MINUTES of MEETING of ARGYLL AND BUTE LOCAL REVIEW BODY held BY MICROSOFT
TEAMS on MONDAY, 31 AUGUST 2026 
Present: Councillor Gordon Blair (Chair) 
Councillor John Armour  Councillor Peter Wallace 
Attending: Emma Ledsom, Senior Solicitor (Adviser)
Fiona McCallum, Committee Services Officer (Minutes)
Matt Aitchison, Applicant 
1. APOLOGIES FOR ABSENCE 
There were no apologies for absence. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. CONSIDER NOTICE OF REVIEW REQUEST: LAND SOUTH OF
FERNBANK, RAHANE (REF: 25/0006/LRB) 
The Chair, Councillor Gordon Blair, welcomed everyone to the meeting.  He explained that
no person present would be entitled to speak other than the Members of the Local Review
Body (LRB) and Ms Ledsom, who would provide procedural advice if required. 
He advised that his first task would be to establish if the Members of the LRB felt that they
had sufficient information before them to come to a decision on the Review. 
All the Members of the LRB agreed that they had sufficient information before them. 
Councillor Blair proposed the following Motion for consideration: 
That the Local Review Body: 
1. Having considered the Notice of Review, the Report of Handling, the Roads
consultation response, the Applicant's submissions and all other information before it,
determines in principle that planning permission should be granted for the erection of a
dwellinghouse and detached double garage, installation of sewage treatment plant and
formation of vehicular access at Land South of Fernbank, Rahane, subject to the
conclusion of a Section 75 Agreement  in accordance with the Heads of Terms
submitted by the Planning Authority to the LRB on 11th May 2026, the planning
conditions and reasons submitted to the LRB by the Planning Authority  on 11th May
2026 (which Heads of Terms, planning conditions and reasons are set out at page 7 to
page 14 of the report pack for the meeting of the LRB held on 29 June 2026) and the
matters specified in this motion. 
2. Finds that while the proposal does not achieve the Roads Authority's preferred visibility
standard of 2.4m x 75m x 1.05m in both directions on the B833, the evidence before
the Local Review Body demonstrates that a visibility splay of 2.0m x 75m x 1.05m in

Page 2

both directions would provide a safe and satisfactory access arrangement in the
particular circumstances of this site. 
3. Concludes that the proposed visibility splays in respect of this new access will provide
net improvements which would provide wider road safety benefits for existing users of
the B833, including neighbouring accesses and road users generally, whilst also
allowing the development of a dwellinghouse on a gap site within the settlement
boundary. 
4. Accordingly finds that, notwithstanding the technical departure from the Roads
Authority's preferred 2.4 metre setback standard, the proposal, providing wider road
safety benefits for existing users of the B833 is acceptable in terms of road safety and
that the material considerations identified above are sufficient to outweigh the policy
conflict identified within the delegated refusal. 
REASONS 
The Local Review Body notes that: 
a) The development site lies within the settlement area of Rahane and the Report of
Handling concludes that, aside from the roads issue, the proposal is acceptable in
principle and complies with relevant settlement, design, servicing and environmental
policies.  It is also noted that in the Strategic Housing Investment Plan the Council has
identified the Roseneath Peninsula as repopulation zones. 
b) Members consider that a visibility splay of 75 metres in both directions measured from
a 2.0 metre setback would provide adequate forward visibility for drivers emerging from
the proposed access having regard to wider road safety benefits for existing users of
the B833. 
c) Members further consider that the visibility improvements associated with the proposal
would provide a wider public benefit by improving visibility and safety conditions at this
location for existing users of the road in comparison with the current situation. 
d) In the particular circumstances of this case, these considerations constitute material
considerations of sufficient weight to justify a departure from the strict application of
LDP2 Policies 35 and 39 and any consequential conflict with Policies 01 and 66. 
SECTION 75 AGREEMENT 
The Local Review Body further resolves that: 
1. The application be approved in principle but that no decision notice shall be issued
until all planning obligations required by the Heads of Terms submitted by the Planning
Authority to the LRB on 11th May 2026 have been secured through a concluded and
registrable Section 75 Agreement. 
2. Authority be delegated to Argyll and Bute Council’s Chief Planning Officer to finalise
the terms of the Section 75 Agreement in accordance with the Heads of Terms and the
Council's normal legal and conveyancing requirements. 
3. Authority be delegated to the Chief Planning Officer to issue the decision notice upon:

Page 3

o conclusion of the Section 75 Agreement;
o production of such title documentation, certificates of title, registration
undertakings, searches and other legal documentation as the Planning Authority
reasonably requires to complete the agreement; and
o satisfaction that the agreement is capable of registration against all relevant title
interests. 
4. In the event that the Section 75 Agreement has not been concluded within six months
of today’s date (or such longer period as may be agreed in writing by the Planning
Authority), authority be delegated to the Chief Planning Officer, following consultation
with the Chair of the Local Review Body, either to: 
o continue negotiations where satisfactory progress is being made; or
o refer the matter back to the Local Review Body for further consideration. 
The Motion was unanimously supported by Councillor Armour and Councillor Wallace the
Argyll and Bute Local Review Body resolved accordingly. 
Decision 
The Argyll and Bute Local Review Body, having considered the merits of the case de novo
agreed 
1. In principle to grant planning permission as a minor departure to Policies 35 and 39 of
the Local Development Plan 2, subject to: 
a) the conclusion within 6 months of today’s date (or such longer period as may be
agreed in writing by the Planning Authority) of a Section 75 Legal Agreement in
accordance with the following Heads of Terms to secure appropriate visibility
splays to the north and the south – 
• A Section 75 Agreement is needed to secure areas of land for required visibility
splays from third party landowners; Being the following properties; Fernbank in
a northerly direction and Mambeg Farm, Ach Na Cloich Cottage, Ach Na Cloich
House and Ach Na Cloich Lodge in a southerly direction. 
• "Visibility Splay" means a clear visibility splay of 75 metres in each direction
measured from a point 2 metres back from the edge of the B833 road at the
centre point of the proposed access (as shown on drawing reference
2023_0005-02 REV F) and with no impediment to visibility in either direction
greater than 1.05 metres in height above the level of the existing public road; 
• "Splay Land" means ALL and WHOLE the area of land delineated and shaded
grey and outlined in red on Plan 2023_0005-02 REV F. 
• There shall be no Commencement of Development until such time as the
Visibility Splay has been formed on the Splay Land to the satisfaction of the
Council; and 
b) the following conditions and reasons and additional notes: 
1. Standard Time Limit Condition

Page 4

The development to which this permission relates must be begun not later than
three years from the date of this permission. 
Reason: In accordance with Section 58 of the Town and Country Planning
(Scotland) Act 1997. 
2. Standard Soil Condition 
Where the development involves ground breaking works, soil management
should be undertaken in compliance with the established best practice set out in
the DEFRA publication “Construction Code of Practice for the Sustainable Use
of Soils on Construction Sites 2009”, unless an alternative methodology for
sustainable management of soil is submitted to and approved in writing by the
Planning Authority. 
Reason: In order to ensure that sustainable management of soils and
compliance with the requirements of NPF4 Policy 5A. 
3. PP – Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified
on the application form dated 25/07/2024, supporting information and, the
approved drawings listed in the table below unless the prior written approval of
the planning authority is obtained for an amendment to the approved details
under Section 64 of the Town and Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date
Received
Location Plan 1 of 7 D 26.07.24
Existing Site
Plan
2 of 7 D 26.07.24
Proposed Site
Plan
3 of 7 F 24.09.24
Proposed
Floor Plans of
Dwellinghouse
4 of 7 - 26.07.24
Proposed
Elevations of
Dwellinghouse
5 of 7 - 26.07.24
Proposed
Sections of
Dwellinghouse
6 of 7 - 26.07.24
Proposed
Floor/Roof
Plan and
Elevations of
Detached
Garage Plan
7 of 7 - 26.07.24 
Reason: For the purpose of clarity, to ensure that the development is
implemented in accordance with the approved details.

Page 5

4. Sustainable Urban Drainage 
Notwithstanding Condition 1, details of a sustainable urban drainage system
compliant with the guidance set out in CIRIA’s SuDS Manual C753 must be
submitted to and approved in writing by the planning authority prior to
construction. The surface water drainage shall be operational prior to the
development being brought into use and shall be maintained as such thereafter.  
Reason: To ensure adequate surface water drainage is implemented to prevent
flooding elsewhere. 
5. Landscape 
Notwithstanding Condition 1, no development shall take place until full details of
both hard and soft landscape works to be carried out at the site have been
submitted to and approved in writing by the local planning authority in the form
of a detailed landscaping plan. The approved hard landscaping works shall be
carried out prior to first occupation of the development and the soft landscaping
works / replacement tree planting within the first planting season following first
occupation of the development. The details submitted shall include: 
• hard surfacing materials;
• details of proposed soft landscaping;
• details of proposed boundary treatments;
• details of replacement tree planting (number of, location, size and species);
• programme for completion and subsequent on-going maintenance. 
Reason: In the interests of biodiversity and the natural environment. 
6. Trees 
Notwithstanding Condition 1, A tree protection plan shall be submitted to and
approved in writing by the planning authority which details all retained trees on
and bounding the site (including their root protection zones) and any proposed
tree felling. Thereafter, all retained trees on site shall be protected at all times
during construction in accordance with the British Standard; BS 5837:2012
(Trees in relation to design, demolition and construction – Recommendations). 
Reason: The landscape features to be protected are important to the
appearance and character of the site and the surrounding area and are required
to successfully integrate the proposal with its surroundings. 
7. External Materials 
Notwithstanding Condition 1, Prior to work starting on site samples of the
proposed materials to be used for the external finishes of the development
hereby granted consent shall be submitted to and approved in writing by the
Planning Authority prior to any work starting on site. 
Reason: In the interests of visual amenity and in order to integrate the proposal
with its surroundings.

