Adventure Lane Cic: Change of Use and Conversion of Existing Church and Detached Rear Hall to Form a Family Entertainment Activity Centre Including Erection of Single Storey Link Extension and Associated Works: Trinity Church, 26 Castle Street, Rothesay, Isle of Bute (25/01690/Pp)

Argyll and Bute Council · 19 August 2026
Back to Planning, Protective Services and Licensing Committee — 19 August 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Argyll and Bute Council
Development & Economic Growth   
Planning Application Report and Report of Handling as required by Schedule 2 of the
Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013 relative to applications for Planning Permission or Planning
Permission in Principle 
Reference No: 25/01690/PP
Planning Hierarchy: Local Application
Applicant: Adventure Lane CIC
Proposal: Change of Use and Conversion of Existing Church and
Detached Rear Hall to Form a Family Entertainment
Activity Centre Including Erection of Single Storey Link
Extension and Associated Works
Site Address:  Trinity Church, 26 Castle Street, Rothesay, Isle of Bute
PA20 9HA    
DECISION ROUTE 
☐Delegated - Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997 
Committee - Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission 
• Change of use and conversion of existing church and detached rear hall
to form a family entertainment activity centre
• Erection of single storey extension linking church and detached rear hall
• Formation of an outdoor play area on land to the rear of the hall
• Formation of a covered terrace on the south-facing elevation of the rear
hall
• Provision of secure bike storage behind front boundary walls 
(ii) Other specified operations 
• Internal alterations
• Connection to public water supply and public wastewater drainage
system 
(B) RECOMMENDATION: 
Having due regard to the Development Plan and all other material considerations, it
is recommended that Planning Permission be granted as a minor departure to
Local Development Plan 2 subject to the conditions, reasons and informative notes
set out below.

Page 2

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
(C) CONSULTATIONS: 
Scottish Water (letters dated 20th November 2025 and 30th July 2026) 
Scottish Water has no objections to the proposal. There is currently sufficient
capacity in the Dhu Loch Water Treatment Works and in the Rothesay Wastewater
Treatment Works for connection to service the development. However, it is noted
that further investigations may be required to be carried out once a formal application
has been submitted to them. 
West of Scotland Archaeology Service (e-mail dated 28th November 2025) 
Most of the ground disturbance associated with the proposal would take place
towards the rear of the church building – the creation of the link extension connecting
it to the former church hall and in the ground around the hall for the installation of
the various pieces of outdoor play equipment. 
The church hall occupies ground that was shown as being largely undeveloped on
the 1st edition Ordnance Survey map of 1869, and which is likely to be beyond the
gardens shown by Roy’s Military Survey of Scotland to the rear of the houses fronting
onto Castle Street and the eastern side of the High Street. 
Given that the amount of ground disturbance required for the installation of the play
equipment appears likely to be reasonably limited, it is accepted that, on balance,
the potential for the proposal to encounter and remove significant sub-surface
archaeological material is likely to be too low to warrant a programme of
archaeological work. 
Area Roads Engineer (reports received on 16th January and 25th June 2026) 
Recommendation of refusal on the following grounds: 
• The application does not meet the parking standards set out within Policy 40
of the Council’s Local Development Plan 2. The proposed development
requires at least 29 off-road parking bays to be provided and this has been
shown to be unachievable 
• It is considered that neither the nearest local public car parks nor the streets
surrounding the application property are able to accommodate the increase
in demand for parking that would result from the proposed development.  On
this basis, concern is expressed that the impact arising from the lack of
parking provision would adversely impact road safety, traffic management
and parking within Rothesay 
Environmental Health Service (memo dated 11th June 2026) 
No objections subject to conditions and informative notes regarding food and health
legislation; construction and operational noise; lighting; cooking odour; waste
storage; site drainage; building design and gulls; and asbestos. 
Bute Community Council (comments received on 13th July 2026) 
The Convenor of Bute Community Council, Jean Moffat, has provided the following
statement:

Page 3

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
“At the Bute Community Council meeting of the 24/06/26, a packed house voted
unanimously but for one objector, in favour of the Adventure Lane conversion of
Trinity Church. Whilst the community councillors were not in unanimous agreement,
this, as Convenor of the council, I find irrelevant. Our sole remit is to support the
wishes of the community and as these wishes were so forcibly stated, I am, without
hesitation in full support of our community.” 
(D) HISTORY:   
Listed Building Consent (ref: 01/00190/LIB) was granted on 23rd March 2001 for
internal alterations to the church to provide a W.C. compartment and to increase the
kitchen facilities. 
Listed Building Consent (ref: 03/00509/LIB) and Planning Permission (ref:
03/00512/DET) were granted on 18th June and 2nd June 2003 respectively for
alterations to the pews and choir floor area within the church and the formation of an
emergency exit ramp at the side door on the east-facing elevation. 
No objections were raised on 30th December 2010 to a request (ref: 10/01838/TPO)
for the pollarding of one elm tree in the rear curtilage of the church. 
Advertisement Consent (ref: 11/01450/ADV) was granted on 17th October 2011 for
the erection of a freestanding illuminated notice board in the front curtilage of the
church. 
An application for Listed Building Consent (ref: 25/01691/LIB) is currently under
consideration for the external and internal works at the property. 
(E) PUBLICITY:   
Subject of Neighbour Notification (closing date 26th December 2025) and advertised
as development in a Conservation Area (closing date: 19th December 2025). 
(F) REPRESENTATIONS:   
Objection 
Objections have been received from the following three sources: 
Mrs Kate Howes, Flat 2/2, 36 Castle Street, Rothesay, Isle of Bute (19.12.2025)
Alison Clark, Mount Pleasant Road, Rothesay, Isle of Bute (22.12.2025)
Georgina Holt, 30 Castle Street, Rothesay, Isle of Bute (23.12.2025) 
The points raised can be summarised as follows: 
i. Concern is expressed that the initial ‘Parking Statement & Report’ dated
September 2025 is somewhat disingenuous in representing the number of
available spaces. It is contended that the numbers of available parking
spaces on any of the roads are over inflated as they do not take into
account current traffic restrictions e.g. Castle Street (Zone 18) only has 19
available spaces rather than 32.

