Page 1

Argyll and Bute Council 
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD
17 May 2024 
NOTICE OF MEETING 
A meeting of the ARGYLL AND BUTE LOCAL REVIEW BODY will be held in THE STUDIO
THEATRE, CORRAN HALLS, OBAN on FRIDAY, 24 MAY 2024 at 1:00 PM, which you are
requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. CONSIDER NOTICE OF REVIEW REQUEST: ROWANBRAE, GLENCRUITTEN,
OBAN (REF: 24/0002/LRB) 
(a) Further written submissions from Planning Authority (Pages 3 - 10)  
(b) Comments from Applicant (Pages 11 - 18) 
Argyll and Bute Local Review Body 
Councillor John Armour Councillor Jan Brown
Councillor Kieron Green (Chair)   
Contact: Hazel MacInnes Tel: 01546 604269
Public Document Pack

Page 2

This page is intentionally left blank

Page 3

FURTHER INFORMATION 
FOR 
ARGYLL AND BUTE COUNCIL 
LOCAL REVIEW BODY 
24/0002/LRB 
REFUSAL OF PLANNING PERMISSION 23/00825/PPP 
SITE FOR THE ERECTION OF A DWELLINGHOUSE 
LAND NORTH OF ROWAN BRAE, GLENCRUITTEN, OBAN 
25 MARCH 2024 
Page 3 Agenda Item 3a

Page 4

a) An assessment of the impact, if any, on the application and the Report of
Handling by LDP 2 
In terms of the adopted LDP2 the site is defined as ‘Outwith Settlement Areas’ within an
area identified as ‘Countryside Area' (CA) where Policy 02 of LDP2 gives a presumption
in favour of sustainable development but only where it is of an appropriate scale, design,
siting and use for its countryside location, as set out in the relevant sustainable siting
and design policies contained within LDP2. 
Policy 02 further states that certain development will be supported, generally without the
need for detailed environmental assessments, with these comprising, infill,
redevelopment opportunities of clusters; or previously developed sites. 
It is not considered that the development the subject of the review would accord with
any reasonable interpretation of ‘infill’ or ‘redevelopment of clusters’ (the word ‘cluster’ is
not specifically defined in the LDP2 written statement – this will be discussed in (b)
below but the LRB are advised that the proposal does not constitute a ‘redevelopment’
in any case). 
The proposed development, contrary to the assertions made by the appellant, is clearly
on a ‘greenfield’ site which has not been ‘previously developed’. 
This general support for development is caveated with the requirement to demonstrate
that there will be no unacceptable adverse effects (either individually or cumulatively) on
natural heritage resources, built and/or cultural heritage resources, and landscape and
visual amenity. 
This policy further states that, where there is preliminary evidence that there may be
such adverse effects (and where a formal environmental impact assessment is not
required), a landscape and visual impact assessment may be required. 
The key planning issues here are whether or not the proposed development accords
with the established settlement pattern and, irrespective of this, whether the proposed
development would cause material harm to the immediate and/or wider landscape. 
The sustainable siting and design policies within LDP2, namely, Policy 04, Sustainable
Development, Policy 05, Design and Placemaking, and Policy 08, Sustainable Siting
collectively seek that new development is considered holistically giving full consideration
to the surrounding environment including infrastructure and land uses with proposed
development taking into account the character of the area in terms of its settlement
pattern, layout and density. 
In light of the above, due to the concerns that the Planning Authority has with the site,
as set out in the Report of Handling, should the proposal have come forward and
considered under LDP2, the Planning Authority would have sought the completion of the
Sustainability Checklist and may have required the submission of a Visual Impact
Illustration demonstrating the impact that the proposed development would have on the
landscape. 
It is noted, however, that the appellant has now submitted a substantial amount of detail
seeking to justify the development in terms of its landscape impact, such that officers do
not consider that any further submission is necessary. 
Officers have carefully examined the new information submitted but remain of the
opinion that the development the subject of this review would conflict with NPF4 Policies
Page 4

