hospitality, tourism, and culture. The
cost crisis and our exit from the European Union
have combined with this to exacerbate labour
shortages particularly in our more remote, rural
and island communities. World-wide supply
chain issues have generated severe challenges,
including for the construction sector.
Scotland’s National Strategy for Economic
Transformation aims to make Scotland a
successful place with opportunities for everyone,
in every region of Scotland, to share in our
economic prosperity. It tackles the challenges
of structural inequality, the transition to net
zero, and achieving a green recovery from the
pandemic. It also supports entrepreneurship and
aims to play to the strengths and assets of each
part of Scotland to build community wealth.
Building community wealth should be founded
on an assessment of local assets in partnership
with communities. It also involves better co-
ordinated state investment at national, regional
and local levels to strengthen of Scotland’s
indigenous business base and create
sustainable fair work opportunities. Opportunities
will flow from more land and assets being placed
in the hands of communities or under their
guiding influence.
Our city centres are socially and culturally
important, supporting our productivity and
stimulating innovation and investment. The
pandemic has generated severe impacts and
longer term challenges for these places. The
City Centre Recovery Taskforce has developed
a shared vision for their future with support from
the City Centre Recovery Fund for recovery and
repurposing. Through playing their part in the
delivery of the National Strategy for Economic
Transformation, Scotland’s cities have a
nationally significant opportunity to contribute to
Scotland’s economic recovery and to achieve a
wellbeing economy.
The Town Centre Action Plan Review and our
subsequent response recognises the critical
importance of planning with and for communities
sets a new vision for town centres, and reaffirms
our commitment to the Town Centre First
Principle. It recognises the critical importance of
planning in diversifying the offer within our city
and town centres, to help them thrive, improve
their resilience and anticipate continuing societal,
environmental and economic change. The Place
Based Investment Programme supports our
commitment to town centre action, places, local
living and community wealth building.

Page 54

National Planning Framework 4
16
Part 1 – National Spatial Strategy
National spatial strategy
Our future places will attract new investment,
build business confidence, stimulate GDP,
export growth and entrepreneurship, and
facilitate future ways of working.
Planning will play a key role in creating a
globally competitive, entrepreneurial, inclusive
and sustainable economy, with thriving and
innovative businesses, quality jobs and fair work
for everyone.
We will actively encourage investment where it
is needed most by rebalancing development.
This will play to the economic strengths
and opportunities of each part of Scotland.
Significant investment opportunities include
strategic sites which were previously a focus for
industrial activity but which have experienced
decline. These locations will play a significant
role in our transition to net zero as they are
served by strategic infrastructure, well located
on or close to developed coasts, and could
provide added benefits for communities that are
in greatest need. They also include areas that
have been overlooked historically, but which are
now strategically located for extensive renewable
energy generation.
Planning can enable diversification of city, town
and commercial centres, to better manage their
role and respond to ongoing changes to the
way we shop and access services. The way we
work is changing, and we will need to be flexible
to facilitate future business and employment
that benefits communities and improves places.
Digital connectivity will play a crucial role in
supporting sustainable work in the future.
The way we plan our places can contribute to
our short term recovery, as well as longer term
restructuring to tackle long standing inequalities.
Our strategy is to build a wellbeing economy
that benefits everyone, and every place, in
Scotland. We want the planning system to create
a society that is thriving across economic, social
and environmental dimensions, and that delivers
prosperity for all.
Scotland’s national and international connectivity
for people and freight will remain important,
for the economic, social and cultural benefits it
delivers and for supporting wider Government
ambitions on trade, tourism, and business
development. Airports, ports and rail links
will provide vital connections within Scotland
and beyond which will be crucial to building
on a sustainable recovery whilst helping to
decarbonise transport through low and zero
emissions technologies. Looking ahead, there
will also be opportunities to build on inclusive
growth within communities and support
economic transformation through Green
Freeports in Scotland.
Rural revitalisation, achieved by distributing
development, investment and infrastructure
strategically and by actively enabling rural
development in particular, will play an important
role in this. Key sectors including energy and
food and drink focus on natural resources and
provide signficant employment in rural parts
of Scotland. These sectors also depend on
supporting services and access to markets
and there is significant potential for associated
investment to develop a sustainable supply
chain. Digital connectivity will also be critical to
their continued succes.
Urban areas are a focus for investment in the
built environment and many of our industries and
businesses are located in and around our cities.
These areas will also be more attractive to future
investors and their employees if they are greener
and healthier places to live.

Page 55

National Planning Framework 4
17
Part 1 – National Spatial Strategy
National developments
Six national developments support the delivery of
productive places:
• Clyde Mission brings together substantial
public and private investment to remediate
and regenerate brownfield land along
the River Clyde for economic, social and
environmental uses.
• Aberdeen Harbour facilitates completion of
the South Harbour and access to it as well as
a more mixed use waterfront for Aberdeen on
areas of the harbour that will not in future be
required for port uses. This will contribute to
international and national connectivity, freight
and the renewable energy sector.
• Industrial Green Transition Zones support
transformation of key sites including by
putting in place the infrastructure needed to
commercialise carbon capture and storage
and decarbonise industry. Innovation will
provide green jobs, reduce emissions
and help Scotland lead the way on new
technologies.
• Hunterston Strategic Asset supports re-use
the port and wider site, engaging in new
technologies and creating opportunities from
nuclear decommissioning to make best use
of existing infrastructure and provide local
benefits.
• Chapelcross Power Station Redevelopment
involves the reuse of a key site to provide
a range of economic opportunities for local
communities. Energy produced will help to
reduce heating and transport emissions within
the wider region.
• High Speed Rail ensures connectivity with
the United Kingdom (UK) and beyond,
reduce long distance transport emissions and
optimise the benefits more widely.

Page 56

National Planning Framework 4
18
Part 1 – National Spatial Strategy
CROSS-CUTTING OUTCOME AND POLICY LINKS:
RURAL REVITALISATION
Our strategy and policies support development that helps to retain and increase the population
of rural areas of Scotland.
The spatial strategy reflects a wide range of proposals for development in rural areas, supported
by national developments that recognise the potential and need to expand key sectors including
renewable energy, sustainable transport and green infrastructure.
Policy 17 promotes the development of rural homes, to ensure the needs of communities are
met in a sustainable way. Similarly, Policy 29 encourages development that will contribute
to rural economies and communities. Development proposals that contribute to the viability,
sustainability and diversity of rural businesses are supported while ensuring planning policies
take into consideration local characteristics. Both policies support development in previously
inhabited areas in a way that is guided by LDPs. Greater constraint will be applied in areas
of pressure whilst in rural areas with fragile communities, a more enabling approach has
been taken to support communities to be sustainable and thrive. LDPs are required to set
out an appropriate approach to development in areas of pressure and decline informed by
an understanding of population change and settlement characteristics and how these have
changed over time as well as an understanding of the local circumstances including housing
and travel.
Many policies will also play an important role in supporting rural communities and population
growth. Some focus on supporting sustainable development in key sectors for rural areas
such as Policy 30 on tourism, which aims to ensure community, environmental and business
considerations are fully taken into account. Policy 32 encourages sustainable aquaculture, whilst
Policy 10 supports development in coastal areas that takes into account future vulnerability
to climate change. Policy 11 supports opportunities for renewable energy development whilst
Policy 24 will support the delivery of digital infrastructure to support investment and population
growth in rural areas.
Care has been taken to ensure policies reflect the specific needs and constraints of rural areas.
Policy 13 ensures that in assessing the transport impacts of development, the area’s needs and
characteristics are taken into account. Policy 15 aims to promote local living in broad terms,
including through 20 minute neighbourhoods where practical, recognising varying settlement
patterns and the particular characteristics and challenges of different areas in applying these
principles in practice. Policy 28 also recognises the importance of retail facilities for rural
communities and economies.
Alongside this, recognising that environmental quality is a key asset for rural areas, Policies 3, 4,
5 and 6 ensure that natural assets are protected and enhanced.

Page 57

National Planning Framework 4
19
Part 1 – National Spatial Strategy
CROSS-CUTTING OUTCOME AND POLICY LINKS:
LIFELONG HEALTH AND WELLBEING
Our strategy and policies support development that helps to improve health and wellbeing.
The spatial strategy as a whole recognises that there are significant health inequalities in
Scotland that future development can help to address. The spatial principles aim to ensure that
future development is directed to sustainable locations, recognising that the role of planning in
supporting development in places which would benefit most from regeneration and investment.
The natural environment is fundamental to our health and wellbeing from the benefits we get
from being in nature to the design and delivery of blue and green infrastructure. Policies 1, 3,
4, 5 and 6 manage the effects of development on biodiversity and on natural places. Policy 20
supports development that will provide good quality, accessible greenspaces and nature
networks and Policy 21 supports development that will provide opportunities for sport and
play. Active travel is encouraged by Policy 13 with walking and cycling providing wider health
benefits.
Policy 23 helps to protect health and wellbeing, including by ensuring that air and noise
pollution are taken into account, and by planning and managing development to take hazards
into account. Policy 22 ensures that future flood risk is not exacerbated by development,
and facilitates the delivery of sustainable flood risk management solutions. Policy 10
manages development to reflect future vulnerability of coastal areas. Policy 9 encourages the
redevelopment of brownfield land, helping to reduce the impact of vacant and derelict sites on
communities.
Housing plays a critical role in supporting our health and wellbeing. Policy 16 enables the
delivery of well planned, good quality, affordable, safe and warm homes. Alongside this, Policy
13 supports development that provides, or is accessible by active travel and Policy 15 ensures
people have access to facilities from their homes, including healthcare facilities. Development is
also required to take into account the capacity and any additional needs for community services
and facilities, as part of the infrastructure first approach set out in Policy 18.
Policy 14 applies the six qualities of successful places to development proposals, including
health and wellbeing. As part of this it prioritises key aspects including women’s safety and
suicide risk and aims to ensure development does not undermine the amenity of our existing
homes and places. Climate related mental and physical health effects will be addressed by
the strategy as a whole and in particular by Policies 1 and 2 by ensuring future development
minimises emissions and is built to reflect the future risks of climate change. Health and
wellbeing will also be supported by development that helps us to transition to net zero, as
reflected in Policy 11 on renewable energy, Policy 12 on zero waste, and Policy 19 on heat and
cooling. Wider policies relating to economic development will have a further positive effect on
overall health and wellbeing by supporting employment and investment in our places in a fair
and sustainable way.

Page 58

National Planning Framework 4
20
Part 1 – National Spatial Strategy
National Spatial Strategy
Legend
Strategic maritime routes
Strategic connection
Blue economy
Transmission infrastructure
National Developments
1 Energy Innovation Development on the
Islands
2 Pumped Hydro Storage
Scotland Wide 
3
Strategic Œeneable Electricity Generation
and Transmission Infrastructure
Scotland Wide 
4
Circular Economy Materials Management
Facilities
Scotland Wide 
5
Urban Sustainable, Blue and Green Surface
Water Management Solutions
Edinburgh and Glasgow
6 Urban MassÜŒapid Transit Netorks
Aberdeen, Edinburgh and Glasgow
7 Central Scotland Green Netork
8
National Walking, Cycling and Wheeling
Netor
k
Scotland Wide 
9 Edinburgh Waterfront
10 Dundee Waterfront
11 Stranraer Gateay
12 Digital Fibre Netor
k
Scotland Wide 
13 Clyde Mission
14 Aberdeen Harbour
15 Industrial Green Transition Zones
16 Hunterston Strategic Asset
17 Chapelcross Poer Station Œedevelopment
18 High Speed Œail
15
10
18
16
13 5,6
14 6
9 5,615
11
18
18
17
1
1
1
2
77
7
Indicative

Page 59

National Planning Framework 4
21
Part 1 – National Spatial Strategy
National Developments
Legend
Sustainable Places
1 Energy Innovation Development on the
Islands
2 Pumped Hydro Storage
Scotland Wide 
3
Strategic Renewable Electricity Generation
and Transmission Infrastructure
Scotland Wide 
4
Circular Economy Materials Management
Facilities
Scotland Wide 
5
Urban Sustainable, Blue and Green Surface
Water Management Solutions
Edinburgh and Glasgow
6 Urban Mass·Rapid Transit Networks
Aberdeen, Edinburgh and Glasgow
Liveable Places
7 Central Scotland Green Network
8
National Walking, Cycling and Wheeling
Networë
Scotland Wide 
9 Edinburgh Waterfront
1ö Dundee Waterfront
11 Stranraer Gateway
12 Digital Fibre Networë
Scotland Wide 
Productive Places
13 Clyde Mission
14 Aberdeen Harbour
15 Industrial Green Transition Zones
16 Hunterston Strategic Asset
17 Chapelcross Power Station Redevelopment
18 High Speed Rail
11
1ö
18
18
17
16
2
15
1
1
1
6
14 6
7
15
13 5,6
7
7
Indicative
9 5,6

Page 60

National Planning Framework 4
22
Part 1 – National Spatial Strategy
Regional Spatial Priorities
North and West Coast and Islands
This part of Scotland will be at the forefront of
our efforts to reach net zero emissions by 2045.
It is a diverse area, from Shetland and Orkney
in the north, to the Outer and Inner Hebrides
and the coastal areas of Highland and Argyll
and Bute. As one of the most renewable energy
rich localities in Europe with significant natural
resources, there is a real opportunity for this
area to support our shared national outcomes.
Key centres where lifeline links provide access to
the islands include Lerwick, Kirkwall, Stromness,
Stornoway, Wick and Thurso, Ullapool, Mallaig
and Oban, whilst Tarbert, Lochgilphead and
Campbeltown are important hubs to the south
of the area. These centres provide important
services to their wider hinterlands. Local
projects are ongoing, including the regeneration
of Stromness, the Stornoway Deep Water
Port development, the linked Islands Growth
Deal Outer Hebrides Energy Hub project in
Stornoway, and the Islands Growth Deal Knab
Redevelopment project in Shetland.
The area has an exceptional environment with
coastal and island landscapes that are an
important part of our national identity. It is rich
in biodiversity, sustaining many internationally
significant ecological sites, including the United
Nations Educational, Scientific and Cultural
Organization (UNESCO) Global Geoparks in
the North West Highlands and Shetland, and
Wester Ross UNESCO Biosphere Reserve and
species including some of the best remaining
temperate rainforest sites in Europe. It has a
rich history, language and distinctive cultural
heritage including the St Kilda and the Heart of
Neolithic Orkney UNESCO World Heritage Sites.
These key assets require careful management to
ensure they continue to benefit communities.
There will be significant climate challenges
for this part of Scotland. Island and coastal
ecosystems, and the communities they support,
are naturally more vulnerable to the effects of
climate change, sea level rise and extreme
events. Of particular concern are the impacts
on vulnerable low-lying coastal zones and
infrastructure, with potentially wide-ranging
effects from biodiversity loss to coastal erosion,
flooding and landslips. If we do not take action
to plan and build resilience, communities could
suffer disproportionately from the impacts of
climate change.
A climate and nature conscious approach to
development of this area can help to tackle
wider challenges. The Carbon Neutral Islands
project will support six islands (Hoy, Islay,
Great Cumbrae, Raasay, Barra and Yell) to
become carbon neutral by 2040. This will act
as a catalyst for further climate action across all
Scottish islands to make more attractive, resilient
and sustainable communities in the long-term.
The relatively high levels of community land
ownership, particularly in the Outer Hebrides,
and strong ties with the land and sea reflect this
area’s strong sense of place and local resilience.
Scotland’s National Islands Plan aims to grow
the population and economy, improve transport
and housing, and ensure island communities
are served by the facilities, jobs, education and
services they need to flourish. Environmental
wellbeing, clean and affordable energy, strong
communities, culture and identity are also
priorities.
Around 94 of Scotland’s 900 islands are
permanently inhabited. The size and composition
of each population has changed over the years
and continues to do so. Whilst most recent
estimates indicate population growth across the
majority of local authority areas with islands,
population change within each area is more
complex, with areas of growth and depopulation
varying between islands and coastal
communities, and across different strata of the
population. An ageing population in some parts
of the area will mean that we need to do more to
reverse past patterns of population decline and
sustain local facilities and services that support
rural and dispersed communities.
Public service provision, transport, energy
consumption, fuel poverty, child poverty and
housing, including its affordability, will continue
to be significant challenges. Employment varies
across the area, and can tend to rely on the
public sector, tourism and lower wage sectors,

Page 61

National Planning Framework 4
23
Part 1 – National Spatial Strategy
limiting the scope and choice of skilled jobs in
some locations. It can be difficult to attract and
retain a local workforce to support some jobs,
underlining the importance of building skills and
promoting fair work principles to support future
investment. Language skills are also important
in many areas where Gaelic is used by the
community.
Challenges from the end of free movement
and changing markets, and the agriculture and
fishing industries, will need support to ensure
long-term sustainability, but there are also
substantial economic opportunities presented
by developments in sectors such as renewable
energy generation.
Priorities
Alongside Scotland’s marine planning authorities,
we will work with the area’s exceptional assets
and natural resources to build a more resilient
future for island and coastal communities. By
guiding RSS and LDPs in this area, our strategy
aims to:
• Maximise the benefits of renewable
energy whilst enhancing blue and green
infrastructure, decarbonising transport and
building resilient connections.
• Support coastal and island communities to
become carbon neutral, thus contributing
to net-zero commitments and reducing fuel
poverty.
• Seize the opportunities to grow the blue and
green economy, recognising the world-class
environmental assets that require careful
management and opportunities to develop
skills and diversify employment.
The following national developments will support
delivery of the spatial strategy for this area:
• Energy Innovation Development on the Islands
• Pumped Hydro Storage
• Strategic Renewable Electricity Generation
and Transmission Infrastructure
• Circular Economy Material Management
Facilities
• National Walking, Cycling and Wheeling
Network
• Digital Fibre Network
Further detail about the priorities for this area is
contained in Annex C. Further details of national
developments are contained in Annex B.

Page 62

National Planning Framework 4
24
Part 1 – National Spatial Strategy
North and West Coast and Islands
Legend
Strategic maritime routes
Strategic connection
Blue economy
Transmission infrastructure
National Developments
1 Energy Innovation Development on the
Islands
2 Pumped Hydro Storage
Scotland Wide 
3
Strategic Œenewable Electricity €eneration
and Transmission Infrastructure
Scotland Wide 
4
Circular Economy Materials Management
Facilities
Scotland Wide 
8
National Walking, Cycling and Wheeling
Network
Scotland Wide 
12 Digital Fibre Network
Scotland Wide 
1
1
1
2
Indicative

Page 63

National Planning Framework 4
25
Part 1 – National Spatial Strategy
North
The Highlands of Scotland, Moray, mainland
Argyll, northern parts of rural Stirling and
Perthshire are world renowned for their stunning
landscapes, rich biodiversity and cultural
heritage.
Settlement patterns vary, from dispersed or low
density crofting townships, to key centres such
as Inverness, Ullapool, Dingwall, Grantown-on-
Spey, Aviemore, Elgin, Pitlochry and Aberfeldy.
Cairngorms National Park is a national asset
with internationally significant habitats and
landscapes and there is currently a proposal
to make the Flow Country a UNESCO World
Heritage Site. The northern part of the Loch
Lomond and The Trossachs National Park also
extends into this area.
Emissions here are partly offset by the climate
sequestration from land use and forestry so
that the area acts as a net carbon sink overall.
There are few sources of significant industrial
emissions. Climate change risks include
changing levels of rainfall, increased storm
events, temperature rise, flood risk, rising
sea levels and associated erosion. Tailored
measures will be required to assist communities
in adapting to climate change and transitioning
to net zero.
This rural heartland is much more than a
place of beauty and isolation. Many thriving
communities live here, and they depend on
local jobs and learning to support their quality
of life. Some communities have experienced
outmigration, particularly the loss of younger
people, especially outwith Inverness. Further
population decline is a future risk, particularly
for the west and north. People often depend
on the car and more limited access to services
creates disadvantage, despite the quality of life
and good health that many living here enjoy. An
ageing population will put pressures on some
services.
Parts of the area have recently experienced
an accelerated increase in house prices. The
pandemic has reinforced long standing issues
of affordability and a more mobile remote
workforce has been attracted to the area, adding
increased pressure. Without intervention, access
to affordable homes, jobs and services that
enable local people, including young people,
to stay in their communities could become
more challenging. Fuel and transport poverty
is a particular challenge towards the north and
west and there are significant areas which do
not currently benefit from good quality digital
connectivity.
The area’s environmental quality, culture,
language, landscape and wildlife sustain key
economic sectors including tourism, food and
drink, distilling and clean energy. Extensive
areas of woodland and peatland act as a carbon
sink, contributing significantly to our national
sustainability. The area has a strong economy
with growing income and low unemployment
overall, but there remain pockets of deprivation
both in urban areas and in more remote areas
where there is a need for alternatives to low
skilled and low paid jobs.

Page 64

National Planning Framework 4
26
Part 1 – National Spatial Strategy
Priorities
This part of Scotland can continue to make
a strong contribution towards meeting our
ambition for a net zero and nature positive
country by demonstrating how natural assets
can be managed and used to secure a more
sustainable future. By guiding RSS and LDPs in
this area, our strategy aims to:
• Protect environmental assets and stimulate
investment in natural and engineered solutions
to climate change and nature restoration,
whilst decarbonising transport and building
resilient connections.
• Maintain and help to grow the population
by taking a positive approach to rural
development that strengthens networks of
communities.
• Support local economic development by
making sustainable use of the areas’ world-
class environmental assets to innovate and
lead greener growth.
The following national developments will also
support delivery of the spatial strategy for this
area:
• Pumped Hydro Storage
• Strategic Renewable Electricity Generation
and Transmission Infrastructure
• Circular Economy Material Management
Facilities
• National Walking, Cycling and Wheeling
Network
• Digital Fibre Network
Further detail about the priorities for this area is
contained in Annex C. Further details of national
developments are contained in Annex B.

Page 65

National Planning Framework 4
27
Part 1 – National Spatial Strategy
North
Legend
Strategic connection
Blue economy
Transmission infrastructure
National Developments
2 Pumped Hydro Storage
Scotland Wide 
3
Strategic jenewable Electricity ^eneration
and Transmission Infrastructure
Scotland Wide 
4
Circular Economy Materials Management
Facilities
Scotland Wide 
8
National Walking, Cycling and Wheeling
Network
Scotland Wide 
12 Digital Fibre Network
Scotland Wide 
2
Indicative

Page 66

National Planning Framework 4
28
Part 1 – National Spatial Strategy
North East
The north east is a centre for the skills and
expertise we will need to meet our climate
change commitments. This area will evolve,
through a just transition, to move industry and
business away from the oil and gas sector
towards a cleaner, greener future. Rich in natural
assets, this area, along with the wider Moray
and Cromarty Firths, has built on its oil and
gas experience to pioneer new technologies.
This makes it a uniquely investable proposition
that could benefit Scotland as a whole. We can
build on the area’s experience to find innovative
solutions to climate change.
Emissions generated from this area arise mainly
from transport, industrial and commercial activity
and domestic properties, with land use and
forestry providing carbon sequestration. Car
ownership is particularly high in Aberdeenshire.
Significant parts of the coast will be vulnerable to
future climate impacts.
This area is amongst the most prosperous parts
of Scotland, but has experienced significant
economic challenges in recent years and has
pockets of deprivation. The area comprises a
mix of rural and urban communities, with the city
of Aberdeen and a surrounding network of towns
including Huntly, Fraserburgh, Peterhead, Ellon,
Inverurie and Stonehaven, and significant rural
areas including countryside around Aberdeen
city. Whilst parts of the area have experienced
population decline, several settlements around
Aberdeen have grown. Links from Aberdeenshire
to communities in Moray, Angus and Tayside are
also important.
Affordability and choice of homes is acute
across the area, especially within Aberdeen.
The growing proportion of retirees in
Aberdeenshire presents a further challenge to
housing and service delivery. There are lower
levels of educational attainment and limited
access to services for communities along the
Aberdeenshire and Moray coast. Many of these
places will benefit from further regeneration that
builds on their identity and natural assets.
The excellent quality of the built environment,
natural assets and cultural heritage already
contribute to health and wellbeing in the area
and can form the basis of a transition to net
zero. Some of our highest quality productive
agricultural land is concentrated here, together
with other land-based industries, and the
economy benefits from a strong fishing industry,
alongside its globally significant energy sector.
The dominance of these sectors, together with
wider changes including from the pandemic,
European Union (EU) Exit and global markets,
means that economic diversification and
repurposing of buildings and infrastructure will
be key priorities.
Priorities
This part of Scotland will play a crucial role in
achieving Just Transition to net zero. By guiding
RSS and LDPs in this area, our strategy aims to:
• Plan infrastructure and investment to support
the transition from oil and gas to net zero
whilst protecting and enhancing blue and
green infrastructure and decarbonising
connectivity.
• Focus on continued regeneration through
the principles of local living and 20 minute
neighbourhoods to sustain the skilled
workforce and improve local liveability.
• Support continued economic diversification
and innovation.
The following national developments will also
support delivery of the spatial strategy for this
area:
• Pumped Hydro Storage
• Strategic Renewable Electricity Generation
and Transmission Infrastructure
• Circular Economy Material Management
Facilities
• Urban Mass/Rapid Transit Networks
• National Walking, Cycling and Wheeling
Network
• Digital Fibre Network
• Aberdeen Harbour
• Industrial Green Transition Zones
Further detail about the priorities for this area is
contained in Annex C. Further details of national
developments are contained in Annex B.

Page 67

National Planning Framework 4
29
Part 1 – National Spatial Strategy
North East
Legend
Strategic maritime routes
Strategic connection
Blue economy
Transmission infrastructure
National Developments
2 Pumped Hydro Storage
Scotland Wide 
3
Strategic Renewable Electricity Generation
and Transmission Infrastructure
Scotland Wide 
4
Circular Economy Materials Management
Facilities
Scotland Wide 
6 Urban Mass/Rapid Transit Networks
Aberdeen, Edinburgh and Glasgow
8
National Walking, Cycling and Wheeling
Network
Scotland Wide 
12 Digital Fibre Network
Scotland Wide 
14 Aberdeen Harbour
1ë Industrial Green Transition Zones
1ë
1ë
14 6
Indicative

Page 68

National Planning Framework 4
30
Part 1 – National Spatial Strategy
Central
We will only meet our climate change
commitments if we make significant changes to
the densely populated central belt of Scotland.
Our urban communities will play a critical role in
reducing the emissions generated by the way
we live our lives.
This area includes the Glasgow, Edinburgh,
Stirling, Dundee and Perth city regions as well as
networks of towns and smaller settlements, and
more rural surroundings.
Many of our largest emitters of greenhouse
gas emissions are located in this area,
including Grangemouth where industrial
activity is concentrated, providing high value
manufacturing and employment, and playing
a key role in our resilience. Other key sources
include industrial, manufacturing and waste
management sites and facilities. Overall
emissions from domestic properties and
transport are high as a result of the area’s
population density and the scale of daily
movement within and between city regions. The
growing risk of flooding could have significant
impacts in the future, as many key settlements
and economic assets are located on the Clyde,
Forth and Tay estuaries.
We need to work together to decarbonise
buildings and transport and tackle congestion,
make more efficient use of existing land and
buildings, generate renewable energy and
establish supporting electricity and heat
networks and create more inclusive, greener and
sustainable places that will stand the test of time.
By weaving blue and green infrastructure across
our urban fabric we can ensure that nature
and the outdoors are accessible to everyone,
supporting lifelong health and wellbeing and
creating places that are more resilient to
flooding.
There are significant social and economic
differences across the area – at a broad scale
there are relatively high concentrations of poor
health, child poverty, economic disadvantage
and population decline in parts of the Glasgow
city region contrasting with strong demand
and expected population growth in parts of
the Edinburgh city region. The broad pattern is
repeated for children living in poverty, who are
more likely to live in the Glasgow city region.
Across the area as a whole, however, there are
localised areas of high and low deprivation.
As a nation we have a particular obligation to
do more to tackle the concentration of poor
health outcomes in west central Scotland. Action
is needed to reduce inequality and improve
health and wellbeing so that everyone is able
to thrive. Better places can do more to support
lifelong health and wellbeing by providing
warm homes that are connected to services.
Access to quality greenspace and nature-based
solutions can help to mitigate health inequalities
and improve physical and mental health, by
providing opportunities for play, socialising,
relaxation and physical activity. Developing
our communities to promote local living and
20 minute neighbourhoods can help reduce
inequalities in health. The frequency of urban car
use can be reduced by improving local liveability
and improved access to facilities, helping to
reduce emissions and air pollution. Access to
health and social care facilities will need to be
built into our future places and can benefit from
continuing investment in digital infrastructure and
innovation.
Household projections show there will be a
continuing demand for more homes across the
most urban parts of Scotland. There has been a
strong market, high levels of housebuilding and
pressure on infrastructure in some ‘hot spots’
including the Edinburgh city region, Stirling and
Falkirk, and Perth. In contrast, despite good
connections and infrastructure capacity, it can
be more challenging to encourage the market
to deliver new homes particularly in parts of the
west where unemployment is also higher.
There are also inequalities across each of
the city regions, with local concentrations of
economic deprivation and many former coalfield
communities. Overall, economic performance is
higher in Edinburgh and Glasgow and lower in
surrounding areas including Inverclyde, Ayrshire,
along parts of the Clyde Coast and Lanarkshire.

Page 69

National Planning Framework 4
31
Part 1 – National Spatial Strategy
The diverse business base reflects nationally
important sectors including financial services,
business administration, life sciences,
distribution and transport, retail and commercial,
and manufacturing and production. City centres
are experiencing significant challenges, caused
or accelerated by the pandemic, but each
retain a strong character and distinctive identity,
offering opportunities for new business, homes,
and services. Similar issues apply to the towns
across this area.
A wellbeing economy goes beyond strategic
investment sites to link more closely with
the wellbeing of communities and their local
environments. It will be critical to recognise
the importance of anchor institutions who can
support local investment in our places and
natural and historic assets, provide education,
employment and other services, and act as
community hubs. Significant investment in our
health and social care, justice and learning
estates will continue to provide important
sources of employment and income for smaller
scale local businesses.
Around the area’s settlements there are many
high quality environments, from World Heritage
Sites, historic burghs and conservation areas
to protected biodiversity sites of international
importance, ancient woodlands and areas of
high landscape quality, including the coastline,
country and national parks, and canals. This
brings opportunities for outdoor recreation within
a short distance of the majority of Scotland’s
population.
The coast is an integral part of the area’s
identity, combining natural and cultural heritage
and acting as a focus for investment and
regeneration. We have made progress in
restoring and reusing areas that were historically
a focus for heavy industry and mining, leaving
a legacy of disused sites and areas blighted
by dereliction. Key sites for further investment
include urban waterfronts and former industrial
sites where existing infrastructure can be
reused to support the transition to a low carbon
economy.
Priorities
A coherent strategy that focuses on climate
change and responds to the challenges of the
pandemic will drive forward change to tackle
inequalities and build a new, greener, future for
this part of the country. By guiding RSS and
LDPs in this area, our strategy aims to:
• Provide net zero energy solutions including
extended heat networks and improved energy
efficiency, together with urban greening and
improved low carbon transport.
• Pioneer low carbon, resilient urban living
by rolling out networks of 20 minute
neighbourhoods, future proofing city and
town centres, accelerating urban greening,
investing in net zero homes, and managing
development on the edge of settlements.
• Target economic investment and build
community wealth to overcome disadvantage
and support a greener wellbeing economy.
The following national developments will also
support delivery of the spatial strategy for this
area:
• Pumped Hydro Storage
• Strategic Renewable Electricity Generation
and Transmission Infrastructure
• Circular Economy Material Management
Facilities
• Urban Sustainable, Blue and Green Drainage
Solutions
• Urban Mass/Rapid Transit Networks
• Central Scotland Green Network
• National Walking, Cycling and Wheeling
Network
• Edinburgh Waterfront
• Dundee Waterfront
• Digital Fibre Network
• Clyde Mission
• Industrial Green Transition Zones
• Hunterston Strategic Asset
• High Speed Rail
Further detail about the priorities for this area is
contained in Annex C. Further details of national
developments are contained in Annex B.

Page 70

National Planning Framework 4
32
Part 1 – National Spatial Strategy
Central
Legend
Strategic maritime routes
Strategic connection
Blue economy
National Developments
2 Pumped Hydro Storage
Scotland Wide 
3
Strategic Renewable Electricity Generation
and Transmission Infrastructure
Scotland Wide 
4
Circular Economy Materials Management
Facilities
Scotland Wide 
5
Urban Sustainable, Blue and Green Surface
Water Management Solutions
Edinburgh and Glasgow
6 Urban Mass¹Rapid Transit Networks
Aberdeen, Edinburgh and Glasgow
7 Central Scotland Green Network
Mapping is indicative
8
National Walking, Cycling and Wheeling
Network
Scotland Wide 
9 Edinburgh Waterfront
10 Dundee Waterfront
12 Digital Fibre Network
Scotland Wide 
13 Clyde Mission
15 Industrial Green Transition Zones
16 Hunterston Strategic Asset

18 High Speed Rail
10
13 5,6
18
18
16
15
15
9 5,6
7
77
Indicative

Page 71

National Planning Framework 4
33
Part 1 – National Spatial Strategy
South
The South of Scotland is strategically important
with a strong sense of identity centred on
networks of towns and villages, supported
by distinctive landscapes and coasts. This
is a place with a rich cultural heritage and
exceptional environmental assets and natural
resources, such as the Galloway and Southern
Ayrshire UNESCO Biosphere and Galloway
Forest Dark Sky Park. This area is ambitious for
positive change in the coming years, and the
immediate work to recover from the pandemic
will form the basis of a longer term plan to
respond to the challenges of climate change
and support nature restoration and recovery.
Settlements across this area provide services
to the surrounding rural communities. Towns
are well placed to be models of sustainable
living, with many undergoing regeneration.
Larger settlements include Dumfries, Stranraer,
Galashiels, Hawick, with a network of towns
and villages throughout Dumfries and Galloway
and the Scottish Borders. The area extends
northwards to include Ayrshire towns such as
Ayr, Girvan, Dalmellington and Cumnock in the
west, as well as towards the southern rural parts
of East Lothian in the east and parts of South
Lanarkshire including Biggar and Moffat. Beyond
the towns there are many small settlements and
rural homes, farms and smallholdings.
Cross border relationships are important in
this area, together with strategic transport
connections to England, Northern Ireland and
Ireland.
Emissions in this area are moderate, with
transport and industry emissions being partly
offset by land use. The area has significant areas
of woodland and peatland which act as a carbon
sink and form the basis for future investment
opportunities. The few sites that are significant
sources of greenhouse gas emissions include
industrial and commercial activities, including
some food and drink processing facilities.
Coastal erosion and flood risk is expected to be
a significant challenge in the future, particularly
where there is a risk of impacts on key transport
corridors or settlements.
Working with communities to find new ways
of rural living that are consistent with climate
change will be a challenge for this part of
Scotland, given the relatively high levels of
dependence on the car, limited public transport,
housing affordability challenges and the
dispersed population.
Despite having high levels of wellbeing and
quality of life, population decline is projected to
continue in some regions to the west of the area,
with fewer younger people and more retired
people living in the area in the future. Economic
diversification will help to address dependence
on low wage and public sector employment.
Priorities
Our strategy aims to ensure that this part of
Scotland fulfils its potential. There is significant
potential for the area to develop and increase
recognition of it as a place to live, work and
visit. By guiding RSS and LDPs in this area, our
strategy aims to:
• Protect environmental assets and stimulate
investment in natural and engineered solutions
to climate change and nature restoration,
whilst decarbonising transport and building
resilient physical and digital connections.
• Increase the population by improving local
liveability, creating a low carbon network
of towns and supporting sustainable rural
development.
• Support local economic development whilst
making sustainable use of the area’s world-
class environmental assets to innovate and
lead greener growth.

Page 72

National Planning Framework 4
34
Part 1 – National Spatial Strategy
The following national developments will also
support delivery of the spatial strategy for this
area:
• Pumped Hydro Storage
• Strategic Renewable Electricity Generation
and Transmission Infrastructure
• Circular Economy Material Management
Facilities
• National Walking, Cycling and Wheeling
Network
• Stranraer Gateway
• Digital Fibre Network
• Clyde Mission
• Chapelcross Power Station Redevelopment
• High Speed Rail
Further detail about the priorities for this area is
contained in Annex C. Further details of national
developments are contained in Annex B.

Page 73

National Planning Framework 4
35
Part 1 – National Spatial Strategy
South
Legend
Strategic maritime routes
Strategic connection
Blue economy
National Developments
2 Pumped Hydro Storage
Scotland Wide 
3
Strategic Renewable Electricity ]eneration
and Transmission Infrastructure
Scotland Wide 
4
Circular Economy Materials Management
Facilities
Scotland Wide 
8
National Walking, Cycling and Wheeling
Network
Scotland Wide 
11 Stranraer ]ateway
12 Digital Fibre Network
Scotland Wide 
1¨ Chapelcross Power Station Redeºelopment
18 High Speed Rail
11
18
18
1¨
Indicative

Page 74

Part 2 – National Planning Policy
National Planning Framework 4
36
Sustainable Places
Tackling the climate and nature crises
Policy Principles
Policy Intent:
To encourage, promote and facilitate
development that addresses the global
climate emergency and nature crisis.
Policy Outcomes:
• Zero carbon, nature positive places.
Local Development Plans:
LDPs must address the global climate emergency
and nature crisis by ensuring the spatial strategy
will reduce emissions and adapt to current and
future risks of climate change by promoting
nature recovery and restoration in the area.
Policy 1
When considering all development proposals
significant weight will be given to the global
climate and nature crises.
Policy impact:
 Just Transition
 Conserving and recycling assets
 Local living
 Compact urban growth
 Rebalanced development
 Rural revitalisation
Key policy connections:
All other policies.
Part 2 –
National Planning Policy

Page 75

Part 2 – National Planning Policy 
National Planning Framework 4
37
Climate mitigation and adaptation
Policy Principles
Policy Intent:
To encourage, promote and facilitate
development that minimises emissions and
adapts to the current and future impacts of
climate change.
Policy Outcomes:
• Emissions from development are
minimised; and
• Our places are more resilient to climate
change impacts.
Local Development Plans:
The LDP spatial strategy should be designed
to reduce, minimise or avoid greenhouse gas
emissions. The six spatial principles should
form the basis of the spatial strategy, helping to
guide development to, and create, sustainable
locations. The strategy should be informed by an
understanding of the impacts of the proposals
on greenhouse gas emissions.
LDPs should support adaptation to the current
and future impacts of climate change by taking
into account climate risks, guiding development
away from vulnerable areas, and enabling
places to adapt to those risks.
Policy 2
a) Development proposals will be sited and
designed to minimise lifecycle greenhouse
gas emissions as far as possible.
b) Development proposals will be sited and
designed to adapt to current and future risks
from climate change.
c) Development proposals to retrofit measures to
existing developments that reduce emissions
or support adaptation to climate change will
be supported.
Policy impact:
 Just Transition
 Conserving and recycling assets
 Local living
 Compact urban growth
 Rebalanced development
 Rural revitalisation
Key policy connections:
All other policies.

Page 76

Part 2 – National Planning Policy 
National Planning Framework 4
38
Biodiversity
Policy Principles
Policy Intent:
To protect biodiversity, reverse biodiversity
loss, deliver positive effects from
development and strengthen nature
networks.
Policy Outcomes:
• Biodiversity is enhanced and
better connected including through
strengthened nature networks and nature-
based solutions.
Local Development Plans:
LDPs should protect, conserve, restore and
enhance biodiversity in line with the mitigation
hierarchy. They should also promote nature
recovery and nature restoration across the
development plan area, including by: facilitating
the creation of nature networks and strengthening
connections between them to support improved
ecological connectivity; restoring degraded
habitats or creating new habitats; and
incorporating measures to increase biodiversity,
including populations of priority species.
Policy 3
a) Development proposals will contribute to the
enhancement of biodiversity, including where
relevant, restoring degraded habitats and
building and strengthening nature networks
and the connections between them. Proposals
should also integrate nature-based solutions,
where possible.
b) Development proposals for national or major
development, or for development that requires
an Environmental Impact Assessment will only
be supported where it can be demonstrated
that the proposal will conserve, restore
and enhance biodiversity, including nature
networks so they are in a demonstrably
better state than without intervention. This will
include future management. To inform this,
best practice assessment methods should
be used. Proposals within these categories
will demonstrate how they have met all of the
following criteria:
i. the proposal is based on an understanding
of the existing characteristics of the
site and its local, regional and national
ecological context prior to development,
including the presence of any irreplaceable
habitats;
ii. wherever feasible, nature-based solutions
have been integrated and made best use
of;
iii. an assessment of potential negative effects
which should be fully mitigated in line with
the mitigation hierarchy prior to identifying
enhancements;
iv. significant biodiversity enhancements are
provided, in addition to any proposed
mitigation. This should include nature
networks, linking to and strengthening
habitat connectivity within and beyond the
development, secured within a reasonable
timescale and with reasonable certainty.
Management arrangements for their long-
term retention and monitoring should be
included, wherever appropriate; and
v. local community benefits of the biodiversity
and/or nature networks have been
considered.
c) Proposals for local development will include
appropriate measures to conserve, restore
and enhance biodiversity, in accordance with
national and local guidance. Measures should
be proportionate to the nature and scale
of development. Applications for individual
householder development, or which fall within
scope of (b) above, are excluded from this
requirement.
d) Any potential adverse impacts, including
cumulative impacts, of development proposals
on biodiversity, nature networks and the
natural environment will be minimised through
careful planning and design. This will take
into account the need to reverse biodiversity
loss, safeguard the ecosystem services that
the natural environment provides, and build
resilience by enhancing nature networks and
maximising the potential for restoration.

Page 77

Part 2 – National Planning Policy 
National Planning Framework 4
39
Policy impact:
 Just Transition
 Conserving and recycling assets
 Rebalanced development
 Rural revitalisation
Key policy connections:
Tackling the climate and nature crises
Climate mitigation and adaptation
Natural places
Soils
Forestry, woodland and trees
Green belts
Coastal development
Energy
Design, quality and place
Blue and green infrastructure
Flood risk and water management

Page 78

Part 2 – National Planning Policy
National Planning Framework 4
40
Natural places
Policy Principles
Policy Intent:
To protect, restore and enhance natural
assets making best use of nature-based
solutions.
Policy Outcomes:
• Natural places are protected and restored.
• Natural assets are managed in a
sustainable way that maintains and grows
their essential benefits and services.
Local Development Plans:
LDPs will identify and protect locally, regionally,
nationally and internationally important natural
assets, on land and along coasts. The spatial
strategy should safeguard them and take
into account the objectives and level of
their protected status in allocating land for
development. Spatial strategies should also
better connect nature rich areas by establishing
and growing nature networks to help protect and
restore the biodiversity, ecosystems and natural
processes in their area.
Policy 4
a) Development proposals which by virtue
of type, location or scale will have an
unacceptable impact on the natural
environment, will not be supported.
b) Development proposals that are likely to have
a significant effect on an existing or proposed
European site (Special Area of Conservation
or Special Protection Areas) and are not
directly connected with or necessary to their
conservation management are required to be
subject to an “appropriate assessment” of the
implications for the conservation objectives.
c) Development proposals that will affect a
National Park, National Scenic Area, Site of
Special Scientific Interest or a National Nature
Reserve will only be supported where:
i. The objectives of designation and the
overall integrity of the areas will not be
compromised; or
ii. Any significant adverse effects on the
qualities for which the area has been
designated are clearly outweighed by
social, environmental or economic benefits
of national importance.
All Ramsar sites are also European sites and/
or Sites of Special Scientific Interest and
are extended protection under the relevant
statutory regimes.
d) Development proposals that affect a site
designated as a local nature conservation
site or landscape area in the LDP will only be
supported where:
i. Development will not have significant
adverse effects on the integrity of the
area or the qualities for which it has been
identified; or
ii. Any significant adverse effects on the
integrity of the area are clearly outweighed
by social, environmental or economic
benefits of at least local importance.
e) The precautionary principle will be applied
in accordance with relevant legislation and
Scottish Government guidance.
f) Development proposals that are likely to have
an adverse effect on species protected by
legislation will only be supported where the
proposal meets the relevant statutory tests. If
there is reasonable evidence to suggest that
a protected species is present on a site or
may be affected by a proposed development,
steps must be taken to establish its presence.
The level of protection required by legislation
must be factored into the planning and design
of development, and potential impacts must
be fully considered prior to the determination
of any application.

Page 79

Part 2 – National Planning Policy 
National Planning Framework 4
41
g) Development proposals in areas identified
as wild land in the Nature Scot Wild Land
Areas map will only be supported where the
proposal:
i. will support meeting renewable energy
targets; or,
ii. is for small scale development directly
linked to a rural business or croft, or is
required to support a fragile community in
a rural area.
All such proposals must be accompanied by
a wild land impact assessment which sets
out how design, siting, or other mitigation
measures have been and will be used to
minimise significant impacts on the qualities of
the wild land, as well as any management and
monitoring arrangements where appropriate.
Buffer zones around wild land will not be
applied, and effects of development outwith
wild land areas will not be a significant
consideration.
Policy impact:
 Just Transition
 Conserving and recycling assets
 Rebalanced development
 Rural revitalisation
Key policy connections:
Tackling the climate and nature crises
Climate mitigation and adaptation
Biodiversity
Soils
Forestry, woodland and trees
Historic assets and places
Green belts
Coastal development
Energy
Design, quality and place
Blue and green infrastructure
Play, recreation and sport
Flood risk and water management
Rural development
Tourism

Page 80

Part 2 – National Planning Policy
National Planning Framework 4
42
Soils
Policy Principles
Policy Intent:
To protect carbon-rich soils, restore
peatlands and minimise disturbance to soils
from development.
Policy Outcomes:
• Valued soils are protected and restored.
• Soils, including carbon-rich soils, are
sequestering and storing carbon.
• Soils are healthy and provide essential
ecosystem services for nature, people
and our economy.
Local Development Plans:
LDPs should protect locally, regionally, nationally
and internationally valued soils, including land of
lesser quality that is culturally or locally important
for primary use.
Policy 5
a) Development proposals will only be supported
if they are designed and constructed:
i. In accordance with the mitigation hierarchy
by first avoiding and then minimising
the amount of disturbance to soils on
undeveloped land; and
ii. In a manner that protects soil from damage
including from compaction and erosion,
and that minimises soil sealing.
b) Development proposals on prime agricultural
land, or land of lesser quality that is culturally
or locally important for primary use, as
identified by the LDP, will only be supported
where it is for:
i. Essential infrastructure and there is a
specific locational need and no other
suitable site;
ii. Small-scale development directly linked
to a rural business, farm or croft or for
essential workers for the rural business to
be able to live onsite;
iii. The development of production and
processing facilities associated with the
land produce where no other local site is
suitable;
iv.The generation of energy from renewable
sources or the extraction of minerals and
there is secure provision for restoration;
and
In all of the above exceptions, the layout and
design of the proposal minimises the amount
of protected land that is required.
c) Development proposals on peatland, carbon-
rich soils and priority peatland habitat will only
be supported for:
i. Essential infrastructure and there is a
specific locational need and no other
suitable site;
ii. The generation of energy from renewable
sources that optimises the contribution
of the area to greenhouse gas emissions
reductions targets;
iii. Small-scale development directly linked to
a rural business, farm or croft;
iv.Supporting a fragile community in a rural or
island area; or
v. Restoration of peatland habitats.
d) Where development on peatland, carbon-rich
soils or priority peatland habitat is proposed,
a detailed site specific assessment will be
required to identify:
i. the baseline depth, habitat condition,
quality and stability of carbon rich soils;
ii. the likely effects of the development on
peatland, including on soil disturbance;
and
iii. the likely net effects of the development on
climate emissions and loss of carbon.

Page 81

Part 2 – National Planning Policy 
National Planning Framework 4
43
This assessment should inform careful
project design and ensure, in accordance
with relevant guidance and the mitigation
hierarchy, that adverse impacts are first
avoided and then minimised through
best practice. A peat management plan
will be required to demonstrate that this
approach has been followed, alongside
other appropriate plans required for restoring
and/ or enhancing the site into a functioning
peatland system capable of achieving carbon
sequestration.
e) Development proposals for new commercial
peat extraction, including extensions to
existing sites, will only be supported where:
i. the extracted peat is supporting the
Scottish whisky industry;
ii. there is no reasonable substitute;
iii. the area of extraction is the minimum
necessary and the proposal retains an
in-situ residual depth of peat of at least
1 metre across the whole site, including
drainage features;
iv. the time period for extraction is the
minimum necessary; and
v. there is an agreed comprehensive site
restoration plan which will progressively
restore, over a reasonable timescale, the
area of extraction to a functioning peatland
system capable of achieving carbon
sequestration.
Policy impact:
 Just Transition
 Conserving and recycling assets
 Rebalanced development
 Rural revitalisation
Key policy connections:
Tackling the climate and nature crises
Climate mitigation and adaptation
Biodiversity
Natural places
Forestry, woodland and trees
Historic assets and places
Energy
Blue and green infrastructure
Rural development

Page 82

Part 2 – National Planning Policy 
National Planning Framework 4
44
Forestry, woodland and trees
Policy Principles
Policy Intent:
To protect and expand forests, woodland
and trees.
Policy Outcomes:
• Existing woodlands and trees are
protected, and cover is expanded.
• Woodland and trees on development sites
are sustainably managed.
Local Development Plans:
LDPs should identify and protect existing
woodland and the potential for its enhancement
or expansion to avoid habitat fragmentation and
improve ecological connectivity, helping to support
and expand nature networks. The spatial strategy
should identify and set out proposals for forestry,
woodlands and trees in the area, including their
development, protection and enhancement,
resilience to climate change, and the expansion of
a range of types to provide multiple benefits. This
will be supported and informed by an up to date
Forestry and Woodland Strategy.
Policy 6
a) Development proposals that enhance, expand
and improve woodland and tree cover will be
supported.
b) Development proposals will not be supported
where they will result in:
i. Any loss of ancient woodlands, ancient and
veteran trees, or adverse impact on their
ecological condition;
ii. Adverse impacts on native woodlands,
hedgerows and individual trees of
high biodiversity value, or identified for
protection in the Forestry and Woodland
Strategy;
iii. Fragmenting or severing woodland
habitats, unless appropriate mitigation
measures are identified and implemented
in line with the mitigation hierarchy;
iv. Conflict with Restocking Direction,
Remedial Notice or Registered Notice to
Comply issued by Scottish Forestry.
c) Development proposals involving woodland
removal will only be supported where they
will achieve significant and clearly defined
additional public benefits in accordance
with relevant Scottish Government policy
on woodland removal. Where woodland is
removed, compensatory planting will most
likely be expected to be delivered.
d) Development proposals on sites which include
an area of existing woodland or land identified
in the Forestry and Woodland Strategy as
being suitable for woodland creation will only
be supported where the enhancement and
improvement of woodlands and the planting
of new trees on the site (in accordance with
the Forestry and Woodland Strategy) are
integrated into the design.
Policy impact:
 Just Transition
 Conserving and recycling assets
 Rebalanced development
 Rural revitalisation
Key policy connections:
Tackling the climate and nature crises
Climate mitigation and adaptation
Biodiversity
Natural places
Soils
Historic assets and places
Green belts
Energy
Design, quality and place
Local Living and 20 minute neighbourhoods
Heat and cooling
Blue and green infrastructure
Play, recreation and sport
Flood risk and water management
Health and safety
Tourism

Page 83

Part 2 – National Planning Policy 
National Planning Framework 4
45
Historic assets and places
Policy Principles
Policy Intent:
To protect and enhance historic environment
assets and places, and to enable positive
change as a catalyst for the regeneration of
places.
Policy Outcomes:
• The historic environment is valued,
protected, and enhanced, supporting the
transition to net zero and ensuring assets
are resilient to current and future impacts
of climate change.
• Redundant or neglected historic buildings
are brought back into sustainable and
productive uses.
• Recognise the social, environmental
and economic value of the historic
environment, to our economy and cultural
identity.
Local Development Plans:
LDPs, including through their spatial strategies,
should support the sustainable management of
the historic environment. They should identify,
protect and enhance valued historic assets and
places.
Policy 7
a) Development proposals with a potentially
significant impact on historic assets or places
will be accompanied by an assessment which
is based on an understanding of the cultural
significance of the historic asset and/or place.
The assessment should identify the likely
visual or physical impact of any proposals
for change, including cumulative effects and
provide a sound basis for managing the
impacts of change.
Proposals should also be informed by national
policy and guidance on managing change in
the historic environment, and information held
within Historic Environment Records.
b) Development proposals for the demolition
of listed buildings will not be supported
unless it has been demonstrated that there
are exceptional circumstances and that
all reasonable efforts have been made to
retain, reuse and/or adapt the listed building.
Considerations include whether the:
i. building is no longer of special interest;
ii. building is incapable of physical repair
and re-use as verified through a detailed
structural condition survey report;
iii. repair of the building is not economically
viable and there has been adequate
marketing for existing and/or new uses at a
price reflecting its location and condition for
a reasonable period to attract interest from
potential restoring purchasers; or
iv. demolition of the building is essential to
delivering significant benefits to economic
growth or the wider community.
c) Development proposals for the reuse,
alteration or extension of a listed building will
only be supported where they will preserve
its character, special architectural or historic
interest and setting. Development proposals
affecting the setting of a listed building
should preserve its character, and its special
architectural or historic interest.
d) Development proposals in or affecting
conservation areas will only be supported
where the character and appearance of the
conservation area and its setting is preserved
or enhanced. Relevant considerations include
the:
i. architectural and historic character of the
area;
ii. existing density, built form and layout; and
iii. context and siting, quality of design and
suitable materials.
e) Development proposals in conservation areas
will ensure that existing natural and built
features which contribute to the character
of the conservation area and its setting,
including structures, boundary walls, railings,
trees and hedges, are retained.

Page 84

Part 2 – National Planning Policy
National Planning Framework 4
46
f) Demolition of buildings in a conservation
area which make a positive contribution to its
character will only be supported where it has
been demonstrated that:
i. reasonable efforts have been made to
retain, repair and reuse the building;
ii. the building is of little townscape value;
iii. the structural condition of the building
prevents its retention at a reasonable cost;
or
iv.the form or location of the building makes
its reuse extremely difficult.
g) Where demolition within a conservation area
is to be followed by redevelopment, consent
to demolish will only be supported when an
acceptable design, layout and materials are
being used for the replacement development.
h) Development proposals affecting scheduled
monuments will only be supported where:
i. direct impacts on the scheduled monument
are avoided;
ii. significant adverse impacts on the integrity
of the setting of a scheduled monument are
avoided; or
iii. exceptional circumstances have been
demonstrated to justify the impact on a
scheduled monument and its setting and
impacts on the monument or its setting
have been minimised.
i) Development proposals affecting nationally
important Gardens and Designed Landscapes
will be supported where they protect, preserve
or enhance their cultural significance,
character and integrity and where proposals
will not significantly impact on important views
to, from and within the site, or its setting.
j) Development proposals affecting nationally
important Historic Battlefields will only
be supported where they protect and,
where appropriate, enhance their cultural
significance, key landscape characteristics,
physical remains and special qualities.
k) Development proposals at the coast edge or
that extend offshore will only be supported
where proposals do not significantly hinder
the preservation objectives of Historic Marine
Protected Areas.
l) Development proposals affecting a World
Heritage Site or its setting will only be
supported where their Outstanding Universal
Value is protected and preserved.
m) Development proposals which sensitively
repair, enhance and bring historic buildings,
as identified as being at risk locally or on the
national Buildings at Risk Register, back into
beneficial use will be supported.
n) Enabling development for historic environment
assets or places that would otherwise be
unacceptable in planning terms, will only be
supported when it has been demonstrated
that the enabling development proposed is:
i. essential to secure the future of an historic
environment asset or place which is at risk
of serious deterioration or loss; and
ii. the minimum necessary to secure the
restoration, adaptation and long-term future
of the historic environment asset or place.
The beneficial outcomes for the historic
environment asset or place should be secured
early in the phasing of the development, and
will be ensured through the use of conditions
and/or legal agreements.
o) Non-designated historic environment assets,
places and their setting should be protected
and preserved in situ wherever feasible.
Where there is potential for non-designated
buried archaeological remains to exist below
a site, developers will provide an evaluation
of the archaeological resource at an early
stage so that planning authorities can assess
impacts. Historic buildings may also have
archaeological significance which is not
understood and may require assessment.

Page 85

Part 2 – National Planning Policy
National Planning Framework 4
47
Where impacts cannot be avoided they
should be minimised. Where it has been
demonstrated that avoidance or retention is
not possible, excavation, recording, analysis,
archiving, publication and activities to provide
public benefit may be required through the
use of conditions or legal/planning obligations.
When new archaeological discoveries are
made during the course of development
works, they must be reported to the planning
authority to enable agreement on appropriate
inspection, recording and mitigation measures.
Policy impact:
 Just Transition
 Conserving and recycling assets
 Local living
 Compact urban growth
 Rebalanced development
 Rural revitalisation
Key policy connections:
Tackling the climate and nature crises
Climate mitigation and adaptation
Natural places
Forestry, woodland and trees
Green belts
Brownfield, vacant and derelict land and
empty buildings
Coastal development
Energy
Design, quality and place
Local Living and 20 minute neighbourhoods
Infrastructure first
Quality homes
Rural homes
Blue and green infrastructure
Flood risk and water management
Digital infrastructure
Community wealth building
City, town, local and commercial centres
Rural development
Tourism
Culture and creativity

Page 86

Part 2 – National Planning Policy
National Planning Framework 4
48
Green belts
Policy Principles
Policy Intent:
To encourage, promote and facilitate
compact urban growth and use the land
around our towns and cities sustainably.
Policy Outcomes:
• Development is directed to the right
locations, urban density is increased and
unsustainable growth is prevented.
• The character, landscape, natural setting
and identity of settlements is protected
and enhanced.
• Nature networks are supported and
land is managed to help tackle climate
change.
Local Development Plans:
LDPs should consider using green belts, to
support their spatial strategy as a settlement
management tool to restrict development around
towns and cities.
Green belts will not be necessary for most
settlements but may be zoned around
settlements where there is a significant danger of
unsustainable growth in car-based commuting or
suburbanisation of the countryside.
Green belts should be identified or reviewed
as part of the preparation of LDPs. Boundary
changes may be made to accommodate
planned growth, or to extend, or alter the area
covered as green belt. Detailed green belt
boundaries should be based on evidence and
should be clearly identified in plans.
Policy 8
a) Development proposals within a green
belt designated within the LDP will only be
supported if:
i) they are for:
• development associated with agriculture,
woodland creation, forestry and existing
woodland (including community
woodlands);
• residential accommodation required and
designed for a key worker in a primary
industry within the immediate vicinity of
their place of employment where the
presence of a worker is essential to the
operation of the enterprise, or retired
workers where there is no suitable
alternative accommodation available;
• horticulture, including market gardening
and directly connected retailing, as well
as community growing;
• outdoor recreation, play and sport
or leisure and tourism uses; and
developments that provide opportunities
for access to the open countryside
(including routes for active travel and
core paths);
• flood risk management (such as
development of blue and green
infrastructure within a “drainage
catchment” to manage/mitigate flood risk
and/or drainage issues);
• essential infrastructure or new cemetery
provision;
• minerals operations and renewable
energy developments;
• intensification of established uses,
including extensions to an existing
building where that is ancillary to the
main use;
• the reuse, rehabilitation and conversion
of historic environment assets; or
• one-for-one replacements of existing
permanent homes.
and

Page 87

Part 2 – National Planning Policy 
National Planning Framework 4
49
ii) the following requirements are met:
• reasons are provided as to why a green
belt location is essential and why it
cannot be located on an alternative site
outwith the green belt;
• the purpose of the green belt at that
location is not undermined;
• the proposal is compatible with the
surrounding established countryside and
landscape character;
• the proposal has been designed to
ensure it is of an appropriate scale,
massing and external appearance,
and uses materials that minimise visual
impact on the green belt as far as
possible; and
• there will be no significant long-term
impacts on the environmental quality of
the green belt.
Policy impact:
 Just Transition
 Conserving and recycling assets
 Local living
 Compact urban growth
 Rebalanced development
 Rural revitalisation
Key policy connections:
Tackling the climate and nature crises
Climate mitigation and adaptation
Biodiversity
Natural places
Forestry, woodland and trees
Historic assets and places
Brownfield, vacant and derelict land and
empty buildings
Energy
Sustainable transport
Design, quality and place
Local Living and 20 minute neighbourhoods
Infrastructure first
Quality homes
Rural homes
Blue and green infrastructure
Play, recreation and sport
Flood risk and water management
Digital infrastructure
Business and industry
Rural development
Retail
Tourism
Minerals

Page 88

Part 2 – National Planning Policy 
National Planning Framework 4
50
Brownfield, vacant and derelict land
and empty buildings
Policy Principles
Policy Intent:
To encourage, promote and facilitate the
reuse of brownfield, vacant and derelict land
and empty buildings, and to help reduce the
need for greenfield development.
Policy Outcomes:
• Development is directed to the right
locations, maximising the use of existing
assets and minimising additional land
take.
• The contribution of brownfield land
to nature recovery is recognised and
opportunities for use as productive
greenspace are realised where
appropriate.
• Derelict buildings and spaces are
regenerated to improve wellbeing and
transform our places.
Local Development Plans:
LDPs should set out opportunities for the
sustainable reuse of brownfield land including
vacant and derelict land and empty buildings.
Policy 9
a) Development proposals that will result in
the sustainable reuse of brownfield land
including vacant and derelict land and
buildings, whether permanent or temporary,
will be supported. In determining whether the
reuse is sustainable, the biodiversity value of
brownfield land which has naturalised should
be taken into account.
b) Proposals on greenfield sites will not be
supported unless the site has been allocated
for development or the proposal is explicitly
supported by policies in the LDP.
c) Where land is known or suspected to be
unstable or contaminated, development
proposals will demonstrate that the land is,
or can be made, safe and suitable for the
proposed new use.
d) Development proposals for the reuse of
existing buildings will be supported, taking
into account their suitability for conversion
to other uses. Given the need to conserve
embodied energy, demolition will be regarded
as the least preferred option.
Policy impact:
 Just Transition
 Conserving and recycling assets
 Local living
 Compact urban growth
 Rebalanced development
Key policy connections:
Tackling the climate and nature crises
Climate mitigation and adaptation
Historic assets and places
Zero waste
Design, quality and place
Local Living and 20 minute neighbourhoods
Infrastructure first
Quality homes
Rural homes
Blue and green infrastructure
Play, recreation and sport
Health and safety
Business and industry
City, town, local and commercial centres
Rural development
Culture and creativity

Page 89

Part 2 – National Planning Policy 
National Planning Framework 4
51
Coastal development
Policy Principles
Policy Intent:
To protect coastal communities and assets
and support resilience to the impacts of
climate change.
Policy Outcomes:
• Coastal areas develop sustainably and
adapt to climate change.
Local Development Plans:
LDP spatial strategies should consider how
to adapt coastlines to the impacts of climate
change. This should recognise that rising
sea levels and more extreme weather events
resulting from climate change will potentially
have a significant impact on coastal and
islands areas, and take a precautionary
approach to flood risk including by inundation.
Spatial strategies should reflect the diversity of
coastal areas and opportunities to use nature-
based solutions to improve the resilience of
coastal communities and assets. LDP spatial
strategies should identify areas of developed
and undeveloped coast and should align with
national, sectoral and regional marine plans.
Policy 10
a) Development proposals in developed coastal
areas will only be supported where the
proposal:
i. does not result in the need for further
coastal protection measures taking into
account future sea level change; or
increase the risk to people of coastal
flooding or coastal erosion, including
through the loss of natural coastal defences
including dune systems; and
ii. is anticipated to be supportable in the long-
term, taking into account projected climate
change.
b) Development proposals in undeveloped
coastal areas will only be supported where
they:
i. are necessary to support the blue
economy, net zero emissions or to
contribute to the economy or wellbeing
of communities whose livelihood depend
on marine or coastal activities, or is for
essential infrastructure, where there is
a specific locational need and no other
suitable site;
ii. do not result in the need for further coastal
protection measures taking into account
future sea level change; or increase the
risk to people of coastal flooding or coastal
erosion, including through the loss of
natural coastal defences including dune
systems; and
iii. are anticipated to be supportable in the
long-term, taking into account projected
climate change; or
iv. are designed to have a very short lifespan.
c) Development proposals for coastal defence
measures will be supported if:
i. they are consistent with relevant coastal or
marine plans;
ii. nature-based solutions are utilised and
allow for managed future coastal change
wherever practical; and
iii. any in-perpetuity hard defense measures
can be demonstrated to be necessary to
protect essential assets.
d) Where a design statement is submitted with
any planning application that may impact
on the coast it will take into account, as
appropriate, long-term coastal vulnerability
and resilience.

Page 90

Part 2 – National Planning Policy 
National Planning Framework 4
52
Policy impact:
 Just Transition
 Conserving and recycling assets
 Local living
 Compact urban growth
 Rebalanced development
 Rural revitalisation
Key policy connections:
Tackling the climate and nature crises
Climate mitigation and adaptation
Biodiversity
Natural places
Energy
Design, quality and place
Local Living and 20 minute neighbourhoods
Infrastructure first
Blue and green infrastructure
Play, recreation and sport
Flood risk and water management
Rural development
Tourism
Aquaculture

Page 91

Part 2 – National Planning Policy
National Planning Framework 4
53
Energy
Policy Principles
Policy Intent:
To encourage, promote and facilitate all
forms of renewable energy development
onshore and offshore. This includes energy
generation, storage, new and replacement
transmission and distribution infrastructure
and emerging low-carbon and zero
emissions technologies including hydrogen
and carbon capture utilisation and storage
(CCUS).
Policy Outcomes:
• Expansion of renewable, low-carbon and
zero emissions technologies.
Local Development Plans:
LDPs should seek to realise their area’s full
potential for electricity and heat from renewable,
low carbon and zero emission sources by
identifying a range of opportunities for energy
development.
Policy 11
a) Development proposals for all forms of
renewable, low-carbon and zero emissions
technologies will be supported. These include:
i. wind farms including repowering,
extending, expanding and extending the
life of existing wind farms;
ii. enabling works, such as grid transmission
and distribution infrastructure;
iii. energy storage, such as battery storage
and pumped storage hydro;
iv. small scale renewable energy generation
technology;
v. solar arrays;
vi. proposals associated with negative
emissions technologies and carbon
capture; and
vii. proposals including co-location of these
technologies.
b) Development proposals for wind farms in
National Parks and National Scenic Areas will
not be supported.
c) Development proposals will only be supported
where they maximise net economic impact,
including local and community socio-economic
benefits such as employment, associated
business and supply chain opportunities.
d) Development proposals that impact on
international or national designations will be
assessed in relation to Policy 4.
e) In addition, project design and mitigation will
demonstrate how the following impacts are
addressed:
i. impacts on communities and individual
dwellings, including, residential amenity,
visual impact, noise and shadow flicker;
ii. significant landscape and visual impacts,
recognising that such impacts are to be
expected for some forms of renewable
energy. Where impacts are localised and/
or appropriate design mitigation has been
applied, they will generally be considered
to be acceptable;
iii. public access, including impact on long
distance walking and cycling routes and
scenic routes;
iv. impacts on aviation and defence interests
including seismological recording;
v. impacts on telecommunications and
broadcasting installations, particularly
ensuring that transmission links are not
compromised;
vi. impacts on road traffic and on adjacent
trunk roads, including during construction;
vii. impacts on historic environment;
viii. effects on hydrology, the water
environment and flood risk;
ix. biodiversity including impacts on birds;
x. impacts on trees, woods and forests;
xi. proposals for the decommissioning
of developments, including ancillary
infrastructure, and site restoration;
xii. the quality of site restoration plans
including the measures in place to
safeguard or guarantee availability of
finances to effectively implement those
plans; and
xiii. cumulative impacts.

Page 92

Part 2 – National Planning Policy 
National Planning Framework 4
54
In considering these impacts, significant
weight will be placed on the contribution of
the proposal to renewable energy generation
targets and on greenhouse gas emissions
reduction targets.
Grid capacity should not constrain renewable
energy development. It is for developers to
agree connections to the grid with the relevant
network operator. In the case of proposals
for grid infrastructure, consideration should
be given to underground connections where
possible.
f) Consents for development proposals may be
time-limited. Areas identified for wind farms
are, however, expected to be suitable for use
in perpetuity.
Policy impact:
 Just Transition
 Conserving and recycling assets
 Rebalanced development
Key policy connections:
Tackling the climate and nature crises
Climate mitigation and adaptation
Biodiversity
Natural places
Forestry, woodland and trees
Soils
Historic assets and places
Green belts
Infrastructure first
Heat and cooling
Community wealth building

Page 93

Part 2 – National Planning Policy 
National Planning Framework 4
55
Zero waste
Policy Principles
Policy Intent:
To encourage, promote and facilitate
development that is consistent with the
waste hierarchy.
Policy Outcomes:
• The reduction and reuse of materials in
construction is prioritised.
• Infrastructure for zero waste and to
develop Scotland’s circular economy is
delivered in appropriate locations.
Local Development Plans:
LDPs should identify appropriate locations for
new waste management infrastructure to support
the circular economy and meet identified needs
in a way that moves waste as high up the waste
hierarchy as possible.
Policy 12
a) Development proposals will seek to reduce,
reuse, or recycle materials in line with the
waste hierarchy.
b) Development proposals will be supported
where they:
i. reuse existing buildings and infrastructure;
ii. minimise demolition and salvage materials
for reuse;
iii. minimise waste, reduce pressure on
virgin resources and enable building
materials, components and products to be
disassembled, and reused at the end of
their useful life;
iv. use materials with the lowest forms of
embodied emissions, such as recycled and
natural construction materials;
v. use materials that are suitable for reuse
with minimal reprocessing.
c) Development proposals that are likely to
generate waste when operational, including
residential, commercial, and industrial
properties, will set out how much waste the
proposal is expected to generate and how it
will be managed including:
i. provision to maximise waste reduction and
waste separation at source, and
ii. measures to minimise the cross-
contamination of materials, through
appropriate segregation and storage of
waste; convenient access for the collection
of waste; and recycling and localised waste
management facilities.
d) Development proposals for waste
infrastructure and facilities (except landfill
and energy from waste facilities) will be only
supported where:
i. there are no unacceptable impacts
(including cumulative) on the residential
amenity of nearby dwellings, local
communities; the transport network; and
natural and historic environment assets;
ii. environmental (including cumulative)
impacts relating to noise, dust, smells, pest
control and pollution of land, air and water
are acceptable;
iii. any greenhouse gas emissions resulting
from the processing and transportation
of waste to and from the facility are
minimised;
iv. an adequate buffer zone between sites and
sensitive uses such as homes is provided
taking account of the various environmental
effects likely to arise;
v. a restoration and aftercare scheme
(including appropriate financial
mechanisms) is provided and agreed to
ensure the site is restored;
vi. consideration has been given to co-location
with end users of outputs.
e) Development proposals for new or extended
landfill sites will only be supported if:
i. there is demonstrable need for additional
landfill capacity taking into account
Scottish Government objectives on waste
management; and
ii. waste heat and/or electricity generation
is included. Where this is considered
impractical, evidence and justification will
require to be provided.

Page 94

Part 2 – National Planning Policy 
National Planning Framework 4
56
f) Proposals for the capture, distribution or use
of gases captured from landfill sites or waste
water treatment plant will be supported.
g) Development proposals for energy-from-waste
facilities will not be supported except under
limited circumstances where a national or
local need has been sufficiently demonstrated
(e.g. in terms of capacity need or carbon
benefits) as part of a strategic approach to
residual waste management and where the
proposal:
i. is consistent with climate change mitigation
targets and in line with circular economy
principles;
ii. can demonstrate that a functional heat
network can be created and provided
within the site for appropriate infrastructure
to allow a heat network to be developed
and potential local consumers have been
identified;
iii. is supported by a heat and power plan,
which demonstrates how energy recovered
from the development would be used to
provide electricity and heat and where
consideration is given to methods to
reduce carbon emissions of the facility
(for example through carbon capture and
storage)
iv. complies with relevant guidelines published
by Scottish Environment Protection Agency
(SEPA); and
v. has supplied an acceptable
decarbonisation strategy aligned with
Scottish Government decarbonisation
goals.
Policy impact:
 Just Transition
 Conserving and recycling assets
	Compact urban growth
Key policy connections:
Tackling the climate and nature crises
Climate mitigation and adaptation
Brownfield, vacant and derelict land and
empty buildings
Energy
Infrastructure first
Heat and cooling
Community wealth building
Minerals

Page 95

Part 2 – National Planning Policy
National Planning Framework 4
57
Sustainable transport
Policy Principles
Policy Intent:
To encourage, promote and facilitate
developments that prioritise walking,
wheeling, cycling and public transport for
everyday travel and reduce the need to
travel unsustainably.
Policy Outcomes:
• Investment in transport infrastructure
supports connectivity and reflects place-
based approaches and local living.
• More, better, safer and more
inclusive active and sustainable travel
opportunities.
• Developments are in locations which
support sustainable travel.
Local Development Plans:
LDPs should prioritise locations for future
development that can be accessed by
sustainable modes. The spatial strategy should
reflect the sustainable travel hierarchy and
sustainable investment hierarchy by making best
use of existing infrastructure and services.
LDPs should promote a place-based approach
to consider how to reduce car-dominance.
This could include low traffic schemes, shared
transport options, designing–in speed controls,
bus/cycle priority, pedestrianisation and
minimising space dedicated to car parking.
Consideration should be given to the type, mix
and use of development; local living and 20
minute neighbourhoods; car ownership levels;
the accessibility of proposals and allocations
by sustainable modes; and the accessibility for
users of all abilities.
LDPs should be informed by an appropriate
and effective transport appraisal undertaken in
line with relevant transport appraisal guidance.
Plans should be informed by evidence of the
area’s transport infrastructure capacity, and an
appraisal of the spatial strategy on the transport
network. This should identify any potential
cumulative transport impacts and deliverable
mitigation proposed to inform the plan’s
infrastructure first approach. Where there is likely
to be an impact on the trunk road or rail network,
early engagement with Transport Scotland is
required.
Policy 13
a) Proposals to improve, enhance or provide
active travel infrastructure, public transport
infrastructure or multi-modal hubs will be
supported. This includes proposals:
i. for electric vehicle charging infrastructure
and electric vehicle forecourts, especially
where fuelled by renewable energy.
ii. which support a mode shift of freight from
road to more sustainable modes, including
last-mile delivery.
iii. that build in resilience to the effects of
climate change and where appropriate
incorporate blue and green infrastructure
and nature rich habitats (such as natural
planting or water systems).
b) Development proposals will be supported
where it can be demonstrated that the
transport requirements generated have
been considered in line with the sustainable
travel and investment hierarchies and where
appropriate they:
i. Provide direct, easy, segregated and
safe links to local facilities via walking,
wheeling and cycling networks before
occupation;
ii. Will be accessible by public transport,
ideally supporting the use of existing
services;
iii. Integrate transport modes;
iv. Provide low or zero-emission vehicle
and cycle charging points in safe and
convenient locations, in alignment with
building standards;
v. Supply safe, secure and convenient cycle
parking to meet the needs of users and
which is more conveniently located than
car parking;
vi. Are designed to incorporate safety
measures including safe crossings for
walking and wheeling and reducing the
number and speed of vehicles;

Page 96

Part 2 – National Planning Policy 
National Planning Framework 4
58
vii. Have taken into account, at the earliest
stage of design, the transport needs
of diverse groups including users with
protected characteristics to ensure the
safety, ease and needs of all users; and
viii. Adequately mitigate any impact on local
public access routes.
c) Where a development proposal will generate
a significant increase in the number of person
trips, a transport assessment will be required
to be undertaken in accordance with the
relevant guidance.
d) Development proposals for significant travel
generating uses will not be supported in
locations which would increase reliance
on the private car, taking into account the
specific characteristics of the area.
e) Development proposals which are ambitious
in terms of low/no car parking will be
supported, particularly in urban locations
that are well-served by sustainable transport
modes and where they do not create barriers
to access by disabled people.
f) Development proposals for significant
travel generating uses, or smaller-scale
developments where it is important to monitor
travel patterns resulting from the development,
will only be supported if they are
accompanied by a Travel Plan with supporting
planning conditions/obligations. Travel
plans should set out clear arrangements
for delivering against targets, as well as
monitoring and evaluation.
g) Development proposals that have the
potential to affect the operation and safety
of the Strategic Transport Network will be
fully assessed to determine their impact.
Where it has been demonstrated that existing
infrastructure does not have the capacity to
accommodate a development without adverse
impacts on safety or unacceptable impacts
on operational performance, the cost of the
mitigation measures required to ensure the
continued safe and effective operation of the
network should be met by the developer.
While new junctions on trunk roads are not
normally acceptable, the case for a new
junction will be considered by Transport
Scotland where significant economic or
regeneration benefits can be demonstrated.
New junctions will only be considered if
they are designed in accordance with
relevant guidance and where there will be no
adverse impact on road safety or operational
performance.
Policy impact:
 Just Transition
 Conserving and recycling assets
 Local living
 Compact urban growth
 Rebalanced development
 Rural revitalisation
Key policy connections:
Tackling the climate and nature crises
Climate mitigation and adaptation
Design, quality and place
Local Living and 20 minute neighbourhoods
Infrastructure first
Quality homes
Rural homes
Blue and green infrastructure
Business and industry
City, town, local and commercial centres
Retail
Rural development
Tourism

Page 97

Part 2 – National Planning Policy 
National Planning Framework 4
59
Liveable Places
Design, quality and place
Policy Principles
Policy Intent:
To encourage, promote and facilitate
well designed development that makes
successful places by taking a design-led
approach and applying the Place Principle.
Policy Outcomes:
• Quality places, spaces and environments.
• Places that consistently deliver healthy,
pleasant, distinctive, connected,
sustainable and adaptable qualities.
Local Development Plans:
LDPs should be place-based and created in
line with the Place Principle. The spatial strategy
should be underpinned by the six qualities of
successful places. LDPs should provide clear
expectations for design, quality and place taking
account of the local context, characteristics
and connectivity of the area. They should also
identify where more detailed design guidance
is expected, for example, by way of design
frameworks, briefs, masterplans and design
codes.
Planning authorities should use the Place
Standard tool in the preparation of LDPs and
design guidance to engage with communities
and other stakeholders. They should also
where relevant promote its use in early design
discussions on planning applications.
Policy 14
a) Development proposals will be designed to
improve the quality of an area whether in
urban or rural locations and regardless of
scale.
b) Development proposals will be supported
where they are consistent with the six qualities
of successful places:
Healthy: Supporting the prioritisation of
women’s safety and improving physical and
mental health.
Pleasant: Supporting attractive natural and
built spaces.
Connected: Supporting well connected
networks that make moving around easy
and reduce car dependency
Distinctive: Supporting attention to detail
of local architectural styles and natural
landscapes to be interpreted, literally or
creatively, into designs to reinforce identity.
Sustainable: Supporting the efficient use
of resources that will allow people to live,
play, work and stay in their area, ensuring
climate resilience, and integrating nature
positive, biodiversity solutions.
Adaptable: Supporting commitment
to investing in the long-term value of
buildings, streets and spaces by allowing
for flexibility so that they can be changed
quickly to accommodate different uses as
well as maintained over time.
Further details on delivering the six qualities of
successful places are set out in Annex D.
c) Development proposals that are poorly
designed, detrimental to the amenity of the
surrounding area or inconsistent with the six
qualities of successful places, will not be
supported.

