Democracy Spraffa

Notice_of_Review Combined

Argyll and Bute Council · 21 May 2024
Back to Argyll and Bute Local Review Body — 21 May 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

	

	


Page 2


				

Page 3

		
				


Page 4

				 	!"#$	$!""		% 	
&'()*&
+&,	

	
	*	+

Page 5



Page 6

					

Page 7



		*	*

Page 8

	

Page 9

		'

Page 10

	-		*	

Page 11

&
,	
	-
	
		
	-

./0/%	%1%%/% !!$$##$2)!!
	
	-			'	-	-
	
	
	-
	
&				
	3	
		
	/*	3	

	-
		+

Page 12



Page 13

&		'
		-	-	
	

Page 14

	
	
			
	*
		
&
	
	

Page 15


	

	
			
		4	5	6				7	
	
	

		


	*-	
-				

	3		
8 			


Page 16


	

			

Page 17



9.

-&	/* :
				

Page 18

	/	
	/*7	
	*
 	5
1	/ 	5 

Page 19

	/
	/ 	5 	 

Page 20

	/*


Page 21

No embedded text on this page.

Page 22

	

	/* 	5 6;8 	5
%<
	/* 

Page 23

No embedded text on this page.

Page 24

	2

*	/* 
39 	5
1<	/* 
 	5



Page 25

 	5
%	

Page 26

No embedded text on this page.

Page 27

 	5
0				

Page 28

+

Page 29

	
		

9

	4	5
		0

Page 30

+

Page 31

				.
9

	
=		


=

Page 32


>		;
$
!?$	@!?2!
A#	/
;


Page 33


=*
(&
&,

Page 34

	

	

			

Page 35


 :
				

Page 36

	/	
	/*7	
	*
 	5
.	 

Page 37

	/
1	/ 	5 

Page 38

	/*


Page 39

No embedded text on this page.

Page 40

	
	/ 	5 6;8 	5

9.
 

Page 41

No embedded text on this page.

Page 42

	2

	/* 	5 
39 	5
%<
	/* 
 	5

*	/* 


Page 43

 	5
1<	/*
%	

Page 44

No embedded text on this page.

Page 45

 	5

	
	

	
 	
1	
	

Page 46

No embedded text on this page.

Page 47

	
-			6

Page 48

	


Page 49

	3	+*8


Page 50

No embedded text on this page.

Page 51

	 	 	


Page 52

No embedded text on this page.

Page 53

	2


Page 54

No embedded text on this page.

Page 55

	


Page 56

No embedded text on this page.

Page 57

	#


Page 58

No embedded text on this page.

Page 59

	"

399;

	

Page 60


	

Page 61

-9

Page 62

*		

	
-			
	
/
 %
.
	

Page 63

	
/	

Page 64

	

	

Page 65

		

>


Page 66

 

Page 67

No embedded text on this page.

Page 68




	1
#@	?B/


Page 69

		

	17	

Page 70

No embedded text on this page.

Page 71

7	0	
-	07		

Page 72

	
;


Page 73


0	
-	0



-

Page 74

(*&


Page 75



Page 76

	



	
	


	
+

Page 77

		

Page 78


	
-	
	

	
	3	
	+3	&		

Page 79


	


Page 80

	*				+			

	-
7	
		

Page 81



Page 82

	3			
-			
 	5
6<	"!!	8

	
	

>		
-	
	

Page 83

No embedded text on this page.

Page 84

	
	*	
			
4	5
		
	-
		
	6

Page 85

	



Page 86

	
	*	<

Page 87

	
	
	3
,	8&
		
	-
		
		&
		1	
&
		
	-
	
+	
-		-

Page 88

		


Page 89


&
>	

Page 90


	
	+3		
4	5
		-	/
&
	A	
-	
	3	


Page 91


	


Page 92

&
		/
	

Page 93


	

Page 94

	3		*

Page 95

	

Page 96

	63
	
	-	+

Page 97


	

Page 98

	
		

Page 99

	<
8	C	

Page 100



Page 101

	-&


	
	

	
	



Page 102

	


:
				-7	3	
			,		+3	
-			
D	

Page 103


	6
	-	
	,		

Page 104


8&	:
		
		
			
	


Page 105

	'		
	*	,	
	
		

Page 106

	
	+3&	0-				*	
+

Page 107



Page 108

			
	

Page 109


			E;
	
D	
 	5		6<	"!!	8
/
 	
		,	
	+		-	

	
	

Page 110

No embedded text on this page.

Page 111

	
	
		
-					

Page 112

7	
					
	

Page 113

	
	
-		-

	
	3		

Page 114


),	
	,	
	
&
:
	


Page 115

	
	
3+			3		3	3	
	*-
			
					

Page 116



Page 117



Page 118

	
	
	6
		
		<	
-		

Page 119

	
-	

Page 120


87		
		

Page 121


			3		


Page 122

	
	+	*	

Page 123

	*-
		
	
			
	*	

Page 124

	*-
					
'	
-	<
	&
=+	
	

Page 125

			3	3	
	*-
		


Page 126

	
--					 	:			/


	
	
	
	3	

Page 127

4	5
0-	7	
	


Page 128

	<			*
<	*
37	3	
				3	7	3		3	
	

Page 129

	3		


Page 130

	
--	*-
	

	
	3	

Page 131



Page 132

	

Page 133

	3	
	


Page 134

		


Page 135

	*	


Page 136



Page 137

		
	+3 	5	6<	"!!	8
;	-
		%
	
-	#	3

;	

Page 138

	A


Page 139

	-
	+3

Page 140


	

	
+

Page 141

			
-		
	

Page 142


7		

Page 143

	+

Page 144

	3	
	3	
	*	3	
	
	
-	+3	

Page 145

	

Page 146

	

		
		
	
-	
	+3&	:
				

Page 147


	
				
 	5	6<	"!!	8

	

	
+

Page 148

		
	-	
&	+	
	
	*	
		

	-
	
	+
	
&
>	

Page 149

	3		
	*

Page 150

	
			
4	5
>	

Page 151

	3		

Page 152


	

Page 153

	*			
4	5


	



	
	+3	

Page 154

	3	

Page 155



Page 156

	
		


Page 157

	
	*	

Page 158

	
	

Page 159

	
	+3	

Page 160

					

Page 161

		+3	

	'		-	-

	
	
	*	

Page 162

	
	*		
	

Page 163

		+3&	1	-

		*	
'

Page 164

	*	
	
		
*
	
-	


Page 165

7		 	3	*
F		


Page 166

	
-	
	
	
		
	

Page 167

9
	

		

Page 168

	3			*G	
-		+3	&
		+3	
	
		

7		
	

7	*

Page 169

	
		+3	
-		+	-

	
+

Page 170



Page 171

	*	
-	

Page 172

	
	
	
7		3
		-	


Page 173

4	1
	<7	3	*
7		
7		
&	5
	:			/

0		+			
	+3	

Page 174

	


Page 175

	
	


Page 176

	
	
	

Page 177



Page 178

	
			7		
	


			*			-
		


Page 179

	
	*	

Page 180

4	5 	:			/

0		
*	-
			
	*	

Page 181

	-	

Page 182

	3
	*	
	4	5 	:				/


		
	
	

	
	


	
		-

3	,	
	,			
	+	
+

Page 183



Page 184

				-

		
	
-	
	&	1	

	*				-

				
			*	

Page 185



Page 186

	+

Page 187

&	
=+	
	
+

Page 188



Page 189

			

Page 190

	

Page 191

No embedded text on this page.

