Democracy Spraffa

Agenda reports pack

Argyll and Bute Council · 14 August 2026
Back to Argyll and Bute Local Review Body — 14 August 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 605522
DX 599700 LOCHGILPHEAD 
7 August 2026 
NOTICE OF MEETING 
A meeting of the ARGYLL AND BUTE LOCAL REVIEW BODY will be held BY MICROSOFT
TEAMS on FRIDAY, 14 AUGUST 2026 at 2:00 PM, which you are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. CONSIDER NOTICE OF REVIEW REQUEST: LAND NORTH EAST OF
GLENMACHRIE, GLENEGEDALE, ISLE OF ISLAY (REF: 26/0003/LRB) 
(a) Notice of Review and Supporting Documentation (Pages 3 - 10)  
(b) Comments from Interested Parties (Pages 11 - 32)  
(c) Comments from Applicant (Pages 33 - 34) 
Argyll and Bute Local Review Body 
Councillor Gordon Blair (Chair) Councillor Andrew Kain
Councillor Reeni Kennedy-Boyle   
Contact: Lynsey Innis, Committee and Democratic Services Officer  Tel:  01546 604338
Public Document Pack

Page 2

This page is intentionally left blank

Page 3

Page 1 of 4
Central Validation Team at Argyll and Bute Council 1A Manse Brae Lochgilphead PA31 8RD  Tel: 01546 605518  Email:
planning.hq@argyll-bute.gov.uk
Applications cannot be validated until all the necessary documentation has been submitted and the required fee has been paid.
Thank you for completing this application form:
ONLINE REFERENCE 100696363-006
The online reference is the unique reference for your online form only. The  Planning Authority will allocate an Application Number when
your form is validated. Please quote this reference if you need to contact the planning Authority about this application.
Applicant or Agent Details
Are you an applicant or an agent? * (An agent is an architect, consultant or someone else acting
on behalf of the applicant in connection with this application)  Applicant  Agent
Applicant Details
Please enter Applicant details
Title: You must enter a Building Name or Number, or both: *
Other Title: Building Name:
First Name: * Building Number:
Address 1
Last Name: * (Street): *
Company/Organisation Address 2:
Telephone Number: * Town/City: *
Extension Number: Country: *
Mobile Number: Postcode: *
Fax Number:
Email Address: *
Mrs
Samantha
Tillbrook 80 Swift Street
80
KY118ZL
Scotland
Dunfermline
Page 3 Agenda Item 3a

Page 4

Page 2 of 4
Site Address Details
Planning Authority:
Full postal address of the site (including postcode where available):
Address 1:
Address 2:
Address 3:
Address 4:
Address 5:
Town/City/Settlement:
Post Code:
Please identify/describe the location of the site or sites
Northing Easting
Description of Proposal
Please provide a description of your proposal to which your review relates. The description should be the same as given in the
application form, or as amended with the agreement of the planning authority: *
(Max 500 characters)
Type of Application
What type of application did you submit to the planning authority? *
  Application for planning permission (including householder application but excluding application to work minerals).
  Application for planning permission in principle.
  Further application.
  Application for approval of matters specified in conditions.
Siting of pod, installation of septic tank and associated works (Retrospective).
Argyll and Bute Council
Land North East of Glenmachrie
651134 133320
Page 4

Page 5

Page 3 of 4
What does your review relate to? *
  Refusal Notice.
 Grant of permission with Conditions imposed.
  No decision reached within the prescribed period (two months after validation date or any agreed extension) – deemed refusal.
Statement of reasons for seeking review
You must state in full, why you are a seeking a review of the planning authority’s decision (or failure to make a decision). Your statement
must set out all matters you consider require  to be taken into account in determining your review. If necessary this can be provided as a
separate document in the ‘Supporting Documents’ section: *  (Max 500 characters)
Note: you are unlikely to have a further opportunity to add to your statement of appeal at a later date, so it is essential that you produce
all of the information you want the decision-maker to take into account.
You should not however raise any new matter which was not before the planning authority at the time it decided your application (or at
the time expiry of the period of determination), unless you can demonstrate that the new matter could not have been raised before that
time or that it not being raised before that time is a consequence of exceptional circumstances.
Have you raised any matters which were not before the appointed officer  at the time the  Yes   No
Determination on your application was made? *
If yes, you should explain in the box below, why you are raising the new matter, why it was not raised with the appointed officer before
your application was determined and why you consider it should be considered in your review: * (Max 500 characters)
Please provide a list of all supporting documents, materials and evidence which you wish to submit with your notice of review and intend
to rely on in support of your review. You can attach these documents electronically later in the process: * (Max 500 characters)
Application Details
Please provide the application reference no. given to you by your planning
authority for your previous application.
What date was the application submitted to the planning authority? *
What date was the decision issued by the planning authority? *
I am requesting a review of the refused planning to allow us to site a storm pod, install septic tank and supporting infrastructure to
allow us to visit the Island an utilise our land for visits with our young family. The long term goal is to build a property on the island
as per the previously approved 23/00426/PPP to move our family and our life to the island. We will require a base on the island to
do this and visit until we are in a position to build, the pod will allow us to do this.
We have engaged with a number of timber build companies such as Scot frame, who have carried out a substantial number of
projects on the island, to discuss development on our land. Our Pod is to facilitate the future build as we were informed utilisation
of a caravan for example is not the preferred option of the council and due to visiting a substantial number of times and staying in
near identical pods over the south of the island we believed this would be looked upon more favourably.
25/00032/PP
09/04/2026
09/01/2025
Page 5