Page 4

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
There is no sensible available parking in Zone 2 and Zones 4-8 identified
in the ‘Parking Statement & Report’ as the streets are either single
lane/one way. Additionally, parking would deny access to a number of
businesses including the post office mail and parcel sorting facility. 
Zone 19 is Serpentine Road and it is not physically possible to park on this
road. 
Comment: This issue is addressed in the assessment contained in
Appendix A later in this report. 
ii. It is contended that, when the church was used for worship on Sundays, it
was always utter chaos with double and illegal parking to let passengers
alight. 
Comment: This issue is addressed in the assessment contained in
Appendix A later in this report. 
iii. Concern is expressed that the premises is on a dangerous blind corner
with speeding traffic and low visibility. It is pointed out that, particularly
considering the aim of attracting families with children, traffic management
measures will be essential. 
Comment: This issue is addressed in the assessment contained in
Appendix A later in this report. 
iv. Castle Street and Bishop Street are the key roads that provide access for
heavy goods vehicles and emergency services. Current parking on these
two streets makes road usage challenging for drivers of these types of
vehicle, with Bishop Street operating an informal priority to oncoming uphill
traffic. 
Comment: This issue is addressed in the assessment contained in
Appendix A later in this report. 
v. It is pointed out that there is no bus stop on Castle Street. 
Comment: This issue is addressed in the assessment contained in
Appendix A later in this report. 
vi. It is queried how many event spaces and coffee shops a population of
6037 can support. 
Comment: The activities to be provided within the proposed centre are
considered to be complementary to other facilities in Rothesay. 
vii. It is queried whether the scheme fits with the published overarching
Council economic development and improvement plans. 
Comment: The Argyll and Bute Economic Strategy (2024-2034) has four
key strategic pillars: ‘People’, ‘Place’, ‘Planet’ and ‘Prosperity’. The current
proposal fits with many of the objectives within these four pillars: improving
workforce skills; supporting job opportunities in emerging and new
industries; investing in our towns, rural and remote rural communities,
including our islands and peninsulas, to attract new people and

Page 5

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
businesses; investing in critical economic infrastructure such as the re-use
of land and buildings for community benefit; and revitalising the tourism
sector. 
viii. It is pointed out that young parents leave the island for better jobs, housing
and education choices for their children with the only growth group on Bute
being the over 50s. 
Comment: Two of the objectives of the proposal are to provide
employment and to create a facility for a wide range of ages, both of which
would hopefully contribute to keeping young people and people with young
families on the island. 
ix. Tourists will visit the island but, in 2026/2027, the ferries are operating a
reduced timetable to accommodate a maintenance program. 
Comment: This issue does not have a material bearing upon the Planning
aspects of the case. 
x. It is contended that hymns and organ music were always clearly heard
emanating from the church. There is already noise pollution created by
Bute Yard and the proposal would exacerbate this issue such that one of
the objectors won’t be able to open their windows at all. 
Comment: This issue is addressed in the assessment contained in
Appendix A later in this report. 
xi. Reservations are expressed that the proposal would result in another
licensed premises in this part of Rothesay, which already includes Bute
Yard, the Galatea Bar, the Golfers Bar, the Taverna and Mac's Bar. 
Comment: The issue of a lack of need for a particular type of development
does not have a material bearing upon the Planning aspects of the case. 
xii. Concern is expressed that, as the premises would have an alcohol licence
and would open until 1 p.m. three nights of the week, the proposal would
result in excessive noise and drunken behaviour in a residential area. 
Comment: This issue is addressed in the assessment contained in
Appendix A later in this report. 
xiii. Concern is expressed that the stated aim of providing family and child
activities may be dependent on revenue from food and drink. 
Comment: This issue does not have a material bearing upon the Planning
aspects of the case. 
Support 
Expressions of support have been received from the following nine sources: 
Miss Joanne Cowie, 135J High Street, Rothesay, Isle of Bute (02.12.2025)
Mrs Charlene Kane, 31 Wyndham Road, Rothesay, Isle of Bute (03.12.2025)
Mrs Linda Baird, 2 Abbotsford, Gowanfield Terrace, Rothesay, Isle of Bute
(09.12.2025)

