FURTHER INFORMATION 
FOR 
ARGYLL AND BUTE COUNCIL 
LOCAL REVIEW BODY 
24/0002/LRB 
REFUSAL OF PLANNING PERMISSION 23/00825/PPP 
SITE FOR THE ERECTION OF A DWELLINGHOUSE 
LAND NORTH OF ROWAN BRAE, GLENCRUITTEN, OBAN 
25 MARCH 2024

Page 2

a) An assessment of the impact, if any, on the application and the Report of
Handling by LDP 2 
In terms of the adopted LDP2 the site is defined as ‘Outwith Settlement Areas’ within an
area identified as ‘Countryside Area' (CA) where Policy 02 of LDP2 gives a presumption
in favour of sustainable development but only where it is of an appropriate scale, design,
siting and use for its countryside location, as set out in the relevant sustainable siting
and design policies contained within LDP2. 
Policy 02 further states that certain development will be supported, generally without the
need for detailed environmental assessments, with these comprising, infill,
redevelopment opportunities of clusters; or previously developed sites. 
It is not considered that the development the subject of the review would accord with
any reasonable interpretation of ‘infill’ or ‘redevelopment of clusters’ (the word ‘cluster’ is
not specifically defined in the LDP2 written statement – this will be discussed in (b)
below but the LRB are advised that the proposal does not constitute a ‘redevelopment’
in any case). 
The proposed development, contrary to the assertions made by the appellant, is clearly
on a ‘greenfield’ site which has not been ‘previously developed’. 
This general support for development is caveated with the requirement to demonstrate
that there will be no unacceptable adverse effects (either individually or cumulatively) on
natural heritage resources, built and/or cultural heritage resources, and landscape and
visual amenity. 
This policy further states that, where there is preliminary evidence that there may be
such adverse effects (and where a formal environmental impact assessment is not
required), a landscape and visual impact assessment may be required. 
The key planning issues here are whether or not the proposed development accords
with the established settlement pattern and, irrespective of this, whether the proposed
development would cause material harm to the immediate and/or wider landscape. 
The sustainable siting and design policies within LDP2, namely, Policy 04, Sustainable
Development, Policy 05, Design and Placemaking, and Policy 08, Sustainable Siting
collectively seek that new development is considered holistically giving full consideration
to the surrounding environment including infrastructure and land uses with proposed
development taking into account the character of the area in terms of its settlement
pattern, layout and density. 
In light of the above, due to the concerns that the Planning Authority has with the site,
as set out in the Report of Handling, should the proposal have come forward and
considered under LDP2, the Planning Authority would have sought the completion of the
Sustainability Checklist and may have required the submission of a Visual Impact
Illustration demonstrating the impact that the proposed development would have on the
landscape. 
It is noted, however, that the appellant has now submitted a substantial amount of detail
seeking to justify the development in terms of its landscape impact, such that officers do
not consider that any further submission is necessary. 
Officers have carefully examined the new information submitted but remain of the
opinion that the development the subject of this review would conflict with NPF4 Policies

Page 3

9, 14 and 17, and Policies LDP STRAT 1, LDP DM 1, LDP 3, LDP 9, SG LDP ENV 14
and SG LDP HOU 1 of the Local Development Plan in force at the time of the original
decision. Having carried out a reassessment of the proposals under LDP2, officers
consider that the development is now contrary to LDP2 Policies 2, 4, 5 and 8 and
remains contrary to NPF4 Policies 9, 14 and 17. 
It is accepted that the appellant takes a different view. 
b) Clarification on the definition of clusters; how many houses constitute one
cluster; and if the proposed development is part of one cluster; or part of one
cluster amongst other clusters. 
Both the former LDP and the current LDP2 do not provide a definition of ‘clusters’. 
However, the Oxford English Dictionary defines a ‘cluster’ as: A number of persons,
animals or things gathered or situated close together. 
The assessment that the development pattern along the Connel Back Road, as set out
in the Report of Handling, comprises small clusters of development, some set alongside
the public road and others set back, broken up with area of open ground, is an officer
based assessment of the settlement pattern undertaken during the processing of the
application. 
The assessment that the site formed part of a ‘cluster’ was not based on any specific
number, but a landscape assessment by the officer who was of the opinion that the site
formed part of the existing cluster of development centred around the public road
junction to the south. 
In hindsight, it may perhaps have been clearer to simply rely upon the term ‘settlement
pattern’ in this regard. 
c) Model conditions and reasons that could accompany an approval of the
application should the Local Review Body be so minded. 
CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 23/00825/PPP 
Standard Time Limit Condition  (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions  
1. PPP – Matters Requiring AMSC Submission 
Plans and particulars of the matters specified in conditions 3, 4, 5, 6, 7 and 9 below
shall be submitted by way of application(s) for Approval of Matters Specified in
Conditions in accordance with the timescales and other limitations in Section 59 of
the Town and Country Planning (Scotland) Act 1997 as amended. Thereafter the
development shall be completed wholly in accordance with the approved details. 
Reason: To accord with Section 59 of the Town and Country Planning (Scotland) Act
1997 as amended. 
Note to Applicant