Page 98

Part 2 – National Planning Policy 
National Planning Framework 4
60
Policy impact:
 Just Transition
 Conserving and recycling assets
 Local living
 Compact urban growth
 Rebalanced development
 Rural revitalisation
Key policy connections:
All other policies.

Page 99

Part 2 – National Planning Policy
National Planning Framework 4
61
Local Living and 20 minute
neighbourhoods
Policy Principles
Policy Intent:
To encourage, promote and facilitate the
application of the Place Principle and create
connected and compact neighbourhoods
where people can meet the majority of their
daily needs within a reasonable distance of
their home, preferably by walking, wheeling or
cycling or using sustainable transport options.
Policy Outcomes:
• Places are planned to improve local living
in a way that reflects local circumstances.
• A network of high-quality, accessible,
mixed-use neighbourhoods which support
health and wellbeing, reduce inequalities
and are resilient to the effects of climate
change.
• New and existing communities are planned
together with homes and the key local
infrastructure including schools, community
centres, local shops, greenspaces, health
and social care, digital and sustainable
transport links.
Local Development Plans:
LDPs should support local living, including
20 minute neighbourhoods within settlements,
through the spatial strategy, associated site
briefs and masterplans. The approach should
take into account the local context, consider
the varying settlement patterns and reflect the
particular characteristics and challenges faced
by each place. Communities and businesses will
have an important role to play in informing this,
helping to strengthen local living through their
engagement with the planning system.
Policy 15
a) Development proposals will contribute
to local living including, where relevant,
20 minute neighbourhoods. To establish
this, consideration will be given to existing
settlement pattern, and the level and quality of
interconnectivity of the proposed development
with the surrounding area, including local
access to:
• sustainable modes of transport including
local public transport and safe, high quality
walking, wheeling and cycling networks;
• employment;
• shopping;
• health and social care facilities;
• childcare, schools and lifelong learning
opportunities;
• playgrounds and informal play
opportunities, parks, green streets and
spaces, community gardens, opportunities
for food growth and allotments, sport and
recreation facilities;
• publicly accessible toilets;
• affordable and accessible housing options,
ability to age in place and housing
diversity.
Policy impact:
 Just Transition
 Conserving and recycling assets
 Local living
 Compact urban growth
 Rebalanced development
 Rural revitalisation
Key policy connections:
Tackling the climate and nature crises
Climate mitigation and adaptation
Sustainable transport
Design, quality and place
Infrastructure first
Quality homes
Blue and green infrastructure
Play, recreation and sport
Community wealth building
City, town, local and commercial centres
Retail

Page 100

Part 2 – National Planning Policy 
National Planning Framework 4
62
Quality homes
Policy Principles
Policy Intent:
To encourage, promote and facilitate the
delivery of more high quality, affordable and
sustainable homes, in the right locations,
providing choice across tenures that meet
the diverse housing needs of people and
communities across Scotland.
Policy Outcomes:
• Good quality homes are at the heart
of great places and contribute to
strengthening the health and wellbeing of
communities.
• Provision of land in the right locations to
accommodate future need and demand
for new homes, supported by the
appropriate infrastructure.
• More energy efficient, net zero emissions
homes, supporting a greener, fairer and
more inclusive wellbeing economy and
community wealth building, tackling both
fuel and child poverty.
Local Development Plans:
LDPs are expected to identify a Local Housing
Land Requirement for the area they cover. This
is to meet the duty for a housing target and
to represent how much land is required. To
promote an ambitious and plan-led approach,
the Local Housing Land Requirement is
expected to exceed the 10 year Minimum All-
Tenure Housing Land Requirement (MATHLR)
set out in Annex E.
Deliverable land should be allocated to meet
the 10 year Local Housing Land Requirement in
locations that create quality places for people to
live. Areas that may be suitable for new homes
beyond 10 years are also to be identified. The
location of where new homes are allocated
should be consistent with local living including,
where relevant, 20 minute neighbourhoods and
an infrastructure first approach. In rural and
island areas, authorities are encouraged to
set out tailored approaches to housing which
reflect locally specific market circumstances and
delivery approaches. Diverse needs and delivery
models should be taken into account across
all areas, as well as allocating land to ensure
provision of accommodation for Gypsy/Travellers
and Travelling Showpeople where need is
identified.
The LDP delivery programme is expected to
establish a deliverable housing land pipeline
for the Local Housing Land Requirement.
The purpose of the pipeline is to provide a
transparent view of the phasing of housing
allocations so that interventions, including
infrastructure, that enable delivery can be
planned: it is not to stage permissions.
Representing when land will be brought forward,
phasing is expected across the short (1-3 years),
medium (4-6 years) and long-term (7-10 years).
Where sites earlier in the deliverable housing
land pipeline are not delivering as programmed,
and alternative delivery mechanisms identified
in the delivery programme are not practical,
measures should be considered to enable earlier
delivery of long-term deliverable sites (7-10
years) or areas identified for new homes beyond
10 years. De-allocations should be considered
where sites are no longer deliverable. The
annual Housing Land Audit will monitor the
delivery of housing land to inform the pipeline
and the actions to be taken in the delivery
programme.
Policy 16
a) Development proposals for new homes on
land allocated for housing in LDPs will be
supported.
b) Development proposals that include 50 or
more homes, and smaller developments if
required by local policy or guidance, should
be accompanied by a Statement of Community
Benefit. The statement will explain the
contribution of the proposed development to:
i. meeting local housing requirements,
including affordable homes;
ii. providing or enhancing local infrastructure,
facilities and services; and
iii. improving the residential amenity of the
surrounding area.

Page 101

Part 2 – National Planning Policy
National Planning Framework 4
63
c) Development proposals for new homes
that improve affordability and choice by
being adaptable to changing and diverse
needs, and which address identified gaps
in provision, will be supported. This could
include:
i. self-provided homes;
ii. accessible, adaptable and wheelchair
accessible homes;
iii. build to rent;
iv. affordable homes;
v. a range of size of homes such as those
for larger families;
vi. homes for older people, including
supported accommodation, care homes
and sheltered housing;
vii. homes for people undertaking further and
higher education; and
viii. homes for other specialist groups such as
service personnel.
d) Development proposals for public or private,
permanent or temporary, Gypsy/Travellers
sites and family yards and Travelling
Showpeople yards, including on land not
specifically allocated for this use in the
LDP, should be supported where a need
is identified and the proposal is otherwise
consistent with the plan spatial strategy and
other relevant policies, including human rights
and equality.
e) Development proposals for new homes will
be supported where they make provision
for affordable homes to meet an identified
need. Proposals for market homes will only
be supported where the contribution to
the provision of affordable homes on a site
will be at least 25% of the total number of
homes, unless the LDP sets out locations or
circumstances where:
i. a higher contribution is justified by
evidence of need, or
ii. a lower contribution is justified, for example,
by evidence of impact on viability,
where proposals are small in scale, or to
incentivise particular types of homes that
are needed to diversify the supply, such as
self-build or wheelchair accessible homes.
The contribution is to be provided in
accordance with local policy or guidance.
f) Development proposals for new homes on
land not allocated for housing in the LDP will
only be supported in limited circumstances
where:
i. the proposal is supported by an agreed
timescale for build-out; and
ii. the proposal is otherwise consistent with
the plan spatial strategy and other relevant
policies including local living and 20 minute
neighbourhoods;
iii. and either:
· delivery of sites is happening earlier
than identified in the deliverable housing
land pipeline. This will be determined
by reference to two consecutive years
of the Housing Land Audit evidencing
substantial delivery earlier than pipeline
timescales and that general trend being
sustained; or
· the proposal is consistent with policy on
rural homes; or
· the proposal is for smaller scale
opportunities within an existing
settlement boundary; or
· the proposal is for the delivery of less
than 50 affordable homes as part of
a local authority supported affordable
housing plan.
g) Householder development proposals will be
supported where they:
i. do not have a detrimental impact on the
character or environmental quality of the
home and the surrounding area in terms of
size, design and materials; and
ii. do not have a detrimental effect on
the neighbouring properties in terms
of physical impact, overshadowing or
overlooking.
h) Householder development proposals that
provide adaptations in response to risks from
a changing climate, or relating to people
with health conditions that lead to particular
accommodation needs will be supported.

Page 102

Part 2 – National Planning Policy 
National Planning Framework 4
64
Policy impact:
 Just Transition
 Conserving and recycling assets
 Local living
 Compact urban growth
 Rebalanced development
 Rural revitalisation
Key policy connections:
Tackling the climate and nature crises
Climate mitigation and adaptation
Green belts
Brownfield, vacant and derelict land and
empty buildings
Sustainable transport
Design, quality and place
Local Living and 20 minute neighbourhoods
Infrastructure first
Heat and cooling
Blue and green infrastructure
Play, recreation and sport
Rural homes
Health and safety
City, town, local and commercial centres

Page 103

Part 2 – National Planning Policy 
National Planning Framework 4
65
Rural homes
Policy Principles
Policy Intent:
To encourage, promote and facilitate the
delivery of more high quality, affordable
and sustainable rural homes in the right
locations.
Policy Outcomes:
• Improved choice of homes across tenures
so that identified local needs of people
and communities in rural and island areas
are met.
• Homes are provided that support
sustainable rural communities and are
linked with service provision.
• The distinctive character, sense of place
and natural and cultural assets of rural
areas are safeguarded and enhanced.
Local Development Plans:
LDPs should be informed by an understanding
of population change over time, locally specific
needs and market circumstances in rural and
island areas.
LDPs should set out tailored approaches to rural
housing and where relevant include proposals
for future population growth – including
provision for small-scale housing such as
crofts and woodland crofts and the appropriate
resettlement of previously inhabited areas.
The Scottish Government’s 6 fold Urban Rural
Classification 2020 should be used to identify
remote rural areas. Plans should reflect locally
appropriate delivery approaches. Previously
inhabited areas that are suitable for resettlement
should be identified in the spatial strategy.
Policy 17
a) Development proposals for new homes in
rural areas will be supported where the
development is suitably scaled, sited and
designed to be in keeping with the character
of the area and the development:
i. is on a site allocated for housing within
the LDP;
ii. reuses brownfield land where a return to
a natural state has not or will not happen
without intervention;
iii. reuses a redundant or unused building;
iv. is an appropriate use of a historic
environment asset or is appropriate
enabling development to secure the
future of historic environment assets;
v. is demonstrated to be necessary to
support the sustainable management of a
viable rural business or croft, and there is
an essential need for a worker (including
those taking majority control of a farm
business) to live permanently at or near
their place of work;
vi. is for a single home for the retirement
succession of a viable farm holding;
vii. is for the subdivision of an existing
residential dwelling; the scale of which
is in keeping with the character and
infrastructure provision in the area; or
viii. reinstates a former dwelling house or is
a one-for-one replacement of an existing
permanent house.
b) Development proposals for new homes in
rural areas will consider how the development
will contribute towards local living and take
into account identified local housing needs
(including affordable housing), economic
considerations and the transport needs of
the development as appropriate for the rural
location.
c) Development proposals for new homes in
remote rural areas will be supported where
the proposal:
i. supports and sustains existing fragile
communities;
ii. supports identified local housing outcomes;
and

Page 104

Part 2 – National Planning Policy 
National Planning Framework 4
66
iii. is suitable in terms of location, access, and
environmental impact.
d) Development proposals for new homes
that support the resettlement of previously
inhabited areas will be supported where the
proposal:
i. is in an area identified in the LDP as
suitable for resettlement;
ii. is designed to a high standard;
iii. responds to its rural location; and
iv. is designed to minimise greenhouse gas
emissions as far as possible.
Policy impact:
 Just Transition
 Conserving and recycling assets
 Local living
 Compact urban growth
 Rebalanced development
 Rural revitalisation
Key policy connections:
Tackling the climate and nature crises
Climate mitigation and adaptation
Natural places
Historic assets and places
Green belts
Brownfield, vacant and derelict land and
empty buildings
Coastal development
Sustainable transport
Design, quality and place
Local Living and 20 minute neighbourhoods
Infrastructure first
Quality homes
City, town, local and commercial centres
Rural development
Tourism

Page 105

Part 2 – National Planning Policy 
National Planning Framework 4
67
Infrastructure first
Policy Principles
Policy Intent:
To encourage, promote and facilitate
an infrastructure first approach to land
use planning, which puts infrastructure
considerations at the heart of placemaking.
Policy Outcomes:
• Infrastructure considerations are integral
to development planning and decision
making and potential impacts on
infrastructure and infrastructure needs
are understood early in the development
planning process as part of an evidenced
based approach.
• Existing infrastructure assets are used
sustainably, prioritising low-carbon
solutions.
• Infrastructure requirements, and their
planned delivery to meet the needs of
communities, are clear.
Local Development Plans:
LDPs and delivery programmes should be
based on an integrated infrastructure first
approach. Plans should:
• be informed by evidence on infrastructure
capacity, condition, needs and deliverability
within the plan area, including cross boundary
infrastructure;
• set out the infrastructure requirements to
deliver the spatial strategy, informed by the
evidence base, identifying the infrastructure
priorities, and where, how, when and by
whom they will be delivered; and
• indicate the type, level (or method of
calculation) and location of the financial
or in-kind contributions, and the types of
development from which they will be required.
Plans should align with relevant national, regional
and local infrastructure plans and policies
and take account of the Scottish Government
infrastructure investment hierarchy and
sustainable travel and investment hierarchies in
developing the spatial strategy. Consistent early
engagement and collaboration between relevant
stakeholders will better inform decisions on land
use and investment.
Policy 18
a) Development proposals which provide (or
contribute to) infrastructure in line with that
identified as necessary in LDPs and their
delivery programmes will be supported.
b) The impacts of development proposals
on infrastructure should be mitigated.
Development proposals will only be
supported where it can be demonstrated
that provision is made to address the
impacts on infrastructure. Where planning
conditions, planning obligations, or other legal
agreements are to be used, the relevant tests
will apply.
Where planning obligations are entered into, they
should meet the following tests:
– be necessary to make the proposed
development acceptable in planning terms
– serve a planning purpose
– relate to the impacts of the proposed
development
– fairly and reasonably relate in scale and kind to
the proposed development
– be reasonable in all other respects
Planning conditions should only be imposed
where they meet all of the following tests. They
should be:
– necessary
– relevant to planning
– relevant to the development to be permitted
– enforceable
– precise
– reasonable in all other respects

Page 106

Part 2 – National Planning Policy
National Planning Framework 4
68
Policy impact:
 Just Transition
 Conserving and recycling assets
 Local living
 Compact urban growth
 Rebalanced development
Key policy connections:
Tackling the climate and nature crises
Climate mitigation and adaptation
Biodiversity
Brownfield, vacant and derelict land and
empty buildings
Energy
Zero waste
Sustainable transport
Design, quality and place
Local Living and 20 minute neighbourhoods
Heat and cooling
Quality homes
Rural homes
Blue and green infrastructure
Play, recreation and sport
Flood risk and water management
Health and safety
Digital infrastructure
Business and industry
City, town, local and commercial centres
Rural development

Page 107

Part 2 – National Planning Policy 
National Planning Framework 4
69
Heat and cooling
Policy Principles
Policy Intent:
To encourage, promote and facilitate
development that supports decarbonised
solutions to heat and cooling demand
and ensure adaptation to more extreme
temperatures.
Policy Outcomes:
• Development is connected to expanded
heat networks which use and store heat
from low or zero emission sources.
• Buildings and places are adapted to
more extreme temperatures.
Local Development Plans:
LDPs should take into account the area’s Local
Heat & Energy Efficiency Strategy (LHEES). The
spatial strategy should take into account areas of
heat network potential and any designated Heat
Network Zones (HNZ).
Policy 19
a) Development proposals within or adjacent to
a Heat Network Zone identified in a LDP will
only be supported where they are designed
and constructed to connect to the existing
heat network.
b) Proposals for retrofitting a connection to a
heat network will be supported.
c) Where a heat network is planned but not
yet in place, development proposals will
only be supported where they are designed
and constructed to allow for cost-effective
connection at a later date.
d) National and major developments that will
generate waste or surplus heat and which
are located in areas of heat demand, will be
supported providing wider considerations,
including residential amenity, are not
adversely impacted. A Heat and Power Plan
should demonstrate how energy recovered
from the development will be used to produce
electricity and heat.
e) Development proposals for energy
infrastructure will be supported where they:
i. repurpose former fossil fuel infrastructure
for the production or handling of low
carbon energy;
ii. are within or adjacent to a Heat Network
Zone; and
iii. can be cost-effectively linked to an existing
or planned heat network.
f) Development proposals for buildings that will
be occupied by people will be supported
where they are designed to promote
sustainable temperature management, for
example by prioritising natural or passive
solutions such as siting, orientation, and
materials.
Policy impact:
 Just Transition
 Conserving and recycling assets
 Rebalanced development
Key policy connections:
Tackling the climate and nature crises
Climate mitigation and adaptation
Energy
Zero waste
Infrastructure first
Blue and green infrastructure
Business and industry

Page 108

Part 2 – National Planning Policy
National Planning Framework 4
70
Blue and green infrastructure
Policy Principles
Policy Intent:
To protect and enhance blue and green
infrastructure and their networks.
Policy Outcomes:
• Blue and green infrastructure are
an integral part of early design and
development processes; are designed to
deliver multiple functions including climate
mitigation, nature restoration, biodiversity
enhancement, flood prevention and water
management.
• Communities benefit from accessible,
high quality blue, green and civic spaces.
Local Development Plans:
LDPs should be informed by relevant, up-to-
date audits and/or strategies, covering the
multiple functions and benefits of blue and
green infrastructure. The spatial strategy should
identify and protect blue and green infrastructure
assets and networks; enhance and expand
existing provision including new blue and/or
green infrastructure. This may include retrofitting.
Priorities for connectivity to other blue and/or
green infrastructure assets, including to address
cross-boundary needs and opportunities, should
also be identified.
LDPs should encourage the permanent or
temporary use of unused or under-used land as
green infrastructure. Where this is temporary, this
should not prevent future development potential
from being realised.
LDPs should safeguard access rights and
core paths, including active travel routes, and
encourage new and enhanced opportunities for
access linked to wider networks.
Policy 20
a) Development proposals that result in
fragmentation or net loss of existing blue and
green infrastructure will only be supported
where it can be demonstrated that the
proposal would not result in or exacerbate a
deficit in blue or green infrastructure provision,
and the overall integrity of the network will be
maintained. The planning authority’s Open
Space Strategy should inform this.
b) Development proposals for or incorporating
new or enhanced blue and/or green
infrastructure will be supported. Where
appropriate, this will be an integral element
of the design that responds to local
circumstances.
Design will take account of existing provision,
new requirements and network connections
(identified in relevant strategies such as
the Open Space Strategies) to ensure the
proposed blue and/or green infrastructure
is of an appropriate type(s), quantity, quality
and accessibility and is designed to be multi-
functional and well integrated into the overall
proposals.
c) Development proposals in regional and
country parks will only be supported where
they are compatible with the uses, natural
habitats, and character of the park.
d) Development proposals for temporary open
space or green space on unused or under-
used land will be supported.
e) Development proposals that include new or
enhanced blue and/or green infrastructure
will provide effective management and
maintenance plans covering the funding
arrangements for their long-term delivery and
upkeep, and the party or parties responsible
for these.

Page 109

Part 2 – National Planning Policy 
National Planning Framework 4
71
Policy impact:
 Just Transition
 Local living
 Compact urban growth
 Rebalanced development
 Rural revitalisation
Key policy connections:
Tackling the climate and nature crises
Climate mitigation and adaptation
Biodiversity
Natural places
Soils
Forestry, woodland and trees
Historic assets and places
Green belts
Sustainable transport
Design, quality and place
Local Living and 20 minute neighbourhoods
Infrastructure first
Heat and cooling
Quality homes
Play, recreation and sport
Flood risk and water management
Health and safety
City, town, local and commercial centres
Rural development

Page 110

Part 2 – National Planning Policy 
National Planning Framework 4
72
Play, recreation and sport
Policy Principles
Policy Intent:
To encourage, promote and facilitate spaces
and opportunities for play, recreation and
sport.
Policy Outcomes:
• Natural and built environments are
improved, with more equitable access to
opportunities for play and recreation.
• Physical and mental health are improved
through provision of, and access to,
outdoor recreation, play and sport
facilities.
Local Development Plans:
LDPs should identify sites for sports, play
and outdoor recreation for people of all ages.
This should be based on an understanding
of the needs and demand in the community
and informed by the planning authority’s Play
Sufficiency Assessment and Open Space
Strategy. These spaces can be incorporated
as part of enhancing and expanding blue and
green infrastructure, taking account of relevant
agencies’ plans or policy frameworks, such as
flood risk and/or water management plans. New
provisions should be well-designed, high quality,
accessible and inclusive.
Policy 21
a) Development proposals which result in the
loss of outdoor sports facilities will only be
supported where the proposal:
i. is ancillary to the principal use of the site
as an outdoor sports facility; or
ii. involves only a minor part of the facility and
would not affect its use; or
iii. meets a requirement to replace the facility
which would be lost, either by a new
facility or by upgrading an existing facility
to provide a better quality facility. The
location will be convenient for users and
the overall playing capacity of the area will
be maintained; or
iv. can demonstrate that there is a clear
excess of provision to meet current and
anticipated demand in the area, and
that the site would be developed without
detriment to the overall quality of provision.
This should be informed by the local
authority’s Open Space Strategy and/or Play
Sufficiency Assessment and in consultation
with sportscotland where appropriate.
b) Development proposals that result in the
quantitative and/or qualitative loss of children’s
outdoor play provision, will only be supported
where it can be demonstrated that there is no
ongoing or future demand or the existing play
provision will be replaced by a newly created,
or improved existing asset, that is better
quality or more appropriate.
This should be informed by the planning
authority’s Play Sufficiency Assessment.
c) Development proposals for temporary or
informal play space on unused or underused
land will be supported.
d) Development proposals likely to be occupied
or used by children and young people will
be supported where they incorporate well-
designed, good quality provision for play,
recreation, and relaxation that is proportionate
to the scale and nature of the development
and existing provision in the area.
e) Development proposals that include new
streets and public realm should be inclusive
and enable children and young people to play
and move around safely and independently,
maximising opportunities for informal and
incidental play in the neighbourhood.
f) New, replacement or improved play provision
will, as far as possible and as appropriate:
i. provide stimulating environments;
ii. provide a range of play experiences
including opportunities to connect with
nature;
iii. be inclusive;
iv. be suitable for different ages of children
and young people;
v. be easily and safely accessible by
children and young people independently,
including those with a disability;

Page 111

Part 2 – National Planning Policy 
National Planning Framework 4
73
vi. incorporate trees and/or other forms of
greenery;
vii. form an integral part of the surrounding
neighbourhood;
viii. be well overlooked for passive
surveillance;
ix. be linked directly to other open spaces
and play areas.
g) Development proposals that include new or
enhanced play or sport facilities will provide
effective management and maintenance plans
covering the funding arrangements for their
long-term delivery and upkeep, and the party
or parties responsible for these.
Policy impact:
 Just Transition
 Compact urban growth
	Local living
	Rebalanced development
	Rural revitalisation
Key policy connections:
Tackling the climate and nature crises
Climate mitigation and adaptation
Biodiversity
Natural places
Forestry, woodland and trees
Historic assets and places
Green belts
Brownfield, vacant and derelict land and
empty buildings
Sustainable transport
Design, quality and place
Local Living and 20 minute neighbourhoods
Infrastructure first
Quality homes
Rural homes
Blue and green infrastructure
Flood risk and water management
Health and safety
City, town, local and commercial centres
Culture and creativity

Page 112

Part 2 – National Planning Policy 
National Planning Framework 4
74
Flood risk and water management
Policy Principles
Policy Intent:
To strengthen resilience to flood risk by
promoting avoidance as a first principle and
reducing the vulnerability of existing and
future development to flooding.
Policy Outcomes:
• Places are resilient to current and future
flood risk.
• Water resources are used efficiently and
sustainably.
• Wider use of natural flood risk
management benefits people and nature.
Local Development Plans:
LDPs should strengthen community resilience
to the current and future impacts of climate
change, by avoiding development in areas at
flood risk as a first principle. Resilience should
also be supported by managing the need to
bring previously used sites in built up areas into
positive use; planning for adaptation measures;
and identifying opportunities to implement
improvements to the water environment through
natural flood risk management and blue green
infrastructure.
Plans should take into account the probability
of flooding from all sources and make use of
relevant flood risk and river basin management
plans for the area. A precautionary approach
should be taken, regarding the calculated
probability of flooding as a best estimate, not
a precise forecast. For areas where climate
change is likely to result in increased flood
exposure that becomes unmanageable,
consideration should be given to alternative
sustainable land use.
Policy 22
a) Development proposals at risk of flooding or
in a flood risk area will only be supported if
they are for:
i. essential infrastructure where the location is
required for operational reasons;
ii. water compatible uses;
iii. redevelopment of an existing building or
site for an equal or less vulnerable use; or.
iv. redevelopment of previously used sites in
built up areas where the LDP has identified
a need to bring these into positive use and
where proposals demonstrate that long-
term safety and resilience can be secured
in accordance with relevant SEPA advice.
The protection offered by an existing formal
flood protection scheme or one under
construction can be taken into account when
determining flood risk.
In such cases, it will be demonstrated by the
applicant that:
• all risks of flooding are understood and
addressed;
• there is no reduction in floodplain capacity,
increased risk for others, or a need for
future flood protection schemes;
• the development remains safe and
operational during floods;
• flood resistant and resilient materials and
construction methods are used; and
• future adaptations can be made to
accommodate the effects of climate
change.
Additionally, for development proposals
meeting criteria part iv), where flood risk is
managed at the site rather than avoided these
will also require:
• the first occupied/utilised floor, and the
underside of the development if relevant, to
be above the flood risk level and have an
additional allowance for freeboard; and
• that the proposal does not create an island
of development and that safe access/
egress can be achieved.

Page 113

Part 2 – National Planning Policy 
National Planning Framework 4
75
b) Small scale extensions and alterations to
existing buildings will only be supported
where they will not significantly increase flood
risk.
c) Development proposals will:
i. not increase the risk of surface water
flooding to others, or itself be at risk.
ii. manage all rain and surface water through
sustainable urban drainage systems
(SUDS), which should form part of and
integrate with proposed and existing blue-
green infrastructure. All proposals should
presume no surface water connection to
the combined sewer;
iii. seek to minimise the area of impermeable
surface.
d) Development proposals will be supported if
they can be connected to the public water
mains. If connection is not feasible, the
applicant will need to demonstrate that water
for drinking water purposes will be sourced
from a sustainable water source that is
resilient to periods of water scarcity.
e) Development proposals which create, expand
or enhance opportunities for natural flood
risk management, including blue and green
infrastructure, will be supported.
Policy impact:
	Just Transition
	Conserving and recycling assets
	Local living
	Compact urban growth
	Rebalanced development
	Rural revitalisation
Key policy connections:
Tackling the climate and nature crises
Climate mitigation and adaptation
Biodiversity
Green belts
Coastal development
Design, quality and place
Infrastructure first
Quality homes
Blue and green infrastructure
Health and safety
Business and industry

Page 114

Part 2 – National Planning Policy 
National Planning Framework 4
76
Health and safety
Policy Principles
Policy Intent:
To protect people and places from
environmental harm, mitigate risks arising
from safety hazards and encourage,
promote and facilitate development that
improves health and wellbeing.
Policy Outcomes:
• Health is improved and health inequalities
are reduced.
• Safe places protect human health and the
environment.
• A planned approach supports health
infrastructure delivery.
Local Development Plans:
LDP spatial strategies should seek to tackle
health inequalities particularly in places which
are experiencing the most disadvantage.
They should identify the health and social
care services and infrastructure needed in
the area, including potential for co-location of
complementary services, in partnership with
Health Boards and Health and Social Care
Partnerships.
LDPs should create healthier places for example
through opportunities for exercise, healthier
lifestyles, land for community food growing
and allotments, and awareness of locations of
concern for suicide.
Spatial strategies should maintain appropriate
distances between sites with hazardous
substances and areas where the public are likely
to be present and areas of particular natural
sensitivity or interest.
Policy 23
a) Development proposals that will have
positive effects on health will be supported.
This could include, for example, proposals
that incorporate opportunities for exercise,
community food growing or allotments.
b) Development proposals which are likely to
have a significant adverse effect on health
will not be supported. A Health Impact
Assessment may be required.
c) Development proposals for health and social
care facilities and infrastructure will be
supported.
d) Development proposals that are likely to have
significant adverse effects on air quality will
not be supported. Development proposals will
consider opportunities to improve air quality
and reduce exposure to poor air quality. An air
quality assessment may be required where the
nature of the proposal or the air quality in the
location suggest significant effects are likely.
e) Development proposals that are likely to
raise unacceptable noise issues will not be
supported. The agent of change principle
applies to noise sensitive development. A
Noise Impact Assessment may be required
where the nature of the proposal or its location
suggests that significant effects are likely.
f) Development proposals will be designed to
take into account suicide risk.
g) Development proposals within the vicinity of a
major accident hazard site or major accident
hazard pipeline (because of the presence of
toxic, highly reactive, explosive or inflammable
substances) will consider the associated risks
and potential impacts of the proposal and the
major accident hazard site/pipeline of being
located in proximity to one another.
h) Applications for hazardous substances
consent will consider the likely potential
impacts on surrounding populations and the
environment.
i) Any advice from Health and Safety Executive,
the Office of Nuclear Regulation or the
Scottish Environment Protection Agency that
planning permission or hazardous substances
consent should be refused, or conditions to
be attached to a grant of consent, should not
be overridden by the decision maker without
the most careful consideration.
j) Similar considerations apply in respect of
development proposals either for or near
licensed explosive sites (including military
explosive storage sites).

Page 115

Part 2 – National Planning Policy 
National Planning Framework 4
77
Policy impact:
	Just Transition
	Local living
	Compact urban growth
	Rebalanced development
Key policy connections:
Tackling the climate and nature crises
Climate mitigation and adaptation
Forestry, woodland and trees
Energy
Zero waste
Sustainable transport
Design, quality and place
Local Living and 20 minute neighbourhoods
Infrastructure first
Heat and cooling
Quality homes
Blue and green infrastructure
Play, recreation and sport
Flood risk and water management
Digital infrastructure
Business and industry
City, town, local and commercial centres
Retail
Culture and creativity
Aquaculture
Minerals

Page 116

Part 2 – National Planning Policy 
National Planning Framework 4
78
Digital infrastructure
Policy Principles
Policy Intent:
To encourage, promote and facilitate the roll-
out of digital infrastructure across Scotland
to unlock the potential of all our places and
the economy.
Policy Outcomes:
• Appropriate, universal and future proofed
digital infrastructure across the country.
• Local living is supported and the need to
travel is reduced.
Local Development Plans:
LDPs should support the delivery of digital
infrastructure, including fixed line and mobile
connectivity, particularly in areas with gaps in
connectivity and barriers to digital access.
Policy 24
a) Development proposals that incorporate
appropriate, universal, and future-proofed
digital infrastructure will be supported.
b) Development proposals that deliver new
digital services or provide technological
improvements, particularly in areas with no or
low connectivity capacity, will be supported.
c) Development proposals that are aligned
with and support the delivery of local or
national programmes for the roll-out of digital
infrastructure will be supported.
d) Development proposals that deliver new
connectivity will be supported where there are
benefits of this connectivity for communities
and the local economy.
e) Development proposals for digital
infrastructure will only be supported where:
i. the visual and amenity impacts of the
proposed development have been
minimised through careful siting, design,
height, materials and, landscaping, taking
into account cumulative impacts and
relevant technical constraints;
ii. it has been demonstrated that, before
erecting a new ground based mast, the
possibility of erecting antennas on an
existing building, mast or other structure,
replacing an existing mast and/or site
sharing has been explored; and
iii. there is no physical obstruction to
aerodrome operations, technical sites, or
existing transmitter/receiver facilities.
Policy impact:
	Just Transition
	Conserving and recycling assets
	Local living
	Compact urban growth
	Rebalanced development
	Rural revitalisation
Key policy connections:
Tackling the climate and nature crises
Natural places
Green belts
Zero waste
Design, quality and place
Local Living and 20 minute neighbourhoods
Infrastructure first
Health and safety
Community wealth building
Business and industry
City, town, local and commercial centres
Rural development

Page 117

Part 2 – National Planning Policy 
National Planning Framework 4
79
Productive Places
Community wealth building
Policy Principles
Policy Intent:
To encourage, promote and facilitate
a new strategic approach to economic
development that also provides a practical
model for building a wellbeing economy at
local, regional and national levels.
Policy Outcomes:
• local economic development that focuses
on community and place benefits as a
central and primary consideration – to
support local employment and supply
chains.
• support community ownership and
management of buildings and land.
Local Development Plans:
LDPs should be aligned with any strategy
for community wealth building for the area.
Spatial strategies should address community
wealth building priorities; identify community
assets; set out opportunities to tackle economic
disadvantage and inequality; and seek to
provide benefits for local communities.
Policy 25
a) Development proposals which contribute
to local or regional community wealth
building strategies and are consistent with
local economic priorities will be supported.
This could include for example improving
community resilience and reducing inequalities;
increasing spending within communities;
ensuring the use of local supply chains
and services; local job creation; supporting
community led proposals, including creation
of new local firms and enabling community led
ownership of buildings and assets.
b) Development proposals linked to community
ownership and management of land will be
supported.
Policy impact:
	Just Transition
	Rebalanced development
	Rural revitalisation
Key policy connections:
Brownfield, vacant and derelict land and
empty buildings
Local Living and 20 minute neighbourhoods
Business and industry

Page 118

Part 2 – National Planning Policy 
National Planning Framework 4
80
Business and industry
Policy Principles
Policy Intent:
To encourage, promote and facilitate business
and industry uses and to enable alternative
ways of working such as home working, live-
work units and micro-businesses.
Policy Outcomes:
• Recovery within the business and industry
sector is sustainable and inclusive.
• Investment in the business and industrial
sector contributes to community wealth
building.
Local Development Plans:
LDPs should allocate sufficient land for business
and industry, taking into account business and
industry land audits, in particular ensuring that
there is a suitable range of sites that meet current
market demand, location, size and quality in
terms of accessibility and services. This allocation
should take account of local economic strategies
and support broader objectives of delivering a
low carbon and net zero economic recovery, and
a fairer and more inclusive wellbeing economy.
Policy 26
a) Development proposals for business and
industry uses on sites allocated for those uses
in the LDP will be supported.
b) Development proposals for home working,
live-work units and micro-businesses will
be supported where it is demonstrated
that the scale and nature of the proposed
business and building will be compatible
with the surrounding area and there will be
no unacceptable impacts on amenity or
neighbouring uses.
c) Development proposals for business and
industry uses will be supported where they
are compatible with the primary business
function of the area. Other employment
uses will be supported where they will not
prejudice the primary function of the area and
are compatible with the business/industrial
character of the area.
d) Development proposals for business, general
industrial and storage and distribution uses
outwith areas identified for those uses in the
LDP will only be supported where:
i. It is demonstrated that there are no
suitable alternatives allocated in the LDP
or identified in the employment land audit;
and
ii. The nature and scale of the activity will be
compatible with the surrounding area.
e) Development proposals for business and
industry will take into account:
i. Impact on surrounding residential amenity;
sensitive uses and the natural and historic
environment;
ii. The need for appropriate site restoration at
the end of a period of commercial use.
f) Major developments for manufacturing
or industry will be accompanied by a
decarbonisation strategy to demonstrate how
greenhouse gas emissions from the process
are appropriately abated. The strategy may
include carbon capture and storage.
Policy impact:
	Just Transition
	Conserving and recycling assets
	Local living
	Compact urban growth
	Rebalanced development
Key policy connections:
Tackling the climate and nature crises
Climate mitigation and adaptation
Sustainable transport
Design, quality and place
Local Living and 20 minute neighbourhoods
Health and safety
Digital infrastructure
Community wealth building
City, town, local and commercial centres
Rural development

Page 119

Part 2 – National Planning Policy
National Planning Framework 4
81
City, town, local and commercial
centres
Policy Principles
Policy Intent:
To encourage, promote and facilitate
development in our city and town centres,
recognising they are a national asset. This
will be achieved by applying the Town
Centre First approach to help centres
adapt positively to long-term economic,
environmental and societal changes, and by
encouraging town centre living.
Policy Outcomes:
• Centres are vibrant, healthy, creative,
enterprising, accessible and resilient
places for people to live, learn, work,
enjoy and visit.
• Development is directed to the most
sustainable locations that are accessible
by a range of sustainable transport
modes and provide communities with
easy access to the goods, services and
recreational opportunities they need.
Local Development Plans:
LDPs should support sustainable futures for
city, town and local centres, in particular
opportunities to enhance city and town centres.
They should, where relevant, also support
proposals for improving the sustainability of
existing commercial centres where appropriate.
LDPs should identify a network of centres
that reflect the principles of 20 minute
neighbourhoods and the town centre vision.
LDPs should be informed by evidence on where
clustering of non-retail uses may be adversely
impacting on the wellbeing of communities. They
should also consider, and if appropriate, identify
any areas where drive-through facilities may
be acceptable where they would not negatively
impact on the principles of local living or
sustainable travel.
LDPs should provide a proportion of their
Local Housing Land Requirements in city and
town centres and be proactive in identifying
opportunities to support residential development.
Policy 27
a) Development proposals that enhance and
improve the vitality and viability of city, town
and local centres, including proposals that
increase the mix of uses, will be supported.
b) Development proposals will be consistent
with the town centre first approach. Proposals
for uses which will generate significant
footfall, including commercial, leisure, offices,
community, sport and cultural facilities, public
buildings such as libraries, education and
healthcare facilities, and public spaces:
i. will be supported in existing city, town and
local centres, and
ii. will not be supported outwith those centres
unless a town centre first assessment
demonstrates that:
• all centre and edge of centre options
have been sequentially assessed and
discounted as unsuitable or unavailable;
• the scale of development cannot
reasonably be altered or reduced in
scale to allow it to be accommodated in
a centre; and
• the impacts on existing centres have
been thoroughly assessed and there will
be no significant adverse effect on the
vitality and viability of the centres.

Page 120

Part 2 – National Planning Policy 
National Planning Framework 4
82
Town Centre First Assessment
For development proposals which are out
of city/town centre and which will generate
significant footfall a Town Centre First
Assessment will be provided. Applicants
should agree the data required with the
planning authority before undertaking the
assessment, and should present information
on areas of dispute in a succinct and
comparable form.
The town centre first assessment should:
– identify the potential relationship of the
proposed development with the network of
centres identified in the LDP;
– demonstrate the potential economic impact
of the development and any possible
displacement effects, including the net
impact on jobs; and
– consider supply chains and whether local
suppliers and workers will be a viable
option; and
– the environmental impact of transporting
goods and of staff and visitors travelling to
the location.
The town centre first assessment should
be applied flexibly and realistically for
community, education, health and social
care and sport and leisure facilities so
that they are easily accessible to the
communities they are intended to serve.
c) Development proposals for non-retail uses
will not be supported if further provision of
these services will undermine the character
and amenity of the area or the health and
wellbeing of communities, particularly in
disadvantaged areas. These uses include:
i. Hot food takeaways, including permanently
sited vans;
ii. Betting offices; and
iii. High interest money lending premises.
d) Drive-through developments will only be
supported where they are specifically
supported in the LDP.
Town centre living
e) Development proposals for residential
development within city/town centres will be
supported, including:
i. New build residential development.
ii. The re-use of a vacant building within city/
town centres where it can be demonstrated
that the existing use is no longer viable
and the proposed change of use adds to
viability and vitality of the area.
iii. The conversion, or reuse of vacant upper
floors of properties within city/town centres
for residential.
f) Development proposals for residential use at
ground floor level within city/town centres will
only be supported where the proposal will:
i. retain an attractive and appropriate
frontage;
ii. not adversely affect the vitality and viability
of a shopping area or the wider centre; and
iii. not result in an undesirable concentration
of uses, or ‘dead frontages’.
g) Development proposals for city or town centre
living will take into account the residential
amenity of the proposal. This must be
clearly demonstrated where the proposed
development is in the same built structure as:
i. a hot food premises, live music venue,
amusement arcade/centre, casino or
licensed premises (with the exception of
hotels, restaurants, cafés or off licences);
and/or
ii. there is a common or shared access with
licenced premises or other use likely to be
detrimental to residential amenity.

Page 121

Part 2 – National Planning Policy
National Planning Framework 4
83
Policy impact:
	Just Transition
	Conserving and recycling assets
	Local living
	Compact urban growth
	Rebalanced development
	Rural revitalisation
Key policy connections:
Tackling the climate and nature crises
Climate mitigation and adaptation
Historic assets and places
Brownfield, vacant and derelict land and
empty buildings
Sustainable transport
Design, quality and place
Local Living and 20 minute neighbourhoods
Infrastructure first
Quality homes
Blue and green infrastructure
Play, recreation and sport
Health and safety
Community wealth building
Business and industry
Retail
Rural development
Tourism
Culture and creativity

Page 122

Part 2 – National Planning Policy 
National Planning Framework 4
84
Retail
Policy Principles
Policy Intent:
To encourage, promote and facilitate retail
investment to the most sustainable locations
that are most accessible by a range of
sustainable transport modes.
Policy Outcomes:
• Retail development and the location of
shops support vibrant city, town and local
centres.
• Communities can access the shops
and goods they need by a range of
sustainable transport modes including on
foot, by bike, and by public transport, as
part of local living.
Local Development Plans:
LDPs should consider where there may be a
need for further retail provision, this may be:
• where a retail study identifies deficiencies in
retail provision in terms of quality and quantity
in an area; or
• when allocating sites for housing or the
creation of new communities, in terms of
the need for neighbourhood shopping, and
supporting local living.
LDPs should identify areas where proposals for
healthy food and drink outlets can be supported.
Policy 28
a) Development proposals for retail (including
expansions and changes of use) will be
consistent with the town centre first principle.
This means that new retail proposals:
i. will be supported in existing city, town and
local centres, and
ii. will be supported in edge-of-centre areas
or in commercial centres if they are
allocated as sites suitable for new retail
development in the LDP.
iii. will not be supported in out of centre
locations (other than those meeting policy
28(c) or 28(d)).
b) Development proposals for retail that are
consistent with the sequential approach (set
out in a) and click-and-collect locker pick up
points, will be supported where the proposed
development:
i. is of an appropriate scale for the location;
ii. will have an acceptable impact on the
character and amenity of the area; and
iii. is located to best channel footfall and
activity, to benefit the place as a whole.
c) Proposals for new small scale neighbourhood
retail development will be supported where
the proposed development:
i. contributes to local living, including where
relevant 20 minute neighbourhoods and/or
ii. can be demonstrated to contribute to
the health and wellbeing of the local
community.
d) In island and rural areas, development
proposals for shops ancillary to other uses
such as farm shops, craft shops and shops
linked to petrol/service/charging stations will
be supported where:
i. it will serve local needs, support local living
and local jobs;
ii. the potential impact on nearby town and
commercial centres or village/local shops is
acceptable;
iii. it will provide a service throughout the year;
and
iv. the likely impacts of traffic generation and
access and parking arrangements are
acceptable.

Page 123

Part 2 – National Planning Policy 
National Planning Framework 4
85
Policy impact:
	Local living
	Compact urban growth
	Rural revitalisation
Key policy connections:
Tackling the climate and nature crises
Climate mitigation and adaptation
Sustainable transport
Design, quality and place
Local Living and 20 minute neighbourhoods
Health and safety
City, town, local and commercial centres
Rural development

Page 124

Part 2 – National Planning Policy 
National Planning Framework 4
86
Rural development
Policy Principles
Policy Intent:
To encourage rural economic activity,
innovation and diversification whilst ensuring
that the distinctive character of the rural
area and the service function of small towns,
natural assets and cultural heritage are
safeguarded and enhanced.
Policy Outcomes:
• Rural places are vibrant and sustainable
and rural communities and businesses are
supported.
• A balanced and sustainable rural population.
Local Development Plans:
LDPs should identify the characteristics of
rural areas within the plan area, including the
existing pattern of development, pressures,
environmental assets, community priorities
and economic needs of each area. The spatial
strategy should set out an appropriate approach
to development in rural areas which reflects
the identified characteristics. The Scottish
Government’s 6 fold Urban Rural Classification
2020 should be used to identify remote rural
areas. Spatial strategies should support the
sustainability and prosperity of rural communities
and economies. Previously inhabited areas
which are suitable for resettlement should be
identified in the spatial strategy.
Policy 29
a) Development proposals that contribute to the
viability, sustainability and diversity of rural
communities and local rural economy will be
supported, including:
i. farms, crofts, woodland crofts or other
land use businesses, where use of good
quality land for development is minimised
and business viability is not adversely
affected;
ii. diversification of existing businesses;
iii. production and processing facilities for
local produce and materials, for example
sawmills, or local food production;
iv. essential community services;
v. essential infrastructure;
vi. reuse of a redundant or unused building;
vii. appropriate use of a historic environment
asset or is appropriate enabling
development to secure the future of
historic environment assets;
viii. reuse of brownfield land where a return to
a natural state has not or will not happen
without intervention;
ix. small scale developments that support
new ways of working such as remote
working, homeworking and community
hubs; or
x. improvement or restoration of the natural
environment.
b) Development proposals in rural areas should
be suitably scaled, sited and designed
to be in keeping with the character of the
area. They should also consider how the
development will contribute towards local
living and take into account the transport
needs of the development as appropriate for
the rural location.
c) Development proposals in remote rural areas,
where new development can often help to
sustain fragile communities, will be supported
where the proposal:
i. will support local employment;
ii. supports and sustains existing
communities, for example through provision
of digital infrastructure; and
iii. is suitable in terms of location, access,
siting, design and environmental impact.
d) Development proposals that support the
resettlement of previously inhabited areas will
be supported where the proposal:
i. is in an area identified in the LDP as
suitable for resettlement;
ii. is designed to a high standard;
iii. responds to their rural location; and
iv. is designed to minimise greenhouse gas
emissions as far as possible.

Page 125

Part 2 – National Planning Policy 
National Planning Framework 4
87
Policy impact:
	Just Transition
	Conserving and recycling assets
	Local living
	Compact urban growth
	Rebalanced development
	Rural revitalisation
Key policy connections:
Tackling the climate and nature crises
Climate mitigation and adaptation
Natural places
Soils
Historic assets and places
Green belts
Brownfield, vacant and derelict land and
empty buildings
Coastal development
Sustainable transport
Design, quality and place
Local Living and 20 minute neighbourhoods
Infrastructure first
Rural homes
Blue and green infrastructure
Flood risk and water management
Business and industry
City, town, local and commercial centres
Retail
Tourism
Culture and creativity
Aquaculture
Minerals

Page 126

Part 2 – National Planning Policy 
National Planning Framework 4
88
Tourism
Policy Principles
Policy Intent:
To encourage, promote and facilitate
sustainable tourism development which
benefits local people, is consistent with
our net zero and nature commitments, and
inspires people to visit Scotland.
Policy Outcomes:
• Communities and places enjoy economic,
social and cultural benefits from tourism,
supporting resilience and stimulating job
creation.
Local Development Plans:
LDPs should support the recovery, growth
and long-term resilience of the tourism sector.
The spatial strategy should identify suitable
locations which reflect opportunities for tourism
development by taking full account of the needs
of communities, visitors, the industry and the
environment. Relevant national and local sector
driven tourism strategies should also be taken
into account.
The spatial strategy should also identify areas
of pressure where existing tourism provision
is having adverse impacts on the environment
or the quality of life and health and wellbeing
of local communities, and where further
development is not appropriate.
Policy 30
a) Development proposals for new or extended
tourist facilities or accommodation, including
caravan and camping sites, in locations
identified in the LDP, will be supported.
b) Proposals for tourism related development will
take into account:
i. The contribution made to the local
economy;
ii. Compatibility with the surrounding area
in terms of the nature and scale of the
activity and impacts of increased visitors;
iii. Impacts on communities, for example
by hindering the provision of homes and
services for local people;
iv. Opportunities for sustainable travel and
appropriate management of parking and
traffic generation and scope for sustaining
public transport services particularly in
rural areas;
v. Accessibility for disabled people;
vi. Measures taken to minimise carbon
emissions;
vii. Opportunities to provide access to the
natural environment.
c) Development proposals that involve the
change of use of a tourism-related facility will
only be supported where it is demonstrated
that the existing use is no longer viable and
that there is no requirement for alternative
tourism-related facilities in the area.
d) Proposals for huts will be supported where
the nature and scale of the development is
compatible with the surrounding area and the
proposal complies with relevant good practice
guidance.
e) Development proposals for the reuse of
existing buildings for short term holiday letting
will not be supported where the proposal will
result in:
i. An unacceptable impact on local amenity
or the character of a neighbourhood or
area; or
ii. The loss of residential accommodation
where such loss is not outweighed by
demonstrable local economic benefits.

Page 127

Part 2 – National Planning Policy
National Planning Framework 4
89
Policy impact:
	Just Transition
	Conserving and recycling assets
	Local living
	Rebalanced development
	Rural revitalisation
Key policy connections:
Tackling the climate and nature crises
Climate mitigation and adaptation
Natural places
Historic assets and places
Coastal development
Sustainable transport
Design, quality and place
Quality homes
Rural homes
Health and safety
Community wealth building
City, town, local and commercial centres
Retail
Rural development
Culture and creativity

Page 128

Part 2 – National Planning Policy 
National Planning Framework 4
90
Culture and creativity
Policy Principles
Policy Intent:
To encourage, promote and facilitate
development which reflects our diverse
culture and creativity, and to support our
culture and creative industries.
Policy Outcomes:
• Locally distinctive places reflect the
diversity of communities and support
regeneration and town centre vibrancy.
• Cultural and creative industries are
expanded, providing jobs and investment.
• Communities have access to cultural and
creative activities.
Local Development Plans:
LDPs should recognise and support
opportunities for jobs and investment in the
creative sector, culture, heritage and the arts.
Policy 31
a) Development proposals that involve a
significant change to existing, or the creation
of new, public open spaces will make
provision for public art. Public art proposals
which reflect diversity, culture and creativity
will be supported.
b) Development proposals for creative
workspaces or other cultural uses that involve
the temporary use of vacant spaces or
property will be supported.
c) Development proposals that would result in
the loss of an arts or cultural venue will only
supported where:
i. there is no longer a sustainable demand
for the venue and after marketing the site
at a reasonable rate for at least 12 months,
through relevant local and national agents
and online platforms, there has been no
viable interest from potential operators; or
ii. the venue, as evidenced by consultation,
no longer meets the needs of users and
cannot be adapted; or
iii. alternative provision of equal or greater
standard is made available at a suitable
location within the local area; and
iv. the loss of the venue does not result in
loss or damage to assets or objects of
significant cultural value.
d) Development proposals within the vicinity
of existing arts venues will fully reflect the
agent of change principle and will only be
supported where they can demonstrate that
measures can be put in place to ensure that
existing noise and disturbance impacts on the
proposed development would be acceptable
and that existing venues and facilities can
continue without additional restrictions being
placed on them as a result of the proposed
new development.
Policy impact:
	Just Transition
	Conserving and recycling assets
	Local living
	Rebalanced development
Key policy connections:
Tackling the climate and nature crises
Climate mitigation and adaptation
Historic assets and places
Brownfield, vacant and derelict land and
empty buildings
Zero waste
Sustainable transport
Design, quality and place
Local Living and 20 minute neighbourhoods
Blue and green infrastructure
Play, recreation and sport
Health and safety
Digital infrastructure
Community wealth building
City, town, local and commercial centres
Rural development
Tourism

Page 129

Part 2 – National Planning Policy 
National Planning Framework 4
91
Aquaculture
Policy Principles
Policy Intent:
To encourage, promote and facilitate
aquaculture development and minimise
any adverse effects on the environment,
including cumulative impacts.
Planning should support an aquaculture
industry that is sustainable, diverse,
competitive, economically viable and which
contributes to food security, whilst operating
with social licence, within environmental limits
and which ensures there is a thriving marine
ecosystem for future generations.
Policy Outcomes:
• New aquaculture development is in
locations that reflect industry needs and
considers environmental impacts.
• Producers will contribute to communities
and local economies.
• Prosperous finfish, shellfish and seaweed
sectors.
• Migratory fish species are safeguarded.
Local Development Plans:
LDPs should guide new aquaculture
development in line with National and Regional
Marine Planning, and will minimise adverse
environmental impacts, including cumulative
impacts, that arise from other existing and
planned aquaculture developments in the area
while also reflecting industry needs.
Policy 32
a) To safeguard migratory fish species,
further salmon and trout open pen fish farm
developments on the north and east coasts of
mainland Scotland will not be supported.
b) Development proposals for aquaculture will be
supported where they comply with the LDP,
the National Marine Plan and, where relevant,
the appropriate Regional Marine Plan.
c) Development proposals for fish farms
will demonstrate that operational impacts
(including from noise, acoustic deterrent
devices (where applicable) light, access,
navigation, containment, deposition, waste
emissions and sea lice, impacts on wild
salmonids, aquaculture litter (and odour
and impacts on other marine users)) are
acceptable and comply with the relevant
regulatory framework.
d) Development proposals for fish farm
developments will only be supported where
the following impacts have been assessed
and mitigated:
i. landscape and visual impact of the
proposal including the siting and design of
cages, lines and associated facilities taking
into account the character of the location;
ii. the impact of any land based facilities,
ensuring that the siting and design are
appropriate for the location;
iii. impacts on natural heritage, designated
sites and priority marine features; and
iv. impacts on historic marine protected areas.
e) Applications for open water farmed finfish
or shellfish development are excluded from
the requirements of policy 3b) and 3c) and
will instead apply all relevant provisions from
National and Regional Marine Plans.
Policy impact:
	Just Transition
	Rebalanced development
 Rural revitalisation
Key policy connections:
Tackling the climate and nature crises
Historic assets and places
Natural places
Biodiversity
Coastal development
Design, quality and place
Health and safety
Community wealth building
Business and industry
Rural development

Page 130

Part 2 – National Planning Policy 
National Planning Framework 4
92
Minerals
Policy Principles
Policy Intent:
To support the sustainable management of
resources and minimise the impacts of the
extraction of minerals on communities and
the environment.
Policy Outcomes:
• Sufficient resources are available to meet
industry demands, making an essential
contribution to the Scottish economy.
• Important raw materials for manufacturing,
construction, agriculture, and other
industries are available.
• Important workable mineral resources
are protected from sterilisation by other
developments.
• Communities and the environment are
protected from the impacts of mineral
extraction.
Local Development Plans:
LDPs should support a landbank of construction
aggregates of at least 10-years at all times in
the relevant market areas, whilst promoting
sustainable resource management, safeguarding
important workable mineral resources, which
are of economic or conservation value, and take
steps to ensure these are not sterilised by other
types of development.
Policy 33
a) Development proposals that seek to
explore, develop, and produce fossil fuels
(excluding unconventional oil and gas) will
not be supported other than in exceptional
circumstances. Any such exceptions will be
required to demonstrate that the proposal
is consistent with national policy on energy
and targets for reducing greenhouse gas
emissions.
b) The Scottish Government does not support
the development of unconventional oil and
gas in Scotland. This means development
connected to the onshore exploration,
appraisal or production of coal bed methane
or shale oil or shale gas, using unconventional
oil and gas extraction techniques, including
hydraulic fracturing and dewatering for coal
bed methane.
c) Development proposals that would sterilise
mineral deposits of economic value will only
be supported where:
i. there is an overriding need for the
development and prior extraction of the
mineral cannot reasonably be undertaken;
or
ii. extraction of the mineral is impracticable or
unlikely to be environmentally acceptable.
d) Development proposals for the sustainable
extraction of minerals will only be supported
where they:
i. will not result in significant adverse
impacts on biodiversity, geodiversity and
the natural environment, sensitive habitats
and the historic environment, as well as
landscape and visual impacts;
ii. provide an adequate buffer zone between
sites and settlements taking account of
the specific circumstances of individual
proposals, including size, duration,
location, method of working, topography,
and the characteristics of the various
environmental effects likely to arise;
iii. can demonstrate that there are no
significant adverse impacts (including
cumulative impact) on any nearby homes,
local communities and known sensitive
receptors and designations;
iv. demonstrate acceptable levels (including
cumulative impact) of noise, dust,
vibration and potential pollution of land,
air and water;
v. minimise transport impacts through the
number and length of lorry trips and by
using rail or water transport wherever
practical;
vi. have appropriate mitigation plans in place
for any adverse impacts;
vii. include schemes for a high standard
of restoration and aftercare and
commitment that such work is undertaken
at the earliest opportunity. As a further

Page 131

Part 2 – National Planning Policy 
National Planning Framework 4
93
safeguard a range of financial guarantee
options are available, and the most
effective solution should be considered
and agreed on a site-by-site basis.
Solutions should provide assurance and
clarity over the amount and period of
the guarantee and in particular, where it
is a bond, the risks covered (including
operator failure) and the triggers for
calling in a bond, including payment
terms.
e) Development proposals for borrow pits will
only be supported where:
i. the proposal is tied to a specific project
and is time-limited;
ii. the proposal complies with the above
mineral extraction criteria taking into
account the temporary nature of the
development; and
iii. appropriate restoration proposals are
enforceable.
Policy impact:
	Conserving and recycling assets
Key policy connections:
Tackling the climate and nature crises
Biodiversity
Natural places
Historic assets and places
Zero waste
Infrastructure first
Health and safety

Page 132

Part 3 – Annexes
National Planning Framework 4
94
National Planning Framework 4
94
Annex A – How to use this document
Purpose of Planning
The purpose of planning is to manage the
development and use of land in the long-term
public interest.
The decisions we make today will have
implications for future generations. Scotland in
2045 will be different. We must embrace and
deliver radical change so we can tackle and
adapt to climate change, restore biodiversity
loss, improve health and wellbeing, reduce
inequalities, build a wellbeing economy and
create great places.
Role of the National Planning Framework
Scotland 2045: our Fourth National Planning
Framework, commonly known as NPF4, is
required by law to set out the Scottish Ministers’
policies and proposals for the development and
use of land. It plays a key role in supporting the
delivery of Scotland’s national outcomes and the
United Nations Sustainable Development Goals.
National Performance Framework
Our Purpose, Values and National Outcomes
We have 
a globally 
competitive, 
entrepreneurial, 
inclusive and 
sustainable 
economy
We are open,
connected and
make a positive
contribution
internationally
We tackle 
poverty by 
sharing 
opportunities, 
wealth and power
more equally
We live in 
communities 
that are inclusive, 
empowered, 
resilient 
and safe
We grow up
loved, safe and
respected so 
that we 
realise our 
full potential
We are well 
educated, 
skilled and 
able to 
contribute 
to society
We have 
thriving and 
innovative 
businesses, 
with quality jobs
and fair work for
everyone
We are 
healthy and 
active
We value, enjoy,
protect and
enhance our
environment
We are creative
and our vibrant
and diverse
cultures are
expressed and
enjoyed widely
OUR VALUES
We are a society which treats all our 
people with kindness, dignity and 
compassion, respects the rule 
of law, and acts in an open 
and transparent way
OUR PURPOSE
To focus on creating a 
more successful country with 
opportunities for all of Scotland 
to flourish through increased 
wellbeing, and sustainable and 
inclusive economic growth
We respect, 
protect and 
fulfil human
rights and 
live free from
discrimination
Part 3 –
Annexes

Page 133

Part 3 – Annexes
National Planning Framework 4
95
NPF4 includes a long-term spatial strategy to
2045. This reflects the spatial aspects of a range
of Scottish Government policies, including the
Infrastructure Investment Plan.
The Infrastructure Investment Plan (IIP)
identified that NPF4 would include housing land
requirements framed within a spatial strategy
that aligns with the investment programme and
principles, and highlighted that national planning
policies would include an infrastructure first
approach.
The NPF4 strategy, policies and national
developments are aligned to the strategic
themes of the IIP: enabling the transition to net
zero emissions and environmental sustainability;
driving inclusive economic growth; and building
resilient and sustainable places. The policies
and instruction for LDPs activate the IIP
priorities within the themes to the degree that
those priorities involve physical development,
opportunities for people and improvements
for place. Minimum All Tenure Housing Land
Requirements are set out at Annex E. The
investment hierarchy influences the approach
to NPF4 overall and features specifically in
instructions for LDPs in Policy 18 ‘Infrastructure
First’.
NPF4 replaces National Planning Framework
3 (2014) and Scottish Planning Policy (2014).
NPF4 should be read as a whole. It represents a
package of planning policies to guide us to the
place we want Scotland to be in 2045.
NPF4 is required by law to contribute to 6
outcomes:
• Meeting the housing needs of people living in
Scotland including, in particular, the housing
needs for older people and disabled people,
• Improving the health and wellbeing of people
living in Scotland,
• Increasing the population of rural areas of
Scotland,
• Improving equality and eliminating
discrimination,
• Meeting any targets relating to the reduction
of emissions of greenhouse gases, and
• Securing positive effects for biodiversity.
Statements setting out further detail on the
contribution of NPF4 to each outcome are set
out in Part 1.

Page 134

Part 3 – Annexes
National Planning Framework 4
96
Plan-led Approach
A plan-led approach is central to supporting the delivery of Scotland’s national outcomes and
broader sustainable development goals. It is a legislative requirement that planning decisions
must be made in accordance with the development plan, unless material considerations indicate
otherwise.
The statutory development plan for any given area of Scotland consists of the National Planning
Framework and the relevant LDP(s). The Town and Country Planning (Scotland) Act 1997 prescribes
four different plans, at different scales:
National Planning Framework (NPF) The National Planning Framework sets out the Scottish
Ministers’ policies and proposals for the development and
use of land.
The NPF must have regard to any adopted regional spatial
strategy.
NPF4 is part of the statutory development plan.
Regional spatial strategies (RSS) The Planning (Scotland) Act 2019 introduced a new duty
requiring the preparation of regional spatial strategies.
A planning authority, or authorities acting jointly will
prepare these long-term spatial strategies for the strategic
development of an area.
RSS are not part of the statutory development plan, but
have an important role to play in informing future versions
of the NPF and LDPs.
Local development plans (LDPs) Planning authorities must prepare one or more LDPs for
their area.
The LDP sets out a spatial strategy for the development of
that area. It must take into account the National Planning
Framework and any registered local place plan in the area
it covers. It must have regard to the authority’s adopted
regional spatial strategy. The LDP must also have regard
to any local outcomes improvement plan for the area it
covers.
LDPs are part of the statutory development plan.
Local place plans (LPPs) Local place plans are community-led plans setting out
proposals for the development and use of land. They must
have regard to the NPF, any LDP which covers the same
area, and also any locality plan which covers the same
area.
LPPs are not part of the statutory development plan, but
have an important role to play in informing LDPs.

Page 135

Part 3 – Annexes
National Planning Framework 4
97
Spatial Strategy
Part 1 sets out our spatial strategy for Scotland
to 2045, identifying:
• 6 spatial principles which will influence all our
plans and decisions:
–Just transition
–Conserving and recycling assets
–Local living
–Compact urban growth
–Rebalanced development
–Rural revitalisation
• 3 themes, linked to the United Nations
Sustainable Development Goals and Scottish
Government National Performance Framework:
–Sustainable places where we reduce
emissions, restore and better connect
biodiversity
–Liveable places where we can all live better,
healthier lives
–Productive places where we have a greener,
fairer and more inclusive wellbeing economy
LDPs should take account of these principles
and outcomes, and they should also be reflected
within regional spatial strategies and local place
plans.
National Developments
Eighteen national developments have been
identified. These are significant developments of
national importance that will help to deliver the
spatial strategy. They are intentionally high level
and focus on key elements, as the projects are
at different stages.
National development status does not grant
planning permission for the development and all
relevant consents are required.
Their designation means that the principle of the
development does not need to be agreed in later
consenting processes, providing more certainty
for communities, business and investors.
Their designation is not intended to describe
in detail how the projects should be designed,
matters to consider, or impact assessments
and mitigation to be applied. In addition to
the statement of need at Annex B, decision
makers for applications for consent for national
developments should take into account all
relevant policies.
LDPs should take forward proposals for national
developments where relevant and facilitate their
delivery. This could be through supporting land
allocations, policy intervention and LDP delivery
programmes.
Regional Spatial Priorities
Regional spatial priorities set out how each
part of the country can use their assets and
opportunities to help deliver the overall strategy.
The detail of these priorities should be further
considered and consulted upon through the
local development planning process, and where
appropriate through regional spatial strategies
and regional transport strategies.
The maps are indicative, and certain authorities
may have a role to play in more than one
regional area. The broad areas identified in
NPF4 are intended to act as a flexible framework
to guide the preparation of future Regional
Spatial Strategies. It is open to planning
authorities to decide for themselves, including
by working in partnership with others, the most
appropriate scale and extent of areas to be
covered by Regional Spatial Strategies.
Statutory guidance will guide the preparation of
Regional Spatial Strategies.

Page 136

Part 3 – Annexes
National Planning Framework 4
98
National Planning Policy
Part 2 sets out our policy framework by topic
under the three themes.
Planning is complex and requires careful
balancing of issues. The policy intent is
provided to aid plan makers and decision
makers to understand the intent of each policy
and to help deliver policy aspirations.
The policy outcomes set out what we want
to achieve and will help to influence future
monitoring of the planning system.
The Local Development Plan section clarifies
the expected role of LDPs for each topic. The
focus for LDPs should be on land allocation
through the spatial strategy and interpreting this
national policy in a local context. There is no
need for LDPs to replicate policies within NPF4,
but authorities can add further detail including
locally specific policies should they consider
to be a need to do so, based on the area’s
individual characteristics.
The policy sections are for use in the
determination of planning applications. The
policies should be read as a whole. Planning
decisions must be made in accordance
with the development plan, unless material
considerations indicate otherwise. It is for the
decision maker to determine what weight to
attach to policies on a case by case basis.
Where a policy states that development will
be supported, it is in principle, and it is for the
decision maker to take into account all other
relevant policies.
The policy impact section shows which spatial
principles the policy will help to deliver.
The key policy connections help to show the
key connections between policies, but are not
intended to be comprehensive.

Page 137

Part 3 – Annexes
National Planning Framework 4
99
Annex B – National Developments Statements of Need
1 Research project: Lifecycle Greenhouse Gas Emissions of NPF4 Proposed National Developments Assessment Findings 
(LUC 2021) available online at https://www.transformingplanning.scot/national-planning-framework/
National developments are significant
developments of national importance that will
help to deliver our spatial strategy.
Eighteen national developments will support the
delivery of our spatial strategy. These national
developments range from single large scale
projects or collections and networks of several
smaller scale proposals. They are also intended
to act as exemplars of the Place Principle and
placemaking approaches.
The statements of need set out in this annex
are a requirement of the Town and Country
Planning (Scotland) Act 1997 and describe the
development to be considered as a national
development for consent handling purposes.
An assessment of the likely impact of each
proposed national development’s lifecycle
greenhouse gas emissions on achieving national
greenhouse gas emissions reductions targets1
(with the meaning given in the Climate Change
(Scotland) Act 2009) has been undertaken. The
assessment is based on the detail provided at
the time of the assessment, and the conclusion
may alter depending on the nature and detail of
the projects taken forward.
The potential for national developments to affect
European designated sites, depending on
the precise design, location and construction
of individual projects, has been identified by
the Habitats Regulations Appraisal (HRA) of
NPF4. Any such development would need to
be considered carefully at project level and all
relevant statutory tests met.

Page 138

Part 3 – Annexes
National Planning Framework 4
100
1. Energy Innovation Development on the
Islands
This national development supports proposed
developments in the Outer Hebrides, Shetland
and Orkney island groups, for renewable energy
generation, renewable hydrogen production,
infrastructure and shipping, and associated
opportunities in the supply chain for fabrication,
research and development.
Any strategy for deployment of these
technologies must enable decarbonisation
at pace and cannot be used to justify
unsustainable levels of fossil fuel extraction or
impede Scotland’s just transition to net zero.
This is aligned with low carbon energy projects
within the Islands Growth Deal that have been
developed with local partners such as the
Islands Centre for Net Zero and encompasses
other projects that can facilitate net zero aims.
The use of low and zero emission fuels will
play a crucial role in decarbonising island and
mainland energy use, shipping, strengthening
energy security overall and creating a low
carbon energy economy for the islands and
islanders. The developments will add value
where they link into national and international
energy expertise, learning and research and
development networks.
Location
Outer Hebrides, Shetland, Orkney and
surrounding waters.
Need
These classes of development support the
potential of the three island authorities to
exemplify a transition to a net zero society. This
will support delivery of our spatial strategy by
helping to sustain communities in rural and
island areas by stimulating employment and
innovation.
Designation and classes of development
A development contributing to ‘Energy Innovation
Development on the Islands’ in the location
described, within one or more of the Classes of
Development described below and that is of a
scale or type that would otherwise have been
classified as ‘major’ by ‘The Town and Country
Planning (Hierarchy of Developments) (Scotland)
Regulations 2009’, is designated a national
development:
Outer Hebrides – Supporting the Arnish
Renewables Base and Outer Hebrides Energy
Hub
The classes below apply to development that is
for delivery of the Arnish Renewables Base and
Outer Hebrides Energy Hub:
a) New or updated on and/or off shore
infrastructure for energy generation from
renewables exceeding 50 megawatts
capacity;
b) Electricity transmission cables and converter
stations on and/or off shore of 132 kilovolts
(kv) and above;
c) Infrastructure for the production, storage and
transportation of low and zero-carbon fuels
(that are not electricity or heat) including
renewable hydrogen; and hydrogen
production related chemicals including
ammonia with appropriate carbon capture
linked to transport and storage infrastructure;
d) Improved oil storage infrastructure for
Stornoway, with appropriate emissions
abatement; and
e) Quay to service renewable energy, energy
transportation, energy decommissioning,
fabrication or freight handling, including
new or enhanced associated laydown or
operational area at Arnish.

