Argyll and Bute Council
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD 
26 May 2025 
NOTICE OF MEETING 
A meeting of the ARGYLL AND BUTE LOCAL REVIEW BODY will be held BY MICROSOFT
TEAMS on MONDAY, 2 JUNE 2025 at 11:30 AM, which you are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. CONSIDER NOTICE OF REVIEW REQUEST: LAND EAST OF TALIESIN WEST,
GARELOCHHEAD (REF: 24/0008/LRB) 
(a) Protected Species Walkover Report (Pages 3 - 36)  
(b) Comment from Local Biodiversity Officer (Pages 37 - 38)  
(c) Further Information and comment Planning (Pages 39 - 48) 
Argyll and Bute Local Review Body 
Councillor Gordon Blair (Chair) Councillor Jan Brown
Councillor Andrew Kain   
Contact: Fiona McCallum  Tel: 0154 604392
Public Document Pack

Page 2

This page is intentionally left blank

Page 3

Project: 24_PEA_10_92 - CJ
Site: Land East of Taliesin West, Garelochhead, Helensburgh G84 0AU, UK
Client: Lorne Thomson
This Report is the copyright of Woodland Solutions Northern Limited t/a ROAVR Group.
Any unauthorised reproduction or usage by any person other than the addressee is strictly prohibited.
Page 3 Agenda Item 3a

Page 4

Project
Number:
24_PEA_10_92 - CJ
Report Type: Site Walkover - Otters - Potential Roost Features
Site Address: Land East of Taliesin West, Garelochhead, Helensburgh G84
0AU, UK
Role: Name: Date:
Client Lorne Thomson N/A
Surveyor Connor S. Johnston 31/10/24
Consultant Connor S. Johnston
Reviewer
Revision History
Date: Version number: Summary of changes:
31/10/24 1.0 First Draft
1.0 First Issue
ROAVR Group all rights reserved.
Page 4

Page 5

Summary:
Site Surveyed Land East of Taliesin West, Garelochhead
National Grid Reference: NS 23668 91235
Purpose & Brief Protected species and PRA commissioned by Lorne
Tomson
Development Proposals The proposed development involves the construction of a
house on the western boundary of the site on a patch of
grassland
Methods Otter and GLTA (Ground Level Tree Assessment) walkover
Confirmed Ecological
Constraints
None
Potential Ecological
Constraints
Roosting bats
Recommendations For
Further Survey Works
CEMP implementation, Pre works check for otter signs
Opportunities For Ecological
Enhancements
Bat boxes
Removal of Invasive Species
ROAVR Group all rights reserved.
Page 5

Page 6

Table of Contents
Acknowledgements:
Client Documents:
1 Introduction
SITE DESCRIPTION
DEVELOPMENT PROPOSALS
SCOPE OF WORKS
2 Methodology
DESKTOP STUDY
Otters
PRELIMINARY BAT ROOST ASSESSMENT (PRA)
SUITABILITY ASSESSMENT
ECOLOGICAL CONSTRAINTS AND MITIGATION
LIMITATIONS
3 Policy and Legislative Context
POLICY AND LEGISLATION
NATIONAL PLANNING POLICY
LOCAL PLANNING POLICY
4 Desktop Study
HISTORICAL SPECIES RECORDS
5 Site Survey Results
6 Evaluation and Assessment
8 Conclusions
ECOLOGICAL CONSTRAINTS
MITIGATION STRATEGIES
SUMMARY
9 References and Bibliography
10 Limitations
Appendix 1: Site Location and Assessment Boundary
ROAVR Group all rights reserved.
Page 6

Page 7

Acknowledgements:
Data referred to within this report was sourced from the NBN Atlas. This resource
is managed by the National Biodiversity Network and is designed to support
environmental research, conservation, and decision-making.
Client Documents:
This report has been completed on the assumption that the plans provided by
the client at the time of issue of this report remain the same. A list of the
documents provided by the client can be found in the table below.
Table: Documents provided by the client as of October 2024
Plans provided by the client as of 29/10/2024
2019_0057-03
1 Introduction
1.1 ROAVR Group were commissioned to undertake a Protected species
walkover to determine the presence/absence of Potential Roost Features
(PRF’s) and Otters at land near Glencairn Park, Garelochhead,
Helensburgh G84 0AU, UK
1.2 The survey was comprised of a desktop study and site walkover
1.3 The methodology and results are outlined within the report where
applicable.
1.4 The report is to be submitted to support a planning application to redevelop
the site.
1.5 The information and recommendations within this report have been
prepared and provided in accordance with CIEEM’s Code of Professional
Conduct (CIEEM, 2022).
ROAVR Group all rights reserved.
Page 7

Page 8

SITE DESCRIPTION
1.6 The survey site covers an area of approximately 2.2 hectares and is centred
on ‘NS 23668 91235’.
1.7 The site is situated in Garelochhead in the Argyll and Bute Council control
area. The site is located on the West side of the town and is accessed via the
B872 road.
1.8 The site is currently a mixture of broadleaved woodland, species-poor neutral
grassland, areas of bare ground and patches of scrub and bracken with the
McAulay burn running through the centre of the site.
DEVELOPMENT PROPOSALS
1.9 The site is planned for redevelopment, with a house proposed for
construction in the western portion over the species-poor grassland. Future
plans may include the development of a car park in the northern section of
the site, currently comprising bare ground.
SCOPE OF WORKS
1.10 The aims of this assessment were to:
- Identify the likely ecological constraints associated with the proposed
development concerning otters and potential roosting features used by
bats
- Identify suitable mitigation measures (if required);
- Determine whether further surveys are necessary
2 Methodology
DESKTOP STUDY
2.1 Site-specific information concerning protected species and protected
habitats within a 2km search area was sourced from NBN Atlas.
2.2 To ensure that ecological data searches were up to date, species
data were screened and all data records pre-2014 were omitted from the
results.
2.3 The results of the desktop study should be considered to be indicative
only.
ROAVR Group all rights reserved.
Page 8

Page 9

Otters
2.4 The site walkover followed the standing advice from NatureScot. The site was
surveyed including a systematic search for spraints, paw prints, paths, slides,
food remains, holts and places of shelter.
2.5 The survey was conducted on foot. Habitats and features of importance were
mapped using a GPS-enabled handset.
PRELIMINARY BAT ROOST ASSESSMENT (PRA)
2.7 A Preliminary Bat Roost Assessment, comprised of a preliminary ground
level tree assessment (GLTA) undertaken by Connor Johnston during the site
survey on 31/10/2024. The GLTA was undertaken in line with the Bat
Conservation Trust’s ‘Bat Surveys for Professional Ecologists: Best Practice
Guidelines’ (Collins, 2023) using non-invasive methods.
2.8 The survey included an active search for bats, evidence of bats (such as
droppings, feeding remains, urine splatters, oil staining, bat fur and/or
scratch marks) and potential roosting features (PRFs). PRFs of trees are listed
in Table 2.8.1. PRFs of built structures are listed in Table 2.8.2. The lists are not
exhaustive but show examples of the most commonly used roosting features
of built structures and trees.
Table 2.8.1: Potential roosting features (PRFs) in built structures listed in Bat Conservation
Trust’s ‘Bat Surveys for Professional Ecologists: Best Practice Guidelines’ (Collins, 2023).
Potential roosting features (PRFs) in built structures
External Internal
- Access/egress through windowsills,
window panes and walls;
- Behind peeling paintwork or lifted
rendering;
- Behind hanging tiles;
- Weatherboarding;
- Eaves;
- Soffit boxes;
- Fascias;
- Lead flashing;
- Gaps under felt (even including those
of flats roofs);
- Under tiles/slates;
- Existing bat boxes;
- Gaps in brickwork or stonework which
provide access/egress to cavity or
rubble-filled walls
- Behind wooden panelling;
- In lintels above doors and windows;
- Behind window shutters and curtains;
- Behind pictures, posters, furniture,
peeling paintwork, peeling wallpaper,
lifted plaster and boarded windows;
- Inside cupboards and in chimneys
accessible from fireplaces;
- Within attic roof voids;
- The top of gable end or dividing walls;
- The top of chimney breasts;
- Ridge and hip beams and other roof
beams;
- Mortise and tenon joints;
- All beams;
- The junction of roof timbers, especially
where ridge and hip beams meet;
- Behind purlins;
- Between tiles and the roof lining;
- Under flat felt roofs
ROAVR Group all rights reserved.
Page 9

