Democracy Spraffa

Agenda reports pack

Argyll and Bute Council · 7 April 2025
Back to Argyll and Bute Local Review Body — 7 April 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD 
31 March 2025 
NOTICE OF MEETING 
A meeting of the ARGYLL AND BUTE LOCAL REVIEW BODY will be held BY MICROSOFT
TEAMS on MONDAY, 7 APRIL 2025 at 1:00 PM, which you are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. CONSIDER NOTICE OF REVIEW REQUEST: RHU HOUSE, RHU ROAD, PORT
CHARLOTTE, ISLE OF ISLAY, PA48 7TP (REF: 25/0003/LRB) 
(a) Notice of Review and Supporting Documentation (Pages 3 - 58)  
(b) Comments from Interested Parties (Pages 59 - 124)  
(c) Comments from Applicant (Pages 125 - 128) 
Argyll and Bute Local Review Body 
Councillor Kieron Green (Chair) Councillor Graham Hardie
Councillor Peter Wallace   
Contact: Fiona McCallum, Committee Services Officer Tel: 01546 604392
Public Document Pack

Page 2

This page is intentionally left blank

Page 3

Ref: AB1 ARGYLL AND BUTE COUNCIL
www.argyll-bute.gov.uk/** 
NOTICE OF REVIEW 
OFFICIAL USE 
17 Feb 2025 
Date Received 
Notice of Request for Review under Section 43(a)8 of the Town and Country Planning
(Scotland) Act 1997 and the Town and Country Planning (Schemes of Delegation and Local
Review Procedure) (Scotland) Regulations 2013
Important – Please read the notes on how to complete this form and use Block Capitals.
Further information is available on the Council’s website.
You should, if you wish, seek advice from a Professional Advisor on how to complete this
form.
(1) APPLICANT FOR REVIEW  (2) AGENT (if any)  
Name Ann Smith Name 
Address 28 Sandhaven Address 
Sandbank       
Dunoon      
Post Code PA23 8QN Post Code 
Tel. No.  Tel. No. 
Email  Email 
(3) Do you wish correspondence to be sent to you   x       or your Agent 
(4) (a) Reference Number of Planning Application 
24/01696/pp   
(b) Date of Submission Submitted 12/09/24
Validated 26/09/24   
(c) Date of Decision Notice (if applicable) Received 03/12/24   
(5) Address of Appeal Property Rhu House
Rhu Road
Port Charlotte
Isle of Islay
PA48 7TP        
Page 3 Agenda Item 3a

Page 4

(6) Description of Proposal Replace 5 old single glazed timber sash windows
and timber door with ‘look alike’ white upvc vertical
sliding sash windows with mock horns and central
glazing bar to give the appearance of four panes
also dark green composite door again in ‘look alike’
style  with vertical grooves and frosted glass panel
(no decoration)on upper part of door to allow for
privacy.           
(7) Please set out detailed reasons for requesting the review:-
This house has been in my family for over 100 years. The windows
and door have been in situ for at least 60+ years probably more. They are
single glazed, draughty- the wood is rotten. They cannot be opened. The
door is also draughty and insecure. Condensation is also a big factor.
Having recently replaced old storage heaters with new Dimplex
Quantum ones, I feel without new windows they will not work efficiently
wasting energy and money.
The house is located in what is probably one of the most exposed
spots in the village. Being so close to the sea impacts on the maintenance
required-a big factor in opting for upvc. Given the location and the effects
of climate change-windier and wetter-we feel the very best option is to
replace with upvc double glazed look alike units as described above.
I want to have this decision reviewed as I feel it was unfair basing it
on the house’s location in the village at the bottom of the brae. The refusal
said original door colour was black .That is incorrect, it is dark green,which is
why I chose the darkest green I could find for the proposed new door.Also no
mention of the glazing bars which we had proposed making it look like 4
pane window.The Consultee response from Historic Environment Scotland
did not object to the prposals per se,instead it was left to the local authority.
It is at this point I feel there are inconsistencies in the decision to
refuse planning permission. 
It's a category B listed building within the Port Charlotte conservation area.
I know of at least three other B listed properties with the self same windows
and a couple of others listing status not known. These houses are all of a
similar style and structure to Rhu House.A street view of the village shows
numerous upvc windows with two panes, some with planning permission
granted pre-installation others granted retrospectively.
It's my family home which I inherited on the death of my brother in
2005.We live in Dunoon and visit frequently more or less every other month.
The house is for our own and our family's use. It is not let out .I pay double
council tax on it as a result.At the end of the day I am keen to keep the
house looking as it always has only more comfortable and energy efficient.
Page 4

Page 5

Having looked through the council’s  planning website I have come across
numerous Category B listed houses within the Port Charlotte conservation
area where planning permission has been granted for upvc windows. 
Appeal being made to Scottish ministers for application 24/01803/LIB 
If insufficient space please continue on a separate page.  Is this attached?   
Please tick to confirm 
(8) Have you raised any matters which were not before the appointed officer at the
time determination of your application was made                   No
If yes, you should explain in the box below, why you are raising the new matter, why
it was not raised with the appointed officer before your application was determined
and why you consider it should be considered in your review. 
Page 5

Page 6

(9) If the Local Review Body determines that it requires further information on
“specified matters” please indicate which of the following procedure you would prefer
to provide such information:-
(a) Dealt with by written submission x   
(b) Dealt with by Local Hearing 
(c) Dealt with by written submission and site inspection 
Page 6

Page 7

(d) Dealt with by local hearing and site inspection 
NB it is a matter solely for the Local Review Body to determine if further information is
required and, if so, how it should be obtained.
(10) Please list in the schedule all documentation submitted as part of the application
for review ensuring that each document corresponds to the numbering in the
sections below:-
Schedule of documents submitted with Notice of Review (Note if posting your
paperwork 3 paper copies of each of the documents referred to in the schedule
below must be attached): 
No 
Detail
1  
2  
3  
4  
5  
6  
7  
8  
9  
10 
If insufficient space please continue on a separate page.  Is this attached?                                                                                     
Please tick to confirm 
Submitted by
(Please sign) 
Ann Smith 
Dated 12/02/2025 
Important Notes for Guidance
(1) All matters which the applicant intends to raise in the review must be set
out in or accompany this Notice of Review
Page 7

Page 8

(2) All documents, materials and evidence which the applicant intends to rely
on in the Review must accompany the Notice of Review UNLESS further
information is required under Regulation 15 or by authority of the Hearing
Session Rules. 
(3) Guidance on the procedures can be found on the Council’s website -:
http://www.argyll-bute.gov.uk/planning-and-environment/local-review-body 
(4) In in doubt how to proceed please contact 01546 604392/604269 or email:
localreviewprocess@argyll-bute.gov.uk 
(5) Once completed this form can be either emailed to
localreviewprocess@argyll-bute.gov.uk or returned by post to Committee
Services, (Local Review Body), Kilmory, Lochgilphead, Argyll, PA31 8RT 
(6) You will receive an acknowledgement of this form, usually by electronic
mail (if applicable), within 14 days of the receipt of your form and
supporting documentation. 
If you have any queries relating to the completion of this form please contact
Committee Services on 01546 604392/604269 or email: localreviewprocess@argyll-
bute.gov.uk 
For official use only 
Date form issued 
Issued by (please sign)   
Page 8

Page 9

1A Manse Brae Lochgilphead PA31 8RD 
Your Ref: 
Our Ref: 24/01696/PP
Date: 26 September 2024 
Mrs Ann Smith
28 Sandhaven
Sandbank
Dunoon
PA23 8QN 
Dear Sir/ Madam 
TOWN AND COUNTRY PLANNING (SCOTLAND) ACT 1997 (AS AMENDED)
APPLICANT: Mrs Ann Smith
PROPOSAL: Installation of replacement windows and door
SITE ADDRESS: Rhu House Rhu Road Port Charlotte Isle Of Islay Isle Of Islay 
I acknowledge receipt of your revised application together with  the  planning fee of £325.00. 
Further to checking the revised details your application has been found to be valid on 26th
September 2024 and has now been registered. 
Your application reference number is 24/01696/PP which should be quoted in all communications
with the Council.  Please note that for the purpose of the planning decision notice, the description
of your application will be as described in the “proposal” above.  If you disagree with this
description in any way, please do not hesitate to contact the Area Office in order for any changes
to be made.  Contact should be made within 5 working days of this letter to allow for any changes
to be made, or it will be assumed that you accept the application description. 
If you have not received a formal decision within 2 months of the valid date noted above and would
wish a review into the non determination of your application you should contact Mr David Logan,
Head of Legal and Regulatory Support, Argyll and Bute Council, Kilmory, Lochgilphead, PA31 8RT.
Please note that regulations prescribe that any such review request must be lodged within three
months of the above date. 
If this situation does arise, I would suggest that you get in touch with the relevant area planning
office to discuss the application as a review may not be necessary. If you  wish to discuss the
application while it is with the Council, please contact us on 01546 605518.  
If you wish to view the progress of this or any other application you can do so by visiting the
Council’s Website at www.argyll-bute.gov.uk. 
Argyll and Bute Council
Comhairle Earra Gháidheal agus Bhóid 
Development And Infrastructure Services
Executive Director: Kirsty Flanagan 
Page 9

Page 10

In addition to this facility the public can submit an application electronically by visiting the Scottish
Government Website at www.eplanning.scotland.gov.uk Your application will then be electronically
forwarded to Argyll and Bute Council for processing. 
A ‘Live’ update on the status of the Development Management Service, including information on
current average determination times is available at Planning Service Status. 
Yours faithfully 
Central Validation Team
Development and Economic Growth
01546 605518 
Page 10

Page 11

Page 11

Page 12

Page 12

Page 13

Page 13

Page 14

Page 14

Page 15

Page 15

Page 16

Page 16

Page 17

Page 17

Page 18

This page is intentionally left blank

Page 19

Page 19

Page 20

This page is intentionally left blank

Page 21

Page 21

Page 22

This page is intentionally left blank

Page 23

Page 23

Page 24

Page 24

Page 25

Page 25

Page 26

Page 26

Page 27

Page 27

Page 28

This page is intentionally left blank

Page 29

Page 29

Page 30

This page is intentionally left blank

Page 31

Page 31

Page 32

This page is intentionally left blank

Page 33

%%[TO:]
Huws Gray Ltd (North)
Llangefni Ind Estate
Llangefni
Anglesey
LL77 7JA
QUOTATION CUSTOMER QUOTE DETAILS
TEL :01248 723947 Glazed JOB SPEC :
HUW001ACCOUNT :
16/09/2024QUOTE DATE :
457812OUR REF :
IslayYOUR REF :
Fax :
O/A Frame Size 710mm x 1190mm :
Basic Frame Size 710mm x 1190mm :
1
Qty : 5
Vertical Slider [V/S] Location : 
10 Year
Warranty
MACO
PLUS
WER : A
BS7412
SBD
X
X
X
Frame White
Sash White
Bead White
Cill White
Colour Spec Non Standard Spec
Bead type Sculptured Bead VS Drainage Concealed/Base
Fitting colour White Glass decor shade EWhite Sculpt 11mm
Glass decor shade IWhite Sculpt 11mm Handle White Handles Standard Locking C
Restrictor Travel Restrictor
5 x 4/20/4 Clear Soft Coat : 20mm Black S/Spacer  Blk S/S MSpac V [56] White Sculpt 11mm White Sculpt 11mm        Argon Gas Filled  (522 x 488)
5 x 4/20/4 Clear Soft Coat : 20mm Black S/Spacer  Blk S/S MSpac V [56] White Sculpt 11mm White Sculpt 11mm        Argon Gas Filled  (522 x 490)
Glass Spec
Panel Spec
O/A Frame Size 860mm x 1930mm :
Basic Frame Size 860mm x 1930mm :
2
Qty : 1
70FS Solidor Composite [Style 1] Location :
Open in
10 Year
Warranty
MACO
PLUS
WER : 
SBD
X
Frame White
Bead White
Colour Spec Non Standard Spec
Bead type Sculptured Bead 70FS Cill No Cill
Door hinge White Flag Drainage Face
Handle Bright Chrome Handles Sweet LeveThreshold Milled Ali SG AM370 O/IN
x
Glass Spec
1    / Trieste /  1 Glazed Aperture /  Backing Glass /  68 Lam SC/18/4mm SATIN COMP /  Clear /  Forest Green White Internal  (745 x 1854)
-- /  Sweet Chrome Letterbox /    /  Standard Cassette /  Grooved /  Forest Green Rain Deflector /  
Panel Spec
QuantityExtra Items
Page 1 of 2
Powered By
Page 33

Page 34

QUOTATION YOUR REF :IslayOUR REF :457812
NOTES:
(1) This quotation is valid for a period of 30 days from the date of issue
(2) Glass &/or Panel Sizes are not Confirmed manufacturing sizes at this stage
DATE:PRINT NAME:
We have checked the quotation details (inclusive of specification) and would like to proceed as an Order
SIGN:
All Items are viewed from outside unless stated otherwise
Page 2 of 2CONTACT US
%%[SEND]
Powered By01204 479157
www.glazeritewindows.co.uk
www.facebook.com/glazerite.trade.window.supplier
twitter.com/GlazeriteLtd
Unit 7 Lodge Bank Est
Crown Lane
Horwich
Bolton
BL6 5HY
Page 34

Page 35

ARGYLL AND BUTE COUNCIL 
TOWN & COUNTRY PLANNING (SCOTLAND) ACT 1997 (AS AMENDED), RELATED LEGISLATION 
PLANNING (LISTED BUILDINGS AND CONSERVATION AREAS)
(SCOTLAND) ACT 1997 
The application listed below together with the plans and other documents submitted may be
viewed electronically through Argyll and Bute Council website at www.argyll-bute.gov.uk.
Documents are available to inspect electronically at this time. Customers requiring assistance can
contact us by e-mail: planning.hq@argyll-bute.gov.uk or tel. 01546 605518. 
Anyone wishing to make representations should do so in writing to the undersigned within 21 days
of the appearance of this notice.  Please quote the reference number in any correspondence. 
SCHEDULE 
DESCRIPTION AND LOCATION OF PLANS 
Ref No: 24/01696/PP 
Applicant: Mrs Ann Smith 
Proposal: Installation of replacement windows and door 
Site Address: Rhu House Rhu Road Port Charlotte Isle Of Islay Isle Of Islay 
Listed Building/Conservation Advert 
Oban Times 
Publication Date: 10.10.2024  Closing Date: 31.10.2024 
Page 35

Page 36

This page is intentionally left blank

Page 37

THIS FORM IS TO ADVISE YOU THAT A PLANNING APPLICATION HAS BEEN MADE THAT
MAY AFFECT YOU PLEASE READ THE NOTES CAREFULLY 
Owner, occupier or lessee   Date: 26 September 2024         
N E I G H B O U R   N O T I F I C A T I O N
Town and Country Planning (Development Management Procedure)(Scotland) 
Regulations 2013 
Ref Number 24/01696/PP
Location Rhu House Rhu Road Port Charlotte Isle Of Islay Argyll And Bute PA48 7TP
Proposal Installation of replacement windows and door
Applicant Mrs Ann Smith
Agent - if applicable 
Agent’s address       
Notice is hereby given that an application for planning permission has been received for the above
development that may be of interest to you. 
VIEWING THE PLANS 
The application, plans and other documents submitted may be viewed electronically through Argyll
and Bute Council Website at www.argyll-bute.gov.uk. 
Having regard to Schedule 6, Part 3, s10 of the Coronavirus (Scotland) Act 2020, documents are
only available to inspect electronically at this time. Customers requiring assistance can contact us
by e-mail: planning.hq@argyll-bute.gov.uk, or tel. 01546 605518.  
SUBMITTING COMMENTS 
Comments can be made on the application, either: 
• Online through Argyll and Bute Council Website using the Online Planning Information
system and searching for the planning reference number above.
• By email to  planning.maki@argyll-bute.gov.uk 
• By post to Argyll and Bute Council, Development Management, Kilmory Castle,
Lochgilphead, Argyll, PA31 8RT. Customers are requested to use electronic
communication where possible during the coronavirus pandemic as access to Council
buildings and processing of postal mail is currently restricted and may take longer to be
acknowledged and attached to the planning file. 
You have 21 days from the date on this notice to make comments. 
Please read the Advice to Neighbours information which is printed with this letter. A plan of the
proposed development is also part of this document. 
Page 37

Page 38

A D V I C E   T O   N E I G H B O U R S 
Why have I received this notice? 
This notice has been sent to you because we have received an application for planning permission
to carry out the proposals on the front page. Your land is either adjacent to or lies within 20 metres
of the site (identified by the cross-hatched area on the attached map). As a result the Council is
legally required to inform you of the proposals. You have the right to make comments on the
proposals 
National and Major Planning Applications 
If you have already made comments to the applicant at pre-application stage, you will have to
make comments to the Council on this application if you wish us to take them into account. 
What can I comment on? 
The Council can only consider comments about planning matters. These are called “material
considerations” and some examples are listed below (this list is not exhaustive): 
• Compliance with Development Plan Policy; 
• Appearance (design, materials etc.); 
• Traffic, parking or access problems; 
• Residential amenity (noise, overshadowing etc.); 
• Impact on natural or built environment. 
Loss of view, property values and structural problems, for example, are not material planning
considerations and cannot be taken into account when determining the application. 
What happens if I make representations? 
If your comments are in time and relate to planning matters, they will form part of the report by the
Head of Planning and will be considered before a decision is made on the planning application.
Representations form part of the background papers on the application and will be made public. 
If you have made material representations you will be advised of the Council’s decision. You do
not have a right of appeal against this decision. 
Further advice on commenting on planning proposals can be found on the Council website or we
can send you a copy. 
How we handle planning applications 
Details of how we handle planning applications and make decisions on them can be found on the
Council website. 
Contact Details 
If you have any questions please contact the Area Office on 01546 605518 or email
planning.maki@argyll-bute.gov.uk 
Page 38

Page 39

Map 
Page 39

Page 40

Properties notified. 
Tigh Nam Frangach Main Street Port Charlotte Isle Of Islay Argyll And Bute 
Port Charlotte Store Main Street Port Charlotte Isle Of Islay Isle Of Islay 
Port Charlotte Stores House Main Street Port Charlotte Isle Of Islay Isle Of Islay 
Cala Na Ruadh Rhu Road Port Charlotte Isle Of Islay Isle Of Islay 
Aillidh Rhu Road Port Charlotte Isle Of Islay Isle Of Islay   
Page 40