Page 5

9, 14 and 17, and Policies LDP STRAT 1, LDP DM 1, LDP 3, LDP 9, SG LDP ENV 14
and SG LDP HOU 1 of the Local Development Plan in force at the time of the original
decision. Having carried out a reassessment of the proposals under LDP2, officers
consider that the development is now contrary to LDP2 Policies 2, 4, 5 and 8 and
remains contrary to NPF4 Policies 9, 14 and 17. 
It is accepted that the appellant takes a different view. 
b) Clarification on the definition of clusters; how many houses constitute one
cluster; and if the proposed development is part of one cluster; or part of one
cluster amongst other clusters. 
Both the former LDP and the current LDP2 do not provide a definition of ‘clusters’. 
However, the Oxford English Dictionary defines a ‘cluster’ as: A number of persons,
animals or things gathered or situated close together. 
The assessment that the development pattern along the Connel Back Road, as set out
in the Report of Handling, comprises small clusters of development, some set alongside
the public road and others set back, broken up with area of open ground, is an officer
based assessment of the settlement pattern undertaken during the processing of the
application. 
The assessment that the site formed part of a ‘cluster’ was not based on any specific
number, but a landscape assessment by the officer who was of the opinion that the site
formed part of the existing cluster of development centred around the public road
junction to the south. 
In hindsight, it may perhaps have been clearer to simply rely upon the term ‘settlement
pattern’ in this regard. 
c) Model conditions and reasons that could accompany an approval of the
application should the Local Review Body be so minded. 
CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 23/00825/PPP 
Standard Time Limit Condition  (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions  
1. PPP – Matters Requiring AMSC Submission 
Plans and particulars of the matters specified in conditions 3, 4, 5, 6, 7 and 9 below
shall be submitted by way of application(s) for Approval of Matters Specified in
Conditions in accordance with the timescales and other limitations in Section 59 of
the Town and Country Planning (Scotland) Act 1997 as amended. Thereafter the
development shall be completed wholly in accordance with the approved details. 
Reason: To accord with Section 59 of the Town and Country Planning (Scotland) Act
1997 as amended. 
Note to Applicant 
Page 5

Page 6

Regard should be had to Scottish Waters consultation comments in relation to the
proposed development which are available to view via the Public Access section of
the Council’s website.  
2. PPP – Approved Details 
The development shall be implemented in accordance with the details specified on
the application form dated 24/04/23 and the approved drawings listed in the table
below. 
Plan Title. Plan Ref. No. Version Date
Received
Location and Site Plan  001 B 27/06/23 
Reason:  To accord with Regulation 28 of the Town and Country Planning
(Development Management Procedure) (Scotland) Regulations 2008.  
3. PPP – Timescale to be Agreed for Completion 
Pursuant to Condition 1 - no development shall commence until details of the
proposed timescale for completion of the approved development have been
submitted to and approved by the Planning Authority. Thereafter, the development
shall be implemented in accordance with the duly approved timescale for completion
unless an alternative timescale for completion is otherwise agreed in writing with the
Planning Authority. 
Reason: In order to comply with the requirements of NPF4 Policy 16F.  
4. PPP - Design and Finishes 
Pursuant to Condition 1 – no development shall commence until plans and
particulars of the site layout, design and external finishes of the development has
been submitted to and approved by the Planning Authority. These details shall
incorporate: 
i) A statement addressing the Action Checklist for developing design contained
within the Argyll and Bute Sustainable Design Guide 2006;
ii) A statement addressing how the proposed development has been designed
to be consistent with the six qualities of successful places, as defined within
Policy 14 of NPF4;
iii) Local vernacular design taking consideration of the guidance set out in the
approved Argyll and Bute Sustainable Design Guidance, 2006; 
iv) Maximum of one and a half storeys;
v) Windows with a vertical emphasis;
vi) Have a roof pitch between 37 and 42 degrees finished in natural slate or a
good quality artificial slate;
vii) Details of finished ground floor levels relative to an identifiable fixed datum
located outwith the application site along with details of the existing and
proposed site levels shown in the form of sectional drawings/contour
plans/site level survey, or a combination of these;
viii) Details of an area within the application site for the placement of
refuse/recycling bins.
ix) Details of the potential for the installation of a 7kw Electrical Vehicle Charging
Point within the site. 
Page 6