Page 139

Part 3 – Annexes
National Planning Framework 4
101
Shetland Islands – Supporting the Opportunity
for Renewable Integration with Offshore
Networks (ORION) Clean Energy Project
The classes below apply to development that
is for delivery of renewable and low carbon
aspects of the ORION project:
a) New or updated on and/or off shore
infrastructure for energy generation from
renewables exceeding 50 megawatts
capacity;
b) Electricity transmission cables and converter
stations on and/or off shore of/or exceeding
132kv;
c) Infrastructure for the production, storage and
transportation of low and zero-carbon fuels
(that are not electricity or heat) including
renewable hydrogen; and hydrogen
production related chemicals including
ammonia with appropriate carbon capture
linked to transport, storage, and utilisation
infrastructure at Sullom Voe;
d) Quay to service renewable energy, energy
transportation, energy decommissioning,
fabrication or freight handling, including
new or enhanced associated laydown or
operational area at Sullom Voe, Scatsta,
Lerwick, and Dales Voe (Lerwick);
e) Oil terminal modifications at Sullom Voe to
maintain asset use moving towards net zero
emissions; and
f) New infrastructure, and/or upgraded buildings
and facilities to support the transportation and
storage of captured carbon.
Orkney Islands – Supporting Scapa Flow Future
Fuels Hub and Orkney Harbours
The classes below apply to development that is
for the delivery of the Future Fuels Hub, new quay
in Scapa Flow, and the Orkney Logistics Base at
Hatston, which support services for the renewable
and marine energy and shipping sectors:
a) New or updated on and/or off shore
infrastructure for energy generation from
renewables exceeding 50 megawatts capacity;
b) Electricity transmission cables and converter
stations on and/or off shore of 132kv and
above;
c) Infrastructure for the production, storage and
transportation of low and zero-carbon fuels
(that are not electricity or heat) including
renewable hydrogen; and hydrogen
production related chemicals including
ammonia with appropriate carbon capture
linked to transport and storage infrastructure;
d) Quay to service renewable energy, energy
transportation, energy decommissioning,
fabrication or freight handling, including
new or enhanced associated laydown or
operational area at, Scapa Flow, and Hatston
(Kirkwall); and
e) Oil terminal modifications at Scapa Flow to
maintain asset use moving towards net zero
emissions.
Lifecycle greenhouse gas emissions
assessment
Depending on the nature of the projects taken
forward and considering both direct and indirect
effects, the lifecycle greenhouse gas emissions
assessment concludes this development will
likely have an overall net positive impact on
achieving national greenhouse gas emissions
reduction targets.
Policy impact:
	Rebalanced development
	Conserving and recycling assets
	Rural revitalisation
	Just transition

Page 140

Part 3 – Annexes
National Planning Framework 4
102
2. Pumped Hydro Storage
This national development will play a significant
role in balancing and optimising electricity
generation and maintaining the operability of the
electricity system as part of our transition to net
zero. This is necessary as we continue to move
towards a decarbonised system with much more
renewable generation, the output from which is
defined by weather conditions.
This national development supports additional
capacity at existing sites as well as at new sites.
Cruachan in Argyll is a nationally important
example of a pumped storage facility with
significant potential for enhanced capacity that
could create significant jobs in a rural location.
Location
All Scotland.
Need
This national development supports pumped
hydro storage capacity within the electricity
network through significant new or expanded
sites. This supports the transition to a net
zero economy through the ability of pumped
hydro storage schemes to optimise electricity
generated from renewables by storing and
releasing it when it is required.
Designation and classes of development
A development contributing to ‘Pumped Hydro
Storage’ in the location described, within one or
more of the Classes of Development described
below and that is of a scale or type that would
otherwise have been classified as ‘major’ by
‘The Town and Country Planning (Hierarchy of
Developments) (Scotland) Regulations 2009’, is
designated a national development:
a) New and/or expanded and/or upgraded water
holding reservoir and dam;
b) New and/or upgraded electricity generating
plant structures or buildings;
c) New and/or upgraded pump plant structures
or buildings;
d) New and/or expanded and/or upgraded water
inlet and outlet pipework;
e) New and/or upgraded substations and/or
transformers; and
f) New and/or replacement transmission cables.
Lifecycle greenhouse gas emissions
assessment
Depending on the nature of the projects taken
forward and considering both direct and indirect
effects, the lifecycle greenhouse gas emissions
assessment concludes this development will
likely have an overall net positive impact on
achieving national greenhouse gas emissions
reduction targets.
Policy impact:
	Rebalanced development
	Conserving and recycling assets
	Rural revitalisation
	Just transition

Page 141

Part 3 – Annexes
National Planning Framework 4
103
3. Strategic Renewable Electricity Generation
and Transmission Infrastructure
This national development supports renewable
electricity generation, repowering, and expansion
of the electricity grid.
A large and rapid increase in electricity
generation from renewable sources will be
essential for Scotland to meet its net zero
emissions targets. Certain types of renewable
electricity generation will also be required, which
will include energy storage technology and
capacity, to provide the vital services, including
flexible response, that a zero carbon network will
require. Generation is for domestic consumption
as well as for export to the UK and beyond,
with new capacity helping to decarbonise heat,
transport and industrial energy demand. This
has the potential to support jobs and business
investment, with wider economic benefits.
The electricity transmission grid will need
substantial reinforcement including the addition
of new infrastructure to connect and transmit
the output from new on and offshore capacity to
consumers in Scotland, the rest of the UK and
beyond. Delivery of this national development
will be informed by market, policy and regulatory
developments and decisions.
Location
All Scotland.
Need
Additional electricity generation from renewables
and electricity transmission capacity of scale is
fundamental to achieving a net zero economy
and supports improved network resilience in
rural and island areas. Island transmission
connections in particular can facilitate capturing
the significant renewable energy potential in
those areas as well as delivering significant
social and economic benefits.
Designation and classes of development
A development contributing to ‘Strategic
Renewable Electricity Generation and
Transmission’ in the location described, within
one or more of the Classes of Development
described below and that is of a scale or type
that would otherwise have been classified as
‘major’ by ‘The Town and Country Planning
(Hierarchy of Developments) (Scotland)
Regulations 2009’, is designated a national
development:
a) On and off shore electricity generation,
including electricity storage, from renewables
exceeding 50 megawatts capacity;
b) New and/or replacement upgraded on and
offshore high voltage electricity transmission
lines, cables and interconnectors of 132kv or
more; and
c) New and/or upgraded Infrastructure directly
supporting on and offshore high voltage
electricity lines, cables and interconnectors
including converter stations, switching stations
and substations.
Lifecycle greenhouse gas emissions
assessment
Depending on the nature of the projects taken
forward and considering both direct and indirect
effects, the lifecycle greenhouse gas emissions
assessment concludes this development will
likely have an overall net positive impact on
achieving national greenhouse gas emissions
reduction targets.
Policy impact:
	Local Living
	Rebalanced development
	Conserving and recycling assets
	Just transition

Page 142

Part 3 – Annexes
National Planning Framework 4
104
4. Circular Economy Materials Management
Facilities
This national development supports the
development of facilities required to achieve
a circular economy. This sector will provide
a range of business, skills and employment
opportunities as part of a just transition to a net
zero economy.
The range and scale of facilities required
to manage secondary materials and their
circulation back into the economy is not yet
clear. However, sites and facilities will be
needed to retain the resource value of materials
so that we can maximise the use of materials
in the economy and minimise the use of virgin
materials in order to reduce greenhouse gas
emissions. This is particularly significant for
the construction and demolition industries and
decommissioning industry.
Careful assessment of specific proposals will be
required to ensure they provide sustainable low
carbon solutions, include appropriate controls,
manage any emissions and mitigate localised
impacts including on neighbouring communities
and the wider environment.
Location
All Scotland.
Need
This national development helps maximise
Scotland’s potential to retain the energy and
emissions values within materials already in the
economy.
Designation and classes of development
A development contributing to ‘Circular Economy
Materials Management Facilities’ in the location
described, within one or more of the Classes of
Development described below and that is of a
scale or type that would otherwise have been
classified as ‘major’ by ‘The Town and Country
Planning (Hierarchy of Developments) (Scotland)
Regulations 2009’ is designated a national
development:
a) Facilities for managing secondary materials;
and
b) Recycling facilities.
Lifecycle greenhouse gas emissions
assessment
Depending on the nature of the projects taken
forward and considering both direct and indirect
effects, the lifecycle greenhouse gas emissions
assessment concludes this development will
likely have an overall net positive impact on
achieving national greenhouse gas emissions
reduction targets.
Policy impact:
	Local Living
	Conserving and recycling assets
	Just transition

Page 143

Part 3 – Annexes
National Planning Framework 4
105
5. Urban Sustainable, Blue and Green
Surface Water Management Solutions
This national development aims to build on the
benefits of the Metropolitan Glasgow Strategic
Drainage Partnership, to continue investment and
extend the approach to the Edinburgh city region.
Our biggest cities and their regions will require
improved infrastructure to ensure they are
more resilient to climate change. A strategic,
catchment scale approach to adaptation through
surface water and drainage infrastructure
investment will reduce impacts and risks for
our urban population and is an example of an
infrastructure first approach. Catchment scale
nature-based solutions which may include blue
and green infrastructure should be prioritised.
Grey infrastructure should be optimised and
only used when necessary to augment blue-
green infrastructure solutions. Delivery of multiple
climate, wellbeing and economic benefits should
form the basis of the approach. Whilst this
national development focuses on Edinburgh and
Glasgow other cities and towns may benefit from
similar approaches.
Location
Glasgow and Edinburgh City Regions and their
wider water catchment areas.
Need
A large proportion of our population lives in our
largest cities. The management of surface water
drainage at scale across these city regions will
help us to adapt to extreme weather events that
will become more frequent as a result of climate
change. A nature-based approach to surface
water management has the potential to deliver
multiple health, wellbeing, economic and climate
adaptation and emissions reduction benefits and
it may free up sewer capacity.
Designation and classes of development
A development contributing to ‘Urban
Sustainable, Blue and Green Surface Water
Management Solutions’ in the location described,
within the Class of Development described
below and that is of a scale or type that would
otherwise have been classified as ‘major’ by
‘The Town and Country Planning (Hierarchy of
Developments) (Scotland) Regulations 2009’ is
designated a national development:
a) Spaces, infrastructure, works, structures,
buildings, pipelines, and nature-based
approaches, for surface water management
and drainage systems.
Lifecycle greenhouse gas emissions
assessment
Depending on the nature of the projects taken
forward and considering both direct and indirect
effects, the lifecycle greenhouse gas emissions
assessment concludes this development will
likely have an overall net positive impact on
achieving national greenhouse gas emissions
reduction targets.
Policy impact:
	Compact urban growth
	Local living
	Conserving and recycling assets
	Rural revitalisation
	Just transition

Page 144

Part 3 – Annexes
National Planning Framework 4
106
6. Urban Mass/Rapid Transit Networks
This national development supports low carbon
mass/rapid transit projects for Aberdeen,
Edinburgh and Glasgow.
To reduce transport emissions at scale, we
will require low carbon transport solutions
for these three major cities that can support
transformational reduction in private car use.
Development of the Glasgow ‘Metro’ and
Edinburgh Mass Transit in these cities and their
associated regions plus the Aberdeen Rapid
Transit system are recommendations from the
Strategic Transport Projects Review 2.
This will support placemaking and deliver
improved transport equity across the most
densely populated parts of Scotland, improving
access to employment and supporting
sustainable investment in the longer term. It can
function as part of a broader transport network
that includes active travel, and this places
importance on multi-modal hubs or transport
interchange points.
The type of interventions will be determined
through the on-going development of business
cases and studies but could include the provision
of new systems or extensions to existing
sustainable and public transport networks.
Location
Aberdeen, Glasgow and Edinburgh City Regions.
Need
This national development will help reduce
transport related emissions overall, improve
air quality, reduce the demand for private
vehicle use, support the roll out of 20 minute
neighbourhoods and improve transport equity.
Designation and classes of development
A development contributing to ‘Urban Mass/
Rapid Transit Networks’ in the location
described, within one or more of the Classes
of Development below and that is of a scale or
type that would otherwise have been classified
as ‘major’ by ‘The Town and Country Planning
(Hierarchy of Developments) (Scotland)
Regulations 2009’ is designated a national
development. This relates to development
supported by the Strategic Transport Projects
Review 2 consisting of new or upgraded:
a) Track or road infrastructure;
b) Fuelling or power infrastructure;
c) Passenger facilities; and
d) Depots servicing the networks.
Lifecycle greenhouse gas emissions
assessment
Depending on the nature of the projects taken
forward and considering both direct and indirect
effects, the lifecycle greenhouse gas emissions
assessment concludes this development will
likely have an overall net positive impact on
achieving national greenhouse gas emissions
reduction targets.
Policy impact:
	Compact urban growth
	Local living
	Conserving and recycling assets
	Just transition

Page 145

Part 3 – Annexes
National Planning Framework 4
107
7. Central Scotland Green Network
This national development is one of Europe’s
largest and most ambitious green infrastructure
projects. It will play a key role in tackling the
challenges of climate change and biodiversity
loss including by building and strengthening
nature networks. A greener approach to
development will improve placemaking,
can contribute to the roll-out of 20 minute
neighbourhoods and will benefit biodiversity
connectivity. This has particular relevance in
the more urban parts of Scotland where there is
pressure for development as well as significant
areas requiring regeneration to address past
decline and disadvantage. Regeneration,
repurposing and reuse of brownfield land
should be a priority.
Priorities include enhancement to provide
multi-functional green and blue infrastructure
that provides greatest environmental, lifelong
physical and mental health, social wellbeing
and economic benefits. It focuses on those
areas where greening and development can be
mutually supportive, helping to improve equity
of access to quality green and blue space,
and supporting communities where improving
wellbeing and resilience is most needed,
including to help people adapt to future climate
risks.
Nature-based solutions for climate change
adaptation and mitigation may include woodland
expansion and peatland restoration as a priority.
The connectivity of biodiversity rich areas
may be enhanced through nature networks,
including corridors and stepping stones to
provide enhanced natural capital and improved
ecosystem services.
Location
Central Scotland local authorities within a
boundary identified by the Green Action Trust.
Need
This national development is needed to improve
quality of place and create new opportunities
for investment. This will support delivery of our
spatial strategy which highlights the importance
of accelerating urban greening in this most
densely populated part of Scotland.
Designation and classes of development
A development contributing to ‘Central Scotland
Green Network’ in the location described, within
one or more of the Classes of Development
described below and that is of a scale or type
that would otherwise have been classified as
‘major’ by ‘The Town and Country Planning
(Hierarchy of Developments) (Scotland)
Regulations 2009’, is designated a national
development:
a) Development to create and/or enhance multi-
functional green infrastructure including for:
emissions sequestration; adaptation to climate
change; and biodiversity enhancement;
b) Reuse of vacant and derelict land and
buildings for greening and nature-based
solutions;
c) New and/or upgraded sustainable surface
water management and drainage systems
and the creation of blue space;
d) Use of land for allotments or community food
growing; and
e) Routes for active travel and/or recreation.
Lifecycle Greenhouse Gas Emissions
assessment
Depending on the nature of the projects taken
forward and considering both direct and indirect
effects, the lifecycle greenhouse gas emissions
assessment concludes this development will
likely have an overall net positive impact on
achieving national greenhouse gas emissions
reduction targets.
Policy impact:
	Compact urban growth
	Local living
	Rebalanced development
	Conserving and recycling assets
	Rural revitalisation
	Just transition

Page 146

Part 3 – Annexes
National Planning Framework 4
108
8. National Walking, Cycling and Wheeling
Network
This national development facilitates the shift
from vehicles to walking, cycling and wheeling
for everyday journeys contributing to reducing
greenhouse gas emissions from transport and is
highly beneficial for health and wellbeing.
The upgrading and provision of additional
active travel infrastructure will be fundamental
to the development of a sustainable travel
network providing access to settlements, key
services and amenities, employment and multi-
modal hubs. Infrastructure investment should
be prioritised for locations where it will achieve
our National Transport Strategy 2 priorities and
outcomes, to reduce inequalities, take climate
action, help deliver a wellbeing economy and to
improve health and wellbeing. This will help to
deliver great places to live and work, including
through connecting neighbourhoods, villages
and towns, active freeways and long distance
routes.
Location
All Scotland.
Need
Reducing the need to travel unsustainably is
the highest priority in the sustainable transport
investment hierarchy. This national development
will significantly support modal shift and deliver
multiple outcomes including our commitment
to a 20% reduction in car kilometres by 2030,
associated emissions reduction, health and
air quality improvement. This will support the
delivery of our spatial strategy by creating a
more sustainable distribution of access across
Scotland as a whole.
Designation and classes of development
A development contributing to ‘National Walking,
Cycling and Wheeling Network’ in the location
described, within one or more of the Classes of
Development described below and that is of a
scale or type that would otherwise have been
classified as ‘major’ by ‘The Town and Country
Planning (Hierarchy of Developments) (Scotland)
Regulations 2009’ is designated a national
development:
a) New/and or upgraded routes suitable for
a range of users for walking, cycling and
wheeling that help create a national network
that facilitates short and longer distance
journeys and linkages to multi-modal hubs.
Lifecycle greenhouse gas emissions
assessment
Depending on the nature of the projects taken
forward and considering both direct and indirect
effects, the lifecycle greenhouse gas emissions
assessment concludes this development will
likely have an overall net positive impact on
achieving national greenhouse gas emissions
reduction targets.
Policy impact:
	Compact urban growth
	Local living
	Rebalanced development
	Just transition

Page 147

Part 3 – Annexes
National Planning Framework 4
109
9. Edinburgh Waterfront
This national development supports the
regeneration of strategic sites along the Forth
Waterfront in Edinburgh.
The waterfront is a strategic asset that
contributes to the city’s character and sense of
place and includes significant opportunities for a
wide range of future developments.
Development will include high quality mixed use
proposals that optimise the use of the strategic
asset for residential, community, commercial and
industrial purposes, including support for off-
shore energy relating to port uses. Further cruise
activity should take into account the need to
manage impacts on transport infrastructure.
This will help maintain and grow Edinburgh’s
position as a capital city and commercial
centre with a high quality and accessible living
environment. Development locations and design
will need to address future resilience to the
risks from climate change, impact on health
inequalities, and the potential to incorporate
green and blue infrastructure.
Location
Leith to Granton.
Need
Waterfronts in our largest urban areas are
frequently under-utilised and contain significant
areas of brownfield land as well as existing
infrastructure assets. Their location may be
particularly vulnerable to climate change and
likely risks will require careful management. This
will support delivery of our spatial strategy, which
recognises the importance of our urban coastline
in supporting our sense of place, economy and
wellbeing.
Designation and classes of development
A development contributing to ‘Edinburgh
Waterfront’ in the location described, within one
or more of the Classes of Development described
below and that would otherwise have been of
a scale or type that is classified as ‘major’ by
‘The Town and Country Planning (Hierarchy of
Developments) (Scotland) Regulations 2009’, is
designated a national development:
a) New and/or upgraded buildings for mixed use
and/or residential development;
b) New and/or upgraded buildings for
commercial, industrial, business use;
c) New and/or upgraded utilities;
d) New and/or upgraded green and blue
infrastructure;
e) New and/or upgraded active and sustainable
travel routes; and
f) New and/or upgraded port facilities for vessel
berthing and related landside activities
including for lay-down, and marine sector
services.
Lifecycle greenhouse gas emissions
assessment
Depending on the nature of the projects taken
forward and considering both direct and indirect
effects, the lifecycle greenhouse gas emissions
assessment concludes this development will
likely have an overall net positive impact on
achieving national greenhouse gas emissions
reduction targets.
Policy impact:
	Compact urban growth
	Local living
	Rebalanced development
	Conserving and recycling assets
	Just transition

Page 148

Part 3 – Annexes
National Planning Framework 4
110
10. Dundee Waterfront
This national development supports the
redevelopment of the Dundee Waterfront Zones
including: the Central Waterfront, Seabraes, City
Quay, Dundee Port, Riverside Business Area
and Nature Park, and the Michelin Scotland
Innovation Parc.
Continued delivery of the waterfront transformation
is crucial to securing the role of the city as a
location for investment in the net zero economy.
Supporting population growth alongside
economic opportunities, and skills and career
development, is important in continuing to
demonstrate the sustainability of urban living
in Scotland and a just transition to the net zero
economy.
Further projects associated with this include:
the Michelin Scotland Innovation Parc which
will become an innovation hub for net zero
emission mobility; the Eden Project; and an
improvement of facilities at Dundee Port. This
national development includes reusing land on
and around the Dundee Waterfront to support
the lifelong health and wellbeing of communities,
deliver innovation and attract investment. As the
development progresses it will be important to
support sustainable and active transport options
and to build in adaptation to future climate risks.
Location
Dundee Waterfront zones: Central Waterfront,
Seabraes, City Quay, Dundee Port, Riverside
Business Area and Riverside Nature Park;
Michelin Scotland Innovation Parc.
Need
This national development supports the
continued revitalisation of Dundee Waterfront,
expanded to include Michelin Scotland
Innovation Parc in support of the Tay Cities
Region Economic Strategy and its continued
use for economic purposes. Waterfront locations
may be particularly vulnerable to climate change
and so development requires to be carefully
designed to manage likely risks.
Designation and classes of development
A development contributing to ‘Dundee
Waterfront’ in the location described, within
one or more of the Classes of Development
described below and that would otherwise
have been of a scale or type that is classified
as ‘major’ by ‘The Town and Country Planning
(Hierarchy of Developments) (Scotland)
Regulations 2009’ is designated a national
development:
a) New and/or upgraded buildings for mixed use
and/or residential development;
b) New and/or upgraded buildings for commercial,
industrial, business, storage, distribution,
research, educational, and/or tourism use;
c) New and/or upgraded utilities;
d) New and/or upgraded active and sustainable
travel routes;
e) New and/or upgraded port facilities for vessel
berthing and related landside activities
including for lay-down, freight handling and
marine sector services; and
f) New and/or upgraded green and blue
infrastructure.
Lifecycle greenhouse gas emissions
assessment
Depending on the nature of the projects taken
forward and considering both direct and indirect
effects, the lifecycle greenhouse gas emissions
assessment concludes this development will
likely have an overall net positive impact on
achieving national greenhouse gas emissions
reduction targets.
Policy impact:
	Compact urban growth
	Local living
	Rebalanced development
	Conserving and recycling assets
	Just transition

Page 149

Part 3 – Annexes
National Planning Framework 4
111
11. Stranraer Gateway
This national development supports the
regeneration of Stranraer.
Stranraer is a gateway town. It is located close
to Cairnryan, a key port connecting Scotland to
Northern Ireland, Ireland and beyond to wider
markets.
High quality place-based regeneration will
help address socio-economic inequalities in
Stranraer and to support the wider population
of south west Scotland by acting as a hub and
providing a platform for future investment. This
will be supported by any strategic transport
interventions including road and rail that emerge
from the second Strategic Transport Projects
Review which embeds the National Transport
Strategy’s sustainable travel and investment
hierarchies.
Location
Stranraer and associated transport routes.
Need
Loch Ryan and Stranraer act as a gateway to
Scotland. Reusing the assets in this location will
support the wellbeing, economy and community
in line with the regional growth deal. It will help
to deliver our spatial strategy by driving forward
regeneration of a key hub.
Designation and classes of development
A development contributing to ‘Stranraer
Gateway’ in the location described within one or
more of the Classes of Development described
below and that would otherwise have been of
a scale or type that is classified as ‘major’ by
‘The Town and Country Planning (Hierarchy of
Developments) (Scotland) Regulations 2009’, is
designated a national development:
a) Development contributing to Stranraer
Waterfront regeneration;
b) Marina expansion;
c) Redevelopment of Stranraer harbour east pier;
d) Sustainable, road, rail and freight
infrastructure for access to Stranraer and/or
Cairnryan;
e) New and/or upgraded infrastructure for the
transportation and use of low carbon fuels;
and
f) Reuse of vacant and derelict buildings and
brownfield land, including regeneration of
Blackparks industrial estate.
Lifecycle greenhouse gas emissions
assessment
Depending on the nature of the projects taken
forward and considering both direct and indirect
effects, the lifecycle greenhouse gas emissions
assessment concludes this development will
likely have an overall net positive impact on
achieving national greenhouse gas emissions
reduction targets.
Policy impact:
	Compact urban growth
	Local living
	Rebalanced development
	Conserving and recycling assets
	Rural revitalisation
	Just transition

Page 150

Part 3 – Annexes
National Planning Framework 4
112
12. Digital Fibre Network
This national development supports the
continued roll-out of world-class broadband
across Scotland.
Our strategy requires enhanced digital
connectivity to provide high speed broadband
or equivalent mobile services, prioritising those
areas with weaker networks as part of the
Reaching 100% (R100) programme and Project
Gigabit, including urban, island specific and
rural enhancements. This is a significant utility
including 4G and 5G mobile infrastructure
facilitating home based working, renewable
energy development, rural repopulation and
access to services. The data transmission
network can also support the availability and use
of ‘big data.’ Digital capability is a feature of a
number of City Region and Growth Deals.
Opportunities should be taken to deliver the
infrastructure as part of other infrastructure
upgrades or installation works such as energy
transmission, transportation, and travel networks
where appropriate.
Location
All Scotland.
Need
This is a fundamentally important utility, required
to support development, community wellbeing,
equal access to goods and services, and
emissions reduction from reduced demand for
travel. This will help to deliver our spatial strategy
by complementing a new emphasis of living
locally, and by helping to sustain and grow rural
and island communities.
Designation and classes of development
A development contributing to ‘Digital Fibre
Network’ in the location described, within one or
more of the Classes of Development described
below and that is of a scale or type that would
otherwise have been classified as ‘major’ by
‘The Town and Country Planning (Hierarchy of
Developments) (Scotland) Regulations 2009’, is
designated a national development:
a) Installation of new and/or upgraded
broadband cabling on land and sub-sea for
fixed line and mobile networks; and
b) Green data centres.
Lifecycle greenhouse gas emissions
assessment
Depending on the nature of the projects taken
forward and considering both direct and indirect
effects, the lifecycle greenhouse gas emissions
assessment concludes this development will
likely have an overall negligible impact on
achieving national greenhouse gas emissions
reduction targets.
Policy impact:
	Local living
	Rebalanced development
	Rural revitalisation
	Just transition

Page 151

Part 3 – Annexes
National Planning Framework 4
113
13. Clyde Mission
This national development is a national, place-
based Mission to make the Clyde an engine of
economic success for Glasgow, the city region
and Scotland.
The Clyde Mission is focused on the River Clyde
and the riverside from South Lanarkshire in the
east to Inverclyde and Argyll and Bute in the
west and focusing on an area up to around
500 metres from the river edge. This footprint
includes the parts of the Clyde Gateway, River
Clyde Waterfront, North Clyde River Bank and
River Clyde Corridor frameworks, and Glasgow
Riverside Innovation District.
Across this area significant land assets are
under-utilised, and longstanding inequality,
in relation to poor environment and health
outcomes require to be tackled as a national
priority. An ambitious redevelopment programme
is being taken forward under Five Missions. It is
a collective, cross-sector effort and partnership
working will help bring forward assets and sites
that are ready for redevelopment to sustain
a range of uses. This will repurpose and
reinvigorate brownfield and supporting local
living as well as adapting the area to the impacts
of climate change, where nature-based solutions
would be particularly supported.
Location
The river and land immediately next to it (up to
around 500 metres from the river) along its length.
Need
These classes of development revitalise a major
waterfront asset which is currently under-utilised.
This will support the delivery of our spatial
strategy by attracting investment and reuse of
brownfield land in west central Scotland where
there is a particular need to improve quality
of place, generate employment and support
disadvantaged communities. It will also support
adaptation to climate risks.
Designation and classes of development
A development contributing to ‘Clyde Mission’
in the location described, within one or more
of the Classes of Development described
below and that would otherwise have been of
a scale or type that is classified as ‘major’ by
‘The Town and Country Planning (Hierarchy of
Developments) (Scotland) Regulations 2009’, is
designated a national development:
a) Mixed use, which may include residential,
redevelopment of brownfield land;
b) New, reused and/or upgraded buildings and
facilities for residential, commercial, business
and industrial uses on brownfield land;
c) Upgrade of existing port and harbour assets
for servicing marine functions including
freight and cruise uses and associated
landside commercial and/or industrial land for
supporting services;
d) New and/or upgraded active and sustainable
travel and recreation routes and infrastructure;
and
e) New and/or upgraded infrastructure for
climate adaptation, including nature-based,
green and blue solutions.
Lifecycle greenhouse gas emissions
assessment
Depending on the nature of the projects taken
forward and considering both direct and indirect
effects, the lifecycle greenhouse gas emissions
assessment concludes this development will
likely have an overall net negative impact on
achieving national greenhouse gas emissions
reduction targets.
Policy impact:
	Compact urban growth
	Local living
	Rebalanced development
	Conserving and recycling assets

Page 152

Part 3 – Annexes
National Planning Framework 4
114
14. Aberdeen Harbour
This national development supports the
continued relocation and repurposing of
Aberdeen Harbour. The harbour is a strategically
important asset supporting the economy of the
north east of Scotland.
The south harbour can act as a cluster of
port accessible offshore renewable energy
research, manufacturing and support services.
The facilities are also important for international
connections.
At the south harbour the focus should be
on regenerating existing industrial land and
reorganising land use around the harbour in line
with the spatial strategy of the LDP. By focusing
future port activity here, parts of the existing
harbour in the city centre will become available
for mixed use development, opening up
development land to help reinvigorate Aberdeen
city centre.
This can help provide significant economic
opportunities, in line with the objectives of the
Aberdeen City Region Deal. Environmental
benefits, for example to enhance access
and improve the quality of green space and
active travel options should be designed-in
to help offset any potential impacts on the
amenity of local communities with relevant
projects addressing environmental sensitivities
through careful planning, assessment and
implementation.
The extent to which this should include
additional business and industrial development
outwith the existing north and south harbours
is a matter to be determined in the relevant
LDP, and is outwith the scope of this national
development.
Location
Port of Aberdeen North and South Harbours.
This national development supports the
optimisation of Aberdeen Harbour to support net
zero and stimulate economic investment. It is
also a significant opportunity to support better
placemaking including city centre transformation,
and regeneration of existing land by optimising
the use of new and existing assets. This will
deliver our spatial strategy by helping the north
east of Scotland to achieve a just transition from
a high carbon economy whilst improving quality
of place.
Designation and classes of development
A development contributing to ‘Aberdeen
Harbour’ in the location described, within one or
more of the Classes of Development described
below and that would otherwise have been of
a scale or type that is classified as ‘major’ by
‘The Town and Country Planning (Hierarchy of
Developments) (Scotland) Regulations 2009’ is
designated a national development:
a) Mixed use development reusing land at the
existing (north) Aberdeen Harbour;
b) Upgraded port facilities at Aberdeen Harbour
and completion of South Harbour;
c) New and/or upgraded green infrastructure;
d) Buildings and facilities for commercial,
manufacturing and industrial uses;
e) Infrastructure for the production, storage and
transportation of low carbon and renewable
hydrogen and related chemicals including
ammonia, with carbon capture as necessary;
and
f) Transport infrastructure, including for
sustainable and active travel, for the South
Harbour as supported by the Aberdeen City
Region Deal.
Lifecycle greenhouse gas emissions
assessment
Depending on the nature of the projects taken
forward and considering both direct and indirect
effects, the lifecycle greenhouse gas emissions
assessment concludes this development will
likely have an overall net positive impact on
achieving national greenhouse gas emissions
reduction targets.
Policy impact:
	Local living
	Rebalanced development
	Conserving and recycling assets
	Just transition

Page 153

Part 3 – Annexes
National Planning Framework 4
115
15. Industrial Green Transition Zones
To secure a just transition to a net zero
economy, the decarbonisation of nationally
important industrial sites in a way that ensures
continued jobs, investment and prosperity for
these areas and the communities that depend
on them is essential. Industrial Green Transition
Zones (IGTZ) will support the generation
of significant economic opportunities while
minimising carbon emissions. Technologies that
will help Scotland transition to net zero will be
supported at these locations, with a particular
focus on low carbon and zero emissions
technologies including renewables and the
generation, storage and distribution of low
carbon hydrogen.
The deployment of hydrogen and CCUS at these
locations must demonstrate decarbonisation
at pace and cannot be used to justify
unsustainable levels of fossil fuel extraction or
impede Scotland’s just transition to net zero.
Hydrogen and CCUS are emerging industries,
both government and industry in Scotland wish
to accelerate and maximise the deployment
of green hydrogen. For projects that utilise
carbon capture and storage, we want to ensure
the highest possible carbon capture rates in
the deployment of these technologies. While
there are examples internationally where CCUS
projects have been associated with offshore
Enhanced Oil Recovery, we understand there to
be no plans for offshore Enhanced Oil Recovery
as part of the Scottish Cluster. However, if any
IGTZ is found to be incompatible with Scotland’s
transition to net zero, Scottish Government
policy, along with designations of and classes of
development, will change accordingly.
Industrial Green Transition Zones are:
• The Scottish Cluster encompasses a carbon
capture and storage (CCS) projects network
and is a key strategic vehicle for industrial
decarbonisation, energy generation, and
the transportation and storage of captured
carbon. The designation relates to projects
that form a Scottish Cluster in the first
instance specifically Peterhead, St Fergus
and Grangemouth. Further industrial transition
sites are expected to emerge in the longer
term and benefit from the experience gained
within the Scottish Cluster but do not form part
of this national development. This national
development will support the generation of
significant economic opportunities for low
carbon industry as well as minimising carbon
emissions at scale, and will play a vital part
in maintaining the security and operability
of Scotland’s electricity supply and network.
The creation of hydrogen and deployment
of negative emissions technologies, utilising
CCUS, at commercial scale will establish
the opportunities to decarbonise industry,
transport and heat, as well as other sectors,
and pave the way for the transportation and
storage infrastructure to support the growing
hydrogen economy in Scotland.
• Grangemouth investment zone currently
hosts strategic and critical infrastructure,
high value employment and manufacturing of
materials that are currently vital for every-day
life. This role will continue in the long-term but
must seek to decarbonise given the significant
contribution of the industrial activities to
Scotland’s emissions. It is a key location in
the Scottish Cluster for carbon capture and
storage, and hydrogen deployment. The
Grangemouth Investment Zone will be a focus
for transitioning the petro-chemicals industry
and associated activities into a leading
exemplar of industrial decarbonisation,
significantly helped through the coordination
activities of the Scottish Government’s
Grangemouth Future Industry Board.
Decarbonisation could include opportunities
for: renewable energy innovation; bioenergy;
hydrogen production with carbon capture and
storage; and repurposing of existing strategic
and critical infrastructure such as pipelines.
Location
St Fergus, Peterhead, and Grangemouth.
Need
This national development is required to meet
our targets for emissions reduction. It also
supports a just transition by creating new jobs in
emerging technologies and significant economic
opportunities for lower carbon industry. It will
help to decarbonise other sectors, sites and
regions, paving the way for increasing demand

Page 154

Part 3 – Annexes
National Planning Framework 4
116
to be complemented by the production of
further hydrogen in the future. This will also help
to deliver our spatial strategy by supporting
investment in the North East and the Central Belt
where there has been a relatively high level of
output from fossil fuel industries.
Designation and classes of development
A development contributing to ‘Industrial
Green Transition Zones’ in the location
described, within one or more of the Classes of
Development described below and that would
otherwise have been of a scale or type that is
classified as ‘major’ by ‘The Town and Country
Planning (Hierarchy of Developments) (Scotland)
Regulations 2009’ is designated a national
development.
a) Carbon capture with high capture rates and
negative emission technologies, transportation
and storage of captured carbon forming part
of or helping to create an expandable national
network;
b) Pipeline for transportation and storage of
captured carbon and/or hydrogen;
c) Onshore infrastructure including compression
equipment, supporting pipeline transportation
and shipping transportation of captured
carbon and/or hydrogen;
d) Offshore storage of captured carbon;
e) New and/or upgraded buildings and facilities
for the utilisation of captured carbon;
f) Infrastructure for the production of hydrogen
on shore or off shore where co-located with
off shore wind farms within 0-12 nautical
miles;
g) Infrastructure for the storage of hydrogen on
shore or off shore, including on or near-shore
geological storage;
h) Port facilities for the transport and handling of
hydrogen and carbon dioxide;
i) The application of carbon capture and
storage technology to existing or replacement
thermal power generation capacity;
j) Production, storage and transportation
with appropriate emissions abatement of:
bioenergy; hydrogen production related
chemicals including ammonia;
k) New and/or upgraded buildings for industrial,
manufacturing, business, and educational
or research uses related to the industrial
transition;
l) Town centre regeneration at Grangemouth;
m) Grangemouth flood protection scheme;
n) New and/or upgraded green and blue
infrastructure;
o) New and/or upgraded utilities and/or local
energy network; and
p) New and/or upgraded facilities at the port for
inter-modal freight handling at Grangemouth.
Lifecycle greenhouse gas emissions
assessment
Depending on the nature of the projects taken
forward and considering both direct and indirect
effects, the lifecycle greenhouse gas emissions
assessment concludes this development will
likely have an overall net positive effect on
lifecycle greenhouse gas emissions reductions
targets.
Policy impact:
	Compact urban growth
 Local living
 Rebalanced development
 Conserving and recycling assets
 Rural revitalisation
 Just transition

Page 155

Part 3 – Annexes
National Planning Framework 4
117
16. Hunterston Strategic Asset
This national development supports the
repurposing of Hunterston port as well as the
adjacent former nuclear power station sites and
marketable business land of the Hunterston
Estate. Hunterston has long been recognised
as a strategic location for the port and energy
sectors given its deepwater access and existing
infrastructure. Hunterston is a key site, anchoring
other opportunities around the Firth of Clyde.
The location and infrastructure offers potential
for electricity generation from renewables,
and a variety of commercial uses including
port, research and development, aquaculture,
the circular economy, and environmental
and economic opportunities around nuclear
decommissioning expertise.
New development will need to optimise the
capacity of the transport network, include
active travel links and be compatible with a
location adjacent to sites with nuclear power
uses. Designated biodiversity sites will require
protection and enhancement where possible,
and sustainable flood risk management solutions
will be required for the area. Aligned with the
Ayrshire Growth Deal, jointly funded by the
Scottish and UK Governments, investment in this
location will support a wellbeing economy by
opening up opportunities for employment and
training for local people. A community wealth
building approach has been embedded within
the Deal and Regional Economic Strategy within
Ayrshire, and would be expected to form a part
of future development proposals to ensure the
economic benefits are retained locally as far as
possible, strengthening local supply chains and
supporting businesses and communities across
Ayrshire.
Location
Hunterston Port, nuclear power station sites
and marketable employment land at Hunterston
Estate.
Need
These classes of development support the
redevelopment and reuse of existing strategic
assets and land contributing to a net zero
economy. It also supports delivery of our spatial
strategy by stimulating investment in the west
of Scotland, potentially contributing to the wider
aim of tackling inequalities.
Designation and classes of development
A development contributing to ‘Hunterston
Strategic Asset’ in the location described within
one or more of the Classes of Development
described below and that would otherwise
have been of a scale or type that is classified
as ‘major’ by ‘The Town and Country Planning
(Hierarchy of Developments) (Scotland)
Regulations 2009’, is designated a national
development:
a) Infrastructure to support a multi-modal deep
water harbour;
b) Land and buildings for bulk handling, storage,
processing and distribution;
c) Facilities for marine energy generation
technology fabrication and decommissioning;
d) Facilities for marine energy servicing;
e) Land and buildings for industrial, commercial,
research and development, and training uses;
f) Infrastructure for the capture, transportation
and long-term storage of greenhouse gas
emissions, where transportation may be by
pipe or vehicular means;
g) Infrastructure for the production, storage and
transportation of low carbon and renewable
hydrogen; and hydrogen production related
chemicals including ammonia;
h) Infrastructure for the generation and storage
of electricity from renewables exceeding 50
megawatts; and
i) Electricity transmission infrastructure of 132kv
or more.

Page 156

Part 3 – Annexes
National Planning Framework 4
118
Lifecycle greenhouse gas emissions
assessment
Depending on the nature of the projects taken
forward and considering both direct and indirect
effects, the lifecycle greenhouse gas emissions
assessment concludes this development will
likely have an overall net positive impact on
achieving national greenhouse gas emissions
reduction targets.
Policy impact:
 Compact urban growth
 Local living
 Rebalanced development
 Conserving and recycling assets
 Rural revitalisation
 Just transition

Page 157

Part 3 – Annexes
National Planning Framework 4
119
17. Chapelcross Power Station
Redevelopment
This national development supports the
redevelopment of Chapelcross, a former nuclear
power station site of significant scale regionally
and nationally, and our strategy supports the
reuse of the site to help deliver on net zero and
provide opportunities for communities in the
South of Scotland.
Final uses for the site remain to be agreed,
but the site has locational advantage to act as
an energy hub with opportunities including:
business development with a particular focus
on energy and energy supply chain; energy
generation from solar; electricity storage;
generation of heat; production and storage of
low carbon and renewable hydrogen. This could
link to ambitions for low carbon heat and vehicle
fuel at Stranraer.
The proposal aims to create new job
opportunities, including high value employment.
A community wealth building approach will
ensure that benefits are retained locally as far
as possible, and this in turn will help to sustain
and grow the local population. We also support
opportunities to reduce the fuel costs for local
communities to tackle fuel poverty. Sustainable
access to the site for workers and commercial
vehicles will be required.
Location
Site of the former Chapelcross power station.
Need
This national development supports the reuse
of a significant area of brownfield land in a rural
area with economically fragile communities. It will
also support the just transition to net zero.
Designation and classes of development
A development contributing to ‘Chapelcross
Power Station Redevelopment’ in the location
described, within one or more of the Classes of
Development described below and that would
otherwise have been of a scale or type that is
classified as ‘major’ by ‘The Town and Country
Planning (Hierarchy of Developments) (Scotland)
Regulations 2009’, is designated a national
development:
a) Commercial, industrial, manufacturing, and
office related development occurring on the
Chapelcross development site;
b) Generation of electricity from renewables
exceeding 50 megawatts capacity;
c) Infrastructure for the production, storage and
transportation of low carbon and renewable
hydrogen and related chemicals including
ammonia, with carbon capture as necessary;
and
d) Active and sustainable travel connection to
the site.
Lifecycle greenhouse gas emissions
assessment
Depending on the nature of the projects taken
forward and considering both direct and indirect
effects, the lifecycle greenhouse gas emissions
assessment concludes this development will
likely have an overall net positive impact on
achieving national greenhouse gas emissions
reduction targets.
Policy impact:
 Local living
 Rebalanced development
 Conserving and recycling assets
 Rural revitalisation
 Just transition

Page 158

Part 3 – Annexes
National Planning Framework 4
120
18. High Speed Rail
This national development supports the
implementation of increased infrastructure to
improve rail capacity and connectivity on the
main cross-border routes, the east and west
coast mainlines.
Rail connectivity that can effectively compete
with air and road based transport between the
major towns and cities in Scotland, England
and onward to Europe is an essential part of
reducing transport emissions, making best
use of the rail network and providing greater
connectivity opportunities. There can be
significant emissions savings of approximately
75% to be made when freight is transported by
rail instead of road.
Enhancement would be in addition to and in
conjunction with High Speed 2 (HS2) and other
enhancements identified by the UK Government.
Scottish Ministers have an agreement with
the UK Government to develop infrastructure
enhancements ‘North of HS2’ and Scottish
Ministers continue to press the UK Government
on the imperative that all nations and regions
of Britain benefit from the prosperity that HS2
will deliver both in its construction and its
implementation. The Strategic Transport Projects
Review 2 is appraising through recommendation
45 and will provide the strategic case for
investment in the rail network in Scotland, over
and above the commitments within HS2.
Location
Central and southern Scotland to the border with
England.
Need
This national development aims to ensure a low
emissions air-competitive journey time to cities
in the UK as well as connectivity with European
cities and benefits to freight. This will support
Scotland’s ability to attract and compete for
investment.
Designation and classes of development
A development contributing to ‘High Speed
Rail’ in the location described, within one or
more of the Classes of Development described
below and that is of a scale or type that would
otherwise have been classified as ‘major’ by
‘The Town and Country Planning (Hierarchy of
Developments) (Scotland) Regulations 2009’, is
designated a national development:
a) New and/or upgraded railway track and
electrification solution (overhead cabling and
pylons or on track);
b) New and/or upgraded multi-modal railway
stations to service high-speed lines; and
c) Depot facilities for high speed trains and/
or related to the construction and onward
maintenance of the UK high-speed rail
infrastructure.
Lifecycle greenhouse gas emissions
assessment
Depending on the nature of the projects taken
forward and considering both direct and indirect
effects, the lifecycle greenhouse gas emissions
assessment concludes this development will
likely have an overall net positive impact on
achieving national greenhouse gas emissions
reduction targets.
Policy impact:
 Compact urban growth
 Conserving and recycling assets

Page 159

Part 3 – Annexes
National Planning Framework 4
121
Annex C – Spatial Planning Priorities
This information is intended to guide the
preparation of Regional Spatial Strategies and
LDPs to help deliver Scotland’s national spatial
strategy.
North and West Coast and Islands
This area broadly comprises the island
communities of Shetland, Orkney, the Outer
Hebrides, and parts of Highland and Argyll and
Bute, and the north and west coastline of the
Scottish mainland.
To deliver sustainable places, Regional
Spatial Strategies and Local Development
Plans should maximise the benefits of
renewable energy whilst enhancing blue
and green infrastructure, decarbonising
transport and building resilient
connections.
This area’s natural and cultural assets will
require careful planning and management so
that their special qualities can continue to form
a strong foundation for future development and
investment. There are opportunities for local
projects across this area to come together
and create an enhanced nature network
which benefits quality of life and contributes to
biodiversity recovery and restoration as well as
carbon sequestration.
Resilience and a growing green economy
will depend on delivery of improved grid
connections, including high voltage grid cables
connecting the three island groups to the
mainland. This will be complemented by the
innovation in low and zero carbon fuels and the
roll out of locally distributed energy systems
to reduce emissions from buildings, address
significant fuel poverty and secure longer term
resilience.
Significant peatland restoration and woodland
creation and restoration, along with blue carbon
opportunities will secure wider biodiversity
benefits and be a focus for investment to
offset carbon and secure existing natural
carbon stores. The Lewis Peatlands and the
Flow Country are internationally recognised
as accounting for a significant proportion of
the world’s blanket bog habitat, and there are
opportunities to protect and expand Scotland’s
temperate rainforest, including some of the best
remaining rainforest sites in Europe. Access to
the outdoors, as well as active travel, can benefit
from continued investment in long distance
walking and cycling routes with a range of
projects emerging at a regional scale.
Communities in this area will need resilient
transport connectivity to maintain accessibility
and lifeline links, and further innovation will be
required to help modernise connections and
decarbonise transport systems. A net zero
islands air network and decarbonisation of ferry
services will help to secure the viability and
service stability of island and remote coastal
communities. Communities are keen to explore
long-term ambitions for fixed links for example
across the Sound of Harris and Sound of Barra,
and potentially to connect the Outer Hebrides
to mainland Scotland. An Islands Connectivity
Plan will consider the role of ferries, fixed links
and low carbon aviation in securing lifeline
links and marine access for both leisure and
freight. In addition to the investment potential
of the area’s ports and harbours, the strategic
location of the Northern Isles as a hub for future
shipping using long distance trade routes has
significant potential for investment and growth
over the longer term. There is also potential to
consider decarbonisation of fishing fleets and
the aquaculture industry in the future.
Electric vehicle ownership is already high in
some parts of the area and continued expansion
of charging networks will support further
decarbonisation. Key routes and hubs are
emerging – examples include the aspiration for
an electric spinal route that extends across the
Outer Hebrides. This should be viewed as one
part of a wider system response to net zero that
also strengthens active travel across the area.

Page 160

Part 3 – Annexes
National Planning Framework 4
122
Improved digital connectivity is a priority to
sustain current businesses and create ‘smart’
communities. We are committed to investment
in ultrafast broadband to ensure every property
is connected and to improve mobile coverage.
This will unlock opportunities for rural businesses
and remote working, and make future community
growth more feasible. Full benefits will be
realised by actively tackling the digital divide
by building skills, literacy and learning and
addressing the financial barriers to internet
access. Key projects include the Outer Hebrides
Giga Fibre Network and the North Isles Fibre
Project.
To deliver liveable places, Regional Spatial
Strategies and Local Development Plans
in this area should support coastal and
island communities to become carbon
neutral, thus contributing to net-zero
commitments and reducing fuel poverty.
Future-proofing local liveability will benefit
people as well as the planet. Island and coastal
communities can apply the concept of local
living, including 20 minute neighbourhoods, in
a flexible way and find local solutions to low
carbon living, for example by identifying service
hubs in key locations with good public transport
links. The aim is to build long-term resilience
and self-reliance by minimising the need to
travel whilst sustaining dispersed communities
and rural patterns of development. Communities
in this area will continue to rely to an extent on
the private car, and low carbon solutions to the
provision of services will need to be practical
and affordable. Innovation including electric
vehicle charging and digital connectivity will play
an important role.
Increased coastal flooding and erosion arising
from future climate change will need to be
considered along with impacts on associated
infrastructure such as bridges and transport
networks. The majority of island populations live
in coastal locations and there is a need for a
pro-active and innovative approach that works
with local communities to address this issue.
Regionally and locally driven plans and
strategies will identify areas for future
development that reflect these principles – for
example planned population growth on the
Western Seaboard of Argyll and in a growth
corridor from Tobermory to Oban and on to
Dalmally. Community hubs, where people can
easily access a variety of services, will need
to evolve and grow to support communities
and sustain a range of functions. Ports and
harbours can be a focal point for electric vehicle
charging as well as employment. Sustainable
and fair access to affordable healthier food will
support future resilience and broader objectives
including reduced child poverty and improved
health outcomes. Innovative and equitable
service provision, including digital solutions, will
be needed to support dispersed communities in
a low carbon way.
Communities will need greater choice and
more flexible and affordable homes to support
varying needs. This can be achieved to an
extent by refurbishing the existing building stock
to reduce the release of embedded carbon, as
well as by delivering more affordable, energy
efficient homes. The additional costs of island
homebuilding and development generally, as
well as in delivering net zero, is a challenge that
needs to be factored into a planned approach.
There is a clear need for affordable housing
provision across the region to improve choice
and access to homes, to support local
economies, and in some areas to help offset the
impact of second home ownership and short
term lets on the market. Local solutions may
include key worker housing, temporary homes
for workers in remote areas, and self-provided
homes including self-build and custom-build.
Continued innovation of holistic place-based
solutions, such as the Rural and Islands Housing
Fund, will be required to create homes that meet
diverse community needs, including homes for
an ageing population and to help young people
to stay in or return to their communities. Greater
efforts to ensure young people have more
influence in decisions that affect their future
places could support this, as well as helping
more people access land and crofts and the
reuse of abandoned sites where appropriate.

Page 161

Part 3 – Annexes
National Planning Framework 4
123
To reverse past depopulation and support
existing settlements, planning can help to
sustain communities in more peripheral and
fragile areas in a way that is compatible with
our low carbon agenda and resilient to climate
change impacts. Further action should be taken
where appropriate to encourage economically
active people to previously inhabited areas. This
will also need to reflect climate commitments
and wider aspirations to create sustainable
places that incorporate principles of 20 minute
neighbourhoods and active travel networks.
Coasts will continue to evolve, and development
will be needed to sustain and grow communities
in a sustainable way. Collaboration and strong
alignment of terrestrial and marine planning, at
all levels, will also be needed.
To deliver productive places, Regional
Spatial Strategies and Local Development
Plans in this area should seize the
opportunities to grow the blue and green
economy, recognising the world-class
environmental assets that require careful
management and the opportunities to
develop skills and diversify employment.
This area has significant opportunities for
investment that capitalise on its natural assets
and further strengthen the synergies between
people, land and sea. This will require strong
collaboration and alignment of terrestrial
and marine planning, especially as further
development of related blue economy activities
in the terrestrial environment may increase
competition for marine space and resources
offshore. To significantly reduce greenhouse gas
emissions, more onshore and offshore renewable
energy generation will be needed, bringing
unprecedented opportunities to strengthen local
economies, build community wealth and secure
long-term sustainability. The island authorities
have set targets for creating green jobs and for
rolling out clean and efficient energy systems
to build local resilience. We expect to see
continued innovation to unlock the infrastructure
and business opportunities arising from a blue
and green prosperity agenda.
As a result of its natural advantages, the area
is growing its research excellence, and driving
low-carbon is a core theme of the Islands
Growth Deal. This will support the emergence
of the planned joint Islands Centre for Net Zero,
alongside island-specific initiatives. Orkney has
been home to the European Marine Energy
Centre since 2003 and the Orkney Research
and Innovation Campus (ORIC) in Stromness
provides a focus for Orkney’s renewable and
low carbon industries and research facilities.
There are plans to grow the role of Orkney’s
ports and harbours to support net zero. The
Outer Hebrides Energy Hub plans to establish
the initial infrastructure necessary to support
the production of low carbon hydrogen from
renewable energy and conduct a ‘large village’
trial for Stornoway, and there may also be co-
benefits to be gained for aquaculture in the area.
Shetland aims to grow its net zero contribution
including through a planned ultra-deep water
port development, which would support servicing
the energy sector, oil and gas decommissioning
and large-scale offshore renewables. In addition,
Oban is developing as a university town, and
the European Marine Science Park is a key
opportunity to build the local economy and
provide education locally.
Sea ports are a focus for investment in the blue
economy and further diversification of activities
could generate additional employment across
the area. Potential for business development
ranges from long distance freight to supporting
the cruise and marine leisure sectors and
decommissioning opportunities. There may
also be opportunity for ports in the islands to
establish themselves as near-Arctic marine
transport and logistics hubs, including for
transhipment operations.
There is an aspiration for the servicing of ultra
large container ships with associated facilities
within Scapa Flow. The potential for such
development to adversely affect European site(s)
has been identified through the HRA of NPF4.
Therefore, this would need to be considered
carefully at project level, including through the
Habitats Regulations Appraisal process, to
ascertain that there will be no adverse effects on

Page 162

Part 3 – Annexes
National Planning Framework 4
124
the integrity of European sites, or if this is not the
case, whether there are imperative reasons of
over-riding public interest and relevant statutory
tests can be met.
New infrastructure and repurposing of land will
help to shift industrial activity towards supporting
the offshore renewables sector. Key strategic
sites for industrial investment and associated
port infrastructure and facilities include plans for:
Dales Voe and Scapa Flow as part of the Islands
Growth Deal; Cullivoe; Arnish in Stornoway;
Wick; Scrabster; Gills Bay; Kishorn; Oban; Port
Askaig; and Hatston, Kirkwall. Other key nodes
on the ferries network, including Ullapool, Uig
and Mallaig, will continue to act as important
hubs to support communities, investors and
visitors.
Proposed space ports, which make use of
the area’s relatively remote location and free
airspace, could support our national ambitions to
grow this sector. This includes plans for an Outer
Hebrides Spaceport 1 in Scolpaig, North Uist
and an emphasis on space research and skills
development in Shetland as part of the Islands
Growth Deal, a space port at Machrihanish
and ancillary buildings at Benbecula. Planning
permission has been granted for a space port
at Melness in Sutherland, making use of its
location away from populated areas to provide a
vertical launch facility that could link with wider
opportunities for manufacturing, research and
development across Scotland.
Food and drink is a key sector, with aquaculture,
distilleries, commercial fishing, and seaweed
farming providing a crucial and growing source
of employment for many local communities. This
sector is of national significance, with whisky
generating an estimated £5 billion to the UK
economy and salmon accounting for more than
40% of total food exports. By improving the
resilience of existing infrastructure we will ensure
continued access to international markets.
There are significant opportunities to build on
experience and expertise through associated
research and development. A development
hub at Machrihanish to support aquaculture
research in association with Stirling University
could open up wider opportunities to expand
onshore aquaculture at sites across Scotland.
Within Orkney, farming is still the main industry
providing products for local consumption and for
Scotland’s food and drink sector.
Targeted investment in tourism infrastructure will
ensure the coast and islands can capitalise on
their rich natural assets, heritage and culture to
support better quality and more stable jobs in
the sector whilst providing a positive experience
for visitors and residents. This sector has
been significantly impacted by the pandemic
and a short term focus on recovery can be
underpinned by efforts to secure longer term
sustainability. Planning can help to ensure that
the Rural Tourism Infrastructure Fund is targeted
to places where the pressure is most significant.
Priorities include visitor management of the
area’s World Heritage Sites. Through the Islands
Growth Deal, plans are in place for the Orkney
World Heritage Site Gateway that will manage
and disperse visitors to the Heart of Neolithic
Orkney UNESCO World Heritage Site; and
the Outer Hebrides Destination Development
Project will support the strategic development
of tourism infrastructure, bringing together key
assets including St Kilda World Heritage Site,
the Iolaire Centre, the Hebridean Way, Food and
Drinks trail and the Callanish standing stones.
Other ongoing projects, including long distance
routes such as the Kintyre Way and the Argyll
Sea Kayak Trail and Crinan Canal can help to
expand a high quality offer of exceptional marine
tourism across the area as a whole.
Regionally and locally there is a need for smaller
scale investment across the area to put in place
low maintenance, carefully designed facilities
which better support and manage the impact of
informal tourism including camping, campervans
and day trips. This should reflect the scale and
nature of operators including community trusts,
which can have broad impact and influence.
Efforts to provide access to education and
build skills locally will also support this, with key
projects including plans for the redevelopment
of the Shetland Campus. Additionally, the
lessons we have learned from the pandemic
about remote working could also help to grow
communities by extending the range of high
quality jobs available locally.

Page 163

Part 3 – Annexes
National Planning Framework 4
125
North
This area broadly includes parts of Highland
with parts of Argyll and Bute, Moray, Cairngorms
National Park, as well as the north of Loch
Lomond and The Trossachs National Park, Stirling
and Perth and Kinross, with links west and north
to coastal and island communities.
Priorities
To deliver sustainable places, Regional
Spatial Strategies and Local Development
Plans in this area should protect
environmental assets and stimulate
investment in natural and engineered
solutions to climate change and nature
restoration, whilst decarbonising transport
and building resilient connections.
The area’s natural capital will play a vital role
in locking in carbon and building our resilience
by providing valuable ecosystem services. This
includes sustainable flood risk management,
biodiversity, access and education.
Land and sea assets will play an internationally
significant role in renewable energy generation
and carbon sequestration. The area can act as
a strategic carbon and ecological ‘mitigation
bank’ that can make a major contribution to
our national climate change commitments. A
programme of investment in forestry, woodland
creation, native woodlands and peatland
restoration will play a key role in reducing
our national emissions, providing investment
opportunities, supporting ecosystems and
biodiversity and benefiting current and future
generations. There are also opportunities to
explore the decarbonisation of the forestry
sector, processing and the transport of timber,
and to build community wealth through new
businesses, such as a nationally important tree
nursery in Moray.
Wider but closely related priorities include
continuing conservation at a landscape-scale,
to develop resilient nature networks, deer and
moorland management, visitor management
and recreation, rural housing, community
empowerment and economic development.
This will provide good quality local employment,
strengthen and diversify local economies and
help to secure a sustainable future for local
people. The area’s rivers are also strategic
assets that will continue to benefit from aligned
land use, climate adaptation and biodiversity
enhancement.
The Cairngorms National Park is bringing
together conservation, the visitor experience and
rural development to provide benefits that extend
well beyond the park boundary. Landscape-
scale solutions to build resilience to climate
change, to manage sustainable tourism and
outdoor access, and a commitment to reversing
biodiversity decline and increasing woodland
expansion and peatland restoration, are all key
priorities. Demand for development, including in
pressured areas, will require a planned response
to minimise the impact of second homes on
local communities and ensure new homes are
affordable and meet local needs.
This area also makes an important contribution
to our climate change targets by supporting
renewable energy generation. Repowering and
extending existing wind farms will optimise
their productivity and capitalise on the area’s
significant natural energy resources, and there
is potential to increase offshore wind energy
capacity. A carefully planned approach can
reduce environmental and other impacts
and retain more benefits locally. Community
ownership of renewable energy projects at
all scales could play a key role in improving
resilience, empowering local people to take
control of their own assets and helping tackle
fuel poverty. Pumped hydro storage at
Cruachan and other sites such as Coire Glas
can support the energy network, as well as
providing tourism and recreation opportunities,
and we expect to see a growth in solar power.
As technologies continue to develop, storage
and other forms of generation will grow. The
electricity distribution and transmission network
will require upgrading to support the large
increase in onshore and offshore electricity
generation required to achieve net zero, as well
as to meet new demand from heat and transport.
There will also be a need for more community-
scale energy generation to serve the needs of
local communities directly and build resilience.

Page 164

Part 3 – Annexes
National Planning Framework 4
126
The transport system as a whole will need
to be planned to support a shift to more
sustainable transport whilst maintaining access
to markets and facilities. In line with the transport
sustainable investment hierarchy, development
should first be focused in locations which make
the best use of existing infrastructure and
services before building new infrastructure or
providing new services.
Improvements to the Highland Main Line through
electrification and delivery of new stations
including at Inverness Airport, will help to create
a sustainable commuter network for Inverness
and open up more rural areas to lower carbon
development. Our rolling programme of efficient
electrification is also a key enabler for growth in
rail freight, creating improved connectivity and
providing additional capacity with faster journey
times, better use of track capacity and lower
unit costs. A continued modal shift to rail for
both passengers and freight will bring significant
environmental benefits over time.
Roads will continue to be arteries upon which
local communities and businesses depend.
There will be a need to adapt key routes due
to the impacts of climate change alongside
creating a strong network of charging points,
including improvements to the A96 to improve
safety and to the A9 to maintain a resilient road
link from Thurso and Inverness to the central
belt. Remote and rural areas including islands
are dependent on reliable accessibility by
road including connecting to ferries and ports,
facilitating reliable public transport by road,
access to essential services and transporting
of goods. There is an urgent need for
improvements to the A83 to ensure the resilience
of the economy and communities of wider Argyll,
as well as resilience challenges for other key
routes such as the A82.
Continued investment in the national long
distance walking and cycling network provides
an opportunity to assist in decarbonising tourism
and recreation across the area, whilst also
providing, and acting as a spine for, sustainable
active travel connections for everyday travel in
the vicinity of towns and villages.
Inverness and Oban airports are hubs for air
connections to dispersed communities and Wick
John O’Groats Airport and Broadford Airstrip
on Skye are key connections. Oban Airport is
also an opportunity for investment in compliance
operations and future drone technology. The
Highlands and Islands are aiming to become the
world’s first net zero aviation region by 2040 by
pioneering new approaches including electric
aircraft. Investment in technology and facilities
will be required to achieve this. The proposed
Moray Aerospace Advanced Technology and
Innovation Campus (MAATIC) at Lossiemouth
intends to create a skilled workforce for the
Moray region through focusing on aviation sector
and supply chain.
To deliver liveable places, Regional Spatial
Strategies and Local Development Plans
in this area should maintain and help to
grow the population by taking a positive
approach to rural development that
strengthens networks of communities.
We will do all we can to help reverse
depopulation across rural Scotland. Here, as
with other more rural areas of Scotland, 20
minute neighbourhoods can be tailored to work
with both larger towns and more dispersed
settlement patterns.
Inverness plays a vital role as a regional centre
for services, health, justice, employment,
education, sport, culture and tourism and has
seen significant expansion in recent years. Key
sites for its growth are located primarily to the
east along the Moray coast. A sustainable and
adaptive growth strategy will continue to be
supported by planned investment in education
and health and social care services, as well
as employment uses. The new railway station
serving Inverness Airport will help to connect
local communities with growing employment
opportunities in the wider area. Inverness
Castle, as part of the Inverness and Highland
City Region Deal, will be redeveloped and
opened up to the public, attracting national and
international tourists and encouraging visits to
the wider Highlands and Islands.

Page 165

Part 3 – Annexes
National Planning Framework 4
127
Fort William, Dingwall, Grantown-on-Spey and
Aviemore are key settlements, and the area has
strong relationships with adjacent, more coastal
settlements such as Mallaig, Oban, Wick and
Thurso. Moray also has a strong network of
towns including Forres, Elgin and Nairn. In more
remote communities there is a need to reverse
population decline. A place-based approach (as
demonstrated by Fort William 2040), including
work to improve town centres and reuse
redundant buildings, will support recovery in
a way which responds to the strong character
and identity of each of the area’s towns and
villages. Such an approach is evident in Growth
Deal projects such as Moray’s Cultural Quarter
proposal.
A positive approach to rural development
could support the development of a network of
hubs, and future service provision will require
imaginative solutions so that places can be
resilient and self-supporting. Investment in
strategic health, justice and education facilities
is already planned. In the longer term, digital
solutions, including mobile and remote health
services and virtual education, as well as
continued investment in improved connectivity,
will play an increasingly important role.
As with other parts of Scotland, more homes
will be needed to retain people and attract new
residents of all ages. Many communities have
taken ownership of their land and this could
form the foundations for future development
by unlocking further development sites.
Refurbishment of existing rural buildings and
halting the loss of crofts could help to sustain
the area, and new homes should align with
infrastructure and service provision. They should
also be located and designed to minimise
emissions and to complement the distinctive
character of existing settlements and wider
landscapes. As climate change continues to
have an impact, water supplies and drainage
will need to be secured and maintained. Flood
risk management and changing ecosystems will
need to be factored into future plans to ensure
nature-based adaptation solutions complement
local living. Addressing fuel poverty will require
greater energy efficiency and affordable, low
carbon, distributed heat and electricity networks,
with a model for increased local generation,
having potential to bring benefits. Maintaining
connectivity will be essential, particularly through
public transport that includes rail access and
other active travel networks.
We will continue to support further investment
in digital connectivity but will need to go further
to adapt to climate change and make use of
emerging technologies. Priorities include satellite
and mobile solutions to address ‘not spots’,
and to support local living by reducing the
need to travel unsustainably. To complement
existing physical connections, smart solutions,
local hubs, demand responsive transport, and
active travel networks will help people to access
services and employment and make low carbon
local living a more viable option.
To deliver productive places, Regional
Spatial Strategies and Local Development
Plans in this area should support local
economic development by making
sustainable use of the area’s world-class
environmental assets to innovate and lead
greener growth.
Natural assets and environmental quality
underpin the area’s main economic sectors
and must therefore be protected, restored and
used sustainably. Planning will help to attract
investment, grow and diversify businesses and
enable local entrepreneurship, micro enterprises,
self-employment and social enterprises to
flourish. Remote working can be capitalised on
to build economically active local communities.
This will require the continued roll out of high
quality digital infrastructure and maintenance
and decarbonisation of transport routes to
wider markets. Food miles can be reduced
over time with the help of local community-led
food growing networks, by supporting locally
driven public procurement and, from a land use
perspective, protecting higher quality agricultural
land.

Page 166

Part 3 – Annexes
National Planning Framework 4
128
Ideas are emerging for the area to secure a
low carbon future for tourism. Assets such as
the North Coast 500 and, more recently, the
Kintyre 66 in the adjacent coastal area, as well
as the area’s high quality environment and
associated food and drink products, attract
visitors. However, they also require investment in
improvements to infrastructure to support local
communities and visitors. This will maintain the
quality of the experience and the environment,
facilitate lower carbon transport, promote ‘leave
no footprint’ and encourage longer stays.
This could involve extending the availability
of transport services. There are also many
regionally significant opportunities to create
jobs by growing support services for outdoor
activities such as mountain biking, climbing,
walking and angling and in support of the
country’s winter sport and recreation sector that
is primarily focussed in this area.
Investment in research and development,
business opportunities and local centres of
expertise will help to retain benefits locally and
broaden the range of skilled jobs. There will
also be opportunities to build on and repurpose
existing assets to create greener jobs, such as
the former nuclear installation at Dounreay and
development at Fort William associated with the
Lochaber Smelter.
The area’s coastline contributes to the beauty
and experience of the area and is also a hub for
economic activity including fishing, the cruise
and marine leisure sectors, and the offshore
renewable energy sector. Key ports include the
Cromarty Firth (including Port of Cromarty, Nigg
and Highland Deephaven), Corpach, Ardersier,
Gills Bay, Inverness, Kishorn and Buckie.
Through Opportunity Cromarty Firth and other
projects, new facilities and infrastructure will
help ports to adapt, unlocking their potential to
support the transition from fossil fuels through oil
and gas decommissioning, renewable energy
(including the significant opportunities for marine
energy arising from Scotwind) and low carbon
hydrogen production and storage, and the
expansion of supply chain and services. This
will in turn benefit communities by providing
employment and income for local businesses.
North East
This area focuses on Aberdeen City and
Aberdeenshire with cross-boundary links to Moray,
and south towards Angus and the Tay estuary.
Priorities
To deliver sustainable places, Regional
Spatial Strategies and Local Development
Plans in this area should plan
infrastructure and investment to support
the transition from oil and gas to net zero,
whilst protecting and enhancing blue and
green infrastructure and decarbonising
connectivity.
Action is required to tackle industrial emissions
and transition towards a greener future that
benefits existing communities and attracts further
investment.
Greener energy choices, including hydrogen
and on and offshore renewables, have a natural
home here and will be at the heart of the
area’s future wellbeing economy. Investment
opportunities focus on the green and blue
economy and energy innovation. Significant
infrastructure will be required to deliver a
hydrogen network for Scotland, including
repurposing of existing facilities and the creation
of new capacity. £62 million in the Energy
Transition Fund is supporting four projects to
protect existing jobs and create new jobs in the
North East, and across Scotland, by opening
up opportunities through energy transition and
harnessing private sector funding. This funding
aligns with the Aberdeen City Region Deal
and continuing support for retraining and skills
development. Ports and harbours throughout
the area are key assets in the blue economy.
As offshore renewables are an important part of
Scotland’s energy transition, there will be a need
to align terrestrial and marine development so as
to maximise the potential of this sector.
The area’s growth strategy includes a
commitment to building with nature by creating
multi-functional blue and green networks
and improving green spaces in and around
settlements, connecting with the national
long distance cycling and walking network

Page 167

Part 3 – Annexes
National Planning Framework 4
129
and facilitating active travel. Community-led
climate action will help to provide locally-driven
solutions. A new water supply and waste-water
systems will play an important role in building
long-term resilience.
Aberdeen is a key transport hub providing vital
connections internationally, as well as lifeline
services to Orkney and Shetland. Congestion
will be reduced as a result of the construction
of the Aberdeen Western Peripheral Route, and
the A92/A96 Haudagain Improvement project. In
the city, work is ongoing to lock in the benefits
and prioritise sustainable transport, including
Aberdeen Rapid Transit. More widely the
Aberdeen to Central Belt Rail Improvements will
bring benefits to both passengers and freight.
The area can lead the way in promoting low
emissions vehicles, active travel and public
transport connectivity as part of its contribution
to net zero. Links south to the Central Belt
and west towards Inverness remain vital.
Work is progressing on the £200m investment
being made to improve journey times and
capacity between Aberdeen and the Central
Belt for passengers and freight. Continuing
improvements to digital connectivity and
active travel will reduce the need to travel by
unsustainable modes and facilitate further
remote, home or hub based working.
To deliver liveable places, Regional Spatial
Strategies and Local Development Plans
in this area should focus on continued
regeneration and encourage more 20 minute
neighbourhoods to sustain the skilled
workforce and improve local liveability.
A new focus on local living could help to
address the high levels of car ownership and
respond to the area’s dispersed settlement
pattern. Growth corridors extending from
Aberdeen to Peterhead, Huntly and Laurencekirk
will be a focus for future development, and
strategic sites include new communities at
Chapelton, Grandhome and Countesswells.
There is significant potential to promote more
compact growth by making better use of
brownfield sites and increasing density.
There will be benefits for people of all ages
arising from an increase in local living and a
shift towards 20 minute neighbourhoods and
the creation of connected, walkable, liveable
and thriving places, in both urban and rural
contexts. The aim is to encourage sustainable
travel options, provide communities with
local access to the wider range of facilities,
services and amenities to support healthier and
flourishing communities. In rural places, social
and community infrastructure can be designed
with different settlements working in clusters as
a ‘network of places’, providing services and
amenities that best meet the needs of local rural
communities.
The area’s towns contribute to its sense of place
and further town centre regeneration will help
communities to adapt to current challenges and
future change. Service provision also needs
to reflect the area’s character. Several new
or extended primary and secondary schools
and community facilities are planned and the
area will support wider rural communities by
hosting a new centre of excellence for rural
and remote medicine and social care. Access
to good quality open space and opportunities
for local food growing, including allotments and
community orchards, can benefit health and
wellbeing and tackle inequalities as an integral
part of placemaking.
The area benefits from a productive coastline
that will be a focus for future economic activity
and investment associated with offshore
renewable energy and the blue economy.
The coast is home to communities who will
benefit from continued regeneration and a
move towards 20 minute neighbourhoods
that reduces the need to travel. Key regional
priorities include the regeneration of Banff,
Macduff, Fraserburgh and Peterhead. Future
coastal vulnerability to erosion, sea level rise
and flood risk will need to be factored into
development strategies. The fishing industry
will continue to contribute to the area’s
strong sense of place and shared heritage,
communities and economy, with some ports
and harbours also having opportunities in the
cruise and marine leisure sectors.

Page 168

Part 3 – Annexes
National Planning Framework 4
130
To deliver productive places, Regional
Spatial Strategies and Local Development
Plans in this area should support
continued economic diversification and
innovation.
The relocation of some activity at Aberdeen
Harbour to the south harbour has been an
important element in planning for the future.
Further investment will help to realise its full
potential as a low carbon hub and gateway,
and there may be opportunities for development
at the South Harbour to support the carbon
capture and storage and hydrogen innovation
work at St Fergus and Peterhead in Northern
Aberdeenshire. This is also a significant
opportunity to improve urban liveability by
unlocking waterfront sites for mixed use
development close to the city centre. Local
people will need to be involved in deciding how
potentially significant industrial and business
activity can be accommodated, alongside
regenerating a vibrant, redesigned city centre in
the coming years.
It is essential that environmental impacts
arising from relocation of the harbour and
any onward reorganisation of the land uses
around it are carefully managed in a way that
recognises the location’s natural assets and
sensitivities. We expect the LDPs and consenting
processes to be informed by the required
impact assessments, to play a crucial role in
guiding future development and addressing
environmental sensitivities.
Central
This area broadly covers central Scotland from
the Glasgow city region and the Ayrshires in
the west to Edinburgh city region in the east,
including the Tay cities, the Forth Valley and
Loch Lomond and The Trossachs National Park.
Priorities
To deliver sustainable places, Regional
Spatial Strategies and Local Development
Plans in this area should support net zero
energy solutions including extended heat
networks and improved energy efficiency,
together with urban greening and
improved low carbon transport.
Blue and green infrastructure
The greening of the built environment, including
former industrial areas, is a long held ambition
that we now need to expedite to significantly
reduce emissions, adapt to the future impacts
of climate change and tackle biodiversity loss.
Investment in green infrastructure will support
urban sustainability, help to restore biodiversity,
contribute to our overall targets for reducing
emissions and improve health and wellbeing.
There is much that we have already learned from
past work, for example initiatives to naturalise
former mining features, reclaiming canals
as a cultural heritage and natural asset, and
extensive woodland creation. Wider woodland
expansion across more urban areas could
make a significant contribution to improving
air quality and quality of life by reducing
pollution, managing water and cooling urban
environments. Blue and green networks can help
to deliver compact and liveable cities.
Many initiatives will come together to achieve
urban greening:
• The Central Scotland Green Network will
continue to bring together environmental
enhancement projects. Initiatives such as the
John Muir Pollinator Way demonstrate how
nature networks can help restore and better
connect biodiversity and enhance green
infrastructure at a landscape scale.

Page 169

Part 3 – Annexes
National Planning Framework 4
131
• The Glasgow City Region Green Network,
a long-term transformational programme of
environmental action, can achieve a step
change in the quality and benefits of green
places across west central Scotland and bring
enhanced biodiversity closer to communities.
As part of this, the Clyde Climate Forest is
proposing natural solutions at scale across
the Glasgow city region.
• The Inner Forth Futures Partnership is tackling
the effects of climate change and providing
recreation benefits through projects such as
peatland restoration and woodland expansion,
and supporting the creation of habitat
networks.
• The River Leven Project in Fife is a holistic
place-based approach to development.
Blue and green infrastructure will support
investment and provide environmental, health
and wellbeing benefits for communities.
• The Tayside strategic green and active
travel network also aims to create regionally
significant assets that contribute to the quality
of the area.
• Perthshire Nature Connections Partnership
(PNCP) encompasses a long-term, nature-
based vision for Perth and Kinross that aims
to create a distinct connection between the
Cairngorms and Loch Lomond and The
Trossachs National Parks.
• There is a particular opportunity to build on
the successful regeneration of our canals to
provide an invaluable strategic greenspace
that connects communities across the
area as a whole, contributes to its strong
post-industrial heritage and provides wider
functions such as water management to
support future resilience to climate change.
The potential of a canal asset should be
recognised as a shared priority.
There is a continuing need to invest in renewing
and improving the capacity of flooding, water
and drainage infrastructure to build the resilience
of communities. A catchment-scale approach,
using nature-based solutions, can also provide
benefits for the health and quality of life of
Scotland’s urban communities, particularly
where solutions seek to deliver multiple benefits,
including biodiversity gain and active travel
routes. This approach can also be more cost-
effective than hard engineering solutions and
create lasting jobs. For example, the Glasgow
city region recognises the challenges for
future adaptation and is identifying sustainable
solutions to sea level rise, urban overheating,
and water management.
Engineered solutions to adapt our water
and drainage infrastructure will be required
in some circumstances, but should support
more natural benefits as far as possible.
There is scope to continue, and extend,
the lessons from the Metropolitan Glasgow
Strategic Drainage Partnership to future proof
infrastructure in support of the long-term growth
and development of Edinburgh. The Lothian
Drainage Partnership is taking this forward with
projects emerging within Edinburgh and at the
ClimatEvolution Zone in East Lothian.
At a local scale there is significant potential
to expand raingardens and sustainable urban
drainage systems to help manage surface water
as part of blue and green infrastructure for our
future cities and towns.
Whilst predominantly urban, this part of Scotland
benefits from a rich and diverse rural area
and there are many areas where town meets
countryside. These green areas and natural
spaces are key assets, sustaining communities
that could become better places to live if we
can achieve this in a way that is compatible
with our wider aims for climate change, nature
restoration and 20 minute neighbourhoods. The
pandemic has demonstrated that many people
are looking for more space at home and in their
communities. It will be important to plan positively
and imaginatively to make sustainable use of the
countryside around our cities and towns.
These areas have important functions –
productive agricultural land, providing vital
ecosystem services and spaces for local
food growing, outdoor access and recreation.
They support carbon sequestration, including
through peatland restoration, woodland creation
and conserving natural habitats, and there is
scope for innovation in key sectors including
sustainable food production.

Page 170

Part 3 – Annexes
National Planning Framework 4
132
Planning has the potential to address the impact
of climate change on communities whilst also
generating renewable heat and facilitating
urban cooling from our rivers. Mine water, solar
and onshore support for offshore renewables,
including development that makes use of
existing infrastructure at strategic hubs, all
provide opportunities for decarbonisation.
Loch Lomond and The Trossachs National Park
has landscape-scale opportunities to restore
and enhance nature and respond to climate
change, including through woodland creation
and peatland restoration, as well as natural
flood risk management. The National Park will
continue to support the quality of life and health
of the urban population and its future priorities
include new infrastructure provision to provide
a quality visitor experience and support people
to connect with nature, as well as a greener
tourism sector supported by innovative low
carbon transport solutions. Long distance active
travel and rail routes have untapped potential
to provide sustainable tourism solutions. The
area’s communities can adapt to support more
localised living and working opportunities, with
improved digital connectivity and affordable
housing. More integrated planning and land
management offers opportunities to support land
use change and reduction of greenhouse gas
emissions. The approach also links with and
relates to the action area to the north.
Urban accessibility
A focus on community wealth building, together
with growing opportunities for longer term
remote working, could address the high levels
of transport movement by private car and
challenges of congestion and air pollution
across the area. Local living, including 20
minute neighbourhoods, will help to minimise
future commuting and ensure jobs and
income can be spread more evenly across the
area. Accessibility and transport affordability
can support more resilience which benefits
communities who are less connected.
By putting in place mass/rapid transit systems
for Edinburgh through plans to extend the tram
network, and for Glasgow including the Clyde
Metro and multi-modal connectivity, we have an
opportunity to substantially reduce levels of car-
based commuting, congestion and emissions
from transport at scale.
Connections to the rest of the UK will be
strengthened in the longer term through high
speed rail connectivity, with stations expected
in Glasgow and Edinburgh. Decarbonisation of
freight will require the construction of new hubs
and associated facilities to support logistics.
This will also support growing interest in express
logistics from rail operators that would see
passenger Electrical Multiple Units converted
to carry small freight, targeting the UK parcel
market. Ports on the Clyde, Forth and Tay coasts
will also play a key role in this transition.
Digital connectivity will facilitate remote working,
supporting the growth of towns and villages
outwith the larger cities and potentially leading
to a renaissance in more rural living. It will be
crucial to address digital inequality, whether
through cost, infrastructure or skills development,
as virtual service provision continues to grow.
To deliver liveable places, Regional Spatial
Strategies and Local Development Plans
in this area should pioneer low carbon,
resilient urban living by rolling out
networks of 20 minute neighbourhoods,
future proofing city and town centres,
accelerating urban greening, investing
in net zero homes, and managing
development on the edge of settlements.
20 minute neighbourhoods
The diversity of this area, from metropolitan
districts to rural and dispersed settlements, will
require concerted effort to develop networks of
places that meet the principles of local living and
20 minute neighbourhoods, and with fair access
to a range of services that support sustainable
living. Planning should focus on revitalising cities
and towns at scale, supporting a finer grained
approach to placemaking, and a more intricate
mix of land uses and density. This should
incorporate networks of natural spaces and blue
and green infrastructure, to create health and
wellbeing benefits, increase resilience to climate
change and support the growth of green job
opportunities.

