Argyll and Bute Council
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 605522
DX 599700 LOCHGILPHEAD 
16 October 2025 
NOTICE OF MEETING 
A meeting of the ARGYLL AND BUTE LOCAL REVIEW BODY will be held in IN THE
COLONSAY HOTEL, SCALASAIG, ISLE OF COLONSAY AND BY MICROSOFT TEAMS on
THURSDAY, 23 OCTOBER 2025 at 11:00 AM, which you are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. CONSIDER NOTICE OF REVIEW REQUEST: LAND SOUTH EAST HIGH TOR
COTTAGE, ISLE OF COLONSAY, PA61 7YW (REF: 25/0005/LRB) 
(a) Further Written Information from Applicant (Pages 3 - 4)  
(b) Further Written Information from Planning (Pages 5 - 10)  
(c) Comments from Interest Parties (Pages 11 - 16) 
Argyll and Bute Local Review Body 
Councillor Kieron Green (Chair) Councillor Daniel Hampsey
Councillor Mark Irvine   
Contact: Fiona McCallum   Tel: 01546 604392
Public Document Pack

Page 2

This page is intentionally left blank

Page 3

BS010 - TEXT_ANNO
BS096 - REVISION TABLE
BS098 - REVISION CLOUDS
BS098 - TITLESHEET
BS098 - TITLESHEET (NON-PLOT)
BS099 - VIEWPORT
BS020 - DIMENSIONS
.
.
A
a
s
d
a
s
d
aa
s
d
a
s
d
000
Bracewell Stirling CONSULTING 4865-LRB01LRB - ADDITIONAL INFORMATION REQUEST
Notice of Review - Reference 25/0005/LRB
(Planning Reference: 24/00770/PPP)
Land East High Tor Cottage, Scalasaig,
Isle of Colonsay, PA61 7YW
Response to LRB Additional Information Request: Provide an
indicative proposal of the style of development and the different areas that the
development could be sited on the plot.
The application site extends to circa 3153m2 (0.315 Hectares) or 0.78
Acres.
In order to inform the submission, the applicant commissioned a
topographical study of the site, which included adjacent buildings and
roads. This topographical information was used as the basis to form the
submission documents (extracts opposite of drawings 4865-02-304, 06 &
09).
Through extensive site analysis the applicant identified:
- A suitable location for the site access, which was deemed
acceptable to the Local Authority Roads department - Mr James
Ross - Statutory Consultee Response - 22/05/2024
- Suitable areas to locate a new dwelling that will result in minimal
ground disturbance, correspond visually with adjacent properties,
enhance bio diversity and mitigate the minimal impact of non native
species loss.
- Suitable areas for drainage infrastructure
To enable the applicant to find a permanent home on the island and
accommodate his working life. The applicant seeks to erect a modest
two bedroom detached dwelling, with the necessary site amenities, such
as access, turning, parking etc.
The proposed building will extend to circa 150m2 of floor area, 10-12 %
of which will be used to accommodate a small home office.
In keeping with neighbouring dwellings, the floor area of the proposed
building represents a circa 4.75% build to site area ratio.
The design of the new dwelling will meet the Local Authorities
Sustainable Development Principles and minimise environmental impact
through energy-efficient design, material choices and integration with the
landscape. The palette of building materials will be sourced locally where
possible, and reflect the area's built heritage.
The applicant acknowledges the benefits of a Low Visual Impact Building
and reiterates the points made in earlier representations during the LRB
appeal process.
"The Hebrides and West coast offer many examples of how new
dwellings have been successfully integrated into the surrounding
landscape via a low impact approach, some examples are provided
below. As this is a subjective matter, we urge members to review the
LVA and come to their own conclusions on whether a dwelling or a
suitably designed low impact dwelling could be accommodated on the
site without negatively impacting the surrounding landscape."
(Examples of Low Visual Impact Buildings are offered opposite this text.)
Similarly the applicant wishes to highlight the LVIA established no
adverse visual impact from the erection of a single new dwelling located
within the application site.
Further to this, the LVIA illustrated that it is possible to mitigate the loss
of the non-native species, by replicating the landscape feature, on the
opposite side of the site and achieve a net biodiversity gain through the
provision of native trees and shrubs.
Low Visual Impact Building Example 1 Low Visual Impact Building Example 2 Low Visual Impact Building Example 3
LVIA extract - Visual Baseline
LVIA extract - Proposed Photo Montage - Traditional Building
Site Appraisal Establishing Site Fetaures Site Appraisal Indicating Potential Build AreasTopographical Appraisal
Page 3
Agenda Item
3a