Page 7

Reason: To accord with Section 59 of the Town and Country Planning (Scotland) Act
1997 as amended, and in order to integrate the proposed dwellinghouse with its
surroundings.  
5. PPP – Roads, Access and Parking 
Pursuant to Condition 1 – no development shall commence until plans and
particulars of the means of vehicular access and parking/turning arrangements to
serve the development have been submitted to and approved by the Planning
Authority. Such details shall incorporate:   
i) Upgrade of the junction serving the development site in accordance with the
Council’s Roads Standard Detail Drawing SD 08/004a with visibility splays
measuring 2.4 metres to point X by 53 metres to point Y from the centre line
of the junction ; 
ii) The provision of a parking and turning area in accordance with the
requirements set out in the Car Parking Standards and Policy 40 of the
adopted ‘Argyll and Bute Local Development Plan 2’ 2024. 
Prior to work starting on site, the approved scheme of works in respect of junction
layout shall be formed to at least base course standard and the visibility splays shall
be cleared of all obstructions such that nothing shall disrupt visibility from a point
1.05 metres above the junction at point X to a point 0.6 metres above the public road
carriageway at point Y. The final wearing surface on the access shall be completed
prior to the development first being brought into use and the visibility splays shall be
maintained clear of all obstructions thereafter. 
The approved parking and turning layout shall be implemented in full prior to the
development first being occupied and shall thereafter be maintained clear of
obstruction for the parking and manoeuvring of vehicles. 
Reason: In the interests of road safety. 
Note to Applicant: 
• A Road Opening Permit under the Roads (Scotland) Act 1984 must be obtained
from the Council’s Roads Engineers prior to the formation/alteration of a junction
with the public road.
• No walls, fences, hedges etc. greater than 1 metre in height will be permitted
within 2 metres from the channel line of the public road. 
• The access shall be constructed and drained to ensure that no surface water is
discharged onto the public road.  
6. PPP – Details of New Private Foul Drainage System 
Pursuant to Condition 1 – no development shall commence until details of the
proposed means of private foul drainage to serve the development have been
submitted to and approved by the Planning Authority. 
The duly approved scheme shall be implemented in full concurrently with the
development that it is intended to serve and shall be operational prior to the
occupation of the development. 
Page 7

Page 8

Reason: To ensure that an adequate means of foul drainage is available to serve the
development. 
Note to Applicant: 
Private drainage arrangements are also subject to separate regulation by Building
Standards and SEPA.  
7. PPP – Private Water Supply 
Pursuant to Condition 1, no development shall commence until an appraisal of the
wholesomeness and sufficiency of the intended private water supply and the system
required to serve the development has been submitted to and approved by the
Planning Authority. 
The appraisal shall be carried out by a qualified hydrologist/hydrogeologist or other
suitably competent person and shall include a risk assessment having regard to the
requirements of Schedule 4 of the Private Water Supplies (Scotland) Regulations
2006 or Part 3 of the Water Intended for Human Consumption (Private Supplies)
(Scotland) Regulations 2017 (as appropriate) which shall inform the design of the
system by which a wholesome and sufficient water supply shall be provided and
maintained. 
The appraisal shall also demonstrate that the wholesomeness and sufficiency of any
other supply in the vicinity of the development, or any other person utilising the same
source or supply, shall not be compromised by the proposed development. 
The development shall not be brought into use or occupied until the required water
supply system has been installed in accordance with the agreed specification and is
operational. 
Reason: In the interests of public health and in order to ensure that an adequate
private water supply in terms of both wholesomeness and sufficiency can be
provided to meet the requirements of the proposed development and without
compromising the interests of other users of the same or nearby private water
supplies. 
Notes to Applicant 
1. Regulatory requirements for private water supplies should be discussed with the
Council’s Environmental Health Service in the first instance. 
2. If the development is likely to use 10m3 water per day then the applicant will need
to apply for a registration or licence for water abstraction from SEPA
https://www.sepa.org.uk/regulations/authorisations-and-permits/application-
forms/#Water. 
3. If the proposed development is a commercial undertaking including but not
limited to; use as a holiday or long term private let, workplace, food business,
campsite etc. then the applicant must apply to the Environmental Health service
8 weeks before the intended use date for the private water supply to be
registered and certified as fit for use. Email: pws@argyll-bute.gov.uk 
4. It is recommended that should planning permission be granted, that the applicant
contact this Service to discuss further the measures needed to comply with the
Page 8