Page 10

Table 2.8.2: Potential roosting features (PRFs) in trees listed in Bat Conservation Trust’s
‘Bat Surveys for Professional Ecologists: Best Practice Guidelines’ (Collins, 2023) Table 6.6.
Table 2.8.2. PRF types that can be exploited by bats and how they form (adapted from
Bat Roosts in Trees, BTHK, 2018) reproduced from Table 6.6. (Collins, 2023.)
PRFs formed by disease
and decay
PRFs formed by damage PRFs formed by
association
● Woodpecker holes
● Squirrel holes
● Knot holes
● Pruning cuts
● Tear outs
● Wounds
● Cankers
● Compression forks
● Butt rots
● Lighting strikes
● Hazard beams
● Subsidence
● Cracks
● Shearing cracks
● Transverse snaps
● Welds
● Lifting bark
● Desiccation
● Fissures
● Frost cracks
● Fluting
● Ivy
Table 2.8.3. Guidelines for assessing the suitability of trees on proposed development
sites for bats, to be applied using professional judgement. Reproduced from Table 6.6.
(Collins, 2023.)
Suitability Description
NONE Either no PRFs in the tree or highly unlikely to be any
FAR Further assessment required to establish if PRFs are present in the
tree
PRF A tree with at least one PRF present
2.9 A Site Map was produced to show the location of built structures, trees
and potential roosting features (PRFs) (Appendix 1 figure A1.1).
ROAVR Group all rights reserved.
Page 10

Page 11

SUITABILITY ASSESSMENT
2.10 The likelihood of occurrence of protected ecological features and species
was ranked following the criteria listed in Tables 2.10.1 and 2.10.2.
Likelihood of occurrence was assessed using data collected during the desk
study and after evaluation of the habitats on-site (during the site survey) as
to their likelihood to provide suitability for protected species (i.e. presence of
breeding, nesting, roosting, foraging, commuting and/or refuge habitat for
example).
Table 2.10.1: Criteria used to assess the likelihood of occurrence for protected ecological
features and species on-site (excl. bats).
Likelihood of
occurrence Criteria
Present Confirmed as present during the site survey or by confirmed historical
records.
High
Species are known to be present within proximity to the site (records
present). Habitats on-site are of high quality for the species and/or likely
to support a large population. The site is well connected to good quality
habitat within the local area.
Moderate
Species are known to be present within the local area (records present).
Habitats on-site are of moderate quality for the species and/or likely to
support a moderate population. The site and connected habitats provide
all of the ecological requirements of the species. Suitability of habitats
on-site may be limited due to disconnectivity to the wider landscape,
poor to moderate habitat available within the wider locality, and/or due to
the presence of only a small area of suitable habitat.
Low
Few or no records of the species within the local area. Habitats on-site are
of poor quality for the species and/or likely to support just a few
individuals. The suitability of habitats may be limited due to disturbance,
isolation and/or poor quality habitat available within the wider locality.
However, species presence cannot be discounted due to the national
distribution of the species or the nature of on- site and surrounding
habitats (if all required ecological requirements for the species are
present).
Negligible
While presence cannot be absolutely discounted, the site includes very
limited or poor quality habitat for a particular species. Connected habitats
do not fulfil the ecological requirements of the species. There are no local
records and/or the site is outside the known national range of the species.
ROAVR Group all rights reserved.
Page 11

Page 12

Table 2.10.2: Criteria used to assess the likelihood of occurrence (site’s suitability) for bats,
from Bat Conservation Trust’s ‘Bat Surveys for Professional Ecologists: Best Practice
Guidelines’ (Collins, 2016).
Suitability
Criteria
Roosting bats Foraging / Commuting bats
Negligible
Negligible habitat features on-site likely
to be used by roosting bats.
Negligible habitat features on-site likely
to be used by commuting or foraging
bats.
Low
A structure with one or more potential
roost sites that could be used by
individual bats opportunistically.
However, these potential roost sites do
not provide enough space, shelter,
protection, appropriate conditions
and/or suitable surrounding habitat to
be used regularly or by larger numbers
of bats (i.e. unlikely to be suitable for
maternity or hibernation).
A tree of sufficient size and age to
contain PRFs but with none seen from
the ground or features seen with only
very limited roosting potential.
Habitat that could be used by small
numbers of commuting bats but
isolated ( i.e. not very well connected to
the surrounding landscape by other
habitat).
Suitable, but isolated habitat that could
be used by small numbers of bats for
foraging.
Moderate
A structure with one or more potential
roost sites that could be used by bats
due to their size, shelter, protection,
appropriate conditions and/or suitable
surrounding habitat but unlikely to
support a roost of high conservation
status (with respect to roost type only -
with respect to roost type only).
Continuous habitat connected to the
wider landscape that could be used by
bats for commuting.
Habitat that is connected to the wider
landscape that could be used for bats for
foraging.
High
A structure or tree with one or more
potential roost sites that are obviously
suitable for use by larger numbers of
bats on a more regular basis and
potentially for longer periods of time
due to their size, shelter, protection,
conditions and surrounding habitats.
Continuous, high-quality habitat that is
well connected to the wider landscape
that is likely to be used regularly by
commuting bats.
High-quality habitat that is well
connected to the wider landscape that is
likely to be used regularly by foraging
bats.
Site is close to and connected to known
roosts.
ECOLOGICAL CONSTRAINTS AND MITIGATION
2.11 An evaluation of the potential ecological constraints to the proposed
development and appropriate mitigation strategies was made following
CIEEM’s ‘Guidelines for Ecological Impact Assessment in the UK and Ireland
ROAVR Group all rights reserved.
Page 12

Page 13

(CIEEM, 2018).
LIMITATIONS
2.12 Only one site visit was undertaken, therefore, a full evaluation of species
present throughout the year could not be made. Furthermore, the site
survey was undertaken in October. Therefore, there were seasonal
constraints to species identification. However, the data collected during the
site survey was sufficient to make an appropriate assessment of the site.
3 Policy and Legislative Context
3.1 This section includes the legislative context of those protected species or
other notable species that are recorded on-site or have the potential to be
present on-site. Details on specific legislation for other protected or notable
species that have not been identified as being present, or having the
potential to be present, are not included below.
POLICY AND LEGISLATION
3.11 All UK bat species and their roosts are strictly protected under European and
UK legislation (Conservation of Habitats and Species (Amendment) (EU Exit)
Regulations 2019 (CHSR), and the Wildlife and Countryside Act, (1981) (WCA).
Furthermore, Annexe II of the Habitats Directive lists four UK bat species,
providing them further protection. Under the National Planning Framework,
bats and their roots must be considered during development.
3.12 Non-licensed bat workers are permitted to carry out preliminary roost
assessments providing that they do not enter a known roost site or use
invasive survey techniques such as endoscopes or artificial light. Survey
constraints are discussed later in this report.
3.13 Otters are a European Protected Species and are fully protected under the
Conservation (Natural Habitats, &c.) Regulations 1994 as amended.
Numerous offences are published concerning otters and it is an offence to
deliberately or recklessly:
● capture, injure or kill an otter
● harass an otter or group of otters
● disturb an otter in a holt or any other structure or place it uses for shelter or
protection
● disturb an otter while it is rearing or otherwise caring for its young
● obstruct access to a holt or other structure or place otters use for shelter or
protection, or otherwise deny the animal use of that place
● disturb an otter in a manner or in circumstances likely to significantly affect
ROAVR Group all rights reserved.
Page 13

