Democracy Spraffa

Agenda reports pack

Argyll and Bute Council · 19 October 2026
Back to Argyll and Bute Local Review Body — 19 October 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 605522
DX 599700 LOCHGILPHEAD 
12 October 2026 
NOTICE OF MEETING 
A meeting of the ARGYLL AND BUTE LOCAL REVIEW BODY will be held BY MICROSOFT
TEAMS on MONDAY, 19 OCTOBER 2026 at 10:00 AM, which you are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. CONSIDER NOTICE OF REVIEW REQUEST: TARBERT FARM, ISLE OF GIGHA
(REF: 26/0002/LRB) 
(a) Notice of Review and Supporting Documentation (Pages 3 - 16)  
(b) Comments from Interested Parties (Pages 17 - 114)   
• Planning (Pages 17 – 112)
• Roads (Pages 113 – 114) 
Argyll and Bute Local Review Body 
Councillor Jan Brown Councillor Kieron Green (Chair)
Councillor Fiona Howard   
Contact: Fiona McCallum Tel: 01546 604392
Public Document Pack

Page 2

This page is intentionally left blank

Page 3

Page 1 of 5
Central Validation Team at Argyll and Bute Council 1A Manse Brae Lochgilphead PA31 8RD  Tel: 01546 605518  Email:
planning.hq@argyll-bute.gov.uk
Applications cannot be validated until all the necessary documentation has been submitted and the required fee has been paid.
Thank you for completing this application form:
ONLINE REFERENCE 100618917-015
The online reference is the unique reference for your online form only. The  Planning Authority will allocate an Application Number when
your form is validated. Please quote this reference if you need to contact the planning Authority about this application.
Applicant or Agent Details
Are you an applicant or an agent? * (An agent is an architect, consultant or someone else acting
on behalf of the applicant in connection with this application)  Applicant  Agent
Agent Details
Please enter Agent details
Company/Organisation:
Ref. Number: You must enter a Building Name or Number, or both: *
First Name: * Building Name:
Last Name: * Building Number:
Address 1
Telephone Number: * (Street): *
Extension Number: Address 2:
Mobile Number: Town/City: *
Fax Number: Country: *
Postcode: *
Email Address: *
Is the applicant an individual or an organisation/corporate entity? *
  Individual    Organisation/Corporate entity
Colin Armstrong Architects
Mike
Lawson
Fairways Business Park
Lyle House
IV2 6AA
Scotland
Inverness
Page 3 Agenda Item 3a

Page 4

Page 2 of 5
Applicant Details
Please enter Applicant details
Title: You must enter a Building Name or Number, or both: *
Other Title: Building Name:
First Name: * Building Number:
Address 1
Last Name: * (Street): *
Company/Organisation Address 2:
Telephone Number: * Town/City: *
Extension Number: Country: *
Mobile Number: Postcode: *
Fax Number:
Email Address: *
Site Address Details
Planning Authority:
Full postal address of the site (including postcode where available):
Address 1: 
Address 2:
Address 3:
Address 4:
Address 5:
Town/City/Settlement:
Post Code:
Please identify/describe the location of the site or sites
Northing Easting
Mr
TARBERT FARM
Don
Argyll and Bute Council
Dennis Tarbert Farm
Wee Isle Dairy
ISLE OF GIGHA
PA41 7AA
PA41 7AA
Scotland
651806
Isle of Gigha
165292
Wee Isle Dairy
Page 4

Page 5

Page 3 of 5
Description of Proposal
Please provide a description of your proposal to which your review relates. The description should be the same as given in the
application form, or as amended with the agreement of the planning authority: *
(Max 500 characters)
Type of Application
What type of application did you submit to the planning authority? *
  Application for planning permission (including householder application but excluding application to work minerals).
  Application for planning permission in principle.
  Further application.
  Application for approval of matters specified in conditions.
What does your review relate to? *
  Refusal Notice.
 Grant of permission with Conditions imposed.
  No decision reached within the prescribed period (two months after validation date or any agreed extension) – deemed refusal.
Statement of reasons for seeking review
You must state in full, why you are a seeking a review of the planning authority’s decision (or failure to make a decision). Your statement
must set out all matters you consider require  to be taken into account in determining your review. If necessary this can be provided as a
separate document in the ‘Supporting Documents’ section: *  (Max 500 characters)
Note: you are unlikely to have a further opportunity to add to your statement of appeal at a later date, so it is essential that you produce
all of the information you want the decision-maker to take into account.
You should not however raise any new matter which was not before the planning authority at the time it decided your application (or at
the time expiry of the period of determination), unless you can demonstrate that the new matter could not have been raised before that
time or that it not being raised before that time is a consequence of exceptional circumstances.
Have you raised any matters which were not before the appointed officer  at the time the  Yes   No
Determination on your application was made? *
If yes, you should explain in the box below, why you are raising the new matter, why it was not raised with the appointed officer before
your application was determined and why you consider it should be considered in your review: * (Max 500 characters)
Request to vary condition (Section 42)
We understand that a DMT decision on the use of concrete for farm accesses on the island is due to be made on this in short
course, but don't want to run the risk of running out of time, as the three month period runs out tomorrow.
Page 5

Page 6

Page 4 of 5
Please provide a list of all supporting documents, materials and evidence which you wish to submit with your notice of review and intend
to rely on in support of your review. You can attach these documents electronically later in the process: * (Max 500 characters)
Application Details
Please provide the application reference no. given to you by your planning
authority for your previous application.
What date was the application submitted to the planning authority? *
Review Procedure
The Local Review Body will decide on the procedure to be used to determine your review and may at any time during the review
process require that further information or representations be made to enable them to determine the review. Further information may be
required by one or a combination of procedures, such as: written submissions; the holding of one or more hearing sessions and/or
inspecting the land which is the subject of the review case.
Can this review continue to a conclusion, in your opinion, based on a review of the relevant information provided by yourself and other
parties only,  without any further procedures? For example, written submission, hearing session, site inspection. *
 Yes   No
In the event that the Local Review Body appointed to consider your application decides to inspect the site, in your opinion:
Can the site be clearly seen from a road or public land? *  Yes   No
Is it possible for the site to be accessed safely and without barriers to entry? *  Yes    No
Checklist – Application for Notice of Review
Please complete the following checklist to make sure  you have provided all the necessary information in support of your appeal. Failure
to submit all this  information may result in your appeal  being deemed invalid.
Have you provided the name and address of the applicant?.  *  Yes   No
Have you provided the date and reference number of the application which is the subject of this  Yes   No
review? *
If you are the agent, acting on behalf of the applicant, have you provided details of your name  Yes   No   N/A
and address and indicated whether any notice or correspondence required in connection with the
review should be sent to you or the applicant? *
Have you provided a statement setting out your reasons for requiring a review and by what  Yes   No
procedure (or combination of procedures) you wish the review to be conducted? *
Note: You must state, in full, why you are seeking a review on your application. Your statement must set out all matters you consider
require to be taken into account in determining your review. You may not have a further opportunity to add to your statement of review
at a later date. It is therefore essential that you submit with your notice of review, all necessary information and evidence that you rely
on and wish the Local Review Body to consider as part of your review.
Please attach a copy of all documents, material and evidence which you intend to rely on  Yes   No
(e.g. plans and Drawings) which are now the subject of this review *
Note: Where the review relates to a further application e.g. renewal of planning permission or modification, variation or removal of a
planning condition or where it relates to an application for approval of matters specified in conditions, it is advisable to provide the
application reference number, approved plans and decision notice (if any) from the earlier consent.
Declare – Notice of Review
I/We the applicant/agent certify that this is an application for review on the grounds stated.
Declaration Name: Mr Mike Lawson
Declaration Date: 07/05/2026
Location Plan, 2169 - House and Glamping Pods at Big Knowe House, Gigha - Section 42 Supporting Statement
25/01961/PP
09/12/2025
Page 6

Page 7

Page 5 of 5
Fee Exemption Reason
This is an appeal or request for local review and is not subject to a fee
Page 7

Page 8

This page is intentionally left blank

Page 9

Page 9

Page 10

Page 2           
Page 10

Page 11

Lyle House, Fairways Business Park, Inverness, IV2 6AA 
Page 3          
2. Practical constraints: tarmac was unobtainable
At the time the access was constructed, ferry weight restrictions meant that tarmac could not be
delivered to the island. The applicant was unable to find a way to transport the required plant or
materials – indeed there are incidences where a barge has had to be hired for these type of
works to be carried out on the islands. Concrete was the only practical, proportionate and
deliverable option. The applicant acted responsibly by constructing a compliant, durable access
surface using the only feasible material available. 
3. Rural business context
The applicant operates a small rural business in a remote location where sourcing labour and
materials is extremely difficult. Costs and logistics differ substantially from the mainland. Any
requirement to excavate and replace the existing access would cause avoidable financial harm
and operational disruption that is disproportionate to the planning purpose of the condition. 
4. Access functions as both residential and agricultural track
The access serves the house and holiday pod(s) but also the applicant’s dairy farm, including
regular tractor and plant movements. Tarmac is not suitable for heavy agricultural use, as it
deforms and tears under tractor traffic. This would require frequent resurfacing, creating an
unreasonable and recurring cost for a small rural business. Concrete provides the necessary
durability for agricultural vehicles over the long term. See below image of access during
construction, that was originally submitted in support of discharge of condition 2. 
Page 11

Page 12

Lyle House, Fairways Business Park, Inverness, IV2 6AA 
Page 4           
5. Local road context
The applicant is not aware of any council road resurfacing works on the island since
approximately 2008. Existing tarmac roads are in a poor state of repair. Requiring a higher
standard of construction than the council maintains locally is inconsistent with the practical
context of the area. The concrete access is appropriate, robust and aligned with local conditions. 
6. How this issue arose: leverage during a second application
The issue only came to light when the applicant submitted a second planning application for
two additional pods, using the same access. Transport Planning then raised concerns about the
existing concrete surface under the original consent.
From the applicant’s perspective, the handling of the second application gave the impression
that it was being used as leverage to compel the replacement of the concrete access. This
caused significant confusion and distress, as the applicant believed they had complied with all
relevant requirements to the best of their ability and in good faith. 
7. Communication challenges and impact on collaboration
The applicant and their design team sought to resolve the matter collaboratively and made
several requests for online meetings with council officers. These requests were repeatedly
declined, which made constructive dialogue difficult.
Correspondence from the case officer, James Ross, was at times blunt in tone. While
undoubtedly intended to communicate the council’s position clearly, the applicant found the
exchanges stressful and felt unsupported during what became a prolonged and complex
process.
Furthermore, the applicant has indicated that they would be willing to consider entering into a
legal agreement with the Council whereby they would be responsible for ongoing future
maintenance for the part of the junction constructed in concrete, but personnel from the
Council involved in the determination of the application and discharge of the conditions have
been unable or unwilling to discuss this in any meaningful way with the applicant.
These points are not raised to criticise any individual, but to provide important context about
why this matter has been so difficult for the applicant and why a clear and proportionate
resolution is now essential. 
Page 12

Page 13

Lyle House, Fairways Business Park, Inverness, IV2 6AA 
Page 5          
8. Delay and financial harm
The original application was submitted in February 2023. Almost three years have now passed
attempting to clarify the expectations regarding the access. The applicant has lost three tourist
seasons, and may lose a fourth, of income from the holiday pod(s).
These delays and the uncertainty surrounding this matter have had a significant and
detrimental financial impact on the applicant’s rural business. 
9. Planning purpose is already achieved
The intent of Condition 2 is to ensure road safety through the provision of a stable, durable,
bound surface and appropriate visibility splays. The existing concrete surface satisfies these
requirements. There is no road safety, amenity or operational benefit in replacing the concrete
with tarmac. Requiring the access to be dug up and rebuilt would serve no planning purpose
and would place an undue burden on the applicant. 
Conclusion
For the reasons set out above, we respectfully request that Condition 2 be modified to permit
the existing concrete access surface. This approach:
• meets the planning purpose of the condition
• reflects the practical constraints and remote island context
• avoids disproportionate financial and operational harm
• supports the viability of a fragile rural business
• provides a fair and constructive resolution to a difficult and prolonged situation
Page 13

Page 14

This page is intentionally left blank

Page 15

0
Scale1:1250
25 50 75m
N
SITE AREA: 6006sqm
TARBERT
To
Gigha
To
North End
53000
53000
Figured dimensions only are to be taken from this drawing.
All dimensions are to be checked on site before any work is put in hand.
IF IN DOUBT ASK.
CDM:
Hazard Elimination & Risk Reduction has been undertaken and
recorded where appropriate, in accordance with the requirements
of "The Construction (Design and Management) Regulations 2015"
and the associated "Industry Guidance for Designers"
Printed
on :
From
file
:
Project
Client
Lyle House, Fairways Business Park,
Inverness IV2 6AA
T  : 01463 712 288
W  : www.colinarmstrong.com
DateDescriptionRev
Project No.
Revision
Sheet
@ A3
Drawn byDate Created
Scale
Status
X:\Documents\2169 - Proposed
Glamping Pod Big Knowe House\02. WORK IN
PROGRESS\2.1 BIM
Models\2169-CAA-ZZ-XX-M3-A-000001.rvt
24/02/2023 10:47:41
1 : 1250
and  Tourist Let
Proposed Dwelling House
Don Dennis, Emma Rennie
and Bryce Harvey
DR- A- 0001
2169
Planning
External Works
Location Plan
RG21/02/23
Page 15

Page 16

This page is intentionally left blank

Page 17

1 
STATEMENT OF CASE
FOR
ARGYLL AND BUTE COUNCIL
LOCAL REVIEW BODY 
NON-DETERMINATION OF PLANNING
APPLICATION SEEKING A VARIATION OF
CONDITION 2 RELATIVE TO PLANNING
PERMISSION REF. 23/00391/PP – VARIATION
TO SURFACE OF VEHICULAR ACCESS 
TARBERT FARM, ISLE OF GIGHA, ARGYLL AND
BUTE 
PLANNING APPLICATION REFERENCE
NUMBER 25/01961/PP
LOCAL REVIEW BOARD REFERENCE
NUMBER 26/0002/LRB 
27TH May 2026
Page 17 Agenda Item 3b

Page 18

2 
STATEMENT OF CASE 
The planning authority is Argyll and Bute Council (‘the Council’). The appellant
is Wee Isle Dairy, Mr Don Dennis (‘the appellant’).
The planning application, reference number 25/021961/PP, Variation of
condition 2 of planning permission 23/00391/PP (Erection of dwellinghouse and
siting of family size glamping pod for use as holiday letting accommodation)
variation to surface of vehicular access) at Tarbert Farm, Isle of Gigha (the
appeal site”) was subject to a request for review in the event of non-
determination on 14th May 2026. The planning application has been appealed
and is subject of referral to a Local Review Body.
STATUTORY BASIS ON WHICH THE APPEAL SHOULD BE DECIDED
Section 25 of the Town & Country Planning (Scotland) Act 1997 provides
that where, in making any determination under the planning Acts, regard is
to be had to the development plan, the determination shall be made in
accordance with the plan unless material considerations indicate otherwise.
This is the test for this application. 
STATEMENT OF CASE
The planning authority considers the determining issue in relation to the case
to be the acceptability of the proposed access construction details in relation to
the requirements previously set out by the Council in its determination of
planning application ref. 23/00391/PP. 
The acceptability of the site for the erection of a dwellinghouse and the siting of
a glamping pod for use as holiday letting accommodation has previously been
established through the grant of planning permission ref. 23/00391/PP on 27th
September 2023 (“the 2023 permission”) (copy of decision notice and approved
plans attached)
The 2023 permission is subject to 9 (no) conditions. The only condition
preventing the commencement of development is condition 6 (landscape), the
details of which were submitted on 31st October 2024 and agreed on 1st
November 2024.
A Notice of Initiation of Development form was submitted 21st November 2024. 
Further details relating to the requirements of conditions 2 (formation of
access), 4 (road alterations), 7 (archaeology), and 8 (water supply) were
submitted on 26th November 2024. The requirements of condition 7 has been
satisfactorily been addressed. In relation to water supply (condition 8) details
were discharged on the basis that a public water supply connection was to be
obtained, it is however noted that the details on the current application indicate
a reversion to a private water supply is now proposed and will need to be the
Page 18

Page 19

3 
subject of further scrutiny, including enforcement action if necessary.
Confirmation was however provided by the Council’s Roads Officer on 21st
January 2024 that the provisions of conditions 2, 3, and 4 had not been fully
satisfied. In respect of condition 2 it was observed that the access bellmouth
and service bay had not been properly constructed in accordance with the
requirements of the specified Roads Standard Detail Drawing SD 08/004 Rev
a. The Roads Officer noted that the service was required to be constructed to
standard that would allow this to become part of the public road which in future
would be managed and maintained by the Council and as such required to be
surfaced in a bituminous material. The photos provided however showed the
access and service bay to be constructed with concrete. Commentary was also
provided in relation to non-compliance with condition 3 as a fence appeared to
be located within 2m of the service bay, and that in relation to condition 4,
headwalls had not been constructed at each end of the drainage culvert within
a 2m wide verge.
On the basis of the above, it is understood that the 2023 has been unlawfully
and partially implemented through construction of the connection to the public
road and service bay, formation of part of the access route, and erection of the
glamping pod, it does however appear that elements of the implemented
development do not accord with the detail provided in the approved plans,
coupled with the failure to meet the requirements of condition 2 (and potentially
also conditions 3 and 4) the 2023 permission cannot be considered to have
been lawfully implemented at this point in time but is of significant material
weight as it remains ‘live’. However, if pre-start compliance requirement remain
unaddressed, this permission would expire on 27th September 2026.
Application ref. 25/01961/PP (“the 2025 application”) was submitted on 25th
November 2025 and made valid on the 8th December 2025. This application
has been made under the provisions of Section 42 of the Act and seeks a fresh
permission to be issued with a variation to the terms of condition 2 relative to
the 2023 permission. In summary the 2025 permission seeks to secure
approval for the use of concrete as the surface finish to the vehicular access
bellmouth and service bay as amendment to the terms of condition 2 relative to
23/00391/PP. Alongside the submission of the 2025 application, the appellant
engaged in direct dialogue with the Council’s Roads and Infrastructure Services
(RIS) seeking that the Council review its position on the requirement for
bituminous material in remote and island locations. This matter was taken
forward by RIS and an undertaking to formally review this was provided, this
resulted in a report from the Head of Roads and Infrastructure Services to the
Council’s DMT in May 2026. The progression of the 2025 application was
accordingly put on hold to await the outcome of the RIS report to DMT. A formal
response from the Council’s Roads and Infrastructure Services remains
outstanding and is required for the purpose of addressing any amendment to
condition 2.
Additionally, in considering this matter, the LRB should also be aware of a
related planning application (ref. 24/02082/PP – “the 2024 application”)
submitted by the appellant on 19th November 2024 and valid on 10th January
2025. This separate application seeks planning permission for the erection of
Page 19

