MINUTES of MEETING of ARGYLL AND BUTE LOCAL REVIEW BODY held BY MICROSOFT
TEAMS 
on WEDNESDAY, 12 JUNE 2024 
Present: Councillor Kieron Green (Chair) 
Councillor John Armour  Councillor Jan Brown 
Attending:   
1. APOLOGIES FOR ABSENCE 
There were no apologies for absence. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. CONSIDER NOTICE OF REVIEW REQUEST: LAND NORTH OF
ROWANBRAE, GLENCRUITTEN, OBAN (REF: 24/0002/LRB) 
The Chair, Councillor Kieron Green, welcomed everyone to the meeting.  He explained
that no person present would be entitled to speak other than the Members of the Local
Review Body (LRB) and Mr Logan, who would provide procedural advice if required. 
He advised that his first task would be to establish if the Members of the LRB felt that they
had sufficient information before them to come to a decision on the Review. 
Both Councillors Armour and Brown confirmed that they had sufficient information before
them to come to a decision on the Review. 
The Chair advised that at the last meeting the decision of the LRB had been to continue
consideration of the Review allow for an opportunity to seek to prepare a competent
Motion to justify approval of planning permission in principle. 
The Chair moved the following Motion – 
This LRB considers that the proposed outline permission being sought is of a suitable
scale, design and use for a countryside location as required by LDP Policy 2. Further, in
accordance with LDP Policy 4 the proposal respects the landscape character of the area,
and following LDP Policy 5, the siting respects the topography of the area. As set out in
LDP Policy 8 this is away from a hilltop, skyline or ridge, and has very limited visibility from
the public road. The settlement pattern of the surroundings is also of relevance to the
same policy, and is of small cluster of houses, generally well screened, which it is
considered this proposal largely follows by being in the vicinity of existing development.  
It is acknowledged that LDP Policy 5 and NPF Policy 9 encourage the reuse of previously
developed land, and more specifically that NPF policy 9(b) does not support development
on greenfield sites such as this, unless explicitly supported by policies in the LDP. This
LRB notes the housing pressures in the Oban area, as set out in the Housing Needs and
Demands Assessment, and that paragraph 3.11 on page 14 of the LDP mentions that

Page 2

Oban itself is “increasingly physically constrained, nearing its natural topographic capacity
for growth and development”. It is therefore considered that there is a shortage of
previously developed brownfield land suitable for redevelopment, leading to greenfield
sites such as this being suitable alternatives to meet demand locally. It is of relevance that
NPF Policy 17c states that “proposals for new homes in remote rural areas will be
supported where the proposal…supports identified local housing outcomes”  
The LRB therefore considers that the proposal meets the requirements of all local and
national policies, including LDP2 policies , 4, 5 and 8, and NPF policies 4, 9 and 17, and
agrees to grant outline planning permission, subject to the conditions appended:- 
CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO.
23/00825/PPP 
Standard Time Limit Condition  (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions  
1. PPP – Matters Requiring AMSC Submission 
Plans and particulars of the matters specified in conditions 3, 4, 5, 6, 7 and 9
below shall be submitted by way of application(s) for Approval of Matters
Specified in Conditions in accordance with the timescales and other
limitations in Section 59 of the Town and Country Planning (Scotland) Act
1997 as amended. Thereafter the development shall be completed wholly in
accordance with the approved details. 
Reason: To accord with Section 59 of the Town and Country Planning
(Scotland) Act 1997 as amended. 
Note to Applicant 
Regard should be had to Scottish Waters consultation comments in relation to
the proposed development which are available to view via the Public Access
section of the Council’s website.  
2. PPP – Approved Details 
The development shall be implemented in accordance with the details
specified on the application form dated 24/04/23 and the approved drawings
listed in the table below. 
Plan Title. Plan Ref.
No.
Version Date
Received
Location and Site Plan  001 B 27/06/23 
Reason:  To accord with Regulation 28 of the Town and Country Planning
(Development Management Procedure) (Scotland) Regulations 2008.  
3. PPP – Timescale to be Agreed for Completion