Page 4

Regard should be had to Scottish Waters consultation comments in relation to the
proposed development which are available to view via the Public Access section of
the Council’s website.  
2. PPP – Approved Details 
The development shall be implemented in accordance with the details specified on
the application form dated 24/04/23 and the approved drawings listed in the table
below. 
Plan Title. Plan Ref. No. Version Date
Received
Location and Site Plan  001 B 27/06/23 
Reason:  To accord with Regulation 28 of the Town and Country Planning
(Development Management Procedure) (Scotland) Regulations 2008.  
3. PPP – Timescale to be Agreed for Completion 
Pursuant to Condition 1 - no development shall commence until details of the
proposed timescale for completion of the approved development have been
submitted to and approved by the Planning Authority. Thereafter, the development
shall be implemented in accordance with the duly approved timescale for completion
unless an alternative timescale for completion is otherwise agreed in writing with the
Planning Authority. 
Reason: In order to comply with the requirements of NPF4 Policy 16F.  
4. PPP - Design and Finishes 
Pursuant to Condition 1 – no development shall commence until plans and
particulars of the site layout, design and external finishes of the development has
been submitted to and approved by the Planning Authority. These details shall
incorporate: 
i) A statement addressing the Action Checklist for developing design contained
within the Argyll and Bute Sustainable Design Guide 2006;
ii) A statement addressing how the proposed development has been designed
to be consistent with the six qualities of successful places, as defined within
Policy 14 of NPF4;
iii) Local vernacular design taking consideration of the guidance set out in the
approved Argyll and Bute Sustainable Design Guidance, 2006; 
iv) Maximum of one and a half storeys;
v) Windows with a vertical emphasis;
vi) Have a roof pitch between 37 and 42 degrees finished in natural slate or a
good quality artificial slate;
vii) Details of finished ground floor levels relative to an identifiable fixed datum
located outwith the application site along with details of the existing and
proposed site levels shown in the form of sectional drawings/contour
plans/site level survey, or a combination of these;
viii) Details of an area within the application site for the placement of
refuse/recycling bins.
ix) Details of the potential for the installation of a 7kw Electrical Vehicle Charging
Point within the site.

Page 5

Reason: To accord with Section 59 of the Town and Country Planning (Scotland) Act
1997 as amended, and in order to integrate the proposed dwellinghouse with its
surroundings.  
5. PPP – Roads, Access and Parking 
Pursuant to Condition 1 – no development shall commence until plans and
particulars of the means of vehicular access and parking/turning arrangements to
serve the development have been submitted to and approved by the Planning
Authority. Such details shall incorporate:   
i) Upgrade of the junction serving the development site in accordance with the
Council’s Roads Standard Detail Drawing SD 08/004a with visibility splays
measuring 2.4 metres to point X by 53 metres to point Y from the centre line
of the junction ; 
ii) The provision of a parking and turning area in accordance with the
requirements set out in the Car Parking Standards and Policy 40 of the
adopted ‘Argyll and Bute Local Development Plan 2’ 2024. 
Prior to work starting on site, the approved scheme of works in respect of junction
layout shall be formed to at least base course standard and the visibility splays shall
be cleared of all obstructions such that nothing shall disrupt visibility from a point
1.05 metres above the junction at point X to a point 0.6 metres above the public road
carriageway at point Y. The final wearing surface on the access shall be completed
prior to the development first being brought into use and the visibility splays shall be
maintained clear of all obstructions thereafter. 
The approved parking and turning layout shall be implemented in full prior to the
development first being occupied and shall thereafter be maintained clear of
obstruction for the parking and manoeuvring of vehicles. 
Reason: In the interests of road safety. 
Note to Applicant: 
• A Road Opening Permit under the Roads (Scotland) Act 1984 must be obtained
from the Council’s Roads Engineers prior to the formation/alteration of a junction
with the public road.
• No walls, fences, hedges etc. greater than 1 metre in height will be permitted
within 2 metres from the channel line of the public road. 
• The access shall be constructed and drained to ensure that no surface water is
discharged onto the public road.  
6. PPP – Details of New Private Foul Drainage System 
Pursuant to Condition 1 – no development shall commence until details of the
proposed means of private foul drainage to serve the development have been
submitted to and approved by the Planning Authority. 
The duly approved scheme shall be implemented in full concurrently with the
development that it is intended to serve and shall be operational prior to the
occupation of the development.

