Democracy Spraffa

Planning

Argyll and Bute Council · 10 October 2024
Back to Argyll and Bute Local Review Body — 10 October 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

RESPONSE TO REQUEST FOR FURTHER
INFORMATION 
FOR 
ARGYLL AND BUTE COUNCIL 
LOCAL REVIEW BODY 
24/0012/LRB 
REFUSAL OF PLANNING PERMISSION FOR
ALTERATIONS AND EXTENSION TO
DWELLINGHOUSE AND FORMATION OF PATIO –
PLANNING APPLICATION REFERENCE 23/02358/PP 
ROSEBANK, BREADALBANE STREET,
TOBERMORY, ISLE OF MULL, PA75 6PD

Page 2

INFORMATION REQUIRED 
Appropriate conditions and reasons to attach to any consent in the event that Members of the
LRB were minded to approve the application. 
CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 23/02358/PP 
Standard Time Limit Condition  (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions  
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 08.12.2023, supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Plans as Existing  KMcQ/01  11.12.2023
Block Plan   22.12.2023
Innervision
Screens General
Arrangement
IVC 07/22  22.12.2023
Elevations as
Existing 
KMcQ/02A  22.12.2023
Plans as Proposed  KMcQ/03A  22.12.2023
Elevations and
Sections as
Proposed 
KMcQ/04B  22.12.2023
Technical Drawing   22.12.2023
Location Plan   12.01.2024 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details.  
2. Submission of Details of Materials 
Notwithstanding the effect of Condition 1, no development shall commence until
written details of the type and colour of materials to be used in the construction of the
external walls and roof coverings have been submitted to and approved in writing by
the Planning Authority. The development shall thereafter be completed using the
approved materials or such alternatives as may be agreed in writing with the Planning
Authority. 
Reason: In order to integrate the development into its surroundings.

Page 3

ADDITIONAL NOTES TO APPLICANT 
• A system of surface water drainage is required to prevent water passing onto the public
road. 
• A bin storage area shall be located next to the public road.