Page 4

This page is intentionally left blank

Page 5

Classification: OFFICIAL
The below suggested conditions are provided as requested and are done so without
prejudice to the case put forward by the planning authority. 
CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. (24/00770/PPP,
LRB Reference 25/0005/LRB) 
Standard Time Limit Condition  (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions  
1. PPP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 25.04.2024, supporting information, and the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Location Plan 4865-02-301 B 26.04.2024
General
Development
Layout
4865-02-309 B 26.04.2024
Site Access and
Waste
Management
4865-02-307 B 26.04.2024
Site Appraisal -
Topographical
4865-02-306 B 26.04.2024
Topographical
Survey
4865-02-305 B 26.04.2024
Site
Appraisal –
Biodiversity and
Sustainable
Transport
4865-02-304 B 26.04.2024
Local Development  4865-02-303 B 26.04.2024 
Reason: To accord with Regulation 28 of the Town and Country Planning
(Development Management Procedure) (Scotland) Regulations 2013. 
2. PPP – Matters Requiring AMSC Submission 
Plans and particulars of the matters specified in conditions 3, 4, 5, 6, 7, 8, and 10
below shall be submitted by way of application(s) for Approval of Matters Specified in
Conditions in accordance with the timescales and other limitations in Section 59 of the
Town and Country Planning (Scotland) Act 1997 as amended. Thereafter the
development shall be completed wholly in accordance with the approved details. 
Reason: To accord with Section 59 of the Town and Country Planning (Scotland) Act
1997 as amended. 
Page 5 Agenda Item 3b

Page 6

Classification: OFFICIAL  
3. PPP –  BUILDING SITING, DESIGN & FINISHES – INDIVIDUAL BUILDING 
Pursuant to Condition 1 – no development shall commence until plans and particulars
of the site layout, design and external finishes of the development have been
submitted to and approved by the Planning Authority. These details shall incorporate: 
iv. A statement addressing the Action Checklist for developing design contained
within the Argyll and Bute Sustainable Design Guide 2006; 
v. A statement addressing how the proposed development has been designed to
be consistent with the six qualities of successful places, as defined within
Policy 14 of NPF4; 
vi. Maximum of 1.5 storeys in design; 
vii. Details of finished ground floor levels relative to an identifiable fixed datum
located outwith the application site; 
Reason: To accord with Section 59 of the Town and Country Planning (Scotland) Act
1997 as amended, and in order to integrate the proposed dwellinghouse with its
surrounds. 
4. PPP – Full Landscaping Scheme 
No development shall commence until a scheme of boundary treatment, surface
treatment and landscaping has been submitted to and approved in writing by the
Planning Authority. The scheme shall comprise a planting plan and schedule which
shall include details of: 
i. Existing and proposed ground levels in relation to an identified fixed datum; 
ii. Existing landscaping features and vegetation to be retained; 
iii. Proposed hard landscaping works including the location design and materials
of proposed surfaces, walls, fences and gates; 
iv. Proposed soft landscaping works including the location, species and size of
every tree/shrub to be planted;  
v. A programme for the timing, method of implementation, completion and
subsequent on-going maintenance. 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme unless otherwise approved in writing by the Planning Authority. 
Any trees/shrubs which within a period of five years from the completion of the
approved landscaping scheme fail to become established, die, become seriously
diseased, or are removed or damaged shall be replaced in the following planting
season with equivalent numbers, sizes and species as those originally required to be
planted unless otherwise approved in writing by the Planning Authority. 
Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity. 
Page 6