Page 6

Reason: To ensure that an adequate means of foul drainage is available to serve the
development. 
Note to Applicant: 
Private drainage arrangements are also subject to separate regulation by Building
Standards and SEPA.  
7. PPP – Private Water Supply 
Pursuant to Condition 1, no development shall commence until an appraisal of the
wholesomeness and sufficiency of the intended private water supply and the system
required to serve the development has been submitted to and approved by the
Planning Authority. 
The appraisal shall be carried out by a qualified hydrologist/hydrogeologist or other
suitably competent person and shall include a risk assessment having regard to the
requirements of Schedule 4 of the Private Water Supplies (Scotland) Regulations
2006 or Part 3 of the Water Intended for Human Consumption (Private Supplies)
(Scotland) Regulations 2017 (as appropriate) which shall inform the design of the
system by which a wholesome and sufficient water supply shall be provided and
maintained. 
The appraisal shall also demonstrate that the wholesomeness and sufficiency of any
other supply in the vicinity of the development, or any other person utilising the same
source or supply, shall not be compromised by the proposed development. 
The development shall not be brought into use or occupied until the required water
supply system has been installed in accordance with the agreed specification and is
operational. 
Reason: In the interests of public health and in order to ensure that an adequate
private water supply in terms of both wholesomeness and sufficiency can be
provided to meet the requirements of the proposed development and without
compromising the interests of other users of the same or nearby private water
supplies. 
Notes to Applicant 
1. Regulatory requirements for private water supplies should be discussed with the
Council’s Environmental Health Service in the first instance. 
2. If the development is likely to use 10m3 water per day then the applicant will need
to apply for a registration or licence for water abstraction from SEPA
https://www.sepa.org.uk/regulations/authorisations-and-permits/application-
forms/#Water. 
3. If the proposed development is a commercial undertaking including but not
limited to; use as a holiday or long term private let, workplace, food business,
campsite etc. then the applicant must apply to the Environmental Health service
8 weeks before the intended use date for the private water supply to be
registered and certified as fit for use. Email: pws@argyll-bute.gov.uk 
4. It is recommended that should planning permission be granted, that the applicant
contact this Service to discuss further the measures needed to comply with the

Page 7

requirements of Water Intended for Human Consumption (Private Supplies)
(Scotland) Regulations 2017 or the Private Water Supplies (Scotland)
Regulations 2006, as is applicable.  
8. PPP - Sustainable Drainage System 
Notwithstanding the provisions of Condition 1, the development shall incorporate a
surface water drainage system which is consistent with the principles of Sustainable
urban Drainage Systems (SuDS) compliant with the guidance set out in CIRIA’s
SuDS Manual C753 and Sewers for Scotland 4th Edition.  The requisite surface
water drainage shall be operational prior to the development being brought into use
and shall be maintained as such thereafter. 
Reason: To ensure the provision of an adequate surface water drainage system and
to prevent flooding.  
9. PPP - Landscaping and Biodiversity Enhancement 
Pursuant to Condition 1 – no development shall commence until a scheme of
boundary treatment, surface treatment and landscaping has been submitted to and
approved by the Planning Authority. The scheme shall comprise a planting plan and
schedule which shall include details of: 
i) Existing and proposed ground levels in relation to an identified fixed datum; 
ii) Existing landscaping features and vegetation to be retained; 
iii) Location design and materials of proposed walls, fences and gates; 
iv) Proposed soft and hard landscaping works including the location, species and
size of every tree/shrub to be planted; 
v) A biodiversity statement demonstrating how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these benefits
will be maintained for the lifetime of the development; 
vi) A programme for the timing, method of implementation, completion and
subsequent on-going maintenance. 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme unless otherwise approved in writing by the Planning Authority. 
Any trees/shrubs which within a period of five years from the completion of the
approved landscaping scheme fail to become established, die, become seriously
diseased, or are removed or damaged shall be replaced in the following planting
season with equivalent numbers, sizes and species as those originally required to be
planted unless otherwise approved in writing by the Planning Authority. 
All physical biodiversity enhancement measures (bird nesting boxes, ‘swift bricks’,
wildlife ponds, bat and insect boxes, hedgehog homes etc.) shall be implemented in
full before the development hereby approved is first brought into use. 
All biodiversity enhancement measures consisting of new or enhanced planting shall
be undertaken either in accordance with the approved scheme of implementation or
within the next available planting season following the development first being
brought into use. 
The biodiversity statement should refer to Developing with Nature guidance |
NatureScot as appropriate.

Page 8

Reason:  To assist with the integration of the proposal with its surroundings in the
interests of amenity.