Page 14

the local distribution or abundance of the species
● disturb an otter in a manner or in circumstances likely to impair its ability to
survive, breed or reproduce, or rear or otherwise care for its young
It is also an offence to:
● damage or destroy a breeding site or resting place of such an animal
(whether or not deliberately or recklessly)
● keep, transport, sell or exchange, or offer for sale or exchange any wild otter
(or any part or derivative of one) obtained after 10 June 1994
Otter shelters are legally protected whether or not an otter is present.
NATIONAL PLANNING POLICY
3.2 The National Planning Framework 4 (NPF), introduced in February 2023 sets
out the Government’s planning policies for Scotland and how these are
expected to be applied in the presumption in favour of sustainable
development. Scotland’s planning system and development have an
important contribution to make towards addressing the global biodiversity
crisis. This is reflected in the Fourth National Planning Framework (NPF4),
which sets out new requirements for development to deliver positive effects,
primarily under Policy 3.
This states that all development will contribute to the enhancement of
biodiversity, including where relevant restoring degraded habitats. Proposals
for local development will include appropriate measures to conserve, restore
and enhance biodiversity in accordance with national and local guidance.
3.3 The Government's objectives for planning are to promote sustainable
development, to conserve, enhance and restore the diversity of Scotland’s
wildlife and geology and to contribute to rural renewal and urban
renaissance.
ROAVR Group all rights reserved.
Page 14

Page 15

LOCAL PLANNING POLICY
3.4 This report has been commissioned to comply with local policy.
NATIONAL AND INTERNATIONAL LEGISLATION
3.6 Bern Convention on the Conservation of European Wildlife and Natural
Habitats (1982)
3.7 Convention on the Conservation of Migratory Species of Wild Animals (1983)
3.9 National Parks and Access to the Countryside Act (1949)
3.10 Natural Environment and Rural Communities Act (2006)
3.11 Protection of Badgers Act 1992 and by Section 11 (Schedule 6) of the Wildlife
and Countryside Act 1981 (as amended in Scotland)
3.12 The Water Environment (Controlled Activities) (Scotland) Regulations 2011
3.13 The Habitats Regulations (Scotland) 2017
3.14 The Wildlife and Natural Environment (Scotland) Act 2011
3.15 The Scottish Biodiversity Strategy (2004)
3.16 The Conservation of Habitats and Species Regulations (2017)
3.17 The Convention of International Trade in Endangered Species of Wild Fauna
and Flora (1975)
3.18 The Hedgerows Regulations (1997)
3.19 UK Biodiversity Action Plan (1994)
3.20 Wildlife and Countryside Act (1981)
3.21 Wild Mammals (Protection) Act (1996)
ROAVR Group all rights reserved.
Page 15

Page 16

4 Desktop Study
HISTORICAL SPECIES RECORDS
4.4 Protected species records relating to the site and 2km search area were
obtained from the NBN ATLAS as part of the desktop study.
4.5 A full list of identified species recorded within the 2km search area can be
requested from LERC.
4.6
● There were no records of otters (Lutra lutra) within 2km of the site.
● There were two records for Soprano Pipistrelle (Pipistrellus pygmaeus) and
one record of Common pipistrelle (Pipistrellus pipistrellus)
ROAVR Group all rights reserved.
Page 16

Page 17

5 Site Survey Results
5.1 The site survey was undertaken by Connor Johnston on the 31st October
2024. The weather conditions were considered to be appropriate for the
survey (Table 5.1.1).
Table 5.1.1: Weather conditions at the time of the survey.
Date of site survey: 31/10/2024
Temperature 12 degrees celsius
Wind 16kmh
Precipitation 10%
*Data from Met Office.
ROAVR Group all rights reserved.
Page 17

Page 18

5.2 Potential Roost Features
External Feature of
value to
bats
Notes Photo
Rocky
Crevice
PRF 1
Night or
transitional
roost (low)
This large crevice approximately 20cm long and 15cm tall on the underside of the
bridge offers a sheltered, stable environment that is well-protected from weather
and predators. Its height above the burn (1.5M) and structural depth make it
potentially suitable for bats as a transitional or night roost, especially for resting
between feeding activities.
Located at NS 23609 91131 facing East
ROAVR Group all rights reserved.
Page 18

Page 19

Oak Tree
PRF 2
Night or
transitional
roost (low)
This feature is a longitudinal cavity approximately 30cm long and of undetermined
depth in a moss-covered branch of an oak tree. Its location, natural cover, and
potential internal space provide suitable conditions for individual bats as potential
temporary roost, particularly for species that favour branch cavities in trees for
shelter and protection.
Located at NS 23585 91149 facing Southwest at a 3m elevation
ROAVR Group all rights reserved.
Page 19

Page 20

Oak Tree
PRF 3
Night or
transitional
roost (low)
This feature is a narrow cavity of undetermined depth approximately 20cm long
and 5cm wide in the moss-covered trunk of an oak tree, located near a branch
junction. It offers suitable conditions for individual bats or small groups as a
potential temporary roost, particularly for species that favour trunk cavities in trees
for shelter and protection
Located at NS 23679 91210 facing West at an elevation of 4m
ROAVR Group all rights reserved.
Page 20

Page 21

Oak Tree
PRF 4
Night,
transitional
or daytime
roost
potential
(Moderate)
The longitudinal split in the oak tree trunk, measuring approximately 2 metres in
length and 10 centimetres in width, is a significant potential roost feature. Such
splits, especially when they penetrate deeply into the trunk, offer sheltered
environments that can serve as day, night, or transitional roosts for various bat
species. The size of this split enhances its suitability, providing ample space and
protection. Over time, as the split potentially widens due to natural processes, its
value as a roosting site may increase, offering even more favourable conditions for
bats
Located at NS 23670 91253 facing West at an elevation of 4m
ROAVR Group all rights reserved.
Page 21

Page 22

Oak Tree
PRF 5
Night,
transitional
or daytime
roost
potential
(Moderate)
This natural cavity approximately 15x15cm in an overhanging branch provides a
sheltered and stable environment, making it suitable for use by individual bats or
small groups as a day or night roost. Its internal space offers protection from
outside elements, and the accessible entrance enhances its potential for roosting,
particularly for species that favour tree cavities for shelter.
There is evidence that this branch has been used as a rope swing historically which
would have periodically caused disturbance for any roosting bats.
Located at NS 23755 91216 at an elevation of 5m
ROAVR Group all rights reserved.
Page 22

Page 23

Oak Tree
PRF 6
Night,
transitional
or daytime
roost
potential
(Moderate)
This natural cavity in a moss-covered branch surrounded by holly provides a
sheltered and secure environment, offering potential as a day or night roost for
individual bats or small groups. Its positioning and entrance size make it accessible
while providing sufficient protection from weather and predators, making it
suitable for species that utilise tree cavities for roosting.
Located at NS 23735 91202 at an elevation of 3m facing West
ROAVR Group all rights reserved.
Page 23

Page 24

Ivy
covered
tree
PRF 7
Transitional
or night
roost
potential
(low)
This tree, heavily overgrown with mature ivy, features multiple sheltered cavities
formed by the woody growth of the ivy. The dense ivy cover, including both woody
stems and foliage, provides adequate protection for individual bats and creates a
stable microclimate. The presence of several small cavities offers the potential to
host multiple bats, making it a suitable environment for roosting.
Located at NS 23726 91194 at an elevation of 4m with small cavities in all directions
ROAVR Group all rights reserved.
Page 24

