Democracy Spraffa

Agenda reports pack

Argyll and Bute Council · 8 September 2025
Back to Argyll and Bute Local Review Body — 8 September 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 605522
DX 599700 LOCHGILPHEAD 
1 September 2025 
NOTICE OF MEETING 
A meeting of the ARGYLL AND BUTE LOCAL REVIEW BODY will be held BY MICROSOFT
TEAMS on MONDAY, 8 SEPTEMBER 2025 at 9:00 AM, which you are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. CONSIDER NOTICE OF REVIEW REQUEST: LAND SOUTH EAST OF
ELDERSLIE, OBAN, ARGYLL, PA34 4SB (REF: 25/0008/LRB) 
(a) Notice of Review and Supporting Documentation (Pages 3 - 22)  
(b) Comments from Interested Parties   
• Planning (Pages 23 – 48)
• SEPA (Pages 49 – 62) 
Argyll and Bute Local Review Body 
Councillor Gordon Blair (Chair) Councillor Jan Brown
Councillor Fiona Howard 
Contact: Fiona McCallum Tel: 01546 604392
Public Document Pack

Page 2

This page is intentionally left blank

Page 3

Page 1 of 4
Central Validation Team at Argyll and Bute Council 1A Manse Brae Lochgilphead PA31 8RD  Tel: 01546 605518  Email:
planning.hq@argyll-bute.gov.uk
Applications cannot be validated until all the necessary documentation has been submitted and the required fee has been paid.
Thank you for completing this application form:
ONLINE REFERENCE 100165505-007
The online reference is the unique reference for your online form only. The  Planning Authority will allocate an Application Number when
your form is validated. Please quote this reference if you need to contact the planning Authority about this application.
Applicant or Agent Details
Are you an applicant or an agent? * (An agent is an architect, consultant or someone else acting
on behalf of the applicant in connection with this application)  Applicant  Agent
Applicant Details
Please enter Applicant details
Title: You must enter a Building Name or Number, or both: *
Other Title: Building Name:
First Name: * Building Number:
Address 1
Last Name: * (Street): *
Company/Organisation Address 2:
Telephone Number: * Town/City: *
Extension Number: Country: *
Mobile Number: Postcode: *
Fax Number:
Email Address: *
Mr
Graham
MacEachen Pulpit Hill
Aros Ard
PA34 4LX
United Kingdom
Oban
Point Five Building Design
Page 3 Agenda Item 3a

Page 4

Page 2 of 4
Site Address Details
Planning Authority:
Full postal address of the site (including postcode where available):
Address 1:
Address 2:
Address 3:
Address 4:
Address 5:
Town/City/Settlement:
Post Code:
Please identify/describe the location of the site or sites
Northing Easting
Description of Proposal
Please provide a description of your proposal to which your review relates. The description should be the same as given in the
application form, or as amended with the agreement of the planning authority: *
(Max 500 characters)
Type of Application
What type of application did you submit to the planning authority? *
  Application for planning permission (including householder application but excluding application to work minerals).
  Application for planning permission in principle.
  Further application.
  Application for approval of matters specified in conditions.
Renewal of permission in principle for 2 dwellings
Argyll and Bute Council
728334 185811
Land South East of Elderslie, Oban, Argyll, Pa34 4SB
Page 4

Page 5

Page 3 of 4
What does your review relate to? *
  Refusal Notice.
 Grant of permission with Conditions imposed.
  No decision reached within the prescribed period (two months after validation date or any agreed extension) – deemed refusal.
Statement of reasons for seeking review
You must state in full, why you are a seeking a review of the planning authority’s decision (or failure to make a decision). Your statement
must set out all matters you consider require  to be taken into account in determining your review. If necessary this can be provided as a
separate document in the ‘Supporting Documents’ section: *  (Max 500 characters)
Note: you are unlikely to have a further opportunity to add to your statement of appeal at a later date, so it is essential that you produce
all of the information you want the decision-maker to take into account.
You should not however raise any new matter which was not before the planning authority at the time it decided your application (or at
the time expiry of the period of determination), unless you can demonstrate that the new matter could not have been raised before that
time or that it not being raised before that time is a consequence of exceptional circumstances.
Have you raised any matters which were not before the appointed officer  at the time the  Yes   No
Determination on your application was made? *
If yes, you should explain in the box below, why you are raising the new matter, why it was not raised with the appointed officer before
your application was determined and why you consider it should be considered in your review: * (Max 500 characters)
Please provide a list of all supporting documents, materials and evidence which you wish to submit with your notice of review and intend
to rely on in support of your review. You can attach these documents electronically later in the process: * (Max 500 characters)
Application Details
Please provide the application reference no. given to you by your planning
authority for your previous application.
What date was the application submitted to the planning authority? *
What date was the decision issued by the planning authority? *
The planning officer's handling of this renewal is unreasonably poor and the decision made contradicts planning legislation and
common sense.
Review statement.
24/01069/PPP
29/04/2025
10/06/2024
Page 5

Page 6

Page 4 of 4
Review Procedure
The Local Review Body will decide on the procedure to be used to determine your review and may at any time during the review
process require that further information or representations be made to enable them to determine the review. Further information may be
required by one or a combination of procedures, such as: written submissions; the holding of one or more hearing sessions and/or
inspecting the land which is the subject of the review case.
Can this review continue to a conclusion, in your opinion, based on a review of the relevant information provided by yourself and other
parties only,  without any further procedures? For example, written submission, hearing session, site inspection. *
 Yes   No
Please indicate what procedure (or combination of procedures) you think is most appropriate for the handling of your review. You may
select more than one option if you wish the review to be a combination of procedures.
Please select a further procedure *
Please explain in detail in your own words why this further procedure is required and the matters set out in your statement of appeal it
will deal with?  (Max 500 characters)
In the event that the Local Review Body appointed to consider your application decides to inspect the site, in your opinion:
Can the site be clearly seen from a road or public land? *  Yes   No
Is it possible for the site to be accessed safely and without barriers to entry? *  Yes    No
Checklist – Application for Notice of Review
Please complete the following checklist to make sure  you have provided all the necessary information in support of your appeal. Failure
to submit all this  information may result in your appeal  being deemed invalid.
Have you provided the name and address of the applicant?.  *  Yes   No
Have you provided the date and reference number of the application which is the subject of this  Yes   No
review? *
If you are the agent, acting on behalf of the applicant, have you provided details of your name  Yes   No   N/A
and address and indicated whether any notice or correspondence required in connection with the
review should be sent to you or the applicant? *
Have you provided a statement setting out your reasons for requiring a review and by what  Yes   No
procedure (or combination of procedures) you wish the review to be conducted? *
Note: You must state, in full, why you are seeking a review on your application. Your statement must set out all matters you consider
require to be taken into account in determining your review. You may not have a further opportunity to add to your statement of review
at a later date. It is therefore essential that you submit with your notice of review, all necessary information and evidence that you rely
on and wish the Local Review Body to consider as part of your review.
Please attach a copy of all documents, material and evidence which you intend to rely on  Yes   No
(e.g. plans and Drawings) which are now the subject of this review *
Note: Where the review relates to a further application e.g. renewal of planning permission or modification, variation or removal of a
planning condition or where it relates to an application for approval of matters specified in conditions, it is advisable to provide the
application reference number, approved plans and decision notice (if any) from the earlier consent.
Declare – Notice of Review
I/We the applicant/agent certify that this is an application for review on the grounds stated.
Declaration Name: Mr Graham MacEachen
Declaration Date: 28/07/2025
By means of inspection of the land to which the review relates
SEPA submitted a holding objection because they did not have adequate understanding of the topography of the site.  The
planning officer has failed to apply her local knowledge of this site and or relevant legislation, it is therefor appropriate for the
councillors to see and understand the nature of the site.    Should the councillors agree that this permission should be renewed
without the need for a site visit then the visit can be forgone.
Page 6

Page 7

Request for review for the renewal of planning in principle for two dwellings granted by the DPEA on
5th August 2021 and subsequently refused renewal by the Argyll and Bute planning officer on 29th
April 2025. 
The site is on a hill with a fall of approximately 6m across a site which is approximately 30m across. 
The site and the neighbouring land is steep and the falls are clear to see.  One boundary of the site is
marked by a tributary which is just around 30cm in full flow but o+en runs dry.  This burn is shown
on maps. The site has no history of flooding, or near flooding and the steep gradient of the site and
surrounding area probably precludes the possibility of the site flooding. 
JBA Consulng were appointed to carry out the “Flood Risk Management- Observa3ons on Planning
Applica3on”.  They raised no objec3on to the original planning applica3on and for the renewal they
provided a more detailed response.  This response said that “The site lies out with the indica3ve
limits of coastal and surface water flooding as per the SEPA Future Flood Maps. The fluvial flood
extent overlies with a small sec3on of the access road,”.  The report goes on to say that the culvert
under the access road “is understood to have capacity for the 1 in 200-year with climate change
flood event” which is the acceptable standard. 
Naonal Planning Framework 4 (NPF4) States that: “For planning purposes, at risk of flooding or in a
flood risk area means land or built form with an annual probability of being flooded of greater than
0.5% which must include an appropriate allowance for future climate change…Where the risk of
flooding is less than this threshold, areas will not be considered ‘at risk of flooding “.
As indicated by the flood risk maps and further supported by the JBA Consul3ng’s report, any risk on
this site is below this threshold and this site should be not be considered as ‘at risk of flooding’. 
SEPA guidance indicates that planning authori3es should only consult SEPA where developments
reach the threshold in their “Triage Framework”.  As this site is not considered a flood risk according
to NPF4, it does not meet the threshold for SEPA consulta3on.  Furthermore, included in this Triage
Framework is specific guidance:
“For developments where the only poten3al source of flood risk is from a small watercourse (which
may not be shown in SEPA’s flood maps)” SEPA request that the flood risk should be assessed by the
local authority.  In this instance the local authority have outsourced this assessment to JBA
Consul3ng who have not indicated that a further assessment by SEPA is required. 
The planning officer Fiona ScoD,  In spite of all the informa3on above has created the statement “the
site being within an area at risk of fluvial flooding”, and included this statement within the report of
handling, which indicates a clear disregard for the legisla3on.  When asked by the applicant to jus3fy
the decision to request a SEPA consulta3on, Fiona ScoD responded that  “since permission was first
granted for the site, the flooding maps have been updated which necessitated the consulta3ons with
SEPA”.  This doesn’t seem to make any sense, given that the flood maps show the site not to be at
risk. 
The Problem with the SEPA consulta3on is that they are not a local body, they have no local
knowledge and can’t simply visit the site to get a quick look at the general topography.  So now that
they have been asked to consult, they have requested a package of drawings to help them
understand from their office what can be clearly appreciated on site.  This will require a full
topographical survey and an associated drawing package which will incur bills for professional fees
running into the thousands.  This is a price which the applicant should not have to pay, especially
when SEPA have included the caveat that this may not sa3sfy their needs and they may request a full
flood risk assessment which will cost even more.  Applicants should not be put in the posi3on of
having to spend thousands of pounds on professional fees or reports only to sa3sfy the whim of
Page 7