Page 41

ARGYLL AND BUTE COUNCIL 
PLANNING (LISTED BUILDINGS & CONSERVATION AREAS) (SCOTLAND) ACT 1997 
SECTION 65: APPLICATION AFFECTING THE CHARACTER OR APPEARANCE 
OF A CONSERVATION AREA 
NOTICE IS HEREBY GIVEN THAT THE UNDERNOTED APPLICATION HAS BEEN RECEIVED BY THE COUNCIL
AND IS HEREBY ADVERTISED IN ACCORDANCE WITH THE PROVISIONS OF THE ABOVE LEGISLATION AS THE
PROPOSAL AFFECTS THE CHARACTER OR APPEARANCE OF A CONSERVATION AREA. 
ANY PERSONS WHO WISH TO MAKE REPRESENTATIONS TO THE COUNCIL ABOUT THE APPLICATION SHOULD
MAKE THEM IN WRITING TO THE UNDERSIGNED BY THE FOLLOWING DATE: 
Expiry Date:                                 
COPIES OF THE PLANS AND DOCUMENTS SUBMITTED WITH THE APPLICATION MAY BE INSPECTED
ELECTRONICALLY THROUGH THE ARGYLL AND BUTE WEBSITE AT www.argyll-bute.gov.uk. 
Customers requiring assistance can contact us be e-mail: planning.hq@argyll-bute.gov.uk or tel. 01546 605518 
DESCRIPTION OF PROPOSED DEVELOPMENT 
REF NO: 24/01696/PP 
PLEASE QUOTE THIS REFERENCE NUMBER IN ANY CORRESPONDENCE 
APPLICANT: Mrs Ann Smith 
PROPOSAL: Installation of replacement windows and door 
SITE ADDRESS:  Rhu House Rhu Road Port Charlotte Isle Of Islay Argyll And Bute 
Fergus Murray 
Head of Development and Economic Growth 
26th September 2024 
NOTE:
The information in the Description Of Proposed Development above can assist when using the Simple and Advance
search facility on the Public Access Planning pages of the Website. 
Written comments can be submitted electronically using the Public Access Planning page on the Council website, or
submitted by post addressed to: Argyll and Bute Council, Development Management, Kilmory Castle, Lochgilphead,
Argyll, PA31 8RT 
Members of the public are reminded that any letter of representation received on a planning application is considered a
public document.  
As such members of the public and organisations alike should note that any representations received in respect of any
application will be made available for public inspection. In terms of the Freedom of Information Act, the same
representations will be copied on request. The representations will be published on the Council’s web site. 
It should be noted that the author of a representation is solely responsible for its content and accuracy.  
Representations that are marked Confidential will be returned to the sender and will not be taken into account when the
application is being considered. It should also be noted that anonymous representations will be “shredded” and not
taken into account when the application is being considered. 
Page 41

Page 42

This page is intentionally left blank

Page 43

Argyll and Bute Council      
Development and Economic Growth   
Delegated or Committee Planning Application Report and Report of handling as required
by Schedule 2 of the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2008 relative to applications for Planning Permission or Planning
Permission in Principle
____________________________________________________________________________ 
Reference No:  24/01696/PP 
Planning Hierarchy:  Local Application 
Applicant:   Mrs Ann Smith  
Proposal: Installation of replacement windows and door 
Site Address:   Rhu House, Rhu Road, Port Charlotte, Isle of Islay
____________________________________________________________________________  
DECISION ROUTE 
(i) Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997 
____________________________________________________________________________ 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission 
• Installation of replacement windows and door 
(ii) Other specified operations 
• N/A
____________________________________________________________________________ 
(B) RECOMMENDATION: 
It is recommended that planning permission is refused.
____________________________________________________________________________ 
(C) HISTORY:   
07/00437/LIB - Replacement roof covering – 13.07.2007 
24/01803/LIB - Installation of replacement windows and door – Pending
__________________________________________________________ 
(D) CONSULTATIONS:   
N/A
______________________________________________________________________
Page 43

Page 44

(E) PUBLICITY:   
Oban Times Advertisement - published 10.10.2024, expired 31.10.2024 
Conservation Area Site Notice – expired 17.10.2024 
Neighbour notification in accordance with the requirements of the Development     
Management Procedure (Scotland) Regulations 2013
____________________________________________________________________________ 
(F) REPRESENTATIONS:  
N/A 
(i) Summary of issues raised
N/A
____________________________________________________________
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Statement:  No 
(ii) An appropriate assessment under the Conservation (Natural Habitats)
Regulations 1994:   No 
(iii) A design or design/access statement:   No 
(iv) Sustainability Checklists: No – Given however the nature of the application, it
is nonetheless considered that there is sufficient information on the file to make a
decision. 
(v) A report on the impact of the proposed development eg. Retail impact,
transport impact, noise impact, flood risk, drainage impact etc: 
Photograph of existing windows and door – 12.09.2024 and 26.09.2024
Door Details – 12.09.2024
_____________________________________________________________ 
(H) PLANNING OBLIGATIONS 
(i) Is a Section 75 agreement required:  No
___________________________________________________________________ 
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30, 31 or
32:  No
___________________________________________________________________ 
Page 44

Page 45

(J)  Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account in
assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy 
Sustainable Places 
NPF4 Policy 7 – Historic Assets and Places 
Liveable Places 
NPF4 Policy 14 – Design, Quality and Place 
Argyll and Bute Local Development Plan 2 
Spatial and Settlement Strategy 
Policy 01 – Settlement Areas
Policy 04 – Sustainable Development 
High Quality Places 
Policy 05 – Design and Placemaking
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 10 – Design – All Development
Policy 15 – Protection, Conservation and Enhancement of Our Historic
Environment
Policy 16 – Listed Buildings
Policy 17 – Conservation Areas             
(ii) List of all other material planning considerations taken into account in the
assessment of the application, having due regard to Annex A of Circular
4/2009.
• Scottish Planning Policy
• Planning History
• ABC Technical Note – Biodiversity (Feb 2017)
• TN06 Sustainability Technical Note and Checklist (Oct. 2023)
• TN07 Sustainable Buildings Technical Note and Checklist (Oct. 2023)
• ABC Technical Note – Windows (Apr 2018) 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental Impact
Assessment:  No
____________________________________________________________________________ 
Page 45

Page 46

(L) Has the application been the subject of statutory pre-application consultation
(PAC):  No
_______________________________________________________________
(M) Does the Council have an interest in the site:  No
____________________________________________________________________________
(N) Requirement for a hearing (PAN41 or other):  Not required
_________________________________________________________________________ 
(O)(i) Key Constraints/Designations Affected by the Development:
- None 
(O)(ii) Soils
Agricultural Land Classification:  Built Up Area 
Peatland/Carbon Rich Soils Classification: N/A 
Peat Depth Classification: N/A 
Does the development relate to croft land? No
Would the development restrict access to croft or
better quality agricultural land?
N/A 
Would the development result in fragmentation of
croft / better quality agricultural land?
No 
(O)(iii) Woodland  
Will the proposal result in loss of trees/woodland?
(If yes, detail in summary assessment)
No 
Does the proposal include any replacement or
compensatory planting?
N/A 
(O)(iv) Land Status / LDP Settlement Strategy
Status of Land within the Application  Brownfield 
ABC LDP2 Settlement Strategy  Key Rural Settlement Area
ABC LDP2 Allocations/PDAs/AFAs etc: n/a 
(P) Assessment and summary of determining issues and material considerations 
Rhu House, Rhu Road, Port Charlotte, Isle of Islay, within the Port Charlotte Conservation Area, 
is a Category B listed Building (Ref: LB12436). The listing states as follows:
Earlier 19th century. Traditional. 2 storeys. Rubble; partly rendered; slate roofs.
The host building, which comprises a detached, two storey dwellinghouse, is within the Key
Rural Settlement area of Port Charlotte as designated in the Argyll and Bute Local Development
Page 46

Page 47

Plan 2 (LDP2). It is also within the Scottish Water mains supply, the Scottish Water drainage
operational area and an airfield safeguarding zone (Islay Airport) in LDP 2. It is also in proximity
to, but outwith, the Loch Indaal Marine Consultation Area. 
Rhu House is a Category B listed Building (Ref: LB12436). The listing states as follows:
Earlier 19th century. Traditional. 2 storeys. Rubble; partly rendered; slate roofs.
The Proposal
The application proposes the installation of 5No. existing windows and the replacement of the
existing entrance door. The windows and door are positioned on the front elevation of the host
dwellinghouse. 
The existing front door opening measures some 1.93m high x 0.860m whilst all of the existing
5No. window openings measure some the rear sitting room door opening measures some 1.2m
high x 0.710m wide. 
The original front door, which is painted black (externally) and white (internally) is comprised of
vertical timber panels with a square single pane/glass window positioned in the upper part of the
door.  Each of the 5No. existing windows are timber in construction, sliding sash in their design,
white in colour and each leaf incorporates 2No. single panes of glass separated by a central
vertical glazing bar. 
The proposed replacement front door, which will be installed within the existing opening,
comprises a composite door (colour green) which incorporates a vertical timber-panelled design
(to match the same design of the existing door), a chrome lever door handle and a square
single pane frosted plain window in the upper part of the door. 
The proposed 5No. new windows, all of which are Upvc in their construction, each comprises a
vertical slider movement with both the top and bottom leafs incorporating a single double-glazed
pane of glass. The windows will be installed within the existing opening incorporate a white
frame, sash, bead and cill. 
Permitted Development 
Permitted Development Rights covering aspects of development are detailed in the Town and
Country Planning (General Permitted Development) (Scotland) Order 1992 as amended (the
Regulations) and the associated Circular 1/2024: Householder Permitted Development Rights. 
Class 7a of the Regulations states at paragraph 4 as follows: 
(3) Paragraph (4) applies to development to alter or replace a window in a conservation area
where— 
(a)the window is part of—
(i)the principal elevation, or 
(ii)a side elevation where that elevation fronts a road, and 
(b)the window as altered or replaced would not be the same, or substantially the same, as the
window to be altered or replaced in the following respects— 
(i)the manner in which the window is opened and closed, 
(ii)the number, orientation and colour of the panes comprised in the window, 
Page 47

Page 48

(iii)the dimensions and colour of the frame of the window or any astragal bars comprised in the
window. 
Circular 1/2024: Householder Permitted Development Rights confirms that whilst materials of
the proposed and existing windows do not need to match,  but notes that replacement windows
of a different material that do not match the existing window in respect of the free criteria (e.e.
width of the frame) then prior approval would be required. In this case, were the proposal
submitted for prior approval, the local planning authority would have refused prior approval. As
such, the proposal does not benefit from being considered as permitted development. 
Accordingly, planning permission is required for these works. 
Principle of Development 
Policy 7 ‘Historic assets and places’ of NPF4 states that development proposals with a
potentially significant impact on historic assets or places will be accompanied by an assessment
which is based on an understanding of the cultural significance of the historic asset and/or
place. 
Policy 14 ‘Design, quality and place’ of NPF4 states that development proposals will be
designed to improve the quality of an area whether in urban or rural locations and regardless of
scale. 
In terms of the adopted LDP2, Policy 01 gives support for proposals within settlements that are
compatible with the surrounding uses and respects the character and appearance of
surrounding townscape in terms of scale, massing, design and external finishes and complies
with all relevant LDP2 policies such as set out in the relevant sustainable siting and design
policies of LDP2. 
Policy 05 ‘Design and Placemaking’ of the Argyll and Bute Local Development Plan 2 (LDP 2)
states that to achieve good quality places, proposals should endeavour to comply with a number
of placemaking criteria which include that the design should develop the area’s sense of identity
by understanding and embracing the existing distinctive characteristics, with the design
respecting and complementing its surroundings in terms of density, appearance, height, scale,
massing, materials and finishes. 
Policy 09 ‘Sustainable Design’ of LDP 2 goes on to state that development proposals should
demonstrate consideration of and where possible utilisation of sustainable design and
construction methods in terms of embodied energy; conversion and re-use; and adaptability.   
Policy 15 ‘Supporting the Protection, Conservation and Enhancement of Our Historic Built
Environment’ of LDP2 states that Development proposals will not be acceptable where they fail
to:
• protect, preserve, conserve or enhance the special characteristics and/or cultural
significance of the historic built environment in terms of its location, scale, form, design
or proposed use; or
• avoid any cumulative effect upon the special characteristics and/or cultural significance
of designated built environment sites. 
Proposals for development that would affect either a designated or non-designated heritage
asset or their setting will be expected to demonstrate that they would enable positive change by
balancing the need to secure the long-term sustainability of the asset against the need to
address the impacts of climate change and to meet the council’s wider regeneration objectives,
where appropriate.
Page 48

Page 49

Policy 16 ‘Listed Buildings’ of LDP2 states that a development proposal which affects a Listed
Building, its curtilage or its wider setting will only be supported when it meets the following
criteria:
• It respects the original structure in terms of setting, scale, design, materials and
proposed use, OR
• The proposal is essential to securing an appropriate use of the Listed Building without
undermining its architectural or historic character, or its setting, AND
• It conforms to national policy and guidance, including but not limited to those set out in
the section above ‘Related Documents’. 
Policy 17 ‘Conservation Areas’ states that there is a presumption against development that does
not preserve or enhance the character or appearance of an existing or proposed conservation
area or its setting. 
These policies are considered below. 
Impact on Port Charlotte Conservation Area 
I consider the host building to be a locally important building within the context both of the
Conservation Area and Port Charlotte in general by reason of its size, scale, design,
proportions, materials and setting within the streetscape. 
It is evident having regard to the details/drawings for the new windows, that in respect to the
proposed new windows, they do not represent a ‘like for like’ timber replacement of the existing
timber sliding sash windows. Notwithstanding that there would be no alteration to the size of the
existing window openings and that the general proportions on the new windows would be the
same as the existing windows, I nonetheless consider that a combination of the introduction of
Upvc finishes, double glazing, the different glazing pattern and the design/style of the proposed
windows including their colour, would both individually and cumulatively, undermine the host
buildings character, architectural/historic interest and setting. 
Moreover, given that the host building is attached to another building of similar vernacular style,
proportions and character and whose front elevation windows are timber sliding sash, I also
consider that the introduction of the proposed new windows would unacceptably detract from
the setting of this pair of buildings and the streetscape as a whole. 
In respect of the replacement front door, and whilst I consider its proposed colour to be
sympathetic to the host Listed Building, I nonetheless consider that a combination of the
proposed introduction of its composite finish and the insertion of frosted double glazing would
similarly undermine the host buildings character, architectural/historic interest and setting. 
The relevant policy test in respect of Conservation Areas is whether or not the proposal would
preserve or enhance the character or appearance of an existing or proposed conservation area
or its setting. For the above reasons, given that I consider that the proposals, both individually
and when read as a whole, would undermine the host buildings character, architectural/historic
interest and setting, it logically follows that as a result, the proposal would neither preserve nor
enhance the character or appearance of the Port Charlotte Conservation Area contrary to
Policies 15 and 17 of LDP 2. 
Siting and Design 
Page 49

Page 50

Notwithstanding that I consider that the new windows and door would in themselves incorporate
sustainable design and construction methods such that Policy 09 of LDP 2 would be satisfied in
so far as stated, for the reasons previously detailed, as I consider that the combination of the
design elements including materials, double glazing, glazing pattern, decorative finish, and style
of the new windows and door is unacceptable, and particularly on its prominent front elevation, I
conclude overall that the proposal would as a result be contrary to Policies 01 and 05 of LDP 2. 
Impact on the Host Listed Building 
It is considered that the proposed development, for all the reasons detailed above, would
unacceptably harm and detract from the character, appearance and setting of this Category B
Listed Building. Furthermore, given that the host building is attached to another building of
similar vernacular style, proportions and character and whose front elevation windows are
timber sliding sash, I also consider that the introduction of the proposed new windows in
particular would unacceptably detract from the setting of this pair of buildings and the
streetscape as a whole. 
Accordingly, and for these reasons, it is considered that the proposal would therefore undermine
the host building’s architectural/historic character and its setting contrary to Policy 7 of NPF4
and Policy 16 of LDP 2. 
Recommendation 
For these reasons, and notwithstanding my conclusion in respect of the matter of sustainable
design, as the proposal overall is contrary to Policies 7 and 14 of NPF4 and Policies 01, 05, 08,
09, 10, 15, 16 and 17 of the Argyll and Bute Local Development Plan 2, full planning permission
should be refused for the proposal.
_____________________________________________________________ 
(Q) Is the proposal consistent with the Development Plan: No 
____________________________________________________________________________ 
(R) Reasons why planning permission or a Planning Permission in Principle should
be granted: 
N/A
____________________________________________________________________________
(S) Reasoned justification for a departure to the provisions of the Development Plan: 
N/A
____________________________________________________________________________ 
(T) Need for notification to Scottish Ministers or Historic Scotland:  No
____________________________________________________________________________ 
Author of Report: Francis Gillespie    Date: 25.11.2024 
Reviewing Officer:  Bryn Bowker     Date: 03.12.2024 
Fergus Murray 
Head of Development and Economic Growth 
Page 50

Page 51

REASONS FOR REFUSAL RELATIVE TO APPLICATION REF. NO. 24/01696/PP 
1. The proposed development is contrary to Policies 7 and 14 of NPF4 and Policies 01, 05,
08, 09, 10, 15, 16 and 17 of the Argyll and Bute Local Development Plan 2 in that it
would, if permitted, undermine the host building’s architectural/historic character and
setting and fail to preserve or enhance the character or appearance of the Port Charlotte
Conservation Area.   
APPENDIX TO DECISION REFUSAL NOTICE 
Appendix relative to application 24/01696/PP 
(A) Has the application been the subject of any “non-material”
amendment in terms of Section 32A of the Town and Country
Planning (Scotland) Act 1997 (as amended) to the initial submitted
plans during its processing.
No 
(B) The reason why planning permission has been approved: 
N/A 
Page 51

Page 52

ADDITIONAL NOTES TO APPLICANT 
None. 
Page 52

Page 53

APPENDIX TO DECISION APPROVAL NOTICE 
Appendix relative to application: 22/00174/LIB 
(A) Has the application required an obligation under Section 75 of the
Town and Country Planning (Scotland) Act 1997 (as amended):
☐Yes ☒No 
(B) Has the application been the subject of any “non-material”
amendment in terms of Section 32A of the Town and Country
Planning (Scotland) Act 1997 (as amended) to the initial submitted
plans during its processing.
☐Yes ☒No 
(C) Is the proposal consistent with the Development Plan? ☒Yes ☐No 
(D) The reason why planning permission has been approved: 
The proposal is considered to be consistent with the relevant provisions of the
Development Plan, and there are no other material considerations of sufficient
significance to indicate that it would be appropriate to withhold planning permission
having regard to s25 of the Act. 
Page 53

Page 54

This page is intentionally left blank

Page 55

1A Manse Brae Lochgilphead PA31 8RD 
TOWN AND COUNTRY PLANNING (SCOTLAND) ACT 1997 (AS AMENDED)
TOWN AND COUNTRY PLANNING (DEVELOPMENT MANAGEMENT PROCEDURE)
(SCOTLAND) REGULATIONS 2013 
REFUSAL OF PLANNING PERMISSION 
REFERENCE NUMBER: 24/01696/PP 
Mrs Ann Smith
28 Sandhaven
Sandbank
Dunoon
PA23 8QN 
I refer to your application dated 12th September 2024 for planning permission in respect of the
following development: 
Installation of replacement windows and door
AT:
Rhu House Rhu Road Port Charlotte Isle Of Islay Argyll And Bute 
Argyll and Bute Council in exercise of their powers under the above mentioned Act and
Regulations hereby refuse planning permission for the above development for the reasons(s)
contained in the attached appendix. 
Dated: 3 December 2024 
Fergus Murray
Head of Development and Economic Growth 
Page 55