Page 25

6 Evaluation and Assessment
6.1 Results from the desktop study and site survey were evaluated to assess the
likelihood of occurrence for Otters and Bat potential (as per Tables 2.10.1 and
2.10.2). An evaluation of the potential impacts due to the proposed
development and recommendations for appropriate mitigation measures
are provided in Table 6.1.1 below:
ROAVR Group all rights reserved.
Page 25

Page 26

Table 6.1.1: Likelihood of occurrence of protected ecological features and species on-site, potential impacts due to the proposed
development and recommendations for appropriate mitigation measures.
Protected feature / species Likelihood of
occurrence / suitability Comments / Justification Impact due to Proposed
Development Required Mitigation Measures
Bats (Chiroptera) Roosting bats
Moderate There were historical records
of Common and Soprano
within 2km of the site.
The site overall has good
connectivity, and the habitat
has a moderate likelihood of
roosting bats
The walkover determined
that several natural and
manmade features were
suitable for roosting bats.
The proposed development
involves the construction of a
house on neutral grassland
and will not destroy any PRFs
on site.
The proposed development is
likely to result in disturbance
to suitable roosting habitats at
PRF 4 and PRF 3 as they are
within the area of work.
The implementation of a
Construction Environmental
Management Plan (CEMP)
could be implemented to
minimise disturbance to
potential bat roosts.
This would involve a licensed
bat ecologist conducting a
pre-works inspection
immediately before work
begins to confirm the absence
of bats, with all works carried
out under their supervision.
Low-impact methods, such as
using hand tools near potential
roost features, would reduce
disturbance, and work would
be scheduled to avoid sensitive
times, recognising that the
roosts are unlikely to be used
for hibernation
ROAVR Group all rights reserved.
Page 26

Page 27

Protected feature / species Likelihood of
occurrence / suitability Comments / Justification Impact due to Proposed
Development Required Mitigation Measures
Foraging/Commuting bats
High The woodland and grassland
on site are considered to be
part of a mosaic of suitable
foraging/commuting
habitats.
Mitigation measures must be
put in place to ensure that
disturbance does not increase
during and/or
post-development.
The proposed development
may result in the loss of
suitable foraging/commuting
habitats if suitable mitigation
strategies are not put in place.
Construction works should be
limited to daylight hours (excl.
dawn and dusk) to prevent
disturbance to nighttime
foraging activity.
Post-construction, the use of
artificial lighting should be
limited where possible. Motion
sensors on outside lighting will
prevent prolonged disturbance.
It is recommended that outside
lighting be set on short-timers
(1 minute) and that the
sensitivity be set to large
moving objects only.
Other terrestrial mammals
(excl. bats).
Otters (Lutra lutra)
Low There are no known records
of Otters within 2km of the
site since 1991.
There was suitable habitat in
the nearby watercourse but
no field signs were identified
at the time of the survey
None. No specific mitigation is
required at this time; however,
as the species are transient,
pre-works checks should be
carried out by a suitably
qualified ecologist to ensure no
animals are present along the
watercourse at the time of
works being carried out.
ROAVR Group all rights reserved.
Page 27

Page 28

Protected feature / species Likelihood of
occurrence / suitability Comments / Justification Impact due to Proposed
Development Required Mitigation Measures
Common and widespread mammals
Rabbits Confirmed. There was evidence of
Rabbits on-site in the form of
droppings.
The proposed development
will not result in a substantial
loss that will impact upon local
populations long-term.
Mitigation measures must be
put in place to minimise
disturbance during the
construction phase.
Any necessary excavation of
animal burrows should be done
carefully to avoid unnecessary
suffering (such as crushing or
asphyxiation).
Construction works should
be limited to daylight hours
to prevent
disturbance to nighttime
foraging activity.
Any trenches or other
excavations left open
overnight should either be
well covered or provided
with an escape
ramp (comprised of a
sloped side or wooden
plank reaching up to
ground level or slightly
above), to allow any
wildlife that falls to
escape.
Any newly built boundary
features should incorporate
‘wildlife gaps’ (comprised of a
13x13cm gap at the base of the
feature), to allow widllfie to pass
through.
ROAVR Group all rights reserved.
Page 28

Page 29

Protected feature / species Likelihood of
occurrence / suitability Comments / Justification Impact due to Proposed
Development Required Mitigation Measures
Invasive plant species Confirmed Multiple invasive species
listed under Schedule 9 of
the Wildlife and Countryside
Act 1981 (as amended),
including Rhododendron
and Japanese Knotweed,
were identified during the
survey.
Invasive plant species have
the potential to impact
protected species and
habitats
It is recommended to consult
an expert in invasive species
management to ensure proper
and effective removal.
Professionals can assess the
site-specific conditions and
recommend the most
appropriate removal methods,
such as mechanical cutting
combined with herbicide
application or other techniques
suitable for the habitat
ROAVR Group all rights reserved.
Page 29

Page 30

.
8 Conclusions
8.1 The site at Land at Glencairn Park, Garelochhead is proposed to be
redeveloped with the construction of a house along the western boundary of
the site on a patch of grassland.
8.2 The site has moderate potential for roosting bats, supported by historical
records of Common and Soprano Pipistrelles within 2 km of the area. The site
features good connectivity and suitable habitats, with several natural and
manmade features identified as potential roosting features (PRFs).
Although the proposed development will not directly destroy any PRFs,
construction activities are likely to disturb roosting habitats at PRF 3 and PRF
4, which fall within the works area. To mitigate this, it is recommended to
implement a Construction Environmental Management Plan (CEMP). This
plan should include:
● A pre-works inspection by a licensed bat ecologist to confirm the absence
of bats immediately before construction begins.
● Supervising all works near potential roost features under the guidance of
the bat ecologist.
● Using low-impact methods, such as hand tools near PRFs, to reduce
disturbance.
● Scheduling work to avoid sensitive periods, as the roosts are unlikely to be
used for hibernation.
8.3 The site includes woodland and grassland, forming part of a mosaic of
habitats highly suitable for foraging and commuting bats. To prevent
adverse impacts on these habitats:
● Construction should be limited to daylight hours, avoiding dawn and dusk,
to minimize disturbance to nighttime foraging activity.
● Post-construction, artificial lighting should be minimized, with outside
lights set on short timers (e.g., one minute) and equipped with motion
sensors sensitive only to large objects.
8.4 No evidence of otters was found during the survey, and there are no recent
records within 2 km of the site. Despite suitable habitat in a nearby burn, no
mitigation is required for this species at this time. However, pre works checks
are recommended due to the suitability of nearby habitat
8.5 No incidental evidence of protected species was found on site apart from
rabbit droppings. The proposed development is unlikely to significantly
impact local populations long-term. However, the following
mitigation measures are recommended:
● Excavations of animal burrows should be carried out with care to avoid
harm, such as crushing or asphyxiation.
ROAVR Group all rights reserved.
Page 30

