Page 1

Argyll and Bute Council
Development & Economic Growth   
Planning Application Report and Report of Handling as required by Schedule 2 of the
Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013 relative to applications for Planning Permission or Planning Permission
in Principle 
Reference No: 26/00436/PP
Planning Hierarchy: Local Application
Applicant: West Kintyre Community Council
Proposal: Demolition of existing public toilets and erection of replacement
public toilets
Site Address:  Public Toilets Tayinloan Argyll and Bute   
DECISION ROUTE 
Committee Decision under Local Government Scotland Act 1973   
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission 
• Erection of replacement public toilets building 
(ii) Other specified operations 
• Demolition of existing public toilets building 
(B) RECOMMENDATION: 
The proposal is recommended for approval of Planning Permission subject to conditions
and reasons appended below. 
(C) CONSULTATIONS:   
Isle of Gigha Community Council - 28.04.2026
Objecting to the proposed development advising as follows. 
A consultation with residents of the Isle of Gigha had been conducted.  The majority of the
respondents do not support the application on the following grounds: 
• Objections were raised to the removal of waiting room, which would have a negative impact
on ferry passengers, in particular school students.  
• The existing waiting room is also used as a short-term storage area for goods transporting
to and from the island.  The loss of such space would impact businesses on the Isle of
Gigha.
• Concerns raised regarding the proposal for the facilities to operate on a charging basis.
• Isle of Gigha Community Council should have been engaged in earlier stages of the
development process.
• Existing building should be fully renovated with the addition of accessibility facilities instead
of replacing the building.

Page 2

Comment: Officer’s comment is available in Part (F) and/or assessed further in Appendix A. 
Environmental Health - MAKI - 08.05.2026
No objection. 
Area Roads Mid Argyll Kintyre and Islay - 14.04.2026
No objection advising that the proposal is situated at the end of the C21 Tayinloan Ferry (Public)
Road, adjacent to the Tayinloan Ferry Car Park (No. 42).  Parking is available at the adjacent
car park. 
The Roads Authority note that the applicant has considered pedestrian safety in respect of the
ramp orientation and proposes to install a protective/pedestrian barrier at the end. The Roads
Authority advise that consideration should be given in the future to improve the pedestrian link
between the toilet and the footway on the north side of the vehicle accessway/crossing point. 
Flood Risk Assessor - 13.04.2026
No objection. 
(D) HISTORY:   
None 
(E) PUBLICITY:   
Advert Type: Regulation 20 Advert Local Application              Expiry Date: 01.05.2026 
(F) REPRESENTATIONS:   
(i) Representations received from: 
A total of 19 representations has been received for the application, of which 5 are in support, and
14 in objection of the proposal: 
Support 
• Miss Lusanda Donnelly Atharnach Glenbarr Argyll and Bute PA29 6UT 02.04.2026
• Mrs Emma Byers Smithy House Tayinloan Tarbert Argyll and Bute 01.04.2026
• Ms Marilyn Shedden 2 Fernoch Crescent Lochgilphead Argyll and Bute PA31 8AE
01.04.2026
• Ms Maggie Young 2 Fernoch Crescent Lochgilphead Argyll and Bute PA31 8AE
01.04.2026
• Mr Aaron O'Hanlon 8 Cara View Tayinloan Argyll and Bute PA29 6XJ 03.04.2026 
Objection 
• Mr Tony Philpin Tighcruinn Isle of Gigha Argyll and Bute PA41 7AA 13.04.2026
• Mr Joseph Teale Post Office House Ardminish Isle of Gigha Argyll and Bute
02.04.2026
• Mrs Margaret Wilkieson New Quay South Isle of Gigha Argyll And Bute PA41 7AD
02.04.2026
• Mrs Louise Braithwaite Drumallan Isle of Gigha Argyll and Bute PA41 7AD
04.04.2026
• Mr Anthony Walker 1 Gallochoille Isle of Gigha Argyll and Bute PA41 7AD
02.04.2026

