Consider Notice of Review Request: Tarbert Farm, Isle of Gigha (Ref: 26/0002/Lrb)
Argyll and Bute Council · 5 August 2026
Back to Argyll and Bute Local Review Body — 5 August 2026 and its agenda
Text extracted from the council's PDF. Layout and reading order may differ from the original.
Page 1
NON-DETERMINATION OF PLANNING APPLICATION SEEKING A VARIATION OF CONDITION 2 RELATIVE TO PLANNING PERMISSION REF. 23/00391/PP – VARIATION TO SURFACE OF VEHICULAR ACCESS. TARBERT FARM, ISLE OF GIGHA, ARGYLL AND BUTE. PLANNING APPLICATION REF: 25/01961/PP & LOCAL REVIEW BODY REF: 26/0002/LRB REQUEST FOR FURTHER INFORMATION BY WRITTEN SUBMISSIONS – ROADS 13TH JULY 2026 Information Required Roads Comment To provide specific information on the substantive reasons why a tarred surface rather than a concrete surface was required as the Applicant had indicated there was no good reason for the surface to be tar rather than concrete. Bituminous material (commonly referred to as tar) is specified within the Roads Development Technical Guidance of Argyll and Bute Council, for junctions and accesses that connect with the public road network. This is specified over concrete for the following reasons:- 1. Settlement/Flexibility - Bituminous surfacing is highly flexible and will accommodate any ground settlement at the same rate as the adjacent bituminous material, reducing the effects of differential settlement (edge damage, increased maintenance); 2. Maintenance - Bituminous surfacing is advantageous in terms of the ease of maintenance and repair. Any maintenance undertaken only requires a single material to be transported to the island as the road network is constructed from same. Curing time is generally lower for bituminous material. 3. Cost – Noting the above, with a declining revenue budget it has become more important to ensure a single material type is used to mitigate/minimise impact. Multiple materials will create an inefficient and more costly operation as this will require additional vehicles, plant and equipment for the different laying techniques. Note - Approved Drg. No. DR-A-0002 (dated 23/01/23) also detailed a “6-8m tarred access road with service layby” and no request was made by the Applicant to change from bituminous material to concrete. In this case, the applicant has constructed the access without consent under Section 56 of the Roads (Scotland) Act 1984. It is also unclear whether the appointed contractor held appropriate certification as required under the New Roads and Street Works Act 1991. If the tarred surface is required, to confirm if the tar could be overlayed onto the existing concrete rather than the concrete being removed Whilst in theory this may appear a pragmatic solution, the issue of differential settlement, as identified above, would remain.