Page 8

planning officers.  This prac3ce has gone on in this area too much and building is now restricted to
only those people wealthy enough to spend thousands of pounds on this type of nonsense. 
Furthermore, it is completely contradictory to the planning legisla3on which states “Any
requirements for addi3onal informa3on … should be propor3onate and clearly scoped to avoid
unnecessary costs to applicants and public bodies.” 
The previous applicaon (granted by the DPEA), had a similar issue.  The same planning officer
recommended that the applica3on be refused because she would not acknowledge that a survey of a
bridge accessing the site could be done a+er planning in principle was granted.  In the planning
hearing she even advised that the mo3on to include this survey as a suspensive condi3on was not a
competent mo3on and this denied the elected councillors the chance to vote on this mo3on. 
Subsequently, the DPEA concluded that her advice was wrong and they included this condi3on
within their gran3ng of permission.  
(Contrary to Fiona ScoD’s report of handling, this survey was conducted and submiDed to the council.) 
A neighbouring site was also refused permission by Fiona ScoD, only to be overturned by the elected
councillors at review. 
It is unclear if Fiona ScoD holds some special interest in this area or if there is some reason why she
has aDempted to obstruct these developments, but it has been proven in two cases already that her
advice does not stand up to the scru3ny of a review or of an appeal.  In this case she states that: 
-SEPA are a statutory consultee who must be consulted, but the evidence above indicates that she is
not correct.  
-SEPA’s requirements must be addressed. The holding objec3on by SEPA should be considered
alongside any other objec3on.  Any points raised should be considered but they do not prevent the
gran3ng of planning permission.   
In this instance, SEPA have a lack of knowledge on the site and JBA Consul3ng have provided a
detailed assessment.  This site is not a flood risk so Fiona ScoD’s decision should be overturned and
this planning permission should be renewed. 
Page 8

Page 9

Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a 
Planning and Environmental Appeals Division
Appeal Decision Notice
T: 0300 244 6668
E: dpea@gov.scot
 
Decision 
I allow the appeal and grant planning permission in principle subject to the nine conditions
listed at the end of the decision notice. 
Attention is drawn to the two advisory notes at the end of the notice. 
The appellant has made a claim for expenses.  I have issued a separate decision on this
claim. 
Reasoning 
1. I am required to determine this appeal in accordance with the development plan,
unless material considerations indicate otherwise.  Having regard to the provisions of the
development plan the main issues in this appeal are the principle of development, access
arrangements, design/layout and effect on the natural and built environment. 
2. As there is a listed building adjacent to the appeal site section 59 of the Planning
(Listed Buildings and Conservation Areas) (Scotland) Act 1997 applies and states that in
considering whether to grant planning permission for development which affects a listed
building or its setting, special regard should be had to the desirability of preserving the
building or its setting or any features of special architectural or historic interest which it
possesses. 
3. Parties make reference to the adopted Argyll and Bute Local Development
Plan (2015) and related supplementary guidance.  My attention has also been brought to
the guidance in Transport Scotland’s Design Manual for Roads and Bridges (DMRB), the 
Decision by Gordon S Reid, a Reporter appointed by the Scottish Ministers 
 Planning appeal reference: PPA-130-2077
 Site address: land south east of Elderslie, Oban, PA34 4SA
 Appeal by G MacEachen against the decision by Argyll and Bute Council
 Application for planning permission in principle 19/02562/PPP dated 9 December 2019
refused by notice dated 24 August 2020
 The development proposed: site for the erection of two dwellinghouses
 Application drawings: Location Plan (PR003a-L01b), Site Plan (PR003a-L02b) and
Proposed Footpath (PR003a-L03)
 Date of site visit by Reporter: 7 May 2021 
Date of appeal decision:  05 August 2021
Page 9

Page 10

PPA-130-2077
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a 
2
council’s non-statutory Sustainable Design Guidance (2006) and Small Housing
Developments (2008) and, the appellant’s Road Assessment document. 
4. The appeal site is located to the south-west of the A816 (Soroba Road) and is
accessed from a private road which serves Soroba House Hotel and Mews, Elderslie B&B
and several residential properties.  The private road to the appeal site also forms part of the
core path network and is a link pedestrian/cycle path to the local primary school campus. 
The appeal site is a sloping area of overgrown ground with some shrubs and a single
mature tree.  A layout drawing is submitted for illustrative purposes demonstrating that the
appeal site could accommodate two houses.  A further illustrative drawing sets out the
location of the proposed footway adjacent to the existing bridge/culvert. 
Principle of development 
5. Local development plan policy LDP DM 1 (Development within the Development
Management Zones) sets out the acceptable scale of new development within seven
defined development management zones.  I note that the appeal site is located within the
Oban management zone where encouragement is given to various scales of development
on appropriate sites subject to compliance with other relevant policies and related
supplementary guidance. 
6. In terms of proposals for new housing local development plan policy LDP 8
(Supporting the Strength of Our Communities) recognises the need to ensure that existing
communities are strengthened through the delivery of new sustainable development
opportunities.  In support of this policy, supplementary guidance LDP HOU 1 (General
Housing Development including Affordable Housing) sets out a general presumption in
favour of housing development of the appropriate scale within the defined management
zones unless there is an unacceptable environmental, servicing or access impact.  I note
that the council, in its report of handling, concluded that, given the location of the appeal
site (within the Oban management zone), it had the potential to accommodate two suitably
sited and designed houses. 
7. As the appeal proposal is small scale (less than 5) and is within the Oban
management zone I am satisfied that it would, in principle, gain support from the
presumption in favour of new housing development subject to meeting the requirements of
LDP HOU 1 in relation to the environment and access.  No issues in terms of servicing the
appeal site were raised by the council. 
Parking and Access 
8. The main issue of concern raised by the council relates to whether a satisfactory
means of access can be achieved for the appeal proposal.  Local development plan policy
LDP 11 (Improving Our Connectivity and Infrastructure) seeks to ensure that in supporting
development proposals, best use is made of existing infrastructure and an appropriate
standard of access is delivered to serve new developments including an appropriate level of
car parking.  Further detail for the delivery of these requirements is set out in
supplementary guidance LDP TRAN 4 (New and Existing, Public Roads and Private access
Regimes) and LDP TRAN 6 (Vehicle Parking Provision). 
Page 10

Page 11

PPA-130-2077
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a 
3
9. I note from the illustrative layout that provision for car parking and turning is to be
accommodated within each site.  I am satisfied, given the size of each plot that there would
be sufficient space available to provide the required level of car parking which can be
secured through the imposition of a condition.  Therefore, I find that the appeal proposal,
subject to a condition, would accord with the provisions of supplementary guidance
LDP TRAN 6. 
10. The appeal site is to be accessed from the existing private road, which joins Soroba
Road (A816) to the north east of the appeal site.  Supplementary guidance LDP TRAN 4
advises in Criterion (A) that in the first instance new developments should be served by a
public road.  However, where it is proposed to utilise an existing private road criterion 2(i)
advises that the access should be capable of commensurate improvements considered by
the council to be appropriate to the scale and nature of the new development taking into
account any current access issues. 
11. The appeal proposal would result in the increased use of an existing private road
which also performs the function as a primary school link path/cycle path and, is part of the
core path network.  Therefore, the council in line with criterion 2(i) requested that a safety
audit, risk assessment and traffic management plan be submitted to assess the potential
impact (including during the construction phase) of the appeal proposal and to identify any
necessary mitigation measures.  The appellant submitted a Road Assessment Report
covering each of the areas specified by the council.  I note that the council in its report of
handling advises that it found the appellant’s assessment and mitigation measures to be
acceptable.  I would agree with this conclusion and find that subject to the implementation
of the mitigation measures there would be no adverse impact on pedestrian or vehicle
safety. 
12. Notwithstanding the acceptance of the appellant’s road assessment the council, in
line with criterion (A) of LDP TRAN 4, requires that a short section of the private road at the
existing bridge/culvert (which serves all of the existing properties) be brought up to an
adoptable standard.  The appellant advises that this matter was raised by the council prior
to the submission of the appeal proposal for planning permission in principle and resulted in
the inclusion of the proposed footway and the site boundary being amended to include this
part of the private road.  In addition, the council also requires a turning head to be provided
in the area to the south of the bridge/culvert.  I note that despite including the requirements
recommended by the council the appellant questions the need for the road to be adopted. 
However, no objection has been raised by the appellant to the provision of a turning head
subject to agreeing its exact location. 
13. I note that supplementary guidance LDP TRAN 4 advises that new private roads
should only be used for up to five dwellings.  However, as highlighted by the appellant it is
evident that the current number of properties served by the private road already significantly
exceeds this level (17 properties).  No evidence has been provided by the council to explain
why the existing private road has not been brought up to an adoptable standard in the
course of determining past developments in the area.  Notwithstanding this, I am satisfied
that given the number of properties that this section of the road now serves, and that it is
also a primary school link/cycle path it is not unreasonable for the council to seek to bring
this section of the road up to an adoptable standard.  I find that this would be in accordance
with criteria (A) of LDP TRAN 4. 
Page 11

Page 12

PPA-130-2077
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a 
4
14. In order to bring the private road up to a standard suitable for adoption the council
contends that a structural survey of the bridge/culvert in accordance with the requirements
of DMRB is required.  I note that the appellant disputes the need for a structural survey and
contends that the bridge/culvert is to an appropriate standard to accommodate the likely
traffic generated by the appeal proposal.  Although I note that the council carried out a
visual inspection of the bridge/culvert I have no substantive technical evidence before me to
demonstrate that the bridge could accommodate the likely additional vehicle movements. 
Accordingly, I am satisfied that the council’s requirement for a structural survey is in
accordance with the recognised national guidance (DMRB) for the adoption of a road that
includes a bridge/culvert and that it is required in support of the appeal proposal to allow the
adoption of the private road. 
15. The council contends that as the structural integrity of the bridge/culvert is
fundamental in demonstrating that a satisfactory access can be achieved and to the
standard that allows it to be considered for adoption the use of a suspensive condition is
not appropriate.  The appellant argues that as this is technical information which is similar
to other matters associated with the appeal proposal that require the submission of further
details, it is appropriate to address this through the imposition of a suspensive condition. 
16. Whilst I agree with the council’s position regarding the requirement to bring the road
up to an adoptable standard I am not convinced that the use of a suspensive condition is
inappropriate in this particular case.  The council has already accepted that there would be
no pedestrian or vehicular issues with the access as a result of the proposed development.   
In addition, the appellant on the advice of the council, amended the site boundary to include
this section of the road within the appeal site and the area for the provision of a new
footway, and I note that the appellant has control of the land (through an ownership
interest) at this section of road and the adjacent land immediately to the east.  Therefore,
any potential improvement identified by the survey could be implemented within the appeal
site or on land in control of the appellant.  Finally, as this appeal proposal is for planning
permission in principle there are other detailed and technical matters that would be required
to be covered by suspensive conditions. 
17. Therefore, given the bridge/culvert is within the appeal site I am satisfied that the use
of a suspensive condition requiring the carrying out of a structural survey is appropriate in
this instance.  Furthermore, if further physical works outwith the appeal site are required the
appellant has control over adjacent land that would allow these to be undertaken. 
18. Therefore, I find that subject to the imposition of appropriately worded conditions the
appeal proposal would accord with the requirements of supplementary guidance LDP policy
TRAN 4, policy LDP 11 and supplementary guidance LDP HOU 1.   
Design/layout 
19. From the illustrative layout provided by the appellant I am satisfied that the appeal
site could accommodate two houses.  I note that the council also came to this conclusion in
its report of handling.  However, to ensure that the appeal proposal would accord with the
provisions of policy LDP 9 (Development Setting, Layout and Design) and SG2
(Sustainable Siting and Design Principles) the details of design and layout would require to
be subject to future applications for the approval of matters specified in conditions.  As I am
minded to uphold this appeal I have attached conditions covering these matters.
Page 12