Page 20

4 
an addition two holiday letting accommodation units and associated works on
adjoining land to the 2023 permission. The 2024 application in summary
provides for an intensification in activity which would utilise the same vehicular
access onto the public road as the 2023 permission, there is however provision
to separate tourism traffic by diverting this along a new southern route to a
separate parking area. The 2024 application currently remains undetermined
as it too was held in abeyance whilst awaiting the outcome of the RIS review
and report to DMT, and an updated Roads consultation response is also
necessary to move that matter forward. 
The commentary below sets out officers response to the matters raised by the
Appellant in their LRB submission. 
REQUIREMENT FOR ADDITIONAL INFORMATION AND A HEARING
The proposal seeks to amend/vary the requirements of condition 2 relative to
planning permission ref. 23/00391/PP. Given that the principle of development
has in this instance already been established and remains the subject of a ‘live’
permission (the 2023 permission) it is anticipated that the LRB will be able to
limit its consideration to this specific matter as opposed to considering the
whole proposal afresh. 
It is considered that given the nature of this application the written submissions
process should be sufficient for all parties to provide the LRB with the details
required to reach a decision. Given the above and that the proposal is small-
scale, has no complex or challenging issues and has not been the subject of
significant body of conflicting representation, then it is considered that a
Hearing is not required. 
COMMENT ON APPELLANTS’ SUBMISSION 
Having regard to the detailed reasons for requesting the review set out in in
the appellants’ submission the following points are noted: 
1. Condition Wording and Lack of Clarity. 
Page 20

Page 21

5 
Comment: The terms of condition 2 provide an accurate technical
specification and identification of the Council’s relevant roads guidance
to direct the standard to which the access an service bay must be
provided. It is further noted that the drawings submitted by the applicant
and which form part of the approval specify the use of tarmac on the
site/location plan drawings; had concrete been specified then a
correction to this would have been applied by condition. It is considered
that the provisions of condition 2 satisfy the ‘6 tests’ set out by the
Scottish Government within Circular on the Use of Planning Condition
(4/1998). 
2. Practical constraints: tarmac was unobtainable. 
Comment: It is understood that this is a matter that will be addressed
by the Council’s Roads and Infrastructure Services in their response to
the LRB. 
3. Rural business context 
Comment: It is understood that this is a matter that will be addressed by
the Council’s Roads and Infrastructure Services in their response to the
LRB. 
4. Access functions as both residential and agricultural track 
Page 21

Page 22

6 
Comment: It is understood that this is a matter that will be addressed
by the Council’s Roads and Infrastructure Services in their response to
the LRB. 
5. Local Road Context 
Comment: It is understood that this is a matter that will be addressed by
the Council’s Roads and Infrastructure Services in their response to the
LRB. 
6. How this issue arose: leverage during a second application 
Comment: The Agent for the appellant submitted details of the
constructed bellmouth as part of a discharge of conditions submission
dated 26th November 2024. 
Documentation on file confirms that the case officer forwarded the details
to Roads on 16th January 2025. Roads confirmed on 21st January 2025
that the constructed access did not comply with the requirements of
condition 2. This position was communicated to the Agent for the
appellant on the 23rd January 2025. 
It is observed that the 2024 application (for an additional two pods) was
submitted on 19th November 2024 and validated on 10th January 2025.
Whilst the timelines overlap it is incorrect of the appellant to state that
issue was only flagged in response to the application for further
development. It is noted that officers have sought to resolve this issue
during the processing of the 2024 application for the purpose of avoiding
the situation where the grant of consent gave rise to a further breach of
planning control. It is also noted that once the appellant had commenced
their separate discussion which has resulted in the RIS review, they had
provided instruction that they would prefer a decision on the 2024
submission to be withheld in anticipation that this might provide an
outcome that sat in their favour; officers were happy to oblige.
7. Communication challenges and impact on collaboration
Page 22

Page 23

7 
Comment: It is noted that this matter is not material to the consideration
of the LRB. It is observed that having been made aware of the issue in
January 2025 the appellant and their representatives sought to engage
with a wide range of interests/influencers in respect of this matter. Any
decision to vary Roads technical guidance is a matter that lies outwith
the scope of the Council’s planning service and as such the
Development Management Service have agreed extensions that have
allowed the appellant to explore these options. The Development
Management Service is not however responsible for any difficulty that
the appellant may have experienced in progressing those discussions or
delays in that being concluded. 
8. Delay and financial harm 
Comment: It is noted that this matter is not material to the consideration
of the LRB. The acceptability or otherwise of the proposal must be
considered in relation to the Development Plan and not how the
application was processed. It is further observed that whilst the appellant
has not as yet managed to implement their development in a lawful
manner it is understood that the glamping pod is currently advertised for
let. 
9. Planning purpose is already achieved 
Comment: It is understood that commentary on the technical challenges
presented through the use of concrete will be addressed by the Council’s
Roads and Infrastructure Services in their response to the LRB.
Page 23

Page 24

8 
It is further observed however that due to the appellant's failure to
properly implement the 2023 permission in accordance with both the
terms of condition 2 and the details shown on the approved plans, that
a positive outcome to the LRB would still not be sufficient to wholly
address the planning enforcement liabilities that relate to the
development as currently built, and may require the submission of a
further detailed planning application to resolve. 
OTHER MATTERS 
It is observed that the key policy consideration for the LRB in their determination
of this matter would be whether or not the proposed amendment to the terms
of condition relative to 23/00391/PP would be considered to be consistent with
the requirements of the provisions of Policy 39 of the Argyll and Bute Local
Development Plan 2. 
At the time of writing no formal consultation comment has been received from
the Council’s Roads and Infrastructure Services in respect of the 2025
application. It is however understood that the outcome of the report to DMT in
respect of the use of non-bituminous surface materials on Gigha has not
resulted in any change to the Council’s previously established position. 
On the basis that the Council’s Roads Officers have previously confirmed that
the access as constructed fails to comply with the requirements of the Council’s
Roads Design Guidance (and the identified Standard Roads Drawing) it is the
consideration of officers that the proposal to amend condition2 to provide for
the use of concrete is unacceptable. Officers would however defer to any
updated position provided by Roads on this matter. 
In light of the above and to comply with the requirements of LDP2 Policy 39(a),
it is recommended that the LRB grant planning permission but with a revised
format of condition 2 that secures the removal of the first 5m of concrete and
its replacement with a bituminous material within a period of 3 months from the
date of permission. A revised list of conditions to this effect is provided, this also
takes into account details from the 2023 permission which have already been
submitted for approval and have been discharged.
Page 24

Page 25

9 
CONCLUSION 
Section 25 of the Town and Country Planning Act 1997 requires that all
decisions be made in accordance with the development plan unless material
considerations indicate otherwise. In this case, the proposed development
would be in conflict with the relevant provisions of the development plan when
taken as a whole, and there are no material circumstances to indicate that the
decision should be made other than in accordance with the development plan. 
Taking account of the above, it is respectfully requested that the Appellant’s
request for permission to be granted for use of a concrete surface to the access
and service bay be dismissed. Given that this is a submission under S.42 of the
Act it is advised that permission be granted subject to the conditions appended
which take accord of matters already resolved in relation to landscape,
archaeology and water supply but which set out remedial action which is
necessary to bring the constructed access into alignment with the Council’s
Roads Development Guidance. 
Appended documents: 
23/00391/PP – Decision Notice (separate attachment)
23/00391/PP – Approved Plans (separate attachment)
23/00391/PP – Report of Handling (separate attachment) 
23/00391/PP - Details submitted pursuant to condition 6 (landscape) (submitted
31.10.2024 and approved 01.11.2024) (separate attachment) 
23/00391/PP – Details submitted pursuant to condition 7 (archaeology)
(submitted 25.11.2024 – no response received from WoSAS and assumed to
be acceptable). (separate attachment) 
Suggested Conditions for LRB 26/0002/LRB (Appendix 1 below)
Page 25

Page 26

TOWN AND COUNTRY PLANNING (SCOTLAND) ACT 1997 (AS AMENDED)
TOWN AND COUNTRY PLANNING (DEVELOPMENT MANAGEMENT PROCEDURE)
(SCOTLAND) REGULATIONS 2013 
PLANNING PERMISSION 
REFERENCE NUMBER: 23/00391/PP 
Don Dennis, Emma Rennie And Bryce Harvey
Colin Armstrong Architects
Lyle House
Pavilion 1
Fairways Business Park
Inverness
IV2 6AA 
I refer to your application dated 27th February 2023 for planning permission in respect of the
following development: 
Erection of dwellinghouse and siting of family size glamping pod for use as holiday letting
accommodation
AT:
Land South West Of Tarbert Farm Isle Of Gigha Argyll And Bute   
Argyll and Bute Council in exercise of their powers under the above mentioned Act and
Regulations hereby grant planning permission for the above development in accordance with the
particulars given in the application form and doquetted plans subject however to the conditions
and reasons detailed on the  following page(s). 
It should be understood that this permission does not carry with it any necessary consent or
approval for the proposed development under other statutory enactments and is not a Building
Warrant. 
Dated: 27 September 2023 
Fergus Murray
Head of Development and Economic Growth 
Page 26

Page 27

REFERENCE NUMBER: 23/00391/PP 
Erection of dwellinghouse and siting of family size glamping pod for use as holiday letting
accommodation
AT:
Land South West Of Tarbert Farm Isle Of Gigha Argyll And Bute   
The planning permission as detailed above is subject to the following conditions: 
Standard Time Limit Condition: 
The development to which this permission relates must be begun not later than three years from
the date of this permission. 
Reason: In accordance with Section 58 of the Town and Country Planning (Scotland) Act 1997. 
Standard Soils Management Condition: 
Where the development involves ground breaking works, soil management should be undertaken
in compliance with the established best practice set out in the DEFRA publication “Construction
Code of Practice for the Sustainable Use of Soils on Construction Sites 2009”, unless an
alternative methodology for sustainable management of soil is submitted to and approved in
writing by the Planning Authority. 
Reason: In order to ensure that sustainable management of soils and compliance with the
requirements of NPF4 Policy 5A. 
Additional Conditions: 
1. PP - Approved Details & Standard Notes - Non-EIA Development 
The development shall be implemented in accordance with the details specified on the application
form dated 24.02.2023 supporting information and, the approved drawings listed in the table below
unless the prior written approval of the planning authority is obtained for an amendment to the
approved details under Section 64 of the Town and Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Supplementary Location Plan RG - 0004  15.03.2023 
Location Plan DR- A- 0001  27.02.2023 
Proposed Site Plan DR- A- 0002  27.02.2023 
Proposed Site Section RG - 0003  27.02.2023 
Proposed Floor Plan SF32551 -PLN01-1 A 27.02.2023 
Proposed Elevations SF32551 - PLN01-2 A 27.02.2023 
Glamping Pod Elevations, Floor
Plan and Section as Proposed
AL - 0004  27.02.2023 
Reason: For the purpose of clarity, to ensure that the development is implemented in accordance
with the approved details. 
Page 27

Page 28

2. Notwithstanding the provisions of Condition 1, the proposed access shall be formed in
accordance with the Council's Roads Standard Detail Drawing SD 08/004 Rev a; and visibility
splays of 2.4 metres to point X by 53 metres to point Y from the centre line of the proposed
access. The access shall be surfaced with a bound material in accordance with the stated
Standard Detail Drawing. Prior to work starting on site the access hereby approved shall be
formed to at least base course standard and the visibility splays shall be cleared of all obstructions
such that nothing shall disrupt visibility from a point 1.05 metres above the access at point X to a
point 0.6 metres above the public road carriageway at point Y. The final wearing surface on the
access shall be completed prior to the development first being brought into use and the visibility
splays shall be maintained clear of all obstructions thereafter. 
Reason: In the interests of road safety. 
3. Notwithstanding the provisions of Condition 1, the development shall not include for the
provision of walls, fences or hedges within 2.0 metres of the public road or back of service strip.
The proposed vehicular gates to be installed at the site entrance shall be set back a minimum
distance of 6.00 metres from edge of public road and shall open inwards and away from the public
road. 
Reason: In the interest of road safety. 
4. Notwithstanding the provisions of Condition 1, prior to the commencement of work on site,
the proposed road alteration shall be implemented in accordance with the details set out by the
Roads and Infrastructure Services below: 
(i) Existing road ditch to be culverted under the service bay shall be carried out to the
satisfaction of Roads & Infrastructure Services. 
(ii) Headwalls shall be constructed on each end of the new culvert.
(iii) Provision of parking and turning for a minimum of 3 vehicles within application site - 2
spaces for the main dwelling and 1 space for the glamping pod.  
(iv) Provision of refuse collection point adjacent to the public road. 
Reason: In the interest of road and public safety. 
5. Notwithstanding the provisions of Condition 1, the glamping pod hereby approved shall be
used for short term occupancy only and not as a main residence and shall not be occupied by any
family, group or individual for a cumulative period of more than three calendar months in any one
year. A register showing dates of arrivals and departures shall be maintained by the Site Operator
and shall be available at all reasonable times for inspection by the Planning Authority. 
Reason: In order to define the permitted occupancy to satisfy the provisions of the Development
Plan. 
Page 28

Page 29

6. Notwithstanding the provisions of Condition 1, no development shall commence until a
scheme of boundary treatment, surface treatment and landscaping has been submitted to and
approved in writing by the Planning Authority. The scheme shall include details of: 
i) Location, design and materials of proposed walls, fences and gates;
ii) Surface treatment of proposed means of access and hardstanding areas;
iii) Any proposed re-contouring of the site by means of existing and proposed ground levels;
iv) Proposed hard and soft landscape works;
v) A biodiversity statement demonstrating how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these benefits will be maintained
for the lifetime of the development. 
The development shall not be occupied until such time as the boundary treatment, surface
treatment and any re-contouring works have been completed in accordance with the duly
approved scheme. 
All of the hard and soft landscaping works shall be carried out in accordance with the approved
scheme during the first planting season following the commencement of the development, unless
otherwise agreed in writing by the Planning Authority. 
The biodiversity statement should refer to Developing with Nature guidance | NatureScot as
appropriate. 
Reason: To assist with the integration of the proposal with its surroundings in the interest of
amenity, and to comply with the requirements of NPF4 Policy 3 
7. Notwithstanding the provisions of Condition 1, the developer shall secure the
implementation of an archaeological watching brief, to be carried out by an archaeological
organisation acceptable to the Planning Authority, during all ground disturbance. The retained
archaeological organisation shall be afforded access at all reasonable times and allowed to record,
recover and report items of interest and finds. A method statement for the watching brief will be
submitted by the applicant, agreed by the West of Scotland Archaeology Service, and approved by
the Planning Authority prior to commencement of the watching brief. The name of the
archaeological organisation retained by the developer shall be given to the Planning Authority and
to the West of Scotland Archaeology Service in writing not less than 14 days before development
commences. 
Reason: In order to protect archaeological resources. 
8. Notwithstanding the provisions of Condition 1, no development shall commence until an
appraisal of the wholesomeness and sufficiency of the intended private water supply and the
system required to serve the development has been submitted to and approved in writing by the
Planning Authority. 
The appraisal shall be carried out by a qualified hydrologist and shall include a risk assessment
having regard to the requirements of Schedule 4 of the Private Water Supplies (Scotland)
Regulations 2006 which shall inform the design of the system by which a wholesome and sufficient
water supply shall be provided and maintained. The appraisal shall also demonstrate that the
wholesomeness and sufficiency of any other supply in the vicinity of the development, or any other
person utilising the same source or supply, shall not be compromised by the proposed
development. 
Page 29

Page 30

The development shall not be brought into use or occupied until the required water supply system
has been installed in accordance with the agreed specification and is operational. 
Reason: In the interests of public health and in order to ensure that an adequate private water
supply in terms of both wholesomeness and sufficiency can be provided to meet the requirements
of the proposed development and without compromising the interests of other users of the same or
nearby private water supplies.   
9. Notwithstanding the provisions of Condition 1, the development shall incorporate a surface
water drainage system which is consistent with the principles of Sustainable urban Drainage
Systems (SuDS) compliant with the guidance set out in CIRIA's SuDS Manual C753. The requisite
surface water drainage shall be operational prior to the development being brought into use and
shall be maintained as such thereafter. 
Reason: To ensure the provision of an adequate surface water drainage system and to prevent
flooding. 
Page 30

Page 31

NOTES TO APPLICANT (1) RELATIVE TO APPLICATION NUMBER 23/00391/PP 
STANDARD NOTES 
1. If the applicant is aggrieved by the decision to refuse permission for or approval required
by a condition in respect of the proposed development, or to grant permission or approval
subject to conditions, the applicant may require the planning authority to review the case
under Section 43A of the Town and Country Planning (Scotland) Act 1997 (as amended)
within three months from the date of this notice. A Notice of Review request must be
submitted on an official form which can be obtained by contacting The Local Review Body,
Committee Services, Argyll and Bute Council, Kilmory, Lochgilphead, PA31 8RT or by
email to localreviewprocess@argyll-bute.gov.uk 
2. If permission to develop land is refused or granted subject to conditions and the owner of
the  land claims that the land has become incapable of reasonably beneficial use in its
existing state, and it cannot be rendered capable of reasonably beneficial use by the
carrying out of any development which has been or would be permitted, the owner of the
land may serve on the planning authority a purchase notice requiring the purchase of the
landowner’s interest in the land, in accordance with Part 5 of the Town and Country
Planning (Scotland) Act 1997 (as amended). 
3. In order to comply with Sections 27A(1)  of the Town and Country Planning (Scotland) Act
1997, prior to works commencing on site it is the responsibility of the developer to complete
and submit the following ‘Notice of Initiation of Development’ form to the Planning Authority
specifying the date on which the development will start. Failure to comply with this
requirement constitutes a breach of planning control under Section 123(1) of the Act. 
4. In order to comply with Section 27B(1) of the Town and Country Planning (Scotland) Act
1997 it is the responsibility of the developer to submit the following  ‘Notice of Completion’
form to the Planning Authority specifying the date upon which the development was
completed. 
Page 31

Page 32

INFORMATIVE NOTES 
• Further advice on SuDS can be found in SEPA’s Standing Advice for Small Scale
Development – www.sepa.org.uk 
• Regulatory requirements for private water supplies should be discussed with the
Council’s Environmental Health Officers in the first instance. 
• Regard should be had to the West of Scotland Archaeology Service’s consultation
comments in respect of the proposed development. 
• Operation of the pod for the purposes of a tourist accommodation shall require the
benefit of a separate Site Licence under the Caravan Sites and Control of
Development Act 1960 as amended. Site Licence requirements should be discussed
with the Council’s Environmental Health Officers in the first instance. 
Page 32

Page 33

APPENDIX TO DECISION APPROVAL NOTICE 
Appendix relative to application: 23/00391/PP 
A. Has the application required an obligation under Section 75 of the Town and Country
Planning (Scotland) Act 1997 (as amended): 
Planning Obligation Not Required 
B. Has the application been the subject of any “non-material” amendment in terms of Section
32A of the Town and Country Planning (Scotland) Act 1997 (as amended) to the initial submitted
plans during its processing. 
Yes/No? (if yes, list amendments below) 
No amended plans received     
Summary of amendments (if appropriate): 
C.  Is the proposal a departure from the Development Plan: 
No 
If yes, state level of departure: 
No Departure 
D.  Summary justification statement for approval of planning permission 
The proposal is considered to be consistent with the relevant provisions of the Development Plan,
and there are no other material considerations of sufficient significance to indicate that it would be
appropriate to withhold planning permission having regard to s25 of the Act. 
Page 33