Page 171

Part 3 – Annexes
National Planning Framework 4
133
The car-based design of some of our places,
including many suburban areas and new towns,
mean that a significant shift to a more people
centred approach will be required. Planning
can help retrofit facilities and services into areas
where they are scarce, such as predominantly
residential areas, to enable better integrated,
mixed-use areas. City, town and neighbourhood
centres can be at the heart of this if they are
planned to strengthen self-sufficiency and
bring services and jobs closer to homes. The
recommendations of the recent town centre
review can be delivered by supporting a wider
range of uses and making the most of their
assets.
Accessibility will be a key part of the transition
and will involve investment in infrastructure and
services in line with the sustainable travel and
investment hierarchies, to improve fair access
and reduce carbon emissions. Active travel
networks will need to expand to make walking,
wheeling and cycling an attractive, convenient,
safe, and sustainable choice for everyday
travel. There are significant opportunities for
investment in heat networks, energy storage and
the circular economy to create more sustainable
neighbourhoods.
Energy efficient, affordable homes
As well as building new homes to net zero
standards, more will need to be done to meet
the bigger challenge of upgrading the existing
housing stock to reduce emissions and adapt
to future climate impacts. Emissions from our
homes need to be very substantially reduced –
by 2030, they must fall by 68% from 2020 levels.
Improved energy efficiency will be needed, by
providing zero emissions heating solutions and
more sustainable water management practices
for existing settlements and homes. Improving
sustainable travel options and reliability will help
to reduce transport based emissions associated
with our homes.
There is a particular pressure for housing
solutions, including provision of affordable
homes that meet future needs, in the south
east of Scotland. Edinburgh has committed to
building affordable homes at scale, and will
need to work with the region to accommodate
wider need and demand in a strategic way.
Seven strategic sites, supported through the
Edinburgh and South East Scotland City Region
Deal, could accommodate up to 45,000 homes
and associated economic and employment
benefits including: Blindwells, Calderwood,
Dunfermline, Edinburgh Waterfront, Shawfair,
Tweedbank and Winchburgh. The need for
proposals to be supported by low carbon
transport solutions, in line with the Infrastructure
Investment Plan and National Transport Strategy
investment hierarchies and infrastructure first
approach, will be critical to their success. The
Edinburgh and South East Scotland City Deal
identifies infrastructure investment as part of this.
These interventions and commitments, taken with
the additional transport investment made through
the Deal, will ensure the city region continues to
grow and flourish. Regionally significant services,
including healthcare and social care facilities
and investment in the learning estate, is also
planned to support future growth and sustain
the wellbeing of existing, new and expanding
communities.
Waterfront regeneration
The region’s coasts and firths define the area’s
history and shape its sense of place. There is
potential to unlock the strategic importance of
coasts, estuary and river corridors for climate
mitigation, resilience, and positive environmental
change. Coastal change, driven by climate
change, will need to be managed to build long-
term resilience and future-proof our waterfronts,
where this is feasible. Progress has been made
to create long distance walking and cycling
routes to open up access to waterfront spaces
and reclaim them as a resource for people
as well as industry. There will be a need to
anticipate and mitigate risk from coastal erosion,
flood risk and storm surges, with a focus on
natural solutions which work with the unique
biodiversity and landscape character of these
important places.
These coasts are rich in cultural and natural
heritage. Along the Inner Forth, various
projects provide multiple benefits, including
flood management, cultural landscape
enhancement, habitat creation, access and

Page 172

Part 3 – Annexes
National Planning Framework 4
134
tourism. Edinburgh’s waterfront regeneration
is ongoing, with Granton benefiting from an
ambitious masterplan, the tram extension to
Leith progressing and potential development at
Seafield helping to redefine the city’s relationship
with its coastline. This is reusing existing assets
and helping Edinburgh to become a more
liveable city. A masterplanned approach to
regenerating the Edinburgh Waterfront can take
into account opportunities for the Port of Leith to
service the offshore energy sector. More broadly,
port facilities should continue to be capable of
servicing freight traffic within the Firth of Forth
given the importance of east coast freight links.
The successful regeneration of Dundee
Waterfront has demonstrated the potential to
make sustainable use of our urban coasts, and
ongoing proposals include the creation of a
marina at Victoria Dock and further development
of central waterfront sites. Dundee port has an
aspiration to expand its operational area into the
Firth of Tay. The HRA of NPF4 has identified that
such development would have a high probability
of resulting in adverse effects on the integrity
of European site(s). This would therefore need
to be considered carefully at project level,
including through the HRA process to ascertain
that there will be no adverse effects on European
sites, or if this is not the case, whether there are
imperative reasons of over-riding public interest
and relevant statutory tests are met.
Reuse of brownfield land
A more liveable Central Belt means that we will
need to do more to reuse empty buildings and
brownfield land, including vacant and derelict
land, particularly spaces which have not been
used for decades and can be accessed by
sustainable modes. This will reduce further
urban sprawl and improve local environments.
Around 40% of Scotland’s vacant and derelict
land is concentrated in the Glasgow city region
and its reuse for a range of uses is a key
priority. Edinburgh has committed to building a
significant share of future housing development
on brownfield sites and progress is being made
in Dundee to repurpose disused sites, including
the creation of a new innovation park on the
former Michelin site.
A combination of incentives, investment
and policy support for productively reusing
brownfield land and buildings at risk will be
required to steer development away from
greenfield locations, whilst also acknowledging
their biodiversity value and potential for urban
greening. Public-sector led development can
shape future markets and deliver development
in places where change is needed the most and
can deliver multiple benefits. Redevelopment
should include, but not be limited to, housing
development. By de-risking sites and taking
an infrastructure first approach, this land can
help to achieve a better distribution of new
homes to meet our future needs. This will also
reduce pressure in places where growth is
no longer sustainable. Key projects include
the Eden project on the sites of the former
Dundee gasworks, and the redevelopment of
Ravenscraig, a longstanding post-industrial site
where new development, including improved
transport connectivity, can bring new models of
low carbon living at scale.
To deliver productive places, Regional
Spatial Strategies and Local Development
Plans in this area should target economic
investment and build community wealth
to overcome disadvantage and support a
greener wellbeing economy.
This area has a diverse business base and is a
key engine of growth for Scotland as a whole.
There are many clusters of sites and businesses
which form the basis of regional propositions for
investment. In line with our aspirations to build a
wellbeing economy, opportunities for investment
and development should be designed to
maximise economic, social and environmental
wellbeing, rather than focusing on growth alone.
A planned approach can help to target future
development in areas of significant economic
disadvantage so that new and better jobs are
more fairly distributed to help address national,
regional and more localised inequality.

Page 173

Part 3 – Annexes
National Planning Framework 4
135
City and town centres
The pandemic has brought obvious challenges
for our city centres, but has also unlocked
opportunities to take forward new models of
working that could better support wellbeing
and improve our places in the longer term.
The continued growth of remote and local
working and the creation of hubs within groups
of settlements could significantly reduce the
need to travel, whilst also helping to grow local
businesses and communities.
This raises significant questions for the future of
city centres. Existing offices have the potential
to be repurposed to achieve higher density
mixed use neighbourhoods with a lower carbon
footprint and require careful planning to ensure
future communities are properly supported by
appropriate services.
Glasgow city centre, an exceptional asset and
a primary location and cultural destination, has
been significantly impacted by unprecedented
changes in working patterns, service provision
and the retail sector. Whilst these changes
may not be sustained in the long-term, now
is the time to accelerate work to diversify the
city centre and invest in maintaining and re-
using existing buildings so that it can evolve
to be a more carbon conscious place. Existing
connections mean the centre could sustain
many more homes to meet a commitment to
doubling the city centre population, revitalising
places and creating a 24 hour city that is safe
and open to everyone. Significant investment in
schools, community services and greenspace
will be needed to achieve this and more creative
use of the public realm and a low emission
zone will help to make this a safer and healthier
environment for people of all ages. Innovative
solutions, such as retrofitting energy efficiency
measures to social housing across the city,
could be extended to help improve the built
fabric of the city centre’s commercial properties.
Edinburgh has similar challenges and
opportunities for positive change. High interest
in investment and associated demand for new
homes means that planning will need to help
deliver sustainable development that supports
the quality of life of existing and future residents.
As a capital city with a World Heritage Site at its
core, it will be crucial that future development
takes into account the capacity of the city itself
and its surrounding communities and makes
the most of its exceptional heritage assets,
places and cultural wealth. The City Centre
Transformation Plan supports a move away from
a car-based city centre to create a more liveable
and attractive place to live, work and visit. The
Forth Bridge is also an inscribed UNESCO World
Heritage Site, and our rich industrial and cultural
heritage remains apparent across the area.
Dundee is well on the way towards reinventing
itself through regeneration of the waterfront,
unlocking strategic sites for new homes and
new opportunities for innovation and economic
development arising, such as the Michelin
Scotland Innovation Park and at the port.
Continued regeneration in this area, building
on the city’s rich culture, sense of place and
appetite to innovate will also contribute to the
overall aims for this part of Scotland. The V&A
will continue to be a focal point for this, evolving
to become a National Centre for Design within
this UNESCO City of Design.
Town centres throughout this area will also
play a critical role in driving a new economic
future. The recent town centre review highlights
opportunities to expand the range of services
and facilities they offer, reuse redundant
buildings and provide new homes for a wide
range of people. This in turn will ensure their
crucial role in defining our sense of place is
protected and enhanced, future proofing a key
asset for Scotland as a whole.
Strategic sites
Many business and investment sites are
located along key transport corridors and new
approaches may be required as investment
transitions away from locations that can only be
reached by car towards more accessible areas
that are connected by low carbon and active
travel options.
The Clyde Mission will stimulate investment
in sites along the Clyde to build a wellbeing
economy and achieve a step-change in the
quality of the environment for communities. This

Page 174

Part 3 – Annexes
National Planning Framework 4
136
ambitious project will reuse extensive areas of
vacant and derelict land in accessible locations
and requires a sustainable approach to manage
the future impact of climate change. Key sites
extend from Greenock Ocean Terminal to
Queens Quay, Tradeston, the Broomielaw and
Glasgow City Centre, to Clyde Gateway – a
longstanding regeneration project which has
made exceptional progress in transforming
communities and overcoming inequality. A
national collaboration to support delivery of the
project has significant potential to accelerate
change, attract investment and achieve wider
benefits for communities. The wider Clyde
Coast, an iconic area rich in cultural heritage
and natural assets, can be reimagined through
collective efforts on regeneration in nearby
coastal communities, such as Dunoon and
Rothesay. The area’s accessibility by train and
water means that it is an ideal location for low
carbon tourism and leisure.
Aligning with the Clyde Mission, the Ayrshire
Councils are working together through their
Ayrshire Growth Deal and Community Wealth
Building programme to build economic resilience
and address unemployment, poverty and
inequality across their area, with town centres
at the heart of communities. This includes
proposals for advanced manufacturing and
aerospace engineering which will make use
of the existing infrastructure and investment
opportunities available at Glasgow and
Prestwick airports. Glasgow is already a centre
of expertise for manufacturing satellites and will
benefit from the associated development of a
network of spaceports across the country, whilst
supporting wider industry and employment.
The Ardeer peninsula is also a significant
site for redevelopment of the wider Ayrshire
area. Hunterston is a strategic asset with
deepwater access, where there are plans for
new economic development and employment
uses. Development of the site will need to take
account of future vulnerability to climate change.
A planned marine centre at Ardrossan will
provide further opportunities.
The Edinburgh City Region supports investment
in significant clusters including the Bioquarter,
Mid Fife, Dunfermline, Guardbridge St. Andrews,
Galashiels, Cockenzie, Midlothian and the
M8 corridor. A strategy for West Edinburgh is
emerging which guides a wide range of uses to
create a sustainable extension to the city, with
added benefit from associated improvements
to the quality of place of existing communities.
Proposals focus on locating development on and
around existing transport corridors and work is
ongoing to improve accessibility including the
Edinburgh tram extension. Further investment
should take into account the impact of new
development on potentially compounding
existing capacity constraints and congestion,
and prioritise sustainable choices.
As the highest single source of industrial
emissions in Scotland, and a key part of our
future resilience and manufacturing base,
continued investment at Grangemouth, and
the strategic sites it includes, will be required.
Plans are emerging for innovative industry in the
Falkirk/Grangemouth Investment Zone, building
on the area’s strengths in chemicals and making
the most of strategic assets including the port
and rail connection. There is great potential, not
only to reduce emissions at the Grangemouth
complex, but also to grow the cluster into a
hub of low carbon manufacturing that can
help unlock wider decarbonisation across the
country, with its strategic location, infrastructure,
assets and skills base. Opportunities include
renewable energy innovation, bioenergy
hydrogen production with carbon capture and
storage, and repurposing of existing strategic
and critical infrastructure such as pipelines. The
skills, knowledge and experience that is currently
situated there for the petro-chemicals sector is a
prime resource for the transition to net zero. This
can form a focal point in a wider masterplan for
Forth Valley that brings together opportunities
for energy with the circular economy to
support wider investment in green economic
opportunities.
Coastal sites formerly used for baseload
power generation – specifically Longannet and
Cockenzie – benefit from existing assets and
infrastructure that can be repurposed to form the
basis of new proposals. At Cockenzie, work is
ongoing to develop an opportunity for a Climate
Evolution Zone to generate employment and

Page 175

Part 3 – Annexes
National Planning Framework 4
137
provide essential infrastructure for net zero,
linked with the potential to expand the new
sustainable settlement at Blindwells, within the
Greater Blindwells Development Area. There
is scope to build on the strategic location and
rail connectivity of Longannet to benefit local
communities around this part of the Forth. There
are further opportunities for a range of economic
activities and investment in ports associated with
a green economy at Montrose, Dundee, Rosyth,
Burntisland, and Methil.
The Levenmouth rail link will reconnect Leven
to the mainline rail network with new stations at
Leven and Cameron Bridge by 2024 subject
to consenting processes. This will enhance the
communities it serves and contribute positively
to the lives of people who live there by unlocking
access to social, cultural, employment and
educational opportunity.
The Tay Cities Region has a strong regional
proposal for developing clusters of investment in
research and innovation supporting a range of
sectors in both urban and rural areas including
life sciences, energy, digital, and food production.
Perth is managing housing development in
strategic development areas and transport
infrastructure investment and the creation of a
bus and rail interchange to support modal shift
and establish a new gateway to the city. Work
is underway to deliver local heat and energy
networks, Perth West Regional Innovation Park
and to make Perth the ‘Biodiversity Capital of
Scotland’. Angus Council is progressing its
Mercury Programme to support clean growth, low
carbon transport and housing and agri tech which
will contribute to future food security and reduce
emissions. Key sites include Montrose Port, and
the Angus Rural Mobility Hub in Brechin.
Stirling is bringing forward new opportunities for
innovation and investment, building on the city’s
strong heritage and supported by the area’s
educational institutions. Within Forth Valley, a
National Tartan Centre, the Canal corridor, the
Frontiers of the Roman Empire: Antonine Wall
World Heritage Site, Ochil Hills and Whisky
Trail create a unique heritage offering which will
support local employment and strengthen the
area’s sense of place. Tourism is a key theme in
the emerging regional economic strategy for the
Forth Valley and both the Falkirk Growth Deal and
Stirling and Clackmannanshire City Region Deal.
Ports
Key ports in this area can play a central role in
supporting the expansion of renewable energy,
in particular offshore wind energy. It will also
be important to make use of the infrastructure
to reduce road haulage and secure a more
sustainable freight sector which directly links to
international markets. There are opportunities for
enhanced cruise facilities for the Forth, as well
as the Clyde where Greenock Ocean Terminal,
supported by the Glasgow City Region Deal, can
build on its role as a key gateway. There may be
opportunities to make use of harbour facilities to
support the marine leisure industry.
Development of ports on the Firth of Forth will
also need to take account of the potential for a
substantial increase in freight and passenger
traffic between Scotland and continental Europe,
linked to the Scottish Government’s objective
that Scotland should accede to the EU as
an independent Member State at the earliest
possible opportunity.

Page 176

Part 3 – Annexes
National Planning Framework 4
138
South
This area broadly includes Dumfries and Galloway
and the Scottish Borders, South and East
Ayrshires, South Lanarkshire in the west, with
links to the Lothians towards the east.
Priorities
To deliver sustainable places, Regional
Spatial Strategies and Local Development
Plans in this area should protect
environmental assets and stimulate
investment in natural and engineered
solutions to climate change and nature
restoration, whilst decarbonising transport
and building resilient physical and digital
connections.
This area’s forests and woodland are a
nationally significant asset and its extensive
peatland will need to support carbon storage
and sequestration. The Borderlands Natural
Capital Programme will develop trials and sector
strategies to restore biodiversity, build resilience
and make the most of the area’s natural assets
to support climate change mitigation and
adaptation. This will build on the successes of a
range of nature restoration projects in the area,
such as the Carrifran Wildwoods project.
The UNESCO Galloway and Southern Ayrshire
Biosphere is a crucial environmental asset which
can contribute to the area’s future sustainability,
liveability and productivity. The South of Scotland
Regional Land Use Pilot is providing significant
opportunity to work with landowners, landed
interests and others to look at the multi-benefits
from land use and to maximise natural capital
opportunities.
The South of Scotland is an important centre
for renewable energy generation. Proposals
for consolidating and extending existing wind
farms and associated grid improvements
and supply chain opportunities will require a
carefully planned approach. The Solway Firth
has significant potential for renewable energy
generation in the future, but development will
require careful planning given the sensitivity of
the environment and its international importance
for nature conservation.
The area’s low carbon future will depend on
supporting modal shift and reducing car use,
given current dependence on the car and need
to improve access to services, education and
employment. Low emissions vehicles will only
go some of the way towards addressing future
challenges. Enhancing public transport and
improving connectivity between communities in
the east and west will help to support thriving
and distinct communities.
Public transport, including the bus network,
will play an important role in decarbonisation
and developing innovative solutions and
linkages to the rail system. Active travel should
be supported with wheeling, walking and
cycling within and between towns and other
communities linked to strategic routes for
residents and visitors. This is important not only
for local sustainability but also as a strategic
attraction to take advantage of major outdoor
recreation opportunities.
There is also a need to secure better digital
links to unlock the potential of rural living and
home or hub working. The Borderlands Digital
Infrastructure Programme will play a key role in
supporting connectivity and responding to future
technology and innovation.
To deliver liveable places, Regional Spatial
Strategies and Local Development Plans
in this area should increase the population
by improving local liveability, creating
a low carbon network of towns and
supporting sustainable rural development.
Quality of life for people living in the area will
depend on the network of settlements in the
future and existing communities should form the
basis of a tailored response to the local living
concept. Town centres can be strengthened as
they recover from the pandemic. New measures
to build resilience to climate change will be
required including flood risk management in key
settlements.
Housing provision will play a key role in
supporting the area’s aspirations for economic
development as well as in maintaining

Page 177

Part 3 – Annexes
National Planning Framework 4
139
and growing a working age population.
Decarbonisation of existing homes will be
required, as well as a strategic approach to
rolling out electric vehicle charging. Communities
themselves will have a critical role to play in
shaping their future development.
The area is already investing in regenerating
and future proofing its towns and wider
communities. The Stranraer Gateway Project
is an opportunity to consolidate and bring new
impetus to regenerate this strategically located
settlement. Plans include expansion of the
marina, supported by the Borderlands Inclusive
Growth Deal, and low carbon heating can be
incorporated as part of the transformation of
the wider town. Nearby Cairnryan is a crucial
gateway to Scotland, with a need to make best
use of existing connections.
Regeneration innovation extends across the
area. The HALO Kilmarnock project focuses
on the reuse of vacant industrial land to create
a low carbon community urban village, acting
as an exemplar for innovative transformation
of future places. The Ayrshire Manufacturing
Investment Corridor project supports the
economic generation of Kilmarnock and the
wider region, whilst the CoRE (Community
Renewable Energy) project in Cumnock seeks
to explore, develop and provide solutions
to energy supply and storage challenges in
urban and non-urban areas, and to help in the
development of a new, more flexible energy grid
to complement existing power systems.
To deliver productive places, Regional
Spatial Strategies and Local Development
Plans in this area should support local
economic development whilst making
sustainable use of the area’s world-class
environmental assets to innovate and lead
greener growth.
The future sustainability of the area will depend
on the creation of high quality and green jobs
for local people. The local economy will need to
diversify from its focus on land based industries
(agriculture and forestry), to sustain a wider
range of businesses and jobs. An emphasis on
community wealth building will help to reduce
dependence on public sector employment and
a relatively low wage economy associated with
rural and primary sectors.
The current approach to investment focuses
on strategic growth corridors linking economic
hubs with transport routes. Whilst the strategic
road network is an asset and contributes to the
area’s connections north and south, a long-
term strategy will require innovation and fresh
thinking to ensure that future growth reflects
our commitment to reducing greenhouse gas
emissions and reducing inequality.
The future growth of the east of the area aims
to consolidate existing settlements, capitalise
on the strong sense of place of its towns
and ensure accessibility by locating new
development close to the Borders Rail Line. The
Borderlands Place Programme, Borderlands
Natural Capital Project, future Regional Land Use
Partnerships and other strategic initiatives can
support an integrated approach to protecting
and restoring the area’s natural assets,
enhancing the built environment and achieving
a greener, fairer and more inclusive wellbeing
economy across the area.
Employment opportunities can support
population growth, help to retain more young
people and transition the area away from its
current dependence on low wage sectors. New
ways of working, including remote working could
attract more people to live here, supporting
the economy and sustaining local services and
facilities. This will also benefit from continued
support for local skills development and centres
of further and higher education including the
Galashiels campus of Heriot Watt University and
Glasgow University at the Crichton Campus,
Dumfries.
Significant investment sites include the former
nuclear power station at Chapelcross which
benefits from existing grid connections and
is an opportunity to repurpose the land by
establishing a green energy park that contributes
to national ambitions and innovation. Low carbon
accessibility will be a key challenge, as the site
is remote from Annan and not served by public

Page 178

Part 3 – Annexes
National Planning Framework 4
140
transport. Providing access to wider markets,
the port at Cairnryan could create further
strategic growth opportunities. The expansion
of Tweedbank and an inclusive approach to
economic development in the Central Borders
and Tweeddale are also strategic opportunities.
The area has aspirations to become a
prime outdoor recreation and green tourism
destination. Key projects include the South West
Coastal Path, and projects supported by the
Borderlands Inclusive Growth Deal; the Mountain
Biking Innovation Centre at Innerleithen,
updating the cycling experience and facilities
at some of the 7stanes sites, and Destination
Tweed which will deliver a multi-user path and
cycle route from Moffat to Berwick upon Tweed.
More could be made of the area’s border
location and attractions to ensure visitors make
better use of local services and support the
economy and communities.
The west of the area has a close relationship,
and strategic connection to, Northern Ireland
and Ireland via Cairnryan, as well as across
the English border to Carlisle and onwards to
European markets. The connection to Northern
Ireland and Ireland is already a focus for freight
movements as a result of EU Exit.
In the east, the Scottish Borders has a role to
play as part of the Edinburgh City Region, with
the Borders Railway opening up new sites for
sustainable development towards the north, and
the south sustaining rural industries. Work is
ongoing to assess the feasibility of extending the
Borders Railway from Tweedbank to Carlisle.

Page 179

Part 3 – Annexes
National Planning Framework 4
141
Annex D – Six Qualities of Successful Places
1.  Healthy: Supporting the prioritisation of women’s safety and improving physical and
mental health
Designing for:
• lifelong wellbeing through ensuring spaces, routes and buildings feel safe and welcoming
e.g. through passive surveillance and use of physical safety measures.
• healthy and active lifestyles, through the creation of walkable neighbourhoods, food growing
opportunities and access to nature and greenspace
• accessibility and inclusion for everyone regardless of gender, sexual orientation, age, ability
and culture
• social connectivity and creating a sense of belonging and identity within the community
• environmentally positive places with improved air quality, reactivating derelict and brownfield
land, removing known hazards and good use of green and blue infrastructure
2. Pleasant: Supporting attractive natural and built spaces
Designing for:
• positive social interactions including quality of public realm, civic spaces, streets and
ensuring a lively and inclusive experience
• protection from the elements to create attractive and welcoming surroundings, including
provision for shade and shelter, mitigating against noise, air, light pollution and undesirable
features, as well as ensuring climate resilience, including flood prevention and mitigation
against rising sea levels
• connecting with nature including natural landscape, existing landforms and features,
biodiversity and eco-systems, integrating blue and green infrastructure and visual connection
• variety and quality of play and recreation spaces for people of all ages and abilities
• enjoyment, enabling people to feel at ease, spend more time outdoors and take inspiration
from their surroundings
3.  Connected: Supporting well connected networks that make moving around easy and
reduce car dependency
Designing for:
• active travel by encouraging more walking, wheeling and cycling together with reliable,
accessible, public transport and shared transport hubs that allow for simple modal shifts
• connectivity including strategic cycle routes, local cycle routes, footpaths, pavements, active
travel networks, desire lines, destinations, permeability, accessibility and catering for different
needs and abilities
• convenient connections including local and regional interconnection, infrastructure,
sustainable travel, interchange between public transport and active travel and supporting easy
modal shifts in transport
• pedestrian experience including safe crossing, pedestrian priority, reduced vehicular speed
and noise, inclusive design and surfaces, assistive technology, reduced street clutter, catering
for suitable vehicular parking and management of loading/unloading and deliveries and refuse
collections

Page 180

Part 3 – Annexes
National Planning Framework 4
142
4.  Distinctive: Supporting attention to detail of local architectural styles and natural
landscapes to be interpreted into designs to reinforce identity
Designing for:
• scale including density, building heights, massing, orientation, building lines and legibility
• built form including mix of typologies, types, uses, sizes and tenures
• sense of place including design influences, architectural styles, choice of materials and
finishes, detailing, landscape design, active frontages and cultural context
5.  Sustainable: Supporting the efficient use of resources that will allow people to live, play,
work and stay in their area, ensuring climate resilience and integrating nature positive
biodiversity solutions
Designing for:
• transition to net-zero including energy/carbon efficient solutions, retrofitting, reuse and
repurposing and sharing of existing infrastructure and resources
• climate resilience and nature recovery including incorporating blue and green infrastructure,
integrating nature positive biodiversity solutions
• active local economy including opportunities for local jobs and training, work spaces,
enabling working from home, supporting community enterprise and third sector
• community and local living including access to local services and facilities, education,
community growing and healthy food options, play and recreation and digital connectivity
6.  Adaptable: Supporting commitment to investing in the long-term value of buildings,
streets and spaces by allowing for flexibility so that they can meet the changing needs
and accommodate different uses over time
Designing for:
• quality and function, ensuring fitness for purpose, design for high quality and durability
• longevity and resilience including recognising the role of user centred design to cater for
changing needs over time and to respond to social, economic and environmental priorities
• long-term maintenance including effective engagement, clarity of rights and responsibilities,
community ownership/stewardship, continuous upkeep and improvements
Place Standard Tool and the delivery of successful places
The Place Standard contains 14 themes that support the Six Qualities of Successful Places,
providing a consistent framework to consider and to assess the quality of new and existing places.
The Place Standard tool Design Version is specifically created to support the consideration of
development planning and design within the framework of the 14 Place Standard themes and to
deliver on the Six Qualities of Successful Places.

Page 181

Part 3 – Annexes
National Planning Framework 4
143
Annex E – Minimum All-Tenure Housing Land Requirement
This Annex sets out the Minimum All-Tenure Housing Land Requirement (MATHLR) for each
planning authority in Scotland. This is to meet the requirement of Section 3A(3)(d) of the Town and
Country Planning (Scotland) Act 1997, as amended. The MATHLR is the minimum amount of land,
by reference to the number of housing units, that is to be provided by each planning authority in
Scotland for a 10 year period. The MATHLR is expected to be exceeded in each Local Development
Plan’s Local Housing Land Requirement.
Local and National Park Authority MATHLR
Aberdeen City 7,000
Aberdeenshire 7,550
Angus 2,550
Argyll & Bute 2,150
Cairngorms National Park 850
City of Edinburgh 36,750
Clackmannanshire 1,500
Dumfries & Galloway 4,550
Dundee City 4,300
East Ayrshire 4,050
East Dunbartonshire 2,500
East Lothian 6,500
East Renfrewshire 2,800
Eilean Siar 192
Falkirk 5,250
Fife (Central and South) 5,550
Fife (North) 1,750
All Fife* 7,300
Glasgow City 21,350
Highland 9,500
Inverclyde 1,500
Loch Lomond & The Trossachs National Park 300
Midlothian 8,850
Moray 3,450
North Ayrshire 2,950
North Lanarkshire 7,350
Orkney 1,600
Perth & Kinross 8,500
Renfrewshire 4,900
Scottish Borders 4,800
Shetland 850
South Ayrshire 2,000
South Lanarkshire 7,850
Stirling 3,500
West Dunbartonshire 2,100
West Lothian 9,850
* The total consists of Fife North and Fife Central and South. This reflects that Fife was formerly part of two Strategic
Development Plan areas and contributed to separate Housing Need and Demand Assessments.

Page 182

Part 3 – Annexes
National Planning Framework 4
144
Annex F – Glossary of definitions
20 minute
neighbourhood
A flexible approach to assessing our places against the concept of local
living. A method of achieving connected and often compact neighbourhoods
designed in such a way that people can meet the majority of their daily
needs within a reasonable distance of their home preferably by sustainable
and active travel methods. The principle can be adjusted to include varying
geographical scales from cities and urban environments, to rural and island
communities. Housing would be planned together with local infrastructure
including schools, community centres, local shops and health and social
care to significantly reduce the need to use unsustainable methods of travel,
to prioritise quality of life, help tackle inequalities, increase levels of health
and wellbeing and respond to the climate emergency.
4G 4G is the fourth generation of mobile phone technology, following 2G and
3G. 2G technology was suitable for making calls and sending text messages,
while 3G makes it possible to access the internet more effectively through
devices such as a mobile, tablet or laptop. It’s ideal for services that demand
more capacity, like video streaming, mapping and social networking sites.
5G 5G is much faster than previous generations of wireless technology. 5G also
offers greater capacity, allowing thousands of devices in a small area to be
connected at the same time.
The reduction in latency (the time between instructing a wireless device to
perform an action and that action being completed) means 5G is also more
responsive. Together these features make 5G highly relevant for industrial
applications.
The connectivity and capacity offered by 5G is opening up the potential
for new, innovative services while mobile spectrum can be used in more
effective ways.
Affordable
home/affordable
housing
Good quality homes that are affordable to people on low incomes. This can
include social rented, mid-market rented, shared-ownership, shared-equity,
housing sold at discount (including plots for self-build), self-build plots and
low cost housing without subsidy.
Agent of change
principle
Where an application is made for development which is likely to be
affected by noise from existing development such as, but not limited to,
music venues, manufacturing or industrial sites, large retail outlets, etc.,
the applicant is required to demonstrate both that they have assessed the
potential impact on occupants of the proposed development and that the
proposed design incorporates appropriate measures to mitigate this impact.
Ancient woodland Land that has maintained continuous woodland habitat since at least 1750.
Appropriate
assessment
Regulation 48 of The Conservation (Natural Habitats, &c.) Regulations 1994,
as amended, requires an authority, before deciding to undertake, or give
any consent, permission or other authorisation for certain plans or projects
likely to have a significant effect on a European site in Great Britain (either
alone or in combination with other plans or projects), to make an ‘appropriate
assessment’ of the implications for the site in view of that site’s conservation
objectives.

Page 183

Part 3 – Annexes
National Planning Framework 4
145
Biodiversity The variability in living organisms and the ecological complexes of which
they are part. This includes diversity within species, between species and of
ecosystems (UN Convention on Biological Diversity, 1992).
Blue economy The Blue Economy is sustainable use of ocean resources for economic
growth, improved livelihoods and jobs, while preserving the health of marine
and coastal ecosystem.
Blue
infrastructure
Water environment features within the natural and built environments that
provide a range of ecosystem services. Blue features include rivers, lochs,
wetlands, canals, other water courses, ponds, coastal and marine areas
including beaches, porous paving, sustainable urban drainage systems and
raingardens.
Brownfield Land which has previously been developed. The term may cover vacant
or derelict land, land occupied by redundant or unused buildings and
developed land within the settlement boundary where further intensification of
use is considered acceptable.
Buildings at risk
register
The Buildings at Risk Register (BARR) for Scotland (buildingsatrisk.org.uk)
has been in operation since 1990 and highlights properties of architectural
or historic merit that are considered to be at risk. Buildings at risk are not
necessarily in poor condition, they may simply be standing empty with no
clear future use or be threatened with demolition.
Business and
industry
Business, general industrial and storage and distribution uses and smaller
scale business uses such as home-working, live-work units and micro-
businesses.
Carbon capture
utilisation and
storage
Carbon capture, utilisation and storage (CCUS) encompasses the methods
and technologies used to capture the carbon dioxide generated by large-
scale energy intensive processes, such as power generation and industrial
processes, and transport that captured carbon dioxide for safe and
permanent storage deep underground in a geological formation. In some
applications, the captured carbon dioxide can be recycled and used to
manufacture useful products, thus giving it economic value.
Carbon-rich soils Organo-mineral and peat soils are known as carbon-rich soils. A peat soil is
defined in Scotland as when soil has an organic layer at the surface which
is more than 50cm deep. Organo-mineral soil or peaty soil is soil which has
an organic layer at the surface less than 50cm thick and overlies mineral
layers (e.g. sand, silt and clay particles). There is also a relatively rare group
of soils in Scotland known as humose soils. These have organic rich layers
with between 15 and 35% organic matter. These are mineral soils but also
considered to be carbon rich.
Carbon
sequestration
The long-term removal, capture, or sequestration of carbon dioxide from the
atmosphere to slow or reverse atmospheric carbon dioxide (CO2) pollution
and to mitigate or reverse climate change.
Carbon sink A carbon sink is a natural or artificial reservoir that accumulates and stores
CO2 for an indefinite period.

Page 184

Part 3 – Annexes
National Planning Framework 4
146
Circular economy A circular economy is
one that is designed to
reduce the demand for
raw material in products;
to encourage reuse,
repair and manufacture by
designing products and
materials to last as long
as possible in line with the
waste hierarchy.
Climate change
adaptation
Climate change adaptation is about responding to the changes that we
have seen in our climate over the last few decades, and preparing for the
challenges that we will face as our climate continues to change.
Climate change
mitigation
Climate change mitigation refers to efforts to reduce or prevent emissions
of greenhouse gasses, which have a direct impact on global average
temperatures, and reducing the current concentration of carbon dioxide by
enhancing carbon sinks (for example, increasing the area of forest).
Commercial
centre
Centres which have a more specific focus on retailing and/or leisure uses,
such as shopping centres, commercial leisure developments, mixed retail
and leisure developments, retail parks and factory outlet centres.
Community A body of people. A community can be based on location (for example
people who live or work in or use an area) common identity (for example
a shared ethnicity, language, age) or common interest (for example the
business community, amenity, sports, social or heritage groups).
Community
facilities
Buildings or services used by the community, including community halls,
recreation centres and libraries.
Community hub A community hub is a multi-purpose centre, such as a community centre,
medical centre or school, that provides a range of high quality and cost
effective services to the local community.
Community
wealth building
A people-centred approach to local economic development, which redirects
wealth back into the local economy, and places control and benefits into the
hands of local people.
Conservation
area
Conservation areas are areas which have special architectural or historic
interest that are considered worthy of protection. Their selection, assessment
and designation is carried out by the planning authority. To be designated
as a conservation area it must meet the criteria of ‘special architectural
or historic interest the character or appearance of which is desirable to
preserve or enhance’, as set out in Section 61 of the Planning Listed
Buildings and Conservation Areas (Scotland) Act 1997.

Page 185

Part 3 – Annexes
National Planning Framework 4
147
Cultural
significance
Cultural significance means aesthetic, historic, scientific or social value for
past, present or future generations. Cultural significance can be embodied in
a place itself, its fabric, setting, use, associations, meanings, records, related
places and related objects.
Cumulative
impact
Impact in combination with other development. That includes existing
developments as appropriate, those which have permission, and valid
applications which have not been determined. The weight attached to
undetermined applications should reflect their position in the application
process.
Cumulative
impacts (in
the context of
the strategic
transport
network)
The effect on the operational performance of transport networks of a number
of developments in combination, recognising that the effects of a group
of sites, or development over an area may need different mitigation when
considered together than when considered individually.
Custom-build
housing
Where a person tasks a house builder to tailor a home to their preferences
before it is built.
Decarbonisation Reducing the amount of gaseous carbon compounds released by buildings,
activities or operations.
Deliverable
housing land
pipeline
The expected sequencing of the Local Housing Land Requirement over the
short (1-3 years), medium (4-6 years) and long-term (7-10 years), set out in
the local development plan delivery programme.
Deliverable land Land that is free from constraints or there is a commitment to overcome
constraints, and development is able to be delivered in the period identified
for the site within the Deliverable Housing Land Pipeline.
Derelict land Previously developed land which is un-remediated and/or which has a
constraint caused by its previous use which hampers its redevelopment or
naturalisation.
Design flood Magnitude of the flood adopted for the design of a site, usually defined in
relation to the severity of the flood in terms of its return period.
Ecosystem
services
The benefits people obtain from ecosystems.
Egress (safe,
flood free
pedestrian access
and egress)
A route for the movement of people (not vehicles) of all abilities (on foot or
with mobility assistance) between the development and a place of safety
outwith the design flood level.
Enabling
development
Enabling development is development that would otherwise be unacceptable
in planning terms, but is essential, to secure the future of an historic
environment asset or place which is at risk of serious deterioration or loss.

Page 186

Part 3 – Annexes
National Planning Framework 4
148
Essential
infrastructure
Essential infrastructure includes digital communications infrastructure;
telecommunications infrastructure; all forms of renewable, low-carbon and
zero emission technologies for electricity generation and distribution and
transmission electricity grid networks and primary sub stations; water and
waste water infrastructure; and transport proposals and travel networks
identified in the local development plan.
Evidence report A supporting document to the local development plan. An evidence report
summarises the evidence base for those proposals and policies set out in
the development plan and demonstrates that appropriate consultation has
been undertaken and regard given to the views of the community.
Facilities for
managing
secondary
materials
Facilities where materials can be collected and sorted into the various
component parts or consolidated into bulk quantities for re-use either in their
original or an alternative function and for recovery.
‘Recovery’ means any operation the principal result of which is waste serving
a useful purpose by replacing other materials which would otherwise have
been used to fulfil a particular function, or waste being prepared to fulfil that
function, in the plant or in the wider economy.
‘material recovery’ means any recovery operation, other than energy recovery
and the reprocessing into materials that are to be used as fuels or other
means to generate energy. It includes, inter alia, preparing for re-use,
recycling and backfilling; ‘preparing for re-use’ means checking, cleaning or
repairing recovery operations, by which products or components of products
that have become waste are prepared so that they can be re-used without
any other pre-processing.
Flood The temporary covering by water from any source of land not normally
covered by water, but not including the overflow of a sewage system.
Flooding from all
sources
Includes:
Watercourse /Fluvial Flooding – caused by excessive rainfall or snow melt
within a limited period, which overwhelms the capacity of the watercourse or
river channel, particularly when the ground is already saturated. It can also
arise as a result of the blockage of a channel and/or associated structures
such as small bridges and culverts;
Pluvial Flooding – occurs when rainwater ponds or flows over the ground
(overland flow) before it enters a natural or man-made drainage systems (e.g.
a river or sewer/drain). It can also occur when drainage systems are at full
capacity. It is often combined with sewer flooding and groundwater flooding;
Sewer Flooding – occurs when the sewerage infrastructure has to deal with
loads beyond its design capacity. This occurs most often as a result of high
intensity rainfall events;
Groundwater Flooding – occurs when the water table rises above ground
level. In Scotland this is most commonly associated with the movement of
water through sands and gravels, often connected to the rise and fall of river
levels; and
Coastal Flooding – occurs as a result of high tide, storm surge and wave
activity raising the level of the sea above adjoining land.

Page 187

Part 3 – Annexes
National Planning Framework 4
149
Flood risk The combination of the probability of a flood and the potential adverse
consequences associated with a flood, for human health, the environment,
cultural heritage and economic activity.
Flood risk area or
at risk of flooding
For planning purposes, at risk of flooding or in a flood risk area means land
or built form with an annual probability of being flooded of greater than 0.5%
which must include an appropriate allowance for future climate change.
This risk of flooding is indicated on SEPA’s future flood maps or may need to
be assessed in a flood risk assessment. An appropriate allowance for climate
change should be taken from the latest available guidance and evidence
available for application in Scotland. The calculated risk of flooding can take
account of any existing, formal flood protection schemes in determining the
risk to the site.
Where the risk of flooding is less than this threshold, areas will not be
considered ‘at risk of flooding’ for planning purposes, but this does not mean
there is no risk at all, just that the risk is sufficiently low to be acceptable for
the purpose of planning. This includes areas where the risk of flooding is
reduced below this threshold due to a formal flood protection scheme.
Forestry and
woodland
strategy
A strategy prepared by a planning authority either singly or in collaboration
with other planning authorities, which sets out policies and proposals for the
development of forestry and woodlands in their area, according to [section
A159] of the Town and Country Planning (Scotland) Act 1997.
Freeboard Freeboard is the difference between the design flood level and either the
finished floor levels, solum level, or deck level of a specific development. It
is a safety margin designed to allow for the uncertainties involved in flood
estimation and physical factors that cannot be assessed and vary between
sites e.g., post construction settlement and wave action. In many cases an
adequate freeboard allowance is 600mm above the design flood level2 (in
some situations a more detailed assessment of appropriate freeboard will
need to be carried out).
Gardens and
designed
landscapes
The Inventory of Gardens and Designed Landscapes recognises sites
where garden grounds and landscapes have been intentionally laid out for
artistic effect which are of national importance. Their selection, assessment
and designation is carried out by Historic Environment Scotland. Designed
landscapes are managed primarily through the planning process by the
appropriate planning authority.
Green
infrastructure
Features or spaces within the natural and built environments that provide a
range of ecosystem services.
Green networks Connected areas of green infrastructure and open space, that together form
an integrated and multi-functional network.
Green recovery An economic recovery that helps us work toward net zero emissions in a
way that is fair and that maximises the opportunities to deliver a thriving,
sustainable economy.
2 In line with CIRIA Guidance C624 Development and Flood Risk – Guidance for the Construction Industry 2004.

Page 188

Part 3 – Annexes
National Planning Framework 4
150
Green space Space, other than agricultural land, which serves a recreational or an amenity
function for the public, or provides aesthetic value to the public such as
areas of—
(a) grass,
(b) trees,
(c) other vegetation,
(d) water.
Historic
battlefields
The Inventory of Historic Battlefields recognises sites where a nationally
important battle took place, soldiers fought and died, and where significant
military activities happened. Their selection, assessment and designation
is carried out by Historic Environment Scotland. Battlefields are managed
primarily through the planning process by the appropriate planning authority.
Historic
environment
The historic environment is ‘the physical evidence for human activity that
connects people with place, linked with the associations we can see, feel
and understand’.
Historic
environment
asset
An asset (or ‘historic asset’ or ‘heritage asset’) is a physical element of the
historic environment – a building, monument, site, place, area or landscape
identified as having cultural significance.
Historic marine
protected areas
Historic Marine Protected Areas are areas designated in Scottish territorial
waters (0-12 miles) under the Marine (Scotland) Act 2010 for the purpose of
preserving marine assets of national importance. These can be wrecks of
boats or aircraft or more scattered remains, such as groups of artefacts on
the seabed from a submerged prehistoric landscape. Their designation is
carried out by Marine Scotland based on advice from Historic Environment
Scotland.
Huts A simple building used intermittently as recreational accommodation (i.e.
not a principal residence); having an internal floor area of no more than
30 square meters ; constructed from low impact materials; generally not
connected to mains water, electricity or sewerage; and built in such a way
that it is removable with little or no trace at the end of its life. Huts may be
built singly or in groups.

Page 189

Part 3 – Annexes
National Planning Framework 4
151
Infrastructure first Putting infrastructure considerations at the heart of placemaking. For the
purpose of applying the Infrastructure First policy, the following meaning of
infrastructure will apply:
• communications – including digital and telecommunications networks and
connections;
• existing and planned transport infrastructure and services;
• water management – supply, drainage systems and sewerage (including
flood risk management);
• energy supplies/energy generation – including electricity and heat
networks, distribution and transmission electricity grid networks, and gas
supplies;
• health and social care services – including both services provided in the
community directly by Health Boards and services provided on their behalf
by contractors such as GPs, dentists and pharmacists;
• education – including early years, primary, secondary, further and higher
education services;
• green and blue infrastructure; and
• spaces for play and recreation.
Infrastructure
investment
hierarchy
Scottish Government-wide common hierarchy to aid planning and decision-
making, which prioritises enhancing and maintaining our assets over new
build. See Infrastructure Investment Plan for Scotland 2021-22 to 2025-26
for further details. To support the Infrastructure Investment Plan and its
Infrastructure Investment Hierarchy, also see ‘A guide to Property Asset
Strategy in the Scottish Public Sector’
Just transition Ending our contribution to climate change in a way that is fair and leaves no
one behind
Landbank
(construction
aggregates)
A landbank is calculated by a Planning Authority and is a means of gauging
whether there is sufficient consented construction aggregates (sand/
gravel and hard rock) within their relevant market area, to avoid possible
disruption and/or delays to supply. The calculation is primarily based on
annual extraction figures, sales trends and the known reserves within existing
consented sites.
Lifeline links A lifeline ferry service required in order for a community to be viable.
Listed building A listed building is a built structure of ‘special architectural or historic
interest’. The term ‘building’ can be defined as ‘anything made by people’
such as houses, schools, factories, boundary walls, bridges and sculptures.
Listing covers the whole of a building or structure including its exterior,
interior and any ancillary structures within its curtilage (provided these were
constructed before 1 July 1948). Their selection, assessment and designation
is carried out by Historic Environment Scotland under the Planning (Listed
Buildings and Conservation Areas) (Scotland) Act 1997. Listed Buildings
are managed primarily through the Listed Building Consent process by the
appropriate planning authority.

Page 190

Part 3 – Annexes
National Planning Framework 4
152
Local authority
supported
affordable
housing plan
Plans or strategies for housing approved by a local authority e.g. Local
Housing Strategy, Strategic Housing Investment Plan or future versions of
such documents.
Local housing
land requirement
The amount of land required for housing, as identified by the local
development plan. The Local Housing Land Requirement (LHLR) is expected
to exceed the 10 year Minimum All-Tenure Housing Land Requirement
(MATHLR) set out in the National Planning Framework.
Local housing
strategy
Local Housing Strategies were introduced as part of the Housing (Scotland)
Act 2001 to widen the strategic and enabling role for local authorities in
relation to housing in their area. The Local Housing Strategy (LHS) sets out
the outcomes the Council and its partners want to achieve, and the actions
they will take, to address housing need and demand in their area
Local outcomes
improvement plan
A local outcomes improvement plan (LOIP) is produced by a community
planning partnership (CPP), and describes its local priorities, what
improvements the CPP plans for its local communities, and when it will make
these improvements. The LOIP covers the whole of the council area that the
CPP is responsible for.
Locality plan A locality plan is produced by a CPP, and describes its local priorities, what
improvements the CPP plans for its local communities, and when it will make
these improvements. A locality plan covers a smaller area within a whole
CPP area, or may also be produced for groups who share common interests
or features, for example, young people leaving care or vulnerable adults.
Locations of
concern
A location of concern has been defined as a specific, usually public, site
that is used as a location for suicide and which provides either means or
opportunity for suicide.
Masterplan A strategic scheme within which a location is proposed to be regenerated or
changed in order to meet a perceived challenge or strategic need.
Masterplan
consent area
A masterplan consent area scheme can grant authorisation for the type of
development set out in the scheme, within the geographic location (area)
to which the scheme relates. In setting out the type of development that the
scheme authorises, this can be either expressly specified or described as
type of development that is specified in the scheme.
Minimum all-
tenure housing
land requirement
There is a statutory requirement for the National Planning Framework to
contain targets for the use of land in different areas of Scotland for housing.
To meet this, the National Planning Framework includes a Minimum All-
Tenure Housing Land Requirement (MATHLR) for each planning authority in
Scotland. The MATHLR is the minimum amount of land, by reference to the
number of housing units, that is to be provided by each planning authority
in Scotland for a 10 year period, as set out in Annex E. The MATHLR is
expected to be exceeded in the local development plans Local Housing
Land Requirement.

Page 191

Part 3 – Annexes
National Planning Framework 4
153
Mitigation
hierarchy
The mitigation hierarchy indicates the order
in which the impacts of development should
be considered and addressed. These are:
i. Avoid – by removing the impact at the
outset
ii. Minimise – by reducing the impact
iii. Restore – by repairing damaged habitats
iv.Offset – by compensating for the residual
impact that remains, with preference to
on-site over off-site measures.
National transport
strategy 2
The National Transport Strategy sets out an ambitious vision for Scotland’s
transport system for the next 20 years. The vision is underpinned by four
priorities: Reduces Inequalities, Takes Climate Action, Helps Deliver Inclusive
Economic Growth and Improves our Health and Wellbeing, each with three
associated outcomes.
The Strategy sets out the strategic framework within which future decisions
on investment will be made, including the sustainable travel and investment
hierarchies.
Nature-based
solutions
Nature-based solutions are actions to protect, sustainably manage, and
restore natural and modified ecosystems that address societal challenges
effectively and adaptively, simultaneously providing human wellbeing and
biodiversity benefits.
Nature network A Nature Network is a joined-up system of places important for wild plants
and animals, on land and in water. It allows plants, animals, seeds, nutrients
and water to move from place to place and enables the natural world to
adapt to change, providing plants and animals with places to live, feed and
breed. Effectively functioning nature networks will connect existing nature
rich areas through habitat corridors, habitat ‘stepping stones’, or habitat
restoration areas.
Scotland’s Nature Networks will enable opportunities for achieving ecological
connectivity that meet local priorities for biodiversity and nature; whilst
building and strengthening an evolving regional and national connectivity.
Opportunities for implementation may be identified through, e.g. LDPs and/or
Local Biodiversity Action Plans and/or other existing or new mechanisms such
as those developed under the Scottish Biodiversity Strategy Delivery Plan, to
achieve connectivity within and across urban, peri-urban and rural landscapes.
Negative
emissions
technologies
Negative Emissions Technologies (NETs) are an emerging field of
technologies that remove greenhouse gases from the atmosphere and
utilising carbon capture and storage sequester them permanently.
NETs can include forms of Direct Air Capture with Carbon Storage (DACCS),
Bioenergy with Carbon Capture and Storage (BECCS) or other more
experimental means such as enhanced weathering or biochar.
NETs can be considered one form of Greenhouse Gas Removals (GGRs),
which also includes natural sequestration methods such as afforestation.
It can also be used interchangeably with Carbon Dioxide Removal
technologies (CDR).

Page 192

Part 3 – Annexes
National Planning Framework 4
154
Net zero Scotland has set a target to become ‘ Net Zero ‘ by 2045. This means the
amount of greenhouse gas emissions we put into the atmosphere and the
amount we are able to take out will add up to zero.
Open space Space within and on the edge of settlements comprising green space
or civic areas such as squares, market places and other paved or hard
landscaped areas with a civic function
Open space
strategy
An open space strategy is to set out a strategic framework of the planning
authority’s policies and proposals as to the development, maintenance and
use of green infrastructure in their district, including open spaces and green
networks. It must contain; an audit of existing open space provision, an
assessment of current and future requirements, and any other matter which
the planning authority consider appropriate.
Outdoor sports
facilities
Uses where sportscotland is a statutory consultee under the Town and
Country Planning (Development Management Procedure) (Scotland)
Regulations 2013, which establishes ‘outdoor sports facilities’ as land used
as: (a) an outdoor playing field extending to not less than 0.2ha used for any
sport played on a pitch; (b) an outdoor athletics track; (c) a golf course; (d)
an outdoor tennis court, other than those within a private dwelling, hotel or
other tourist accommodation; and (e) an outdoor bowling green.
Peatland Defined by the presence of peat soil or peaty soil types. This means that
“peat-forming” vegetation is growing and actively forming peat or it has been
grown and formed peat at some point in the past.
Placemaking Placemaking is the process of creating good quality places that promotes
people’s health, happiness and wellbeing. It concerns the environment in
which we live; the people that inhabit these spaces; and the quality of life that
comes from the interaction of people and their surroundings. Placemaking is a
collaborative approach involving the design and development of places over
time, with people and communities central to the process.
Place principle All those responsible for providing services and looking after assets in
a place need to work and plan together, and with local communities, to
improve the lives of people, support inclusive and sustainable economic
growth and create more successful places.
Play sufficiency
assessment
A play sufficiency assessment is the assessment of the sufficiency of play
opportunities for children in their area, carried out by a planning authority
under the duty as set out in Section 7(5) Part 16D(1) of Planning (Scotland)
Act 2019. The assessment forms part of the evidence report for the
preparation of the Local Development Plan.
Prime agricultural
land & land of
lesser quality that
is culturally or
locally important
for primary use
Prime agricultural land is that identified as being Class 1, 2 or 3.1 in the land
capability classification for agriculture developed by Macaulay Land Use
Research Institute (now the James Hutton Institute).
However, for land of lesser quality that is culturally or locally important
for primary use (i.e. for example food production, flood management,
water catchment management and carbon storage), this value should be
recognised in decision-making.

Page 193

Part 3 – Annexes
National Planning Framework 4
155
Priority peatland
habitat
Peatland habitats can be divided into four broad classes (blanket bog,
upland raised bog, lowland raised bog, and fen), depending on the types of
plants that formed the peat. Priority peatland habitats are sub-sets of these
broad habitats which have been recognised under the Scottish Biodiversity
Framework as being important to protect for their conservation and
biodiversity value.
Protected
characteristics
The Equality Act defines the following as protected characteristics:
• age
• disability
• gender reassignment
• marriage and civil partnership
• pregnancy and maternity
• race
• religion or belief
• sex
• sexual orientation
Public benefits Public benefits as defined by the current Scottish Government policy on
woodland removal.
Ramsar sites Wetlands designated under the Ramsar Convention on Wetlands of
International Importance.
Remedial notice
(forestry)
A Remedial Notice is a notice issued by Scottish Ministers if it appears to
them that a person has failed or is failing to comply with a condition on felling
permission, a felling direction (including any condition imposed on it), a
restocking direction (including any condition imposed on it), or a registered
notice to comply.
A Remedial Notice requires the person to take such steps or stop such
activity as may be specified in the notice on order to comply with or
otherwise give effect to the condition, direction or (as the case may be)
registered notice to comply, and, to take steps or stop the activity within the
period specified in the notice.
Restocking
direction
A Restocking Direction is a notice issued by Scottish Ministers, in response
to an unauthorised felling or a failure to comply with a continuing condition
on a felling permission. A restocking direction requires an owner of the land
on which the felled tree was located or the land to which the continuing
condition relates, to stock the land in question.
Recycling
facilities
Facilities for the purpose of recycling. Recycling means any recovery
operation by which waste materials are reprocessed into products, materials
or substances whether for the original or other purposes. It includes the
reprocessing of organic material but does not include energy recovery and
the reprocessing into materials that are to be used as fuels or for backfilling
operations. It does not include nuclear reprocessing.
Self-build
housing
Where a person builds their own house or appoints their own builder.
Self-provided
housing
Includes self-build housing, custom-build housing and collective build
housing.

Page 194

Part 3 – Annexes
National Planning Framework 4
156
Setting Setting is more than the immediate surroundings of a site or building, and
may be related to the function or use of a place, or how it was intended to
fit into the landscape or townscape, the view from it or how it is seen from
areas round about, or areas that are important to the protection of the place,
site or building.
‘Setting’ is the way the surroundings of a historic asset or place contribute to
how it is understood, appreciated and experienced.
Scheduled
monument
Scheduled monuments are archaeological sites or monuments of national
importance that are legally protected under the Ancient Monuments and
Archaeological Areas Act 1979. Their selection, assessment and designation
is carried out by Historic Environment Scotland who maintains the schedule.
Works to Scheduled Monuments are regulated by Historic Environment
Scotland through their Scheduled Monument Consent process.
Short term let The use of a dwellinghouse (a residential house or flat) for rental by persons
other than the owner for short periods and for financial or other remuneration.
Typically includes properties advertised as being available for holiday let,
although can apply to other situations.
Strategic
transport network
Includes the trunk road and rail networks. Its primary purpose is to provide
the safe and efficient movement of strategic long distance traffic between
major centres, although in rural areas it also performs important local
functions.
Sustainable
development
Development that meets the needs of the present without compromising
the ability of future generations to meet their own needs. (The Brundtland
Definition. Our Common Future, The World Commission on Environment and
Development, 1987).
Sustainable
investment
hierarchy
The National Transport Strategy 2 Sustainable Investment Hierarchy will be
used to inform future investment decisions and ensure transport options
that focus on reducing inequalities and the need to travel unsustainably
are prioritised. We also need to focus on maintaining and safely operating
existing assets, taking due consideration of the need to adapt to the impacts
of climate change. Investment promoting a range of measures, including
innovative solutions, to make better use of existing capacity will then be
considered, ensuring that existing transport networks and systems are fully
optimised. Only following these steps should investment involving targeted
infrastructure improvements be considered.
Sustainable
tourism
Sustainable tourism is defined by the United Nation World Tourism
Organisation as “tourism that takes full account of its current and future
economic, social and environmental impacts, addressing the needs of
visitors, the industry, the environment and host communities.”

Page 195

Part 3 – Annexes
National Planning Framework 4
157
Sustainable travel Sustainable travel includes travel by
the top three modes in the sustainable
travel hierarchy. It is recognised that
in some locations, particularly in rural
areas, where the top three modes have
been judged as unfeasible for day to day
travel, low emissions vehicles and shared
transport options will play an important
role.
Sustainable travel
hierarchy
The National Transport Strategy 2 Sustainable Travel Hierarchy should be
used in decision making by promoting walking, wheeling, cycling, public
transport and shared transport options in preference to single occupancy
private car use for the movement of people. The efficient and sustainable
freight transport for the movement of goods, particularly the shift from road to
rail should also be promoted.
Town centre Centres which display:
- a diverse mix of uses, including shopping;
- a high level of accessibility;
- qualities of character and identity which create a sense of place and further
the well-being of communities;
- wider economic and social activity during the day and in the evening; and
- integration with residential areas.
Town centre first The Town Centre First Principle asks that government, local authorities, the
wider public sector, businesses and communities put the health of town
centres at the heart of decision making. It seeks to deliver the best local
outcomes, align policies and target available resources to prioritise town
centre sites, encouraging vibrancy, equality and diversity.
Town centre
vision
Towns and town centres are for the wellbeing of people, the planet and the
economy. Towns are for everyone and everyone has a role to play in making
their own town and town centre successful.
Transport
appraisal
A Transport Appraisal should inform the spatial strategy by appraising the
impact of the potential spatial strategy options on the transport network,
in line with Transport Scotland’s Development Planning and Management
Transport Appraisal Guidance. It should determine the potential impacts of
development on the transport network and mitigation to address adverse
impacts, how they will be funded and who should deliver these. This should
inform the Proposed Plan.

Page 196

Part 3 – Annexes
National Planning Framework 4
158
Transport
assessment
A Transport Assessment report should aim to provide supporting evidence
to accompany the planning application to demonstrate that the development
is sited in a location where current and likely future travel behaviour
will produce a desired and predicted transport output. The Transport
Assessment should provide information in a suitable form to enable
the local authority and, if necessary, Transport Scotland to assess and
determine the planning application, seek any changes to the proposal and
devise necessary planning conditions or negotiate planning or other legal
agreements.
Travel plan A Travel Plan (TP) is a document that sets out a package of positive and
complementary measures for the overall delivery of more sustainable travel
patterns for a specific development. Their ability and success in influencing
travel patterns is dependent upon the commitment of the developer or
occupier of a development and the enforcement of travel plan monitoring by
the local authority. Travel plans should be implemented to encourage a shift
in transport mode for those travelling to and from a development.
Unused or under-
used land
An area of land that is stalled awaiting development, or a pocket of land
within neighbourhood that is not developed or cannot be developed for other
meaningful use or does not have particular identified long-term use.
Vacant land Previously developed land, without physical constraint, which the Planning
Authority has indicated is currently available for redevelopment.
Veteran tree A veteran tree can be classified as such due to age (including relative age
for its species) or for its biological, aesthetic, or cultural interest. Veteran
trees are usually mature and provide additional habitat from natural damage,
environmental conditions or management (e.g. coppice, decay hollows,
fungal fruiting bodies, cavities).
Water compatible
uses
Comprise:
- flood control infrastructure
- environmental monitoring stations
- water transmission infrastructure and pumping stations
- sewage transmission infrastructure and pumping stations
- sand and gravel workings
- docks, marinas and wharves
- navigation facilities
- Ministry of Defence (MOD) defence installations
- ship building, repairing, and dismantling
- dockside fish processing and refrigeration and compatible activities
requiring a waterside location
- water-based recreation (excluding sleeping accommodation)
- lifeguard and coastguard stations
- amenity open space
- nature conservation and biodiversity
- outdoor sports and recreation and essential facilities such as changing
rooms
- essential ancillary sleeping or residential accommodation for staff required
by uses in this category, subject to a specific operational warning and
evacuation plan.

Page 197

Part 3 – Annexes
National Planning Framework 4
159
Wellbeing
economy
Building an economy that is inclusive and that promotes sustainability,
prosperity and resilience, where businesses can thrive and innovate, and that
supports all of our communities across Scotland to access opportunities that
deliver local growth and wellbeing.
Wheeling Travelling by wheelchair.
Woodland Land under stands of trees with a canopy cover of at least 20%, or having
the potential to achieve this, including integral open space, and including
felled areas that are awaiting restocking (replanting). The minimum area is
0.1 ha and there is no minimum height.
World heritage
sites
World Heritage Sites are internationally important cultural and/or natural
heritage sites which have been inscribed for their “Outstanding Universal
Value”. Though no additional statutory controls result from world heritage
designation, the impact of proposed development upon the outstanding
universal value, including its authenticity and integrity of a World Heritage
Site and its setting, is a material consideration in determining planning
applications. Their assessment and designation is carried out by United
Nations Educational, Scientific and Cultural Organisation (UNESCO) based
on advice from State Parties and the relevant devolved Government.

Page 198

Part 3 – Annexes
National Planning Framework 4
160
Annex G – Acronyms
BARR Buildings at Risk Register
BECCS Bioenergy with Carbon Capture and Storage
CCS Carbon Capture and Storage
CCUS Carbon Capture Utilisation and Storage
CDR Carbon Dioxide Removal technologies
CO2 Carbon Dioxide
CoRE Community Renewable Energy
CPP Community Planning Partnership
CWB Community Wealth Building
DACCS Direct Air Capture with Carbon Storage
EIA Environmental Impact Assessment
EU European Union
GGRs Greenhouse Gas Removals
HNZ Heat Network Zones
HRA Habitats Regulations Appraisal
HS2 High Speed 2
IGTZ Industrial Green Transition Zones
IIP Infrastructure Investment Plan
kv Kilovolts
LDPs Local Development Plans
LHEES Local Heat & Energy Efficiency Strategy
LHLR Local Housing Land Requirement
LOIP Local Outcomes Improvement Plan
LPPs Local Place Plans
MATHLR Minimum All-Tenure Housing Land Requirement
MOD Ministry of Defence
NETs Negative Emissions Technologies
NPF National Planning Framework
NPF4 National Planning Framework 4
ORIC Orkney Research and Innovation Campus
ORION Opportunity for Renewable Integration with Offshore Networks
PNCP Perthshire Nature Connections Partnership
RSS Regional Spatial Strategies
SDGs Sustainable Development Goals
SEPA Scottish Environment Protection Agency
TP Travel Plan
UK United Kingdom
UN United Nations
UNESCO United Nations Educational, Scientific and Cultural Organisation

Page 199

© Crown copyright 2023
This publication is licensed under the terms of the Open Government Licence v3.0 except
where otherwise stated. To view this licence, visit nationalarchives.gov.uk/doc/open-
government-licence/version/3 or write to the Information Policy Team, The National
Archives, Kew, London TW9 4DU, or email: psi@nationalarchives.gsi.gov.uk.
Where we have identified any third party copyright information you will need to
obtain permission from the copyright holders concerned.
This publication is available at www.gov.scot
Any enquiries regarding this publication should be sent to us at
The Scottish Government
St Andrew’s House
Edinburgh
EH1 3DG
ISBN: 978-1-80525-482-9 (web only)
Published by The Scottish Government, February 2023
Produced for The Scottish Government by APS Group Scotland, 21 Tennant Street, Edinburgh EH6 5NA
PPDAS1221422 (02/23)
w w w . g o v . s c o t

Page 200

i
An Appraisal of the Conservation Areas
in Helensburgh 2008

Page 201

Here
Here our Victorian ghosts are captured
in their legacies of stone, the grace
and glamour of their dwelling places,
from a time when affluence was no sin.
Here wood is lifted from mundane plank
and turned to filigree, to stairflight,
warm and resonant, or a burnished cherub
may bare polished buttocks on a newel-post.
Here the mere stacking of stone, palewash,
staggered russet bricks and stained glass
that sieves sunshine into bright rugs of light,
all become style far beyond function.
Here perhaps the breaths of genteel words
echo in rooms we now cherish and, in attics
stolen from long-lost maids, small sighs escape
for pleasure at our newfangled reverence.
Catriona Malan 2006

Page 202

Foreword
The Conservation Areas of Argyll and Bute are very special
places. They give us firm connections with our past. They
represent huge shifts in culture, ranging as they do from clachans
and industrial villages to fine harbours and seaside resorts.
In particular, Argyll is renowned for its planned towns. Inveraray is
one of the earliest, with the other white-painted towns and villages
of Islay coming soon afterwards. Most of the larger places such as
Campbeltown, Lochgilphead and Tobermory were set out on a
rigid street plan. Helensburgh, which was founded in 1776 and
named after Lady Helen Sutherland, is perhaps the most rigid of
them all, with a grid-iron pattern of streets covering almost a
square mile.
Although our Conservation Areas are gems that we want to keep
safe they are also 21st century places where we live and work. It
is essential that they do not become merely visitor destinations
and romantic subjects for calendar pictures. It is not only their
appearance that we must safeguard but also their character. So,
every effort must be made to encourage our historic towns,
seaside resorts and fishing harbours to retain their commercial
viability, protecting the tranquillity of our leafy residential areas.
Argyll and Bute Council is committed to preserving and enhancing
the Conservation Areas in its care. It is the duty of every local
authority to review its Conservation Areas from time to time. It is
also best practice to have an appraisal document in place that
provides a sound understanding of a designated area’s special
historic and architectural character and appearance. We are
working on a series of new Conservation Area Appraisals that will
provide a firm basis for decision-making and help us plan for the
future of our historic places, as well as set the scene for active
Conservation Area management.
The unique feature of the way we are developing the new
Conservation Area Appraisals is that local communities take a
central role in producing the appraisal document. I am delighted
that Helensburgh Community Council and other Helensburgh
groups have responded to the challenge of creating this, the first
of the new appraisals. It is a piece of work of extremely high
quality.
My sincere thanks go to Helensburgh Community Council and in
particular to Kathleen Siddle for bringing so many talents together
in the Helensburgh Conservation Areas Group, to the Group for
persevering to bring this exemplary work to fruition and to the
people of Helensburgh for contributing to the document and
actively getting involved in its production. This is Helensburgh's
own Conservation Area Appraisal and it is also Argyll and Bute
Council’s adopted supplementary planning guidance. I am sure
that it will prove to be invaluable to the local authority and an
inspiration to other communities, both in Argyll and Bute and
elsewhere.
Robert Macintyre, Depute Leader Argyll and Bute Council,
Spokesperson for Economy, Environment and Rural Affairs
May 2008 
i

Page 203

Lady Helen Sutherland
Sir James Colquhoun decided to name the town in
honour of his wife, Lady Helen Sutherland, initially re-
ferring to it as ‘My Lady Helen’s Burgh’.
The name Helensburgh first appears in the parish reg-
isters from 1785 and it was apparently in common us-
age shortly after Lady Helen’s death in 1791.
Portrait appearing in a book dated 1869
(artist unknown)
Argyll and Bute Library Service
ii

Page 204

Acknowledgements
Warmest thanks go to everyone who helped make this Appraisal
of the Helensburgh Conservation Areas a reality. Firstly, we are
hugely indebted to the core Helensburgh Conservation Areas
Group (HCAG) who did the necessary and enormous amount of
research and subsequent writing; Alison Graham and Maggie
Sheen from the Helensburgh Study Group, Sandy Kerr from the
Helensburgh Heritage Trust and the Tree Conservation Trust and
David Sinclair from the Helensburgh Community Council.
HCAG understands that this may be the first time a community
group has been charged by a local authority to produce an
Appraisal of a Conservation Area. Sincere thanks are due to
Jenny Carlile, the Conservation and Design Officer for Argyll and
Bute Council, who initiated the setting up of this unique
community project and kindly, and most tactfully, supported our
endeavours.
Thanks also to Pat McCann and Michael Davis of the
Helensburgh Public Library: Pat for his help with the library
display and Michael for his understanding and caring assistance
each time a HCAG member needed it.
In helping to illustrate this document, HCAG has been blessed
with the enthusiastic and able assistance of other Helensburgh
groups, particularly:
¾Helensburgh Photographic Club, most especially Jim
Shimmins, HPC Secretary, who has given of his time and
expertise so positively and courteously
¾Helensburgh and District Art Club
¾Helensburgh Writers Group
¾Lomond Primary School. 
Very many thanks go to all of them for their most valuable
contributions which helped to bring our Conservation Appraisal
document to life.
Lastly, our very grateful thanks go to all the many people who
made helpful comments on the Draft Document, enabling us to
create this final Appraisal.
Kathleen Siddle
Chair HCAG
and
Secretary, Helensburgh Community Council 
iii

Page 205

Helensburgh’s two Conservation Areas
The first Conservation Area which was designated in 1971 surrounds The Hill House.
The second Conservation Area, designated in 1994, covers an extensive part of the town’s residential area but excluded the town centre.
Both have been awarded “outstanding status” by Historic Scotland.
iv

Page 206

Contents
Page
Poem Here      Inside front cover
Foreword  i
Acknowledgements iii
Contents v
List of Illustrations vii
Introduction
1.1 Location and Function of Helensburgh 1
1.2 Designation and Planning context  1
1.3 Purpose of the Appraisal 2
1.4 The Appraisal process 2
Special architectural and historical interest  - What makes
Helensburgh special
2.1 Introduction 7
2.2 A place of paradox: an identity forged by chance 7
2.3 Special historic interest 8
2.4 Special architectural interest 9
2.5 The distinctive character 10
2.6 Design features and aesthetics 12
Helensburgh’s historic development 1776 – 1915
3.1 Introduction 15
3.2 Origins of the burgh 1776 – 1802 15
3.3 Causes of development and growth 16
3.4 The main phases of residential development 1803 – 1915 16
Development of Helensburgh’s  townscape and built environment
4.1 Introduction 25
4.2 The topography of the site and its relationship to the 
street layout 25
4.3 Property and plot size, building density, distribution 
and orientation 26
4.4 Types of residential property 29
4.5 Architectural development  from 1880 to the present 30
4.6 Building materials – walls and roofs 34
Page
Streetscape, gardens and public spaces
5.1 Street trees 35
5.2 Plot boundaries and private gardens  40
5.3 Parks 43
5.4 The significance of Helensburgh's historic designed landscape 44
5.5 Traffic flow 46
Elements that detract from the overall character
and appearance of the Conservation Areas
6.1 Introduction 47
6.2 Schedule of detracting elements 47
Managing change
7.1 Introduction 49
7.2 Cumulative effect of piecemeal change 49
7.3 Current development issues and the design of new-build 50
7.4 Maintenance of public and private property 50
7.5 Management of the public realm 52
7.6 Monitoring change 53
7.7 Other actions to be considered 54
Boundary reviews of the two Conservation Areas
8.1 Introduction 55
8.2 Boundary Issues 55
Conclusion 57
References  and Bibliography 59
Appendices
A. Listed buildings in the Conservation Areas 61
B. Tree Preservation Orders in the Conservation Areas 65
C. The Planning Context 66
D. Analysis of the Questionnaire responses 70
E Garden trees and their contribution to the streetscape 74
F. Possible boundary changes at Review stage 77
G. Ideas Generated by Consultation for Future Action 78
v

Page 207

© Crown copyright.  All Right Reserved. License number 1000023368, 2007.
vi

Page 208

List of Illustrations
Lady Helen Sutherland
Helensburgh’s two Conservation Areas
Aerial Photo: Helensburgh Conservation Areas
Helensburgh in its setting
Some of the members of the Helensburgh
Conservation Areas Group at work
Exhibition in the Victoria Halls
Four images of the Hill House contributed as part
of local community involvement
Exuberant architectural detail
The arcadian character of Upper Helensburgh
The Hill House and houses built by architects
William Leiper and A.N. Paterson
A place of distinctive character and architectural interest
Urban / rural duality of East-West streets
Map: The “Town of Maligs” from a survey of
Luss Estates by Charles Ross of Greenlaw, 1774
Map: Design for the extension of Helensburgh by
Peter Fleming 1803
Map: First Edition Ordnance Survey map
Map: 1880 (Anon.)
Maps: Second Edition Ordnance Survey map
Autumn Colours (1)
The Topography of the site
Page Page
ii Maps: Extracts from the First Edition Ordnance survey map 
iv showing layouts of houses and gardens within feus 27
vi Types of residential property 28
viii The Hill House 30
The old and the new 33
3 Autumn foliage in Argyle Street and Queen Street 35
4 Cherry trees in the spring in Lower Colquhoun Street 37
5
6
8
Cherry blossom in West Argyle Street
Autumn colours (2)
Walls, hedges, gates and gate-piers
Garden settings
38
39
40
41
9 Hermitage Park 43
11 Street and garden trees 45
13 Cherry blossom 48
The recently-repaired Victoria Halls 51
14 The public realm - signage 53
Houses by A.N. Paterson outside the Conservation Areas 54
17 Mansion to East of Sinclair Street 56
18 Cherry Blossom 58
20 Garden trees and their contribution to the streetscape 74
22 Acknowledgements: front cover illustrations   80
23 Street map of Helensburgh and second edition
24 Ordnance Survey Map Insert 
vii

Page 209

Helensburgh in its setting
Views South over the Clyde Estuary
Helensburgh from the waterfront View out to the hills
Top left & bottom left  Jenny Carlile.  Others:  Jim Shimmins
viii

Page 210

Introduction
1.1 Location and Function of Helensburgh and its 
Conservation Areas
Helensburgh lies some 25 miles to the north west of Glasgow.
The town’s situation, south facing over the Clyde estuary on
gently sloping ground and sheltered by the surrounding hills, is
extraordinarily benign. Contrary to original intentions,
Helensburgh never became a manufacturing town so it was saved
from the problems of post-industrial decay experienced elsewhere
on the Clyde. It was, and still is, both a place to visit and a
beautiful place in which to live.
The main historic route into Helensburgh was the Dumbarton to
Portincaple coaching route which runs along the shore and in the
town centre becomes East and West Clyde Streets. The
commuter railway line from Glasgow to Helensburgh also follows
the shore-line and terminates in the town centre at Helensburgh
Central Station.
The two Conservation Areas are parts of a residential suburb
reached by various roads running from south to north up the hill
from the town centre. Sinclair Street is the principal of these north-
south streets forming the “spine” of the town and linking
Helensburgh with the A82 trunk road. Coming into town from this
direction the motorist drives directly down from the open
countryside, into the grid of walled and hedge-lined streets that
form the basic structure for the two Conservation Areas.
The main axis of Helensburgh’s historic residential developments
is Colquhoun Street, one block to the west of Sinclair Street. This
runs from Colquhoun Square at the retailing heart of the town
centre up to the Hill House in the north, but is bisected by the
West Highland Railway. This line meanders through the Upper
Helensburgh Conservation Area, with a station on Sinclair Street.
To the east of Sinclair Street, and separated from it by Hermitage
Park and the Victoria Halls, is the gently curving Charlotte Street.
Adjoining the town centre, the Conservation Areas are traditionally
where any suburb of a town centre would be located. The
difference is in their functional relationship. The wealth of the
original  residents living in what are now the Conservation Areas
was created and acquired elsewhere, traditionally in Glasgow and
in trading across the Empire. What are now the Conservation
Areas served primarily as a suburb of Glasgow, not Helensburgh.
Historically, the Town Centre has been a service centre both to
the residents working outwith the town and visitors to the town.
The development of properties within the Conservation Areas is
therefore a signature of the fortunes painted on a much wider
global context. This has given Helensburgh an underlying
cosmopolitan thread to its culture. Helensburgh thus became a
precious place.
1.2 Designation and Planning Context
The first Conservation Area to be declared in Helensburgh was
that surrounding The Hill House in 1971. A second, much larger
area was declared in 1994. Both Areas have been accorded
“outstanding” status by Historic Scotland. This Appraisal deals
with both areas.
Certain activities that would normally come under planning control
are given exemption under Article 3 of the Town and Country
Planning (General Permitted Development) (Scotland) Order 1992
(Scottish Executive 1992b). Article 4 of that Order enables local
authorities to request the Scottish Government to make a
direction that certain categories of exemption will not apply within
a specified area. Frequently, such application is made in respect
of Conservation Areas. An Article 4 Direction Order is in place
within The Hill House Conservation Area. 
1

Page 211

Apart from the two Conservation Area designations, other
important, legal considerations in the management of the areas
include Listed Buildings and Tree Preservation Orders (TPOs).  A
list of the former is at Appendix A. Details can be found in the
Register held in the local Public Library, on Historic Scotland’s
website. 
Whilst all trees in a Conservation Area are protected as if they
were under a TPO, some parts of the Conservation Areas are
individually protected by TPOs. A full list of the TPOs is given at
Appendix B.
The main elements of the Scottish planning context and of the
local planning context are set out in Appendix C.
At the local level, planning policies are in a period of transition as,
although the Structure Plan is approved, the Modified Finalised
Draft Local Plan for Argyll and Bute is awaiting final adoption in
the early part of 2009.
1.3 Purpose of the Appraisal
Planning Advice Note 71 Conservation Area Management
(Scottish Executive 2004) states on page 5 that Conservation
Area appraisals “analyse what makes a place special and assists
management in: defining and reviewing boundaries; developing
opportunities and priorities for enhancement; assisting policy
formulation; ensuring consistent decision making and supporting
funding bids. An Appraisal is a management tool to enable the
active management of Conservation Areas.”
The purpose of an Appraisal of a Conservation Area is to set out a
more detailed explanation of the special interest and changing
needs of the area. It is intended to be “the basis for the
development of a programme of action that is compatible with the
sensitivities of the historic area and enables local authorities to
fulfil their statutory duties to protect and enhance Conservation
Areas”. Under the proposed new planning framework, all such
documents will be supplementary planning guidance and
regarded as a “material consideration” in reaching decisions.
Conservation Area Management Plans are the next step after the
appraisal. They provide guidance through policy statements to
assist in the preservation and enhancement of the Conservation
Area. This is a direct response to the Planning Act which places a
duty on local planning authorities to formulate and publish
proposals for the preservation and enhancement of its
Conservation Areas. The Conservation Area Management Plan,
taken forward by the Council as planning authority, will shape the
long-term management strategy for Helensburgh’s historic built
environment, bringing together the various services of Argyll and
Bute Council in a corporate consensus, working together with
other agencies operating in the town, the local community and
other stakeholders.
1.4 The Appraisal Process
As noted above under Acknowledgements, this may be the first
time that a community group has been charged with producing an
Appraisal of a Conservation Area. It is therefore ground-breaking
in the way it links the professionals and experts of Argyll and Bute
Council so closely with the Helensburgh community.
The Appraisal process started back in late 2005 when Jenny
Carlile, Argyll and Bute Council’s energetic Conservation and
Design Officer came to a meeting of the Helensburgh Community
Council (HCC) to talk to the members about the very special
quality of the two Helensburgh Conservation Areas.
Subsequently, Jenny invited HCC to liaise with other groups in the
wider Helensburgh community with the purpose of undertaking an
appraisal of the Areas. This action stems directly from the
justification for policy LP ENV 14 of the draft local plan for Argyll
and Bute. (See Appendix C)
HCAG then mounted a public exhibition in the Victoria Halls of
impressions of the Conservation Areas seen through the eyes of
Helensburgh’s photographers, artists, writers and school pupils.
2

