Argyll and Bute Council
Development and Economic Growth 
PROPOSAL OF APPLICATION NOTICE (PAN)
_________________________________________________________________________
Reference: 26/00366/PAN
Applicant: Scottish Hydro Electric Transmission Plc (SSEN Transmission)
Proposal: Development of electricity substation on a new site to replace the existing
Ardnadam substation. 
Site Address: Dunoon Electricity Sub Station, High Road, Sandbank, Dunoon 
INTRODUCTION
Proposal of Application Notices only relate to National and Major Application, as defined by
the Government’s planning hierarchy, and are a statutory requirement prior to the
submission of a further associated planning application, in line with the provisions of the
Planning etc (Scotland) Act 2006. 
The PAN submission marks the start of a minimum 12-week period to allow for community
consultation before an application can be lodged. This PAN submission was made valid on
05 March 2026.Therefore, the earliest date an application could be lodged is 28 May 2026.
In considering this item, Members should restrict comments to issues relating to the material
considerations which may be relevant in the determination of the proposed development in
advance of any subsequent application being presented for determination.
Any opinions or views expressed by Councillors at the pre-application stage must be mindful
of the overarching requirements of fairness, impartiality and of keeping an open mind. The
process provides opportunity for Officers to give feedback to the prospective applicant on
issues which Members would wish to see addressed within the planning application
submission.
The submitted information includes:
• Proposal of Application Notice
• Location Plan 
• Copy of newspaper adverts
The applicant has confirmed the following consultation steps have been undertaken:
Copies of the PAN and supporting information were issued on 19 February to the following
parties: - 
Community Councils
Dunoon Community Council

Page 2

Hunters Quay Community Council 
Community Organisations
Sandbank Community Development Trust
Scenic Sandbank 
Council Leader
Councillor Jim Lynch
Ward Councillors
Councillor Audrey E. Forest
Councillor Daniel Hampsey
Councillor Ross Moreland 
Officer comment:  The site lies within the Cowal Ward area.  However, the Councillors
noted above represent the Dunoon Ward which is located to the south of the site.  The
applicant has been advised of this and officers have requested that Cowal Ward councillors
are included in any further communications, namely: 
Councillor Gordon Blair
Councillor Yvonne McNeilly
Councillor William Sinclair. 
MSP
Jenni Minto 
MP
Brendan O’Hara 
In addition, the following consultation steps are proposed to be undertaken:
Two in-person public consultation events 
17 March 2026 (14:00 – 19:00) – Dunoon Burgh Hall, 195 Argyll Street, Dunoon PA23 7DD
25 August 2026 (14:00 – 19:00) – Dunoon Burgh Hall, 195 Argyll Street, Dunoon, PA23 7DD
Newspaper advert in respect of these events were placed in the Dunoon Observer on 27
February and 06 March in respect of the first event and 07 and 14 August in respect of the
second event. 
The proposed site falls within the Sandbank Community Council area. However, the
Council’s Democratic Services team have confirmed that this Community Council is currently
inactive. The applicant has therefore contacted other community-based organisations in
relation to the PAN including the Sandbank Community Development Trust and Scenic
Sandbank.  
Officers consider that the steps set out in the PAN are acceptable and in accordance with
the requirements of the Regulations to ensure appropriate community consultation is
undertaken.

Page 3

DESCRIPTION OF PROPOSED DEVELOPMENT
Proposed construction and operation of a new 132/33kV Grid Supply Point electricity
substation on a new site to the east of A885 High Road, this replacing the existing Ardnadam
Substation which would be decommissioned on completion on the new facility. 
The proposed development would comprise platform and buildings, associated infrastructure
including new vehicular access to the A885, parking, landscaping, boundary treatments,
screening and SuDS. Indicative locations of temporary construction laydown areas are also
identified. 
A Cable Sealing End Connection would be developed on land adjacent to the existing
Ardnadam Substation, this connecting new substation via an underground cable. 
A site selection process has been undertaken which considered environmental, cost and
engineering factors.
SITE DESCRIPTION
The proposal site (9.5 hectares) lies to the west and south east of the villages of Sandbank
and Ardnadam, Cowal, approximately 2.5 km to the north west of Dunoon.
The site comprises two distinct parts – these linked by the A885, High Road, which is also
included as part the red line boundary.
Western part of the site
This part of the site (3.05 ha) lies to the west of Sandbank and Ardnadam villages, being
situated on sloping land above the settlement area. Land levels rise steeply to the west.
This location forms the existing Ardnadam Substation which is served by a vehicular access
track from the A885. The site boundary also includes rough grazing land to the north west of
substation. Land immediately to the south west forms the site of the proposed Dunoon Grid
Battery Energy Storage Facility (Reference 22/01788/PP).
Various residential properties lie immediately outwith the site to the north west. The southern
edges of the site are defined by Ancient Woodland (of semi natural origin).  
The LDP2 designates this land as Countryside Zone. 
Southern part of the site
This part of the site (5.29 hectares) lies to north east of the existing junction with the A885
High Road and Ferry Road.
This location is identified for the proposed new substation including temporary construction
laydown areas. The land is currently undeveloped, comprising open, rough grassland with
land levels rising towards the northern edges. 
LDP 2 identifies this land as a Strategic Economic Investment Location for industry, business
and storage (Allocated Business Site BI-AL-2/2). These are key locations to promote HIE
Priority Sectors to be safeguarded from inappropriate uses.

