STATEMENT OF CASE FOR ARGYLL AND BUTE COUNCIL 
LOCAL REVIEW BODY
Ref: 25/0009/LRB 
REFUSAL OF PLANNING PERMISSION FOR THE ERECTION OF DWELLINGHOUSE 
LAND WEST OF HELENSLEA, TIGHNABRUAICH, ARGYLL 
Statement of Case
The planning authority is Argyll and Bute Council (“the Council”). The appellant is Mr Mark
Brunjes(“the appellant”). There is no agent employed to act upon Mr Brunjes’s behalf in this
case. 
Planning application 24/00271/PPP, which proposed the erection of a dwelling house, was
refused under delegated powers on the 28th July 2025. The planning decision has been
challenged and is subject of review by the Local Review Body. This is the response by the
Council to the application for a review. 
Background 
Section 25 of the Town & Country Planning (Scotland) Act 1997 provides that where, in
making any determination under the planning Acts, regard is to be had to the
development plan and determination shall be made in accordance with the development
plan unless material considerations indicate otherwise. 
Subsequent to the decision please note that Argyll and Bute Local Development Plan 2
(LDP2) has been adopted on the 28th February 2024. 
Argyll and Bute Council considers the determining issue in relation to the case are as follows: 
• Access to the application site to accommodate the proposed house. 
The Report of Handling (please refer to Appendix 1) sets out Planning and Regulatory
Services assessment of the planning application in terms of policy within the current adopted
Argyll and Bute Development Plan and all other material planning considerations. 
REQUIREMENT FOR ADDITIONAL INFORMATION AND A HEARING 
The proposal constitutes a Local Development in accordance with the Town and Country
Planning (Hierarchy of Developments) (Scotland) Regulations 2009, has no complex or
challenging issues and has not been the subject of significant third party representations. It is
not considered that a Hearing is required. 
COMMENTS ON APPELLANT’S STATEMENT 
The Village Brae is narrow, steep access with limited passing places which is the main
access to the site. The Village Brae by the nature of the constraints on either side of the road
and the topography mean that is cannot be improved i.e. passing places can’t be provided
and widths cannot be increased. 
The key issue is therefore whether the proposal is an intensification of use. 
The appellant states that “The current building on the land was erected on 1918 and was
used continuously by three generations of the McKellar family as a commercial joiner’s

Page 2

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Classification: OFFICIAL
workshop until 1996, and the road access adjacent to Helenslea title plan was in regular use
until the previous owner passed away. During this time the commercial traffic for the
business would have been considerably more than now.” 
The appellant then states “The application site has been used as a commercial premises for
many years and could continue to be used to this effect should I wish to do so. I am of the
view that replacing the workshop with a home would not constitute an intensification of
usage from the commercial use. If anything, I would consider a single dwelling to have less
usage and be an improvement and more in keeping with the pattern of development of the
village and an opportunity to regenerate the vacant site.” 
Officer Response:  The issue in relation to traffic is whether or not the previous commercial
use was capable of being resumed without a requirement for planning permission. We are of
the opinion that the use has been discontinued (it closed in 1996, which is 29 years ago) and
subsequently the evidence as provided with the application suggests the commercial use to
be abandoned. In this instance the planning officers did not afford any significant weight to
the commercial use and therefore viewed it as an intensification of use. 
Members should note that abandonment of a use is not defied in law but there is established
case law.  The leading case is Trustees of Castell-y-Mynach Estate v Taff-Ely BC [1985] and
confirmed in Hughes v SSETR [2000]. This case set out key criteria – the physical condition
of the property, the period of non-use, and intervening uses. In this instance the building was
considered to be severely dilapidated and not capable of accommodating its former use and
the period of non-use is 29 years which is considered significant. 
If Members concluded that there was a legitimate argument that the use could resume then
it would be of relevance as a material consideration in determining whether the proposal
would lead to an intensification or deintensification over existing permitted/lawful activities
utilising the access regime. 
CONCLUSION 
Section 25 of the Town and Country Planning (Scotland) Act 1997 requires that all decisions
be made in accordance with the Development Plan unless material considerations indicate
otherwise.