Page 6

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Jon Usher, 10 Bishop Terrace, Rothesay, Isle of Bute (24.01.2026)
Helen Barr – no address provided (12.06.2026)
Alison Fraser – no address provided (15.06.2026)
Mrs Allison Harley, Flat 2, Montford Apartments, 35A Craigmore Road, Rothesay,
Isle of Bute (20.06.2026)
Steven Douglas, President and Chief Operating Officer, Saputo Dairy UK, 5 The
Heights, Brooklands, Weybridge (13.07.2026) 
The points raised can be summarised as follows: 
a. The proposed conversion of Trinity Church would ensure that the building
would not become rundown and, therefore, would avoid the loss of another
attractive and significant property on Bute. It would also keep the history
of a church that has meant so much to the people of the island. 
Comment: This issue is addressed in the assessment contained in
Appendix A later in this report. 
b. The church building in its former use had space for a congregation of 600,
all of whom were accommodated without any additional car parking
spaces. It is contended that the change of use of the building should not
materially impact the parking available in Rothesay as there are plenty of
unrestricted parking spaces available on adjacent streets as well as car
parks within walking distance of the venue. 
Comment: This issue is addressed in the assessment contained in
Appendix A later in this report. 
c. The capacity of the venue would be well below that of Bute Yard, which is
close by and which has minimal parking available. It is put forward that
parking challenges do not arise when well-attended events in Bute Yard
are taking place e.g. the monthly markets. 
Comment: This point is noted. 
d. The building is in a location that is highly accessible both on foot and by
public transport. 
Comment: This issue is addressed in the assessment contained in
Appendix A later in this report. 
e. An indoor resource offering varied activities for children and families (both
residents and tourists) does not currently exist on Bute (beyond the SULA
Collective, which is craft based). The proposal would offer a much-needed,
year-round indoor facility that would be available during inclement
weather. 
Comment: This issue is addressed in the assessment contained in
Appendix A later in this report. 
f. Children living on the island currently need to go to the mainland for days
out and parties that involve soft play facilities, bowling, etc, thus putting
extra financial burden onto families (ferry cost). The proposed introduction
of Adventure Lane would reduce the need to travel to the mainland for
these types of activities.

Page 7

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Comment: This issue is addressed in the assessment contained in
Appendix A later in this report. 
g. According to the Scottish Index of Multiple Deprivation, Rothesay falls into
the category of an area of deprivation. The use of the building to allow
parents and carers, regardless of income, to participate in activities that
were only available by travelling to the mainland is surely a good thing. 
Comment: This point is noted. 
h. The proposal would create jobs for local people and would also boost local
income for other local businesses as it would draw more visitors to the
island. 
Comment: This issue is addressed in the assessment contained in
Appendix A later in this report. 
i. The proposal would be a viable local option for end-of-term school trips
and for use by scouts, boys brigade, etc. 
Comment: This point is noted. 
j. There are currently no social spaces for teenagers and the proposal would
provide one. 
Comment: This issue is addressed in the assessment contained in
Appendix A later in this report. 
k. Spaces such as those proposed in Adventure Lane support positive
physical, mental and social wellbeing in young people. 
Comment: This issue is addressed in the assessment contained in
Appendix A later in this report. 
l. It is contended that the proposal would not be detrimental to other projects
on the island and it would enhance the investment that Argyll and Bute
Council have made in the Pavilion by allowing greater choice and a diverse
range of facilities. 
Comment: This point is noted. 
m. Concern is expressed that Bute Community Council has recently began to
push a narrative that is not reflective of the community opinion, which is
evident from the significant number of comments on social media. 
Comment: This point is noted. 
n. As one of Bute’s largest employers, Saputo Dairy UK recognises the
importance of initiatives that strengthen communities, improve quality of
life and create opportunities for future generations. The company has
supported the development of the Adventure Lane project through the
Saputo Legacy Fund. The investment followed a thorough assessment
process, during which the proposal demonstrated a strong alignment with

Page 8

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
the objectives of the Fund and its commitment to delivering long-term
benefits to the local community. 
Comment: This point is noted. 
Representation 
A representation neither in support nor opposition to the proposal has been
received from: 
Ms Rose-Marie Barbeau 35 Bishop Street, Rothesay, Isle of Bute (19th December
2025) 
The points raised can be summarised as follows: 
(i) There is support for ensuring that the property does not fall into disrepair
but it is considered that there is not enough experience involved to run a
large hospitality venue and the upkeep of a very challenging building. 
Comment: This point is noted. 
(ii) The proposal has been presented as a family centre with activities for
children but it would appear to be essentially a licensed premises with very
little for those under the age of 8-10. 
Comment: The proposal identifies the provision of indoor and outdoor
play areas that would be suitable for children under the age of 8. 
(iii) On the grounds of noise both inside and outside the premises, it is put
forward that it should close at 10 p.m. in line with Bute Yard. 
Comment: This issue is addressed in the assessment contained in
Appendix A later in this report. 
(iv) The addition of 3 disabled parking bays in a neighbourhood of multiple unit
residences would take away from the seven unrestricted parking spaces
available to residents on Castle Street, upper Bishop Street and lower
Serpentine Road and it's not clear what calculation this provision is based
on. 
Comment: This issue is addressed in the assessment contained in
Appendix A later in this report. 
(v) The Council will need to recognise that traffic-slowing measures will have
to be implemented as it is only because the activities associated with the
previous use of the building as a church were relatively infrequent that a
serious accident did not happen. 
Comment: This issue is addressed in the assessment contained in
Appendix A later in this report. 
Petition 
A petition of support containing 207 signatories was received on 8th July 2026. A
summary of the wording contained in the petition is as follows:

Page 9

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
• The proposal is an exciting opportunity to restore an important historic
building that is currently underused into a modern entertainment activity
centre that would cater for all ages 
• The premises would provide a high-quality leisure destination featuring
family entertainment activities, social spaces, food and drink facilities
together with attractions to increase tourism, support businesses and
encourage year-round economic activity on the Isle of Bute 
Comment: These issues are addressed in the assessment contained in     
Appendix A later in this report. 
Letters of Support for the Adventure Lane project from 2024 
The agent has forwarded individual letters of support for Adventure Lane from a
number of sources. As these letters were written in March and August 2024, they
pre-date the submission of the current Planning and Listed Building applications
and they are understood to have been in association with another stage in the
overall Adventure Lane process.  
The letters are from the following: 
• Brendan O’Hara MP 
• Jenni Minto MSP 
• Session Clerk of Isle of Bute Parish Church 
• CEO of Scotland’s Town Partnerships 
• Apple Tree Nursery in Rothesay 
• Deputy Lieutenant for the Isle of Bute 
• Fyne Futures Ltd in Rothesay 
The representations and documentation referred to in this section are published in
full on the planning application file and are available to view via the Public Access
section of the Council’s website.   
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Impact Assessment Report: ☐Yes No 
(ii) An Appropriate Assessment under the
Conservation (Natural Habitats) Regulations
1994:   
☐Yes No 
(iii) A Design or Design/Access statement:  Yes ☐No

Page 10

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
The application was accompanied by an extensive
‘Design and Access Statement’ prepared by the
agent, JSS Architects. The key points can be
summarised as follows: 
• Throughout the initial concept design
process, significant consideration was given
to the policies within the Argyll and Bute
Local Development Plan 2 and the National
Planning Framework 4 
• The proposed family entertainment activity
centre will provide a new and exciting facility
for the area, offering various activities and
experiences for both locals and tourists.
There is a high demand for this type of
facility in the area 
• The development will increase the footfall
for local businesses and should increase the
length of time that tourists remain in the
local area as it will provide more things to do
and see. This will also benefit other local
businesses as well as the public transport
facilities 
• The Isle of Bute needs to retain and
increase its working age population if its
economy is to thrive in the future. Any
increase in visitors to the island and any
facility which contributes to the retention of
young families on the island will
complement the newly restored Rothesay
Pavilion once it reopens 
• It is acknowledged that the lack of onsite
parking might be considered to be an initial
restriction; however, NPF4 advises that
development proposals which are ambitious
in terms of low/no parking will be supported,
particularly in urban areas that are well
served by sustainable transport modes. 
• The site is well located to provide
sustainable travel options for guests and
locals visiting the Activity Centre with little to
no need for the use of cars. The
accompanying active travel plan highlights
how accessible the venue is by
foot/cycle/public transport. Incentives will be
offered to promote active travel for both staff
and visitors.

Page 11

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
(iv) A Sustainability Checklist (with reference to the
requirements of LDP2 Policy 04): 
No specific ‘Sustainability’ or ‘Sustainable Building’
checklists were submitted with the application.
Notwithstanding this, it is considered that the
information contained in the submitted plans and
the contents of the ‘Design and Access Statement’
referred to in Section (iii) above and the reports
mentioned in Section (v) below provide a sufficient
level of detail to allow a proper assessment to be
carried out.   
☐Yes No  
(v) Reports on the impact of the proposed
development e.g. retail impact, transport impact,
noise impact, flood risk, drainage impact, etc: 
‘Parking Statement & Report’ prepared by SW
Consultancy (N.I.) Ltd (September 2025) 
‘Parking & Transport Report Addendum’ prepared by
Thrive Community Consultants (April 2026) 
‘Roads Objection Response’ prepared by Thrive
Community Consultants (April 2026) 
‘Active Travel Plan’ prepared by Thrive Community
Consultants (April 2026)    
Note: The above reports are summarised in the
assessment section – Section 7 within the Appendix 
Yes ☐No 
The reports and documentation referred to above are published in full on the planning
application file and are available to view via the Public Access section of the Council’s
website.   
(H) PLANNING OBLIGATIONS 
Is a Section 75 obligation required:   ☐Yes No 
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:☐Yes No 
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account
in assessment of the application.

