Democracy Spraffa

27 03 24 2 Anthony Carson Responses to representations from interested parties

Argyll and Bute Council · 16 May 2024
Back to Argyll and Bute Local Review Body — 16 May 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Responses to representations from interested parties.  5 pages 
2. Statutory Consultees – Environmental Health
Consultee Statement from Anthony Carson 
“Background” 
Paragraph 1 – “both the garage building and land, which constitute the
site, have been part of a vehicle repair business for decades”   
Refer to Mr Carson’s Appendix 1 Sales Particulars for Andrews Garage
states the “two commercial units” have been operated by the current
owner “predominantly as a break down and recovery business” and 5
photos showing only one photo of the smaller of the two units (now
demolished) on our site at top right of page with a motorbike on one of
his recovery trailers.  Photos of the larger, curved roof unit shows a
vehicle being repaired up on a hoist and another beside it with the bonnet
open. 
Para 2 – is conditional upon para 1 being true. 
Para 3 – we do recognise what is said here of course.  However, for land
to be classed as “contaminated land” there must be three elements of a
pollutant linkage present – a contaminant, a pathway and a receptor.  Our
two consultants’ reports do not support that all of those three elements are
present on our site. Mr Carson still has questions, with lengthy delays
between raising his queries, but fundamentally the test for “contaminated
land” fails. 
Para 4  - as Steven Gove knows we sent in photos of the site with
puddling all over it just after the smaller unit had been demolished which
showed no evidence of hydrocarbon pollutants on the water surface.  One
of our consultants commented on this too. There was no paint spraying on
the premises recognised in the publication quoted as a major contaminant
and the majority of the remaining potential contaminants mentioned are
hydrocarbon based.

Page 2

Para 5 – we are unable to comment on anything put down drains – there
are no drains from our proposed house site only one from the larger
garage downhill in toilet and sink.  There was no evidence of “waste oils”
or other hydrocarbon based “fluids” on surface puddling on our site as
mentioned above.  There were no tyres or any parts for disposal on the
site when we purchased the property nor did we see any untidiness
around the site having been acquaint with it for years. 
Para 6 – that goes without saying for a professional consultant 
Para 7 – that would be correct as the site had consent for vehicle storage
and parking of Mr Sim’s recovery vehicles. Photos are not of sufficient
resolution to establish materials.  It has been agreed that was the location
for the bunded kerosene tank for the heating of the larger garage – the
small garage was not heated. 
Outline of Consultation and Review process 
We cannot really comment on this section but it seems to us we have two
professionals here who have horns locked.  One an eminent and much
experienced expert in his field who advises on very large contaminated
sites nationwide and is regularly called on in legal cases as an expert
witness who is failing to understand Mr Carson as his queries have
constantly changed focus.  We are stuck in the middle without resolution
but what we have seen is Mr Carson altering the parameters of questions
for Mr Whittle to answer. 
We have referenced the three prerequisites for a pollutant linkage to exist
above.  Mr Whittle has stated his position on this and has referenced all
the regulatory instruments that Mr Carson had suggested he had not paid
credence to in his correspondence.

Page 3

We repeatedly asked Mr Carson to substantiate his claim that he had
“clear evidence” that the garage on our proposed site had “been used as a
vehicle repair workshop”.   
When we submitted our Request for Review he told us it was not
appropriate for him to correspond with us in that regard.   
He asked us to provide the email where he said that. 
We did, on 21 Feb 24, giving him the following from an email sent to us
by Steven Gove in which Steven had copied Mr Carson’s direct quote to
us  “internal details (supported by photographic evidence), show conditions
consistent with commercial vehicle repair activities. ...There is clear evidence that the
building has been used as a vehicle repair workshop.  was sent by you to Steven
Gove on 15 September 2022.” 
However, we still see no such “clear evidence” and the sales particulars
state that the “two commercial units” have been operated by the current
owner “predominantly as a break down and recovery business” and goes
on to list contracts with the AA, RAC, LV, Britannia Rescue and Call
Assist “to name a few”.  The only vehicles we have seen in photographs,
sales particulars or via streetview in the smaller garage is a motorbike on
a recovery trailer and one of the recovery business Land Rovers with Mr
Sims Scottish Vehicle Recovery Association, SVRA, sticker on it. 
The pictures in the sales particulars show on the front page the relevant
right hand smaller shed on our site empty and 5 interior shots – 4 of the
larger garage downhill and only one of the relevant smaller garage in the
page’s top right corner with a recovered motorbike sitting on one of the
garage’s recovery trailers. 
Mr Carson still has not produced the irrefutable evidence he told us he
had that the garage on our site had been used as a vehicle repair garage
and we wonder why he would have made such a claim.

