Democracy Spraffa

Agenda reports pack

Argyll and Bute Council · 23 August 2024
Back to Argyll and Bute Local Review Body — 23 August 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council 
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD
16 August 2024 
NOTICE OF MEETING 
A meeting of the ARGYLL AND BUTE LOCAL REVIEW BODY will be held BY MICROSOFT
TEAMS on FRIDAY, 23 AUGUST 2024 at 10:00 AM, which you are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. CONSIDER NOTICE OF REVIEW REQUEST: LAND EAST OF TALIESIN WEST,
GARELOCHHEAD (REF:  24/0008/LRB) 
(a) Notice of Review and Supporting Documentation (Pages 3 - 58)  
(b) Comments from Interested Parties (Pages 59 - 96)  
(c) Comments from Applicant (Pages 97 - 100) 
Argyll and Bute Local Review Body 
Councillor Gordon Blair (Chair) Councillor Jan Brown
Councillor Andrew Kain   
Contact: Lynsey Innis, Senior Committee Assistant  Tel:  01546 604338
Public Document Pack

Page 2

This page is intentionally left blank

Page 3

Page 1 of 5
Central Validation Team at Argyll and Bute Council 1A Manse Brae Lochgilphead PA31 8RD  Tel: 01546 605518  Email:
planning.hq@argyll-bute.gov.uk
Applications cannot be validated until all the necessary documentation has been submitted and the required fee has been paid.
Thank you for completing this application form:
ONLINE REFERENCE 100668808-001
The online reference is the unique reference for your online form only. The  Planning Authority will allocate an Application Number when
your form is validated. Please quote this reference if you need to contact the planning Authority about this application.
Applicant or Agent Details
Are you an applicant or an agent? * (An agent is an architect, consultant or someone else acting
on behalf of the applicant in connection with this application)  Applicant  Agent
Agent Details
Please enter Agent details
Company/Organisation:
Ref. Number: You must enter a Building Name or Number, or both: *
First Name: * Building Name:
Last Name: * Building Number:
Address 1
Telephone Number: * (Street): *
Extension Number: Address 2:
Mobile Number: Town/City: *
Fax Number: Country: *
Postcode: *
Email Address: *
Is the applicant an individual or an organisation/corporate entity? *
  Individual    Organisation/Corporate entity
MH Planning Associates
Michael
Hyde
West Princes Street
63
G84 8BN
Scotland
Helensburgh
mh@mhplanning.co.uk
Page 3 Agenda Item 3a

Page 4

Page 2 of 5
Applicant Details
Please enter Applicant details
Title: You must enter a Building Name or Number, or both: *
Other Title: Building Name:
First Name: * Building Number:
Address 1
Last Name: * (Street): *
Company/Organisation Address 2:
Telephone Number: * Town/City: *
Extension Number: Country: *
Mobile Number: Postcode: *
Fax Number:
Email Address: *
Site Address Details
Planning Authority:
Full postal address of the site (including postcode where available):
Address 1:
Address 2:
Address 3:
Address 4:
Address 5:
Town/City/Settlement:
Post Code:
Please identify/describe the location of the site or sites
Northing Easting
Mr
Lorne
Argyll and Bute Council
Thomson Suffolk Street
31
G84 9QZ
Land East of Taliesin West, Garelochhead, Argyll And Bute
Scotland
Helensburgh
Page 4

Page 5

Page 3 of 5
Description of Proposal
Please provide a description of your proposal to which your review relates. The description should be the same as given in the
application form, or as amended with the agreement of the planning authority: *
(Max 500 characters)
Type of Application
What type of application did you submit to the planning authority? *
  Application for planning permission (including householder application but excluding application to work minerals).
  Application for planning permission in principle.
  Further application.
  Application for approval of matters specified in conditions.
What does your review relate to? *
  Refusal Notice.
 Grant of permission with Conditions imposed.
  No decision reached within the prescribed period (two months after validation date or any agreed extension) – deemed refusal.
Statement of reasons for seeking review
You must state in full, why you are a seeking a review of the planning authority’s decision (or failure to make a decision). Your statement
must set out all matters you consider require  to be taken into account in determining your review. If necessary this can be provided as a
separate document in the ‘Supporting Documents’ section: *  (Max 500 characters)
Note: you are unlikely to have a further opportunity to add to your statement of appeal at a later date, so it is essential that you produce
all of the information you want the decision-maker to take into account.
You should not however raise any new matter which was not before the planning authority at the time it decided your application (or at
the time expiry of the period of determination), unless you can demonstrate that the new matter could not have been raised before that
time or that it not being raised before that time is a consequence of exceptional circumstances.
Have you raised any matters which were not before the appointed officer  at the time the  Yes   No
Determination on your application was made? *
If yes, you should explain in the box below, why you are raising the new matter, why it was not raised with the appointed officer before
your application was determined and why you consider it should be considered in your review: * (Max 500 characters)
Erection of Dwellinghouse and Public Realm Enhancements
See Grounds for Review
Page 5

Page 6

Page 4 of 5
Please provide a list of all supporting documents, materials and evidence which you wish to submit with your notice of review and intend
to rely on in support of your review. You can attach these documents electronically later in the process: * (Max 500 characters)
Application Details
Please provide the application reference no. given to you by your planning
authority for your previous application.
What date was the application submitted to the planning authority? *
What date was the decision issued by the planning authority? *
Review Procedure
The Local Review Body will decide on the procedure to be used to determine your review and may at any time during the review
process require that further information or representations be made to enable them to determine the review. Further information may be
required by one or a combination of procedures, such as: written submissions; the holding of one or more hearing sessions and/or
inspecting the land which is the subject of the review case.
Can this review continue to a conclusion, in your opinion, based on a review of the relevant information provided by yourself and other
parties only,  without any further procedures? For example, written submission, hearing session, site inspection. *
 Yes   No
Please indicate what procedure (or combination of procedures) you think is most appropriate for the handling of your review. You may
select more than one option if you wish the review to be a combination of procedures.
Please select a further procedure *
Please explain in detail in your own words why this further procedure is required and the matters set out in your statement of appeal it
will deal with?  (Max 500 characters)
In the event that the Local Review Body appointed to consider your application decides to inspect the site, in your opinion:
Can the site be clearly seen from a road or public land? *  Yes   No
Is it possible for the site to be accessed safely and without barriers to entry? *  Yes    No
If there are reasons why you think the local Review Body would be unable to undertake an unaccompanied site inspection, please
explain here.  (Max 500 characters)
Grounds for Review and Supporting Documents 1-5
20/01822/PPP
12/03/2024
By means of inspection of the land to which the review relates
05/10/2020
In order to fully appreciate the signifcance of the public benefits proposed by the applicant
Page 6

Page 7

Page 5 of 5
Checklist – Application for Notice of Review
Please complete the following checklist to make sure  you have provided all the necessary information in support of your appeal. Failure
to submit all this  information may result in your appeal  being deemed invalid.
Have you provided the name and address of the applicant?.  *  Yes   No
Have you provided the date and reference number of the application which is the subject of this  Yes   No
review? *
If you are the agent, acting on behalf of the applicant, have you provided details of your name  Yes   No   N/A
and address and indicated whether any notice or correspondence required in connection with the
review should be sent to you or the applicant? *
Have you provided a statement setting out your reasons for requiring a review and by what  Yes   No
procedure (or combination of procedures) you wish the review to be conducted? *
Note: You must state, in full, why you are seeking a review on your application. Your statement must set out all matters you consider
require to be taken into account in determining your review. You may not have a further opportunity to add to your statement of review
at a later date. It is therefore essential that you submit with your notice of review, all necessary information and evidence that you rely
on and wish the Local Review Body to consider as part of your review.
Please attach a copy of all documents, material and evidence which you intend to rely on  Yes   No
(e.g. plans and Drawings) which are now the subject of this review *
Note: Where the review relates to a further application e.g. renewal of planning permission or modification, variation or removal of a
planning condition or where it relates to an application for approval of matters specified in conditions, it is advisable to provide the
application reference number, approved plans and decision notice (if any) from the earlier consent.
Declare – Notice of Review
I/We the applicant/agent certify that this is an application for review on the grounds stated.
Declaration Name: Mr Michael Hyde
Declaration Date: 18/04/2024
Page 7

Page 8

This page is intentionally left blank

Page 9

REQUEST FOR REVIEW IN RESPECT OF THE
REFUSAL OF AN APPLICATION FOR
PLANNING PERMISSION IN PRINCIPLE
FOR THE ERECTION OF A SINGLE
DWELLINGHOUSE, LAND WEST OF
MCAULAY BURN, GARELOCHHEAD (LPA
REFERENCE 20/01822/PPP) 
GROUNDS FOR REVIEW 
Submitted on behalf of Mr Lorne Thomson 
Page 9

Page 10

Page | 1                            Prepared by Michael Hyde MRTPI Planning Consultant
REQUEST FOR REVIEW IN RESPECT OF THE REFUSAL OF AN APPLICATION FOR
PLANNING PERMISSION IN PRINCIPLE FOR THE ERECTION OF A SINGLE
DWELLINGHOUSE, LAND WEST OF MCAULAY BURN, GARELOCHHEAD (LPA
REFERENCE 20/01822/PPP) 
GROUNDS FOR REVIEW 
1. Background: 
1.1 The site the subject of the current application extends to 2.16 ha of open
land to the east and south of the B833 at Garelochhead.  It is wholly within
the settlement boundary as defined in the recently adopted Local
Development Plan 2 (LDP2). 
1.2 The application site is not designated on the basis of its landscape or
nature conservation value.  It is however now designated as an Open
Space Protection Area (OSPA) (Figure 1). 
Figure 1:  Extract from Local Development Plan 2 
1.3 At the date of the submission of the review application (October 2020)
the OSPA designation was not in force.  The site was however within an
Area for Action (AFA 3/7).  Areas for Action are areas which, subject to
resource availability during the plan-period, would be the focus for
Page 10

Page 11

Page | 2                            Prepared by Michael Hyde MRTPI Planning Consultant
partnership or community action.  In the Council’s Action Programme
published in April 2015, which was in place when the review application
was submitted, with respect to AFA 3/7 this stated that the nature of the
actions proposed were: 
1.  To consider options to effectively manage and visually enhance this
important recreation and open space area within the village; and
2.  That this may include consideration of options for low-key
recreational development links to access provision. 
1.4 It was for this reason that the applicant proposed, as a fundamental part
of his application for planning permission, a proposal to landscape and
manage the remainder of his land for the long term benefit of the local
community. 
1.5 The McAulay Burn passes through the application site, and discharges into
the Gare Loch to the south.  Because of this, part of the application site is
subject to both coastal and river flooding, as indicated on the SEPA Flood
Map. 
1.6 A previous application for the erection of a dwelling on the application
site was submitted in April 2020 (LPA reference 20/00703/PPP).  This
application was subsequently withdrawn, on the advice of the Council, in
order that an appropriate mechanism for implementing the public realm
enhancements could be secured.  The clear inference was that, once this
had been done, planning permission in principle would be able to be
granted. 
1.7 Prior to the submission of that application a pre-application enquiry was
submitted (LPA reference 19/02493/PREAPP).  The response dated 28
November 2019 stated under the heading “Impact upon the Area for
Action designation AFA 3/7 Garelochhead Local” (Document 1): 
“This outlines that Councils strategy for this site which is to enhance
recreation and open space.  The erection of a house in this location
is contrary to this strategy.  In considering whether the house could
be supported as a minor departure from the development plan
other material considerations are required to be examined to
establish if these could outweigh policy in this instance.  It is my view
that there is significant community benefit by way of upgrading of
footpaths, new public realm areas and the new memorial.  I place
significant weight on these considerations and consider the
proposal subject to a full planning assessment, acceptable.” 
Page 11

Page 12

Page | 3                            Prepared by Michael Hyde MRTPI Planning Consultant
1.8 A follow-up pre-application response was received on 29 January 2020
(LPA reference 20/00106/PREAPP) (Document 2).  This referenced the
proposed designation of the application site as part of a larger Open
Space Protection Area (OSPA) and stated that the application site is
considered to have value for recreation, visual function and relaxation. 
The applicant was advised to submit evidence to demonstrate that there
would be no detrimental impact upon the OSPA, or loss to the local
community.  The response concluded by stating that: 
“If this evidence demonstrates no detrimental impact upon the
OSPA, or loss to the local community, I would be willing to consider
it as a minor departure from Policy”. 
1.9 The review application was submitted on 5 October 2020. 
Notwithstanding the initial confirmation that the application proposal
would be able to be supported in principle, as a minor departure from
policy, the application (after being with the Council for over 3 years) was
ultimately refused on 12 March 2024 for the following three reasons
(Document 3): 
1.  The indicative siting would occupy greenfield land within the
settlement boundary and create a net loss and fragmentation of
green space and identified open space, with consequential
harmful impacts on character and amenity within Garelochhead. 
This would be unacceptable and contrary to Policies of 01, 09, 14,
16, 20 and 21 of NPF4, and Policies 04, 05, 06, 26 and 81 of LDP2. 
There would be modest benefits to the community arising from
proposed enhancements, but there would not be a clear
mechanism for their delivery and maintenance and in any regard, it
is considered that the benefits would not outweigh the harmful
impacts identified.  The benefit of the provision of one additional
family home would not be sufficient to outweigh the identified
harm. 
2.  By reason of its isolated position, the development would be starkly
and incongruously situated, and thus poorly integrated into the
established settlement pattern.  The harmful effect of this would be
magnified by the prominence of the siting at the top of a slope and
its proposed site area which cuts across the open space.  For these
reasons the siting would be unacceptable and contrary to NPF4
Policy 14, and LDP2 Policies 01, 04, 05, 08 and 10.  These concerns
could not be reasonably overcome through reserved matters
considerations or details to be secured through conditions, and the
Page 12

Page 13

Page | 4                            Prepared by Michael Hyde MRTPI Planning Consultant
benefits of the proposal would not be sufficient to overcome the
harmful impacts identified. 
3.  No ecological survey has been provided.  The application has not
demonstrated potential impacts on species and biodiversity, and
how any such impacts would be avoided or mitigated.  This is
unacceptable further to Policies 01, 03 and 04 of NPF4 and Policies
06 and 73 of LDP2 and cannot be dealt with by planning conditions
or reserved matters.  The requirement set out in other legislative
frameworks such as the Habitats and Species Regulations, and the
Wildlife and Countryside Act (1981) would not obviate the need for
these matters to be addressed prior to a grant of planning
permission in principle. 
1.10 Whilst it is fully accepted that pre-application advice cannot guarantee
the outcome of a subsequent planning application, if it is to be of any
value, such advice should be reasonably reliable.  In particular, it is logical
for an applicant to expect the advice made by Planning Officers
regarding the principle of a development to be consistent with their
subsequent recommendation following the receipt of a formal submission. 
1.11 The attached awards of costs in relation to appeal
APP/P0240/W/18/3210480 (Document 4), albeit an English decision,
address the issue of the reliability of pre-application advice.  In paragraph
12 of this the appointed Inspector states: 
“I find that this sudden change in position without any reasonable
justification, other than a difference of professional opinion
between two Council officers, amounts to unreasonable behaviour
on behalf of the Council.  Such behaviour provides a great deal of
uncertainty to the developer, particularly in this instance as the
application was submitted with a justifiable expectation that it
would be approved.” 
1.12 There is thus a fair expectation that pre-application advice should be
reliable and that potential applicants should not be given “false hope”. 
This is however exactly what has happened in the current case, the
applicant believes that he was given false hope.  At the pre-application
stage the Council’s Planning Officer stated that in his view there would be
“significant community benefit by way of upgrading of footpaths, new
public realm areas and the new memorial” and that if the application
“demonstrates no detrimental impact upon the OSPA, or loss to the local
community, I would be willing to consider it as a minor departure from
Page 13

Page 14

Page | 5                            Prepared by Michael Hyde MRTPI Planning Consultant
Policy”.  It was on the basis of this advice that the review application was
submitted. 
2. Proposed Development: 
2.1 The development proposed is the erection of a single dwellinghouse.  The
application seeks planning permission in principle, with detailed matters of
design and external appearance reserved for subsequent approval. 
2.2 As the Council’s request, the application site boundary extends to all of
the land in the applicant’s ownership and proposes on the land outwith
the identified house plot a comprehensive package of public realm
enhancement works.  These include the following: 
• The implementation of a scheme of tree planting and woodland
management (see submitted drawings 1561-01C and 1561-02
prepared by Hirst Landscape Architects);
• Improvements to the network of footpaths that cross the
application site; and
• The facilitation of the erection of a memorial to those lives lost when
HMS K13, a steam-propelled First World War K class submarine, sank
in Gare Loch on 29 January 1917 (see
https://en.wikipedia.org/wiki/HMS_K13). 
2.3 With respect to the above, the applicant undertook informal discussions
with Garelochhead Community Council.  In principle the Community
Council stated that they were supportive of the package of proposals,
particularly the K13 memorial. 
3. Relevant Development Plan Policies: 
3.1 Section 25 of the Town and County Planning (Scotland) Act 1997 states
that “where in making any determination under the planning act regard is
to be had to the Development Plan, the determination shall be in
accordance with the plan unless material considerations indicate
otherwise”. 
3.2 Notwithstanding the fact that the review application was submitted in
October 2020, the Development Plan relevant to the application proposal
now comprises the: 
• The National Planning Framework (2023); and
• The Argyll and Bute Local Development Plan 2 (2024). 
Page 14

Page 15

Page | 6                            Prepared by Michael Hyde MRTPI Planning Consultant
3.3 Section 13 of the Planning (Scotland) Act 2019 is now in force.  This alters
Section 24 of the 1997 Act to state that in the event of ‘any
incompatibility’ between a provision of the National Planning Framework
(‘the NPF’) and a provision of a Local Development Plan (‘the LDP’),
whichever of them is the later in date is to prevail. 
National Planning Framework 
3.4 The following policies of the National Planning Framework were referred to
in the reasons for refusal of the review application: 
Policy 1 (Tackling the Climate and Nature Crises), which states that when
considering all development proposals significant weight will be given to
the global climate and nature crises. 
Policy 2 (Climate Mitigation and Adaptation), which states that
development proposals will be sited and designed to minimise lifecycle
greenhouse gas emissions as far as possible and will be sited and
designed to adapt to current and future risks from climate change. 
Policy 3 (Biodiversity), which states that development proposals will
contribute to the enhancement of biodiversity, including where relevant,
restoring degraded habitats and building and strengthening nature
networks and the connections between them.  Proposals should also
integrate nature-based solutions, where possible. 
Proposals for local development will include appropriate measures to
conserve, restore and enhance biodiversity, in accordance with national
and local guidance.  Measures should be proportionate to the nature
and scale of development.   
Policy 4 (Natural Places), which states that development proposals which
by virtue of type, location or scale will have an unacceptable impact on
the natural environment, will not be supported. 
Development proposals that are likely to have an adverse effect on
species protected by legislation will only be supported where the proposal
meets the relevant statutory tests.  If there is reasonable evidence to
suggest that a protected species is present on a site or may be affected
by a proposed development, steps must be taken to establish its
presence.  The level of protection required by legislation must be factored
into the planning and design of development, and potential impacts must
be fully considered prior to the determination of any application. 
Page 15

Page 16

Page | 7                            Prepared by Michael Hyde MRTPI Planning Consultant
Policy 9 (Brownfield, Vacant and Derelict Land and Empty Buildings),
which states that proposals on greenfield sites will not be supported unless
the site has been allocated for development or the proposal is explicitly
supported by policies in the LDP. 
Policy 14 (Design, Quality and Place), which states that development
proposals will be designed to improve the quality of an area whether in
urban or rural locations and regardless of scale.  Development proposals
will be supported where they are consistent with the six qualities of
successful places: 
• Healthy: Supporting the prioritisation of women’s safety and
improving physical and mental health.
• Pleasant: Supporting attractive natural and built spaces.
• Connected: Supporting well connected networks that make
moving around easy and reduce car dependency
• Distinctive: Supporting attention to detail of local architectural styles
and natural landscapes to be interpreted, literally or creatively, into
designs to reinforce identity.
• Sustainable: Supporting the efficient use of resources that will allow
people to live, play, work and stay in their area, ensuring climate
resilience, and integrating nature positive, biodiversity solutions.
• Adaptable: Supporting commitment to investing in the long-term
value of buildings, streets and spaces by allowing for flexibility so
that they can be changed quickly to accommodate different uses
as well as maintained over time. 
Policy 16 (Quality Homes), which states that development proposals for
new homes on land not allocated for housing in the LDP will only be
supported in limited circumstances where: 
i.  The proposal is supported by an agreed timescale for build-out; and
ii.  The proposal is otherwise consistent with the plan spatial strategy
and other relevant policies including local living and 20 minute
neighbourhoods;
iii. and either: 
• Delivery of sites is happening earlier than identified in the
deliverable housing land pipeline.  This will be determined by
reference to two consecutive years of the Housing Land Audit
evidencing substantial delivery earlier than pipeline
timescales and that general trend being sustained; or
• The proposal is consistent with policy on rural homes; or
Page 16