Page 6

Page 4 of 4
Review Procedure
The Local Review Body will decide on the procedure to be used to determine your review and may at any time during the review
process require that further information or representations be made to enable them to determine the review. Further information may be
required by one or a combination of procedures, such as: written submissions; the holding of one or more hearing sessions and/or
inspecting the land which is the subject of the review case.
Can this review continue to a conclusion, in your opinion, based on a review of the relevant information provided by yourself and other
parties only,  without any further procedures? For example, written submission, hearing session, site inspection. *
 Yes   No
In the event that the Local Review Body appointed to consider your application decides to inspect the site, in your opinion:
Can the site be clearly seen from a road or public land? *  Yes   No
Is it possible for the site to be accessed safely and without barriers to entry? *  Yes    No
Checklist – Application for Notice of Review
Please complete the following checklist to make sure  you have provided all the necessary information in support of your appeal. Failure
to submit all this  information may result in your appeal  being deemed invalid.
Have you provided the name and address of the applicant?.  *  Yes   No
Have you provided the date and reference number of the application which is the subject of this  Yes   No
review? *
If you are the agent, acting on behalf of the applicant, have you provided details of your name  Yes   No   N/A
and address and indicated whether any notice or correspondence required in connection with the
review should be sent to you or the applicant? *
Have you provided a statement setting out your reasons for requiring a review and by what  Yes   No
procedure (or combination of procedures) you wish the review to be conducted? *
Note: You must state, in full, why you are seeking a review on your application. Your statement must set out all matters you consider
require to be taken into account in determining your review. You may not have a further opportunity to add to your statement of review
at a later date. It is therefore essential that you submit with your notice of review, all necessary information and evidence that you rely
on and wish the Local Review Body to consider as part of your review.
Please attach a copy of all documents, material and evidence which you intend to rely on  Yes   No
(e.g. plans and Drawings) which are now the subject of this review *
Note: Where the review relates to a further application e.g. renewal of planning permission or modification, variation or removal of a
planning condition or where it relates to an application for approval of matters specified in conditions, it is advisable to provide the
application reference number, approved plans and decision notice (if any) from the earlier consent.
Declare – Notice of Review
I/We the applicant/agent certify that this is an application for review on the grounds stated.
Declaration Name: Mrs Samantha  Tillbrook
Declaration Date: 08/06/2026
Payment Details
Online payment: ZZPL00003062
Payment date: 08/06/2026 14:11:00
Created: 08/06/2026 14:11
Page 6

Page 7

6000
3200
3200
2600
2300
6000 3200
2600
2600
3070
2500
2500
6000 3200
2600
2600
2500
floor plan
SOUTH WEST ELEVATION
cross section
SOUTH EAST ELEVATION
NORTH WEST ELEVATIONNORTH EAST ELEVATION
bedsofa
ensuite
kitchenette
DECKING
multi sensor alarm
to comply with BS
5839: Part 6: 2004.
PIR
aav
PIR
CEILING PENDANT LIGHT FITTING
DOUBLE SWITCHED SOCKET OUTLET
HIGH LEVEL DOUBLE SWITCHED
LIGHT SWITCH
ELECTRIC CONSUMER UNIT AND
METER IF LOCATED TOGETHER
(1000mm ABOVE F.F.L.)
WALL MOUNTED FLOOD LIGHT PIR FITTING WITH INTEGRATED PIR
SOCKET OUTLET
EXTRACTOR FAN
FIRE ALARM
ALL ELECTRICAL WORKS TO
COMPLY WITH BS 7671:2018
Notes
Revision
DateDrawn
Drawing No.
All dimensions to be verified on site prior to commencement of
works or manufacture of any components.
This drawing should not to be scaled from.
If in doubt - Ask!
This drawing is the property of MG Architectural Services and must not be
reproduced without the written consent from MG Architectural Services.
ARCHITECTURAL
SERVICES
AGRICULTURAL-RESIDENTIAL-INDUSTRIAL
Craighead Farm, Mauchline, Ayrshire, Scotland, KA5 6EX
Paper
Contract
MR & MRS TILLBROOK
Willowbank
Glenegedale, Isle Of
Islay, Argyll And Bute
PA42 7AQ
Drawing Title
floor plan, cross section &
elevations.
2025-01-15
S TILLBROOK Jan  2025 A3
PREFABRICATED HOLIDAY CLAMPING POD
Cladding:
Metrotile roof shingles to side and roof
cladding.
Colour: Charcoal grey.
LARCH cladding to front and rear
gables.
Colour: Natural timber
Doors & Windows:
Doors & windows to be double glazed
Upvc units.
Colour: Anthracite Smooth Grey RAL
7016.
3.0
Scale
1:50
Argyll and Bute Council
REFUSED by the PLANNING AUTHORITY
Relative to Application No:
25/00032/PP
Head of Development and Economic Growth
9 April 2026
Page 7

Page 8

Argyll and Bute Council
REFUSED by the PLANNING AUTHORITY
Relative to Application No:
25/00032/PP
Head of Development and Economic Growth
9 April 2026
Page 8

Page 9

Argyll and Bute Council
REFUSED by the PLANNING AUTHORITY
Relative to Application No:
25/00032/PP
Head of Development and Economic Growth 9 April 2026
Page 9