Page 192

	
-		4&		5 	:			/

=+	
	
+

Page 193



Page 194

		

Page 195

	

Page 196

	-	*	
-		
	3			*G	
-	 	:			/

+34	5
0-	
			7		
	*-	
-		7	+	
	
+

Page 197



Page 198

No embedded text on this page.

Page 199

	
-	
	 		:			/
			/9


Page 200

	

Page 201

No embedded text on this page.

Page 202

	

Page 203

	

Page 204



Page 205

	3		
	
	



Page 206

	'

Page 207

		

	3		
+3	


Page 208

	*		
	
	
		4	5
=+	
	
+

Page 209



Page 210

				
	
	
	-
	'		+3	

Page 211

	*	3	 	:			/




Page 212

	6
	
*
	
-	


Page 213

8	
	3		+3	
	*	


Page 214



Page 215

4	5
/
 	:
		7		-7	3	
		,		+3	
	
	
&	:
				
			
	


Page 216

	
'	
	*	,	
	
		

Page 217

	
	+3&	:
		
	+		-	

	
	

Page 218

No embedded text on this page.

Page 219

	
	
		
-	+3	
			

Page 220

&	0		-
			
	*	3	
	
	
-	+37			-

	

Page 221

	+

Page 222

		
		


	

Page 223

	3		
	+3	

Page 224

	
	


Page 225

			
-	
	+3&
			
	
-		

Page 226


7		

Page 227

	+

Page 228

	3	
	

Page 229

	
		
 	:			/

6&&		

Page 230

	38	3		
3		*G	
-		+3	5
/
 	>		+3		
		-	
	&&	3	
-		
	
	

Page 231

-
7	+
	
	
+	
-		
	


Page 232


	
	3			
		
	-
	
+	
-		-

Page 233

		


Page 234


7			

Page 235

+*	
	
+

Page 236

		

	-	*7	
+

Page 237

		

Page 238

No embedded text on this page.

Page 239


	
	6-	8	-
			
&
	
A


Page 240

	-
	+37	

	

Page 241

	;	7	
	)#
29!!29
"9!292!2#
2#9!"92!2

Page 242


	



		

	
	


09>		9	-					
	-
	+3	
		


Page 243

	

Page 244

&

	/ 		=

Page 245



	 29!92!2#

Page 246

REQUEST FOR REVIEW IN RESPECT OF THE
REFUSAL OF AN APPLICATION FOR
PLANNING PERMISSION IN PRINCIPLE
FOR THE ERECTION OF FOUR
DWELLINGHOUSES, INCLUDING
FORMATION OF ACCESS AND
INSTALLATION OF SEPTIC TANK AND
SOAKAWAY, LAND AT COULTORSAY
FARM, BRUICHLADDICH, ISLE OF ISLAY
(LPA REFERENCE 23/01028/PPP) 
GROUNDS FOR REVIEW 
Submitted on behalf of Rosemary and Neil
Wood

Page 247

Page | 1                            Prepared by Michael Hyde MRTPI Planning Consultant
REQUEST FOR REVIEW IN RESPECT OF THE REFUSAL OF AN APPLICATION FOR
PLANNING PERMISSION IN PRINCIPLE FOR THE ERECTION OF FOUR
DWELLINGHOUSES, INCLUDING FORMATION OF ACCESS AND INSTALLATION OF
SEPTIC TANK AND SOAKAWAY, LAND AT COULTORSAY FARM, BRUICHLADDICH,
ISLE OF ISLAY (LPA REFERENCE 23/01028/PPP) 
GROUNDS FOR REVIEW 
1. Background: 
1.1 At the time when the review application was submitted (May 2023) the
application site was almost entirely within a Rural Opportunity Area (ROA)
as defined in the now superseded Local Development Plan (see Figure 1
below).  For some reason, assumed to be a drafting error, the ROA did not
extend quite to the edge of the public highway. 
Figure 1:  Extract from 2015 Local Development Plan Proposals Map 
1.2 Whilst the ROA designation no longer exists, it was in place when the
review application was submitted, and would furthermore have still been
in place had the Council been able to determine the application within
the statutory 2-month period. 
1.3 In the Council’s Supplementary Guidance, with respect to ROAs, it said:

Page 248

Page | 2                            Prepared by Michael Hyde MRTPI Planning Consultant
“The ROAs have been mapped specifically with a view to
identifying areas within which there is a general capacity to
successfully absorb small scale housing development.  This includes
open countryside locations where appropriate forms of small- scale
housing development will be in tune with landscape character and
development pattern.  Consequently, there is a presumption in
favour of small-scale housing development within this zone, subject
to on-going capacity evaluation.  Conversely, there is a
presumption against medium and large-scale housing
development that would not be generally appropriate for these
rural areas and would undermine the intentions of the settlement
strategy.” 
1.4 Small scale housing development was defined as being up to five
dwellings. 
1.5 The application site is also adjacent to, but not within, The Rinns of Islay
Site of Special Scientific Interest (SSSI)/Special Protection Area (SPA),
which is shown hatched on the LDP extract above.  This site is designated
primarily based on it regularly supporting populations of European
importance of Annex 1 species (1986 and 1987) including Hen Harrier
(Circus cyaneus), Corncrake (Crex crex), Chough (Pyrrhocorax
pyrrhocorax), Whooper Swan (Cygnus cygnus) and Greenland White-
Fronted Goose (Anser albifrons flavirostris). 
1.6 Prior to the submission of the review application, in April 2022, a pre-
application enquiry in respect of the proposed development was
submitted (LPA reference 22/00709/PREAPP).  The response received on
18 May 2022 (Document 1) contained the following:  
“In this case the more northerly site is likely to be the most suitable,
notwithstanding the councils hesitation regarding creating an
artificial infill site beside Bruichladdich.  It is recommended that the
proposals for LDP 2 are reviewed.  These are available on the
Council’s planning web site”. 
1.7 A further, more detailed, pre-application inquiry was submitted in April
2023, given the then recent adoption of the revised National Planning
Framework.  The encouraging response received was as follows
(Document 2): 
“Of relevance, NPF4 Policy 9 sets out that proposals on greenfield
sites will not be supported unless the site is explicitly supported by
policies in the LDP. NPF7 Policy 17c) sets out that new homes in
remote rural areas will be supported where it supports and sustains

Page 249

Page | 3                            Prepared by Michael Hyde MRTPI Planning Consultant
existing fragile communities, supports identified local housing
outcomes and is suitable in terms of location, access and
environmental impact 
NPF4 Policy 16f) sets out that new homes on land not allocated for
housing in the LDP will only be supported in limited specified
circumstances, which of relevance includes where there is an
agreed timescale for build out; where the proposal is consistent with
the plan spatial strategy and policies such as local living, and where
the proposal is consistent with policy on rural homes.  The concept
of Local Living is further detailed in NPF4 Policy 15. 
The development is located within a Rural Opportunity Area (ROA)
as defined by the LDP, wherein Policy DM1 envisages small scale
development on appropriate sites, including the open countryside. 
As such, subject to an agreed build out timescale secured by
planning condition, the proposal would meet the requirements of
NPF4 Policy 16f). 
It is considered that the small scale of the proposed development
and its rural location would reasonably comply with policies 2a), 15
and 17c) of NPF4 given the existing dispersed geographical scale of
the environment within which the development is to be located,
and the level and quality of interconnectivity of the proposed
development with the surrounding area where people can
reasonably meet the majority of their daily needs within a
reasonable distance of their home and support the community. This
is underpinned by the broad settlement strategy policy contained
within Policy LDP DM 1, LDP 5, LDP 8, LDP 10 and LDP 11 of the Local
Development Plan. 
Drawing the above together, the principle of residential
development at the site is considered acceptable in principle,
subject to acceptability of the detailed matters set out below.” 
1.8 Notwithstanding the confirmation from the original Planning Officer (Derek
Wilson) that the application proposal would be able to be supported in
principle, the application (after being with the Council for some 8
months), was allocated to a new Planning Officer (Francis Gillespie). 
Contrary to the advice provided by Mr Wilson, Mr Gillespie then
recommended that planning permission should be refused for the
following reason (Document 3): 
“The proposed development, by reason of its scale, form, layout
and location, would introduce an urban character/form of