Page 4

The Sandbank Business Park, which comprises a range of established business, a former
Travelling Person Site which is now in business use, the Cowal Cemetery and Sandbank
Primary School, are situated to the north east of the site. An area of woodland (referred to as
the Brenvaar Strip) and Allocated Business Site (LDP2 reference BI-AL-2/1) are located
immediately to the north east. Loch Loskin lies approximately 300 metres to the south.
The immediate context of the site is characterised by its woodland setting. This includes long
established woodland (of plantation origin) to the south and east, which is also covered by a
Tree Preservation Order. 
Woodland also provides screening to much of the urban development in the locality of the
site including the business park, some residential properties and the Hunters Quay holiday
park is situated with woodland approximately 200 metres to the east of the site. 
A885/ High Road
The site includes the extents of the A885 for 775 metres, this linking the access track to the
existing Ardnadam Substation to the proposed substation site.  
This route is bounded open grassland and woodland, the Sandbank Primary School and
Sandbank Business Park, with the suburban development of Sandbank Ardnadam village
lying to the north. 
DEVELOPMENT PLAN POLICY
This is not a planning application and therefore does not require assessment and
determination in accordance with Section 25 of the Planning Act against the Development
Plan and its policies. However, in considering the merits of this PAN, a number of
Development Plan Policy considerations are relevant
National Planning Framework 4 (Adopted 2023) 
Policy 1 – Tackling the climate and nature crises
Policy 2 – Climate mitigation and adaptation
Policy 3 – Biodiversity
Policy 4 – Natural Places
Policy 5 – Soils
Policy 6 – Forestry, woodland and trees
Policy 7 – Energy
Policy 14 – Design, quality and place
Policy 19 – Heat and cooling
Policy 20 – Blue Green infrastructure
Policy 22 – Flood risk and water management
Policy 23 – Health and Safety
Policy 26 – Business and industry
Policy 29 – Rural development 
Argyll & Bute Local Development Plan 2 (Adopted 2024)
Policy 01 – Settlement Areas

Page 5

Policy 04 – Sustainable Development
Policy 05 – Design and Placemaking
Policy 06 – Green and Blue Infrastructure
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 22 – Economic Development
Policy 30 – The Sustainable Growth of Renewables
Policy 55 – Flooding 
Policy 61 – Sustainable Drainage Systems (SUDS)
Policy 62 – Drainage Impact Assessments
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 77 – Forestry, Woodland and Trees 
Other Relevant Policy Considerations
ABC Technical Note – Biodiversity (Feb 2017)
TN06 Sustainability Technical Note and Checklist (Oct 2023)
TN07 Sustainable Buildings Technical Note and Checklist (Oct 2023)
ABC Landscape Studies
ABC Economic Development Action Plan 
POTENTIAL MATERIAL CONSIDERATIONS
It is considered that the following matters would be material considerations in the
determination of any future application: - 
• Principle of development, acceptability of proposed use on land restricted to business
and industrial enterprises (Use Classes 4, 5, 6 and other sui generis industrial or
business type uses)
• Principle of development, NPF4 identifies infrastructure directly supporting on and
offshore high voltage electricity lines including substations as national development
• Potential impacts to woodland, trees
• Potential impact to biodiversity and protected species
• Site layout including location, design and appearance of structures and transmission
equipment, temporary construction laydown areas 
• Landscape design and visual mitigation including response to local landscape
character, design of site edges and boundary treatments
• Noise impacts including amenity of neighbouring residential uses
• Vehicular access and parking
• Views of statutory consultees in respect of any formal planning application
• Any other material consideration raised in representations 
CONCLUSION
This report sets out information submitted to date as part of the PAN. Summarised are the
policy considerations, against which any future planning application will be considered as
well as potential material considerations and key issues based upon the information received

Page 6

to date. The list is not exhaustive, and further matters may arise as and when a planning
application is received and in light of public representations and consultation responses.
RECOMMENDATION
That Members note the content of the report and submissions and provide such feedback as
they consider appropriate in respect of this PAN to allow these matters to be considered by
the applicant in finalising any future planning application submission. 
Author of Report:  Francis Newton  Date: 30 March 2026
Reviewing Officer:  Sandra Davies  Date: 07 April 2026 
Fergus Murray
Head of Development and Economic Growth