Page 13

PPA-130-2077
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a 
5
Natural and Built Environment 
20. The appeal site is located approximately 25 metres to the south west of Soroba
House Hotel which is a category C listed building.  In addition, there is an area of ancient
woodland further to the south-east.  Local development plan policy LDP 3 (Supporting the
Protection, Conservation and Enhancement of our Environment) seeks to ensure that new
developments do not adversely impact on the natural, human and built form.  I noted at my
site inspection that the appeal site is located to the south-west of the principle elevation of
Soroba House Hotel and given the topography of the area sits at a much lower level with
mature landscaping along the adjoining boundary.  Furthermore, I noted that new
residential development (Soroba Mews) has been developed immediately to the east of the
hotel.  Given the location of the appeal site relative to Soroba House I am satisfied that
subject to appropriate siting, design, finishing materials and landscaping the appeal
proposal would not adversely affect the setting of the listed building.  In addition, I note that
Historic Environment Scotland and the council raised no concerns in relation to the impact
on the setting of the listed building. 
21. In terms of the effect on existing woodland I established at my site inspection that
there was only one mature tree within the appeal site which is located at the south-west
boundary.  Given its position this tree could be accommodated within the site without
adversely affecting the layout of the appeal proposal.  I am satisfied that no other mature
trees or woodland would be adversely affected by the appeal proposal.  However, I agree
with the council that given there are mature trees in the surrounding area a condition be
attached requiring a detailed landscaping plan including boundary treatments to ensure that
the appeal proposal is appropriately accommodated within the wider landscape setting. 
22. Accordingly, subject to conditions I find that the appeal proposal accords with the
provisions of policy LDP 3, supplementary guidance LDP ENV 16(a) (Development Impact
on Listed Buildings), Section 59 of the Planning (Listed Building and Conservation Area)
(Scotland) Act 1997, supplementary guidance LDP ENV 6 (Development Impact on
Trees/Woodland), supplementary guidance LDP ENV 14 (Landscape) and supplementary
guidance LDP HOU 1. 
23. Overall, I am satisfied that subject to conditions the principle of residential
development for two houses at the appeal site would accord with the relevant policies of the
local development plan and the related supplementary guidance. 
Other matters 
24. Apart from the matters raised by the council’s roads service no objections were
raised by any of the consultees subject to the imposition of conditions relating to flood risk,
drainage and finished floor levels.  The council has provided me with conditions to address
each of these matters.  I note that the appellant raises concerns that the proposed
conditions in relation to design are overly restrictive and contends that these would be more
appropriately addressed at the detailed design stage.  In light of these concerns I have
made some minor amendments to the council’s proposed conditions to allow for the further
consideration of these matters by parties.  The revised conditions are attached at the end of
the decision notice. 
Page 13

Page 14

PPA-130-2077
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a 
6
25. The appeal proposal attracted 18 letters of representation raising concerns regarding
the impact of the proposed development in terms of over development of the area, traffic
and pedestrian safety, parking, drainage, flooding and the condition and structural integrity
of the existing bridge.  I have taken full account of these concerns in my considerations as
set out above.  Reference was also made in the representations to previous applications at
the appeal site, but I note that these applications were withdrawn prior to determination by
the council and, therefore, I find that they are not relevant to the current appeal case. 
26. The appellant makes reference to other planning applications approved by the
council within the council area that have included the use of private roads.  Whilst I note
these matters I am unaware of the circumstances of these particular planning applications
and in any case I must determine the appeal case before me on its own merits. 
Conclusion 
27. I therefore conclude, for the reasons set out above, that the appeal proposal, subject
to conditions, accords overall with the relevant provisions of the development plan and that
there are no material considerations which would justify refusing to grant planning
permission.  I have considered all the other matters raised, but there are none which would
lead me to alter my conclusions. 
Gordon S Reid
Reporter 
Conditions 
1. Plans and particulars of the matters specified in conditions 3, 4, 5, 6, 7, 8 and 9 below
shall be submitted by way of application(s) for Approval of Matters Specified in Conditions
in accordance with the timescales and other limitations in Section 59 of the Town and
Country Planning (Scotland) Act 1997 as amended.  Thereafter, the development shall be
completed wholly in accordance with the approved details. 
Reason: In accordance with Section 59 of the Town and Country Planning (Scotland)
Act 1997 (as amended). 
2. The development shall be implemented in accordance with the details specified on the
application form for planning permission in principle reference 19/02562/PPP
dated 15/05/19 and the approved drawing reference numbers as follows: Location Plan
PR003a-L01b, Site Plan PR003a-L02b and Proposed Footpath PR003a-L03. 
Reason: To accord with Regulation 28 of the Town and Country Planning (Development
Management Procedure) (Scotland) Regulations 2008. 
3. Pursuant to Condition 1. – No development shall commence until details of the required
improvements to the service road and connection with the existing public road have been
submitted to and approved by the planning authority.  Such details shall incorporate: 
i) A vehicular access layout providing a road from the junction with the U128, Soroba Hill
Road, extending for 33 metres or thereabouts (including bridge/culvert) in a southerly
Page 14

Page 15

PPA-130-2077
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a 
7
direction, to the Soroba House Hotel/Soroba Lodge junction on the private track, over which
the public has a right of access in terms of the Roads (Scotland) Act 1984. 
ii) The junction with the existing public road improved to provide visibility splays of 2.4
metres to point X by 42 metres to point Y formed from the centre line of the junction. 
iii) A turning head for the public service vehicle to be located to the south of the bridge,
opposite the Soroba House Hotel/Soroba Lodge junction. 
Prior to work starting on site, the junction with the existing public road shall be fully formed
and surfaced and the visibility splays shall be cleared of all obstructions such that nothing
shall disrupt visibility from a point 1.05 metres above the junction at point X to a
point 0.6 metres above the public road carriageway at point Y. The visibility splays shall be
maintained clear of all obstructions thereafter. 
All access roads and footways granted consent shall be constructed to at least base course
level prior to any work starting on the erection of the buildings which they are intended to
serve and the final wearing surface of the roads and footways shall be applied concurrently
with the construction of the final building. 
Reason: In the interests of road safety and to ensure the timely provision of a service road
commensurate to the scale of the overall development and having regard to the status of
the proposed access as a residential service road. 
4. Pursuant to Condition 1 – no development shall commence until plans and particulars of
the parking/turning arrangements to serve the development have been submitted to and
approved by the planning authority. Such details shall incorporate: 
i) The provision of parking and turning in accordance with the requirements of Policy SG
LDP TRAN 6 of the adopted ‘Argyll and Bute Local Development Plan’ 2015.  The approved
parking and turning layout shall be implemented in full prior to the development first being
occupied and shall thereafter be maintained clear of obstruction for the parking and
manoeuvring of vehicles. 
Reason: In the interests of road safety. 
5. Pursuant to Condition 1 – no development shall commence until a detailed structural
survey of the existing bridge/culvert has been submitted to and approved in writing by the
planning authority in consultation with the Council’s structures team.  The required survey
shall be prepared by a qualified structural engineer and shall be sufficient to certify that the
existing bridge/culvert is able to safely accommodate up to 44 gross metric tonnes multi
axle heavy goods vehicles. Or, should such certification not be demonstrated provide a
detailed written schedule and specification of the works necessary to improve or replace the
existing bridge/culvert in order that it will accommodate vehicles of the type and weight
specified in above. 
Any improvement/rebuilding/replacement works agreed by virtue of the above requirements
must be fully completed to the satisfaction of the planning authority in consultation with the
Council’s structures team before any other part of the development commences. 
Page 15

Page 16

PPA-130-2077
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a 
8
Reason: In the interests of road safety. 
6. Pursuant to Condition 1 – no development shall commence until details of the proposed
means of private foul drainage to serve the development have been submitted to and
approved by the planning authority.  The duly approved scheme shall be implemented in full
concurrently with the development that it is intended to serve and shall be operational prior
to the occupation of the development. 
Reason: To ensure that an adequate means of foul drainage is available to serve the
development. 
7. Notwithstanding the provisions of Condition 2, the development shall incorporate a
surface water drainage system which is consistent with the principles of sustainable urban
drainage systems (SuDS) compliant with the guidance set out in CIRIA’s SuDS
Manual C753.  The requisite surface water drainage shall be operational prior to the
development being brought into use and shall be maintained as such thereafter. 
Reason: To ensure the provision of an adequate surface water drainage system and to
prevent flooding. 
8. Pursuant to Condition 1 – no development shall commence until plans and particulars of
the site layout, design and external finishes of the development have been submitted to and
approved by the planning authority. These details shall incorporate: 
i) A statement addressing the action checklist for developing design contained within the
Argyll and Bute Sustainable Design Guide 2006;
ii) A local vernacular design;
iii) External walls finished in natural stone, wet dash render, timber cladding or a mixture of
these materials;
iv) Details of finished ground floor levels relative to an identifiable fixed datum located out
with the application site; and
v) Details of existing and proposed site levels shown in the form of sectional
drawings/contour plans/site level survey, or a combination of these. 
Reason: To accord with Section 59 of the Town and Country Planning (Scotland) Act 1997
as amended, and in order to integrate the proposed dwellinghouse with its surrounds. 
9. Pursuant to Condition 1 – no development shall commence until a scheme of boundary
treatment, surface treatment and landscaping has been submitted to and approved by the
planning authority.  The scheme shall comprise a planting plan and schedule which shall
include details of: 
i) Existing and proposed ground levels in relation to an identified fixed datum;
ii) Existing landscaping features and vegetation to be retained;
iii) The location, design and materials of proposed walls, fences and gates;
iv) Proposed soft and hard landscaping works including the location, species and size of
every tree/shrub to be planted; and
v) A programme for the timing, method of implementation, completion and subsequent on-
going maintenance. 
Page 16

Page 17

PPA-130-2077
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a 
9
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme unless otherwise approved in writing by the planning authority. 
Any trees/shrubs which within a period of five years from the completion of the approved
landscaping scheme fail to become established, die, become seriously diseased, or are
removed or damaged shall be replaced in the following planting season with equivalent
numbers, sizes and species as those originally required to be planted unless otherwise
approved in writing by the planning authority. 
Reason: To assist with the integration of the proposal with its surroundings in the interest of
amenity. 
Advisory notes 
1. Notice of the start of development:  The person carrying out the development must
give advance notice in writing to the planning authority of the date when it is intended to
start.  Failure to do so is a breach of planning control.  It could result in the planning
authority taking enforcement action.  (See sections 27A and 123(1) of the Town and
Country Planning (Scotland) Act 1997 (as amended).) 
2. Notice of the completion of the development:  As soon as possible after it is finished,
the person who completed the development must write to the planning authority to confirm
the position.  (See section 27B of the Town and Country Planning (Scotland) Act 1997 (as
amended).) 
Page 17

Page 18

This page is intentionally left blank

Page 19

Page 19

Page 20

This page is intentionally left blank

Page 21

Page 21

Page 22

This page is intentionally left blank

Page 23

Classification: OFFICIAL
STATEMENT OF CASE 
FOR 
ARGYLL AND BUTE COUNCIL 
LOCAL REVIEW BODY 
25/0008/LRB 
REFUSAL OF PLANNING PERMISSION FOR
RENEWAL OF PLANNING PERMISSION IN
PRINCIPAL REFERENCE 19/02562/PPP (APPROVED
AT APPEAL) (SITE FOR THE ERECTION OF 2
DWELLINGHOUSES) 
– PLANNING APPLICATION REFERENCE
24/01069/PPP 
LAND SOUTH EAST OF ELDERSLIE OBAN ARGYLL
AND BUTE   
Page 23 Agenda Item 3b