Page 12

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy 
Sustainable Places 
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
NPF4 Policy 7 – Historic Assets and Places 
NPF4 Policy 9 – Brownfield, Vacant and Derelict Land and Empty Buildings
NPF4 Policy 12 – Zero Waste 
NPF4 Policy 13 – Sustainable Transport 
Liveable Places 
NPF4 Policy 14 – Design, Quality and Place
NPF4 Policy 15 – Local Living and 20 Minute Neighbourhoods
NPF4 Policy 21 – Play, Recreation and Sport
NPF4 Policy 22 – Flood Risk and Water Management
NPF4 Policy 23 – Health and Safety 
Productive Places 
NPF4 Policy 25 – Community Wealth Building
NPF4 Policy 27 – City, Town, Local and Commercial Centres 
NPF4 Policy 29 – Rural Development
NPF4 Policy 30 - Tourism 
Argyll and Bute Local Development Plan 2 (Adopted 2024) 
Spatial and Settlement Strategy 
Policy 01 – Settlement Areas
Policy 04 – Sustainable Development 
High Quality Places 
Policy 05 – Design and Placemaking
Policy 08 – Sustainable Siting 
Policy 09 – Sustainable Design
Policy 10 – Design – All Development
Policy 11 – Design – Conversions and Change of Use
Policy 15 – Supporting the Protection, Conservation and Enhancement of our
Historic Built Environment
Policy 17 – Conservation Areas
Policy 21 – Sites of Archaeological Importance

Page 13

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Diverse and Sustainable Economy 
Policy 23 – Tourist Development, Accommodation, Infrastructure and Facilities
Policy 25 – Tourism Development Opportunities  
Connected Places 
Policy 33 – Public Transport Infrastructure
Policy 40 – Vehicle Parking Provision 
Sustainable Communities 
Policy 49 – Sport, Recreation and Community Facilities
Policy 55 – Flooding
Policy 60 – Private Sewage Treatment Plants and Wastewater Drainage Systems
Policy 63 – Waste Related Development and Waste Management 
High Quality Environment 
Policy 71 – Development Impact on Local Landscape Area (LLA)
Policy 73 – Development Impact on Habitats, Species and Biodiversity 
(ii)  List of all other material planning considerations taken into account in
the assessment of the application, having due regard to Annex A of
Circular 3/2013. 
Consultation Responses
Third Party Comments
Planning History
LDP2 Technical Notes 
Argyll and Bute Sustainable Design Guidance 2006
Roads Development Technical Guidance 2024
Historic Environment Policy Statement 2019
Historic Environment Scotland – ‘Managing Change in the Historic Environment’
Publications 
(K) Is the development a Schedule 2 Development not requiring an Environmental
Impact Assessment:  ☐Yes No 
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  ☐Yes No 
(M) Does the Council have an interest in the site: ☐Yes No 
(N) Requirement for a pre-determination hearing: ☐Yes No 
Objections to the application have been received from a total of three sources and,
in terms of the ‘Scheme of Administration and Delegations’ contained in the Council’s
Constitution (2025), this number is less than the eleven that is required in order for
the PPSL Committee to consider a proposal.

Page 14

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
The reason that this particular application is before Members results from the
recommendation of the Roads Department that Planning Permission be refused on
the grounds of a lack of parking spaces and the resultant impact of this on road
safety, traffic management and parking within Rothesay and the Planning
Department’s opinion that there are mitigating circumstances such that an approval
can be justified as a minor departure to Development Plan policy. 
In considering the benefits of holding a pre-determination hearing in this particular
case, it is the opinion of the Department that the representations that have been
received, the views that have been expressed by consultees, the supporting
documentation that has been submitted and the Officer assessment of the relevant
planning issues contained within this report provide a sufficient level of information
to enable Members to make an informed decision based on all of the material
planning considerations pertaining to the development. 
It is, therefore, considered that the proposal does not raises any complex or technical
issues that have not been addressed in the Report of Handling and, therefore, it is
the Department’s position that a discretionary local hearing would not add value to
the planning process.    
(O) (i) Key Constraints/Designations Affected by the Development: 
Local Landscape Area
Conservation Area
Category B Listed Building 
(ii) Soils 
Agricultural Land Classification:  Built-up Area/Unclassified Land          
Peatland/Carbon Rich Soils
Classification:
☐Class 1
☐Class 2
☐Class 3 
 N/A 
Peat Depth Classification: N/A  
Does the development relate to croft
land? 
☐Yes ☒No 
Would the development restrict
access to croft or better quality
agricultural land? 
☐Yes ☒No 
Would the development result in
fragmentation of croft / better quality
agricultural land?
☐Yes ☒No 
(iii) Woodland  
Will the proposal result in loss of
trees/woodland?
☐Yes
☒No

Page 15

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Does the proposal include any
replacement or compensatory
planting? 
☐Yes
☐No – details to be secured by condition
☒Not applicable
(iv)Land Status / LDP Settlement Strategy  
Status of Land within the Application  ☒Brownfield
☐Brownfield Reclaimed by Nature
☐Greenfield    
ABC LDP2 Settlement Strategy 
☒Settlement Area
☐Countryside Area
☐Remote Countryside Area
☐Helensburgh & Lomond Greenbelt
ABC LDP2 Allocations/PDAs/AFAs, etc: 
Edge of Town Centre   
(P)(v) Summary assessment and summary of determining issues and material
considerations 
Planning Permission is sought for the change of use of the vacant Trinity Church site
in Castle Street, Rothesay to a family entertainment activity centre. This will involve
the provision of a range of play experiences in the main church building to the front
(including a modular golf course, bowling lanes, interactive darts, virtual reality
experiences, etc. with a bar/restaurant) and a physical link is to be created to the hall
to the rear, which is planned to accommodate an indoor adventure playground and
party room. On the land to the rear of the hall, four pieces of outdoor play equipment
are to be installed. 
The key issues are the principle of development, the impact on the built environment,
the community, economic and tourism benefits, the impact on residential amenity
and the impact on parking and the local road network. 
These key issues are summarised below whilst all other minor issues are considered
in the detailed assessment within the Appendix.  
Principle of Development 
The application relates to the change of use of a currently vacant church and rear
hall (a brownfield site) that is within Rothesay, which is the main settlement on the
Isle of Bute. The proposal is considered to provide a sustainable new use for the site
that would secure its long-term future through the retention, reuse, recording and
sensitive adaptation of the principal building. It will incorporate both indoor and
outdoor high-quality recreation and leisure facilities that will provide a positive
contribution to the community and tourist network as it will enhance the experience
of both residents and visitors to the island. 
The proposed alterations and extension of the building would be appropriate in terms
of their effect on the character of the Rothesay Conservation Area and the
Department is of the opinion that the intended use would have no materially
detrimental impact on parking and the local road network in this part of Rothesay.