Page 4

Also included in Mr Carson’s Appendix is our consultant, Mr Whittle’s
email response on 17 July 2023 where he states “we were surprised to
(recently) receive such a long list of comments [there were over 40] from
Environmental Health regarding the above property and our Phase 1 & 2
Environmental Assessment Report (Jan 2023) particularly as we thought
we had addressed the main issues in our email issued on 5 April 2023
(and sent on to the Council shortly after).”  - there had been only 5 issues
requiring answers from Mr Carson then.   
Mr Whittle goes on to say in this email – 
It appears that most of the items raised relate to presentational issues
and/or a misunderstanding of the scale of the proposed development/very
small size of site which comprises the following:
• Only one small dwelling is proposed
• The proposed house is directly underlain by very low permeability
intact rock strata
…
• The site has not been associated with bulk petrol storage or significant
use of paints etc
• The site is not located in an environmentally sensitive location (ie
does not adjoin a watercourse and is not underlain by a significant
aquifer) 
He then goes on to state he has answered each point in Mr Carson’s table
“(in blue text in appended column)” and “we trust that these (extensive)
clarifications will assist and permit the development to proceed” 
That was not to be the case and Mr Carson responded in September 2023
to Steven Gove’s email of July 2023 passing on Mr Whittle’s response
detailed above.  Mr Carson then appears to take another tack raising
procedural issues in respect of legislation that he was alleging Mr Whittle
had not followed.  Mr Whittle answered that too.

Page 5

Mr Whittle produced his Phase 1 & 2 Environmental Assessment Report
in January 2023 for us and has commented that he has never experienced
issues such as this with any of the other Scottish local authorities he deals
with regularly. 
It would help if Mr Carson would explain fully what he wants if not the
81 page report from an industry professional consultant and 26 page
report from a structural engineer. 
“Notes on specific comments in the Raeburn Supporting Document” 
1. Paragraph 2 – the quote has the end missing it should be added as it
ends “at the rear of the large nissen type shed” i.e. not on our proposed
house site.
2. As can be seen in our document No 3 the business did expand in 1983.
The larger shed became the heated vehicle workshop and the
expansion of the business into vehicle recovery necessitated the
smaller shed becoming as detailed on the stamped plans “vehicle
parking and storage”.
3. i)From WAT-PS-10-01 diagrams which show a contaminant pathway
to a receptor it appears clear that there is no pathway to groundwater
when both consultants’ reports analyse the geology underlying our site
as impermeable and without the presence of a significant underlying
aquifer.    
4. ii)Contrary to this we are actually waiting on Mr Carson’s response -
From: karen raeburn <ksraeburn@yahoo.co.uk>
Sent: 09 November 2023 14:37
To: Gove, Steven <steven.gove@argyll-bute.gov.uk>
Subject: Erection of Dwellinghouse, Andrews Garage Site, Tighnabruaich (ref:
22/00221/PP)
Afternoon Steven 
I hope you are well. 
Is there any feedback yet from Anthony Carson?   
Nor have we received his “clear evidence” that the small garage on
our site had been a vehicle repair workshop. We made the point that
this was not how the premises were sold to us.