Page 34

10 
Appendix 1: SUGGESTED CONDITIONS AND REASONS RELATIVE TO LRB
REF. 26/0002/LRB (25/01961/PP)
Standard Time Limit Condition (as defined by Regulation)
Standard Condition on Soil Management During Construction
Additional Conditions
1. PP - Approved Details & Standard Notes – Non EIA Development
The development shall be implemented in accordance with the details specified
on the application form for 23/00319/PP dated 24.02.2023, supporting
information and, the approved drawings relative to 23/00319/PP listed in the
table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the
Town and Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Supplementary Location
Plan
RG - 0004  15.03.2023
Location Plan DR- A- 0001  27.02.2023
Proposed Site Plan DR- A- 0002  27.02.2023
Proposed Site Section RG - 0003  27.02.2023
Proposed Floor Plan SF32551 -
PLN01-1
A 27.02.2023
Proposed Elevations SF32551 -
PLN01-2
A 27.02.2023
Glamping Pod
Elevations, Floor Plan
and Section as
Proposed
AL - 0004  27.02.2023 
Reason: For the purpose of clarity, to ensure that the development is
implemented in accordance with the approved details.
2. The vehicular access shall be formed in accordance with the Council’s Roads
Standard Detail Drawing SD 08/004 Rev a; and visibility splays of 2.4 metres
to point X by 53 metres to point Y from the centre line of the proposed access.
The access shall be surfaced with a bound material in accordance with the
stated Standard Detail Drawing. Within 3 months from the date of this
permission the concrete surface on the first 5m of the existing vehicular access
(measured from the carriageway edge) shall be removed and replaced with a
bituminous material. Unless an alternative timescale is otherwise agreed in
writing with the planning authority in consultation with the Roads Authority. 
Prior to any further development taking place on site, the visibility splays shall
be cleared of all obstructions such that nothing shall disrupt visibility from a
point 1.05 metres above the access at point X to a point 0.6 metres above the
public road carriageway at point Y. The final wearing surface on the access
shall be completed prior to the development first being brought into use and the
visibility splays shall be maintained clear of all obstructions thereafter. 
Reason: In the interests of road safety.
Page 34

Page 35

11 
3. Notwithstanding the provisions of Condition 1, the development shall not
include for the provision of walls, fences or hedges within 2.0 metres of the
public road or back of service strip. The proposed vehicular gates to be installed
at the site entrance shall be set back a minimum distance of 6.00 metres from
edge of public road and shall open inwards and away from the public road. 
Reason: In the interest of road safety. 
4. Notwithstanding the provisions of Condition 1, prior any further development
works on site, the vehicular access and service bay shall be wholly
implemented in accordance with the details set out by the Roads and
Infrastructure Services below: 
(i) Existing road ditch to be culverted under the service bay shall be
carried out to the satisfaction of Roads & Infrastructure Services.
(ii) Headwalls shall be constructed on each end of the new culvert.
(iii) Provision of parking and turning for a minimum of 3 vehicles within
application site - 2 spaces for the main dwelling and 1 space for the glamping
pod.
(iv) Provision of refuse collection point adjacent to the public road. 
Reason: In the interest of road and public safety. 
5. Notwithstanding the provisions of Condition 1, the glamping pod hereby
approved shall be used for short term occupancy only and not as a main
residence and shall not be occupied by any family, group or individual for a
cumulative period of more than three calendar months in any one year. A
register showing dates of arrivals and departures shall be maintained by the
Site Operator and shall be available at all reasonable times for inspection by
the Planning Authority. 
Reason: In order to define the permitted occupancy to satisfy the provisions
of the Development Plan.
6. The development shall be implemented in accordance with the scheme of
landscape and boundary treatment submitted and approved in relation to
planning permission ref. 23/00319/PP – plan ref. DR-A-0002 Rev A. submitted
on 31st October 2024 and agreed by the planning authority on 1st November
2024. 
Reason: To assist with the integration of the proposal with its surroundings in
the interest of amenity, and to comply with the requirements of NPF4 Policy 3
7. Notwithstanding the provisions of Condition 1, the development shall not be
first occupied until an appraisal of the wholesomeness and sufficiency of the
intended private water supply and the system required to serve the
development has been submitted to and approved in writing by the Planning
Authority, OR until such time as a connection to the public water supply has
been obtained and provided and evidence to this effect has been submitted for
written approval of the planning authority. 
The appraisal of a private water supply shall be carried out by a qualified
hydrologist and shall include a risk assessment having regard to the
requirements of Schedule 4 of the Private Water Supplies (Scotland)
Page 35

Page 36

12 
Regulations 2006 which shall inform the design of the system by which a
wholesome and sufficient water supply shall be provided and maintained. The
appraisal shall also demonstrate that the wholesomeness and sufficiency of
any other supply in the vicinity of the development, or any other person utilising
the same source or supply, shall not be compromised by the proposed
development. 
The development shall not be brought into use or occupied until the required
water supply system has been installed in accordance with the agreed
specification and is operational.
Reason: In the interests of public health and in order to ensure that an
adequate water supply in terms of both wholesomeness and sufficiency can
be provided to meet the requirements of the proposed development and
without compromising the interests of other users of the same or nearby
private water supplies. 
8. Notwithstanding the provisions of Condition 1, the development shall
incorporate a surface water drainage system which is consistent with the
principles of Sustainable urban Drainage Systems (SuDS) compliant with the
guidance set out in CIRIA's SuDS Manual C753. The requisite surface water
drainage shall be operational prior to the development being brought into use
and shall be maintained as such thereafter. 
Reason: To ensure the provision of an adequate surface water drainage
system and to prevent flooding. 
SUGGESTED ADDITIONAL NOTES TO APPLICANT RELATIVE TO LRB REF.
26/0002/LRB (25/01961/PP) 
 Further advice on SuDS can be found in SEPA’s Standing Advice for Small Scale
Development – www.sepa.org.uk 
 Operation of the pod for the purposes of a tourist accommodation shall require
the benefit of a separate Site Licence under the Caravan Sites and Control of
Development Act 1960 as amended. Site Licence requirements should be
discussed with the Council’s Environmental Health Officers in the first instance. 
 A Road Opening Permit under the Roads (Scotland) Act 1984 must be obtained
from the Council’s Roads Engineers prior to the formation/alteration of a junction
with the public road. 
 The access shall be constructed and drained to ensure that no surface water is
discharged onto the public road. 
 Regulatory requirements for private water supplies should be discussed with the
Council’s Environmental Health Officers in the first instance.
Page 36

Page 37

0 1 3 4 5m2
FRONT(ENTRANCE)ELEVATION
Fixed Fixed
1500 600
1200
900
1050
1050
900
1050
1050
1000
2100
1800
1200
900
0 1 3 4 5m2
REAR ELEVATION
Fixed Fixed
1500
1200
900
1800
2100
900
1200
900
1500
1350
750
0 1 3 4 5m2
RH SIDE ELEVATION
Fixed
1800
1200
900
1800
2100
Fixed
1500
1350
750
Fixed
0 1 3 4 5m2
LH SIDE ELEVATION
THIS DRAWING IS COPYRIGHT & CANNOT BE COPIED IN WHOLE OR IN PART
WITHOUT THE WRITTEN CONSENT OF SCOTFRAME TIMBER ENGINEERING LIMITED.
COPYRIGHT:-
17/02/231:50 @ A1 CP
Isle of Gigha, PA41 7AA
Proposed New House atBig Knowe House, Tarbert Farm
Mr & Mrs Dennis
SF32551 - PLN01-2 A
NOTES:
· '3 STAR' CLOSED PANEL TIMBER FRAME KIT - 140mm Val-U-Therm
· SOLID FLOOR CONSTRUCTION
· PROFILED METAL CLADDING TO ROOF
· UPVC WINDOWS & COMPOSITE DOORS
· UPVC ROOFLINE
Smooth cement render
to basecourse to be
in contrasting
colour.
Black UV resistant
PVCu Rainwater goods
to match windows
High performance
PVCu windows &
composite doors in
'Anthracite Grey'
colour.
Smooth cement render
to basecourse to be
in contrasting
colour.
PVCu Soffit and
Fascia in
'Anthracite Grey'
to match windows
Black UV resistant
PVCu Rainwater goods
to match windows
Smooth cement render
to basecourse to be
in contrasting
colour (matching
cills.)
Black UV resistant
PVCu Rainwater goods
to match windows
Profiled metal
cladding
Dark grey ridge
flashing to match in
with roof sheeting
White render to
main main body of
house
White render to
main main body of
house
A CLIENT AMENDMENTS 23/02/23
White render to
main main body of
house
Page 37

Page 38

838
838
838
838
838
1385 Sliding Doors 1235 Sliding Doors
1235 Sliding Doors
Module 10
1800x2100 French Doors
Leading
Fixed1500x1350/OF
600x1050/O
1500x1200/OF
1500x1200/OF
Bedroom 2 Dining AreaLounge
Kitchen
Hall
St.W
En-S
Cl.
UtilityBedroom 1
Bedroom 4
/Study
GROUND FLOOR PLAN
0 1 3 4 5m2
Total Floor Area - 112.2m²(to plasterboard)
Total Kit Area - 114.2m²(to structural kit)
838
838
900x1200/O
838
900x1050/O
1500x1350/OF
900x2100/F
1800x1200/OF
1800x1200/OF
W W
3905 2200 4050 3630
8010
3630
2720192515303905
3405
630
3825
1348 1323
3345
3345
3345
3405
630
1790
2825
1400
1400
THIS DRAWING IS COPYRIGHT & CANNOT BE COPIED IN WHOLE OR IN PART
WITHOUT THE WRITTEN CONSENT OF SCOTFRAME TIMBER ENGINEERING LIMITED.
COPYRIGHT:-
17/02/231:50 @ A1 CP
Isle of Gigha, PA41 7AA
Proposed New House atBig Knowe House, Tarbert Farm
Mr & Mrs Dennis
SF32551 - PLN01-1 A
NOTES:
· '3 STAR' CLOSED PANEL TIMBER FRAME KIT - 140mm Val-U-Therm
· SOLID FLOOR CONSTRUCTION
· PROFILED METAL CLADDING TO ROOF
· UPVC WINDOWS & COMPOSITE DOORS
· UPVC ROOFLINE
A CLIENT AMENDMENTS 23/02/23
Page 38

Page 39

0
Scale1:1250
25 50 75m
N
SITE AREA: 6006sqm
TARBERT
To
Gigha
To
North End
53000
53000
Figured dimensions only are to be taken from this drawing.
All dimensions are to be checked on site before any work is put in hand.
IF IN DOUBT ASK.
CDM:
Hazard Elimination & Risk Reduction has been undertaken and
recorded where appropriate, in accordance with the requirements
of "The Construction (Design and Management) Regulations 2015"
and the associated "Industry Guidance for Designers"
Printed
on :
From
file
:
Project
Client
Lyle House, Fairways Business Park,
Inverness IV2 6AA
T  : 01463 712 288
W  : www.colinarmstrong.com
DateDescriptionRev
Project No.
Revision
Sheet
@ A3
Drawn byDate Created
Scale
Status
X:\Documents\2169 - Proposed
Glamping Pod Big Knowe House\02. WORK IN
PROGRESS\2.1 BIM
Models\2169-CAA-ZZ-XX-M3-A-000001.rvt
24/02/2023 10:47:41
1 : 1250
and  Tourist Let
Proposed Dwelling House
Don Dennis, Emma Rennie
and Bryce Harvey
DR- A- 0001
2169
Planning
External Works
Location Plan
RG21/02/23
Page 39

Page 40

8.6 m 
8.8 m
9.0 m 
8.2 m 
8.2 m 
8.4 m 
8.4 m 
8.4 m 
8.6 m 
8.6 m 
8.6 m 
8.8 m 
8.8 m 
9.0 m 
9.0 m 
9.0 m 
9.2 m 
9.2 m 
9.2 m 
9.4 m 
8.8 m
0 20 40 60m
Scale 1:1000
N
SITE AREA: 6006sqm
1
0003
1
0003
Area of hardstanding to aid in the
collection of waste and recycling
Proposed House
Proposed Tourist Let unit
Site Area: 826sqm
TARBERT
Photovoltaic Panels
Proposed treatment plant
and soawkaway
Surface water soakaway
6m -8m Tarred access road with
service layby
Airsource heat pump
Airsource heat pump
Rural access digram with service layby
Natural land feature - Knoll
Oil secondary heating source
Figured dimensions only are to be taken from this drawing.
All dimensions are to be checked on site before any work is put in hand.
IF IN DOUBT ASK.
CDM:
Hazard Elimination & Risk Reduction has been undertaken and
recorded where appropriate, in accordance with the requirements
of "The Construction (Design and Management) Regulations 2015"
and the associated "Industry Guidance for Designers"
Printed
on :
From
file
:
Project
Client
Lyle House, Fairways Business Park,
Inverness IV2 6AA
T  : 01463 712 288
W  : www.colinarmstrong.com
DateDescriptionRev
Project No.
Revision
Sheet
@ A3
Drawn byDate Created
Scale
Status
X:\Documents\2169 - Proposed
Glamping Pod Big Knowe House\02. WORK IN
PROGRESS\2.1 BIM
Models\2169-CAA-ZZ-XX-M3-A-000001.rvt
24/02/2023 10:50:36
1 : 1000
and  Tourist Let
Proposed Dwelling House
Don Dennis, Emma Rennie
and Bryce Harvey
DR- A- 0002
2169
Planning
External Works
Site Plan
AL23.01.23
Page 40

Page 41

HOUSE SITE KNOLL TRACK SLOPING LAND ROAD
FFL+9m
+15m
+10m
Figured dimensions only are to be taken from this drawing.
All dimensions are to be checked on site before any work is put in hand.
IF IN DOUBT ASK.
CDM:
Hazard Elimination & Risk Reduction has been undertaken and
recorded where appropriate, in accordance with the requirements
of "The Construction (Design and Management) Regulations 2015"
and the associated "Industry Guidance for Designers"
Printed
on
:
From
file
:
Project
Client
Lyle House, Fairways Business Park,
Inverness IV2 6AA
T  : 01463 712 288
W  : www.colinarmstrong.com
DateDescriptionRev
Drawing No.
Project No.
Revision
Scale Sheet
@ A1
Date Created Drawn by
Status
X:\Docum
ents\2169 - Proposed
Glam
ping
Pod
Big
Knowe
House\02. W
ORK IN
PROGRESS\2.1 BIM
Models\2169-CAA-ZZ-XX-M3-A-000001.rvt
24/02/2023 10:51:05
1 : 500
and  Tourist Let
Proposed Dwelling House
Don Dennis, Emma Rennie
and Bryce Harvey
0003
2169
Planning
02/21/23 RG
Site Section
Scale -  1 : 500
Section A
Page 41

Page 42

FF
6000
4500
WM
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
6
0004
6
0004
Metal Sheet Roof
Grey Windows and doors
Timber cladding
Ground Floor
0GL
-150
2400
Figured dimensions only are to be taken from this drawing.
All dimensions are to be checked on site before any work is put in hand.
IF IN DOUBT ASK.
CDM:
Hazard Elimination & Risk Reduction has been undertaken and
recorded where appropriate, in accordance with the requirements
of "The Construction (Design and Management) Regulations 2015"
and the associated "Industry Guidance for Designers"
Printed
on
:
From
file
:
Project
Client
Lyle House, Fairways Business Park,
Inverness IV2 6AA
T  : 01463 712 288
W  : www.colinarmstrong.com
DateDescriptionRev
Drawing No.
Project No.
Revision
Scale Sheet
@ A2
Date Created Drawn by
Status
X:\Docum
ents\2169 - Proposed
Glam
ping
Pod
Big
Knowe
House\02. W
ORK IN
PROGRESS\2.1 BIM
M
odels\2169-RT1-2019-glam
ping
pod.rvt
24/02/2023 10:45:24
As indicated
Proposed House and Tourist let unit,
Ilse of Gigha
Don Dennis, Emma Rennie and Bryce
Harvey
0004
2169
Tourist Let Unit
Planning
24.01.23 AL
General Arrangement
Scale -  1 : 50
Ground Floor Plan
Scale -  1 : 100
Elevation 1
Scale -  1 : 100
Elevation 2
Scale -  1 : 100
Elevation 3
Scale -  1 : 100
Elevation 4
Scale -
Exploded 3D 01
0 2 4 6m
Scale 1:100
Scale -  1 : 50
Section 1 Page 42

Page 43

Figured dimensions only are to be taken from this drawing.
All dimensions are to be checked on site before any work is put in hand.
IF IN DOUBT ASK.
CDM:
Hazard Elimination & Risk Reduction has been undertaken and
recorded where appropriate, in accordance with the requirements
of "The Construction (Design and Management) Regulations 2015"
and the associated "Industry Guidance for Designers"
Printed
on
:
From
file
:
Project
Client
Lyle House, Fairways Business Park,
Inverness IV2 6AA
T  : 01463 712 288
W  : www.colinarmstrong.com
DateDescriptionRev
Drawing No.
Project No.
Revision
Scale Sheet
@ A1
Date Created Drawn by
Status
X:\Docum
ents\2169 - Proposed
Glam
ping
Pod
Big
Knowe
House\02. W
ORK IN
PROGRESS\2.1 BIM
Models\2169-CAA-ZZ-XX-M3-A-000001.rvt
14/03/2023 07:45:00
1 : 10000
and  Tourist Let
Proposed Dwelling House
Don Dennis, Emma Rennie
and Bryce Harvey
0004
2169
Planning
03/14/23 RG
Suplimentry Location Map
Scale - 1 : 10000
1/10000 Map
Site
Page 43

Page 44

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Argyll and Bute Council
Development & Economic Growth   
Planning Application Report and Report of Handling as required by Schedule 2 of the
Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013 relative to applications for Planning Permission or Planning
Permission in Principle 
Reference No: 23/00391/PP 
Planning Hierarchy: Local Development 
Applicant: Don Dennis, Emma Rennie And Bryce Harvey 
Proposal: Erection of dwellinghouse and siting of family size glamping pod for
use as holiday letting accommodation 
Site Address:  Land South West of Tarbert Farm Isle Of Gigha Argyll And Bute    
DECISION ROUTE 
☒Delegated - Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997 
☐Committee - Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission
• Erection of dwellinghouse 
• Siting of family size glamping pod for use as holiday letting
accommodation. 
(ii) Other specified operations
• Installation of foul drainage treatment plant 
• Installation of surface water soakaway
• Installation of ASHPs 
(B) RECOMMENDATION: 
The proposal is recommended for approval of Planning Permission subject to
conditions and reasons appended below. 
(C) CONSULTATIONS:   
Roads and Infrastructure Services 
No objection subject to conditions appended below – 17.04.2023 
Page 44

Page 45

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Scottish Water 
No objection – 31.03.2023 
Environmental Health 
No objection subject to condition – 15.09.2023 
West of Scotland Archaeological Services (WOSAS) 
No objection subject to conditions appended below – 19.04.2023 
Historic Environment Scotland (HES) 
No objection – 25.04.2023 
(D) HISTORY:   
11/01511/PPP – Site for the erection of dwellinghouse. Approved: 20.12.2011 
13/01511/PP – Erection of residential/commercial property with detached domestic
garage. Approved: 05.11.2013 
(E) PUBLICITY:   
Regulation 20 Advert (expiry date: 28.04.2023) 
(F) REPRESENTATIONS:   
(i) Representations received from: 
None received 
Representations are published in full on the planning application file and are available
to view via the Public Access section of the Council’s website. 
(ii) Summary of issues raised: 
• N/A 
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Impact Assessment Report: ☐Yes ☒No (if Yes insert
EIAR topics below)  
(ii) An Appropriate Assessment under the
Conservation (Natural Habitats) Regulations
1994:   
☐Yes ☒No (if Yes attach
as an appendix)
Page 45