Page 3

• Miss Charlie-Jane Elder 1 High Row Ardminish Isle of Gigha Argyll and Bute
02.04.2026
• Miss Rona Allan 1 Raon Mor Isle of Gigha Argyll and Bute PA41 7AG 04.04.2026
• Mr Nigel Braithwaite Drumallan Isle of Gigha Argyll and Bute PA41 7AD
03.04.2026
• Ms Marion Stevenson Cuddyport Isle of Gigha Argyll and Bute PA41 7AD
22.04.2026
• Mr John Bannatyne 1 Grianan Isle of Gigha Argyll and Bute PA41 7AE 04.04.2026
• Ms Margaret McSporran Acarsaid Alainn Isle Of Gigha Argyll and Bute PA41 7AD
04.04.2026
• Miss Hannah Storie Post Office House Ardminish Isle of Gigha Argyll and Bute
02.04.2026
• Mr Keith Wilson Heather Lea Ardminish Isle of Gigha Isle of Gigha Argyll and Bute
13.04.2026
• Mr Neil Bannatyne Ardlamy Farm Isle of Gigha Argyll and Bute PA41 7AD
04.04.2026 
Representations are published in full on the planning application file and are available to view via
the Public Access section of the Council’s website. 
(ii) Summary of issues raised: 
As noted above, representations are published in full and are available to view on the
Council’s website. In brief summary, respondents have raised the following points: 
• New toilets are much needed to cater the needs of the locals, and passengers
using ferry service to and from the Isle of Gigha.  The proposal is also able to
cater for the needs of visitors travelling on the Kintyre Peninsula and such
provision would enhance the area. 
Comment: The above representations are noted. 
• Objection was raised to the removal of the waiting room, which would have a
negative impact on ferry passengers, in particular school students.  Concerns
were raised that other existing shelters in the vicinity are inadequate,
especially during adverse weather conditions and in the event of an extended
wait due to delay of the ferry service. 
Comment: This matter is assessed further in Appendix A. 
• The existing waiting room is also used as a short-term storage area for goods
being transported to and from the Isle of Gigha.  The loss of such space would
impact businesses on the island. 
Comment: Storage use within the existing waiting room is not considered a
community facility under LDP2 Policy 50, Retention of Community Facilities
nor key services under LDP2 Policy 51, Retention of Key Services.  This
matter is also assessed further in Appendix A. 
• The existing building should be fully renovated with the addition of
accessibility facilities. 
• The replacement building should incorporate a larger footprint compared to
the existing building. 
• The replacement building should incorporate a fully pitched roof which is more
aesthetically appropriate.

Page 4

Comment: This matter is assessed further in Appendix A. 
• Interior space should be rearranged to cater for demand.  Suggestions were
given in terms of internal facilities, for example provision of baby caring
facilities and adult changing facilities.   
Comment: An informative is recommended below to advise the applicant to
have regard to the suggestions made within the public representations,
particularly in relation to internal facilities within the proposed toilets. 
• Concerns raised regarding the proposal for the facilities to operate on a
charging basis.  The accessible toilet should be free of charge and accessible
via a radar key. 
Comment: Cost and/or payment means to use the facilities are not material
planning considerations. Notwithstanding the above, an informative is
recommended below to advise the applicant to have regard to the suggestions
made within the public representations, particularly in relation to internal
facilities within the proposed toilets. 
• Residents of the Isle of Gigha have been excluded from the project planning
stage considering the facilities at the ferry terminal in Tayinloan are essential
island infrastructure. 
Comments: The Planning Authority has had no input into the project planning
stage of the proposed development.  The Isle of Gigha Community Council
were consulted, and statutory public consultation was undertaken. 
Consultation response and public representations received are material
considerations which inform planning assessment. 
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Impact Assessment Report: No  
(ii) An Appropriate Assessment under the Conservation
(Natural Habitats) Regulations 1994:
No 
(iii) A Design or Design/Access statement: Yes  
(iv) Sustainability Checklists (with reference to the
requirements of LDP2 Policy 04) 
TN06 Sustainability Checklist
TN07 Sustainable Buildings Checklist 
The relevant Sustainability Checklists have been submitted and
examined. It is the assessment of the Case Officer that the
applicant has understood and given adequate consideration to
the sustainability aspects of the proposed development,
sufficient to accord with the core sustainability requirements of
both national and local planning policy, specifically the relevant
details of the ‘Sustainable Places’ group of policies within NPF4
and LDP2 policies 04, 08 and 09.
Yes
Yes