Page 250

Page | 4                            Prepared by Michael Hyde MRTPI Planning Consultant
development into this countryside setting which would have an
adverse visual impact which would, as a result, have a significant
adverse impact on the character of the landscape.  Consequently,
the proposal would be contrary to Policies LDP DM1, LDP 3, LDP 9,
SG LDP HOU (A) (B), LDP ACE 1, SG LDP Sustainable, SG LDP ENV 14
of the Argyll and Bute Local Development Plan 2015, NPF4 policies
4a, 9b, 14, 16f) 17c) iii, and emerging LDP2 policies 02, 04, 05, and
08.” 
1.9 Whilst it is fully accepted that pre-application advice cannot guarantee
the outcome of a subsequent planning application, if it is to be of any
value, such advice should be reasonably reliable.  In particular, it is logical
for an applicant to expect the advice made by Planning Officers
regarding the principle of a development to be consistent with their
subsequent recommendation following the receipt of a formal submission. 
1.10 The attached awards of costs in relation to appeal
APP/M1710/W/20/3256965 (Document 4), albeit an English decision,
address the issue of the reliability of pre-application advice.  As the
Inspector stated: 
“Pre-application advice is provided informally and on a without
prejudice basis.  There may be circumstances where
representations received during the course of a planning
application justify making a departure from earlier advice.
However, none of the responses in this case raise any matter that
could not have been foreseen at the pre-application stage.  The
issues are clear and straightforward.  Had the pre-application
advice been negative then the appellants may not have
proceeded with a planning application, and they would have
avoided the costs of an appeal.  Their application was submitted in
good faith”. 
1.11 There is a fair expectation that pre-application advice should be reliable
and that potential applicants should not be given “false hope”.  This is
however exactly what has happened in the current case, the applicants
believe that they were given false hope.  Mr Wilson, on behalf of the
Council, stated unambiguously that the principle of residential
development at the site was considered to be acceptable.  On the basis
of his advice the applicants committed themselves to the payment of the
required fee of £5,622 (£5,400 for the application and £222 for the
newspaper advert).  They were naturally extremely disappointed when,
because of a change of Planning Officer, planning permission in principle
was then ultimately refused.

Page 251

Page | 5                            Prepared by Michael Hyde MRTPI Planning Consultant
2. Proposed Development: 
2.1 The development proposed is, in principle, the erection of four
dwellinghouses.  All matters other than indicative siting and access are
reserved for subsequent approval.  A new access will be formed, and a
septic tank (or treatment plant) and soakaway will also be provided. 
3. Relevant Development Plan Policies: 
3.1 Section 25 of the Town and County Planning (Scotland) Act 1997 states
that “where in making any determination under the planning act regard is
to be had to the Development Plan, the determination shall be in
accordance with the plan unless material considerations indicate
otherwise”. 
3.2 The Development Plan relevant to the current planning application now
comprises: 
• The National Planning Framework (2023); and
• The Argyll and Bute Local Development Plan 2 (2024). 
3.3 Section 13 of the Planning (Scotland) Act 2019 is now in force.  This altered
Section 24 of the 1997 Act to state that in the event of ‘any
incompatibility’ between a provision of the National Planning Framework
(‘the NPF’) and a provision of a Local Development Plan (‘the LDP’),
whichever of them is the later in date is to prevail. 
National Planning Framework 
3.4 The following polices of NPF4 were referred to in the reason for refusal of
the review application: 
Policy 4 (Natural Places), which states that development proposals which
by virtue of type, location or scale will have an unacceptable impact on
the natural environment, will not be supported. 
Policy 9 (Brownfield, Vacant and Derelict Land and Empty Buildings),
which states inter alia that proposals on greenfield sites will not be
supported unless the site has been allocated for development or the
proposal is explicitly supported by policies in the LDP. 
Policy 14 (Design, Quality and Place), which states that development
proposals will be supported where they are consistent with the six qualities
of successful places:

Page 252

Page | 6                            Prepared by Michael Hyde MRTPI Planning Consultant
• Healthy: Supporting the prioritisation of women’s safety and
improving physical and mental health.
• Pleasant: Supporting attractive natural and built spaces.
• Connected: Supporting well connected networks that make
moving around easy and reduce car dependency
• Distinctive: Supporting attention to detail of local architectural styles
and natural landscapes to be interpreted, literally or creatively, into
designs to reinforce identity.
• Sustainable: Supporting the efficient use of resources that will allow
people to live, play, work and stay in their area, ensuring climate
resilience, and integrating nature positive, biodiversity solutions.
• Adaptable: Supporting commitment to investing in the long-term
value of buildings, streets and spaces by allowing for flexibility so
that they can be changed quickly to accommodate different uses
as well as maintained over time. 
Policy 16 (Quality Homes), which states inter alia that development
proposals for new homes on land not allocated for housing in the LDP will
only be supported in limited circumstances where: 
i.  The proposal is supported by an agreed timescale for build-out; and
ii.  The proposal is otherwise consistent with the plan spatial strategy
and other relevant policies including local living and 20 minute
neighbourhoods;
iii. and either: 
• Delivery of sites is happening earlier than identified in the
deliverable housing land pipeline. This will be determined by
reference to two consecutive years of the Housing Land Audit
evidencing substantial delivery earlier than pipeline
timescales and that general trend being sustained; or
• The proposal is consistent with policy on rural homes; or
• The proposal is for smaller scale opportunities within an
existing settlement boundary; or
• The proposal is for the delivery of less than 50 affordable
homes as part of a local authority supported affordable
housing plan. 
Policy 17 (Rural Homes), which states that development proposals for new
homes in remote rural areas will be supported where the proposal: 
i.  Supports and sustains existing fragile communities;
ii.  Supports identified local housing outcomes; and
iii.  Is suitable in terms of location, access, and environmental impact.

Page 253

Page | 7                            Prepared by Michael Hyde MRTPI Planning Consultant
Local Development Plan 2 
3.5 The following policies of the recently adopted Local Development Plan 2
were also referred to in the single reason for refusal: 
Policy 02 (Outwith Settlement Areas), which states that outwith the
Settlement Areas shown on the proposals map, development will only be
acceptable where it can be demonstrated that it accords with: 
• An allocation of this plan, or
• Parts A, B or C as set out below, and
• All other relevant policies of the LDP2. 
With respect to the third bullet point, particular attention is drawn to the
need for development proposals to accord with Policies 70 to 76 with
respect to landscape and the natural environment. 
A – Countryside Areas 
Within the Countryside Areas there is a presumption in favour of
sustainable development where this is of an appropriate scale, design,
siting and use for its countryside location, as detailed in the relevant
subject policies. In particular, the following types of development will be
supported by the council, generally without the need for detailed
environmental assessments, although such may still be required where
there is evidence of any environmental risk: 
• Infill; or
• Rounding off; or
• Redevelopment opportunities of clusters; or
• Previously developed sites. 
Note: Development adjacent to, but outwith settlement boundaries which
are delineated in the Proposals Maps will not constitute infill, rounding off
or redevelopment. 
Policy 04 (Sustainable Development), which states that in preparing new
development proposals, developers should seek to demonstrate the
following sustainable development principles, which the planning
authority will also use in deciding whether or not to grant planning
permission: 
a)  Maximise the opportunity for local community benefit, including the
creation of district (renewable) heat networks, where viable;
b)  Make efficient use of vacant and/or derelict land including