Page 46

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
(iii) A Design or Design/Access statement:    ☒Yes ☐No (if Yes insert
summary of key issues
below) 
Appraises the site and
area, and analyses the
proposal against LDP
Policies. 
(iv) A report on the impact of the proposed
development eg. Retail impact, transport
impact, noise impact, flood risk, drainage
impact etc:  
☐Yes ☒No (if Yes list
supporting documents
below)   
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:   ☐Yes ☒No (if Yes insert details of the
terms and heads of agreement and,
grounds for refusal if not completed
within 4 months below)   
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  ☐Yes ☒No (if Yes insert details of direction below)    
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account
in assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy 
Sustainable Places
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
NPF4 Policy 5 – Soils
NPF4 Policy 7 – Historic Assets and Places
NPF4 Policy 9 – Brownfield, Vacant and Derelict Land and Empty Buildings (includes
provisions relevant to Greenfield Sites)
NPF4 Policy 12 – Zero Waste
NPF4 Policy 13 – Sustainable Transport 
Liveable Places
NPF4 Policy 14 – Design, Quality and Place
NPF4 Policy 15 – Local Living and 20 Minute Neighbourhoods
Page 46

Page 47

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
NPF4 Policy 16 – Quality Homes
NPF4 Policy 17 – Rural Homes
NPF4 Policy 22 – Flood Risk and Water Management
NPF4 Policy 23 – Health and Safety 
Productive Places
NPF4 Policy 29 – Rural Development
NPF4 Policy 30 – Tourism 
‘Argyll and Bute Local Development Plan’ Adopted March 2015 
LDP STRAT 1 – Sustainable Development 
LDP DM 1 – Development within the Development Management Zones 
LDP 3 – Supporting the Protection Conservation and Enhancement of our
Environment 
LDP 5 –Supporting the Sustainable Growth of our Economy 
LDP 8 – Supporting the Strength of our Communities 
LDP 9 – Development Setting, Layout and Design 
LDP 10 – Maximising our Resources and Reducing our Consumption 
LDP 11 – Improving our Connectivity and Infrastructure 
Local Development Plan Schedules 
‘Supplementary Guidance to the Argyll and Bute Local Plan 2015’ (Adopted
March 2016 & December 2016) 
Natural Environment 
SG LDP ENV 1 – Impact on Habitats, Species and our Biodiversity
SG LDP ENV 11 – Protection of Soil and Peat Resources 
Landscape and Design 
SG LDP ENV 14 – Landscape 
Historic Environment and Archaeology 
SG LDP ENV 19 – Impact on Scheduled Ancient Monuments (SAMs) 
Support for Business & Industry: Main Potential Growth Sector: Tourism 
SG LDP TOUR 1 – Tourist Facilities and Accommodation, including Static and
Touring Caravans
SG LDP TOUR 3 – Promoting Tourism Development Areas 
General Housing Development 
SG LDP HOU 1 – General Housing Development Including Affordable Housing
Provision 
Bad Neighbour Development 
SG LDP BAD 2 – Bad Neighbour Development in Reverse 
Sustainable Siting and Design
Page 47

Page 48

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
SG LDP Sustainable – Sustainable Siting and Design Principles 
Resources and Consumption 
SG LDP SERV 1 – Private Sewage Treatment Plants & Wastewater Systems
SG LDP SERV 2 – Incorporation of Natural Features / SuDS
SG LDP SERV 5(b) – Provision of Waste Storage & Collection Facilities within New
Development
SG LDP SERV 6 – Private Water Supplies and Water Conservation 
Transport (Including Core Paths) 
SG LDP TRAN 4 – New & Existing, Public Roads & Private Access Regimes
SG LDP TRAN 6 – Vehicle Parking Provision 
(ii)  List of all other material planning considerations taken into account in
the assessment of the application, having due regard to Annex A of
Circular 3/2013. (delete as appropriate) 
• Third Party Representations
• Consultation Reponses
• Planning History
• ABC Technical Note – Biodiversity (Feb 2017)
• ABC draft Technical Note – Argyll and Bute Windows (April 2018)  
Argyll and Bute proposed Local Development Plan 2 (November 2019) – The
Examination by Scottish Government Reporters to the Argyll and Bute Local
Development Plan 2 has now concluded and the Examination Report has been
published (13th June 2023). The Examination Report is a material consideration of
significant weight and may be used as such until the conclusion of the LDP2
Adoption Process. Consequently, the Proposed Local Development Plan 2 as
recommended to be modified by the Examination Report and the published Non
Notifiable Modifications is a material consideration in the determination of all
planning and related applications. 
Spatial and Settlement Strategy 
Policy 02 – Outwith Settlement Areas
Policy 04 – Sustainable Development 
High Quality Places 
Policy 05 – Design and Placemaking
Policy 06 – Green Infrastructure
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 10 – Design – All Development
Policy 14 – Bad Neighbour Development
Policy 15 – Protection, Conservation and Enhancement of Our Historic Environment
Policy 19 – Scheduled Monuments 
Diverse and Sustainable Economy 
Page 48

Page 49

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Policy 23 – Tourism Development, Accommodation, Infrastructure and Facilities
Policy 25 – Tourism Development Opportunities 
Connected Places 
Policy 32 – Active Travel
Policy 33 – Public Transport
Policy 34 – Electric Vehicle Charging Points
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes
Policy 36 – New Private Accesses
Policy 39 – Construction Standards for Private Accesses
Policy 40 – Vehicle Parking Provision 
Sustainable Communities 
Policy 58 – Private Water Supplies and Water Conservation
Policy 60 – Private Sewage Treatment Plants and Wastewater Drainage Systems
Policy 61 – Sustainable Urban Drainage Systems (SUDS) 
High Quality Environment 
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 79 – Protection of Soil and Peat Resources 
Local Development Plan 2 Schedules 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment:  ☐Yes ☒No (if Yes confirm date of screening opinion and
reference below)    
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  ☐Yes ☒No (if Yes provide summary detail of PAC below) 
(M) Has a Sustainability Checklist been submitted:  ☐Yes ☒No (if Yes provide detail
below) 
(N) Does the Council have an interest in the site:  ☐Yes ☒No (if Yes provide detail
below) 
(O) Requirement for a pre-determination hearing: ☐Yes ☒No (if Yes insert details
below)    
(P)(i) Key Constraints/Designations Affected by the Development:
• N/A 
(P)(ii) Soils
Agricultural Land Classification:  Class: 5.10
Page 49

Page 50

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Peatland/Carbon Rich Soils Classification: ☐Class 1
☐Class 2
☐Class 3
☒N/A
Peat Depth Classification: N/A  
Does the development relate to croft land? ☐Yes ☒No
Would the development restrict access to croft
or better quality agricultural land?
☐Yes ☒No ☐N/A
Would the development result in
fragmentation of croft / better quality
agricultural land?
☐Yes ☒No ☐N/A 
(P)(iii) Woodland  
Will the proposal result in loss of
trees/woodland?
(If yes, detail in summary assessment)
☐Yes
☒No 
Does the proposal include any replacement or
compensatory planting?
☐Yes
☒No details to be secured by condition
☐N/A  
(P)(iv) Land Status / LDP Settlement Strategy
Status of Land within the Application
(tick all relevant boxes)
☐Brownfield
☐Brownfield Reclaimed by Nature
☒Greenfield 
ABC LDP 2015 Settlement Strategy 
LDP DM 1 (tick all relevant boxes) 
☐Main Town Settlement Area
☐Key Rural Settlement Area
☐Village/Minor Settlement Area
☒Rural Opportunity Area
☐Countryside Zone
☐Very Sensitive Countryside Zone
☐Greenbelt
ABC pLDP2 Settlement Strategy
(tick all relevant boxes) 
☐Settlement Area
☒Countryside Area
☐Remote Countryside Area
☐Helensburgh & Lomond Greenbelt
ABC LDP 2015 Allocations/PDAs/AFAs
etc: 
N/A
ABC pLDP2 Allocations/PDAs/AFAs
etc: 
N/A 
(P)(v) Summary assessment and summary of determining issues and material
considerations 
Planning permission is sought for the erection of dwellinghouse and siting of family
size glamping pod for use as holiday letting accommodation. 
Principle 
Of relevance, NPF4 Policy 9B sets out that proposals on greenfield sites will not be
supported unless the site has been allocated for development or explicitly supported
Page 50

Page 51

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
by policies in the Local Development Plan (LDP). NPF4 Policy 14A generally
supports development proposals designed to improve the quality of an area whether
in urban or rural locations and regardless of scale. NPF4 Policy 16F sets out that
development proposals for new homes on land not allocated for housing in LDP will
only be supported in limited circumstances. NPF4 Policy 17C sets out that new
homes in remote rural areas will be supported where it supports and sustains existing
fragile communities; supports identified local housing outcomes; and is suitable in
terms of location, access and environmental impact. 
NPF4 Policy 30A states that proposals for new or extended tourist facilities or
accommodation, including caravan and camping sites, in locations identified in the
LDP, will be supported. 
NPF4 Policies 29A and 29B supports proposals that contributes to the viability,
sustainability and diversity of rural communities and local rural economy taking into
account how the development will contribute towards local living and take into
account the transport needs of the development as appropriate for the rural location.
While 29C expects development proposals in remote rural areas, where new
development can often help to sustain fragile communities, to be supported where
the proposal ii. supports and sustains existing communities; and iii. is suitable in
terms of location, access, siting, design and environmental impact. 
The site is located on Gigha Island and within a Rural Opportunity Area (ROA)
wherein the provision of Policies LDP DM 1 and SG LDP HOU 1 of the adopted Argyll
and Bute LDP supports the principle of small scale residential development on
appropriate sites. In addition, the small scale nature of the proposal and its location
on a rural island designated as at tourism development area within the LDP weighs
in favour of the proposal. Though likely to only generate a small income, the tourist
accommodation would also meet the aims of the LDP to enhance the tourism industry
and the local economy. 
By reason of the existing dispersed geographical scale of the wider environment
within which the site is located; and its compliance with the existing settlement
pattern within the Island coupled with the level of interconnectivity of the proposed
development with the surrounding area, people can reasonably meet the majority of
their daily needs within a reasonable distance of their home. Thus, the proposal also
complies with the NPF4 Policy 15; and ABC LDP 2015 Policies LDP DM 1 and LDP
8. 
Drawing the above together, the principle of residential and tourist development at
the site is considered acceptable, subject to the acceptability of the detailed matters
set out below. 
Local character and appearance 
The proposal is located outwith a local or national designation and does not give rise
to any immediate impact upon the natural or established environment. The local
settlement pattern outwith Ardminish  is of dispersed isolated residential buildings or
farm lands with cluster of buildings across the island. The proposal would not be an
exception to this local settlement pattern in that, it will be established on a land where
it will be isolated yet in keeping with the local pattern. The proposal is a rectangular
single storey bungalow with a small scale rectangular cabin for use as a tourist
accommodation. Together the buildings would create an acceptable small isolated
developed site conforming to the local settlement pattern on the Island and partly
obscured from the road by an intervening knoll. 
Page 51

Page 52

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
By reason of its siting, traditional design (including finishing materials), scale and
massing the proposal would not detract from the existing settlement pattern nor the
character and appearance of the wider locale. Additionally, in the absence of any
immediate neighbouring properties, there are no concerns with daylight,
overshadowing and overlooking. Having regard to the proposed tourist
accommodation on site, it is considered that due to the orientation and relationship
between the two buildings– approx. 32m apart, there are no overlooking or amenity
concerns. 
The proposal is therefore considered consistent with the relevant provisions of NPF4
Policies 14, 16, and 17; and ABC LDP 2015 Policies LDP 3, LDP 9, SG LDP ENV
14 and SG Sustainable. 
Historic Environment 
The application site lies within close proximity to two scheduled ancient monuments
(SAM) – Ridh a'Chaibeil, burial ground & cross SE of Tarbert (SM 3308) is located
some 300m W of the site while Cairnvickuie, cross incised stone NW of (SM 3306)
is approx. 310m NW and 80m S of the former SAM. Historic environment Scotland
was therefore consulted on the application. HES note that while the proposed
development may be present in longer distance inward views, due to its location, it
is unlikely to be visible from key outward views associated with the setting of the
SAMs. However, as the development will form part of the existing dispersed
settlement pattern, the level of change to the baseline setting of the monuments that
might derive from the proposal is unlikely to raise issues of national significance. 
In view of the above, it is considered that the proposal does not raise any concerns
detrimental to the designated SAMs and their settings and therefore is deemed
compliant with NPF4 Policy 7 and ABC LDP 2015 Policies LDP 3 and SG LDP ENV
19. 
Biodiversity 
The proposal does not relate to, nor is it within immediate proximity of any nature
conservation designation. The site is an agricultural grazing land with limited
biodiversity value. The proposal does not include any detail of proposed biodiversity
enhancements that would be delivered by the development; however, in this instance
it is considered that this may reasonably be secured by suspensive condition seeking
improvements to be considered and delivered alongside proposals for landscape,
boundary treatment and surface treatment for the development. Similarly, a condition
requiring soil management practices would also be necessary based on NPF4 Policy
5. The proposal is considered to be consistent with the relevant provisions of NPF4
Policies 3 and 5 and ABC LDP Policies LDP 3, SG LDP ENV 1 and SG LDP ENV
11. 
Water/drainage 
The application indicates that the development intends to rely on both private water
supply and foul drainage system. While Scottish Water (SW) confirmed public
water supply availability from Gigha Water Treatment Works, it cannot confirm
capacity is currently available to meet the requirement. SW also confirmed there is
no public Waste Water infrastructure within the vicinity. It is therefore considered
that the proposed private water supply and foul drainage systems are justified. 
Page 52

Page 53

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Environmental Health have raised no concerns to the proposal. 
With respect to surface water, a condition has been appended to ensure suitable
drainage systems (including SuDs) are provided for the proposed development. On
this basis, the proposal, subject to the conditions appended below, is considered
consistent with the provisions of NPF 4 policy 18 and 22; and ABC LDP 2015 Policies
LDP 10 and SG LDP SERV 1, SG LDP SERV 2 and SG LDP SERV 6. 
Roads 
The development seeks to form a new private access off the existing public road
located some 225 east of the proposed site. Road’s consultee response raised no
objection to the proposal subject to conditions deemed necessary and as such
appended below. The proposal is considered to be consistent with the relevant
requirements of NPF4 Policy 13, and ABC LDP Policy LDP 11, SG LDP TRAN 4 and
SG LDP TRAN 6. 
Waste/Recycling 
The proposed site plan with drawing no. DR- A- 0002 shows the location of a refuse
collection point adjacent to the public road in line with the Council’s Waste Strategy
and as such the proposal would be consistent with the requirements of NPF4 Policy
12, and ABC LDP Policy LDP 10 and SG LDP SERV 5(b). 
Other Considerations  
The proposal is located approx. 230 SE of Tarbert farm where the development could
potentially be impacted by odour and/or noise. Environmental Health was consulted
on the application and have raised no objection or concerns to the development
being established within the vicinity. Consequently, the development is deemed
compliant to the provisions of NPF4 Policies 23; and ABC LDP 2015 Policies LDP 8
and SG LDP BAD 2. 
Matters Raised by Proposed Local Development Plan 2 (as modified by Examination) 
Proposed Local Development Plan 2 as recommended to be modified by the
Examination Report is now a significant material consideration. In this instance it is
considered that this application does not give rise to any fundamental conflict with
the relevant policies of PLDP2. 
(Q) Is the proposal consistent with the Development Plan: ☒Yes ☐No 
(R) Reasons why Planning Permission or Planning Permission in Principle Should
be Granted: 
The proposal subject to conditions is considered to be consistent with the relevant
provisions of the Development Plan, and there are no other material considerations
of sufficient significance to indicate that it would be appropriate to withhold planning
permission having regard to s25 of the Act. 
Page 53

Page 54

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
(S) Reasoned justification for a departure to the provisions of the Development
Plan 
N/A 
(T) Need for notification to Scottish Ministers or Historic Environment Scotland:
☐Yes ☒No (If yes provide detail below)   
Author of Report: Tiwaah Antwi Date: 15.09.2023 
Reviewing Officer: Bryn Bowker Date: 27.09.2023 
Fergus Murray
Head of Development & Economic Growth 
Page 54

Page 55

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 23/00391/PP 
Standard Time Limit Condition (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions  
1.  PP - Approved Details & Standard Notes – Non-EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 24.02.2023 supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Supplementary Location Plan RG - 0004  15.03.2023 
Location Plan DR- A- 0001  27.02.2023 
Proposed Site Plan DR- A- 0002  27.02.2023 
Proposed Site Section RG - 0003  27.02.2023 
Proposed Floor Plan SF32551 -
PLN01-1
A 27.02.2023 
Proposed Elevations SF32551 -
PLN01-2
A 27.02.2023 
Glamping Pod Elevations, Floor Plan
and Section as Proposed
AL - 0004  27.02.2023 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details.  
2.  Notwithstanding the provisions of Condition 1, the proposed access shall be formed in
accordance with the Council’s Roads Standard Detail Drawing SD 08/004 Rev a; and
visibility splays of 2.4 metres to point X by 53 metres to point Y from the centre line of
the proposed access. The access shall be surfaced with a bound material in
accordance with the stated Standard Detail Drawing. Prior to work starting on site the
access hereby approved shall be formed to at least base course standard and the
visibility splays shall be cleared of all obstructions such that nothing shall disrupt
visibility from a point 1.05 metres above the access at point X to a point 0.6 metres
above the public road carriageway at point Y. The final wearing surface on the access
shall be completed prior to the development first being brought into use and the
visibility splays shall be maintained clear of all obstructions thereafter. 
Reason: In the interests of road safety.  
3.  Notwithstanding the provisions of Condition 1, the development shall not include for
the provision of walls, fences or hedges within 2.0 metres of the public road or back of
service strip. The proposed vehicular gates to be installed at the site entrance shall be
set back a minimum distance of 6.00 metres from edge of public road and shall open
inwards and away from the public road. 
Reason: In the interest of road safety.  
Page 55