Page 3

Pursuant to Condition 1 - no development shall commence until details of the
proposed timescale for completion of the approved development have been
submitted to and approved by the Planning Authority. Thereafter, the
development shall be implemented in accordance with the duly approved
timescale for completion unless an alternative timescale for completion is
otherwise agreed in writing with the Planning Authority. 
Reason: In order to comply with the requirements of NPF4 Policy 16F.  
4. PPP - Design and Finishes 
Pursuant to Condition 1 – no development shall commence until plans and
particulars of the site layout, design and external finishes of the development
has been submitted to and approved by the Planning Authority. These details
shall incorporate: 
i) A statement addressing the Action Checklist for developing design
contained within the Argyll and Bute Sustainable Design Guide 2006;
ii) A statement addressing how the proposed development has been
designed to be consistent with the six qualities of successful places, as
defined within Policy 14 of NPF4;
iii) Local vernacular design taking consideration of the guidance set out in
the approved Argyll and Bute Sustainable Design Guidance, 2006; 
iv) Maximum of one and a half storeys;
v) Windows with a vertical emphasis;
vi) Have a roof pitch between 37 and 42 degrees finished in natural slate
or a good quality artificial slate;
vii) Details of finished ground floor levels relative to an identifiable fixed
datum located outwith the application site along with details of the
existing and proposed site levels shown in the form of sectional
drawings/contour plans/site level survey, or a combination of these;
viii)Details of an area within the application site for the placement of
refuse/recycling bins.
ix) Details of the potential for the installation of a 7kw Electrical Vehicle
Charging Point within the site. 
Reason: To accord with Section 59 of the Town and Country Planning
(Scotland) Act 1997 as amended, and in order to integrate the proposed
dwellinghouse with its surroundings.  
5. PPP – Roads, Access and Parking 
Pursuant to Condition 1 – no development shall commence until plans and
particulars of the means of vehicular access and parking/turning
arrangements to serve the development have been submitted to and
approved by the Planning Authority. Such details shall incorporate:   
i) Upgrade of the junction serving the development site in accordance
with the Council’s Roads Standard Detail Drawing SD 08/004a with
visibility splays measuring 2.4 metres to point X by 53 metres to point
Y from the centre line of the junction ;

Page 4

ii) The provision of a parking and turning area in accordance with the
requirements set out in the Car Parking Standards and Policy 40 of the
adopted ‘Argyll and Bute Local Development Plan 2’ 2024. 
Prior to work starting on site, the approved scheme of works in respect of
junction layout shall be formed to at least base course standard and the
visibility splays shall be cleared of all obstructions such that nothing shall
disrupt visibility from a point 1.05 metres above the junction at point X to a
point 0.6 metres above the public road carriageway at point Y. The final
wearing surface on the access shall be completed prior to the development
first being brought into use and the visibility splays shall be maintained clear
of all obstructions thereafter. 
The approved parking and turning layout shall be implemented in full prior to
the development first being occupied and shall thereafter be maintained clear
of obstruction for the parking and manoeuvring of vehicles. 
Reason: In the interests of road safety. 
Note to Applicant: 
• A Road Opening Permit under the Roads (Scotland) Act 1984 must be
obtained from the Council’s Roads Engineers prior to the
formation/alteration of a junction with the public road.
• No walls, fences, hedges etc. greater than 1 metre in height will be
permitted within 2 metres from the channel line of the public road. 
• The access shall be constructed and drained to ensure that no surface
water is discharged onto the public road.  
6. PPP – Details of New Private Foul Drainage System 
Pursuant to Condition 1 – no development shall commence until details of the
proposed means of private foul drainage to serve the development have been
submitted to and approved by the Planning Authority. 
The duly approved scheme shall be implemented in full concurrently with the
development that it is intended to serve and shall be operational prior to the
occupation of the development. 
Reason: To ensure that an adequate means of foul drainage is available to
serve the development. 
Note to Applicant: 
Private drainage arrangements are also subject to separate regulation by
Building Standards and SEPA.  
7. PPP – Private Water Supply 
Pursuant to Condition 1, no development shall commence until an appraisal
of the wholesomeness and sufficiency of the intended private water supply
and the system required to serve the development has been submitted to and
approved by the Planning Authority.