Page 17

Page | 8                            Prepared by Michael Hyde MRTPI Planning Consultant
• The proposal is for smaller scale opportunities within an
existing settlement boundary; or
• The proposal is for the delivery of less than 50 affordable
homes as part of a local authority supported affordable
housing plan. 
Policy 20 (Blue and Green Infrastructure), which states that development
proposals that result in fragmentation or net loss of existing blue and green
infrastructure will only be supported where it can be demonstrated that
the proposal would not result in or exacerbate a deficit in blue or green
infrastructure provision, and the overall integrity of the network will be
maintained.  The planning authority’s Open Space Strategy should inform
this. 
Policy 21 (Play, Recreation and Sport), which states that development
proposals that include new streets and public realm should be inclusive
and enable children and young people to play and move around safely
and independently, maximising opportunities for informal and incidental
play in the neighbourhood. 
Local Development Plan 2 
3.5 The following policies of the Local Development Plan 2 were also referred
to in the reasons for refusal of the review application: 
Policy 01 (Settlement Areas), which states that within the Settlement Areas
as defined on the proposals maps development will normally be
acceptable where: 
• It is located within an area of land allocated for the proposed use in
this Local Development Plan 2 and it complies with any
development brief which has been approved by the Council; or
• It is on a site which is the redevelopment of a brownfield site; or
• Is on a non-brownfield site, and the proposal is considered
acceptable in relation to the overall land supply for the proposed
use, and
• It is compatible with surrounding uses including but not exclusively;
providing access, service areas, infrastructure for existing, proposed
or potential future development, and
• It is of an appropriate scale and fit for the size of settlement in which
it is proposed; and
• Respects the character and appearance of the surrounding
townscape in terms of density, scale, massing, design, external
finishes and access arrangements; and
Page 17

Page 18

Page | 9                            Prepared by Michael Hyde MRTPI Planning Consultant
• It complies with all relevant Local Development Plan 2 policies. 
Policy 04 (Sustainable Development), which states that in preparing new
development proposals, developers should seek to demonstrate the
following sustainable development principles, which the planning
authority will also use in deciding whether or not to grant planning
permission: 
a)  Maximise the opportunity for local community benefit, including the
creation of district (renewable) heat networks, where viable;
b)  Make efficient use of vacant and/or derelict land including
appropriate buildings;
c)  Support existing communities and maximise the use of existing
infrastructure and services;
d)  Maximise the opportunities for sustainable forms of design including
minimising waste, reducing our carbon footprint, increasing energy
efficiency, solar panels, ground, water and air source heat pumps
and other forms of renewable energy generation;
e)  Avoid the use of locally important good quality agricultural land;
f)  Utilise public transport corridors and active travel networks;
g)  Avoid the loss of important recreational and amenity open space;
h)  Conserve and enhance the natural and built environment and
avoid significant adverse impacts on biodiversity, natural and
heritage assets;
i)  Respect the landscape character of an area and the setting and
character of settlements;
j)  Avoid places with significant risk of flooding, tidal inundation,
coastal erosion or ground instability; and
k)  Avoid having significant adverse impacts on land, air and water
environment. 
Policy 05 (Design and Placemaking), which states that to achieve good
quality places proposals should endeavour to comply with all of the
following placemaking criteria: 
• The proposed use should be compatible with surrounding land uses.
• The proposal should, where practicable, be resource efficient by
utilising existing infrastructure and facilities.
• The design should respect site topography and any surrounding
important landmarks or views.
• The design should create and improve connectivity within, and
where practical, beyond the site.
• Green and blue infrastructure should be an integral part of the
design process from the outset.
Page 18

Page 19

Page | 10                            Prepared by Michael Hyde MRTPI Planning Consultant
• The design should develop the area’s sense of identity by
understanding and embracing the existing distinctive
characteristics, with the design respecting and complementing its
surroundings in terms of density, appearance, height, scale,
massing, materials and finishes.
• Where the site contains existing buildings, structures and/or natural
features that contribute to the character and identity of the wider
area, these should be retained and sensitively integrated into the
design unless it has been clearly demonstrated to the planning
authority that it is not practicable.
• The siting and design should respond to the natural environment in
a sustainable manner.
• The proposal should consider the design of active frontages, and
create welcoming, inclusive places with a coherent structure of
streets, spaces and buildings which are easy to move around,
prioritising the needs of pedestrians and cyclists above motor
vehicles.
• The access to and orientation of buildings should reinforce the
street or open space to create safe and pleasant places.
• The design should be sustainable in terms of materials and
construction and should consider future adaptability, and climate
change mitigation measures. 
Policy 06 (Green and Blue Infrastructure), which states that where
appropriate new non householder developments shall adequately
demonstrate how green and blue infrastructure has been integrated into
the design of the proposal from the outset. In particular, but not limited to,
proposals should demonstrate: 
• How the development contributes to existing green networks – the
linkage of the proposed green and blue infrastructure for the
development to the existing wider green and blue infrastructure.
• How the development promotes active travel – how priority for
movement in, out and around the development is given to walking
and other non-motorised forms of transport and how it links to wider
active travel networks.
• How the development provides for open green space – how
multifunctional green space has been embedded into the design
of the development including formal and informal open spaces
and how they contribute to the creation of a high quality place.
(This includes how the provision of the required amounts of
children’s play space and communal casual open space set out in
Policy 68 – Housing Greenspace, which has been made an integral
part of the design.)
Page 19

Page 20

Page | 11                            Prepared by Michael Hyde MRTPI Planning Consultant
• How the development provides for biodiversity – how it preserves
and enhances local habitats within and around the site and
contributes to existing wildlife corridors.
• How development proposals will manage all rain and surface water
through sustainable urban drainage systems (SUDS), which should
form part of and integrate with proposed and existing blue-green
infrastructure. All SUDS features should be in accordance with the
Principles of The SUDS Manual (C753).
• Climate change – how the proposed green and blue infrastructure
provision contributes to climate change mitigation and adaptation.
• That the proposal would not have a negative impact upon existing
green and blue infrastructure or would result in the fragmentation or
loss of integrity of existing green networks.
• How the proposed green and blue infrastructure will be managed
in the future including maintenance and funding arrangements for
its long term management. 
Policy 08 (Sustainable Siting), which states that each of the following will
apply when assessing any proposal for development, including those for
outbuildings and extensions: 
• The development should integrate into the landscape or existing
built form to minimise detrimental effects on the environment.
Particularly careful attention should be given to hilltop, skyline or
ridge locations, where development will only be acceptable if such
a location cannot be avoided and any significant adverse
landscape and visual effects are clearly outweighed by social,
environmental or economic benefits of community wide
importance arising from the development proposal, and have been
sufficiently mitigated through an environmental impact assessment
or landscape and visual impact assessment.
• Development on a sloping site should be designed sensitively taking
account of the topography in order to prevent significant
excavation or under-building.
• The siting of a development should take into account the character
of the area in terms of its settlement pattern, layout and density.
• All new residential developments are required to consider provision
for Growing Spaces – See Policy 06 – Green and Blue Infrastructure.
• Any development should be carefully sited to avoid overshadowing
or overlooking of itself or other properties.
• The development should be positioned within the landscape to
make the best use of solar gain, natural ventilation and shelter from
the elements and minimise adverse environmental effects – this
Page 20

Page 21

Page | 12                            Prepared by Michael Hyde MRTPI Planning Consultant
need must be balanced with the restrictions and opportunities the
topography places on the siting.
• The development should be sited within easy access of existing
infrastructure and services
• Any ancillary development such as parking and service areas,
should be sensitively designed and sited. 
A co-ordinated approach is required to development in that it must not
compromise the effective development of adjacent land, or the
comprehensive development and regeneration of a wider area as
provided for in a masterplan, strategy or development brief approved by
the council. 
Policy 10 (Design: All Development), which states that the design of any
development must: 
• Demonstrate an understanding of and appropriate response to the
proposed development site and wider context including
consideration of character and, where applicable, urban grain;
and
• Acknowledge the scale, mass and spirit of nearby buildings but
steer clear of mimicry and pastiche; and
• Incorporate existing and enhancing features where applicable;
and
• Avoid falsification of period details; and
• Use appropriate proportions for building elements and details
including, where applicable, massing and fenestration; and
• Use materials that are harmonious with the context but embody
honesty and legibility of contemporary design; and
• Consider the embodied energy and durability of proposed
materials; and
• Incorporate the use of flood resistant and resilient materials and
construction methods. 
Policy 26 (Informal Public Outdoor Recreation and Leisure Related
Development), which states that development which provides for
enhanced informal public outdoor recreation and leisure facilities and
attractions or provides improved opportunities for outdoor access will be
supported where: 
• It addresses an identifiable shortfall or makes a positive contribution
to the tourism network and visitor experience; and
• It can be demonstrated to the satisfaction of the planning authority
that the proposal can be satisfactorily integrated into the
Page 21

Page 22

Page | 13                            Prepared by Michael Hyde MRTPI Planning Consultant
landscape; and
• There are no adverse environmental, access, or servicing impacts. 
Policy 73 (Development Impact on Habitats, Species and Biodiversity),
which states that when considering development proposals Argyll and
Bute Council will give full consideration to the legislation, policies and
conservation objectives, contained within the following: 
i)  Wildlife and Countryside Act 1981; (and as amended by the Nature
Conservation (Scotland) Act 2004); Species listed on Schedules 1, 5,
7, 8, 9 and 14.
ii)  Wildlife and Natural Environment (Scotland) Act 2011. A Code of
Practice on Non-Native Species supports this Act.
iii)  Protection of Badgers Act 1992.
iv)  The Conservation (Natural Habitats, &c.) Regulations 1994, species
listed on Schedules 2 and 4. 
When considering development proposals, the Council will also seek to
contribute to the delivery of the objectives and targets set by the Local
Biodiversity Action Plan (LBAP) and the Scottish Biodiversity Strategy.
Development proposals will be encouraged to incorporate, safeguard
and enhance existing site biodiversity wherever possible. Applications for
new developments may be required to complete a biodiversity checklist
related to the scale, nature and location of the development (see LDP2
TN04 Technical Note: Biodiversity Checklist). 
Where there is evidence to suggest that a habitat or species of
international, national and/or local importance exists on a proposed
development site or would be affected by the proposed development,
the Council will require the applicant, at his/her own expense, to submit a
specialist survey of the site’s natural environment, and if necessary, a
mitigation plan, with the planning application. 
Policy 81 (Open Space Protection Areas), which states that development
proposals resulting in the loss of Open Space Protection Areas will not be
permitted, except in circumstances where one or more of the following
apply: 
a)  The proposed development is ancillary to the principal use of the
site or only involves a very minor part of the site and in either case
would not affect its integrity and continued existing use or amenity
value.
b)  Where a proposal would involve the loss of an outdoor sports
facility; the facility which would be lost would be replaced by a
Page 22

Page 23

Page | 14                            Prepared by Michael Hyde MRTPI Planning Consultant
new facility of comparable or greater benefit and in a location that
is convenient for its users, or by the upgrading of an existing facility
to provide one of better quality either within the same site or at
another location which is convenient for its users and which
maintains or improves the overall capacity in the area.
c)  Where a proposal would involve the loss of an outdoor sports
facility; a relevant strategy, and consultation with SportScotland,
has demonstrated that there is a clear excess of provision to meet
current and anticipated demand in the area, and that the site
would be developed without detriment to the overall quality of
provision. In this situation it should be adequately demonstrated
that all reasonable attempts have been made to sell or transfer the
facility for an alternative sports or recreational use.
d)  Where a proposal would involve the loss of a recreational facility or
a site for the growing of food; the facility which would be lost would
be replaced by a new facility of comparable or greater benefit
and in a location that is convenient for its users, or by the upgrading
of an existing facility to provide one of better quality either within
the same site or at another location which is convenient for its users
and which maintains or improves the overall capacity in the area.
e)  In the case of greenspace amenity areas (public or private); it can
be adequately demonstrated that there would be no loss of the
amenity value it provides through either partial, or complete
development and that an alternative provision of equal benefit
and accessibility can be made available. 
4. Grounds for Review: 
4.1 Whilst the Planning Officer has referred to a significant number of lengthy
policies in the three reasons for refusal of the review application it is
considered that the following are the key planning issues that require to
be addressed by the Local Review Body: 
The Principle of the Development 
4.2 The application site is located within the settlement boundary for
Garelochhead.  As such, having regard to Policy 01 of the recently
adopted LDP2, there is a general presumption in favour of new
development.  Notwithstanding this, it is also the case that the entirely of
the land in the applicant’s ownership has (without his agreement) been
designated by the Council as an Open Space Protection Area (OSPA). 
4.3 Having regard to this designation Policy 81 of LDP2 states that
development proposals resulting in the loss of OSPAs will not be permitted
Page 23

Page 24

Page | 15                            Prepared by Michael Hyde MRTPI Planning Consultant
unless, in the case of greenspace amenity areas (public or private), it can
be adequately demonstrated that there would be no loss of the amenity
value it provides through either partial, or complete development and
that an alternative provision of equal benefit and accessibility can be
made available. 
4.4 The development of the application site would result in the loss of just 5.5%
of the overall OSPA.  On the other hand, the remaining 21% of the OSPA
that is also in the applicant’s ownership will be significantly enhanced, by
the applicant, for the benefit of everyone who uses the land.  The
enhancements proposed include improvements to the network of
informal footpaths through the site, the implementation of a scheme of
tree planting and woodland management, and the formation of wild
flower meadows (see Figure 2 below).   
Figure 2: Proposed Public Realm Enhancement (Extract from Hirst
Landscape Architects Drawing 1561-01C) 
4.5 The Planning Officer has said in the reasons for refusal that these public
benefits would be “modest” and that there would not be a clear
mechanism for their delivery and maintenance; contrast this with the
Page 24

Page 25

Page | 16                            Prepared by Michael Hyde MRTPI Planning Consultant
advice of the Planning Officer who provided the pre-application advice
who considered that the benefits to the community would be
“significant”. 
4.6 It is also not correct to say that there would be no mechanism that would
secure the proposed public realm enhancements.  These could be
secured either via the imposition of an appropriately worded planning
condition, or through the registering of a Section 75 Agreement, and both
of these options have been discussed with the Council.  It was precisely
for this reason that the applicant was advised by Officers to withdraw
application 20/00703/PPP, and to reapply with the red line application site
boundary around all of his land. 
4.7 Whist there might therefore be considered to be a conflict with Policy 81
of the LDP2, given the OSPA designation, as the Planning Act states,
determinations should be in accordance with the plan unless material
considerations indicate otherwise.  In this instance it is considered that the
material considerations, i.e. the proposed public realm enhancements
(which can be secured, and which will be funded entirely by the
applicant), are sufficient to outweigh the loss of a very small part of the
overall OSPA.  On this basis, planning permission in principle should be
able to be granted as a ‘minor departure’ from the provisions of the
Development Plan. 
Potential Impact on Biodiversity 
4.8 As noted above, the application site is not specifically designated for its
biodiversity value.  The third reason for refusal of planning permission
nevertheless states that no ecological survey has been provided, and that
this issue cannot be dealt with by planning conditions or reserved matters. 
The Council’s Biodiversity Officer submitted a consultation response
(Document 5).  Notwithstanding the fact that the site is not specifically
designated for its wildlife value the applicant was requested to undertake
surveys in respect of otters, bats, birds, mammals, insects, reptiles,
amphibians and fish! 
4.9 In this respect the applicant found himself in a ‘Catch 22’ situation.  He
had previously been advised by the Planning Officer that the application
was going to be recommended for refusal in principle, yet he was then
being asked to spend a not insignificant amount of money on wildlife
surveys.  The applicant has no objections to undertaking the requested
wildlife surveys but would only feel comfortable in committing to doing so
if the Local Review Body were able to confirm that the application would
be able to be approved in principle.  
Page 25

Page 26

Page | 17                            Prepared by Michael Hyde MRTPI Planning Consultant
4.10 With respect to biodiversity Policy 3 of the NPF is particularly relevant.  This
states that development proposals will contribute to the enhancement of
biodiversity, including where relevant, restoring degraded habitats and
building and strengthening nature networks and the connections
between them.  Proposals for local developments should include
appropriate measures to conserve, restore and enhance biodiversity, in
accordance with national and local guidance. 
4.11 As has been noted above the applicant is proposing, should planning
permission in principle be granted, a significant programme of tree and
shrub planting, and the formation of wildflower meadows, on his land.  All
of these measures will significantly increase the overall biodiversity value
of the application site, in accordance with the requirements of Policy 3 of
the NPF. 
4.12 Furthermore, the applicant is already committed to an ongoing
programme of works to eradicate Japanese knotweed (Reynoutria
japonica syn. Fallopia japonica) from his land.  To date approximately an
acre or previously inaccessible land has been cleared of knotweed,
which was in the region of 10 feet high and spreading.  This should be
completely eradicated within another two years. 
4.13 SEPA’s advice with respect to Japanese knotweed is that if you have this
on your land, you should ensure it does not spread off your land.  If it
spreads into the wild, this is an offence under the provisions of the Wildlife
and Countryside Act.  The Council’s Biodiversity Action Plan also
recognises the danger to the natural environment, should Japanese
knotweed be allowed to spread. 
Potential Flood Risk 
4.14 Finally, although not a reason for refusal, and as noted above, parts of the
land owned by the applicant are subject to both coastal and river
flooding, as indicated on the SEPA Flood map.  Both Policy 22 of the NPF
and Policy 55 of the LDP2 state that development on the functional flood
plain will not be able to be supported, other than in limited circumstances
such as essential infrastructure or water compatible uses, 
4.15 The initial application (20/00703/PPP) was accompanied by a
topographical survey, and also a Flood Risk Assessment (FRA) that was
undertaken in 2007.  This FRA states that any flood risk to the land
proposed for development comes from high water levels in the McAulay
Burn, or a high tide in the Gare Loch backing up the burn, and from
possible combinations of these events.
Page 26

Page 27

Page | 18                            Prepared by Michael Hyde MRTPI Planning Consultant
4.16 The 2007 FRA compared the 1 in 200 year water level of 4.0 mAOD, with
existing ground levels over the area, and indicated that whilst some of the
applicant’s land would be at medium to high risk of flooding, the area of
higher land adjoining the B833 (which includes the proposed house plot)
would be suitable for new residential development.  To ensure that any
new housing is secure against both tidal and fluvial flooding, the FRA
recommends that the finished floor level of any new dwellings be no lower
than 5.6 mAOD.  The application site is c 8.5-9.0 mAOD, and thus the
proposed new dwelling will not be at risk of flooding. 
4.17 Notwithstanding the above SEPA initially objected to application
20/00703/PPP, and provided the following advice: 
“The FRA has adopted a conservative approach and allowed for
1m freeboard, where it recommends that the house Finished Flood
Level (FFL) would sit at a level of 5.6m AOD, which we consider to
represent a conservative level. Due to the age of the FRA, we are
unable to accept the outputs for land use planning and therefore
require the assessment to be updated.  
Alternatively, we acknowledge that parts of the site clearly sit
above the functional floodplain and we require the proposed
location of the dwellinghouse to be confirmed. We note that the
general supporting statement stipulates that the house will be
located at 8.5m AOD – 9m AOD, which is well above the functional
floodplain.  Conversely, the Indicative Masterplan shows an ‘Area
Proposed for Development’ that starts at 4.5m AOD, and may be
within the functional floodplain. 
In summary, we would either need to see evidence that the
proposed unit will be situated at a conservative elevation
(significantly above the CFB), or we would need to see a revised
Flood Risk Assessment, before reviewing our objection on flood risk
grounds.” 
4.18 Similar advice was received from the Council’s Flood Management
Officer. 
4.19 In response to this advice the applicant commissioned Kaya Consulting to
provide comments on flood risk to the proposed development based on
its location.  The application would not have commissioned the Flood Risk
Assessment (FRA) had he known that his application was going to be
refused.  The FRA concluded that: 
Page 27

Page 28

Page | 19                            Prepared by Michael Hyde MRTPI Planning Consultant
“Finished Floor Levels for the development should be discussed with
the local council with reference to the latest climate change
guidance.  It is understood that the Finished Floor Level of the
proposed development will not be lower than 7.0mAOD.  On this
basis, it will be at least 1.7 m above the estimated 1 in 200-year plus
climate change flood level, which is more than enough to
encompass a freeboard (typically 0.6 m) and an allowance for
waves.” 
4.20 Drawing 2019_0057/04A indicates the developable part of the proposed
house plot, all of which is above 7.0mAOD.  On the basis of the prior
submission of this drawing SEPA confirmed that their objection to the
application could be withdrawn.  There will therefore be no conflict with
either Policy 22 of the NPF or Policy 55 of the LDP2. 
5. Conclusions: 
5.1 In conclusion, prior to the submission of the review application, the
applicant undertook two ‘rounds’ or pre-application discussions with the
Council.  The Planning Officer confirmed that in his opinion there would be
“significant community benefit by way of upgrading of footpaths, new
public realm areas and the new memorial” and that if the application
submission demonstrated no detrimental impact upon the proposed
OSPA, or loss to the local community,  that he “would be willing to
consider it as a minor departure from Policy”.  It was on the basis of this
advice that the review application was submitted. 
5.2 At the date of the submission of the review application (October 2020)
the OSPA designation was not in force.  The site was however within an
Area for Action (AFA 3/7).  Areas for Action are areas which, subject to
resource availability during the plan-period, would be the focus for
partnership or community action.  In the Council’s Action Programme
published in April 2015, which was in place when the review application
was submitted, with respect to AFA 3/7 this stated that the nature of the
actions proposed were: 
1.  To consider options to effectively manage and visually enhance this
important recreation and open space area within the village; and
2.  That this may include consideration of options for low-key
recreational development links to access provision. 
5.3 It was for this reason that the applicant proposed, as a fundamental part
of his application for planning permission, proposals to landscape and
manage the remainder of his land for the long term benefit of the local
Page 28