Page 5

(v) A report on the impact of the proposed development
e.g. Retail impact, transport impact, noise impact,
flood risk, drainage impact etc:
No   
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:    No   
(I) Has a Direction been issued by Scottish Ministers in terms of
Regulation 30, 31 or 32:
No    
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account in
assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy 
Sustainable Places
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
NPF4 Policy 9 – Brownfield, Vacant and Derelict Land and Empty Buildings (includes
provisions relevant to Greenfield Sites)
NPF4 Policy 13 – Sustainable Transport 
Liveable Places
NPF4 Policy 14 – Design, Quality and Place
NPF4 Policy 22 – Flood Risk and Water Management
NPF4 Policy 23 – Health and Safety 
Productive Places
NPF4 Policy 25 – Community Wealth Building
NPF4 Policy 29 – Rural Development
NPF4 Policy 30 – Tourism 
Argyll and Bute Local Development Plan 2 (Adopted 2024) 
Spatial and Settlement Strategy
Policy 02 – Outwith Settlement Areas
Policy 04 – Sustainable Development 
High Quality Places
Policy 05 – Design and Placemaking
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 10 – Design – All Development 
Diverse and Sustainable Economy
Policy 23 – Tourism Development, Accommodation, Infrastructure and Facilities

Page 6

Connected Places
Policy 42 – Safeguarding Piers and Harbours 
Sustainable Communities
Policy 50 – Retention of Community Facilities
Policy 51 – Retention of Key Services
Policy 55 – Flooding 
High Quality Environment
Policy 71 – Development Impact on Local Landscape Areas (LLA’s) 
Local Development Plan 2 Schedules 
(ii)  List of all other material planning considerations taken into account in the
assessment of the application, having due regard to Annex A of Circular
3/2013. 
• Third Party Representations
• Consultation Reponses
• ABC Technical Note – Biodiversity (Feb 2017)
• TN06 Sustainability Technical Note and Checklist (Oct. 2023)
• TN07 Sustainable Buildings Technical Note and Checklist (Oct. 2023) 
(K) Is the proposal a Schedule 2 Development not requiring an
Environmental Impact Assessment:
No    
(L) Has the application been the subject of statutory pre-
application consultation (PAC):
No 
(M) Does the Council have an interest in the site: No 
(N) Requirement for a pre-determination hearing: 
In deciding whether to hold a discretionary hearing Members should
consider:  
• How up to date the Development Plan is, the relevance of the
policies to the proposed development, and whether the
representations are on development plan policy grounds which have
recently been considered through the development plan process. 
• The degree of local interest and controversy on material
considerations, together with the relative size of community affected,
set against the relative number of representations and their
provenance. 
At the time of writing, representations have been received from 19
respondents in relation to this planning application. 14 respondents raise
objection and 5 submit support. 
It is the opinion of Planning Officers that the representations received,
together with officer assessment of the relevant planning issues
contained within this report, provide all the information required to enable
No