Page 10

This page is intentionally left blank

Page 11

STATEMENT OF CASE 
ARGYLL AND BUTE COUNCIL 
LOCAL REVIEW BODY 
25/0003/LRB 
REFUSAL OF PLANNING PERMISSION REFERENCE
25/00032/PP FOR SITING OF POD, INSTALLATION
OF SEPTIC TANK AND ASSOCIATED WORKS
(RETROSPECTIVE) 
LAND NORTH EAST OF GLENMACHRIE,
GLENEGEDALE, ISLE OF ISLAY 
30 JUNE 2026 
Page 11 Agenda Item 3b

Page 12

STATEMENT OF CASE 
The Planning Authority is Argyll and Bute Council (‘the Council’). The appellant is Mrs
Samantha Tillbrook (“the appellant”). 
Planning permission 25/00032/PP for the siting of a pod, installation of septic tank and
associated works (retrospective) on Land North East of Glenmachrie, Glenegedale, Isle of
Islay  (“the appeal site”) was refused by the Planning Service under delegated powers on the
9 April 2026. 
This decision is the subject of referral to a Local Review Body. 
DESCRIPTION OF SITE 
The site the subject of this Review is situated to the north east of Glenmachrie, Glenegedale,
Isle of Islay comprising an area of rough grazing, generally rectangular in shape, measuring
approximately 0.114 hectares in area. 
The pod, which has been sited, is broadly rectangular shaped in floor area incorporating a
barrel-roof design providing a kitchenette/living/bedroom area, a separate bathroom/ensuite
and a decking area. 
The materials palette includes grey coloured metrotile roof shingles to the side and roof with
natural larch cladding to the front and rear gables. 
STATUTORY BASIS ON WHICH THE APPEAL SHOULD BE DECIDED 
Section 25 of the Town and Country Planning (Scotland) Act 1997 provides that where, in
making any determination under the Planning Act, regard is to be had to the development
plan, and all other material planning considerations and the determination shall be made
in accordance with the plan unless material considerations indicate otherwise.  This is the
test for this application. 
STATEMENT OF CASE 
Argyll and Bute Council considers the determining issues in relation to the case are as follows: 
• Whether the site represents an appropriate opportunity for development with the pod
and whether it complies with National and Local Planning Policy. 
The Report of Handing (Appendix A) sets out the Council’s full assessment of the application
in terms of these determining issues. 
REQUIREMENT FOR ADDITIONAL INFORMATION AND A HEARING 
It is not considered that any additional information is required in light of the appellant’s
submission.  The issues raised were assessed in the Report of Handling which is contained
in Appendix 1.  As such it is considered that Members have all the information they need to
determine the case. Given the above and that the proposal is small-scale, has no complex or
Page 12

Page 13

challenging issues, and has not been the subject of any significant public representation, it is
not considered that a Hearing is required. 
COMMENT ON APPELLANT’S SUBMISSION 
The case from the Planning Service is set out in the Report of Handling appended to this
statement.   
With regards to the Appellant’s submission, Officers have the following comments. 
Whilst it is acknowledged that the site benefits from an extant planning permission in principle,
reference 23/00426/PPP, until 23 July 2026, this permission merely establishes the principle
of a dwellinghouse on the site.  To date, no detailed siting or design details for the proposed
dwellinghouse on the site have been submitted to the Planning Service for consideration. 
In the absence of a live planning permission for the development of the site with a
dwellinghouse, the proposed pod is not considered to be an appropriate development, which
has resulted in the introduction of an incongruous feature within the site and the wider
landscape. 
The proposed pod should not be granted permission in isolation without being backed up by
an associated live planning permission for the development of the site with a dwellinghouse. 
The aspiration of the appellant to utilise the site for the proposed pod to allow them to visit the
island is not a material planning matter. 
CONCLUSION 
Section 25 of the Town and Country Planning Act 1997 (as amended) requires that all
decisions be made in accordance with the development plan unless material considerations
indicate otherwise. 
It remains the view of the Planning Service, as set out in the Report of Handling appended to
this statement, that the granting of permission for the pod would result in a development which
would have an unacceptable impact on the character and appearance of the area.
Taking account of the above, it is respectfully requested that the application for review be
dismissed. 
Page 13

Page 14

APPENDIX A - REPORT OF HANDLING 25/00032/PP 
_________________________________________________________________________
Argyll and Bute Council
Development & Economic Growth  
Delegated or Committee Planning Application Report and Report of handling as
required by Schedule 2 of the Town and Country Planning (Development Management
Procedure) (Scotland) Regulations 2008 relative to applications for Planning
Permission or Planning Permission in Principle
_________________________________________________________________________
Reference No:  25/00032/PP
Planning Hierarchy:  Local Application
Applicant:   Mrs Samantha Tillbrook
Proposal: Siting of pod, installation of septic tank and associated works
(Retrospective)
Site Address: Land North East of Glenmachrie, Glenegedale, Isle of Islay,
Argyll and Bute
_________________________________________________________________________
DECISION ROUTE 
(i) Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997 
_________________________________________________________________________
(A)  THE APPLICATION
(i) Development Requiring Express Planning Permission
• Erection of pod
• Formation of vehicular access to access road 
• Installation of septic tank
(ii) Other specified operations
• Connection to services
_________________________________________________________________________
(B) RECOMMENDATION:
It is recommended that planning permission be refused for the reasons stated
_________________________________________________________________________
(C) HISTORY:   
23/00426/PPP - Site for the erection of dwellinghouse – Approved – 20.07.2023
Page 14