Page 56

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
4.  Notwithstanding the provisions of Condition 1, prior to the commencement of work on
site, the proposed road alteration shall be implemented in accordance with the details
set out by the Roads and Infrastructure Services below: 
(i) Existing road ditch to be culverted under the service bay shall be carried
out to the satisfaction of Roads & Infrastructure Services. 
(ii) Headwalls shall be constructed on each end of the new culvert.
(iii) Provision of parking and turning for a minimum of 3 vehicles within
application site – 2 spaces for the main dwelling and 1 space for the
glamping pod.  
(iv) Provision of refuse collection point adjacent to the public road. 
Reason: In the interest of road and public safety.  
5.  Notwithstanding the provisions of Condition 1, the glamping pod hereby approved shall
be used for short term occupancy only and not as a main residence and shall not be
occupied by any family, group or individual for a cumulative period of more than three
calendar months in any one year. A register showing dates of arrivals and departures
shall be maintained by the Site Operator and shall be available at all reasonable times
for inspection by the Planning Authority. 
Reason: In order to define the permitted occupancy to satisfy the provisions of the
Development Plan.  
6.  Notwithstanding the provisions of Condition 1, no development shall commence until
a scheme of boundary treatment, surface treatment and landscaping has been
submitted to and approved in writing by the Planning Authority. The scheme shall
include details of: 
i) Location, design and materials of proposed walls, fences and gates;
ii) Surface treatment of proposed means of access and hardstanding
areas;
iii) Any proposed re-contouring of the site by means of existing and
proposed ground levels;
iv) Proposed hard and soft landscape works;
v) A biodiversity statement demonstrating how the proposal will contribute
to conservation/restoration/enhancement of biodiversity, and how
these benefits will be maintained for the lifetime of the development. 
The development shall not be occupied until such time as the boundary treatment,
surface treatment and any re-contouring works have been completed in accordance
with the duly approved scheme. 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme during the first planting season following the commencement of the
development, unless otherwise agreed in writing by the Planning Authority. 
The biodiversity statement should refer to Developing with Nature guidance |
NatureScot as appropriate. 
Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity, and to comply with the requirements of NPF4 Policy 3  
7.  Notwithstanding the provisions of Condition 1, the developer shall secure the
implementation of an archaeological watching brief, to be carried out by an
Page 56

Page 57

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
archaeological organisation acceptable to the Planning Authority, during all ground
disturbance. The retained archaeological organisation shall be afforded access at all
reasonable times and allowed to record, recover and report items of interest and finds.
A method statement for the watching brief will be submitted by the applicant, agreed
by the West of Scotland Archaeology Service, and approved by the Planning Authority
prior to commencement of the watching brief. The name of the archaeological
organisation retained by the developer shall be given to the Planning Authority and to
the West of Scotland Archaeology Service in writing not less than 14 days before
development commences. 
Reason: In order to protect archaeological resources. 
8.  Notwithstanding the provisions of Condition 1, no development shall commence until
an appraisal of the wholesomeness and sufficiency of the intended private water
supply and the system required to serve the development has been submitted to and
approved in writing by the Planning Authority. 
The appraisal shall be carried out by a qualified hydrologist and shall include a risk
assessment having regard to the requirements of Schedule 4 of the Private Water
Supplies (Scotland) Regulations 2006 which shall inform the design of the system by
which a wholesome and sufficient water supply shall be provided and maintained. The
appraisal shall also demonstrate that the wholesomeness and sufficiency of any other
supply in the vicinity of the development, or any other person utilising the same source
or supply, shall not be compromised by the proposed development. 
The development shall not be brought into use or occupied until the required water
supply system has been installed in accordance with the agreed specification and is
operational. 
Reason: In the interests of public health and in order to ensure that an adequate
private water supply in terms of both wholesomeness and sufficiency can be provided
to meet the requirements of the proposed development and without compromising the
interests of other users of the same or nearby private water supplies.    
9.  Notwithstanding the provisions of Condition 1, the development shall incorporate a
surface water drainage system which is consistent with the principles of Sustainable
urban Drainage Systems (SuDS) compliant with the guidance set out in CIRIA’s SuDS
Manual C753. The requisite surface water drainage shall be operational prior to the
development being brought into use and shall be maintained as such thereafter. 
Reason: To ensure the provision of an adequate surface water drainage system and
to prevent flooding.   
Page 57

Page 58

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
NOTE TO APPLICANT (Copy Informative Notes to Uniform Decision Tab) 
• Further advice on SuDS can be found in SEPA’s Standing Advice for Small Scale
Development – www.sepa.org.uk 
• Regulatory requirements for private water supplies should be discussed with the
Council’s Environmental Health Officers in the first instance. 
• Regard should be had to the West of Scotland Archaeology Service’s consultation
comments in respect of the proposed development. 
• Operation of the pod for the purposes of a tourist accommodation shall require the
benefit of a separate Site Licence under the Caravan Sites and Control of Development
Act 1960 as amended. Site Licence requirements should be discussed with the
Council’s Environmental Health Officers in the first instance. 
Page 58

Page 59

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
APPENDIX TO DECISION APPROVAL NOTICE 
Appendix relative to application 23/00391/PP 
(A) Has the application required an obligation under Section 75 of
the Town and Country Planning (Scotland) Act 1997 (as
amended):
☐Yes ☒No
(Complete
Uniform
Decision,
Recommendation
tab) 
If Yes: The terms of the Section 75 obligation may be viewed on the Council’s
website at www.argyll-bute.gov.uk by recalling the application reference
number on the Council’s Public Access Module and then by “Clicking” Section
75 Obligation under the attached correspondence or by viewing the Public
Planning register located at Planning Services, 1A Manse Brae, Lochgilphead,
Argyll, PA31 8RD. 
(B) Has the application been the subject of any “non-material”
amendment in terms of Section 32A of the Town and Country
Planning (Scotland) Act 1997 (as amended) to the initial
submitted plans during its processing.
☐Yes ☒No
(Complete
Uniform
Reception, Plans
Tab) 
(C) Is the proposal consistent with the Development Plan? ☒Yes ☐No
(Complete
Uniform
Decision,
Recommendation
Tab) 
(D) The reason why planning permission has been approved: 
The proposal subject to conditions is considered to be consistent with the relevant
provisions of the Development Plan, and there are no other material considerations
of sufficient significance to indicate that it would be appropriate to withhold planning
permission having regard to s25 of the Act. 
Page 59

Page 60

8.6 m 
8.8 m 
9.0 m 
8.2 m 
8.2 m 
8.4 m 
8.4 m 
8.4 m 
8.6 m 
8.6 m 
8.6 m 
8.8 m 
8.8 m 
9.0 m 
9.0 m 
9.0 m 
9.2 m 
9.2 m 
9.2 m 
9.4 m 
8.8 m
0 20 40 60m
Scale 1:1000
N
SITE AREA: 6006sqm
1
0003
1
0003
Area of hardstanding to aid in the
collection of waste and recycling
Proposed House
Proposed Tourist Let unit
Site Area: 826sqm
TARBERT
Photovoltaic Panels
Proposed treatment plant
and soawkaway
Surface water soakaway
6m -8m Tarred access road with
service layby
Airsource heat pump
Airsource heat pump
Rural access digram with service layby
Natural land feature - Knoll
Oil secondary heating source
BIODIVERSITY STATEMENT: Proposed species rich long grass area to
be sown with a grass / wildflower seed
mix. Areas to be managed to promote the biodiversity of the
areas with regular
annual cutting of seeded areas and the control of invasive weed
species. Scotia
seeds ' Get Nectar- rich quick mix' sown @ 2g/m2.
BOUNDARY TREATEMENT: to be post and wire fences throughout.
HARD LANDSCAPING: Driveway surface treatement to be
compacted hardcore with a whin/quarry dust finish.
Planning condition 6: no development shall commence until a
scheme of boundary treatment, surface treatment and landscaping has been submitted to
and approved in writing by the Planning Authority. The scheme shall include details of:
i) Location, design and materials of proposed walls, fences and gates;
ii) Surface treatment of proposed means of access and hardstanding areas;
iii) Any proposed re-contouring of the site by means of existing and proposed ground levels;
iv) Proposed hard and soft landscape works;
v) A biodiversity statement demonstrating how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these benefits will be
maintained for the lifetime of the development. The development shall not be occupied until
such time as the boundary treatment, surface treatment and any re-contouring works have
been completed in accordance with the duly approved scheme. All of the hard and soft
landscaping works shall be carried out in accordance with the approved scheme during the
first planting season following the commencement of the development, unless otherwise
agreed in writing by the Planning Authority.
The biodiversity statement should refer to Developing with Nature guidance | NatureScot as
appropriate. Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity, and to comply with the requirements of NPF4 Policy 3
RECONTOURING: Proposed contours shown, building pads avoid
the small 'knoll' to the north of the site so minimal recontouring is
required for this development.
Figured dimensions only are to be taken from this drawing.
All dimensions are to be checked on site before any work is put in hand.
IF IN DOUBT ASK.
CDM:
Hazard Elimination & Risk Reduction has been undertaken and
recorded where appropriate, in accordance with the requirements
of "The Construction (Design and Management) Regulations 2015"
and the associated "Industry Guidance for Designers"
Printed
on :
From
file
:
Project
Client
Lyle House, Fairways Business Park,
Inverness IV2 6AA
T  : 01463 712 288
W  : www.colinarmstrong.com
DateDescriptionRev
Project No.
Revision
Sheet
@ A3
Drawn byDate Created
Scale
Status
X:\Documents\2169 - Proposed
Glamping Pod Big Knowe House\02. WORK IN
PROGRESS\2.1 BIM
Models\2169-CAA-ZZ-XX-M3-A-000001.rvt
31/10/2024 12:32:13
A
1 : 1000
and  Tourist Let
Proposed Dwelling House
Don Dennis, Emma Rennie
and Bryce Harvey
DR- A- 0002
2169
Planning
External Works
Site Plan
AL23.01.23
A Landscape planning condition
wildflower area added
31.10.202
4
Page 60

Page 61

878– Watching Brief on land SW of Tarbert Farm, Isle of Gigha, Argyll 
Argyll Archaeology: page 1 of 8 
REPORT: WATCHING BRIEF ON LAND SOUTHWEST OF TARBERT FARM,
ISLE OF GIGHA, ARGYLL 
Client: Emma Rennie 
Planning ref. No.:  23/00391/PP 
Produced by Clare Ellis of Argyll Archaeology 
22nd November 2024 
Page 61

Page 62

878– Watching Brief on land SW of Tarbert Farm, Isle of Gigha, Argyll 
Argyll Archaeology: page 2 of 8
0. NON TECHNICAL SUMMARY 
0.1 A watching brief was maintained on the machine excavation of the cable trench
for the new electricity supply to a new build house and the machine stripping of
turf and topsoil over the footprint of the new build house on land southwest of
Tarbert Farm, Isle of Gigha.  No features or deposits of archaeological or
historical significance were observed and it is the recommendation of this report
that no further archaeological works are required with respect to this
development. 
1. INTRODUCTION 
1.1 The site (Fig. 1) lies within Argyll and Bute Council area and is roughly
centred on NGR.: NR 65051 51667. The watching brief on both the cable
trench for the power cable and the footprint of the new house took place on
20th November 2024. The construction of the tourist let unit and a new track
running towards it had been completed prior to the watching brief being
undertaken. 
2. OBJECTIVES 
2.1 The archaeological objectives are: 
a.  to determine the presence or absence of archaeological features within
the confines of the cable trench 
b.  to fully excavate any archaeological features identified 
c. to propose further stages of work as required 
3. METHOD 
3.1 A 13 ton tracked excavator equipped with a ditching bucket was used to strip
the topsoil down to the underlying natural over the footprint of the house (Fig.
1). The route for the new power cable was dug using a narrow toothless bucket
some 0.50m wide. The spoil was placed on the side of the cable trench. All
machine stripping was carried out in the presence of an archaeologist. The
weather was dry.
Page 62

Page 63

878– Watching Brief on land SW of Tarbert Farm, Isle of Gigha, Argyll 
Argyll Archaeology: page 3 of 8 
Fig. 1. Land southwest of Tarbert Farm, cable route for the supply of electricity and footprint of the new build house subject to an
archaeological watching brief.
Page 63

Page 64

878– Watching Brief on land SW of Tarbert Farm, Isle of Gigha, Argyll 
Argyll Archaeology: page 4 of 8 
4.0 RESULTS AND DISCUSSION 
4.1 The tourist unit and part of the track leading up to it had been constructed prior
to the watching brief taking place; the associated ground preparation works were
not observed by an archaeologist. However, the track had been constructed by
the build up of crushed rock over the grass of the field; there had been no
stripping of the turf or topsoil.   
4.2 The footprint of the new house and the parking/turning area was stripped of turf
and topsoil under archaeological supervision (Fig. 2). The topsoil, a
yellow/orange silt loam was barely 0.10m deep in most places and sat directly
over bedrock.  Slightly more silt was observed at the north end between the
rocky northern outcrop and the southern outcrop on which the house will sit. No
archaeological deposits were observed. 
Fig. 2. Stripping of the house and parking footprint. 
4.3 The new cable route ran from an exiting power pole, that was adjacent to the
road, in a westerly direction up a slight slope towards the house plot (Fig. 3).
Immediately adjacent to the road the soil was waterlogged with a thin layer of
black organic matter observed in section at a depth of 0.40-0.50m. This material
is thought to be the remains of a relatively recently buried waterlogged ground
surface. Along the length of the cable trench fragmentary bedrock lay under the
topsoil which was generally around 0.30m deep but thinned in places where
bedrock was very near the surface. A few rubble and modern drains were
observed. The trench was excavated down to between 0.80m and 0.90m where
hard bedrock was not encountered.  No archaeological features were observed. 
Page 64

Page 65

878– Watching Brief on land SW of Tarbert Farm, Isle of Gigha, Argyll 
Argyll Archaeology: page 5 of 8 
Fig. 3. Excavated power cable trench, looking east 
5.0 RECOMMENDATION 
5.1 No features or deposits of archaeological significance were observed during the
watching brief. Although the final section of the access track has not been
constructed up to the house this is going to comprise crushed bedrock placed
directly over the grass and therefore its construction will not require to be
monitored by an archaeologist. Similarly, the final section of the access track to
the tourist unit has not been completed, but again this will comprise crushed
bedrock laid directly over the grass and therefore will not require archaeological
monitoring. 
5.2 It is the recommendation of this report that no further archaeological work is
required in association with this development.
Page 65

Page 66

878– Watching Brief on land SW of Tarbert Farm, Isle of Gigha, Argyll 
Argyll Archaeology: page 6 of 8
Appendices 
Appendix 1: photographic register 
No. Description
Taken
from
1 Machine stripping of the house footprint SW
2 Machine stripping of the house footprint W
3 Machine stripping of the house footprint NW
4 Machine stripping of the house footprint SW
5 Machine stripping of the house footprint W
6 Machine stripping of the house footprint W
7 Power cable trench  W
8 Power cable trench  W
9 Power cable trench  W
Page 66

Page 67

878– Watching Brief on land SW of Tarbert Farm, Isle of Gigha, Argyll 
Argyll Archaeology: page 7 of 8
Page 67

Page 68

878– Watching Brief on land SW of Tarbert Farm, Isle of Gigha, Argyll 
Argyll Archaeology: page 8 of 8
Appendix 2: DES Entry 
LOCAL AUTHORITY: Argyll and Bute Council
PROJECT TITLE/SITE NAME:  Tarbert Farm
PROJECT CODE: 878
PARISH:  Gigha and Cara
NAME OF CONTRIBUTOR:  Clare Ellis
NAME OF ORGANISATION:  Argyll Archaeology
TYPE(S) OF PROJECT: Watching brief
NMRS NO(S):  None
SITE/MONUMENT TYPE(S):  None
SIGNIFICANT FINDS:  None 
NGR (2 letters, 8 or 10 figures) NR 65051 51667
START DATE (this season) 20th November 2024
END DATE (this season) 20th November 2024
PREVIOUS WORK (incl. DES ref.) 
MAIN (NARRATIVE)
DESCRIPTION: 
(May include information from other
fields) 
A watching brief was maintained on the machine excavation of the footprint of a new house
and cable trench for the electricity supply on land southwest of Tarbert l Farm, Isle of Gigha. 
No features or deposits of archaeological or historical significance were observed and it is the
recommendation of this report that no further archaeological works are required with respect
to the development.
PROPOSED FUTURE WORK:  None
CAPTION(S) FOR ILLUSTRS: 
SPONSOR OR FUNDING BODY:  Emma Rennie
ADDRESS OF MAIN
CONTRIBUTOR: 
Davaar Cottage, Campbeltown, Argyll. PA28 6RE
EMAIL ADDRESS: ellisclare@argyll-archaeology.co.uk
ARCHIVE LOCATION
(intended/deposited)
NRHE 
Page 68

Page 69

Track
Tarbert
Tank
Drain Track
© Crown Copyright and database right 2025
All rights reserved. OS license (customer) account number AC0000849384
Location Plan relative to: 26/0002/LRB
O
0 40 8020 Meters
Site
Page 69

Page 70

This page is intentionally left blank

Page 71

TOWN AND COUNTRY PLANNING (SCOTLAND) ACT 1997 (AS AMENDED)
TOWN AND COUNTRY PLANNING (DEVELOPMENT MANAGEMENT PROCEDURE)
(SCOTLAND) REGULATIONS 2013 
PLANNING PERMISSION 
REFERENCE NUMBER: 23/00391/PP 
Don Dennis, Emma Rennie And Bryce Harvey
Colin Armstrong Architects
Lyle House
Pavilion 1
Fairways Business Park
Inverness
IV2 6AA 
I refer to your application dated 27th February 2023 for planning permission in respect of the
following development: 
Erection of dwellinghouse and siting of family size glamping pod for use as holiday letting
accommodation
AT:
Land South West Of Tarbert Farm Isle Of Gigha Argyll And Bute   
Argyll and Bute Council in exercise of their powers under the above mentioned Act and
Regulations hereby grant planning permission for the above development in accordance with the
particulars given in the application form and doquetted plans subject however to the conditions
and reasons detailed on the  following page(s). 
It should be understood that this permission does not carry with it any necessary consent or
approval for the proposed development under other statutory enactments and is not a Building
Warrant. 
Dated: 27 September 2023 
Fergus Murray
Head of Development and Economic Growth 
Page 71

Page 72

REFERENCE NUMBER: 23/00391/PP 
Erection of dwellinghouse and siting of family size glamping pod for use as holiday letting
accommodation
AT:
Land South West Of Tarbert Farm Isle Of Gigha Argyll And Bute   
The planning permission as detailed above is subject to the following conditions: 
Standard Time Limit Condition: 
The development to which this permission relates must be begun not later than three years from
the date of this permission. 
Reason: In accordance with Section 58 of the Town and Country Planning (Scotland) Act 1997. 
Standard Soils Management Condition: 
Where the development involves ground breaking works, soil management should be undertaken
in compliance with the established best practice set out in the DEFRA publication “Construction
Code of Practice for the Sustainable Use of Soils on Construction Sites 2009”, unless an
alternative methodology for sustainable management of soil is submitted to and approved in
writing by the Planning Authority. 
Reason: In order to ensure that sustainable management of soils and compliance with the
requirements of NPF4 Policy 5A. 
Additional Conditions: 
1. PP - Approved Details & Standard Notes - Non-EIA Development 
The development shall be implemented in accordance with the details specified on the application
form dated 24.02.2023 supporting information and, the approved drawings listed in the table below
unless the prior written approval of the planning authority is obtained for an amendment to the
approved details under Section 64 of the Town and Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Supplementary Location Plan RG - 0004  15.03.2023 
Location Plan DR- A- 0001  27.02.2023 
Proposed Site Plan DR- A- 0002  27.02.2023 
Proposed Site Section RG - 0003  27.02.2023 
Proposed Floor Plan SF32551 -PLN01-1 A 27.02.2023 
Proposed Elevations SF32551 - PLN01-2 A 27.02.2023 
Glamping Pod Elevations, Floor
Plan and Section as Proposed
AL - 0004  27.02.2023 
Reason: For the purpose of clarity, to ensure that the development is implemented in accordance
with the approved details. 
Page 72