Page 16

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Overall, the principle of the proposed development is considered to accord with the
relevant NPF4 policies relative to the reuse of brownfield, vacant and derelict land
and empty buildings and to the LDP2 Settlement Strategy.   
Impact on the Built Environment 
The subject property, which dates from the mid-19th century, is a Category B Listed
Building that occupies a prominent position in the Rothesay Conservation Area close
to the point where Castle Street and Bishop Street join. 
Due to the amalgamation of congregations as a result of a decline in worshippers,
the building has been vacant for a couple of years. The proposal represents an
opportunity to bring the building back into active use and this is recognised as a key
component in ensuring that it does not fall into disrepair and become a derelict
structure. 
As such, the current proposal is to be welcomed and it is also clear that it has been
developed with respect and careful consideration of the existing property and its
significant internal features. The alterations that are identified have been formulated
with the intention of increasing the usability of the church building to cater for multiple
activities whilst retaining its historical character. 
The scheme introduces accessible entry points and a platform lift to ensure inclusive
access throughout, while safeguarding historic fabric. Interventions have been
carefully located to avoid adverse impact on key fixtures and finishes, in line with
HES’s Managing Change: Accessibility guidance. The existing street access,
boundary wall, and railings are retained, preserving the established historic setting. 
Prior to any alteration works taking place, a photographic and drawn recording
exercise will be undertaken to capture the current layout, fixtures, and condition of
the church. 
Having regard to all of the above, the proposal is considered to be acceptable and
to preserve the character and appearance of the site in question and this part of the
Rothesay Conservation Area. 
Community, Economic and Tourism Benefits 
Development Plan Policies support proposals that provide significant community,
economic and tourism benefits. In the case of the current application, an international
corporate donor, Saputo Dairy UK, set up a Legacy Fund in 2021 to support projects
for the benefit of the community on the Isle of Bute. After extensive research, two
projects were identified which met the needs of the island community and one of
these projects is the subject of this application. 
The information that accompanies this application explains that engagement took
place with the community to identify the type of facilities that are needed. This led to
the formulation of the family entertainment activity centre, which will meet a number
of objectives, including: the provision of assorted opportunities for exercise for all
ages, thus having a positive effect on public health and wellbeing; the offering of
training opportunities for young people as well as local employment; the use of local
contractors, suppliers, and businesses where possible; the creation of increased
spending within the community by both locals and tourists; and a complementary but

Page 17

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
different experience in comparison with other facilities on Bute that will help attract
visitors to the island for longer stays. 
Having regard to all of the above, the proposal is considered to be a project that will
have an extremely positive effect on the local community and will boost the island’s
economy and the visitor experience. 
Impact on Residential Amenity 
LDP2 Policy 14 seeks to resist any proposal that would have an unacceptable
adverse impact upon the amenity of neighbouring land uses, including as a result of
noise, odour, light pollution, etc.   
In the case of the current application, there are residential properties adjoining the
site on the same side of Castle Street and there are also dwellings on the opposite
side of the road. The Environmental Health Service has been consulted and has
recommended conditions and informative notes in respect of a number of matters,
including external lighting, noise management, the collection, treatment and disposal
of cooking odours, etc. 
It is considered that the use of appropriately worded conditions and informative notes
would successfully mitigate any potential adverse impact upon neighbouring amenity
arising from the proposed development in accordance with the above-mentioned
LDP2 policy. 
Impact on Parking and the Local Road Network 
Policy 40 of LDP2 states that off-street car and vehicle parking shall be provided for
development in accordance with prescribed car parking standards. The policy also
refers to those circumstances where a zero parking exemption can be applied. 
There have never been off-street, dedicated parking spaces associated with Trinity
Church over its 180-year use as a place of worship and no spaces are identified as
part of the current application. In this case, the type of proposed use is not one of
the exempt categories of development and, although it is considered edge of town
centre, the site is just outwith the identified town centre. In these circumstances, the
zero parking exemption cannot be applied. 
The applicant and agent have acknowledged that parking is a significant issue and,
for this reason, they employed a consultant to carry out an initial car parking study
(‘Parking Statement & Report’ prepared by SW Consultancy (N.I.) Ltd in September
2025) and a different consultant (Thrive Community Consultants) was engaged to
submit a ‘Parking & Transport Report Addendum’, a ‘Roads Objection Response’
and an ‘Active Travel Plan’ in April 2026. 
Having considered the supporting documentation that has been provided by the
applicant and agent, the Roads Department have recommended refusal on the
following grounds: 
• The application does not meet the parking standards set out within Policy 40
of the Council’s Local Development Plan 2. The proposed development
requires at least 29 off-road parking bays to be provided and this has been
shown to be unachievable