Page 15

Other history of relevance in proximity:
14/01665/PPP - Site for the erection of 3 dwellinghouses, installation of septic tank and
formation of vehicular access - Land North of Glenmachrie, Glenegedale, Isle of Islay -
Approved 04.09.2014 (relates to a site across the road from the current application site).
18/00811/PPP - Site for the erection of 3 dwellinghouses - Land North of Glenmachrie,
Glenegedale, Isle of Islay - Approved 05.07.2018 (relates to a site across the road from the
current application site).
21/02033/PP - Erection of dwellinghouse with integral garage including formation of vehicular
access and installation of sewage treatment plant - Land North West of Glenmachrie (Plot 2),
Glenegedale, Isle of Islay - Approved 09.03.2022 (relates to a site across the road from the
current application site).
19/01135/PP - Erection of dwellinghouse, formation of vehicular access and installation of
septic tank - Plot 1 Land North of Glenmachrie, Glenegedale, Isle of Islay - Approved
31.10.2019.
19/01280/PPP - Site for the erection of dwellinghouse - (Plot 1) Land North of Glenmachrie,
Glenegedale, Isle of Islay - Approved 12.08.2019.
19/01281/PPP - Site for the erection of dwellinghouse - (Plot 2) Land North of Glenmachrie,
Glenegedale, Isle of Islay - Approved 12.08.2019.
19/01282/PPP - Site for the erection of dwellinghouse - (Plot 3) Land North of Glenmachrie,
Glenegedale, Isle of Islay - Approved 12.08.2019. 
19/01283/PPP - Site for the erection of dwellinghouse - (Plot 4) Land North of Glenmachrie,
Glenegedale, Isle of Islay - Approved 12.08.2019.
19/01284/PPP - Site for the erection of dwellinghouse - (Plot 5) Land North of Glenmachrie,
Glenegedale, Isle of Islay - Approved 12.08.2019.
20/01702/PP - Formation of access and installation of sewage treatment plant to serve 5
dwellinghouses - Approved 12.01.2021.
24/02085/PPP - Erection of two detached dwellinghouses and installation of septic tanks –
Approved 21.10.25
_____________________________________________________________________
(D) CONSULTATIONS:  
ABC Roads – No objection subject to conditions - 31.01.2025
Highlands & Islands Airport Lid. (HIAL) – No objection – 06.02.2025
SEPA – No objection – 05.02.2025
Flood Risk Officer - No objection – 24.01.2025
SSEN Transmission – No objection – 28.01.2025
_____________________________________________________________
(E) PUBLICITY:   
Oban Times Advertisement - published 30.01.2025, expired 20.02.2025
Page 15

Page 16

Neighbour notification in accordance with the requirements of the Development  Management
Procedure (Scotland) Regulations 2013
_________________________________________________________________________
(F) REPRESENTATIONS:  
(i) Representations received from:            
N/A
(ii) Summary of issues raised:            
N/A
_________________________________________________________________________
(G) SUPPORTING INFORMATION  
Has the application been the subject of:
(i) Environmental Statement:  No
(ii) An appropriate assessment under the Conservation (Natural Habitats)
Regulations 1994:   No
(iii) A design or design/access statement: No
(iv) Sustainability Checklists: 
TN06 Sustainability Checklist – Yes – 09.01.2025  
TN07 Sustainable Buildings Checklist – Yes – 09.01.2025
Based on the available information, it is considered there is sufficient
information available to issue a decision on the proposed development. 
(v) A report on the impact of the proposed development eg. Retail impact,
transport impact, noise impact, flood risk, drainage impact etc:   No
_________________________________________________________________________
(H) PLANNING OBLIGATIONS
(i) Is a Section 75 agreement required:  No
___________________________________________________________________
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30, 31
or 32:  No
___________________________________________________________________ 
(J)  Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account in
assessment of the application.
Page 16

Page 17

National Planning Framework 4 (Adopted 13th February 2023)  
Part 2 – National Planning Policy  
Sustainable Places  
NPF4 Policy 1 – Tackling the Climate and Nature Crises  
NPF4 Policy 2 – Climate Mitigation and Adaption  
NPF4 Policy 3 – Biodiversity  
NPF4 Policy 4 – Natural Places  
NPF4 Policy 9 – Brownfield, Vacant and Derelict Land and Empty Buildings  
NPF4 Policy 12 – Zero Waste   
Liveable Places  
NPF4 Policy 14 – Design, Quality and Place  
NPF4 Policy 17 – Rural Homes
NPF4 Policy 22 – Flood Risk and Water Management 
Productive Places  
NPF4 Policy 29 – Rural Development
Argyll and Bute Local Development Plan 2 (Adopted 2024)
Spatial and Settlement Strategy
Policy 02 – Outwith Settlement Areas
Policy 04 – Sustainable Development 
High Quality Places
Policy 05 – Design and Placemaking
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 10 – Design – All Development 
Connected Places
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes
Policy 40 – Vehicle Parking Provision 
Sustainable Communities
Policy 55 – Flooding
Policy 60 – Private Sewage Treatment Plants and Wastewater Drainage Systems
Policy 61 – Sustainable Urban Drainage Systems (SUDS) 
(ii) List of all other material planning considerations taken into account in
the assessment of the application, having due regard to Annex A of
Circular 4/2009.
• Consultation Responses
• Planning History
• ABC Technical Note – Biodiversity (Feb 2017)
• TN06 Sustainability Technical Note and Checklist (Oct. 2023)
Page 17