Page 3

Classification: OFFICIAL
Appendix 1 
Argyll and Bute Council
Development & Economic Growth   
Planning Application Report and Report of Handling as required by Schedule 2 of the
Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013 relative to applications for Planning Permission or Planning
Permission in Principle 
Reference No: 24/00271/PPP
Planning Hierarchy: Local Application
Applicant: Mr Mark Brunjes
Proposal: Demolition of Existing Workshop, Erection of Dwellinghouse and
Detached Annex and Associated Drainage Arrangements
Site Address: Land West of Helenslea, Tighnabruaich    
DECISION ROUTE 
☒Delegated - Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997 
☐Committee - Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission 
• Erection of a dwelling house and detached annex
• Installation of private foul drainage system
• Creation of private water supply
• Formation of parking and turning for two vehicles 
(ii) Other specified operations 
• Demolition of existing workshop
• Use of existing site access 
(B) RECOMMENDATION: 
Having due regard to the Development Plan and all other material considerations, it
is recommended that Planning Permission in Principle be refused for the reasons
appended to this report. 
(C) CONSULTATIONS:   
Environmental Health Officer (memo dated 25.03.2024)

Page 4

Classification: OFFICIAL
No objections subject to conditions and informative notes regarding lighting, noise
during demolition and construction works, micro-renewable energy, waste
arrangements, etc. 
Scottish Water (letter dated 02.04.2024)  
There is currently sufficient capacity in the Tighnabruaich Water Treatment Works to
service the development. 
The proposal would be serviced by Tighnabruaich Waste Water Treatment Works
although Scottish Water is unable to confirm current capacity. In order to allow them
to fully appraise the proposals, Scottish Water suggest that the applicant completes
a Pre-Development Enquiry (PDE) Form and submits it directly to them via their
Customer Portal or contacts Development Operations.  
For reasons of sustainability, and to protect their customers from potential future
sewer flooding, Scottish Water will not accept any surface water connections into
their combined sewer system. 
Contaminated Land Officer (memo dated 15.04.2024) 
The application involves the redevelopment of land where there is an indication of
previous uses which may be contaminative. Further information could be provided
by the applicant to clarify this although if this is not available or forthcoming or it
indicates potential land contamination issues then it is recommended that Planning
Permission should be granted with a condition requiring the carrying out of a phased
site investigation and risk assessment and, if necessary, the implementation of a
remediation strategy and verification plan. 
Area Roads Engineer (report dated 20.11.2024)   
An objection is raised to the proposal on the following grounds: 
• The upper section of the adopted U035 Village Brae is a single-track road
measuring less than 5.5 metres in width and lacking any passing places. This
road currently serves 14 residential properties and, due to geographical
limitations, there is insufficient capacity to implement the necessary road
improvements to accommodate the intensification in usage 
• The private access road connecting the adopted road U035 Village Brae to
the proposed development site has a width of less than 5.5 metres. It
currently provides access to 8 properties with a large amount of on-street
parking and, due to existing constraints, it cannot be improved to ensure safe
access and egress at the proposed development site 
(D) HISTORY:   
An application for Planning Permission (ref: 08/01593/DET) for the demolition of the
existing workshop and the erection of a dwellinghouse at the site that is the subject
of the current application was withdrawn on 17th February 2009.   
(E) PUBLICITY:

Page 5

Classification: OFFICIAL 
Neighbour notification in accordance with the requirements of the Development
Management Procedure (Scotland) Regulations 2013 (expiry date: 15th April 2024)
and advertised under Regulation 20 (expiry date. 26th April 2024). 
(F) REPRESENTATIONS:   
(i) Objections have been received from the following eight sources:  
Colin Wood, Flat 2, Lorne Place, Tighnabruaich (received on 01.04.2024, 
08.04.2024, 10.04.2024 and 11.04.2024) 
Elizabeth Gairns, Flat 7, Lorne Place, Tighnabruaich (received on
05.04.2024) 
Sheena Currie, Crarae Cottage, Bobby’s Brae, Tighnabruaich (received on
06.04.2024) 
David McCreadie, Flat 6, Lorne Place, Tighnabruaich (received on
07.04.2024) 
Lorna Weir, Flat 3, Lorne Place, Tighnabruaich (received on 08.04.2024) 
Roderick Roberts, The Cuillins, Tighnabruaich (received on 10.04.2024) 
George Houston, Flat 1, Lorne Place, Tighnabruaich (received on
10.04.2024) 
Agnes Cook, Flat 4, Lorne Place, Tighnabruaich (received on Tighnabruaich
11.04.2024) 
(ii) Summary of issues raised: 
• Constrained access – various comments from all of those above on access
stating that, if the development is granted, it would be dangerous and
detrimental to the access and amenity of the properties on Lorne Place which
is narrow and a dead end. 
Congestion is currently experienced on Lorne Place as there is no off-street
parking (photographs submitted of parked cars – up to 6 cars can be parked
blocking the route between Village Brae and the application site) and
concern is expressed that any service (refuse) and emergency vehicles
would be impeded. The existing parking cars would be displaced and make
the situation worse. Some residents have mobility issues and need to park
close to their house. 
• Drainage and Sewage – will require investigation. 
• Contamination – there is a risk of contamination to the burn from building
and drainage works. The burn is host to brown trout and there is a deep pool
just below the site. Materials dumped on the land are visible on the side of
the burn and there could be more dumping of material. It ranges from old
bikes, sanitary ware and building supplies.