Page 212

This exhibition was organised to coincide with the publication of the
draft Appraisal document. As well as being part of the exhibition,
150 copies of this Draft Appraisal were circulated widely within
Helensburgh, including to representatives of the groups mentioned
above and further afield to Argyll and Bute Council Officials,
stakeholders and interested partners like the planners and
developers, the utility and transport companies, Historic Scotland,
the Scottish Tourist Association and the National Trust for Scotland
among others. Background working papers were also made
available.
Feedback from this whole exercise was obtained by post-it
responses at the exhibition, and from questionnaires seeking both
quantitative and qualitative information.
In addition, talks were given to the Helensburgh Photographic Club,
The Helensburgh and District Art Club and the Helensburgh Writers
Group, explaining the work of HCAG and inviting them to help
illustrate the Appraisal document by contributing their interpretation
of what the Conservation Areas mean to them. Lomond School,
Hermitage Primary School and Hermitage Academy were also
contacted and overall the response from each of these clubs, groups
and schools has been tremendous.
This part of the project involved discussing the work of HCAG with
householders in the Conservation Areas and asking permission for
their houses to be photographed or painted. Again, the response was
wonderfully positive and through this process, the profile of the
Conservation Areas, HCAG and the Appraisal continued to be raised
in Helensburgh.
Some of the members of the Helensburgh
Conservation Areas Group at  work.
Kathleen Siddle (2006) 
3

Page 213

The comments of all these groups, professionals and interested
individuals have been an invaluable source of information which
has fed this Appraisal document.  An analysis of the responses is
presented in Appendix D.
We are fortunate in Helensburgh in having a large number of ac-
tive voluntary organisations and groups. Representatives of sev-
eral of these agreed to join the newly created Helensburgh Con-
servation Areas Group (HCAG) and have proved very enthusiastic
and helpful members. They have included representatives from
the Helensburgh Community Council, the Helensburgh Study
Group, the Helensburgh Heritage Trust, the Helensburgh Tree
Conservation Trust and the Helensburgh Civic Society.
The Helensburgh Community Council and HCAG members be-
lieve that Public Consultation is a vital ingredient to the success of
this project. Several mechanisms were put in train as work pro-
gressed to create awareness and encourage involvement. 
These included:
¾letters in local newspapers
¾photographic display in the local public library
¾progress reports to local organisations
¾school visits and talks
¾contributions from creative clubs (arts, photographers and
writers)
¾residents in the Conservation Areas were contacted for per-
mission to photograph significant architecture and settings
¾advice sought from professionals with relevant expertise.
In most cases, an invitation was given to readers to contact the
Group for further details of the work of HCAG.
HCAG has also given encouragement to community groups in
Campbeltown and in Cove and Kilcreggan. We send our best
wishes to both these groups and to communities in other areas
who wish to produce their own Conservation Appraisal document.
Exhibition in the Victoria Halls
Jenny Carlile
4

Page 214

Four Images
of
The Hill House
Contributed as part of local community
involvement in the Conservation Area
Appraisal process
Sofia Perina-Miller
James Spence Carrie Morrison, aged 11, Lomond School Neil Macleod 
5

Page 215

Exuberant Architectural Detail
Jim Shimmins (2006)
6

Page 216

Special architectural and historic interest
- What makes Helensburgh special
2.1 Introduction
This chapter explains why Helensburgh and its Conservation
Areas are of importance both historically and architecturally. It
shows why they have been awarded “outstanding” status by
Historic Scotland. 
The Conservation Areas also need to be understood within the
wider context of the town. What has evolved is complex. So, later
sections in this chapter explore what gives the Conservation
Areas such a distinctive and unique character.
In addition to the guidance available from Historic Scotland, we
have consulted work on the evaluation of heritage features by two
state bodies in Australia - New South Wales Heritage Office 2001
and Government of Victoria Online.
2.2 A place of paradox: an identity forged by
chance
In Helensburgh there is a conjunction of apparent opposites
(physically, socially and economically) that has produced a place
of incomparable character that is not easily categorised.
The following features of Helensburgh need to be borne in mind
as being the context within which the Conservation Areas sit:
¾The community in Helensburgh is an independent-minded
one. While the town of 15,000 people is within the
governance of mainly rural Argyll and Bute it is also on the
periphery of Greater Glasgow.
¾While the Conservation Areas may seem to form a suburb
of Helensburgh town centre, historically they developed as
dormitory areas for Greater Glasgow.
¾Although conceived as a place of manufacture for
dispossessed farming communities on the Luss estate,
Helensburgh became, ironically, a haven for the rich
merchant and professional classes escaping the disease
and foul air of the merchant city of Glasgow at the height of
its prosperity. 
¾Laid out in the austere age of the Enlightenment, the built
environment emerged later at the tipping point to the start
of the Romantic period when fashion permitted wealthy
Victorians and Edwardians to indulge their architectural
fancies.
¾Unusually, the suburb sustained the town centre, with
upper Helensburgh residents providing the wealth gained in
the city and across the Empire to sustain the artisans and
the shopkeepers of lower Helensburgh. It became a
socially divided town.
¾Known as the “Garden City of the Clyde” in the 1930s,
Helensburgh predates the Garden City movement by half a
century.  (Sheen, M R 2007)
¾In the 20th century, more densely built housing areas were
developed on the edges of the town. This has resulted in
the Conservation Areas becoming more central, but still
with clear views to hills and water and has created a
striking disparity between the arcadian character of the
Conservation Areas and the more dense form of the newer
housing areas. 
7

Page 217

The arcadian character of Upper Helensburgh
Jenny Carlile (2006)
2.3  Special historic interest
The development of Upper Helensburgh spans the period from the
beginning of the 19th century to the early 20th century. The
Conservation Areas reflect the changing styles and fashions of house
and garden design over this period. They portray a past way of life,
one that was experienced by the new, extremely wealthy middle
class arising from the burgeoning world-wide trade that was centred
on nearby Glasgow.
Helensburgh’s earliest road pattern was set out on a grid, with
feus allocated as rectangular (usually quarter-acre) plots. By the
time much building had commenced changing fashion had led
to an extraordinary conjunction of architectural styles, all set
within this rigid grid.  The urban-rural duality created by the
large urban villas in extensive estate-like gardens creates much
interest.
Helensburgh is also significant in the context of the history of urban
planning. Unlike other settlements, the wide-open streets and
generous plots for large gardens offered a ‘breathing space’ not
known in modern towns (Battrum, 1865). By 1865, Helensburgh was
two thirds developed – well before the Garden City movement took
off in the early twentieth century.
The number of important people connected with Helensburgh,
include technological inventors, famous artists, architects, poets and
industry leaders and merchants. Helensburgh has been an important
place of innovation, culture and the arts.
Notable people associated with Helensburgh and district  include:
Inventors Henry Bell and John Logie Baird
Scientists Lord Kelvin (William Thomson) 
Sir William Ramsay, Sir Joseph & Sir
William Hooker and Sir James Frazer
Writers & Poets A.J. Cronin, Neil Munro & WH Auden
Actors & Entertainers Jack Buchanan & Jimmy Logan
Architects & Artists  Charles Rennie Mackintosh
A.N. Paterson, Burnet & Leiper
8

Page 218

In particular, the work of the Glasgow Boys and Girls - especially
Charles Rennie Mackintosh and Margaret MacDonald Mackintosh -
has put upper Helensburgh on the world scene as a place of great
artistic and stylistic achievement that influenced generations of 20th
century artists and designers.
2.4 Special Architectural Interest
“Upper Helensburgh has a unique collection of turn-of-the-
century villas, including one of the great houses of 20th century
architecture” (Walker, F. 2000).
The Helensburgh Conservation Areas are interesting
architecturally because they demonstrate the evolution of
domestic architecture for the increasingly wealthy middle class
during the middle and latter half of the 19th century and early
20th century.
The lower slopes of Helensburgh were developed first, with
successive streets added to the grid pattern, or occasionally
sweeping off into a more fashionable crescent or a wide sweep to
accommodate the coming railway, up the side of the estuary as time
progressed. This pattern of development has resulted in a
progression of architectural styles - from early Victorian to Edwardian
- moving up the hill. 
Unlike the earlier, more strictly planned towns such as Inveraray or
Port Charlotte (Islay), there is an eclectic mix of styles here.
Architectural references range from the Greek, Italian, French and
Gothic to the Scottish Baronial and the English “half-timbered” or
“Shavian” look.
Battrum notes in 1865 that even the earlier villas of the “cottage
order” offer “every variety of design and size of construction, though
of late years taste has run more in erection of mansions of a large
and handsome appearance”. While the former would have been
holiday homes for the most part, these latter would  have been more
permanent residences made possible by the new railway connection
to Glasgow.
Top:  The Hill House by Charles Rennie Mackintosh (1902)
Middle:  Longcroft by A.N. Paterson (1901)
Lower:  House by William Leiper (1871)
Jim Shimmins (2006) 
9

Page 219

The extraordinary mixture of styles continued during the whole
period including decorative Edwardian additions to Victorian
Houses of an earlier and plainer design. Libraries and billiard
rooms were fashionable additions of this later period.
Charles Rennie Mackintosh and Baillie Scott, two significant
architects of world-wide standing designed houses within the
Conservation Areas. A.N. Paterson and William Leiper, local
architects with national reputations built and extended numerous
houses here.
(For a more detailed analysis of buildings and their architects,
grouped according to the main development phases see Chapter
4 Development of the townscape and built environment, in
particular sections 4.3 - 4.5, page 26)
2.5 The Distinctive Character
A significant part of the character of the Conservation Areas
lies in the spatial arrangement, and in the extraordinary
contrast and variety, which is harmonised within a unifying
framework of repeating patterns in the streetscape. It is in the
coming together and in the resolution of opposing
characteristics rather than in some singular or outstanding
element that character and ‘sense of place’ have been forged.
The overarching pattern: Informal elements within a formal
structure
The most striking aspects of Helensburgh are the grid pattern of
its layout, the south-facing residences set in spacious grounds
and the broad tree-lined streets running north-south and east-
west. This formality of structure – the linearity of the street plan
and the imposing design of the later mansions is tempered by
many organic elements.
Far from being anonymous, each street has its own character, and
each block its own unique conjunction of distinctive residences set
in large grounds. There is thus a repeating pattern that never (in
the detail) exactly replicates itself and offers constant variety. In
travelling from one point to another, the route need never be the
same. 
With only minimal restrictions at the time of building, both
architecture and streetscape have made for individual exuberance
that is, nevertheless, constrained by the overarching grid
structure. The grid itself therefore has acquired the imperfections
of those things organic which lend both character, identity, and
appeal.
The tranquillity of much of the two Conservation Areas is an
essential part of their character and enables enjoyment of the
attractive and varied streetscapes by all who choose to wander
round.
Streetscape: The Urban – Country Park
The grid pattern and regimented street tree planting are very
urban in character. Yet where one might anticipate a monument,
grand building or statue, the vistas looking both east and west
lead surprisingly to the hills framed by avenues of trees and
foliage and the grass verges, which give a romantic, country park
feel.
Cherry trees predominate in the streets, providing a festive
appearance in the spring that is praised by  Japanese visitors and
bright leaf colour in the darker days of autumn.
Repeating patterns that unify and lend a sense of harmony and
character are the low sandstone walls and hedges (often privet
mixed with wild species like hawthorn) on the northern boundaries
of East-West streets offering glimpses into leafy drives
10

Page 220

up to mansions. In contrast the high stone-walls of the southern
boundary of East-West streets when viewed from the road, often
have a distinctly urban mews character with their outbuildings and
tradesmen’s entrances.
The species planted and the designs created for gardens are not
necessarily spectacular (other than the garden at the Hill House
which has recently been reinstated to its original design) but for
the most part they generally reflect 19th and 20th century fashion.
The Feus: Urban Mansion – Country Park Estate
While the style of the houses varies from plain Victorian to
decorative Edwardian, most are essentially quite suburban (apart
from the earlier cottage-style residences), yet the contrasting
spaciousness of the setting is evocative of a country estate.
The placing of the villa or mansion within its rectangular plot
generally seeks to create a country house atmosphere, with long
and winding tree-lined driveways leading to imposing entrance
porches.
Garden fronts and lawns look south, offering sea views framed by
trees and shrubs. Coach houses, gardeners' cottages, laundries
and other subsidiary buildings are tucked away round the back of
the plot. This results in a distinctive character to the streets that
run east-west. 
On the north side of these streets, mature trees and shrubs offer
only occasional glimpses of buildings that are guarded by
imposing gates and gate piers, while on the south side of these
streets there are the high stone walls of ancillary domestic offices
and kitchen gardens.
A place of distinctive character and architectural interest
Decorative Edwardian
additions to a plainer
Victorian House
A long, curving
drive through  
Gardens planted
for pleasure
Queen Street, looking
west, with leafy drive-
ways leading up to
south-facing mansions
on one side but with a
harder, more urban
character on the
other.
Top: David Sinclair 2007.  Others: David Sheen 2006 
11

Page 221

Some mansions placed on the corners of the grid arrangement
take advantage of the extra length of drive made possible by a
main gate set in the side (north-south) street.
Helensburgh’s uniqueness and its vulnerability
Helensburgh has acquired a distinctive character and style of its
own. Although the grid within which the houses are placed is rigid,
the style of the houses themselves was never planned.
Nevertheless, what has emerged, the patterns within patterns,
embodies a design logic that has proved relatively robust. The
area remains remarkably intact.
There are now many pressures, both social and economic,
acting upon the area. Mansions have been divided into
apartments and new houses built in extensive gardens.
Unlike some historic built environments there is ‘space’
enabling the area to absorb, at least to some extent, the
expanding needs of a modern age. How far adaptation to
modern living can be accommodated without destroying the
historic features and distinctive character is fundamental to
the preservation of its distinctive and very special character
and appearance. 
This Appraisal will serve to inform decision making in the future.
Furthermore, the  Management Plan, to be prepared by the
Council, will bring together everyone involved in managing,
maintaining and changing the character and appearance of the
Conservation Areas and help us to preserve - and enhance - this
very special place.
2.6 Design features and aesthetics
The Conservation Areas are noted for their aesthetic appeal.
Indeed it is the landscape architecture (the geometric structure of
the grid contrasted with the freedom of the infill) rather than any
individual villa that gives rise to the aesthetic appeal and to the
essence of place. In assessing these, we have been influenced by
the work of Christopher Alexander (Alexander, C. 1979).
The notable degree of unity in the landscape architecture of the
Helensburgh Conservation Areas comes from the dominance of
some features, balance in others and in repetitions of contrasting
elements.
Unity in the Conservation Areas comes from the:
¾tight, but not immutable grid structure
¾repetition of the tree-lined streetscape
¾positioning of houses to the north side of properties and
facing south
¾use of sandstone (grey and red) and slated roofs
¾high stone walls on the northern boundary of properties
¾hedges and low stone walls along other boundaries
Contrast arises from the:
¾garden settings of urban villas
¾eclectic style of villas and mansions
¾later additions in contrasting architectural styles
¾later make-overs introducing new materials
¾influences of the Arts and Crafts movement
¾urban/rural contrast on E-W streets, the country park feel
looking north and the urban aspect looking south.
Dominance comes from:
¾linearity
¾vertical line of the built environment, including building
height and fenestration.
Balance is achieved by:
¾proportions and scale of buildings
¾the ratio of house to large garden
12

Page 222

Urban / rural duality of East-West Streets
[Note the urban nature on the south side of the street and the rural character of the north]
Looking East
Looking West  David Sheen (2006) 
13

Page 223

The ‘Town of Maligs’ from a survey of Luss Estates by Charles Ross of Greenlaw,
Map held in Helensburgh Public Library
14

Page 224

Helensburgh’s historic development 1776-1915
3.1 Introduction
Helensburgh’s outstanding historic townscape was developed as
a planned new burgh on a superb site on the north shore of the
Clyde estuary. It evolved through successive phases of planning
and development from the start of the last quarter of the 18th
century, throughout the whole of the 19th century up until the
outbreak of the First World War. Despite the serious economic
problems that subsequently arose in Glasgow and around the
Clyde Estuary, some further development of a similar, but more
restrained character, continued in the inter-war period and two
notable houses, “Ballytrim” and Green Park (both now listed)
were built in the 20th century.
The two designated Conservation Areas cover only the suburban
part of town that developed from around 1840 onwards. In order
to fully understand the development of these Conservation Areas
it is important to consider the historical development of the town
as a whole. Furthermore, the review of the Conservation Areas
will  require an appreciation of the historic context in which they
sit and we need to assess whether current designations are
sufficient for the protection of Helensburgh’s built heritage and
streetscape. Hence, this section and the working paper on which
it is based cover the historic development of the burgh as a whole
from 1776 onward.
3.2 Origins of the burgh 1776-1802
The development of the burgh was initiated around 1776 by Sir
James Colquhoun (26th Baronet of Luss and 1st of GB) and
continued by his direct descendents. The land, sited on the north
shore of the Clyde estuary, had previously been owned by the
Clan MacAulay of Ardencaple Castle to the west (now
demolished), whose family roots and ownership of land are
documented in historical records going back to the 13th century.
They had sold it in 1705 to Sir John Schaw of Greenock, whose
daughter in turn sold it to Sir James Colquhoun in 1752.
Feus for building purposes were first advertised in 1776 and a
particular aim was to encourage cottage industries, primarily
different forms of textile manufacture. It is thought this was
intended to provide employment for crofters displaced by the
introduction of sheep farming, known to have been in progress on
the Colquhoun estates from at least 1769. The income from the
feus granted would also contribute to the annual income of the
estate. The introduction of sheep and the establishment of new
towns and villages were typical actions undertaken by estate
owners of the era in order to promote economic improvement.
In the event, early development was slow, with apparently only 17
houses on plots feued by 1794. The attempts to introduce textile
production failed in contrast to the growth of textile industries
elsewhere in the Clyde area. The main occupations in practice
are thought to have been subsistence farming, fishing and related
activities such as milling, malting, blacksmithing, cooperage (for
herring barrels) and distilling. Nevertheless, the intent to continue
with planned development remained.
Sir James Colquhoun decided to name the town in honour of his
wife, Lady Helen Sutherland, initially referring to it as ‘My Lady
Helen’s Burgh’. The name Helensburgh first appears in the parish
registers from 1785 and it was apparently in common usage
shortly after Lady Helen’s death in 1791. 
15

Page 225

The 1791-1799 Statistical Account of Scotland (Sinclair, Sir J.
1799. ed.) records for the Parish of Row, presumably referring to
Helensburgh, that there is “…one village in the parish, lately built,
which contains about one hundred souls”. This was sufficient to
justify a petition by Sir James for the Burgh Charter, granted by
King George III in 1802.
3.3 Drivers of development and growth
The development of the Burgh occurred in successive phases
through a combination of formal planning, controls and chance.
The main drivers of demand for villas and other accommodation in
Helensburgh were the fashion for sea water cures in the early 19th
century and the demand for summer residences in an attractive,
healthy environment away from Glasgow.
The successive phases of economic development of Glasgow and
the Clyde Estuary throughout the 19th century, the consequent
growth of the business and professional classes, and the
developments in transport made Helensburgh increasingly
accessible from further afield:
1809 Coaching services had commenced by this date and
substantial coaching inns were built to provide
accommodation to travellers.
1812  PS Comet, the first commercial steamship in
Europe, started service between Glasgow and Port
Glasgow; shortly afterwards to Helensburgh also.
The Comet was designed and commissioned by
Henry Bell, innovator, proprietor of the Baths Inn and
first provost of Helensburgh.
1816 Pier of basic construction put up on the site of the
present pier.
1834 Grant of ground for the improvement of the pier.
1841 Glasgow – Greenock railway opened leading to rail/
steamer services to Helensburgh
1858  Glasgow – Helensburgh railway line opened.
1882 Craigendoran steamer terminal opened.
1894 West Highland Railway opened.
The main population growth (referring to permanent residents as
opposed to the large number of summer residents and visitors)
spanned 50 years from 1831-1881. During this period, the
population rose from 1,170 to 7,893 permanent residents. The
start of the fastest period of growth coincided with the building and
opening of the Glasgow-Helensburgh railway in the 1850s. The
expansion then began to tail off, with a population of 8,529
recorded in the census of 1911.
3.4 The main phases of residential development
1803 - 1839
The 1803 Design for the Extension of the Town of Helensburgh,
(Fleming, P. 1803) surveyed and planned by Peter Fleming, a
young Glasgow surveyor (born 1783 and emigrated to Canada in
the 1820s), shows a substantial scheme for the development of a
planned town and also existing properties on the shore road
(Clyde Street). This Helensburgh scheme predates Fleming’s map
and planning scheme for Glasgow City Council, commissioned in
1806, published in 1807. 
The smaller properties with close packed buildings are shown
close to the current town centre; the four larger properties with
detached buildings are further out, round the East Bay.
Although the area proposed for development was an attractive
estuary site, access was not particularly good, even by the
standards of the time, Glasgow was at least six hours distant by
16

Page 226

Design for the extension of Helensburgh by Peter Fleming – 1803 
Map held in Helensburgh Public Library
Detail showing feus 
17

Page 227

© Crown copyright.  All Right Reserved.  Licence number  1000023368 18

Page 228

horse drawn transport and sea access was by sailing boat in a
tidal estuary with a shallow shoreline.
The area of ground planned out measured approximately 1.4
miles (2.25 km) along the shoreline and extended nearly one third
of a mile inland (0.5 km). The area covered by the plan, with
reference to existing streets, is:
West One block beyond Sutherland St.
North Montrose St
East Six blocks East of Adelaide St, at which there
was a change of angle of the crossways streets
related to the curving shoreline
On the west side, the plan extends considerably beyond the 1802
burgh boundary which followed the line of Glennan Burn.
The planning principles applied were those of a grid layout with
broad streets. The square-ish blocks of the main grid were divided
up into feuing lots – 16 per block of about 2 acres. From later
maps, it appears that the original block layout was followed quite
closely in the early phase of development, but the plots feued
were often larger than the basic units, and the shapes frequently
do not follow the plot boundaries as drawn.
The street width is shown as a uniform 60 ft between the plot
boundaries around the blocks and this was actually followed in
the street layout up to, and including, Montrose Street. The 60ft
includes any pavements or verges made then or at a later date.
Orderly and spacious town plans were common in Scotland in the
late 18th and early 19th centuries following James Craig’s layout of
1768 for Edinburgh’s New Town.
According to a directory of 1834, there were 217 householders in
the area of which 126 offered lodgings from 1 to 14 rooms.
Publications from 1830 – 1842 refer to a row of whitewashed
houses or cottages fronting the beach with villas behind. This is
supported by a map in the Atlas of Scotland, Dunbartonshire
(Thompson, J. 1832). The properties were said to have been built
solely or chiefly as sea-bathing quarters, the summer homes of
Glasgow’s merchant class.
1840-1859
This period may be regarded as the first phase of Helensburgh’s
Victorian villa developments. Development in the first half of this
phase preceded the direct rail connection from Glasgow but there
was a rail/steamer service via Greenock that took around 1½
hours. The rapid population growth from 1851 to 1861 indicates
that the construction and opening of the Glasgow – Helensburgh
railway in 1858 had a marked effect on Helensburgh’s popularity
as a place to live among the business and professional classes.
The parts of the grid that were laid out and probably largely
populated at this time extended up as far as the original burgh
boundary at Millig Street. There were some other properties
constructed further out along Sinclair Street / Luss Road. By the
time of the first Ordnance Survey map (surveyed 1860, published
1865), villas had already been built on sites between Millig Street
and Queen Street.
The following description was published in 1846 (Hawkstone-
Hutton and Gorrie, 1846) 
“Helensburgh….has rapidly grown into importance as a
fashionable watering-place, and a favourite resort of families of
distinction during the summer months. The town is regularly built,
and consists partly of one principal street, extending along the
shore for more than a mile, and intersected at right angles by
numerous other well-formed streets. The houses are of
handsome appearance, and interspersed with pleasing villas
having grounds tastefully laid out; the surrounding scenery, also,
is agreeably diversified…. There are two commodious hotels 
19

Page 229

Map of 1880 (Anon. 1880) held in Helensburgh Library
Showing the curved roads introduced by Spence’s proposals of 1857. Even by 1880, some of these remained on paper only, and not all
were implemented.
20

Page 230

with several inns, and also numerous lodging houses for the
accommodation of visitors. On the shore, at the east end of the
town, is a spacious and well-arranged building (ie the Baths Inn,
now Queen’s Court, East Clyde Street), containing hot and cold
baths, with every requisite appendage”.
While the lines of the early 19th century grid and similar block
sizes were continued up the hill, the street layout and block sizes
start to depart from the original pattern in the developments north
of Argyle Street. The main features are the dog-leg in John Street,
the break in Stafford Street and the five rectangular blocks of
about 3½ – 4½ acres in the vicinity of the Glennan Burn and John
Street.
The distance between plot boundaries across Stafford, Millig and
Upper John Streets is significantly less than the standard 60ft
width of the main grid. 
The major variation occurred to the east of what is now Sinclair
Street where a large area was feued to form the Hermitage Estate
and other large blocks to the east of Sinclair Street including
Lansdowne Park (demolished about 2004, redevelopment
pending) and Chapel Acre (demolished and site redeveloped).
The first Ordnance Survey Map of 1860 shows that these blocks
contained very few buildings and the ground appears to have
been mostly private parkland and woodland.
In 1857 William Spence (1806-1883), an architect practising in the
west of Scotland and Ulster, was commissioned to draw up a
further proposed feuing plan (Spence, W. 1857). He had
previously designed Rhu Parish Church (1847) and had feued
sites for 16 houses along West Montrose Street, on one of which
he built his own home, Ardlui House (demolished). The Spence
design introduced curves and crescents into the Helensburgh
street plan, notably Sutherland Crescent to the west and King’s
Crescent lower down to the east, below the line of a former beach
cliff.
1860-1879
The majority of plots developed to the west, east and north (up to
the West Highland Railway) in the 1860s and 1870s are
estimated to be half, one or 1½ acres in area. The grid of two acre
square-ish blocks was continued up the hill north of Queen Street
between Colquhoun Street and Sinclair Street but on either side,
it gave way to rectangular blocks, the long axes of which run
across the slope. This is thought to be part of the Spence design.
The plots continued to be feued for the purpose of building
detached dwellings and their associated outbuildings. They
generally ran between two parallel straight streets or between the
inner and outer curves of the crescents. (Osborne, B.D. C.1912).
The main villa developments of this phase took place north of
Queen Street, in the Sutherland Crescent area to the west and on
the east side of Alma Crescent (now Charlotte Street). The
architect William Spence is said to have feued a substantial block
of building land to the north of Abercromby Street in 1875
(Osborne, B.D. C.1912).
Development was started on part of the Hermitage Estate, in
particular the original Hermitage School (opened 1880,
demolished 1977), Prince Albert Terrace on Victoria Road and the
Victoria Halls (1887). The remaining grounds are now Hermitage
Park. 
21

Page 231

© Crown copyright.  All Right Reserved.  License number 1000023368 (2007)
Note: for more detail see insert 22

Page 232

It appears that the commercial centre of the town was also substan-
tially redeveloped during this period and up to World War 1 (WW1)
(1914-18). A number of gap sites were filled with later tenements, of-
ten on an urban scale (in the Glasgow style), with a building stone
that  contrasted with earlier neighbours.
1880-1915
The block dimensions of the 1803 grid design were continued be-
tween Sinclair Street and Colquhoun Street up to West Dhuhill Drive,
the last blocks to the north being determined by the curve of Sinclair
Street/Luss Road and the earlier properties of Dhuhill (mid 19th cen-
tury) and Dhuhill House (1847). Colquhoun Street, the main axis of
the whole development, was continued right up to the burgh’s north-
ern edge at what is now the Blackhill Plantation.
The further development of the north side of Rossdhu Drive took off
in the early 1880s, although the first plots were subsequently reduced
in size by the cutting of the West Highland Railway. It appears that
the typical large, pale sandstone Victorian villas, immediately on the
north side of the West Highland Railway, were the last of their type to
be built in the burgh (c.1883).
From 1880 onward, the main development was of individually com-
missioned large villas on large plots north of the West Highland Rail-
way, with other plots developed to the east and west plus some va-
cant plots on existing streets. So, at a time when population growth
was slowing, the villa developments were particularly low density and
high prestige. There was a marked change of taste and fashion in
architecture and interior design with the uptake of the ideas and prac-
tices of the English Arts and Crafts movement and a return to earlier
Scottish roots with the Scottish Renaissance styles.
Autumn colours (1)
Jim Shimmins (2006) 
23

Page 233

The Topography of the Site
Houses on raised beach (Kings Crescent)
Milligs Burn running through Hermitage Park
Jim Shimmins (2006)
24

Page 234

Development of Helensburgh’s townscape and built environment
4.1 Introduction
This section sets out to summarise the development of the built
environment from 1803 to the present day. However, this forms
only part of the picture. The contribution of the planting of street
trees in the grass verges, the broad grass verges themselves, the
characteristics of plot boundaries, private garden grounds and
public green spaces are major aspects of the townscape and
crucial elements of its character. These topics are covered in
Section 5.
Formal planning and controls were exerted on the built
environment by Sir James Colquhoun of Luss (26th Baronet of
Luss and 1st of GB) and his successors as landowner and feudal
superior.  After the granting of the Burgh Charter by George III in
1802 the administration of the town became the responsibility of
the Town Council, although the Colquhoun family remained
involved.  As the Burgh expanded, the Colquhoun family was
asked from time to time to grant land for various development
purposes.  The Colquhouns also built bridges at their own
expense in order to facilitate expansion of the town.
4.2 The topography of the site and its relationship
to the street lay-out
Helensburgh’s street grid has been superimposed on a landform
of gently sloping beach terraces punctuated by steeper slopes,
the remnants of raised beach cliffs. The elevation change
between the shore and the top of Helensburgh at The Hill House
is 300ft.
Quoting Roberts 2002:
“As the ice melted and ran out into the seas, the sea level rose.
The land, relieved of its burden of ice, was uplifted. This
happened intermittently causing a series of changes in the
relative levels of land and sea. The result is a terrace of beach
deposit, inland of the present shoreline, and raised beach cliffs.
Lower Helensburgh from King Street seawards and the
Ardencaple estate are on the former beach terrace…….
Walking up Sinclair Street or Colquhoun Street you will come to a
steep bit between King Street and Argyle Street, which represents
the cliff, at Queen Street is another steep bit and just above the
Highland railway is another.”
The Glennan and Milligs Burns have cut into this post-glacial
landform, particularly at the steeper sections. These burns are not
a major feature of the townscape as they largely run through
private property or between plots, except for Hermitage Park
which has a section of the Milligs Burn. They may in places be
seen from street bridges and the trees on their steep banks form
a green corridor. In the lower part of the town, the burns are
largely built over. There are a number of other, much smaller
watercourses, largely out of public view.
One axis of the original grid runs approximately north north-east
up the slope from the estuary shore while the other lies across the
slope, following the natural contours and more or less parallel to
the shore. Some lateral streets such as Millig Street are built on
beach terraces; in other cases there has probably been some infill
to provide the fairly level roads. Some of the irregularities in the
street grid are due to the underlying landform e.g. the steep slope
above Kings Crescent. 
25

Page 235

The result of the use of a grid lay-out on south facing, sloping
ground is the highly effective exploitation of the site to provide
exceptional vistas both from many properties (where not now
obscured by trees) and down many of the streets sloping towards
the Clyde. A number of the lateral streets provide fine views of
farmland and heather clad hills in the surrounding area.
The shoreline (outside the current Conservation Areas) has been
extensively modified starting with the building of the Dumbarton to
Portincaple road in the 18th century. Subsequent development has
included the construction of the Helensburgh and Craigendoran
piers, the esplanades on the East and West Bays, reclaimed land
around Helensburgh pier, retaining walls, groins and the outflows
of storm drains on the foreshore.
4.3 Property and plot size, building density,
distribution and orientation
According to Battrum’s Guide (1867), although the development
plots in Helensburgh were originally to be sold off in quarter acre
feus it was not long before variety began to creep in, with some
people buying double plots to build small mansions. Also, the
street layout became less rigid as time went on and development
encroached further and further up the hill. Historically, in very
general terms, the density of development reduced the higher up
the hill it was. 
Broadly speaking:
¾Pre 1860, the very large grounds feued were adjacent to
the Glennan Burn, and between Sinclair Street and the
Milligs Burn, e.g. Hermitage Estate estimated at about 27
acres; Lansdowne Park, Chapel Acre, Burnbrae and
Westburn of 3 to 4 acres (referring to the first O.S. map).
¾In general, the later phases of development, even including
the inter war period, are characterised by larger plot sizes
of ½ or 1 acre and a more uniform building line along the
slope. Feuing conditions required that buildings be a
minimum of 20 ft from the plot boundary, although in
practice outbuildings were still constructed along rear
boundaries.
¾Moving up the hill, the great majority of properties face
southwards towards the estuary.
To the south, between Argyle Street and the sea front, the
conditions and pattern of feuing permitted a higher density of
development and variety of types and uses of buildings. This was
the area covered by the original development plan of 1803.
However, the first Ordnance Survey map about 60 years later
suggests that the ground sold off was not always in multiples of
the plots shown on the 1803 plan. Development occurred at
different stages and there was considerable infill in the late 19th
century. For example, the terraced town houses of Glenan
Gardens and other properties in that block almost surround the
two much earlier houses built on the two acre square.
As the villa developments spread up the hill, villas were generally
positioned to exploit the sloping ground and views over the lower
town and the Clyde Estuary. They were often positioned towards
the rear of the plots resulting in terraces of detached villas all
facing in the same direction. The different types of boundary,
entrance, architectural character (often vernacular in style at the
rear), building stone of the house walls and finish of the stone
comparing the front and rear of the properties means that there is
a marked contrast between the south and north sides of many of
the lateral streets. This is a distinctive feature of Helensburgh’s
townscape. 
26

Page 236

Extracts from the First Edition Ordnance Survey map showing layouts of houses and gardens 
27

Page 237

Types of residential property
Prior to mid 19th century
Mid 19th century – early 1880s
Top:  Allan Carrie (2006) 
Others:  Jim Shimmins (2006)  Post 1880s 28

Page 238

More specifically, the Conservation Areas fall into three zones in
terms of building density, plot size and street lay-out:
1) The main grid south of the West Highland Railway and west of
Sinclair Street. This in turn has higher density lower down the hill
and lower density higher up but without a distinct break between
the two (Upper Helensburgh Conservation Area).
2) The area east of Sinclair Street comprising a few dense blocks
lower down, the areas originally developed as large properties in
particularly large grounds, mid to late Victorian, Edwardian and
post Edwardian villa developments, typically on plots of half an
acre or larger (Upper Helensburgh Conservation Area).
3) Mostly Edwardian and post Edwardian period villas on large
plots (The Hill House Conservation Area).
4.4 Types of residential property
This section provides a summary of property types grouped
according to the main development phases.
1776 – mid 19th century
¾Georgian, Regency and early Victorian plain 3-bay villas,
stone or whitewashed stone
¾1½ storey houses, sometimes whitewashed but often left
with the local sandstone exposed; cottage or vernacular
character with dormer windows but often spacious e.g. 7 or
8 apartment. 
¾Single storey cottages with or without attics, mostly outside
the current Conservation Areas.
Mid 19th century – early 1880s
¾Main period of Victorian villa development typically two full
storeys in height and with increased use of imported
blonde sandstone, at least for front façades, from the late
1850s. Wash-houses and outbuildings are often of
vernacular style
¾The more prestigious properties were individually
commissioned from reputed architects. At the start of this
phase, the favoured styles for domestic architecture were
Classical, Italianate, and Tudor revival.
Early 1880s – WW1 (1914-1918)
¾Mostly villas were individually commissioned; others were
built in small groups by the same architect/developer.
Scots Baronial gave way to the Arts and Crafts movement,
the buildings of which could have either Scottish or English
architectural references, and sometimes both
¾Infill terraced development occurred on larger plots and
redeveloped sites in the lower town and on Hermitage
Estate e.g. Prince Albert Terrace, Victoria Road; Glenan
Gardens; properties on West King Street. These have
architectural features typical of Scottish Victorian town
developments of 1880-1900 but are an anomaly in the
setting of Helensburgh’s period villas. A number of earlier
villas were extended during this phase, often in a
contrasting architectural style.
The Inter-War Years (1918-1937)
¾Mostly detached villas influenced by the English Arts and
Crafts style or with Art Deco influences e.g. window design. 
29

Page 239

4.5 Architectural development from 1880 to the
present
The large properties of 1880-1915
The first listed building in the Arts and Crafts style dates from
c1881 and the great majority of villas that followed were
influenced by major proponents of the Arts and Crafts movement
(e.g. R. Norman Shaw and Charles Voysey) and their Scottish
counterparts such as Robert Lorimer, who was a leading figure of
the progression from the Scots Baronial revival to a style of house
building based on vernacular architecture
The architects were almost all Scottish. The White House, Upper
Colquhoun Street, one of only two commissions in Scotland by the
English architect M. H. Baillie Scott, is the exception. Three
architects, resident in the Burgh, William Leiper, A. N. Paterson
and Robert Wemyss (who trained with Leiper), were responsible
for the majority of large villas of the late Victorian/Edwardian and
post Edwardian periods. Prominent Glasgow firms accounted for
others. Leiper and Paterson both designed houses for
themselves. Leiper built Terpersie (1871); Paterson built first a
group of villas at Rowallan Street / Millig Street (1895) and then
Longcroft in West Rossdhu Drive (1901).  In this group of houses
may be found both Scottish and English historic architectural
references (sometimes both in the same building), building
traditions and materials. The majority borrow from early English
building styles, including timber framing, and many of these have
red rosemary tiled roofs rather than local or Ballachulish slate.
These houses provide the setting of, and a counterpoint to, two
important buildings that introduced new ideas. By far the more
radical of these is The Hill House (Mackintosh) which is Scottish in
its architectural references rather than the White House (Baillie
Scott) which is very English. The Hill House (1902), Charles
Rennie Mackintosh’s most important commission for a private
house, was built on one of the most prestigious sites for the
publisher Walter Blackie. The client explicitly rejected the English
styles (Cairney, J. 2004).
“...I told him [i.e. CRM] that I didn’t like red-tiled roofs, brick and
plaster with wooden beams – I preferred roughcast for the walls
and slates for the roof….”
The Hill House
Jim Shimmins (2006)
30

Page 240

The use of the site, its position at the highest point of
Colquhoun Street, the nature of the boundaries of the
property and the contrast with the other large villas nearby
all serve to increase the impact of The Hill House.
The Inter-War Period (1918-1937)
Despite the depressed economic situation in the west of Scotland
and the impact of the stock market crash of 1929, some further
development of individual villas took place, for example on ½ - 1
acre plots on West and East Lennox Drives and at the west end
of Millig Street. Most are modest compared to the pre World War
1 buildings. However, there are two listed villas:
¾Ballytrim, Arts and Crafts, 1926 (Sinclair Street, (upper
end)
¾Green Park, Art Deco, 1935 (Charlotte Street, on the site
of a Victorian villa destroyed by fire)
Most of the other villas built in these decades were more modest
but still substantial. Bell systems and maids’ quarters indicate a
segment of society that still used domestic service, often live-in,
on a daily basis. This largely disappeared with World War 2.
Developments and changes after WW 2 (1945)
Relatively little change occurred in the inter-war period affecting
the period properties and streetscape of the villa developments in
upper Helensburgh. However, the Second World War was a
turning point.
The economic and social conditions after WW 2 appear to have
depressed overall demand for larger properties, not least
because of the demands of upkeep on a daily basis. By this
stage, many properties were already 100 years old and many had
roofs in poor condition requiring major repairs. Some villas were
subdivided, mostly into upper and lower conversions. As a result,
external side and rear staircases, built to provide separate
entrances, are now common. The design of some villas permitted
partitioning to give adjoining dwellings. In other cases,
outbuildings have been converted and added to. Examples of this
exist on Sinclair Street, James Street and Queen Street.
Modern infill and adjacent housing estates
Accelerating changes in the region during the 1960s and 1970s
resulted in an influx of people living on the newly-built estates on
the outskirts of town, depressed prices of old houses due to lack
of mortgage availability (affordable to buy but not to maintain) and
new, affordable timber-framed houses, with mortgage availability.
The inflation of new house prices over this period, together with
the availability of plots within the feus of larger properties, led to a
considerable amount of infill over a relatively short period of time.
These houses, typically detached bungalows, may be found to
the front, to the side or to the rear of the original villa, depending
on the shape of the plot and the position of the original house
within it. 
From a heritage and architectural point of view, it is the
property built in front gardens that intrudes most on the
historic streetscape. New build in the grounds of a villa can
lead to a loss of integrity of the villa. A villa is a house set
within its own designed garden, the two being inter-
connected and together create a particular character. By
altering one, you affect the other.
From a planning perspective, the 1995 Dumbarton District Wide
Local Plan (West Dunbartonshire Council 1999) is informative:
4.57 “Within both Conservation Areas covering
Helensburgh pressures for house/or plot sub-division
have in the past sometime created an alien architecture
with inferior designs poorly related to their surroundings
which have in certain locations detracted from the area’s
character”. 
31

Page 241

Concerns over infill are commonly expressed on several counts:
¾over-development
¾pressures for house subdivision
¾pressures for plot subdivision
¾alien architecture
¾inferior designs
¾location as a key factor
Such concerns are further validated by the list of more specific
aspects collected from people, both familiar with or visiting the
area (fresh eyes) – see Appendix D.
The impact of the modern houses is thus three fold:
¾architectural: types of structure, style and building
materials
¾building density and spatial relationships
¾loss of garden ground and plantings.
While it would be interesting to map the degree of densification
and to assess the visual impact street by street, such a survey is
beyond the scope of this Appraisal.  There is evidence and some
comfort that densification has been contained.
Period from 1980s to the present
Although damaging, the period of rapid development in the 1970s
was relatively short-lived as measures were taken by Dumbarton
District to counter the problems. The 1995 Local Plan (West
Dunbartonshire Council 1999) stated that:
“An Interim Policy Statement was introduced in 1980 for Upper
Helensburgh the policies of which were incorporated in revised
form in Local Plan No. 2 and the whole area subsequently
designated as being within a Conservation Area. Since the
introduction of these policies, there has been a marked
improvement in the layout and design of development in terms of
plot size and the provision of an independent frontage compatible
with those of neighbouring properties. The aim of the policies to
secure adequate plots has generally been successful in ensuring
‘town cramming’ of a townscape notable for having large house
plots, does not occur. The above policy also requires that the
design of such new-plotted development also complements the
prevailing architectural features and preserves the character of the
area. The continued implementation of these policies covering the
Conservation Areas within Helensburgh is considered necessary
to retain the townscape features of the town”.
The strictness of these planning policies, while stemming much
that was undesirable during the 1970s still produced some
perverse effects in the siting of houses on plots. While obeying the
rules, some new buildings do not respect the overall “pattern”. For
example, where three large executive houses have been built on
the site of a former mansion when two would have been better.
While each house sits on the required area of land the addition of
one extra house disrupts the pattern and character.
Policies which have now been in operation for 20 years have held
at bay what could have turned into a major disaster. Over this
period, other new build has continued but at a much reduced rate
due to scarcity and the elevated price of any land for sale.
Generally more up-market “executive-style” houses, not
bungalows, have been built which have been much more, though
by no means entirely, sympathetic to the Conservation Areas. Only
two of the modern houses are noted as being of architectural merit
(Walker, F.A. and Sinclair, F. 1992.) – Bowhouse, East Argyle
Street (architect, Tony Vogt) and 40A Charlotte Street (architect,
John McIntyre).
32

Page 242

The Old and the New
There has been a considerable amount of infill over a rela-
tively short period of time.
It is the property built into the front gardens that has the most
impact upon the special qualities of the Conservation Areas.
Top: Jim Shimmins;  Left: Andy Boag;  Right:  Michael Blake (2006) 
33

Page 243

Housing Estates
Modern housing estates built on green field sites now flank The
Hill House Conservation Area: around Blackhill Drive, on the north
side of Kennedy Drive, around Sinclair Drive and, to the east of
the Milligs Burn, the Glade Estate. In some places, screening
between the historic and modern developments is poor.
The relatively small development at Chapelacre Grove, largely
tucked away off East Abercromby Street and occupying the site of
the 19th century Chapel Acre House and its extensive grounds lies
within the Upper Helensburgh Conservation Area. The scale of its
detached houses and its block of flats reflects that elsewhere on
the Conservation Area  but the open-plan nature of its gardens
and other open space contrasts strongly with the enclosed
character of earlier houses in the vicinity.
4.6 Building materials – Walls and Roofs
Walling stone
A unifying characteristic of Helensburgh is the extensive use of
local sandstone, typically reddish, pink or a warm pale grey in
colour, which was extensively used for boundary walls and as a
walling stone (Roberts, A. 2002). It was also used for the gable
ends and backs of houses where the main façade is imported fine
sandstone (to reduce cost). Some of the older houses and
cottages are also of
local stone, as is the West Kirk (1858) - except for the fine quoins,
sills and mullions which would have been brought in from
elsewhere. 
Rubble was obtained from local conglomerate for which there
were numerous small quarries in lower Helensburgh at one time.
This was used to fill the spaces between uneven building blocks
cleaved from the local sandstone. Some properties (even later
ones such as The Hill House) were built of local stone and harling.
Red sandstone was imported from Bonhill, Arran (by sea) and
Dumfriesshire. Once the Glasgow-Helensburgh railway was
opened for goods traffic in 1857, building stone could be brought
in more cheaply from further afield. The more extensive use of a
younger, pale honey coloured sandstone from the Glasgow
quarries probably dates from this time. This stone was used for
the Municipal Buildings, the Victoria Halls and residential
properties in the upper west end.
Roofing materials
A second unifying feature is the extensive use of local slate from a
large former slate quarry at Clynder and smaller ones in the
vicinity of Rhu. These may be coloured purple, or grey-green.
Similar slate from Luss and Aberfoyle is indistinguishable.
Ballachulish slate, darker and more uniform than the local slate,
may be observed on later properties, including The Hill House. It
may also have been used in the re-roofing of buildings that
predate the railways.
Clay tiles were used only in Arts and Crafts style buildings as
roofing or wall cladding materials. Tiles and bricks were all
imported due to the lack of suitable local clay.
34

Page 244

Streetscape, gardens and public spaces
5.1 Street trees
Introduction
A notable feature of Helensburgh is the extensive and mature
plantings of avenues of trees that enhance the broad streets and
their grass verges. The street tree plantings reinforce the grid
layout, because they follow its form, and also soften its effect.
The street trees both contrast with and complement the
extensive plantings of trees and shrubs in private garden
grounds. They provide continuity across the boundaries
between public and private space, leading into wider vistas.
Deciduous species and cultivars predominate, in particular
ornamental, flowering species. Most streets are planted with a single
type of tree. In others, two species alternate and, in others, still a
wider range of species was planted. This provides variety in the
streetscapes with a change in character from street to street, coupled
with seasonal variety and great seasonal interest throughout the
year.
Much of the street tree planting is within the current Conservation
Areas. However, there are important avenues of street trees that are
partly or wholly excluded from the current Conservation Areas:
¾Argyle Street, south side
¾King Street, west and east sections beyond the commercial
centre
¾Princes Street, west and east sections beyond the commercial
centre
Autumn foliage in Argyle Street
Autumn foliage in Queen Street
Jim Shimmins (2006) 
35

Page 245

History of the street trees
The history of street tree planting may be summarised as follows:
Pre 1860
Even prior to the major systematic plantings from the early 20th
century onward, it is likely that some property owners did plant
trees outside their gardens on the verges that they were
responsible for maintaining. The 1860 Ordnance Survey map
indicates that tree planting along plot boundaries was common. In
a few instances there appear to be lines of trees just outside plot
boundaries.
1860
A public meeting called for trees to be planted in the streets
(Noble, S.N. (ed) 2002).
1883
There is a record of “broad and carefully trimmed ribands of turf
betwixt the sidewalks and the carriageway, several [of which] are
planted, boulevard fashion with small trees “. (Dingwall, C. 2002).
1910 – 1970s
There was planned planting of street trees with records of the
work undertaken. A major phase of tree planting was initiated in
1910, the driving force being town councillor, Dr J. Ewing Hunter.
This approach was subsequently continued by Mr A. Campbell
and Mr T. A. McColl, Parks Superintendents (McColl, T.A. 1972)
up until the early 1970s. They were largely responsible for the
extensive plantings of cherry trees. Tree planting was also
continued in the post WW2 developments.
1970s – 2001
Helensburgh Burgh Council ceased to exist in 1975 due to the
reorganisation of local government. The neglect of the street trees
appears to date from this point.
2001
By this time many street trees had reached maturity or passed
their prime, leading to a need for remedial action and a renewal
programme. A number had died leaving gaps that had not been
filled.
The Helensburgh Tree Conservation Trust was founded to
promote public awareness of the importance of the street trees
and stimulate action to conserve and enhance them.
2003
Donald Rodger Associates did a professional survey (dated Nov
2003) for the Helensburgh Tree Conservation Trust. Detailed
information and accompanying maps (scale 1:10,000) were
recorded for 1829 trees. The assemblage covers 103 species and
varieties.
2005
A Helensburgh Street Trees Management Plan was prepared
by Donald Rodger Associates for the Helensburgh Tree
Conservation Trust. This sets out actions required over the
next 30 years in order to manage and renew this outstanding
asset of the town. The tree population is ageing and is at risk
without such a renewal programme.
36

Page 246

Cherry Trees in the Spring
Painting by Neil Macleod 
37

Page 247

Prunus Hisawara East & West Argyle Street & Lower
Colquhoun Street with later
plantings in  Upper Colquhoun
Street.
Prunus Tai-haku East & West Princes Streets
Prunus padus Watereri East King Street
Prunus Daikoku Henry Bell Street
Prunus Ukon Lower Sutherland Street
Prunus Yoshina East Abercromby Street
Prunus avium Campbell Street & George Street
Prunus Oku Miyaku Upper George Street
Prunus Shirofugena Stafford Street
Prunus cerasifera Pissardii James Street & Cairndhu Avenue
The elevation change of 300 ft means that there is a difference of
approximately 1 week between the shore and the top of the town
in the opening of the blossom. The progression of the pink
blossom up the hill is a particular feature of Colquhoun Street in
spring.
Cherry blossom in West Argyle Street
Jim Shimmins (2006)
Street tree plantings – particular features
The first major avenue to be planted appears to have been the
silver birch trees lining West Montrose Street, dating from 1910.
This has long since become an impressive avenue of stately
trees.
Outstanding among Helensburgh’s ornamental flowering trees are
the cherry trees. At their peak with the spring blossom, they also
provide an attractive green summer canopy and impressive
autumn colour that can last well into November. Important
avenues are:
38

Page 248

The conservation significance of Helensburgh’s street trees
The Helensburgh Street Trees Management Plan (Rodger, D.
2005) includes the following assessment of the significance of
Helensburgh’s street trees and the streetscape overall:
“….a special and highly distinctive urban landscape arguably
unrivalled anywhere else in Scotland. The ‘old town’ in particular
has its own landscape character and the combination of well-
treed gardens and the substantial population of street trees
creates an attractive setting which complements and enhances
the architectural heritage of the town.”
Helensburgh’s street layout, verges and tree plantings constitute
a notable historic designed landscape of exceptional conservation
significance.
Risks to Helensburgh’s street trees and streetscape
The tree population is ageing and the quality of the streetscape
will steadily be eroded unless a renewal programme of the type
set out in the Helensburgh Street Trees Management Plan 2005
is followed.
Some early actions have been taken and new trees planted but
the labour and maintenance requirements over the long term are
considerable. 
Resources for this long-term programme are highly uncertain.
Autumn Colours (2)
Jim Shimmins 
39

Page 249

The original walling stone is predominantly the warm coloured,
local sandstone contrasting with the colour provided by the variety
of types of hedging that may be seen. Many properties have
highly decorative gates and gate piers, some of which are listed
as being of special architectural or historic interest in their own
right..
The hedges are mostly evergreen, commonly privet, but there are
a number of beech and mixed hedges too. Double hedges are a
feature of a number of properties.
Contribution of private gardens to the streetscape
While in many cases private gardens are largely screened by
boundary plantings, others are not so enclosed and views into
attractive private gardens are a feature of Helensburgh streets.
Much of Helensburgh was developed around the time Scottish
and other plant hunters were exploring different regions of the
world and introducing new species into cultivation in the UK. The
botanist Sir William Hooker and his son Joseph (later Sir Joseph
Hooker, botanist and explorer (1817-1911) had associations with
Helensburgh and were summer residents for a time:
Hooker encouraged gardeners in the West of Scotland to grow his
Himalayan rhododendrons from seed – with great success. He
was fond of comparing the Sikkim Himalaya with the Clyde of his
youth. From one Himalayan setting, he wrote ‘What puts me most
in mind of Helensburgh is the universality of fine weather on
Sundays’ (Vickerman, K. and Richmond, L. 2005).
Garden Settings
Top: Michael Blake (2006).  Others:  Jim Shimmins (2006)  40

Page 250

Mansion to the East of Sinclair Street
The area east of Sinclair Street comprises typically villa developments on plots of half an acre or larger
41

Page 251

Helensburgh has climatic and soil conditions that permit the
cultivation of a similar range of trees, shrubs and smaller garden
plants to that found in the major west coast gardens of Argyll and
Bute. Indeed, many local residents regularly purchase specimens
propagated from these and other collections. The level of interest
in terms of the design and planting of individual Helensburgh
gardens does vary. However, even relatively small gardens may
contain several hundred specimens and be of real botanical
interest.
At one end of the scale plantings include forest giants from
around the world such as redwoods, Douglas and silver firs, Scots
and introduced pines, cedar of Lebanon, hemlocks, monkey
puzzle and Eucalyptus plus deciduous species ranging from
native broad-leaved species to the Chinese dawn redwood.
At the other end of the scale a great variety of bulbs and
herbaceous plants are grown, right down to the tiniest alpines.
Despite the cool, damp climate, a wide range of habitats exists.
Local ground conditions vary depending on whether the plot is on
clay or on one of the raised beaches. Even species adapted to
arid conditions such as bristlecone pines may be grown outside in
the right spot. An example of the variety within gardens in two
streets is provided in Appendix E.
The list of larger trees in Helensburgh may be expected to include
many specimens 100 years old and more. Many of the species
reach 100ft and upwards at maturity. While the large number of
stately trees contribute greatly to the townscape, where they are
close to houses they can be oppressive to residents, block views,
cast excessive shade over both houses and gardens and be out
of scale with the size of plot in which they grow. Informed
management of these more mature trees is to be recommended.
Medium sized trees and larger shrubs, often planted around plot
boundaries, make a major contribution to the streetscape and
vistas around the town. Popular ornamental trees and shrubs (a
wide range of species and varieties) include Magnolias,
Rhododendrons, Acers, Camellias, Pieris, rowans, birches,
flowering cherries, Laburnum and hollies.
Somewhat more specialised are the Eucryphias, Crinodendrons,
Embothriums, Cordylines and Pittosporums. These groups may
be regarded as significant trees and shrubs that make a major
contribution to the special character of the townscape.
Survey work would establish the species and varieties
represented in Helensburgh gardens, the extent of plantings of
significant species and varieties, important formal plantings (e.g.
along driveways), and the overall botanical interest of the
gardens. Also, street by street surveys would establish local
characteristics which vary greatly from one place to another, even
between the north and south sides of the lateral streets. The
Conservation Area Management Plan would benefit from such
analysis.
42

Page 252

Walls, hedges, gates & gate-piers
5.2 Plot boundaries and private gardens 
Introduction
Plot boundaries and private gardens contribute
immeasurably to the green and leafy streetscape of
Helensburgh and provide a considerable, varied habitat for
wildlife. There is a particularly strong horticultural tradition in
the town extending from the original layout of the garden
grounds through to the present day.
The layout of gardens and grounds is indicated on the Ordnance
Survey map of 1860. Today there are numerous examples where
the layout, built structures and planting are still typical of the
particular period. However many plots have been subdivided,
layouts changed and structures lost.
In the case of the properties built from 1880 onwards, architects
typically paid a great deal of attention to garden design as an
extension to, and setting of, the main house. Original garden
designs exist for at least some properties within the Local
Collection in Helensburgh Library. The garden of The Hill House
(Charles Rennie Mackintosh) has been carefully rejuvenated,
including the reinstatement of an orchard, under the stewardship
of the National Trust for Scotland.
Boundaries
The conditions of feu for the private properties specified that plots
should be enclosed and, taken together, the boundary hedges
and walls extend for some tens of miles. The nature of these
boundaries makes a major contribution to the distinctive
streetscape of Helensburgh.
Top: Andy Boag (2006),.  Others:  David Sheen (2007)
43

Page 253

5.3 Parks
Hermitage Park
Hermitage Park, situated on the east side of Sinclair Street is
formed from part of the grounds of the original Hermitage Estate,
part of which was sold off for development in the late 19th century.
A recent assessment of the history, development and condition of
the park found that Hermitage Park is of considerable heritage
significance (Davis, M. 2002 and Dingwall, C. 2002).
The park is part of the former extensive landscaped grounds of
Hermitage House, one of the largest of Helensburgh’s villa
developments. It is the setting for the Category A listed walled
garden that contains the war memorial designed by the architect
A. N. Paterson. 
Hermitage Park augments the private villa gardens and plantings
of street trees which combine to contribute to Helensburgh’s
unique streetscape.
Unfortunately the park seems to be somewhat degraded due to
over planting in the late 20th century and insufficient maintenance
that have resulted in the loss of internal views of features (such
as the cascades of the Milligs Burn) and external views of the
estuary. There are also some unattractive and poorly maintained
modern features and structures.
Walker’s Rest
Walker’s Rest is a small park accessed from the top of Sinclair
Street on the east side.
Hermitage Park
Jim Shimmins (2007) 
44

Page 254

Parks and public spaces outside the current Conservation
Areas
There are other public parks and open spaces outside the current
Conservation Areas that are part of the historic development of
the town:
¾Helensburgh Cemetery (relatively small scale and not
extensively planted compared to other ‘garden cemeteries’
of the 19th century)
¾East End Public Park, East King Street – a recreation
ground gifted by a local benefactor
¾Kidston Park – small park with spectacular views at the
western end of the West Bay promenade, also gifted by a
local benefactor.
¾James Street – small play park, also donated by a local
benefactor.
¾Duchess Wood—a major recreational resource and Local
Nature Reserve
¾Castle Wood—an ancient woodland site
¾East Bay Esplanade
¾Kirkmichael Park
5.4 The significance of Helensburgh’s historic
designed landscape
Helensburgh’s street layout, verges and tree plantings alone
constitute a historic designed landscape of exceptional
conservation significance. This is augmented by the extent of
the private gardens and the plantings within them.
The features of private grounds that fall within the criteria for
historic designed landscapes are the:
¾structure provided by the street grid and the feuing pattern
within the grid
¾boundary walls and hedges put in place according to the
design of the street grid and the applicable conditions of feu
¾stipulations of the conditions of feu resulting in low density
of development and considerable garden ground
¾the extensive consequential plantings of trees and shrubs
just inside plot boundaries, albeit according to individual
choice.
The features that may be considered of historic and botanical
interest are:
¾the contribution of Helensburgh gardeners of the 19th
century and later as a group to the more general
introduction of plants new to cultivation in Scotland beyond
the formal botanical collections. This is likely to have been
disproportionate.
¾the connection with the prominent 19th century botanists Sir
William and Sir Joseph Hooker, and their likely influence on
botanical collections and gardening in the West of Scotland
(enquiry to Helensburgh Library, Local Collection; Mike and
Sue Thornley, Glenarn, Rhu from enquiries to Kew
Gardens, London in 2000)
¾the great number and variety of ornamental trees and
shrubs visible from the streets, often impressive, mature
specimens
¾the range of signature trees and shrubs which define
particular areas widely planted across the town
¾the overall botanical interest, albeit much is largely not on
public view.
45

Page 255

Street and Garden Trees
Helensburgh’s street layout, verges and tree plantings alone constitute a historic designed landscape of exceptional conserva-
tion importance. This is augmented by the extent of the private gardens and the plantings within them
Jim Shimmins (2006) 
46

Page 256

5.5 Traffic flow
The tranquillity of much of the two Conservation Areas is an
essential part of their character. It enables enjoyment of the
attractive and varied streetscapes by all who choose to wander
around.
Traffic passing through the Conservation Areas mainly uses
Sinclair Street, West Montrose Street and Charlotte Street.
School traffic appears to be increasing and particularly affects
John Street, Queen Street and Millig Street.  Traffic calming with
speed bumps has been introduced here which has the effect of
moving traffic on to other residential streets and creates a street
scene which is at odds with the tranquil atmosphere of these
streets. 
Away from Sinclair Street, the distribution of footpaths around the
streets is haphazard, with some of the paths between the grass
verges and the boundary walls of properties being surfaced and
clear of weeds, with others being allowed to grass over and others
becoming wet and muddy. This leads to many pedestrians
(including dog-walkers and joggers) going along the middle of the
road.
Compared to similar areas in the major conurbations, the
appearance of Helensburgh’s historic residential district does not
suffer from dense on-street parking despite high levels of car
ownership.
As in New York, the grid pattern of streets in Helensburgh results
in an exceedingly large number of crossroads. The character of
any Conservation Area can be adversely affected by a clutter of
road signs. While these should be adequate to maintain road
safety, a balance needs to be struck with the amenity of the area.
Large-scale development that would generate significantly
increased traffic levels at these intersections should be
discouraged.
47
The West Highland Railway provides a physical barrier to both
pedestrian and vehicle movement between the two Conservation
Areas. Pedestrian and cycle routes around Helensburgh could be
greatly enhanced by a bridge across the railway at Colquhoun
Street. Colquhoun Street could therefore become a direct
pedestrian and cycle route between the sea front and Hill House.
This was suggested in design projects executed in 2005 by
students from the Mackintosh School of Architecture, Glasgow
School of Art as one of their suggested ways to regenerate the
town.

Page 257

Elements that detract from the overall character and appearance of
the Conservation Areas
6.1 Introduction
All built environments are subject to alteration and change and
are much influenced by prevailing socio-economic factors.
Conservation Area status offers a certain degree of protection
depending on objectives set by the planning guidelines of the
period but they cannot cover all contingencies.
An important part of the Appraisal exercise has been
consultation with the wider community. This section lists
factors which have been brought to the attention of HCAG by
residents and visitors as seeming to be out of character with
the area.  See Appendix D for further information.
6.2 Schedule of detracting elements
Many examples in the following lists may seem relatively
minor and insignificant when viewed individually, but taken
together have a cumulative detrimental impact on the overall
pattern and sense of place of the Conservation Areas.
New Buildings, division of feus
¾modern bungalows built in the front gardens of large
mansions
¾dominant horizontal line of modern (bungalows especially)
and landscape windows, out of character with portrait
windows of traditional buildings
¾small modern buildings out of scale with larger buildings
and in own plot of land
¾new buildings which obscure the view of old houses
¾the poor quality design of new buildings 
¾the building on of external staircases of an unsympathetic
design and materials
¾the division of feus leading, in some cases, to inappropriate
planting and fencing
Alterations to Buildings
Over the years, the traditional character of buildings has been
eroded by:
¾replacement windows not retaining original design or being
constructed of unsuitable materials
¾UPVC windows of non-traditional proportions
¾use of brightly-coloured renderings and paints not in
keeping with surrounding natural materials
¾removal of the ornate bargeboards of Victorian houses
¾replacement of traditional guttering with UPVC
¾replacement of local slates with unsympathetic alternatives
¾garages of a temporary nature – corrugated iron, asbestos,
etc.
¾addition of unsympathetic and ill-proportioned (often mock-
Victorian) conservatories
¾removal / replacement of chimneys
¾erosion caused in general by loss of quality in materials,
craftsmanship and design.
Changes to the landscape within feus:
¾subdivision of plot to south of main façade of original
building
¾loss of mature trees where a new house has been built
¾replacement of hedging by fences
¾replacement of characteristic privet/beech/ hawthorn/holly
hedging by conifer
¾high conifer hedging which has gone out of control
¾loss of stone walls- replacement by artificial stone
¾paved/ asphalted driveways, many intruding onto road
¾modern gates. 
48

Page 258

Visual pollution of streetscape:
¾traffic signage is particularly intrusive – speed signs, one-
way signs, yellow lines, speed bumps
¾street lights are unsympathetic
¾loss of grass verges to parking spaces
¾car parking on the streets
¾grass verges not kept up
¾missing and unhealthy trees in verges
¾trees of a different species destroying overall pattern
¾replacement street name plates of an inferior quality
¾the lack of mature trees where modern bungalows have
been built in front of mansions.
Dereliction and loss of historic buildings:
¾  deterioration and dereliction of buildings
¾  demolition of neglected buildings
¾  pressure to re-develop plots
49

Page 259

Managing Change
7.1 Introduction
This section looks at the factors that will influence change in the
Conservation Areas over the next few years. It builds on the
schedule of detracting elements (set out in Section 6 above) and
looks at the vulnerability of Helensburgh's Conservation Areas,
together with the pressures upon their special architectural and
historic character and appearance.
In the course of the work to date, the Group has identified a
number of key issues on which it would be helpful to make
more progress. While some issues will need to be addressed
through the planning system (as part of day-to-day
Development Management), others will require the co-
ordinated efforts of various agencies through a management
plan. Indeed, this section of the Appraisal is expected to
inform the development of a brief for the future Conservation
Areas Management Plan. 
People undertaking work in the Conservation Areas can bring
about change.  If the character of the Conservation Areas is to be
preserved and enhanced it is important that they are aware of the
significance of the Conservation Areas and what makes them
special.
7.2 Cumulative effect of piecemeal changes
Many changes that have occurred since WW2 are relatively small
scale. Some fall within the scope of the planning and development
control system and some not. While some of these changes are of
an appropriate nature from a conservation point of view or are
sited where they do not impinge on the appearance of the area,
others are more intrusive or have resulted in the loss of original
features. 
The cumulative effect of deleterious changes is significant erosion
of character. Examples include the erection of garages,
conservatories, extensions, replacement windows, replacement
gutters and down pipes, exterior painting and changes to garden
grounds. A significant risk to boundary walls and streetscapes can
result from the sub-division of property or new buildings within
existing plots due to the need to provide additional street
accesses and parking facilities.
There is a significant continuing risk of further loss of original
features and failure to replace them according to conservation
principles.
Window replacement is continuing, driven by the greater
insulation properties of modern double-glazing, as much as the
need to repair deterioration. Neither the appearance of the glass
nor the quality of the timber used even in the 1930s can be readily
replicated today. Article 4 directions in respect of windows apply
in The Hill House Conservation Area but not currently in the
Upper Helensburgh Conservation Area.
Boundary walls, gates and piers are also at risk from lack of
maintenance and changing fashions in landscape design. As
households now often have several cars and other vehicles, there
is likely to have been a significant loss of garden ground to hard
standing for vehicles and boats.
Some of these changes, which would normally be regarded as
“permitted development”, can be brought under the planning
system. During the Review and Management Plan process
desirability of controlling these minor changes by means of Article
4 Directions should be considered. 
50

Page 260

7.3 Current development issues and the design of
new-build
Pressures for development in the Helensburgh Conservation
Areas relate to:
¾ new residential development within the gardens of large
houses
¾ sub-division of large houses into flatted accommodation
¾ change of use of large houses to nursing homes or small
hotels
¾ re-development of sites where the principle building has
been damaged or destroyed by fire.
Dealing with these issues in such a way as to ensure a future
for the buildings and maintenance of the character of the
Conservation Areas will be a major challenge, but one that
needs to be confronted.
The new Local Plan looks to the guidance set out in the four
volumes of the new Argyll and Bute Sustainable Design Guidance
(2006) and to Conservation Area Appraisals such as this one. The
four volumes of Argyll and Bute Council’s Sustainable Design
Guidance will be helpful in supporting this Appraisal document
when considering proposals for change in the Conservation
Areas.
In particular, there is a page in Volume 3 (Working with the
Historic Built Environment) that is specific to the
Helensburgh Conservation Areas. Here, the emphasis is on
location and design, rather than density. Which is reflected in
the emerging Argyll and Bute Local Plan
Design Guidance
Argyll and Bute Council's Sustainable Design Guidance
published in 2006 shows (particularly in Volume 3 Working
with the Historic Built Environment) how good modern
architecture can be achieved within a historic context without
copying the past but by respecting the character and
appearance of the neighbourhood.  We recommend this
approach within the Helensburgh Conservation Areas and
urge anyone considering  developing here to look especially
at the page covering Helensburgh itself (page 47).
7.4 Maintenance of public and private property
There are good examples in Helensburgh of exemplary
maintenance, reinstatement, enhancement and even major
renovation projects of very large properties and their grounds. The
Victoria Halls have been greatly improved by work undertaken by
both the Local Authority and a voluntary body, the Friends of the
Victoria Halls.
Adequate maintenance will reduce the need for large-scale,
expensive works. Lack of planned maintenance will result in rapid
deterioration. Some buildings have been neglected, demonstrating
that standards and practice are highly variable. This applies to:
¾prevention of deterioration in the first place e.g. through
adequate roof ventilation and maintenance, sub-floor
ventilation, protecting exterior timber and routine
maintenance of all types
¾early remediation e.g. fixing leaks promptly, replacing
deteriorated roofing felt, ensuring pointing is sound both on
the main buildings and boundary walls
¾rectifying long term deterioration e.g. corroded zinc and
lead; ground floor joist ends affected by wet rot (a common
problem); corrosion of roofing nails; cracking, spalling and
crumbling of clay tiles.
The measures whereby the Council can deter owners from
allowing buildings to become derelict or important internal features
being removed need to be considered.
51

Page 261

The Recently Repaired Victoria Halls
Painting by Neil Macleod 
52

Page 262

7.5 Management of the public realm
Those organisations and individuals responsible for
maintaining and up-grading the public spaces that bind the
Conservation Areas together - from its grid of streets to its
public park - need to work together to preserve and enhance
the special qualities that have been set out earlier in this
document.
Designed landscapes, street trees, verges & footpaths
Part of the designed landscape of the town is the use of street
trees. Plans for the maintenance of these are an essential part of
the maintenance of the character of the area. Similarly, the
maintenance of Hermitage Park is an important issue. Adequate
funding arrangements need to be put in place to ensure that future
of Helensburgh's open spaces is safeguarded.
The requirement for a long term programme of replacement and
management of the street trees has been set out by the
Helensburgh Tree Conservation Trust. A long-term planting and
maintenance programme has been developed.  If it is not
implemented, there will be a fairly rapid, further loss of this
essential element of a historic designed landscape of exceptional
conservation importance. The Conservation Areas Management
Plan will prescribe appropriate action.
Hermitage Park has many fine mature species. However, over the
years some parts have become oppressively dense. How best the
park can be managed to meet its purposes should be covered by
the Conservation Areas Management Plan process
The Conservation Areas Management Plan should ensure co-
ordinated management and surfacing regimes for the many grass
verges and footpaths (both un-made and surfaced) that contribute
so much to the special qualities of the Helensburgh  Conservation
Areas.
Street furniture
A number of on-going maintenance activities provide an
opportunity to enhance the character of the Conservation Areas.
The status of the Conservation Areas should be recognised by the
local authority and the public utility companies through a higher
standard of street furniture. The Conservation Areas
Management Plan should specify such an approach. There is a
clear need to explore how adaptations for modern living can be
made without destroying historic features and their distinctive
character.
Lighting
Street lighting in the Conservation Areas is not of consistent
design and is of variable quality and condition. Replacing outworn
street lights will provide an opportunity to enhance the
streetscape. The design of good light fittings is one of the
important ways to do this and is particularly important in The Hill
House Conservation Area because of the potential World Heritage
Site status.
Street names  and signage
Much of the signage has recently been replaced, necessitated by
the number of missing or unreadable street name signs. The new
signs are very clear.  Unfortunately, from a heritage point of view,
the shape and word lay-out; lack of relief in the lettering, the
materials and style of lettering are all out of character with the
historic originals. Consideration should be given to higher quality
and uniform street signs in the management plan.
The size, design and number of road traffic signs (particularly
illuminated ones) should be kept to a minimum but ensuring the
safety of all road users. How best this can be achieved at the
numerous intersections within the Helensburgh Conservation
Areas will need to be addressed by all parties. 
53

Page 263

Public Utilities
Public utility companies are usually exempt from planning controls
when providing their services and need to be brought on board as
willing partners in the stewardship of the Conservation Areas,
through the Conservation Areas Management Plan process.
Installations, especially large boxes in the streets, can be very
obtrusive and need to be placed with the special qualities of the
Conservation Areas in mind.  Similarly, marker signs need to be
placed more sympathetically, be better vandal-proofed and, above
all, maintained well.
Any special surfaces should be reinstated permanently with the
correct materials when trenching or repairs take place. Agreeing
suitable materials and co-ordinating street works will be key to the
preservation and enhancement of the Conservation Areas.
7.6 Monitoring change
Development Management decisions within the Conservation
Areas will primarily be informed by adopted Council policy
together with the approved Sustainable Design
Guidance.  This Appraisal and subsequent Management Plan,
following approval by the Council, will further inform the
decision making process as supplementary planning
guidance relevant to Helensburgh’s Conservation areas. In
order for the Appraisal and the Management Plan to remain
current and effective a monitoring system will need to be
developed as is the case with planning policy. The
Management Plan should consider factors such as:
¾Changes in the use of buildings both within and outwith
planning control
¾Trends in planning applications
¾Changes to the integrity of the overall pattern
¾Figures for plot size, and trends in average plot sizes
¾Cumulative effect of piecemeal changes such as the
erection of garages and conservatories, building of
extensions, replacement windows and replacement
gutters / down pipes
¾Analysis of the scope for further development
¾Deterioration of buildings and materials.
The Public Realm
- signage 
Ken Crawford (2006) 
54

Page 264

7.7 Other actions to be considered
There is also a need for information to be made more readily
available. The means of ensuring awareness on the part of
owners, occupiers, developers, the various Council departments
and the suppliers of utilities need to be re-assessed for their
effectiveness and new methods of working, as appropriate.  There
is scope for producing much more in the way of leaflets to inform
the general public about the quality of the Conservation Areas and
the importance of maintaining them.  Additional advice to
householders on property maintenance, traditional materials and
building repair could help to reduce deterioration in the areas’
character and appearance.  It would also be useful to have
published guidance on sourcing suitable replacements for such
things as slates, tiles, windows and boundary features.
Adequate safeguards need to be put in place to prevent further
erosion of the special qualities of these two Conservation Areas.
The Council will also need to demonstrate that the setting of the
Hill House is adequately protected in the event of a nomination for
inclusion as part of a potential C.R. Mackintosh World Heritage
Site.
It would be helpful if applicant submitted Design Statements
setting out the impact of their proposed development.
Houses by A.N. Paterson outwith the Conservation Areas
Jim Shimmins (2006)
55

Page 265

Boundary Reviews of the two Conservation Areas
8.1 Introduction
Argyll and Bute Council will review the boundaries of the two
Conservation Areas in Helensburgh in light of this Appraisal. The
Council will also ensure that the Hill House Conservation Area
forms a suitable “buffer zone” for this potential World Heritage
Site.
Any proposals for alterations to the boundaries will be the subject
of further public consultation.
8.2 Boundary Issues
The following observations have been aired during the
Appraisal’s consultation process.
The Hill House Conservation Area (potential World Heritage
Site buffer zone)
Parts of the boundary may be unduly close to the subject. Indeed,
part of the car park for The Hill House which is immediately
adjacent to the garden lies outwith the Conservation Area (albeit
within the Green Belt). The merits of an extension should be
examined.
Upper Helensburgh Conservation Area
There is some obvious logic to most of the boundary which
currently exists along the western, northern and eastern sides.
The selection of the southern boundary seems more arbitrary.
However, there are a number of points around the whole
boundary where there is no marked difference between the
character of the properties on either side of the boundary. It is
suggested that these situations (listed in Appendix F) be
examined closely.
A new or extended Conservation Area
The distribution of listed buildings in the town and the geographic
spread of work by architects of renown are perhaps not
adequately encompassed by the existing designations. Given the
cohesiveness of the overall town plan and the pervasiveness of
the special character throughout a much wider area than currently
designated, the Review should examine the case for extension or
additional designation(s).
In particular, the current Conservation Areas exclude:
¾oldest buildings of the town, buildings of historic
significance and a large number of listed buildings of
diverse types including churches by important Scottish
architects
¾sites of the first large feus for residential properties
between  East Clyde Street and the shore (Regency period
and mid 19th century listed buildings)
¾non-listed properties, built primarily of local stone, in the
lower town that date back to Helensburgh’s early days as a
summer resort
¾Victorian terraces of Craigendoran
¾important plantings of street trees, including the cherry
trees on the south side of Argyle Street
¾Canary Houses by A.N. Paterson which lie on the west
side of Rowallan Street and the north side of Millig Street.
Splitting the Upper Helensburgh Conservation Area
The current size of the Upper Helensburgh Conservation Area is
acknowledged to be very large when compared to many other
areas. It is also acknowledged in the historical review that
because of the timeframe over which the development of the area
took place, the sizes and layout of plots vary across the area.
Splitting the area may provide an opportunity to identify more
localised special characteristics  56

