Democracy Spraffa

DPC Landscape 2300391PP

Argyll and Bute Council · 30 June 2026
Back to Argyll and Bute Local Review Body — 30 June 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

8.6 m 
8.8 m 
9.0 m 
8.2 m 
8.2 m 
8.4 m 
8.4 m 
8.4 m 
8.6 m 
8.6 m 
8.6 m 
8.8 m 
8.8 m 
9.0 m 
9.0 m 
9.0 m 
9.2 m 
9.2 m 
9.2 m 
9.4 m 
8.8 m
0 20 40 60m
Scale 1:1000
N
SITE AREA: 6006sqm
1
0003
1
0003
Area of hardstanding to aid in the
collection of waste and recycling
Proposed House
Proposed Tourist Let unit
Site Area: 826sqm
TARBERT
Photovoltaic Panels
Proposed treatment plant
and soawkaway
Surface water soakaway
6m -8m Tarred access road with
service layby
Airsource heat pump
Airsource heat pump
Rural access digram with service layby
Natural land feature - Knoll
Oil secondary heating source
BIODIVERSITY STATEMENT: Proposed species rich long grass area to
be sown with a grass / wildflower seed
mix. Areas to be managed to promote the biodiversity of the
areas with regular
annual cutting of seeded areas and the control of invasive weed
species. Scotia
seeds ' Get Nectar- rich quick mix' sown @ 2g/m2.
BOUNDARY TREATEMENT: to be post and wire fences throughout.
HARD LANDSCAPING: Driveway surface treatement to be
compacted hardcore with a whin/quarry dust finish.
Planning condition 6: no development shall commence until a
scheme of boundary treatment, surface treatment and landscaping has been submitted to
and approved in writing by the Planning Authority. The scheme shall include details of:
i) Location, design and materials of proposed walls, fences and gates;
ii) Surface treatment of proposed means of access and hardstanding areas;
iii) Any proposed re-contouring of the site by means of existing and proposed ground levels;
iv) Proposed hard and soft landscape works;
v) A biodiversity statement demonstrating how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these benefits will be
maintained for the lifetime of the development. The development shall not be occupied until
such time as the boundary treatment, surface treatment and any re-contouring works have
been completed in accordance with the duly approved scheme. All of the hard and soft
landscaping works shall be carried out in accordance with the approved scheme during the
first planting season following the commencement of the development, unless otherwise
agreed in writing by the Planning Authority.
The biodiversity statement should refer to Developing with Nature guidance | NatureScot as
appropriate. Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity, and to comply with the requirements of NPF4 Policy 3
RECONTOURING: Proposed contours shown, building pads avoid
the small 'knoll' to the north of the site so minimal recontouring is
required for this development.
Figured dimensions only are to be taken from this drawing.
All dimensions are to be checked on site before any work is put in hand.
IF IN DOUBT ASK.
CDM:
Hazard Elimination & Risk Reduction has been undertaken and
recorded where appropriate, in accordance with the requirements
of "The Construction (Design and Management) Regulations 2015"
and the associated "Industry Guidance for Designers"
Printed
on :
From
file
:
Project
Client
Lyle House, Fairways Business Park,
Inverness IV2 6AA
T  : 01463 712 288
W  : www.colinarmstrong.com
DateDescriptionRev
Project No.
Revision
Sheet
@ A3
Drawn byDate Created
Scale
Status
X:\Documents\2169 - Proposed
Glamping Pod Big Knowe House\02. WORK IN
PROGRESS\2.1 BIM
Models\2169-CAA-ZZ-XX-M3-A-000001.rvt
31/10/2024 12:32:13
A
1 : 1000
and  Tourist Let
Proposed Dwelling House
Don Dennis, Emma Rennie
and Bryce Harvey
DR- A- 0002
2169
Planning
External Works
Site Plan
AL23.01.23
A Landscape planning condition
wildflower area added
31.10.202
4