Page 56

REASONS FOR REFUSAL RELATIVE TO APPLICATION NUMBER: 24/01696/PP 
1. The proposed development is contrary to Policies 7 and 14 of NPF4 and Policies 01, 05,
08, 09, 10, 15, 16 and 17 of the Argyll and Bute Local Development Plan 2 in that it would,
if permitted, undermine the host building's architectural/historic character and setting and
fail to preserve or enhance the character or appearance of the Port Charlotte Conservation
Area. 
Page 56

Page 57

NOTES TO APPLICANT (1) RELATIVE TO APPLICATION NUMBER 24/01696/PP 
1. If the applicant is aggrieved by the decision to refuse permission for or approval required by
a condition in respect of the proposed development, or to grant permission or approval
subject to conditions, the applicant may require the planning authority to review the case
under Section 43A of the Town and Country Planning (Scotland) Act 1997 (as amended)
within three months from the date of this notice. A Notice of Review request must be
submitted on an official form which can be obtained by contacting The Local Review Body,
Committee Services, Argyll and Bute Council, Kilmory, Lochgilphead, PA31 8RT or by
email to localreviewprocess@argyll-bute.gov.uk 
2. If permission to develop land is refused or granted subject to conditions and the owner of
the  land claims that the land has become incapable of reasonably beneficial use in its
existing state, and it cannot be rendered capable of reasonably beneficial use by the
carrying out of any development which has been or would be permitted, the owner of the
land may serve on the planning authority a purchase notice requiring the purchase of the
landowner’s interest in the land, in accordance with Part 5 of the Town and Country
Planning (Scotland) Act 1997 (as amended). 
Page 57

Page 58

APPENDIX TO DECISION REFUSAL NOTICE 
Appendix relative to application: 24/01696/PP 
A. Has the application been the subject of any “non-material” amendment in terms of
Section 32A of the Town and Country Planning (Scotland) Act 1997 (as amended) to
the initial submitted plans during its processing. 
No 
B.  Is the proposal a departure from the Development Plan: 
No 
C.  Summary justification statement for refusal of planning permission 
The proposal is considered to be in conflict with the relevant provisions of the Development
Plan, and there are no other material considerations of sufficient significance to indicate
that it would be appropriate to grant planning permission having regard to s25 of the Act. As
such, planning permission should be refused for the proposed development. 
Page 58

Page 59

STATEMENT OF CASE 
FOR 
ARGYLL AND BUTE COUNCIL 
LOCAL REVIEW BODY 
RHU HOUSE, RHU ROAD, PORT CHARLOTTE,
ISLE OF ISLAY, PA48 7TP 
PLANNING APPLICATION REFERENCE
NUMBER 24/01696/PP 
LOCAL REVIEW BOARD REFERENCE 
NUMBER 25/0003/LRB 
5th March 2025
Page 59 Agenda Item 3b

Page 60

STATEMENT OF CASE 
The planning authority is Argyll and Bute Council (‘the Council’). The appellant
is Mrs Ann Smith, 28 Sandhaven, Sandbank, Dunoon, PA23 8QN (‘the
appellant’). 
The planning application, reference number 24/01696/PP, for the installation
of replacement windows and door at Rhu House, Rhu Road, Port Charlotte,
Isle of Islay, PA48 7TP (“the appeal site”) that was refused on the 3rd
December 2024. The sole reason for refusal has been appealed to the Local
Review Body. 
DESCRIPTION OF SITE 
The application site, which comprises a detached, two storey dwellinghouse
known as Rhu House which is a Category B Listed Building (Ref: LB12436),
lies within the Key Rural Settlement area of Port Charlotte as designated in
the Argyll and Bute Local Development Plan 2 (LDP 2). It is also within the
Scottish Water mains supply, the Scottish Water drainage operational area
and an airfield safeguarding zone (Islay Airport) in LDP 2. It is also in
proximity to, but outwith, the Loch Indaal Marine Consultation Area. 
SITE HISTORY 
The planning history of the site and locality is detailed in Section C of the
Report of Handling. 
STATUTORY BASIS ON WHICH THE APPEAL SHOULD BE DECIDED
Section 25 of the Town & Country Planning (Scotland) Act 1997 provides
that where, in making any determination under the planning Acts, regard is
to be had to the development plan, the determination shall be made in
accordance with the plan unless material considerations indicate otherwise. 
This is the test for this application. 
STATEMENT OF CASE 
As detailed above, the planning application was refused by Argyll and Bute
Council on 3rd December 2024. 
This review is centred upon the sole issue of the proposal’s impact, or
otherwise, on the character and setting of the host building and the character
and appearance of the Port Charlotte Conservation Area. 
No other material matters in respect of the proposal are the subject of this
review. 
Page 60

Page 61

As such, Argyll and Bute Council considers the determining issue in relation to
the case is as follows:- 
- Whether the proposal would respect the architectural/historic
character and setting of Rhu House and preserve or enhance the
character or appearance of the Port Charlotte Conservation Area. 
The Report of Handling (copy attached) sets out the Council’s assessment of
the application in terms of Development Plan policy and other material
considerations. 
REQUIREMENT FOR ADDITIONAL INFORMATION AND A HEARING 
It is considered that no new information has been raised in the appellants’
submission. A detailed planning policy assessment (which was relevant at the
time of the assessment of the planning application) and all other material
planning considerations including the assessment of roads matters is covered
in the Report of Handling. As such it is considered that Members have all the
information they need to determine the case. Given the above and that the
proposal is small-scale, has no complex or challenging issues and has not
been the subject of significant body of conflicting representation, then it is
considered that a Hearing is not required. 
COMMENT ON APPELLANTS’ SUBMISSION 
Having regard to the grounds for review set out in the appellant’s submission,
the following points are noted: 
1. The appellant states:
‘This house has been in my family for over 100 years. The
windows and door have been in situ for at least 60+ years
probably more. They are single glazed, draughty, the wood is
rotten. They cannot be opened. The door is also draughty and
insecure. Condensation is also a big factor’. 
The Council does not dispute the appellant’s description and
characterisation of the condition of the existing windows and door
which are proposed to be replaced under 24/01696/PP. 
The Council acknowledges the minor inaccuracy in its Report of
Handling (RoH) in so far as the colour of the existing door is dark green
and not black as stated in the RoH and that the replacement new door
would include glazing bars the effect of which would be to create the
visual appearance of the door incorporating a 4-pane window. 
The colour of the existing door, even if it was correctly reported in the
RoH, and the proposed incorporation of a 4-pane window into the
proposed design of the replacement door would not overcome the
Council’s fundamental concerns in respect of the proposal that it would
not respect the architectural/historic character and setting of Rhu
Page 61

Page 62

House or preserve or enhance the character or appearance of the Port
Charlotte Conservation Area that it would justify granting planning
permission for the proposed development. 
In respect of the condition of the existing windows, as set out in the
Report of Handling for the listed building application under
24/01803/LIB (copy attached), for listed buildings, the Council’s
Windows Working Note (copy attached) states only refurbishment or
like for like timber replacement shall be permitted. This position is
supported by Historic Scotland’s Managing Change in the Historic
Environment Windows Guidance Note (copy attached) which at page
18 also sets out ‘In replacing sash windows, materials other than
timber, e.g. uPVC, will rarely be acceptable’. 
2.  The appellant states:
‘Given the location and the effects of climate change-windier and
wetter-we feel the very best option is to replace with upvc double
glazed look alike units’. 
The Council would respond that the host building is a Grade B Listed
Building which also lies within a Conservation Area. For this reason,
and in these circumstances, relevant planning policy applies and
adopts a more stricter approach/test as to the acceptability, or
otherwise, of development proposals. 
In respect of proposals within Conservation Areas, the relevant policy
test is that the proposal must preserve or enhance the character or
appearance of the Conservation Area. In respect of Listed Building, the
relevant policy test is that the proposal must respect its
architectural/historic character and setting. 
For the reasons stated in the RoH, the Council contends that in the
particular circumstances of this case the proposed development
satisfies neither of the policy tests detailed above. Accordingly, the
Council concluded that planning permission should be refused. 
3. The appellant states:
‘The consultee response from Historic Environment Scotland did
not object to the proposals per se, instead it was left to the local
authority’. 
For clarity, Historic Environment Scotland (HES) was consulted for the
associated listed building application (24/01803/LIB) but not consulted
in respect of the application for planning permission which is the
subject of this review. 
For assistance, and under 24/01803/LIB, HES stated, in summary, as
follows: 
‘The existing windows appear to be of a traditional timber construction
arranged in a two over two pattern. The door is a modern replacement
Page 62

Page 63

with an upper glazed panel. There is no condition report for the existing
windows, particularly an assessment of whether they are beyond
economic repair. 
Where windows are historic or original we advise that they are repaired
and sensitively upgraded unless they are beyond economic repair. If
the principle of replacement is accepted, we recommend your Council
seek further information on the proposed material of the windows, to
clarify whether they would be a good match for the existing. You can
find more advice about windows in our Managing Change in the
Historic Environment: Windows | HES | History and Guide to Energy
Retrofit of Traditional Buildings | Hist Env Scotland
(historicenvironment.scot). 
As detailed above, the Council’s Windows Working Note (copy
attached) states only refurbishment or like for like timber replacement
shall be permitted. This position is supported by Historic Scotland’s
Managing Change in the Historic Environment Windows Guidance
Note (copy attached) which at page 18 also sets out ‘In replacing sash
windows, materials other than timber, e.g. uPVC, will rarely be
acceptable’. 
For the reasons stated in the RoH, the Council concluded that planning
permission should be refused. 
4. The appellant states:
‘I feel there are inconsistencies in the decision to refuse planning
permission. 
I know of at least three other B listed properties with the self same
windows and a couple of others listing status not known. 
A street view of the village shows numerous upvc windows with
two panes, some with planning permission granted pre-
installation others granted retrospectively. 
I have come across numerous Category B listed houses within the
Port Charlotte conservation area where planning permission has
been granted for upvc windows’. 
The Council notes that the appellant has not provided details of those
dwellings, Listed or otherwise, to which she refers in her statement of
case. In the absence of this evidential context, the Council contend that
limited weight must be attached to any inference that planning
permission granted to those proposals must automatically follow in
respect of the proposal which is the subject of this review. 
In any event, the Council would respectfully state that each planning
application must be considered on its own individual merits and in its
own evidential context. In this case, the Council concluded that, for the
Page 63

Page 64

reasons detailed in its RoH, the proposal would not respect the
architectural/historic character and setting of Rhu House or preserve or
enhance the character or appearance of the Port Charlotte
Conservation Area. Accordingly, it refused planning permission for the
proposed development as it was contrary to Policies 7 and 14 of NPF4
and Policies 01, 05, 08, 09, 10, 15, 16 and 17 of the Argyll and Bute
Local Development Plan 2. 
5. The appellant states:
‘At the end of the day I am keen to keep the house looking as it
always has only more comfortable and energy efficient’. 
The Council strongly advocates the pursuit of sustainable development
and energy efficiency. In the particular circumstances of this case,
however, and given the listed status of the host building and its siting
within a Conservation Area, the Council considered that the proposed
development, as one method of helping energy efficiency, would not
overcome the strong policy concerns against the proposal as detailed
above and in the accompanying RoH to justify setting them aside in
this case. Accordingly, the Council respectfully states that planning
permission should be refused for the proposed development. 
CONCLUSION 
Section 25 of the Town and Country Planning Act 1997 requires that all
decisions be made in accordance with the development plan unless material
considerations indicate otherwise. 
The determination of these proceedings will accordingly require a decision to
be made with regard to the extant ‘Development Plan’ position. The report of
handling includes commentary that identifies the provisions of the Argyll and
Bute Local Development Plan 2 (LDP 2) which were relevant to the
determination of this application. 
In this case the LRB must therefore ensure that proposal complies with
Policies 7 and 14 of NPF4 and Policies 01, 05, 08, 09, 10, 15, 16 and 17 of
the Argyll and Bute Local Development Plan 2 which, together, represent the
relevant planning policy upon which to assess the merits of the proposed
development in the particular circumstances of this case. 
Appended documents:
Report of Handling 24/01696/PP
Report of Handling 24/01803/LIB
ABC Windows Working Note
Historic Scotland’s Managing Change in the Historic Environment Windows
Guidance Note
Historic Scotland consultation response to LIB application which is subject to
a separate Appeal submitted to Scottish Ministers 
Page 64

Page 65

Argyll and Bute Council      
Development and Economic Growth   
Delegated or Committee Planning Application Report and Report of handling as required
by Schedule 2 of the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2008 relative to applications for Planning Permission or Planning
Permission in Principle
____________________________________________________________________________ 
Reference No:  24/01696/PP 
Planning Hierarchy:  Local Application 
Applicant:   Mrs Ann Smith  
Proposal: Installation of replacement windows and door 
Site Address:   Rhu House, Rhu Road, Port Charlotte, Isle of Islay
____________________________________________________________________________  
DECISION ROUTE 
(i) Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997 
____________________________________________________________________________ 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission 
• Installation of replacement windows and door 
(ii) Other specified operations 
• N/A
____________________________________________________________________________ 
(B) RECOMMENDATION: 
It is recommended that planning permission is refused.
____________________________________________________________________________ 
(C) HISTORY:   
07/00437/LIB - Replacement roof covering – 13.07.2007 
24/01803/LIB - Installation of replacement windows and door – Pending
__________________________________________________________ 
(D) CONSULTATIONS:   
N/A
______________________________________________________________________
Page 65

Page 66

(E) PUBLICITY:   
Oban Times Advertisement - published 10.10.2024, expired 31.10.2024 
Conservation Area Site Notice – expired 17.10.2024 
Neighbour notification in accordance with the requirements of the Development     
Management Procedure (Scotland) Regulations 2013
____________________________________________________________________________ 
(F) REPRESENTATIONS:  
N/A 
(i) Summary of issues raised
N/A
____________________________________________________________
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Statement:  No 
(ii) An appropriate assessment under the Conservation (Natural Habitats)
Regulations 1994:   No 
(iii) A design or design/access statement:   No 
(iv) Sustainability Checklists: No – Given however the nature of the application, it
is nonetheless considered that there is sufficient information on the file to make a
decision. 
(v) A report on the impact of the proposed development eg. Retail impact,
transport impact, noise impact, flood risk, drainage impact etc: 
Photograph of existing windows and door – 12.09.2024 and 26.09.2024
Door Details – 12.09.2024
_____________________________________________________________ 
(H) PLANNING OBLIGATIONS 
(i) Is a Section 75 agreement required:  No
___________________________________________________________________ 
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30, 31 or
32:  No
___________________________________________________________________ 
Page 66

Page 67

(J)  Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account in
assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy 
Sustainable Places 
NPF4 Policy 7 – Historic Assets and Places 
Liveable Places 
NPF4 Policy 14 – Design, Quality and Place 
Argyll and Bute Local Development Plan 2 
Spatial and Settlement Strategy 
Policy 01 – Settlement Areas
Policy 04 – Sustainable Development 
High Quality Places 
Policy 05 – Design and Placemaking
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 10 – Design – All Development
Policy 15 – Protection, Conservation and Enhancement of Our Historic
Environment
Policy 16 – Listed Buildings
Policy 17 – Conservation Areas             
(ii) List of all other material planning considerations taken into account in the
assessment of the application, having due regard to Annex A of Circular
4/2009.
• Scottish Planning Policy
• Planning History
• ABC Technical Note – Biodiversity (Feb 2017)
• TN06 Sustainability Technical Note and Checklist (Oct. 2023)
• TN07 Sustainable Buildings Technical Note and Checklist (Oct. 2023)
• ABC Technical Note – Windows (Apr 2018) 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental Impact
Assessment:  No
____________________________________________________________________________ 
Page 67

Page 68

(L) Has the application been the subject of statutory pre-application consultation
(PAC):  No
_______________________________________________________________
(M) Does the Council have an interest in the site:  No
____________________________________________________________________________
(N) Requirement for a hearing (PAN41 or other):  Not required
_________________________________________________________________________ 
(O)(i) Key Constraints/Designations Affected by the Development:
- None 
(O)(ii) Soils
Agricultural Land Classification:  Built Up Area 
Peatland/Carbon Rich Soils Classification: N/A 
Peat Depth Classification: N/A 
Does the development relate to croft land? No
Would the development restrict access to croft or
better quality agricultural land?
N/A 
Would the development result in fragmentation of
croft / better quality agricultural land?
No 
(O)(iii) Woodland  
Will the proposal result in loss of trees/woodland?
(If yes, detail in summary assessment)
No 
Does the proposal include any replacement or
compensatory planting?
N/A 
(O)(iv) Land Status / LDP Settlement Strategy
Status of Land within the Application  Brownfield 
ABC LDP2 Settlement Strategy  Key Rural Settlement Area
ABC LDP2 Allocations/PDAs/AFAs etc: n/a 
(P) Assessment and summary of determining issues and material considerations 
Rhu House, Rhu Road, Port Charlotte, Isle of Islay, within the Port Charlotte Conservation Area, 
is a Category B listed Building (Ref: LB12436). The listing states as follows:
Earlier 19th century. Traditional. 2 storeys. Rubble; partly rendered; slate roofs.
The host building, which comprises a detached, two storey dwellinghouse, is within the Key
Rural Settlement area of Port Charlotte as designated in the Argyll and Bute Local Development
Page 68

Page 69

Plan 2 (LDP2). It is also within the Scottish Water mains supply, the Scottish Water drainage
operational area and an airfield safeguarding zone (Islay Airport) in LDP 2. It is also in proximity
to, but outwith, the Loch Indaal Marine Consultation Area. 
Rhu House is a Category B listed Building (Ref: LB12436). The listing states as follows:
Earlier 19th century. Traditional. 2 storeys. Rubble; partly rendered; slate roofs.
The Proposal
The application proposes the installation of 5No. existing windows and the replacement of the
existing entrance door. The windows and door are positioned on the front elevation of the host
dwellinghouse. 
The existing front door opening measures some 1.93m high x 0.860m whilst all of the existing
5No. window openings measure some the rear sitting room door opening measures some 1.2m
high x 0.710m wide. 
The original front door, which is painted black (externally) and white (internally) is comprised of
vertical timber panels with a square single pane/glass window positioned in the upper part of the
door.  Each of the 5No. existing windows are timber in construction, sliding sash in their design,
white in colour and each leaf incorporates 2No. single panes of glass separated by a central
vertical glazing bar. 
The proposed replacement front door, which will be installed within the existing opening,
comprises a composite door (colour green) which incorporates a vertical timber-panelled design
(to match the same design of the existing door), a chrome lever door handle and a square
single pane frosted plain window in the upper part of the door. 
The proposed 5No. new windows, all of which are Upvc in their construction, each comprises a
vertical slider movement with both the top and bottom leafs incorporating a single double-glazed
pane of glass. The windows will be installed within the existing opening incorporate a white
frame, sash, bead and cill. 
Permitted Development 
Permitted Development Rights covering aspects of development are detailed in the Town and
Country Planning (General Permitted Development) (Scotland) Order 1992 as amended (the
Regulations) and the associated Circular 1/2024: Householder Permitted Development Rights. 
Class 7a of the Regulations states at paragraph 4 as follows: 
(3) Paragraph (4) applies to development to alter or replace a window in a conservation area
where— 
(a)the window is part of—
(i)the principal elevation, or 
(ii)a side elevation where that elevation fronts a road, and 
(b)the window as altered or replaced would not be the same, or substantially the same, as the
window to be altered or replaced in the following respects— 
(i)the manner in which the window is opened and closed, 
(ii)the number, orientation and colour of the panes comprised in the window, 
Page 69