Page 7

Classification: OFFICIAL
5. PPP – Biodiversity Enhancement 
Pursuant to Condition 1 - no development shall commence until a biodiversity
statement has been submitted to and approved by the Planning Authority. The
statement shall demonstrate how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these benefits will be
implemented and maintained for the lifetime of the development. 
All physical biodiversity enhancement measures (bird nesting boxes, ‘swift bricks’,
wildlife ponds, bat and insect boxes, hedgehog homes etc) shall be implemented in
full before the development hereby approved is first brought into use. 
All biodiversity enhancement measures consisting of new or enhanced planting shall
be undertaken either in accordance with the approved scheme of implementation or
within the next available planting season following the development first being
brought into use. 
The biodiversity statement should refer to Developing with Nature guidance |
NatureScot as appropriate.  
Reason: To comply with the requirements of NPF4 Policy 3  
6. PPP - Single Building Access Requirements 
Pursuant to Condition 1 – no development shall commence until plans and particulars
of the means of vehicular access and parking/turning arrangements to serve the
development have been submitted to and approved by the Planning Authority. Such
details shall incorporate:      
i. Formation of the junction serving the development site in accordance with the
Council’s Roads Standard Detail Drawing SD 08/004 Rev a; with visibility
splays measuring 2.40 metres to point X by 75 metres to point Y from the centre
line of the junction 
ii. A long section for the proposed vehicular access, starting at the public road
and terminating at the parking and turning area for the proposed dwelling. The
gradient over the first 5m of the private access shall be less than 5% and
thereafter should not exceed 12%; 
iii. A refuse collection point adjacent to the public road; 
iv. No fence, walls or hedges within 2.00 metres of the edge of the public road or
back of service bay; 
v. Strictly no excavation works within the public road embankment; 
ii. The provision of parking and turning in accordance with the requirements of
Policy 40 and Table 5 of the Argyll and Bute Local Development Plan 2 2024. 
Prior to work starting on site, the approved scheme of works in respect of junction
layout shall be formed to at least base course standard and the visibility splays shall
be cleared of all obstructions such that nothing shall disrupt visibility from a point 1.05
metres above the junction at point X to a point 0.6 metres above the public road
carriageway at point Y. The final wearing surface on the access shall be completed
Page 7

Page 8

Classification: OFFICIAL
prior to the development first being brought into use and the visibility splays shall be
maintained clear of all obstructions thereafter. 
The approved parking and turning layout shall be implemented in full prior to the
development first being occupied and shall thereafter be maintained clear of
obstruction for the parking and manoeuvring of vehicles. 
Reason: In the interests of road safety. 
Note to Applicant:    
• A Road Opening Permit under the Roads (Scotland) Act 1984 must be
obtained from the Council’s Roads Engineers prior to the formation/alteration
of a junction with the public road. 
• The access shall be constructed and drained to ensure that no surface water
is discharged onto the public road. 
7. PPP – Surface Water Drainage – Requirement for DIA 
Pursuant to Condition 1 – no development shall commence until a Drainage Impact
Assessment, which includes a scheme for management of surface water within the
development site, has been submitted to and approved by the Planning Authority. 
The duly approved scheme shall be implemented in full concurrently with the
development that it is intended to serve and shall be operational prior to the occupation
of the development and shall be maintained as such thereafter. 
Reason: To ensure the provision of an adequate surface water drainage system and
to prevent flooding. 
8. PPP – Details of New Private Foul Drainage System 
Pursuant to Condition 1 – no development shall commence until details of the
proposed means of private foul drainage to serve the development have been
submitted to and approved by the Planning Authority. 
The duly approved scheme shall be implemented in full concurrently with the
development that it is intended to serve and shall be operational prior to the occupation
of the development. 
Reason: To ensure that an adequate means of foul drainage is available to serve the
development. 
Note to Applicant: 
• Private drainage arrangements are also subject to separate regulation by
Building Standards and SEPA. 
9. PPP – Removal of PD Rights - Dwellinghouse: 
Page 8

