MINUTES of MEETING of ARGYLL AND BUTE LOCAL REVIEW BODY held BY MICROSOFT
TEAMS on TUESDAY, 30 JUNE 2026 
Present: Councillor Kieron Green (Chair) 
Councillor Daniel Hampsey  Councillor Mark Irvine 
Attending: Iain Jackson, Governance, Risk and Safety Manager (Adviser)
Fiona McCallum, Committee Services Officer (Minute)
Alan MacDonald, Agent
Dante Lopez, Agent 
1. APOLOGIES FOR ABSENCE 
There were no apologies for absence. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. CONSIDER NOTICE OF REVIEW REQUEST: LAND SOUTH EAST OF
HIGH TOR COTTAGE, ISLE OF COLONSAY, PA61 7YW (REF:
25/0005/LRB) 
The Chair, Councillor Kieron Green, welcomed everyone to the meeting.  He explained
that no person present would be entitled to speak other than the Members of the Local
Review Body (LRB) and Mr Jackson, who would provide procedural advice if required. 
The Chair referred to the previous meeting held following a site inspection on 3 June
2026, where it was agreed to continuation consideration of this case to allow Members
time to seek advice on the preparation of a competent Motion.  It had also been agreed at
that meeting to amend the planning condition 4 in respect of a Full Landscape Scheme, to
also include “details of any trees to be removed including the location, species and size of
every tree/shrubs to be planted”. 
He advised that his first task would be seek confirmation from the Members of the LRB
that they had sufficient information to determination this application today. 
The Members of the LRB confirmed that they had sufficient information. 
Councillor Hampsey moved the following Motion which was confirmed to be competent: 
The Local Review Body, having considered the Notice of Review, all supporting
documentation, representations received, the Appointed Officer's Report of Handling and
Refusal Notice, and having undertaken a site inspection of the review site and its
surroundings, agrees to uphold the review and grant Planning Permission in Principle for
the erection of a dwellinghouse at Land South East of High Tor Cottage, Scalasaig, Isle of
Colonsay (Ref. 24/00770/PPP). 
In reaching this decision, the Local Review Body notes that:

Page 2

1. Following the site inspection, Members are satisfied that the characteristics of the site
and its relationship with the surrounding built form and landscape differ from the level
of impact described within the reasons for refusal. 
2. Members do not consider that the proposal would result in an unacceptable adverse
impact on the landscape character or appearance of the area to the extent originally
identified within the refusal decision. 
3. Members are satisfied that the principle of a single dwellinghouse at this location is
capable of being accommodated without materially undermining the existing settlement
pattern or resulting in unacceptable landscape harm. 
4. The application seeks Planning Permission in Principle only, and detailed matters
relating to siting, scale, design, appearance, landscaping, access arrangements and
mitigation measures would be subject to further consideration through any subsequent
application for approval of matters specified in conditions to ensure compliance with
the relevant provisions of LDP2 policies 02, 04(h), 05, and 08; and NPF4 policies 4(a),
14, and 17.   
5. Members consider that any remaining concerns regarding detailed design, integration
into the landscape and landscaping treatment can be appropriately addressed through
the future approval process and planning conditions. 
The Local Review Body therefore concludes that the reasons for refusal are not of such
significance as to justify withholding planning permission in principle and that, on balance,
the proposal accords with the relevant provisions of National Planning Framework 4 and
the Argyll and Bute Local Development Plan. 
The Local Review Body therefore grants Planning Permission in Principle, subject to the
planning conditions and reasons detailed at pages 5 to 10 of the agenda pack for the
meeting of the LRB held on 3 June 2026 to include the following addition to planning
condition 4 - Full Landscape Scheme, as agreed by the LRB on 3 June, part vi. “details of
any trees to be removed including the location, species and size of every tree/shrubs to be
planted” along with the preparation of a suitable decision notice by the Head of
Development and Economic Growth.” 
Moved by Councillor Daniel Hampsey, seconded by Councillor Mark Irvine. 
Councillor Green thanked Councillor Hampsey for all his work in the preparation of this
competent Motion.  He commented that he thought it would still be challenging on this site
but he was content for the LRB to proceed on this basis.  He stressed it was important that
the detailed planning permission addressed several of the points that had been raised. 
On that basis the Motion was unanimously supported and the Members of the LRB
resolved accordingly. 
Decision 
The Argyll and Bute LRB, having considered the merits of the case de novo agreed to
uphold the review and grant Planning Permission in Principle for the erection of a
dwellinghouse at Land South East of High Tor Cottage, Scalasaig, Isle of Colonsay (Ref.
24/00770/PPP) subject to the following conditions and reasons:

Page 3

Standard Time Limit Condition (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. PPP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 25.04.2024, supporting information, and the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Location Plan 4865-02-301 B 26.04.2024
General
Development
Layout
4865-02-309 B 26.04.2024
Site Access and
Waste
Management
4865-02-307 B 26.04.2024
Site Appraisal -
Topographical
4865-02-306 B 26.04.2024
Topographical
Survey
4865-02-305 B 26.04.2024
Site Appraisal –
Biodiversity and
Sustainable
Transport
4865-02-304 B 26.04.2024
Local
Development 
4865-02-303 B 26.04.2024 
Reason: To accord with Regulation 28 of the Town and Country Planning
(Development Management Procedure) (Scotland) Regulations 2013. 
2. PPP – Matters Requiring AMSC Submission 
Plans and particulars of the matters specified in conditions 3, 4, 5, 6, 7, 8, and 10
below shall be submitted by way of application(s) for Approval of Matters Specified in
Conditions in accordance with the timescales and other limitations in Section 59 of the
Town and Country Planning (Scotland) Act 1997 as amended. Thereafter the
development shall be completed wholly in accordance with the approved details. 
Reason: To accord with Section 59 of the Town and Country Planning (Scotland) Act
1997 as amended. 
3. PPP – BUILDING SITING, DESIGN & FINISHES – INDIVIDUAL BUILDING 
Pursuant to Condition 1 – no development shall commence until plans and particulars
of the site layout, design and external finishes of the development have been
submitted to and approved by the Planning Authority. These details shall incorporate:

Page 4

i. A statement addressing the Action Checklist for developing design contained
within the Argyll and Bute Sustainable Design Guide 2006; 
ii. A statement addressing how the proposed development has been designed to
be consistent with the six qualities of successful places, as defined within Policy
14 of NPF4; 
iii. Maximum of 1.5 storeys in design; 
iv. Details of finished ground floor levels relative to an identifiable fixed datum
located outwith the application site. 
Reason: To accord with Section 59 of the Town and Country Planning (Scotland) Act
1997 as amended, and in order to integrate the proposed dwellinghouse with its
surrounds 
4. PPP – Full Landscaping Scheme 
No development shall commence until a scheme of boundary treatment, surface
treatment and landscaping has been submitted to and approved in writing by the
Planning Authority. The scheme shall comprise a planting plan and schedule which
shall include details of: 
i. Existing and proposed ground levels in relation to an identified fixed datum; 
ii. Existing landscaping features and vegetation to be retained; 
iii. Proposed hard landscaping works including the location design and materials of
proposed surfaces, walls, fences and gates; 
iv. Proposed soft landscaping works including the location, species and size of
every tree/shrub to be planted;  
v. A programme for the timing, method of implementation, completion and
subsequent on-going maintenance; 
vi. Details of any trees to be removed including the location, species and size of
every tree/shrubs to be planted” along with the preparation of a suitable
decision notice by the Head of Development and Economic Growth. 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme unless otherwise approved in writing by the Planning Authority. 
Any trees/shrubs which within a period of five years from the completion of the
approved landscaping scheme fail to become established, die, become seriously
diseased, or are removed or damaged shall be replaced in the following planting
season with equivalent numbers, sizes and species as those originally required to be
planted unless otherwise approved in writing by the Planning Authority. 
Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity. 
5. PPP – Biodiversity Enhancement 
Pursuant to Condition 1 - no development shall commence until a biodiversity
statement has been submitted to and approved by the Planning Authority. The
statement shall demonstrate how the proposal will contribute to

Page 5

conservation/restoration/enhancement of biodiversity, and how these benefits will be
implemented and maintained for the lifetime of the development. 
All physical biodiversity enhancement measures (bird nesting boxes, ‘swift bricks’,
wildlife ponds, bat and insect boxes, hedgehog homes etc) shall be implemented in full
before the development hereby approved is first brought into use. 
All biodiversity enhancement measures consisting of new or enhanced planting shall
be undertaken either in accordance with the approved scheme of implementation or
within the next available planting season following the development first being brought
into use. 
The biodiversity statement should refer to Developing with Nature guidance |
NatureScot as appropriate.   
Reason: To comply with the requirements of NPF4 Policy 3. 
6. PPP - Single Building Access Requirements 
Pursuant to Condition 1 – no development shall commence until plans and particulars
of the means of vehicular access and parking/turning arrangements to serve the
development have been submitted to and approved by the Planning Authority. Such
details shall incorporate:      
i. Formation of the junction serving the development site in accordance with the
Council’s Roads Standard Detail Drawing SD 08/004 Rev a; with visibility splays
measuring 2.40 metres to point X by 75 metres to point Y from the centre line of
the junction; 
ii. A long section for the proposed vehicular access, starting at the public road and
terminating at the parking and turning area for the proposed dwelling. The
gradient over the first 5m of the private access shall be less than 5% and
thereafter should not exceed 12%; 
iii. A refuse collection point adjacent to the public road; 
iv. No fence, walls or hedges within 2.00 metres of the edge of the public road or
back of service bay; 
v. Strictly no excavation works within the public road embankment; 
vi. The provision of parking and turning in accordance with the requirements of
Policy 40 and Table 5 of the Argyll and Bute Local Development Plan 2 2024. 
Prior to work starting on site, the approved scheme of works in respect of junction
layout shall be formed to at least base course standard and the visibility splays shall be
cleared of all obstructions such that nothing shall disrupt visibility from a point 1.05
metres above the junction at point X to a point 0.6 metres above the public road
carriageway at point Y. The final wearing surface on the access shall be completed
prior to the development first being brought into use and the visibility splays shall be
maintained clear of all obstructions thereafter.