Page 6

Classification: OFFICIAL 
• Residential Amenity – The house will result in a reduction in the amenity of
residents of Lorne Place, The Cuillins and Helenslea. 
Officer comment: all of the above matters will be is addressed in the
assessment below.  
• Ownership - the boundary plans are incorrect. The Title Deeds show that the
westerly boundary of Lorne Place extends from the south-easterly corner of
Lorne Place along the line of the southerly wall. Therefore, the westerly
boundary for Lorne Place is approx.4.5m/other states 6.5m further to the
west than is shown on the applicant’s plan.  The proposed parking and annex
are therefore encroaching on land owned by Lorne place. 
Officer comment: The application plans have been amended to remove the
land in question (approx. 111 sqm) from the application site and this is
considered an acceptable variation. Section 34A of the Town and Country
Planning (Scotland) Act 1997 (as amended) makes provision for an
application for Planning Permission in Principle to be varied with the
agreement of the Planning Authority after it has been registered but prior to
its determination. It also mentions that, when an application is varied under
this section, the Planning Authority may give notice of the variation to
neighbouring parties “as they consider appropriate”. 
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Impact Assessment Report: ☐Yes ☒No 
(ii) An Appropriate Assessment under the Conservation
(Natural Habitats) Regulations 1994:   
☐Yes ☒No 
(iii) A Design or Design/Access statement: 
(iv) Sustainability Checklists (with reference to the
requirements of LDP2 Policy 04) 
TN06 Sustainability Checklist 
TN07 Sustainable Buildings Checklist
☒Yes ☐No 
☒Yes ☐No 
☒Yes ☐No 
(v) A report on the impact of the proposed development e.g.
Retail impact, transport impact, noise impact, flood risk,
drainage impact, etc.
☐Yes ☒No 
(H) PLANNING OBLIGATIONS 
Is a Section 75 obligation required:   ☐Yes ☒No

Page 7

Classification: OFFICIAL 
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  ☐Yes ☒No 
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account
in assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy 
Sustainable Places 
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
NPF4 Policy 5 – Soils 
NPF4 Policy 9 – Brownfield, Vacant and Derelict Land and Empty Buildings  
NPF4 Policy 12 – Zero Waste
NPF4 Policy 13 – Sustainable Transport 
Liveable Places 
NPF4 Policy 14 – Design, Quality and Place 
NPF4 Policy 15 – Local Living and 20 Minute Neighbourhoods 
NPF4 Policy 16 – Quality Homes 
NPF4 Policy 18 – Infrastructure First 
NPF4 Policy 22 – Flood Risk and Water Management 
Argyll and Bute Local Development Plan 2 (Adopted 2024) 
Spatial and Settlement Strategy 
Policy 01 – Settlement Areas
Policy 04 – Sustainable Development 
High Quality Places 
Policy 05 – Design and Placemaking
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 10 – Design – All Development 
Connected Places 
Policy 34 – Electric Vehicle Charging Points
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes

Page 8

Classification: OFFICIAL
Policy 37 – Development Utilising an Existing Private Access or Existing Private
Road
Policy 40 – Vehicle Parking Provision 
Sustainable Communities 
Policy 58 – Private Water Supplies and Water Conservation 
Policy 60 – Private Sewage Treatment Plants and Wastewater Drainage Systems 
Policy 61 – Sustainable Urban Drainage Systems (SUDS)
Policy 63 – Waste Related Development and Waste Management 
Homes for People 
Policy 66 – New Residential Development on Non-Allocated Housing Sites within
Settlement Areas 
High Quality Environment 
Policy 71 – Development Impact on Local Landscape Area (LLA) 
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 77 – Forestry, Woodland and Trees
Policy 79 – Protection of Soil and Peat Resources
Policy 82 – Contaminated Land 
(ii)  List of all other material planning considerations taken into account in
the assessment of the application, having due regard to Annex A of
Circular 3/2013. 
• Third Party Representations 
• Consultation Responses 
• Planning History 
• TN06 Sustainability Technical Note and Checklist (Oct. 2023)
• TN07 Sustainable Buildings Technical Note and Checklist (Oct. 2023)
• ABC Housing Needs and Demand Assessment
• ABC Housing Emergency Statement
• ABC Design Guides 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment:  ☐Yes ☒No 
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  ☐Yes ☒No 
(M) Does the Council have an interest in the site:  ☐Yes ☒No 
(N) Requirement for a pre-determination hearing: ☐Yes ☒No

Page 9

Classification: OFFICIAL
(O)(i) Key Constraints/Designations Affected by the Development: 
Bute and South Cowal Local Landscape Area 
Potential Contaminated Land 
SEPA Waste Water Drainage Consultation Area 
(O)(ii) Soils 
Agricultural Land Classification:  Built Up Area
Peatland/Carbon Rich Soils
Classification:
☐Class 1
☐Class 2
☐Class 3
☒N/A 
Peat Depth Classification: N/A  
Does the development relate to croft
land?
☐Yes ☒No
Would the development restrict access
to croft or better quality agricultural
land?
☐Yes ☐No ☒N/A
Would the development result in
fragmentation of croft / better quality
agricultural land?
☐Yes ☐No ☒N/A 
iii) Woodland  
Will the proposal result in loss of
trees/woodland? 
☐Yes
☒No
Does the proposal include any
replacement or compensatory
planting?
☐Yes
☐No details to be secured by condition
☒N/A  
(O)(iv) Land Status / LDP Settlement Strategy 
Status of Land within the Application  ☒Brownfield
☐Brownfield Reclaimed by Nature
☐Greenfield 
ABC LDP2 Settlement Strategy
☒Settlement Area
☐Countryside Area
☐Remote Countryside Area
☐Helensburgh & Lomond Greenbelt
ABC LDP2 Allocations/PDAs/AFAs,
etc.: 
N/A   
(P) Assessment and summary of determining issues and material considerations 
Planning Permission in Principle is sought for the erection of a dwellinghouse on
land west of Helenslea, Tighnabruaich

Page 10

Classification: OFFICIAL
The key issues for consideration are: 
• Principle of Development
• Local Living and Sustainable Transport
• Sense of Place and Quality of Design
• Natural Environment
• Access and Parking
• Infrastructure and Services (Including Waste Storage and Collection)
• Flood and Water Management
• Contaminated Land 
Site and surroundings 
The application site has an area of approximately 1,435m2 and contains an old
dilapidated workshop. The land is currently vacant and considered brownfield. It sits
off the Village Brae in the village of Tighnabruaich off a private access that serves
properties at Lorne Place and a detached dwelling at Helenslea. The site is close to
the village centre where there are a few shops, restaurants and a hotel. The area
has a number of historic buildings but none are listed and it is not a Conservation
Area. The site and workshop have been vacant since 1996 and previous to this it
was used as a commercial site.   
As set out in the planning history an application was made in 2008 for a house but
the roads comments at the time were raising concern about the substandard
condition of the road, the ownership/right of access and parking/turning
requirements. The application was then withdrawn. There was no details on this
application file of the previous commercial use. 
Proposed Development 
The application proposes the demolition of the dilapidated workshop and the erection
of a dwellinghouse and a small detached annex (for use as a home office) plus new
foul drainage treatment works with a soakaway. The indicative footprint of the house
is approximately 72m2. The existing private access will be extended into the site and
a turning area and parking for two cars provided.  The application is made in principle
and therefore does not include any detailed design for the house or annex. 
Settlement and Spatial Strategy 
The site is located within the village of Tighnabruaich which, along with neighbouring
Kames, is identified as a Key Rural Settlement Area in the Argyll and Bute Local
Development Plan 2 2024 (LDP2) wherein the provisions of Policy 01 serve to give
encouragement in principle for up to and including small scale housing development
on appropriate sites. 
Policy 01 states that proposals within settlements will be acceptable if they are
compatible with the surrounding uses including but not exclusively, providing access,
service areas, infrastructure for existing, proposed or potential future development
and are of an appropriate scale and fit for the size of settlement in which they are
proposed. 
NPF4 Policy 9 (a) supports development on brownfield sites and the site in this case
is brownfield and redevelopment in principle is supported by this part of the policy.
Part (c) relating to contaminated land is examined below and, if permission was to

