STATEMENT OF CASE - SUPPLEMENTARY
INFORMATION- 
FOR
ARGYLL AND BUTE COUNCIL
LOCAL REVIEW BODY
REFUSAL OF PLANNING PERMISSION FOR
THE CHANGE OF USE OF EXISTING
COASTGUARD STATION TO FORM
DWELLINGHOUSE AT FORMER COASTGUARD
STATION, SOUTHEND, ARGYLL AND BUTE
PLANNING APPLICATION REFERENCE
NUMBER 22/02186/PP
LOCAL REVIEW BOARD REFERENCE
NUMBER 24/0018/LRB
17th April 2025

Page 2

SUPPLEMENTARY INFORMATION BACKGROUND
The Review Body seeks commentary from the Planning Authority on the
consideration of the revised plans and conditions and reasons to accompany
any approval with the inclusion of a condition restricting the use of the building
to that of a holiday home for family use.
COMMENTS ON SUPPLEMENTARY INFORMATION REQUEST
1. BASIS OF ORIGINAL SUBMISSION
The proposal as originally submitted and as considered during the application
processing and determination was for the change of use of the subject building
to a residential dwelling. The Supplementary Information Request seeks the
Planning Authority’s consideration of the acceptability of the building being
changed to a holiday home and restricted by planning condition. 
The Planning Authority confirm that the consideration of the proposal as a
holiday let is a materially different proposal from that of the planning application
and would give rise to a completely different assessment including against
different planning policies which are specific to tourism uses, such as that being
suggested.
The application as put forward under ref. 22/02186/PP was for a residential
dwelling and therefore the Planning Authority has competently assessed the
scheme on that basis. A materially different scheme such as that being put
forward in this Supplementary Information Request, should be subject to the
submission of a separate planning application.
2. COMMENTARY ON ADDITIONAL SCALED PLANS
Additional scaled plans have been provided (drawing reference: MAC-25100-
02 Rev A; and a drawing with no reference number). The second plan which
has no reference number still fails to provide any scale bar, or written
dimensions. The former plan (MAC-25100-02 Rev.A) shows an in internal
layout at first floor level with an additional shower room. 
Our previous commentary on the building size remains. The existing building
footprint takes up a majority of the plot with limited space surrounding it. The
proposed conversion looks to create a residential unit with approximately
39sqm of habitable accommodation on a very restricted plot. The first-floor attic
space of building is restricted by sloping ceilings which significantly reduces the
amount of usable floorspace on this level. In addition, reduced headroom, such
as beneath a sloping ceiling can cause problems in the use of both facilities
and furniture, usable spaces within a dwelling should therefore have an
unobstructed height of at least 1.8m/ a height that a person can stand in. The
proposal would not have sufficient useable space to afford the occupier an

Page 3

acceptable residential living environment and represents a low-quality design
in respect of living standards for future occupants.  
3. DRAFT CONDITIONS
Should the Local Review Body be minded to approve the application for a
dwellinghouse the draft conditions to be attached to any decision are
recommended as:
1. PP - Approved Details & Standard Notes – Non EIA Development
The development shall be implemented in accordance with the details specified on
the application form dated 27/01/2024; supporting information and, the approved
drawings listed in the table below unless the prior written approval of the planning
authority is obtained for an amendment to the approved details under Section 64
of the Town and Country Planning (Scotland) Act 1997.
Plan Title. Plan Ref. No. Version Date Received
Location Plan 1304/P/1 3rd November
2022
Plan Section and
Elevations as
Existing
1304/P/2 3rd November
2022
Plan Section and
Elevations
Proposed
1304/P/3-A 22nd April 2024
Plan Section and
Elevations
Existing Site Plan
Proposed
1304/P/6 20h August 2024
Reason: For the purpose of clarity, to ensure that the development is implemented
in accordance with the approved details.
2. PP –Biodiversity Enhancement Measures
Notwithstanding the effect of Condition 1, no development shall commence until a
biodiversity statement demonstrating how the proposal will contribute to
conservation/ restoration/ enhancement of biodiversity has been submitted to and
approved in writing by the Planning Authority. 
The biodiversity statement should refer to Developing with Nature guidance
|NatureScot as appropriate.
Reason: To comply with the requirements of NPF4 Policy 3.
3. PP – Junction with Private Road
Notwithstanding the effect of Condition 1, no development shall commence until a
finalised scaled layout plan showing the connection of the private access to the
public road has been submitted to and approved by the Local Planning Authority.