Page 29

Page | 20                            Prepared by Michael Hyde MRTPI Planning Consultant
community.  His proposals include the following: 
• The undertaking of a comprehensive package of public realm
enhancements on the land outwith the identified house plot (see
submitted drawings 1561-01C and 1561-02 prepared by Hirst
Landscape Architects).  This will include the implementation of a
scheme of tree planting and woodland management;
• Improvements to the network of footpaths that cross the
application site; and
• The facilitation of the erection of a memorial to those lives lost when
HMS K13, a steam-propelled First World War K class submarine, sank
in Gare Loch on 29 January 1917 (see
https://en.wikipedia.org/wiki/HMS_K13). 
5.4 In this context the applicant undertook informal discussions with
Garelochhead Community Council.  In principle the Community Council
stated that they were supportive of the package of proposals, particularly
the K13 memorial.  The implementation of the proposed public realm
enhancements could easily be secured either via the imposition of an
appropriately worded planning condition, or through the registering of a
Section 75 Agreement. 
5.5 The application site is not designated for its biodiversity value and is not at
risk from flooding.  With respect to biodiversity Policy 3 of the NPF states
that development proposals will contribute to the enhancement of
biodiversity, including where relevant, restoring degraded habitats and
building and strengthening nature networks and the connections
between them.  As is noted above the applicant is already eradicating
Japanese knotweed from his land, and is furthermore proposing, should
planning permission in principle be granted, a significant programme of
new tree and shrub planting, and the formation of wildflower meadows. 
All of these measures will significantly increase the overall biodiversity
value of the application site, in accordance with the requirements of this
policy. 
5.6 On the basis of all of the above, given the “significant community benefit”
that would accrue, at no cost to the Council, should planning permission
in principle be able to be granted, it is hoped that an approval can be
forthcoming as a minor departure from the provisions of the Development
Plan.
Page 29

Page 30

This page is intentionally left blank

Page 31

Argyll and Bute Council – Development Management 
Pre Application Advice Report 
28th November 2019 
Reference: 19/02493/PREAPP
Proposed
Development:
Pre Application Enquiry - erection of dwellinghouse, upgrade of existing
footpaths, provision of footbridge and erection of memorial
Site Address: Land At Garelochhead Argyll And Bute   
The information represents the informal view of the planning officer and is given without
prejudice to the outcome of any planning application submitted in respect of the above
development.
Page 31

Page 32

Permissions Required 
☐  Planning permission     
Type of Application 
☐ Local Application 
EIA Scoping/Screening Required 
☐ No, EIA screening is not required   
Pre Application Consultation Required 
☐ No       
Site Visit Undertaken 
☐ No     
Local Development Plan Policies 
• LDP STRAT 1 – Sustainable Development 
The Settlement and Spatial Strategy
• LDP DM1 – Development within the Development Management Zones 
Protection, Conserving and Enhancing our Outstanding Environment Together
• LDP 3 – Supporting the Protection, Conservation and Enhancement of our Environment 
Strengthening Our Communities Together
• LDP 8 – Supporting the Strength of our Communities 
• LDP 9 – Development Setting, Layout and Design 
Improving Our Connectivity and Infrastructure Together
• LDP 11 – Improving our Connectivity and Infrastructure 
Local Development Plan – Supplementary Guidance Policies 
Natural Environment
• SG LDP ENV 1 – Development Impact of Habitats, Species and Our Biodiversity (i.e.
biological diversity)
• SG LDP ENV 6 – Development Impact on Trees / Woodland 
Landscape and Design
• SG LDP ENV 14 –Landscape 
General Housing Development
• SG LDP HOU 1 – General Housing Development including Affordable Housing 
Page 32

Page 33

Sport, Leisure, Recreation and Open Space
• SG LDP REC/COM 1 – Sport, Recreation and Community Facilities
• SG LDP REC/COM 2 – Safeguarding Sports Field, Recreation Areas and Open Space
Protection Areas  
Departures from the Local Development Plan
• SG LDP DEP 1 – Departures to the Local Development Plan  
Sustainable Siting and Design
• SG LDP Sustainable - Sustainable Siting and Design Principles  
Resources and Consumption
• SG LDP SERV 1 – Private Sewerage Treatment Plants and Wastewater (i.e. drainage)
systems
• SG LDP SERV 2 – Incorporation of Natural Features / Sustainable Systems (SUDS)
• SG LDP SERV 5(b) – Provision of Waste Storage and Collection Facilities within New
Development
• SG LDP SERV 6 – Private Water Supplies and Water Conservation 
Addressing Climate Change
• SG LDP SERV 7 – Flooding and Land Erosion – The Risk Framework for Development
• SG LDP CC 1 – Climate Change and Sustainable Buildings 
Transport (including core paths)
• SG LDP TRAN 4 – New and Existing, Public Roads and Private Access Regimes
• SG LDP TRAN 6 –Vehicle Parking Provision
• SG LDP TRAN 1 Access to the Outdoors 
Other Relevant Material Considerations 
Area for Action AFA3/7
Public Paths: C280(a) - Garelochhead to Loch Long Way 
Planning History 
None 
Assessment 
I refer to the above and can confirm the following observations; 
Erection of dwellinghouse.
Policy DM 1 allows development within the Key Rural Settlements up to and including medium scale
on appropriate sites. The proposal for one dwellinghouse is within the terms of this Policy 
Policy LDP 3 outlines that the Council will assess applications for planning permission with the aim
of protecting conserving and where possible enhancing the built, human and natural environment. I
would suggest that any proposed design would ensure the established character and local
distinctiveness of the area is preserved in terms of scale, form and design. The site is not located
within a National Scenic Area nor is it within an Area of Panoramic Quality. 
Page 33

Page 34

Policy LDP 8 – Supporting the Strength of Our Communities
The current proposal sits comfortably within these parameters as it is for one unit. Housing
development proposals shall make appropriate access, recreational and open space provision for
the special needs groups. 
Policy LDP 9 – Development Setting, Layout and Design
The design of developments and structures shall be compatible with the surroundings, particular
attention shall be given to massing, form and design details within sensitive locations. This open
recreational space is considered visually sensitive. I would suggest the design reflects other houses
within this area and the public realm and memorial areas are located away from the footprint of the
house. 
Policy LDP 10 – Maximising our Resources and Reducing Our Consumption
Connection to the public sewer will be required, unless you can demonstrate that connection is not
feasible, for technical or economic reasons, or the receiving waste water treatment plant is at
capacity and Scottish Water at that time has no programmed investment to increase that capacity;
and the proposal is not likely to result in or add to existing environmental, amenity or health problems.
Planning consent for development with private waste water systems will only be allowed where
proposals satisfy all of the above. 
In accordance with Government Advice the Council will encourage developers to incorporate existing
ponds, watercourses or wetlands as positive environmental features in development schemes. The
Council will also require that canalisation or culverting, which can increase the risk of flooding and
also greatly reduce the ecological and amenity value of watercourses are avoided wherever
practicable and designed sensitively where unavoidable. Sustainable Drainage Systems (SuDs)
provide benefits in terms of flood avoidance, water quality, habitat creation and amenity. Proposals
for SuDs measures compliant with technical guidance will be required in relation to all development
prior to determination. 
The Council will require all development proposals incorporate proposals for SUDS measures in
accordance with technical guidance. A Drainage Impact Assessment (DIA) is required as the area
is affected by flooding and will have a lot of wildlife interest. In all cases the Council will encourage
the use of sustainable options for waste and surface water drainage. 
Housing developments shall make effective provision for the storage, recycling, composting where
appropriate, separation and collection of waste from within the development site or when
appropriate, from an appropriate roadside or other specified collection point or points (for onward
reuse and recycling) 
There is support in principle for the use of private water supplies where a public water supply is not,
or could not be made available. This support is subject to the private water supply being of adequate
quality and quantity to serve the proposed development without prejudicing the lawful interests of
neighbouring properties or land and water users. Applicants will be required to submit full details of
the proposed private water supply arrangements with their application, including a report by
independent and suitably qualified engineers demonstrating that the proposed water supply has
sufficient capacity and quality to supply existing water users and the proposed new development. In
addition, in those areas where Scottish Water advise that there are on-going public water supply
shortages, all developments that require water supplies for either human or animal consumption, or
for other processes or activities relating to industrial or commercial activities shall require to
demonstrate the incorporation of water conservation measures such as rainwater harvesting or the
re-use of grey water. 
Policy LDP 11 Improving our Connectivity and Infrastructure.
Integration of the development with existing and potential public transport shall be taken fully into
account. The proposed development shall be accessible by a range of modes of transport, including
walking, cycling, public transport and car. An appropriate standard of access is delivered to serve
Page 34

Page 35

new developments, including off-site highway improvements where appropriate, maximum and
minimum car parking standards are applied, the location and design of new infrastructure is
appropriate and standards for drainage, sewage, waste water and water supply are applied. Off-
street car and vehicle parking shall be provided for development on the following basis:
Car parking standards; 1.5 spaces per 1 bedroom unit, 2 spaces per 2-3 bedroom unit and 3 spaces
per 4 or more bedroom units. 
Consideration should be given to Development Impact on Trees/Woodland in as the site is heavily
wooded. Argyll and Bute Council will also resist development likely to have an adverse impact on
trees by ensuring through the development management process that adequate provision is made
for the preservation of and where appropriate the planting of new woodland/trees, including
compensatory planting and management agreements. 
Erection of footbridge
The design of the footbridge should be in keeping within an established residential area and be
domestic in scale. The proposal should also meet the terms of the Councils National Roads
Development Guide: Proposed Argyll and Bute Local Amendments and SG LDP TRAN 4. 
Public Realm works/Upgrading of footpaths
Materials used should include sustainable design principles outlined above. The proposal should
meet the terms of the Councils National Roads Development Guide: Proposed Argyll and Bute Local
Amendments and SG LDP TRAN 4. Any public footpath should ensure the protection of the Public
Path: C280(a) - Garelochhead to Loch Long Way which is a core pathway to the south of the site. 
Erection of memorial
I would suggest there is community engagement in relation to the siting and design of this memorial. 
Impact upon the Area for Action designation AFA 3/7 Garelochhead Local
This outlines that Councils strategy for this site which is to enhance recreation and open space. The
erection of a house in this location is contrary to this strategy. In considering whether the house
could be supported as a minor departure from the development plan other material considerations
are required to be examined to establish if these could outweigh policy in this instance. It is my view
that there is significant community benefit by way of upgrading of footpaths, new public realm areas
and the new memorial. I place significant weight on these considerations and consider the proposal
subject to a full planning assessment, acceptable. 
This preliminary assessment is based on current information, in the event of a formal planning
application being submitted, the Council must take into account views of consultees and
representations from the public as appropriate. Any subsequent assessment must reflect this and
may therefore differ from the initial assessment. Finally, the above is the view of Development
Management and may not necessarily be those of the Planning Authority. If you do decide to make
an application for planning permission, please be aware that the Council actively promotes online
submission of applications through the Government’s ePlanning Portal at
www.eplanning.scotland.gov.uk You can also get more advice and guidance on our own website at
www.argyll-bute.gov.uk 
Consultees for any future application 
The following consultees are likely to be consulted in the event of a formal application being
consulted.  You may wish to contact consultees for additional pre application advice prior to the
submission of your application.  Please note that on occasion it may be necessary to involve
consultees who are listed below as a formal application progresses. 
• Scottish Water 
• Helensburgh Community Council
• Biodiversity Officer
Page 35

Page 36

• Argyll and Bute Council Environmental Health 
• Flood Risk Assessor 
• Scottish Environmental Protection Agency
• Argyll and Bute Council Roads 
Supporting information required for any future application  
• Design and Access Statement;
• Landscape Plan;
• Topographical Survey; 
Case Officer Name and Contact Details 
Name of Officer: Frazer MacLeod
Designation: Planning Officer
Tel: 01546 605518 
Useful Information: 
Apply Online: https://www.eplanning.scot/ePlanningClient/ 
National Validation Guidance: https://www.argyll-bute.gov.uk/sites/default/files/hops-validation-and-
determination-guidance-updated-12-10-17.pdf 
Processing Agreements: https://www.argyll-bute.gov.uk/processing-agreements 
Page 36

Page 37

Argyll and Bute Council – Development Management 
Pre Application Advice Report 
29th January 2020 
Reference: 20/00106/PREAPP
Proposed
Development:
Pre Application Enquiry - erection of dwellinghouse/s, upgrade of existing footpaths,
provision of footbridge and erection of memorial
Site Address: Land At Garelochhead Argyll And Bute   
The information represents the informal view of the planning officer and is given without prejudice
to the outcome of any planning application submitted in respect of the above development.
Page 37

Page 38

Permissions Required 
☐  Planning permission     
Type of Application 
☐ Local Application 
EIA Scoping/Screening Required 
☐ No, EIA screening is not required   
Pre Application Consultation Required 
☐ No       
Site Visit Undertaken 
☐ No     
Local Development Plan 2 
The site is now designated as an open space protection area (OSPA) which are open spaces that
can include; 
1. Outdoor sports facilities - such as sports pitches, bowling greens and tennis courts
2. Valued recreation areas - such as woodlands, parks and other areas that are accessible for
informal recreation
3. Areas for growing food - such as allotments or community gardens
4. Greenspace amenity areas – Accessible and non-accessible areas that provide visual
amenity functions in and around our settlements such as maintaining setting, identity or
character or by providing visual green spaces within more built up areas. 
The site within this pre-application area is considered to fall into category of 2 and 4 as it has value
for recreation, visual function and relaxation. Any loss of OSPAs will require robust justification. In
certain situations it will be necessary to demonstrate that all at attempts have been made to transfer
or sell the facility concerned for the same or a similar alternative use in order that appropriate
opportunity has been given to preserve the open space resource and avoid its loss to development. 
The revised LDP2 policy for OSPA areas is; 
Policy 81 – Open Space Protection Areas
Development proposals resulting in the loss of Open Space Protection Areas will not be permitted,
except in circumstances where one or more of the following apply: 
a) The proposed development is ancillary to the principal use of the site or only involves a very minor
part of the site and in either case would not affect its integrity and continued existing use or amenity
value. 
b) Where a proposal would involve the loss of an outdoor sports facility; the facility which would be
lost would be replaced by a new facility of comparable or greater benefit and in a location that is
convenient for its users, or by the upgrading of an existing facility to provide one of better quality
Page 38

Page 39

either within the same site or at another location which is convenient for its users and which
maintains or improves the overall capacity in the area. 
c) Where a proposal would involve the loss of an outdoor sports facility; a relevant strategy, and
consultation with SportScotland, has demonstrated that there is a clear excess of provision to meet
current and anticipated demand in the area, and that the site would be developed without detriment
to the overall quality of provision. In this situation it should be adequately demonstrated that all
reasonable attempts have been made to sell or transfer the facility for an alternative sports or
recreational use. 
d) Where a proposal would involve the loss of a recreational facility or a site for the growing of food;
the facility which would be lost would be replaced by a new facility of comparable or greater
benefit and in a location that is convenient for its users, or by the upgrading of an existing facility
to provide one of better quality either within the same site or at another location which is convenient
for its users and which maintains or improves the overall capacity in the area. 
e) In the case of greenspace amenity areas (public or private); it can be adequately demonstrated
that there would be no loss of the amenity value it provides through either partial, or complete
development and that an alternative provision of equal benefit and accessibility can be made
available. 
Assessment 
The current proposal is tested against the most relevant parts of policy which are parts (a) and (e).
The use of the site as a location for a housing development is contrary to this policy, I would therefore
require justification to be submitted alongside any planning application to show the following; 
• Evidence from the landowner that all at attempts have been made to transfer or sell the facility
concerned for the same or a similar alternative use in order that appropriate opportunity has
been given to preserve the open space resource and avoid its loss to development. 
• Evidence that the housing development is ancillary to the principal use of the site or only
involves a very minor part of the site with no detriment to woodland. 
• Evidence the housing development would not affect the integrity and continued existing use
or amenity value of the OSPA. 
• The submission of a woodland maintenance and management strategy. 
• Evidence that the area of the proposed housing development can be provided at an
alternative site with equal community benefit and accessibility. 
If this evidence demonstrates no detrimental impact upon the OSPA, or loss to the local community,
I would be willing to consider it as a minor departure from Policy. 
This preliminary assessment is based on current information, in the event of a formal planning
application being submitted, the Council must take into account views of consultees and
representations from the public as appropriate. Any subsequent assessment must reflect this and
may therefore differ from the initial assessment. Finally, the above is the view of Development
Management and may not necessarily be those of the Planning Authority. If you do decide to make
an application for planning permission, please be aware that the Council actively promotes online
submission of applications through the Government’s ePlanning Portal at
www.eplanning.scotland.gov.uk 
You can also get more advice and guidance on our own website at www.argyll-bute.gov.uk 
Page 39

Page 40

Other Relevant Material Considerations 
PAN 65 – Planning and Open Space 
Planning History 
None 
Consultees for any future application 
The following consultees are likely to be consulted in the event of a formal application being
consulted.  You may wish to contact consultees for additional pre application advice prior to the
submission of your application.  Please note that on occasion it may be necessary to involve
consultees who are listed below as a formal application progresses. 
• Scottish Water 
• Helensburgh Community Council
• Biodiversity Officer
• Argyll and Bute Council Environmental Health 
• Flood Risk Assessor 
• Scottish Environmental Protection Agency
• Argyll and Bute Council Roads 
Supporting information required for any future application  
• Design and Access Statement;
• Landscape Plan;
• Topographical Survey; 
Case Officer Name and Contact Details 
Name of Officer: Frazer MacLeod
Designation: Planning Officer
Tel: 01546 605518 
Useful Information: 
Apply Online: https://www.eplanning.scot/ePlanningClient/ 
National Validation Guidance: https://www.argyll-bute.gov.uk/sites/default/files/hops-validation-and-
determination-guidance-updated-12-10-17.pdf 
Processing Agreements: https://www.argyll-bute.gov.uk/processing-agreements 
Page 40

Page 41

38 East Clyde Street Helensburgh G84 7PG
TOWN AND COUNTRY PLANNING (SCOTLAND) ACT 1997 (AS AMENDED)
TOWN AND COUNTRY PLANNING (DEVELOPMENT MANAGEMENT PROCEDURE)
(SCOTLAND) REGULATIONS 2013
REFUSAL OF PLANNING PERMISSION IN PRINCIPLE
REFERENCE NUMBER: 20/01822/PPP
Mr Lorne Thomson
MH Planning Associates
63 West Princes Street
Helensburgh
Scotland
G84 8BN
I refer to your application dated 6th October 2020 for planning permission in principle under the
above mentioned Act and Regulations in respect of the following development:
Site for the erection of dwellinghouse and public realm enhancements at Land East Of
Taliesin West Garelochhead Argyll And Bute  
Argyll and Bute Council in exercise of their powers under the above mentioned Act and
Regulations hereby refuse planning permission in principle for the above development for the
reason(s) contained in the attached appendix.
Dated: 12 March 2024
Fergus Murray
Head of Development and Economic Growth
Page 41

Page 42

REASONS FOR REFUSAL RELATIVE TO APPLICATION NUMBER: 20/01822/PPP
1. The indicative siting would occupy greenfield land within the settlement boundary, and create a
net loss and fragmentation of green space and identified open space, with consequential harmful
impacts on character and amenity within Garelochhead. This would be unacceptable and contrary
to Policies of 01, 09, 14, 16, 20 and 21 of NPF4, and Policies 04, 05, 06, 26 and 81 of LDP2. There
would be modest benefits to the community arising from proposed enhancements, but there would
not be a clear mechanism for their delivery and maintenance and in any regard it is considered that
the benefits would not outweigh the harmful impacts identified. The benefit of the provision of one
additional family home would not be sufficient to outweigh the identified harm.
2. By reason of its isolated position, the development would be starkly and incongruously situated,
and thus poorly integrated into the established settlement pattern. The harmful effect of this would
be magnified by the prominence of the siting at the top of a slope and its proposed site area which
cuts across the open space. For these reasons the siting would be unacceptable and contrary to
NPF4 Policy 14, and LDP2 Policies 01, 04, 05, 08 and 10. These concerns could not be
reasonably overcome through reserved matters considerations or details to be secured through
conditions, and the benefits of the proposal would not be sufficient to overcome the harmful
impacts identified.
3. No ecological survey has been provided. The application has not demonstrated potential
impacts on species and biodiversity, and how any such impacts would be avoided or mitigated.
This is unacceptable further to Policies 01, 03 and 04 of NPF4 and Policies 06 and 73 of LDP2,
and cannot be dealt with by planning conditions or reserved matters. The requirement set out in
other legislative frameworks such as the Habitats and Species Regulations, and the Wildlife and
Countryside Act (1981) would not obviate the need for these matters to be addressed prior to a
grant of planning permission in principle.
Page 42