Page 266

Conclusion
This Appraisal, being descriptive, has mainly covered those
aspects that make the Upper Helensburgh Conservation Area
and The Hill House Conservation Area so valuable both
historically and architecturally and unique as an urban
landscape. Overall, the area remains remarkably intact, the
pattern is preserved as are a great proportion of the
buildings. But, because it retains its extraordinary attraction,
it has not remained static; changes have taken place and
infill has occurred. 
Throughout the process of compiling the Appraisal, undertaking
consultation in various forms and mounting an exhibition a
number of messages have come through that are worth bearing in
mind as thought is given to how a management plan can be
produced and implemented.
The first of these is that the Conservation Areas, despite
their undoubted historical and architectural significance, are
primarily places where people live and work. Without that
duality of use, the Conservation Areas will not survive. In
other words, in thinking about any proposed changes within
a Conservation Area, it is important to remember that they
must remain suitable for modern use.
The second thought is that some of the buildings within the
Conservation Areas might not have received planning permission
if an application were submitted in more recent times. The
reasons for this are that the buildings are frequently very
individualistic and in their day some of them were ground-
breaking in terms of style and design. 
If the Conservation Areas are to continue to evolve, it will be
important to have scope for innovations in design if the long
history of architectural evolution is to continue to unfold. Indeed,
architectural innovation should be encouraged.
Many people commented on the privilege and penalties aspects
of living in a Conservation Area. They recognise the privilege
associated with living in quality houses of considerable
architectural merit and of being part of an area of very pleasant
aspect. They also understand that this imposes a duty to maintain
these assets and the landscape in which they are set – even
more so if they are in a listed building. In most cases, the call was
for a degree of common sense in relation to proposed changes of
use and fabric. Where building materials are exorbitantly
expensive to replace, owners look for guidance on acceptable
modern alternatives and on practical maintenance and repair.
A number of working papers have been assembled on many of
the above issues and will be available for the Review Process.
Suggestions for a raft of possible future actions that have been
mooted at various points in the process of preparing this
document and undertaking wider consultation are gathered
together in Appendix G. This provides a great deal of food for
thought in starting the process of producing a Management Plan
for the Areas.
There is clearly very considerable support for and interest in the
current Conservation Areas. A lively debate on how best to look
after them into the future has already been initiated. This has built
on work previously undertaken in connection with the activities of
the Helensburgh Study Group (unpublished papers held in the
local library) and the Vision Steering Group of the Helensburgh
Community Council (unpublished papers held in the local library).
In addition, Argyll and Bute Council commissioned work on the
town centre and waterfront by the Yellow Book Consultants
(Yellow Book 2004).   
57

Page 267

Cherry Blossom
Jim Shimmins 58

Page 268

References and Bibliography
Alexander, Christopher. 1979. The Timeless Way of Building. Oxford University Press. New York.
Anon, 1880. Proposed Feuing Plan of Helensburgh, Parish of Row. [Based on plan by William Spence 1857. Copy held in Helensburgh
Public Library reference section]
Argyll and Bute Council. 2005a. Draft Finalised Local Plan (unadopted): Written Statement.
Argyll and Bute Council. 2005b. Draft Finalised Local Plan (unadopted): Proposal Maps Folder.
Argyll and Bute Council. 2006a. Draft Finalised Local Plan (unadopted): Character Appraisal/ Key Environmental Features.
Argyll and Bute Council. 2006b. Draft Finalised Local Plan (unadopted): Modified Plan (unadopted)
Argyll and Bute Council. 2006c. Sustainable Design Guidance: 4Volumes. Argyll and Bute Council.
Battrum, William. 1865. Battrum’s Guide to Helensburgh and Neighbourhood. 2nd Edition. William Battrum. Helensburgh
Battrum, William. 1867. Battrum’s Guide to Helensburgh and Neighbourhood. William Battrum. Helensburgh
Cairney, J. 2004. The quest for Charles Rennie Mackintosh. Luath Press, Edinburgh.
Davis, M. 2002. “Hermitage Park and Helensburgh: a short history”. [ms available in Helensburgh Public Library reference section]
Dingwall, Christopher. 2002. “Preliminary Notes on the Hermitage Park and other Public Open Spaces in Helensburgh”. [ms in Helensburgh
Public Library reference section.]
Fleming, P. 1803. Design for the Expansion of the Town of Helensburgh. [Map held in the Helensburgh Public Library reference section.]
Government of Vicoria. Planning Notes: Applying the Heritage overlay. Download at www.dse.vic.gov.au/CA256F310024B628
Groom, Francis H. 1883, Ordnance Gazetteer of Scotland. Grange Publishing Works, Edinburgh.
Hawkstone-Hutton and Gorrie 1846. A Topographical Dictionary of Scotland.
Helensburgh Community Council. 2004. The Vision for Helensburgh. Helensburgh Community Council. Helensburgh.
Historic Scotland. 1998. Memorandum of Guidance on Listed Buildings and Conservation Areas. The House. Edinburgh. Available to
download at www.historic_scotland.gov.uk/memorandum of guidance_1998.pdf
Historic Scotland. 2000. Conservation Plans: A Guide to the Preparation of Conservation Plans. Historic Scotland. Edinburgh. Available to
download at www.historic_scotland.gov.uk/conservation_plans.pdf
Historic Scotland. 2006. Guide to the Protection of Scotland’s Listed Buildings- What it means to Owners and Occupiers. Available to
download at www.historic_scotland.gov.uk/listed_buildings.pdf
Historic Scotland. Statutory List. [Available to download via  RCAHMS. Pastmap. Listed Buildings of Scotland.]
McColl, T. A. 1972. ‘Fine Heritage of Trees’ in Helensburgh and Gareloch Times, June 14th, 1972. [ms held in Helensburgh Public Library
reference section. L.C. 941.3727]
Noble, S.N. (ed) 2002. 200 Years of Helensburgh 1802-1902. Argyll Press, Glendaruel.
New South Wales Heritage Office. 2001. Assessing Heritage Significance. New South Wales Heritage Office.
www.heritage.nsw.gov.au
Osborne, B. D. c1912.William Spence, Architect 1806-1883. in Lennox History Society Magazine. [Ms in Helensburgh Public Library
reference section].
Roberts, A. 2002 ‘The Geology of the Lands of Mallig’ in Noble, S.N. (ed) 200 Years of Helensburgh, 1802-2002. Argyll Press, Glendaruel.
Rodger, D. 2003. Helensburgh Street Tree Survey. Donald Roger Associates, Gullane. 
59

Page 269

References and Bibliography continued
Scottish Executive. 1997a. Town and Country Planning (Scotland) Act. Ch 8 Scottish Executive, Edinburgh
Scottish Executive. 1997b. Planning (Listed Buildings and Conservation Areas) (Scotland) Act 1997 Ch 9. Stationery Office, London
Scottish Executive. 1997c. Planning Advice Note 52 Planning in Small Towns. Scottish Executive, Edinburgh
Scottish Executive. 2001. PPG 18: Planning and the Historic Environment: Designing Places. Scottish Executive, Edinburgh.
Scottish Executive. 2002. SPP1 The Planning System. Scottish Executive, Edinburgh.
Scottish Executive. 2003a. Planning Advice Note 67 Housing Quality. Scottish Executive, Edinburgh.
Scottish Executive. 2003b. Planning Advice Note 68 Design Statements. Scottish Executive, Edinburgh.
Scottish Executive. 2004. Planning Advice Note 71 Conservation Area Management. Scottish Executive, Edinburgh.
Scottish Executive. 2005. A Guide to Conservation Areas in Scotland: Guide to the designation, safeguarding and enforcement of
Conservation Areas. Scottish Executive, Development Department. [Web publication available at www.scotland.gov.uk/
publications/2005/03/2914159/15200]
Scottish Executive. 2006a. SPP 21 Greenbelts. Scottish Executive, Edinburgh.
Scottish Executive. 2006b. The Planning etc. (Scotland) Act 2006 asp 17. The Stationery Office. London.
Sheen, Margaret  R. November 2007. Helensburgh: The Garden City of the Clyde. ms held by Helensburgh Study Group.
Sinclair, Sir John. (ed) 1799. The Statistical Account of Scotland: Parish of Row.
Spence, William. 1857. Proposed Feuing Plan of Helensburgh, Parish of Row. (Copy held in Helensburgh Public Library and Scottish
Records Office- Plan No 3517)
Thompson, John. 1832. Atlas of Scotland, Dunbartonshire.
Vickerman, K. and Richmond, L. 2005. The Glasgow Boys who brought the Rhododendron into art. University of Glasgow Newsletter. Feb.
2005.
Walker, F.A., 2000. Buildings of Scotland: Argyll and Bute. Penguin Books Ltd. London.
Walker, F.A. and Sinclair, F. 1992. North Clyde Estuary: An Illustrated Architectural Guide. Royal Incorporation of Architects in Scotland,
Edinburgh.
West Dunbartonshire Council. 1999. Dumbarton District Wide Local Plan. West Dumbarton Council and Argyll and Bute Council
Yellow Book. 2004. Helensburgh Town Centre and Waterfront: Strategy and Action Plan. Yellow Book. Paisley.
60

Page 270

Appendix A
Listed Buildings in the Conservation Areas
Full, up-to-date details may be found under “Helensburgh” on Historic Scotland's website at http://hsewsf.sedsh.gov.uk/hslive
Some entries (with the same reference number) have been included twice. This is because some corner plots which contain different
properties (under different street names) and are all part of the same entry and share the same reference number.
Some boundary walls, gates and gate-piers are listed as part of the house entry and have been included under the heading “Walls etc.”
Definitions of Historic Scotland’s Categories
Category A
Buildings of national or international importance, either architectural or historic, or fine little-altered examples of some particular period, style
or building type.
Category B
Buildings of regional or more than local importance or major examples of some period, style or building type which may have been altered.
Category C(S)
Buildings of local importance, lesser examples of any period, style or building type, as originally constructed or altered, and simple,
traditional buildings, which group well with categories A and B or are part of a planned group such as an estate or industrial complex.
C
Areas
Ref
No
Street Number House Name Walls
etc
Date Architect Cate-
gory
Style
Yes 34695 Abercromby E 9 Auchentail Yes 19thc l B Classical
Yes 34720 Abercromby E 15 No 19thc l Stewart & Paterson extnsion 1916 B Classical
Yes 34699 Abercromby E 19 No 1907 Mitchell & Whitelaw B Arts & Crafts
Yes 34698 Abercromby E 17 No 1907 Mitchell & Whitelaw B Arts & Crafts
Yes 34697 Abercromby E 13 Yes 1900 c B
Yes 34700 Abercromby W 18 Summer House only No 19thc l C(S)
Yes 34702 Albert 4 Moorgate Yes 1903 A N Paterson B Arts & Crafts
Yes 34812 Campbell 43,45 Yes 1856 B Classical porch 
61

Page 271

Appendix A continued
C
Areas
Ref
No
Street Number House Name Walls
etc
Date Architect Cate-
gory
Style
Yes 34696 Charlotte 47 Green Park No 1935 John Boyd B Art Deco
Yes 34719 Charlotte 44 No 19thc l C(S)
Yes 34718 Charlotte 45 No 1909 William Leiper & W Hunter McNab 1913 B A & C / Eng Shavian
Yes 34717 Charlotte 43 No 1906 William Leiper B A & C / Eng Shavian
Yes 34716 Charlotte 41 No 1906 William Leiper B A & C / Eng Shavian
Yes 34715 Charlotte 33 The Crossways Yes 1914 Stewart & Paterson B Arts & Crafts + Renaissance doorcase
Yes 34720 Charlotte 46 Arden No 19thc l Stewart & Paterson extnsion 1916 B Classical
Yes 34757 Colquhoun 62 Kildare Lodge Yes 1860c C(S)
Yes 34755 Colquhoun 41 Galloway Cottage No 1865? Alexander Thomson? + William Spence 1877 B Greek revival
Yes 34760 Colquhoun U 6 Lynton Yes 1908 William Leiper B
Yes 34761 Colquhoun U 8 The Hill House Yes 1902 Charles Rennie Mackintosh A Modern idiom Scots Baronial
Yes 34759 Colquhoun U 4 Braeriach Yes 1909 Robert Wemyss B Arts & Crafts
Yes 34758 Colquhoun U 2 Whincroft Yes 1915 A N Paterson B
Yes 34762 Colquhoun U 15 The White House Yes 1899 M H Baillie Scott A Arts & Crafts / Voyseyesque
Yes 34763 Colquhoun U 17 Drumadoon Yes 1901-3 William Leiper A Arts & Crafts
Yes 34770 Dhuhill Drive W Brincliffe Yes 1907 Frank Burnet, Boston & Carruthers B Free Style
Yes 34769 Dhuhill Drive W Dhuhill House No 1847 B Franco-Italianate
Yes 34771 Dhuhill Drive W Greycourt No 1911 A N Paterson A Arts & Crafts + renaissance 17th c
Yes 34772 Dhuhill Drive W Letham Hill No 1914 John Burnet & Son B Arts & Crafts S
Yes 34774 Douglas Drive Red Tower Yes 1898 William Leiper A Franco/Sc Renaissance + Shavian OE
Yes 34773 Douglas Drive Tordarroch Yes 1883 William Leiper B Shavian Old English
Yes 34776 Easterhill 4 Dunluce No 1907 Mitchell & Whitelaw B Arts & Crafts S
Yes 34775 Easterhill 3 No 1907 Mitchell & Whitelaw B Arts & Crafts
Yes 34780 Glasgow 23 No 19thc
m
C(S)
Yes 34781 Glasgow 25 No 1898 Robert Wemyss B Free Style
Yes 34782 Glasgow 29 No 19thc l C(S)
Yes 34784 Glenfinlas U Clunie Hill Yes 19thc l B
Yes 34785 Havelock 19 No 19thc l C(S)
Yes 34816 Havelock 26 No 19thc l William Leiper addition 1893 C(S) Classical
62

Page 272

Appendix A continued
C
Areas
Ref
No
Street Number House Name Walls
etc
Date Architect Cate-
gory
Style
Yes 34786 Henry Bell 23 Redcote No 1881 T L Watson B Shavian Old English / Arts & Crafts
Yes 34787 James 77 Methfield No 19thc l C(S)
Yes 34788 James 89 Lomond School No 19thc
m
William Leiper remodelled 1888 & 1891 B Jacobean
Yes 34798 John 76 Glen Kin Yes 19thc
m
William Leiper additions 1889 B
Yes 34799 John 80 Yes 19thc
m
B
Yes 34797 John 70 No 1840c B DEMOLISHED
Yes 34800 Kennedy Drive Cuilvona No 1909 Duncan McNaughton (+ 1930) B Arts & Crafts
Yes 34810 King W 108 Carrisbrooke Yes 1860 William Fraser additions 1901 B
Yes 34812 Millig 14 Yes 1856 B Classical porch
Yes 34814 Millig 20 Yes 1872 William Leiper conservatory 1901 +AN Paterson 1910 B Classical
Yes 34813 Millig 18 Wester Millig Yes 1870 William Leiper (adtns AN Paterson & Douglas 1903) B French
Yes 34880 Millig 39 The Ingle Yes 1858 (Campbell Douglas & Paterson 1909 & Paterson 1910) C(S)
Yes 34815 Millig 22 No 1895 A N Paterson B Arts & Crafts
Yes 34816 Montrose 19, 19A
19B
No 19thc l William Leiper addition 1893 C(S) Classical
Yes 34819 Montrose E 31 No 1860c William Leiper addition 1880c B Classical
Yes 34820 Montrose W 1 Dalfruin Yes 19thc l B
Yes 34898 Montrose West L 7a Elstane Yes 19thc
m
+ Duncan McNaughtan 1878 & 1901 C(S)
Yes 34898 Montrose West L 7a Yes 19thc
m
+ Duncan McNaughtan 1878 & 1901 C(S)
Yes 34821 Munro Drive E 6 Easterhill No 1910c Mitchell & Whitelaw B Arts & Crafts
Yes 34822 Munro Drive W 4 Brantwoode Yes 1895 William Leiper A Arts & Crafts/Shavian Old English
Yes 34823 Munro Drive W 6 Strathmoyne Yes 1899 Robert Wemyss B Arts & Crafts/Shavian Old English
Yes 34844 Queen 32 Deanston Yes 19thc l C(S)
Yes 34839 Queen 25 Yes 1898 William Leiper C(S) Former stables
Yes 34840 Queen 6 Haywood No 1874 C(S)
Yes 34841 Queen 10 Westward No 19thc l C(S)
Yes 34842 Queen 20 Ardvuela Yes 19thc l B
Yes 34814 Queen 33 Woodend Yes 1872 William Leiper conservatory 1901 +AN Paterson 1910 B Classical 
63

Page 273

Appendix A continued
C
Areas
Ref
No
Street Number House Name Walls
etc
Date Architect Cate-
gory
Style
Yes 34843 Queen 24 Yes 19thc
e
C(S) Classical
Yes 34788 Queen 13 No 19thc
m
William Leiper remodelled 1888 & 1891 B Jacobean
Yes 34851 Rossdhu W Longcroft No 1901-2 A N Paterson A Scottish Renaissance 17th c
Yes 34862 Sinclair 113 Moorlands Yes 1873 B
Yes 34874 Sinclair 116 Station Master's Hse No 1894 C(S)
Yes 34878 Sinclair 146 Drum-Millig No 1909 A N Paterson B Arts & Crafts
Yes 34877 Sinclair 134 Albion Lodge No 1883 William Leiper B Arts & Crafts/Shavian Old English
Yes 34860 Sinclair 107 Thornton Lodge No 1857 Boucher & Cosland B Italianate
Yes 34875 Sinclair 118 Rokneys Yes 1899 Robert Wemyss B
Yes 34873 Sinclair 106 No 1850c William Spence C(S)
Yes 34869 Sinclair Victoria Halls No 1887 J & R S Ingram (AN Paterson minor+ 1899) B Scots Baronial town hall
Yes 34866 Sinclair Old Millig Toll Hse No 19thc
e
B
Yes 34858 Sinclair 101 Millfield Yes 19thc
e-m
B
Yes 34864 Sinclair Dhuhill Lodge Yes 1898 William Leiper B Scots Baronial
Yes 34863 Sinclair 127 Dhuhill Yes 19thc
m
James Smith? B
Yes 34861 Sinclair 109, 111 Cawdor Lodge & Tower Hse No 1860 (R Wemyss minor additions) B
Yes 34859 Sinclair 103 Rowanmore Yes 1860c C(S)
Yes 34865 Sinclair 135 Ardluss Yes 1900 William Leiper B Arts & Crafts
Yes 34876 Sinclair 132 Ballytrim Yes 1926 Stewart & Paterson? C(S) Arts & Crafts
Yes 34872 Sinclair Hermitage Pk War memoiral Yes 1923 A N Paterson A
Yes 34854 St Michael 5 No 19thc l C(S)
Yes 34884 Suffolk 34 & 36 Kintillo House No 1860c (William Leiper 1888&1889) B
Yes 34883 Suffolk 26 No 19thc
m
B
Yes 34822 Suffolk 22a No 19thc
m
C(S)
Yes 34881 Suffolk 25 Auchenteil Yes 1864 B
64

Page 274

Appendix A continued
C
Areas
Ref
No
Street Number House Name Walls
etc
Date Architect Cate-
gory
Style
Yes 34879 Suffolk 19 No 1859 C(S) Tudor Revival
Yes 34880 Suffolk 23 The Grange Yes 1858 (Campbell Douglas & Paterson 1909 & Paterson 1910) C(S)
Yes 34885 Sutherland Cresc L 6 No 19thc l C(S)
Yes 34886 Sutherland Cresc L 7 No 19thc l C(S)
Yes 34887 Sutherland Cresc U 1 Rhu-Arden Yes 1871 c William Leiper B Greek Revival
Yes 34890 Sutherland Cresc U 2 Terpersie (Thurlow) No 1871 William Leiper's own house B Arts & Crafts “English Cottage"
Yes 34879 Sutherland Cresc L 1 No 1859 C(S) Tudor Revival
Yes 34891 Victoria The Lindens No 19thc l B
Appendix B
Tree Preservation Orders in the Conservation Areas
Reference Nos. Reference Nos. Date Location
Argyll and Bute Dumbarton
5/04 01.04.04 Burnside House, 38-40 Campbell Street
100 TPO 16 16.10.72 Chapel Acre
TPO 40 King’s Crescent
TPO 35 15.08.97 Lansdowne Park
TPO 9 Woodend 
65

Page 275

Appendix C
The Planning Context:
The National Level
Relevant legislation and
guidance forming part of
the national planning
framework in Scotland is
listed in table 1. This is
not an exhaustive listing
but contains the docu-
ments that the Group
used in reaching an un-
derstanding of the work
that they were undertak-
ing.
Table 1
Legislation and Guidance pertinent to Conservation Areas
Legislation
Town and Country Planning (General Development) (Scotland) Order 1992
Town and Country Planning (Scotland) Act Ch 8 1997
Planning (Listed Buildings and Conservation Areas) (Scotland) Act Ch 9 1997
Planning etc.(Scotland) Act 2006 asp 17
Guidance
SPP 1 The Planning System
SPP 21  Greenbelts
NPPG 18 Planning in the Historic Environment: Designing Places. Nov 2001
PAN 52 Planning in Small Towns
PAN 67 Housing Quality. Feb 2003
PAN 68 Design Statements. August 2003
PAN 71 Conservation Area Management. December 2004.
A Guide to Conservation Areas in Scotland: Guide to the designation, safeguarding and 
enforcement of Conservation Areas 2005
Circular 17/1987 New Procedures and Revised Guidance relating to Listed Buildings in
Conservation Areas
Circular 9/1992 Planning and Compensation Act 1991 Enforcement of Tree Preservation
Orders
Memorandum of Guidance on Listed Buildings and Conservation Areas 1998
Conservation Plans: A guide to the Preparation of Conservation Plans 2000
Guide to the Protection of Scotland’s Listed Buildings– what it means to Owners and
occupiers. 2006
66

Page 276

Appendix C continued
C2 Former Planning Policies (West Dunbartonshire)
The Plan prepared for
West Dunbartonshire in
1999 when Helensburgh
came under the jurisdiction
of that Authority is theoreti-
cally the extant planning
guidance. However, it is
some time since it was
written and the Conserva-
tion Areas are now the re-
sponsibility of Argyll and
Bute Council. The relevant
policies in the Dumbarton
plan are listed in Table 2.
These are the policies that
have been operational until
fairly recently. Therefore it
is the success or failure of
the implementation of
these policies that is
largely reflected in the cur-
rent state of the Conserva-
tion Areas.
Table 2
Relevant Policies in the West Dunbartonshire Council Plan
Policy No DC 1 Development proposals to have a high standard of building and landscape design (criteria
given)
Policy No BE 2 Preparation of Character Appraisals for Conservation Areas (CAs)
Policy No BE 3 High standards for renovations, alterations and extensions in CAs
Policy No BE 4 Presumption for retention of buildings in CAs.
Policy No BE 5 Outline planning applications in CAs
Policy No BE 6 Reassessment and update of Article 4 Direction Orders
Policy No BE 7 Upper Helensburgh CA: criteria for new build
Policy No BE 8 Identifying new uses for vacant listed buildings
Policy No BE 9 Maintenance of listed buildings in Council  & private ownership
Policy No BE 10 Design and choice of materials for listed buildings
Policy No BE 11 Criteria for listing further buildings
Policy No BE 12 Responsibilities that come with listed buildings
Policy No BE 14 Demolition of derelict properties
Policy No H 5 Maintaining and enhancing the character of residential areas
The full text of these policies is contained in the Plan, copies of which can be consulted in Helens-
burgh Public Library. Other policies may also apply. 
67

Page 277

Appendix C continued
C3 Current Local Planning Policies
The local plan for Argyll and Bute was the subject of a
Public Inquiry in 2007. The policies in the plan which are
relevant to Conservation Areas are listed in table 3. Some
of these have been the subject of amendments or objec-
tions. Nonetheless, planning applications are increasingly
being determined with these policies in mind. Policy LP
ENV 14 is key and, in its latest form, states:
“There is a presumption against development that does
not preserve or enhance the character or appearance of
an existing or proposed Conservation Area or its setting,
or a Special Built Environment Area.
New development within these areas and on sites forming
part of their settings must be of the highest quality, re-
spect and enhance the architectural and other special
qualities that give rise to their actual or proposed designa-
tion and conform to Historic Scotland’s Memorandum of
Guidance on Listed Buildings and Conservation Areas to-
gether with Appendix A of this Plan.
Outline planning applications will not normally be consid-
ered appropriate for proposed development in Conserva-
tion Areas.
The contribution which trees make towards the character
or appearance of a Conservation Area will be taken into
account when considering development proposals”.
Table 3
Relevant policies in the Argyll and Bute Council
Draft Finalised Local Plan
LP ENV 1 Development impact in the general environment
LP ENV 11 Development impact on historic gardens and designed land-
scapes
LP ENV 13a  Development impact on listed buildings
LP ENV 13b Demolition of Listed Buildings
LP ENV 14 Development in Conservation Areas & Special Built Environ-
ment Areas
LP ENV 15 Demolition in Conservation Areas
LP ENV 18 Protection and enhancement of buildings
LP ENV 19 Development setting, layout and design
LP BUS 1 Business and Industry proposals in existing settlements
LP ADV 1     Advertisements
LP TOUR 1 Tourist facilities and accommodation
LP HOU 4 Housing green-space
LP PG 1    Planning gain
LP ENF 1 Enforcement action
LP DEP 1 Departures to the Development Plan
The full text of these policies is contained in the Plan, copies of which can
be consulted in Helensburgh Public Library. Other policies may apply.
The text is also available on the Argyll and Bute Council website:
www.argyll-bute.gov.uk.
68

Page 278

Appendix D
Analysis of the Questionnaire Responses
Introduction
The questionnaire was produced as a means of obtaining views on selected topics whilst providing opportunities for free comment. In total,
150 were issued and 48 were returned. Additionally, there were several sets of very detailed comments not submitted via the questionnaire
which have been taken into account in this finalised document.
Q1. It would be helpful to know a little about your interest in this topic. Please tick all or any of the following that apply:
Resident within the Conservation Areas (CAs)
Resident in Helensburgh
Have professional interest in planning, architecture or related professions
Member of an organisation concerned with the future of Helensburgh
Involved with Community Council or Local Authority
Answers to Q1.
Background Residency Total
In Helensburgh (Not in Helensburgh
In CA Not In CA
Professional 7 2 2 11
Organisation 6 8 1 15
Community Council or Local
Authority
3 5 4 12
Total 16 15 7 38
Commentary:  The headings under background in the table above are short-forms for the fuller statements in the question posed. There is
almost equal representation of residents in the CAs and other Helensburgh residents. The majority of respondents not living in Helensburgh
had a professional or local government interest. 
69

Page 279

Q2. To what extent does the draft Appraisal meet the following purposes?  Please tick a box in each row
The text for the rows on the form is the same as that in the first column of the table below.
Answers to Q2.
Aspect of document Response
Very Well Well Partially Not at all Not sure Total No response
Analyses what makes the place
special?
23 22 1 0 0 46 0
Identifies opportunities for enhancement 4 21 17 1 1 44 2
Sets out changing needs 5 17 16 1 3 42 4
Defines boundaries 20 17 6 0 0 43 3
Reviews boundaries 9 22 9 1 1 42 4
Ensures consistent decision-making 3 15 13 6 6 43 3
Assists in policy formulation 12 15 11 1 2 41 5
Provides a basis for a programme of
action
10 13 17 3 1 44 2
Enables active management 5 18 12 3 4 42 4
Provides supplementary planning
guidance
8 16 13 5 2 44 2
Total 99 176 115 21 20 441 29
Commentary: The elements given were those identified in various guidance documents relating to the preparation of Appraisals for
Conservation Areas.  The response was overwhelmingly favourable.  The weakest performance was against the statement “ensures
consistent decision making”.  The Group agrees with this.  Perhaps it would have been better to have said “assists in” rather than
“ensures”. However, in the draft document there was little direct guidance available to those taking decisions on planning matters in
the CAs. The strongest marking was in relation to the analysis of what makes the place special.  This was very rewarding as this is
the element that we felt we should major on and was also the one that caused us the most heart-searching.
70

Page 280

Q3. Please list the issues/changes which are eroding the character of the Conservation Areas and which you would like to see
Answers to Q3
Issues/ Changes No of
Mentions
Total per
category
BASIC INFRASTRUCTURE 36
Issues/Changes 5
Pavements/paths 13
Lighting 5
Drainage 3
Street furniture 2
Parking 1
Traffic management 3
Road signs 4
STREETSCAPE 31
Verges 12
Trees 14
Lamp standards 1
Street name signs 4
ELEMENTS OF CHARACTER 23
Quality of building design 7
Appropriateness of design 3
Appropriateness of materials 2
Character of boundaries 4
Entrances 1
Plot density 3
Issues/Changes No of
Mentions
Total per
category
ELEMENTS OF CHARACTER
contd
Use of non-permeable surfaces 1
Outbuildings 1
Tree in gardens 1
TRENDS 20
Infill 12
Vandalism 2
Litter 1
Demolition of sandstone build-
ings
1
Loss of greenspace 4
OTHER 3
Householders being unaware of
CAs
2
Hermitage Park 1
ISSUES OUTWITH CAs 4
The Pier 1
Speed restrictions in roads 1
Empty shops 1
Dog Fouling 1 
71

Page 281

Commentary on Q3. : The Group had decided to leave this as a very open question and not to constrain the topics in any way. Despite the
calibre of the respondents, there was a tendency to highlight more widespread issues and not to confine responses to a) the Conservation
Areas or b) the issues that were eroding the character of the Areas. There was overlap/ transferability of some of the responses dealing with
infrastructure and streetscape in that it was not always clear to what extent the issues were seen to be practical or aesthetic. With hindsight
we would probably have obtained a clearer response by providing some examples or categories.
The topics that were most frequently mentioned were street trees, pavements/ paths, road verges and building infill (either by plot subdivsion
or by use of green space). Combining some of the categories used, there was equal concern over the quality and appropriateness of
building design and the choice of materials.
Q4. Do you consider the current boundaries are appropriate for a) Upper Helensburgh b) The Hill House?
Answers to Q4
CA Response
Yes No Not Sure No re-
sponse
Total
Upper Hel-
ensburgh
17 20 7 4 48
The Hill
House
22 13 7 6 48
Total 39 33 14 10 96
Commentary: Although the draft Appraisal did identify some boundary issues in both CAs, the responses can hardly be taken as indicating
a strong conviction for or against in either case.
Q5. Would you support the undertaking of an evaluation of the town centre as a further Conservation Area?
Answers to Q5
Yes No Not Sure No response Total
32 9 3 4 48
Commentary:  The question posed related to undertaking an evaluation – not to seeking designation. Those answering in the affirmative
often attached caveats about the creation of another CA and several of those saying no, did so on the basis that they were opposed to a
designation on the grounds of it stifling development and therefore saw no point in exploring the situation. There is clearly support for an
evaluation.
72

Page 282

Q6. What would improve this draft document?
Answers to Q6.
The main suggestions for improvement were:
Provide a summary
Make it more succinct
Avoid repetition
Make the main message clearer
Expand the current issues section
Reduce the historical and discussion sections
Produce an audit of the pre WW2 buildings and settings
Make clear that good contemporary design is appropriate in the CAs
Discuss the interface between the CAs and the rest of the town.
Commentary: In retrospect, there might have been merit in providing more of a structure against which people could comment. However, as
we had hoped, this question produced a welter of relevant, useful, detailed comment on all aspects of the document. Those above were
among the recurring points that dealt with the document as a whole. There was also much congratulatory comment. 
73

Page 283

Appendix E
Garden Trees and their contribution to the streetscape
Trees in gardens as seen from the road
The trees in gardens make a major contribution to the streetscape and sense of place.
This Appendix is a sampling of two roads :
¾James Street which runs North-South
¾Queen Street which runs East-West
Of especial note are the following:
¾the similarity of distribution of large specimens on both sides of James Street
¾the unequal distribution of planting on Queen Street
¾the abundance of trees (and shrubs but not surveyed) on the north side of Queen Street in the front gardens – excepting where new
bungalows have been built
¾the scarcity of planting on the south side of Queen Street where houses and outbuildings back close on the street.
David Sinclair 2007
74

Page 284

Below is a diagram of James Street from Queen Street to West Argyle Street with the streets shown in grey
West side East side
Millig Street
Stafford Street
West Montrose Street
West Argyle Street
Sycamore
Holly, Cypress
Laburnum, Yew, Lime
Birch, Laburnum, Magnolia
Laurel, Flowering Cherry
Willow, Weeping Ash
Lime, Weeping Ash, Cypress
Laburnum, Rowan
Flowering Cherry, Horse Chestnut
Sycamore, Cherry
Hornbeam
Maple, Rowan
Crab Apple, Maple
Rowan
Queen Street 
Maple
Beech
Pear, Cherry, Maple
Wych Elm, Bay Laurel, Magnolia
Cypress
Flowering Cherry
Wych Elm, Flowering Cherry, Sycamore
Copper Beech, Birch
Weeping Ash, Golden Cypress
Rowan, Strawberry Tree
Magnolia, Flowering Cherry
Scots Pine, Horse Chestnut
Copper Beech, Flowering Cherry
Birch, Yew, Willow
Sycamore, Copper Beech
Flowering Cherry, Horse Chestnut 
75

Page 285

Below is a diagram of Queen Street from Sinclair Street to Suffolk Street showing the streets in grey
North Side South Side
Sinclair Street
Lime, Sycamore
Flowering Cherry, Hornbeam
Lime, Weeping Ash
Golden Cypress, Maple, Holly, Birch, Cherry
Colquhoun Street
Yew, Maple Holly, Cedar
Cypress, Cedar
Dogwood, Maple, Golden Cypress
Sycamore, Beech
Rowan
James Street
Lime, Douglas Fir, Birch
Flowering Cherry, Larch
Pine, Lime, Flowering Cherry
John Street
Tulip Tree, Cypress
Larch, Sycamore, Maple
Cherry, Hawthorn, Oak
Oak, Flowering Cherry
Weeping Ash
Copper Beech, Horse Chestnut
Lime, Sycamore, Flowering Cherry
Willow, Spruce, Maple, Yew
Beech, Holly, Willow, Birch
Sycamore, Lime, Beech
Redwood, Oak
Laburnum, Sycamore, Maple
Yew
Birch, Cherry
Sycamore
Sycamore
Flowering Cherry, Willow
Spruce
Maple, Yew
Suffolk Street
76

Page 286

Appendix F
Possible Boundary Changes to be considered at the Review stage
The Hill House Conservation Area (possible World Heritage Site Buffer Zone):
1. relocation of the northern boundary some 250 metres north of the north side of the woodland plantation
2. moving the southern boundary to the centre of the carriageway of West Rossdhu Drive thus incorporating the railway halt and the
wide verge, trees and boundary wall along the north side of West Rossdhu Drive
3. in conjunction with “A” below, bring in the Millig Burn and its associated wilderness.
Upper Helensburgh Conservation Area:
The adjustments which are suggested for review primarily involve the removal of areas of post war housing and the incorporation of contigu-
ous sites of listed buildings.
A. removal of the post war housing comprising Sinclair Drive and various cul-de-sacs extending eastwards
B. inclusion of the Golf Clubhouse since it is of a similar vintage to the neighbouring properties within the Conservation Area
C. inclusion of Victoria Infirmary and Helensburgh Cemetery
D. review the boundary in the vicinity of King’s Crescent
E. consider inclusion of the properties along the south side of East Montrose Street
F. removal of a small number of modern houses to the west of Woodend Street and to the north of West King Street
G. removal of the southwards bastion extending along the south side of West King Street as far as Suffolk Street
H. removal of the whole of the area to the north of the south side of Kennedy Drive
I. Inclusion of A.N. Paterson, Canary Houses on the west side of Rowallan Street and the north side of Millig Street
J. South side of Argyle Street.
A new Conservation Area?
An evaluation of the town centre could be done, with a view to designating it as a Conservation Area. 
77

Page 287

Appendix G
Ideas Generated by Consultation for Future Action
During the process of preparing the Appraisal, especially during the consultation phase, many ideas were generated concerning what might
be done to preserve or enhance the quality of the Conservation Areas.  These thoughts are more closely linked to a future Management Plan
for the Areas and hence, do not form part of the Appraisal.  Nonetheless, in order to preserve them for future consideration, they have been
collected together and assembled into groups according to what aim the ideas were presumed to be seeking to achieve.  Some are more
controversial than others and some will undoubtedly provoke fierce debate. All are presented so that they can be evaluated and
accepted or rejected.
1. To ensure the preservation and enhancement of the
Special Character
1.1 Apply planning policy guidance consistently
1.2 Judge planning applications on the basis of the full
range of impacts
1.3 Explore means of ensuring that trees in the Conser-
vation Areas are safeguarded
1.4 Set out policies and criteria to assist decision making
on planning control matters
1.5 Ensure that public utilities and Council Departments
require clearance for actions
` 1.6 Support the bid for World Heritage status for The Hill
House
1.7 Identify emerging issues and make recommendations
for their resolution
1.8 Consider preparing a bid to the Historic Environment
Regeneration Fund for implementation of the plan
1.9 Investigate the availability of funds for maintenance
2. To encourage appropriate preservation and enhance-
ment
2.1 Develop incentive schemes
2.2 Produce a design guide for new build within Conser-
vation Areas
2.3 Produce advice on the removal/replacement of
garden trees and shrubs
2.4 Create arrangements to ensure that all residents are
aware of the legal situation and any guidelines
2.5 Produce advice on traditional garden plants
2.6 Set out clearly the responsibilities of owners and
occupiers
2.7 Set out criteria for judging the feasibility of retaining
features
2.8 Provide guidance on restoration opportunities
2.9 Examine the scope for undoing conversions
2.10 Identify emerging issues and make recommenda-
tions for their resolution
2.11 Produce a Q&A booklet for residents
2.12 Investigate funding sources and grant giving
schemes
78

Page 288

Appendix G continued
3. To create a database to facilitate future assessment and
planning
3.1 Establish database framework and accessibility
3.2 Monitor standards of maintenance
3.3 Establish a means of monitoring the state of the
resource
3.4 Compile a CD-ROM or DVD with key information
3.5 Complete a townscape audit
3.6 Complete a plot size analysis
3.7 Create a register of example feu conditions
3.8 Commission a survey of garden features
3.9 Ensure relevant publications are acquired by the
local library
3.10 Evaluate effectiveness of existing Tree Preservation
Orders
3.11 Produce a review of Tree Preservation Orders and
consents granted
4. To increase awareness of the special character of the
area
4.1 Arrange for plaques to be erected outside notable
houses
4.2 Produce a leaflet for the general public
4.3 Develop a series of trail leaflets—architects, styles
etc.
4.4 Produce a DVD about Helensburgh and its Conser-
vation Areas
4.5 Ensure information about the Conservation Areas is
on Helensburgh web sites 
79

Page 289

1 2 3 4 5 6
7 9 10 11 128
Front Cover Acknowledgements
1, 2, 3, 4, 6, 7, 8, 10 & 11 Jim Shimmins
5 & 12 Jenny Carlile
80

Page 290

designing
A Policy Statement for Scotland
streets
Policies
Street design must consider place before
movement.
Street design guidance, as set out in this
document, can be a material consideration in
determining planning applications and appeals.
Street design should meet the six qualities of
successful places, as set out in Designing Places.
Street design should be based on balanced
decision-making and must adopt a
multidisciplinary collaborative approach.
Street design should run planning permission
and Road Construction Consent (RCC) processes
in parallel.
© Crown copyright 2010
ISBN: 978-0-7559-8264-6
RR Donnelley B63780 03/10
www.scotland.gov.uk
>
>
>
>
>
designingstreets
A
PolicyStatementforScotland

Page 291

Contents
1 Foreword
John Swinney MSP
Cabinet Secretary for Finance
and Sustainable Growth
3 Introduction
Status and aims of Designing Streets
The value of good street design
Policy relationship
Who is Designing Streets for?
Development of the document
Streets and roads
The relationship of Designing Streets
to main and busy streets
5 How to use this document
7 Part 1: General: Creating streets and places
11 Part 2: Detail: Getting the design right
55 Part 3: Process: How to achieve better outcomes
59 Conclusion
60 Annex: Technical questions and answers
What is the legal and technical context?
What is the risk and liability?
What are the issues regarding disability
discrimination?
What are the adoption and maintenance issues?
64 References
© Crown copyright 2010
ISBN: 978-0-7559-8264-6
The Scottish Government
St Andrew’s House
Edinburgh
EH1 3DG
Produced for the Scottish Government by
RR Donnelley B63780 3/10
ImagesSuppliedby
ATKINS
Cadell2 LLP
City of Edinburgh Council
Dougie Barnett Photography
EDAW (AECOM)
Gillespies
HTA
John Cooper Photography
John Thomson & Partners
Karen Esslement
Keith Hunter Photography
Land Use Consultants
Living Streets
Malcolm Fraser Architects
Parc Craigmillar
Paul Zanre Photography
Phil Jones Associates
WSP
Acknowledgments
Designing Streets was produced by a
multidisciplinary team led by WSP UK.
CoreTeam
Elaine Barrie (WSP)
Andrew Cameron (WSP)
Karen Esslemont (EDAW)
Keith Gowenlock – Project Director (WSP)
Colin Innes (Shepherd and Wedderburn LLP)
Phil Jones (Phil Jones Associates)
Neil McDonald (WSP)
David Nicol (WSP)
Chris Pittner (WSP)
Alan Young (WSP)
SteeringGroup
Mic Ralph – SCOTS (Glasgow City Council)
Stuart D’all – SCOTS (Perth and Kinross Council)
Paul Ince – SCOTS (East Lothian Council)
Neil McLean – SEPA

Page 292

John Swinney MSP
Cabinet Secretary for Finance and Sustainable Growth
place
Foreword
Scotland’s best streets provide some of the most valuable social
spaces that we possess. The process of street design offers an
opportunity to deliver far more to our society than simply transport
corridors. Well-designed streets can be a vital resource in social,
economic and cultural terms; they can be the main component of
our public realm and a core element of local and national identity.
Well-designed streets can also be crucial components in Scotland’s
drive towards sustainable development and responding to climate
change. Attractive and well-connected street networks encourage
more people to walk and cycle to local destinations, improving
their health while reducing motor traffic, energy use and pollution.
Historically, Scotland has produced a wealth of unique and
distinctive streets, squares, mews and lanes, and I believe that
there is a great deal that can be learned from our past successes
in this regard. Designing Streets is now positioned at the heart of
planning, transport and architecture policy. This document underpins
Scottish Ministers’ resolve to move away from a prescriptive,
standards-based approach in order to return to one which better
enables designers and local authorities to unlock the full potential
of our streets to become vibrant, safe and attractive places.
I welcome Designing Streets as a new policy document which
puts place and people before the movement of motor vehicles.
The Scottish Government is committed to an agenda of sustainable
development that focuses on the creation of quality places and
Scottish Ministers believe that good street design is of critical
importance in this effort. This policy statement represents a step
change in established practices and, given the direct influence
that streets can have on our lives and environment, I believe it to
be an essential change.
before movement
1

Page 293

Introduction
LandUseConsultants
2

Page 294

3
StatusandaimsofDesigningStreets
This document is the first policy statement in Scotland for street
design.
The premise upon which the document is based is that good
street design should derive from an intelligent response to location,
rather than the rigid application of standards, regardless of
context. Designing Streets does not, thus, support a standards-
based methodology for street design but instead requires a
design-led approach. This demands taking into account site-
specific requirements and involves early engagement with all
relevant parties. Designing Streets marks the Scottish
Government’s commitment to move away from processes which
tend to result in streets with a poor sense of place and to change
the emphasis of policy requirements to raise the quality of design
in urban and rural development.
Thevalueofgoodstreetdesign
Streets exert an immense influence upon our lifestyles and
behaviour. Street design also has a direct influence on significant
issues such as climate change, public health, social justice,
inclusivity and local and district economies. Designing Streets
recognises these pressures and seeks to build a collective
response through the design of new streets and the regeneration
of existing streets that is informed by as wide a range of issues
and stakeholders as possible. Through the introduction of this
policy, the Scottish Government seeks to ensure that specific
interests are no longer promoted without an appreciation of the
wider context. Collaboration and awareness between what have
often previously existed as singular processes is vital if the aims of
Designing Streets are to be met.
Policyrelationship
This document sits alongside Designing Places1, which sets out
government aspirations for design and the role of the planning
system in delivering these. Together, they are the Scottish
Government’s two key policy statements on design and place-
making. Both documents are national planning policy and are
supported by a range of design-based Planning Advice Notes
(PANs).
Designing Streets updates and replaces PAN 76 New Residential
Streets2 (which is now withdrawn) and, in doing so, marks a
distinct shift, raising the importance of street design issues from
the subject of advice to that of policy. In addition, all previous road
guidance and standards documents based on DB323 principles
are superseded by Designing Streets. Many local authorities in
Scotland have developed their own street design guidance and
there is still an important role for local guidance to ensure that
street design responds to local context. These existing documents
may contain information on construction details and local palettes
of materials which is still relevant, however information on
principles, layout and street geometry which is not consistent with
Designing Streets should be revised. Designing Streets should be
adopted by all Scottish local authorities or should provide the
basis for local and site-specific policy and guidance.
Designing Streets is not
astandards-based
document. Balanced
decision-making isat
thecoreof this policy.
Design-ledsolutions
must be employed.

Page 295

4
WhoisDesigningStreetsfor?
Designing Streets is aimed at everyone who plays a part in creating
or determining the quality of streets; architects, engineers,
planners, developers, politicians, local authorities and, indeed,
anyone who has an interest in how street design is taken forward.
It is important that professionals understand all of the key issues
and do not restrict their interest to any one particular area.
Designing Streets is expected to be used predominantly for the
design, construction, adoption and maintenance of new streets,
but it is also applicable to existing streets subject to re-design.
Developmentofthedocument
Designing Streets was developed for the Scottish Government by
a multi-disciplinary team of roads and transportation engineers,
urban designers, planners and legal advisors, led by WSP UK.
The document has been informed by case studies and best
practice, and was subject to significant stakeholder consultation.
It derives, in essence, from Manual for Streets4, which was
produced for the Department for Transport, the Welsh Assembly
Government and Communities and Local Government. Manual
for Streets is evidence-based guidance which focuses on lightly
trafficked residential streets and cited and commissioned detailed
research. Designing Streets has been tailored to meet Scotland’s
needs and, as a policy document, does not reproduce this
evidence in detail.
Streetsandroads
Streets have to fulfil a complex variety of functions in order to
meet people’s needs as places in which to live, to work and to
move around. Their design requires a thoughtful approach that
balances potential conflicts between different users and
objectives. A clear distinction can be drawn in functional terms
between roads and streets as follows:
Roads are thoroughfares whose main function is to facilitate
the movement of motor traffic.
Streets have important public realm functions beyond those
related to motor traffic. They are typically lined with buildings
and public spaces and, whilst facilitation of movement is still a
key function, they normally support a range of social, leisure,
retail and commercial functions.
All thoroughfares within urban settings and rural boundaries
should normally be treated as streets.
Reference should no longer be made to road hierarchies based
on terminology such as local distributor/local access roads.
>
>
TherelationshipofDesigningStreets
tomainandbusystreets
Designing Streets provides policy that should be followed in
designing and approving all streets. Whilst its technical advice is
aimed particularly at residential and lightly trafficked streets, many
of the key principles are also applicable to other types of street,
for example rural and high streets. When considering busier
streets, the movement function of the street may well become
more significant or complex but this should be resolved through
an integrated design approach and should not compromise the
quality or the sense of place.
Design Manual for Roads and Bridges (DMRB)5 is the standard for
the design, maintenance and improvement of trunk roads and
motorways. There are some locations, however, where a more
sensitive design that follows the principles of Designing Streets
may well be appropriate, such as where a small burgh High Street
is also a trunk road.
Most importantly, a multi-disciplinary approach, full community
engagement and a balanced appreciation of context and function
is fundamental to successful outcomes in such cases.
The diagram below shows where streets and roads exist and
where they often meet.
Designing Streets policy and guidance should be applied within all urban and
rural boundaries

Page 296

5
Howtousethisdocument
Designing Streets is split into three parts plus an annex:
Part 1: General – Creating streets and places
Part 2: Detail – Getting the design right
Part 3: Process – How to achieve better outcomes
The document begins with an overview of creating places, with
street design as a key consideration. It then looks at the detail
of how to approach the creation of well-designed streets. This is
followed by a description of processes which should be followed in
order to achieve the best outcomes. Within each part, the policies
are highlighted, and then supported by background information.
The Annex provides a series of questions and answers on some
of the more technical issues.
>
>
>
General
Creating streets and places
Detail
Getting the design right
Process
How to achieve better outcomes
01
02
03
Detail
General
Process

Page 297

6
Creating
streetsand
places
KeithHunter

Page 298

7
Part01General
Creatingstreetsandplaces
Good street design can promote a better quality of living for everyone. Sustainable patterns of behaviour can be
influenced greatly by the intelligent design of streets. It is therefore essential that all parties involved in street design ensure
that streets contribute as positively to their environment as is possible.
Creating good streets is not principally about creating successful traffic movement: it is about creating successful places.
Streets have two key functions: place and movement.
In the more recent past, vehicle movement has often
dominated the design of streets, resulting in many
streets being out of context with their location and overly
influenced by prescriptive standards. The prime concern
of Designing Streets, in contrast, is to reverse this trend
and shift the focus firmly back to the creation of
successful places through good street design.
A‘senseofplace’
A sense of place can be considered as the character or
atmosphere of a place and the connection felt by people
with that place. A positive sense of place is fundamental
to a richer and more fulfilling environment. It comes
largely from creating a strong relationship between
the street and the buildings and spaces that frame it.
A positive sense of place encompasses a number of
aspects, most notably the street’s:
local distinctiveness;
visual quality; and
potential to encourage social and economic activity.>
>
>
policies
Street design must consider place before movement
Street design guidance, as set out in this document, can be a material consideration
in determining planning applications and appeals
>
>
General
Consider the place before vehicle movement
Source:LeonKrier
✗
✓

Page 299

8
Movement
Providing for movement along a street is vital, but it should not be
considered independently of the street’s other functions. The
need to cater for motor vehicles is well understood by designers,
but the passage of people on foot and cycle has often been
neglected. Walking and cycling are important modes of travel,
offering a more sustainable alternative to the car, making a
positive contribution to the overall character of a place, public
health, social interaction and to tackling climate change through
reductions in carbon emissions.
Achievingtherightbalancebetweenplaceand
movement
Streets should no longer be designed by assuming ‘place’ to be
automatically subservient to ‘movement’.
Good street design demands that issues of place and movement
are considered together. The status of a street is dependent on
its relative importance within a network in terms of both these
considerations, and its status should commonly determine the
design approach taken. It is only by considering both functions
that the right balance will be achieved, but the focus of street
design should be on creating a positive sense of place that is
supported by an appropriate movement pattern. Other than in
the design of motorways and some other inter-urban roads, it is
seldom appropriate to focus solely on either place or movement
functions, even in streets carrying heavier volumes of traffic, such
as high streets.
Place status denotes the relative significance of a street, junction
or section of a street in human terms. The most important places
will usually be near the centre of any settlement or built-up area,
but important places will also exist along arterial routes, in district
centres, local centres and within neighbourhoods.
In new developments, locations with a relatively high place function
would be those where people are likely to gather and interact with
each other, such as outside schools, in local town and district
centres or near parades of shops. Streets that pass through these
areas need to reflect the importance of these places in their
design, which in new developments should be identified at the
masterplan/scheme design stage.
Movement status can be expressed in terms of traffic volume
and the importance of the street, or section of street, within a
network. Movement status should be considered in terms of all
modes of movement, including vehicle traffic, pedestrian and
cycle flows and public transport. Movement status can vary along
the length of a route. Another way of assessing the movement
status of a street is to consider the geographical scale of the
destinations it serves. Here, movement status can range from
national networks (including motorways) through to city, town,
district, neighbourhood and local networks, where the movement
function of motor vehicles is slightly lower.
place
comes first
General

Page 300

9
Placeandmovementmatrix
Defining the relative importance of particular streets/roads in terms
of place and movement functions should inform subsequent
design choices. For example:
motorways – high movement function, low place function;
high streets – medium movement function, high place
function; and
residential streets – low to medium movement function,
medium to high place function.
This way of looking at streets can be expressed as a two-dimensional
matrix (right) where the axes are defined in terms of place and
movement. Areas where people are likely to gather and interact
with each other will have a high place function.
The matrix recognises that, whilst some streets are more
important than others in terms of traffic flow, some are also more
important than others in terms of their place function and deserve
to be treated differently. This approach allows designers to break
away from previous approaches to hierarchy, whereby street
designs were only based on traffic considerations.
Once the relative significance of the movement and place functions
has been established, it is possible to set objectives for particular
parts of a network. This will allow the local authority to select
appropriate design criteria for creating new links or for changing
existing ones.
Movement and place considerations are important in determining
the appropriate design speeds, speed limits and urban structure,
along with the level of adjacent development and traffic composition.
Planning Permission may be refused and the refusal defended at
appeal or local review solely on design grounds.
Designing Streets is national planning policy and its policies should
be taken into account by local authorities when determining
planning applications and producing guidance. Designing Places
and Designing Streets stand together as the two key design
policy statements for Scotland.
>
>
>
Streetdesignguidance,as
setoutinthisdocument,can
beamaterialconsideration
indeterminingplanning
applicationsandappeals
General
Place function
Residential street
High streetMotorway
Movem
entfunction
Cadell2LLP
andJCooper

Page 301

10
Gettingthe
designright
JohnThompsonandPartners

Page 302

11
Part02Detail
Gettingthedesignright
The issues around good street design are highly dependent on context and may vary considerably in their nature and
complexity from one circumstance to another. However, an approach which is underpinned by a consideration of the six
qualities of successful places set out in Designing Places has clear benefits as a methodology to ensure that key issues
are addressed. This policy statement elaborates on issues of street design in relation to these qualities and also describes
an approach to the development of well-designed streets from large-scale to detailed considerations.
– Distinctive
policy
Street design should meet the six qualities of successful places, as set out
in Designing Places
>
Detail
– Distinctive
– Safe & pleasant
– Easy to move around
– Welcoming
– Adaptable
– Resource efficient
These six qualities provide a framework which should be used
when considering street design. To help show how they relate to
each other, the table on the following pages identifies some of the
key considerations which relate to ‘quality’. This information is then
further supported by more detailed technical information on how
to create good street design.

Page 303

12
Thesixqualitiesofsuccessfulplaces:
Keyconsiderationsforstreetdesign
distinctive
Blockstructure
The urban form should be
distinctive with landmarks
and vistas that provide good
orientation and navigation of
an area
Contextandcharacter
The requirements and impact
of pedestrians, cycles and
vehicles should be reconciled
with local context to create
streets with distinctive
character
Opportunities should be
taken to respond to, and to
derive value from, relevant
elements of the historic
environment in creating
places of distinctive
character
>
>
>
Street design should
respond to local context to
deliver places that are
distinctive
safe&pleasant easytomovearound
Pedestriansandcyclists
Street user hierarchy should
consider pedestrians first
and private motor vehicles
last
Street design should be
inclusive, providing for all
people regardless of age or
ability
Achievingappropriate
trafficspeed
Design should be used to
influence driver behaviour to
reduce vehicle speed to
levels that are appropriate for
the local context and deliver
safe streets for all
Reducingclutter
Signs and street markings
should be kept to a minimum
and considered early in the
design process
Street lighting should be as
discreet as possible, but
provide adequate illumination
Street furniture should be
located for maximum benefit
and to reduce pedestrian
obstruction
>
>
>
>
>
>
Connectionswithinaplace
Street design should provide
good connectivity for all
modes of movement and for
all groups of street users
respecting diversity and
inclusion
Publictransport
Public transport planning
should be considered at an
early stage in the design
process
Junctiontypesand
arrangements
Junctions should be
designed with the
considerations of the needs
of pedestrians first
Junctions should be
designed to suit context and
urban form – standardised
forms should not dictate the
street pattern
>
>
>
>
Streets should be designed
to be safe and attractive
places
Streets should be easy to
move around for all users
and connect well to existing
movement networks
Detail

Page 304

13
welcoming
Walkableneighbourhoods
Street layouts should be
configured to allow walkable
access to local amenities for
all street users
Streetsforpeople
Streets should allow for and
encourage social interaction
>
>
Street layout and detail
should encourage positive
interaction for all members
of the community
adaptable resourceefficient
Connectionstowider
networks
Street patterns should be
fully integrated with
surrounding networks to
provide flexibility and
accommodate changes in
built and social environments
Integratingparking
Parking should be
accommodated by a variety
of means to provide flexibility
and lessen visual impact
Serviceandemergency
vehicles
Street layouts should
accommodate emergency
and service vehicles without
compromising a positive
sense of place
>
>
>
Orientation
Orientation of buildings,
streets and open space
should maximise
environmental benefits
Drainage
Streets should use
appropriate SUDS
techniques as relevant to the
context in order to minimise
environmental impacts
Utilities
The accommodation of
services should not
determine the layout
of streets or footways
Planting
Street design should aim to
integrate natural landscape
features and foster positive
biodiversity
Materials
Materials should be
distinctive, easily maintained,
provide durability and be of
a standard and quality to
appeal visually within the
specific context
>
>
>
>
>
Street networks should be
designed to accommodate
future adaptation
Street design should
consider orientation, the
integration of sustainable
drainage and use attractive,
durable materials that can
be easily maintained
Detail

Page 305

14
When designing streets, it is important to consider the relevant
issues in a hierarchical way, working from issues of structure
through to layout and geometry and on to matters of detail. The
guidance in Designing Streets is structured in this way to help inform
the understanding and approach of those involved in street design.
Guidance in support of the considerations in the preceding table
is now ordered hierarchically, providing information on street
design from macro to micro scales. The hierarchy is a guide to
understanding and addressing relevant issues, however there will be
overlaps between issues dependant on specific circumstances.
Streetdesignhierarchy
Streetstructure
Pedestrians and cyclists pg 15
Connections to wider networks pg 19
Connections within a place pg 20
Block structure pg 22
Walkable neighbourhoods pg 26
Public transport pg 28
Context and character pg 29
Orientation pg 31
Streetlayout
Achieving appropriate traffic speed pg 32
Junction types and arrangements pg 36
Streets for people pg 38
Integrating parking pg 40
Emergency and service vehicles pg 44
Streetdetail
Drainage pg 46
Utilities pg 48
Planting pg 49
Materials pg 50
Reducing clutter pg 51
Detail

Page 306

15
Streetstructure
Pedestriansandcyclists
Keyconsiderations
Street user hierarchy should consider pedestrians first and private motor vehicles last
Street design should be inclusive, providing for all people regardless of age or ability>
>
Edinburgh New Town
The block dimensions are of a scale that encourages walking
Detail
Pedestrians
Walking is the most sustainable form of transport. Streets should
be designed, not only to allow for walking, but to actively
encourage it to take place. The propensity to walk is influenced
not only by distance, but also by the quality of the walking
experience. All streets should offer a pleasant walking experience.
Sightlines and visibility towards destinations or intermediate points
are important for navigating and personal security, and they can
help people with cognitive impairment. Pedestrians may be
walking with purpose or engaging in other activities such as play,
socialising, shopping or just sitting. The issues for street design in
relation to these activities are explored later in the document.
Within the context of Designing Streets, pedestrians include
wheelchair users, mobility scooter users and people pushing
wheeled equipment such as prams.
Pedestrianmovement
The layout of our towns and cities historically suited pedestrian
movement though, over time, motor vehicles have come to
dominate our streets. A return to the prioritisation of pedestrian
movement over vehicle movement has implications for the design
of crossings and street interfaces.
Gillespies

Page 307

16
Surface level crossings can be of a number of types, as outlined
below:
Uncontrolled crossings – should have dropped kerbs.
Informal crossings – can be created through careful use of
paving materials and street furniture to indicate a crossing
place which encourages slow-moving traffic to give way to
pedestrians.
Formal crossings – of which the Zebra crossing type
involves the minimum delay for pedestrians when used in the
right situation. There are four types of Signalised crossings –
Pelican, Puffin, Toucan and Equestrian crossings. Puffin
crossings have a variable crossing time; they use pedestrian
detectors to match the length of the crossing period to the
time pedestrians take to cross. Toucan and Equestrian
crossings operate in a similar manner to Puffin crossings
except that cyclists can also use Toucan crossings, while
Equestrian crossings have a separate crossing for horse riders.
Equestrian crossings can also be combined with cycle and
pedestrian facilities. Signalised crossings are preferred by the
older people and people with visual and mobility impairments.
>
>
>
There are a number of general principles which should be
observed in the design of crossing places as follows:
Consideration should be given to the raising of crossings, of
whichever type to footway height where possible. Footway
surfacing of contrasting colour should be used to demonstrate
pedestrian priority and tactile paving should be used to
indicate the change in condition to visually impaired pedestrians.
Pedestrian refuges and kerb build-outs, used separately, or in
combination, effectively narrow the carriageway and so reduce
the crossing distance.
Footbridges and subways should be avoided; they are usually
unsuccessful and create hostile environments – the ground
level should be prioritised for pedestrians.
Pedestrian desire lines should be kept as straight as possible
at side-street junctions. Small corner radii minimise the need
for pedestrians to deviate from their desire line.
>
>
>
>
The effects of corner radii on pedestrians
Detail
Pedestrian desire line ( ) is maintained
Vehicles turn slowly (10-15 mph)>
> Pedestrian desire line deflected
Detour required to minimise crossing distance
Vehicles turn faster (20-30 mph)
>
>
>
Pedestrian does not have to look further behind to
check for turning vehicles
Pedestrian can easily establish priority because
vehicles turn slowly
>
> Pedestrian must look further behind to check for fast
turning vehicles
Pedestrian cannot normally establish priority against
fast turning vehicles
>
>
DevonCountyCouncil

Page 308

17
With small corner radii, large vehicles may need to use the full
carriageway width to turn. Swept-path analysis can be used to
determine the minimum dimensions required. The footway may
need to be strengthened locally in order to allow for larger
vehicles occasionally overrunning the corner.
The approach to footways and pedestrian movement should be
design-led. Any footway should be fit for purpose, but should give
primary importance to delivering positive, attractive spaces. There
is no maximum width for footways. In lightly-used streets (such as
those with a purely residential function), the unobstructed width
for pedestrians should generally be 1.5 – 2 m, however this can
be varied to accommodate character and practical requirements.
Additional width should be considered between the footway and
a heavily used carriageway, or adjacent to gathering places, such
as schools and shops.
Porch roofs, awnings, garage doors, bay windows, balconies or
other building elements should allow for clear movement of
pedestrians underneath.
Designers should attempt to keep pedestrian (and cycle) routes
as near to level as possible along their length and width, within
the constraints of the site. Longitudinal gradients should ideally be
no more than 5%, although topography or other circumstances
may require steeper gradients.
Inviting pedestrian link
Raised crossover, but located away from the desire line for pedestrians and therefore
ignored – the crossover should be nearer the junction with, in this case, a steeper
ramp for vehicles entering the side street
This can cause particular difficulty for pedestrians with mobility or visual impairments
Detail
JohnThompson&Partners,QueenElizabethPark
Andrew
CameronW
SP

Page 309

18
Cyclists
Cyclists should generally be accommodated on the carriageway.
Only where traffic volumes and speeds are high should the need
for a cycle lane be considered.
Cyclists are more likely to choose routes that enable them to keep
moving. Routes that take cyclists away from their desire lines and
require them to concede priority to side-street traffic are less likely
to be used. Designs should contain direct, barrier-free routes for
cyclists.
The design of junctions affects the way motorists interact with
cyclists. It is recommended that junctions are designed to promote
slow motor-vehicle speeds. This may include short corner radii as
well as vertical deflections.
Cycle tracks are more suited to leisure routes over relatively
open spaces. In a built-up area, they should be well overlooked.
The headroom over routes used by cyclists should normally
be 2.7 m (minimum 2.4 m). The maximum gradients should
generally be no more than 3%, or 5% maximum over a
distance of 100 m or less, and 7% maximum over a distance of
30 m or less. However, topography may dictate the gradients,
particularly if the route is in the carriageway. A cycle route with
a steep gradient may be better than none at all.
Cycling by Design 2010, alongside the Cycling Action Plan for
Scotland, is due for publication in April 2010 and will be available
at www.transportscotland.gov.uk.
Local Transport Note 2/08 Cycle Infrastructure Design6 contain
further details on designing for cycles.
Inclusivedesign
Inclusive design should be a first principle in street design. The
Disability Discrimination Act 20057 makes it unlawful for a public
authority, without justification, to discriminate against a disabled
person when exercising its functions.
PAN 78, Inclusive Design8, contains information on inclusion and
the roles and responsibilities of those involved in the built
environment. An inclusive environment is one which can be used
by everyone, regardless of age, gender, ethnicity or disability.
Issues around disability and age are especially relevant to those
involved in the design of the external environment. Particular effort
should be made to engage with representatives from these groups
and consider specific requirements when developing street design.
This should be undertaken at an early stage in the design process.
The requirements upon designers and decision makers regarding
mobility equality are discussed later in this document in the Annex.
>
>
The effect of corner radii on cyclists near turning vehicles
Detail
Cycle and car speeds compatible>
Danger from fast-turning vehicles cutting across cyclists>
DevonCountyCouncil
JohnThompson&Partners
The Department for Transport document, Inclusive Mobility9
provides detailed information on inclusive design. The Transport
Scotland document, Disability Discrimination Act: Good Practice
Guide for Roads10 contains information on inclusive design in the
construction, operation and maintenance of road infrastructure.