Page 7

Members to make an informed decision based on all of the material
planning considerations in this case. 
In this instance it is not considered that the objections raise any complex
or technical issues that have not been addressed in the current Report of
Handling and it is not considered that a discretionary local hearing would
add value to the planning process.  
The determining factor in the assessment of this application is whether
the proposed development is consistent with the provisions of the
adopted National Planning Framework 4 and Local Development Plan 2
and whether the issues raised by third parties raise material
considerations of sufficient significance to withhold planning permission. 
In this instance the proposed development is considered to be consistent
with the provisions of both National and Local Planning Policy whilst
providing improved public toilet provision. 
A full report is provided within Appendix A.    
(O)(i) Key Constraints/Designations Affected by the Development: 
• SEPA Flood Zones (Coastal (Future Flood Maps))
• HSE Consultation - Outer Zone
• West Kintyre (Coast) LLA 
(O)(ii) Soils
Agricultural Land Classification:  Built Up Area 
Peatland/Carbon Rich Soils Classification: N/A 
Peat Depth Classification: N/A 
Does the development relate to croft land? No 
Would the development restrict access to croft or
better-quality agricultural land? 
N/A
Would the development result in fragmentation of croft
/ better quality agricultural land?
N/A 
(O)(iii) Woodland  
Will the proposal result in loss of trees/woodland?  No
Does the proposal include any replacement or
compensatory planting?
N/A 
(O)(iv) Land Status / LDP Settlement Strategy
Status of Land within the Application  Brownfield
ABC LDP2 Settlement Strategy  Countryside Area 
ABC LDP2 Allocations/PDAs/AFAs etc: N/A

Page 8

(P) Summary assessment and summary of determining issues and material
considerations 
The proposal seeks planning permission for the demolition of an existing public toilet block and
the erection of a replacement public toilet block at Tayinloan. The application site is located on
land adjacent to Tayinloan Slipway where ferry service is available connecting the Isle of Gigha. 
In terms of the adopted Argyll and Bute Local Development Plan 2 (LDP2) the application site is
located within the Countryside Area wherein Policy 02 sets out a presumption in favour of
sustainable development where this is of appropriate scale, design, siting and use for its
countryside location.   
NPF4 Policy 29 sets out that development proposals in remote rural areas (within which the
application site is located) will be supported where the proposal supports and sustains existing
communities; and is suitable in terms of location, access, siting, design and environmental
impact.  NPF4 Policy 30, Tourism part b) sets out a range of matters that tourism related
development will take into account with LDP2 Policy 23, Tourism Development, Accommodation,
Infrastructure and Facilities supporting improved tourist facilities and accommodation subject to
a number of criteria.  LDP2 Policy 50, Retention of Community Facilities states that development
involving the loss or change of use of facilities (including any ancillary land) presently used or
last used for community purposes will only be permitted subject to specific criteria.   
The determining factors in the assessment of this application are considered to be whether this
location is acceptable for the proposed development having regard to its effect on landscape,
biodiversity effects, provision of tourist/ community facilities, road network/parking, and flood risk. 
Officers note that there is a body of opposition to the proposed development alongside a smaller
proportion of support for the proposal. 
Overall, having assessed the proposal against the relevant provisions of the Development Plan
as a whole and considering representations and consultee comments submitted, it is considered
that there are no substantive grounds to withhold consent, and it is recommended that planning
permission should be granted, subject to the conditions set out below. 
This application would normally have been determined as a local application under the Council’s
agreed scheme of delegation. However, the application has received sufficient public
representations to require the planning application to be put before Members for determination. 
(Q) Is the proposal consistent with the Development Plan:  Yes 
(R) Reasons why Planning Permission or Planning Permission in Principle Should be
Granted: 
The proposal is considered to be consistent with the relevant provisions of the
Development Plan, and there are no other material considerations of sufficient
significance, including issues raised by third parties, to indicate that it would be
appropriate to withhold planning permission having regard to Section 25 of the Act. 
(S) Reasoned justification for a departure to the provisions of the Development Plan 
N/A 
(T) Need for notification to Scottish Ministers or Historic
Environment Scotland:
No