Page 11

Classification: OFFICIAL
have been approved, a condition would have been attached requiring an appropriate
assessment to be prepared and, if necessary, suitable remediation measures to be
agreed and implemented. 
The proposal is supported in principle because it is a small-scale residential infill
development within a settlement but there is an issue with the access which means
it is contrary to the Settlement Strategy as indicated above – LDP2 Policy 01 and, in
turn, NPF4 Policy 9. 
Housing Policy 
NPF4 Policy 16 and LDP2 Policy 66 operate a general presumption in favour of
housing development provided that the location and scale accords with the
provisions of LDP2 Policy 01 unless there is an unacceptable environmental,
servicing or access impact. NPF4 Policy 16 supports development for new homes
on land not allocated for housing in the LDP where the proposal is consistent with
the plan spatial strategy and other relevant policies including local living and 20
minute neighbourhoods (Policy 15) and must meet one of the criteria under Part (iii).
It is considered that the proposal meets the third point which gives support for smaller
scale opportunities within an existing settlement boundary. It is also close to the
facilities and amenities of the village so meets Policy 15. 
However, the policies all state that the proposal must accord with all other relevant
policies. In this case, it is not considered that the site has capacity to accommodate
a dwellinghouse without resulting in a materially detrimental impact upon road safety. 
On this basis, it is considered that the proposal is not consistent with LDP2 Policies
01 and 66 given the significant access issues, which are examined in detail later in
this report. 
Design and layout 
NPF4 Policy 14 and LDP2 Policies 05, 08, 09 and 10 serve to ensure that new
development, by reason of density and layout, effectively integrate with the urban
setting and they resist developments with poor quality or inappropriate layouts or
densities including over-development. 
In addition, LDP2 Policy 71 relates to Local Landscape Areas (LLAs) and it seeks to
resist development where its scale, location or design would have a significant
adverse impact on the character of the landscape. 
The application includes an indicative layout and it is considered that a dwellinghouse
with a modest footprint would not represent an overdevelopment of the site and
would have a ‘neutral’ effect thereby preserving the character and appearance of the
LLA within which the site is located. 
As the current application seeks to establish the principle of a dwellinghouse, no
specific design has been submitted for assessment by the Planning Authority. If
permission was to have been granted, it would be at the ‘approval of matters
specified in condition’ stage where the details of the proposed development would
have been assessed in the context of the various criteria set out in the ‘place
principle’ referred to in NPF4 Policy 14. 
Residential Amenity of Neighbours

Page 12

Classification: OFFICIAL
There is concern from some of the contributors with regard to overlooking but this
cannot be considered given there are no detailed designs. The indicative layout that
is shown in the submitted plans identifies that there would be sufficient distance
between the new house and neighbouring properties. 
If permission was to have been granted, it would have been at the ‘approval of
matters specified in condition’ stage where issues such as overlooking of garden
areas, window to window distances, etc. would have been considered in detail. 
Access and Parking 
NPF4 Policy 13 supports development that provide easy access by sustainable
transport modes and also provide charging points for vehicles and cycles and safe,
secure cycle parking. 
Argyll and Bute LDP2 Policy 35 (Design of New and Existing Public Roads and
Private Access), Policy 37 (Development Utilising an Existing Private Access), Policy
39 (Construction Standards for Private Access) and Policy 40 (Vehicle Parking
Provision) are all relevant in the assessment of the proposal. 
In addition, Policy 66 (e) states that new residential development must have “an
appropriate standard of access to and parking for vehicles associated with the
development is provided, it does not result in the loss of any existing parking spaces,
and that traffic generated as a result of the development is capable of being
accommodated within the capacity of the existing road network surrounding the
development.” A material consideration is the Roads Development Technical
Guidance. 
As explained above in the description of the proposed development, vehicular
access to the site is obtained from the U035 Village Brae via a private road. Village
Brae, whilst unclassified, is a publicly adopted road that presently serves 14
residential properties. The road is narrow and has a steep gradient at parts with no
passing places. 
LDP2 Policy 35 states that “acceptance of development utilising new and existing
public roads, private roads and private access regimes is subject to road safety and
street design issues being addressed to the satisfaction of the Roads Authority and
the Planning Authority.” 
The Council’s published Roads Development Technical Guidance does not
specifically deal with situations such as the current application where there are issues
with the capacity of the adopted road network to accommodate further development.
However, the document does provide advice on those cases where a proposed
development would be served by an existing private access and this is considered
to be sufficiently analogous to the existing application for a similar approach to be
considered. In such cases, the Technical Guidance advocates that each application
should be considered on its own merits with the assessment principally being based
on environment, local context and predicted access requirements (for example,
deliveries and refuse collection). 
In the case of the current application, the Roads Department have carried out an
assessment and their conclusion is that Village Brae does not have the capacity to
accommodate any further development and that, due to geographical constraints,
this public road cannot be improved. This is the basis of one of the reasons for refusal
recommended by the Roads Department.