Page 9

Classification: OFFICIAL
Notwithstanding the provisions of the Town and Country Planning (General Permitted
Development) (Scotland) Order 1992 (as amended), (or any Order revoking and re-
enacting that Order(s) with or without modifications), nothing in Article 2(4) of or the
Schedule to that Order, shall operate so as to permit, within the area subject of this
permission, any development referred to in Part 1 and Classes 1A, 1B, 1C, 1D, 2A,
2B, 3A, 3AA, 3B, 3C, 3D, 3E, 6G, 6HC and Part 2 and Class 9 of the aforementioned
Schedule, as summarised below: 
PART 1: DEVELOPMENT WITHIN THE CURTILAGE OF A DWELLINGHOUSE    
Class 1A: Any enlargement of a dwellinghouse by way of a single storey ground floor
extension, including any alteration to the roof required for the purpose of the
enlargement. 
.  
Class 1B: Any enlargement of a dwellinghouse by way of a ground floor extension
consisting of more than one storey, including any alteration to the roof required for the
purpose of the enlargement. 
Class 1C: The erection, construction or alteration of any porch outside any external
door of a dwellinghouse. 
Class 1D: Any enlargement of a dwellinghouse by way of an addition or alteration to
its roof. 
Class 2A: The erection, construction or alteration of any access ramp outside an
external door of a dwellinghouse. 
Class 2B: Any improvement, addition or other alteration to the external appearance of
a dwellinghouse that is not an enlargement. 
Class 3A: The provision within the curtilage of a dwellinghouse of a building for any
purpose incidental to the enjoyment of that dwellinghouse or the alteration,
maintenance or improvement of such a building. 
Class 3AA: The provision within the curtilage of a dwellinghouse of a building for any
purpose incidental to the enjoyment of that dwellinghouse. 
Class 3B: The carrying out of any building, engineering, installation or other operation
within the curtilage of a dwellinghouse for any purpose incidental to the enjoyment of
the dwellinghouse. 
Class 3C: The provision within the curtilage of a dwellinghouse of a hard surface for
any purpose incidental to the enjoyment of that dwellinghouse or the replacement in
whole or in part of such a surface. 
Class 3D: The erection, construction, maintenance, improvement or alteration of any
deck or other raised platform within the curtilage of a dwellinghouse for any purpose
incidental to the enjoyment of that dwellinghouse. 
Class 3E: The erection, construction, maintenance, improvement or alteration of any
gate, fence, wall or other means of enclosure any part of which would be within or
would bound the curtilage of a dwellinghouse. 
Class 6G: The installation, alteration or replacement of a free standing wind turbine
within the curtilage of a dwelling
Page 9

Page 10

Classification: OFFICIAL 
Class 6HC: The installation, alteration or replacement of a wind turbine on a detached
dwellinghouse.  
PART 2: SUNDRY MINOR OPERATIONS 
Class 9: Stone cleaning or painting of the exterior of a building. 
No such development shall be carried out at any time within this Part and these
Classes without the express grant of planning permission. 
Reason: To protect the sensitive area and the setting of the proposed dwellinghouse,
in the interest of visual amenity and public health, from unsympathetic siting and
design of developments normally carried out without planning permission; these
normally being permitted under Article 2(4) of the Town and Country Planning (General
Permitted Development) (Scotland) Order 1992 (as amended). 
10. PPP – Timescale to be Agreed for Completion 
Pursuant to Condition 1. – no development shall commence until details of the
proposed timescale for completion of the approved development have been submitted
to and approved by the Planning Authority. Thereafter, the development shall be
implemented in accordance with the duly approved timescale for completion unless an
alternative timescale for completion is otherwise agreed in writing with the Planning
Authority. 
Reason: In order to comply with the requirements of NPF4 Policy 16F. 
END. 
Page 10

Page 11

Classification: OFFICIAL
My objections still refer to the nature and wildlife that will be disturbed by building in
this area. Wild goats often come to this piece of ground as do buzzards and a hen
harrier and otters. It is a sheltered area in a dip for wildlife on an exposed coastline. 
As for the design of the proposed building - it is not in keeping with the other
properties on the seafront. Argyll and Bute have in the past been very insistent that
the houses on the shore should be of a similar style and this proposed structure is in
no way similar. There is a natural end to the shore line properties with the next stage
of housing being further back. It will be very visible from the sea as you approach the
island and will detract from the balance that is there at present. 
Sheena Nisbet
26 August 2025
Page 11 Agenda Item 3c