Page 70

(iii)the dimensions and colour of the frame of the window or any astragal bars comprised in the
window. 
Circular 1/2024: Householder Permitted Development Rights confirms that whilst materials of
the proposed and existing windows do not need to match,  but notes that replacement windows
of a different material that do not match the existing window in respect of the free criteria (e.e.
width of the frame) then prior approval would be required. In this case, were the proposal
submitted for prior approval, the local planning authority would have refused prior approval. As
such, the proposal does not benefit from being considered as permitted development. 
Accordingly, planning permission is required for these works. 
Principle of Development 
Policy 7 ‘Historic assets and places’ of NPF4 states that development proposals with a
potentially significant impact on historic assets or places will be accompanied by an assessment
which is based on an understanding of the cultural significance of the historic asset and/or
place. 
Policy 14 ‘Design, quality and place’ of NPF4 states that development proposals will be
designed to improve the quality of an area whether in urban or rural locations and regardless of
scale. 
In terms of the adopted LDP2, Policy 01 gives support for proposals within settlements that are
compatible with the surrounding uses and respects the character and appearance of
surrounding townscape in terms of scale, massing, design and external finishes and complies
with all relevant LDP2 policies such as set out in the relevant sustainable siting and design
policies of LDP2. 
Policy 05 ‘Design and Placemaking’ of the Argyll and Bute Local Development Plan 2 (LDP 2)
states that to achieve good quality places, proposals should endeavour to comply with a number
of placemaking criteria which include that the design should develop the area’s sense of identity
by understanding and embracing the existing distinctive characteristics, with the design
respecting and complementing its surroundings in terms of density, appearance, height, scale,
massing, materials and finishes. 
Policy 09 ‘Sustainable Design’ of LDP 2 goes on to state that development proposals should
demonstrate consideration of and where possible utilisation of sustainable design and
construction methods in terms of embodied energy; conversion and re-use; and adaptability.   
Policy 15 ‘Supporting the Protection, Conservation and Enhancement of Our Historic Built
Environment’ of LDP2 states that Development proposals will not be acceptable where they fail
to:
• protect, preserve, conserve or enhance the special characteristics and/or cultural
significance of the historic built environment in terms of its location, scale, form, design
or proposed use; or
• avoid any cumulative effect upon the special characteristics and/or cultural significance
of designated built environment sites. 
Proposals for development that would affect either a designated or non-designated heritage
asset or their setting will be expected to demonstrate that they would enable positive change by
balancing the need to secure the long-term sustainability of the asset against the need to
address the impacts of climate change and to meet the council’s wider regeneration objectives,
where appropriate.
Page 70

Page 71

Policy 16 ‘Listed Buildings’ of LDP2 states that a development proposal which affects a Listed
Building, its curtilage or its wider setting will only be supported when it meets the following
criteria:
• It respects the original structure in terms of setting, scale, design, materials and
proposed use, OR
• The proposal is essential to securing an appropriate use of the Listed Building without
undermining its architectural or historic character, or its setting, AND
• It conforms to national policy and guidance, including but not limited to those set out in
the section above ‘Related Documents’. 
Policy 17 ‘Conservation Areas’ states that there is a presumption against development that does
not preserve or enhance the character or appearance of an existing or proposed conservation
area or its setting. 
These policies are considered below. 
Impact on Port Charlotte Conservation Area 
I consider the host building to be a locally important building within the context both of the
Conservation Area and Port Charlotte in general by reason of its size, scale, design,
proportions, materials and setting within the streetscape. 
It is evident having regard to the details/drawings for the new windows, that in respect to the
proposed new windows, they do not represent a ‘like for like’ timber replacement of the existing
timber sliding sash windows. Notwithstanding that there would be no alteration to the size of the
existing window openings and that the general proportions on the new windows would be the
same as the existing windows, I nonetheless consider that a combination of the introduction of
Upvc finishes, double glazing, the different glazing pattern and the design/style of the proposed
windows including their colour, would both individually and cumulatively, undermine the host
buildings character, architectural/historic interest and setting. 
Moreover, given that the host building is attached to another building of similar vernacular style,
proportions and character and whose front elevation windows are timber sliding sash, I also
consider that the introduction of the proposed new windows would unacceptably detract from
the setting of this pair of buildings and the streetscape as a whole. 
In respect of the replacement front door, and whilst I consider its proposed colour to be
sympathetic to the host Listed Building, I nonetheless consider that a combination of the
proposed introduction of its composite finish and the insertion of frosted double glazing would
similarly undermine the host buildings character, architectural/historic interest and setting. 
The relevant policy test in respect of Conservation Areas is whether or not the proposal would
preserve or enhance the character or appearance of an existing or proposed conservation area
or its setting. For the above reasons, given that I consider that the proposals, both individually
and when read as a whole, would undermine the host buildings character, architectural/historic
interest and setting, it logically follows that as a result, the proposal would neither preserve nor
enhance the character or appearance of the Port Charlotte Conservation Area contrary to
Policies 15 and 17 of LDP 2. 
Siting and Design 
Page 71

Page 72

Notwithstanding that I consider that the new windows and door would in themselves incorporate
sustainable design and construction methods such that Policy 09 of LDP 2 would be satisfied in
so far as stated, for the reasons previously detailed, as I consider that the combination of the
design elements including materials, double glazing, glazing pattern, decorative finish, and style
of the new windows and door is unacceptable, and particularly on its prominent front elevation, I
conclude overall that the proposal would as a result be contrary to Policies 01 and 05 of LDP 2. 
Impact on the Host Listed Building 
It is considered that the proposed development, for all the reasons detailed above, would
unacceptably harm and detract from the character, appearance and setting of this Category B
Listed Building. Furthermore, given that the host building is attached to another building of
similar vernacular style, proportions and character and whose front elevation windows are
timber sliding sash, I also consider that the introduction of the proposed new windows in
particular would unacceptably detract from the setting of this pair of buildings and the
streetscape as a whole. 
Accordingly, and for these reasons, it is considered that the proposal would therefore undermine
the host building’s architectural/historic character and its setting contrary to Policy 7 of NPF4
and Policy 16 of LDP 2. 
Recommendation 
For these reasons, and notwithstanding my conclusion in respect of the matter of sustainable
design, as the proposal overall is contrary to Policies 7 and 14 of NPF4 and Policies 01, 05, 08,
09, 10, 15, 16 and 17 of the Argyll and Bute Local Development Plan 2, full planning permission
should be refused for the proposal.
_____________________________________________________________ 
(Q) Is the proposal consistent with the Development Plan: No 
____________________________________________________________________________ 
(R) Reasons why planning permission or a Planning Permission in Principle should
be granted: 
N/A
____________________________________________________________________________
(S) Reasoned justification for a departure to the provisions of the Development Plan: 
N/A
____________________________________________________________________________ 
(T) Need for notification to Scottish Ministers or Historic Scotland:  No
____________________________________________________________________________ 
Author of Report: Francis Gillespie    Date: 25.11.2024 
Reviewing Officer:  Bryn Bowker     Date: 03.12.2024 
Fergus Murray 
Head of Development and Economic Growth 
Page 72

Page 73

REASONS FOR REFUSAL RELATIVE TO APPLICATION REF. NO. 24/01696/PP 
1. The proposed development is contrary to Policies 7 and 14 of NPF4 and Policies 01, 05,
08, 09, 10, 15, 16 and 17 of the Argyll and Bute Local Development Plan 2 in that it
would, if permitted, undermine the host building’s architectural/historic character and
setting and fail to preserve or enhance the character or appearance of the Port Charlotte
Conservation Area.   
APPENDIX TO DECISION REFUSAL NOTICE 
Appendix relative to application 24/01696/PP 
(A) Has the application been the subject of any “non-material”
amendment in terms of Section 32A of the Town and Country
Planning (Scotland) Act 1997 (as amended) to the initial submitted
plans during its processing.
No 
(B) The reason why planning permission has been approved: 
N/A 
Page 73

Page 74

ADDITIONAL NOTES TO APPLICANT 
None. 
Page 74

Page 75

APPENDIX TO DECISION APPROVAL NOTICE 
Appendix relative to application: 22/00174/LIB 
(A) Has the application required an obligation under Section 75 of the
Town and Country Planning (Scotland) Act 1997 (as amended):
☐Yes ☒No 
(B) Has the application been the subject of any “non-material”
amendment in terms of Section 32A of the Town and Country
Planning (Scotland) Act 1997 (as amended) to the initial submitted
plans during its processing.
☐Yes ☒No 
(C) Is the proposal consistent with the Development Plan? ☒Yes ☐No 
(D) The reason why planning permission has been approved: 
The proposal is considered to be consistent with the relevant provisions of the
Development Plan, and there are no other material considerations of sufficient
significance to indicate that it would be appropriate to withhold planning permission
having regard to s25 of the Act. 
Page 75

Page 76

This page is intentionally left blank

Page 77

Argyll and Bute Council      
Development and Economic Growth   
Delegated or Committee Planning Application Report and Report of handling as required
by Schedule 2 of the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2008 relative to applications for Planning Permission or Planning
Permission in Principle
____________________________________________________________________________ 
Reference No:  24/01803/LIB 
Planning Hierarchy:  Local Application 
Applicant:   Mrs Ann Smith  
Proposal: Installation of replacement windows and door 
Site Address:   Rhu House, Rhu Road, Port Charlotte, Isle of Islay
____________________________________________________________________________  
DECISION ROUTE 
(i) Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997 
____________________________________________________________________________ 
(A)  THE APPLICATION 
(i) Works requiring listed building consent: 
• Installation of replacement windows and door 
(ii) Other specified operations 
• N/A
____________________________________________________________________________ 
(B) RECOMMENDATION: 
It is recommended that Listed Building consent is refused
____________________________________________________________________________ 
(C) HISTORY:   
07/00437/LIB - Replacement roof covering – 13.07.2007 
24/01696/PP - Installation of replacement windows and door – Pending
__________________________________________________________ 
(D) CONSULTATIONS:   
Historic Environment Scotland – No objection – 21.10.2024
Page 77

Page 78

______________________________________________________________________ 
(E) PUBLICITY:   
Oban Times/Edinburgh Gazette Advertisement - published 10.10.2024, expired 
31.10.2024 
Listed Building Site Notice – expired 28.10.2024
____________________________________________________________________________ 
(F) REPRESENTATIONS:   
N/A 
(i) Summary of issues raised 
N/A
____________________________________________________________
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Statement:  No 
(ii) An appropriate assessment under the Conservation (Natural Habitats)
Regulations 1994:   No 
(iii) A design or design/access statement:   No 
(iv) Sustainability Checklists: No - The application was submitted prior to the
adoption of LDP2 and it is considered there is sufficient information on the file to
make a decision. 
(v) A report on the impact of the proposed development eg. Retail impact,
transport impact, noise impact, flood risk, drainage impact etc: 
Photograph of existing windows and door – 01.10.2024
Door Details – 01.10.2024
_____________________________________________________________ 
(H) PLANNING OBLIGATIONS 
(i) Is a Section 75 agreement required:  No
___________________________________________________________________ 
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30, 31 or
32:  No
___________________________________________________________________ 
Page 78

Page 79

(J)  Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account in
assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy 
Sustainable Places 
NPF4 Policy 7 – Historic Assets and Places 
Argyll and Bute Local Development Plan 2 
High Quality Places 
Policy 15 – Protection, Conservation and Enhancement of Our Historic
Environment
Policy 16 – Listed Buildings             
(ii) List of all other material planning considerations taken into account in the
assessment of the application, having due regard to Annex A of Circular
4/2009. 
• ABC Technical Note – Windows (Apr 2018) 
Historic Environment Scotland: 
• Historic Environment Policy for Scotland
• Managing Change in the Historic Environment: Setting 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental Impact
Assessment:  No
____________________________________________________________________________ 
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  No
_______________________________________________________________
(M) Does the Council have an interest in the site:  No
____________________________________________________________________________
(N) Requirement for a hearing (PAN41 or other):  Not required
_________________________________________________________________________ 
(O)(i) Key Constraints/Designations Affected by the Development:
- None 
(O)(ii) Soils
Page 79

Page 80

Agricultural Land Classification:  Built Up Area 
Peatland/Carbon Rich Soils Classification: N/A 
Peat Depth Classification: N/A 
Does the development relate to croft land? No
Would the development restrict access to croft or
better quality agricultural land?
N/A 
Would the development result in fragmentation of
croft / better quality agricultural land?
No 
(O)(iii) Woodland  
Will the proposal result in loss of trees/woodland?
(If yes, detail in summary assessment)
No 
Does the proposal include any replacement or
compensatory planting?
N/A 
(O)(iv) Land Status / LDP Settlement Strategy
Status of Land within the Application  Brownfield 
ABC LDP2 Settlement Strategy  Main Town Settlement Area
ABC LDP2 Allocations/PDAs/AFAs etc: n/a 
(P) Assessment and summary of determining issues and material considerations 
Rhu House, Rhu Road, Port Charlotte, Isle of Islay, within the Port Charlotte Conservation Area, 
is a Category B listed Building (Ref: LB12436). The listing states as follows: 
Earlier 19th century. Traditional. 2 storeys. Rubble; partly rendered; slate roofs. 
The host building, which comprises a detached, two storey dwellinghouse, is within the Key
Rural Settlement area of Port Charlotte as designated in the Argyll and Bute Local Development
Plan 2 (LDP2). It is also within the Scottish Water mains supply, the Scottish Water drainage
operational area and an airfield safeguarding zone (Islay Airport) in LDP 2. It is also in proximity
to, but outwith, the Loch Indaal Marine Consultation Area. 
The Proposal 
The application proposes the installation of 5No. existing windows and the replacement of the
existing entrance door. The windows and door are positioned on the front elevation of the host
dwellinghouse. 
The existing front door opening measures some 1.93m high x 0.860m whilst all of the existing
5No. window openings measure some the rear sitting room door opening measures some 1.2m
high x 0.710m wide. 
Page 80

Page 81

The original front door, which is painted black (externally) and white (internally) is comprised of
vertical timber panels with a square single pane/glass window positioned in the upper part of the
door.  Each of the 5No. existing windows are timber in construction, sliding sash in their design,
white in colour and each leaf incorporates 2No. single panes of glass separated by a central
vertical glazing bar. 
The proposed replacement front door, which will be installed within the existing opening,
comprises a composite door (colour green) which incorporates a vertical timber-panelled design
(to match the same design of the existing door), a chrome lever door handle and a square
single pane frosted plain window in the upper part of the door. 
The proposed 5No. new windows, all of which are Upvc in their construction, each comprises a
vertical slider movement with both the top and bottom leafs incorporating a single double-glazed
pane of glass. The windows will be installed within the existing opening incorporate a white
frame, sash, bead and cill. 
Assessment 
Policy 7 of NPF4 states, 
“Development proposals for the reuse, alteration or extension of a listed building will only be
supported where they will preserve its character, special architectural or historic interest and
setting”. 
Policy 16 of Argyll and Bute Local Development Plan (LDP 2) 2024 states 
“A development proposal which affects a Listed Building, its curtilage or its wider setting will only
be supported when it meets the following criteria: 
• It respects the original structure in terms of setting, scale, design, materials and
proposed use, OR 
• The proposal is essential to securing an appropriate use of the Listed Building without
undermining its architectural or historic character, or its setting, AND
• It conforms to national policy and guidance, including but not limited to those set out in
the section above ‘Related Documents’. 
The Council’s Technical Working Note (Working Note) states that windows ‘are an essential
element in the external character, appearance and composition of traditional buildings. They are
an important element of a building’s design and weatherproofing. The size, shape and position
of the openings are significant, as are the form and design of the framing and glazing. Their
style, detailing and materials help us to understand when a building was constructed or altered,
its function and advances in related glazing technology. In simple vernacular buildings a
considerable amount of the character comes from the windows. 
When replaced unsympathetically the appearance of the building is damaged, and the unity that
comes from the repetition of window patterns and traditional materials is diminished.
Cumulatively this leads to an erosion of the character of the street and over time the whole
area’. 
The Working Note goes on to state that in respect of Listed Buildings, ‘only refurbishment /
repair or ‘like for like’ timber replacement shall be permitted’. This position is supported further
wherein it states that all replacements (frontage and rear) should be sympathetic to the original
and traditional windows. 
Page 81

Page 82

In this case, neither refurbishment nor repair of the existing sliding sash windows are proposed.
Moreover, no evidence was provided to demonstrate that these options have been considered
even in the first instance. 
It is evident, having regard to the details/drawings for the new windows, that they do not
represent a ‘like for like’ timber replacement of the existing timber sliding sash windows.
Notwithstanding that there would be no alteration to the size of the existing window openings
and that the general proportions on the new windows would be the same as the existing
windows, I nonetheless consider that a combination of the introduction of Upvc finishes, double
glazing, the different glazing pattern and the design/style of the proposed windows including
their colour, would both individually and cumulatively, undermine the host buildings character,
architectural/historic interest and setting. 
Moreover, given that the host building is attached to another building of similar vernacular style,
proportions and character and whose front elevation windows are timber sliding sash, I also
consider that the introduction of the proposed new windows would unacceptably detract from
the setting of this pair of buildings and the streetscape as a whole. 
In respect of the replacement front door, and whilst I consider its proposed colour to be
sympathetic to the host Listed Building, I nonetheless consider that a combination of the
proposed introduction of its composite finish and the insertion of frosted double glazing would
similarly undermine the host buildings character, architectural/historic interest and setting. 
All in all therefore and when assessed both individually and as a whole, for the reasons detailed
above, it is therefore considered the proposal is contrary to Policy 7 of NPF4 and Policy 16 of
LDP 2. 
Recommendation: 
As it is considered that the proposal is contrary to Policy 7 of NPF4 and Policy 16 of the Argyll
and Bute Local Development Plan 2, listed building consent should be refused for the proposal.
_____________________________________________________________ 
(Q) Is the proposal consistent with the Development Plan: Yes 
____________________________________________________________________________ 
(R) Reasons why planning permission or a Planning Permission in Principle should
be granted: 
N/A
____________________________________________________________________________ 
(S) Reasoned justification for a departure to the provisions of the Development Plan: 
N/A
____________________________________________________________________________ 
(T) Need for notification to Scottish Ministers or Historic Scotland:  No
____________________________________________________________________________ 
Page 82

Page 83

Author of Report: Francis Gillespie    Date: 25.11.2024 
Reviewing Officer:  Bryn Bowker     Date: 03.12.2024 
Fergus Murray 
Head of Development and Economic Growth 
Page 83

Page 84

REASONS FOR REFUSAL RELATIVE TO APPLICATION REF. NO. 24/01803/LIB 
1. The proposed development is contrary to Policy 7 of NPF4 and Policy 16 of the Argyll
and Bute Local Development Plan 2 in that it would undermine and thereby fail to
preserve the host Listed Building’s character, architectural/historic interest and setting. 
APPENDIX TO DECISION REFUSAL NOTICE 
Appendix relative to application 24/01803/LIB 
(A) Has the application been the subject of any “non-material”
amendment in terms of Section 32A of the Town and Country
Planning (Scotland) Act 1997 (as amended) to the initial submitted
plans during its processing.
No 
(B) The reason why planning permission has been approved: 
N/A 
Page 84