Page 9

requirements of Water Intended for Human Consumption (Private Supplies)
(Scotland) Regulations 2017 or the Private Water Supplies (Scotland)
Regulations 2006, as is applicable.  
8. PPP - Sustainable Drainage System 
Notwithstanding the provisions of Condition 1, the development shall incorporate a
surface water drainage system which is consistent with the principles of Sustainable
urban Drainage Systems (SuDS) compliant with the guidance set out in CIRIA’s
SuDS Manual C753 and Sewers for Scotland 4th Edition.  The requisite surface
water drainage shall be operational prior to the development being brought into use
and shall be maintained as such thereafter. 
Reason: To ensure the provision of an adequate surface water drainage system and
to prevent flooding.  
9. PPP - Landscaping and Biodiversity Enhancement 
Pursuant to Condition 1 – no development shall commence until a scheme of
boundary treatment, surface treatment and landscaping has been submitted to and
approved by the Planning Authority. The scheme shall comprise a planting plan and
schedule which shall include details of: 
i) Existing and proposed ground levels in relation to an identified fixed datum; 
ii) Existing landscaping features and vegetation to be retained; 
iii) Location design and materials of proposed walls, fences and gates; 
iv) Proposed soft and hard landscaping works including the location, species and
size of every tree/shrub to be planted; 
v) A biodiversity statement demonstrating how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these benefits
will be maintained for the lifetime of the development; 
vi) A programme for the timing, method of implementation, completion and
subsequent on-going maintenance. 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme unless otherwise approved in writing by the Planning Authority. 
Any trees/shrubs which within a period of five years from the completion of the
approved landscaping scheme fail to become established, die, become seriously
diseased, or are removed or damaged shall be replaced in the following planting
season with equivalent numbers, sizes and species as those originally required to be
planted unless otherwise approved in writing by the Planning Authority. 
All physical biodiversity enhancement measures (bird nesting boxes, ‘swift bricks’,
wildlife ponds, bat and insect boxes, hedgehog homes etc.) shall be implemented in
full before the development hereby approved is first brought into use. 
All biodiversity enhancement measures consisting of new or enhanced planting shall
be undertaken either in accordance with the approved scheme of implementation or
within the next available planting season following the development first being
brought into use. 
The biodiversity statement should refer to Developing with Nature guidance |
NatureScot as appropriate.
Page 9

Page 10

Reason:  To assist with the integration of the proposal with its surroundings in the
interests of amenity. 
Page 10

Page 11

1 
FURTHER INFORMATION 
FOR 
ARGYLL AND BUTE COUNCIL 
LOCAL REVIEW BODY 
24/0002/LRB 
REFUSAL OF PLANNING PERMISSION 23/00825/PPP 
SITE FOR THE ERECTION OF A DWELLINGHOUSE 
LAND NORTH OF ROWAN BRAE, GLENCRUITTEN, OBAN 
Applicant’s Further Submission 8th April 2024 
ARGYLL AND BUTE
A HOUSING EMERGENCY AND MORE FLEXIBILTY REQUIRED
Statement by Pippa Milne, Chief Executive of Argyll and Bute Council, in March
2024 in reply to Mike Mackenzie following concerns raised over depopulation and
lack of flexibility in the existing planning process.
“The Council remains focussed on reversing the population decline and sees
housing as a key factor in tackling this. This has been demonstrated by it
being the first local authority in Scotland to declare a housing emergency and
its recent housing summit.
These are complex issues which require a partnership approach to tackle
them.
The Council's LDP2 has also now been formally adopted and is now the first
LDP in Scotland to be adopted since NPF4. It brings with it more flexibility for
development across Argyll and Bute.”
The following policy failures are a consequence of the planning authority’s
assessment that “general support for development is caveated with the
requirement to demonstrate that there will be no unacceptable adverse effects
(either individually or cumulatively) on natural heritage resources, built and/or
cultural heritage resources, and landscape and visual amenity.”
The planning Authority have considered that the proposed development would
cause material harm to the immediate and/or wider landscape based on the
review of material submitted in application for planning permission rather than the
using an evidence based technical matrix for assessing landscape impacts, where
the importance of the viewpoint is judged against the magnitude of the impact of
the proposed development in relation to the landscape condition.
Page 11 Agenda Item 3b