Page 18

• TN07 Sustainable Buildings Technical Note and Checklist (Oct. 2023)
• Local Living and 20 Minute Neighbourhoods: Planning Guidance
(Scottish Government) 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment:  No
_________________________________________________________________________
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  Yes
24/02197/PREAPP – ‘Looking to apply for permission to site holiday pod for use prior to
applying for full planning permission for dwellinghouse on land as per PPP. Once house had
been build we will consider change of use to holiday pod for visitors’ – 20.12.2024
_________________________________________________________________________
(M) Does the Council have an interest in the site:  No
_________________________________________________________________________
(N) Requirement for a hearing (PAN41 or other):  Not required
_________________________________________________________________________
(O)(i) Key Constraints/Designations Affected by the Development: 
None
(O)(ii) Soils
Agricultural Land Classification:  5.2 
Peatland/Carbon Rich Soils Classification: N/A 
Peat Depth Classification: 0.00 
Does the development relate to croft land? No
Would the development restrict access to croft
or better quality agricultural land?
N/A 
Would the development result in fragmentation
of croft / better quality agricultural land?
No 
(O)(iii) Woodland  
Page 18

Page 19

Will the proposal result in loss of
trees/woodland?
(If yes, detail in summary assessment)
No 
Does the proposal include any replacement or
compensatory planting?
N/A 
(O)(iv) Land Status / LDP Settlement Strategy
Status of Land within the Application  Greenfield 
ABC LDP2 Settlement Strategy  Countryside Area
ABC LDP2 Allocations/PDAs/AFAs etc: n/a 
_________________________________________________________________________
(P) Assessment and summary of determining issues and material considerations
The application for planning permission proposes the siting of a pod and the installation of a
septic tank and associated works at Land North East of Glenmachrie, Glenegedale, Isle of
Islay, Argyll and Bute. This is a retrospective application.
The application site is within the countryside as designated in the Argyll and Bute Local
Development Plan 2 (LDP2). It is also within the Scottish Water mains supply and an airfield
safeguarding zone (Islay Airport) (but does not meet the relevant consultation trigger) in LDP
2.
The application site, which is generally rectangular in shape and measures some 0.114
hectares in area, comprises an area of rough grazing.
Planning permission 23/00426/PPP was approved at the application site on 20.07.2023 for
the erection of a dwellinghouse. This is an extant permission. To date, however, no Reserved
Matters application has been submitted.
The Proposal
As detailed above, the application proposes the siting of a pod and the installation of a septic
tank and associated works. It is a retrospective application.
The pod, which is broadly rectangular shaped in floor area and incorporates a barrel-roof
design, comprises a kitchenette/living/bedroom area, a separate bathroom/ensuite and a
decking area.
The pod measures approximately 6m (L) x 3.2m (W) x 2.6m (H). The decking area, which is
accessed directly from the kitchenette/living/bedroom area, measures approximately 2.5m (L)
x 3.1m (W). The materials palette includes metrotile roof shingles to the side and roof cladding
(colour: charcoal grey) and larch cladding to the front and rear gables (colour: natural timber).
The pod will be accessed via a set of double-glazed doors on its north-west elevation. 
Page 19

Page 20

Access to the pod will be via an existing field access which is accessed directly from the public
road (A846). Condition 3 of 23/00426/PPP requires the formation of the junction serving the
current application site (which is the same site as that approved under 23/00426/PPP for the
erection of a dwellinghouse) in accordance with the Council’s Roads Standard Detail Drawing
SD 08/002 Rev a; with visibility splays measuring 2.4 metres x 136 metres. It is intended that
this access would serve the pod which is the subject of this application, the dwellinghouse
approved under any reserved matters application, and any development of a further two
houses on adjoining/adjacent land under 24/02085/PPP which was approved on 21.10.25. 
The Councils Roads Engineer has advised that the following matters should be addressed by
condition on any approval;
1.Connection of site access to the public road, 136 x 2.40 x 1.05 metres.
2. Connection of site access to the public road to be constructed as per standard detail drawing
ref: SD 08/002 Rev B. Radius to be 6.00 metres minimum. Access width to be 5.50 metres
minimum. 
3. Positive surface water drainage to be installed to prevent the discharge of surface water
onto the public road.
4. Turning and parking for two vehicles. 
5.Turning head for a commercial vehicle to be provided to serve the three dwellings.
6. No fences, walls or hedges within 2.00 metres of the public road.
7. Vehicular gates to be set back a minimum distance of 6.00 metres from edge of public road.
Gates to open inwards to site. Gate     posts to be set back 1.00 metre on each side of the
5.50 metre wide access. 
8. Existing roadside ditch to be cleaned to establish the correct invert level, prior to installing
culvert. 
9. Existing ditch to be culverted under the proposed new vehicular access, to the satisfaction
of Roads & Infrastructure Services. 
10. Headwalls to be provided at each end of the culvert under the private access.
11. New access to be sited no closer to an existing access than 25.00 metres.
12. Refuse collection point to be provided adjacent to the public road. 
Had the recommendation of this decision been to approve the application it would have been
necessary to impose a condition requiring the satisfactory submission and discharge of these
details.
The pod is sited within the north-east portion of the application site. Parking for 2No. vehicles
will be provided adjacent to the pod. A septic tank which will incorporate a soakaway, will be
installed along the southern boundary of the application site.
Principle 
Policy 3 ‘Biodiversity’ of NPF4 states that any potential adverse impacts, including cumulative
impacts, of development proposals on biodiversity, nature networks and the natural
environment will be minimized through careful planning and design.
Policy 4 ‘Natural Places’ of NPF4 states that development proposals which by virtue of type,
location or scale will have an unacceptable impact on the natural environment will not be
supported.
Page 20