Page 24

Classification: OFFICIAL 
STATEMENT OF CASE 
The Planning Authority is Argyll and Bute Council (‘the Council’). The appellant is Mr Graham
MacEachen (“the appellant”). 
Planning permission 24/01069/PPP for the Renewal of planning permission in principal
reference 19/02562/PPP (approved at appeal) (Site for the erection of 2 dwellinghouses) at
Land South East Of Elderslie Oban Argyll And Bute  (“the appeal site”) was refused by the
Planning Service under delegated powers on the 29th April 2025. 
This decision is the subject of referral to a Local Review Body. 
DESCRIPTION OF SITE 
The site the subject of this Review is on the periphery of Oban town centre comprising a gently
sloping area of ground situated adjacent to a private access track which spurs from the A816
public road.  To the north is the long established bed and breakfast establishment of Elderslie
with Soroba House Hotel, a Category C Listed Building, and the Soroba House Mews
development to the east but at a much higher level than the application site. 
SEPA advise that whilst the site is not shown to be at risk of flooding based on the SEPA
Future Flood Maps, a small unnamed watercourse (with a catchment of less than 3km2) is
located at the east perimeter of the proposed development. SEPA advise that whilst the Flood
Maps don’t cover small watercourses, they advise that they can still cause serious flooding. 
SEPA further advise that there are small culverts situated approximately 8m upstream of the
site on the access track to the south and downstream of the site adjacent to Elderslie Guest
House. The path of the watercourse runs through a wooded area which could cause a
blockage to the culvert structures. If the upstream culvert was to become blocked, it may result
in an overland flow path which could inundate the site, similarly blockage of the downstream
culvert could cause water to back up and inundate the site and other local receptors. SEPA
advise that they would expect a site-specific assessment to consider a range of blockage
scenarios to investigate these potential flooding mechanisms. 
STATUTORY BASIS ON WHICH THE APPEAL SHOULD BE DECIDED 
Section 25 of the Town and Country Planning (Scotland) Act 1997 provides that where, in
making any determination under the Planning Act, regard is to be had to the development
plan, and all other material planning considerations and the determination shall be made
in accordance with the plan unless material considerations indicate otherwise.  This is the
test for this application.  
Page 24

Page 25

Classification: OFFICIAL
STATEMENT OF CASE 
Argyll and Bute Council considers the determining issues in relation to the case are as follows: 
• Whether sufficient evidence has been submitted to fully understand and address flood
risk associated with the site and surrounding area to the satisfaction of SEPA. 
• If not, whether the proposal would conflict with the provisions NPF4 Policy 22 and
LDP2 Policy 55 which adopt a precautionary approach regarding the calculated
probability of flooding as a best estimate, and therefore, in the absence of substantive
evidence to the contrary, it would lead to a greater risk of flooding than currently exists
for future occupants of the proposed development, and for others in the area. 
Specifically, whether the applicant has failed to provide topographic ground level
information and culvert details to allow further consideration of these matters as
required by SEPA. 
• Given that SEPA, a statutory consultee on flooding, has objected, and the applicant
has not provided any substantive evidence in response to demonstrate that the
development will not be subject to flood risk nor exacerbate flood risk elsewhere, then
the development can only be considered to conflict with NPF4 Policy 22 and LDP2
Policy 55 as they relate to flood risk. 
The Report of Handing (Appendix A) sets out the Council’s full assessment of the application
in terms of these key determining issues. 
Officers ultimately had no choice but to refuse planning permission due to the robustly
maintained objection by SEPA. Members are respectfully reminded that SEPA are a statutory
consultee of national significance and their advice cannot be set aside by the Local Planning
Authority. Any recommendation contrary to the advice of SEPA must be notified to Scottish
Ministers. 
REQUIREMENT FOR ADDITIONAL INFORMATION AND A HEARING 
In accordance with the national legislative framework, Members cannot determine to grant this
Review ‘in house’. Should they be minded to do so, the matter must first be referred to
Ministers. Whilst it is open to Members to request the submission by the Applicant of the
additional site information required by SEPA, Members are reminded that officers have
already spent considerable time and effort trying to secure this information on behalf of SEPA.
Should Members be more successful in this regard, they are respectfully reminded that any
additional information received will need to be the subject of further consultation with SEPA. 
Notwithstanding the above, it is not considered that any additional information is required in
light of the appellant’s submission.  The issues raised were assessed in the Report of Handling
which is contained in Appendix A.  As such it is considered that Members have all the
information they need to determine the case. Given the above and that the proposal has no
complex or challenging issues, and has not been the subject of any significant public
representation, it is not considered that a Hearing is required. 
COMMENT ON APPELLANT’S SUBMISSION 
The Appellant has submitted a supporting statement which is highly critical of Officers. The
following brief comments are made in relation to his submission:
Page 25

Page 26

Classification: OFFICIAL 
• The Appellant appears to be suggesting that the decision to consult SEPA was a
deliberate one made by the Case Officer and, further, that this decision was motivated
by malicious intent. 
Comment Any such suggestion is robustly denied. The decision to consult SEPA in
respect of the development the subject of this Review was made by the Council’s
Validation Team and based solely upon the site constraints information available to
them. This decision was made and actioned before the planning application had even
been allocated to a Case Officer. The Appellant is aware of this. 
• The Appellant complains that the site survey information required by SEPA will incur
substantial professional fees and with no certain outcome. He states that, “Applicants
should not be put in the position of having to spend thousands of pounds on
professional fees or reports only to satisfy the whim of planning officers”. 
Comment Whilst officers have every sympathy with the Appellant regarding the cost
of such works, the requirement for this is categorically not the ‘whim of Planning
Officers’. Site development can be a very expensive process and officers fully
understand that. The Appellant’s ‘fight’ here is with SEPA and not with Officers. He is
very well aware of this. 
Through an examination of the relevant case files, it is clear to me that the current
situation is, on the contrary, largely of the Appellant’s own making. – He was granted
planning permission in principle for the development of two dwellinghouses on the 5th
August 2021 (Application reference 19/02562/PPP / DPEA reference PPA-130-2077).
This permission was subject to several planning conditions, none of which have been
progressed through a valid application (or applications) for the Approval of Matters
Subject to (Planning) Conditions (AMSC). As a direct consequence of this inaction by
the Appellant, the previous permission expired. Furthermore, in the interim period, a
new National Planning Policy Framework (NPF4) has been introduced with a materially
greater emphasis on flood risk. It is this change in National Planning Policy and an
attendant change in the approach to flood risk by SEPA that has led directly to the
current position. This could all have been avoided had the Appellant progressed his
previous permission. 
Whilst it is accepted that the previous planning permission was granted on Appeal, the
Appellant’s allegations that the Case Officer was (and is) somehow at fault is robustly
refuted. – What the Appellant doesn’t mention in his current Statement is the fact that
he applied for an award of costs at the time of the earlier appeal, siting many of the
same allegations as currently. The Government appointed Reporter dismissed this
claim for costs determining that, “the Council has not acted in an unreasonable manner
resulting in liability for expenses” and that, “despite my separate decision to allow the
related planning appeal, I do not consider that the Council has acted in an
unreasonable manner in refusing planning permission or that any unnecessary costs
have been incurred by the appellant. Consequently, I find that an award of costs is not
justified.” 
In respect of the application the subject of the current Review, and contrary to the
Appellant’s statement, Officers spent considerable time trying to secure a positive
outcome. This included sustained negotiation over a nine month period including at
least a dozen separate emails from the Case Officer to SEPA, JBA Consulting and the
Appellant in regard to the flood risk issues. This elicited four separate consultation
responses from SEPA and culminated in a final email to the Appellant dated 26th March
2025 stating:
Page 26

Page 27

Classification: OFFICIAL 
“Good morning Graham 
Thank you for your e-mail. 
As part of our performance recovery efforts, Planning Officers have been instructed to
be proactive in their management of planning cases to avoid undue delay and to
minimise the number of cases awaiting determination.  Where applicants have been
asked to provide supplementary information and failed to do this within a reasonable
timescale, Officers are empowered to seek withdrawal or issue refusals. 
Accordingly, it is our intention to proceed to determine the application within the coming
weeks as a technical refusal due to the lack of submission of the requested information. 
However, you may wish to consider withdrawing the application, address the
outstanding issues and then arrange to resubmit the application.  Any resubmission
within a year of withdrawal of the original application would benefit from a ‘free go’ with
regards to the planning fee. 
Considering the above, please advise whether you wish the application to be
determined or whether you wish to have it withdrawn. 
I look forward to hearing from you. 
Kind regards, 
Fiona Scott” 
No response to this email was received and, accordingly having exhausted all other
options, the Case Officer sought a final response from SEPA and planning permission
was refused on the 29th April 2025. 
A summary of the interaction with SEPA is contained within Part P, NPF4 Policy 22 of
the Report of Handling attached as Appendix A. 
CONCLUSION 
Section 25 of the Town and Country Planning Act 1997 (as amended) requires that all
decisions be made in accordance with the development plan unless material considerations
indicate otherwise. 
In this case, as detailed in the Report of Handling appended to this submission, Insufficient
evidence has been submitted to fully understand and address flood risk associated with the
site and surrounding area. 
As such, the proposal would conflict with the provisions NPF4 Policy 22 and LDP2 Policy 55
which adopt a precautionary approach regarding the calculated probability of flooding as a
best estimate, and therefore, in the absence of substantive evidence to the contrary, it would
lead to a greater risk of flooding than currently exists for future occupants of the proposed
development, and for others in the area.  Specifically, the appellant has failed to provide
topographic ground level information and culvert details to allow further consideration of these
matters. 
Page 27

Page 28

Classification: OFFICIAL
Given that SEPA, a statutory consultee on flooding, has objected, and the applicant has not
provided any substantive evidence in response to demonstrate that the development will not
be subject to flood risk nor exacerbate flood risk elsewhere, then the development can only
be considered to conflict with NPF4 Policy 22 and LDP2 Policy 55 as they relate to flood risk. 
Taking account of the above, it is respectfully submitted that the application for Review be
dismissed. 
Page 28

Page 29

Classification: OFFICIAL
APPENDIX A – REPORT OF HANDLING 
Argyll and Bute Council
Development & Economic Growth   
Planning Application Report and Report of Handling as required by Schedule 2 of the
Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013 relative to applications for Planning Permission or Planning
Permission in Principle 
Reference No: 24/01069/PPP 
Planning Hierarchy: Local
Applicant: Mr Graham MacEachen
Proposal: Renewal of Planning Permission in Principle Reference
19/02562/PPP – Site for the Erection of Two Dwellinghouses 
Site Address:  Land South East of Elderslie, Oban 
DECISION ROUTE 
☒Delegated - Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997 
☐Committee - Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission 
• Site for the erection of two dwellinghouses 
• Upgrade of existing vehicular access 
(ii) Other specified operations 
• Connection to public water main 
• Connection to public drainage network 
(B) RECOMMENDATION: 
Having due regard to the Development Plan and all other material considerations, it
is recommended that planning permission in principle be refused for the reasons
appended to this report. 
(C) CONSULTATIONS:   
Argyll and Bute Council – Roads Authority 
No response at time of report. 
Argyll and Bute Council – Access Officer 
No response at time of report. 
Page 29

Page 30

Classification: OFFICIAL 
Argyll and Bute Council – Oban Airport 
No response at time of report. 
Scottish Water 
Letter dated 25/06/24 advising no objection to the proposed development which
would be serviced from the Tullich Water Treatment Works and the Oban Waste
Water Treatment Works where there is currently sufficient capacity.  Scottish Water
do however advise that further investigations may be required once applications for
connection to their infrastructure are submitted to them for consideration. 
Rights of Way Society 
No response at time of report. 
Historic Environment Scotland 
Letter dated 05/07/25 advising no objection to the proposed development regarding
the impact on Scheduled Ancient Monuments SM4302 and SM4161, Ariogan
Cairns. 
Scottish Environment Protection Agency (SEPA)
Finalised response dated 22/04/25 submitting a holding objection due to the lack of
information submitted with the application to address their flood risk concerns. 
JBA Consulting Ltd (JBA) 
Finalised response dated 10/09/24 advising no objection to the proposed
development but providing advisory comments regarding the design of the proposed
surface water scheme for the proposed development. 
Consultation responses are published in full on the planning application file and are
available to view via the Public Access section of the Council’s website. 
(D) HISTORY:   
PPA-130-2077
Appeal against refusal of 19/02562/PPP – Appeal Upheld & PPP granted: 05/08/21 
19/02562/PPP 
Site for the erection of 2 dwellinghouses – Refused: 20/08/20 
(E) PUBLICITY:   
The proposal has been advertised in terms of Regulation 20 and Neighbour
Notification procedures, overall closing date 18/07/24. 
(F) REPRESENTATIONS:   
No representations have been received regarding the proposed development. 
(G) SUPPORTING INFORMATION 
Has the application been the subject of:
Page 30