Page 6

8. Sustainable Design 
Notwithstanding Condition 1, Prior to the commencement of development,
details of the on site micro renewable energy to provide heat or electricity to the
property and details of the use of the final materials – including details of any re-
cycled materials or local sourced materials and their embodied energy for each
materials, shall first be submitted and approved in writing by the Local Planning
Authority. Thereafter the approved micro renewables and materials must be
used in the development hereby approved. 
Reason: In order to ensure compliance with LDP2 Policy 09 and to ensure the
building is being as energy efficient as possible in order to respond to climate
change. 
9. Biodiversity Enhancement 
Notwithstanding Condition 1, no development shall commence until a
biodiversity statement has been submitted to and approved in writing by the
Planning Authority. The statement shall demonstrate how the proposal will
contribute to conservation/restoration/enhancement of biodiversity, and how
these benefits will be implemented and maintained for the lifetime of the
development. All physical biodiversity enhancement measures (bird nesting
boxes, ‘swift bricks’, wildlife ponds, bat and insect boxes, hedgehog homes etc)
shall be implemented in full before the development hereby approved is first
brought into use. All biodiversity enhancement measures consisting of new or
enhanced planting shall be undertaken either in accordance with the approved
scheme of implementation or within the next available planting season following
the development first being brought into use. The biodiversity statement should
refer to Developing with Nature guidance | NatureScot as appropriate. 
Reason: To comply with the requirements of NPF4 Policy 3. 
10. Quality Homes 
Notwithstanding Condition 1, no development shall commence until details of
the proposed timescale for completion of the approved development have been
submitted to and approved by the Planning Authority. Thereafter, the
development shall be implemented in accordance with the duly approved
timescale for completion unless an alternative timescale for completion is
otherwise agreed in writing with the Planning Authority. 
Reason: In order to comply with the requirements of NPF4 Policy 16F. 
11. Potential Sources of Nuisance 
Notwithstanding Condition 1, Prior to work starting on site, identification and
assessment of all potential sources of nuisance, including noise/ vibration, dust,
and any temporary lighting provided, which may cause disturbance to nearby
residents during the construction process shall be undertaken by the applicant.
This should include consideration of intended hours of operation, movement of
vehicles, use of plant and storage of equipment and materials on site. For all
potential sources of nuisance, the applicant will be required to provide a
management plan with details of suitable control measures to be put in place so

Page 7

as to ensure that construction does not cause loss of amenity to local residents
and/or statutory nuisance. The management plan must be submitted to and
approved by the Planning Authority and thereafter complied with. 
Reason: In order to avoid sources of nuisance in the interest of amenity. 
12. Scottish Water 
Notwithstanding Condition 1, Prior to the commencement of Development, the
developer shall submit written evidence to the Planning Authority that an
agreement with Scottish Water is in place for the connection of the proposed
development to the public water supply. 
Reason: In the interests of public health and to ensure the availability of an
adequate water supply to serve the proposed development. 
13. Foul Drainage 
Notwithstanding the effect of Condition 1, Full details of the proposed disposal
of foul drainage from the site shall be submitted to and approved in writing by
the Planning Authority prior to development on site commencing. Thereafter the
approved foul drainage system shall be fully operational prior to the
commencement of operations. 
Reason: In the interests of public health and In order to prevent pollution of any
watercourses. 
14. Pre Commencement Ecological Survey 
Notwithstanding Condition 1, no development shall commence until a pre-
commencement survey for the presence of protected species (to include
reptiles, amphibians, red squirrel, pine martins, hedgehogs and breeding birds
etc.); has been carried out by an appropriately qualified ecologist and has been
submitted for the written approval of the Planning Authority in consultation with
the Council’s Biodiversity Officer. In circumstances where species of interest are
identified as being present, or at risk from construction works, the survey shall
further provide suggested avoidance and or mitigation measures, including
timing constraints, to address such presence or risk. The development shall be
implemented in accordance with the measures identified in the duly approved
scheme. 
Reason: In order to establish that the circumstances of the site have not
changed significantly between approval and implementation of the development
for the purpose of protecting natural heritage assets in the interest of nature
conservation. 
15. Details of Waste Storage and Collection Arrangements 
Prior to the commencement of the development (or such other timescale as
may be agreed in writing with the Planning Authority), details of the proposed
arrangements for the storage and collection of waste shall be submitted to and
approved in writing by the Planning Authority. The arrangements shall be
implemented in accordance with the approved requirements prior to the