Page 21

Policy 9 ‘Brownfield, vacant and derelict land and empty buildings’ of NPF4 states that
proposals on greenfield sites will not be supported unless the site is explicitly supported by
policies in the LDP.
Policy 14 ‘Design, quality and place’ of NPF4 states that development proposals will be
designed to improve the quality of an area whether in urban or rural locations and regardless
of scale.
Policy 29 ‘Rural Development’ of NPF4 states that development proposals in remote rural
areas, where new development can often help to sustain fragile communities will be supported
where the proposal satisfies 3No. criteria.
In terms of the adopted LDP2, and as detailed previously, the site is within a designated
Countryside Area (CA). Herein, Policy 02 of LDP 2 gives a presumption in favour of
sustainable development where this is of an appropriate scale, design, siting and use for its
countryside location, as detailed in the relevant subject policies such as set out in the relevant
sustainable siting and design policies of LDP 2.
Policy 05 ‘Design and Placemaking’ of LDP 2 states that to achieve good quality places,
proposals should endeavour to comply with a number of placemaking criteria which include
that the design should develop the area’s sense of identity by understanding and embracing
the existing distinctive characteristics, with the design respecting and complementing its
surroundings in terms of density, appearance, height, scale, massing, materials and finishes.
Policy 08 ‘Sustainable Siting’ of LDP 2 states that a number of criteria (8No. in total) will apply
in respect of sustainable siting when assessing any proposal for development. Criteria relating
to integration, design, layout, parking, residential amenity and energy efficiency are assessed
further below in the section titled ‘other material considerations’ and therein under the
respective heading. As the application site does not comprise a sloping site, the second
criterion of the policy is not relevant to the application proposal.
Policy 09 ‘Sustainable Design’ of LDP 2 goes on to state that development proposals should
demonstrate consideration of and where possible utilisation of sustainable design and
construction methods in terms of embodied energy; conversion and re-use; and adaptability.
Policy 55 ‘Flooding’ of LDP 2 states that development on the functional flood plain (land with
greater than 0.5% (1 in 200) probability of flooding in any year) will be considered contrary to
the objectives of this plan, except in the limited circumstances set out in part c) of this policy.
Development elsewhere will be subject to assessment as set out in parts a) and b) of this
policy, as relevant. It goes on to state that in all cases where the potential for flooding is
highlighted, the planning authority will exercise the ‘precautionary principle’ and refuse
development  proposals where such proposals do not comply with parts a), b), c) or d) of this
policy and/or on the advice of the Scottish Environment Protection Agency (SEPA).
These policies are considered further below.
As detailed above Policy 29 of NPF4 states as follows:
‘Development proposals in remote rural areas, where new development can often help to
sustain fragile communities, will be supported where the proposal:
i. will support local employment;
ii. supports and sustains existing communities, for example through provision of digital
infrastructure; and 
iii. is suitable in terms of location, access, siting, design and environmental impact. 
Page 21

Page 22

Whilst it is acknowledged that the proposal by its nature does not, in itself, provide for direct
local employment opportunities, nonetheless given that the intended use of the pod is for
vacation purposes by the applicant, the proposal would support the local service sector
(shops/public houses/restaurants etc.). For this reason, it is considered that the proposal
would therefore support local employment in so far as stated. Furthermore, and for generally
the same reasons, as the proposal would supports the local service sector, it would therefore
support and sustain the local/existing community in this part of Islay.
Matters in respect of the third criterion of Policy 29(c), that is, whether the proposal is suitable
in terms of location, access, siting, design environmental impact, will be assessed in detail
under the heading ‘Other relevant material considerations’ below.
In overall terms, it is therefore considered that the principle of the siting of a pod at the
application site is acceptable, subject to the consideration of the below matters.
Other relevant material considerations are assessed in further detail below.
Siting & Design
In respect of design matters, given that the pod is simple in its form and that it would utilise
simple palette of traditional materials, it is considered that, in itself, its design is acceptable in
the local context. However, it sits as an isolated feature within a field and is visible from the
road. The proposal therefore appears as an isolated feature of prominent visibility at the
current time.
However, and as detailed previously, planning permission in principle for the erection of a
single dwellinghouse at this application site was approved on 20.07.2023 under
23/00426/PPP. Whilst no reserved matters application have, to date, been submitted for the
dwellinghouse, this permission in principle nonetheless remains extant and, as such,
represents a material consideration in the context of the current proposal. 
Notwithstanding that no details of the design/scale/massing/proportions and siting of the
dwellinghouse have been submitted, it is nonetheless considered that the addition of a pod at
the application site would represent overdevelopment of the site such that the combination of
the site density and form of development would have an unacceptable impact on the character
and appearance of the area. For this reason, the proposal fails to comply with Policy 14 of
NPF4 and Policies 5, 8, 9 and 10 of LDP 2 to the extent specified. 
Impacts on Neighbouring Properties
As detailed above, no reserved matters application for the dwellinghouse which was approved
in principle under at the application site under 23/00426/PPP have been submitted to date.
Nonetheless because this permission is extant, the current proposal for the pod must therefore
be assessed in the context of a dwellinghouse being present at the application site. The
potential for  two additional dwellings in the immediate locality under 24/02085/PPP are also
material to the consideration of these matters. 
Although the proposed orientation and disposition of the approved dwellinghouse is currently
not known, given scale of the application site, it is considered that a dwellinghouse even of
moderate scale and massing would require to be sited generally in close proximity to the
proposed pod. At such close distance, combined with the lack of any established intervening
boundary treatment, it is therefore considered that this form of development and inter-
relationship would create unacceptable residential impacts for the occupiers of both the
dwellinghouse and the pod by reason of loss of privacy/overlooking/noise and/or disturbance. 
This potential for unacceptable noise and disturbance would also be applicable for the
adjoining plot of land where PPP for two houses has been granted under 24/02085/PPP.   
Page 22