Page 12

2 
Those conditions are characterised as:-
HIGH
MODERATE
LOW.
The detail can be seen by clicking this link.
METHODOLOGY FOR LANDSCAPE AND VISUAL ASSESSMENT 
In this application the sensitivity of the viewpoint, the magnitude of the impact of
the proposal and the condition of the landscape generally could only be described
as LOW.
Using a much simpler “glass half full/glass half empty” analogy, and where a
landscape assessment matrix reflects low scores, and even assuming that this
application is borderline, in terms of whether or not the “development would
cause material harm to the immediate and/or wider landscape” which we do not
agree is the case, but even if we did, there is scope to adopt a “GLASS HALF FULL”
approach as suggested by the Pippa Milne above.
That would be the start of a much more flexible approach to development across
Argyll and Bute reflecting a much more a more positive ethos of interpretation of
the new Planning Framework NPF4. Scottish Government introduced this
framework to do that very thing, to make the planning process more flexible, not
more rigid and inflexible as the Glass half empty approach would suggest.
According to the handling report of this application it fails on NPF4, Policy 9, 14
and 17, which I have noted below and commented on for ease of reference.
Incidentally, a house was recently approved at a position 800m away from this
application site and was approved. 
Page 12

Page 13

3 
NPF4 POLICY 9
BROWNFIELD. DERELICT AND VACANT LAND &
EMPTY BUILDINGS
Local Development Plans:
LDPs should set out opportunities for the sustainable reuse of brownfield land
including vacant and derelict land and empty buildings. 
Policy 9
a) Development proposals that will result in the sustainable reuse of brownfield land
including vacant and derelict land and buildings, whether permanent or temporary,
will be supported. In determining whether the reuse is sustainable, the biodiversity
value of brownfield land which has naturalised should be taken into account.
b) Proposals on greenfield sites will not be supported unless the site has been
allocated for development or the proposal is explicitly supported by policies in the
LDP.
c) Where land is known or suspected to be unstable or contaminated, development
proposals will demonstrate that the land is, or can be made, safe and suitable for
the proposed new use.
d) Development proposals for the reuse of existing buildings will be supported, taking
into account their suitability for conversion to other uses. Given the need to conserve
embodied energy, demolition will be regarded as the least preferred option.
The Land is of little agricultural merit, and the biodiversity
value limited. Although not a brownfield site the development
proposals for the re-use of derelict land should be supported
as the proposals are consistent with NPF9 in that regard. 
Page 13

Page 14

4 
NPF4 POLICY 14
LIVEABLE PLACES
Local Development Plans:
LDPs should be place-based and created in line with the Place Principle. The spatial
strategy should be underpinned by the six qualities of successful places. LDPs should
provide clear expectations for design, quality and place taking account of the local
context, characteristics and connectivity of the area. They should also identify where
more detailed design guidance is expected, for example, by way of design
frameworks, briefs, masterplans and design codes.
Planning authorities should use the Place Standard tool in the preparation of LDPs and
design guidance to engage with communities and other stakeholders. They should also
where relevant promote its use in early design discussions on planning applications.
Policy 14
a) Development proposals will be designed to improve the quality of an area
whether in urban or rural locations and regardless of scale.
b) Development proposals will be supported where they are consistent with the six
qualities of successful places:
Healthy: Supporting the prioritisation of women’s safety and improving physical
and mental health.
Pleasant: Supporting attractive natural and built spaces.
Connected: Supporting well connected networks that make moving around easy
and reduce car dependency
Distinctive: Supporting attention to detail of local architectural styles and
natural landscapes to be interpreted, literally or creatively, into designs to
reinforce identity.
Sustainable: Supporting the efficient use of resources that will allow people to
live, play, work and stay in their area, ensuring climate resilience, and
integrating nature positive, biodiversity solutions.
Adaptable: Supporting commitment to investing in the long-term value of
buildings, streets and spaces by allowing for flexibility so that they can be
changed quickly to accommodate different uses as well as maintained over time.
Further details on delivering the six qualities of successful places are set out in
Annex D.
c) Development proposals that are poorly designed, detrimental to the amenity of the
surrounding area or inconsistent with the six qualities of successful places, will not be
supported.
The proposal fits the “THE 6 QUALITIES OFSUCESSFUL PLACE”
which underpins the essence of Policy 14, therefore must be
compliant. 
Page 14