Page 6

The approved parking and turning layout shall be implemented in full prior to the
development first being occupied and shall thereafter be maintained clear of
obstruction for the parking and manoeuvring of vehicles. 
Reason: In the interests of road safety. 
Note to Applicant:    
• A Road Opening Permit under the Roads (Scotland) Act 1984 must be obtained
from the Council’s Roads Engineers prior to the formation/alteration of a junction
with the public road. 
• The access shall be constructed and drained to ensure that no surface water is
discharged onto the public road. 
7. PPP – Surface Water Drainage – Requirement for DIA 
Pursuant to Condition 1 – no development shall commence until a Drainage Impact
Assessment, which includes a scheme for management of surface water within the
development site, has been submitted to and approved by the Planning Authority. 
The duly approved scheme shall be implemented in full concurrently with the
development that it is intended to serve and shall be operational prior to the occupation
of the development and shall be maintained as such thereafter. 
Reason: To ensure the provision of an adequate surface water drainage system and to
prevent flooding. 
8. PPP – Details of New Private Foul Drainage System 
Pursuant to Condition 1 – no development shall commence until details of the
proposed means of private foul drainage to serve the development have been
submitted to and approved by the Planning Authority. 
The duly approved scheme shall be implemented in full concurrently with the
development that it is intended to serve and shall be operational prior to the occupation
of the development. 
Reason: To ensure that an adequate means of foul drainage is available to serve the
development. 
Note to Applicant: 
• Private drainage arrangements are also subject to separate regulation by Building
Standards and SEPA. 
9. PPP – Removal of PD Rights - Dwellinghouse: 
PART 1: DEVELOPMENT WITHIN THE CURTILAGE OF A DWELLINGHOUSE    
Class 1A: Any enlargement of a dwellinghouse by way of a single storey ground floor
extension, including any alteration to the roof required for the purpose of the
enlargement.

Page 7

Class 1B: Any enlargement of a dwellinghouse by way of a ground floor extension
consisting of more than one storey, including any alteration to the roof required for the
purpose of the enlargement. 
Class 1C: The erection, construction or alteration of any porch outside any external
door of a dwellinghouse. 
Class 1D: Any enlargement of a dwellinghouse by way of an addition or alteration to its
roof. 
Class 2A: The erection, construction or alteration of any access ramp outside an
external door of a dwellinghouse. 
Class 2B: Any improvement, addition or other alteration to the external appearance of
a dwellinghouse that is not an enlargement. 
Class 3A: The provision within the curtilage of a dwellinghouse of a building for any
purpose incidental to the enjoyment of that dwellinghouse or the alteration,
maintenance or improvement of such a building. 
Class 3AA: The provision within the curtilage of a dwellinghouse of a building for any
purpose incidental to the enjoyment of that dwellinghouse. 
Class 3B: The carrying out of any building, engineering, installation or other operation
within the curtilage of a dwellinghouse for any purpose incidental to the enjoyment of
the dwellinghouse. 
Class 3C: The provision within the curtilage of a dwellinghouse of a hard surface for
any purpose incidental to the enjoyment of that dwellinghouse or the replacement in
whole or in part of such a surface. 
Class 3D: The erection, construction, maintenance, improvement or alteration of any
deck or other raised platform within the curtilage of a dwellinghouse for any purpose
incidental to the enjoyment of that dwellinghouse. 
Class 3E: The erection, construction, maintenance, improvement or alteration of any
gate, fence, wall or other means of enclosure any part of which would be within or
would bound the curtilage of a dwellinghouse. 
Class 6G: The installation, alteration or replacement of a free standing wind turbine
within the curtilage of a dwelling 
Class 6HC: The installation, alteration or replacement of a wind turbine on a detached
dwellinghouse.  
PART 2: SUNDRY MINOR OPERATIONS 
Class 9: Stone cleaning or painting of the exterior of a building. 
No such development shall be carried out at any time within this Part and these
Classes without the express grant of planning permission.

Page 8

Reason: To protect the sensitive area and the setting of the proposed dwellinghouse,
in the interest of visual amenity and public health, from unsympathetic siting and
design of developments normally carried out without planning permission; these
normally being permitted under Article 2(4) of the Town and Country Planning (General
Permitted Development) (Scotland) Order 1992 (as amended). 
10. PPP – Timescale to be Agreed for Completion 
Pursuant to Condition 1. – no development shall commence until details of the
proposed timescale for completion of the approved development have been submitted
to and approved by the Planning Authority. Thereafter, the development shall be
implemented in accordance with the duly approved timescale for completion unless an
alternative timescale for completion is otherwise agreed in writing with the Planning
Authority. 
Reason: In order to comply with the requirements of NPF4 Policy 16F. 
(Reference: Paperwork previously issued for Meetings held on 6 August 2025 and 3 June
2026)