Page 23

For these reasons, it is considered that the proposed development would also fail to comply
with Policy 14 of NPF4 and Policies 5, 8 and 9 of LDP 2 in so far as stated.
Biodiversity
Policy 3 of NPF4 states that proposals will contribute to the enhancement of biodiversity
including restoring degraded habitats and strengthening nature networks and the connections
between them. Local developments must include appropriate measures to conserve, restore
and enhance biodiversity and measures should be proportionate to the nature and scale of
the development. This is also reinforced by Policy 73 of the LDP 2.
In this case, there is no loss of biodiversity given the existing site context within which the pod
is located. However, it is acknowledged that a planning condition could be attached to secure
planting which would improve biodiversity at the application site.
Access, Parking & Road Safety
As detailed above, ABC Roads have no objection to the proposal. Notwithstanding this,
overlaying Drawing No. 2024-DEED-02 Rev A. ‘Site Plan’ submitted with the current proposal
with approved Drawing No. 23-2932-PPP-02 Rev B. ‘Site Plan’ shows that the current
proposal would be accessed by the same singular access as that of the extant permission.
However, the current drawing shows the siting of 2No. parking bays where the proposed
access terminates. Given this arrangement, no access could be provided to serve the
dwellinghouse approved in principle in the extant permission under 23/00426/PPP. Technical
requirements in respect of access and parking associated with this use are capable of being
addressed by condition as set out in the Area Roads Engineer Response.
Recommendation
The proposed development is contrary to Policy 14 of NPF4 and Policies 5, 8, 9, 10 and  35
of LDP 2 in that it would, if permitted, create a form of development that would have an
unacceptable impact on the character and appearance of the area and cause unacceptable
impacts upon residential amenity for existing and future occupiers. It is therefore considered
that  planning permission should be refused for the proposal.
Enforcement Considerations:
There is currently a live Enforcement Case relating to this unauthorised development and
therefore the existing structure should be removed within 3 months of the date of this decision
(or any subsequent unfavourable appeal decision)  and the ground restored to its condition
prior to the development taking place to avoid formal enforcement action being taken.
_________________________________________________________________________
(Q) Is the proposal consistent with the Development Plan: No 
_________________________________________________________________________
(R) Reasons why planning permission or a Planning Permission in Principle
should be granted: N/A
_________________________________________________________________________
(S) Reasoned justification for a departure to the provisions of the Development
Plan: 
N/A
_________________________________________________________________________ 
Page 23

Page 24

(T) Need for notification to Scottish Ministers or Historic Scotland:  No
_________________________________________________________________________
Author of Report: Francis Gillespie    Date: 09.06.2025
Reviewing Officer:  David Moore     Date: 08.04.2026
Fergus Murray 
Head of Development and Economic Growth 
Page 24

Page 25

REASONS FOR REFUSAL RELATIVE TO APPLICATION REF. NO. 25/00032/PP 
1. The proposed development is contrary to Policy 14 of NPF4 and Policies 5, 8, 9, 10
and  35 of LDP 2 in that it would, if permitted, create a form of development that would
have an unacceptable impact on the character and appearance of the area and cause
unacceptable impacts upon residential amenity for existing and future occupiers. It is
therefore considered that  planning permission should be refused for the proposal.   
Page 25

Page 26

APPENDIX TO DECISION REFUSAL NOTICE 
Appendix relative to application 25/00032/PP 
(A) Has the application been the subject of any “non-material”
amendment in terms of Section 32A of the Town and Country
Planning (Scotland) Act 1997 (as amended) to the initial
submitted plans during its processing.
No 
(B) The reason why planning permission has been Refused: 
The proposed development is contrary to Policy 14 of NPF4 and Policies 5, 8, 9, 10
and  35 of LDP 2 in that it would, if permitted, create a form of development that
would have an unacceptable impact on the character and appearance of the area
and cause unacceptable impacts upon residential amenity for existing and future
occupiers. It is therefore considered that  planning permission should be refused for
the proposal. 
Page 26

Page 27

Marchrie View
FB
17.4m
Drain
A 846
© Crown Copyright and database right 2025
All rights reserved. OS license (customer) account number AC0000849384
Location Plan relative to: 26/0003/LRB
O
0 25 5012.5 Meters
Site
Page 27