Page 31

● Construction should be limited to daylight hours to avoid disturbing
nighttime foraging activity.
● Trenches or other excavations left open overnight should be covered or
fitted with escape ramps (e.g., a sloped side or wooden plank).
● Any newly constructed boundary features should include wildlife gaps
(13x13 cm) to allow wildlife movement.
ECOLOGICAL CONSTRAINTS
8.3 Development proposals must have regard for protected species identified
as potentially occurring on, or near to, the site. Mitigation measures to
protect these species have been produced within this report to ensure
that the proposed works comply with relevant UK legislation.
8.6 Further mitigation measures have been outlined within the report to
ensure that protected species are not impacted by the development.
Ecological Clerk of Works (ECoW) supervision will be required throughout
the construction phase to ensure that the recommended mitigation
measures are implemented appropriately.
MITIGATION STRATEGIES
8.7 No further surveys should be required, however a CEMP should be
implemented to ensure necessary precautions are taken.
8.9 A tool box talk should be given to all relevant personal by a suitable
qualified ecologist before any works commence on-site to outline ecological
constraints and the required mitigation measures.
8.10 The grassland should be retained at a short sward prior to any
demolition/construction works commencing on-site in order to ensure
that the habitat does not become more favourable to amphibians and/or
reptiles.
8.12 Tree works (if required) should take place outside the breeding season
(typically March-October) or once a suitability-qualified ecologist has
inspected the trees for breeding birds and confirmed that there are no
active nests.
8.13 Construction works should be limited to daylight hours (excl. dawn and
dusk) to prevent disturbance to nighttime foraging activity.
8.14 Vegetation removal must be undertaken using hand tools. Cut vegetative
materials should be checked and removed from the site immediately.
8.15 Any trenches or other excavations left open overnight should be well
covered to deter Badgers from entering. If this is not possible, any
trenches or other excavations left open overnight should either be
ROAVR Group all rights reserved.
Page 31

Page 32

provided with an escape ramp (comprised of a sloped side or wooden
plank reaching up to ground level or slightly above), to allow any wildlife
that falls in to escape.
8.16 Any necessary excavation of animal burrows should be done carefully to
avoid unnecessary suffering (such as crushing or asphyxiation).
8.17 During hibernation season (October to March), piles of leaf litter and logs
should be retained to ensure hibernating hedgehogs are not harmed. If
removal is unavoidable, the piles must be carefully checked before
burning.
8.18 Post-construction, the use of artificial lighting should be limited where
possible. Motion sensors on outside lighting will prevent prolonged
disturbance. It is recommended that outside lighting be set on
short-timers (1 minute) and that the sensitivity is set to large moving objects
only.
8.19 Any newly built boundary features should incorporate ‘wildlife gaps’
(comprising a 13x13cm gap at the base of the feature), to allow wildlife to
pass through.
SUMMARY
8.20 Subject to the completion of a CEMP to ensure suitable mitigation measures
are implemented, the proposed development is unlikely to have a significant
ecological impact on otter and bat species in the area.
ROAVR Group all rights reserved.
Page 32

Page 33

9 References and Bibliography
1. ARG UK. (2010). Advice Note 5: Great Crested Newt Habitat Suitability
Index. ARG UK, UK.
2. CIEEM. (2017). Guide to Ecological Surveys and Their Purpose. CIEEM,
Winchester.
3. CIEEM. (2017). Guidelines for Preliminary Ecological Appraisal. CIEEM,
Winchester.
4. CIEEM. (2019). Guidelines for Ecological Impact Assessment in the UK and
Ireland: Terrestrial, Freshwater, Coastal, Marine. CIEEM, Winchester.
5. CIEEM. (2021). Biodiversity Net Gain Report & Audit Templates. CIEEM,
Winchester.
6. CIEEM. (2022). Code of Professional Conduct. CIEEM, Winchester.
7. CIRIA, CIEEM & IEMA. (2016). Biodiversity Net Gain. Good practice principles
for development. CIEEM, Winchester.
8. CIRIA, CIEEM & IEMA. (2019). Biodiversity Net Gain. Good practice principles
for development: A practical guide. CIEEM, Winchester.
9. J. Collins. (2016). Bat Surveys for Professional Ecologists: Good Practice
Guidelines 3rd Edition. The Bat Conservation Trust, London
10. DEFRA. (2022). DEFRA MAGIC. https://magic.defra.gov.uk.
11. English Nature. (2001). Great Crested Newt Mitigation Guidelines. English
Nature, UK.
12. Gunnell, K., Grant, G. & Williams, C. (2012). Landscape and Urban Design for
Bats and Biodiversity. Bat Conservation Trust, London.
13. The UK Habitat Classification Manual (Butcher et al., 2020).
14. Langton, T., Beckett, C. & Foster, J. (2001). Great Crested Newt Conservation
Handbook. Froglife, Suffolk.
15. Ministry of Housing, Communities and Local Government. (2012). National
Planning Policy Framework. https://assets.publishing.service.gov.uk/.
16. Mitchell-Jones, A.J. (2004). Bat Mitigation Guidelines. English Nature,
Peterborough.
17. Mitchell-Jone, A.J. & McLeish, A.P. (2004). Bat Workers Manual 3rd Edition.
JNCC, UK.
18. Scottish Badgers. (2018). Surveying for Badgers Good Practice Guidelines
Version 1. Scottish Badgers, Scotland.
19. Reason, P.F. and Wray, S. (2023). UK Bat Mitigation Guidelines: a guide to
impact assessment, mitigation and compensation for developments
affecting bats. Chartered Institute of Ecology and Environmental
Management, Ampfield.
ROAVR Group all rights reserved.
Page 33

Page 34

10 Limitations
10.1 ROAVR Group has prepared this Report for the sole use of the above
named Client/Agent in accordance with our terms of business, under
which our services were performed. No other warranty, expressed or
implied, is made as to the professional advice included in this Report or any
other services provided by us.
10.2 This Report may not be relied upon by any other party without the prior
and express written agreement of ROAVR Group. The assessments made
assume that the land use will continue for its current purpose without
significant change. ROAVR Group has not independently verified
information obtained from third parties.
10.3 This report, data tables and raw data remain the copyright of ROAVR until
such time as any monies owed are settled in full and the report may be
withdrawn at any time.
10.4 The ultimate decision to do/not do any work on any structure/tree/feature
and any legal consequences of any action taken/not taken lies solely with
yourselves and/or your employees/subcontractors. ROAVR Group accepts
no liability or responsibility in any way for any actions taken/not taken by
you and/or your employees and/or any other person/organisation engaged
in carrying out/not carrying out any of the proposed work.
Should you require any further information, please do not hesitate to contact us at
any time.
Prepared by: Connor Johnston
Checked by: Aiden Berg
ROAVR Group all rights reserved.
Page 34

Page 35

Appendix 1: Site Location and Assessment Boundary
Figure A1.1 Site location (Purple) Survey Boundary (Red)
ROAVR Group all rights reserved.
Page 35

Page 36

This page is intentionally left blank

Page 37

Classification: OFFICIAL
Notice of Request for Review - Land East of Taliesin West, Garelochhead
(Ref:  24/0008/LRB and 20/01822/PPP)
Please find below my response to the Protected Species Walkover Report.
European Protected Species
Otter (Lutra lutra)
• No evidence recorded on site
Comment: I agree that pre-works checks should be carried out by a suitably qualified
ecologist immediately prior to works commencing. 
Bats (varying species)
• 4 Potential Bat Roosting Features (PRF) of Low suitability were recorded on site
• 3 Potential Bat Roosting Features (PRF) of Moderate suitability were recorded on site
• No PRF’s are to be destroyed by the proposed development
• 2 PRF’s (one with low suitability and one with moderate suitability) are likely to result
in disturbance from the proposed development
• The site offers High suitability for foraging / commuting bats
Comment: I agree with the findings and find that the development would not be
detrimental to the maintenance of the population of the species at a favourable
conservation status in its natural range but the potential roots should be protected
where possible. The trees identified as having PRF should not be removed and should
be protected during the construction period. Also the proposed mitigation measures
within the report should be following and secured by condition and a condition should
ensure a Construction Environmental Management Plan (CEMP) is provided at the next
application stage (AMSC). This should include details of mitigation measures necessary
to avoid disturbance to any potential roosting and / or foraging / commuting bats
including the retention of the trees with PRF. 
Recommendations:
The following should be covered by conditions that shall be discharged at the next
application stage (AMSC): 
• Prior to commencement of development a CEMP shall be submitted to and
approved by the local authority. The CEMP shall include the appropriate mitigation
measures as recommended within the Protected Species Walkover Report, namely:
- A pre-works inspection by a licensed bat ecologist to confirm the absence of bats
immediately before construction begins.
- Supervision of all works near potential roost features under the guidance of the bat
ecologist. 
- The use of low-impact methods of construction, such as hand tools near PRFs, to
reduce disturbance. 
Page 37 Agenda Item 3b