Page 13

Classification: OFFICIAL 
At the time of the officer site visit in June 2024, the easternmost boundary of the land
on which the dwellinghouse is to be erected was enclosed with Heras fencing and it
is this land over which vehicular access would be taken into the curtilage of the
proposed property. Two signs were attached to the fencing with the wording ‘Do not
enter – Caution Unsafe building’ and ‘No parking – Keep clear’. The site itself is
considerably overgrown and, in addition to the dilapidated workshop, various items
were being stored, including building materials, a bicycle and a boat. 
On the basis of the above observations, it is reasonable to conclude that no vehicles
have been using the access into the site for a considerable period of time. 
As highlighted by the neighbours, there are constraints on the section of private road
between the public road and the development site, which is approximately 22.5
metres in length. At present, this is a relatively narrow access that is in front of a
terraced row of 8 houses known as Lorne Place. 
The properties do not have off-street parking and residents park their vehicles along
the access thus causing a significant level of congestion. The parking of vehicles on
this access would prevent the safe access and egress of cars in association with the
occupation of the proposed dwellinghouse. 
Although it could be used as a means of addressing the issue referred to in the
preceding paragraph, the displacement of the existing parking area in order to keep
the access clear for vehicles associated with the occupation of the proposed
dwellinghouse is likely to have an adverse effect on the usage of Village Brae on the
basis that there would be the potential for cars to be parked in alternative locations
that would compromise road safety. 
The applicant was approached regarding the access and provided a written response
on 21st November 2024: 
- Prior to purchasing the site in 2000, the workshop was used as a commercial
builder/joiners work business until 1996, and has been in continuous use by
me since 2000.
- The road to the site is typical of those in the town. There is adequate passing
space for vehicles with a row of parked cars on the other side of the road.
- The proposed development includes on-site parking, using a legal right of
way by means of access into the development site. It would not cause the
residents to need to park elsewhere. 
- The premise of this objection is the development will cause parking
congestion, as noted this is not the case. The site has an established access
point and parking provision, which under its current use could be legally
operated commercially and which would arguably cause more disruption to
the residents of Lorne Place. The proposal will rejuvenate the site, remove
dilapidated buildings and build a small home with no increase to on street
parking. 
In a more recent communication, the agent (e-mail dated 1st July 2025) has enquired
if a condition restricting the number of cars at the proposed dwellinghouse to one
would be a mechanism that could be used to manage traffic. 
The above points have been taken into account but they are not considered to be of
sufficient strength to overcome the significant adverse effects on road safety and the
local road network that are identified in this report.