Page 73

2. Notwithstanding the provisions of Condition 1, the proposed access shall be formed in
accordance with the Council's Roads Standard Detail Drawing SD 08/004 Rev a; and visibility
splays of 2.4 metres to point X by 53 metres to point Y from the centre line of the proposed
access. The access shall be surfaced with a bound material in accordance with the stated
Standard Detail Drawing. Prior to work starting on site the access hereby approved shall be
formed to at least base course standard and the visibility splays shall be cleared of all obstructions
such that nothing shall disrupt visibility from a point 1.05 metres above the access at point X to a
point 0.6 metres above the public road carriageway at point Y. The final wearing surface on the
access shall be completed prior to the development first being brought into use and the visibility
splays shall be maintained clear of all obstructions thereafter. 
Reason: In the interests of road safety. 
3. Notwithstanding the provisions of Condition 1, the development shall not include for the
provision of walls, fences or hedges within 2.0 metres of the public road or back of service strip.
The proposed vehicular gates to be installed at the site entrance shall be set back a minimum
distance of 6.00 metres from edge of public road and shall open inwards and away from the public
road. 
Reason: In the interest of road safety. 
4. Notwithstanding the provisions of Condition 1, prior to the commencement of work on site,
the proposed road alteration shall be implemented in accordance with the details set out by the
Roads and Infrastructure Services below: 
(i) Existing road ditch to be culverted under the service bay shall be carried out to the
satisfaction of Roads & Infrastructure Services. 
(ii) Headwalls shall be constructed on each end of the new culvert.
(iii) Provision of parking and turning for a minimum of 3 vehicles within application site - 2
spaces for the main dwelling and 1 space for the glamping pod.  
(iv) Provision of refuse collection point adjacent to the public road. 
Reason: In the interest of road and public safety. 
5. Notwithstanding the provisions of Condition 1, the glamping pod hereby approved shall be
used for short term occupancy only and not as a main residence and shall not be occupied by any
family, group or individual for a cumulative period of more than three calendar months in any one
year. A register showing dates of arrivals and departures shall be maintained by the Site Operator
and shall be available at all reasonable times for inspection by the Planning Authority. 
Reason: In order to define the permitted occupancy to satisfy the provisions of the Development
Plan. 
Page 73

Page 74

6. Notwithstanding the provisions of Condition 1, no development shall commence until a
scheme of boundary treatment, surface treatment and landscaping has been submitted to and
approved in writing by the Planning Authority. The scheme shall include details of: 
i) Location, design and materials of proposed walls, fences and gates;
ii) Surface treatment of proposed means of access and hardstanding areas;
iii) Any proposed re-contouring of the site by means of existing and proposed ground levels;
iv) Proposed hard and soft landscape works;
v) A biodiversity statement demonstrating how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these benefits will be maintained
for the lifetime of the development. 
The development shall not be occupied until such time as the boundary treatment, surface
treatment and any re-contouring works have been completed in accordance with the duly
approved scheme. 
All of the hard and soft landscaping works shall be carried out in accordance with the approved
scheme during the first planting season following the commencement of the development, unless
otherwise agreed in writing by the Planning Authority. 
The biodiversity statement should refer to Developing with Nature guidance | NatureScot as
appropriate. 
Reason: To assist with the integration of the proposal with its surroundings in the interest of
amenity, and to comply with the requirements of NPF4 Policy 3 
7. Notwithstanding the provisions of Condition 1, the developer shall secure the
implementation of an archaeological watching brief, to be carried out by an archaeological
organisation acceptable to the Planning Authority, during all ground disturbance. The retained
archaeological organisation shall be afforded access at all reasonable times and allowed to record,
recover and report items of interest and finds. A method statement for the watching brief will be
submitted by the applicant, agreed by the West of Scotland Archaeology Service, and approved by
the Planning Authority prior to commencement of the watching brief. The name of the
archaeological organisation retained by the developer shall be given to the Planning Authority and
to the West of Scotland Archaeology Service in writing not less than 14 days before development
commences. 
Reason: In order to protect archaeological resources. 
8. Notwithstanding the provisions of Condition 1, no development shall commence until an
appraisal of the wholesomeness and sufficiency of the intended private water supply and the
system required to serve the development has been submitted to and approved in writing by the
Planning Authority. 
The appraisal shall be carried out by a qualified hydrologist and shall include a risk assessment
having regard to the requirements of Schedule 4 of the Private Water Supplies (Scotland)
Regulations 2006 which shall inform the design of the system by which a wholesome and sufficient
water supply shall be provided and maintained. The appraisal shall also demonstrate that the
wholesomeness and sufficiency of any other supply in the vicinity of the development, or any other
person utilising the same source or supply, shall not be compromised by the proposed
development. 
Page 74

Page 75

The development shall not be brought into use or occupied until the required water supply system
has been installed in accordance with the agreed specification and is operational. 
Reason: In the interests of public health and in order to ensure that an adequate private water
supply in terms of both wholesomeness and sufficiency can be provided to meet the requirements
of the proposed development and without compromising the interests of other users of the same or
nearby private water supplies.   
9. Notwithstanding the provisions of Condition 1, the development shall incorporate a surface
water drainage system which is consistent with the principles of Sustainable urban Drainage
Systems (SuDS) compliant with the guidance set out in CIRIA's SuDS Manual C753. The requisite
surface water drainage shall be operational prior to the development being brought into use and
shall be maintained as such thereafter. 
Reason: To ensure the provision of an adequate surface water drainage system and to prevent
flooding. 
Page 75

Page 76

NOTES TO APPLICANT (1) RELATIVE TO APPLICATION NUMBER 23/00391/PP 
STANDARD NOTES 
1. If the applicant is aggrieved by the decision to refuse permission for or approval required
by a condition in respect of the proposed development, or to grant permission or approval
subject to conditions, the applicant may require the planning authority to review the case
under Section 43A of the Town and Country Planning (Scotland) Act 1997 (as amended)
within three months from the date of this notice. A Notice of Review request must be
submitted on an official form which can be obtained by contacting The Local Review Body,
Committee Services, Argyll and Bute Council, Kilmory, Lochgilphead, PA31 8RT or by
email to localreviewprocess@argyll-bute.gov.uk 
2. If permission to develop land is refused or granted subject to conditions and the owner of
the  land claims that the land has become incapable of reasonably beneficial use in its
existing state, and it cannot be rendered capable of reasonably beneficial use by the
carrying out of any development which has been or would be permitted, the owner of the
land may serve on the planning authority a purchase notice requiring the purchase of the
landowner’s interest in the land, in accordance with Part 5 of the Town and Country
Planning (Scotland) Act 1997 (as amended). 
3. In order to comply with Sections 27A(1)  of the Town and Country Planning (Scotland) Act
1997, prior to works commencing on site it is the responsibility of the developer to complete
and submit the following ‘Notice of Initiation of Development’ form to the Planning Authority
specifying the date on which the development will start. Failure to comply with this
requirement constitutes a breach of planning control under Section 123(1) of the Act. 
4. In order to comply with Section 27B(1) of the Town and Country Planning (Scotland) Act
1997 it is the responsibility of the developer to submit the following  ‘Notice of Completion’
form to the Planning Authority specifying the date upon which the development was
completed. 
Page 76

Page 77

INFORMATIVE NOTES 
• Further advice on SuDS can be found in SEPA’s Standing Advice for Small Scale
Development – www.sepa.org.uk 
• Regulatory requirements for private water supplies should be discussed with the
Council’s Environmental Health Officers in the first instance. 
• Regard should be had to the West of Scotland Archaeology Service’s consultation
comments in respect of the proposed development. 
• Operation of the pod for the purposes of a tourist accommodation shall require the
benefit of a separate Site Licence under the Caravan Sites and Control of
Development Act 1960 as amended. Site Licence requirements should be discussed
with the Council’s Environmental Health Officers in the first instance. 
Page 77

Page 78

APPENDIX TO DECISION APPROVAL NOTICE 
Appendix relative to application: 23/00391/PP 
A. Has the application required an obligation under Section 75 of the Town and Country
Planning (Scotland) Act 1997 (as amended): 
Planning Obligation Not Required 
B. Has the application been the subject of any “non-material” amendment in terms of Section
32A of the Town and Country Planning (Scotland) Act 1997 (as amended) to the initial submitted
plans during its processing. 
Yes/No? (if yes, list amendments below) 
No amended plans received     
Summary of amendments (if appropriate): 
C.  Is the proposal a departure from the Development Plan: 
No 
If yes, state level of departure: 
No Departure 
D.  Summary justification statement for approval of planning permission 
The proposal is considered to be consistent with the relevant provisions of the Development Plan,
and there are no other material considerations of sufficient significance to indicate that it would be
appropriate to withhold planning permission having regard to s25 of the Act. 
Page 78

Page 79

0 1 3 4 5m2
FRONT(ENTRANCE)ELEVATION
Fixed Fixed
1500 600
1200
900
1050
1050
900
1050
1050
1000
2100
1800
1200
900
0 1 3 4 5m2
REAR ELEVATION
Fixed Fixed
1500
1200
900
1800
2100
900
1200
900
1500
1350
750
0 1 3 4 5m2
RH SIDE ELEVATION
Fixed
1800
1200
900
1800
2100
Fixed
1500
1350
750
Fixed
0 1 3 4 5m2
LH SIDE ELEVATION
THIS DRAWING IS COPYRIGHT & CANNOT BE COPIED IN WHOLE OR IN PART
WITHOUT THE WRITTEN CONSENT OF SCOTFRAME TIMBER ENGINEERING LIMITED.
COPYRIGHT:-
17/02/231:50 @ A1 CP
Isle of Gigha, PA41 7AA
Proposed New House atBig Knowe House, Tarbert Farm
Mr & Mrs Dennis
SF32551 - PLN01-2 A
NOTES:
· '3 STAR' CLOSED PANEL TIMBER FRAME KIT - 140mm Val-U-Therm
· SOLID FLOOR CONSTRUCTION
· PROFILED METAL CLADDING TO ROOF
· UPVC WINDOWS & COMPOSITE DOORS
· UPVC ROOFLINE
Smooth cement render
to basecourse to be
in contrasting
colour.
Black UV resistant
PVCu Rainwater goods
to match windows
High performance
PVCu windows &
composite doors in
'Anthracite Grey'
colour.
Smooth cement render
to basecourse to be
in contrasting
colour.
PVCu Soffit and
Fascia in
'Anthracite Grey'
to match windows
Black UV resistant
PVCu Rainwater goods
to match windows
Smooth cement render
to basecourse to be
in contrasting
colour (matching
cills.)
Black UV resistant
PVCu Rainwater goods
to match windows
Profiled metal
cladding
Dark grey ridge
flashing to match in
with roof sheeting
White render to
main main body of
house
White render to
main main body of
house
A CLIENT AMENDMENTS 23/02/23
White render to
main main body of
house
Page 79

Page 80

838
838
838
838
838
1385 Sliding Doors 1235 Sliding Doors
1235 Sliding Doors
Module 10
1800x2100 French Doors
Leading
Fixed1500x1350/OF
600x1050/O
1500x1200/OF
1500x1200/OF
Bedroom 2 Dining AreaLounge
Kitchen
Hall
St.W
En-S
Cl.
UtilityBedroom 1
Bedroom 4
/Study
GROUND FLOOR PLAN
0 1 3 4 5m2
Total Floor Area - 112.2m²(to plasterboard)
Total Kit Area - 114.2m²(to structural kit)
838
838
900x1200/O
838
900x1050/O
1500x1350/OF
900x2100/F
1800x1200/OF
1800x1200/OF
W W
3905 2200 4050 3630
8010
3630
2720192515303905
3405
630
3825
1348 1323
3345
3345
3345
3405
630
1790
2825
1400
1400
THIS DRAWING IS COPYRIGHT & CANNOT BE COPIED IN WHOLE OR IN PART
WITHOUT THE WRITTEN CONSENT OF SCOTFRAME TIMBER ENGINEERING LIMITED.
COPYRIGHT:-
17/02/231:50 @ A1 CP
Isle of Gigha, PA41 7AA
Proposed New House atBig Knowe House, Tarbert Farm
Mr & Mrs Dennis
SF32551 - PLN01-1 A
NOTES:
· '3 STAR' CLOSED PANEL TIMBER FRAME KIT - 140mm Val-U-Therm
· SOLID FLOOR CONSTRUCTION
· PROFILED METAL CLADDING TO ROOF
· UPVC WINDOWS & COMPOSITE DOORS
· UPVC ROOFLINE
A CLIENT AMENDMENTS 23/02/23
Page 80

Page 81

0
Scale1:1250
25 50 75m
N
SITE AREA: 6006sqm
TARBERT
To
Gigha
To
North End
53000
53000
Figured dimensions only are to be taken from this drawing.
All dimensions are to be checked on site before any work is put in hand.
IF IN DOUBT ASK.
CDM:
Hazard Elimination & Risk Reduction has been undertaken and
recorded where appropriate, in accordance with the requirements
of "The Construction (Design and Management) Regulations 2015"
and the associated "Industry Guidance for Designers"
Printed
on :
From
file
:
Project
Client
Lyle House, Fairways Business Park,
Inverness IV2 6AA
T  : 01463 712 288
W  : www.colinarmstrong.com
DateDescriptionRev
Project No.
Revision
Sheet
@ A3
Drawn byDate Created
Scale
Status
X:\Documents\2169 - Proposed
Glamping Pod Big Knowe House\02. WORK IN
PROGRESS\2.1 BIM
Models\2169-CAA-ZZ-XX-M3-A-000001.rvt
24/02/2023 10:47:41
1 : 1250
and  Tourist Let
Proposed Dwelling House
Don Dennis, Emma Rennie
and Bryce Harvey
DR- A- 0001
2169
Planning
External Works
Location Plan
RG21/02/23
Page 81

Page 82

8.6 m 
8.8 m
9.0 m 
8.2 m 
8.2 m 
8.4 m 
8.4 m 
8.4 m 
8.6 m 
8.6 m 
8.6 m 
8.8 m 
8.8 m 
9.0 m 
9.0 m 
9.0 m 
9.2 m 
9.2 m 
9.2 m 
9.4 m 
8.8 m
0 20 40 60m
Scale 1:1000
N
SITE AREA: 6006sqm
1
0003
1
0003
Area of hardstanding to aid in the
collection of waste and recycling
Proposed House
Proposed Tourist Let unit
Site Area: 826sqm
TARBERT
Photovoltaic Panels
Proposed treatment plant
and soawkaway
Surface water soakaway
6m -8m Tarred access road with
service layby
Airsource heat pump
Airsource heat pump
Rural access digram with service layby
Natural land feature - Knoll
Oil secondary heating source
Figured dimensions only are to be taken from this drawing.
All dimensions are to be checked on site before any work is put in hand.
IF IN DOUBT ASK.
CDM:
Hazard Elimination & Risk Reduction has been undertaken and
recorded where appropriate, in accordance with the requirements
of "The Construction (Design and Management) Regulations 2015"
and the associated "Industry Guidance for Designers"
Printed
on :
From
file
:
Project
Client
Lyle House, Fairways Business Park,
Inverness IV2 6AA
T  : 01463 712 288
W  : www.colinarmstrong.com
DateDescriptionRev
Project No.
Revision
Sheet
@ A3
Drawn byDate Created
Scale
Status
X:\Documents\2169 - Proposed
Glamping Pod Big Knowe House\02. WORK IN
PROGRESS\2.1 BIM
Models\2169-CAA-ZZ-XX-M3-A-000001.rvt
24/02/2023 10:50:36
1 : 1000
and  Tourist Let
Proposed Dwelling House
Don Dennis, Emma Rennie
and Bryce Harvey
DR- A- 0002
2169
Planning
External Works
Site Plan
AL23.01.23
Page 82

Page 83

HOUSE SITE KNOLL TRACK SLOPING LAND ROAD
FFL+9m
+15m
+10m
Figured dimensions only are to be taken from this drawing.
All dimensions are to be checked on site before any work is put in hand.
IF IN DOUBT ASK.
CDM:
Hazard Elimination & Risk Reduction has been undertaken and
recorded where appropriate, in accordance with the requirements
of "The Construction (Design and Management) Regulations 2015"
and the associated "Industry Guidance for Designers"
Printed
on
:
From
file
:
Project
Client
Lyle House, Fairways Business Park,
Inverness IV2 6AA
T  : 01463 712 288
W  : www.colinarmstrong.com
DateDescriptionRev
Drawing No.
Project No.
Revision
Scale Sheet
@ A1
Date Created Drawn by
Status
X:\Docum
ents\2169 - Proposed
Glam
ping
Pod
Big
Knowe
House\02. W
ORK IN
PROGRESS\2.1 BIM
Models\2169-CAA-ZZ-XX-M3-A-000001.rvt
24/02/2023 10:51:05
1 : 500
and  Tourist Let
Proposed Dwelling House
Don Dennis, Emma Rennie
and Bryce Harvey
0003
2169
Planning
02/21/23 RG
Site Section
Scale -  1 : 500
Section A
Page 83

Page 84

FF
6000
4500
WM
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
6
0004
6
0004
Metal Sheet Roof
Grey Windows and doors
Timber cladding
Ground Floor
0GL
-150
2400
Figured dimensions only are to be taken from this drawing.
All dimensions are to be checked on site before any work is put in hand.
IF IN DOUBT ASK.
CDM:
Hazard Elimination & Risk Reduction has been undertaken and
recorded where appropriate, in accordance with the requirements
of "The Construction (Design and Management) Regulations 2015"
and the associated "Industry Guidance for Designers"
Printed
on
:
From
file
:
Project
Client
Lyle House, Fairways Business Park,
Inverness IV2 6AA
T  : 01463 712 288
W  : www.colinarmstrong.com
DateDescriptionRev
Drawing No.
Project No.
Revision
Scale Sheet
@ A2
Date Created Drawn by
Status
X:\Docum
ents\2169 - Proposed
Glam
ping
Pod
Big
Knowe
House\02. W
ORK IN
PROGRESS\2.1 BIM
M
odels\2169-RT1-2019-glam
ping
pod.rvt
24/02/2023 10:45:24
As indicated
Proposed House and Tourist let unit,
Ilse of Gigha
Don Dennis, Emma Rennie and Bryce
Harvey
0004
2169
Tourist Let Unit
Planning
24.01.23 AL
General Arrangement
Scale -  1 : 50
Ground Floor Plan
Scale -  1 : 100
Elevation 1
Scale -  1 : 100
Elevation 2
Scale -  1 : 100
Elevation 3
Scale -  1 : 100
Elevation 4
Scale -
Exploded 3D 01
0 2 4 6m
Scale 1:100
Scale -  1 : 50
Section 1 Page 84

Page 85

Figured dimensions only are to be taken from this drawing.
All dimensions are to be checked on site before any work is put in hand.
IF IN DOUBT ASK.
CDM:
Hazard Elimination & Risk Reduction has been undertaken and
recorded where appropriate, in accordance with the requirements
of "The Construction (Design and Management) Regulations 2015"
and the associated "Industry Guidance for Designers"
Printed
on
:
From
file
:
Project
Client
Lyle House, Fairways Business Park,
Inverness IV2 6AA
T  : 01463 712 288
W  : www.colinarmstrong.com
DateDescriptionRev
Drawing No.
Project No.
Revision
Scale Sheet
@ A1
Date Created Drawn by
Status
X:\Docum
ents\2169 - Proposed
Glam
ping
Pod
Big
Knowe
House\02. W
ORK IN
PROGRESS\2.1 BIM
Models\2169-CAA-ZZ-XX-M3-A-000001.rvt
14/03/2023 07:45:00
1 : 10000
and  Tourist Let
Proposed Dwelling House
Don Dennis, Emma Rennie
and Bryce Harvey
0004
2169
Planning
03/14/23 RG
Suplimentry Location Map
Scale - 1 : 10000
1/10000 Map
Site
Page 85