Page 254

Page | 8                            Prepared by Michael Hyde MRTPI Planning Consultant
appropriate buildings;
c)  Support existing communities and maximise the use of existing
infrastructure and services;
d)  Maximise the opportunities for sustainable forms of design including
minimising waste, reducing our carbon footprint, increasing energy
efficiency, solar panels, ground, water and air source heat pumps
and other forms of renewable energy generation;
e)  Avoid the use of locally important good quality agricultural land;
f)  Utilise public transport corridors and active travel networks;
g)  Avoid the loss of important recreational and amenity open space;
h)  Conserve and enhance the natural and built environment and
avoid significant adverse impacts on biodiversity, natural and
heritage assets;
i)  Respect the landscape character of an area and the setting and
character of settlements;
j)  Avoid places with significant risk of flooding, tidal inundation,
coastal erosion or ground instability; and
k)  Avoid having significant adverse impacts on land, air and water
environment. 
Policy 05 (Design and Placemaking), which states that to achieve good
quality places proposals should endeavour to comply with all of the
following placemaking criteria: 
• The proposed use should be compatible with surrounding land uses.
• The proposal should, where practicable, be resource efficient by
utilising existing infrastructure and facilities.
• The design should respect site topography and any surrounding
important landmarks or views.
• The design should create and improve connectivity within, and
where practical, beyond the site.
• Green and blue infrastructure should be an integral part of the
design process from the outset.
• The design should develop the area’s sense of identity by
understanding and embracing the existing distinctive
characteristics, with the design respecting and complementing its
surroundings in terms of density, appearance, height, scale,
massing, materials and finishes.
• Where the site contains existing buildings, structures and/or natural
features that contribute to the character and identity of the wider
area, these should be retained and sensitively integrated into the
design unless it has been clearly demonstrated to the planning
authority that it is not practicable.
• The siting and design should respond to the natural environment in
a sustainable manner.

Page 255

Page | 9                            Prepared by Michael Hyde MRTPI Planning Consultant
• The proposal should consider the design of active frontages, and
create welcoming, inclusive places with a coherent structure of
streets, spaces and buildings which are easy to move around,
prioritising the needs of pedestrians and cyclists above motor
vehicles.
• The access to and orientation of buildings should reinforce the
street or open space to create safe and pleasant places.
• The design should be sustainable in terms of materials and
construction and should consider future adaptability, and climate
change mitigation measures. 
Policy 08 (Sustainable Siting), which states that each of the following will
apply when assessing any proposal for development, including those for
outbuildings and extensions: 
• The development should integrate into the landscape or existing
built form to minimise detrimental effects on the environment.
Particularly careful attention should be given to hilltop, skyline or
ridge locations, where development will only be acceptable if such
a location cannot be avoided and any significant adverse
landscape and visual effects are clearly outweighed by social,
environmental or economic benefits of community wide
importance arising from the development proposal, and have been
sufficiently mitigated through an environmental impact assessment
or landscape and visual impact assessment.
• Development on a sloping site should be designed sensitively taking
account of the topography in order to prevent significant
excavation or under-building.
• The siting of a development should take into account the character
of the area in terms of its settlement pattern, layout and density.
• All new residential developments are required to consider provision
for Growing Spaces – See Policy 06 – Green and Blue Infrastructure.
• Any development should be carefully sited to avoid overshadowing
or overlooking of itself or other properties.
• The development should be positioned within the landscape to
make the best use of solar gain, natural ventilation and shelter from
the elements and minimise adverse environmental effects – this
need must be balanced with the restrictions and opportunities the
topography places on the siting.
• The development should be sited within easy access of existing
infrastructure and services
• Any ancillary development such as parking and service areas,
should be sensitively designed and sited.
• A co-ordinated approach is required to development in that it must
not compromise the effective development of adjacent land or the

Page 256

Page | 10                            Prepared by Michael Hyde MRTPI Planning Consultant
comprehensive development and regeneration of a wider area as
provided for in a masterplan, strategy or development brief
approved by the Council. 
2. Grounds for Review: 
2.1 The Scottish Government have stated that planning should take a positive
approach to enabling high-quality development and making efficient use
of land to deliver long-term benefits for the public while protecting and
enhancing natural and cultural resources.  With respect to the submitted
application for review, having regard to the provisions of the
Development Plan the following is the only planning issue that will require
to be assessed by the Members of the Local Review Body. 
The Principle of the Development 
2.2 Having regard to the single reason for refusal of the review application,
whilst a significant number of Development Plan polices have been
referred to, the key issue appears to be one of potential landscape
impact.  The Planning Officer states that in his opinion, by reason of its
scale, form, layout and location, the proposal would introduce an urban
character/form of development into a countryside setting, and that this
would have a significant adverse impact on the character of the
landscape. 
2.3 This assessment is not agreed with for the following reasons. 
2.4 The review application is only for planning permission in principle.  The
Council can exercise full control over all matters of siting, access, design,
external appearance and landscaping at the ‘Matters Specified in
Conditions’ stage.  Whilst an indicative site plan was submitted to
accompany the review application, this simply showed how four house
plots, and access and drainage arrangements, could in principle be
accommodated within the application site boundary. 
2.5 The prevailing pattern of development on the Isle of Islay, outwith the
defined settlements, is one of dispersed groups of 2, 3, 4 or more dwellings,
in the main sited parallel to the public road.  This has been acknowledged
by Officers for many years.  In the Report of Handing with respect to
another almost identical planning application for planning permission in
principle for the erection of four dwellings on land South-East of Neriby
Cottage, Bridgend (LPA reference 22/00462/PPP) the Planning Officer (Mr
Wilson) stated: 
“The proposal is for four detached houses within the site accessed

Page 257

Page | 11                            Prepared by Michael Hyde MRTPI Planning Consultant
by two new separate accesses.  A new septic tank (or treatment
plant) will also be provided.  No details of siting or design have
been supplied.  Similarly, policies LDP 10, SG LDP SERV 1, SERV 2 and
SERV 5(b) regarding water, drainage and waste management on
site require further detail.  It is expected that modest single storey
style cottage dwellinghouses would be proposed with retention of
roadside vegetation and new plantings to the rear.  It is also
inappropriate (sic) to create a row of houses rather than four
standalone developments.  The latter is deemed not be a ribbon
development as defined in the LDP as it is fewer than six houses,
with no potential for easterly expansion.  It is expected that the
design will have all houses addressing the main road and be a
single house deep within the plot.  The application is within a locality
where development is relatively sparse and predominantly relates
to isolated farms and individual and small linear groupings of
modest roadside cottages.  Whilst a grouping of four dwellings
would be a significant presence in its self within this context it is
noted that there is a similar grouping of four semi-detached
dwellings to the SE at Mulindry.  The details currently submitted show
development set approximately 17m back within the site with the
intention being to create a regular building line.” 
2.6 The same assessment should be able to be made in respect of the review
application, i.e. that the development of four roadside dwellings would
not have a significant adverse impact on the character of the landscape,
and furthermore would be entirely in keeping with the prevailing pattern
of development on the island. 
Material Considerations 
2.7 In 2019 the Council Commissioned the Islay Strategic Housing Overview.  A
report was prepared by Community Housing Scotland (https://www.argyll-
bute.gov.uk/sites/default/files/migrated_files/islay_strategic_housing_over
view_-_cht_-_september_2019.pdf).  This noted in particular that central
and south Islay had demonstrated the highest demand in terms of
locations for new housing, that second homes represented approximately
22% of the housing stock (Islay, Jura and Colonsay), and that there was a
strong demand evidenced from businesses who require more housing in
order to attract and retain a skilled workforce, the lack of which was
restricting their growth and expansion. 
The Housing Emergency 
2.8 After careful consideration of a range of issues, including the rise in
homelessness, and a lack of housing choice for key workers, it was