Page 43

NOTES TO APPLICANT (1) RELATIVE TO APPLICATION NUMBER 20/01822/PPP
1. If the applicant is aggrieved by the decision to refuse permission for or approval required by
a condition in respect of the proposed development, or to grant permission or approval
subject to conditions, the applicant may require the planning authority to review the case
under Section 43A of the Town and Country Planning (Scotland) Act 1997 (as amended)
within three months from the date of this notice. A Notice of Review request must be
submitted on an official form which can be obtained by contacting The Local Review Body,
Committee Services, Argyll and Bute Council, Kilmory, Lochgilphead, PA31 8RT or by
email to localreviewprocess@argyll-bute.gov.uk
2. If permission to develop land is refused or granted subject to conditions and the owner of
the  land claims that the land has become incapable of reasonably beneficial use in its
existing state, and it cannot be rendered capable of reasonably beneficial use by the
carrying out of any development which has been or would be permitted, the owner of the
land may serve on the planning authority a purchase notice requiring the purchase of the
landowner’s interest in the land, in accordance with Part 5 of the Town and Country
Planning (Scotland) Act 1997 (as amended).
Page 43

Page 44

APPENDIX TO DECISION REFUSAL NOTICE
Appendix relative to application: 20/01822/PPP
A. Has the application been the subject of any “non-material” amendment in terms of Section
32A of the Town and Country Planning (Scotland) Act 1997 (as amended) to the initial
submitted plans during its processing.
No (delete as appropriate) if yes, list amendments
B. Is the proposal a departure from the Development Plan:
No
If yes, state level of departure:
C. Summary justification statement for refusal of planning permission in principle
The proposal is considered to be contrary to policies 01, 03, 04, 14, 16, 20 and 21 of
National Planning Framework 4, and policies 01, 04, 05, 06, 08, 10, 26, 73 and 81 of the
Argyll and Bute Local Development Plan 2, and there are no other material considerations
of sufficient significance to indicate that it would be appropriate to grant planning
permission in this instance as a departure to the Development Plan having regard to s25 of
the Act.
Page 44

Page 45

https://www.gov.uk/planning-inspectorate
Costs Decision
Hearing Held on 26 June 2019
Site visit made on 25 and 26 June 2019
by Alexander Walker MPlan MRTPI
an Inspector appointed by the Secretary of State
Decision date: 16th July 2019
Costs application in relation to Appeal Ref: APP/P0240/W/18/3210480
Former Shefford Lower School, land off Wynchwood Lane, Shefford SG17
5XA
• The application is made under the Town and Country Planning Act 1990, sections 78,
322 and Schedule 6, and the Local Government Act 1972, section 250(5).
• The application is made by Mr Troy Mayer on behalf of Black Horse Residential Ltd.  for
a full award of costs against Central Bedfordshire Council.
• The hearing was in connection with an appeal against the refusal of planning permission
for the demolition of existing building and erection of 7 new dwellings.
Decision
1. The application for an award of costs is allowed in the terms set out below.
The submissions for Mr Troy Mayer on behalf of Black Horse Residential
Ltd.
2. The applicant claims that whilst the decision notice refers to a single policy,
Policy DM3 of the Central Bedfordshire Core Strategy and Development
Management Policies (CSDMP) 2009, the Council has provided no evidence as
to why the proposal does not accord with this policy.
3. Furthermore, the Council have proposed the site for development from the
marketing exercise.  The approach taken by the local highway authority that
the access of Wynchwood Lane is unsuitable would sterilise the site, which is an
unreasonable turnaround on behalf of the Council
The response by Central Bedfordshire Council
4. The Council refute the applicant’s first claim as Policy DM3 is clearly identified
in the reason for refusal.  Furthermore, it was not necessary to raise it in
addition to the applicant’s discussion on Policy DM3 during the hearing.
5. In response to the second claim, the Council state that the local planning
authority and highway authority were not involved in the preparation of this
evidence submitted at the marketing stage of the site.  Furthermore, whilst the
pre-application advice was in favour of the proposal, this does not prejudice the
local planning authority’s consideration of the formal submission of the
application.
Page 45

Page 46

Costs Decision APP/P0240/W/18/3210480
https://www.gov.uk/planning-inspectorate   2
Reasons
6. Planning Policy Guidance advises that, irrespective of the outcome of the
appeal, costs may only be awarded against a party who has behaved
unreasonably and thereby caused the party applying for costs to incur
unnecessary expense in the appeal process.
7. The reason for refusal set out in the decision notice is complete, precise,
specific and relevant to the application.  It also clearly states that the proposal
would conflict with Policy DM3 of the CSDMP.  This reason was adequately
substantiated by the Council in its statement of case, which demonstrates how
the proposal would harm highway safety, with particular regard to visibility and
access for refuse collection vehicles.  Whilst the Council does not explicitly refer
to DM3 in in its statement of case, the applicant evidently identified the
relevance of this policy, stating during the hearing that bullet point 8 was the
relevant part of the policy, to which the Council agreed.  By the inclusion of this
Policy within the reason for refusal, and with bullet point 8 being the only
relevant part of it to this proposal, it is clear to infer from this and their
remaining evidence that the Council finds that the proposal does not
incorporate appropriate access.
8. Therefore, in this regard, I do not consider that the Council have behaved
unreasonably.
9. With regard to the second claim, the site was marketed by the Council.  In
support of this marketing exercise was a Transport Statement, prepared by
PSP Consulting for Bidwells, on behalf of the Council’s Estates Department.
The statement identifies that there is adequate 2m x2m pedestrian visibility
splays at the point of access from the site onto Wynchwood Lane.  There is no
indication as to whether the access off Wynchwood Lane onto Ampthill Road
would be suitable.  Nevertheless, the statement concludes that there will be no
objection from the highway authority to the residential redevelopment of the
site.
10. Following the applicant’s purchase of the site, a pre-application enquiry was
submitted to the Council for the demolition of the existing building and erection
of 7 dwellings.  In respect of issues pertaining to Highway Safety and Car
Parking, the response was that the access route along Wynchwood Lane would
be sufficient to allow two way traffic movements and with a footway of nearly
3m along Ampthill Road visibility at the junction meets design standards.  I
note that it does not specifically refer to driver/pedestrian or driver/driver
inter-visibility.  Nevertheless, given that these are fundamental highway safety
considerations, it seems highly unlikely that both of these aspects were not
considered.
11. There is no evidence that the development plan and any relevant guidance has
changed since the marketing exercise was carried out and the pre-application
advice given.  The Council confirmed that the advice given was that of the
individual officer at the time, who no longer works for the Council.
Nevertheless, the advice given was on behalf of the Council.  The appellant,
understandably, submitted the application on the basis of this advice.
12. The current Council highways officer considers that the proposal does conflict
with the development plan and relevant guidance.  Whilst I appreciate that the
pre-application advice is not binding upon the Council, it clearly indicates that
Page 46

Page 47

Costs Decision APP/P0240/W/18/3210480
https://www.gov.uk/planning-inspectorate   3
there would be no objection to the proposal on highways grounds.  The sudden
change in the Council’s position, which stemmed purely from a change in the
highways officer considering the proposal, as confirmed by the Council,
resulted in the application being refused and the subject appeal being lodged. 
I find that this sudden change in position without any reasonable justification,
other than a difference of professional opinion between two Council officers,
amounts to unreasonable behaviour on behalf of the Council.  Such behaviour
provides a great deal of uncertainty to the developer, particularly in this
instance as the application was submitted with a justifiable expectation that it
would be approved.
13. As I have found that the proposal would not result in any significantly harmful
effect on highway safety, as a result of this unreasonable behaviour the
appellant has incurred unnecessary costs in the appeal process.
Conclusion
14. I conclude therefore that unreasonable behaviour resulting in unnecessary or
wasted expense has been demonstrated and that a full award of costs is
justified.
Costs Order
15. In exercise of the powers under section 250(5) of the Local Government Act
1972 and Schedule 6 of the Town and Country Planning Act 1990 as amended,
and all other enabling powers in that behalf, IT IS HEREBY ORDERED that
Central Bedfordshire Council shall pay to Mr Troy Mayer on behalf of Black
Horse Residential Ltd., the costs of the appeal proceedings described in the
heading of this decision.
16. The applicant is now invited to submit to Central Bedfordshire Council, to whom
a copy of this decision has been sent, details of those costs with a view to
reaching agreement as to the amount.
INSPECTOR
Page 47

Page 48

This page is intentionally left blank

Page 49

Page 49

Page 50

2
In summary and as I outlined above, I require further information on the ecological
and biodiversity interest (including trees, shrubs and grasslands) of the site in the form of a
survey report with mitigation along with further information on public realm works in relation to
the details of the plant selection in the Landscape Planting Plan, construction details of the path,
flood management, protection of the water course and a Maintenance Plan for the public area.
I look forward to receiving the results of the ecological surveys and the details of the Trees and
Shrub Protection Plan and Landscape Planting Plan in order to provide further comment.
If you require clarification, please do not hesitate to contact me.
Yours sincerely,
-
Marina Curran-Colthart, Local Biodiversity Officer, Argyll and Bute Council.
https://www.argyll-bute.gov.uk/sites/default/files/biodiversity technical note feb 2017 4.pdf
https://www.nature.scot/sites/default/fi1es/2019-
09/Pol1inators%20in%20Planning%20and%20Construction%20Guide.pdf
Page 50

Page 51

LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
MH
MH
MH
MH
MH
MH
MH
MH
P
P
P
P
P
P
BIN
BIN
BIN
G
G
G
G
G
G
G
G
G
G
G
T T
T
T
T
T
T
T
T
T
T
TT
T
T
T
TT
IC
IC
BT
BT
BT
BT
BT
BT
BT
IL
FH
TP
MKR
MKR
MKR
MKRMKRMKR
RS
RS
BL
BL
BL
BL
BL
BL
BL
CV
JB
JB
13.652
23.980
1A2.702
35.925
48.470
59.840
65.925
75.032
84.701
8A3.303
94.564
505.778
8B3.457
103.302
10A5.850
113.091
10B5.737
122.782
X13.024
8D3.834
8E3.614
8F3.638
518.531
525.534
8C3.887
691020N 691020N
691040N 691040N
691060N 691060N
691080N 691080N
691100N 691100N
691120N 691120N
691140N 691140N
691160N 691160N
691180N 691180N
691200N 691200N
691220N 691220N
691240N 691240N
691260N 691260N
691280N 691280N
691300N 691300N
691320N 691320N
223520E
223520E
223540E
223540E
223560E
223560E
223580E
223580E
223600E
223600E
223620E
223620E
223640E
223640E
223660E
223660E
223680E
223680E
223700E
223700E
223720E
223720E
223740E
223740E
223760E
223760E
223780E
223780E
223800E
223800E
0.33
0.44
0.58
0.77
0.97
1.35
1.77
1.86
1.48
1.08
0.85
0.70
0.61
0.49
0.34
0.61
0.73
0.84
1.10
1.45
1.95
2.11
1.51
1.10
1.03
0.75
0.51
0.58
0.440.50
0.67
0.65
0.66
1.02
1.17
1.52
2.062.04
1.54
1.21
1.00
0.78
0.75
0.59
0.74
0.79
0.87
0.96
1.21
1.70
2.03
3.56
3.58
3.65
3.68
3.71
3.71
3.78
3.75
3.78
3.68
3.70
3.66
3.67
3.57
3.57
3.88
3.87
3.76
2.78
2.78
2.33
2.67
3.73
3.17
3.21
3.63
3.08
3.33
3.71
3.77
3.81
3.96
3.70
3.88
3.74
3.54
3.36
3.24
3.02
3.24
3.60
3.68
3.79
3.78
3.91
3.30
2.68
2.71
3.25
3.55
3.31
3.37
2.79
3.83
3.60
3.71
3.63
3.67
3.41
3.54
3.53
3.57
3.43
3.67
3.32
3.11
2.27
1.28
2.28
1.26
2.58
2.93
3.47
1.35
1.33
1.34
3.75
3.88
3.91
3.80
3.63
3.48
3.56
3.51
2.62
2.25
2.31
2.24
2.24
2.28
2.402.50
2.67
2.58
2.43
2.51
2.20
2.39
2.34
2.36
2.23
2.18
2.18
2.06
2.01
1.61
2.00
2.21
1.52
1.15
1.24
1.27
1.30
1.30
1.28
1.25
1.38
1.18
1.34 1.16
1.26
1.77
1.37
1.36
1.37
1.38
1.33
1.28
1.60
2.17
3.07
2.43
3.09
2.77
3.32
1.45
1.40
1.54
1.48
1.31
1.26
1.30
1.52
1.51
1.81
1.82
1.84
1.83
1.84
1.81
1.98
1.99
2.00
2.14
2.20
2.27
1.73
1.32
1.53
1.53
1.55
1.52
1.62
1.74
1.56
1.21
1.84
1.86
1.32
2.09
4.60
5.17
5.80
6.29
6.81
7.18
7.72
8.618.60
7.85
7.16
6.58
6.11
5.56
4.96
4.31
3.12
2.38
4.37
4.93
5.46
6.06
6.60
6.05
5.29
4.44
3.80
3.20
3.25
3.42
3.92
4.84
4.58
5.32
3.68
1.95
1.88
3.02
2.21
2.24
2.08
2.88
3.28
3.68
3.42
3.07
2.48
2.22
1.94
2.15
1.57
1.89
1.57
1.76
1.89
5.02
5.43
6.04 5.93
6.37
6.33
7.12
7.36
7.53
7.65
7.65
7.72 7.74
7.84
7.89
8.10
7.81
7.62
7.42
7.17
6.84
6.35
5.81
5.22
4.72
4.58
5.16
5.75
6.33
7.03
7.24
7.47
7.71
7.99
8.13
7.84
7.61
7.38
7.29
6.42
6.50
6.12 5.39
4.58
4.575.59
4.59
5.07
4.30
3.79
3.78
3.72
5.16
4.08
4.62
3.78
4.33
3.75
4.68
5.26
5.84
7.13
7.34
7.57
7.81
8.09
7.07
6.76
6.86
9.54
9.41
9.31
9.59
10.13
10.21
10.70
10.73
10.41
9.97
9.41
8.85
9.60
9.20
8.69
8.25
8.09
8.35
8.88
9.43
9.98
10.44
10.65
10.60
10.17
9.74
10.95
10.78
10.53
10.12
9.59
9.01
8.538.45
8.98
9.53
10.09
10.54
10.70
10.27
9.84
10.64
10.83
10.68
10.78
10.62
10.26
10.08
10.01
9.96
9.91
9.94
10.43
9.17
8.18
7.22
6.38
10.04
10.15
10.40
7.29
8.61
9.69
9.61
7.26
6.48
8.46
7.67
7.11
6.83
9.10
9.84
9.20
9.17
9.09
9.85
8.67
7.50
6.71
9.71
8.58
7.75
7.17
6.326.42
6.67
6.37
6.29
6.26
6.43
6.14
6.01
6.77
6.47
6.40
6.38
5.87 5.80
5.53
5.12
4.91
4.92
4.97
4.94
4.92
4.93
6.27
6.14
6.00 5.93
5.63
5.22
5.01
5.02
5.07
5.01
5.20
5.35
5.53
5.69
5.78
5.88
6.02
6.21
5.90 5.95
5.82
5.68
5.63
5.46
5.25
5.11
5.05
5.03
5.04
5.12
5.31
5.49
5.67
5.83
5.92
6.03
6.34
5.11
5.26
5.42
4.90
4.85
5.04
4.80
6.00
6.09
6.57
6.34
6.40
6.22
4.70
4.74
5.23
5.23
5.34
5.70
5.10
5.07
5.25
5.47
5.73
6.18
6.19
6.01
5.24
5.56
5.30
5.13
5.23
5.31
5.25
5.50
5.37
5.19
5.11
5.06
5.24
5.04
5.145.14
5.09
4.99
5.01
5.36
5.16
5.25
5.41
5.15
5.29
5.02
5.04
5.38
4.79
4.76
4.78
5.15
5.33
5.12
4.98
4.86
4.94
5.19
5.23
5.25
5.09
4.95
4.90
4.68
4.37
3.90
3.90
3.58
3.58
3.54
3.63
3.85
4.11
4.95
4.75
4.78
4.81
4.83
4.82
4.87
4.79
4.78
4.81
4.76
4.73
4.70
4.69
4.68
4.73
4.72
4.72
4.88
4.88
4.76
4.74
4.72
4.78
4.77
4.99
4.96
4.72
4.66
4.66
4.67
4.86
5.01
4.734.72
4.70
4.81
4.48
4.33
3.85
3.813.77
3.72
4.04
4.99
4.82
3.93
3.66
4.46
4.35
4.91
4.86
4.82
4.79
4.79
4.76
4.75
4.74
4.79
4.82
4.82
4.04
6.03
4.90
4.01
3.66
3.67
3.94
4.79
6.13
6.17
5.76
5.74
3.81
5.71
5.05
3.26
3.08
2.89
2.69
3.52
5.70
6.11
5.78
5.67
5.69
5.79
5.60
3.13
3.42
3.12
3.25
3.42
3.73
4.36
5.56
3.82
2.76
3.00
2.96
3.21
2.11
2.12
2.22
2.392.72
2.64
2.74
2.46 2.15
2.13
2.21
3.21
5.71
5.69
5.77
5.86
5.99
6.00
5.59
5.76
5.80
5.77
5.755.77
5.79
5.84
5.88
5.89
5.87
5.67
5.64
5.65
5.67
5.71
5.78
5.77
5.79
5.78
4.38
3.68
3.70
4.81
3.69
3.653.52
4.18
5.35
5.43
5.72
5.67
5.68
5.88
5.77
5.83
5.79
5.81
5.82
5.83
5.72
5.50
5.64
5.35
6.35
6.43
6.79 6.78
7.17
7.45
7.67
7.80
3.48
3.47
3.29
3.36
3.17
3.30
3.45
3.51
3.52
3.46
3.20
3.07
2.97
2.91
2.98
3.06
3.18
3.30
3.55
3.15
2.87
2.92
3.04
3.47
2.852.01
1.94
2.08
2.76
2.90
2.89
3.00
2.95
1.93
1.94
4.41
4.60
4.48
4.42
2.89
2.81
2.76
2.72
2.60
2.95
2.80
1.91
2.00
1.96
1.88
2.01
2.06
2.14
2.15
2.49
2.50
2.69 2.66
2.71
2.43
2.47
2.45
1.51
1.71
1.38
2.12
2.51
2.50
1.99
1.93
2.18
2.00
2.45
2.43
2.56 2.52
2.59
2.39
3.25
3.07
2.98
2.96
2.98
2.93
3.47 2.79
2.75
2.41
2.433.39
3.16
2.22
3.19
3.07
3.01
3.08
3.14
3.40
3.39
2.45
2.45
2.39
3.21
3.33
3.32
3.49
2.88
2.84
2.78
2.61
2.58
2.14
2.69
2.70
2.78
3.39
3.62
3.85
3.48
3.88
4.13
5.22
4.23
3.40
2.87
2.91
2.82
2.83
5.40
5.19
2.69
2.84
2.85
3.13
3.87
3.62
3.51
3.39
3.66
3.52
4.29
3.13
2.93
2.95
2.83
2.48
3.74
3.86
4.05
4.88
5.49
4.63
4.40
5.13
5.98
5.13
5.52
6.54
7.99
5.62
6.16
6.98
8.03
7.96
8.53
8.88
8.99
6.35
7.60
8.24
8.38
7.26
8.80
8.52
7.84
7.16
7.77
8.56
8.19
7.21
6.45
5.96
4.38
4.92
5.18
5.12
5.55
5.275.64
5.825.95
5.60
5.55
5.28
3.97
3.62
3.76
3.14
3.34
3.33
2.72
2.80
4.20
2.40
2.54
2.38
4.14
2.42
2.89
1.85
9.04
9.12
3.15
3.53
2.94
2.67
8.53
8.33
8.79
4.495.40
3.48
3.29
3.38
3.16
3.10
3.00
2.99
4.62
4.60
4.38
5.09
4.68
3.774.27
4.23
4.25
4.80
3.13
4.60 4.73
3.15 4.73
3.94
4.63
4.32
4.34
4.86
5.00
4.75
2.262.69
2.92 1.99
2.15
1.90
2.41
2.27
2.78
2.30
2.30
2.34
2.22
dense foliageunable to survey dense foliageunable to survey
dense foliageunable to survey
dense foliageunable to survey
dense foliageunable to survey
dense foliageunable to survey
dense foliageunable to survey
dense foliageunable to survey
dense foliageunable to survey
dense foliageunable to survey
dense foliageunable to survey
dense foliageunable to survey
TARMAC
TARMAC
TARMAC
TARMAC
TARMAC
TARMAC
TARMAC
TARMAC
TARMAC
TARMAC
TARMAC
TARMAC
TARMAC
TARMAC
TARMAC
TARMAC
TARMAC
TARMAC
TARMAC
TARMAC
TARMAC
CONCRETE SLABS
CONCRETE
TARMAC
TARMAC
TARMAC
TARMAC
TARMAC
TARMAC
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
PEBBLES/BEACH
PEBBLES/BEACH
PEBBLES/BEACH
PEBBLES/BEACH
PEBBLES/BEACH
GRASS
GRASS
PEBBLES
PEBBLES
PEBBLES
PEBBLES
DIRT PATH
DIRT PATH
DIRT PATH
DIRT PATH
DIRT PATH
DIRT PATH
GRASS
GRASS
GRASS
pipes
Top of Bank
Bottom of Bank
Top of Bank
Top of Bank
Top of Bank
Top of Bank
Top of Bank
Top of Bank
Top of Bank
Top of Bank
Top of Bank
Top of Bank
Top of Bank
Top of Bank
Top of Bank
Top of Bank
Top of Bank
Top of Bank
Top of Bank
Top of Bank
Top of Bank
Top of Bank
Top of Bank
Top of Bank
Top of Bank
Top of Bank
Top of Bank
Bottom of Bank
Bottom of Bank
Bottom of Bank
Bottom of Bank
0.5
0.5
0.5
1.0
1.0
1.0
1.0
1.5
1.51.51.5
1.5
1.5
1.5
0.5
4.0
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.0
3.0
3.0
3.0
3.0
3.0
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.0
2.02.0
2.0
2.0
2.0
2.0
2.0
2.5
5.5
10.5
10.5
10.0
10.0
10.0
9.0
9.0
9.0
8.5
8.5
8.5
8.5
8.0
8.0
8.0
8.0
8.0
7.5
7.5
7.5
7.5
7.5
7.5
9.5
9.5
9.5
9.5
6.5
6.5
6.5
6.5
6.5
6.5
7.0
7.0
7.0
7.0
7.0
6.5
6.0
6.0
6.0
6.0
6.0
6.0
6.0
4.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.5
5.5
5.5
5.5
5.5
4.5
4.5
4.5
4.5
5.0
5.0
5.0
5.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
6.0
6.0
6.5
7.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.0
2.5
2.5 2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.52.5
2.5
2.5
2.5
2.0
2.0
2.0
2.0
2.0
2.0
2.02.0
2.0
2.0
2.0
1.5
1.5
1.5
1.5
2.0
3.5
2.0
2.5
2.0
D SC
LIN
WAY
UPLAND
QUEEN 'S
CRESCENTW
HISTLEFIELD
ROAD
6m
11m B872
96m
22m
10m
50m
20m
Path
Oakfield
30m
NorthFernicarry
PW
Fernicarry
Farm
NTL
MLWS
Bruach
Chorrach
A
FB
FB
MHWS
NTL
Wood
OR
HOOL ROAD
FE
Sheepfold
Tel Ex
FAIRW
O
MCAUL
TCYD
ROAD
Y
SMIDD
B872
Track
School
Primary
Garelochhead
LPY
L
B833
PO
Park
Public
Bendarroch
Ordnance Survey, (c) Crown Copyright 2019. All rights reserved. Licence number 100022432
A3
Drawing Number:
Project:
Drawing Title:
Issue Status:
Revision:
Date:
Scale:
Drawn By:
DescriptionDate
Revision Description
Rev By
THIS DRAWING IS COPYRIGHT
DO NOT SCALE FROM DRAWING
63 West Princes Street
Helensburgh
G84 8BN
01436 674 777
07816 907 203
www.mhplanning.co.uk
Client:
MH Planning
Associates
Mr Lorne Thompson
Land at Garelochhead
Site Location Plan
2019_0057-03
B
April 2020
1:1250 and 1:10,000 @ A3
KM
Planning
l o c a t i o n   p l a n
scale 1:1250 @ A3 n o r t h
Red line indicates extent of 'Application site'
0m 50m 100m10m 20m
PS Scale Bar for 1:1250
s u p p l e m e n t a r y   l o c a t i o n   p l a n
scale 1:10,000 @ A3
n o r t h
0m 1000m100m
PS Scale Bar for 1:10,000
500m
Apr '20 Point of Access Indicated A KM
Site Area - 2.16ha
New path
New path
New path
New path
Footbridge
Blue line indicates extent of other land in ownership of the applicant
Proposed Point
of Access
Oct '20 Red Line altered, house added B KM
Page 51