Page 38

Classification: OFFICIAL
- Scheduling of work within non-sensitive periods in relation to bats (late November
until March).
• Prior to commencement of development a tree survey shall be submitted to the
local authority. This survey should identify any trees to be felled, all trees to be
retained and include the retention of all trees with potential bat roost features. A
Tree Protection Plan shall also be submitted to ensure the all retained trees and their
root systems are protected throughout construction. 
• Prior to commencement of development an updated Landscaping plan shall be
submitted to and approved by the local authority. This plan should include; 
- each tree retained and proposed to be planted; including species location and age
of each tree, timings of planting and programme of ongoing monitoring and
management. 
- Proposed biodiversity enhancement measures to include location and purpose
(bat / bird / red squirrel box, retention of log piles etc.).
- Location and species of woodland meadow mix, timings of planting and
programme of ongoing monitoring and management.
- Location and species of bee, bird and butterfly meadow mix, timings of planting
and programme of ongoing monitoring and management.
- Location and species of hedging mix, timings of planting and programme of
ongoing monitoring and management.
It is noted that the applicant should pay regard to the ‘Developing with Nature’
guidance on the NatureScot website https://www.nature.scot/doc/developing-
nature-guidance#planting-for-nature
• Throughout the construction period it is required that the applicant appoints an
Ecological Clerk of Works (ECoW) for the duration of the works. The ECoW shall
carry out pre-works surveys, Toolbox Talks and ensure implementation of the
required mitigation measures.
• Throughout the construction period the applicant is required to consult with an
appropriate expert on the removal of the Invasive Non-Native Species (INNS) on site
to ensure it is removed appropriately and with minimal impact on the surrounding
environment. 
Helen McCallin BSc (Hons), MSc 
Local Biodiversity Project Officer
Argyll & Bute Council 
Page 38

Page 39

Classification: OFFICIAL 
RESPONSE TO REQUEST FOR FURTHER
INFORMATION 
FOR 
ARGYLL AND BUTE COUNCIL 
LOCAL REVIEW BODY 
REFUSAL OF PLANNING PERMISSION FOR
ERECTION OF SINGLE DWELLINGHOUSE AT LAND
WEST OF MCAULAY BURN, GARELOCHHEAD 
PLANNING APPLICATION REFERENCE NUMBER
20/01822/PP 
LOCAL REVIEW BOARD REFERENCE 
NUMBER 24/0008/LRB 
20th JANUARY 2025 
Page 39 Agenda Item 3c

Page 40

Classification: OFFICIAL
INFORMATION REQUIRED 
The following request has been made: 
• In circulating the Protected Species Walkover Report, the LRB have afforded you
[the planning authority] the opportunity to review and provide comment on the report
and to review the conditions and reasons that may be attached to any approval of the
application no later than 20 January 2025. 
• The LRB have also requested that the relevant planning obligation (either an
agreement with the planning authority or a unilateral obligation by the appellant under
section 75 of the Town and Country Planning (Scotland) Act 1997 or some suitable
alternative arrangement as may be agreed by the parties) to be completed and
registered or recorded, as the case may be, and submitted only to the LRB
(localreviewprocess@argyll-bute.gov.uk) as soon as its recorded/registered or at the
latest by 2 May 2025, being the end of the 26-week period. 
On the 6th January we received the comments from the Biodiversity Officer in relation to the
Protected Species walkover survey and their recommendation for the amended conditions. 
The planning authority have reviewed the planning conditions and have set these out in the
first section of this document. The conditions have incorporated the comments from the
Biodiversity officer and the comments from SEPA made on 24th October in relation to the
draft conditions. These are now a final set of conditions. 
In relation to the second request, we are working with the applicant to finalise either a
planning obligation (Section 75 agreement) with the planning authority or a unilateral
obligation by the appellant under section 75 of the Town and Country Planning (Scotland)
Act 1997. In the absence of any further instruction from the LRB we are working to the
recommended heads of terms provided in the previous further information request. The
heads of terms seek to ensure the woodland, paths, memorial and any other works are
retained, enhanced and maintained in perpetuity in the interest of amenity and to safeguard
this Open Space Protection Area in the long term. 
Recommended heads of term:
o Prior to start of any commencement of works on site, a site management plan shall
be submitted to, and approved in writing by, the planning authority for the application
site including the woodland and open areas, memorial and proposed new footpaths.
o The site management plan must include management of any Invasive Non-Native
Species, in particular Japanese Knotweed and enhancement of any habitats/species
as identified in ecological and tree surveys (to be undertaken) of the site.
o Details of what shall be included in the site management plan including a detailed
action plan and timings for works and long-term maintenance of the footpaths.
o Details of how frequently this site management plan shall be reviewed and updated
(timescales) in agreement with the planning authority.
o Details of how this site management plan will be implemented and reviewed in
perpetuity. 
Page 40

Page 41

Classification: OFFICIAL
Revised Draft Conditions 
Draft conditions and reasons to attach to the permission in the event that Members of the
LRB are minded to approve the application with a planning obligation. 
Standard Time Limit Condition 
This consent constitutes a Planning Permission in Principle under Section 59 of the
Town and Country Planning (Scotland) Act 1997 as amended and as such does not
authorise the commencement of development until matters requiring the further consent
of the Planning Authority, as specified in Condition 1 (within the list of Additional
Conditions below), have been satisfied. 
Application(s) for Approval of Matters Specified in Conditions must be made in
accordance with the provisions of Regulation 12 of the Town and Country Planning
(Development Management Procedure) (Scotland) Regulations 2013 within the time
limits specified below. 
Any application for Approval of Matters Specified in Conditions must be submitted to the
Planning Authority no later than three years from the date of this permission in principle.
Any elements of the Planning Permission in Principle for which further approval of the
Planning Authority has not been sought within the prescribed three year time period will
no longer be capable of being implemented within the terms of this permission. 
The development to which this planning permission in principle relates must commence
no later than five years from the date of this permission, or within the expiration of two
years from the final approval of all Approval of Matters Specified in Conditions,
whichever is the later. If the development has not commenced within this period, then
this planning permission in principle shall lapse. 
Reason: To accord with Section 59 of the Town and Country Planning (Scotland) Act
1997 as amended. 
Standard Soil Condition 
Where the development involves ground breaking works, soil management should be
undertaken in compliance with the established best practice set out in the DEFRA
publication “Construction Code of Practice for the Sustainable Use of Soils on
Construction Sites 2009”, unless an alternative methodology for sustainable
management of soil is submitted to and approved in writing by the Planning Authority. 
Reason: In order to ensure that sustainable management of soils and compliance with
the requirements of NPF4 Policy 5A. 
1. PPP - Matters Requiring AMSC Submission 
Plans, survey and other particulars of the matters specified in conditions 5, 6, 7, 8, 9,
10, 11, 12 and 13 below shall be submitted by way of application(s) for Approval of
Matters Specified in Conditions in accordance with the timescales and other limitations
in Section 59 of the Town and Country Planning (Scotland) Act 1997 as amended.
Thereafter the development shall be completed wholly in accordance with the approved
details. 
Reason: To accord with Section 59 of the Town and Country Planning (Scotland) Act
1997 as amended.
Page 41