Page 12

This page is intentionally left blank

Page 13

Classification: OFFICIAL
Hi Fiona, 
Thank you for the further opportunity to comment on this outline planning
application. 
I note that the site meeting will be focussed on the landscape and primarily from a
factual perspective. 
I note that draft / illustrative planning conditions have been prepared for the
possibility of outline planning approval being given. 
Unless I wasn’t copied in, I note that the applicant has not at this stage provided
more specific detail on precise building location or design, relying on a map from the
earlier paperwork. 
In terms of the visual impacts, I would ask the visiting Council team to look for the
following features: 
- the physical coherence of the Glassard settlement (reflecting its planned nature); 
- the general uniformity of the building design; 
- the lie of the buildings in the landscape (tucked into the the hillside without intruding
in the view of the sky or sea); 
- the more elevated and potentially intrusive position of the proposed site (which
would intrude very differently in the view of sky and sea); 
- the size and position of the copse of fir trees (“Mary Beaton’s wood”), planted as a
windbreak and vulnerable to being felled by winter gales if thinned out); and finally 
- the general nature of the housing in the immediate vicinity (residential rather than
industrial / commercial and traditional design). 
I remain of the view that a building on this particular site would be visually
incongruous; but also inconsistent with the zoning / designation of the land in the
local plan. 
It would also be inconsistent with the Council undertakings given at the previous
Council site visit to consider the planning application in relation to Fasgadh, where it
was stated explicitly that Fasgadh would not set a precedent for further ribbon
development to the South (reflected in the subsequent decision to exclude that site
from the development zones in the local plan). 
On both planning and political grounds, I think the granting of outline planning
Page 13

Page 14

Classification: OFFICIAL
permission would clearly therefore be open to challenge. 
On the draft planning conditions provided, I do not think that these justify a
development here. They are prospective mitigations. 
Some of those would, of course, be vital in the event of a decision to proceed - the
design and landscaping would be vital for the visual impact, as would the use of the
site more generally. 
The prevention of noise pollution would also be essential. The area is unusually
quiet. There is no crofting, agricultural or other such business activity involving noise.
That is why a wind turbine, immediately adjacent to other residential properties,
would be so incongruous and antisocial. 
In summary, I do not see that there is a way of granting permission here that would
not be open to challenge, primarily because the Council would be deviating from its
own adopted policies and plans in an unreasonable manner.
So I think the Council should stick with its decision to refuse outline planning
permission. 
Kind regards, 
Donald Carmichael
5 September 2025
Page 14

Page 15

Classification: OFFICIAL
Hello Fiona 
Thank you for giving an opportunity to comment further on this outline planning
application. 
I am of the opinion expressed in my earlier correspondence that any building
development on this site would be inappropriate. 
To grant outline planning permission there:
• risks the potential for ribbon development to be extended all along the coast
from Glassard to Scalasaig
• goes against the Council's own express commitment that the earlier
controversial application to build Am Fasgadh would not set a precedent for
further development; an assurance given following the Council's site visit at
that time which I well recall
• ignores the decision made that that area would be excluded from the
development zones in the local plan
In addition to these pertinent facts there is much else to take into consideration:
• visually the site in question is in a much more prominent position than the rest
of Glassard which is low-lying in comparison and does not obstruct the
magnificent vistas of sea, sky and the surrounding islands to north, east and
south
• the application entails an additional access being created on this single-track
road close to several others which serve five existing properties
• the impact, aesthetically and materially, on the environment would be
detrimental and irretrievable
• creating access to and building here will inevitably lead to loss of habitat and
shelter - trees where bats and herons roost, the open area where hen harriers
hunt, a place where slow worms find protection, and where water from on of
Glassard's old wells still flows
• potential for noise pollution is a concern in an area which is generally quiet
and unaffected by the sounds associated with machinery, construction or
agriculture
• the inevitable loss of even a few trees will spell an end to those that remain in
the windbreak simply by exposure to gales; this is already borne out by some
unnecessary felling carried out by the Estate in recent years. Any new
plantings would take decades to  establish and mature
Page 15

Page 16

Classification: OFFICIAL
• the sense of space and uninterrupted horizon presently enjoyed by residents
and passers-by at this location has great amenity value precisely on account
of its attractiveness and unimpeded aspect - in my opinion it is one of
Colonsay's greatly appreciated 'breathing spaces'
This list is not exhaustive but I would request that the Council representatives and
their visiting team take into consideration the nature of this small island and its
unique qualities while deliberating on the above factors relating to landscape and
buildings in the landscape, the area's visible features, aspects, its environment and
aesthetic appeal. 
In conclusion, I would emphasise the Council's earlier decisions in relation to land
designation and zoning in the local plan, and its previous undertaking not to permit
further development in this area south of Glassard. 
I believe therefore that the Council's decision to refuse planning permission should
remain unchanged. 
Kind regards
Mary Carmichael
11 September 2025
Page 16