Page 52

This page is intentionally left blank

Page 53

LP
LP
P
T
T
T
MKR
BL
BL
59.840
505.778
8B3.457
8D3.834
8E3.614
8F3.638
518.531
525.534
8C3.887
5.80
6.29
6.81
7.18
7.72
8.618.60
7.85
7.16
6.58
6.11
5.56
5.46
6.06
6.60
6.05
5.29
4.84
4.58
5.32
7.99
8.138.09
9.54
9.41
9.31
9.59
10.13
10.21
10.70
10.73
10.41
9.97
9.41
8.85
9.60
9.20
8.69
8.35
8.88
9.43
9.98
10.44
10.65
10.60
10.17
9.74
10.95
10.78
10.53
10.12
9.59
9.01
8.538.45
8.98
9.53
10.09
10.54
10.70
10.27
9.84
10.64
10.83
10.68
10.78
10.62
10.26
10.43
10.40
9.69
9.61
9.84
9.20
9.17
9.09
9.85
9.71
2.59
3.08
3.39
3.21
3.33
3.32
3.49
2.88
2.84
2.78
2.61
2.58
2.69
2.70
2.78 3.85
3.48
3.88
4.13
5.22
4.23
3.40
2.87
2.91
2.82
2.83
5.40
5.19
2.69
2.84
2.85
3.51
3.39
3.66
3.52
2.93
2.95
2.83
2.48
3.74
4.40
5.98
5.13
5.52
6.54
7.99
5.62
6.16
6.98
8.03
7.96
8.53
8.88
8.99
6.35
7.60
8.24
8.38
7.26
8.80
8.52
7.84
7.16
7.77
8.56
8.19
7.21
6.45
5.96
4.38
4.92
5.18
5.12
5.55
5.275.64
5.82
5.95
5.60
5.55
5.28
3.97
3.62
3.76
3.14
3.34
3.33
2.72
2.80
4.20
2.40
9.04
9.12
8.53
8.33
8.79
dense foliage
unable to survey
dense foliage
unable to survey
dense foliage
unable to survey
dense foliage
unable to survey
dense foliage
unable to survey
dense foliage
unable to survey
TARMAC
TARMAC
TARMAC
TARMAC
TARMAC
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
Top of Bank
Top of Bank
Top of Bank
Top of Bank
10.5
10.5
10.0
10.0
9.0
9.0
9.0
8.5
8.5
8.5
8.0
8.0
8.0
8.0
7.5
7.5
7.5
7.5
9.5
9.5
9.5
6.5
6.5
6.5
7.0
7.0
7.0
6.0
6.0
6.0
6.0
5.5
5.5
5.5
5.5
5.0
5.0
5.0
4.5
4.5
4.5
4.0
4.0
4.0
3.0
3.0
3.0
3.0
3.0
3.5
3.5
3.5
3.5
A3
Drawing Number:
Project:
Drawing Title:
Issue Status:
Revision:
Date:
Scale:
Drawn By:
DescriptionDate
Revision Description
Rev By
THIS DRAWING IS COPYRIGHT
DO NOT SCALE FROM DRAWING
63 West Princes Street
Helensburgh
G84 8BN
01436 674 777
07816 907 203
www.mhplanning.co.uk
Client:
MH Planning
Associates
Mr Lorne Thompson
Land at Garelochhead
Site Plan
2019_0057-04
A
June 2020
1:500 @ A3
KM
Planning
s i t e   p l a n
scale 1:500 @ A3
Oct '20 Colour change to line A KM
0m 10m
PS Scale Bar for 1:500
20m 30m 50m40m
Site area less than 7.0m AOD is shaded red
Page 53

Page 54

This page is intentionally left blank

Page 55

INDICATIVE HOUSE LOCATION
PROPOSED GRAVEL SURFACE
PROPOSED WOODLAND MEADOW
MIX
PROPOSED BEE, BIRD AND BUTTERFLY
MEADOW MIX
REV A - 10/09/20 - CG/PRM
LAYOUT UPDATED FOLLOWING COMMENTS FROM CLIENT
ON 04/09/20.
REV B - 15/09/20 - CG/PRM
LEGEND AMENDED FOLLOWING COMMENTS FROM CLIENT
ON 13/09/20.
REV C - 17/09/20 - CG/PRM
HOUSE FOOTPRINT AMENDED FOLLOWING COMMENTS RE-
CIEVED ON 16/09/20.
PROPOSED FOOTPATH
PLANNING
C
PROPOSED NATIVE SHRUB HEDGING
MIX. E.G: HOLLY, BEACH, BUCKTHORN
& HONEYSUCKLE
N.B: REFER TO DWG No. 1561-02 FOR
PRECEDENT IMAGES AND ILLUSTRIONS
Page 55

Page 56

This page is intentionally left blank

Page 57

PRECEDENT IMAGES:
P
R
O
P
O
S
E
D
TR
E
E
P
LA
N
TIN
G
P
R
O
P
O
S
E
D
PATH
S
U
R
FA
C
E
S
P
R
O
P
O
S
E
D 
H
E
D
G
E
P
LA
N
TIN
G
INDICATIVE HOUSING LAYOUT
MEMORIAL EXAMPLE
N.B: VISUAL OF HOUSE FOR INDICATIVE PURPOSED ONLY.
SIZE AND STYLE MAY CHANGE.
W
ILD
FLO
W
E
R
P
LA
N
TIN
G
LAND AT GARELOCHHEADPLANNINGCG PRM
16/09/2020 PRECEDENT IMAGES1561-02
MR LORNE THOMPSON
PROPOSED NATIVE TREE PLANTING SUCH AS
BIRCH, FIELD MAPLE, HOLLY, HAWTHORN &
BLACKTHORN TO SUPPORT LOCAL
BIODIVERSITY AND ENCOURAGE WILDLIFE.
PROPOSED PUBLIC FOOTPATH MATERIAL
TO VARY FROM COMPACTED RECYCLED
STONE, RECYCLED BARK MULCH AND
MOWN GRASS.
PROPOSED HEDGING TO CONTAIN A MIX-
TURE OF NATIVE SPECIES SUCH AS;
BEECH, HAWTHORN, HONEYSUCKLE &
HOLLY TO HELP SUSTAIN LOCAL WILD-
LIFE.
PROPOSED INDICATIVE WILDFLOWER MEADOW
MIX TO PROVIDE SEASONAL INTEREST AS WELL
AS INCREASE BIODIVERSITY AND ENCOURAGE
WILDLIFE.
Page 57

Page 58

This page is intentionally left blank

Page 59

STATEMENT OF CASE 
FOR 
ARGYLL AND BUTE COUNCIL 
LOCAL REVIEW BODY 
REFUSAL OF PLANNING PERMISSION FOR
ERECTION OF SINGLE DWELLINGHOUSE AT
LAND WEST OF MCAULAY BURN,
GARELOCHHEAD 
PLANNING APPLICATION REFERENCE
NUMBER 20/01822/PP 
LOCAL REVIEW BOARD REFERENCE 
NUMBER 24/0008/LRB 
3rd MAY 2024
Page 59 Agenda Item 3b

Page 60

STATEMENT OF CASE 
The planning authority is Argyll and Bute Council (‘the Council’). The appellants are
Mr Lorne Thomson (‘the appellants’) and their agent is Mr Michael Hyde (‘the agent’). 
The planning application, reference number 20/01822/PP, for the erection of a
dwellinghouse at land west of McAulay burn, Garelochhead (“the appeal site”) was
refused under delegated powers on the 12th March 2024. The planning application
has been appealed and is subject of referral to a Local Review Body. 
DESCRIPTION OF SITE 
The application site is located within the settlement of Garelochhead within an area
of open space. The site is situated alongside the junction of the B872 and B833, to
the south-west of a telephone exchange building, and opposite a ribbon of detached
dwellings at the west side of the B833. The site is traversed by the McAulay Burn.
The land slopes principally to the south and east towards the Gare Loch. 
SITE HISTORY 
The planning history of the site and locality is detailed in Section D of the Report of
Handling and includes one previous application which was withdrawn. 
STATUTORY BASIS ON WHICH THE APPEAL SHOULD BE DECIDED
Section 25 of the Town & Country Planning (Scotland) Act 1997 provides that
where, in making any determination under the planning Acts, regard is to be had
to the development plan, the determination shall be made in accordance with the
plan unless material considerations indicate otherwise.  This is the test for this
application. 
STATEMENT OF CASE 
Argyll and Bute Council considers the determining issues in relation to the case are
as follows:- 
- Whether the proposed location and siting is harmful to the character
and amenity of the green space and identified open space and whether
the public open space enhancements are sufficient to justify the
proposal contrary to policy. 
- Whether the proposed location and siting of the proposed development
have sufficient regard to the context of their setting. 
- Whether there is sufficient evidence with regard to the impacts on
biodiversity. 
The Report of Handling (attached) sets out the Council’s assessment of the
application in terms of Development Plan policy and other material considerations. 
Page 60

Page 61

REQUIREMENT FOR ADDITIONAL INFORMATION AND A HEARING 
It is considered that no new information has been raised in the appellants’
submission. The issues raised were covered in the Report of Handling which is
contained in Appendix 1, including a summary of the representations submitted from
8 objectors. As such it is considered that Members have all the information they need
to determine the case. Given the above and that the proposal is small-scale, has no
complex or challenging issues and has not been the subject of significant body of
conflicting representation, then it is considered that a Hearing is not required. 
COMMENT ON APPELLANTS’ SUBMISSION 
Having regard to the detailed reasons for requesting the review set out in part (7) of
the appellants’ submission the following points are noted: 
1. The appellant has set out an alternative case to the matters considered
by officers in setting out Reason for Refusal no. 1 which considers the
whether the proposal is harmful to the open space. 
The appellant’s agent argues that the application site would result in the loss
of just 5.5% of the overall Open Space Protection Area. The agent argues
that the original pre-application advice was that the public realm
enhancements were significant in contrast with the assessment within the
Report of Handling which states the benefits are modest.  It is noted that
officer’s assessment of this aspect of the proposal is set out within Section P
of the main report of handling and is primarily addressed under the sub-
section headed ‘Open Space Protection Area’. This sub-section highlights the
relevant policy considerations and includes commentary on the relevance of
other developments referenced by the appellant as these matters were also
highlighted as supporting information to the planning application. The
planning officer reports states “The loss of a significant part of the OSPA
within this parcel would harm the amenity of the settlement, for residents and
visitors.” Therefore, despite arguments made by the appellant that the amount
of open space is small, the planning officer argues that it is a significant part
of the OSPA.  Members should note that the location of the open space within
the wider context is vital in the assessment of whether the loss is acceptable,
not just merely the area of the open space to be lost. Also, it should be noted
that at pre-application stage there is not a full assessment of all matters and
often there is no site visit, and guidance is given to an applicant and it has no
bearing on the final decision made following a full assessment of all matters. 
It is agreed that it is not correct to say there would be no mechanism to
secure the proposed public realm enhancements and a planning obligation,
could secure the delivery of the enhancements. At no time did the planning
officer say that this was not the case. In fact the report clearly states
“enhancements of the remaining area would be welcome, subject to details,
and maintenance provisions which in the context of planning permission
would have to be secured by legal agreement” fully acknowledging that if we
found the proposal acceptable then negotiation would take place to secure
this legal agreement. Members are drawn to the point that, even if the
enhancements were secured via a legal agreement, it is not considered that
these enhancements would outweigh the effects of the fragmentation and
reduction of the informal recreation space, contrary to policy. 
Page 61

Page 62

2. The appellant has set out their views on the potential impact on
biodiversity. 
It is noted that officer’s assessment of this aspect of the proposal is set out
within Section P of the main report of handling and is primarily addressed
under the sub-sections headed ‘Natural Environment’. We would not dispute
that planning conditions can be used to secure re-surveys or clarification on
impacts in relation to species and trees on a site. Indeed the planning officer
recognises that a condition could be used to secure additional planting and to
secure ecological surveys. However, in relation to biodiversity, it should be
noted that NPF4 and the newly adopted LDP2, give added protection to
biodiversity given the biodiversity crisis, hence why the officer states that a
precautionary approach is applied given there was insufficient information to
assess the proposal against these new policies. Given the application was to
be refused, then it was not considered appropriate to request the surveys
prior to determination. 
3. The appellant has set out their view in relation to potential impact
on flood risk. 
It is noted that officer’s assessment of this aspect of the proposal is set out
within Section P of the main report of handling and is primarily addressed
under the sub-section headed ‘Flood Risk’ and there are no objections with
regard to flood risk and this is not a reason for refusal. The appellant is
merely drawing members attention to the Flood Risk Assessment which is
listed within the Supporting Documents Section G of the report. 
CONCLUSION 
Section 25 of the Town and Country Planning Act 1997 requires that all decisions be
made in accordance with the development plan unless material considerations
indicate otherwise. 
At the time the decision was made, the ‘Development Plan’ for Argyll and Bute
(excluding the area covered by the Loch Lomond and the Trossachs National Park
Authority) was and still is the National Planning Framework 4 and LDP2 which
require to be applied holistically with preference afforded to LDP2, as the most recent
expression of policy, in the event of any conflict between the two policy documents.
For the avoidance of doubt, it is also confirmed that the Argyll and Bute Local
Development Plan 2015 and its associated Supplementary Guidance are now
superseded and accordingly should not be afforded significant material weight in
planning determinations. 
Summary Commentary on Key Material Considerations: 
Whether the development is harmful to this greenfield site designated as an
Open Space Protection Area 
LDP2 Policy 81 states that development proposals resulting in the loss of Open
Space Protection Areas will not be permitted except for circumstances in the list
provided in the policy – in particular that there would be no loss of amenity value it
provides through either partial, or complete development. NPF4 Policy 9 sets out that
proposals on Greenfield sites will not be supported unless the site has been allocated
for development or the proposal is explicitly supported by policies in the LDP.
Page 62

Page 63

Whilst this site is within the settlement area for Garelochhead, the site is greenfield
and part of an Open Space Protection Area. The site has been eroded by removal of
trees and unauthorised dumping of material, but nevertheless, it serves to provide
valuable amenity space to the village. The proposal results in a new loss and
fragmentation of open space. 
The proposal is accordingly considered to be contrary to NPF4 policies 1, 9, 14, 16,
20 and 21 and LDP2 Policies 04, 05, 06, 26 and 81. 
Whether the development is appropriately sited in keeping with the local
character of Garelochead. 
The site is located within the village of Garelochead identified as Settlement Area in
the Argyll and Bute Local Development Plan 2 2024 (LDP2) wherein the provisions of
Policy 01 serve to give encouragement in principle for development. Within the
settlement zone, LDP2 Policy 01 sets out a general presumption in support of
development provided that such development is appropriately sited, is of a scale and
design which fits within the context of the locale, is compatible with the character and
amenity of its surrounds and, does not give rise to adverse access or servicing
implications. 
Whilst this site is within the settlement area for Garelochhead, which has some
potential to accommodate a residential development, the officers have reached a
view that the siting of the dwellinghouse proposed does not satisfactorily respect the
character and appearance of the surrounding area. The character of the area is
ribbon development along the west of the B833 with no development interrupting this
side of the road. The site is in an isolated position on the eastern side of the road and
would be starkly and incongruous with the established settlement pattern. It is at the
top of the slope and cuts across the open space. 
The proposal is accordingly considered to be contrary to NPF4 Policy 14, and LDP2
Policies  01, 04, 05, 08 and 10. 
Whether the development protects and enhances the biodiversity of the
local area. 
LDP2 policy 73 states that when considering proposals that full consideration needs
to be given to species protected by the Wildlife and Conservation Act 1981, the
Protection of Badgers Act and the Conservation Regulations 1994. NPF4 Policy 3
says that any potential adverse impact on biodiversity, nature networks and the
natural environment will be minimised though careful planning and design and Policy
4 states a precautionary principle will be applied in accordance with relevant
legislation and proposals likely to have an adverse effect on species will only be
supported where the proposal meets the relevant statutory tests. 
In this instance, there is a lack of ecological information on the condition of the
existing site and given it is an open space site with a nearby watercourse then a
precautionary approach has been taken in this regard.   
The proposal is accordingly considered to be contrary to NPF4 Polices 3 and 4, and
LDP2 Policies 06 and 73. 
Page 63

Page 64

Taking account of the above, it is respectfully requested that the request for a review
be dismissed. 
Appended documents:
Report of Handling 
Page 64