Page 258

Page | 12                            Prepared by Michael Hyde MRTPI Planning Consultant
considered necessary in June 2023 for the Council to acknowledge a
“Housing Emergency”.  The report that led to this decision notes that a
lack of accommodation stifles employment and that the majority of
employers surveyed on Islay have experienced difficulties recruiting staff
due to lack of housing. 
2.9 Whilst the Planning Officer (Mr Gillespie) accepts in his Report of Handling
that there are a number of benefits associated with the proposed
development, including the contribution it would make to existing
communities and local housing outcomes, particularly in the context of
the Council declaring a ‘Housing Emergency’, he nevertheless concludes
that these factors would (in his opinion) not outweigh the conflict the
proposed development would have with the provisions of the
Development Plan when taken as a whole. 
3. Conclusions: 
3.1 It is not accepted that the proposed development would introduce an
‘urban’ character/form of development into a countryside setting, or that
there would be a significant adverse impact on the character of the
landscape.  The prevailing pattern of development on the Isle of Islay,
outwith the defined settlements, is already one of dispersed groups of 2, 3,
4 or more dwellings sited parallel to the public road.  All of the details of
siting, design and external appearance of the four new dwellings can be
adequately controlled through the required detailed application
submissions. 
3.2 The Council have recently declared a ‘Housing Emergency’, and on Islay
in particular it had been evidenced that the lack of accommodation on
the island is stifling employment, and thus economic growth, and that the
majority of employers surveyed have experienced difficulties recruiting
staff due to a lack of housing. 
3.3 With respect to Policy 16 of the National Planning Framework, as was
noted by Mr Wilson, this policy would be complied with subject to an
agreed build out timescale, which can be secured by a planning
condition. 
3.4 Given the acknowledged demand for new dwellings on Islay there were
however potential purchasers for all four of the plots applied for.  All of
these, so it is understood, were people who live and work on the island.  In
the light of this, as has been accepted elsewhere in Argyll and Bute, the
applicants would also have no objection to the imposition of the following
occupancy restriction:

Page 259

Page | 13                            Prepared by Michael Hyde MRTPI Planning Consultant
“Primary Residence: The dwelling houses that are the subject of this
permission must only be occupied as a primary residence (i.e. the
dwelling must be the main residence of the occupier and the
dwelling where the occupier usually lives).” 
3.5 This restriction would prevent any of the proposed new dwellings being
occupied as second or holiday homes. 
3.6 In conclusion it is therefore considered that any potential landscape
impact, which would not in any event be significant, should easily be able
to outweighed by the acute need for new housing for local people who
live and work on Islay.

Page 260

Argyll and Bute Council
Comhairle Earra Gháidheal agus Bhóid 
Development And Infrastructure Services
Executive Director: Kirsty Flanagan 
1A Manse Brae Lochgilphead PA31 8RD 
Our Ref: 22/00709/PREAPP 
18 May 2022 
Rosemary Wood
Coultorsay Farm
Bruichladdich
Isle Of Islay
Isle Of Islay
Argyll And Bute
PA49 7UN 
Dear Sir/ Madam 
TOWN AND COUNTRY PLANNING (SCOTLAND) ACT 1997 (AS AMENDED)
PRELIMINARY ENQUIRY PROPOSAL: Sell 4 plots for developments.
SITE ADDRESS: Coultorsay Farm Bruichladdich Isle Of Islay Isle Of Islay Argyll And Bute 
Thank you for your enquiry regarding the above proposal, which was received on 4th April 2022,   
This report has been prepared in the office using case cross referencing, remote sensing and map
views both commercial and council maintained, and records of a site visit on 11.05.2022. 
Argyll and Bute proposed Local Development Plan 2 (November 2019) – The unchallenged
policies and proposals within pLDP2 may be afforded significant material weighting in the
determination of planning applications at this time as the settled and unopposed view of the
Council. The provisions of pLDP2 that may be afforded significant weighting in the determination of
this application are listed below:
• Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes
• Policy 36 – New Private Accesses
• Policy 37 – Development Utilising an Existing Private Access or Existing Private   
•                    Road
• Policy 38 – Construction Standards for Public Roads
• Policy 39 – Construction Standards for Private Access
• Policy 40 – Vehicle Parking Provision
• Policy 58 – Private Water Supplies and Water Conservation 
This proposal identifies two approximately 0.5ha rectangular sites either side of the Bruichladdich
warehouses access road and around 135m and 375m south of the boundary of the Minor
Settlement. Both sites address the A847 and may be accessed from the warehouse road rather
than the main road. The northerly site lies mainly in a Rural Opportunity Area (ROA). The southerly
in the countryside and additionally partly in a Site of Scientific Interest (SSSI) and a Special
Protection Area (SPA) associated with the Rinns of Islay. These designations are defined in the
Local Development Plan (adopted 2015)(LDP). LDP 2 is likely to remove the ROA classification in
favour of simply settlement and countryside designations.     
It is understood the preferred site would be designed to contain four houses.

Page 261

A map outlining these designations is attached to the end of this report. 
Policy LDP DM1 encourages sustainable development on appropriate sites within the ROA,
however the areas designated as the Countryside Zone would only be encouraged on sites which
would be a change of use of an existing building or the following definitions: 
• Redevelopment – a development of new buildings involving significant demolitions; or the
extension of a building involving more than a doubling of the cubic volume of the building
but not exceeding three times the cubic volume (less than a doubling being treated as a
building extension and more than trebling as a new build).   
• Infill – new development positioned largely between other substantial buildings and this
new development being of a scale subordinate to the combined scale of the buildings
adjacent to the development site. 
• Rounding off – new development positioned largely between substantial building(s) on one
side and a substantial ground or natural feature on the other side and arranged such that
the local pattern of development terminates at that point. 
The proposed southerly site fails to meet any of those criteria and an exceptional case for housing
would be required to be made if this was the proposer’s preferred site. Additionally, building on this
plot would create infill opportunities for the subsequent development of the northerly site which
would be contrary to the intention of the spatial plan and would extend the settlement contrary to
the plan. The southerly site may also encroach the SSSI and SPA and therefore would require
natural heritage reports regarding species and habitats. The map may guide you to alter the red
line boundaries to avoid countryside and Natura designations requiring to be assessed.   
Any development would be a change of use of the land what is not deemed to be high quality
agricultural land. The change of use would be to Class 9 Houses. This is a designation of the Town
and Country Planning Use Classes (Scotland) Order 1997. 
Any chosen site should be sufficient for modest buildings, parking infrastructure, foul water
treatment and amenity space. 
In exceptional cases, up to and including large scale may be supported in the coutryside if it
accords with an Area Capacity Evaluation (ACE) which is likely to be absent from LDP 2 but is still
relevant at present.   
The ‘exceptional case’ required to justify carrying out of an ACE is in all circumstances, either; 
the demonstration of a locational and/or operational need tied to a precise location which is agreed
with and acceptable to the planning authority, or; 
demonstration of an overriding economic or community benefit which outweighs other policies of
the Local Development Plan and is agreed with and acceptable to the planning authority. 
Proposals in the countryside will be assessed on their individual merits and impacts. In this respect
any application would benefit from a detailed design statement including landscape visualisations.
Similarly the onus is on the applicants and their agents to supply the visualisations to aid council
officers where an ACE is required. 
In this case the more northerly site is likely to be the most suitable, notwithstanding the councils
hesitation regarding creating an artificial infill site beside Bruichladdich. It is recommended that the
proposals for LDP 2 are reviewed. These are available on the councils planning web site.     
As we move towards LDP 2 (possibly October) we will be able to treat each application with the
assistance not only of site visits but Landscape Visual Impact Assessment documentation which
we expect to accompany any application. In this respect we would require to see how the house
sits near other buildings and any substantial natural feature. Registered croft land which does not