Page 85

0 | P a g e
Seirbheis Planaidh Earra-Ghaidheal is Bhoid
Argyll and Bute Planning Service
TECHNICAL WORKING NOTE
ARGYLL and BUTE WINDOWS 
April 2018 
FINALISED DRAFT – 27.03.18
Page 85

Page 86

1 | P a g e
Contents
INTRODUCTION & BACKGROUND ......................................................................................................... 2
WINDOWS POLICY STATEMENTS ...................................................................................................................................... 2
INVESTMENT ......................................................................................................................................................................... 2
AIMS AND RELATED ADVICE ............................................................................................................................................... 2
1 - THE REQUIREMENT FOR CONSENT .................................................................................................. 2
2 - THE IMPORTANCE OF WINDOWS ...................................................................................................... 3
3 - INVESTING IN ARGYLL AND BUTE’S CONSERVATION AREAS ............................................................ 4
4 - EXISTING POLICY........................................................................................................................... 5
NATIONAL POLICY .............................................................................................................................................................. 5
LOCAL POLICY ..................................................................................................................................................................... 6
5 - ARGYLL AND BUTE WINDOWS – TECHNICAL STATEMENTS .............................................................. 7
STATEMENT 1 – PREFERENCE FOR RETENTION, REPAIR AND REFURBISHMENT ............................................................ 8
STATEMENT 2 – REPLACE ‘LIKE FOR LIKE’ IN LISTED BUILDINGS AND PRIME TOWNSCAPE BLOCKS ........................ 10
STATEMENT 3 – FLEXIBILITY FOR UNLISTED BUILDINGS & OTHER TOWNSCAPE BLOCKS ........................................ 12
STATEMENT 4 – REPLACING NON-TRADITIONAL WINDOWS ..................................................................................... 13
6 - ENFORCEMENT ............................................................................................................................ 14
APPENDIX A – PERFORMANCE IMPROVEMENTS ................................................................................. 15
APPENDIX B – COST COMPARISON ................................................................................................... 18
APPENDIX C – PRIME TOWNSCAPE BLOCK ASSESSMENT .................................................................. 19
ADDITIONAL INFORMATION ................................................................................................................ 20 
Page 86

Page 87

2 | P a g e
Argyll and Bute
Windows 
Technical Working Note
Introduction & Background
Argyll and Bute has 32 conservation areas and
around 2,000 listed structures.  Of these
Rothesay is the second largest in Scotland and
has benefited considerably from its own
Technical Working Note for replacement
windows.  The success of this document has led
to the creation of this technical working note to
stand alongside the adopted Local Development
Plan to assist building owners seeking to replace
windows in a conservation area and / or a listed
building.  The document will provide certainty and
advice with respect to appropriate window
replacements and repairing existing windows.   
Windows Policy Statements
There have been significant changes to local and
national policy and guidance since the original
window policy statements of the mid-1990s. 
However, the general principles about
replacement windows in Conservation Areas and
Listed Buildings have remained fairly consistent
over this time.  There have also been
advancements in restoration / refurbishment
techniques, energy efficiency technology and
new window products have come onto the market
in the past 20 years that now influence
replacement options.   
Investment
Since 2008 there has also been significant
investment into the council’s historic
environment.  Almost £15m has been invested in
the conservation areas of Campbeltown,
Inveraray, Dunoon and Rothesay.  This has seen
a significant uplift in these areas and property
owners have reacted positively with match
funding whilst the planning department has seen
a willingness to invest in timber windows and
doors.  
Aims and related advice
This Technical Working Note aims to provide
clear and consistent planning advice in relation to
the replacement and refurbishment of windows in
Conservation Areas and Listed Buildings. 
This Guidance must be read in conjunction with
the Development Plan, the Councils Historic
Environment Strategy 2015 and Scottish Historic
Environment Policy – Managing Change (see
Section 4 – Existing Policy, for more information). 
Page 87

Page 88

 Argyll and Bute Windows - Technical Working Note - 2018
3 | P a g e
1 - The requirement for consent 
Through the Planning (Listed Buildings and Conservation Areas) (Scotland) Act 1997 Argyll & Bute
Council have a statutory obligation to ensure the preservation and protection of Listed Buildings and
Conservation Areas.  The designation of a Conservation Area or Listed Building is not intended to prevent
change but rather to ensure the special character or appearance of the historic asset is protected or
enhanced.  Maps for each of Argyll and Bute’s 32 conservation areas can be found on our website
In order to manage change in Conservation Areas, planning consent is required for the replacement
of any window in both residential and commercial properties. Listed buildings will also require Listed
Building Consent. The fee currently set for submitting a planning application is £202 per development
(could include multiple window replacements).  
Consent is not required for the majority of repair / refurbishment works or ‘like for like’ replacements
(please see Statement 1 and 2 below).  
Contact the Planning Department for further information before commencing your project.                                            
2 - The importance of windows
Many local streetscapes rely on historic, materials, doors and windows for much of their architectural
impact and character.  
Windows are an essential element in the external character, appearance and composition of traditional
buildings. They are an important element of a building’s design and weatherproofing. The size, shape and
position of the openings are significant, as are the form and design of the framing and glazing. Their style,
detailing and materials help us to understand when a building was constructed or altered, its function and
advances in related glazing technology. In simple vernacular buildings a considerable amount of the
character comes from the windows.
When replaced unsympathetically the appearance of the building is damaged, and the unity that comes
from the repetition of window patterns and traditional materials, particularly in tenements and terraced
properties, is diminished. Cumulatively this leads to an erosion of the character of the street and over time
the whole area. 
Page 88

Page 89

 Argyll and Bute Windows
4 | P a g e
Examples of inappropriate doors and windows, whether by design or use of materials, can be found in
most conservation areas. Their presence does not mean that they are appropriate or necessarily that a
precedent has been set.   
3 - Investing in Argyll and Bute’s Conservation Areas
Argyll and Bute has benefited greatly from various sources of public funding in key conservation areas of
Campbeltown, Inveraray and Rothesay.  We have been successful in bidding across various funding
streams including Historic Environment Scotland grants including Townscape Heritage Initiative (THI) and
Conservation Area Regeneration Scheme (CARS), Heritage Lottery Fund and LEADER.  These funding
streams are competitive across Scotland and preparation often takes years.  
Rothesay has seen a significant investment under the THI.  This is a 5-year programme which seeks to
revitalise the historic town centre, by offering grants to property owners to assist with structural and
external repairs to historic buildings. Individual upgrading projects include the upgrading of Guildford
Court Apartments, Duncan’s Hall, Guildford Square gap site and various shop front improvements.  
Both Campbeltown and Inveraray have also seen significant investment and their successes can be seen
in projects such as the town hall in Campbeltown and the Discovery Centre in Inveraray.  
Funders recognised the value of Argyll and Bute’s heritage and supported heritage led regeneration
projects to the value of:-
Campbeltown     £8,540,778
Inveraray     £3,766,273
Rothesay     £1,653,997
Dunoon     £1,889,429
TOTAL     £15,850,477
This means that an approximate investment of £15.8 million has been made in the area between March
2011 and March 2018 principally for heritage led projects.  It should be noted that this figure does not
include the investments made by private owners which will add a significant additional value of funding to
these figures.  To this extent, it is essential that this Technical Working Note supports conservation
principals, protects and promotes improvements in the Conservation Areas and underpins the wider
heritage led regeneration.              
Page 89

Page 90

 Argyll and Bute Windows - Technical Working Note - 2018
5 | P a g e
4 - Existing Policy
The primary statutory and non-statutory policies and guidance in relation to window replacement are
contained within the following documents:-
National Policy
 Historic Environment Scotland Policy (June 2016) 
Historic Environment Scotland Policy Statement (June 2016) 
 Managing Change in the Historic Environment – Windows (January 2018)
Managing Change in the Historic Environment: Windows (January 2018) 
o ‘Repairs and alterations to a historic building should protect its character
and special interest. The contribution windows make to this character must
therefore be understood before proceeding.’ 
o ‘Where windows are of historic interest, repair of their components is
preferable to replacement. This approach not only retained historically-
important fabric and character, but is sustainable.’ 
o ‘Where existing windows are beyond repair, or of little historic interest it should be acceptable
to replace them.’ ‘Generally, replacement windows should seek to match the original windows
in design, form, fixing, method of opening and materials. In replacing sash windows,
materials other than timber, e.g. uPVC, will rarely be acceptable.’ 
o ‘In most cases, as thermal performance is a major driver for change, replacement windows
will be double glazed. In such cases care is required to adapt the detailed design of new
timber windows to incorporate double-glazed units.’ ‘Standard double-glazing may
occasionally be acceptable for some replacement windows, e.g. one-over-one sashes.
However, the thicker astragals required by standard units … mean they often cannot replicate
historic multi-pane patterns, especially those windows with thinner astragals. 
 INFORM – Maintaining Sash and Case Windows (July 2007) 
Historic Scotland INFORM series - Maintaining Sash and Case Windows (July 2007) 
Page 90

Page 91

 Argyll and Bute Windows
6 | P a g e
Local Policy
 Argyll and Bute Local Development Plan 2015
https://www.argyll-bute.gov.uk/ldp
The following policy is contained within the Argyll and Bute Local Development Plan 2015 and associated
Supplementary Guidance and has been endorsed by the Scottish Government appointed Reporter:- 
 Policy LDP 3 – Supporting the Protection, Conservation and Enhancement of our
Environment
A development proposal will not be supported when it does not protect,
conserve or where possible enhance the established character of the built
environment in terms of its location, scale, form and design.
 SG LDP ENV 16(a) – Development Impact on Listed Buildings
Development affecting a listed building or its setting shall preserve the
building or its setting, and any features of special architectural or historic
interest that it possesses. 
 SG LDP ENV 17 – Development Impact on Conservation Areas 
There is a presumption against development that does not preserve or enhance the character or
appearance of an existing or proposed Conservation Area or its setting, or a Special Built
Environment Area. 
New development within these areas and on sites forming part of their settings must be of the
highest quality, respect and enhance the architectural and other special qualities that give rise to
their actual or proposed designation and conform to Scottish Historic Environment Policy 2011
and accompanying Managing Change Guidance Notes. 
 Argyll and Bute Historic Environment Strategy (2015) 
Argyll and Bute Council - Historic Environment Strategy 2015-2020 
Page 91

Page 92

 Argyll and Bute Windows - Technical Working Note - 2018
7 | P a g e
5 – Argyll and Bute Windows – Technical Statements
Similar to the previous windows policy notes, this new Technical Working Note seeks to add a third and
more detailed layer of guidance over and above the established National and Local Policy context as
specified in the previous section.  It is also acknowledged that there have been a number of unfortunate
and unsympathetic alterations to buildings that have occurred over the years as a result of permitted
development rights, unauthorised works or consents which has negatively affected the historic integrity of
a number of buildings and townscape blocks.  There is also acceptance that a number of properties have
suffered from lack of investment and maintenance meaning some traditional timber windows are now in
poor condition or not as thermally efficient as they once were.   
This Technical Note seeks to add a degree of pragmatism and flexibility to the specific development
pressures in Conservation Areas.  This is in light of the considerable loss of traditional windows in some
of the townscape blocks, previous national policy position (outlined in the Windows Policy Statements)
and acknowledging that new windows products are now on the market.  It is also accepted that
expectations for thermal efficiency, ease of maintenance, security and noise cancelling from windows
have increased in line with modern living standards. 
It remains the unaltered position of the Council that economic benefits can arise from preserving and
enhancing the outstanding built heritage of our conservation areas through maintaining and improving the
appearance of its historical buildings.  Such enhancements and uplift can lead to a more vibrant town
centre, improved visitor attractions and outstanding environment beneficial to everyday living.   
Above all, this Technical Note aims to build upon the successful heritage led regeneration by improving
the overall management and appearance of windows in our Conservation Areas.  It provides clarity /
certainty to owners of buildings in the Conservation Areas, guiding them upon what options they have
when repairing or replacing their windows.  It also has a strong emphasis of improving the current
situation (the status quo) and uplifting the appearance of the Conservation Areas by seeking that
unsympathetic windows are not replaced by similarly poor products. 
This Technical Working Note does not replace or supersede the statutory guidance contained within the
Development Plan but shall be afforded weighting and be considered as a material planning
consideration when assessing new proposals for window refurbishment or replacement.   
Page 92

Page 93

 Argyll and Bute Windows
8 | P a g e
Statement 1 – Preference for retention, repair and refurbishment 
Summary of Statement 1 – Repair and Refurbish
 Heritage – Excellent.  Retains the existing character and appearance of the building as intended
by original architect.
 Cost - Excellent – Refurbishment is regularly cheaper than replacement options.  A planning
application is not required.  Retains local carpentry skills / employment.  Cost dependant on
extent of overhauling required, shutters, level of draft proofing or installation of secondary glazing.   
 Energy efficiency & noise attenuation – It is accepted that poorly maintained traditional
windows can prove to be thermally inefficient.  Draft stripping and the installation of timber
shutters, curtains or internal secondary glazing can significantly improve performance.
 Maintenance -  Simplex hinges are normally fitted (inward swing) and can make maintenance,
cleaning and repair quite straightforward. Certain parts of window can also be replaced / painted
in isolation as required.  Historic Environment Scotland recommends painting every 5 years.  
 Ease of opening – The weight of certain traditional sash and case windows may make them
difficult for some people to open. Consideration should be given to re-balancing the windows or
the installation of a fenestrator.  
In all circumstances, it is the Councils preferred option that traditional windows are retained,
repaired or refurbished over replacement.  Timber sash and case windows have a long life if
adequately maintained and they can be a sound investment in the overall value of a building as it retains
the historical character and design as it was originally intended.  Such works do not require planning or
listed building consent as long as they are ‘like for like’ repairs (see below definition of ‘like for like’) so
there shall be an immediate saving of over £202 in terms of an application fee in comparison to a
replacement option.   
The Council considers windows of significant heritage value such as cylinder sheet, curved glass,
crown and patent plate glass to be of particular importance.     
The repair and refurbishment of timber sash and case windows can be carried out by most joiners and
supports local skills and employment.  The Rothesay THI ran practical courses on traditional skills. The
practical sash and case windows repair course was attended by local joiners, who on completion of the
course were asked, ‘how will the skills and knowledge you gained be useful within your present job?’ to
which they replied: “[the skills] will help produce a better quality finish”, “[I have] more confidence to
promote [my] business” and the course will “help widen [the] range of jobs [I am] able to take on”.
The scope and cost of the repair / refurbishment shall be very dependent on the condition of the windows
and requirements of the building owner.  
There is a misconception that traditional timber sash and case windows are expensive or difficult to
maintain and are incapable of meeting modern performance standards in terms of energy efficiency and
noise attenuation.   
Page 93

Page 94

 Argyll and Bute Windows - Technical Working Note - 2018
9 | P a g e
Simple techniques for maintenance such as regular painting (every 5 years) or use of long lasting patent
paint can significantly improve the function, life and performance of a traditional window.  In addition, a
joiner can cost effectively re-hang, draft strip and repair seals on exiting windows to improve acoustic and
energy performance.  Additional performance improvements can be obtained from the introduction of
secondary glazing, installing shutters or heavy weight curtains.  More information is contained within 
Appendix A – Performance Improvements.   
New timber sash and case windows @ 27 Main Street, Campbeltown
‘Like for like’ repairs and refurbishment 
For the avoidance of doubt, it should be emphasised that ‘like for like’ in this
context means the same materials (timber), glazing (single glazed), proportions,
thickness, profile, glazing pattern, details of construction, decorative finish and
details as the existing.  Careful attention needs to be paid to replicating astragals,
glazing bars, horns and colour.    If any element is not identical then you may
require planning or listed building consent.  Please contact the planning department
before commencing your project.   
Page 94

Page 95

 Argyll and Bute Windows
10 | P a g e
Statement 2 – Replace ‘like for like’ in listed buildings and prime townscape blocks
Summary of Statement 2 – Like for like replacements
 Heritage – Good.  Largely retains the existing character and appearance of the building as
intended by original architect by using traditional materials and proportions.  
 Cost - Most expensive option especially if installing slim line double glazing.  Retains local
carpentry skills / employment.  Cost dependant on product chosen.  Planning application may not
be required (no £202 fee).  Extent of overhauling required, shutters, level of draft proofing or
installation of secondary glazing.   
 Energy efficiency & noise attenuation – Excellent. New materials and draft proofing mean
these will perform as good as most uPVC windows – especially if double glazing installed.   
Shutters, curtains or internal secondary glazing can significantly improve performance.
 Maintenance -  Simplex hinges are normally fitted (inward swing) and can make maintenance,
cleaning and repair quite straightforward.
 Ease of opening – The weight of sash and case windows may make them difficult for some
people to open. New ones should be balanced properly or consideration should be given
installing a fenestrator.   
Listed Buildings have been designated by Historic Environment Scotland (HES - formally Historic
Scotland), on behalf of Scottish Ministers, specifically due to their special interest.  They contribute
significantly to the overall heritage appeal of the Conservation Areas. Arguably, they are the most
important buildings in the context of a Conservation Area.  
When an application has been received for proposed replacement windows the planning authority will
need to consider the current condition of the townscape block and what contribution the block makes to
the overall qualifying interests of the conservation area.  The townscape blocks approach is pivotal to
establishing the appropriateness of different window materials and types in a building.  If the townscape
block is a pristine example of quality timber windows then it should be considered ‘prime’ in the context of
the wider conservation area.  This will be on a case by case basis but officers will look for the overall
contribution the block makes to the conservation area.  Townscape blocks, like listed buildings, will play a
pivotal role in creating the unique sense of place and heritage interest in the conservation area.  Appendix
C contains a brief guide to assist officers with this assessment.  
In Listed Buildings and Prime Townscape Blocks, only refurbishment / repair (Statement 1) or ‘like
for like’ timber replacement shall be permitted.  
Replacement sash and case units are widely available from glazers, window fitters and joiners and can
be a good substitute for traditional windows, especially if the original is incapable of being repaired or
refurbished.  The new material and seals shall have very good energy efficiency and noise attenuation
properties similar to uPVC ones.  New modern timber sash and case windows are also likely to be fitted
with Simplex hinges or inward opening to allow ease of access for painting and cleaning.  
When considering the design of your replacement window its essential to consider the fine detail and
characteristics of your existing window to get a ‘like for like’ match.   If the same materials (timber),
glazing (single glazed), general proportions, glazing pattern, details of construction, decorative finish,
Page 95