Page 8

dwellinghouse hereby approved being occupied and shall thereafter be retained
in perpetuity unless otherwise agreed in writing by the Planning Authority. 
Reason: In order to accord with the principles of sustainable waste
management within 14.16. 17. NPF4 Policy 12 and LDP2 Policy 63 and to
ensure that the bins are suitably sited within the house or its curtilage to not
cause obstruction and harm the character of the area. 
16. Vehicular Visibility Splays 
Notwithstanding the effect of Condition 1; Prior to the commencement of the
development hereby approved, vehicular visibility splays shall be formed as
follows; 75 metres in both directions measured from a point 2 metres back from
the edge of the carriageway at the centre point of the proposed access as
indicated on the approved drawing reference 2023_0005-02 REV F. No walls,
hedges, fences or other obstructions shall thereafter be allowed over a height of
1.05 metres above the level of the carriageway within these visibility splays. 
Reason: In the interests of road safety. 
17. Vehicular Access 
Notwithstanding the effect of Condition 1; prior to the first occupation of the
dwellinghouse hereby approved, the following works to form the new vehicular
access are required; 
• The formation of a service bay as per Argyll and Bute standard detail
SD08/006A in the location as indicated on the approved drawing reference
2023_0005-02 REV F, and; 
• The formation of a vehicular access as per Argyll and Bute standard detail
SD08/002A in the location as indicated on the approved drawing reference
2023_0005-02 REV F, including the first 5m of the access being surfaced in
a bound material, a minimum driveway width of 5.5m for the first 10m and
3m thereafter, and; 
• Any access gates sited at least 6 metres back from the edge of the
carriageway to allow an entering vehicle to stop clear of the carriageway
when the gates are closed, furthermore any access gates must be hung so
that they do not open towards the carriageway, and; 
• The gradient of the driveway shall not exceed 1 in 20 (5%) for the first 5
metres and shall thereafter not be steeper than 1 in 8 (12.5%), and; 
• Drainage should be achieved within the curtilage such that no water flows
onto the carriageway. 
Reason: In the interests of road safety.

Page 9

18. Parking and Turning 
Notwithstanding the effect of Condition 1; prior to the first occupation of the
dwellinghouse hereby approved, 2 No. parking spaces with adequate turning
space shall be provided within the curtilage of the dwellinghouse. 
Reason: In the interests of road safety. 
Additional Notes 
• A roads opening permit (Section 56) must be obtained prior to any works on, or
alongside the existing adopted carriageway. 
• LDP2 Policy 34 - Electric Vehicle Charging states that for all new build houses
with private off street parking dedicated cable ducting connecting each private
residential parking space to the nearest electricity supply connection point
capable of supporting the installation of a 7 kilowatt EV charging point shall be
installed. This has since been superseded by a new Building Regulations
standard (ref 7.2 of Technical Handbook Jan 2025 edition) which requires a
minimum of one electric vehicle charge point socket with an output rating of not
less than 7 kW to be provided adjacent to the parking space. As it is controlled
via Building Standard then this has not been subject to a condition. 
• The MOD have advised that given the location of the house in relation to the
explosive safeguarding zone, they would highly recommend the developer
considers incorporating at least 4mm to 6mm thick toughened glass to the outer
pane, cavity, and at least 6.8mm thick laminated glass with a PVB interlayer to
the innermost pane of the windows. 
2. that no Decision Notice shall be issued until all planning obligations required by the
Heads of Terms have been secured through a concluded and registrable Section 75
Agreement. 
3. That authority be delegated to the Argyll and Bute Council’s Chief Planning Officer to
finalise the terms of the Section 75 Agreement in accordance with the Heads of Terms
and the Council’s normal legal and conveyancing requirements. 
4. That authority be delegated to the Chief Planning Officer to issue the decision notice
upon: 
• conclusion of the Section 75 Agreement;
• production of such title documentation, certificates to title, registration
undertakings, searches and other legal documentation as the Planning Authority
reasonably requires to complete the agreement; and
• satisfaction that the Agreement is capable of registration against all relevant title
interests. 
5. In the event that the Section 75 Agreement has not been concluded within six months
of today’s date (or such longer period as may be agreed in writing by the Planning
Authority), authority be delegated to the Chief Planning Officer, following consultation
with the Chair of the Local Review Body, either to:

Page 10

• continue negotiations where satisfactory progress is being made; or
• refer the matter back to the Local Review Body for further consideration.