Page 31

Classification: OFFICIAL 
(i) Environmental Impact Assessment Report: ☐Yes ☒No 
(ii) An Appropriate Assessment under the
Conservation (Natural Habitats) Regulations
1994:   
☐Yes ☒No 
(iii) A Design or Design/Access statement:    ☐Yes ☒No 
(iv) Sustainability Checklists (with reference to the requirements of LDP2
Policy 04) 
TN06 Sustainability Checklist
TN07 Sustainable Buildings Checklist 
The relevant Sustainability Checklists has been
submitted and examined. It is the assessment of the
Case Officer that the applicant has understood and
given adequate consideration to the sustainability
aspects of the proposed development, sufficient to
accord with the core sustainability requirements of both
national and local planning policy, specifically the
relevant details of the ‘Sustainable Places’ group of
policies within NPF4 and LDP2 policies 04, 08 and 09.
☒Yes ☐No
☐Yes ☒No  
(v) A report on the impact of the proposed
development e.g. Retail impact, transport
impact, noise impact, flood risk, drainage
impact etc:  
☐Yes ☒No 
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:   ☐Yes ☒No 
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  ☐Yes ☒No 
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account
in assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy 
Sustainable Places
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
Page 31

Page 32

Classification: OFFICIAL
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
NPF4 Policy 6 – Forestry, Woodland and Trees
NPF4 Policy 7 – Historic Assets and Places
NPF4 Policy 9 – Brownfield, Vacant and Derelict Land and Empty Buildings (includes
provisions relevant to Greenfield Sites)
NPF4 Policy 12 – Zero Waste
NPF4 Policy 13 – Sustainable Transport 
Liveable Places
NPF4 Policy 14 – Design, Quality and Place
NPF4 Policy 15 – Local Living and 20 Minute Neighbourhoods
NPF4 Policy 16 – Quality Homes
NPF4 Policy 18 – Infrastructure First
NPF4 Policy 22 – Flood Risk and Water Management 
Argyll and Bute Local Development Plan 2 (Adopted 2024) 
Spatial and Settlement Strategy 
Policy 01 – Settlement Areas
Policy 04 – Sustainable Development 
High Quality Places 
Policy 05 – Design and Placemaking
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 10 – Design – All Development
Policy 15 – Protection, Conservation and Enhancement of Our Historic Environment
Policy 16 – Listed Buildings 
Connected Places 
Policy 34 – Electric Vehicle Charging Points
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes
Policy 37 – Development Utilising an Existing Private Access or Existing Private
Road
Policy 40 – Vehicle Parking Provision 
Sustainable Communities 
Policy 55 – Flooding
Policy 61 – Sustainable Urban Drainage Systems (SUDS)
Policy 63 – Waste Related Development and Waste Management 
Homes for People 
Policy 66 – New Residential Development on Non-Allocated Housing Sites within
Settlement Areas 
High Quality Environment 
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 77 – Forestry, Woodland and Trees
Page 32

Page 33

Classification: OFFICIAL 
(ii)  List of all other material planning considerations taken into account in
the assessment of the application, having due regard to Annex A of
Circular 3/2013. 
• Consultation Reponses
• Planning History
• ABC Technical Note – Biodiversity (Feb 2017)
• TN06 Sustainability Technical Note and Checklist (Oct. 2023)
• TN21 VII and LVIA Light Technical Note (Oct. 2023)
• TN07 Sustainable Buildings Technical Note and Checklist (Oct. 2023)
• ABC Housing Needs and Demand Assessment
• ABC Housing Emergency Statement
• SEPA Standing Guidance for Development Management (Dec. 2022) 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment:  ☐Yes ☒No 
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  ☐Yes ☒No 
(M) Does the Council have an interest in the site:  ☐Yes ☒No 
(N) Requirement for a pre-determination hearing: ☐Yes ☒No 
(O)(i) Key Constraints/Designations Affected by the Development: 
• SAMs, (4161 and 4302) Ariogan Cairns
• Category C Listed Building 
(O)(ii) Soils
Agricultural Land Classification:  Built Up Area
Peatland/Carbon Rich Soils Classification: ☐Class 1
☐Class 2
☐Class 3
☒N/A
Peat Depth Classification: N/A  
Does the development relate to croft land? ☐Yes ☒No
Would the development restrict access to croft
or better quality agricultural land?
☐Yes ☐No ☒N/A
Would the development result in
fragmentation of croft / better quality
agricultural land?
☐Yes ☐No ☒N/A 
(O)(iii) Woodland  
Page 33

Page 34

Classification: OFFICIAL
Will the proposal result in loss of
trees/woodland?
(If yes, detail in summary assessment)
☐Yes
☒No 
Does the proposal include any replacement or
compensatory planting?
☐Yes
☒No details to be secured by condition
☐N/A  
(O)(iv) Land Status / LDP Settlement Strategy
Status of Land within the Application
(tick all relevant boxes)
☐Brownfield
☐Brownfield Reclaimed by Nature
☒Greenfield 
ABC LDP2 Settlement Strategy
(tick all relevant boxes) 
☒Settlement Area
☐Countryside Area
☐Remote Countryside Area
☐Helensburgh & Lomond Greenbelt
ABC LDP2 Allocations/PDAs/AFAs etc: 
N/A 
(P) Summary assessment and summary of determining issues and material
considerations 
Introduction and Background 
The site the subject of this application is on the periphery of Oban town centre
comprising a gently sloping area of ground situated adjacent to a private access
track which spurs from the A816 public road.  To the north is the long established
bed and breakfast establishment of Elderslie with Soroba House Hotel, a Category
C Listed Building, and the Soroba House Mews development to the east but at a
much higher level than the application site. 
The principle of the development of this site with two dwellinghouses has been
established by the granting of planning permission in principle (PPP) at appeal by
the DPEA on 5 August 2021 following the refusal of permission by the Planning
Authority on 24 August 2020. 
The permission granted by the DPEA established the principle of the proposed
development of the site with 2 dwellinghouses with the matters of layout and design
to be addressed by way of future application(s) for approval of matters specified in
conditions.   
The current application was submitted and validated within the lifetime of the
previous permission granted by the DPEA thereby representing a timeous renewal
with the previous PPP representing a significant material planning consideration in
the current application to renew the previous permission. 
During the processing of the previous application, Officers were satisfied that the
application site had the potential to successfully accommodate two suitably sited and
designed dwellinghouses within the defined Settlement of Oban which would relate
to the settlement pattern of the surrounding area. 
Page 34

Page 35

Classification: OFFICIAL
However, Officers considered that the application failed to demonstrate that a safe
vehicular access regime could be achieved to serve the proposed development due
to the structural integrity of the bridge within the vehicular access regime not having
been fully and satisfactorily addressed.  Officers deemed that the structural integrity
of the bridge was fundamental in demonstrating that a satisfactory access regime
could be achieved to serve the proposed development and considered that the use
of a suspensive condition to secure further details not to be appropriate. 
Accordingly, PPP was refused by Members at the meeting of the Planning,
Protective Services and Licensing Committee in August 2020.   
However, upon review at appeal the DPEA was satisfied that the use of a suspensive
condition requiring a structural survey of the bridge to be undertaken in order to
demonstrate that it was capable of accommodating further development was
appropriate and they upheld the appeal granting PPP subject to a number of
conditions including the requirement for the submission of a structural survey of the
bridge. 
To date, none of the conditions have been addressed and the permission appears
to have lain idle to the extent that it has now expired. 
The above represents a brief summary of the DPEA decision with the full decision
published on the previous planning application file, reference 19/02562/PPP,
available to view via the Public Access section of the Council’s website. 
Since the DPEA issued their decision granting PPP for the proposed development,
there has been a  material change in national planning policy and in the Local
Development Plan.   
Argyll and Bute ‘Local Development Plan 2’ (LDP2) was adopted on 28 February
2024 which, together with NPF4 which was adopted on 13 February 2023, represent
the Development Plan providing the policy background against which proposed
developments are assessed. 
The proposal is assessed against the relevant NPF4 Policies below which include
details of the associated LDP2 policies. 
Compliance with National and Local Development Plan 2 Policy 
Argyll and Bute ‘Local Development Plan 2’ (LDP2) was adopted on 28 February
2024 which, together with NPF4 which was adopted on 13 February 2023, represent
the Development Plan providing the policy background against which proposed
developments are assessed. 
The proposal is assessed against the relevant NPF4 Policies below which include
details of the associated LDP2 policies. 
NPF4 Policy 1 – Tackling the Climate and Nature Crises seek to prioritise the
climate and nature crises in all decisions; it requires to be applied together with other
policies in NPF4. 
Guidance from the Scottish Government advises that it is for the decision maker to
determine whether the significant weight to be applied tips the balance in favour for,
or against a proposal on the basis of its positive or negative contribution to climate
and nature crises.   
Page 35

Page 36

Classification: OFFICIAL
NPF4 Policy 2 – Climate, Mitigation and Adaption  seeks to ensure that new
development proposals will be sited to minimise lifecycle greenhouse gas emissions
as far as possible, and that proposals will be sited and designed to adapt to current
and future risks from climate change. 
Guidance from the Scottish Government confirms that at present there is no single
accepted methodology for calculating and / or minimising emissions. The emphasis
is on minimising emissions as far as possible, rather than eliminating emissions. The
Spatial Settlement Strategy set out within LDP2  seeks to deliver sustainable levels
of growth by steering the majority of development to our existing settlements as
these are where the most of our current infrastructure, services, employment
opportunities, housing and community facilities are to be found, however LDP2
recognises that there are instances where a different approach to significant
development has to be taken particularly where existing infrastructure or services
are at capacity and where a more sustainable option would be to provide new
facilities elsewhere. 
NPF4 Policy 3 – Biodiversity seeks to protect biodiversity, reverse biodiversity loss
and deliver positive effects from development and strengthen nature networks. 
In the case of the development proposed by this application, it is not considered that
there are any issues of compliance with Policy 3. No material biodiversity impacts
have been identified in the assessment of this application by the Planning Authority
and whilst no specific proposals for biodiversity improvements have been submitted
it is considered that adequate and proportionate measures for biodiversity
enhancement and protection could be secured via planning condition in the event
that permission was to be granted. The proposed development is therefore
considered to be in compliance with NPF4 Policy 3 and LDP2 Policy 73 as
underpinned by LDP Policies LDP 3 and SG LDP ENV 1 and Policy 73, Development
Impact on Habitats, Species and Biodiversity  
NPF4 Policy 4 – Natural Places seeks to protect, restore and enhance natural
assets making best use of nature-based solutions. 
The development proposed by the current planning application is considered
appropriate in terms of its type, location and scale such that it will have no
unacceptable impact on the natural environment. The proposed development is not
within any designated European site of natural environment conservation or
protection, it is not located within a National Park, a National Scenic Area a SSSI or
RAMSAR site, or a National Nature Reserve. Neither is it located within a site
designated as a Local Nature Conservation Site or Landscape Area or within an area
identified as Wild Land. 
The proposed development is therefore considered to be in accordance with NPF4
Policy 4 and does not conflict with the provisions of LDP2. 
NPF4 Policy 6 – Forestry, Woodland and Trees seeks to protect and expand
forests, woodlands and trees. 
The woodland surrounding the site has been designated as Ancient Woodland by
NatureScot, these being classified as areas of ancient and semi-natural woodland
which are important and irreplaceable national resources which should be protected
and enhanced.  Whilst there is no significant tree cover on the application site that
would be lost as a result of the proposed development, there are areas of woodland
surrounding the site and therefore in the event that permission was to be granted, it
Page 36