Page 42

Classification: OFFICIAL 
2. PPP - Approved Details 
The development shall be implemented in accordance with the details specified on the
application form dated 5th October 2020 and the approved drawings listed in the table
below. 
Plan Title Plan Ref. No. Version Date Received
Site location plan and
indicative siting
2019_0057-03 D 13/01/2021 
Reason: To accord with Regulation 28 of the Town and Country Planning
(Development Management Procedure) (Scotland) Regulations 2008. 
3. PPP – Flooding 
The proposed house hereby permitted shall be sited to the west of McAuley Burn on
ground levels of greater than 5.80mAOD (inclusive of a climate change allowance and
free board of 0.6m). 
Reason: To ensure that the proposed house is not at risk of flooding. 
4. PPP – Removal of Permitted Development 
Notwithstanding the provisions of the Town and Country Planning (General Permitted
Development) (Scotland) Order 1992 (as amended), (or any Order revoking and re-
enacting that Order(s) with or without modifications), nothing in Article 2(4) of or the
Schedule to that Order, shall operate so as to permit, within the area subject of this
permission, any development referred to in Part 1 and Classes 3A, 3AA, 3C, 3E and
Part 2 and Class 7 of the aforementioned Schedule, as summarised below:
PART 1: DEVELOPMENT WITHIN THE CURTILAGE OF A DWELLINGHOUSE 
Class 3A: The provision within the curtilage of a dwellinghouse of a building for any
purpose incidental to the enjoyment of that dwellinghouse or the alteration,
maintenance or improvement of such a building.
Class 3AA: The provision within the curtilage of a dwellinghouse of a building for any
purpose incidental to the enjoyment of that dwellinghouse.
Class 3C: The provision within the curtilage of a dwellinghouse of a hard surface for
any purpose incidental to the enjoyment of that dwellinghouse or the replacement in
whole or in part of such a surface.
Class 3E: The erection, construction, maintenance, improvement or alteration of any
gate, fence, wall or other means of enclosure any part of which would be within or
would bound the curtilage of a dwellinghouse.
PART 2: SUNDRY MINOR OPERATIONS
Class 7: The erection, construction, maintenance, improvement or alteration of a gate,
fence, wall or other means of enclosure.
No such development shall be carried out at any time within this Part and these
Classes without the express grant of planning permission.
Page 42

Page 43

Classification: OFFICIAL
Reason: To protect the sensitive area and the setting of the proposed dwellinghouse,
in the interest of visual amenity and flooding, from unsympathetic siting and design of
developments normally carried out without planning permission; these normally being
permitted under Article 2(4) of the Town and Country Planning (General Permitted
Development) (Scotland) Order 1992 (as amended). 
5. PPP - Timescale to be Agreed for Completion 
Pursuant to Condition 1 - no development shall commence until details of the proposed
timescale for completion of the approved development have been submitted to and
approved by the Planning Authority. Thereafter, the development shall be implemented
in accordance with the duly approved timescale for completion unless an alternative
timescale for completion is otherwise agreed in writing with the Planning Authority. 
Reason: In order to comply with the requirements of NPF4 Policy 16F. 
6. PPP - Design and Finishes of Dwellinghouse 
Pursuant to Condition 1 - no development shall commence until plans and particulars
of the site layout including final curtilage of the dwellinghouse, design and external
finishes of the dwellinghouse have been submitted to and approved by the Planning
Authority. These details shall incorporate: 
i. A statement addressing the Action Checklist for developing design
contained within the Argyll and Bute Sustainable Design Guide 2006;
ii. A statement addressing the biodiversity surveys and how they have
been taken into account in terms of siting/design;
iii. Details of finished ground floor level of the development relative to an
identifiable fixed datum located outwith the application site, along with
details of the existing and proposed site levels shown in the form of
sectional drawings/contour plans/site level survey, or a combination of
these;
iv. Details of an area within the application site for the placement of
refuse/recycling bins and EV charge point; 
v. Details of the re-defined curtilage of the dwellinghouse taking into
account the topography of the site, the walkover report, any natural
features and the forthcoming tree  survey. 
Reason: To accord with Section 59 of the Town and Country Planning (Scotland) Act
1997 as amended, and in order to integrate the proposed dwellinghouse with its
surroundings. 
7. PPP – Design and Finishes of Public realm works 
Pursuant to Condition 1 - no development shall commence until plans and particulars
of the design and materials of the proposed public realm works have been submitted
to and approved by the Planning Authority. These details shall incorporate:
i. Details of the construction specification for the paths;
ii. Details of any benches and seating;
iii. Details of location and materials to be used in forming the area around
the Memorial;
iv. Details and location of the proposed Memorial. 
The approved Public realm works shall thereafter be fully completed prior to
development commencing on the dwellinghouse plot. 
Page 43

Page 44

Classification: OFFICIAL 
Reason: To accord with Section 59 of the Town and Country Planning (Scotland) Act
1997 as amended, and in order to integrate the public realm works with its
surroundings. 
8. PPP - Roads, Access and Parking 
Pursuant to Condition 1 - no development shall commence until plans and particulars
of the means of vehicular access and parking/turning arrangements to serve the
development have been submitted to and approved by the Planning Authority. Such
details shall incorporate: 
i. Formation of the vehicular access at the junction with the B833 public road in
accordance with the Council's Roads Standard Detail Drawing SD 08/005B
with visibility splays measuring 2.4 metres to point X by 42 metres to point Y
from the centre line of the junction; 
ii. The provision of parking and turning in accordance with the requirements of
Policy 40 and the Car Parking Standards of the adopted 'Argyll and Bute Local
Development Plan 2' 2024; 
iii. The provision of a bin storage area adjacent to the public road. 
Prior to work starting on site, the approved scheme of works in respect of junction
layout shall be formed to at least base course standard and the visibility splays shall
be cleared of all obstructions such that nothing shall disrupt visibility from a point 1.05
metres above the junction at point X to a point 0.6 metres above the public road
carriageway at point Y. The final wearing surface on the access shall be completed
prior to the development first being brought into use and the visibility splays shall be
maintained clear of all obstructions thereafter. The approved parking and turning
layout shall be implemented in full prior to the development first being occupied and
shall thereafter be maintained clear of obstruction for the parking and manoeuvring
of vehicles. 
Reason: In the interests of road safety. 
9. PPP - Sustainable Drainage System 
Pursuant to Condition 1, the development shall incorporate a surface water drainage
system which is consistent with the principles of Sustainable urban Drainage Systems
(SuDS) compliant with the guidance set out in CIRIA's SuDS Manual C753 and the
details shall first submitted and approved in writing with the planning authority. The
requisite surface water drainage shall be operational prior to the development being
brought into use and shall be maintained as such thereafter. 
Reason: To ensure the provision of an adequate surface water drainage system and
to prevent flooding. 
Note to Applicant: Further advice on SuDS can be found in SEPA's Standing Advice
for Small Scale Development - www.sepa.org.uk 
10. PPP – Tree Survey, Retention and Protection 
Pursuant to Condition 1 - no development shall commence until a scheme for the
retention and safeguarding of trees during construction has been submitted to and
approved by the Planning Authority. The scheme shall comprise:
Page 44