Page 9

Author of Report: Long Ting Yip/Fiona Scott  Date: 28.05.2026 
Reviewing Officer: Tim Williams Date: 02/06/26 
Fergus Murray
Head of Development & Economic Growth

Page 10

CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 26/00436/PP 
Standard Time Limit Condition (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions  
1. PP - Approved Details & Standard Notes – Non-EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 6.3.2026, supporting information and, the approved drawings listed
in the table below unless the prior written approval of the planning authority is obtained for
an amendment to the approved details under Section 64 of the Town and Country Planning
(Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Location Plan 1/3  09.03.2026
Existing Site Plan, Elevations and
Floor Plan
25-3167-PP-01  09.03.2026
Proposed Site Plan, Elevations and
Floor Plan
25-3167-PP-02  09.03.2026
Biodiversity Statement   09.03.2026
Design Statement – 2 Pages    09.03.2026 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details.  
2. PP – Biodiversity Enhancement 
Notwithstanding the provisions of Condition 1, all physical biodiversity enhancement
measures identified in the submitted Biodiversity Statement shall be implemented in full
before the development hereby approved is first brought into use. 
All biodiversity enhancement measures consisting of new or enhanced planting shall be
undertaken either in accordance with the approved scheme of implementation or within the
next available planting season following the development first being brought into use. 
Reason: To comply with the requirements of NPF4 Policy 3.

Page 11

ADDITIONAL NOTES TO APPLICANT 
• Area Roads Consultation Advice 
Please note the advice and guidance contained in the consultation response from Area
Roads is available to view via the Public Access section of the Council’s website. 
• The applicant is advised to have regard to the suggestions made within the public
representations, particularly in relation to internal facilities. These representations are
available to view via the Public Access section of the Council’s website.

Page 12

COMMITTEE REPORT
APPENDIX A – RELATIVE TO APPLICATION
NUMBER: 
26/00436/PP 
PLANNING LAND USE AND POLICY ASSESSMENT 
1. Proposed Development 
1.1. Planning permission is sought for the demolition of existing public toilets and the erection of
replacement public toilets, located at Tayinloan. 
2. Location and Nature of Proposed Development 
2.1. The application site is located at land adjacent to Tayinloan Slipway where ferry service to the
Isle of Gigha is available. Tayinloan Ferry Car Park is located to the south of the application site
across the vehicular access to the slipway, and Ferry Farm cluster with a tearoom is to the
immediate northeast of the application site. 
2.2. The proposal seeks to replace the existing public toilet building, which is ageing and without
provision of accessible facilities and inclusive design. 
The existing public toilets provide one female W.C. with a washhand basin; and one male W.C.
with two urinals and a washhand basin.  A small waiting room is also provided within the
existing building.  The applicant stated that the existing building could not be modified to include
a fully compliant accessible access ramp due to the height of the finished floor level and the
space required to achieve compliant gradients and landing. 
The proposed replacement building comprises a single storey structure which would have a
similar footprint when compared to the existing building.  The building would feature wet dash
rendering in white, and a mono pitched roof with profile steel composite panels.  White uPVC
windows with frosted glass, and black coloured rainwater goods would be installed. 
Having regard to its overall siting, scale, massing and design, the proposed development is
deemed acceptable in that it would not have any detrimental visual impact on the established
landscape/townscape, local character and appearance.   
Regarding public representations received providing comments on the internal facilities to be
provided within the replacement building, an informative is recommended to advise the applicant
to have regard to suggestions made within the public representations. 
In terms of any potential impact on amenity to the surrounding area, the proposal mainly
represents the replacement of an existing toilet building.  The Environmental Health Officer was
consulted and raised no objection to the application. 
The replacement toilet building would provide the same sanitary facilities as the existing building,
with the addition of an accessible entrance and a dedicated accessible W.C. facility.  No waiting
room would be provided in the replacement toilet building.   
The anticipated demolition and construction period of the proposed development is
approximately five months during which time two temporary portable toilet units would be
provided on site. 
Officers are satisfied that the proposal is an acceptable development which would not give rise
to any significant adverse visual impact within its site or wider setting and one which would
provide improved public toilet provision.