Page 65

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Argyll and Bute Council
Development & Economic Growth   
Planning Application Report and Report of Handling as required by Schedule 2 of the
Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013 relative to applications for Planning Permission or Planning
Permission in Principle 
Reference No: 20/01822/PPP
Planning Hierarchy: Local Application
Applicant: Mr Lorne Thomson
Proposal: Site for the erection of dwellinghouse and public realm
enhancements
Site Address:  Land East Of Taliesin West
Garelochhead  
DECISION ROUTE 
☒Delegated - Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997 
☐Committee - Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission
• Erection of dwelling house
• Formation of vehicular access
• Laying out of footpaths (improvement of informal ways)
• Install memorial 
(ii) Other specified operations
• n/a 
(B) RECOMMENDATION: 
Having due regard to the Development Plan and all other material considerations, it
is recommended that planning permission be refused and reasons appended to this
report. 
(C) CONSULTATIONS:   
Argyll and Bute Biodiversity Officer – 05/01/2021 [earlier comments have been
superseded]:
The applicant has not provided any ecological or biodiversity survey information for
this proposal. The following surveys should be carried out by an appropriately
qualified person at the optimum time of year and include mitigation:
1. European Protected Species- Otter and Bats; and Protected Species: birds,
mammals, insects, reptiles, amphibians and fish.
2. Trees and Shrubs: the location and condition of the trees especially those that
are either on or close to the development site along with those that are in the public
realm area need to be assessed for species, condition and wildlife. The shrubs,
Page 65

Page 66

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
grass areas and the species within need to be included as part of the surveys along
with advice on a Tree and Shrub Protection Plan.
The proposal for the public realm works requires further information in relation to
the details of the plant selection in the Landscape Planting Plan, the construction of
the path, flood management, protection of the water course and a Maintenance
Plan for the public area. 
[officer comment: the agent has challenged the scope of ecological surveying
recommended, however these are considered proportionate given the undeveloped
nature of the site]. 
Argyll and Bute Flood Risk Management – 04/11/2020: 
No objections. Kaya Consulting Ltd. was commissioned through MH Planning
Associates to provide comment on the flood risk associated with this application,
this has been submitted in the form of the updated Flood Risk Statement(FRS).
This statement expands upon conclusions from the initial Flood Risk Assessment
(FRA) prepared by Dr John Riddell dated October 2007.
No information pertaining to historical flooding has been supplied with the
application. The submitted FRA nor the updated flood statement include any
historic flooding information.
The site is partially overlain by the 1:200-year surface water, fluvial and coastal
flood extents as shown on the SEPA Flood Map (2014). The surface water flood
extent covers a small area to the north of the site, whilst the fluvial and coastal
extents cover a larger area to the north, east and south of the site, overlying the
McCauley Burn and estuary in close proximity to the site. However, with reference
to the site plan and the FRS, it has been adequately demonstrated that the
proposed structure lies outside of the indicative limits of flooding.
No finished floor levels to mAOD have been included with this In Principle
application, however, the supporting planning statement informs that the proposed
site for the dwellinghouse is situated at circa 8.5-9.0m AOD. This is confirmed
within the site plan.
The updated FRS informs that the location of the dwellinghouse will be outwith the
revised coastal floodplain and given its height above the burn there is little risk of
fluvial flooding. The methods and allowances used to quantify the flood risk are
current and acceptable. It is understood that the Finished Floor Level of the
proposed development will not be lower than 7.0m AOD. On this basis, the FFLs
will be at least 1.7m above the estimated 1 in 200-year plus climate change flood
level, which is enough to encompass a freeboard and an allowance for waves. This
is acceptable. 
Argyll and Bute Development Policy – 12/02/2024:
The status of the application site as an Open Space Protection Area was
considered at the examination of the Proposed Local Development Plan 2. The
relevant parts of the Report of Examination are detailed below: 
“Area to the south of the B872 and east of the B833 
6. This site is part of a designated open space protection area on land to the north
and south of the B872, at its junction with the B833. There is however a significant
change from the adopted plan, where the site forms part of AFA 3/7, which is a
designated area for action identified as “local; enhance recreation and open space”.
7. The representation seeks the removal of land to the south of the B872 from the
open space protection area, to provide for a residential development and a
community building. This is supported by a statement indicating that the remainder
Page 66

Page 67

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
of the open space protection area within the control of the prospective developer
would be enhanced in terms described in the summary of the representation above.
8. There are essentially two elements to examine in relation to this representation.
The first is the effect on the open space area, and therefore the character and
amenity of the village, should this part of the open space protection area be
removed. 
9. From my inspection of the site and the surrounding area, the open space is
accessible from the B872, adjacent to a small car park and redundant telephone
exchange building. The open space is also accessible from the B833, and
particularly from a footpath running from east to west in the southern part of the
site. The open space constitutes informal grassland interspersed with mature trees,
which although not appearing to have significant informal recreational use,
nevertheless contributes significantly to the character and amenity of the village. 
10. The second element to examine is the effect from the development of the part
of the site to the south of the B872 for residential (and other) development. It is not
clear whether the representation seeks the designation of the site for housing, but
in any event, that appears to be the primary reason for seeking the removal of the
site from the open space protection area. 
11. The development of the site for housing would have some adverse effect on the
character and amenity of the village, which would not necessarily be sufficiently
compensated by the enhancement of the remaining area, although I accept that the
removal of the area for action (from the adopted plan) perhaps makes the
enhancement of any part of this open space protection area otherwise less likely. 
12. However, the open space protection area is not an embargo on development.
Any development would fall to be considered under Policy 81 of the proposed plan.
This would include appropriate consideration being given to mitigation through the
provision or improvement of recreational facilities or greenspace elsewhere. Given
my findings above, I also find this is the correct approach which should be taken
with respect to any proposals for development on the site. I note that pre-
application advice was provided in November 2019, under the framework of the
adopted plan. Such advice could also be sought under the framework of the
proposed plan. 
13. I do not consider that the loss of the area for action identified in the adopted
plan makes a significant difference to the case for the removal of protected open
space from the proposed plan. The action proposed through the adopted plan is to
enhance recreation and open space, and so the change to an open space
protection area merely changes the active consideration of open space
enhancement to a more passive approach. I do not consider that residential
development would necessarily be an appropriate approach to enhancing
recreation and open space. 
Overall conclusions 
14. I conclude that there is insufficient evidence to justify the removal of (or part of)
either of the above open space protection areas, and that therefore no
modifications should be made to the proposed plan in either case”. 
The Council have accepted the recommendations made by the Reporters. The
Council have published the LDP 2 Proposals for Adoption and have notified our
intention to adopt the plan following clearance by Scottish Ministers.  While LDP 2
has not been formally adopted, given its advanced stage, it should be given
significant weight as a material consideration in the assessment of this application. 
Argyll and Bute Roads – 25/11/2020:
Confirmed no objections subject to conditions:
Page 67

Page 68

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
1. Prior to Works Commencing on Site, a sightline visibility splay of 2.4 x 42 x 1.05
metres at the proposed new driveway access with B833 shall be provided in both
directions and thereafter maintained in perpetuity;
2. A minimum 4.5 metre wide vehicle access is required and shall be constructed
as per Operational Services Drg No SD 08/002;
3. The first 5 metres of each driveway access shall be surfaced in a bituminous
material or other approved hard material. This work shall be completed prior to
occupation of the dwelling houses;
4. The gradient of the new driveway accesses shall be no steeper than 1 in 20 (5%)
over the first 5 metres and thereafter no greater than 1 in 8 (12.5%);
5. Surface water must not be able to flow from the site onto carriageway;
6. The provision of off street car parking and turning within the curtilage of the
dwelling house shall be in accordance with SG TRAN 6.
Note: Integral garages are not considered as part of the car park provision 
Defence Infrastructure Organisation – 09/12/2020:
The site of the proposed dwelling house occupies the outer explosive safeguarding
zone, the vulnerable building distance (VBD), surrounding Defence Munitions (DM)
Coulport. This is the area contained between the yellow and purple lines shown on
the DM Coulport statutory explosive safeguarding plan. All buildings occupying the
VBD should be ‘non-vulnerable’ that is of robust construction and design so that
should an explosion occur at the MOD storage facility, buildings nearby will not
collapse or sustain damage that could cause critical injury to the occupants. In this
context, buildings that contain large areas of glass, tall structures (in excess of 3
storeys) and buildings of light weight construction are of particular concern to the
MOD.
In principle the MOD has no safeguarding objections to this proposed development
but due to the proposed sites location within the outer explosive safeguarding zone,
the MOD will need to complete a more detailed assessment once plans and further
information about the height and building materials become available. Such details
required for our assessments are:
• Details of the structural form
• External wall make-up & details
• Floor specification
• Details of roof structure/make up & covering
• Details of the extent of glazing on each of the elevations (drawings of the building
elevations would be satisfactory for this)
• Details of the window frame & glazing specification 
We therefore require the following condition to be included in any planning
permission:
“Prior to the construction of any dwelling associated with this permission details of
the method of construction of the dwelling shall be submitted to the Planning
Authority to allow further consultation with the Ministry of Defence (MOD)
safeguarding department. Such details as may be approved by the Planning
Authority in consultation with the MOD shall thereafter be implemented. Reason:
The site is located within a MOD safeguarding zone and construction of any
dwelling requires to accord with necessary standards in the interests of safety”. 
In summary, with regards to the concerns identified above, please could DIO
Safeguarding be consulted at all future planning/application stages of this
development proposal. It is important that the conditions requested in this response
are included in any planning permission granted. As per Planning Circular 2 2003:
The Town and Country Planning (Safeguarded Aerodromes, Technical Sites and
Military Explosives Storage Areas) (Scotland), if Argyll and Bute Council decides to
Page 68

Page 69

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
grant planning permission contrary to our advice then we must be notified 28 days
prior to a decision being made. 
Scottish Water – 09/11/2020:
Comments in relation to existing water and sewer infrastructure within/near the site
boundary that could be in potential conflict with any future development. 
Scottish Water – 20/02/2024:
There is currently sufficient capacity for a foul only connection in the
GARELOCHEAD 1 Waste Water Treatment works. 
Scottish Environment Protection Agency (SEPA) – 04/08/2022:
The land to the east of the McAuley Burn is within the functional flood plain and
therefore not suitable for development. However, the west past of the site is shown
to be mostly outwith the functional plain and therefore suitable for development
above a level of 5.19mAOD. 
We would have no objection provided a condition is applied which ensures that
development is limited to land on the west of the McAulay Burn where ground
levels are greater than 5.19mAOD and a free board of 0.6m should be applied to
finished floor levels with a minimum level of 5.79mAOD being achieved. The
condition should also ensure that permitted development rights are removed for the
land to the east of the McAulay Burn. This is to ensure that a precautionary
approach is taken to flood risk from all sources, as is required by the policy
principles set out in paragraph 255 of Scottish Planning Policy.
Further technical flood risk advice is given in Section 3 below outlining why we
object to any development on land to the east of the McCauley Burn. This response
supersedes our previous response 5789 dated 13 July 2022. 
[officer comment: the indicative siting is for land to the west of the McCaulay Burn
and no development is proposed in this application for land to the east of the
McCaulay Burn]. 
Scotways – no comments received. 
(D) HISTORY:   
20/00703/PPP: Site for the erection of dwellinghouse. Withdrawn 01.10.2020. 
(E) PUBLICITY:   
Advert Type: Regulation 20 Advert Local Application
Expiry Date: 10.12.2020 
19 neighbouring properties were notified in writing. 
(F) REPRESENTATIONS:   
(i) Representations received from: 
8 letters of representation have been received. 
Representations are published in full on the planning application file and are available
to view via the Public Access section of the Council’s website.
Page 69

Page 70

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
(ii) Summary of issues raised: 
The matters of objection are summarised as follows: 
• Principle of development within an Open Space Protection Area as identified in
LDP2 (2019);
• Impacts upon the value of the semi-natural and accessible land to the community;
• Impacts on character and appearance of site and surroundings;
• Harmful impacts upon natural environment - as established semi-natural
unimproved grassland with copses of native woodland along with individual trees
and shrubs together with wildflowers and space for birds;
• No need for public realm improvements, as the site is already accessible;
• Since the application has been submitted, it has been observed that the site has
been physically damaged through clearance and some forms of groundworks;
• Road and pedestrian safety concerns relating to visibility of/from proposed access;
• Flood risk impacts elsewhere;
• Precedent for further development on the land;
• Note alleged unauthorised works carried out on part of the site;
• Objections to previous application should be taken into account [officer comment:
the application is assessed on its own merits in light of the development plan and
any material planning considerations which may include representations made on
the application]. 
Representations have also been made in support of the application on the following
grounds: 
• Treating of invasive species, removal of rubbish and wider improvements in
proposed public realm works would benefit the site;
• Enhancements would reduce antisocial behaviour and improve the appearance
and utility of the land. 
These concerns are noted and where relevant to material planning considerations they have
been taken into account in the assessment of the application. 
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Impact Assessment Report: ☐Yes ☒No 
(ii) An Appropriate Assessment under the
Conservation (Natural Habitats) Regulations
1994:   
☐Yes ☒No 
(iii) A Design or Design/Access statement:    ☐Yes ☒No 
(iv) A Sustainability Checklist:  ☐Yes ☒No 
(v) A report on the impact of the proposed
development eg. Retail impact, transport
☒Yes ☐No 
Page 70

Page 71

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
impact, noise impact, flood risk, drainage
impact etc. 
- Covering letter dated 05/10/2020
- Supporting Planning Statement
- Flood Risk Assessment by Gavia
Environmental dated 28/03/2022 (P21286)
- Flood Risk Statement by Kaya Consulting
dated 30/06/2020 (KC1901/AM)
- Untitled topographical survey 
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:   ☐Yes ☒No 
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  ☐Yes ☒No 
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account
in assessment of the application. 
National Planning Framework 4 (February 2023) 
Part 2 – National Planning Policy 
Sustainable Places
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
NPF4 Policy 5 – Soils
NPF4 Policy 6 – Forestry, Woodland and Trees
NPF4 Policy 9 – Brownfield, Vacant and Derelict Land and Empty Buildings (includes
provisions relevant to Greenfield Sites)
NPF4 Policy 10 – Coastal Development
NPF4 Policy 12 – Zero Waste
NPF4 Policy 13 – Sustainable Transport 
Liveable Places
NPF4 Policy 14 – Design, Quality and Place
NPF4 Policy 15 – Local Living and 20 Minute Neighbourhoods
NPF4 Policy 16 – Quality Homes
NPF4 Policy 18 – Infrastructure First
NPF4 Policy 20 – Blue and Green Infrastructure
NPF4 Policy 21 – Play, Recreation and Sport
NPF4 Policy 22 – Flood Risk and Water Management 
Page 71

Page 72

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Argyll and Bute proposed Local Development Plan 2 (Adopted Feb 2024) 
Spatial and Settlement Strategy
Policy 01 – Settlement Areas
Policy 04 – Sustainable Development 
High Quality Places
Policy 05 – Design and Placemaking 
Policy 06 – Green and Blue Infrastructure
Policy 08 – Sustainable Siting 
Policy 09 – Sustainable Design 
Policy 10 – Design – All Development 
Diverse and Sustainable Economy
Policy 26 – Informal Public Outdoor Recreation and Leisure Related Development 
Connected Places
Policy 32 – Active Travel
Policy 33 – Public Transport
Policy 34 – Electric Vehicle Charging Points
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes
Policy 36 – New Private Accesses
Policy 39 – Construction Standards for Private Accesses
Policy 40 – Vehicle Parking Provision 
Sustainable Communities
Policy 54 – Safeguarding Zones of Notifiable Installations
Policy 55 – Flooding
Policy 57 – Risk Appraisals
Policy 58 – Private Water Supplies and Water Conservation
Policy 59 – Water Quality and the Environment
Policy 61 – Sustainable Urban Drainage Systems (SUDS)
Policy 63 – Waste Related Development and Waste Management 
Homes for People
Policy 66 – New residential development on non-allocated housing sites within
Settlement Areas 
High Quality Environment
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 77 – Forestry, Woodland and Trees
Policy 78 – Woodland Removal
Policy 81 – Open Space Protection Areas 
(ii)  List of all other material planning considerations taken into account in
the assessment of the application, having due regard to Annex A of
Circular 3/2013. 
• Third Party Representations
• Consultation Reponses
• Planning History
• ABC Technical Note – Biodiversity (Feb 2017)
• TN06 Sustainability Technical Note and Checklist (Oct. 2023)
• TN07 Sustainable Buildings Technical Note and Checklist (Oct. 2023)
Page 72

Page 73

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment:  ☐Yes ☒No 
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  ☐Yes ☒No 
(M) Does the Council have an interest in the site:  ☐Yes ☒No 
(N) Requirement for a pre-determination hearing: ☐Yes ☒No 
(O)(i) Key Constraints/Designations Affected by the Development: 
• Garelochhead - Settlement Zone 
• MOD Safeguarding zone Ref P/SLR/20/DN/2 – Coulport
• Open Space Protection Area (LDP2 2024)
• Coastal and River Flooding – High Likelihood (parts of site) 
(O)(ii) Soils
Agricultural Land Classification:  Built Up Area
Peatland/Carbon Rich Soils Classification: ☐Class 1
☐Class 2
☐Class 3
☒N/A 
Peat Depth Classification: N/A 
Does the development relate to croft land?  ☐Yes ☒No
Would the development restrict access to croft
or better quality agricultural land? 
☐Yes ☒No ☐N/A
Would the development result in
fragmentation of croft / better quality
agricultural land?
☐Yes ☐No ☒N/A 
(O)(iii) Woodland  
Will the proposal result in loss of
trees/woodland?
(If yes, detail in summary assessment) 
☒Yes
☐No 
Does the proposal include any replacement or
compensatory planting?
☐Yes
☒No details to be secured by condition
☐N/A  
(O)(iv) Land Status / LDP Settlement Strategy
Status of Land within the Application  ☐Brownfield
☐Brownfield Reclaimed by Nature
☒Greenfield 
Page 73

Page 74

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
ABC LDP2 Settlement Strategy 
☒Settlement Area
☐Countryside Area
☐Remote Countryside Area
☐Helensburgh & Lomond Greenbelt
ABC LDP2 Allocations/PDAs/AFAs etc: 
Open Space Protection Area 
(P) Summary assessment and summary of determining issues and material
considerations 
NPF4 Policy 1 seeks to prioritise the climate and nature crises in all decisions, and
this will be considered as part of the overall assessment below. 
The key issues for consideration are: 
• Principle of Development
• Impact on Character and Appearance
• Impact on Neighbour Amenities 
• Highways Impacts
• Drainage and Infrastructure
• Natural Environment 
Site description 
The site is located in the Garelochhead settlement zone as identified in the Argyll and
Bute Local Development Plan 2024. 
The site is situated alongside the junction of the B872 and B833, to the south-west of
a telephone exchange building, and opposite a ribbon of detached dwellings at the
west side of the B833. 
The site is traversed by the McAulay Burn. The land slopes principally to the south
and east towards the Gare Loch. Much of the site, excluding its westernmost reach,
are identified as at 10% chance of flooding each year from river, coastal and surface
sources. 
The site is traversed by trodden paths which are not mapped but have been indicated
to an extent on the submitted location plan. The site is largely accessible to the public. 
Core Path C280(a) (Garelochhead to Loch Long Way) runs adjacent to the south side
of the site and a bench is situated close to its junction with the main road (B833). 
The site is within a wider area that was previously identified in LDP 2015 as an Area
for Action 3/7 for enhancement of recreation and open space but now in the adopted
LDP2 it is allocated as an Open Space Protection Area. 
A portion of the site at its north-east corner – on the east side of McCaulay Burn –
has been subject to recent clearance of trees and shrubs, and development including
the formation of hardstanding and siting of freestanding modular fencing. No record
of planning permission has been found for these works. 
The western portion of the site has also been subject to recent clearance of trees and
shrubs, and appears to that earthworks have taken place. No record of planning
permission has been found for these works.
Page 74

Page 75

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
The application describes the site as vacant land. It does not appear to be brownfield,
or previously developed, land. It is not considered by officers to be vacant land but a
greenfield site given there is no evidence of previous development. 
The Proposal 
Planning Permission in Principle is sought for the erection of a dwelling house and
public realm enhancements. The supporting statement confirms that detailed design
and external appearance are to be reserved matters. 
The submitted location plan also indicates a ‘Potential Future Development Area’. The
Potential Future Development Area does not form part of the application, which is for
one single dwelling house, already identified indicatively on the site and location
plans, and public realm enhancements, and is therefore not subject to further
assessment other than in scope of the application for one single dwelling house and
the public realm enhancements indicated. An informative can be added to the
decision with regard to this. 
The submitted Proposed Landscape Layout plan 1561-01-E received 13/01/2021 and
Site Location Plan 2019_0057-03D show proposed access taken from the B833 at
the west side of the site. They show an indicative siting of the proposed dwelling at a
position within some 30m of the site’s western boundary, and a domestic curtilage
extending up to some 70m into the site form its western boundary with the B833. This
is also reflected on drawing 2019_0057-04-A. 
Plan 1561-01-E shows proposed shrub planting within the domestic curtilage. Plan
1561-01-E also shows proposed public realm enhancements outside of the proposed
domestic curtilage, comprising tree, shrub planting and soft landscaping. In addition,
it shows a proposed footpath following the lines of the existing trodden paths, and
location for a proposed memorial with gravel surfacing situated at the southeast
corner of the wider site. 
The public realm enhancements are identified in the Covering Letter as including “the
implementation of a scheme of tree planting and woodland management; and the
facilitation of the erection of a memorial to those lives lost when HMS K13, a steam-
propelled First World War K class submarine, sank in Gare Loch on 29 January 1917”.
It also states that “initial discussions with Garelochhead Community Council [have
taken place]. In principle the Community Council are supportive of this package of
proposals, particularly the K13 memorial”. 
The application states that the dwelling would be connected to the public water
supply, public drainage and would include Sustainable Urban Drainage for surface
water. 
The site plan identifies trees on the site. Trees appear to have been recently removed
and should the application be found acceptable an updated tree survey would be
required. 
The application is supported by a planning statement and a flood risk assessment. A
revised flood risk assessment has been submitted since the initial flood risk
assessment undertaken in 2007 does not consider up-to-date data or take current
methods and guidance into account. Further work undertaken by Kaya dated 30th
June 2020 Ref. KC1901/AM is a review of topographic ground levels and the risk of
coastal flooding.
Page 75