Page 310

19
Connectionstowidernetworks
Keyconsideration
Street patterns should be fully integrated with surrounding networks to provide flexibility and
accommodate changes in built and social environments
>
Connectinglayoutstotheirsurroundings
Street networks should, in general, be connected. Connected or
‘permeable’ networks encourage walking and cycling, and make
navigation through places easier. They also lead to a more even
spread of motor traffic throughout an area and so avoid the need
for distributor roads with less desirable place characteristics.
Permeability of places is a crucial component in good street design.
Internal permeability is important, but any area should also be
properly connected with adjacent street networks. A development
with poor links to the surrounding area creates an enclave which
encourages movement to and from it by car rather than by other
modes. New developments and alterations to existing street
networks should be designed with multiple access points that
connect with, and complement, existing street patterns.
Themovementframework
A key consideration for achieving sustainable development is how
design can influence the way that people choose to travel.
Designers need to respond to a wide range of policies aimed at
making car use a matter of choice rather than habit or
dependence. Regional and local transport strategies can directly
inform the design process as part of the policy implementation
process.
It is recommended that the movement framework for a new
development is based on the user hierarchy in the previous
section, Pedestrians and cyclists. Applying the hierarchy will lead
to a design that increases the attractiveness of walking, cycling
and the use of public transport. Delays to cars resulting from
adopting this approach are unlikely to be significant in residential
areas. The movement framework should also take account of the
form of the buildings, landscape and activities that contribute to
the character of the street and the links between new and existing
routes and places.
Internally permeable neighbourhoods lacking direct connections with one
another – to be avoided
Consider how best the site can be
connected with nearby main
routes and public transport
facilities
The typical cul-de-sac response
creates an introverted layout which
fails to integrate with its
surroundings
A more pedestrian friendly
approach that integrates with the
surrounding community – it links
existing and proposed streets and
provides direct routes to bus stops
The street pattern then forms the
basis for perimeter blocks which
ensure that buildings contribute
positively to the public realm
Bus stop Principal routes Internal streets
Integrating new developments into the existing urban fabric is essential
Detail
StreetsandPatterns,Marshall
TheUrbanDesignCompendium
✗

Page 311

20
Connectionswithinaplace
Keyconsideration
Street design should provide good connectivity for all modes of movement and for all groups of
street users, respecting diversity and inclusion
>
Detail
Connectedstreetnetworks
In recent decades, the dominant patterns of development have
been those in which housing, employment, retail and other
facilities have been created in a segmentary fashion or zoned in
separate areas, which are often poorly connected with one
another. Such developments often increase the reliance on car
use and discourage movement on foot.
Government policy now supports the creation of mixed-use
neighbourhoods with well-connected street patterns, where daily
needs are within walking distance of most residents. Layouts built
on these more traditional lines are likely to be more adaptable and
will lead to lower car use, thus contributing to wider transportation
and environmental objectives.
The dispersed and zoned layout, as shown in the suburban
sprawl diagram opposite, should not be used when designing
new developments and this model should be avoided, where
practicable, when considering existing or infill developments.
Developments and streets should generally be structured around
a compact and walkable layout. The diagram illustrating mixed and
connected neighbourhoods, opposite, illustrates how this can be
achieved; these layouts have a mix of uses spread throughout,
rather than a zoned approach to use.
To create a permeable network, it is generally recommended that
streets with one-way operation are avoided. They require additional
signs and result in longer vehicular journeys and higher speed.
✗
✓
Suburban sprawl
Mixed and connected neighbourhoods
[Community facilities] [Business park]
[Retail zone] [Residential zone]

Page 312

21
Casestudy
Residentialstreets:Polnoon
Polnoon is located at the western edge of
Eaglesham village, an 18th-century Conservation
Area village in East Renfrewshire. Planning
permission for the site had been obtained in 2006
for the development of housing in a typical
standards-led, cul-de-sac layout.
In 2008, the Scottish Government, Mactaggart &
Mickel Ltd and East Renfrewshire Council worked
in a collaborative process to re-design the site to
develop a new neighbourhood in accordance with
the principles of Designing Streets and Designing
Places.
The sequence of diagrams illustrates the
differences between the initial cul-de-sac layout
and the more permeable, pedestrian-friendly
design developed through the collaborative
re-design process.
The new layout offers a clear hierarchy of shared
surface public realm spaces – streets, lanes,
courtyards and a central square – which were
designed to reduce vehicle speeds and create a
more pedestrian-friendly environment. The
re-designed new neighbourhood contains improved
spatial permeability, an increased density from 92 to
121 dwellings and a more contextual treatment for
standard house type elevations. Planning
permission and RCC processes were run in parallel.
B-Plan
A simple, but key technique which was used in
developing the Polnoon masterplan was the
Bavarian B-Plan tool. This is an effective method
for developing ideas by colour coding the three key
issues in a layout: ‘movement’ in yellow, ‘buildings’
in red and ‘open space’ in green. The B-Plan
images to the right show the differences between
the previous consent and the re-designed
masterplan.
The Polnoon project sets a new standard for
residential development across Scotland. The
project clearly illustrates that, by putting place
before movement when considering the design of
streets, a better place can be created.
Detailed information on the Polnoon project can
be found at: www.scotland.gov.uk/Topics/
Built-Environment/AandP/Projects/Polnoon
Layout
Before After
Before – Cul de sac After – Hierarchy of streets
Bavarian B Plan: Bringing movement, buildings and open space all together
Before
18% Movement
15% Buildings
15% Open space (Public)
52% Open space (Private)
After
23% Movement
20% Buildings
15% Open space (Public)
42% Open space (Private)
Detail

Page 313

22
Urban blocks
Parking within potential for parking
on all streets
Important buildings
around square
Grass & trees
Informal lane
onto open
space
Small courtyard
housingOverlooked
pedestrian route
MORE
FORMAL
MORE
INFORMAL
Key frontage
MEWS
MEW
S
Blockstructure
Keyconsideration
The urban form should be distinctive with landmarks and vistas that provide good orientation and
navigation of an area
>
Detail
Structure
The structure of a street network can take a variety of forms, from
formal grid layouts to more irregular arrangements.
It is important to consider the street structures that are appropriate
in any given situation. It may be that an existing grid structure is
continued in order to maintain connectivity or perhaps it may be
more appropriate to break an existing pattern to respond to
important external factors such as vistas, topography or significant
building lines. What is important is that responses to layout
structure should be design-led and responsive to context. They
should not be the product of standard approaches or the
application of inappropriate models.
The principle of integrated access and movement means that the
perimeter block is usually an effective structure for residential
neighbourhoods. A block structure works in terms of providing
direct, convenient, populated and overlooked routes. In addition,
it makes efficient use of land, offers opportunities for enclosed
private or communal gardens, and is a tried and tested way of
creating quality places.
Within a block structure, the designer has more freedom to create
innovative layouts. The layouts illustrated in this section, and
variations on them (such as a ‘broken grid’ with the occasional
courtyard), are recommended when planning residential and
mixed-use neighbourhoods.
Consideration should be given to the layout and impact of
Sustainable Urban Drainage Systems (SUDS) when working on
street and block layouts, as these can have determining effects
on the overall urban structure. Detailed guidance on SUDS is
given in this document in the section Street detail, Drainage.
Andrew
CamreonW
SP
Diagram illustrating a range of street and place typologies

Page 314

23
Streetpatterns
Short and curved or irregular streets can contribute to variety and
a sense of place, and may also be appropriate where there are
topographical or other site constraints, or where there is a need to
introduce some variation for the sake of interest. However, layouts
that use excessive or gratuitous curves should be avoided, as
they are less efficient, reduce legibility and make access for
pedestrians and cyclists less direct.
Straight streets maximise connections between places and can
better serve the needs of pedestrians who prefer direct routes.
The regular spacing of junctions, where drivers are required to
slow, can be an effective method for reducing vehicle speeds on
straight road layouts.
Conventional culs-de sac, are strongly discouraged. The preference
is for networked routes and spaces which connect new residential
and mixed use areas together and link with existing development
forms.
Short culs-de sac may occasionally be required because of
topography, boundary or other constraints. Caution must,
however, be exercised when planning for culs-de sac, as they
concentrate traffic impact on a small number of dwellings, require
turning heads that are wasteful in land terms and lead to
additional vehicle travel and emissions, particularly by service
vehicles. Through connections for pedestrians and cyclists should
be provided where possible but should be wide, well lit and well
overlooked with active frontages.
Rectilinear grid
Concentric grids designed to promote access to local
centres or public transport routes
Irregular layouts
Variations in block structure Detail
Backsandfronts
In general, it is recommended that different treatments are employed in the design of the fronts and backs of houses and other buildings.
The basic principle is ‘public fronts and private backs’.
Exceptions to this may be employed where the building form contains a double frontage, such as a colony house type. Colony streets
can increase the density of a typical terrace and provide positive street edges in a distinctive manner.
Busier streets should also follow this principle. Frontage development and multiple access points on busier streets add to activity intensity
and traffic calming as well as a sense of place.
Section through colony street illustrating double frontage

Page 315

24
Width
Width between buildings is a key dimension and needs to be
considered in relation to function and aesthetics. There are no
fixed rules on street widths but account should be taken of the
variety of activities taking place in the street and of the scale of
the buildings on either side. The distance between frontages in
residential streets typically ranges from 10 m to 18 m, although
there are examples of widths significantly less than this working well.
Rigid standards on street widths should be avoided and new streets
should be laid out with consideration given to the relationship
between scale and the nature of the space created.
Height
The public realm is defined by height as well as width or, more
accurately, the ratio of height to width. It is therefore recommended
that the height of buildings (or mature trees where present in
wider streets) is in proportion to the width of the intervening public
space to achieve the level of enclosure appropriate to the
character and function of the street. Where building height is
increased, it is important to avoid creating spaces with an
oppressive or claustrophobic nature.
Detail
High street Mews
Residential street
12 - 18m
7.5 - 12m18 - 30m
Boulevard
27 - 36m
Square
18 - 100m
Length
Street length can have a significant effect on the quality of a
place. Acknowledging and framing vistas and landmarks can help
bring an identity to a neighbourhood and orientate users.
However, long straights can encourage high traffic speeds, which
should be mitigated through careful design (see Street Layout
section – Achieving Appropriate Traffic Speeds).
Buildingsatjunctions
The arrangement of buildings and footways has a major influence
on defining the space at a junction. It is better to design the
junction from this starting point rather than purely on vehicle
movement. In terms of streetscape, a wide carriageway with tight,
enclosed corners makes a better junction than cutback corners
with a sweeping curve. This might involve bringing buildings
forward to the corner. Junction treatments are explored in more
detail in the Street Layout section.
JohnThompson&Partners
Variation in building height can add visual interest

Page 316

25
Squares&spaces
A street and block structure can be enhanced with punctuations of public space. This may take the form of parks, green edges or
formal and informal squares. The introduction of small, informal squares in a residential area can support navigation, provide social
areas for people to gather and children to play, slow traffic speed and create positive character.
The design of squares, both small and large, should respond to the context of the place. A square will not be successful unless it is
aligned with the potential activities of a place and the building forms.
Otherlayoutconsiderations
The layout of a new housing or mixed-use area should take account of the following factors:
the need to reduce the dominance of vehicle traffic;
the need to mitigate noise pollution such as from roads or railways;
the importance of orientation, variety and visual interest (The provision of views and vistas, landmarks, gateways and focal points
are means to emphasise urban structure, hierarchies and connections.);
the need for crime prevention, including the provision of defensible private and communal space, and active, overlooked streets
(An appropriate mix of uses can often encourage activity and movement at all times.);
the management of the transition from the public to the private realm (The space between the fronts of buildings and carriageways,
footways or other public spaces needs to be carefully considered. Continuous building lines are preferred as they provide definition
to, and enclosure of, the public realm.);
the handling of building lines (Where no front garden is provided, the setback of dwellings from the street is a key consideration in
terms of: defining the character of the street determining a degree of privacy; amenity space for plants or seating, etc.; and
functional space for rubbish bins, external utility meters or storage, including secure parking for bicycles.); and
the handling of car parking (Keeping garages and parking areas level with, or behind, the main building line can be aesthetically
beneficial in streetscape terms.).
>
>
>
>
>
>
>
Detail
Small residential square
Local neighbourhood square
Large urban square
Cadell2
Malcolm
FraserArchitects
JCooper
Gillespies
HTA,Oakridgevillage
HTA,Oakridgevillage

Page 317

26
Walkableneighbourhoods
Keyconsideration
Street layouts should be configured to allow walkable access to local amenities for all street users>
Detail
Thewalkableneighbourhood
Walkable neighbourhoods are characterised by having a range of
facilities within 5 minutes (up to about 400m) walking distance of
residential areas which residents may access comfortably on foot.
Where amenities cannot be provided within this area, good public
transport links to relevant facilities should be accessible.
In many cases, it may be better for a new development to reinforce
existing centres and facilities rather than providing alternative
facilities.
Andrew
CameronW
SP
400m
5 minute walk

Page 318

27
Walkable neighbourhoods should be on an appropriate scale,
with pedestrian routes matching desire lines as closely as
possible. Permeable networks help minimise walking distances.
Good connectivity and the formation of local or district centres are
key to establishing walkable neighbourhoods. By concentrating
facilities along key routes and junctions, particularly at the
convergence of main routes, neighbourhood centres can be
established that contribute both practical services and a local
identity to a place. Within the larger context, walkable
neighbourhoods should have good linkages to other local centres,
building a larger network of distinct neighbourhoods. The hierarchy
and scale of these neighbourhoods can vary within a town or city;
the greater the density of development, the more facilities can be
supported.
Density is also an important consideration in reducing reliance on
the private car. Scottish Planning Policy encourages a flexible
approach to density, reflecting the desirability of using land efficiently
and the need to promote higher density development in places
well served by public transport. Residential densities should be
planned to take advantage of proximity to activities, or to good
public transport linking those activities.
Detail
CityofEdinburghCouncil

Page 319

28
Publictransport
Keyconsideration
Public transport planning should be
considered at an early stage in the design
process
Busroutes
The principal streets within a development should be the streets
on which public transport runs. These should be identified in the
design process, working in partnership with public transport
operators. Bus routes and stops should form key elements of the
walkable neighbourhood. Designers and local authorities should
try to ensure that development densities will be high enough to
support a good level of service without long-term subsidy.
Layouts designed with strong connections to local networks,
and which avoid long one-way loops or long distances without
passenger catchments, are likely to be more viable.
Using a residential street as a bus route need not require restrictions
on direct vehicular access to housing. Detailed requirements for
streets designated as bus routes can be determined in consultation
with local public transport operators. Streets on bus routes should
not generally be less than 6.0 m wide (although this could be
reduced on short sections with good inter-visibility between
opposing flows). The presence and arrangement of on-street
parking, and the manner of its provision, may affect width
requirements.
Swept-path analysis can be used to determine the ability of
streets to accommodate large vehicles. When considering the
level of provision required for the movement of buses, account
should be taken of the frequency and the likelihood of two buses
travelling in opposite directions meeting each other on a route.
>
Busstops
In new developments, it is essential to consider the siting of public
transport stops and related pedestrian desire lines at an early
stage of design. Close co-operation is required between public
transport operators, the local authorities and the developer.
Bus stops should be sited so they can be easily accessed by
all pedestrians.
Bus stops should be placed near junctions so that they can
be accessed by more than one route on foot, or near specific
passenger destinations. (schools, shops, etc.)
The bus should generally stop on the street and not in a lay-by.
Bus stops should be high-quality places that are safe and
comfortable to use.
Footways at bus stops should be wide enough for waiting
passengers while still allowing for pedestrian movement along
the footway. This may require local widening at the stop.
Provision should be made within the streetscape for features
that that assist passengers getting on and off buses. This may
involve areas of raised footway. It is important that such
features are integrated within the overall design of the street
and do not pose difficulties for those with visual impairments.
>
>
>
>
>
>
Detail
Bustrackinginresidentiallayout

Page 320

29
Contextandcharacter
Keyconsideration
The requirements and impact of pedestrians, cycles and vehicles should be reconciled with local
context to create streets with distinctive character
Opportunities should be taken to respond to, and to derive value from, relevant elements of the
historic environment in creating places of distinctive character
>
>
Character
Streets and the public realm at large play an important part in the
development and expression of local character and culture. The
character of a place is not determined by the particular materials
or physical appearance of a place alone, but also by the patterns
of movement and social interaction that it produces. When
considering the structure of streets, it is important that street and
block forms are selected that will enhance the character of an area.
Street character types in new residential developments should be
determined by a sensitive response to site conditions as well as
the relative importance of both place and movement functions.
When developing layouts, consideration should be given to the
character of each individual street as well as the overall urban
structure.
Scotland has a wide range of distinctive street typologies and the
successful arrangement of these can result in networks with
positive characters. When developing street networks it can be
useful to consider typologies such as the following, in order to
create distinctive environments:
high street tenement block
mixed-use street avenue
square courtyard
crescent/circus cross
mews lane/loan
terrace/row vennel/wynd
colony
The above list is not exhaustive. It is important that the individual
characteristics of any of the above street types are well defined
and meaningful. Site specific design codes can ensure that the
principal elements of a street’s character are controlled and distinct.
>>
> >
>
> >
> >
> >
> >
Detail
The street hierarchy of Edinburgh New Town accommodates variety of character
within a cohesive urban structure
Main avenue mixed-uses/primary zone
Residential street/secondary zone
Residential and service lane/tertiary zone

Page 321

30
Variety
Character can be enhanced and emphasised by variety in the streetscape. Punctuating key views with landmarks or green edges can
provide visual cues that aid navigation as well as helping to develop areas of individual character within the overall urban structure.
Developing a series of linked spaces with distinctive identities can also aid navigation while providing a cohesive character for a
neighbourhood. By employing a network of varied streets, each with particular characteristics, a diverse streetscape with varied visual
interest can be achieved. Variation in scale and density can develop areas with distinct physical characteristics as well as reflecting the
types of activities that take place in the area.
Detail
Landmark/vista stop helps to develop a unique character, emphasise street hierarchy and aid navigation
Green edge signifies a significant junction and a change in street pattern as well as offering visual relief and local amenity
Ground floor commercial and retail space also emphasises the street hierarchy, provides amenity and an active street edge

Page 322

31
Orientation
Keyconsideration
Orientation of buildings, streets and open space should maximise environmental benefits>
The orientation of streets can have a large impact on the
environmental performance of buildings as well as contributing
to perceptions of safety and attractiveness.
Solarimpact
Bright, sunny streets can foster a positive sense of place. The
layout of streets should be considered in relation to building
heights to maximise the amount of light reaching the public realm.
This is particularly important in areas where people gather and
activities take place. Local shops and facilities should be arranged
to provide southerly aspects to the activities that will most benefit
from bright, attractive external space.
By arranging streets so that buildings are able to maximise solar
gain, it is possible for buildings to reduce heat and light
requirements. Principal elevations should address the sun path
wherever possible and the presentation of blank gables to the
south should be avoided.
On occasion, it may be that narrow, intimate streets are appropriate
to a particular context and will not require to have as direct a
relationship to the sun path as a large public boulevard or square.
Prevailingwind
Traditionally, many street layouts evolved to respond directly to the
prevailing wind direction. This led to streets where pedestrians
were sheltered from the extremities of the environment, ultimately
producing streets where people were more likely to gather and take
ownership of a place. This also led to patterns of development
that were particular or unique to the microclimate of a settlement
and helped to evolve a distinctive local design response.
Designers should take prevailing wind conditions into account to
maximise on-street shelter and also to minimise the impact of
cold air infiltration into buildings. This can have an impact on the
direction of streets, the scale of individual buildings, street width
and the relationship of a settlement to natural landscape features.
Detail

Page 323

32
Streetlayout
Achievingappropriatetrafficspeed
Keyconsideration
Design should be used to influence driver
behaviour to reduce vehicle speed to levels
that are appropriate for the local context and
deliver safe streets for all
For residential streets, a maximum design speed of 20 mph
should normally be an objective.
Designers should aim to create streets that control vehicle
speeds naturally by well-crafted design from the outset rather
than through unsympathetic traffic-calming measures added at
the end of the design process.
The provision of separate pedestrian and/or cycle routes away
from motor traffic should only be considered as a last resort.
Research has shown that the presence of pedestrians has an
effect in reducing traffic speeds.
Evidence from traffic calming schemes suggests that speed-
controlling features are needed at intervals of around 60-80m in
order to achieve speeds of 20 mph or less. Straight and
uninterrupted links should therefore be limited to this range to
help ensure that the arrangement has a natural traffic-calming
effect. Designs should not rely solely on conventional traffic
calming techniques, such as speed cushions and humps; these
do little to develop a positive sense of place. Instead, speed-
controlling features should be built into the layout of the street,
taking advantage of building alignment, parking, road narrowings,
landscaping and other design features, rather than resorting
solely to vertical deflection.
The range of traffic-calming measures available act in different ways:
Psychology and perception – play a strong part in
influencing driver behaviour. Street features and human
activity can influence the speed at which people choose to
drive. Features likely to be effective include:
• edge markings that visually narrow the road – speed
reduction is likely to be greatest where the edging is
textured to appear unsuitable on which to drive;
• buildings in close proximity to the street;
• reduced carriageway width;
• physical features in the carriageway;
• features associated with potential activity in, or close to,
the carriageway, such as pedestrian refuges;
• on-street parking, particularly when the vehicles are
parked in blocks on alternate sides of the street, either in
echelon formation or perpendicular to the carriageway;
• the types of land use associated with greater numbers of
people, for example shops; schools and places of work;
and
• landscaping.
>
>
Street dimensions – can have a significant influence on
speeds. Keeping lengths of street between junctions short is
particularly effective.
Reductions in forward visibility – are associated with
reduced driving speeds.
Changes in priority/or no priority – at junctions. This can
be used to disrupt flow and therefore bring overall speeds
down.
Physical features – involving vertical or horizontal deflection
can be very effective in reducing speed.
Materials – can reduce speed by both visual perception and
by physical characteristics, such as cobbled surfaces.
Reductions in carriageway width are most effective in reducing
driving speed.
>
>
>
>
>
Detail
Trees planted in the highway at Newhall, Harlow, help to reduce
vehicle speeds
EDAW

Page 324

33
Visibilityrequirements
Visibility should be checked at junctions and along the street. Visibility is measured horizontally and vertically.
Using plan views of proposed layouts, checks for visibility in the horizontal plane ensure that views are not obstructed by vertical
obstructions.
Checking visibility in the vertical plane is then carried out to ensure that views in the horizontal plane are not compromised by obstructions
such as the crest of a hill, or a bridge at a dip in the road ahead. It also takes into account the variation in driver eye height and the
height range of obstructions. Eye height is assumed to range from 1.05 m (for car drivers) to 2 m (for lorry drivers). Drivers need to be
able to see obstructions 2 m high down to a point 600 mm above the carriageway.
Speed Kilometres
per hour 16 20 24 25 30 32 40 45 48 50 60
10 12 15 16 19 20 25 28 30 31 37
9 12 15 16 20 22 31 36 40 43 56
11 14 17 18 23 25 33 39 43 45 59
Miles per
hour
SSD
(metres)
SSD
adjusted for
bonnet
length
Detail
2000max.
600min.
2000max.
1050min.
Typically 2400
Stoppingsightdistance
The stopping sight distance (SSD) is the distance within which drivers need to be able to see ahead and stop from a given speed.
The SSD values used in Designing Streets are based on research into deceleration rates, driver perception-reaction times and speed.
These SSD values are appropriate for residential and lightly trafficked streets. The table below shows the effect of speed on SSD. These
values are independent of traffic flow or type of road. It is recommended that they are used on all streets with 85th percentile wet
weather speeds up to 60 kph.
Below around 20 mph, shorter SSDs themselves may not achieve low vehicle speeds: the design of the whole street and how this will
influence speed needs to be considered at the start of the process; e.g. the positioning of buildings and the presence of on-street
parking.
Further information on SSDs, including details of the calculation formula, and also the relationship between visibility and speed is
available in TRL Report No. 33211 and TRL Report No. 66112.

Page 325

34
Visibilitysplaysatjunctions
The visibility splay at a junction ensures there is adequate inter-visibility between vehicles on the major and minor arms.
The distance back along the minor arm from which visibility is measured is known as the X distance. It is generally measured back from
the ‘give way’ line (or an imaginary ‘give way’ line if no such markings are provided). This distance is normally measured along the
centreline of the minor arm for simplicity, but in some circumstances (for example where there is a wide splitter island on the minor arm)
it will be more appropriate to measure it from the actual position of the driver.
The Y distance represents the distance that a driver who is about to exit from the minor arm can see to his left and right along the main
alignment. For simplicity, it is measured along the nearside kerb line of the main arm, although vehicles will normally be travelling a
distance from the kerb line. The measurement is taken from the point where this line intersects the centreline of the minor arm (unless,
as above there is a splitter island in the minor arm).
When the main alignment is curved and the minor arm joins on the outside of a bend, another check is necessary to make sure that an
approaching vehicle on the main arm is visible over the whole of the Y distance. This is done by drawing an additional sight line which
meets the nearest wheel track at a tangent.
Some circumstances make it unlikely that vehicles approaching from the left on the main arm will cross the centreline of the main arm –
opposing flows may be physically segregated at that point, for example. If so, the visibility splay to the left can be measured to the
centreline of the main arm.
Left-hand
visibility splay
Possible features
preventing vehicles from
crossing centre line
Y distance Y distance
Alternative left-hand visibility splay if
vehicle approaching from the left are
unable to cross the centre line
X distance
Right-hand
visibility splay
XandYdistances
An X distance of 2.4 m should normally be used in most built-up situations, as this represents a reasonable maximum distance
between the front of the car and the driver’s eye.
A minimum figure of 2 m may be considered in some very lightly-trafficked and slow-speed situations, but using this value will mean that
the front of some vehicles will protrude slightly into the running carriageway of the major arm. The ability of drivers and cyclists to see
this overhang from a reasonable distance, and to manoeuvre around it without undue difficulty, should be considered.
Using an X distance in excess of 2.4 m is not generally required in built-up areas.
The Y distance should be based on values for SSD.
Detail

Page 326

35
Forwardvisibility
Forward visibility is the distance a driver needs to see ahead to
stop safely for obstructions in the street. The minimum forward
visibility required is equal to the minimum SSD. It is checked by
measuring between points on a curve along the centreline of the
inner traffic lane. Consideration should be given to vertical
geometry and any other obstructions.
There will be situations where it is desirable to reduce forward
visibility in conjunction with other methods to control traffic speeds.
Visibilityalongthestreetedge
Vehicle exits at the back edge of the footway mean that emerging
drivers will have to take account of people on the footway. The
absence of wide visibility splays at private driveways will encourage
drivers to emerge more cautiously. Consideration should be given to
whether this will be appropriate, taking into account the following:
the frequency of vehicle movements;
the amount of pedestrian activity; and
the width of the footway.
Obstaclestovisibility
Parking in visibility splays in built-up areas is quite common, yet
it does not appear to create significant problems in practice.
Defined parking bays can be provided outside the visibility splay
if required, and the use of tracked streets that allow for informal
parking is also an option. Encroachment of parking space into
visibility splays should be avoided where practical.
The impact of other obstacles, such as street trees and street
lighting columns, should be assessed in terms of their impact on
the overall envelope of visibility. In general, occasional obstacles
to visibility that are not large enough to fully obscure a whole
vehicle or a pedestrian, including a child or wheelchair user, will
not have a significant impact on road safety.
>
>
>
An example of the reduction in forward visibility to reduce vehicle speed
Forward visibility measured along centre of inner lane
Visibility splays
Visibility splay envelope
Measurement of forward visibility
Detail
Andrew
CameronW
SP

Page 327

36
Junctiontypesandarrangements
Keyconsideration
Junctions should be designed with the considerations of the needs of pedestrians first
Junctions should be designed to suit context and urban form – standardised forms should not
dictate the street pattern
>
>
Junctions
The success of a well-designed junction frequently derives from
the way in which buildings frame the space in which the junction
sits. Decisions on building placement should be made first, with
the quality of the space in mind, and the junction then designed to
suit the space created.
Junctions that should be used in residential areas include:
crossroads and staggered junctions;
T and Y junctions;
formal and informal squares; and
mini roundabouts.
Junctions are generally places of high accessibility and good
natural surveillance. Junctions generally, and crossroads junctions
in particular, are therefore ideal places for locating facilities such
as public buildings, shops and public transport stops.
>
>
>
>
Junction design should facilitate direct pedestrian desire lines,
and this will often mean using small corner radii. The use of swept
path analysis will ensure that the junctions are negotiable by
vehicles. However, consideration should be given to the
robustness of the design and quality of construction to withstand
any occasional vehicle overrun.
Crossroads are convenient for pedestrians, as they minimise
diversion from desire lines when crossing the street. They also
make it easier to create permeable and legible street networks.
Where designers are concerned about potential user conflict,
they may consider placing the junction within a square or on a
speed table.
Conventional roundabouts are not generally appropriate for
residential developments. Mini-roundabouts may have some
application in residential areas, as they cause less deviation for
pedestrians and are easier for cyclists to use. In addition, they
do not occupy as much land. Practitioners should refer to
Mini-roundabouts: Good Practice Guidelines13.
Nodal form T Y Cross/
staggered Multi-armed Square Circus Crescent
Regular
Irregular
Detail

Page 328

37
Spacingofjunctions
The spacing of junctions should be determined by the type and
size of urban blocks appropriate for the development. Block size
should be based on the need for permeability and, generally, tends
to become smaller as density and pedestrian activity increases.
Smaller blocks create the need for more frequent junctions. This
improves permeability for pedestrians and cyclists, and the impact
of motor traffic is dispersed over a wider area. Junctions do not
always need to cater for all types of traffic. Some of the arms of a
junction may be limited to pedestrian and cycle movement only.
Turningareas
Connected street networks will generally eliminate the need for
vehicles to turn around.
Where it is necessary to provide for vehicles turning (e.g. in a
cul-de-sac or court), a tracking assessment should be made to
indicate the types of vehicles that may be making this manoeuvre
and how they can be accommodated. The turning space provided
should relate to its environment, not specifically to vehicle
movement, as this can result in a space with no use other than for
turning vehicles. To be effective and usable, the turning space must
be kept clear of parked vehicles. It is essential, therefore, that
adequate parking is provided for residents in suitable locations.
Overrunareas
Overrun areas should generally be avoided in residential and
mixed-use streets. They can:
be visually intrusive;
interfere with pedestrian desire lines; and
pose a hazard for cyclists.
Overrun areas can, however, help to overcome problems with
regular or high volume access for larger vehicles.
Frontageaccess
One of the key differences between streets with a 30 mph speed
restriction or below and roads is that streets normally provide
direct access to buildings and public spaces. This helps to
generate activity and a positive relationship between the street
and its surroundings. Providing direct access to buildings is also
efficient in land-use terms.
It is recommended that direct access on roads with a 30 mph
speed restriction is acceptable with flows of up to 10,000 vehicles
per day.
>
>
>
Quadrant kerbstones used instead of large radii at junctions reduce the dominance of the carriageway and respond to pedestrian desire lines – this is reinforced by the
placement and form of the adjacent buildings
Detail
DavidNicol,W
SP

Page 329

38
Streetsforpeople
Keyconsideration
Streets should allow for and encourage social interaction>
decreasinglysegregated
increasinglyshared
increasinglycooperative
Detail
Streetsassocialspaces
The design of all streets should recognise the importance of
creating places for people to enjoy, rather than simply providing
corridors for the movement of traffic. Streets should generally be
designed with a focus on social interaction.
A significant amount of interaction within a community takes place
in the external environment, and street design should encourage
this by creating inclusive social spaces where children can play,
people can stop to chat, and other appropriate activities can take
place safely. In order for this to occur, it is essential that vehicular
traffic does not dominate the street.
The propensity for people to use a street as a social space is
increased by careful design and by applying the user hierarchy
where pedestrians are considered first, as indicated in the section
Pedestrians and cyclists.
SharedSpace
A Shared Space is a street or place accessible to both pedestrians
and vehicles that is designed to enable pedestrians to move more
freely by reducing traffic management features that tend to
encourage users of vehicles to assume priority.
Achieving this reduction in dominance can be assisted by the
techniques described previously and also by the minimal use of
traffic signs, road markings and other traffic management features
where appropriate. With less, or no, traffic management measures
giving clear indications of priority, motorists are encouraged to
recognise the space as being different, drive more slowly, and
respond directly to the behaviour of other users (including other
motorists).
Guard railing
Excessive road markings and signs
Conventional kerbs
Intrusive lighting columns
Vehicle movement and parking dominant
No roadmarkings or signage
Informal crossing
More dominant pedestrian area
Low kerbs
Common material for footway area carriageway
Reduction in vehicle parking impact
Reduced carriageway width
More informal street compositioning
Sensitive soft landscaping
Level surface – no deliniation between street user zones
User hierarchy favours pedestrians

Page 330

39
Home Zones are essentially Shared Spaces, and are provided in
residential areas. Home Zones can be formally designated as
such under Section 74 of the Transport (Scotland) Act 2001,14
although there is no requirement to do so. Further guidance on
the design of Home Zones concept schemes is given in Home
Zones; Challenging the future of our streets15, Home Zone Design
Guidelines16 and at www.homezones.org.uk.
Levelsurfaces
Some Shared Space schemes feature what is often referred to as
a shared or level surface, although not all will do so. There is a
variety of terminology used to describe this approach; this
document will refer to the technique as a level surface. For the
purposes of this guidance, a level surface is a street surface that
is not physically segregated by kerb or level differences into areas
for particular users. Level surfaces work best in relatively calm
traffic environments.
The lack of defined areas for pedestrians and vehicles is intended
to indicate that the street is meant to be shared equally by all
users. Motorists are expected to adapt their behaviour to that of
other street users, driving slowly and giving way as appropriate.
The key aims are to:
encourage low vehicle speeds;
create an environment in which pedestrians can walk, or stop
and chat, without feeling intimidated by motor traffic;
make it easier for people to move around, particularly
wheelchair users and people pushing wheeled equipment
such as prams; and
promote social interaction.
In the absence of a formal carriageway, experience shows that
motorists entering the area will tend to drive more cautiously and
negotiate the right of way with pedestrians on a more conciliatory
level.
Control of car parking needs to be considered in level surface
areas. Car parking should be organised to deter cluttered streets
and sufficient provision, including the provision of disabled parking
spaces, should be allocated around a scheme to ensure that
parking is distributed evenly and clearly.
Level surfaces are only one component of the principles of Shared
Space and should not be solely relied upon to create good streets
or to slow traffic.
Ensuringinclusivedesign
Shared Space, and level surfaces in particular, can cause problems
for some disabled people. The absence of a conventional kerb in
level surfaces can pose problems for some blind or partially-
sighted people, who often rely on this feature to find their way
around. The lack of visual cues may also pose problems for
pedestrians with cognitive difficulties. It is therefore important that
level surface schemes include an alternative means by which
visually-impaired people can navigate. Such elements can be
designed in collaboration with local people, including
representatives from local disability groups and access panels.
>
>
>
>
Disability groups should also be invited to provide input
throughout the Quality Audit stages. Quality Audits are explained in
more detail in Part 3 How to achieve better outcomes. Any design
solution should be informed by local context and the local community.
Research commissioned by the Department for Transport looking
into Shared Space is currently underway and is due for final
publication in 2011. The first stage of the research was published
in Shared Space Project Stage 1: Appraisal of Shared Space.17
The conclusions of this report include the statement that
“evidence broadly suggests that Shared Space Schemes can
deliver benefits: they appear to support economic activity,
improve perceptions of personal security, be popular generally
with the public and traders and increase freedom of movement
for many people including some vulnerable pedestrians.” The
report concluded that “a case can be made for level surfaces as a
valid feature in some settings but that the detailed design of
particular schemes needs to recognise and respond to the needs
of all users.”
It should be noted that this is an intermediate report and its findings
will be subject to final clarification. Final outcomes of this research
should be taken into account when considering Shared Space.
Research commissioned by the Disabled Persons Transport
Advisory Committee (DPTAC) on the implications of Home Zones
for disabled people was published in 2007. Designing for
Disabled People in Home Zones18 contains relevant guidance.
Surfacetreatments
Shared Space streets are often constructed from paviours or
other materials rather than asphalt, which helps emphasise their
difference from conventional streets. Research for Manual for
Streets shows that block paving reduces traffic speeds by
between 2.5 mph and 4.5 mph, compared with speeds on
asphalt surfaces. The use of block paving can also provide
permeable surfaces for drainage.
Block paving may not be appropriate in all Shared Space or level
surface areas, and contextual circumstances are key to decisions
on materials. Coloured or textured asphalts can provide an
effective delineation. Many Scottish towns and villages contain
existing areas of successful level surfaces that use traditional
materials or simple asphalt surfaces.
Detail
PerthshireHousingAssociation

Page 331

40
Integratingparking
Keyconsiderations
Parking should be accommodated by a variety of means to provide flexibility and lessen visual impact
Cycleparking
Providing enough convenient and secure cycle parking at homes and other locations for both residents and visitors is critical to
increasing the use of cycles. In residential developments, designers should aim to make access to cycle storage at least as convenient
as access to car parking.
>
Cycle parking that has good surveillance and is at a key location – in this example
near a hospital entrance
Carparking
The Scottish Government’s general planning policy for car parking is set out in the Transport section of the Scottish Planning Policy
(SPP)20. This makes it clear that it is important to consider a design-led approach to the provision of car parking space that is well-
integrated with a high-quality public realm. A design-led and contextual strategy for car parking can often lessen the impact on the built
environment. Car parking can be provided in a number of ways as set out over the following pages.
Detail
Reference should be made to the relevant local guidance and any
relevant travel plans to determine the appropriate level of provision
of cycle parking. The following key principles should, however,
apply:
Shared cycle parking facilities should be secure, overlooked
and convenient to use with shelter provided wherever practical.
Appropriate provision should be made for all potential users
including children and visitors.
Cycle parking can be provided in a number of ways such as:
within garages; bespoke cycle storage; communal areas in
flats; and on-street cycle racks.
Cycle stands need to be located clear of pedestrian desire
lines, and generally closer to the carriageway than to buildings.
Cycle parking should be provided at bus and train stations to
assist transition between transport modes.
Cycle parking should be detectable by blind or partially
sighted people.
Further guidance on the design of cycling facilities is provided in
LTN 2/08 Cycle Infrastructure design.19
>
>
>
>
>
>
Andrew
CameronW
SP

Page 332

41
On-street parking
On-street parking in residential streets can help to reduce traffic speeds. This kind of parking can be counted towards the overall
provision required in new developments, both for residents and visitors. Parking on adopted roads cannot be allocated to individual
properties, but is a common resource.
In the past, on-street parking bays have been rigidly defined, creating an artificial constraint on street layout. More informal parking
arrangements are to be encouraged, such as the use of subtle widening within a street or by using end-on or angled parking within a
square. Trees, planting or street furniture can be used to discourage indiscriminate parking in an attractive way. Parking violations,
however, cannot be acted upon without Traffic Regulation Orders, with traffic signs and road markings to indicate the restrictions in place.
An arrangement of parking bays adjacent to the running lanes is often the preferred way of providing on-street parking. It is recommended
that, in most circumstances, at least some parking demand in residential and mixed-use areas is met with well-designed on-street parking:
Breaking up the visual impact can sometimes be achieved by limiting on-street parking to small groups of around five spaces.
In deciding how much on-street parking is appropriate, it is recommended that the positive and negative effects listed in the ‘On-street
parking’ box are considered.
>
Gradual widening of the carriageway
to create more informal on-street
spaces, with running carriageway
checked using vehicle tracking
On-streetparking:positiveandnegativeeffects
The positive effects of on-street parking are that it:
provides a common resource, catering for vehicles used by residents, visitors and service providers in an efficient manner;
is able to cater for peak demands from various users at different times of the day, for example people at work or residents;
adds activity to the street and slows traffic;
is typically well overlooked, providing improved security;
is popular and likely to be well-used;
can provide a useful buffer between pedestrians and traffic; and
potentially allows the creation of areas within perimeter blocks that are free of cars.
The negative effects of on-street parking are that it:
can be visually dominant within a street scene and can undermine the established character;
may lead to footway parking unless the street is properly designed to accommodate parked vehicles;
can be dangerous and intimidating for cyclists, due to car doors opening and cars moving in and out; and
can impair the social and play function of shared spaces if it is overly dominant.
In most situations, it will not be necessary to provide parking spaces specifically for service vehicles, such as delivery vans, which
are normally stationary for a relatively short time.
>
>
>
>
>
>
>
>
>
>
>
Detail

Page 333

42
Off-street parking
Off-street parking will be required in many developments, whether
on the house plot, in rear courtyards or in underground structures.
On-plot parking should be designed so that the front garden is
not overly dominated by the parking space.
Off-street parking includes off-street courtyards and rear
courtyards, and the key principles are that that they:
are not car parks but places which have parking in them;
should be overlooked by adjoining houses or by buildings
entered from the parking area; and
should normally include, at most, 10 parking spaces. If there
are more spaces, the courtyard layout should be broken up.
Where spaces are allocated in shared areas, these may not be
adopted and do not constitute roads under the Roads (Scotland)
Act 1984. Alternative arrangements for the future maintenance of
these areas will need to be found, whether by a factor or through
other agencies.
Care must be taken to ensure good natural surveillance in any
off-street parking areas. Vehicular accesses to any off-street
parking areas will need to be taken into account within the overall
street design.
Basement or undercroft parking
The advantage of putting cars underground is that it preserves the
street frontage, uses land more efficiently and may be more
convenient for drivers accessing the building, particularly in adverse
weather. However, as with courtyard parking, much depends on
the location and design of the entrance. Careful consideration
should be given to the visual impact of undercroft parking at
street level.
>
>
>
>
>
Detail
Parking courts should be considered as positive places
On-plot parking
Parking within the front curtilage should generally be avoided as it breaks up the frontage, can be unsightly and restricts informal
surveillance. On-plot parking may be suitable in restricted situations when integrated with other parking solutions and when considered in
terms of the overall street profile.
Garages
Garages are not always used for car parking and this can create additional demand for on-street parking. Car ports are a good
alternative. Dimensions for garages should be sufficient to recognise current vehicle sizes in order to encourage their use for car
storage.
Parking spaces for disabled people
It is recommended that parking bays for disabled people are designed so that drivers and passengers, either of whom may be
disabled, can get in and out of the car easily. They should allow wheelchairs users to gain access from the side and the rear. The bays
should be large enough to protect people from moving traffic when they cannot get in or out of their car on the footway side. Dropped
kerbs should be conveniently sited to enable drivers who use wheelchairs to gain easy access to footways. Further information is
contained in PAN 78 Inclusive Design.
Car Parking; What Works Where21 provides a comprehensive toolkit for designers that gives useful advice on the most appropriate
forms of car parking relevant to different types of residential development. Consideration should also be given to the Safer Parking
Scheme initiative of the Association of Chief Police Officers (ACPO) and aimed at reducing crime and the fear of crime in parking areas.
PAN 77 Designing Safer Places22 also discusses this issue.
>
>
>
KarenEsslemont
Discreet undercroft parking

Page 334

43
6.0m
Parallel parking arrangement
2.0m
2.4m
Perpendicular parking arrangement
4.8m
4.8m
W
Suggested parallel and
perpendicular parking
arrangements
b1
90° 90°
w1
Tracking assessment
b1 < b2
w1 < w2
b2b
90°
w
w2
The effect on overall street width requirements when wider car
parking spaces are provided
The width (W above) needed to access echelon or perpendicular spaces conveniently, depends on the width of the bay and the angle
of approach. For a 2.4 m wide bay, these values are typically:
at 90 degrees, W = 6.0 m;
at 60 degrees, W = 4.2 m; and
at 45 degrees, W = 3.6 m.
The width requirements can be reduced if the spaces are made wider. Swept-path analysis can be used to assess the effect of wider
spaces on reducing the need for manoeuvring space, as illustrated in the diagrams below.
>
>
>
Where space is limited, it may not be possible to provide for
vehicles to get into the spaces in one movement. Some back and
fore manoeuvring may be required. This is likely to be acceptable
where traffic volumes and speeds are low.
Otherparkingissues
Other issues for the design team and local authority to consider
include:
the appropriate level of car parking provision including the
level of provision for disabled people (Blue Badge Holders);
the negative impacts of conversion of front gardens to parking
and parking in conservation areas;
provision below normal demand (Lower levels can work
successfully when adequate on-street parking controls are
present and where it is possible for residents to reach day-to-
day destinations, such as jobs, schools and shops, without
the use of a car.);
the potential for the use of car clubs which provide
neighbourhood-based short-term car hire to members;
>
>
>
>
Detail
unallocated parking (Not all parking spaces need to be allocated to individual properties. Unallocated parking provides a common
resource for a neighbourhood or a specific development.); and
the hazards and inconvenience to pedestrians caused by footway parking (It is therefore recommended that footway parking be
minimised through the design of the street.).
>
>
Motorcycleparking
In planning for private residential parking, in most situations motorcycles will be able to use car parking spaces, but in some situations it
will be appropriate to provide designated motorcycle parking areas. Guidance on motorcycle parking is contained in Traffic Advisory
Leaflet 02/02.23 General advice on designing streets to meet the need of motorcycles is given in the Guidelines for Motorcycling.24
To estimate the space required for parking motorcycles, it is recommended that a 2.0 m by 0.8 m footprint is allowed per motorcycle.
Dimensionsforcarparkingspacesandmanoeuvringspace
For parking parallel to the street, each vehicle will typically need an area of about 2 m wide and 6 m long.
For echelon or perpendicular parking, individual bays will need to be indicated or marked. The rectangular bay area should be sized
as follows:
Absolute minimum of 2.4 m wide by 4.8 m long
Desirable 2.5 m wide by 5.0 m long>
>

Page 335

44
Emergencyandservicevehicles
Keyconsiderations
Street layouts should accommodate
emergency and service vehicles without
compromising a positive sense of place
Emergencyvehicles
The requirements for emergency vehicles are generally dictated
by the fire service requirements. All development proposals
should be discussed with the relevant Fire Authorities.
The Association of Chief Fire Officers has expanded upon and
clarified these requirements as follows:
A 3.7 m carriageway (kerb to kerb) is required for operating
space at the scene of a fire. Simply to reach a fire, the access
route could be reduced to 2.75 m over short distances,
provided the pump appliance can get to within 45 m of all
points within a dwelling.
If an authority or developer wishes to reduce the running
carriageway width to below 3.7 m, they should consult the
local Fire Safety Officer.
Servicevehicles
The design of streets should accommodate service vehicles
without allowing their requirements to dominate the layout.
On streets with low traffic flows and speeds, it may be assumed
that vehicles will be able to use the full width of the carriageway to
manoeuvre. Larger vehicles which are only expected to use a
street infrequently, such as pantechnicons, need not be fully
accommodated – designers could assume that they will have to
reverse or undertake multi-point turns to turn around for the
relatively small number of times they will require access. The
involvement of the local authority in determining design solutions
for service vehicles is important.
Well-connected street networks have significant advantages for
service vehicles. A shorter route can be used to cover a given
area, and reversing may be avoided altogether.
>
>
>
Wastecollectionvehicles
It is essential that liaison between the designers, the waste, roads,
planning and building control authorities, and access officers,
takes place at an early stage.
Planning authorities should ensure that new developments make
sufficient provision for waste management and recycling and
should promote designs and layouts that secure the integration
of waste management facilities without adverse impact on the
street scene.
Policy for local and regional waste planning bodies is set out in
Scottish Planning Policy.
Routing for waste vehicles should be determined at the concept
masterplan or scheme design stage. Wherever possible, routing
should be configured so that the refuse collection can be made
without the need for the vehicle having to reverse, as turning
areas may be obstructed by parked vehicles.
While it is always possible to design new streets to take the largest
vehicle that could be manufactured, this would conflict with the
desire to create quality places. It is neither necessary nor desirable
to design new streets to accommodate larger waste collection
vehicles than can be used within existing streets in the area.
Swept-path analysis can be used to assess layouts for accessibility.
Where achieving these standards would undermine quality of
place, alternative vehicle sizes and/or collection methods should
be considered.
BS 5906: 2005 recommends a maximum reversing distance for
refuse vehicles of 12 m. Longer distances can be considered, but
any reversing routes should be straight and free from obstacles or
visual obstructions.
Detail

Page 336

45
Section 3.25 of the Scottish Building Standards (Domestic)
Technical HandbooK25 provides guidance on achieving the
standards set in the Building (Scotland) Regulations 200426 with
regard to solid waste storage and collection point. The collection
point can be on-street or may be at another location defined by
the waste authority. Key recommendations are that:
residents should not be required to carry waste more than
30 m (excluding any vertical distance) to the storage point;
waste collection vehicles should ideally be able to get to
within 25 m of the storage point (although BS 5906: 2005
recommends slightly shorter distances) and the gradient
between the two should not exceed 1:12; and
there should be a maximum of three steps for waste
containers up to 250 litres, and none when larger containers
are used (The Health and Safety Executive recommends that,
ideally, there should be no steps to negotiate).
BS 5906: 200527 provides guidance and recommendations on good
practice. The standard advises on dealing with typical weekly
waste and recommends that the distance over which containers
are transported by collectors should not normally exceed 15 m for
two-wheeled containers, and 10 m for four-wheeled containers.
>
>
>
Detail

Page 337

46
Streetdetail
Drainage
Keyconsiderations
Streets should use appropriate SUDS techniques as relevant to the context in order to minimise
environmental impacts
>
Streetdrainage
The majority of streets are designed to accommodate the
disposal of foul and surface water and this needs to be considered
at an early stage in the design of street layouts. This includes
consideration of foul drainage, surface water and Sustainable
Urban Drainage Systems (SUDS).
Fouldrainage
This will normally take the form of drains around the curtilage of
buildings which come under the Building (Scotland) Regulations
2004 and sewers located in the street where the relevant
guidance is found within Sewers for Scotland.28
The adoption process for sewers is set by Section 16 of the
Sewerage (Scotland) Act 1968.29 The Scottish Water document
Sewers for Scotland is a guide to facilitate the procurement,
design, maintenance and adoption of sewers by Scottish Water.
Surfacewaterdrainage
The street provides a conduit for the storage or disposal of
rainwater and, by its nature and its impact on the environment,
the management of surface water runoff is a more complex matter
than dealing with foul water. Sustainable drainage solutions
adoptable by both local authorities and Scottish Water are set out
in The SUDS Manual.30 The emphasis is on the sustainable
management of surface water, whereby conveyance is maintained
between SUDS features in the traditional sense using pipework
and open channels with SUDS features enhancing water quality,
amenity and biodiversity, whilst controlling run-off quantity.
When considering the management of surface water, designers,
developers and authorities need to take account of the PAN 61:
Planning and Sustainable Urban Drainage,31 Scottish Planning
Policy, and the Water Environment and Water Services (Scotland)
Act 2003 (WEWS Act 2003).32 WEWS Act 2003 transposes the
Water Framework Directive33 to assess, protect and enhance
water environments in Scotland, into national law. The Water
Environment (Controlled Activities) (Scotland) Regulations 2005
(CAR)434 have been introduced under WEWS Act 2003 to allow
regulatory controls on this matter.
The Flood Risk Management (Scotland) Act 200935 requires local
authorities to assess and prepare maps of relevant bodies of
water and SUDS which will assist in the preparation of flood risk
management plans by each local authority.
Detail
LandUseConsultants
The planning and management of surface water discharge from
buildings and roads requires a co-ordinated approach to evaluating
flood risk and developing an integrated urban drainage strategy.
The responsibility for undertaking site specific flood risk
assessments in new developments (FRA) rests with the developer.
However, Scottish Planning Policy advocates a partnership
approach, consulting with the relevant stakeholders to compile
the FRA. This will involve the local authority as flood authority,
the Scottish Environmental Protection Agency (SEPA) and
Scottish Water.
Sewers for Scotland recommends, and some local authorities
require, that drainage criteria for new development comply with
the drainage assessment requirements set out in Drainage
Assessment – A Guide for Scotland.36

Page 338

47
SustainableUrbanDrainageSystems
The term Sustainable Urban Drainage Systems covers the whole
range of sustainable approaches to surface water drainage
management. SUDS aim to mimic natural drainage processes and
remove pollutants from urban run-off at source. SUDS comprise a
wide range of techniques, including permeable paving, swales,
detention basins, filter strips, filter drains, infiltration systems,
bio-retention, ponds and wetlands. To realise the greatest
improvement in water quality amenity and biodiversity and flood
risk management, these components should be used in
combination, sometimes referred to as the SUDS Management
Train, as described in The SUDS Manual.
SUDS are more sustainable than conventional drainage methods
because they:
manage run-off flow rates, using infiltration and the retention
of storm water;
protect or enhance the water quality;
are sympathetic to the environmental setting and the needs of
the local community;
provide a habitat for wildlife in urban watercourses;
encourage natural groundwater recharge (where appropriate);
and
can assist in reduction or removal of drainage network
constraints.
They do this by:
dealing with run-off close to where the rain falls (source control);
managing pollution at its source; and
protecting water resources from pollution created by
accidental spills or other sources.
The use of SUDS is seen as a primary objective by the Government
and should be applied wherever practical and technically feasible.
Granting of planning permission will be dependent on agreement
between the local planning authority and SEPA, as statutory
consultees. It is a SEPA requirement that sufficient levels of SUDS
are provided.
New guidance, SUDS for Roads,37 has been developed by the
SUDS Working Party, including representatives of SEPA, Scottish
Water and local authorities, regarding acceptable forms of SUDS
to be applied to roads.
Detailed guidance on the selection and design of SUDS is
contained in The SUDS Manual, Sewers for Scotland and SUDS
for Roads. All stakeholders need to be aware of the importance of
the application of SUDS as part of an integrated urban drainage
strategy for a development.
>
>
>
>
>
>
>
>
>
Detail
Andrew
Cameron,W
SP

Page 339

48
Utilities
Keyconsiderations
The accommodation of services should not
determine the layout of streets or footways
Utilities are an essential component of street infrastructure and
can have an important effect on layout issues, such as footway
widths. The accommodation of utilities must not, however,
compromise the creation of a sense of place or influence the
design disproportionately. It is essential to liaise with the utility
companies when the layouts of the buildings and streets are
being designed.
Service strips should be designed to accommodate the services
contained rather than by the application of rigid standards.
>
The availability and location of existing services should be
identified at the outset. Where possible, all utility apparatus should
be laid in ‘corridors’ throughout the site. This will facilitate the
installation of the services and any future connections as the
development proceeds.
Most residential streets provide routes for statutory undertakers
and other services. Detailed advice on providing for utilities in new
developments can be found in NJUG Guidance38 and local
authority guidelines.
Detail
An image of a layout driven by standards and formulaic solutions – the use of large radius bends, overly-dominant lighting columns, large building setbacks, inefficient
land use, and inappropriate traffic calming contribute nothing to a positive sense of place
Andrew
CameronW
SP

Page 340

49
Planting
Keyconsiderations
Street design should aim to integrate natural
landscape features and foster positive
biodiversity
Intelligent and appropriate planting in street design is encouraged.
Planting, particularly street trees, helps to soften the street scene
while creating visual interest, improving microclimate and providing
valuable habitats for wildlife. Whilst appropriate driver sightlines
should be maintained, vegetation can be used to limit excessive
forward visibility to limit traffic speeds.
Care should be taken to preserve existing trees, particularly when
changes to a street are planned. Consideration should also be
given to the relationship of streets to existing and new green
networks. Green networks can often provide pedestrian or cycle
routes that offer increased connectivity and add a distinctive
character area for people to enjoy.
>
Careful consideration needs to be given to appropriate tree
selection, their location and how they are planted. Detailed advice
on this issue is contained in the Communities and Local
Government document, Tree Roots in the Built Environment.39
If possible, semi-mature trees should be planted. Slow-growing
species with narrow trunks and canopies above 2 m should be
considered.
Maintenance arrangements for all planted areas need to be
established at an early stage, as they affect the design, including
the choice of species and their locations. The approval and
maintenance of proposed planting within the street boundary will
be required to comply with Sections 50 and 51 of the Roads
(Scotland) Act 1984.40
Alternatives to formal adoption may require innovative
arrangements to secure long-term management of planting. These
may include the careful design of ownership boundaries, the use of
covenants and annual service charges on new properties.
Detail
KarenEsslemontEDAW
Atkins

Page 341

50
Materials
Keyconsiderations
Materials should be distinctive, easily
maintained, provide durability and be of a
standard and quality to appeal visually within
the specific context
Materialsandconstruction
Places need to look good and work well in the long term. Design
costs are only a small percentage of the overall costs, but it is the
quality of the design that makes the difference in creating places
that will stand the test of time. Well-designed places last longer
and are easier to maintain, thus the costs of the design element
are repaid over time. The specification for materials and
maintenance regimes should be written to provide high standards
of durability and environmental performance. Maintenance should
be straightforward and management regimes should ensure that
there are clear lines of responsibility. The long term success of places
can be as dependent on visual appeal as durability. The quality of
the design and its appropriateness to an area can have a significant
effect on the extent to which a place is liked and well-used.
Local authorities should be prepared to allow the use of alternative
materials, landscaping treatments and features to those normally
approved if they will help to create a positive sense of place and
enhance context.
It is recommended that all materials:
are easy to maintain;
are safe for purpose;
are durable;
are sustainable (including the manufacturing process and
energy use);
are appropriate to the context; and
provide clear street definition and hierarchy.>
>
>
>
>
>
>
Arrangementsforfuturemaintenance
It is important that decisions on the future maintenance
arrangements of the streets and public spaces in a development
are made early in the design process. If the streets are to be
adopted by the local roads authority, the layout and material
choices must be acceptable to the authority.
It is possible for streets to remain private but, ideally, a properly-
constituted body with defined legal responsibilities will need to
be established to maintain the streets to the common benefit of
residents.
A road authority will require legal certainty that the streets are
going to be properly maintained in perpetuity by these private
arrangements. Approval for construction of new private streets will
be required under Sections 17 and/or 21 of the Roads (Scotland)
Act 1984 and, under Section 13 of this Act, the local roads
authority has powers to require a private road is maintained to a
reasonable standard (as set by the authority).
A roads authority may be unwilling to adopt items such as
planting and street furniture (e.g. play equipment and public art)
which are not considered to relate to the movement functions of
the street. If there is no private management company,
arrangements can be made for such features to be maintained
by another local authority department.
Detail
GillespiesandPaulZanre

Page 342

51
Reducingclutter
Keyconsiderations
Signs and street markings should be kept to a
minimum and considered early in the design
process
Street lighting should be as discreet as
possible, but provide adequate illumination
Street furniture should be located for
maximum benefit and to reduce pedestrian
obstruction
Trafficsigns
The Traffic Signs Regulations and General Directions 200241
(TSRGD), is a regulatory document which details every traffic sign
prescribed for use in the UK. It includes all of the prescribed road
markings, as a road marking is legally a sign. TSRGD also
stipulates the conditions under which each sign may be used.
Further advice on the use of signs is contained in the Traffic Signs
Manual,42 which gives advice on the application of traffic signs in
common situations. Compliance with TSRGD is mandatory. The
Traffic Signs Manual is guidance and there is therefore scope for
moving away from its recommendations if justified by local
circumstances.
Therequirementforsigns
No sign is fundamentally required by TSRGD per se. Signs are
only needed to warn or inform, or to give effect to Traffic
Regulation Orders (TROs) and TSRGD simply sets out how signs
must be used once it has been decided that they are necessary.
Signs are most effective when used sparingly. Designers should
ensure that each sign is necessary – they should use the flexibility
within the TSRGD and associated guidance documents to ensure
that signs are provided as required, but do not dominate the
visual appearance of streets.
The non-provision of signs and markings may be appropriate in
lightly-trafficked environments specifically designed to promote
low speeds. It reduces clutter and the relative lack of signage may
also itself encourage lower vehicle speeds.
Signs which have no clear purpose should be removed to reduce
clutter and to ensure that essential messages are prominent.
Although much signage is provided for the benefit of motorised
users, it is generally located on the footway and can contribute
to clutter.
In the case of new developments, some road authorities seek to
guard against having to install additional signs at their own
expense later, by requiring all manner of signs to be provided by
the developer at the outset. This will lead to clutter and is not
recommended. The preferred way of addressing such concerns is
to issue a bond to cover an agreed period, so that additional
signs, if deemed absolutely necessary, can be installed later at the
developer’s expense if required.
>
>
>
Detail
JohnThompson&Partners
Andrew
CameronW
SP
Inappropriate signage
Overly dominant signage that detracts from the place

Page 343

52
It is desirable to limit the number of posts in footways. Where
possible, signs should be attached to adjacent walls, not more
than 2 m from the edge of the carriageway, or be grouped on
posts.
Existing streets should be subject to a signs audit to ensure that
they are not over-signed and, in particular, that old, redundant
signs have been removed.
The use of centre lines is not an absolute requirement. There is
some evidence that, in appropriate circumstances, the absence of
white lines can encourage drivers to drive at lower speeds.
Most unsignalised junctions are designed assuming a dominant
flow, with priority indicated by give-way signs and markings. There
is no statutory requirement for junction priority to be specified.
Unmarked junctions that require drivers to ‘negotiate’ their way
through may be appropriate on lower volume streets, as this can
help to control speeds.
Streetfurniture
Every piece of street furniture should earn its place in the street.
Street furniture should have a clear function and should not be
regarded as simple ornamentation. Street furniture should be
integrated into the overall design of a street and relate to context.
Street furniture that encourages human activity can also
contribute to a sense of place. The most obvious example of this
is seating, or features that can act as secondary seating such as
low walls or planters. Wherever possible, street furniture should
perform more than one function in the interests of reducing clutter
and improving amenity.
Seating is necessary to provide rest points for pedestrians,
particularly older people or people with mobility or visual
impairments, and extra seating should be considered where
people congregate, such as squares, local shops and schools.
Guidance is given in PAN 78 Inclusive Design and BS 8300.43
Seating can sometimes attract anti-social behaviour and therefore
should be located where there is good lighting and natural
surveillance.
Guardrailing
Guard railing should not be provided unless a clear need for it has
been identified. Introducing measures to reduce traffic flows and
speeds may be helpful in removing the need for guard railing. In
most cases, it is unlikely that guard railing will be required on
residential streets.
Detail
Andrew
CameronW
SP
As well as being visually intrusive, the inappropriate use of guard railings can block
pedestrian desire lines, with consequential possible dangers

Page 344

53
Lighting
Where streets are to be lit, lighting should be planned as an
integral part of the design of the street layout at an early stage.
Lighting should illuminate both the carriageway and the footway.
Consideration should be given to attaching lighting units to
buildings to reduce street clutter. Under Section 35 (5) of the Roads
(Scotland) Act, local authorities have the power to fix lighting to
walls and buildings, subject to a statutory consultation with
involved parties and a specified notice period.
Lighting should be appropriate and sympathetic to the context.
A street lighting assessment can be helpful in determining both
the level of lighting and the type of equipment used in the area.
In street design, consideration should be given to the purpose of
lighting, the scale of lighting relative to human users of the street,
the width of the street and the height of surrounding buildings.
Where road and pedestrian area lighting are both required, some
road authorities install lamp columns featuring a secondary
footway light mounted at a lower height. This can assist in
illuminating pedestrian areas well, particularly where footways are
wide or shaded by trees.
The colour of lighting is another important consideration. This
relates both to people’s ability to discern colour under artificial
light and the colour ‘temperature’ of the light. Light colour
temperature is a consequence of the composition of the light,
ranging simply from blue (cold) to red (warm). Generally, pedestrians
prefer whiter lighting.
Lighting should generally be in accordance with BS EN 13201-2,44
BS EN 13201-3,45 and BS EN 13201-4.46 Guidance on lighting
design is given in BS 5489-1, Code of Practice for the Design of
Road Lighting,47 to comply with the requirements of BS EN 13201.
This is a guidance document only and local circumstances may
require different approaches.
Further guidance is contained within Controlling Light Pollution
and Reducing Lighting Energy Consumption,48 PAN 51: Planning,
Environmental Protection and Regulation49 and PAN 77:
Designing Safer Places.
Detail
Andrew
CameronW
SP
Building-mounted lighting

Page 345

54
Howto
achievebetter
outcomes
Atkins
54

Page 346

Part03Process
Howtoachievebetteroutcomes
Designing Streets recognises that good design requires to be supported by an informed process. The large number of stakeholders
involved in street design demands that the overlaps between professionals, decision makers and the public are fully integrated and
work in a collaborative way.
55
Process
policies
Street design should be based on balanced decision-making and must adopt
a multidisciplinary collaborative approach
Street design should run planning permission and Road Construction Consent
(RCC) processes in parallel
>
>
Jointworkingprocesses
Street design involves a wide range of contributors and it is essential that these individuals and organisations work together from the
earliest point towards a common objective – the delivery of distinctive streets where functionality is accommodated within a positive
sense of place.
It is important for the various parts of local authorities to work together when giving input to a development proposal. Developers may
be faced with conflicting requirements if different parts of local authorities fail to coordinate their input. This can cause delay and a loss
of design quality. This is particularly problematic when one section of a local authority – for example the roads adoption/Roads
Construction Consent (RCC) or maintenance engineers – become involved late in the process and require significant changes to the
design. A collaborative process of partnership and cooperation is required from the outset between all relevant parties.
Similarly, it is vital that developer teams also work in an integrated manner to deliver quality street design and provide appropriate interfaces
with local authorities and other stakeholders. Engagement with agencies is encouraged as early as possible, preferably at pre-application
stage. Detailed policy issues must be addressed as early in the process as possible in order to integrate solutions and streamline processes.
Ongoing dialogue between all parties – developer teams, authorities, agencies, the public including disability groups and access panels –
is essential.
JohnThompson&Partners

Page 347

56
Casestudy
PARCCraigmillar,Edinburgh
PARC Craigmillar is a joint venture company between the EDI
Group Ltd and the City of Edinburgh Council. Together with groups
and representatives from the Craigmillar community, the Company
works on the regeneration of the Craigmillar area in Edinburgh.
Central to the regeneration project is the innovative approach to
street design. The project contains successful Shared Space/
Home Zone areas and level surfaces that link the residential
streets and new primary schools campus, providing an area in
which vehicle movement is secondary to the activity of pedestrians.
Much of the Shared Space area is constructed with permeable
paving, which integrates drainage functions within the on-street
parking bays and carriageway build-up. The design of the
carriageway was undertaken in a collaborative process with the
City of Edinburgh Council, to a standard that allowed the Council
to adopt the streets including the areas of permeable paving.
Careful and efficient incorporation of underground utilities and
services was paramount to ensure the successful design of
these streets.
PARC Craigmillar’s Shared Space development at Wauchope
Square has been nationally recognised - winning the best Home
Zone category in the UK Street Design awards 2009, awarded by
Local Government News.
The work at Craigmillar illustrates how many of the functions of
streets can be integrated in both innovative designs and collaborative
processes that result in streets with a distinctive and positive
character and excellent functionality.
03
KeithHunter
KeithHunter
Process

Page 348

57
Jointplanningpermission&RCCprocesses
Research carried out for the Scottish Government in 2005 identified ways in which the Roads Construction Consent process could be
better integrated with the planning approval process. This process has now been updated accordingly, and will provide greater certainty
for developers taking forward more innovative designs and meet government objectives for streamlining the planning process. The
chart below illustrates a method to follow to comply with the national policy on this matter.
Residentialstreetapprovalprocess
StreetEngineeringReview(SER)Notes
Undertake SER in accordance with Local Authority guidance and relevant national policy/guidance (e.g. Designing Streets).
SER to include areas such as:
Agreement of street layout including landscaping proposals in relation to the following:
– Vehicle tracking of layout (particular attention to be given to refuse vehicles and buses)
– Approval of key visibility splays
– Speed control
– Agreement of drainage discharge rates
– Agreement of SUDS techniques
– Schematic drainage layout for foul and surface water including dimension requirements against building and landscaping
– Key materials palette
– Utilities strategy
>
Street Approval Process
Obtain all necessary technical information
including Street Engineering Review (SER)
Planning Process
Site appraisal
Preparation of planning
permission in principle
Planning permission
in principle
Detailed planning permission
Support Information
InitialPlanningStage1
DetailedPlanningandStreet
EngineeringStage2
RCC
DetailedDesign
SubmissionStage3
Early discussion with Planners, RCC
Engineers to give advice on Engineering
matters. Advice to be sought from SEPA
and Scottish Water regarding drainage
issues
Planning permission in principle granted
with consideration given to Street
Engineering matters
Street Engineering Review (please refer to
notes below). Detailed consultations
with RCC, Drainage, Utility Engineers
along with Masterplanners Architects
and Landscape Architects
SER approval. Layout fixed for detailed
RCC design
Road Construction Consent Granted
Stage 1 Quality Audit
Transportation
Assessment of development
Flood Risk Assessment/
Drainage Study
Utility Assessment
Preparation of detailed RCC design in
accordance with agreed development
layout and principles set in SER
Stage 2 Quality Audit
SER guidance
Process
Approval of matters specified in
conditions or application for
detailed planning permission
In some instances, insufficient detail may exist at planning permission in principle stage to justify RCC processes to take place.
Balanced decisions on individual applications are required.
Diagram:WatermanBoreham
TransportPlanning

Page 349

58
QualityAudits
The Quality Audit process aims to allow for more innovative design
solutions where over safety-cautious practices can be omitted in
favour of creating places that are high quality and enjoyable to use.
A Quality Audit draws together assessments by various
professionals, and each may be undertaken within particular
guidelines. By grouping the assessments together, any
compromises in the design will be apparent, making it easier for
decision makers to view the scheme in the round.
Quality Audits can ensure that street designs are appropriate and
meet the objectives agreed at the outset. Documented audit and
sign-off systems also provide a strong defence against any liability
claims that may arise after the scheme has been implemented.
Quality Audits are particularly beneficial in the following
circumstances:
at option testing stage;
at pre-application stage;
where strong tensions exist between different objectives, a
Quality Audit will aid more balanced decision–making;
for schemes within existing streets, where a quality audit will
provide an opportunity for decision-makers to make a
balanced assessment of different considerations before
approving a particular solution; and
for smaller schemes where no Design Statement will be required.
The audit may include documents required by the local planning
authority to support an application.
A Quality Audit should be integral to the design and implementation
and not a tick box exercise. A typical audit may include some of the
following assessments but the content will depend on the type of
scheme and the objectives which the scheme is seeking to meet:
an audit of visual quality
a review of how the street will be used by the community
a Road Safety Audit
an inclusive access audit
a walking audit
a cycle audit
RoadSafetyAudits(RSA)
The purpose of the RSA is to identify potential road safety
problems. Road Safety Audits can be a key component within an
overall Quality Audit. Road Safety Audits are routinely carried out
for many road schemes. The Institution of Highways and
Transportation (IHT) Guidelines on RSA sit alongside the relevant
standard contained in DMRB as the recognised industry standard
documents in the UK. The procedures set out in DMRB, however,
are a formal requirement for trunk roads only.
>
>
>
>
>
>
>
>
>
>
>
It is important to understand that RSAs are not mandatory for
local road authorities. Many residential streets, where the design
is carried out by a developer’s consultant, are assessed
independently by the local roads authority. In many authorities,
there is no requirement for a further check by a Roads Safety
Audit team, particularly where it is clear that motorised traffic
volumes and speeds, and the degree of potential conflict between
different user-groups, is not going to be significant.
An RSA is not a check on compliance with design standards.
Audits should take all road users into account, including
pedestrians and cyclists. The auditor reviews the proposals and
the local authority decides whether or not to accept particular
recommendations.
It is also important to note that the design team retains responsibility
for the scheme and is not governed by the findings of the report.
There is, therefore, no sense in which the scheme passes or fails
the RSA process. Designers do not have to comply with the
recommendations of a Safety Audit although, in such cases, they
would be expected to justify their reasoning within a written report.
The process set out in DMRB requires the audit team to be
independent of the design team, and road safety issues are
therefore often considered in isolation from visual quality and
successful place-making issues. It can therefore be difficult to
achieve a balanced design through dialogue and compromise.
The requirement for independence need not, however, prevent
contact between the design team and the audit team throughout
the process.
The involvement of road safety professionals as an integral part of
the design team is recommended to help to overcome problems.
This allows ideas to be tested and considered in more balanced
and creative ways, and should overcome situations where perceived
safety issues lead to late changes to schemes, often to the
detriment of design quality.
Another area of concern with the current system is that RSAs may
seek to identify all possible risks without distinguishing between
major and minor risks, or quantifying the probability of them taking
place. There can also be a tendency for auditors to encourage
designs that achieve safety through segregating vulnerable road
users from road traffic. Such designs can perform poorly in terms
of streetscape quality, pedestrian amenity and security and, in
some circumstances, can actually reduce safety levels.
It would therefore be useful if RSAs included an assessment of
the relative significance of any potential safety problems. A risk
assessment to consider the severity of a safety problem and the
likelihood of occurrence would make it considerably easier for
decision-makers to strike an appropriate balance. An example of
a risk assessment framework is given in Highway Risk and
Liability Claims.50
Process

Page 350

59
Conclusion
Good street design impacts upon a wide variety of issues, and it
is, thus, essential for all those involved in designing streets to
work productively to achieve the goals of this policy document.
The design rationale, processes and justification for a new
approach to street design have been clearly laid out. It is,
however, of central importance that individuals and organisations
adopt both the spirit and the detail of this policy and engage in a
proactive manner.
The outcomes for all of those involved in street design are not
simply designs, approvals or agreements: they are the delivery of
new lively, vibrant and sustainable places of which Scotland can
be proud for generations to come.
Process
JCooper

Page 351

60
Whatisthelegalandtechnicalcontext?
A complex set of legislation, polices and guidance applies to the
design of streets. There is a tendency among some designers and
approving authorities to treat design guidance as hard and fast rules
because of the mistaken assumption that to do otherwise would be
illegal or counter to a stringent policy. This approach is wrong. It
restricts innovation,and leads to standardised streets with little sense
of place or quality. In fact, there is considerable scope for designers
and approving authorities to adopt a more flexible approach on
many issues. It is, therefore, Scottish Government policy in
Designing Places and Designing Streets to encourage street design
which engenders place and quality.
By copying a standard example without due consideration,
designers abrogate their own professionalism. When doing so,
they still retain responsibility for the design, as it is their decision to
copy a standard example which has been produced by individuals
who may never have seen the site in question, and which may
therefore not be suitable.
The following comprise the various tiers of instruction and advice:
the legal framework of statutes, regulations and case law
government policy
government guidance
local policies
local guidance
design standards
evidence and research base and the concept of
‘evidence-based design’
The Westminster and Scottish Parliaments and the Courts have
established the legal framework. In this respect, certain aspects of
transport are reserved to Westminster in terms of the Scotland
Act 199851. For example, this includes the provisions which are
the subject matter of the Road Traffic Act 198852, namely traffic
signs and speed limits.
The Scottish Government develops policies aimed at meeting
various objectives which roads and planning authorities are directed
to follow. Designing Places and Designing Streets are such policies.
It also issues supporting guidance to help authorities implement
these policies, including the guidance in this document.
Evidence-based design has been developed as a concept within
recent years. A distinction needs to be drawn between policies,
guidance and practices that are, in essence, rule of thumb and
that reflect simply a continuation of a conventional approach, and
those that are based on science, statistics and designed
experimental studies, and regularly challenged to ensure that they
are relevant to modern needs and conditions. Designing Streets is
supported by an evidence base.
>
>
>
>
>
>
>
Within this overall framework, road and planning authorities have
considerable leeway to develop local policies and standards, and
to make technical judgements with regard to how they are applied.
Other bodies also produce advisory and research material on
which they can draw.
Whatistheriskandliability?
Concerns around risk and liability frequently lead to the rigid
application of standards that can stifle design-led, contextual
approaches. Roads authorities have often applied a very cautious
approach in order to avoid potential liability in the event of
damage or injury.
This over-cautious approach is ill-advised, and restricts innovation
and responses to local context. Recent case law has established
that drivers are primarily responsible for their own safety and
although road authorities have a general duty under Section 39 of
the Road Traffic Act 1988 to promote safety, this does not create
a duty of care.
A major concern expressed by some road authorities when
considering more innovative designs, or designs that are at variance
with established practice, is whether they would incur a liability in
the event of damage or injury.
This can lead to an over-cautious approach, where designers
strictly comply with guidance regardless of its suitability, and to
the detriment of innovation. This is not conducive to creating
distinctive places that help to support thriving communities.
In fact, imaginative and context-specific design that does not rely
on conventional standards can achieve high levels of safety. The
design of Poundbury in Dorset, for example, did not comply fully
with standards and guidance then extant, yet it has very few
reported accidents. This issue was explored in some detail in the
publication Highway Risk and Liability Claims 2009.
Claims against road authorities relate almost exclusively to alleged
deficiencies in maintenance. Claims for design faults are extremely
rare. The duty of the road authority to maintain the road is set out
in the Roads (Scotland) Act 1984, and case law has clarified the
law in this area.
The courts in Scotland have adopted a cautious approach when
considering the duty of care potentially owed by roads authorities.
Merely because a roads authority has powers, this does not
generally open up the authority to liability. The circumstances in
which roads authorities have been held liable in damages have been
very restricted. The restrictive approach has also been adopted in
circumstances where the risk of an accident may well be foreseeable.
(See Murray v Nicholls and Bennett v J Lamont & Sons).
Annex:Technicalquestionsandanswers

Page 352

61
The Scottish line of authority has been recently reinforced by the
House of Lords in the case of Gorringe v. Calderdale MBC (2004).
A claim was made against a highway authority in England (‘roads’
authority in Scotland) for failing to maintain a ‘SLOW’ marking on
the approach to a sharp crest. The judgement confirmed a
number of important points which were that:
the authority’s duty to ‘maintain’ covers the fabric of a
highway, but not signs and markings;
there is no requirement for the road authority to ‘give warning
of obvious dangers’ and natural road hazards; and
drivers are ‘first and foremost responsible for their own safety’.
A handful of claims for negligence and/or failure to carry out a
statutory duty have been made under section 39 of the Road
Traffic Act 1988, which places a general duty on road authorities
to promote road safety. In connection with new roads, Section 39
(3)(c) states that road authorities ‘in constructing new roads, must
take such measures as appear to the authority to be appropriate
to reduce the possibilities of such accidents when the roads
come into use’.
The Gorringe v. Calderdale judgment made it clear that Section
39 of the Road Traffic Act 1988 did not create a duty of care and,
therefore, does not form the basis for a liability claim.
Advice to road authorities on managing their risks associated with
new designs is given in Chapter 5 of Highway Risk and Liability
Claims (2009). In summary, this advises that authorities should
put procedures in place that allow rational decisions to be made
with the minimum of bureaucracy, and create an audit trail which
could subsequently be used as evidence in court.
Suggested procedures include the following key steps:
set clear and concise scheme objectives;
work up the design against these objectives; and
review the design against these objectives through a quality
audit.
Balanceddecisions
A suggested framework from Highway Risk and Liability Claims
(2009) which accords with those set out in Designing Streets is:
Vision – there should be an overall vision for an area that reflects
local and national policy and, where appropriate, the views of the
local community
Objectives/Purpose – there should be a robust understanding of
what the scheme is intended to do. This will normally include
balancing:
movement and place;
risk and opportunity; and
ensuring sustainability.
Design – this should be worked up against the objectives
Quality audit – this is a review of the design against the objectives
set
>
>
>
>
>
>
>
>
>
Whataretheissuesregarding
disabilitydiscrimination?
Road and planning authorities must comply with the Disability
Equality Duty under the Disability Discrimination Act 2005. This
means that in their decisions and actions, authorities are required
to have due regard to six principles, which are to:
promote equality of opportunity between disabled persons
and other persons;
eliminate discrimination that is unlawful under the 2005 Act;
eliminate harassment of disabled persons that is related to
their disabilities;
promote positive attitudes towards disabled persons;
encourage participation by disabled persons in public life; and
take steps to take account of disabled persons’ disabilities,
even where that involves treating disabled persons more
favourably than other persons.
Those who fail to observe these requirements will be at the risk of
a claim. Not only is there an expectation of positive action, but the
duty is retrospective and local authorities will be expected to take
reasonable action to rectify occurrences of non-compliance in
existing areas.
The Disability Rights Commission (DRC) has published a Statutory
Code of Practice on the Disability Equality Duty53 and it has also
published specific guidance for those dealing with planning,
buildings and the street environment.
Whataretheadoptionand
maintenanceissues?
Keyconsiderations
The quality of the environment created by new development
needs to be sustained long after the last property has been
occupied. This requires good design and high-quality
construction, followed by good management and maintenance.
Authorities are encouraged to adopt a palette of suitable local
and natural materials which allow for more creative design
whilst being practical to maintain.
Resource efficiency and sustainability should be addressed
through the use of appropriate materials and systems
including SUDS.
The inclusion of planting (in particular street trees) is
encouraged within the street environment.
Roadsadoption–legalframework
Provision of roads for new developments is controlled and
consented by the local roads authority through the Roads
Construction Consent (RCC) process, governed by Section 21 of
the Roads (Scotland) Act 1984. For the purposes of adoption, all
streets are deemed to be roads under this Act.
>
>
>
>
>
>
>
>
>
>

Page 353

62
Under the terms of the RCC, having first secured technical
approval of the designs from the local authority, the developer is
obliged to construct roads over which there is a public right of
passage to an agreed standard. Expenses will be payable by the
developer to the roads authority to cover its reasonable costs in
inspecting the construction of the works and associated testing.
The Roads (Scotland) Act 1984 sets out the obligations of the
developer to construct the roads and maintain them for a set
period of normally 12 months. Following the satisfactory
discharge of these obligations, the new roads can be offered to
the roads authority for adoption. If the road is adopted, it will in
the future be maintainable by the roads authority.
RoadBondSecurity
Where Roads Construction Consent is granted relative to roads
associated with housing development, the granting of the consent
will require the deposit of sum or surety (Roads Bond) sufficient to
meet the cost of constructing the road. The purpose of this bond
is to enable the roads authority to meet the cost of constructing
or completing the construction of the roads, should the developer
fail in his responsibility to do so under the terms of the granted RCC.
Before any roads works commence on such a housing
development, the developer will normally be required to have both
the Roads Construction Consent and the Roads Bond in place.
Thus, before any construction begins, the developer will normally
be required either:
to secure the payment of the estimated cost of the road
works under the requirements of the Roads (Scotland) Act
1984; or
to make an agreement with the road authority under terms of
the Act and provide a Bond of Surety.
Privatestreets
Where a developer wishes streets to remain private, some roads
authorities have incorporated conditions into the planning approval
to require the developer to design, construct and to make
arrangements for the future maintenance of the new streets to a
standard acceptable to the authority. This agreement may still
require the submission and approval of an RCC under the terms
of Section 21 of the Act.
Landscapefeaturesadoption
Maintenance arrangements for all planted areas should be
established at an early stage, as they affect the design, including
the choice of species and their locations. The approval and
maintenance of proposed planting within the road boundary will
be required to comply with Sections 50 and 51 of the Roads
(Scotland) Act 1984.
Alternatives to formal adoption may require innovative arrangements
to secure long-term landscape management. These may include
the careful design of ownership boundaries, the use of covenants
and annual service charges on new properties.
>
>
Whatisadoptable?
The roads authority has considerable discretion in exercising its
powers as to whether to grant a Roads Construction Consent
under Section 21 of the Act.
A roads authority can be required to adopt a road constructed in
accordance with an RCC. The streets put forward for adoption
must be constructed to the agreed standard and will be subject
to a 12 month period of use as a road whilst being maintained to
the agreed standard by the developer.
Roads authorities have tended to only adopt streets that serve
more than a particular number of individual dwellings or more than
one commercial premises. Two to three dwellings is often set as
the lower limit, but some authorities have set figures above this.
DesignstandardsforRoadConstructionConsent
Roads authorities are now encouraged to take a flexible approach
to road adoption in order to allow greater scope for designs that
respond to their surroundings and create a sense of place. It is
recognised, however, that roads authorities will need to ensure that
any future maintenance liability is kept within acceptable limits.
One way of enabling designers to achieve local distinctiveness
without causing excessive maintenance costs will be for roads
authorities to develop a limited palette of special materials and
street furniture. Such materials and components, and their typical
application, could, for example, be set out in local design
guidance and be adopted as a planning policy.
Clear cases must be made where the adoption of designs are
sought that differ substantially from those envisaged in a local
authority’s design guide or Designing Streets. Developers should
produce well-reasoned design arguments in relation to this.
Roads authorities would normally be expected to adopt:
residential streets, combined footways and cycle tracks;
footways adjacent to carriageways and main footpaths
serving residential areas;
Home Zones and level surface streets;
land within visibility splays at junctions and on bends (in some
cases);
street trees;
any verges and planted areas adjacent to the carriageway;
structures, i.e. retaining walls and embankments, which
support the road or any other adoptable area;
street lighting;
gullies, gully connections and road drains and other road
drainage features;
on-street parking spaces adjacent to carriageways; and
service strips adjacent to level surface streets.>
>
>
>
>
>
>
>
>
>
>

Page 354

63
Privatemanagementcompanies/factors
Any unadopted communal areas will need to be managed and
maintained through private arrangements. Typical areas maintained
in this way include communal gardens, shared off-street car
parking, shared cycle storage, communal refuse storage and
composting facilities and sustainable energy infrastructure.
Approvalprocessesfornewstreets
The design and approval of new streets is governed by both
planning and roads legislation. The design process must therefore
recognise both sets of requirements. The Roads (Scotland) Act
1984 is the primary legislation for new roads, and all new roads
must receive RCC under Section 21 of that Act prior to
construction. Previous practice applied by most local authorities
dictates that the formal RCC approval process only starts with the
granting of planning permission, or at least with the agreement of
the final planning layout. The process thus results in a 2-stage
(planning and roads) approval process that not only significantly
extends the overall statutory approval process and delays
commencement of development construction but, by more rigid
application of engineering requirements at this 2nd stage, can
lead to a dilution of overall design quality.
Street design requires an integrated approach to approval,
involving collaboration between planning officers and RCC
engineers. In this way, roads colleagues will be satisfied with the
fundamentals of the development proposal, and can approve it in
principle concurrent with the granting of planning permission.
RCC engineers will have an important role to play as consultees in
the planning application process. It is as a consultee that the
roads authority can ensure that an appropriate 2-stage approach
is adopted. The roads authority should be satisfied that sufficient
information has been provided with the planning application to
ensure that a subsequent RCC reflecting the design will not alter
the details approved under the planning permission. These
discussions should take place as early as possible – before a
layout is worked up and a planning application submitted. It is
important that any principles that have been agreed at this point
in the design process are not revisited later, unless there has been
a significant change in circumstances.
Planning policies should set the overall benchmark for the design
quality of any new development, which includes the new streets
as a key part of the public realm. This is why local authorities
should have specific planning policies on street design ideally
within the development plan, or as Supplementary Planning
Guidance (SPG). Planners and road engineers should work
together to ensure policies are up to date and allow for the most
appropriate street patterns.
The flow chart contained in Part 3 of this document shows how
a more integrated system should operate, and the key design
decisions which would need to be taken, and signed off, at
each stage.
AdoptionofSUDS
Adoption issues will need to be clarified at an early stage in the
design process, with the likely adopting authorities; Scottish Water,
local authority and potential private bodies. The amendments to
Section 7 of the Sewerage (Scotland) Act 1968 published within
SUDS for Roads, focus on adoption of SUDS at a regional level
by encouraging a collaborative approach to shared systems
between local authorities and Scottish Water. It is important for a
continuous, team-based approach to this matter.