Page 13

3. Settlement Strategy 
3.1. In terms of the adopted Argyll and Bute Local Development Plan 2 (LDP2), the application site
is located within the Countryside Area wherein Policy 02 set out a presumption in favour of
sustainable development where this is of appropriate scale, design, siting and use for its
countryside location.   
4. Compliance with National and Local Development Plan 2 Policy 
Argyll and Bute ‘Local Development Plan 2’ (LDP2) was adopted on 28 February 2024 which,
together with NPF4 which was adopted on 13 February 2023, represent the Development Plan
providing the policy background against which proposed developments are assessed. 
The proposal is assessed against the relevant NPF4 Policies below which include details of the
associated LDP2 policies. 
4.1. NPF4 Policy 1 – Tackling the Climate and Nature Crises seek to prioritise the climate and
nature crises in all decisions; it requires to be applied together with other policies in NPF4. 
Guidance from the Scottish Government advises that it is for the decision maker to determine
whether the significant weight to be applied tips the balance in favour for, or against a proposal
on the basis of its positive or negative contribution to climate and nature crises.    
4.2. NPF4 Policy 2 – Climate, Mitigation and Adaption seeks to ensure that new development
proposals will be sited to minimise lifecycle greenhouse gas emissions as far as possible, and
that proposals will be sited and designed to adapt to current and future risks from climate
change. 
Guidance from the Scottish Government confirms that at present there is no single accepted
methodology for calculating and / or minimising emissions. The emphasis is on minimising
emissions as far as possible, rather than eliminating emissions. The Spatial Settlement Strategy
set out within LDP2  seeks to deliver sustainable levels of growth by steering the majority of
development to our existing settlements as these are where the most of our current
infrastructure, services, employment opportunities, housing and community facilities are to be
found, however LDP2 recognises that there are instances where a different approach to
significant development has to be taken particularly where existing infrastructure or services are
at capacity and where a more sustainable option would be to provide new facilities elsewhere. 
4.3. NPF4 Policy 3 – Biodiversity seeks to protect biodiversity, reverse biodiversity loss and deliver
positive effects from development and strengthen nature networks. 
A Biodiversity Statement is submitted along with the application.  The statement proposes the
installation of small planters for plants for pollinators; installation of bee hotels; and installation
of sparrow colony nest boxes. 
A relevant condition is recommended to ensure the provision of such biodiversity enhancement
installations. 
As such, subject to the condition, it is not considered that the proposed development would have
a material detrimental effect on the established natural environment within its immediate
surrounding due to the scale of the proposed development compliant with NPF4 Policy 3 and
LDP2 Policy 73, Development Impact on Habitats and Species. 
4.4. NPF4 Policy 4- Natural Places seeks to protect, restore and enhance natural assets making
best use of nature-based solutions. 
The application site is located within the West Kintyre (Coast) Local Landscape Area (LLA). The
proposal represents replacement of an existing toilet building, which already has an established