Page 76

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
The revised flood risk assessment by Gavia (2022) considers the north-east portion
of the site identified as ‘Potential Future Development Area’. 
Principle of Development 
Policy 1 of NPF4 seeks to promote nature-positive places, promoting nature recovery
and restoration. 
Further to NPF4 Policy 3, Development proposals will contribute to the enhancement
of biodiversity, including where relevant, restoring degraded habitats. At (c) it states
that Proposals for local development will include appropriate measures to conserve,
restore and enhance biodiversity, in accordance with national and local guidance.
Measures should be proportionate to the nature and scale of development. 
NPF4 Policy 4 states that Development proposals that are likely to have an adverse
effect on species protected by legislation will only be supported where the proposal
meets the relevant statutory tests. If there is reasonable evidence to suggest that a
protected species is present on a site or may be affected by a proposed development,
steps must be taken to establish its presence. The level of protection required by
legislation must be factored into the planning and design of development, and
potential impacts must be fully considered prior to the determination of any
application. The policy notes that The precautionary principle will be applied in
accordance with relevant legislation and Scottish Government guidance. 
NPF4 Policy 6 states that Development proposals on sites which include an area of
existing woodland or land identified in the Forestry and Woodland Strategy as being
suitable for woodland creation will only be supported where the enhancement and
improvement of woodlands and the planting of new trees on the site (in accordance
with the Forestry and Woodland Strategy) are integrated into the design. 
NPF4 Policy 9 seeks to encourage, promote and facilitate the reuse of brownfield,
vacant and derelict land and empty buildings, and to help reduce the need for
greenfield development. It states that proposals on greenfield sites will not be
supported unless the site has been allocated for development or the proposal is
explicitly supported by policies in the LDP. 
NPF4 Policy 10 relates to coastal development. At (b) it states that: Development
proposals in undeveloped coastal areas will only be supported where they: i. are
necessary to support the blue economy, net zero emissions or to contribute to the
economy or wellbeing of communities whose livelihood depend on marine or coastal
activities, or is for essential infrastructure, where there is a specific locational need
and no other suitable site; ii. do not result in the need for further coastal protection
measures taking into account future sea level change; or increase the risk to people
of coastal flooding or coastal erosion, including through the loss of natural coastal
defences including dune systems; and iii. are anticipated to be supportable in the
long-term, taking into account projected climate change; or iv. are designed to have
a very short lifespan. 
Policy 15 of NPF4 seeks to support local living and 20 minute neighbourhoods within
settlements. 
Policy 16 of NPF4 supports development proposals for new homes on land not
allocated for housing in limited circumstances including those where the proposal is
for smaller scale opportunities within an existing settlement boundary. 
Page 76

Page 77

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Policy 20 of NPF4 notes the multiple benefits of blue and green infrastructure,
including climate mitigation, nature restoration, biodiversity enhancement, flood
prevention and water management, and community benefits of accessible high quality
blue, green and civic spaces. At paragraph (a) it states that Development proposals
that result in fragmentation or net loss of existing blue and green infrastructure will
only be supported where it can be demonstrated that the proposal would not result in
or exacerbate a deficit in blue or green infrastructure provision, and the overall
integrity of the network will be maintained. The planning authority’s Open Space
Strategy should inform this. At (e) it notes that Development proposals that include
new or enhanced blue and/or green infrastructure will provide effective management
and maintenance plans covering the funding arrangements for their long-term delivery
and upkeep, and the party or parties responsible for these. 
Policy 21 of NPF4 notes that spaces and opportunities for play, recreation and sport
are beneficial for physical and mental health, and that these can include informal and
incidental opportunities within existing green and blue infrastructure. 
Policy 22 of NPF4 states that development should be avoided in areas at flood risk
as a first principle. It states at (a) that: Development proposals …in a flood risk area
will only be supported if they are for: i. essential infrastructure where the location is 
required for operational reasons; ii. water compatible uses; iii. redevelopment of an
existing building or site for an equal or less vulnerable use; or. iv. redevelopment of
previously used sites in built up areas where the LDP has identified a need to bring
these into positive use and where proposals demonstrate that long-term safety and
resilience can be secured in accordance with relevant SEPA advice. 
The LDP2 Policy 01 directs development to identified settlement areas, where it would
normally be acceptable provided, among other matters, it is of an appropriate scale
and fit for the size of settlement in which it is proposed, and respects the character
and appearance of the surrounding townscape in terms of density scale massing
design external finishes and access arrangements. 
Policy 04 seeks to support sustainable development, (b) making efficient use of
vacant or derelict land including appropriate buildings, (g) avoiding the use of
important recreational and amenity open space, and (h) conserving and enhancing
the natural and built environment and avoiding significant adverse impacts on
biodiversity natural and heritage assets, (i) respecting the landscape character and
the setting and character of settlements, among other matters. 
Further to Policy 05 of LDP2, the design of development should respect site
topography, green and blue infrastructure should be an integral part of the design
process, the design should develop the area's sense of identity, among other matters. 
Policy 06 of LDP2 notes how informal open space can contribute to a high quality
place, and states that proposals should demonstrate that the development would not
have a negative impact upon existing green and blue infrastructure or result in the
fragmentation or loss of integrity of existing green networks. Long term management
including maintenance and funding arrangements should also be demonstrated. 
The preamble to Policy 26 of LDP2 notes that the tourism-based economy can benefit
from the provision of informal outdoor recreational, leisure and access facilities which
can also provide services to local communities. Where they are provided within
settlements they will be most accessible to the widest range of potential
customers/users.
Page 77

Page 78

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Policy 54 relates to Safeguarding Zones of Notifiable Installations. The DIO has
commented on the application and should it be found acceptable, a suitably worded
condition can be attached to any planning permission. 
Policy 55 of LDP2 reflects NPF4 policy relating to flood risk. 
Policy 59 seeks to protect Water Quality and the Environment. 
Policy 73 states that Development proposals will be encouraged to incorporate,
safeguard and enhance existing site biodiversity wherever possible. Applications for
new developments may be required to complete a biodiversity checklist related to the
scale, nature and location of the development (see LDP2 TN04 Technical Note:
Biodiversity Checklist). Were the application otherwise found acceptable, … 
Policy 77 of LDP2 requires that Where woodland, hedgerows or individual trees are
removed in association with development, adequate provision must be made for the
planting of new woodland resources, including compensatory planting in accordance
with the sequential approach set out in Policy 78 – Woodland Removal. 
Policy 81 of LDP2 states that Development proposals resulting in the loss of Open
Space Protection Areas will not be permitted, except in circumstances where one or
more of the following apply:
a) The proposed development is ancillary to the principal use of the site or only
involves a very minor part of the site and in either case would not affect its integrity
and continued existing use or amenity value.
b) Where a proposal would involve the loss of an outdoor sports facility; the facility
which would be lost would be replaced by a new facility of comparable or greater
benefit and in a location that is convenient for its users, or by the upgrading of an
existing facility to provide one of better quality either within the same site or at another
location which is convenient for its users and which maintains or improves the overall
capacity in the area. 
c) Where a proposal would involve the loss of an outdoor sports facility; a relevant
strategy, and consultation with SportScotland, has demonstrated that there is a clear
excess of provision to meet current and anticipated demand in the area, and that the
site would be developed without detriment to the overall quality of provision. In this
situation it should be adequately demonstrated that all reasonable attempts have
been made to sell or transfer the facility for an alternative sports or recreational use.
d) Where a proposal would involve the loss of a recreational facility or a site for the
growing of food; the facility which would be lost would be replaced by a new facility of
comparable or greater benefit and in a location that is convenient for its users, or by
the upgrading of an existing facility to provide one of better quality either within the
same site or at another location which is convenient for its users and which maintains
or improves the overall capacity in the area.
e) In the case of greenspace amenity areas (public or private); it can be adequately
demonstrated that there would be no loss of the amenity value it provides through
either partial, or complete development and that an alternative provision of equal
benefit and accessibility can be made available. 
Location
The site is within the settlement area of Garelochhead. LDP2 Policy 01 directs
development to identified settlement areas. Policy 16 of NPF4 supports development
proposals for new homes on land not allocated for housing in limited circumstances
including those where the proposal is for smaller scale opportunities within an existing
Page 78

Page 79

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
settlement boundary. Development at the site would be capable of meeting these
broad objectives. 
Infrastructure and connectivity
Policy 15 of NPF4 seeks to support local living and 20-minute neighbourhoods within 
settlements. Policy 18 of NPF4 supports an ‘infrastructure-first’ approach to
development. Policy 04 of LDP2 seeks to support sustainable development. Located
in an existing settlement, development at the site would be capable of meeting these
aims in general. 
Vacant land
NPF4 defines Vacant Land as Previously developed land, without physical constraint,
which the Planning Authority has indicated is currently available for redevelopment.
Policy 9 of NPF4 states that proposals on greenfield sites will not be supported unless
the site has been allocated for development or the proposal is explicitly supported by
policies in the LDP. 
Historic mapping and the site characteristics (notwithstanding apparent recent
unauthorised works) indicate that the site is not previously developed. The site is
therefore considered to be greenfield site and this weighs significantly against the
proposed development at the site in principle. 
Green and Blue Infrastructure 
The development would form a large domestic curtilage, and comprise a dwelling with
associated access and likely domestic paraphernalia – fencing, outbuildings. It would
fragment the green space and lead to a net loss of green space in the settlement
contrary to the objectives of Policy 20 of NPF4 and Policies 5 and 6 of LDP2. This is
a negative aspect in terms of the principle of the proposal. Watercourses and the
coastal setting would not be significantly affected, subject to conditions relating to
construction management for example. The development by reason of its scale,
character and layout would be reasonably capable of maintaining water standards
further to Policy 59 of LDP2. 
There would be some improvements offered to the quality of the green space and
these carry weight, although some aspects of land management relate to
responsibilities covered by other legislative frameworks and should be carried out
regardless of planning permission. Furthermore, while some works could be
reasonably secured by condition other aspects of the proposed public realm
enhancements would require legal agreements (e.g. future maintenance) and no
indication has been given by the applicant in this regard. In addition, trees appear to
have been removed from the site since the application was submitted, along with
apparently unauthorised earthworks. On this basis the potential for improvements to
the green and blue infrastructure, as part of any planning permission carries a
reduced weight. 
Flood risk
The proposed indicative siting of built form would be situated more than 7.0m above
ordnance datum. SEPA has confirmed no objection subject to conditions, including
removal of relevant permitted development rights. In this regard the proposal is
complaint with NPF4 Policy 22 and Policy 55 of LDP2 acceptable in principle on flood
risk grounds. 
Open Space Protection Area (OSPA)
The site has been noted as comprising informal grassland interspersed with mature
trees, which although not appearing to have significant informal recreational use,
Page 79

Page 80

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
nevertheless contributes significantly to the character and amenity of the village. It is
part of a wider OSPA which includes Bendarroch public park. 
The development as shown on the indicative layout would occupy a significant portion
of the identified OSPA, and particularly the area of the OSPA south of the B872, as
domestic curtilage. The application proposes enhancements and a memorial to
improve the amenity value of the remaining area which would mitigate the impacts of
the loss to a degree. 
The loss of a significant part of the OSPA within this parcel would harm the amenity
of the settlement, for residents and visitors. There is no scope in the application for
alternative provision. While enhancements of the remaining area would be welcome,
subject to details, and maintenance provisions which in the context of planning
permission would have to be secured by legal agreement, it is not considered that
these would outweigh the effects of the fragmentation and reduction of informal
recreational space. This would be contrary to NPF4 Policy 21, and LDP2 Policies 26
and 81. 
MOD Safeguarding 
The site is in scope of notification for MOD Safeguarding zone Ref P/SLR/20/DN/2 –
Coulport. The DIO has commented and this matter can be dealt with by conditions,
and therefore does not affect the principle of the development in accordance with
Policy 54 of LDP2. 
Proposed public realm enhancements
The public realm enhancements would not involve a material change of use or
significantly affect flood risk at the site or elsewhere, subject to details that can be
addressed at reserved matters stage or by conditions. They are acceptable in general
principle. 
Character and Appearance 
Policy 14 of NPF4 seeks to encourage, promote and facilitate well designed
development that makes successful places by taking a design-led approach and
applying the Place Principle. Development design should improve the quality of an
area. Development proposals that are poorly designed, detrimental to the amenity of
the surrounding area or inconsistent with the six qualities of successful places, will
not be supported. 
The LDP2 Policy 01 directs development to identified settlement areas, where it would
normally be acceptable provided, among other matters, it is of an appropriate scale
and fit for the size of settlement in which it is proposed, and respects the character
and appearance of the surrounding townscape in terms of density scale massing
design external finishes and access arrangements. 
Policy 08 of LDP2 requires that development should integrate into the landscape or
existing built form to minimise detrimental effects on the environment. Particularly
careful attention should be given to hilltop, skyline or ridge locations where
development will only be acceptable if such a location cannot be avoided and any
significant adverse landscape and visual effects are clearly outweighed by social,
environmental or economic benefits of community-wide importance, and have been
sufficiently mitigated through landscape and visual impact assessments among
others. 
Page 80

Page 81

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Policy 08 also states that Development on a sloping site should be designed
sensitively taking account of the topography in order to prevent significant excavation
or under-building. The siting of a development should take into account the character
of the area in terms of its settlement pattern, layout and density. 
Policy 10 of LDP2 states that The design of any development must: Demonstrate an
understanding of and appropriate response to the proposed development site and
wider context including consideration of character and, where applicable, urban grain.
This is also reflected in Policy 66 of LDP2. 
The land subject to the indicative siting is on a pronounced slope eastwards towards
the Burn and Gareloch. Flood risk dictates that the dwelling would be positioned close
to the top of this slope. 
The land appears to have been subject to unauthorised earth works as well as
significant tree and shrub removal since the application was submitted.
Notwithstanding this, which appears to be an aberrant and temporary situation, the
land is a natural or semi-natural scrubland with informal access to the burn, providing
a general amenity to the public through its intrinsic value and contributing to the
character and quality of the settlement. 
The building in the indicative location would be an isolated feature at the top of the
slope. At the time of assessment, the trees that populated the site have been largely
removed. Its relatively bare character as a result would magnify the prominence of a
dwelling at this point. Although it would be situated opposite a ribbon of substantial
dwellings, the indicative siting indicates an isolated and stark feature within the
townscape which would sit uncomfortably in the wider grain of the settlement pattern. 
While matters relating to ground levels and detailed design including underbuilding
could be addressed at reserved matters stages, it is not considered that this would
overcome the issues arising from the siting in this instance. Softening of the context
through tree planting could mitigate this impact to a degree but would take a
considerable time to establish. 
The loss of the area given over to the siting of a house and domestic curtilage would
additionally remove to an extent the qualitative benefits of the undeveloped land to
the character and amenities of the settlement, and its contribution to health and
wellbeing. While permitted development rights could be removed, and landscaping
secured, by conditions, there would nonetheless be a diminution of the natural or
semi-natural space with consequent impacts on the character and appearance of the
area. 
The proposed public realm enhancements are limited detail but as far as can be
ascertained appear acceptable in character and appearance terms. 
It is considered that the development would not be a positive response to the
established settlement pattern, or to the local topography, and would present an
isolated, stark and incongruous feature. This would be harmful to the character and
appearance of the site and surroundings, in addition to the loss of the inherent
contribution made by the existing natural or semi-natural space. In these regards the
development would be unacceptable and contrary to Policy 14 of NPF4, and LDP2
Policies 01, 08 and 10. 
Neighbour amenities 
Page 81

Page 82

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Policies NPF4 14, and Policies 08 and 66 of LDP2 (2019) seek to ensure that
development maintains the amenities of its surrounding area. 
The proposed siting would be relatively remote from surrounding properties and
separated from them by the public realm. For this reason the development would not
significantly impact the amenities of nearby residential occupiers in any relevant
regard. Specific impacts arising from detailed design and scale for example could be
reasonably addressed in this instance in a reserved matters application. 
Roads 
NPF4 Policy 13, LDP (2015) and LDP2 (2019) policies 34, 35, 36 and 39 collectively
seek to ensure appropriate infrastructure and that developments are served by a safe
means of vehicular access and have an appropriate parking and turning area within
the site. 
ABC Roads offer no objections subject to conditions which can be reasonably
attached to planning permission or secured through reserved matters. 
Natural Environment 
NPF4 Policy 3 (Biodiversity) seeks to protect biodiversity, reverse biodiversity loss
and deliver positive effects from development and strengthen nature networks. NPF4
Policy 4 seeks to protect, restore and enhance natural assets including protected sites
and species. 
Full consideration is to be given to legislation, policies and conservation objectives
such as the Habitats and Species Regulations, and the Wildlife and Countryside Act
(1981) in relation to protected species and habitats. 
Policy 6 of LDP2 (Green and Blue Infrastructure) seeks to preserve and enhance
biodiversity and water environment conditions. Policy 73 of LDP2 (Development
Impact on Habitats, Species and Biodiversity) states that “Development proposals will
be encouraged to incorporate, safeguard and enhance existing site biodiversity
wherever possible”. 
Trees
The proposal is on a site which has been wooded. The application indicates that
further planting would take place. Trees appear to have been removed from the site,
along with apparently unauthorised earthworks, since the application was submitted,
and this is a negative aspect to the application context. No arboricultural survey has
been provided. There is no Tree Preservation Order relating to the site. Further to
NPF4 Policy 6 and LDP2 Policy 77, replacement and any additional planting could be
secured by condition and therefore the wooded characteristics of the site would not
affect the acceptability of the development in this instance. 
Biodiversity
The site is not specifically identified in relation to protected habitats and species.
However it is a mixed natural and semi-natural environment, and noting its
characteristics and the precautionary principle, it is reasonable that a proposal is
required to address the potential for protected species that may be affected, and to
identify how biodiversity at the site would be enhanced or restored. Were the
application otherwise found acceptable, an ecological survey would be required. It
would not be reasonable to leave this matter to a planning condition. In the absence
Page 82

Page 83

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
of a proportionate ecological survey, the application is unacceptable and contrary to
NPF Policies 1, 3 and 4 and LDP2 Policies 06 and 73. 
Soils
The application site is sloping, has no agricultural land classification and is not within
an identified area of peatland, carbon-rich soils or priority peatland habitat. 
(Q) Is the proposal consistent with the Development Plan: ☐Yes ☒No 
(R) Reasons why Planning Permission or Planning Permission in Principle Should
be Refused: 
The indicative siting would occupy greenfield land within the settlement boundary,
and create a net loss and fragmentation of green space and identified open space,
with consequential harmful impacts on character and amenity within Garelochhead.
This would be unacceptable and contrary to Policies of 01, 09, 14, 16, 20 and 21 of
NPF4, and Policies 04, 05, 06, 26 and 81 of LDP2. There would be modest benefits
to the community arising from proposed enhancements, but there would not be a
clear mechanism for their delivery and maintenance and in any regard it is
considered that the benefits would not outweigh the harmful impacts identified. The
benefit of the provision of one additional family home would not be sufficient to
outweigh the identified harm. 
By reason of its isolated position, the development would be starkly and
incongruously situated, and thus poorly integrated into the established settlement
pattern. The harmful effect of this would be magnified by the prominence of the siting
at the top of a slope and its proposed site area which cuts across the open space.
For these reasons the siting would be unacceptable and contrary to NPF4 Policy 14,
and LDP2 Policies 01, 04, 05, 08 and 10. These concerns could not be reasonably
overcome through reserved matters considerations or details to be secured through
conditions, and the benefits of the proposal would not be sufficient to overcome the
harmful impacts identified. 
No ecological survey has been provided. The application has not demonstrated
potential impacts on species and biodiversity, and how any such impacts would be
avoided or mitigated. This is unacceptable further to Policies 01, 03 and 04 of NPF4
and Policies 06 and 73 of LDP2, and cannot be dealt with by planning conditions or
reserved matters. The requirement set out in other legislative frameworks such as
the Habitats and Species Regulations, and the Wildlife and Countryside Act (1981)
would not obviate the need for these matters to be addressed prior to a grant of
planning permission in principle. 
(S) Reasoned justification for a departure to the provisions of the Development
Plan 
N/A 
(T) Need for notification to Scottish Ministers or Historic Environment Scotland:
☐Yes ☒No
Page 83