Page 5

The appraisal shall be carried out by a qualified hydrologist/hydrogeologist or
other suitably competent person and shall include a risk assessment having
regard to the requirements of Schedule 4 of the Private Water Supplies
(Scotland) Regulations 2006 or Part 3 of the Water Intended for Human
Consumption (Private Supplies) (Scotland) Regulations 2017 (as appropriate)
which shall inform the design of the system by which a wholesome and
sufficient water supply shall be provided and maintained. 
The appraisal shall also demonstrate that the wholesomeness and sufficiency
of any other supply in the vicinity of the development, or any other person
utilising the same source or supply, shall not be compromised by the
proposed development. 
The development shall not be brought into use or occupied until the required
water supply system has been installed in accordance with the agreed
specification and is operational. 
Reason: In the interests of public health and in order to ensure that an
adequate private water supply in terms of both wholesomeness and
sufficiency can be provided to meet the requirements of the proposed
development and without compromising the interests of other users of the
same or nearby private water supplies. 
Notes to Applicant 
1. Regulatory requirements for private water supplies should be discussed
with the Council’s Environmental Health Service in the first instance. 
2. If the development is likely to use 10m3 water per day then the applicant
will need to apply for a registration or licence for water abstraction from
SEPA https://www.sepa.org.uk/regulations/authorisations-and-
permits/application-forms/#Water. 
3. If the proposed development is a commercial undertaking including but not
limited to; use as a holiday or long term private let, workplace, food
business, campsite etc. then the applicant must apply to the
Environmental Health service 8 weeks before the intended use date for
the private water supply to be registered and certified as fit for use. Email:
pws@argyll-bute.gov.uk 
4. It is recommended that should planning permission be granted, that the
applicant contact this Service to discuss further the measures needed to
comply with the requirements of Water Intended for Human Consumption
(Private Supplies) (Scotland) Regulations 2017 or the Private Water
Supplies (Scotland) Regulations 2006, as is applicable.  
8. PPP - Sustainable Drainage System 
Notwithstanding the provisions of Condition 1, the development shall
incorporate a surface water drainage system which is consistent with the
principles of Sustainable urban Drainage Systems (SuDS) compliant with the
guidance set out in CIRIA’s SuDS Manual C753 and Sewers for Scotland 4th

Page 6

Edition.  The requisite surface water drainage shall be operational prior to the
development being brought into use and shall be maintained as such
thereafter. 
Reason: To ensure the provision of an adequate surface water drainage
system and to prevent flooding.  
9. PPP - Landscaping and Biodiversity Enhancement 
Pursuant to Condition 1 – no development shall commence until a scheme of
boundary treatment, surface treatment and landscaping has been submitted
to and approved by the Planning Authority. The scheme shall comprise a
planting plan and schedule which shall include details of: 
i) Existing and proposed ground levels in relation to an identified fixed
datum; 
ii) Existing landscaping features and vegetation to be retained; 
iii) Location design and materials of proposed walls, fences and gates; 
iv) Proposed soft and hard landscaping works including the location,
species and size of every tree/shrub to be planted; 
v) A biodiversity statement demonstrating how the proposal will contribute
to conservation/restoration/enhancement of biodiversity, and how these
benefits will be maintained for the lifetime of the development; 
vi) A programme for the timing, method of implementation, completion and
subsequent on-going maintenance. 
All of the hard and soft landscaping works shall be carried out in accordance
with the approved scheme unless otherwise approved in writing by the
Planning Authority. 
Any trees/shrubs which within a period of five years from the completion of
the approved landscaping scheme fail to become established, die, become
seriously diseased, or are removed or damaged shall be replaced in the
following planting season with equivalent numbers, sizes and species as
those originally required to be planted unless otherwise approved in writing by
the Planning Authority. 
All physical biodiversity enhancement measures (bird nesting boxes, ‘swift
bricks’, wildlife ponds, bat and insect boxes, hedgehog homes etc.) shall be
implemented in full before the development hereby approved is first brought
into use. 
All biodiversity enhancement measures consisting of new or enhanced
planting shall be undertaken either in accordance with the approved scheme
of implementation or within the next available planting season following the
development first being brought into use. 
The biodiversity statement should refer to Developing with Nature guidance |
NatureScot as appropriate. 
Reason:  To assist with the integration of the proposal with its surroundings in
the interests of amenity.

Page 7

Decision 
The Argyll and Bute Local Review Body, having considered the merits of the case de
novo, unanimously agreed to uphold the request for review and to grant planning
permission in principle as per the above Motion. 
(Reference: Notice of Motion by Councillor Kieron Green, tabled)