Page 14

landscape presence and forms part of the supporting/ancillary facilities at an existing ferry
slipway and adjacent car park.   
As such it is not considered that the proposed development would have a material detrimental
effect on the established natural environment within its immediate surrounding due to the scale
of the proposed development compliant with NPF4 Policy 4, Natural Places and LDP2 Policy
71, Development Impact on Local Landscape Areas (LLA). 
4.5. NPF4 Policy 9, Brownfield, Vacant and Derelict Land and Empty Buildings seeks to
encourage, promote and facilitate the reuse of brownfield, vacant and derelict land and empty
buildings, and to help reduce the need for greenfield development. 
The development represents brownfield development by virtue of the fact that the proposal
represents the replacement of an existing building which is directly supported by NPF4 Policy
9(a) with no conflict with the provisions of LDP2 Policy 02.   
4.6. NPF4 Policy 13 - Sustainable Transport seeks to encourage, promote and facilitate
developments that prioritise walking, wheeling, cycling and public transport for everyday travel
and reduce the need to travel unsustainably. 
The application site is located at land adjacent to Tayinloan Slipway and adjacent to the
Tayinloan Ferry Car Park.  Public transportation including a bus service and a ferry service are
available.   
Area Roads were consulted in this regard and have no objection to the application, commenting
that consideration should be given in the future to improve the pedestrian link between the toilets
building and the footway on the north side of the vehicle accessway/crossing point.  As such,
an informative is recommended to remind the applicant to note the consultation comments of
Area Roads. 
In view of the above the proposal is deemed consistent with the relevant provisions of NPF4
Policy 13, Sustainable Transport and does not conflict with the provisions of LDP2. 
4.7. NPF4 Policy 14 – Design, Quality and Place seeks to encourage, promote and facilitate well
designed development that makes successful places by taking a design-led approach and
applying the ‘Place Principle’. 
Part (a) of Policy 14 seeks development proposals to be designed to improve the quality of an
area, whether in urban or rural locations, and regardless of scale. 
As detailed above, having regard for its overall siting, scale, massing and design, Officers are
satisfied that the proposed development is deemed acceptable in that it would not have any
detrimental visual impact on the established land/townscape, local character and appearance
whilst providing improved public toilet provision.   
The proposed development would be consistent with the relevant provisions of NPF4 Policy 14
and the sustainable siting and design policies of LDP2 namely Policy 04, Sustainable
Development, Policy 05, Design and Placemaking, Policy 09, Sustainable Design and Policy
10, Design: All Development which, in summary, collectively seek to ensure that developments
are compatible with surrounding land uses, make use of existing infrastructure, are of an
appropriate scale, sustainable design and finishes for their site; and ensure that no adverse
visual or amenity impacts arise. 
4.8. NPF4 Policy 22 – Flood Risk and Water Management seeks to strengthen resilience to flood
risk and to ensure that water resources are used efficiently and sustainably. 
The application site is located adjacent to the coast.  According to SEPA Future Flood Map (i.e.
the 1 in 200-year with climate change event), the site partly lies within the indicative limits of
coastal flooding as per the SEPA Future Flood Map.