Page 96

 Argyll and Bute Windows - Technical Working Note - 2018
11 | P a g e
thickness of profile and details as the existing are proposed then the Council may consider this as a ‘like
for like’ replacement.  Most joiners should be able to create a ‘like for like’ replacement timber sash and
case units.  In these cases neither planning nor listed building consent will be required.  A saving of over
£202 for submitting a planning application could be achieved over other replacements.  
In opting for a ‘like for like’ solution careful attention needs to be paid to replicating astragals, glazing
bars, horns and colour.    If any element is not identical then you will require planning or listed building
consent.  We advise that you contact the Planning Department before commencing your project.  
In prime Listed Buildings all replacements (frontage and rear) should be sympathetic to the original and
traditional windows.
Rear Elevations and De-Valued Listed Buildings
On rear or secondary elevations of some Prime Townscape Blocks additional flexibility may be afforded
(similar to approach under Statement 3, below) depending on the availability of public views, contribution
to the Conservation Area and integrity.  
In exceptional circumstances, where a listed building has been identified as being ‘de-valued’ (as
assessed by officers) through unsympathetic historic window replacements and alterations a more flexible
approach will also be applied.  In such cases we will always seek to secure uplift in design and window
quality in the first instance.  High quality timber dual swing which give the appearance of a sash and case
windows in all respects except when open and high quality well-proportioned uPVC sliding sash units
which retain the distinct step of sash and case windows are likely to be acceptable.  Fixed pane windows
should also seek to have a stepped effect but greater flexibility will be afforded as long as the proportions
and window pattern are acceptable.    
Double glazing
The introduction of double glazing within new timber sash and case windows is likely to be acceptable but
will require planning and listed building consent.  The inclusion of slim line double glazing is the preferred
option and shall significantly increase sound reduction and energy efficiency.  Slim line double glazing is
filled with a mixture of Krypton and Xenon gases which are heavier gases and offer much better
performance than most uPVC windows which are filled with Argon.  They usually come with a much
longer guarantee than most windows.  
Glazing replacement is unlikely to be supported where the glass is original and has heritage value such
as curved glass, crown glass, stained glass or other significance.  
Regular (i.e. non- slim line) double glazing may be acceptable however it can present problems with small
paned windows as the glazing bars have generally to be deeper and wider than the original patterns to
accommodate the sealed glazing units.  
It is acknowledged that new or replacement timber sliding sash windows, particularly if double glazed, can
be expensive.  See Appendix B – Cost Comparison. 
Page 96

Page 97

 Argyll and Bute Windows
12 | P a g e
Statement 3 – Flexibility for unlisted buildings & other townscape blocks
Summary of Statement 3 – Flexible approach for un-listed buildings and other townscape blocks
 Heritage – Fair.  May include materials or opening mechanism that is not authentic.  When
windows are closed the appearance of a traditional sash and case will be apparent.  Shall only be
applied to buildings or elevations of lesser importance in the Conservation Area.  
 Cost - More expensive than refurbishment / repair but some units likely to cost less than
replacement timber sash and case.  Price dependant on the style and material of window unit.
 Energy efficiency & noise attenuation – New materials and draft proofing mean these will
perform very well – especially if double glazing and good quality.  
 Maintenance - May offer a variety of opening arrangements to clean from inside and unlikely to
require surface treatment (painting).  uPVC windows usually cannot be repaired – defects will
require total new unit.  
 Ease of opening – May offer a variety of opening arrangements for internal cleaning
Buildings that are not listed or have not been identified as a Prime Townscape Block are still important
within the Conservation Area and can contribute effectively to it.  For these buildings it is still
recommended that either repair, refurbishment or ‘like for like’ timber replacement is pursued in
the first instance.  However, it is accepted that these buildings have already lost some or all of their
original windows or historical fenestration value through inappropriate replacements over the years.  
In these circumstances, a number of different units will be permitted including:-
1. Good quality, well-proportioned white uPVC sliding sash and case;
2. White painted timber double swing / tilt & turn with a stepped effect which give the
appearance of a sash and case windows in all respects except when open; and 
3. uPVC fixed pane units (no opening mechanism in accordance with Building Standards)
and double swing opening mechanism windows with good proportions and that mimic the
stepped effect of sash and case window will also normally be acceptable 
Timber swing windows    Example of poor quality uPVC windows 
Page 97

Page 98

 Argyll and Bute Windows - Technical Working Note - 2018
13 | P a g e
In all of these situations planning consent will be required (£202 fee) along with suitable drawings and
manufacturer specifications.  Care is should be taken when considering the introduction of new materials
and double glazing to ensure that the thickness of the mouldings/ surrounds, proportions, ironmongery
and detailing match the original window as closely as possible.  This can be particularly difficult to achieve
with some low quality or older styles of double glazed uPVC units.   
In all instances the general glazing pattern should mirror the existing traditional window unless there are
strong reasons for permitting a change e.g. to reinstate some consistency or unity to a building or street
frontage where different glazing pattern predominates and where there is no sound reason for
maintaining a different pattern.  Where glazing bars or astragals are required, these must be carefully
designed and detailed to match the original or, where appropriate the predominant window style.   
Rear Elevations 
On rear elevations additional flexibility may be afforded depending on the availability of public views,
contribution to the Conservation Area and overall integrity of the block.  Replacements should match the
original in terms of general design, but does not necessarily have to replicate a traditional sliding sash
and case in terms of opening mechanism or stepped effect.  Most white coated modern materials and
products are likely to be acceptable if the glazing pattern and proportions are broadly similar to the
original or surrounding the windows.   
Statement 4 – Replacing non-traditional windows
One of the important aims of this Technical Working Note is to uplift the current status quo and reverse
the damage caused by some of unsympathetic window replacements that have occurred over the years. 
The presence of poor quality windows in certain townscape blocks does not mean that they are
appropriate or necessarily that a precedent has been set.   Whilst ‘like for like’ replacements do not need
consent the Council shall always seek to improve the current arrangements where possible.   
In all properties the planning authority shall seek uplift in the appearance of existing windows.  In
properties where they are seeking to replace poor quality uPVC and / or aluminium framed
windows any replacement that provides an overall improvement to the appearance of the building
shall be considered by the planning authority. 
When assessing applications to replace windows that are not original / traditional a sequential approach
should be applied:-
1. Re-introduction of timber sliding sash and case units;
2. Installation of better quality windows than currently installed - good quality uPVC sliding sash or
timber swing units for example; then
3. Installation of units of any material which retain the distinct step of sash and case windows and
which give the appearance of a sash and case windows in all respects except when open.  
It is unlikely that windows outside the parameters listed above shall be acceptable unless there is clear
benefit or enhancement from what has already been installed.  
Page 98

Page 99

 Argyll and Bute Windows
14 | P a g e
6 - Enforcement 
Replacing windows without obtaining the necessary planning or listed building consents is a serious
matter.  Argyll and Bute Council has the power to challenge any owner / occupier and require a
retrospective application to be submitted or instigate formal enforcement proceedings if the replacements
are deemed to be unacceptable.  In situations where a mutually agreed solution cannot be reached the
Council may pursue the owner / occupier to restore the property to its original state.  Alternatively, the
Council may undertake the works themselves and then place a charge upon the property.  Enforcement
action can only be taken within 4 years of the installation or replacement taking place for most buildings
however for listed buildings there is no time limit.   
Unauthorised and unsympathetic alterations to a Listed Building can be a criminal offence and you may
be reported the Procurator Fiscal.  Any formal enforcement action may lead to problems in the sale of
your property as it shall be recorded as a burden against the address until it is resolved.   
Page 99

Page 100

 Argyll and Bute Windows - Technical Working Note - 2018
15 | P a g e
Appendix A – Performance Improvements
Maintenance 
The poor performance of many traditional timber sash and case windows is caused by substandard
maintenance.  Decay in sash windows is mainly caused by moisture penetration which can be prevented
by thorough painting.   Historic Scotland recommends painting timber sash and case windows every 5
years.  Where rot has penetrated a frame it is possible to splice in individual sections to match the
originals in all respects.  
More detailed guidance for owners of property with sash and case windows is available within Historic
Scotland INFORM series - Maintaining Sash and Case Windows (July 2007) the Council’s own Window
Advice Note published as part of the Rothesay Townscape Heritage Initiative http://www.argyll-
bute.gov.uk/sites/default/files/RothesayWindowAdviceNote1.pdf
The ease of opening and cleaning of traditional windows can be significantly improved by re-balancing
the weights within the exiting windows, fitting Simplex hinges (if not already fitted) or Fenestrators and
usually be attended to from within the property. 
An application to the outer pane of slim profile double glazing is applied to make it self-cleaning. This
cannot be removed by water cleaning agents or high pressure equipment and the coating is much more
scratch resistant than normal glass. It is water and dust repellent and improves light transmission by
around 2%. It also comes with a 10 year guarantee.
http://www.slimliteglass.co.uk/slimlite-self-cleaning-double-glazed-units.html
Until recently there was only one supplier making the product but there are now eight due to the level of
demand. 
The benefit of timber is that is can be repaired. New sections can be spliced in if they rot, however plastic
windows cannot be repaired and need to be completely replaced when they fail. 
Please see advice on maintenance at the following:
http://www.argyll-bute.gov.uk/chord/maintenance-advice
https://www.historicenvironment.scot/advice-and-support/ 
Performance 
REPAIR
Draught proofing, repairing seals, and re-hanging can have the following effect: 
• Reducing draughts
• Eliminating rattle
• Substantially reducing noise
• Smoother operation 
Many traditional timber windows are sound and can be overhauled to retrofit slim profile double glazing
and other draughtproofing measures. 
Page 100

Page 101

 Argyll and Bute Windows
16 | P a g e
Historic Scotland Technical Paper 01 - Thermal Performance of Traditional Windows (October 2006) 
Well-fitted external or internal wooden shutters dramatically decrease heat loss from both draughts and
conduction through the window. Conduction losses alone are cut by 60%. 
Historic England: Traditional Windows: their care, repair and upgrading (February 2017) 
Repairing windows, rather than whole scale replacement is often the most cost effective approach, as
well as being the most environmentally friendly and most aesthetically pleasing. 
ENERGY
Heat loss is often cited as a factor as to why people want to alter windows.
A window renovation process, which retains much of the existing material, has clear environmental
benefits over manufacturing replacement windows, be these wooden or uPVC. 
Most heat is lost through gaps in the seal around the glazing and/or the window itself. 
The process of renovation, rather than replacement, has the benefit of using 1/40th of the embodied
energy of replacement. 
Where a window is clearly ‘leaky’ (with gaps around the frame and rails where sash windows meet)
research has shown that repairing and draught proofing it can reduce air infiltration by over 80%. Further
benefits can be gained simply by closing curtains, blinds and shutters and these can produce the same
heat savings as double glazing. The addition of secondary glazing can also reduce heat loss by nearly
60% (and is also effective in reducing sound transmission).
Historic England: Traditional Windows: their care, repair and upgrading (February 2017)
Secondary glazing, rather than double glazing, actually offers the best U value performance.
The whole-life environmental costs of replacement will be much greater than simply refurbishing. It will
take many years before savings on heating offset the large amounts of energy used to make PVC-u
windows in the first place. 
Although recycling does exist for PVC-u windows this is limited to waste sections left over in
manufacturing rather than for complete redundant windows. Discarded windows end up in landfill sites
with the potential for releasing some of the most damaging industrial pollutants. 
Historic England: Traditional Windows: their care, repair and upgrading (February 2017)
The environmental benefits of window renovation are:
• Uses 1/40th of the energy of replacement
• Material sent to landfill is reduced
• Use of finite resources is minimised
• Invested energy, or carbon store, is retained 
ACOUSTIC
Re-hanging and draught proofing original seals around the window will significantly reduce noise levels.
Page 101

Page 102

 Argyll and Bute Windows - Technical Working Note - 2018
17 | P a g e
Draught proofing can increase sound protection levels by up to 10 decibels. 
The inclusion of double glazing further increases sound reduction. 
Many new windows are filled with Argon gas, which is very light and ineffective for sound reduction,
however slim profile double glazing is filled with a mixture of Krypton and Xenon gases which are heavier
gases and offer much better sound reduction as a result, offering up to 31 decibel noise reduction. 
http://www.slimliteglass.co.uk/sound-reduction-a-u-values.html 
Windows are one of the most vulnerable parts of a building to noise transmission due to their relatively
lightweight construction. Depending on the number of openings and the quality of the seals between the
openings, a single glazed window without seals may only achieve a noise reduction of 18–25dBA. When
closed, sealed double glazed units perform little better than single glazing because the two panes of glass
are rigidly connected with a minimal cavity so the two panes resonate together. A secondary window with
an air space of 100mm or more de-couples the movement of the two panes of glass and reduces the
resonance between the two. Sound insulation of up to 45dBA can typically be achieved. Higher levels of
sound insulation are obtained as the gap increases, particularly if the reveals are lined with an acoustic
material, though minimal improvements occur with cavities beyond 200mm. The use of thicker or acoustic
laminate glass within the secondary window also improves the acoustic performance of the installation. 
Historic England: Traditional Windows: their care, repair and upgrading (February 2017) 
Quality 
If a town’s buildings are well maintained, people are more likely to spend time in that town. 
Heritage acts as an economic driver for a number of towns with historic interest. 
The Historic Environment Advisory Council for Scotland submitted a paper to Scottish Ministers in 2009 to
provide strategic advice to matters affecting such historic environment. 
http://www.heacs.org.uk/documents/2009/economicimpact.pdf 
They found that the historic environment played a large part to the prosperity of the nation: 
‘The greater share of economic impacts relate to tourism expenditure attributable to the historic
environment. Indeed, tourism expenditure attributable to the historic environment is estimated to support
some 37,000 FTE employees in Scotland, with this representing nearly £1.3 billion in respect of GVA’. 
They concluded that: 
‘There is a compelling case for increased investment in the historic environment. Traditionally, the case
has been made for greater investment to ensure the protection and enhancement of the historic
environment. The results of this study demonstrate that there is also a strong economic rationale for
increased investment in order to maximise the contribution the historic environment makes to the
prosperity of the nation. The Scottish Ministers should consider the appropriate level of investment in the
historic environment against this wider background. 
The Townscape Heritage Initiative and Conservation Area Regeneration Scheme projects running in
Campbeltown, Inveraray and Rothesay are therefore critical to the economic development of each town
and seek not just to preserve each respective town’s historic architecture but to instigate positive change
by making substantial improvements in key areas with large visual impact.
Page 102

Page 103

 Argyll and Bute Windows
18 | P a g e
The historic value of each town is also critical in attracting external funding. 
The appropriate use of materials is crucial in assisting this positive change and in lifting the appearance
of town centres. 
If poor quality materials are used they not only undermine the positive change but can also be harmful to
the performance of the building. 
Environmental 
The environmental advantages of Window Renovation are as follows:
• Consumes up to 40x less energy than would be needed for replacement
• Reduction in material needed to be sent to landfill
• Less dependence on, and usage of, finite resources
• Carbon store and invested energy is retained
PVC-u is short for Poly Vinyl Chloride un-plasticised and these windows are assembled from factory-
made components designed for rigidity, thermal performance and ease of production. Their design,
detailing and operation make them look completely different to traditional windows.
Historic England: Traditional Windows: their care, repair and upgrading (February 2017)
Appendix B – Cost Comparison
Research has been undertaken to obtain an indicative price quotations for the most popular types of
window refurbishments or replacements:-
TYPE OF PRODUCT OR
WORKS DESCRIPTION COST
Paint window   £65
Add simplex hinge  £55
Make small repair  £50
Good overhaul of window Include draft strip and fixing of loose parts /
joints £140
Install slim line Double Glazing On standard window (1m X 2m) £350
Make big repair  Including a new cill on standard sized window £185
Big repair on big window  Including new cill and installation of double
glazing £900
New top swing (fully reversible)
uPVC Unit
900 X 1170 dimension.  Flat profiled unlike
traditional sash and case. Excluding fitting £310
New uPVC casement unit 900 X 1170 dimension.  Flat profiled unlike
traditional sash and case. Excluding fitting £386
New vertical sliding sash and
case (uPVC)
900 X 1170 dimension.  Good proportioned
uPVC sash and case unit including stepped
profile.  Excluding fitting
£412
New timber vertical sliding sash
and case 900 X 1170 dimension.  Excluding fitting £681
Page 103

Page 104

 Argyll and Bute Windows - Technical Working Note - 2018
19 | P a g e
Appendix C – Prime Townscape Block Assessment 
In order to assist officers in undertaking a townscape block assessment the following methodology has
been developed from the existing Technical Working Note - Rothesay Windows.  All planning applications
for replacement windows should seek an ‘uplift’ to the current situation.  However, it is up to the planning
authority to determine if a townscape block can be considered ‘prime’ i.e. pristine or ‘de-valued’ i.e.
significant poor quality interventions having an adverse impact on the character.  The below method is a
general guide to identifying these blocks, however the overall decision will rest with the decision makers.
Blocks may be individual buildings (likely to be listed buildings), small terraces, or whole streets.   
Identifying Prime Townscape Blocks
These will be buildings that have retained their historic integrity and provide a significant degree of quality
to the overall conservation area.  They will depend on their location, outlook and exposure but they will all
be of high quality with mostly traditional windows and doors.  These important buildings that have
retained their integrity can be considered Prime Townscape Blocks.  
De-Valued Townscape Blocks
De-valued blocks will be those in secondary locations in conservation areas.  Buildings will be
compromised by a large degree of unsympathetic window and door replacements.  Public views will be
restricted.  These blocks will generally not be located in prominent public areas such as main squares
and shopping precincts.  
Ultimately it will be for the assessing officer to make the judgement on the status of the townscape block
and how the proposed window replacement will affect its integrity and how this might impact on the
overall qualifying interests of the conservation area.   
Page 104

Page 105

 Argyll and Bute Windows
20 | P a g e
Additional Information 
Useful sources of information
 Scottish Civic Trust: Windows: a frame of mind, a guide to window repair and replacement
 Historic Scotland: Thermal performance of traditional windows
 Historic Scotland: Caring for your sash and case windows a home owners guide
 Historic Environment Scotland: Managing change in the historic environment: Windows (this document is a
material consideration in determining planning applications) 
 English Heritage: Secondary glazing for windows
 English Heritage: Draft proofing doors and windows
Maintenance Advice for homeowners
 Historic Scotland – INFORM Series – Maintaining Sash and Case Windows (July 2006)
https://www.historicenvironment.scot/archives-and-
research/publications/publication/?publicationid=de744d4d-0610-48f4-af5e-a59500f93be8
 Historic England – Traditional Windows: their care, repair and upgrading (February 2017)
https://www.historicengland.org.uk/images-books/publications/traditional-windows-care-repair-upgrading/
Product Information
 Sash Fenestrator (makes it easy to open sash windows)
https://www.mightonproducts.com/products/sash-window-hardware/window-assistance/fenestrator#
Other Useful References:
 Case Study South Uist, insulation to windows, doors walls and roof
http://conservation.historic-scotland.gov.uk/hs-refurb-case-study-6.pdf 
 Case Study: Five Edinburgh Tenement Flats – Wall and window upgrades
http://conservation.historic-scotland.gov.uk/hs-refurb-case-study-1.pdf 
 Case Study : Garden Bothy, Cumnock
http://conservation.historic-scotland.gov.uk/hs-refurb-case-study-8.pdf 
 Slim‐profile double glazing Thermal performance and embodied energy
Page 105