Page 262

have an occupying house may considered with regard to a competent and comprehensive medium
term croft management plan.   
Policy requires any development to respect the character of an area and to conserve and enhance
the natural and built environments and avoid significant adverse impacts on biodiversity and
natural resources; hence the emphasis on *sustainable development. 
If the applicant is not making a formal application, permissions in principle do not require the detail
of the building and/or its position within the plot, however, conditions are attached to any approval
outlining the expectations in this regard. These conditions must be consistent with any subsequent
formal application and may require to be discharged in advance of any express application for
permission.     
A design and access statement should be attached to any application clearly showing the site
selection criteria and the reasons for sites in the settlements being ruled out. This should also
provide detailed modelling of the development within the landscape and reference the council’s
own guidance and housing reports regarding the island. 
Any new access and road will require consultation with the council’s Roads department and may
be worth while contacting in advance. Council policy is generally to refuse intensification of use
from an unadoptable road.   
Any proposed work will require to comply with minimum building standards and building warrants
may also be required before the work starts. You can verify this with your local authority building
standards department. 
A construction and movement management plan should be considered regarding access, and
maintenance around infrastructure and with regard to surrounding properties and built environment
and be attached to any application. 
We are happy to answer any questions arising from (or related to) this report. Please note that this
preliminary assessment is based on current information.  In the event of a formal planning
application being submitted, the Council must take into account views of consultees and
representations from the public as appropriate.  Any subsequent assessment must reflect this and
may therefore differ from the initial assessment.  Finally, the above is the view of Development
Management and may not necessarily be that of the Planning Authority. Should you decide to
make an application for planning permission, please be aware that the Council actively promotes
online submission of applications through the Government’s ePlanning Portal at
www.eplanning.scotland.gov.uk . You can also get more advice and guidance on our own website
at www.argyll-bute.gov.uk. 
Definition:
* Sustainable: “development that meets the needs of the present without compromising the    
ability of future generations to meet their own needs” Brandtland. The principle is applied in 
the plan by way of the development management zones, which are largely founded on 
general development capacities. 
Consultations on any formal proposal may include (though not exclusive to):
• Building Standards
• Environmental Health
• Roads and Amenity
• Scottish Water 
• SEPA
• Nature Scotland
• WoSAS

Page 263

The LDP policies covering any proposal may include (though not exclusive to): 
LDP STRAT 1 - Sustainable Development
LDP DM 1 - Development within the Development Management Zones
LDP 3 - Supporting the Protection, Conservation and Enhancement of our Environment
LDP 5 - Supporting the Sustainable Growth of our Economy
LDP 8 – Supporting the Strength of our Communities 
LDP 9 - Development Setting, Layout and Design
LDP 10 – Maximising Our Resources and Reducing Our Consumption
LDP 11 – Improving Our Connectivity and Infrastructure 
SG LDP HOU 1 - General Housing Development Including Affordable Housing Provision
SG LDP ENV 1 - Development Impact on Habitats, Species and our Biodiversity  
SG LDP ENV 2 = Development Impact on European Sites  
SG LDP ENV 4 = Development Impact on Sites of Special Scientific Interest (SSSIs) and                               
National Nature Reserves
SG LDP ENV 14 - Landscape
SG LDP Sustainable - Sustainable Siting and Design Principles
SG LDP ACE 1 - Area Capacity Evaluation
SG LDP TRAN 4 – New and Existing, Public Roads and Private Access Regimes
SG LDP TRAN 6 - Vehicle Parking Provision 
https://www.argyll-bute.gov.uk/ldp 
Spatial policy map

Page 264

Green – Rural Opportunity Area (current but under review for LDP 2
Cross hatch – Countryside, SSSI, SPA
Buff – Countryside zone 
If you wish to discuss any aspect of the above, please do not hesitate to contact me. 
Yours faithfully 
Derek Wilson
Planning Officer

Page 265

1
Michael Hyde
Subject: FW: Land at Coultorsay Farm, Bruichladdich, Isle of Islay [OFFICIAL]
From: Wilson, Derek <Derek.Wilson@argyll-bute.gov.uk> 
Sent: Wednesday, April 12, 2023 7:13 AM
To: Michael Hyde <mh@mhplanning.co.uk>
Subject: RE: Land at Coultorsay Farm, Bruichladdich, Isle of Islay [OFFICIAL] 
Classification: OFFICIAL
Morning,
Apologies for the delay.
When considering NPF4 regarding ROH sites, we try to establish a principle which does not mean every ROH site is
suitable. 
Principle
Of relevance, NPF4 Policy 9 sets out that proposals on greenfield sites will not be supported unless the site is explicitly
supported by policies in the LDP. NPF7 Policy 17c) sets out that new homes in remote rural areas will be supported
where it supports and sustains existing fragile communities, supports identified local housing outcomes and is suitable
in terms of location, access and environmental impact 
NPF4 Policy 16f) sets out that new homes on land not allocated for housing in the LDP will only be supported in limited
specified circumstances, which of relevance includes where there is an agreed timescale for build out; where the
proposal is consistent with the plan spatial strategy and policies such as local living, and where the proposal is
consistent with policy on rural homes. The concept of Local Living is further detailed in NPF4 Policy 15. 
The development is located within a Rural Opportunity Area (ROA) as defined by the LDP, wherein Policy DM1 envisages
small scale development on appropriate sites, including the open countryside. As such, subject to an agreed build out
timescale secured by planning condition, the proposal would meet the requirements of NPF4 Policy 16f). 
It is considered that the small scale of the proposed development and its rural location would reasonably comply with
policies 2a), 15 and 17c) of NPF4 given the existing dispersed geographical scale of the environment within which the
development is to be located, and the level and quality of interconnectivity of the proposed development with the
surrounding area where people can reasonably meet the majority of their daily needs within a reasonable distance of
their home and support the community. This is underpinned by the broad settlement strategy policy contained within
Policy LDP DM 1, LDP 5, LDP 8, LDP 10 and LDP 11 of the Local Development Plan. 
Drawing the above together, the principle of residential development at the site is considered acceptable in principle,
subject to acceptability of the detailed matters set out below. 
This is now a standard housing template for reports but may vary with the specifics of the proposals. 
Regards,
Derek Wilson   
From: Michael Hyde <mh@mhplanning.co.uk> 
Sent: 04 April 2023 09:49
To: Wilson, Derek <Derek.Wilson@argyll-bute.gov.uk>