Page 355

64
References
1. Designing Places: Scottish Executive 2001
2. Planning Advice Note (PAN)76 Residential Streets: Scottish
Executive 2005
3. Design Bulletin 32 (DB32) – Layout of Residential Roads and
Footpaths: Institution of Civil Engineers (ICE) 1977. DB32 was
not published in Scotland, although it has been widely used
by roads authorities as a basis for Scottish standards.
4. Manual for Streets: Department for Transport 2007 gives advice
for the design of residential streets in England and Wales.
5. Design Manual for Roads and Bridges (DMRB): The Highways
Agency. The DMRB suite of documents is updated several
times each year.
6. Local Transport Note 2/08 Cycle Infrastructure Design:
Department for Transport 2008
7. Disability Discrimination Act 2005: The Stationery Office (TSO)
8. Planning and Buildings Standards Advice Note (PAN)78,
Inclusive Design: Scottish Executive 2006
9. Inclusive Mobility – A Guide to Best Practice on Access to
Pedestrian and Transport Infrastructure: Department for
Transport 2002
10. Disability Discrimination Act: Good Practice Guide for Roads:
Transport Scotland 2009
11. TRL Report No. 332 – Road layout design standards and
driver behaviour: Transport Research Laboratory 1998
12. TRL Report No. 661 – Manual for streets: evidence and
research: Transport Research Laboratory 2007
13. Mini-roundabouts: Good Practice Guidelines: Department for
Transport 2006
14. Transport (Scotland) Act 2001: The Stationery Office (TSO)
15. Home Zones; Challenging the future of our streets:
Department for Transport 2005
16. Home Zone Design Guidelines: Institute of Highway Incorporated
Engineers (IHIE) 2002
17. Shared Space Project Stage 1: Appraisal of Shared Space:
Department for Transport 2009
18. Designing for Disabled People in Home Zones: Disabled
Persons Transport Advisory Committee (DPTAC) 2007
19. Local Transport Note (LTN) 2/08 Cycle Infrastructure Design:
Department for Transport 2008
20. Scottish Planning Policy (SPP): Scottish Government 2010
21. Car Parking; What Works Where: English Partnerships 2006
22. Planning Advice Note (PAN) 77 Designing Safer Places:
Scottish Executive 2006
23. Traffic Advisory Leaflet 02/02: Department for Transport 2005
24. Guidelines for Motorcycling: Institute of Highway Incorporated
Engineers (IHIE) 2005
25. Scottish Building Standards Technical Handbooks: The
Stationery Office (TSO) (2004) revised 2007. These Technical
Handbooks provide guidance on achieving the standards set
in the Building (Scotland) Regulations 2004 and are available
in two volumes; for Domestic buildings and for Non-domestic
buildings.
26. Building (Scotland) Regulations 2004: The Stationery Office (TSO)
27. BS 5906: 2005 – Waste management in buildings: British
Standard 2005
28. Sewers for Scotland: Scottish Water (second edition) 2007
29. Sewerage (Scotland) Act 1968: The Stationery Office (TSO)
30. The SUDS Manual: CIRIA 2007
31. Planning Advice Note (PAN) 61: Planning and Sustainable
Urban Drainage: Scottish Executive 2001
32. Water Environment and Water Services (Scotland) Act 2003
(WEWS Act 2003)
33. Water Framework Directive: The European Water Framework
Directive came into force in December 2000 and became part
of UK law in December 2003.
34. Water Environment (Controlled Activities) (Scotland)
Regulations 2005 (CAR)4:
35. Flood Risk Management (Scotland) Act 2009: The Stationery
Office (TSO)
36. Drainage Assessment – A Guide for Scotland: Scottish
Environmental Protection Agency/SUDS Working Party 2005
37. SUDS for Roads: SUDS Working Party (authored WSP) 2009
38. Volume 2: NJUG Guidelines On The Positioning Of
Underground Utilities Apparatus For New Development Sites
(Issue 3): National Joint Utilities Group 2007
39. Tree Roots in the Built Environment: Department for
Communities and Local Government 2006
40. Roads (Scotland) Act 1984: The Stationery Office (TSO)
41. The Traffic Signs Regulations and General Directions:
The Stationery Office (TSO) 2002
42. Traffic Signs Manual: Department for Transport 2006
43. BS 8300 – Design of buildings and their approaches to meet
the needs of disabled people: British Standard 2009
44. BS EN 13201-2:2003: Road lighting. Performance
requirements 2003
45. BS EN 13201-3:2003: Road lighting. Part 3: Calculation of
performance 2003
46. BS EN 13201-4:2003: Road lighting. Methods of measuring
lighting performance 2003
47. BS 5489-1:2003+A2:2008: Code of Practice for the Design of
Road Lighting. Lighting of Roads and Public Amenity Areas
(Amended 2008)
48. Controlling Light Pollution and Reducing Lighting Energy
Consumption: Scottish Government (Web only from
www.scotland.gov.uk) 2007
49. Planning Advice Note (PAN) 51: Planning, Environmental
Protection and Regulation (Revised 2006)
50. Highway Risk and Liability Claims: UK Roads Board and the
Institution of Civil Engineers (ICE) 2009
51. Scotland Act 1998: The Stationery Office (TSO)
52. Road Traffic Act 1988: The Stationery Office (TSO)
53. Statutory Code of Practice on the Disability Equality Duty
(England and Wales) 2005: The Disability Rights Commission
(DRC)

Page 356

Contents
1 Foreword
John Swinney MSP
Cabinet Secretary for Finance
and Sustainable Growth
3 Introduction
Status and aims of Designing Streets
The value of good street design
Policy relationship
Who is Designing Streets for?
Development of the document
Streets and roads
The relationship of Designing Streets
to main and busy streets
5 How to use this document
7 Part 1: General: Creating streets and places
11 Part 2: Detail: Getting the design right
55 Part 3: Process: How to achieve better outcomes
59 Conclusion
60 Annex: Technical questions and answers
What is the legal and technical context?
What is the risk and liability?
What are the issues regarding disability
discrimination?
What are the adoption and maintenance issues?
64 References
© Crown copyright 2010
ISBN: 978-0-7559-8264-6
The Scottish Government
St Andrew’s House
Edinburgh
EH1 3DG
Produced for the Scottish Government by
RR Donnelley B63780 3/10
ImagesSuppliedby
ATKINS
Cadell2 LLP
City of Edinburgh Council
Dougie Barnett Photography
EDAW (AECOM)
Gillespies
HTA
John Cooper Photography
John Thomson & Partners
Karen Esslement
Keith Hunter Photography
Land Use Consultants
Living Streets
Malcolm Fraser Architects
Parc Craigmillar
Paul Zanre Photography
Phil Jones Associates
WSP
Acknowledgments
Designing Streets was produced by a
multidisciplinary team led by WSP UK.
CoreTeam
Elaine Barrie (WSP)
Andrew Cameron (WSP)
Karen Esslemont (EDAW)
Keith Gowenlock – Project Director (WSP)
Colin Innes (Shepherd and Wedderburn LLP)
Phil Jones (Phil Jones Associates)
Neil McDonald (WSP)
David Nicol (WSP)
Chris Pittner (WSP)
Alan Young (WSP)
SteeringGroup
Mic Ralph – SCOTS (Glasgow City Council)
Stuart D’all – SCOTS (Perth and Kinross Council)
Paul Ince – SCOTS (East Lothian Council)
Neil McLean – SEPA

Page 357

designing
A Policy Statement for Scotland
streets
Policies
Street design must consider place before
movement.
Street design guidance, as set out in this
document, can be a material consideration in
determining planning applications and appeals.
Street design should meet the six qualities of
successful places, as set out in Designing Places.
Street design should be based on balanced
decision-making and must adopt a
multidisciplinary collaborative approach.
Street design should run planning permission
and Road Construction Consent (RCC) processes
in parallel.
© Crown copyright 2010
ISBN: 978-0-7559-8264-6
RR Donnelley B63780 03/10
www.scotland.gov.uk
>
>
>
>
>
designingstreets
A
PolicyStatementforScotland

Page 358

NATIONAL 
ROADS DEVELOPMENT GUIDE
S  C  O  T  SS  C  O  T  S
Mt<4
Vo^oU
r
EO ^.
a. v[o1 ro1
f*
?
,i_
S3
a
rT ^ _r;j
12- r^j
1 *
o L/
r- /'
• ■*''t!
.-,- / ,
• / y '
BfritiT J
^ C-c
ss
>►
// y
--V\.i .\ A
_ ■ r\
1®rw* -
■•"vvs.NV*•'
S£ V----';V* 7
/JH
/ A

Page 359

Acknowledgements
ROADS DEVELOPMENT GUIDE
Last updated
August 2015
3
SCOTS National Roads Development Guide Project Steering
Group
John Thomson
Perth & Kinross Council (Chairman)
Richard Simmons
Fife Council
Ken Aitken
Transport Scotland
Mic Ralph
Glasgow City Council
Alistair MacKinnon, Rachel Kennedy
Aberdeenshire Council
John Danby
The Highland Council
Tom Rodgers
Aberdeen City Council
David Greenlade
Inverclyde Council
Andy Barnes, Graham Harris 
Angus Council
Richard Gerring
Moray Council
Campbell Divertie, Bill Weston
Argyll & Bute Council
Jack McConnache, David Hilditch, Crawford Forsyth
North Ayrshire Council
Stuart Cullen
Clackmannanshire Council
Jim Johnston
North Lanarkshire Council
Ian Cooper, Graeme Alison
Dumfries & Galloway Council
Robert McArthur
Renfrewshire Council
Mike Giblin
Dundee City Council
Ron Elliot, Derek Inglis
Scottish Borders Council
Kevan Aitken, Stuart Norval
East Ayrshire Council
Colin Gair
Shetland Islands Council
Gary Blair
East Dunbartonshire Council
Emma Thomson
South Ayrshire Council
Grant Talac, Paul Ince
East Lothian Council
Fraser Jack
South Lanarkshire Council
Andrew McBride, Matthew Simpson
City of Edinburgh Council
Jim McGregor
Stirling Council
Craig Russell, Brian Raeburn
Falkirk Council
Robert Smith, Jim Stewart
West Lothian Council

Page 360

Part 3
ROADS DEVELOPMENT GUIDE
74
3.1.2 Private Access
(a) Access Criteria
Similar to the above criteria, private vehicular
access to developments will require to
accommodate the numbers and types of
vehicles using the access in a safe manner. 
The form of access may also require to
be enhanced in order to accommodate
pedestrians and cyclists.
(b) Segregation at Commercial Accesses
In the case of commercial developments,
vulnerable users should be provided with a
separate pedestrian access.
(c) Individual Dwellings
In general, access to individual dwellings
should be by means of a dropped kerb
footway crossing as shown in Figure 8.  In rural
or semi-rural areas the x and y distance is
dependent on the speed of traffic on the road
based on the relevant speed limit applicable
at that location.
Private Commercial Access
Figure 8  Driveway Access

Page 361

Part 3
ROADS DEVELOPMENT GUIDE
75
Last updated
June 2017
Figure 9 Single Minor Commercial Access,
Housing Court or Car Park up to
50 spaces
Figure 10 Minor Commercial Access
or Car Park with more than
50 spaces
Figure 11 Major Commercial or
Industrial Access
(d) Access Layouts
Access layouts are shown in Figures 9 to 11.  Note: These details require to be updated to
narrow ramps and consistent passage along footway.

Page 362

LDRA Ltd v Secretary of State for Communities and Local..., 2016 WL 01745179...
© 2024 Thomson Reuters. 1
Ldra Limited, Dr Michael Hennell, Colin Evans, Priory
Wharf Management Company Limited v Secretary of
State for Communities and Local Government, Cammell
Laird Shiprepairs and Shipbuilders Limited, Wirral
Borough Council
No Substantial Judicial Treatment
Court
Queen's Bench Division (Administrative Court)
Judgment Date
6 May 2016
Case No: CO/5680/2015
High Court of Justice Queen's Bench Division Planning Court
[2016] EWHC 950 (Admin), 2016 WL 01745179
Before: Mrs Justice Lang DBE
Date: 6 May 2016
Hearing date: 14 April 2016
Representation
Timothy Jones (instructed by Richard Buxton Solicitors) for the Claimants.
Stephen Whale (instructed by The Government Legal Department ) for the First Defendant.
The Second and Third Defendants did not appear and were not represented.
Judgment
Mrs Justice Lang:
1.  In this claim under section 288 of the Town and Country Planning Act 1990 (“TCPA 1990”), the Claimants
applied to quash the decision of the Secretary of State for Communities and Local Government, dated 13 October
2015, made on his behalf by an Inspector (Mr Richard Clegg), in which he allowed an appeal by Cammell Laird
Shiprepairers & Shipbuilders Ltd (“the developer”), and granted planning permission for an on-shore office and
warehouse building at the car park, Alabama Way, Birkenhead, Merseyside, CH41 5LJ (“the Site”), to serve
as a marine operations and maintenance facility for off-shore projects The off-shore projects to be serviced by
the development were windfarms in Liverpool Bay and the Irish Sea. A marine licence had been granted for
the proposed floating pontoon and linkspan structure.
2.  The Site is immediately adjacent to the River Mersey. Once the site of a railway, the car park and the adjacent
Monks Ferry slipway are now owned by Wirrall Borough Council (“WBC”). The public currently enjoy access
to the car park. Charter boat companies use the slipway with the knowledge of WBC. WBC has resolved that its
freehold interest in the Site could be sold to the developer. However, planning permission for this development
was refused by WBC on 23 July 2014, on the grounds that it would result in an unacceptable loss of amenity

Page 363

LDRA Ltd v Secretary of State for Communities and Local..., 2016 WL 01745179...
© 2024 Thomson Reuters. 2
for the occupiers at the adjacent residential development at Priory Wharf by virtue of increased noise, general
disturbance and poor outlook.
3.  The site is within an area designated as a Primarily Industrial Area in the adopted Wirral Unitary Development
Plan (“Wirral UDP”). Policy EM6 provides that applications for new employment development (defined as
falling within Classes B1, B2 and B8 of the Town and Country Planning (Use Classes) Order 1987 )) will
be permitted, provided it does not lead to an unacceptable loss of amenity or have an adverse effect upon
neighbouring uses. WBC concluded that the potential impact upon occupants of Priory Wharf would be contrary
to Policy EM6.
4.  On appeal by the developer, the Inspector identified six main issues (Appeal Decision (“AD”) [7]):
i)  The effect of the proposed development on the living conditions of nearby residents of Priory Wharf.
ii)  The effect of the proposed development on the operation of LRDA Ltd, the occupier of the offices to
the south of the site.
iii)  The effect of the proposed development on nature conservation.
iv)  The effect of the proposed development on heritage assets.
v)  The suitability of the site for development, having regard to flood risk.
vi)  The effect of other considerations in the overall planning balance.
5.  The appeal was opposed by the Claimants, who were adversely affected by the proposal, and had previously
objected to WBC.
6.  The First Claimant operates a high technology business on the industrial park immediately to the south of the
Site. The Second Claimant, Dr Hennell, is the managing director and founder of the First Claimant company.
7.  The Third Claimant, Mr Evans, is a member of the Mersey Charter Boat Association, a qualified yacht
master and a charter-boat operator. He operates the “Mersey Lass” on the River Mersey for fishing trips and
wreck diving. He has operated a charter boat service on the River Mersey since 1991.
8.  The Fourth Claimant is the Priory Wharf Management Company Ltd which operates for the benefit of
residents of Priory Wharf, the four storey residential complex located immediately to the north of the Site.
9.  After a hearing lasting two days, and two site visits, the Inspector decided that the appeal should be allowed
and planning permission should be granted, subject to conditions. His overall conclusions were as follows:
“75.  The appeal site lies within a primary industrial area on the UDP Proposals Map.
Within this designation, the proposed offices and warehouse would be acceptable in
principle. However the criteria in Policies EM6 and EM7 apply to new employment
development and are also relevant. The development of the site at Alabama Way for a
marine operations and maintenance facility would not cause unacceptable harm to the
living conditions of nearby residents at Priory Wharf, nor would it result in material
harm to the operations of LDRA Ltd. Insofar as nature conservation interests are

Page 364

LDRA Ltd v Secretary of State for Communities and Local..., 2016 WL 01745179...
© 2024 Thomson Reuters. 3
concerned, there would be no significant adverse effect, and I have found no conflict
with Policies EM6 and EM7.
76.  The proposal would not detract from the significance of heritage assets, and there
would be no conflict with Policy CH1 of the UDP which seeks to safeguard listed
buildings. Policies in the UDP concerning the developed coastal zone and the inter-
tidal zone are also relevant to the appeal proposal. Whilst there is compliance with
most provisions of Policies CO1 and COI7, the closure of about 40m of the riverside
footway would conflict with the requirement to preserve public access to the coast.
77.  As a consequence of the conflict with Policy CO1 concerning public access to
the coast the proposal would not be fully consistent with the Development Plan. I
consider that the effect on jobs is of neutral significance in the planning balance, but
the proposal would contribute to the implementation of off-shore renewable energy
projects, and it would thereby accord with a core planning principle of the NPPF. This
is a significant benefit of the proposal which clearly outweighs the limited harm of
conflict with Policy CO1 arising from the loss of a short stretch of footway.”
10.  In their application under section 288 TCPA 1990 , the Claimants submitted that the Inspector erred in
respect of his approach to:
i)  The adverse impact of vibration on the First Claimant's business;
ii)  The adverse impact on disabled persons, because of loss of the car park, and access to the riverside.
iii)  The loss of access to the slipway by charter-boat operators.
iv)  The proposed condition excluding B2 uses in the building.
v)  An alternative available site.
11.  Ground 5 was added by way of a late amendment, and both parties filed late witness statements in respect
of the issues which it raised.
12.  The First Defendant's response was that the decision did not disclose any error of law on the part of
the Inspector, who had considered all relevant matters, giving them such weight as he found appropriate, and
reached conclusions on the planning merits of the proposal which could not be successfully challenged.
Legal framework
13.  Under section 288 TCPA 1990 , a person aggrieved may apply to quash a decision on the grounds that (a)
it is not within the powers of the Act; or (b) any of the relevant requirements have not been complied with and
in consequence, the interests of the applicant have been substantially prejudiced.
14.  The general principles of judicial review are applicable to a challenge under section 288 TCPA 1990 . Thus,
the Claimants must establish that the Secretary of State misdirected himself in law or acted irrationally or failed
to have regard to relevant considerations or that there was some procedural impropriety.

Page 365

LDRA Ltd v Secretary of State for Communities and Local..., 2016 WL 01745179...
© 2024 Thomson Reuters. 4
15.  The exercise of planning judgment and the weighing of the various issues are matters for the decision-
maker and not for the Court: Seddon Properties v Secretary of State for the Environment (1978) 42 P &CR 26
. As Sullivan J. said in Newsmith v Secretary of State for the Environment, Transport and the Regions [2001]
EWHC Admin 74 , at [6]:
“An application under section 288 is not an opportunity for a review of the planning
merits of an Inspector's decision.”
16.  The determination of an application for planning permission is to be made in accordance with the
development plan, unless material considerations indicate otherwise: section 38(6) of the Planning and
Compulsory Purchase Act 2004 , read together with section 70(2) TCPA 1990 . The NPPF is a material
consideration for these purposes.
17.  An Inspector's decision letter must be read (1) fairly and in good faith, and as a whole; (2) in a
straightforward down-to-earth manner, without excessive legalism or criticism; (3) as if by a well-informed
reader who understands the principal controversial issues in the case: see Lord Bridge in South Lakeland v
Secretary of State for the Environment [1992] 2 AC 141 , at 148G-H; Sir Thomas Bingham MR in Clarke
Homes v Secretary of State for the Environment (1993) 66 P & CR 263 , at 271; Seddon Properties v Secretary
of State for the Environment (1981) 42 P & CR 26 , at 28; and South Somerset District Council v Secretary of
State for the Environment (1993) 66 P & CR 83 .
Ground 1: Vibration
18.  The First Claimant operates an international high technology business, including testing of bespoke
computer programmes intended to ensure the safety of both civil and military aircraft. The equipment used
for this is highly sensitive. The evidence of Dr Hennell was that the vibration generated by the proposed
development, particularly during the construction phase, but also when in operation, would irrevocably harm
its computer discs. It would have to re-locate to another site if the development went ahead.
19.  The developer commissioned consultants who prepared a detailed “Construction Noise and Vibration
Assessment” which referenced British Standard 5228–2 on Vibration, and the Approved Code of Practice,
including best practice vibration mitigation requirements. BS 5228–2 addresses vibration limits for buildings,
and contents of buildings, such as disc drives which are sensitive to vibration below the level directly perceptible
to people. Because of uncertainty concerning the level of transmitted vibration, and its acceptability to the
particular environment, preliminary trials and monitoring may have to be designed to establish a suitable
procedure for the work. The report recommended a Noise and Vibration Management Plan, which would
be incorporated into the Construction Environmental Management Plan, proposed as a condition of planning
consent.
20.  The Inspector accepted the evidence from the consultants that the risk of damaging vibration from the
movement and engines of the crew transfer vessels was negligible. Vibration during construction would present
a risk but it could be acceptably mitigated by use of the less intensive methods of work recommended in
the report, and by monitoring. The Inspector imposed the conditions recommended by the consultants which
provided that development could not take place until there was an approved plan addressing “construction noise
and vibration management, monitoring and mitigation measures” which was to be adhered to throughout the
construction period. In the light of this condition, he was not certain that it would be necessary for the business

Page 366

LDRA Ltd v Secretary of State for Communities and Local..., 2016 WL 01745179...
© 2024 Thomson Reuters. 5
to re-locate. Even if it did, the loss of jobs would be balanced by about 65 new jobs created by the development
proposal.
21. The Claimants criticised the Inspector's decision, on the grounds that he failed adequately to address their
concerns, and erred in his approach to the British Standards, and relied on monitoring instead of prevention.
In my judgment, these criticisms were not justified. The Inspector gave proper consideration to the issue, and
reached conclusions which were supported by the consultants' evidence.
Ground 2: Disabled persons' access to the riverside
22. The Claimants submitted that the Inspector failed to appreciate and/or take into account that the likely
impact of the development was that disabled persons would no longer be able to access the riverside. This
was contrary to Policy CO1 of the adopted Wirral UDP which states that “ Public access to the coast will be
expected to be preserved and where practical and safe to do so, enhanced .” Paragraph 20.19 of the reasoned
justification provides that “ No development … should lead to a reduction in public access to the coast, and
indeed where possible, should enhance it. ” In reaching his conclusions on this issue, the Inspector failed to
discharge the public sector equality duty under section 149 of the Equality Act 2010 , in particular subsections
(1)(a) and (b) and (3)(a) and (b) .
23. The Secretary of State agreed that section 149 of the Equality Act 2010 applied but submitted that the
Inspector had discharged the duty by having due regard to the needs identified in subsections (1) and (3) . There
was no error of law in his approach to access by disabled persons.
24. Section 149 of the Equality Act 2010 provides:
“149 Public sector equality duty
(1) A public authority must, in the exercise of its functions, have due regard to the
need to—
(a) eliminate discrimination, harassment, victimisation and any other conduct that is
prohibited by or under this Act;
(b) advance equality of opportunity between persons who share a relevant protected
characteristic and persons who do not share it;
(c) foster good relations between persons who share a relevant protected characteristic
and persons who do not share it.
(2) A person who is not a public authority but who exercises public functions must, in
the exercise of those functions, have due regard to the matters mentioned in subsection
(1).
(3) Having due regard to the need to advance equality of opportunity between persons
who share a relevant protected characteristic and persons who do not share it involves
having due regard, in particular, to the need to—
(a) remove or minimise disadvantages suffered by persons who share a relevant
protected characteristic that are connected to that characteristic;
(b) take steps to meet the needs of persons who share a relevant protected characteristic
that are different from the needs of persons who do not share it;

Page 367

LDRA Ltd v Secretary of State for Communities and Local..., 2016 WL 01745179...
© 2024 Thomson Reuters. 6
(c)  encourage persons who share a relevant protected characteristic to participate
in public life or in any other activity in which participation by such persons is
disproportionately low.
(4)  The steps involved in meeting the needs of disabled persons that are different from
the needs of persons who are not disabled include, in particular, steps to take account
of disabled persons' disabilities.
(5)  Having due regard to the need to foster good relations between persons who share
a relevant protected characteristic and persons who do not share it involves having due
regard, in particular, to the need to—
(a)  tackle prejudice, and
(b)  promote understanding.
(6)  Compliance with the duties in this section may involve treating some persons more
favourably than others; but that is not to be taken as permitting conduct that would
otherwise be prohibited by or under this Act.
(7)  The relevant protected characteristics are—
age;
disability;
gender reassignment;
pregnancy and maternity;
race;
religion or belief;
sex;
sexual orientation.
…”
25.  The public sector equality duty has been the subject of detailed consideration by the courts over the years.
Mr Whale referred me to R (Coleman) v London Borough of Barnet [2012] EWHC 3725 (Admin) , in which
Lindblom J. (as he then was) held that the local planning authority had due regard to the statutory equality duty
which had been fully set out in the planning officers' report. Lindblom J. set out the principles to be applied
as follows:
“65.  The relevant jurisprudence is clear and not controversial.

Page 368

LDRA Ltd v Secretary of State for Communities and Local..., 2016 WL 01745179...
© 2024 Thomson Reuters. 7
66.  As Dyson LJ said in [ R (Baker) v Secretary of State for Communities and Local
G overnment [2009] PTSR 809 ] (in paragraph 31), the duty is not a duty to achieve a
result, but to have due regard to the need to achieve the statutory goals. This distinction,
said Dyson LJ, is “vital”. The failure of a decision-maker to make explicit reference to
the relevant statutory provision (in that case section 71(1) of the Race Relations Act
1976 ) would not determine whether the duty under the statute had been performed,
for this “would be to sacrifice substance to form” (ibid., paragraph 36). Dyson LJ went
on to say this:
“37  The question in every case is whether the decision-
maker has in substance had due regard to the relevant
statutory need. Just as the use of a mantra referring to the
statutory provision does not of itself show that the duty
has been performed, so too a failure to refer expressly
to the statute does not of itself show that the duty has
not been performed. … To see whether the duty has been
performed, it is necessary to turn to the substance of the
decision and its reasoning.
38  Nevertheless, although a reference to section 71(1)
may not be sufficient to show that the duty has been
performed, in my judgment it is good practice for an
inspector (and indeed any decision-maker who is subject
to the duty) to make reference to the provision … in
all cases where section 71(1) is in play. In this way,
the decision-maker is more likely to ensure that the
relevant factors are taken into account and the scope for
argument as to whether the duty has been performed will
be reduced.”
67.  The court must consider whether due regard has been paid to the equality duty,
and not simply whether the failure to have due regard to that duty was Wednesbury
unreasonable ( R (Child Poverty Action Group) v Secretary of State for Work and
Pensions [2011] EWHC 2616 (Admin) , at paragraphs 70 to 72). “Due” regard means,
as Dyson LJ said in Baker (at paragraph 31), “the regard that is appropriate in all
the circumstances”. The circumstances include “the importance of the areas of life
of the members of the disadvantaged … group that are affected by the inequality of
opportunity and the extent of the inequality” and “such countervailing factors as are
relevant to the function which the decision-maker is performing” (ibid.).
68.  As Aikens LJ said in [ R (Brown) v Secretary of State for Work and Pensions
[2009] PTSR 1506 ] (at paragraph 35), “the general duty [in section 49A(1) of the
Disability Discrimination Act 1995 ] is expressed in broad and wide-ranging terms of
the needs or targets to bring about a change of climate, but the section is silent as to
how it should be done”. He emphasized (at paragraph 82) the need for the decision-
maker to “pay regard to any countervailing factors which, in the context of the function
being exercised, it is proper and reasonable for the public authority to consider”. What
these factors are in a particular case will depend on the function being exercised and
all the circumstances that bear upon it. Aikens LJ added:

Page 369

LDRA Ltd v Secretary of State for Communities and Local..., 2016 WL 01745179...
© 2024 Thomson Reuters. 8
“… Clearly, economic and practical factors will often
be important be important. Moreover, the weight to be
given to the countervailing factors is a matter for the
public authority concerned, rather then the court, unless
the assessment by the public authority is unreasonable or
irrational …”
…
70. Performance of the due regard duty must be an integral part of the formation
of the decision, not merely the justification for the making of that decision (see R
(Kaur) v Ealing LBC [2008] EWHC 2062 (Admin) , at paragraph 24). Because the
performance of the duty is a matter of substance, to be judged according to the facts of
the case in hand, there must be enough information to enable the necessary balancing
exercise to be carried out, and that information must be before the decision-maker (see
Child Poverty Action Group , at paragraphs 70 to 76). In Brown it was held that the
underlying objective of the general duty under section 49A(1) of the 1995 Act was “to
create a greater awareness on the part of public authorities of the need to take account
of disability in all its forms and to ensure that it is brought into “the mix” as a relevant
factor when decisions are taken that may affect disabled people” (paragraph 30).
71. The decision under challenge in this case is a planning decision, the decision of
a local planning authority to approve a scheme of development. It is not a decision
of a public body to withdraw or reduce a particular service, such as the court had to
consider, for example, in the Birmingham case, which concerned the provision made
for disabilities in the then current budget of Birmingham City Council. Much of the
case law is concerned with decisions of that kind. This is not to say that the public
sector equality duty is less onerous in a planning case than it is in others. It is not. But
in such a case the circumstances in which the authority's performance of the duty has
to be scrutinized will inevitably be different.”
26. More recently, in Moore and Coates v Secretary of State for Communities and Local Government & Ors
[2015] EWHC 44 (Admin) , another planning case, Gilbart J. provided a helpful summary of the law on the
public sector equality duty:
“109.  In Bracking v Secretary of State for Work and Pensions [2013] EWCA Civ 1345
, para 26 McCombe LJ summarised the principles to be derived from the authorities
on s 149 , as follows:
“(1)  As stated by Arden LJ in R (Elias) v Secretary of State for Defence [2006] EWCA
Civ 1293 at 274, [2006] IRLR 934, [2006] 1 WLR 3213 , equality duties are an integral
and important part of the mechanisms for ensuring the fulfilment of the aims of anti-
discrimination legislation.
(2) An important evidential element in the demonstration of the discharge of the duty
is the recording of the steps taken by the decision maker in seeking to meet the statutory

Page 370

LDRA Ltd v Secretary of State for Communities and Local..., 2016 WL 01745179...
© 2024 Thomson Reuters. 9
requirements: R (BAPIO Action Ltd) v Secretary of State for the Home Department
[2006] EWCA Civ 1293, [2006] IRLR 934, [2006] 1 WLR 3213 (Stanley Burnton J
(as he then was)).
(3)  The relevant duty is upon the Minister or other decision maker personally. What
matters is what he or she took into account and what he or she knew. Thus, the Minister
or decision maker cannot be taken to know what his or her officials know or what may
have been in the minds of officials in proffering their advice: R (National Association
of Health Stores) v Department of Health [2005] EWCA Civ 154 at 26–27] per Sedley
LJ.
(4)  A Minister must assess the risk and extent of any adverse impact and the ways in
which such risk may be eliminated before the adoption of a proposed policy and not
merely as a “rearguard action”, following a concluded decision: per Moses LJ, sitting
as a Judge of the Administrative Court, in Kaur & Shah v LB Ealing [2008] EWHC
2062 (Admin) at 23–24.
(5)  These and other points were reviewed by Aikens LJ, giving the judgment of the
Divisional Court, in R (Brown) v Secretary of State for Work and Pensions [2008]
EWHC 3158 (Admin), [2009] PTSR 1506 , as follows:
i)  The public authority decision maker must be aware of the duty to have “due regard”
to the relevant matters;
ii)  The duty must be fulfilled before and at the time when a particular policy is being
considered;
iii)  The duty must be “exercised in substance, with rigour, and with an open mind”. It
is not a question of “ticking boxes”; while there is no duty to make express reference to
the regard paid to the relevant duty, reference to it and to the relevant criteria reduces
the scope for argument;
iv)  The duty is non-delegable; and
v)  Is a continuing one.
vi)  It is good practice for a decision maker to keep records demonstrating
consideration of the duty.
(6)  [G]eneral regard to issues of equality is not the same as having specific regard, by
way of conscious approach to the statutory criteria.” (per Davis J (as he then was) in
R (Meany) v Harlow DC [2009] EWHC 559 (Admin) at 84, approved in this court in
R (Bailey) v Brent LBC [2011] EWCA Civ 1586 at 74–75.)
(7)  Officials reporting to or advising Ministers/other public authority decision makers,
on matters material to the discharge of the duty, must not merely tell the Minister/
decision maker what he/she wants to hear but they have to be “rigorous in both
enquiring and reporting to them”: R (Domb) v Hammersmith & Fulham LBC [2009]
EWCA Civ 941 at 79 per Sedley LJ.”
110.  McCombe LJ went on to identify three further principles, which may be
summarised as follows:
(8)  It is for the Court to decide for itself if due regard has been had, but providing
this is done it is for the decision maker to decide what weight to give to the equality
implications of the decision (following R (Hurley & Moore) v Secretary of State for

Page 371

LDRA Ltd v Secretary of State for Communities and Local..., 2016 WL 01745179...
© 2024 Thomson Reuters. 10
Business, Innovation and Skills [2012] EWHC 201 (Admin) , per Elias LJ @ [77]-
[78]).
(9) “[T]he duty of due regard under the statute requires public authorities to be
properly informed before taking a decision. If the relevant material is not available,
there will be a duty to acquire it and this will frequently mean that some further
consideration with appropriate groups is required” ( R (Hurley & Moore) v Secretary
of State for Business, Innovation and Skills [2012] EWHC 201 (Admin) , per Elias LJ
@ [89]).
(10) The duty to have due regard concerns the impact of the proposal on all persons
with the protected characteristic and also, specifically, upon any particular class of
persons within a protected category who might most obviously be adversely affected
by the proposal ( Bracking , per McCombe LJ @ [40]).
111. As to the importance of the second principle, McCombe LJ stated @ [60]-[61]:
“it seems to me that the 2010 Act imposes a heavy burden
upon public authorities in discharging the PSED and in
ensuring that there is evidence available, if necessary,
to demonstrate that discharge. It seems to have been
the intention of Parliament that these considerations
of equality of opportunity (where they arise) are now
to be placed at the centre of formulation of policy
by all public authorities, side by side with all other
pressing circumstances of whatever magnitude” and “In
the absence of evidence of a ‘structured attempt to focus
upon the details of equality issues’ (per my Lord, Elias
LJ in Hurley & Moore ) a decision maker is likely to
be in difficulties if his or her subsequent decision is
challenged”.”
27. In this case, the evidence before the Inspector was that public access to the river from Birkenhead is very
limited. The Site is the only place in the area where public parking next to the river is readily available. The
large car park is immediately beside the River Mersey, thus enabling disabled people and their carers to enjoy
the river and the fine views across it, and to watch the activities of ships and smaller boats. Disabled people can
remain in the car park area (which is built on two levels) or if they are sufficiently mobile, they can proceed a
short distance to the riverside promenade (which forms part of the Wirral Circular Trail) either in a wheelchair
or on foot. There was clear evidence before the Inspector from several sources that this car park, and the access
which it gave to the river, was an amenity which was both regularly used and valued by disabled people (both
adults and children with special needs). I am unable to accept Mr Whale's submission that there was insufficient
evidence of use of the car park by disabled persons for this ground to succeed.
28. The proposed development will be built on the car park, and so visitors will no longer be able to drive and
park by the riverside. Visitors will have to find street parking in Church Street or Ivy Street. From there they
will have to proceed on foot along the streets and down a steep footpath for a distance of about 119 metres to
reach the riverside. The Statement of Common Ground (“SCG”) recorded at paragraph 3.3, “ a steep gradient
across the site with the highest elevation in the west of the site approximately 14m Above Ordnance Datum
(AOD) sloping to approximately 5.5 AOD in the north east of the site ”. In a different context, when considering

Page 372

LDRA Ltd v Secretary of State for Communities and Local..., 2016 WL 01745179...
© 2024 Thomson Reuters. 11
the impact of the development on Priory Wharf at AD [16], the Inspector said that the appeal Site “ slopes
down towards the waterfront from about 14m above Ordnance datum (AOD) at the junction of Alabama Way
and Monks Ferry to above 6–7 AOD by the riverside wall ”. The discrepancy between the agreed figure of 5.5
AOD in the SCG, and the figure of “above 6–7 AOD” stated by the Inspector, was unexplained, as the SCG
figure was not disputed at the hearing.
29.  The Inspector's findings were as follows:
“59.  Policy CO1 expects that public access to the coast will be at least preserved,
and Policy CO7 requires that public access should be preserved unless this would
be impractical. The greater part of the appeal site comprises a public car park, and a
riverside footway from the north continues across the site to its southern boundary.
Plan AL16 identifies these areas as highway, which it is proposed would be stopped
up. The justification to Policy CO1 refers to an objective of the Council to complete
a continuous coastal route for pedestrians and cyclists. The proposal would not sever
the riverside route, since a gate prevents access to the south beyond the appeal site.
The footway between Priory Wharf and the appeal site would continue to provide
public access from the surrounding area to the riverside and the route to the north
to Woodside. Only a short stretch of footway would be excluded from public use by
virtue of the proposal, and there would still be the opportunity to reach the riverside
immediately to the north of the existing slipway. Nevertheless there would be a loss
of public access across the site, a distance of about 40m, contrary to the requirement
of Policy CO1 to preserve public access to the coast. I appreciate that it would be
impractical to permit public access on foot within the operational site, and for this
reason I find no conflict with Policy CO7.
60.  There is disagreement between the parties concerning the usage of the public car
park at Alabama Way. The car park is a pay and display facility, and the Council's
evidence, endorsed by the Appellant, is that it is little used. Information from ticket
sales for the period from January 2011 to April 2014 indicates that on average only
2–4 vehicles a day are parked on the site. Local residents reported that at times there
could be up to 30 cars present, and it was suggested that the discrepancy with ticket
sales could be due to use of the car park by disabled persons who are exempt from
charges, and the non-purchase of tickets for some short stays. I note that photographs
9 and 10 in the Appellant's LVIA show use of the car park by at least 6 and 8 cars
respectively, in excess of the Council's evidence but markedly less than the number
suggested by local residents. There are opportunities to park on nearby streets, and
the Council is satisfied that space here would accommodate parking displaced from
Alabama Way. No parking survey of the locality has been submitted, but I anticipate
that in the evening and at weekends, when there may be more people wishing to reach
the riverside by car, competition for on-street spaces with vehicles associated with
the industrial and commercial premises in the locality would be less than during the
normal working day. That said, the off-street spaces are further from the riverside and
less convenient to use, particularly for disabled persons.
61.  As a consequence of redevelopment of the appeal site, there would be no direct
access to a short stretch of riverside footway, and the loss of the car park would make
it less convenient for those travelling to this part of the riverside by car to reach their
destination. I conclude that the proposal would not preserve public access to the coast,
and that it would conflict with Policy CO1 of the UDP. This is a matter to which I give
limited weight, bearing in mind the short length of footway affected and the continuing
opportunity to reach the riverside in the vicinity of Monks Ferry.”

Page 373

LDRA Ltd v Secretary of State for Communities and Local..., 2016 WL 01745179...
© 2024 Thomson Reuters. 12
30. The Claimants submitted that the Inspector's approach displayed a serious failure to understand the reality
of the impact on disabled people. The proposed development was not merely inconvenient, as it would be for
able-bodied people; rather it would prevent access to the riverside. Only able-bodied people would have the
“ continuing opportunity to reach the riverside in the vicinity of Monks Ferry ”, referred to by the Inspector
at AD [61].
31. In my judgment, there was a strong argument, based on the written and photographic evidence, that disabled
people with impaired mobility would find it very difficult or impossible to go down to the riverside if the
development is built because (a) they would be parked too far away; and (b) the footpath down to the riverside,
and back up, would be too steep for disabled people and their carers to manage. Even a disabled resident at
nearby Priory Wharf said she would find it too difficult. Mrs Cartwright, resident at Priory Wharf, stated in her
letter objecting to the development:
“My husband unfortunately suffered a stroke two years ago so obviously he has
restricted movement. We use that car park regularly, it is so convenient for me to run
him round in the car …. I push him along the promenade because it is nice and flat.
I could not do this otherwise because I am no longer young myself. The steep slope
down to the car park on foot and with a wheelchair is out of the question for me. I am
at a loss to understand the thinking on these plans because that area is used by many,
it is the only open space left here that is not taken up by industry.”
32. Applying the legal principles set out above, I have concluded that the Inspector did not have due regard to
the duty under section 149 in this case. In particular, because of the lack of any detailed consideration of the
value of the existing amenity to disabled persons (including, for the immobile, being able to sit in the car and
look at the river); the lack of any other comparable amenity in the Birkenhead area; the practical difficulties
which would be experienced by persons with restricted mobility and their carers in descending and climbing the
steep footpath to the riverside; and the apparent failure to consider whether the loss of the car park would not
be merely “less convenient” for disabled persons but might well mean that they would be unable to access the
riverside at all. If the Inspector was not fully appraised of the relevant information, he was under an obligation to
seek the information required. The statutory equality duty was not mentioned in the planning officers' report, nor
in the Inspector's decision. Of course, the Inspector could comply with the duty without specifically referring to
it. But there is no indication in the decision that the Inspector considered the factors set out in section 149 , and
tellingly there is no reference, express or implied, to the statutory considerations of removing or minimising
disadvantages suffered by disabled persons, and taking steps to meet the needs of disabled persons. I consider
it is likely that the Inspector overlooked section 149 in reaching his decision, and thus made an error of law.
33. I am unable to accept Mr Whale's submission that I should not quash the decision because this was only
a sub-issue, not a main issue in the appeal, and if the Inspector had performed his statutory duty, the decision
would have been the same in any event. In my view, the evidence of disadvantage to disabled persons was
significant, and the Inspector failed to recognise its importance. I cannot say with confidence that the Inspector's
conclusion as to the weight to be accorded to the factor of coastal access would have been the same if the
Inspector had properly applied his mind to the considerations set out in section 149 . Moreover, the section 149
duty is concerned with the manner in which decisions are made, not merely outcomes.
Ground 3: Loss of access to the slipway by charter-boat operators
34. The Claimants submitted that the Inspector failed adequately to address the adverse impact of the proposed
development on charter-boat operators who would no longer be able to operate their businesses from Monks
Ferry slipway. Mr Flint, who owns Discovery Charters Ltd, gave evidence that, because of the tides, Monks
Ferry slipway was the only location within 60 miles where 24 hour access was feasible throughout the year.
He used it regularly. The Third Claimant, Mr Evans, who runs diving and fishing trips from Monks Ferry
throughout the year, confirmed that there was no suitable alternative access because of tidal conditions. Mr

Page 374

LDRA Ltd v Secretary of State for Communities and Local..., 2016 WL 01745179...
© 2024 Thomson Reuters. 13
Dickinson, who runs a single hull boat with a capacity of 10 passengers from Monks Ferry, also uses it full-time.
He explained that there were eleven local charter boats and another 5 or 6 Welsh boats that used the slipway.
Mr Parry, of Jensen Sea Angling, sent an objection in writing saying that although he mainly worked out of
Liverpool Marina, he had to use the slipway when he could not access the Marina because of tides.
35.  According to the Council, the slipway is not open to the public (it is gated); it is intended for use by the
emergency services and the Council. The Claimants submitted that the 24 hour emergency access to and from
the river at Monks Ferry ought, in the interests of safety, to be maintained. Use of the Monks Ferry slipway by the
charter-boat operators is not officially authorised by WBC, but the Council has been aware of it for many years,
and has not objected. A public or private right of access is now being investigated by the charter-boat owners.
36.  The Inspector's conclusions were as follows:
“64.  I have also considered the implications of the proposal for charter boat operators
who use the slipway to collect and disembark customers. Representatives of the
Mersey Charter Boats Association explained that the slipway is used by about 11
local boats and 5/6 Welsh boats, principally in connection with fishing trips. The three
operators who appeared at the hearing explained that there is no place other than the
Monks Ferry slipway where they are able to gain 24 hours access to the Mersey. This
is important since fishing trips do not typically last from one high tide to another,
and each considered that inability to use the slipway would threaten the future of his
business. However no detailed assessments have been submitted to demonstrate that
the operation of these businesses cannot be adjusted to withstand the loss of access to
the Monks Ferry slipway. Another operator, although objecting to the proposal, has
stated that he uses the slipway on rare occasions and works out of Liverpool Marina
during the winter months.
65.  Although the charter boat operators make use of the slipway, their right to do so
has been questioned by the Appellant. The slipway is owned by the Council, which
has explained that the slipway is not open to the public, that there are no recorded
permit holders, and that it is intended for use by the Council, emergency services and
Government agencies. At the hearing the legal representatives of the Appellant and
LDRA/ Dr Hennell agreed that private rights of way could be established if there
was evidence of uninterrupted use over a period of 20 years. That is not a matter for
consideration as part of this appeal. However, if a private right to access the slipway
by the charter boat operators were established they should be able to continue using
it irrespective of the development. On the other hand, if no such right were found to
exist, there would appear to be no basis for their use of the slipway.
66.  The proposal would create up to 65 new jobs, but there is a possibility that jobs
at LDRA would be moved out of the area if redevelopment went ahead. The number
of jobs created by Cammell Laird would be less than the number potentially affected
at LDRA; however in my judgement there would be greater certainty attached to job
creation by the development on the appeal site, and I consider that these factors carry
equivalent weight. From what I have heard, the ability of the charter boat operators to
continue to use the slipway by is not dependent on the outcome of this appeal. Overall,
the implications of the proposal for jobs are a neutral factor in the planning balance.”
37.  I understand why the charter boat operators were aggrieved at the Inspector's approach to this issue, in
particular, because he did not fully accept their evidence. However, this is not a re-hearing of the appeal before
the Inspector and the Inspector's conclusions can only be successfully challenged if there is an error of law. I
am unable to identify any error of law in the Inspector's approach. In my view, he was not persuaded by their

Page 375

LDRA Ltd v Secretary of State for Communities and Local..., 2016 WL 01745179...
© 2024 Thomson Reuters. 14
evidence as to the likely impact on their businesses. On my reading of the decision, he did not decide this issue
on the basis of whether there were or were not any rights of access to the slipway.
38.  The point concerning provision for emergency access to the slipway was not pursued at the hearing before
me. It ought to be addressed at any re-hearing of the appeal, if it remains a live issue.
Ground 4: B2 use
39.  The Claimants submitted that the Inspector erred in refusing to impose a condition restricting use of the
building to B1 and B8 uses, excluding B2 use.
40.  The application for planning permission was made upon the basis of proposed B1, B2 and B8 uses. The
Design and Access Statement referred to a building within B2 use. This was consistent with the Site's allocation.
The Statement of Common Ground recorded at paragraph 4.2: “1,500 sq m storage and office building (use
class B2: general industry)”.
41.  The Inspector refused to impose the condition proposed by the Claimants, and previously agreed by the
developer, restricting the use of the building to B1 and B8 uses. He held:
“74.  The Appellant has put forward the proposal as a blend of B1, B2 and B8 uses.
A condition restricting the use of the site to B1 and B8 uses would therefore be
unreasonable. In any event conditions requiring a construction management plan and
noise mitigation measures should protect the amenities of adjacent occupiers, and they
would also render a condition concerning loud individual noises unnecessary.”
42.  In my judgment, the Inspector's decision was correct. Although the evidence pointed to primarily B1 and
B8 use, it was clear that the developer at all times sought B2 use as well. I do not consider that the Inspector
misunderstood the Claimants' suggestion that the condition be limited to the building, despite his use of the
word “site”. I find it inconceivable that the Inspector overlooked potential B2 use at this Site, when he granted
planning permission and imposed conditions to protect the amenities of neighbouring occupants.
Ground 5: An alternative available site
43.  It was common ground at the appeal that it was appropriate for possible alternative sites to be considered
and the developer presented a report considering six alternative locations. The Claimants submitted that the
Inspector erred in his approach to a potential alternative site, running between Pacific Road, Woodside (near
the Irish ferry terminal), and Seacombe (an area which includes the Mersey Ferry jetty and a derelict riverside
site known as Kings Wharf/Fishermen's Wharf). This area was not considered by the developer.
44.  The Inspector, at AD [67] to [70], considered the alternative sites presented by the developer and then
said, at [70]:
“Dr Hennell has pointed to unused land and foreshore between Pacific Road at
Woodside and Seacombe, and has also made reference to the Liverpool side of the
river. However there are no details of specific locations in these extensive areas.
The information before me does not indicate that any of the alternative locations
put forward would be more appropriate for the proposed marine operation and
maintenance facility than the appeal site.”
45.  It was not in dispute that the Inspector had the following material before him:

Page 376

LDRA Ltd v Secretary of State for Communities and Local..., 2016 WL 01745179...
© 2024 Thomson Reuters. 15
i)  The appeal statement of Dr Hennell referred to “ extensive unused land and foreshore area between Pacific
Road, Birkenhead and the Seacombe Ferry, Wallasey. This is already an area for deep-water operations,
such as ferries to Ireland. ”
ii)  Dr Hennell's written presentation to the WBC Planning Committee stated “ there is an extensive unused
land and foreshore area between Pacific Road and the Seacombe ferry. This is already an area for deep
water operations (ferries to Ireland, etc). This land may also be in the possession of another company
related to Cammell Laird .”
46.  During the hearing before me, Dr Hennell's solicitors' notes were produced. They were good quality notes,
and their accuracy was not disputed by the Secretary of State. After the site visits, the note summarised a
roundtable discussion about alternative sites, in which Dr Hennell referred to “ North of Irish Ferry terminal.
Land available ”. The Irish ferry terminal is at Woodside. The Claimants submitted that this was a further means
of identifying the site to the Inspector.
47.  The Inspector conducted an accompanied site visit by boat, travelling across the River Mersey from
Liverpool towards Birkenhead, and back. According to the evidence of Mr Flint and Mr Dickinson, as they
reached a point approximately 500m from the Site, it was possible to see the coastline from Woodside to
Seacombe, north of the appeal Site. Mr Dickinson explained to the Inspector that WBC had suggested that the
charter-boats could use Seacombe Ferry jetty but that it was too high for their boats. Mr Dickinson then pointed
out the derelict land at Kings Wharf (also known as Fishermen's Wharf because of the public house there) and
said that it could be used for the on-shore maintenance operations for the wind farms and the Seacombe Ferry
jetty could be used for access to the river. At this point, Mr Vitkovitch of Cammell Laird interrupted and told
the Inspector that Kings Wharf was not a suitable site. Dr Hennell was also present on the boat and has filed a
witness statement confirming that the site which he referred to in his evidence was pointed out to the Inspector
on the boat trip.
48.  The Inspector has filed two witness statements dealing with this and other issues. In his first witness
statement at paragraph 5, he stated that he interpreted Dr Hennell's description of an alternative location in his
statement (set out above) as extending up to but not including the Seacombe Ferry. In paragraph 7, he stated that
at the site visit, the hearing did not continue and so no evidence could be given. Those present were restricted
to pointing out places and features. He said:
“the boat travelled across the river from Liverpool Marina towards the appeal site and
it then went upstream to Rock Ferry to enable views of possible alternative sites to the
south of the appeal site. Seacombe Ferry is, by contrast, downstream and to the north
of the appeal site. After Rock Ferry, the boat followed the same course in reverse back
to Liverpool Marina. I have no recollection of a site at Seacombe Ferry being pointed
out during the site visit.”
49.  In his second statement, the Inspector repeated his description of the route of the boat, saying he had no
recollection of Seacombe Ferry being pointed out to him. At paragraph 11, he stated that he was unclear as to
whether the Kings Wharf site was the same site as the Seacombe Ferry site, or a different one.
50.  Mr Vitkovitch has filed a brief statement which did not state in terms whether or not he recalls the
conversation described by Messrs Flint and Dickinson. However, he stated that he agreed with the Inspector's
statements.
51.  On considering the witness statements, looking at the maps, and hearing submissions, I am satisfied, on
the balance of probabilities, that when they were on the site visit, Messrs Dickinson and Flint pointed out to
the Inspector the location of Seacombe Ferry and the land south of it, known as Kings Wharf or Fishermen's
Wharf. I found their evidence detailed, plausible and convincing. It appeared to me that the Inspector either did
not understand the significance of what he was being shown, or subsequently forgot about it. Contrary to the

Page 377

LDRA Ltd v Secretary of State for Communities and Local..., 2016 WL 01745179...
© 2024 Thomson Reuters. 16
Inspector's recollection, I am satisfied that, as the boat was coming over from Liverpool, there would have been
a clear view of the coastline north of the appeal Site, before the vessel turned south to look at the alternative
sites referred to by the developer.
52.  The purpose of the site visit was to identify and view possible alternative sites. Those accompanying the
Inspector were permitted to point out the sites and identify features. In my view, there was a breach of natural
justice/procedural fairness in that the Inspector did not take into account the identification of the Seacombe
Ferry/Kings Wharf site. The Inspector subsequently dismissed Dr Hennell's evidence on the basis that his
proposed alternative site had not been properly identified to him. In my view, the Inspector's witness statements
demonstrated that he was confused about the area which Dr Hennell was referring to, and he did not understand
the location of the potential alternative site. Rather than dismiss it out of hand, he ought to have asked for
further assistance by way of maps or photographs or conducted a site visit on land, so that he could give it
due consideration.
53.  If due consideration had been given to this alternative site, the outcome might have been different, and in my
view the Claimants have been substantially prejudiced. If the alternative site had been found to be suitable and
did not have the adverse impacts of the appeal Site, planning permission might not have been given. Subsequent
events lend support to Dr Hennell's submission that this was a suitable alternative site. Dong Energy, which
holds the contracts for the servicing of off-shore wind turbines located in the Irish Sea, was granted planning
permission by WBC on 7 December 2015 for a wind turbine servicing facility to be built at Kings Wharf,
Seacombe, with sea access via Seacombe Ferry terminal. These were the locations shown to the Inspector by
Mr Dickinson on the boat trip, and the alternative site proposed by Dr Hennell. Mrs Lawson, who is the Chair
of the Priory Wharf Management Company Ltd, has stated in her witness statement:
“I refer to the witness statement of Dr Hennell in relation to the alternative facility at
Seacombe Ferry, which is before the Council at the date of this witness statement. The
leader of Wirral Borough Council, Cllr Phillip Davies, has confirmed to me personally
that the Council supports the Dong Energy facility so as to avoid the adverse residential
amenity impacts the development at Alabama Way would give rise to. ”
54.  As the developer and WBC did not appear before me, it was not known what were the future plans for the
appeal Site, and obviously that is not an issue for me in this application.
Conclusion
55.  The Claimants' application succeeds on Grounds 2 and 5 and the decision of the Inspector must be quashed.
Crown copyright

Page 378

Argyll and Bute Council
Development and Infrastructure Services 
Delegated or Committee Planning Application Report and Report of handling as required by
Schedule 2 of the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013 relative to applications for Planning Permission or Planning
Permission in Principle 
Reference No: 23/01046/PP
Planning Hierarchy: Local Application
Applicant: Mrs Dawn Anderson
Proposal: Proposed alterations to widen driveway entrance
Site Address: 50 Charlotte Street Helensburgh Argyll And Bute G84 7SR  
DECISION ROUTE 
Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997     
(A) THE APPLICATION 
i) Development Requiring Express Planning Permission
Proposed alterations to widen driveway entrance
ii) Other Specified Operations
None 
(B) RECOMMENDATION: 
Having due regard to the Development Plan and all other material considerations, it is
recommended that planning permission be refused and reasons appended to this report. 
______________________________________________________________________________ 
(C) HISTORY: 
97/00228/DET and 97/00578/LIB
Alterations and extension to dwellinghouse 
Approved 25.06.1997 
21/00299/PP and 21/00300/LIB
Installation of satellite dish and two cctv cameras   
22/00597/LIB
Re-painting of eaves and soffits (with Farrow and Ball black paint) 
29.06.2023 
22/00599/PP and 22/00600/LIB
Internal alterations to ground floor layout, replace glazed walkway with solid timber walls, replace
existing windows with crittal windows, and change south facing window with french door opening,
formation of new steps, clad garage gable wall and formation of additional parking

Page 379

09.11.2022 
22/00171/ENFCON – Enforcement notice  
Change of access, formation of hardstanding and formation of parking area. – The notice relates
to the removal of the grass verge and replacement with hardstanding to widened the existing
access and create an area for parking vehicles.  The works were unauthorised and the notice
required the owner to stop utilising the land for parking, remove the hardstanding and re-instate the
grass verge to the land affected.
23/01047/LIB
Alteration to straighten edges of existing driveway between existing gate posts
Application returned     
(D) CONSULTATIONS:
Roads Helensburgh and Lomond - 04.08.2023 
On review of the proposed, the access opening within the wall does not correspondingly increase
in width. As such, the proposed widening would not support access or egress to the property. 
Any subsequent widening of the access over the verge could however be considered as an
approved location for off street parking, a function which is not supported due to its proximity to a
bend, limited visibility and the inability for a vehicle to enter and leave in a forward gear. I confirm
Roads refuse the proposed as the widening works do not support a widened access route within
the existing wall and, therefore consider the proposed widening works may be considered as an
approved provision for vehicle parking within the verge. 
(E) PUBLICITY:
Advert Type: Listed Building/Conservation Advert   Expiry Date: 29.06.2023
(F) REPRESENTATIONS:
i) Representations received from:
Objections
Dr And Mrs Thomson, 48 Charlotte Street, Helensburgh, Argyll And Bute, G84 7SD
22.06.2023, 10.07.2023, 21.08.2023 and further comments on 24.11.2023
ii) Summary of issues raised:
The points raised can be summarised as follows:
i. The widening is unnecessary as the entrance is already at least double vehicle width
so more than sufficient for residential ‘entering’ purposes
Comment: The Area Roads Engineer has commented on this issue and this is
addressed in the assessment within Section (P) below.
ii. The proposal to widen the entrance to 6.3m would provide tripe parking on the verge
(as objected to previously by the Roads Dept)
Comment: This is addressed in the assessment within Section (P) below.
iii. There are various comments in relation to the streetlight that was moved from outside
number 50 to outside number 48 and is considered to be impacting on number 48 and
also in relation to loss of light at the bend.

Page 380

Comment: This issue does not have a material bearing upon the planning aspects of
the case. The lamppost has been relocated and this is not subject to planning
permission. Class 30 within the General Permitted Development Order (as amended)
gives provisions for erection, maintenance, improvement or other alteration by a local
authority of street furniture required in connection with the operation of any public
service administered by them. 
iv. Concerns raised about impact on natural and built environment, namely that the
widening would see more of Helensburgh’s grass verge heritage being lost (as
objected to by the Community Council previously) and also it is the only household
on Charlotte Street from Parklands School north that already parks permanently on
the verge and it generally affects the appearance of the street.
Comment: This is addressed in the assessment within Section (P) below.
v. The entrance on the roadside verge is used currently as a parking bay for 2-3 vehicles
which rarely, if ever, enter the courtyard or builders-yard within.
Comment: This is noted and has been observed on site visits.
vi. Traffic, parking or access problems – this proposal jeopardises public safety with
multiple parking on the verge at this blind corner and right-angled bend.
Comment: The road safety aspects of the application are addressed in the
assessment contained in Section (P) below.
vii. A number of comments have been made in relation to the planning application forms,
submitted plans including the omission of the streetlight in the proposal description,
questioning whether pre-application discussions have taken place, trees have not
been marked on the drawings, the statement regarding ownership is incorrect as Luss
Estates own the verge, the location plan not matching the Registers of Scotland.
Comment: It is ultimately the responsibility of the applicant and agent to ensure that
accurate information is contained in the submitted documentation and plans and that
the proper procedures are followed.  There is no requirement for a location plan to
match the Registers of Scotland map.
viii. There are no made-up pavements along the entire length of upper Charlotte Street
on either side, the grass verge therefore acts as pavements for safe passage of all
pedestrians at this location, particularly at this blind, hill summit bend. The consultant
is concerned that there is a lack of space on the right of access for safe passage of
any occasional visitor to number 50 but the safety of the general public using upper
Charlotte Street – who would be forced to use the road – therefore posing a safety
issue for the general public not those using number 50. Photographs have been
submitted to show that there is ample room for a pushchair or wheelchair to access
the pedestrian gate of no.50 without having to cross the grass verge. Photographs of
parking on the verge on East Rossdhu Dv was due to a skip being sited temporarily
unlike the skips at number 50 which have been there for 2 years.
Comment: The public safety aspects of the application are addressed in the
assessment contained in Section (P) below.
(G) SUPPORTING INFORMATION
i) Environmental Statement: Not Required
ii) An appropriate assessment under the Conservation (Natural Habitats) Regulations 1994:
Not required.

Page 381

iii) A design or design/access statement:   No 
iv) A report on the impact of the proposed development e.g. Retail impact, transport impact,
noise impact, flood risk, drainage impact etc: 
Modus Transport Solutions - The layout of the existing driveway is historic and does not
meet current requirements with respect to private residential driveways. At present, the
existing driveway does not provide sufficient space for access in and around a vehicle
parked on the driveway without the need to use the adjacent grassed area which more
often than not is muddy and not suitable for pushchairs or more importantly wheelchair
access. The driveway proposals would allow easier access to a parked vehicle while at the
same time allowing a safe and direct route to the pedestrian entrance to the property.
It is the professional opinion of Modus Transport Solutions Ltd that the driveway proposals
at 50 Charlotte Street, Helensburgh, will provide a safe and modern driveway layout to
meet the requirements of all users without compromising road safety in the area. 
Supporting Statement by Anderson Strathern – The proposal is squaring off the driveway
rather than widening the driveway.  Reference is made to the SCOTS roads development
guide stating that the driveway falls short of the threshold ‘private access will require to
accommodate the numbers and types of vehicles using the access in a safe manner’ in
terms of safety and access. Reference is made to parking arrangements on East Rossdhu
Drive stating the proposal mirrors the parking arrangements. 
(H) PLANNING OBLIGATIONS 
None Required 
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30, 31 or
32: 
(J) Section 25 of the Act; Development Plan and any other material considerations over
and above those listed above which have been taken into account in the assessment
of the application 
(i) List of all Development Plan Policy considerations taken into account in assessment
of the application.
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy 
Sustainable Places
NPF4 Policy 7 – Historic Assets and Places 
Liveable Places
NPF4 Policy 14 – Design, Quality and Place 
Argyll and Bute Local Development Plan (March 2015) 
LDP DM1 – Development within the Development Management Zones
LDP 3 – Supporting the Protection Conservation and Enhancement of our
Environment LDP 9 – Development Setting, Layout and Design
LDP 11 – Improving our Connectivity and Infrastructure 
Supplementary Guidance (2016)
SG LDP ENV 17 – Development in Conservation Areas and Special Built Environment
Areas
SG LDP Sustainable Siting and Design Principles

Page 382

SG LDP TRAN 4 – New & Existing, Public Roads & Private Access Regimes 
(ii) List of other material planning considerations taken into account in the assessment
of the application, having due regard to Annex A of Circular 4/2009.
Planning History
Consultation Responses
Third Party Representations
An Appraisal of the Conservation Areas of Helensburgh 2008 by Helensburgh
Conservation Area Group and Argyll and Bute Council 
Argyll and Bute Proposed Local Development Plan 2 (November 2019) 
The Examination by Scottish Government Reporters into the Argyll and Bute
Proposed Local Development Plan 2 (PLDP2) has now concluded and the
Examination Report has been published. The Examination Report; the PLDP2 as
recommended to be modified by the Examination Report; and the published Non
Notifiable Modifications are material considerations in the determination of all
planning and related applications. 
PLDP2 Policies (as recommended for modification) relevant to the current application
are as follows: 
Policy 01 – Settlement Areas
Policy 05 – Design and Placemaking 
Policy 10 – Design – All Development
Policy 15 – Supporting the Protection, Conservation and Enhancement of our Historic
Built Environment
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes
Policy 39 – Construction Standards for Private Accesses 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental Impact
Assessment : No 
(L) Has the application been subject of statutory pre-application consultation (PAC): 
No Pre-application consultation required 
(M) Has a sustainability check list been submitted: No 
(N) Does the Council have an interest in the site: No   
(O) Requirement for hearing: No 
(P)(i) Key Constraints/Designations Affected by the Development:         
Helensburgh Upper Conservation Area 
Listed Building 
(P)(ii) Soils
Agricultural Land Classification:  Built up area – n/a 
Peatland/Carbon Rich Soils Classification: ☐Class 1
☐Class 2
☐Class 3
☒N/A

Page 383

Peat Depth Classification: N/A
Does the development relate to croft land? ☐Yes ☒No
Would the development restrict access to croft
or better quality agricultural land?
☐Yes ☐No ☒N/A
Would the development result in
fragmentation of croft / better quality
agricultural land?
☐Yes ☐No ☒N/A
(P)(iii) Woodland
Does the development result in loss of
trees/woodland?
☐Yes
☒No
Does the application include any replacement
or compensatory planting?
☐Yes
☐No details to be secured by condition
☒N/A
(P)(iv) Land Status / LDP Settlement Strategy
Status of Land within the Application ☐Brownfield
☐Brownfield Reclaimed by Nature
☒Greenfield
ABC LDP 2015 Settlement Strategy
LDP DM 1 
☒Main Town Settlement Area
☐Key Rural Settlement Area
☐Village/Minor Settlement Area
☐Rural Opportunity Area
☐Countryside Zone
☐Very Sensitive Countryside Zone
☐Greenbelt
ABC pLDP2 Settlement Strategy
☒Settlement Area
☐Countryside Area
☐Remote Countryside Area
☐Helensburgh & Lomond Greenbelt
ABC LDP 2015 Allocations/PDAs/AFAs
etc:
N/A
ABC pLDP2 Allocations/PDAs/AFAs etc:
N/A
(P)(v) Summary assessment and summary of determining issues and material
considerations
Background and Proposal and Site Description
Planning Permission is sought for the widening of a vehicular access onto Charlotte Street
within the verge abounding the street in front of the dwellinghouse known as ’50 Charlotte
street’, which is a residential property within the Helensburgh Upper Conservation Area. The
house to which this relates is the former coach house to Halpland (48 Charlotte Street) and
are part of the same listing building designation, which is a Category B. The listing describes
the houses as: 48 Charlotte Street, Hapland Including Boundary Walls and Gatepiers, And
Former Coach House, 50 Charlotte Street. In previous permissions the former Coach House
is also known as ‘the mews’. It has an established use as a residential property separate to
Hapland despite no record of a former application for subdivision. The house has been
extended as part of the application 97/00228/DET and within this permission is full details of
the available parking and turning and the approved widening of the entrance at that time. The
house is 2x bedroom and within the courtyard there is a garage for one car and parking and

Page 384

turning for one car. This meets the required parking standards for a 2 bed house at the time
and also meets the current parking requirements within the LDP. 
The site lies at the top end of Charlotte Street where there is 90 degree turn on to East
Rossdhu Drive. The driveway entrance is approximately 17m from the corner. There is
another driveway access to the north approximately 9m from the site. This driveway accesses
the property known as Southdene, 52 Charlotte Street. 
The driveway for 50 Charlotte Street (relating to the proposal) has been subject to
enforcement action in relation to the changes to access, formation of hardstanding and
formation of parking area. The notice required the applicant to:  “Stop utilising the land for
parking, remove the hardstanding and re-instate the grass verge to the land affected.” This
was not complied with within the 2 month timeframe – 17th March 2023 but the applicant
decided to submit this retrospective application which was not encouraged. 
Helensburgh is designated as ‘Main Settlement’ in the Local Development Plan and the
Policies of NPF4, LDP 2015 and PLDP2 (as recommended for modification) generally
advocate a variety of scales and forms of development in this type of settlement subject to
compliance with other relevant Development Plan policies and supplementary guidance.  The
determining issues are road safety, effects on the character of the environment (built/natural).
These issues are examined in turn below. 
Road Safety 
The Area Roads Engineer’s comments set out that there is a road safety concern in relation
to widening the access and recommend refusal of the application on the grounds of road
safety. Given this is the main concern relating to this case then this is explained in more
detail. 
The main points are that:
- The existing access is approx. 3.5m wide and can accommodate one vehicle entering
the property alongside safe pedestrian access alongside (noting the average car width is
1.8m leaving).
- The applicant argues that they require to widened the access to create safe pedestrian
access to their property (not provide additional parking) but the current driveway is
adequate for safe pedestrian access (as explained above).
- It is not a shared driveway so there is no requirement for this driveway entrance to be
any wider than 3m.
- The applicant refers to SCOTs National Roads Development guide which states that
“private vehicular access to developments will require to accommodate the numbers and
types of vehicles using the access in a safe manner”. The applicant claims the driveway
falls short of this threshold in terms of safety and access. Argyll and Bute Roads Manager
has confirmed that the access is suitable for the numbers and types of vehicles that would
be using a 2 bedroom property.
- The proposed access is to be widened (or as the applicant describes it – squared off) to
6.3m across the whole driveway, thus allowing two cars to be able to park side by side.
- The access is located near to a bend and visibility is poor at this corner of Charlotte Street
and East Rossdhu Drive. A standard visibility of 42 x 2.4 x 1.05 metres for a 30mph zone
cannot be met at this location.
- The current driveway can be satisfactorily utilised by vehicles of 50 Charlotte Street and
they can enter the properties parking area, park and turn within the grounds of the
property and then exit in a forward gear and not reverse on to the street when there is
poor visibility.
- The applicant’s supporting statement refers to another decision in a rural area of Argyll
and Bute where a driveway was widening. This is within a different location, setting and
is not relevant to this case.
- The applicant’s supporting statement draws attention to the Scottish Government’s
Designing Streets policy which states that “on-plot parking may be suitable when
considered in terms of overall street profile”. The applicant claims that on reviewing

Page 385

other driveways on East Rossdhu Drive that the proposed development mirrors existing
parking arrangements on the verge. The applicant is thereby admitting that the
widening/squaring off will allow parking on the verge.
- It is expected that the widening of the driveway will encourage parking on the verge
(which is currently taking place) where cars are reversing out on to the street. 
- It is recognised that the street is lightly trafficked but reversing out on to a street where
there is poor visibility is considered a road safety concern. 
It is therefore considered that the proposal does not accord with the Development Plan
policies namely LD 11 Improving our Connectivity and Infrastructure and SG LDP TRAN 4
which sets out the construction standards to be applied in relation to a private driveway on to
a public road, given the widening of the driveway is unnecessary and even though it is not
proposed to be used for parking, it will encourage vehicles to park here and they will have to
reverse on to the street near a bend where there is poor visibility. It would also be contrary to
the Proposed LDP Policy 35. 
Pedestrian Safety
The objector raised issues relating to pedestrian safety, stating that pedestrians currently use
the grass verge as a pavement.  It is confirmed that this is the case on this street and on
many other streets in Helensburgh. The current parking of vehicles permanently on the
driveway of no.50 is displacing pedestrians on to the carriageway where there is potential
conflict with vehicles. This is a material consideration in determining of this application. 
Natural Environment 
There are no biodiversity impacts identified in the assessment of this application by the
Planning Authority in relation to the loss of grass verge. 
Built Environment
The site is within the Upper Helensburgh Conservation Area and is adjacent to a Listed
Building as described above. The development relates to the grass verge which is an
attractive feature of the Helensburgh Upper Conservation Area. It is not a feature of the
conservation area to find car parking within this verge area, but driveways and footways are
a common feature crossing the verge. In deed the Conservation Area Appraisal states “the
grid pattern and regimented street tree planting are very urban in character yet where one
might anticipate a monument, grand building or statue, the vistas looking both east and
west lead surprisingly to the hills framed by avenues of trees and foliage and the grass
verges, which give a romantic, country park feel.” It then goes on to state “the contribution
of the planting of street trees in the grass verges, the broad grass verges themselves, the
characteristics of plot boundaries, private garden grounds and public green spaces are
major aspects of the townscape and crucial elements of its character.” 
The hardstanding is a good quality material (Marshalls cobbled sets) that is in keeping with
the Conservation area and the listed property and does not cause concern. 
However the as explained above, the extending of the driveway is encouraging parking on
the driveway and the creation of a parking area rather than a driveway. This is not in
keeping with the Conservation Area where the grass verges on the whole are kept clear of
parked cars and are an attractive feature of the Conservation Area. It is considered that
extending this driveway will encourage parking on this verge area which in turn detracts
from the character of the Conservation Area and therefore the proposal is contrary to Policy
7 Historic Assets and Places part d which states that proposals in or affecting conservation
areas will only be supported where the character and appearance of the conservation is
preserved or enhanced. The proposal is also contrary to the relevant Local Development
Plan policies LDP 3 and SG LDP ENV 17 and the proposed Local Development Plan policy
15.

Page 386

Design, quality and place
NPF4 policy 14 seeks to ensure that proposals improve the quality of an area. For the
reasons highlighted above under the built heritage section, the proposal would not improve
the quality of the area. It would make the place less attractive and contrary to Policy 14
alongside the Local Development Plan design policy 9, SG LDP Sustainable siting and
design principles and the proposed LDP policies 05 and 10 given the proposal does not
achieve a good quality place. 
Conclusion
Given all of the above and notwithstanding that the road is lightly trafficked there remains
concerns about road safety that alongside the concerns about the impacts on the natural
and built environment would justify refusal. Therefore it is considered that, the development
does not accord with the relevant NPF4 Policies and Local Development Plan Policies and
Supplementary Guidance and there are no material considerations that would mean that
support could be given. In conclusion, it is recommended that the extended driveway is
refused.   
______________________________________________________________________________
(Q) Is the proposal consistent with the Development Plan: N/a
(R) Reasons why Planning Permission or a Planning Permission in Principle should be
Refused
The proposal is considered to be contrary to policies 7 and 14 of NPF 4, and policies LDP3,
LDP 9, LDP 11, and SG LDP TRAN 4, SG LDP ENV 1, and SG LDP Sustainable Siting and
Design Guidance of the Argyll and Bute Local Development Plan 2015, and there are no
other material considerations of sufficient significance to indicate that it would be
appropriate to grant planning permission in this instance as a departure to the Development
Plan having regard to s25 of the Act.
Furthermore, the proposal is also considered to be contrary to the provisions of draft
policies 05, 10, 15 and 35 of the proposed Local Development Plan 2.
(S) Reasoned justification for a departure to the provisions of the Development Plan:
N/A
(T) Need for notification to Scottish Ministers or Historic Scotland: No
Author of Report: Kirsty Sweeney Date:  8th December 2023 
Reviewing Officer: Peter Bain    Date:  11th December 2023
Fergus Murray
Head of Development and Economic Growth

Page 387

REASONS FOR REFUSAL RELATIVE TO APPLICATION: 23/01046/PP
1. The proposal does not accord with the Development Plan policies namely LDP 11 Improving
our Connectivity and Infrastructure and SG LDP TRAN 4 which sets out the construction
standards to be applied in relation to a private driveway on to a public road, given the widening
of the driveway is unnecessary and even though it is not proposed to be used for parking, it will
encourage vehicles to park here and they will have to reverse on to the street near a bend where
there is poor visibility. It would also be contrary to the Proposed LDP Policy 35 for the same
reasons.
2. In addition the displacement of pedestrians from the grass verge on to the road, due to parking
on the widened driveway would present a potential conflict with vehicles. The current pedestrian
access to no 50 is adequate and meets Roads Authority guidelines and requirements.
3. The widening of the driveway would encourage parking on the grass verge, which would be out
of character with the Conservation Area, where the grass verge is a dominant feature and a
crucial element of the character of the Conservation Area. The proposal is therefore contrary to
Policy 7 Historic Assets and Places part d which states that proposals in or affecting
conservation areas will only be supported where the character and appearance of the
conservation is preserved or enhanced. The proposal is also contrary to the relevant Local
Development Plan policies LDP3 and SG LDP ENV 17 and the proposed Local Development
Plan policy 15.
4. In addition, the proposal is contrary to Policy 14 of NPF4 alongside Local Development Plan
design policy 9, SG LDP Sustainable siting and design principles and the proposed LDP policies
05 and 10 given the proposal does not achieve a good quality place and erodes the quality of
the place.

Page 388

APPENDIX TO DECISION REFUSAL NOTICE 
Appendix relative to application 23/01046/PP 
(A) Has the application been the subject of any “non-material”
amendment in terms of Section 32A of the Town and Country
Planning (Scotland) Act 1997 (as amended) to the initial
submitted plans during its processing.
☐Yes ☒No 
(B) The reason why planning permission has been approved: 
As above.

Page 389

Supporting statement of Dawn Anderson
A planning application was made to Argyll & Bute council to make minor changes to an existing paved
driveway. 
The driveway covering was installed in the 90’s, around a lamp post, hence the concave design, and
measured 6.3m pillar to pillar. 
The materials used in the original works were neither heritage nor complimentary of a Victorian listed
building and badly needed replaced.
Land on either side of the access was never levelled and on one side it’s difficult to exit cars or open the
driveway gates due to the uphill slope.
The other side slopes downhill, exiting cars is dangerous in wet or winter weather and pedestrian access to
the house gate is a mud slope. (The grass is long gone and the slope has been infilled with rubble by my
builders due to health & safety concerns). The blue lines show where vehicular access is required to access
driveway gates and where the path should be.

Page 390

I purchased the land from Luss Estates to improve the entrance, rebuild with heritage cobbles, and level the
slopes to allow safe access to the double driveway gates and separate house gate. I asked Argyll & Bute
council to move the lamppost, which they did free of charge in June 2022, as I am the landowner.
A planning application to make the driveway wider in the middle to cover the slope was “misinterpreted”
as a brand new driveway development due to the architects use of the term ‘widening’ in the description.
Despite clarifying communications from me, the architect, top planning counsel and a roads specialist, the
planners continued with the application as a new driveway development, ignoring arguments of concern
about accessibility, health & safety, disability laws and building regulations, subsequently refusing
permission.
I cannot rent my house out to tenants should I wish to do so, as the entrance is unsafe and I could be
accused and sued for discrimination by a disabled tenant if I cannot make the necessary changes to the
entrance.
The entrance does not comply with current building regulations and is very easily remedied to ensure safe
access for everyone, including me, my family, my friends and any wheelchair users, now or in the future.

Page 391

I’ve slipped down the hill exiting my car, I’ve toppled the bins a few times and it’s not safe, especially at
night. If I had a disability, walking difficulties or used a wheelchair I couldn’t get into my own house safely
without assistance. 
Helensburgh Fire station have confirmed to me that the current access to the property entrance is
unsuitable and should be a level footpath of 900mm width (minimum) for emergency personnel to meet
current Health & Safety legislation.
Despite requesting a site visit by the Head of Roads and the Head of Planning, neither were interested.
I welcome and encourage a site visit to the property, particularly by any councillors with a disability or
whom use a wheelchair or with experience of caring for family members with mobility issues. 
This is not about parking, this is about improving the entrance to include a path for anyone to get in and
out of the house safely.
I respectfully request that planning permission is granted for this very modest planning application.
Dawn Anderson
50 Charlotte Street
Helensburgh