Page 15

5 
NPF4 POLICY 17
RURAL HOMES
Local Development Plans:
LDPs should be informed by an understanding of population change over time, locally
specific needs and market circumstances in rural and island areas.
LDPs should set out tailored approaches to rural housing and where relevant include
proposals for future population growth – including provision for small-scale housing such as
crofts and woodland crofts and the appropriate resettlement of previously inhabited
areas. The Scottish Government’s 6 fold Urban Rural Classification 2020 should be used to
identify remote rural areas. Plans should reflect locally appropriate delivery approaches.
Previously inhabited areas that are suitable for resettlement should be identified in the
spatial strategy.
Policy 17
a) Development proposals for new homes in rural areas will be supported where the
development is suitably scaled, sited and designed to be in keeping with the character of
the area and the development:
i. is on a site allocated for housing within the LDP;
ii. reuses brownfield land where a return to a natural state has not or will not happen
without intervention;
iii. reuses a redundant or unused building;
iv. is an appropriate use of a historic environment asset or is appropriate enabling
development to secure the future of historic environment assets;
v. is demonstrated to be necessary to support the sustainable management of a viable
rural business or croft, and there is an essential need for a worker (including those taking
majority control of a farm business) to live permanently at or near their place of work;
vi. is for a single home for the retirement succession of a viable farm holding;
vii. is for the subdivision of an existing residential dwelling; the scale of which is in
keeping with the character and infrastructure provision in the area; or
viii. reinstates a former dwelling house or is a one-for-one replacement of an existing
permanent house.
b) Development proposals for new homes in rural areas will consider how the development
will contribute towards local living and take into account identified local housing needs
(including affordable housing), economic considerations and the transport needs of the
development as appropriate for the rural location.
c) Development proposals for new homes in remote rural areas will be supported where
the proposal:
i. supports and sustains existing fragile communities;
ii. supports identified local housing outcomes; and 
Page 15

Page 16

6 
Part 2 – National Planning Policy
National Planning Framework 4
66
iii. is suitable in terms of location, access, and environmental impact.
d) Development proposals for new homes that support the resettlement of previously
inhabited areas will be supported where the proposal:
i. is in an area identified in the LDP as suitable for resettlement;
ii. is designed to a high standard;
iii. responds to its rural location; and
iv. is designed to minimize greenhouse gas emissions as far as possible. 
Applicable policies from above.
a)i,ii, v, vi, 
b) 
c)I, ii, 
NPF4 66
ii, iii, and iv.  
And to underpin those policies the LDP 2 extract from above
“LDPs should set out tailored approaches to rural housing and
where relevant include proposals for future population growth
– including provision for small-scale housing such as crofts and
woodland crofts and the appropriate resettlement of
previously inhabited areas. The Scottish Government’s 6 fold
Urban Rural Classification 2020 should be used to identify
remote rural areas. Plans should reflect locally appropriate
delivery approaches. Previously inhabited areas that are
suitable for resettlement should be identified in the spatial
strategy.” 
Page 16

Page 17

7 
building design studio 
inveresregan house ardchattan argyll  PA37 1RG 
iain@inveresregan.co.uk 
07766394079 
9th April 2024
Page 17

Page 18

This page is intentionally left blank