Page 266

2
Cc: Bowker, Bryn <Bryn.Bowker@argyll-bute.gov.uk>; ldp <ldp@argyll-bute.gov.uk>
Subject: RE: Land at Coultorsay Farm, Bruichladdich, Isle of Islay 
Hello Derek 
Back in May last year you responded to a pre-application enquiry in respect of the development of potentially
4 house plots on land at Coultorsay Farm, Bruichladdich (copy of response attached).  In respect of the
‘northern site’, which is mainly in a ROA at the moment, you said: 
“In this case the more northerly site is likely to be the most suitable, notwithstanding the councils
hesitation regarding creating an artificial infill site beside Bruichladdich. It is recommended that the
proposals for LDP 2 are reviewed. These are available on the Council’s planning web site. 
As we move towards LDP 2 (possibly October) we will be able to treat each application with the
assistance not only of site visits but Landscape Visual Impact Assessment documentation which we
expect to accompany any application.  In this respect we would require to see how the house sits near
other buildings and any substantial natural feature.  Registered croft land which does not have an
occupying house may considered with regard to a competent and comprehensive medium term croft
management plan”. 
Clearly in policy terms things have now changed fundamentally!  The new NPF4 policy on rural homes (Policy
17) does not seem to be as accommodating as the proposed Policy 02 in the (hopefully) soon to be adopted
Local Development Plan 2.  Policy 17 says that: 
(a)       development proposals for new homes in rural areas will be supported where the development is
suitably scaled, sited and designed to be in keeping with the character of the area and the
development: 
i.          Is on a site allocated for housing within the LDP;
ii.          Reuses brownfield land where a return to a natural state has not or will not happen without
intervention;
iii.         Reuses a redundant or unused building;
iv.         Is an appropriate use of a historic environment asset or is appropriate enabling development to
secure the future of historic environment assets;
v.         Is demonstrated to be necessary to support the sustainable management of a viable rural
business or croft, and there is an essential need for a worker (including those taking majority
control of a farm business) to live permanently at or near their place of work;
vi.         Is for a single home for the retirement succession of a viable farm holding;
vii.        Is for the subdivision of an existing residential dwelling; the scale of which is in keeping with the
character and infrastructure provision in the area; or
viii.       Reinstates a former dwelling house or is a one-for-one replacement of an existing permanent
house. 
None of (i) to (viii) would appear to apply?  Policy 17 however has other elements as follows: 
b)         Development proposals for new homes in rural areas will consider how the development will contribute
towards local living and take into account identified local housing needs (including affordable
housing), economic considerations and the transport needs of the development as appropriate for the
rural location. 
c)         Development proposals for new homes in remote rural areas will be supported where the proposal:
i.          Supports and sustains existing fragile communities;
ii.          Supports identified local housing outcomes; and
iii.         Is suitable in terms of location, access, and environmental impact.

Page 267

3
Would either of (b) or (c) add support for a proposal?  I’m really struggling (as I’m sure you are) to work out
how to approach applications for new houses in the countryside given the interplay between the NPF4 and
the LDP. 
What do you think?  I’ve copied in the Policy Team in case they might be able to help. 
Regards 
Mike 
Michael Hyde MRTPI
MH Planning Associates
www.mhplanning.co.uk
m: 07816 907203
New Office Address: 63 West Princes Street, Helensburgh, G84 8BN 
Argyll and Bute Council's e-mail system (also used by LiveArgyll) classifies the sensitivity of emails
according to the Government Security Classifications. 
Privileged/Confidential Information may be contained in this message. If you are not the addressee
indicated in this message (or responsible for delivery of the message to such person), you may not
disclose, copy or deliver this message to anyone and any action taken or omitted to be taken in reliance
on it, is prohibited and may be unlawful. 
In such case, you should destroy this message and kindly notify the sender by reply email. Opinions,
conclusions and other information in this message that do not relate to the official business of Argyll and
Bute Council or LiveArgyll shall be understood as neither given nor endorsed by them. 
All communications sent to or from Argyll and Bute Council or LiveArgyll may be subject to recording
and/or monitoring in accordance with relevant legislation. 
This email has been scanned for viruses, vandals and malicious content.

Page 268

1A Manse Brae Lochgilphead PA31 8RD 
TOWN AND COUNTRY PLANNING (SCOTLAND) ACT 1997 (AS AMENDED) 
TOWN AND COUNTRY PLANNING (DEVELOPMENT MANAGEMENT PROCEDURE)
(SCOTLAND) REGULATIONS 2013 
REFUSAL OF PLANNING PERMISSION IN PRINCIPLE 
REFERENCE NUMBER: 23/01028/PPP 
Mr and Mrs Rosemary and Neil Wood
MH Planning Associates
63 West Princes Street
Helensburgh
Argyll And Bute
G84 8BN 
I refer to your application dated 25th May 2023 for planning permission in principle under the
above mentioned Act and Regulations in respect of the following development: 
Site for the erection of 4 dwellinghouses at Land At Coultorsay Farm Bruichladdich Isle Of
Islay Argyll And Bute 
Argyll and Bute Council in exercise of their powers under the above mentioned Act and
Regulations hereby refuse planning permission in principle for the above development for the
reason(s) contained in the attached appendix. 
Dated: 15 February 2024 
Fergus Murray
Head of Development and Economic Growth

Page 269

REASONS FOR REFUSAL RELATIVE TO APPLICATION NUMBER: 23/01028/PPP 
1. The proposed development, by reason of its scale, form, layout and location, would
introduce an urban character/form of development into this countryside setting which would have
an adverse visual impact which would, as a result, have a significant adverse impact on the
character of the landscape. Consequently, the proposal would be contrary to Policies LDP DM1,
LDP 3, LDP 9, SG LDP HOU (A) (B), LDP ACE 1, SG LDP Sustainable, SG LDP ENV 14 of the
Argyll and Bute Local Development Plan 2015, NPF4 policies 4a, 9b, 14, 16f) 17c) iii, and
emerging LDP2 policies 02, 04, 05, and 08.

Page 270

NOTES TO APPLICANT (1) RELATIVE TO APPLICATION NUMBER 23/01028/PPP 
1. If the applicant is aggrieved by the decision to refuse permission for or approval required by
a condition in respect of the proposed development, or to grant permission or approval
subject to conditions, the applicant may require the planning authority to review the case
under Section 43A of the Town and Country Planning (Scotland) Act 1997 (as amended)
within three months from the date of this notice. A Notice of Review request must be
submitted on an official form which can be obtained by contacting The Local Review Body,
Committee Services, Argyll and Bute Council, Kilmory, Lochgilphead, PA31 8RT or by
email to localreviewprocess@argyll-bute.gov.uk 
2. If permission to develop land is refused or granted subject to conditions and the owner of
the  land claims that the land has become incapable of reasonably beneficial use in its
existing state, and it cannot be rendered capable of reasonably beneficial use by the
carrying out of any development which has been or would be permitted, the owner of the
land may serve on the planning authority a purchase notice requiring the purchase of the
landowner’s interest in the land, in accordance with Part 5 of the Town and Country
Planning (Scotland) Act 1997 (as amended).

Page 271

APPENDIX TO DECISION REFUSAL NOTICE 
Appendix relative to application: 23/01028/PPP 
A. Has the application been the subject of any “non-material” amendment in terms of
Section 32A of the Town and Country Planning (Scotland) Act 1997 (as amended) to
the initial submitted plans during its processing. 
Yes/No (delete as appropriate) if yes, list amendments 
No 
B.  Is the proposal a departure from the Development Plan: 
No 
If yes, state level of departure: 
C.  Summary justification statement for refusal of planning permission in principle 
The proposed development, by reason of its scale, form, layout and location, would        
introduce an urban character/form of development into this countryside setting which would have
an adverse visual impact which would, as a result, have a significant adverse impact on the
character of the landscape. Consequently, the proposal would be contrary to Policies LDP DM1,
LDP 3, LDP 9, SG LDP HOU (A) (B), LDP ACE 1, SG LDP Sustainable, SG LDP ENV 14 of the
Argyll and Bute Local Development Plan 2015, NPF4 policies 4a, 9b, 14, 16f) 17c) iii, and
emerging LDP2 policies 02, 04, 05, and 08.

