DPC Landscape 2300391PP
Argyll and Bute Council · 19 October 2026
Back to Argyll and Bute Local Review Body — 19 October 2026 and its agenda
Text extracted from the council's PDF. Layout and reading order may differ from the original.
Page 1
8.6 m 8.8 m 9.0 m 8.2 m 8.2 m 8.4 m 8.4 m 8.4 m 8.6 m 8.6 m 8.6 m 8.8 m 8.8 m 9.0 m 9.0 m 9.0 m 9.2 m 9.2 m 9.2 m 9.4 m 8.8 m 0 20 40 60m Scale 1:1000 N SITE AREA: 6006sqm 1 0003 1 0003 Area of hardstanding to aid in the collection of waste and recycling Proposed House Proposed Tourist Let unit Site Area: 826sqm TARBERT Photovoltaic Panels Proposed treatment plant and soawkaway Surface water soakaway 6m -8m Tarred access road with service layby Airsource heat pump Airsource heat pump Rural access digram with service layby Natural land feature - Knoll Oil secondary heating source BIODIVERSITY STATEMENT: Proposed species rich long grass area to be sown with a grass / wildflower seed mix. Areas to be managed to promote the biodiversity of the areas with regular annual cutting of seeded areas and the control of invasive weed species. Scotia seeds ' Get Nectar- rich quick mix' sown @ 2g/m2. BOUNDARY TREATEMENT: to be post and wire fences throughout. HARD LANDSCAPING: Driveway surface treatement to be compacted hardcore with a whin/quarry dust finish. Planning condition 6: no development shall commence until a scheme of boundary treatment, surface treatment and landscaping has been submitted to and approved in writing by the Planning Authority. The scheme shall include details of: i) Location, design and materials of proposed walls, fences and gates; ii) Surface treatment of proposed means of access and hardstanding areas; iii) Any proposed re-contouring of the site by means of existing and proposed ground levels; iv) Proposed hard and soft landscape works; v) A biodiversity statement demonstrating how the proposal will contribute to conservation/restoration/enhancement of biodiversity, and how these benefits will be maintained for the lifetime of the development. The development shall not be occupied until such time as the boundary treatment, surface treatment and any re-contouring works have been completed in accordance with the duly approved scheme. All of the hard and soft landscaping works shall be carried out in accordance with the approved scheme during the first planting season following the commencement of the development, unless otherwise agreed in writing by the Planning Authority. The biodiversity statement should refer to Developing with Nature guidance | NatureScot as appropriate. Reason: To assist with the integration of the proposal with its surroundings in the interest of amenity, and to comply with the requirements of NPF4 Policy 3 RECONTOURING: Proposed contours shown, building pads avoid the small 'knoll' to the north of the site so minimal recontouring is required for this development. Figured dimensions only are to be taken from this drawing. All dimensions are to be checked on site before any work is put in hand. IF IN DOUBT ASK. CDM: Hazard Elimination & Risk Reduction has been undertaken and recorded where appropriate, in accordance with the requirements of "The Construction (Design and Management) Regulations 2015" and the associated "Industry Guidance for Designers" Printed on : From file : Project Client Lyle House, Fairways Business Park, Inverness IV2 6AA T : 01463 712 288 W : www.colinarmstrong.com DateDescriptionRev Project No. Revision Sheet @ A3 Drawn byDate Created Scale Status X:\Documents\2169 - Proposed Glamping Pod Big Knowe House\02. WORK IN PROGRESS\2.1 BIM Models\2169-CAA-ZZ-XX-M3-A-000001.rvt 31/10/2024 12:32:13 A 1 : 1000 and Tourist Let Proposed Dwelling House Don Dennis, Emma Rennie and Bryce Harvey DR- A- 0002 2169 Planning External Works Site Plan AL23.01.23 A Landscape planning condition wildflower area added 31.10.202 4