Page 106

 Argyll and Bute Windows - Technical Working Note - 2018
21 | P a g e
http://conservation.historic-scotland.gov.uk/techpaper9.pdf 
 Historic Scotland: Technical Paper 23: Thermal assessment of internal shutters and window film
applied to traditional single glazed sash and case windows (January 2014)
http://conservation.historic-scotland.gov.uk/hs-technicalpaper-23.pdf 
 Historic Scotland Technical Paper 01 - Thermal Performance of Traditional Windows (October 2006) 
This paper presents research from testing the thermal performance of traditional timber sash and case
windows, comparing the original single glazed windows against various upgrading options such as blinds,
curtains, shutters, secondary glazing and double glazing. 
https://www.historicenvironment.scot/archives-and-
research/publications/publication/?publicationId=f3e97c76-b4fa-4c76-a197-a59400be931b 
 Historic England: Traditional Windows: their care, repair and upgrading (February 2017) 
This guidance covers both timber and metal windows and is aimed at building professionals and property-
owners. It sets out to show the significance of traditional domestic windows by charting their history over
centuries of technical development and fashion. Detailed technical guidance is then provided on their
maintenance, repair, thermal upgrading as well as on their replacement.
https://www.historicengland.org.uk/images-books/publications/traditional-windows-care-repair-upgrading/
 Historic Scotland – Guide For Practitioners: Conservation of Timber Sash and Case Windows
(February 2002) 
http://conservation.historic-scotland.gov.uk/publication-detail?pubid=8563 
 Inform easy read guide to improving thermal efficiency :
http://conservation.historic-scotland.gov.uk/inform-energy-efficiency.pdf 
Page 106

Page 107

MANAGING CHANGE IN 
THE HISTORIC ENVIRONMENT
WINDOWS
January 2018
Page 107

Page 108

2
MANAGING CHANGE IS A SERIES
OF GUIDANCE NOTES ABOUT
MANAGING CHANGE IN THE
HISTORIC ENVIRONMENT. ALONG
WITH HISTORIC ENVIRONMENT
SCOTLAND’S POLICY STATEMENT
(JUNE 2016), THEY SUPPORT THE
SCOTTISH GOVERNMENT POLICIES
SET OUT IN SCOTTISH PLANNING
POLICY (2014)
The aim of the series is to identify the main issues that can
arise in different situations, to advise how best to deal with
these, and to offer further sources of information. They are also
intended to provide advice to local authorities when developing
their planning policies, and in the determination of applications
relating to the historic environment.
Cover image: Signet Library, Parliament Square,
Edinburgh. A round-headed sash and case window
with astragals, or glazing bars.
Below: Gourock Rope Works, Port Glasgow. 
Conversion of a former industrial building with the
addition of new windows suitable for its change to
residential use.
3Cover image:
© Nick Haynes
Page 108

Page 109

KEY ISSUES
1.  The windows of a historic building form
an important element in defining its
special interest and character.
2.  The contribution windows make to the
character of a historic building must
be understood before considering
alteration.
3.  The size, shape, design and proportions
of a window, the reflective sparkle and
irregularities of old glass, the pattern
of design, the materials and details of
construction, the method of opening,
the finish, and associated fixtures,
typically contribute to the character of
a historic window.
4.  Maintenance and appropriate repair is
the preferred means of safeguarding
the character of a historic window.
5.  Improvements in energy efficiency of
existing windows can be achieved by
draught-proofing, internal secondary
glazing, and use of shutters and lined
curtains.
6.  Some types of double-glazing can be
incorporated within existing window
joinery and may be acceptable where
no historic glass remains.
7.  Where a window is of limited interest or
beyond repair, its replacement should
be permitted. New double-glazed
windows may be acceptable, if they
can closely match the original window
design, detail and materials.
8.  Local planning authorities give
advice on the requirement for listed
building consent, planning and other
permissions, and will often have their
own detailed guidance on windows.
Listed building consent is required for
any works affecting the special interest
or character of a listed building and
planning permission may be required
for window replacement within a
conservation area.
INTRODUCTION AND PURPOSE OF DOCUMENT
Historic Environment Scotland is charged
with ensuring our historic environment
provides a strong foundation in building a
successful future for Scotland. One of its
roles is to provide advice about managing
change in the historic environment.
This note sets out the principles that
apply to altering the windows of historic
buildings. It has been produced to guide
local authorities when developing their
planning policies and in the determination
of applications relating to the historic
environment.
Historic Environment Scotland will be
consulted on listed building consent cases
for works to windows in A and B listed
buildings, and expect this guidance to
inform decision making.
Local authorities alone determine listed
building consent applications for windows
in Category C listed buildings and
planning applications, where applicable,
for windows in unlisted buildings in
conservation areas. Whilst this guidance
is best practice for historic buildings
generally, local authorities will often
have specific window guidance for listed
and unlisted buildings in conservation
areas, reflecting local character and
particular circumstances, and thus, other
approaches may be appropriate.
In this guidance note the term ‘historic
window’ is used for both original and
significant historic windows.
Monuments scheduled under the Ancient
Monuments & Archaeological Areas
Act 1979 require scheduled monument
consent for any works. Where a structure
is both scheduled and listed, the
scheduling controls take precedence.
Further advice is available from Historic
Environment Scotland’s website: 
www.historicenvironment.scot/advice-
and-support/listing-scheduling
and-designations/scheduled-monuments
4 5MANAGING CHANGE IN THE HISTORIC ENVIRONMENT WINDOWS MANAGING CHANGE IN THE HISTORIC ENVIRONMENT WINDOWS
Page 109

Page 110

1. WHY ARE HISTORIC WINDOWS IMPORTANT ?
Windows make a substantial contribution
to the character, authenticity and physical
integrity of most historic buildings and
also to the character and interest of
historic streets and places.
They are an important element of a
building’s design. The size, shape and
positioning of the openings are significant,
as are the form and design of the framing,
astragals and glazing. Their style, detailing
and materials help us to understand the
date when a building was constructed
or altered, its function, and advances in
related technology.
Windows can be a product of many
factors, including the status of the
building, architectural fashions,
technological changes, local customs and
even individual designers.
In simple vernacular or plainer buildings a
considerable amount of the character and
visual prominence of a building can derive
from the windows.
2. IDENTIFYING THE INTEREST OF HISTORIC WINDOWS
The significance of a historic window
is derived from a number of factors
including its form or shape, the
characteristics of historic glass, the
materials and details of construction,
the method and pattern of opening,
associated fixtures, and sometimes even
the paint colour.
This guidance is focused on the most
common type of traditional historic
window, the double-hung vertically-sliding
timber sash and case window (the sash
window). Other window types will be
addressed later in the document.
FORM AND DESIGN
There are many shapes and sizes of
historic window, from simple rectangular
openings to arched or elaborately-
traceried windows. Whilst some windows
are sized and located for purely functional
purposes, in most cases, windows are
carefully provided as part of a broader
design for a building or group of buildings.
Window proportions and spacing
frequently relate to other elements of the
building, such as the overall dimensions
of an elevation or other features (e.g.
doorways). Windows are important
components of the hierarchy of an
architectural design or interior, perhaps
expressing different parts of a building and
principal rooms within, through differences
in size, positioning and design.
6 7MANAGING CHANGE IN THE HISTORIC ENVIRONMENT WINDOWS MANAGING CHANGE IN THE HISTORIC ENVIRONMENT WINDOWS
Six over six pane timber
sash and case windows,
Edinburgh. This style of
window was popular from
the eighteenth to the mid
nineteenth century. This
one image shows the varied
reflections provided by
different kinds of crown,
cylinder and plate glass.
Page 110

Page 111

HISTORIC GLASS
The different production methods for
various types of historic glass resulted in a
wide range of thicknesses and tints, whilst
irregularities in the process often provide
an attractive reflective sparkle, refractive
variety and distinctive appearance to each
window.
Two forms of early glass predominated
until the later nineteenth century. Crown
glass was made by hand-spinning
molten glass into a thin circular disc
which was then cut into individual panes.
From around 1700 onwards, cylinder or
broad sheet glass was made by forming
cylinders of molten glass that were then
cut and flattened into thick panes. Both
these methods were expensive, had
a restricted pane size, and produced
distortions and bubbles in the glazing that
add character, and identify the production
process. Surviving examples of this hand-
made glass should be retained.
Early plate glass was quite thick and
expensive, made in a similar method to
cylinder glass or by casting molten glass
on a table and then grinding and polishing
it flat. The cylinder sheet glazing process
was greatly improved in the 1830s which is
also when Patent plate glass was invented,
allowing thinner low-tax glass to be
produced, with later mechanical polishing
further reducing costs. The production
methods of improved cylinder and plate
glass retain varying levels of imperfections
and irregularities in the glass that can add
character to a window.
MODERN GLASS
Drawn flat sheet and float glass are both
C20th mechanised processes, the latter
producing glass with few imperfections.
More recently, glazing technology has
produced many different types of glazing,
the major change being the advent of
double-glazing or Insulated Glass Units
(IGUs) with two panes of glass separated
by either a vacuum cavity, or a cavity
filled with air or an inert gas, to reduce
energy loss through the glazing. Standard
double glazing has two panes, usually of
4-6mm glass, with a cavity of around 13-
20mm. Slim, thin or narrow-profile/section
double-glazing has cavities of between
3mm and 6mm and a narrower edge strip.
Vacuum glass has a ‘cavity’ between the
panes of only 0.2mm. The latter two are
sometimes used to replace historic glass
within existing or new frames. Both double
glazing and specialist single glazing can
be fitted with low-emissivity coatings
which can further improve their thermal
efficiency.
GLAZING PATTERNS
The vertically sliding sash and case
window was introduced to Scotland in
the early 1670s. After some variation it
commonly comprised two equally-sized
glazed sashes that slide vertically, on
counterbalanced lead or iron weights, in a
sash case or box set in a rebate in the wall
for weather protection. Windows were
made of softwood, usually well-seasoned
pine, often imported.
8 9MANAGING CHANGE IN THE HISTORIC ENVIRONMENT WINDOWS MANAGING CHANGE IN THE HISTORIC ENVIRONMENT WINDOWS
Early sash windows were sometimes
fixed or held open by pegs rather than
counterbalanced weights. Their sashes
contained small thick panes, often square,
held by thick glazing bars or ‘astragals’.
As the eighteenth century progressed an
arrangement of two equally-sized sashes
containing six ‘portrait’ format panes each
became the standard. Generally, over time,
astragal sections and glass thicknesses
reduced as window openings increased
in size and glazing technology improved.
The standard six-over-six ‘Georgian’
pattern was widely used until at least the
mid-nineteenth century, with occasional
use of ‘lying-panes’ (‘landscape’ format)
and margin panes, but the advent of
improved cylinder and patent plate glass,
and the removal of taxes, allowed larger
panes of glass and fewer astragals. There
was a gradual transition to larger panes
with four-over-four and two-over-two
panes frequently used, but by the later
nineteenth century the one-over-one
pattern was common. Horns, added to the
meeting rails of sash windows to address
these heavier panes of glass, are not very
common in Scotland and often do not
appear until late in the C19th, if at all.
When larger pane sizes first became
available, often the astragals in existing
sashes would be removed and retrofitted
with single panes of glass. Again, due
to expense, frequently only the front
windows of properties would be re-glazed
in this fashion. Likewise, in new buildings,
sometimes the rear elevations continued
to be designed with cheaper smaller
panes.
Either side of 1900 saw experimentation
with different sash sizes, often a lower
large-paned sash with smaller multi-paned
sash above, or sometimes decorative
glass. The popular ‘Queen Anne’ style
saw the reintroduction of smaller panes,
and sometimes exposed sash cases,
whilst multi-paned sashes were popular
in inter-war social and private housing
developments.
OTHER WINDOW TYPES
Besides the sash and case window,
there were other types of window used
in Scotland, including timber and metal
casements, often with leaded lights,
associated with the ‘cottage orne’ style
and with Arts & Crafts style housing.
Although timber windows continued to
predominate as a framing material until
the Second World War, the early C20th
saw the introduction of steel casement
windows, popularised by the Crittall
Company. They allowed schools and
industrial buildings to have large expanses
of glazing and curtain walling, and also
facilitated ‘picture windows’ in housing.
The use of steel windows was largely
superseded in the post-war period by
aluminium, and later still, uPVC.
Page 111

Page 112

10 11MANAGING CHANGE IN THE HISTORIC ENVIRONMENT WINDOWS MANAGING CHANGE IN THE HISTORIC ENVIRONMENT WINDOWS
Pulley
Shutter
Top Sash
Parting Bead
Window Case
Pulley Stile
Sash Cord
Sash Fastener
Bottom Sash
Baton Rod
Astragal/Glazing Bar
Sash Lift
Window
Back Lining
Panelling
Pulley
Sash
Cord
Sash
Weight
Stone
Cill
Window
case inner
lining
Window
case
outer
lining
Window
Case
Simpson and Brown
Meeting
Rails
Sash
Stile
Sash
Bottom
Rail
A typical sash and case window, including the terms used
to describe parts of the window in this leaflet
2
The component parts of the sash and case window
Weight
Box
(Recess
in Case)
Removable Pocket Piece
(concealed  behind shutter
or in inner or outer pulley
stile at low level)
METHOD OF OPENING
The way in which a window opens can
contribute significantly to the authenticity
and appearance of a historic building. All
traditional ‘double hung’ sash and case
windows open by sliding the sashes up
and down in the same plane: in the open
position they never project outwards or
inwards from the building. Other common
forms of opening method are casements,
which are hinged at the side and open
outwards (or more rarely inwards), and
hoppers, which are hinged at the bottom
and usually open on a track or restrictor.
Some C20th metal-framed windows use a
vertical or horizontal pivot mechanism.
FINISH
Like most softwoods, window frames
were traditionally painted, and this is the
preferred finish. It is sometimes possible
to sample underlying layers to establish
the original paint colours. Whilst shades of
white are now ubiquitous, many traditional
colours were much darker, with green,
brown and black often used. Lead-based
paint is now prohibited, but more recently
natural paint systems have offered an
alternative to synthetic paint.
ASSOCIATED FIXTURES
A wide range of fixtures are often
associated with historic windows,
including sash cases, cords, weights,
sash lifts, catches, shutters (and their
ironmongery), architraves and blinds.
Surviving original ironmongery should
be retained and reused. Many sashes in
Scotland incorporate ‘simplex’ hinges 
that allow them to be opened inwards 
for cleaning.
Associated fixtures such as traditional timber
shutters, where they survive, contribute to the
interest and character of a window
Illustration of a typical sash and case window
Page 112

Page 113

3. PRINCIPLES FOR REPAIR AND ALTERATIONS
CHARACTER AND INTEREST OF 
THE BUILDING
Repairs and alterations to a historic
building should protect its character and
special interest. The contribution windows
make to this character must therefore
be understood before proceeding. In
assessing the character, it is essential
to determine whether the windows
are original to the building or, if later,
whether they are of historic significance
in their own right: e.g., part of a major
or important scheme of overall works or
decoration to the building. Evidence from
adjacent or similar buildings, especially
planned set-pieces or terraces, will be
important. Such an assessment will inform
any subsequent strategy for repair or
replacement.
REPAIR
Where windows are of historic interest,
repair of their components is preferable
to replacement. This approach not only
retains historically-important fabric and
character, but is sustainable. Historic
timber windows often used high-quality
close-grained softwood, not easily
available today, and with maintenance,
have frequently lasted hundreds of years.
In some cases there will be cosmetic
damage to windows, with sashes painted
shut, or peeling paint, often only on the
more exposed faces of the building.
There may also be individually decayed
elements, such as rotten cills, which
can normally be repaired or replaced.
However, there will be situations when
a window is in such poor condition,
damaged or rotten to an extent that it
is not possible or practicable to repair it.
A specialist joiner may be able to advise
on condition, and more detailed advice
on the repair of timber windows can be
found in our Inform and Short Guides
(details at the end of this leaflet).
Steel windows can also suffer from rust
and distortion and, although repair is
possible and preferable, sometimes this
may not be practicable.
12 13MANAGING CHANGE IN THE HISTORIC ENVIRONMENT WINDOWS MANAGING CHANGE IN THE HISTORIC ENVIRONMENT WINDOWS
ALTERATION
An assessment of character and special
interest will be important when changes
to the window’s design are envisaged. If
clear evidence for an earlier pattern exists,
reinstatement of that pattern should be
acceptable, unless the later windows are
of interest in their own right; for example,
if they relate to significant alterations and
additions that are part of the building’s
special interest.
In other cases the windows may be
modern replacements, sometimes inexact
copies of the original examples, or using
inappropriate sections or materials. In
such cases it should be acceptable to
replace the windows with an aim to regain
the original design intention or improve
the existing situation.
VENTILATION
Sometimes additional controlled
ventilation is required, especially in
conversion works. Discreet vents inserted
in the head, meeting rail or sides of the
window should be used rather than
adding prominent trickle vents. Further
information on providing alternative
methods of ventilation is available in our
Short Guide to Sash and Case Windows.
SECURITY
Additional window security measures,
such as security bolts or sash restrictors,
can normally be installed discreetly
without damage to the historic character
of the building. Use of traditional
internal shutters, or if necessary internal
retractable grilles, is likely to be less
disruptive to the historic appearance of a
building than external shutters.
Where external measures are unavoidable,
removable grilles are more acceptable
than permanent fixtures (including roller
shutters). Where no historic glass remains
laminated, toughened glass can often be
installed to increase security.
COLOUR
Where colour or early paint schemes
can be established by analysis, their
use should be acceptable, although
individual changes to set-piece designs or
terraces may be unwelcome. Some local
authorities control the palette of window
paint colours to maintain the unified
design of a conservation area or groups
of listed buildings in multiple ownership/
occupation. In addition, some areas have
developed a custom of using specific
colours; e.g., black-painted frames in the
West End of Glasgow and white frames in
Edinburgh New Town.
Repair of a sash and case window showing
replacement of some of the component parts,
such as the cill.
Image:© Derek Thompson
Page 113

Page 114

14 15MANAGING CHANGE IN THE HISTORIC ENVIRONMENT WINDOWS MANAGING CHANGE IN THE HISTORIC ENVIRONMENT WINDOWS
NEW WINDOW OPENINGS
Location and design are key
considerations in proposals for new
window openings. New openings must
be carefully located to avoid disruption
to the characteristics of the surrounding
external and internal context. For example,
subsidiary elevations with no formal
symmetry, or rooms with few internal
features, are likely to be more suitable
for new window openings than principal
elevations or rooms.
In cases where the building forms part of
a larger grouping, it may be necessary to
consider the wider context of the group
and the potential for unsuitable precedent
and cumulative effect if similar work was
undertaken on every building. Where
the location is appropriate in principle,
the design of the new window must take
account of the size, proportion, material
and detailing of surrounding nearby
windows.
BLOCKING UP WINDOWS
Permanent blocking of windows by
building up the opening should only
occur where the window makes very
little contribution to the character of the
building. If the window is of any interest,
evidence of the opening, such as the
window surrounds, cill, lintel or relieving
arch should be retained, preferably with
the window kept in-situ with blocking
materials set behind or with the blocking
recessed to the position of the former
window, creating a traditional blind
window. If the window being blocked is of
no interest or detrimental to the building
it can be blocked without any evidence
being kept, using materials compatible
with the surrounding masonry.
CONVERTING WINDOWS TO DOORS
Subsidiary elevations are more suitable
for work of this type. Wherever possible
the existing width of the window
should be maintained and the opening
expanded downwards to ground level.
Depending on the circumstances, it may
be appropriate to match any external
window-surround detailing at the lower
level. Where windows contribute to the
character of an elevation or internal space,
the replacement door should be solid
to cill level and glazed above to match
the pattern of surrounding windows.
Any internal joinery, such as shutters or
panelling, should be retained and matched
at the lower level of the new opening.
Doors are also sometimes converted to
windows. Here, if the door is an important
part of the character of the building, it
will be desirable to provide a glazed or
part-glazed door rather than blocking up
the opening to insert a window.
BLIND WINDOWS
Original blind or dummy windows form
an important part of the interest of a
historic building and should not normally
be opened up. Such features were
originally designed to maintain the pattern
and symmetry of window openings in
the external elevations of a building, or
sometimes to provide a visual trick or
‘trompe l’oeuil’. They are often faced in
large stone slabs designed to resemble
the sashes. Often fireplaces, chimneys,
or other internal features prevented the
creation of working windows in some
locations. Windows specifically blocked
to avoid paying window taxation are
rarer.
South Charlotte
Street, Edinburgh.
The blind openings
are detailed with
cills and a meeting
rail to maintain
the symmetry of
the architectural
elevation. There
are chimney flues
behind them within
the walling.
Image:
© Nick Haynes
Page 114