Page 4

The details shall demonstrate accordance with the Council’s Roads Standard Detail
Drawing SD 08/005 Rev.B. The final wearing surface on the access shall be
completed prior to the development first being brought into use and the visibility
splays shall be maintained clear of all obstructions thereafter and maintained in
accordance with the approved plans.
Reason: In the interests of road safety.
4. PP – Parking and Turning as shown
The parking and turning area shall be laid out and surfaced in accordance with the
details shown on the approved plans prior to the development first being occupied
and shall thereafter be maintained clear of obstruction for the parking and
manoeuvring of vehicles providing parking for two vehicles on site. 
Reason: In the interests of road safety.
5. PP – Refuse collection
The refuse collection point shall be provided adjacent to the public road prior to the
development first being occupied and shall thereafter be maintained in accordance
with the approved details.  
Reason: In the interests of road safety.
6. PP – Construction Hours
Notwithstanding the provisions of Condition 1, the construction of the development
hereby permitted shall be restricted to the specified hours of 0800-1800 hours
Monday to Friday, 0800 – 1300 hours Saturday and not at all on Sunday, Bank or
Scottish Public Holidays. 
Reason: To minimise the impact of noise, generated by construction activities on
occupiers of residential properties. 
7. PP- Buildout Timescale
No development shall commence until details of the proposed timescale for
completion of the approved development have been submitted to and approved by
the Planning Authority. Thereafter, the development shall be implemented in
accordance with the duly approved timescale for completion unless an alternative
timescale for completion is otherwise agreed in writing with the Planning Authority. 
Reason: In order to comply with the requirements of NPF4 Policy 16F.
8. PP- Contaminated Land Assessment
No development shall commence until, a scheme will be submitted by the Developer
(at their expense) to identify and assess potential contamination on site. No
construction work shall commence until the scheme has been submitted to, and
approved, by the Planning Authority, and is thereafter implemented in accordance
with the scheme so approved.

Page 5

The scheme shall be undertaken by a competent person or persons in accordance
with relevant authoritative guidance including PAN 33 (2000) and BS10175:2011 or,
in the event of these being superseded or supplemented, the most up-to-date
version(s) of any subsequent revision(s) of, and/or supplement(s) to, these
documents. This scheme should contain details of proposals to investigate and
remediate potential contamination to the satisfaction of the Planning Authority, and
must include:- 
a) A desk study and development of a conceptual site model including (where
necessary) a detailed site investigation strategy. The desk study and the scope and
method of recommended further investigations shall be agreed with the Council prior
to addressing parts b, c, and d of this condition. Should the desk study show the
need for further assessment this will be undertaken in the following sequence: 
b) A detailed investigation of the nature and extent of contamination on site, and
assessment of the risks such contamination presents.
c) Development and agreement of a remedial strategy (if required) to treat/ remove
contamination ensuring the site is made suitable for its proposed use (this shall
include a method statement, programme of works, and proposed verification plan). 
d) Submission of a verification report for any agreed remedial actions detailing and
evidencing the completion of these works.
Written confirmation from the Planning Authority, that the scheme has been
implemented and completed shall be required by the Developer before any
development hereby approved commences. Where remedial measures are required
as part of the development construction detail, commencement must be agreed in
writing with the Planning Authority. 
Reason: To ensure that the potential risks to human health, the water environment,
property, and, ecological systems arising from any identified land contamination
have been adequately addressed.
CONCLUSION
Section 25 of the Town and Country Planning Act 1997 requires that all
decisions be made in accordance with the development plan unless material
considerations indicate otherwise.
Summary Commentary on Key Material Considerations:
The application as submitted and determined by the Planning Authority was for
the change of use of the subject  building to residential accommodation. The
Review should be determined on this basis. The notion to amend the scheme
to be a holiday let is a materially different proposal and a different assessment
would be undertaken as a result. Should the Appellant wish to pursue a holiday
let, it is recommended that they apply for planning permission to allow a full and
competent assessment of such a proposal to take place.
On this basis, the Planning Authority will not provide an assessment of a holiday
let and reiterate our previous comments on the key matter of this Review:
- Whether the proposed building, due to its scale, plot ratio and
design, would provide a suitable residential environment for its
future occupiers

Page 6

Policy 66 of LDP2 permits residential developments where (amongst other
requirements):
a) the layout, density, plot ratio, scale, form and materials of any proposed
development do not detract from the character of the surrounding buildings and
the local area; and 
a)  the site provides a suitable residential environment;
LDP2 Policy 11 states that all proposals for conversions and changes of use to
buildings must:
a) Respect the character of the traditional use; and
b) Reuse materials wherever practicable; and
c) Retain features of particular architectural or historic interest; and
d) Be capable of providing the proposed use without substantial extension
or alterations which would be detrimental to the character of the building;
and
e) Be in scale and sympathy with the surrounding landscape and not
require significant infrastructure that is detrimental to the character or
amenity of the place.
For the reasons given above, it is considered the proposed development would
not be capable of providing the occupier a suitable residential environment due
to the building’s restrictive scale. Officers raise concern that by allowing this
development, it would negatively set a precedent on space standards/what
constitutes an acceptable internal living environment for future occupants for
the Argyll and Bute area.
The proposal is accordingly considered to be contrary to NPF4 Policies 14 and
16, and Policies 10, 11, and 66 of LDP 2.
Taking account of the above, it is respectfully requested that the request for a
review be dismissed.