Page 14

Classification: OFFICIAL 
In this evidential context, given that the Council’s Roads Department has advised
that the existing public road does not have the capacity for the development of any
additional dwellinghouse without essential improvement works being carried out but
that, due to geographical constraints, such improvement works would be
unachievable, the proposal fails to comply with LDP2 Policies 35 and 37 and with
criterion (e) of LDP2 Policy 66 in respect of matters of road safety. 
In terms of parking and turning provision within the site, LDP2 Policy 40 specifies
that a dwellinghouse with 2-3 bedrooms should include two in-curtilage parking
spaces whilst three spaces are stipulated in association with a 4 or more bedroom
unit. 
The current proposal indicates the erection of a three-bedroomed dwellinghouse and
a detached annexe (which is to be used as a home office) and two parking spaces
would require being included within the curtilage of this type of property. This
provision is met in the indicative site layout that has been submitted with the
application. 
In terms of the vehicle charging points referred to in LDP2 Policy 34, the applicant
has confirmed that dedicated cable ducting could be installed to support the provision
of a charging point. The proposal, therefore, complies with LDP2 Policies 34 and 40. 
Servicing and Infrastructure 
NPF4 Policy 18 seeks to encourage, promote and facilitate an infrastructure first
approach to land use planning, which puts infrastructure considerations at the heart
of placemaking. NPF4 Policy 22(c) supports proposed developments if they can be
connected to the public water mains. The above NPF4 Policies are underpinned in
LDP2 Policy 60 (Private Sewage Treatment Plants and Wastewater Drainage
Systems). 
Scottish Water has confirmed that there is currently sufficient capacity in the public
water supply and public sewerage system to accommodate the proposal. However,
it is proposed that the dwellinghouse would be served by a private foul drainage
system and a private water supply. 
Policy 60 of the Argyll and Bute Local Development Plan 2 states that if a connection
to the public sewer connection is not feasible, then the applicant must demonstrate
this either for technical or economic reasons. The applicant submitted a document
from Building Cost Consultants (a RICS Quantity Surveyor) that contained
comparative costings for the two drainage options – connection to the mains sewer
or treatment on the site and discharge to the adjacent watercourse. 
The submitted information indicates that connection to the public system would be
more expensive than providing private arrangements, with the final figure being
dependent on the cost of obtaining a wayleave. The applicant also confirmed it was
a similar issue with the private water supply. Based on this information, it is
considered that there is sufficient justification for an exception to be made in this case
and, if permission was to have been granted, further details could have been secured
via conditions. 
In addition, NPF4 Policy 12(c) expects that developments (including residential
proposals) should incorporate measures to allow the appropriate segregation and
storage of waste together with convenient access for the collection of waste. The

Page 15

Classification: OFFICIAL
NPF4 Policy is underpinned in LDP2 Policy 63 (Waste Related Development and
Waste Management). 
It is considered that the application has sufficient land to provide storage bins and, if
permission was to have been granted, further details could have been secured via a
condition. 
Flood and Water Management 
NPF4 Policy 22(c) supports proposed developments that would not increase the risk
of surface water flooding to others, or itself be at risk; that would manage all rain and
surface water through sustainable urban drainage systems; and that would minimise
the area of impermeable surface. The above NPF4 Policy is underpinned in LDP2
Policy 55 (Flooding) and Policy 61 (Sustainable Drainage Systems). 
The site is not within a flood risk zone. The applicant does not include any details of
the surface water drainage but there is sufficient land and a nearby burn to discharge
into so it is likely to be achievable to provide a suitable system. 
If permission was to have been granted, further details could have been secured via
a condition and, therefore, the proposed development is considered to accord with
the relevant Policies. 
Contaminated Land 
NPF4 Policy 9 (c) states that where land is known or suspected to be unstable or
contaminated, development proposals will demonstrate that the land is, or can be
made safe and suitable for the proposed new use. Policy 82 of LDP2 also states the
requirement for the applicant to undertake a contaminated land assessment and
implement suitable remediation measures before the commencement of any new
use. 
The applicant completed the contaminated land questionnaire and stated that some
dumping had occurred on the land, including garden waste, grass cuttings and
discarded household items. This was removed when the applicant arranged for the
site to be fenced to stop this issue. The contaminated land officer has commented
that there is still potential for contaminants to be present so, if permission was to
have been granted, appropriate further assessment could have been secured via a
condition 
Conclusion 
Notwithstanding that the application proposal is acceptable in principle and also in
respect of siting and design, noise and impacts on neighbouring properties,
biodiversity and infrastructure and services including waste, it fails to provide a safe
means of vehicular access into the development site and would result in the loss of
existing on-street parking. As such, Planning Permission in Principle should be
refused for the proposal. 
(Q) Is the proposal consistent with the Development Plan: ☐Yes ☒No 
(R) Reasons why Planning Permission or Planning Permission in Principle Should
be Granted:

Page 16

Classification: OFFICIAL 
N/A 
(S) Reasoned justification for a departure to the provisions of the Development
Plan 
N/A 
(T) Need for notification to Scottish Ministers or Historic Environment Scotland:
☐Yes ☒No   
Author of Report: Kirsty Sweeney Date: 
Reviewing Officer:  Date: 
Fergus Murray
Head of Development & Economic Growth