Page 272

https://www.gov.uk/planning-inspectorate 
Costs Decision
Site visit made on 16 November 2020
by Robert Parker BSc (Hons) Dip TP MRTPI
an Inspector appointed by the Secretary of State
Decision date: 03 December 2020 
Costs application in relation to Appeal Ref: APP/M1710/W/20/3256965
17 Lovage Way, Horndean, Waterlooville PO8 0JG
• The application is made under the Town and Country Planning Act 1990, sections 78,
322 and Schedule 6, and the Local Government Act 1972, section 250(5).
• The application is made by Mr and Mrs K Sweeney for a full award of costs against East
Hampshire District Council.
• The appeal was against the refusal of planning permission for change of use of a small
section of amenity land to the rear to residential use and enclose it with timber fencing,
with concrete posts to match the existing garden fencing. 
Decision
1. The application for an award of costs is allowed in the terms set out below.
Reasons
2. Parties in planning appeals normally meet their own expenses. The Planning
Practice Guidance advises that costs may only be awarded against a party who
has behaved unreasonably and thereby caused another party to incur
unnecessary or wasted expense in the appeal process. Behaviours and actions
prior to the appeal can be taken into account in the Inspector’s consideration
of whether or not costs should be awarded.
3. The National Planning Policy Framework emphasises the importance of good
quality pre-application discussion. Early engagement has significant potential to
improve the efficiency and effectiveness of the planning application system for
all parties. The appellants followed this advice and sought an opinion from the
local planning authority prior to making a planning application. The Council’s
response contained caveats in relation to the choice of boundary treatments,
but a reasonable person reading the letter would conclude that the principle
was acceptable. The fact that the author of the letter was a principal officer of
the Council gave added confidence regarding the reliability of the advice.
4. Pre-application advice is provided informally and on a without prejudice basis.
There may be circumstances where representations received during the course of
a planning application justify making a departure from earlier advice. However,
none of the responses in this case raise any matter that could not have been
foreseen at the pre-application stage. The issues are clear and straightforward.
Had the pre-application advice been negative then the appellants may not have
proceeded with a planning application and they would have avoided the costs of
an appeal. Their application was submitted in good faith.

Page 273

Costs Decision APP/M1710/W/20/3256965 
https://www.gov.uk/planning-inspectorate                          2
5. The officer report accepted that existing vegetation could be removed and that
there was a fallback of erecting a 1 m high fence without needing permission.
However, the proposal for taller fencing was deemed to be more harmful. Whilst
I do not agree, this was a judgement which the Council was entitled to make.
The authority has taken account of the relevant material considerations.
6. Where the Council has behaved unreasonably is in its lack of consistency with
pre-application advice. There is a fair expectation that such advice should be
reliable and that potential applicants should not be given false hope. After
encouraging the appellants to submit an application the Council has
backtracked to a position whereby it considers the principle of the change of
use is unacceptable, notwithstanding that removal of vegetation has already
taken place. There is no convincing explanation for this change in stance. 
7. If the concern had related solely to the design of boundary treatment then this
should have been flagged up before the application was determined. Better
still, the Council’s preference should have been set out in its pre-application
letter. To make the appellants guess, when there are only a finite number of
options for height and material, is patently unreasonable.
8. To conclude, had the appellants been actively dissuaded from making the
application in the first place, as opposed to being encouraged to proceed, they
would not have incurred the costs of going to appeal. I therefore find that
unreasonable behaviour resulting in unnecessary or wasted expense in the
appeal process has been demonstrated and a full award of costs is justified.
Costs Order
9. In the exercise of the powers under section 250(5) of the Local Government
Act 1972 and Schedule 6 of the Town and Country Planning Act 1990 as
amended, and all other enabling powers in that behalf, IT IS HEREBY ORDERED
that East Hampshire District Council shall pay to Mr and Mrs K Sweeney, the
costs of appeal proceedings described in the heading of this decision such costs
to be assessed in the Senior Courts Costs Office if not agreed.
10. The applicants are now invited to submit to East Hampshire District Council, to
whom a copy of this decision has been sent, details of those costs with a view
to reaching agreement as to the amount. 
Robert Parker
INSPECTOR

Page 274

8m
8m
7m
16m
17m
Port Bahn
Stonayburn
Drain
50m
30m
Drain
Curlew
Drain
FarmCoultorsay
Cottage
Drain
War
20m
Cnoc Allanta
Cnoc a' Chuil
Drain
Meml
Drain
Port Flora
Sinks
Tel Ex
70m
Sand
A3
Drawing Number:
Project:
Drawing Title:
Issue Status:
Revision:
Date:
Scale:
Drawn By:
DescriptionDate
Revision Description
Rev By
THIS DRAWING IS COPYRIGHT
DO NOT SCALE FROM DRAWING
63 West Princes Street
Helensburgh
G84 8BN
01436 674 777
07816 907 203
www.mhplanning.co.uk
Client:
MH Planning
Associates
Neil and Rosemary Wood
Formation of Development Plots, at:
Coultorsay Farm, Bruichladdich, Ise of Islay
Location Plan
2022_0065-00
-
April 2023
1:2500 @ A3
KM
Planning
red line indicates extent of application site
n o r t hl o c a t i o n   p l a n
0m 100m 200m20m 40m
PS Scale Bar for 1:2500

Page 275

n o r t h
A3
Drawing Number:
Project:
Drawing Title:
Issue Status:
Revision:
Date:
Scale:
Drawn By:
DescriptionDate
Revision Description
Rev By
THIS DRAWING IS COPYRIGHT
DO NOT SCALE FROM DRAWING
63 West Princes Street
Helensburgh
G84 8BN
01436 674 777
07816 907 203
www.mhplanning.co.uk
Client:
MH Planning
Associates
Neil and Rosemary Wood
Formation of Development Plots, at:
Coultorsay Farm, Bruichladdich, Ise of Islay
Supplementary Location Plan
2022_0065-01
-
April 2023
1:25,000 @ A3
KM
Planning
s u p p l e m e n t a r y   l o c a t i o n   p l a n
scale 1:25,000 @ A3
0m 1000m 2000m200m 400m
PS Scale Bar for 1:25,000
Application Site

Page 276

Coultorsay Farm
Drain
House
Coultorsay
A 847
FB
Drain
Coultorsay Farm
PROPOSED
HOUSE
NO.2
PROPOSED
HOUSE
NO.3
PROPOSED
HOUSE
NO.4
PROPOSED
HOUSE
NO.1
SEPTIC TANK
PARTIAL SOAKAWAY
BT
ACCESS TRACK
ACCESS TRACK
TURNING
FIELD ACCESS PLOT 1 = 2013m²
PLOT 2 = 1527m²
PLOT 3 = 1540m²
PLOT 4 = 1712m²
n o r t hs i t e   p l a n
Scale 1:500 @ A1
Drawing Number:
Project:
Drawing Title:
Issue Status:
Revision:
Date:
Scale:
Drawn By:
DescriptionDate
Revision Description
Rev By
THIS DRAWING IS COPYRIGHT
DO NOT SCALE FROM DRAWING
63 West Princes Street
Helensburgh
G84 8BN
01436 674 777
07816 907 203
www.mhplanning.co.uk
A1
Client:
MH Planning
Associates
Neil and Rosemary Wood
Formation of Development Plots, at:
Coultorsay Farm, Bruichladdich, Ise of Islay
Site Plan
2022_0065-02
-
April 2023
1:500 @ A1
KM
Planning
0m 10m
PS Scale Bar for 1:500
20m 30m 50m40m
APPLICATION SITE AREA = 0.89ha