Page 37

Classification: OFFICIAL
would be appropriate to impose a planning condition requiring any future detailed
application to be accompanied by a detailed Woodland Management Plan which
should identify the trees to be retained, tree works proposed, together with details of
landscaping to further integrate the proposed development into its landscape setting. 
In the event that permission was to be granted, with the aforementioned planning
condition, the proposal would not conflict with the broad aim of NPF4 Policy 6 or
LDP2 Policy 77, Forestry, Woodland and Trees which seek to retain trees within
proposed developments. 
NPF4 Policy 7 – Historic Assets seeks to protect and enhance historic environment
assets and places, and to enable positive change as a catalyst for the regeneration
of places. 
Part (a) of Policy 7 seeks to ensure that any proposals which are likely to have a
significant impact on historic assets or places are accompanied by an assessment
which is based on an understanding of the cultural significance of the historic asset
and/or place with Part (h) seeking to protect the integrity and setting of Scheduled
Ancient Monuments (SAM). 
In this case, it is not considered that the proposed development will have a significant
impact on historic assets, places or SAMs as described below. 
Whilst the site is situated adjacent to Soroba House Hotel, a Category C Listed
Building, due to the surrounding landform, the application site sits much lower in the
landscape than Soroba House Hotel and therefore the proposed development will
not be readily visible within the same visual envelope. Subject to appropriate siting,
design and finishing materials, it is not considered that the proposed development,
which is within an area of defined settlement, and which is adjacent to existing
building development, would be materially harmful to the current setting of Soroba
House Hotel or its setting within the wider landscape.   
Whilst there are two SAMs, (4161 and 4302) situated to the south of the application
site, these are a significant distance from the site which, due to the distance involved
and the intervening landscape, will ensure that they are not viewed within the same
visual envelope thereby not resulting in any adverse impact on their setting. 
In this instance, in the event that permission was to be granted, the proposal would
not conflict with the provisions of NPF4 Policy 7 or LDP2 Policies 15, Protection,
Conservation and Enhancement of Our Historic Environment, Policy 16, Listed
Buildings and Policy 19, Scheduled Monuments. 
NPF4 Policy 9 - Brownfield, Vacant and Derelict Land and Empty Buildings
seeks to encourage, promote and facilitate the reuse of brownfield, vacant and
derelict land and empty buildings, and to help reduce the need for greenfield
development. 
Whilst the development proposed by this planning application is on a greenfield site,
in terms of our adopted settlement strategy, the site of the proposed development is
within the defined Settlement of Oban where Policy 01 of LDP2 gives a general
presumption in favour of sustainable development where it is compatible with
surrounding uses; provides suitable  access and infrastructure; is of an appropriate
scale and fit for the size of settlement in which it is proposed; it respects the character
and appearance of the surrounding townscape in terms of density, scale, massing,
design, external finishes and it complies with all other relevant LDP2 policies.
Page 37

Page 38

Classification: OFFICIAL 
As detailed above, Officers are satisfied that the application site has the potential to
successfully accommodate two suitably sited and designed dwellinghouses within
the defined Settlement of Oban which would relate to the settlement pattern of the
surrounding area. 
In the event the permission was to be granted, the proposed development would be
consistent with the broad aims of NPF4 Policy 9 and the spatial and settlement
strategy set out in LDP2 Policy 01. 
NPF4 Policy 12 – Zero Waste seeks to encourage, promote and facilitate
development that is consistent with the waste hierarchy as defined within the policy
document. 
The development the subject of this planning application seeks to establish the
principle of two dwellinghouses. Whilst this is a development likely to generate waste
when operational, it will benefit from regular waste uplifts by the Council and will be
expected to comply with our adopted and enforced recycling and reuse strategy. In
this regard, in the event that permission was to be granted, the proposed
development would not conflict with the requirements of NPF4 Policy 12 or LDP2
Policy 63, Waste Related Development and Waste Management which seek to
ensure that effective provision for waste/recycling is provided within developments. 
NPF4 Policy 13 – Sustainable Transport seeks to encourage, promote and
facilitate developments that prioritise walking, wheeling, cycling and public transport
for everyday travel and reduce the need to travel unsustainably. 
The application is seeking to establish the principle of two dwellinghouses which is
not considered to be a significant travel generating use or a proposal where it is
considered important to monitor travel patterns resulting from the development.   
Part (b) of Policy 13 requires consideration of the sustainable travel hierarchies
including provision for vehicles and cycle charging points. In the event that
permission was to be granted a condition could be imposed to secure the provision
of electrical vehicle charging points (EVC) within the site. 
The application proposes to utilise an existing private access track spurring from the
A816 public road. 
During the processing of the previous application, the Roads Authority deferred their
decision until such time as the applicant submitted further information to allow a
definitive decision on the proposal to be made.  The consultation response was in
two-parts:   
The first part required the submission of a Safety Audit/Risk Assessment/Traffic
Management Plan to ascertain and mitigate any implications caused by the
proposed development both during the construction phase and on completion of the
development due to the fact that the proposed access is situated on a primary
school/link path/cycle path which forms part of the Core Path Network.   
The second part of the consultation response required a full structural survey of the
bridge accessing the site from the A816 public road to demonstrate that the bridge
can safely support a 44 tonne vehicle, being the minimum weight necessary to
service any construction site relying on this proposed route of access.   
Page 38

Page 39

Classification: OFFICIAL
The applicant addressed the first part by submitting a Traffic Assessment which was
accepted by the Roads Authority, the Access Officer and Scotways, however, the
structural report was not submitted. 
Officers were of the view that access to the site formed a critical part of the
application and that the structural survey should be sought in advance of permission
being granted to demonstrate that the bridge structure could safely and structurally
cope with the increased weight and volume of traffic both during and post
construction for the proposed development.  Officers did not deem it appropriate to
deal with the structural report by way of a suspensive condition. 
However, as detailed above, the DPEA was satisfied that the use of a suspensive
condition on the grant of permission, requiring the submission of a structural survey
of the bridge, was appropriate and on this basis, they upheld the appeal granting
permission subject to such a condition. 
In light of the above, in the event that permission was to be granted for the proposed
development, the same conditions could be imposed to secure the requirements
previously sought by the Roads Authority, including the structural survey of the
bridge, plus a new condition to address the additional requirement of EVC charging
points within the site, rendering the proposal consistent with the broad aims of NPF4
Policy 13 and LDP2 Policies 34, EVC Charging Points, Policy 35, Design of New
and Existing, Public Roads and Private Access Regimes, Policy 37, Development
Utilising an Existing Private Access or Existing Private Road and Policy 40, Vehicle
Parking Provision which collectively seek to ensure that proposed developments are
served by a suitable and safe access regime and provide appropriate parking
provision commensurate with the scale of the development proposed. 
NPF4 Policy 14 – Design, Quality and Place seeks to encourage, promote and
facilitate well designed development that makes successful places by taking a
design-led approach and applying the ‘Place Principle’. 
As detailed above the application is seeking to secure PPP to establish the principle
of two dwellinghouse.  The necessary future application(s) for the approval of the
details of the proposed development would be expected to comply with the ‘place
principle’ as set out in NPF4 Policy 14 and should permission be granted, planning
conditions would ensure that the development was designed to an appropriate
standard. 
In the event that permission was to be granted, with conditions, the development the
subject of this planning application would be considered to accord with the broad
aims of NPF4 Policy 14 and the sustainable siting and design policies of LDP2
namely Policy 5, Design and Placemaking, Policy 08, Sustainable Siting, Policy 09,
Sustainable Design and Policy 10, Design: All Development which, in summary,
collectively seek to ensure that developments are compatible with surrounding land
uses, are sited sensitively within the landscape making use of existing infrastructure,
are of an appropriate scale, sustainable design and finishes for their site; and ensure
that no adverse visual or amenity impacts arise. 
NPF4 Policy 15 – Local Living and 20 Minute Neighbourhoods seeks to
encourage, promote and facilitate the application of the ‘Place Principle’ and create
connected and compact neighbourhoods where people can meet the majority of their
daily needs within a reasonable distance of their home, preferably by walking,
wheeling or cycling or using sustainable transport options. 
Page 39

Page 40

Classification: OFFICIAL
In terms of our adopted settlement strategy, the site of the proposed dwellinghouse
is in an area identified as being within a defined ‘Settlement Area’ where LDP2 Policy
01  gives a general presumption in favour of sustainable development where it is
compatible with surrounding uses; provides suitable  access and infrastructure; is of
an appropriate scale and fit for the size of settlement in which it is proposed; it
respects the character and appearance of the surrounding landscape in terms of
density, scale, massing, design, external finishes and that it complies with all other
relevant LDP2 policies. 
In this instance, it is considered that the small scale of the proposed development,
and its rural location, would reasonably comply with Policy 15 of NPF4 given the
existing dispersed geographical scale of the environment within which the
development is to be located, and given its compliance with the existing settlement
pattern and the level and quality of interconnectivity of the proposed development
with the surrounding area where people can reasonably meet the majority of their
daily needs within a reasonable distance of their home. 
The proposed development aligns with NPF4 and there is no conflict with LDP2
Policy 01. 
NPF4 Policy 16 – Quality Homes seeks to encourage, promote and facilitate the
delivery of more high quality, affordable and sustainable homes in the right locations
and providing choice of tenure to meet diverse housing needs. 
Policy 16(c) supports development proposals for new homes that improve
affordability and choice by being adaptable to changing and diverse needs, and
which address identified gaps in provision, including ‘self-provided homes’ of which
the proposed development represents. 
With regards to Part (f) of Policy 16(i) an agreed timescale for build-out will be
covered through the use of a planning condition; 16(ii), whilst the development
proposed by this planning application is not on land actively allocated for housing in
the LDP2, it would wholly accord with the adopted settlement strategy and would
accord with the principles of ‘local living’ and ’20 minute neighbourhoods’; 16(iii) the
proposal is for a smaller scale opportunity within an existing settlement boundary. 
The proposed development is deemed to be consistent with NPF4 Policy 16 and
there is no conflict with LDP 2 Policy 01, ‘Settlement Area’ due to the proposed
development being an appropriate development within the defined settlement. 
NPF4 Policy 18 – Infrastructure First seeks to encourage, promote and facilitate
an infrastructure first approach to land use, which puts infrastructure considerations
at the heart of placemaking. 
The application proposes connection to the public water and waste water
infrastructure within the control of Scottish Water.  In their response to the application
Scottish Water advise that the proposed development would be serviced from the
Tullich Water Treatment Works and the Oban Waste Water Treatment Works where
there is currently sufficient capacity.  Scottish Water do however advise that further
investigations may be required once formal application(s) for connection to their
infrastructure is submitted to them for consideration.   
In this regard, in the event that permission was to be granted, suitable infrastructure
could be provided rendering the proposed development consistent with the
requirements of NPF4 Policy 18 and LDP2 Policy 04, Sustainable Development
Page 40