Page 15

The Council’s flood risk advisor was consulted in this regard, raising no objection, citing that the
application is for a like-for-like replacement of toilet block, thus there is no change to flood risk. 
The proposal falls below the criteria for consultation with SEPA due to the development being a
like-for-like replacement toilet block. 
In view of the above the proposal is deemed consistent with the relevant provisions of NPF4
Policy 22, Flood Risk and Water Management and LDP2 Policy 55, Flooding. 
4.9. NPF4 Policy 29, Rural Development sets out that development proposals in remote rural areas
(within which the application site is located) will be supported where the proposal supports and
sustains existing communities; and is suitable in terms of location, access, siting, design and
environmental impact. 
The proposal to provide a replacement toilet block, with improved facilities meets with the main
aims of NPF4 Policy 29. 
4.10. NPF4 Policy 30,Tourism, Part b) sets out a range of matters that tourism related
development will take into account.  This includes the contribution made to the local economy,
compatibility with the surrounding area in terms of activity and the impact of increased visitors;
impacts on communities; opportunities for sustainable travel, appropriate parking and traffic
generation, and public transport; accessibility for disabled people; measures to minimise carbon
emissions; and opportunities to provide access to the natural environment.   
LDP2 Policy 23, Tourist Development, Accommodation, Infrastructure and Facilities
supports improved tourist facilities and accommodation where the development is in a form
scale and location which is consistent with its surroundings; and respect and integrate well with
the landscape/townscape character and amenity of the surrounding area. 
The application site is located at land adjacent to Tayinloan Slipway which is also within a short
distance of the village of Tayinloan; and situated along the wider A83 trunk road corridor.  It is
noted that the public toilets are used by a wide range of users, including ferry passengers, locals,
and visitors visiting the local area, along on the A83 trunk road and wider Kintyre Peninsula. 
The proposal would support ongoing economic activity related to tourism and improve provision
of rural infrastructure.  As assessed in the above paragraphs, the proposed development is also
considered suitable in terms of location, access, siting, design and environmental impact. 
No waiting room would be provided in the replacement toilet building.  The applicant confirmed
that the footprint of the building could not be enlarged to incorporate a waiting room within the
replacement building.  The reason being the applicant does not own or have control over the
surrounding land; and the replacement building with similar footprint would require to comply
with current Building Standards to accommodate the accessible WC and the accessible access
ramp. 
A site visit was conducted on 21.4.2026, where it was noted that there are two other shelters
around the Tayinloan Slipway.  This includes a covered and three sides enclosed 5-bay bus
stop shelter with seating available located towards the southwest of the application site across
the vehicular access to the slipway; and a partly enclosed shelter at the head of the slipway. 
Considering there are provisions of similar passenger waiting facilities available within the
vicinity, it is not considered that there would be a significant detrimental effect from its loss on
the overall provision of waiting facilities within the local area that it currently serves.   
Considering the above, it is considered that the proposal complies with NPF4 Policy 30,
Tourism, LDP2 Policy 23, Tourist Development, Accommodation, Infrastructure and Facilities
and Policy 50, Retention of Community Facilities. 
4.11. LDP2 Policy 50, Retention of Community Facilities states that development involving the
loss or change of use of facilities (including any ancillary land) presently used or last used for

Page 16

community purposes will only be permitted where: it is clearly demonstrated that the facility is
surplus to the requirements of the community or communities it serves, either for its current
purpose or an alternative community use, or; it is clearly demonstrated that is no longer
financially viable to retain the facility and that all reasonable attempts have been made to retain
it, or; there would be no significant detrimental effect from its loss on the overall provision of
similar facilities within the local area that it currently serves, or; alternative provision of equal or
greater benefit to the community is made available at a suitable location within the local area. 
Isle of Gigha Community Council were consulted and objected to the proposal on grounds
summarised above, subsequent to a consultation with households of the Isle of Gigha. 
Public representations received suggest that the existing waiting room is also used for short
term storage area to allow storage of goods being transported to and from the Isle of Gigha.  In
this regard, it is considered that the storage use is not directly related to the main purpose of the
existing waiting room.  In addition, the storage area is not a community facility under LDP2 Policy
50, Retention of Community Facilities nor a key service identified under LDP2 Policy 51,
Retention of Key Services as such, these policies are not applicable to the short-term storage
area. 
4.12. LDP2 Policy 42, Safeguarding Piers, Ports and Harbours supports development within
established commercial harbour port and pier areas, where the proposal is ancillary to activities
taking place within that particular facility and that the proposal would not adversely affect the
commercial viability or efficient operation of the facility for marine related uses. 
The proposed development providing a replacement toilet block raises no conflict with the
provisions of this policy. 
5. Conclusion 
5.1. The determining factors in the assessment of this application are considered to be whether this
location is acceptable for the proposed development having regard to its effect on landscape,
biodiversity effects, provision of tourist/ community facilities, road network/parking, and flood
risk.  Officers note that there is a body of opposition to the proposed development alongside a
smaller proportion of support for the proposal. 
5.2. The proposed development has been assessed against all of the above potential constraints
and designations and has been considered to raise no issues or concerns other than the
aforementioned with associated proposed conditions where necessary. 
5.3. Based on the above, it is considered that the proposal is consistent with relevant policies of
NPF4 and the adopted Argyll and Bute LDP2 and there are no other material considerations
that would justify withholding planning permission.