Page 18

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
• It is considered that neither the nearest local public car parks nor the streets
surrounding the application property are able to accommodate the increase
in demand for parking that would result from the proposed development.  On
this basis, concern is expressed that the impact arising from the lack of
parking provision would adversely impact road safety, traffic management
and parking within Rothesay 
The proposal departs from parking standards due to the absence of on-site parking.
However, this is justified as the provision of parking would require the loss of the
historic frontage and boundary features of the Category B Listed Building, causing
harm to the character of the listed building and Rothesay Conservation Area. There
is also no land within the applicant's control on which parking could be provided. 
Parking surveys have identified that there is on-street parking capacity relatively
close to the facility. The proposed use has a maximum capacity of 200 persons,
substantially lower than the church's historic capacity of around 600 persons, and
therefore is not expected to generate greater parking demand than the existing lawful
use. 
The site occupies a highly accessible town-centre location, served by bus services,
ferry connections, taxi facilities and convenient pedestrian links. In addition, an Active
Travel Plan can be secured by condition to encourage sustainable travel and
manage visitor arrivals and departures. 
Furthermore, National Planning Framework 4 supports low or no parking
developments in accessible urban locations well served by sustainable transport.
Taking account of the heritage benefits of securing a viable long-term use for the
listed building, the site's accessibility and the active travel measures proposed, the
departure from parking standards is considered justified in this instance. 
Whilst it is recognised that the proposal does not meet the provisions of Policy 40 of
LDP2 in terms of off-street parking, the mitigating factors detailed above are of
sufficient materiality for the application to be approved as a minor departure to the
Development Plan, which is set out in detail below. 
Conclusion 
The proposal has been considered against all of the relevant policies and it is
considered that significant material weight should be afforded to sensitively bringing
this important Listed Building back into active use to benefit Rothesay town centre
and the wider Isle of Bute. The family entertainment activity centre will have
considerable community, economic and tourism benefits. It is preferable to have off-
street parking but, given a variety of factors including the relative capacities of the
lawful and proposed uses, the provision of an Active Travel Plan, and the proximity
to public transport links, it is not considered that the absence of off-street parking is
a reason for refusal. In conclusion, the proposal, if approved, will successfully
contribute to the sense of place and vitality of the Town Centre. 
(Q) Is the application consistent with the Development Plan: ☐Yes No 
(R) 
Reasons why Planning Permission should be granted 
See Section (S) below.

Page 19

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
(S) Reasoned justification for a departure to the provisions of the Development
Plan 
Policy 40 of LDP2 states that off-street car and vehicle parking shall be provided for
development in accordance with prescribed car parking standards. The policy also
refers to those circumstances where a zero parking exemption can be applied. 
There have never been off-street, dedicated parking spaces associated with Trinity
Church over its 180-year use as a place of worship and no spaces are identified as
part of the current application. In this case, the type of proposed use is not one of
the exempt categories of development and, although it is considered edge of town
centre, the site is just outwith the identified town centre. In these circumstances, the
zero parking exemption cannot be applied. 
The applicant and agent have acknowledged that parking is a significant issue and,
for this reason, they employed a consultant to carry out an initial car parking study
(‘Parking Statement & Report’ prepared by SW Consultancy (N.I.) Ltd in September
2025) and a different consultant (Thrive Community Consultants) was engaged to
submit a ‘Parking & Transport Report Addendum’, a ‘Roads Objection Response’
and an ‘Active Travel Plan’ in April 2026. 
Having considered the supporting documentation that has been provided by the
applicant and agent, the Roads Department have recommended refusal on the
following grounds: 
• The application does not meet the parking standards set out within Policy 40
of the Council’s Local Development Plan 2. The proposed development
requires at least 29 off-road parking bays to be provided and this has been
shown to be unachievable 
• It is considered that neither the nearest local public car parks nor the streets
surrounding the application property are able to accommodate the increase
in demand for parking that would result from the proposed development.  On
this basis, concern is expressed that the impact arising from the lack of
parking provision would adversely impact road safety, traffic management
and parking within Rothesay 
There are a number of factors to consider in this part of the assessment: 
• Trinity Church is a Category B Listed Building and one of its key features is
the quality of the boundary treatment of the frontage onto Castle Street,
comprising the low-coped stone wall; the panelled gate piers flanking the
central entry; and the pyramidal caps surmounted by decorative cast-iron
lamp standards. The provision of off-street parking would result in the loss of
this feature to the detriment of the townscape of this part of the Rothesay
Conservation Area 
• It is understood that, due to there being no areas of vacant land in the
applicant’s ownership, there are no options for providing off-street parking in
relation to the proposed development 
• The parking surveys submitted as part of the application identify that there is
on-street parking capacity exceeding the notional demand of 29 spaces