Page 41

Classification: OFFICIAL
which seek to ensure that suitable infrastructure is available to serve proposed
developments. 
NPF4 Policy 22 – Flood Risk and Water Management seeks to strengthen
resilience to flood risk and to ensure that water resources are used efficiently and
sustainably. 
Water Supply 
As detailed at NPF4 Policy 18 above, the development the subject of this planning
application proposes connection to the public water main to which Scottish Water
has raised no objection. 
Sustainable Drainage System 
With regards to the management of rain and surface water at the site, in the event
that permission was to be granted, this could be controlled through a planning
condition to secure a suitable sustainable drainage system for the site. 
Flooding 
Due to the site being within an area at risk of fluvial flooding, consultation was
undertaken with SEPA and the Council’s flooding advisors, JBA. 
Whilst JBA raised no objection to the proposed development upon the submission
of further information from the applicant, which comprised photographs of the
watercourse in question and culvert dimensions, SEPA submitted a holding
objection due to the lack of information submitted with regards to flood risk and
having proper regard to national planning policy on flood risk, something that JBA
appear to have discounted. 
SEPA advise that whilst the site is not shown to be at risk of flooding based on the
SEPA Future Flood Maps, a small unnamed watercourse (with a catchment of less
than 3km2) is located at the east perimeter of the proposed development. SEPA
advise that whilst the Flood Maps don’t cover small watercourses, they advise that
they can still cause serious flooding. 
SEPA further advise that there are small culverts situated approximately 8m
upstream of the site on the access track to the south and downstream of the site
adjacent to Elderslie Guest House. The path of the watercourse runs through a
wooded area which could cause a blockage to the culvert structures. If the upstream
culvert was to become blocked, it may result in an overland flow path which could
inundate the site, similarly blockage of the downstream culvert could cause water to
back up and inundate the site and other local receptors. SEPA advise that they would
expect a site-specific assessment to consider a range of blockage scenarios to
investigate these potential flooding mechanisms. 
In light of these comments SEPA submitted a holding objection until such time as
further topographic information and details on the culverts were submitted to them
for consideration which they advised may allow them to remove their holding
objection.  SEPA further advised that should additional information be submitted and
be insufficient to provide a robust assessment of the risk of flooding to the proposed
development, then a detailed Flood Risk Assessment (FRA) may require to be
prepared for the site.  SEPA’s comments were provided to the applicant for action,
however the applicant was reluctant to submit the details requested by SEPA.  Due
Page 41

Page 42

Classification: OFFICIAL
to this reluctance, Officers agreed to forward the information to SEPA which the
applicant had previously submitted to JBA for review.  However, upon reviewing the
additional information, SEPA maintained their holding objection until such time as
the previously requested topographic and culvert information was submitted. 
In light of the ongoing holding objection from SEPA, Officers contacted the applicant
to advise that the application was going to be progressed as a technical refusal due
to the lack of additional information requested by SEPA to allow them to assess flood
risk having been submitted.  The applicant responded by submitting two additional
photographs direct to SEPA indicating that it was his view that this would be sufficient
to allow SEPA to understand the site gradients and surrounding land without the
requirement to submit the full details requested in their previous responses. 
SEPA’s final response acknowledged the additional photographs submitted by the
applicant but SEPA advised that the details were not sufficient to demonstrate that
the application site is not at risk of flooding and consequently maintained their
holding objection.  SEPA reiterated their previous comments that the submission of
topographic ground level information and details of the culverts would be required to
allow them to consider removing their holding objection.  SEPA also acknowledged
the assessment carried out by JBA, however, to enable verification, SEPA require
the further detail on the culverts previously requested. 
Considering the above, in the absence of the topographical and culvert details
required by SEPA in relation to potential flood risk posed by an identified minor water
course, and in the absence of any evidence to suggest that the development will not
exacerbate flood risk associated with the site, the proposal is deemed contrary to
the provisions of NPF4 Policy 22 and LDP2 Policy 55 which adopt a precautionary
approach regarding the calculated probability of flooding within proposed
developments.   
Given that the above policy requirements seek to establish whether the principle of
development is acceptable insofar as it is related to flood risk, it is not considered
that a planning condition could be used to address the above policy conflict. 
Conclusion 
Notwithstanding the above assessment that the site could, potentially, successfully
accommodate two suitably sited and designed dwellinghouses, and that appropriate
infrastructure could be achieved, insufficient evidence has been submitted to fully
understand and address flood risk associated with the site and surrounding area and
therefore the proposal would conflict with the provisions NPF4 Policy 22 and LDP2
Policy 55 on the grounds that, in the absence of substantive evidence, it would lead
to a greater risk of flooding than currently exists for future occupants of the proposed
development, and for others in the area. 
The proposal is therefore recommended for refusal for the reasons set out below. 
(Q) Is the proposal consistent with the Development Plan: ☐Yes ☒No 
(R) Reasons why Planning Permission Should be Refused: 
See reasons for refusal below. 
Page 42

Page 43

Classification: OFFICIAL 
(S) Reasoned justification for a departure to the provisions of the Development
Plan 
N/A 
(T) Need for notification to Scottish Ministers or Historic Environment Scotland:
☐Yes ☒No 
Author of Report: Fiona Scott  Date: 28/04/25 
Reviewing Officer: Tim Williams Date: 29/04/25 
Fergus Murray
Head of Development & Economic Growth 
Page 43

Page 44

Classification: OFFICIAL
REASONS FOR REFUSAL RELATIVE TO APPLICATION REF. NO. 24/01069/PPP 
1. Insufficient evidence has been submitted to fully understand and address flood risk
associated with the site and surrounding area. 
As such, the proposal would conflict with the provisions NPF4 Policy 22 and LDP2
Policy 55 which adopt a precautionary approach regarding the calculated probability
of flooding as a best estimate, and therefore, in the absence of substantive evidence
to the contrary, it would lead to a greater risk of flooding than currently exists for future
occupants of the proposed development, and for others in the area.  Specifically, the
applicant has failed to provide topographic ground level information and culvert details
to allow further consideration of these matters. 
Given that SEPA, a statutory consultee on flooding, has objected, and the applicant
has not provided any substantive evidence in response to demonstrate that the
development will not be subject to flood risk nor exacerbate flood risk elsewhere, then
the development can only be considered to conflict with NPF4 Policy 22 and LDP2
Policy 55 as they relate to flood risk. 
Page 44

Page 45

Classification: OFFICIAL
APPENDIX TO DECISION REFUSAL NOTICE 
Appendix relative to application 24/01069/PPP 
(A) Has the application been the subject of any “non-material”
amendment in terms of Section 32A of the Town and Country
Planning (Scotland) Act 1997 (as amended) to the initial submitted
plans during its processing.
☐Yes ☒No 
(B) The reason why planning permission has been refused: 
See reasons for refusal above. 
Page 45

Page 46

This page is intentionally left blank

Page 47

"
"
© Crown Copyright and database right 2024
All rights reserved. OS license (customer) account number AC0000849384
Location Plan Relative to: 25/0008/LRB
O
1:2,500
0 20 4010 Meters
Application Site
Page 47

Page 48

This page is intentionally left blank

Page 49

Classification: OFFICIAL
To Whom It May Concern, 
Town and Country Planning (Scotland) Acts
25/0008/LRB
24/01069/PPP - Renewal of planning permission in principal reference
19/02562/PPP (approved at appeal) (Site for the erection of 2 dwellinghouses)
Land South East Of Elderslie, Oban, Argyll, PA34 4SB  
Thank you for your email of 30 July relating to the above.
We previously responded to planning application 24/01069/PPP in our letters
referenced PCS-20002026, PCS-20003215 and PCS-20005081. We can confirm
that our position (holding objection) remains as set out in our previous comments
which also include details of the information that would be required to enable us to
comment further on the planning application. 
I trust these comments are of assistance - please do not hesitate to contact me if you
require any further information. 
Kind regards,
Jessica Fraser
Planning Officer 
Disclaimer
The information contained in this email and any attachments may be confidential and is intended
solely for the use of the intended recipients. Access, copying or re-use of the information in it by any
other is not authorised. If you are not the intended recipient, please notify us immediately by return
email to postmaster@sepa.org.uk. Registered office: SEPA, Angus Smith Building, 6 Parklands
Avenue, Eurocentral, Holytown, North Lanarkshire, ML1 4WQ. Communications with SEPA may be
monitored or recorded or released in order to secure the effective operation of the system and for
other lawful purposes. 
Dh’fhaodadh gum bi am fiosrachadh sa phost-d seo agus ceanglachan sam bith a tha na chois
dìomhair, agus cha bu chòir am fiosrachadh a bhith air a chleachdadh le neach sam bith ach an
luchd-faighinn a bha còir am fiosrachadh fhaighinn. Chan fhaod neach sam bith eile cothrom
fhaighinn air an fhiosrachadh a tha sa phost-d no a tha an cois a’ phuist-d, chan fhaod iad lethbhreac
a dhèanamh dheth no a chleachdadh arithist. Mura h-ann dhuibhse a tha am post-d seo, feuch gun
inns sibh dhuinn sa bhad le bhith cur post-d gu postmaster@sepa.org.uk. Togalach Aonghais Mhic a'
Ghobhainn, 6 Craobhraid Parklands, Eurocentral, Baile a' Chuilinn, Siorrachd Lannraig a Tuath, ML1
4WQ. Faodar conaltradh còmhla ri SEPA a sgrùdadh no a chlàradh no a sgaoileadh gus obrachadh
èifeachdach an t-siostaim a ghlèidheadh agus airson adhbharan laghail eile. 
Page 49

Page 50

This page is intentionally left blank

Page 51

OFFICIAL
OFFICIAL 
Our Ref:  PCS-20002026
Planning Department Your Ref:  24/01069/PPP
Argyll and Bute Council   
SEPA Email Contact:
By email only to: planning.olandi@argyll-
bute.gov.uk
planning.north@sepa.org.uk   
11 July 2024
Dear Fiona Scott 
Town and Country Planning (Scotland) Acts
Renewal of planning permission in principal reference 19/02562/PPP (approved at
appeal) (Site for the erection of 2 dwellinghouses)
Land South East Of Elderslie, Oban, Argyll And Bute 
Thank you for your consultation which was received by SEPA on 19 June 2024 in relation
to the above application. We understand the reason for consultation is Flooding. Thank
you also for your further email of 19 June confirming that the proposal does not fall within
any of the exceptions set out in NPF4 Policy 22(a). 
Unfortunately, the information supplied with this planning application is insufficient to allow
us to determine the potential impacts in terms of flood risk. We therefore submit a
holding objection and request that determination be deferred until the information
outlined below has been provided for our assessment. If the planning authority proposes to
grant planning permission contrary to this advice on flood risk, the Town and Country
Planning (Notification of Applications) (Scotland) Direction 2009 provides criteria for the
referral to the Scottish Ministers of such cases. You may therefore wish to consider if this
proposal falls within the scope of this Direction. 
Page 51

Page 52

OFFICIAL
OFFICIAL
1. Flood risk
1.1 In line with National Planning Framework 4 (Policy 22), a precautionary approach to
flood risk should be taken by avoiding development within areas at risk of flooding
(land or built form with an annual probability of being flooded of greater than 0.5%
which must include an appropriate allowance for future climate change).
1.2 The site is not shown to be at risk of flooding based on the SEPA Future Flood Maps.
However, a small unnamed watercourse (with a catchment of less than 3km2) is
located at the east perimeter of the proposed development. The SEPA Flood Maps
don’t cover small watercourses, but they can still cause serious flooding. You can
view the SEPA Flood Maps and find out more about them at Flood Maps | SEPA -
Flood Maps | SEPA. 
1.3 There are small culverts situated approximately 8m upstream of the site on the
access track to the south and downstream of the site adjacent to Elderslie Guest
House. The path of the watercourse runs through a wooded area which could cause a
blockage to the culvert structures. If the upstream culvert was to become blocked, it
may result in an overland flow path which could inundate the site, similarly blockage
of the downstream culvert could cause water to back up and inundate the site and
other local receptors. We would expect a site-specific assessment to consider a range
of blockage scenarios to investigate these potential flooding mechanisms. 
1.4 We therefore submit a holding objection to the proposed development as it is
potentially at risk of fluvial flooding. To enable us to review our position, we ask that a
detailed Flood Risk Assessment (FRA) is provided which has been completed by a
suitably qualified professional. This should consider the risk from the unnamed
watercourse. For more information on SEPA’s requirements for detailed flood risk
assessments, please see our Technical flood risk guidance for stakeholders
(sepa.org.uk), section 3.3. Please note this document is currently being updated to
reflect changes due to NPF4, so some information may be out-of-date.
Advisories
1.5 We advise that you contact your Flood Risk Management Officer who may be able to
Page 52