Page 86

This page is intentionally left blank

Page 87

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Argyll and Bute Council
Development & Economic Growth   
Planning Application Report and Report of Handling as required by Schedule 2 of the
Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013 relative to applications for Planning Permission or Planning
Permission in Principle 
Reference No: 23/00391/PP 
Planning Hierarchy: Local Development 
Applicant: Don Dennis, Emma Rennie And Bryce Harvey 
Proposal: Erection of dwellinghouse and siting of family size glamping pod for
use as holiday letting accommodation 
Site Address:  Land South West of Tarbert Farm Isle Of Gigha Argyll And Bute    
DECISION ROUTE 
☒Delegated - Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997 
☐Committee - Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission
• Erection of dwellinghouse 
• Siting of family size glamping pod for use as holiday letting
accommodation. 
(ii) Other specified operations
• Installation of foul drainage treatment plant 
• Installation of surface water soakaway
• Installation of ASHPs 
(B) RECOMMENDATION: 
The proposal is recommended for approval of Planning Permission subject to
conditions and reasons appended below. 
(C) CONSULTATIONS:   
Roads and Infrastructure Services 
No objection subject to conditions appended below – 17.04.2023 
Page 87

Page 88

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Scottish Water 
No objection – 31.03.2023 
Environmental Health 
No objection subject to condition – 15.09.2023 
West of Scotland Archaeological Services (WOSAS) 
No objection subject to conditions appended below – 19.04.2023 
Historic Environment Scotland (HES) 
No objection – 25.04.2023 
(D) HISTORY:   
11/01511/PPP – Site for the erection of dwellinghouse. Approved: 20.12.2011 
13/01511/PP – Erection of residential/commercial property with detached domestic
garage. Approved: 05.11.2013 
(E) PUBLICITY:   
Regulation 20 Advert (expiry date: 28.04.2023) 
(F) REPRESENTATIONS:   
(i) Representations received from: 
None received 
Representations are published in full on the planning application file and are available
to view via the Public Access section of the Council’s website. 
(ii) Summary of issues raised: 
• N/A 
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Impact Assessment Report: ☐Yes ☒No (if Yes insert
EIAR topics below)  
(ii) An Appropriate Assessment under the
Conservation (Natural Habitats) Regulations
1994:   
☐Yes ☒No (if Yes attach
as an appendix)
Page 88

Page 89

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
(iii) A Design or Design/Access statement:    ☒Yes ☐No (if Yes insert
summary of key issues
below) 
Appraises the site and
area, and analyses the
proposal against LDP
Policies. 
(iv) A report on the impact of the proposed
development eg. Retail impact, transport
impact, noise impact, flood risk, drainage
impact etc:  
☐Yes ☒No (if Yes list
supporting documents
below)   
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:   ☐Yes ☒No (if Yes insert details of the
terms and heads of agreement and,
grounds for refusal if not completed
within 4 months below)   
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  ☐Yes ☒No (if Yes insert details of direction below)    
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account
in assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy 
Sustainable Places
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
NPF4 Policy 5 – Soils
NPF4 Policy 7 – Historic Assets and Places
NPF4 Policy 9 – Brownfield, Vacant and Derelict Land and Empty Buildings (includes
provisions relevant to Greenfield Sites)
NPF4 Policy 12 – Zero Waste
NPF4 Policy 13 – Sustainable Transport 
Liveable Places
NPF4 Policy 14 – Design, Quality and Place
NPF4 Policy 15 – Local Living and 20 Minute Neighbourhoods
Page 89

Page 90

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
NPF4 Policy 16 – Quality Homes
NPF4 Policy 17 – Rural Homes
NPF4 Policy 22 – Flood Risk and Water Management
NPF4 Policy 23 – Health and Safety 
Productive Places
NPF4 Policy 29 – Rural Development
NPF4 Policy 30 – Tourism 
‘Argyll and Bute Local Development Plan’ Adopted March 2015 
LDP STRAT 1 – Sustainable Development 
LDP DM 1 – Development within the Development Management Zones 
LDP 3 – Supporting the Protection Conservation and Enhancement of our
Environment 
LDP 5 –Supporting the Sustainable Growth of our Economy 
LDP 8 – Supporting the Strength of our Communities 
LDP 9 – Development Setting, Layout and Design 
LDP 10 – Maximising our Resources and Reducing our Consumption 
LDP 11 – Improving our Connectivity and Infrastructure 
Local Development Plan Schedules 
‘Supplementary Guidance to the Argyll and Bute Local Plan 2015’ (Adopted
March 2016 & December 2016) 
Natural Environment 
SG LDP ENV 1 – Impact on Habitats, Species and our Biodiversity
SG LDP ENV 11 – Protection of Soil and Peat Resources 
Landscape and Design 
SG LDP ENV 14 – Landscape 
Historic Environment and Archaeology 
SG LDP ENV 19 – Impact on Scheduled Ancient Monuments (SAMs) 
Support for Business & Industry: Main Potential Growth Sector: Tourism 
SG LDP TOUR 1 – Tourist Facilities and Accommodation, including Static and
Touring Caravans
SG LDP TOUR 3 – Promoting Tourism Development Areas 
General Housing Development 
SG LDP HOU 1 – General Housing Development Including Affordable Housing
Provision 
Bad Neighbour Development 
SG LDP BAD 2 – Bad Neighbour Development in Reverse 
Sustainable Siting and Design
Page 90

Page 91

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
SG LDP Sustainable – Sustainable Siting and Design Principles 
Resources and Consumption 
SG LDP SERV 1 – Private Sewage Treatment Plants & Wastewater Systems
SG LDP SERV 2 – Incorporation of Natural Features / SuDS
SG LDP SERV 5(b) – Provision of Waste Storage & Collection Facilities within New
Development
SG LDP SERV 6 – Private Water Supplies and Water Conservation 
Transport (Including Core Paths) 
SG LDP TRAN 4 – New & Existing, Public Roads & Private Access Regimes
SG LDP TRAN 6 – Vehicle Parking Provision 
(ii)  List of all other material planning considerations taken into account in
the assessment of the application, having due regard to Annex A of
Circular 3/2013. (delete as appropriate) 
• Third Party Representations
• Consultation Reponses
• Planning History
• ABC Technical Note – Biodiversity (Feb 2017)
• ABC draft Technical Note – Argyll and Bute Windows (April 2018)  
Argyll and Bute proposed Local Development Plan 2 (November 2019) – The
Examination by Scottish Government Reporters to the Argyll and Bute Local
Development Plan 2 has now concluded and the Examination Report has been
published (13th June 2023). The Examination Report is a material consideration of
significant weight and may be used as such until the conclusion of the LDP2
Adoption Process. Consequently, the Proposed Local Development Plan 2 as
recommended to be modified by the Examination Report and the published Non
Notifiable Modifications is a material consideration in the determination of all
planning and related applications. 
Spatial and Settlement Strategy 
Policy 02 – Outwith Settlement Areas
Policy 04 – Sustainable Development 
High Quality Places 
Policy 05 – Design and Placemaking
Policy 06 – Green Infrastructure
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 10 – Design – All Development
Policy 14 – Bad Neighbour Development
Policy 15 – Protection, Conservation and Enhancement of Our Historic Environment
Policy 19 – Scheduled Monuments 
Diverse and Sustainable Economy 
Page 91

Page 92

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Policy 23 – Tourism Development, Accommodation, Infrastructure and Facilities
Policy 25 – Tourism Development Opportunities 
Connected Places 
Policy 32 – Active Travel
Policy 33 – Public Transport
Policy 34 – Electric Vehicle Charging Points
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes
Policy 36 – New Private Accesses
Policy 39 – Construction Standards for Private Accesses
Policy 40 – Vehicle Parking Provision 
Sustainable Communities 
Policy 58 – Private Water Supplies and Water Conservation
Policy 60 – Private Sewage Treatment Plants and Wastewater Drainage Systems
Policy 61 – Sustainable Urban Drainage Systems (SUDS) 
High Quality Environment 
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 79 – Protection of Soil and Peat Resources 
Local Development Plan 2 Schedules 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment:  ☐Yes ☒No (if Yes confirm date of screening opinion and
reference below)    
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  ☐Yes ☒No (if Yes provide summary detail of PAC below) 
(M) Has a Sustainability Checklist been submitted:  ☐Yes ☒No (if Yes provide detail
below) 
(N) Does the Council have an interest in the site:  ☐Yes ☒No (if Yes provide detail
below) 
(O) Requirement for a pre-determination hearing: ☐Yes ☒No (if Yes insert details
below)    
(P)(i) Key Constraints/Designations Affected by the Development:
• N/A 
(P)(ii) Soils
Agricultural Land Classification:  Class: 5.10
Page 92

Page 93

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Peatland/Carbon Rich Soils Classification: ☐Class 1
☐Class 2
☐Class 3
☒N/A
Peat Depth Classification: N/A  
Does the development relate to croft land? ☐Yes ☒No
Would the development restrict access to croft
or better quality agricultural land?
☐Yes ☒No ☐N/A
Would the development result in
fragmentation of croft / better quality
agricultural land?
☐Yes ☒No ☐N/A 
(P)(iii) Woodland  
Will the proposal result in loss of
trees/woodland?
(If yes, detail in summary assessment)
☐Yes
☒No 
Does the proposal include any replacement or
compensatory planting?
☐Yes
☒No details to be secured by condition
☐N/A  
(P)(iv) Land Status / LDP Settlement Strategy
Status of Land within the Application
(tick all relevant boxes)
☐Brownfield
☐Brownfield Reclaimed by Nature
☒Greenfield 
ABC LDP 2015 Settlement Strategy 
LDP DM 1 (tick all relevant boxes) 
☐Main Town Settlement Area
☐Key Rural Settlement Area
☐Village/Minor Settlement Area
☒Rural Opportunity Area
☐Countryside Zone
☐Very Sensitive Countryside Zone
☐Greenbelt
ABC pLDP2 Settlement Strategy
(tick all relevant boxes) 
☐Settlement Area
☒Countryside Area
☐Remote Countryside Area
☐Helensburgh & Lomond Greenbelt
ABC LDP 2015 Allocations/PDAs/AFAs
etc: 
N/A
ABC pLDP2 Allocations/PDAs/AFAs
etc: 
N/A 
(P)(v) Summary assessment and summary of determining issues and material
considerations 
Planning permission is sought for the erection of dwellinghouse and siting of family
size glamping pod for use as holiday letting accommodation. 
Principle 
Of relevance, NPF4 Policy 9B sets out that proposals on greenfield sites will not be
supported unless the site has been allocated for development or explicitly supported
Page 93

Page 94

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
by policies in the Local Development Plan (LDP). NPF4 Policy 14A generally
supports development proposals designed to improve the quality of an area whether
in urban or rural locations and regardless of scale. NPF4 Policy 16F sets out that
development proposals for new homes on land not allocated for housing in LDP will
only be supported in limited circumstances. NPF4 Policy 17C sets out that new
homes in remote rural areas will be supported where it supports and sustains existing
fragile communities; supports identified local housing outcomes; and is suitable in
terms of location, access and environmental impact. 
NPF4 Policy 30A states that proposals for new or extended tourist facilities or
accommodation, including caravan and camping sites, in locations identified in the
LDP, will be supported. 
NPF4 Policies 29A and 29B supports proposals that contributes to the viability,
sustainability and diversity of rural communities and local rural economy taking into
account how the development will contribute towards local living and take into
account the transport needs of the development as appropriate for the rural location.
While 29C expects development proposals in remote rural areas, where new
development can often help to sustain fragile communities, to be supported where
the proposal ii. supports and sustains existing communities; and iii. is suitable in
terms of location, access, siting, design and environmental impact. 
The site is located on Gigha Island and within a Rural Opportunity Area (ROA)
wherein the provision of Policies LDP DM 1 and SG LDP HOU 1 of the adopted Argyll
and Bute LDP supports the principle of small scale residential development on
appropriate sites. In addition, the small scale nature of the proposal and its location
on a rural island designated as at tourism development area within the LDP weighs
in favour of the proposal. Though likely to only generate a small income, the tourist
accommodation would also meet the aims of the LDP to enhance the tourism industry
and the local economy. 
By reason of the existing dispersed geographical scale of the wider environment
within which the site is located; and its compliance with the existing settlement
pattern within the Island coupled with the level of interconnectivity of the proposed
development with the surrounding area, people can reasonably meet the majority of
their daily needs within a reasonable distance of their home. Thus, the proposal also
complies with the NPF4 Policy 15; and ABC LDP 2015 Policies LDP DM 1 and LDP
8. 
Drawing the above together, the principle of residential and tourist development at
the site is considered acceptable, subject to the acceptability of the detailed matters
set out below. 
Local character and appearance 
The proposal is located outwith a local or national designation and does not give rise
to any immediate impact upon the natural or established environment. The local
settlement pattern outwith Ardminish  is of dispersed isolated residential buildings or
farm lands with cluster of buildings across the island. The proposal would not be an
exception to this local settlement pattern in that, it will be established on a land where
it will be isolated yet in keeping with the local pattern. The proposal is a rectangular
single storey bungalow with a small scale rectangular cabin for use as a tourist
accommodation. Together the buildings would create an acceptable small isolated
developed site conforming to the local settlement pattern on the Island and partly
obscured from the road by an intervening knoll. 
Page 94

Page 95

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
By reason of its siting, traditional design (including finishing materials), scale and
massing the proposal would not detract from the existing settlement pattern nor the
character and appearance of the wider locale. Additionally, in the absence of any
immediate neighbouring properties, there are no concerns with daylight,
overshadowing and overlooking. Having regard to the proposed tourist
accommodation on site, it is considered that due to the orientation and relationship
between the two buildings– approx. 32m apart, there are no overlooking or amenity
concerns. 
The proposal is therefore considered consistent with the relevant provisions of NPF4
Policies 14, 16, and 17; and ABC LDP 2015 Policies LDP 3, LDP 9, SG LDP ENV
14 and SG Sustainable. 
Historic Environment 
The application site lies within close proximity to two scheduled ancient monuments
(SAM) – Ridh a'Chaibeil, burial ground & cross SE of Tarbert (SM 3308) is located
some 300m W of the site while Cairnvickuie, cross incised stone NW of (SM 3306)
is approx. 310m NW and 80m S of the former SAM. Historic environment Scotland
was therefore consulted on the application. HES note that while the proposed
development may be present in longer distance inward views, due to its location, it
is unlikely to be visible from key outward views associated with the setting of the
SAMs. However, as the development will form part of the existing dispersed
settlement pattern, the level of change to the baseline setting of the monuments that
might derive from the proposal is unlikely to raise issues of national significance. 
In view of the above, it is considered that the proposal does not raise any concerns
detrimental to the designated SAMs and their settings and therefore is deemed
compliant with NPF4 Policy 7 and ABC LDP 2015 Policies LDP 3 and SG LDP ENV
19. 
Biodiversity 
The proposal does not relate to, nor is it within immediate proximity of any nature
conservation designation. The site is an agricultural grazing land with limited
biodiversity value. The proposal does not include any detail of proposed biodiversity
enhancements that would be delivered by the development; however, in this instance
it is considered that this may reasonably be secured by suspensive condition seeking
improvements to be considered and delivered alongside proposals for landscape,
boundary treatment and surface treatment for the development. Similarly, a condition
requiring soil management practices would also be necessary based on NPF4 Policy
5. The proposal is considered to be consistent with the relevant provisions of NPF4
Policies 3 and 5 and ABC LDP Policies LDP 3, SG LDP ENV 1 and SG LDP ENV
11. 
Water/drainage 
The application indicates that the development intends to rely on both private water
supply and foul drainage system. While Scottish Water (SW) confirmed public
water supply availability from Gigha Water Treatment Works, it cannot confirm
capacity is currently available to meet the requirement. SW also confirmed there is
no public Waste Water infrastructure within the vicinity. It is therefore considered
that the proposed private water supply and foul drainage systems are justified. 
Page 95

Page 96

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Environmental Health have raised no concerns to the proposal. 
With respect to surface water, a condition has been appended to ensure suitable
drainage systems (including SuDs) are provided for the proposed development. On
this basis, the proposal, subject to the conditions appended below, is considered
consistent with the provisions of NPF 4 policy 18 and 22; and ABC LDP 2015 Policies
LDP 10 and SG LDP SERV 1, SG LDP SERV 2 and SG LDP SERV 6. 
Roads 
The development seeks to form a new private access off the existing public road
located some 225 east of the proposed site. Road’s consultee response raised no
objection to the proposal subject to conditions deemed necessary and as such
appended below. The proposal is considered to be consistent with the relevant
requirements of NPF4 Policy 13, and ABC LDP Policy LDP 11, SG LDP TRAN 4 and
SG LDP TRAN 6. 
Waste/Recycling 
The proposed site plan with drawing no. DR- A- 0002 shows the location of a refuse
collection point adjacent to the public road in line with the Council’s Waste Strategy
and as such the proposal would be consistent with the requirements of NPF4 Policy
12, and ABC LDP Policy LDP 10 and SG LDP SERV 5(b). 
Other Considerations  
The proposal is located approx. 230 SE of Tarbert farm where the development could
potentially be impacted by odour and/or noise. Environmental Health was consulted
on the application and have raised no objection or concerns to the development
being established within the vicinity. Consequently, the development is deemed
compliant to the provisions of NPF4 Policies 23; and ABC LDP 2015 Policies LDP 8
and SG LDP BAD 2. 
Matters Raised by Proposed Local Development Plan 2 (as modified by Examination) 
Proposed Local Development Plan 2 as recommended to be modified by the
Examination Report is now a significant material consideration. In this instance it is
considered that this application does not give rise to any fundamental conflict with
the relevant policies of PLDP2. 
(Q) Is the proposal consistent with the Development Plan: ☒Yes ☐No 
(R) Reasons why Planning Permission or Planning Permission in Principle Should
be Granted: 
The proposal subject to conditions is considered to be consistent with the relevant
provisions of the Development Plan, and there are no other material considerations
of sufficient significance to indicate that it would be appropriate to withhold planning
permission having regard to s25 of the Act. 
Page 96

Page 97

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
(S) Reasoned justification for a departure to the provisions of the Development
Plan 
N/A 
(T) Need for notification to Scottish Ministers or Historic Environment Scotland:
☐Yes ☒No (If yes provide detail below)   
Author of Report: Tiwaah Antwi Date: 15.09.2023 
Reviewing Officer: Bryn Bowker Date: 27.09.2023 
Fergus Murray
Head of Development & Economic Growth 
Page 97