Page 17

Classification: OFFICIAL
REASON FOR REFUSAL RELATIVE TO APPLICATION REF. NO. 24/00271/PPP 
1. The existing public road U035 (Village Brae) in this part of Tighnabruaich currently
serves 14 properties and is a single track road measuring less than 5.5 metres in width
that has a lack of passing places. On the basis of these limitations, it is considered
that the road in its current form does not have the capacity to accommodate the
increase in vehicular movements associated with the development of an additional
dwellinghouse. 
Due to the inherent geographical constraints associated with the road, the
implementation of commensurate improvements such as increases in width and the
provision of additional passing places is unachievable. 
In addition, the private access that connects the application site and the public road
has a width of less than 5.5 metres and provides on-street parking for 8 properties.
The parking of vehicles on this access would prevent the safe access and egress of
cars in association with the occupation of the proposed dwellinghouse. 
Although it could be used as a means of addressing the issue referred to in the
preceding paragraph, the displacement of the existing parking area in order to keep
the access clear for vehicles associated with the occupation of the proposed
dwellinghouse is likely to have an adverse effect on the usage of Village Brae on the
basis that there would be the potential for cars to be parked in alternative locations
that would compromise road safety. 
Having regard to all of the foregoing, the proposed development is considered to be
contrary to Policy 9 of National Planning Framework 4 and Policies 01, 35, 37 and
66(e) of the Argyll and Bute Local Development Plan 2.

Page 18

Classification: OFFICIAL
List of Plans and Documents relevant to the refusal 
Title Drawing No. Version/Issue Date Filed
Location and Site
Plan
PL-001 A 19/08/2024

Page 19

Classification: OFFICIAL
APPENDIX TO DECISION REFUSAL NOTICE 
Appendix relative to application 24/00271/PPP 
(A) Has the application been the subject of any “non-material”
amendment in terms of Section 32A of the Town and Country
Planning (Scotland) Act 1997 (as amended) to the initial submitted
plans during its processing. 
The extent of the red line delineating the boundary of the application
site was reduced in order to correspond with the land ownership of
the applicant.
☒Yes ☐No 
(B) The reason why planning permission has been refused: 
The proposal is considered to be contrary to Policy 9 of National Planning
Framework 4 and Policies 01, 35, 37 and 66(e) of the Argyll and Bute Local
Development Plan 2, and there are no other material considerations of sufficient
significance to indicate that it would be appropriate to grant Planning Permission in
Principle in this instance as a departure to the Development Plan having regard to
s25 of the Act.

Page 20

197826
197876
197926
197968672876
672926
672976
673018
A8003
Crarae
Oakburn
Hotel
Helenslea
Lorne
Place
Appin
Cottages
197826
197876
197926
197968672876
672926
672976
673018
A8003
Crarae
Oakburn
Hotel
Helenslea
Lorne
Place
Appin
Cottages
Parking and turning for 2no.
vehicles.
Surface water and treated foul to
soakaway, discharging to
adjacent burn to engineer's
design.
Domestic foul treatment  works
with sampling chamber,
discharging to soakaway to
engineer's design.
Footprint of proposed dwelling.
Existing access to site.
Existing vegetation cut pack as
required.
Annex adjecent to house
Existing dilapidated workshop
building to be demolished
SCALE (@ A1)
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
ISSUE STATUS
Do not scale from this drawing.
This drawing is to be read in conjunction with all relevant
architecture, civil / structural and service engineers
drawings and specifications.
All dimensions are shown in metric.
This drawings remains the copyright of.
TECHNIQUE ARCHITECTURE AND DESIGN LTD.
Technique
Architecture & Design
+44(0)141-266-0265
info@techniquestudio.com
www.techniquestudio.com
As indicated
A
04/03/2024
Location and Site Plans
160
Land adjecent to Helenslea, Tighnabruaich
M. Brunjes
PL-001
JR
PLANNING
Rev Description Date
- First Issue 16/01/24
A Red Line Boundary Amended 04/03/2024
1 : 500
Proposed Site Plan3 1 : 500
Existing Site Plan2
1 : 2500
Location Plan1
50m 250m
50m10m 50m10m
Argyll and Bute Council
REFUSED by the PLANNING AUTHORITY
Relative to Application No:
24/00271/PPP
Fergus Murray
Head of Development and Economic Growth
28 July 2025