Page 53

OFFICIAL
OFFICIAL
provide further information regarding flood history and flooding issues in the area.
1.6 Safe access/egress by emergency vehicles and surface water risks are matters under
the remit of the local Flood Risk Management Authority at Argyll and Bute Council. It
is therefore for the Council to consider theses issues. 
1.7 We recommend that an appropriate buffer zone is considered. We recommend that
for channel widths of less than 2 meters, a riparian corridor with of 10 meters remains
undeveloped on each channel bank.
2. Other planning matters
2.1 For all other planning matters, please see our triage framework and standing advice
which are available on our website: www.sepa.org.uk/environment/land/planning/
3. Regulatory advice for the applicant
3.1 Details of regulatory requirements can be found on the regulations section of our
website or by contacting our local compliance team at ahsh@sepa.org.uk. 
If you have queries relating to this letter, please contact us at planning.north@sepa.org.uk. 
Your sincerely 
Jessica Fraser, Planning Officer, Planning Service 
Ecopy to: fiona.scott@argyll-bute.gov.uk 
Disclaimer: This advice is given without prejudice to any decision made on elements of the
proposal regulated by us, as such a decision may take into account factors not considered at this
time. We prefer all the technical information required for any SEPA consents to be submitted at the
same time as the planning or similar application. However, we consider it to be at the applicant's
commercial risk if any significant changes required during the regulatory stage necessitate a
further planning application or similar application and/or neighbour notification or advertising. We
have relied on the accuracy and completeness of the information supplied to us in providing the
above advice and can take no responsibility for incorrect data or interpretation, or omissions, in
such information. If we have not referred to a particular issue in our response, it should not be
assumed that there is no impact associated with that issue. For planning applications, if you did not
specifically request advice on flood risk, then advice will not have been provided on this issue.
Further information on our consultation arrangements generally can be found on our website
planning pages - www.sepa.org.uk/environment/land/planning/
Page 53

Page 54

This page is intentionally left blank

Page 55

OFFICIAL
OFFICIAL 
Fiona Scott Our Ref:  PCS-20003215
Planning Department Your Ref:  24/01069/PPP
Argyll and Bute Council   
SEPA Email Contact:
By email only to: planning.olandi@argyll-
bute.gov.uk
planning.north@sepa.org.uk   
16 October 2024
Dear Fiona Scott 
Town and Country Planning (Scotland) Acts
Renewal of planning permission in principal reference 19/02562/PPP (approved at
appeal) (Site for the erection of 2 dwellinghouses)
Land South East Of Elderslie, Oban, Argyll And Bute 
Thank you for your re-consultation on the above planning application which was received
by SEPA on 1 October 2024 in relation to the above application. We note this follows our
previous response referenced PCS-20002028 and dated 11 July 2024. 
Following review of the information provided, we currently maintain our holding
objection to this application on the basis of flood risk and request that determination is
deferred until the information outlined below has been provided for our assessment.  
1. Flood risk
1.1 In line with National Planning Framework 4 (Policy 22), a precautionary approach to
flood risk should be taken by avoiding development within areas at risk of flooding
(land or built form with an annual probability of being flooded of greater than 0.5%
Page 55

Page 56

OFFICIAL
OFFICIAL
which must include an appropriate allowance for future climate change).
1.2 There is a potential fluvial flood risk from a small unnamed burn to the east of the site.
The SEPA Future Flood Maps don’t cover small watercourses (catchments <3km2),
but they can still cause serious flooding. You can view the SEPA Flood Maps and find
out more about them at Flood Maps | SEPA - Flood Maps | SEPA. The development
is potentially within the flow path of the unnamed burn in the event of out-of-bank
flooding.
1.3 A flood risk/drainage impact assessment was carried out in September 2024 by JBA
Consulting on behalf of the Planning Authority. This report provided calculations on
the culvert capacity at the northeast corner of the site. The culvert was calculated to
be able to convey flows from a 1 in 200 plus climate change flood event. 
1.4 To verify the calculations and to determine that the development is not at risk of
flooding, in the first instance, we would request the following information.
a. Topographic ground level information relating to the pre- and post-development
ground and if available minimum finished floor levels relative to Ordnance Datum.
Topographic level information should include at least one site sections and
extended cross sections across the watercourse (including the channel bed levels
and bank levels of both the nearside and opposite bank), upstream, downstream
and adjacent to the site.
b. Information on the culvert which should include the material the culvert is made
from and levels of the inlet and outlet of the culvert relative to Ordnance Datum
along with culvert length. The approximate flood relief level at the culvert is also
required. In addition to this, photographs of the culvert at the northeast corner of the
site are required. 
1.5 If the above information demonstrates that the development is well elevated above
the banks of the watercourse, we may be able to remove our objection in relation to
flood risk. However, the applicant should be aware that if this information is
insufficient to provide a robust assessment of the risk of flooding to the proposed
development, then a detailed Flood Risk Assessment may need to be carried out by a
Page 56

Page 57

OFFICIAL
OFFICIAL
suitably qualified professional.
1.6 In addition to the above, in our previous response we highlighted the requirement for
a buffer strip adjacent to the watercourse. We note that this application is for renewal
of planning permission in principle and therefore a detailed site layout will be
submitted at a later stage. However, the current site layout plan shows an area of
paving over a small section of the watercourse. SEPA are generally opposed to
culverting for land gain and would expect that the watercourse is left free of
development, including an appropriate buffer area. We are likely to request this by
condition. The buffer strip should be inline with Highland Councils Riparian buffer strip
guidance in their Flood Risk and Drainage Impact Assessment Supplementary
Guidance. Although please note we may comment further on an appropriate buffer
distance following submission of the above requested flood risk information.  
If you have queries relating to this letter, please contact us at planning.north@sepa.org.uk. 
Your sincerely 
Jessica Fraser
Planning Officer
Planning Service 
Ecopy to:   Fiona.Scott@argyll-bute.gov.uk   
Disclaimer: This advice is given without prejudice to any decision made on elements of the
proposal regulated by us, as such a decision may take into account factors not considered at this
time. We prefer all the technical information required for any SEPA consents to be submitted at the
same time as the planning or similar application. However, we consider it to be at the applicant's
commercial risk if any significant changes required during the regulatory stage necessitate a
further planning application or similar application and/or neighbour notification or advertising. We
have relied on the accuracy and completeness of the information supplied to us in providing the
above advice and can take no responsibility for incorrect data or interpretation, or omissions, in
such information. If we have not referred to a particular issue in our response, it should not be
assumed that there is no impact associated with that issue. For planning applications, if you did not
specifically request advice on flood risk, then advice will not have been provided on this issue.
Further information on our consultation arrangements generally can be found on our website
planning pages - www.sepa.org.uk/environment/land/planning/
Page 57

Page 58

This page is intentionally left blank

Page 59

OFFICIAL
OFFICIAL 
Graham MacEachen Our Ref:  PCS-20005081 
Your Ref:  24/01069/PPP   
SEPA Email Contact:
By email only to: gm@pointfivebd.com  planning.north@sepa.org.uk   
22 April 2025
Dear Graham MacEachen 
Town and Country Planning (Scotland) Acts
24/01069/PPP
Renewal of planning permission in principal reference 19/02562/PPP (approved at
appeal) (Site for the erection of 2 dwellinghouses)
Land South East Of Elderslie, Oban, Argyll And Bute 
Thank you for your email relating to the above planning application which was received by
SEPA on 30 March 2025. We note this follows our previous response referenced PCS-
20003215 (16 October 2025). As this relates to a live planning application, we have also
copied in the case officer at Argyll and Bute Council for information. 
We have considered the two photographs attached to your email. However, unfortunately
these are not sufficient to demonstrate that the site is not at risk from flooding. We
therefore currently maintain our holding objection to this application on the basis of
flood risk.  
We confirm that our previous comments (PCS-20003215) still apply. Please therefore refer
to our previous letter. We have also provided some further explanation below which we
hope will assist.
Page 59

Page 60

OFFICIAL
OFFICIAL 
1. Flood risk
1.1 In our previous response (PCS-20003215) we requested that a topographic ground
level survey relative to Ordnance Datum is undertaken to assess the fluvial risk to the
site from the small unnamed burn at the site. Small watercourses can cause serious
flooding, especially during summer convective storms, which have been observed to
generate the highest peak flows in small catchments such as this one. It therefore
needs to be ensured that the site is not at flood risk from this small watercourse pre-
and post-development, which is why minimum finished floor levels are also requested,
if available. As the Planning Authority has confirmed that this site does not fall into
any of the exceptions of National Planning Framework 4 (Policy 22a), the
development site must sit outwith the flood risk area.   
1.2 We also asked that topographic ground level information include at least one site
sections and extended cross sections across the watercourse (including the channel
bed levels and bank levels of both the nearside and opposite bank), upstream,
downstream and adjacent to the site. This is to determine whether the channel can
convey flows of a 1 in 200 year flood event, with an allowance for climate change,
without flooding the site. We appreciate the submission of photographs of the channel
however we cannot determine cross sectional levels from these photographs.   
1.3 As previously highlighted, we acknowledge the assessment carried out in relation to
the culvert in the northeast corner of the site in September 2024 by JBA Consulting.
However, to enable verification, and to ensure the culvert can convey flows from a 1
in 200 plus climate change flood event without affecting the development site, we
asked that information be submitted on: the material the culvert is made from, levels
of the inlet and outlet of the culvert relative to Ordnance Datum, culvert length, the
approximate flood relief level at the culvert  and photographs of the culvert at the
northeast corner of the site. It is particularly important that full consideration is given
to the culverts as the development is situated within a wooded area, and therefore
blockage from wood debris can affect the conveyance of flows.  
Page 60

Page 61

OFFICIAL
OFFICIAL
1.4 For our full advice, please see our previous response, which also included advice on
buffer strips. We will be happy to review our comments following submission of the
above requested information. However, we wish to highlight that if that information is
insufficient to provide a robust assessment of the risk of flooding to the proposed
development, then a detailed Flood Risk Assessment may need to be carried out by a
suitably qualified professional.
If you have queries relating to this letter, please contact us at planning.north@sepa.org.uk
including our reference number in the email subject. 
Your sincerely, 
Jessica Fraser
Planning Officer
Planning Service 
Ecopy to:   Fiona.Scott@argyll-bute.gov.uk   
Disclaimer: This advice is given without prejudice to any decision made on elements of the
proposal regulated by us, as such a decision may take into account factors not considered at this
time. We prefer all the technical information required for any SEPA consents to be submitted at the
same time as the planning or similar application. However, we consider it to be at the applicant's
commercial risk if any significant changes required during the regulatory stage necessitate a
further planning application or similar application and/or neighbour notification or advertising. We
have relied on the accuracy and completeness of the information supplied to us in providing the
above advice and can take no responsibility for incorrect data or interpretation, or omissions, in
such information. If we have not referred to a particular issue in our response, it should not be
assumed that there is no impact associated with that issue. For planning applications, if you did not
specifically request advice on flood risk, then advice will not have been provided on this issue.
Further information on our consultation arrangements generally can be found on our website
planning pages - www.sepa.org.uk/environment/land/planning/
Page 61

Page 62

This page is intentionally left blank