Page 98

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 23/00391/PP 
Standard Time Limit Condition (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions  
1.  PP - Approved Details & Standard Notes – Non-EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 24.02.2023 supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Supplementary Location Plan RG - 0004  15.03.2023 
Location Plan DR- A- 0001  27.02.2023 
Proposed Site Plan DR- A- 0002  27.02.2023 
Proposed Site Section RG - 0003  27.02.2023 
Proposed Floor Plan SF32551 -
PLN01-1
A 27.02.2023 
Proposed Elevations SF32551 -
PLN01-2
A 27.02.2023 
Glamping Pod Elevations, Floor Plan
and Section as Proposed
AL - 0004  27.02.2023 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details.  
2.  Notwithstanding the provisions of Condition 1, the proposed access shall be formed in
accordance with the Council’s Roads Standard Detail Drawing SD 08/004 Rev a; and
visibility splays of 2.4 metres to point X by 53 metres to point Y from the centre line of
the proposed access. The access shall be surfaced with a bound material in
accordance with the stated Standard Detail Drawing. Prior to work starting on site the
access hereby approved shall be formed to at least base course standard and the
visibility splays shall be cleared of all obstructions such that nothing shall disrupt
visibility from a point 1.05 metres above the access at point X to a point 0.6 metres
above the public road carriageway at point Y. The final wearing surface on the access
shall be completed prior to the development first being brought into use and the
visibility splays shall be maintained clear of all obstructions thereafter. 
Reason: In the interests of road safety.  
3.  Notwithstanding the provisions of Condition 1, the development shall not include for
the provision of walls, fences or hedges within 2.0 metres of the public road or back of
service strip. The proposed vehicular gates to be installed at the site entrance shall be
set back a minimum distance of 6.00 metres from edge of public road and shall open
inwards and away from the public road. 
Reason: In the interest of road safety.  
Page 98

Page 99

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
4.  Notwithstanding the provisions of Condition 1, prior to the commencement of work on
site, the proposed road alteration shall be implemented in accordance with the details
set out by the Roads and Infrastructure Services below: 
(i) Existing road ditch to be culverted under the service bay shall be carried
out to the satisfaction of Roads & Infrastructure Services. 
(ii) Headwalls shall be constructed on each end of the new culvert.
(iii) Provision of parking and turning for a minimum of 3 vehicles within
application site – 2 spaces for the main dwelling and 1 space for the
glamping pod.  
(iv) Provision of refuse collection point adjacent to the public road. 
Reason: In the interest of road and public safety.  
5.  Notwithstanding the provisions of Condition 1, the glamping pod hereby approved shall
be used for short term occupancy only and not as a main residence and shall not be
occupied by any family, group or individual for a cumulative period of more than three
calendar months in any one year. A register showing dates of arrivals and departures
shall be maintained by the Site Operator and shall be available at all reasonable times
for inspection by the Planning Authority. 
Reason: In order to define the permitted occupancy to satisfy the provisions of the
Development Plan.  
6.  Notwithstanding the provisions of Condition 1, no development shall commence until
a scheme of boundary treatment, surface treatment and landscaping has been
submitted to and approved in writing by the Planning Authority. The scheme shall
include details of: 
i) Location, design and materials of proposed walls, fences and gates;
ii) Surface treatment of proposed means of access and hardstanding
areas;
iii) Any proposed re-contouring of the site by means of existing and
proposed ground levels;
iv) Proposed hard and soft landscape works;
v) A biodiversity statement demonstrating how the proposal will contribute
to conservation/restoration/enhancement of biodiversity, and how
these benefits will be maintained for the lifetime of the development. 
The development shall not be occupied until such time as the boundary treatment,
surface treatment and any re-contouring works have been completed in accordance
with the duly approved scheme. 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme during the first planting season following the commencement of the
development, unless otherwise agreed in writing by the Planning Authority. 
The biodiversity statement should refer to Developing with Nature guidance |
NatureScot as appropriate. 
Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity, and to comply with the requirements of NPF4 Policy 3  
7.  Notwithstanding the provisions of Condition 1, the developer shall secure the
implementation of an archaeological watching brief, to be carried out by an
Page 99

Page 100

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
archaeological organisation acceptable to the Planning Authority, during all ground
disturbance. The retained archaeological organisation shall be afforded access at all
reasonable times and allowed to record, recover and report items of interest and finds.
A method statement for the watching brief will be submitted by the applicant, agreed
by the West of Scotland Archaeology Service, and approved by the Planning Authority
prior to commencement of the watching brief. The name of the archaeological
organisation retained by the developer shall be given to the Planning Authority and to
the West of Scotland Archaeology Service in writing not less than 14 days before
development commences. 
Reason: In order to protect archaeological resources. 
8.  Notwithstanding the provisions of Condition 1, no development shall commence until
an appraisal of the wholesomeness and sufficiency of the intended private water
supply and the system required to serve the development has been submitted to and
approved in writing by the Planning Authority. 
The appraisal shall be carried out by a qualified hydrologist and shall include a risk
assessment having regard to the requirements of Schedule 4 of the Private Water
Supplies (Scotland) Regulations 2006 which shall inform the design of the system by
which a wholesome and sufficient water supply shall be provided and maintained. The
appraisal shall also demonstrate that the wholesomeness and sufficiency of any other
supply in the vicinity of the development, or any other person utilising the same source
or supply, shall not be compromised by the proposed development. 
The development shall not be brought into use or occupied until the required water
supply system has been installed in accordance with the agreed specification and is
operational. 
Reason: In the interests of public health and in order to ensure that an adequate
private water supply in terms of both wholesomeness and sufficiency can be provided
to meet the requirements of the proposed development and without compromising the
interests of other users of the same or nearby private water supplies.    
9.  Notwithstanding the provisions of Condition 1, the development shall incorporate a
surface water drainage system which is consistent with the principles of Sustainable
urban Drainage Systems (SuDS) compliant with the guidance set out in CIRIA’s SuDS
Manual C753. The requisite surface water drainage shall be operational prior to the
development being brought into use and shall be maintained as such thereafter. 
Reason: To ensure the provision of an adequate surface water drainage system and
to prevent flooding.   
Page 100

Page 101

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
NOTE TO APPLICANT (Copy Informative Notes to Uniform Decision Tab) 
• Further advice on SuDS can be found in SEPA’s Standing Advice for Small Scale
Development – www.sepa.org.uk 
• Regulatory requirements for private water supplies should be discussed with the
Council’s Environmental Health Officers in the first instance. 
• Regard should be had to the West of Scotland Archaeology Service’s consultation
comments in respect of the proposed development. 
• Operation of the pod for the purposes of a tourist accommodation shall require the
benefit of a separate Site Licence under the Caravan Sites and Control of Development
Act 1960 as amended. Site Licence requirements should be discussed with the
Council’s Environmental Health Officers in the first instance. 
Page 101

Page 102

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
APPENDIX TO DECISION APPROVAL NOTICE 
Appendix relative to application 23/00391/PP 
(A) Has the application required an obligation under Section 75 of
the Town and Country Planning (Scotland) Act 1997 (as
amended):
☐Yes ☒No
(Complete
Uniform
Decision,
Recommendation
tab) 
If Yes: The terms of the Section 75 obligation may be viewed on the Council’s
website at www.argyll-bute.gov.uk by recalling the application reference
number on the Council’s Public Access Module and then by “Clicking” Section
75 Obligation under the attached correspondence or by viewing the Public
Planning register located at Planning Services, 1A Manse Brae, Lochgilphead,
Argyll, PA31 8RD. 
(B) Has the application been the subject of any “non-material”
amendment in terms of Section 32A of the Town and Country
Planning (Scotland) Act 1997 (as amended) to the initial
submitted plans during its processing.
☐Yes ☒No
(Complete
Uniform
Reception, Plans
Tab) 
(C) Is the proposal consistent with the Development Plan? ☒Yes ☐No
(Complete
Uniform
Decision,
Recommendation
Tab) 
(D) The reason why planning permission has been approved: 
The proposal subject to conditions is considered to be consistent with the relevant
provisions of the Development Plan, and there are no other material considerations
of sufficient significance to indicate that it would be appropriate to withhold planning
permission having regard to s25 of the Act. 
Page 102

Page 103

8.6 m 
8.8 m 
9.0 m 
8.2 m 
8.2 m 
8.4 m 
8.4 m 
8.4 m 
8.6 m 
8.6 m 
8.6 m 
8.8 m 
8.8 m 
9.0 m 
9.0 m 
9.0 m 
9.2 m 
9.2 m 
9.2 m 
9.4 m 
8.8 m
0 20 40 60m
Scale 1:1000
N
SITE AREA: 6006sqm
1
0003
1
0003
Area of hardstanding to aid in the
collection of waste and recycling
Proposed House
Proposed Tourist Let unit
Site Area: 826sqm
TARBERT
Photovoltaic Panels
Proposed treatment plant
and soawkaway
Surface water soakaway
6m -8m Tarred access road with
service layby
Airsource heat pump
Airsource heat pump
Rural access digram with service layby
Natural land feature - Knoll
Oil secondary heating source
BIODIVERSITY STATEMENT: Proposed species rich long grass area to
be sown with a grass / wildflower seed
mix. Areas to be managed to promote the biodiversity of the
areas with regular
annual cutting of seeded areas and the control of invasive weed
species. Scotia
seeds ' Get Nectar- rich quick mix' sown @ 2g/m2.
BOUNDARY TREATEMENT: to be post and wire fences throughout.
HARD LANDSCAPING: Driveway surface treatement to be
compacted hardcore with a whin/quarry dust finish.
Planning condition 6: no development shall commence until a
scheme of boundary treatment, surface treatment and landscaping has been submitted to
and approved in writing by the Planning Authority. The scheme shall include details of:
i) Location, design and materials of proposed walls, fences and gates;
ii) Surface treatment of proposed means of access and hardstanding areas;
iii) Any proposed re-contouring of the site by means of existing and proposed ground levels;
iv) Proposed hard and soft landscape works;
v) A biodiversity statement demonstrating how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these benefits will be
maintained for the lifetime of the development. The development shall not be occupied until
such time as the boundary treatment, surface treatment and any re-contouring works have
been completed in accordance with the duly approved scheme. All of the hard and soft
landscaping works shall be carried out in accordance with the approved scheme during the
first planting season following the commencement of the development, unless otherwise
agreed in writing by the Planning Authority.
The biodiversity statement should refer to Developing with Nature guidance | NatureScot as
appropriate. Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity, and to comply with the requirements of NPF4 Policy 3
RECONTOURING: Proposed contours shown, building pads avoid
the small 'knoll' to the north of the site so minimal recontouring is
required for this development.
Figured dimensions only are to be taken from this drawing.
All dimensions are to be checked on site before any work is put in hand.
IF IN DOUBT ASK.
CDM:
Hazard Elimination & Risk Reduction has been undertaken and
recorded where appropriate, in accordance with the requirements
of "The Construction (Design and Management) Regulations 2015"
and the associated "Industry Guidance for Designers"
Printed
on :
From
file
:
Project
Client
Lyle House, Fairways Business Park,
Inverness IV2 6AA
T  : 01463 712 288
W  : www.colinarmstrong.com
DateDescriptionRev
Project No.
Revision
Sheet
@ A3
Drawn byDate Created
Scale
Status
X:\Documents\2169 - Proposed
Glamping Pod Big Knowe House\02. WORK IN
PROGRESS\2.1 BIM
Models\2169-CAA-ZZ-XX-M3-A-000001.rvt
31/10/2024 12:32:13
A
1 : 1000
and  Tourist Let
Proposed Dwelling House
Don Dennis, Emma Rennie
and Bryce Harvey
DR- A- 0002
2169
Planning
External Works
Site Plan
AL23.01.23
A Landscape planning condition
wildflower area added
31.10.202
4
Page 103

Page 104

This page is intentionally left blank

Page 105

878– Watching Brief on land SW of Tarbert Farm, Isle of Gigha, Argyll 
Argyll Archaeology: page 1 of 8 
REPORT: WATCHING BRIEF ON LAND SOUTHWEST OF TARBERT FARM,
ISLE OF GIGHA, ARGYLL 
Client: Emma Rennie 
Planning ref. No.:  23/00391/PP 
Produced by Clare Ellis of Argyll Archaeology 
22nd November 2024 
Page 105

Page 106

878– Watching Brief on land SW of Tarbert Farm, Isle of Gigha, Argyll 
Argyll Archaeology: page 2 of 8
0. NON TECHNICAL SUMMARY 
0.1 A watching brief was maintained on the machine excavation of the cable trench
for the new electricity supply to a new build house and the machine stripping of
turf and topsoil over the footprint of the new build house on land southwest of
Tarbert Farm, Isle of Gigha.  No features or deposits of archaeological or
historical significance were observed and it is the recommendation of this report
that no further archaeological works are required with respect to this
development. 
1. INTRODUCTION 
1.1 The site (Fig. 1) lies within Argyll and Bute Council area and is roughly
centred on NGR.: NR 65051 51667. The watching brief on both the cable
trench for the power cable and the footprint of the new house took place on
20th November 2024. The construction of the tourist let unit and a new track
running towards it had been completed prior to the watching brief being
undertaken. 
2. OBJECTIVES 
2.1 The archaeological objectives are: 
a.  to determine the presence or absence of archaeological features within
the confines of the cable trench 
b.  to fully excavate any archaeological features identified 
c. to propose further stages of work as required 
3. METHOD 
3.1 A 13 ton tracked excavator equipped with a ditching bucket was used to strip
the topsoil down to the underlying natural over the footprint of the house (Fig.
1). The route for the new power cable was dug using a narrow toothless bucket
some 0.50m wide. The spoil was placed on the side of the cable trench. All
machine stripping was carried out in the presence of an archaeologist. The
weather was dry.
Page 106

Page 107

878– Watching Brief on land SW of Tarbert Farm, Isle of Gigha, Argyll 
Argyll Archaeology: page 3 of 8 
Fig. 1. Land southwest of Tarbert Farm, cable route for the supply of electricity and footprint of the new build house subject to an
archaeological watching brief.
Page 107

Page 108

878– Watching Brief on land SW of Tarbert Farm, Isle of Gigha, Argyll 
Argyll Archaeology: page 4 of 8 
4.0 RESULTS AND DISCUSSION 
4.1 The tourist unit and part of the track leading up to it had been constructed prior
to the watching brief taking place; the associated ground preparation works were
not observed by an archaeologist. However, the track had been constructed by
the build up of crushed rock over the grass of the field; there had been no
stripping of the turf or topsoil.   
4.2 The footprint of the new house and the parking/turning area was stripped of turf
and topsoil under archaeological supervision (Fig. 2). The topsoil, a
yellow/orange silt loam was barely 0.10m deep in most places and sat directly
over bedrock.  Slightly more silt was observed at the north end between the
rocky northern outcrop and the southern outcrop on which the house will sit. No
archaeological deposits were observed. 
Fig. 2. Stripping of the house and parking footprint. 
4.3 The new cable route ran from an exiting power pole, that was adjacent to the
road, in a westerly direction up a slight slope towards the house plot (Fig. 3).
Immediately adjacent to the road the soil was waterlogged with a thin layer of
black organic matter observed in section at a depth of 0.40-0.50m. This material
is thought to be the remains of a relatively recently buried waterlogged ground
surface. Along the length of the cable trench fragmentary bedrock lay under the
topsoil which was generally around 0.30m deep but thinned in places where
bedrock was very near the surface. A few rubble and modern drains were
observed. The trench was excavated down to between 0.80m and 0.90m where
hard bedrock was not encountered.  No archaeological features were observed. 
Page 108

Page 109

878– Watching Brief on land SW of Tarbert Farm, Isle of Gigha, Argyll 
Argyll Archaeology: page 5 of 8 
Fig. 3. Excavated power cable trench, looking east 
5.0 RECOMMENDATION 
5.1 No features or deposits of archaeological significance were observed during the
watching brief. Although the final section of the access track has not been
constructed up to the house this is going to comprise crushed bedrock placed
directly over the grass and therefore its construction will not require to be
monitored by an archaeologist. Similarly, the final section of the access track to
the tourist unit has not been completed, but again this will comprise crushed
bedrock laid directly over the grass and therefore will not require archaeological
monitoring. 
5.2 It is the recommendation of this report that no further archaeological work is
required in association with this development.
Page 109

Page 110

878– Watching Brief on land SW of Tarbert Farm, Isle of Gigha, Argyll 
Argyll Archaeology: page 6 of 8
Appendices 
Appendix 1: photographic register 
No. Description
Taken
from
1 Machine stripping of the house footprint SW
2 Machine stripping of the house footprint W
3 Machine stripping of the house footprint NW
4 Machine stripping of the house footprint SW
5 Machine stripping of the house footprint W
6 Machine stripping of the house footprint W
7 Power cable trench  W
8 Power cable trench  W
9 Power cable trench  W
Page 110

Page 111

878– Watching Brief on land SW of Tarbert Farm, Isle of Gigha, Argyll 
Argyll Archaeology: page 7 of 8
Page 111

Page 112

878– Watching Brief on land SW of Tarbert Farm, Isle of Gigha, Argyll 
Argyll Archaeology: page 8 of 8
Appendix 2: DES Entry 
LOCAL AUTHORITY: Argyll and Bute Council
PROJECT TITLE/SITE NAME:  Tarbert Farm
PROJECT CODE: 878
PARISH:  Gigha and Cara
NAME OF CONTRIBUTOR:  Clare Ellis
NAME OF ORGANISATION:  Argyll Archaeology
TYPE(S) OF PROJECT: Watching brief
NMRS NO(S):  None
SITE/MONUMENT TYPE(S):  None
SIGNIFICANT FINDS:  None 
NGR (2 letters, 8 or 10 figures) NR 65051 51667
START DATE (this season) 20th November 2024
END DATE (this season) 20th November 2024
PREVIOUS WORK (incl. DES ref.) 
MAIN (NARRATIVE)
DESCRIPTION: 
(May include information from other
fields) 
A watching brief was maintained on the machine excavation of the footprint of a new house
and cable trench for the electricity supply on land southwest of Tarbert l Farm, Isle of Gigha. 
No features or deposits of archaeological or historical significance were observed and it is the
recommendation of this report that no further archaeological works are required with respect
to the development.
PROPOSED FUTURE WORK:  None
CAPTION(S) FOR ILLUSTRS: 
SPONSOR OR FUNDING BODY:  Emma Rennie
ADDRESS OF MAIN
CONTRIBUTOR: 
Davaar Cottage, Campbeltown, Argyll. PA28 6RE
EMAIL ADDRESS: ellisclare@argyll-archaeology.co.uk
ARCHIVE LOCATION
(intended/deposited)
NRHE 
Page 112

Page 113

Good Afternoon Fiona,  
Please see below comments from Roads in relation to this case:-  
• The matter has been considered via a report to the Senior Leadership Team (SLT) and
the agreed position is that Gigha does not meet the criteria for our Roads Development
Technical Guidance to be amended to allow it to be treated as a special case for
bituminous material. Although taking bituminous material to the island may present
some challenges and additional costs may be incurred, these are not deemed
prohibitive, in the way that 2 ferries to Jura could be. In light of this, the previous position
set out by Roads and Infrastructure Services (RIS) has not changed i.e. Roads
Development Technical Guidance should be followed and the junction/access should
be constructed in accordance with the planning conditions and drawings (Drg. No. DR-
A-0002 dated 23/01/23 by Colin Armstrong Architects detailing a “6-8m tarred access
road with service layby”.
• We note the report submitted by planning and their comments regarding removal of the
first 5m of concrete material and its replacement with a bituminous material. This is a
position that RIS find acceptable at this time, specific to this case.  
Regards  
Allan
27 May 2026
Page 113

Page 114

This page is intentionally left blank