Page 28

This page is intentionally left blank

Page 29

Roads & Infrastructure Services – Traffic and Development
Mid Argyll, Kintyre and Islay Area
OBSERVATIONS ON PLANNING APPLICATION                   
Our Ref: 26/0003/LRB                                                       
Contact: Allan Finlay       
Tel: 01546 604640                                       
Planning Application No: 26/0003/LRB     Dated: 16th Jun 2026       Received: 16th Jun 2026       
Applicant: Mrs Samanth Tilbrook
Proposed Development: Siting of pod, installation of septic tank and associated works (Retrospective)
Location: Land North East of Glenmachrie, Glenegedale, Isle of Islay
Type of consent: Local Review Body (LRB)
Ref. No(s) of Drg(s) submitted: 
RECOMMENDATION: Comments Only 
Item
Ref.
COMMENTS 
1
2
3
4
5
The site is located off the A846 Port Askaig to Ardbeg (Public) Road, within a rural 60mph speed
restriction. The site is accessed from an existing sub-standard junction, approx. 500m south east of the
main airport access. 
This LRB is in relation to the previously rejected application Ref: 25/00032/PP (Siting of pod, installation
of septic tank and associated works). 
The wider site has been subject to the following relevant applications:- 
 19/01280-01284/PPP - Site for the erection of dwellinghouses (Plots 1-5, NW of access);
 20/01702/PP - Formation of access and installation of sewage treatment plant to serve 5
dwellinghouses (Plots NW of access);
 23/00426/PPP - Site for the erection of dwellinghouses (Plot 6, SE of access);
 24/02085/PPP - Erection of two detached dwellinghouses and installation of septic tanks (Plots
2&3). 
It has been made clear to the respective applicants that a development with more than five dwellings will
require a road that is constructed to an adoptable standard. Roads and Infrastructure Servies (RIS)
consider this application will count as one of the five. 
RIS have stipulated that the connection with the public road is to be upgraded as per the Council’s
Standard Detail SD08/002. This has been conditioned in all previous applications. It is noted that works
to the access have commenced but remains unsurfaced and incomplete (see photo below). 
The previous Roads response on application Ref 25/00032/PP stated “No objections subject to
conditions” however it is noted that the footprint of the 2no. parking bays is in conflict with the indicative
access to Plot 6 (23/00426/PPP). 
Access looking from NW - 23/06/2026
Page 29

Page 30

Item
Ref.
SUMMARY 
1 The previous position set out by Roads and Infrastructure Services (RIS) has not changed in respect of
application 25/00032/PP however RIS would note that with regard to the 2no. parking bays, if application
for Plot 6 (23/00426/PPP) is reactivated then the parking and access arrangement will require to be
revised and agreed with RIS. It is noted that all land is within the same ownership and contained within
the same plot. 
Signed: Allan Finlay, Technical Officer                                        Date: 25/06/2026
Page 30

Page 31

OFFICIAL
Your Ref: 26/0003/LRB
Dear Lynsey,
In the absence of accurate location information, I am unable to undertake a full
assessment of this retrospective planning application. However, based on the
submitted drawings, it is apparent that the proposed structure is located in close
proximity to Islay Airport.
Notwithstanding this, the structure has a maximum height of only 2.6 metres and, given
that the application is retrospective, I am satisfied that it does not give rise to any
safeguarding concerns in relation to Islay Airport.
Accordingly, Highlands and Islands Airports Limited (HIAL) has no objection to the
granting of this retrospective planning permission on safeguarding grounds.
Andy Brown
HIAL Safeguarding Officer.
Safeguarding
Highlands and Islands Airports Ltd
Inverness Airport Dalcross IV2 7JB
https://protect.checkpoint.com/v2/r06/___www.hial.co.uk___.ZXV3Mjphcmd5bGxhbmRidXRlY291bmNpbDE6YzpvOmRlNjI4OTBlMDU5MDM3YWZhZjc4NWRjMWUyYmMzNmQ0Ojc6MGFmOTplMmEzYTk2NzVjYjU2YzIzODlkNzZkZmE3YWQ0YTVhOWY1ZTdjOTE1OTQyMWI2OWY0MjE2YTYyZWU3MzUxZjdmOnQ6VDpG
Values
Page 31

Page 32

This page is intentionally left blank

Page 33

Classification: OFFICIAL
Good morning, 
Please see the response to 25/0003/LRB 
As per the planning in principle 23/00426/PPP standing on the land we are currently engaged
with Scotframe to determine the best use of the land taking into consideration the conditions
set in the original PPP. We are currently proposing a "Spey" style 1 ½ story property on the land.
Please see attached initial visual of property for reference, orientation and footprint to be
confirmed and application to be submitted once design approved with Contractor. As stated
the pod is for our use only so do not see the " disturbance, lack of privacy/ overlooking or noise"
stated in the rejection notice being a contributing factor.   
The parking for the pod will utilise the access road up to the point of construction of the
property, at that point an additional 1 x space layby style as shown on drawing) will be created
to allow parking and access to property to be maintained. Once Construction of the property
has been complete, parking will be as per drawing at front of property. 
The pod is to allow a base on the island prior to and during construction of a family dwell house,
we are well aware of the vast number of pod style properties on the island due to utilisation of
these during visits. We are also aware that these are vastly more favourable than " caravans"
hence the application. We hope that the application and the concept drawing are looked
favourably upon. 
Many thanks 
Samantha Cunningham 
Page 33 Agenda Item 3c

Page 34

Page 34