Page 45

Classification: OFFICIAL  
i) A survey of trees on, and overhanging, the entire site indicating the
location, species, height, canopy spread and condition of each tree
and specify any trees to be removed due to health or safety reasons;
ii) An assessment of the amenity and nature conservation value of tree
groups and individual trees which shall inform the layout of the
development proposed;
iii) A programme of measures for the protection of trees during
construction works which shall include the positioning of fencing in
accordance with BS 5837:2012 "Trees in Relation to Design,
Demolition and Construction";
iv) Details of additional and replacement tree planting within the site;
v) All trees identified with potential bat roost features should be retained
where possible and if to be removed, then a suitable bat mitigation
scheme shall be submitted and approved in writing with the planning
authority.  
Tree protection measures shall be implemented for the full duration of construction
works in accordance with the duly approved scheme. No trees shall be lopped,
topped or felled other than in accordance with the details of the approved scheme
unless otherwise approved in writing by the Planning Authority.  
Reason: In order to retain trees as part of the development in the interests of amenity
and nature conservation. 
11. PPP - Landscaping and Biodiversity Enhancement (Dwellinghouse plot) 
Pursuant to Condition 1 - no development shall commence until a scheme of
boundary treatment, surface treatment and landscaping for the curtilage of the
dwelling has been submitted to and approved by the Planning Authority. The scheme
shall comprise a planting plan and schedule which shall include details of: 
i. Existing and proposed ground levels in relation to an identified fixed datum;
ii. Existing landscaping features and vegetation to be retained; 
iii. Location design and materials of proposed walls, fences and gates;
iv. Proposed soft and hard landscaping works including the location, species and
size of every tree/shrub to be planted; 
v. A biodiversity statement demonstrating how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these benefits
will be maintained for the lifetime of the development; 
vi. A programme for the timing, method of implementation, completion and
subsequent maintenance. 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme unless otherwise approved in writing by the Planning Authority.
Any trees/shrubs which within a period of five years from the completion of the
approved landscaping scheme fail to become established, die, become seriously
diseased, or are removed or damaged shall be replaced in the following planting
season with equivalent numbers, sizes and species as those originally required to be
planted unless otherwise approved in writing by the Planning Authority. All physical
biodiversity enhancement measures (bird nesting boxes, 'swift bricks', wildlife ponds,
bat and insect boxes, hedgehog homes etc.) shall be implemented in full before the
dwelling house hereby approved is first brought into use. All biodiversity
enhancement measures consisting of new or enhanced planting shall be undertaken
either in accordance with the approved scheme of implementation or within the next
Page 45

Page 46

Classification: OFFICIAL
available planting season following the development first being brought into use. The
biodiversity statement should refer to Developing with Nature guidance | NatureScot
as appropriate. 
Reason: To assist with the integration of the proposal with its surroundings in the
interests of amenity. 
12. PPP - Landscaping and Biodiversity Enhancement (Public realm works) 
Pursuant to Condition 1 - no development shall commence until a scheme of
boundary treatment, surface treatment and landscaping for the public realm works
has been submitted to and approved by the Planning Authority. The scheme shall
comprise a planting plan and schedule which shall include details of: 
i. Existing and proposed ground levels in relation to an identified fixed datum;
ii. Existing landscaping features and vegetation to be retained; 
iii. Location design and materials of proposed walls, fences and gates;
iv. Proposed soft and hard landscaping works including the location, species and
size of every tree/shrub to be planted; 
v. Details of how the scheme will contribute to
conservation/restoration/enhancement of biodiversity, and how these benefits
will be maintained for the lifetime of the development; 
vi. A programme for the timing, method of implementation, completion and
subsequent ongoing maintenance;
vii. Location of bat / bird / red squirrel boxes, retention of log piles;
viii. Location and species of woodland meadow mix, timings of planting and
programme of ongoing monitoring and management;
ix. Location and species of bee, bird and butterfly meadow mix, timings of
planting and programme of ongoing monitoring and management;
x. Location and species of hedging mix, timings of planting and programme of
ongoing monitoring and management;
xi. Throughout the construction period the applicant is required to consult with
an appropriate expert on the removal of the Invasive Non-Native Species
(INNS) on site to ensure it is removed appropriately and with minimal impact
on the surrounding environment. 
All of the hard and soft landscaping works and biodiversity enhancement measures
shall be carried out in accordance with the approved scheme unless otherwise
approved in writing by the Planning Authority prior to works beginning on the
dwellinghouse (part of this decision). Any trees/shrubs which within a period of five
years from the completion of the approved landscaping scheme fail to become
established, die, become seriously diseased, or are removed or damaged shall be
replaced in the following planting season with equivalent numbers, sizes and species
as those originally required to be planted unless otherwise approved in writing by the
Planning Authority. The biodiversity statement should refer to Developing with Nature
guidance | NatureScot as appropriate. 
Reason: To assist with the integration of the proposal with its surroundings in the
interests of amenity. 
13. PPP - Construction Environmental Management Plan (Public realm works) 
Page 46

Page 47

Classification: OFFICIAL
Pursuant to Condition 1 – no development shall commence until a Construction
Environmental Management Plan (CEMP) has been submitted to and agreed in
writing by the Local Planning Authority. The approved plan shall be fully adhered to
throughout the construction period, and shall provide, amongst other things, for: 
i. The CEMP shall include the appropriate mitigation measures as
recommended within the Protected Species Walkover Report;
ii. Pollution prevention measures;
iii. Identification of any sources of dust and assessing the impacts on those living
nearby and incorporation of suitable measures for controlling dust;
iv. Measures for preventing spills;
v. Temporary lighting details;
vi. Specifications and a timetable of works for the construction phase of the
development;
vii. Staff training as induction for work on site including a Toolbox Talk detailing
the potential for protected species and how harm is to be avoided should
these be encountered;
viii. Measures to avoid entrapment or harm to mammals;
ix. Pollution prevention measures including management of plant, materials,
chemicals and fuels, and washing/storage arrangements;
x. Measures to prevent light spillage to surrounding spaces in particular
woodland and rivers;
xi. The parking of vehicles of site operatives and visitors;
xii. Loading and unloading of plant and materials;
xiii. The erection and maintenance of any security hoarding/fencing;
xiv. Details of minimising the impact of noise-generating works on nearby
residential properties - best practicable means for the mitigation of noise and
vibration, as per BS 5228-1 and 2:2009+A1:2014, must be identified;
xv. A pre-works inspection by a licensed bat ecologist to confirm the absence of
bats immediately before construction begins;
xvi. The use of low-impact methods of construction, such as hand tools near
potential bat roost features, to reduce disturbance;
xvii. Scheduling of work within non-sensitive periods in relation to bats (late
November until March).  
The submitted details shall have regard to SEPA's Guidelines for Pollution Prevention
5: Works and maintenance in or near water and current guidance from the Institute
of Lighting Professionals regarding the reduction of obtrusive light.  
Reason: In the interests of biodiversity and in the interests of residential amenity. 
14. PPP - Ecological Clerk of Works (Public realm works) 
Throughout the construction of the public realm works, an appropriately qualified
‘Ecological Clerk of Works’ (ECOW) shall be available to direct the micro-siting of the
paths, benches and memorial, to ensure that sensitive features are avoided, and that
habitat enhancement works and all mitigation and restoration measures are fully
implemented. The ECOW shall liaise with Councils Biodiversity Officer and the role of
the ECOW shall be clearly conveyed to all personnel prior to their commencement of
work on the site. 
Reason: In the interests of nature conservation. 
Page 47

Page 48

Classification: OFFICIAL 
Draft Informatives 
In order to comply with Sections 27A(1) of the Town and Country Planning (Scotland) Act
1997, prior to works commencing on site it is the responsibility of the developer to complete
and submit the following ‘Notice of Initiation of Development’ form to the Planning Authority
specifying the date on which the development will start. Failure to comply with this requirement
constitutes a breach of planning control under Section 123(1) of the Act. 4. 
In order to comply with Section 27B(1) of the Town and Country Planning (Scotland) Act 1997
it is the responsibility of the developer to submit the attached ‘Notice of Completion’ to the
Planning Authority specifying the date upon which the development was completed 