Page 115

16 17MANAGING CHANGE IN THE HISTORIC ENVIRONMENT WINDOWS MANAGING CHANGE IN THE HISTORIC ENVIRONMENT WINDOWS
4. UPGRADING WINDOWS
ADDRESSING ENERGY EFFICIENCY AND
HEAT LOSS
Having regard for the energy conservation
of buildings in use is an important
element in addressing climate change and
reducing heating costs. In many cases
effective and sustainable improvements to
the energy efficiency of historic buildings
are possible and can be achieved without
damage to their character.
It is important to consider heat loss
throughout the entire envelope of a
building and, in most cases, less invasive
approaches than double-glazing or
window replacement may be more cost-
effective in both the short and longer term.
However, single-glazed windows are often
the worst-thermally performing element in
a building and a readily identifiable route
for heat loss, especially in buildings with
large window-to-wall ratios.
There are several methods of improving
the energy efficiency of existing windows.
Low-key and low-cost improvements
include applying low-emissivity window
films onto or behind the glass. At night,
considerable improvements to heat
loss can be obtained by lined curtains,
insulated blinds, or using historic
shutters, which can also be insulated. A
combination of the above measures can
be particularly effective.
DRAUGHT-PROOFING
Sash windows were designed to allow
some air flow into a room but not to be
draughty. Draught-proofing can reduce
air-leakage and the feeling of cold within a
building. It is relatively simple to draught-
proof a window using silicone sealant,
foam-backed strips or by inserting brush
strips into the baton rods and meeting
rails. Removing draughts can lead to
reductions in the heating levels required
and can also be helpful in reducing dust
and noise.
SECONDARY GLAZING
Recent technical research (see section 6
& 7) shows internal secondary glazing can
reduce heat loss by over 60% and also
has the advantage of leaving the original
windows untouched, a welcome approach
where the window is significant, retains
historic glass, or where adaptation for
double-glazing would be complicated
or damaging. It can also be cheaper
than replacement, and can be a more
permanent solution than double-glazed
units, whose performance will degrade
over time. Acoustically, secondary glazing
can also be better at reducing noise
transmission than double-glazing.
Systems vary, but normally comprise glass
in thin aluminium or timber frames set on
the internal window framing or staff beads,
and they can sometimes be designed
and fitted to still allow historic shutters to
function. Secondary double-glazing is rarer,
but has also been used. Care should be
taken to keep frame sections minimal and
match up internal meeting rails or frames
with outside sashes. Painting the external
frame face black can further disguise units
from external view. Care is needed to allow
ease of use for both opening and cleaning.
Temporary or demountable secondary
glazing solutions are also available, utilising
clear rigid acrylic or polycarbonate
sheets. These can also provide significant
reductions in heat loss, and can be fitted
easily (often with velcro or magnetic
strips) for winter and removed and stored
in summer. Another approach is to fix the
sheets to individual panes. Again, these
approaches can significantly reduce heat
loss at a lower cost than more invasive
works.
RETROFITTING DOUBLE-GLAZING
In some cases, where no historic glass
survives, it can sometimes be possible
to retrofit double-glazing within existing
window frames. Due to the design and
construction of historic windows, it is
normally only vacuum- or narrow-profile
double glazing that may be able to be
used. Vacuum glazing is thin enough
to directly replace single glazing, but if
narrow-profile glazing is used, the windows
concerned will have to be robust enough to
withstand any adaption or routing required
to accommodate the thicker panes. Any
works that either weaken the window or
may lead to exacerbated decay
should be avoided.
The use of traditional shutters at night can help
reduce heat loss.
Inveraray Castle, Argyll, showing the
discreet addition of secondary glazing,
in this case polycarbonate sheeting on
magnetic strips. The placing of the unit
allows the shutters to operate freely.
Image: © Glaze & Save Ltd
Page 115

Page 116

18 19MANAGING CHANGE IN THE HISTORIC ENVIRONMENT WINDOWS MANAGING CHANGE IN THE HISTORIC ENVIRONMENT WINDOWS
5. REPLACEMENT WINDOWS
REPLACEMENT DOUBLE GLAZED
WINDOWS
Where existing windows are beyond
repair, or of little historic interest, it should
be acceptable to replace them. This can
involve replacing just the individual sashes
or the sash case as well. Where a new sash
case is fitted it should be set wholly within
the wall’s rebate, with no, or minimal,
protrusion of the case’s facing plate,
unless exposed sash-cases are a feature
of the original design. Sash cases were
traditionally fixed with timber wedges and
burnt sand mastic. Internal shutters and
joinery should always be retained.
Generally, replacement windows should
seek to match the original windows in
design, form, fixing, method of opening
and materials. In replacing sash windows,
materials other than timber, e.g. uPVC,
will rarely be acceptable. Softwood is
traditionally used, now often treated to
improve durability.
For metal windows, steel replacement
double-glazed windows are available,
although can be expensive for individual
replacements. Aluminium may be
acceptable as an alternative if original
patterns and sections can be successfully
replicated.
The success of a replacement window will
depend on its detailed design, and on how
well the new replicates the old. Features
to consider in the design of new windows
may include the correct placing of the
case within the wall and, importantly, its
method of operation with vertically sliding
sashes. Sections of sash meeting rails and
astragal profiles should match the original
as closely as possible, and horns should
only be provided if there is historical
evidence for their use. In seeking the best
replication of the design and construction
of the window, how astragals hold the
glass is important. Therefore, true, or
through, astragals should be provided.
In most cases, as thermal performance is
a major driver for change, replacement
windows will be double-glazed. In such
cases care is required to adapt the
detailed design of new timber windows to
incorporate double-glazed units
Narrow-profile double glazing has been
specifically developed to allow more
accurate replication of historic window
patterns, and vacuum glass is similarly
marketed. Such approaches have directly
resulted in double-glazing becoming more
generally acceptable in historic buildings,
with consequent improvements in energy
efficiency. Although some narrow-section
units may not be optimised for thermal
performance, they give significant
improvements in heat loss from single
glazing and can allow for near like-for-like
replacement windows.
Standard double-glazing may occasionally
be acceptable for some replacement
windows, e.g. one-over-one sashes.
However, the thicker astragals required by
standard units, together with limitations
on some manufacturer’s guidance on
edge-sealing of units, mean they often
cannot successfully replicate historic
multi-pane patterns, especially those
windows with thinner astragals.
Example of narrow-profile double-
glazing retrofitted within an existing
sash window.
Page 116

Page 117

20 21MANAGING CHANGE IN THE HISTORIC ENVIRONMENT WINDOWS MANAGING CHANGE IN THE HISTORIC ENVIRONMENT WINDOWS
Some manufacturers have attempted to
address this by using a standard double-
glazed unit with applied astragals or an
astragal cassette, often in conjunction
with integral dividers in the cavity.
Such approaches may be considered in
cases where a replacement window will
improve the current situation, allowing an
aesthetically accurate match. Astragals
sandwiched between panes alone, will be
very unlikely to be acceptable.
FITTING GLAZING
Double glazed units can be fitted with
putty, or a synthetic glazing compound.
Windows should be fitted according to
manufacturer’s instructions as linseed oil
putty may damage unit seals. It may be
possible to use timber fixing beads, but
the beads should replicate the 45-degree
section of traditional putty. Smaller details
such as the colour of internal spacer bars
in unit cavities can also be important; e.g.,
white can better replicate the glazing bar
colour.
6. CONSENTS
Listed building consent is required for any
work to a listed building that affects its
special interest and planning permission
may be required for replacement windows
in conservation areas.
The local authority determines the need
for consent/permission. With listed
buildings, they may consider minor
works such as draught-proofing will not
require consent. Other works, such as
the installation of secondary glazing,
may sometimes require consent, often
depending on its detailed design. More
intensive works; e.g., retrofitting double
glazing, will be likely to require consent, as
will window replacement.
Where consent is required, an application
is made to the local planning authority.
This should include accurate scale
drawings showing both the existing
windows and the proposed works
in context. It is normally helpful to
provide detailed technical information
and photographs. A brief description
of the interest of the windows and
an explanation of the impact of the
alterations are always helpful in assessing
change. Where an application proposes
the replacement of a window or windows
in poor condition, a condition survey by an
appropriately-skilled tradesman is useful.
Notwithstanding the need to protect
the historic environment, applicants
and local planning authorities should
ensure replacement windows comply
with the requirements of the Building
(Scotland) Regulations 2004. Some
change of use applications may have
implications for windows (e.g. window
guards). Historic Environment Scotland’s
guide for Practitioners 6 – Conservation
of Traditional buildings – provides further
guidance on the application of the
Scottish Building Standards.
MEETING PERFORMANCE STANDARDS
If you are replacing your windows you
will want assurance that the units being
supplied achieve the results you seek.
New glazing, in particular, Insulating Glass
Units (IGUs), should be manufactured
in accordance with the requirements
of the Product Standard EN 1279-5, a
requirement for legal compliance with
the Construction Products Regulations
(CPR). The industry body, the Glass and
Glazing Federation (GGF) has a wealth of
information for consumers and providers
on its website and in its publications;
http://www.ggf.org.uk/publications, which
includes the Industry Guidance details on
the Construction Product Regulations and
the tests that must be complied with to
meet them.
Page 117

Page 118

22 MANAGING CHANGE IN THE HISTORIC ENVIRONMENT WINDOWS
7. FURTHER INFORMATION AND ADVICE
For the full range of Inform Guides,
Practitioner Guides, Technical Advice
Notes and Research Reports please see
the Publications section of the Historic
Scotland website. The following will be of
particular interest;
Looking After your Sash & Case Windows
(2003)
Guide for Practitioners: Conservation of
Timber Sash & Case Windows (2002)
Research Report: The Historical &
Technical Development of Sash & Case
Windows in Scotland (2001)
Inform Guide: Maintaining Sash & Case
Windows (2007)
Inform Guide: Maintaining Traditional Plain
Glass and Glazing (2007)
Inform Guide: Decorative Domestic Glass
(2007)
Short Guide: Fabric Improvements for
energy efficiency in traditional building
(2013)
Technical Paper 1: Thermal Performance of
Traditional Windows
Technical Paper 23: Thermal assessment
of internal shutters and window film
applied to traditional single glazed sash
and case windows
In addition we have several
Refurbishment Case Studies that
show the upgrading or replacement of
windows and also include costs for such
works.
GRANT ASSISTANCE
In some cases grants and loans
are available for energy efficiency
improvements, including windows. 
Home Energy Scotland provide free,
impartial advice. On 0808 808 2282 or 
www.energysavingtrust.org.uk/scotland/
grants-loans
23MANAGING CHANGE IN THE HISTORIC ENVIRONMENT WINDOWS
Page 118

Page 119

Historic Environment Scotland
Longmore House
Salisbury Place
Edinburgh EH9 1SH
Telephone 0131 668 8716
Email HMEnquiries@hes.scot
www.historicenvironment.scot
Text © 2018 Historic Environment Scotland
This edition published January 2018
Historic Environment Scotland is
the lead public body established to
investigate, care for and promote
Scotland’s historic environment.
Page 119

Page 120

This page is intentionally left blank

Page 121

Historic Environment Scotland – Longmore House, Salisbury Place, Edinburgh, EH9 1SH 
Scottish Charity No. SC045925
VAT No. GB 221 8680 15 
By email to: planning.maki@argyll-
bute.gov.uk 
Argyll and Bute Council - Lochgilphead Office
Planning Services
1A Manse Brae
Lochgilphead
PA31 8RD 
Longmore House
Salisbury Place
Edinburgh
EH9 1SH 
Enquiry Line: 0131-668-8716
HMConsultations@hes.scot 
Our case ID: 300075857
Your ref: 24/01803/LIB
21 October 2024
Dear Argyll and Bute Council 
Planning (Listed Building Consent and Conservation Area Consent
Procedure) (Scotland) Regulations 2015
Rhu House Rhu Road Port Charlotte Isle Of Islay Isle Of Islay Argyll And Bute
PA48 7TP - Installation of replacement windows and door 
Thank you for your consultation which we received on 01 October 2024.  The proposals
affect: 
Ref Name Designation Type
LB12436 "RHU" BY PORT NA CEASACH, 1. DICK, 2.
MCLELLAND
Listed Building 
Our Advice 
Category B-listed Rhu House is an earlier 19th century traditional 2-storey, 3 bay house. 
The proposal seeks to replace the windows and door to the principal elevation. 
The existing windows appear to be of a traditional timber construction arranged in a two
over two pattern. The door is a modern replacement with an upper glazed panel. There is
no condition report for the existing windows, particularly an assessment of whether they
are beyond economic repair. 
Where windows are historic or original we advise that they are repaired and sensitively
upgraded unless they are beyond economic repair. If the principle of replacement is
accepted, we recommend your Council seek further information on the proposed material
of the windows, to clarify whether they would be a good match for the existing. You can
find more advice about windows in our Managing Change in the Historic Environment:
Windows | HES | History and Guide to Energy Retrofit of Traditional Buildings | Hist Env
Scotland (historicenvironment.scot). 
We have no comments regarding the proposed new door. 
Planning authorities are expected to treat our comments as a material consideration, and
this advice should be taken into account in your decision making.  Our view is that the
Page 121

Page 122

Historic Environment Scotland – Longmore House, Salisbury Place, Edinburgh, EH9 1SH 
Scottish Charity No. SC045925
VAT No. GB 221 8680 15 
proposals do not raise historic environment issues of national significance and therefore
we do not object.  However, our decision not to object should not be taken as our support
for the proposals.  This application should be determined in accordance with national and
local policy on listed building consent, together with related policy guidance. 
Further Information 
This response applies to the current proposal. An amended scheme may require another
consultation with us, which should be sent to HMConsultations@hes.scot. 
Decisions affecting the historic environment should take the Historic Environment Policy
for Scotland (HEPS) into account as a material consideration. Our series of Managing
Change in the Historic Environment Guidance Notes supports national policy on the
historic environment, including HEPS, and explains how it should be applied. Technical
advice is available through our Technical Conservation website at www.engineshed.org. 
Please contact us if you have any questions about this response.  The officer managing
this case is James Turner who can be contacted by phone on 0131 668 8912 or by email
at James.Turner@hes.scot.  However, if you wish to reconsult us on this proposal please
email HMConsultations@hes.scot. 
Yours faithfully 
Historic Environment Scotland 
Page 122

Page 123

Page 123

Page 124

This page is intentionally left blank

Page 125

Classification: OFFICIAL
case: LBA-130-2030
Site Address: Rhu House, Rhu Road, Port Charlotte, Isle Of Islay,
PA48 7TP
Case Detail: Installation Of Replacement Windows And Door At:
Rhu House Rhu Road Port Charlotte Isle Of Islay 
I have comments to make on your reply.
The reason I did not specify actual houses is that I was concerned about GDPR and did
not want to fall foul of the data protection legislation.
Having phoned the planning department I was advised that the information was in the
public domain therefore could be used in my appeal.
I have checked various applications on the planning website and have included them in
my reply today.
I have also included partial quotes on the planning permitted correspondence  
Regards 
Ann Smith 
The application site, which comprises a detached, two storey dwellinghouse known
as Rhu House which is a Category B Listed Building (Ref: LB1243)
The house is in fact semi detached 
the proposed incorporation of a 4-pane window into the proposed design of the
replacement door
Proposal is for plain window no glazing bars frosted glass for privacy.
The Council notes that the appellant has not provided details of those dwellings,
Listed or otherwise, to which she refers in her statement of case.
Details:
Cat B  Main Street  18/00723/pp
“*It should be noted that, although the building is category ‘B’ listed, an application for listed
building consent is not being required in this instance. As the openings are not changing, the
removal of the existing frames does not entail loss of any historic fabric and the proposed windows
are a clearly improvement, it is not considered that the works will affect the building’s character as a
building of special architectural or historic interest” 
Page 125 Agenda Item 3c

Page 126

Classification: OFFICIAL
Cat B Main Street 17/03058/pp and 17/03059/lib 
“Whilst it would always be preferable that the replacement windows were of timber construction, in
this case the windows installed are of a high quality sash and case type and it is not considered that
their construction in upvc presents an unacceptable impact upon the Listed Building”
Cat B Main Street 20/00224pp
“Replacement windows are designed to benefit the house occupants with regard to reducing energy
consumption. In a conservation area the first consideration should be repair and refurbish of the
doors and windows. If that proves to be impractical the replacements should be designed to
replicate and/or improve the existing as far as possible. In this case modern materials will be used”
Cat B Main Street 22/0971/pp and 22/0970lib
“Subject to conditions, the proposal would preserve the architectural and historical interest of the
listed building, and thus meet the requirements of Policy 7 of NPF4 and Policies LDP 3, LDP 9 and SG
LDP ENV 16(a) of the Argyll and Bute Local Development Plan 2015. As such, listed building consent
should be granted for the proposal.”
Cat B Main Street 20/00224/pp 
“The proposal is to replace five windows to the front of the property. They are visible within the
streetscape but as they should be recessed within their openings to match the existing style,
proportions and positioning they are unlikely to be incongruous
The new windows are to be of white uPVC which is acceptable in this case.” 
Cat B Shore Street  23/02122/pp and 23/02123/lib
“In response to the concerns raised, the proposed windows have been amended to include a sash
opening movement in order to protect the architectural interest of the building. This approach is
also considered to be consistent with HES guidance on Managing Change, and the Council's
Guidance on replacement of windows in listed buildings and conservation areas. Additionally, there
were no 3rd party representations made.”
Cat B Shore Street 15/01050/lib
-“ The windows which are proposed to be renewed are of good quality with a traditional
appearance, despite the modern materials.” 
Page 126

Page 127

Classification: OFFICIAL
Cat C Main Street 23/01010/pp
“The new replacement windows installed in March 2023 are considered an improvement and consist
of white upvc sliding sash and case” 
Cat C Main Street  22/01887/lib and 22/01889/pp 
Unlisted  Main Street 21/00875/pp
“The proposal will not give rise to any material planning considerations which would support a
recommendation other than approval of an application which accords with Local Development Plan
policy and relevant guidance. “
All of these examples I have given were mentioned in my original statement though not
identified.All these examples have been granted planning permission.All are UPVC,some
four pane some two pane. 
Ann Smith 
Page 127

Page 128

This page is intentionally left blank