Page 84

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Author of Report: Rob Lilburn Date: 23.02.2024 
Reviewing Officer: Kirsty Sweeney Date: 11.03.2024 
Fergus Murray
Head of Development & Economic Growth 
Page 84

Page 85

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
REASONS FOR REFUSAL RELATIVE TO APPLICATION REF. NO.20/01822/PPP 
1. The indicative siting would occupy greenfield land within the settlement boundary, and
create a net loss and fragmentation of green space and identified open space, with
consequential harmful impacts on character and amenity within Garelochhead. This
would be unacceptable and contrary to Policies of 01, 09, 14, 16, 20 and 21 of NPF4,
and Policies 04, 05, 06, 26 and 81 of LDP2. There would be modest benefits to the
community arising from proposed enhancements, but there would not be a clear
mechanism for their delivery and maintenance and in any regard it is considered that
the benefits would not outweigh the harmful impacts identified. The benefit of the
provision of one additional family home would not be sufficient to outweigh the
identified harm. 
2. By reason of its isolated position, the development would be starkly and incongruously
situated, and thus poorly integrated into the established settlement pattern. The
harmful effect of this would be magnified by the prominence of the siting at the top of
a slope and its proposed site area which cuts across the open space. For these
reasons the siting would be unacceptable and contrary to NPF4 Policy 14, and LDP2
Policies 01, 04, 05, 08 and 10. These concerns could not be reasonably overcome
through reserved matters considerations or details to be secured through conditions,
and the benefits of the proposal would not be sufficient to overcome the harmful
impacts identified. 
3. No ecological survey has been provided. The application has not demonstrated
potential impacts on species and biodiversity, and how any such impacts would be
avoided or mitigated. This is unacceptable further to Policies 01, 03 and 04 of NPF4
and Policies 06 and 73 of LDP2, and cannot be dealt with by planning conditions or
reserved matters. The requirement set out in other legislative frameworks such as the
Habitats and Species Regulations, and the Wildlife and Countryside Act (1981) would
not obviate the need for these matters to be addressed prior to a grant of planning
permission in principle. 
Page 85

Page 86

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
APPENDIX TO DECISION REFUSAL NOTICE 
PLANS LIST 
Plan Title.  Plan Ref. No. Version Date Received
Site location plan  2019_0057-03 D 13/01/2021
Proposed landscape
and indicative siting 
1561-01-E  13/01/2021
Proposed
landscaping 
1561 02  05/11/2020
Site plan showing
flood level
2019_0057-04 A 06/10/2020 
SUPPORTING DOCUMENTS LIST 
Document Title.  Dated Ref. No. Date
Received
Covering letter  05/10/2020  06/10/2020
Supporting Planning
Statement  
06/10/2020
Flood Risk
Assessment by
Gavia
Environmental_2007
28/03/2022 P21286 01/07/2022
Flood Risk
Statement by Kaya
Consulting_2000
30/06/2020 KC1901/AM 06/10/2020
Untitled
topographical survey  
06/10/2020 
Superseded documents: 
• Flood Risk Assessment received 06/10/2020 Draft 4/10/2007 John Riddell 
Not relevant to the assessment:
• Untitled topographical survey of Potential Future Development Area received 01/07/2022 
• OSPA Boundary 2019_0057-02 received 06/10/2020 
Page 86

Page 87

From: Planning.North
To: Planning.Handl
Cc: Innis, Lynsey
Subject: PCS-20001342 SEPA Response to 20/01822/PPP
Date: 02 May 2024 09:44:59
Attachments: image.png
To Whom It May Concern
Town and Country Planning (Scotland) Acts
20/01822/PPP
Site for the erection of dwellinghouse and public realm enhancements
Land East of Taliesin West, Garelochhead, Argyll and Bute
SEPA have reviewed the information provided. We note that flood risk was not a
reason for refusal, however, our response of 12 January 2024 remains our
position. We further note that the request for review refers to a previous response
from SEPA.
I trust these comments are of assistance - please do not hesitate to contact me if
you require any further information.
Kind regards
Nicki Dunn
Senior Planning Officer
Disclaimer
The information contained in this email and any attachments may be confidential and is intended
solely for the use of the intended recipients. Access, copying or re-use of the information in it by any
other is not authorised. If you are not the intended recipient, please notify us immediately by return
email to postmaster@sepa.org.uk. Registered office: SEPA, Angus Smith Building, 6 Parklands
Avenue, Eurocentral, Holytown, North Lanarkshire, ML1 4WQ. Communications with SEPA may be
monitored or recorded or released in order to secure the effective operation of the system and for
other lawful purposes.
Dh’fhaodadh gum bi am fiosrachadh sa phost-d seo agus ceanglachan sam bith a tha na chois
dìomhair, agus cha bu chòir am fiosrachadh a bhith air a chleachdadh le neach sam bith ach an
luchd-faighinn a bha còir am fiosrachadh fhaighinn. Chan fhaod neach sam bith eile cothrom
fhaighinn air an fhiosrachadh a tha sa phost-d no a tha an cois a’ phuist-d, chan fhaod iad lethbhreac
a dhèanamh dheth no a chleachdadh arithist. Mura h-ann dhuibhse a tha am post-d seo, feuch gun
inns sibh dhuinn sa bhad le bhith cur post-d gu postmaster@sepa.org.uk. Togalach Aonghais Mhic a'
Ghobhainn, 6 Craobhraid Parklands, Eurocentral, Baile a' Chuilinn, Siorrachd Lannraig a Tuath, ML1
4WQ. Faodar conaltradh còmhla ri SEPA a sgrùdadh no a chlàradh no a sgaoileadh gus obrachadh
èifeachdach an t-siostaim a ghlèidheadh agus airson adhbharan laghail eile.
Page 87

Page 88

This page is intentionally left blank

Page 89

From: Neil Feggans
To: Innis, Lynsey
Subject: RE: Notice of Request for Review 24/0008/LRB: Planning Application 20/01822/PPP -Erection of Dwellinghouse & Public Realm
Enhancements, Land East Of Taliesin West, Garelochhead [03090]
Date: 25 April 2024 12:50:37
Attachments: image001.png
image002.png
image003.png
Thanks, Lynsey. I briefly read through the appellant’s case, focussing on those parts relevant to public access, so
missed the reference to the English case. I intentionally used the words “it seems, in error, you included with your
notification..” in case I had overlooked a reference to the English case in the Review documentation. J
Kind regards,
Neil.
Neil Feggans
Access Officer
I work part-time: usually on Tuesdays, Wednesdays and Thursdays.
Scottish Rights of Way and Access Society (ScotWays)
24 Annandale Street, Edinburgh EH7 4AN
tel: 0131 558 1222
web: www.scotways.com
follow us on Twitter: @ScotWays
find us on Facebook: www.facebook.com/scotways
Safeguarding Public Access in Scotland since 1845
A company limited by guarantee, registered in Scotland
Company number SC024243
Registered office as above
Scottish Charity number SC015460
From: Innis, Lynsey
Sent: 25 April 2024 12:37
To: Neil Feggans
Subject: RE: Notice of Request for Review 24/0008/LRB: Planning Application 20/01822/PPP -Erection of
Dwellinghouse & Public Realm Enhancements, Land East Of Taliesin West, Garelochhead [03090]
Good afternoon Mr Feggans
Thank you for the very prompt response to my email of 23 April 2024 in relation to the above Notice of Request
for Review.   I can confirm that document 4, is in fact referred to within the applicants case, please see paragraph
1.11 of the Grounds for Review document and has therefore not been included in error.
I will ensure that your comments are taken into consideration by the Local Review Body, when it meets to consider
the case.
Kind Regards
Lynsey
From: Neil Feggans <Neil_Feggans@Scotways.com>
Sent: 25 April 2024 10:53
To: Innis, Lynsey <Lynsey.Innis@argyll-bute.gov.uk>
Subject: Notice of Request for Review 24/0008/LRB: Planning Application 20/01822/PPP -Erection of
Dwellinghouse & Public Realm Enhancements, Land East Of Taliesin West, Garelochhead [03090]
Page 89

Page 90

Good morning Ms. Innis,
Thank you for notifying ScotWays of the receipt of the above Notice of Review.
ScotWays has no substantive comment to make on the Review, as whether or not the development forming the subject
of it takes place will have no significant impact, positive or negative, on public access resources in Garelochehead.
In case you are not already aware of it, it seems, in error, you included with your notification of review letter a document
(Document 4) pertaining to the decision of a Planning Inspector to award costs in an English case.
Kind regards,
Neil.
Neil Feggans
Access Officer
I work part-time: usually on Tuesdays, Wednesdays and Thursdays.
Scottish Rights of Way and Access Society (ScotWays)
24 Annandale Street, Edinburgh EH7 4AN
tel: 0131 558 1222
web: www.scotways.com
follow us on Twitter: @ScotWays
find us on Facebook: www.facebook.com/scotways
Safeguarding Public Access in Scotland since 1845
A company limited by guarantee, registered in Scotland
Company number SC024243
Registered office as above
Scottish Charity number SC015460
From: Innis, Lynsey 
Sent: 23 April 2024 10:23
To: Bain, Peter (Planning); Sweeney, Kirsty; Lilburn, Robert; David.Cameron@jbaconsulting.com;
Alexandra.Maskell@jbaconsulting.com; McKenzie, Sheila;
planning.north@sepa.org.uk; planning.sw@sepa.org.uk; Lodge, Mark  Kane, Raymond 
planningconsultations@scottishwater.co.uk; DIO-Safeguarding-Statutory@mod.gov.uk; Gritten, Jolyon Info
<info@Scotways.com>
Cc: localreviewprocess McLean, Abby
Subject: Notice of Request for Review - Land East of Taliesin West, Garelochhead (Ref: 24/0008/LRB) [OFFICIAL]
Classification: OFFICIAL
Good morning,
Please find attached the Notice of Request for Review (AB3 – 240008LRB), together with a copy of the request for
review and supporting documentation in respect of the above case.
Please note that any representations must be received by Tuesday, 7 May 2024, being 14 days after then date of
this notice.
Kind Regards
Page 90

Page 91

Lynsey Innis
Senior Committee Assistant
Legal and Regulatory Support
Argyll and Bute Council
Kilmory
Lochgilphead
PA31 8RT
Tel: 01546 604338
Email: lynsey.innis@argyll-bute.gov.uk
Argyll and Bute – Realising our potential together
For information on how we manage your data under the General Data Protection Regulations please click on the
following link:- https://www.argyll-bute.gov.uk/data-protection
Argyll and Bute Council's e-mail system (also used by LiveArgyll) classifies the sensitivity of emails
according to the Government Security Classifications.
Privileged/Confidential Information may be contained in this message. If you are not the addressee
indicated in this message (or responsible for delivery of the message to such person), you may not disclose,
copy or deliver this message to anyone and any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful.
In such case, you should destroy this message and kindly notify the sender by reply email. Opinions,
conclusions and other information in this message that do not relate to the official business of Argyll and
Bute Council or LiveArgyll shall be understood as neither given nor endorsed by them.
All communications sent to or from Argyll and Bute Council or LiveArgyll may be subject to recording
and/or monitoring in accordance with relevant legislation.
This email has been scanned for viruses, vandals and malicious content.
Argyll and Bute Council's e-mail system (also used by LiveArgyll) classifies the sensitivity of emails
according to the Government Security Classifications.
Privileged/Confidential Information may be contained in this message. If you are not the addressee
indicated in this message (or responsible for delivery of the message to such person), you may not disclose,
copy or deliver this message to anyone and any action taken or omitted to be taken in reliance on it, is
Page 91

Page 92

This page is intentionally left blank

Page 93

From: NICHOLAS BEEVERS
To: Innis, Lynsey
Subject: Re: Notice of Request for Review - Land East of Taliesin West, Garelochhead (Ref: 24/0008/LRB) [OFFICIAL]
Date: 24 April 2024 14:42:49
Attachments: image001.png
image002.png
image003.png
Dear Lynsey -
Thank you for your email.
My response is as follows:
Further to my initial two objections (version 1 without and version 2 with so called public realm enhancements)
against this planning application, I support the council's decision to deny planning permission in principle for this
development. Protection of the open space protection area for Garelochhead is an inspiring decision by the planners
and will be a relief to the ~150 objectors who cherish the open space the area provides and the contribution the area
makes to the visual amenity of Garelochhead. The extensive report submitted by the planning consultants does not
justify a change of decision as the applicant was never guaranteed anything by the council and the applicant
accepted the risk that comes with buying land with no grounds for planning.
On Tue, Apr 23, 2024 at 10:23 AM Innis, Lynsey wrote:
Classification: OFFICIAL
Good morning,
Please find attached the Notice of Request for Review (AB3 – 240008LRB), together with a copy of the request
for review and supporting documentation in respect of the above case.
Please note that any representations must be received by Tuesday, 7 May 2024, being 14 days after then date of
this notice.
Kind Regards
Lynsey Innis
Senior Committee Assistant
Legal and Regulatory Support
Argyll and Bute Council
Kilmory
Lochgilphead
PA31 8RT
Tel: 01546 604338
Page 93

Page 94

This page is intentionally left blank

Page 95

From: localreviewprocess
To: Innis, Lynsey
Subject: FW: Planning Application 20/01822/PPP
Date: 29 April 2024 14:04:07
-----Original Message-----
From: Alistair McIntyre
Sent: 29 April 2024 13:31
To: localreviewprocess <localreviewprocess@argyll-bute.gov.uk>
Subject: Planning Application 20/01822/PPP
Dear Sir/Madam,
With regard to Planning Application 20/01822/PPP and Local Review Body Ref. 24/0008/LRB, I wish to make
comment as follows below.
First of all, I welcome and applaud the decision of Argyll and Bute Council to refuse the application to build a
dwelling-house on the site, described as Land to the East of Taliesin West. With the whole area in question
being designated as Open Space Protection Area, the decision is clearly the correct one. Further to my earlier
representations on this planning application, I'd like to make additional comment as follows.
There has been further damage to the larger site in question. More broad-leaved trees have been cut down. A
number of these were a little downstream of the road bridge across the McAulay Burn. Trees often afford some
mutual protection against the wind, and it may be that with those gone, the thin line of trees a little downstream
has been rendered more liable to windthrow, and indeed several have toppled in recent months.
Another effect of the cutting down of the trees is that, for those coming from the direction of the road from the
Peninsula, the approach to Garelochhead has lost any sylvan character. With a view now dominated by a large
assortment of cars and other vehicles in the compound on the other side of the McAulay Burn, as well as the
former Telephone Exchange, neither of which is a pretty sight, Garelochhead can now be interpreted as a
strictly utilitarian place.
Also further to my previous comments, huge amounts of poor quality soil have been moved on to the larger site.
This material evidently has a high clay content, and it has smothered attractive plants such as wild hyacinth and
ground-nut. Coarse species like dockens and dandelions are already establishing themselves in their place. In
addition, at least one access/egress point for an informal trod path  has been obliterated in the process.
Whether by accident or design, a number of sections of large tree trunks have appeared on the wider site, close
to the public road, in recent months.
The site has clearly suffered a great deal of degradation over the past few years. Despite this, however, the area
continues to be very popular with walkers, as it  has been for many years, and long may this continue.
Yours sincerely,
Alistair McIntyre.
--
This email has been checked for viruses by AVG antivirus software.
www.avg.com
---
________________________________
Argyll and Bute Council classify the sensitivity of emails according to the Government Security Classifications.
The adopted classifications are:
Page 95

Page 96

This page is intentionally left blank

Page 97

MH Planning Associates 
63 West Princes Street, Helensburgh, G84 8BN Tel: 01436 674777 Mob: 07816 907203
Web: www.mhplanning.co.uk Email: info@mhplanning.co.uk
16 May 2024 
Lynsey Innis
Senior Committee Assistant
Legal and Regulatory Support
Argyll and Bute Council
Kilmory
Lochgilphead
PA31 8RT 
Ref MHP: 2019_0057 
Dear Lynsey 
REQUEST FOR REVIEW IN RESPECT OF THE REFUSAL OF AN APPLICATION FOR PLANNING
PERMISSION IN PRINCIPLE FOR THE ERECTION OF A SINGLE DWELLINGHOUSE, LAND
WEST OF MCAULAY BURN, GARELOCHHEAD (LPA REFERENCE 20/01822/PPP) 
I refer to your e-mail dated 8 May 2024 inviting comments regarding the
representations received in connection with the above application for review.  My
response is as follows. 
Is the application proposal harmful to the open space? 
As noted in the appellant’s Grounds for Review the application now under
consideration by the Local Review Body was submitted in October 2020.  The
application should therefore have been determined in February 2021 (2 months from
the date of the submission).  At the date of the submission of the application the site
was not within an Open Space Protection Area (OSPA).  It was however in an Area
for Action (AFA), and the focus of the AFA designation was to consider options to
effectively manage and visually enhance this important recreation and open space
area within the village.  It is for this reason that the applicant proposes, as an integral
part of his application proposals the landscaping and ongoing management the
remainder of his land, for the long term benefit of the local community. 
Officer say that the application proposal would result in the loss of a “significant part
of the OSPA”.  As noted in the Grounds for Review the proposed house plot equates
to just 5.5% of the total area of OSPA.  It is difficult to therefore understand how the
loss of this could be “significant” when 94.5% of the OSPA would remain open and
accessible to members of the public. 
Over and above the proposed house plot the applicant owns a further 21% of the
Page 97 Agenda Item 3c

Page 98

Page 2 of 3 
OSPA.  This area of land will be significantly enhanced, by the applicant, for the
benefit of everyone who uses it.  The enhancements proposed include improvements
to the network of informal footpaths through the site, the implementation of a
scheme of tree planting and woodland management, the formation of wild flower
meadows and the facilitation of a site the erection of a memorial to those lives lost
when HMS K13 sank in Gare Loch in 1917. 
The proposed public realm enhancements, which would be funded entirely by the
applicant, can be secured through the imposition of a planning condition or by
entering into a Section 75 Planning Obligation. 
On this key issue the members of the Local Review Body are entitled to conclude
that on balance the benefits of the public realm enhancements that are being
proposed outweigh the loss of what is in reality a very small part of the overall OSPA. 
This was clearly the opinion of the  Planning Officer who provided the initial pre-
application advice.  He said in 2019 that “it is my view that there is significant
community benefit by way of upgrading of footpaths, new public realm areas and
the new memorial.  I place significant weight on these considerations and consider
the proposal subject to a full planning assessment, acceptable”. 
Is the application proposal harmful to biodiversity? 
The application site is not specifically designated for its biodiversity value. 
Notwithstanding this, whist the review application was under consideration by
Officer’s, the applicant was asked to survey the site for any signs of otters, bats, birds,
mammals, insects, reptiles, amphibians and fish! 
As the applicant had been advised by the Planning Officer that the application was
going to be recommended for refusal in principle he did not, for very
understandable reasons, want to commit to the not insignificant costs associated
with the survey of the site for such a long list of species.  The applicant has no
objections to undertaking the requested wildlife surveys but would only feel
comfortable in committing to doing so if the Local Review Body were able to confirm
that the application would be able to be approved in principle. 
In this context, the applicant is pleased to note that the Planning Officer has now
stated that a planning condition could be used in order to secure both additional
planting and ecological surveys. 
Under this heading Officers have referred specifically to Policy 3 of the National
Planning Framework (NPF).  This states that development proposals will contribute to
the enhancement of biodiversity, including where relevant, restoring degraded
habitats and building and strengthening nature networks and the connections
between them.  The applicant is proposing a significant programme of tree and
shrub planting, and the formation of wildflower meadows, on his land.  All of these
Page 98

Page 99

Page 3 of 3
measures will significantly increase the overall biodiversity value of the application
site, in accordance with the requirements of the NPF.
As was noted in the Grounds for Review, the applicant is already committed to an
ongoing programme of works to eradicate Japanese knotweed (Reynoutria
japonica syn. Fallopia japonica) from his land.  To date approximately an acre or
previously inaccessible land has been cleared this very invasive species, which was in
the region of 10 feet high and spreading.  The Council’s own Biodiversity Action Plan
recognises the danger to the natural environment, should Japanese knotweed be
allowed to spread.
Conclusion
In conclusion it is considered that the review application can be approved as a
‘minor departure’ from the provisions of Policy 81 of the recently adopted Local
Development Plan 2 on the basis of the significant community benefit that would
accrue by way of the proposed improvements to the network of informal footpaths
through the site, the implementation of a scheme of tree planting and woodland
management, the formation of wild flower meadows and the facilitation of a site for
the erection of the K13 memorial, all of which would be funded by the applicant.
I trust that this is sufficient for your needs however please do not hesitate to let me
know if you wish me to provide more information on any point.
Yours sincerely
Michael Hyde MRTPI
MH Planning Associates
Page 99

Page 100

This page is intentionally left blank