Page 20

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
close to the facility, in particular High Street (Zone 11) has capacity for 63
cars and there are always spaces on both weekdays and weekends for
around 15 to 20 cars on average. King Street (Zone 15) is also highlighted
as having capacity of around 10 spaces on average 
• The capacity of the proposed use is 200 people, which is significantly less
than the existing use as a church which is 600 people 
• The lawful use of the site is as a Class 10 Non-Residential Institution and the
other uses that could be introduced under this classification without the need
for Planning Permission have the potential to generate relatively large
numbers of movements. In the absence of permission being required, the
Planning Authority would have no mechanisms by which to mitigate the
impact of these uses 
• The Active Travel Plan has a number of measures to control the arrivals and
departures and overall capacity at any one time and this Travel Plan can be
secured by condition thereby providing a degree of influence on travel
methods and limitation on car usage 
• The site is also well served by sustainable transport options, including
adjacent bus stops and the main bus terminal at Guildford Square where
most residents will arrive and depart at Rothesay, a nearby taxi rank, the
ferry terminal (the source of one of the key target market), and safe
pedestrian routes with dedicated crossing points 
• The aspirations inherent in National Planning Framework 4 where
development proposals which are ambitious in terms of low/no parking will
be supported, particularly in urban areas that are well served by sustainable
transport modes 
Whilst it is recognised that the proposal does not meet the provisions of Policy 40 of
LDP2 in terms of off-street parking, the mitigating factors detailed above are of
sufficient materiality for the application to be approved as a minor departure to the
Development Plan. 
(T) Need for notification to Scottish Ministers or Historic Environment Scotland:
☐Yes No   
Author of Report: Steven Gove    Date: 3rd August 2026 
Reviewing Officer:  Kirsty Sweeney    Date: 4th August 2026 
Fergus Murray
Head of Development and Economic Growth

Page 21

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 25/01690/PP 
Standard Time Limit Condition for Planning Permission (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. Approved Details 
Unless otherwise directed by any of the conditions below, the development shall be
implemented in accordance with the details specified on the application form dated
9th October 2025; supporting information; and the approved drawings listed in the
table below unless the prior written approval of the Planning Authority is obtained for
an amendment to the approved details under Section 64 of the Town and Country
Planning (Scotland) Act 1997. 
Plan Title.  Plan Ref. No. Version Date
Received 
Location Plan  Drawing No. 1473_001  B 10.10.2025
Existing Block Plan Drawing No. 1473_002  C  17.11.2025
Existing Ground &
Intermediate Floor
Plans 
Drawing No. 1473_003  A 10.10.2025
Existing Upper &
Bell Tower Floor
Plans  
Drawing No. 1473_004  A 10.10.2025
Existing Sections  Drawing No. 1473_005  A 10.10.2025
Existing Church
Elevations  
Drawing No. 1473_006  A 10.10.2025
Existing Church
Elevations 
Drawing No. 1473_007  A 10.10.2025
Existing Church Hall
Elevations 
Drawing No. 1473_008  B 17.11.2025
Existing Elevations  Drawing No. 1473_009  - 10.10.2025
Proposed Block Plan  Drawing No. 1473_102  C 17.11.2025
Proposed Ground &
Intermediate Floor
Plans 
Drawing No. 1473_103  - 10.10.2025
Proposed Upper &
Bell Tower Floor
Plans
Drawing No. 1473_104 - 10.10.2025

Page 22

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Proposed Sections  Drawing No. 1473_105  A 10.10.2025
Proposed Elevations  Drawing No. 1473_106  B 17.11.2025
Proposed Elevations  Drawing No. 1473_107  A 10.10.2025
Proposed Elevations  Drawing No. 1473_108  B 17.11.2025
Proposed Elevations  Drawing No. 1473_109  A 
Door, Window &
Louvre Schedule 
Drawing No. 1473_200   17.11.2025
Detail No.1 of
Outdoor Large Play
Tower 
Plan 1 of 6  17.11.2025
Detail No.2 of
Outdoor Large Play
Tower 
Plan 2 of 6  17.11.2025
Detail No.1 of
Outdoor Toddler
Play Tower 
Plan 3 of 6  17.11.2025
Detail No.2 of
Outdoor Toddler
Play Tower  
Plan 4 of 6  17.11.2025
Details of Outdoor
Nest Swing 
Plan 5 of 6  17.11.2025
Details of Outdoor
Seesaw 
Plan 6 of 6  17.11.2025 
Reason: For the purpose of clarity, to ensure that the development is implemented
in accordance with the approved details. 
2. Active Travel Plan 
Prior to the coming into use of any part of the development hereby approved, an
Active Travel Plan (ATP) shall be submitted to and approved in writing by the
Planning Authority. 
Unless otherwise agreed with the Planning Authority, the ATP shall incorporate at a
minimum the following: 
i. An introduction with context and development details 
ii. A Policy Statement, including any relevant site-specific policies 
iii. A site audit and accessibility review

Page 23

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
iv. A statement on the intended outcomes, including an identification of the
daily capacity of the premises (i.e. maximum number of users)   
v. A clear management and delivery structure, including the identification of
the Travel Plan Co-ordinator 
vi. Details of the measures that will be implemented to ensure that the agreed
number of daily maximum users will not be exceeded (e.g. the operation
of a managed, booking-based system) 
vii. Details of the initiatives to be used in encouraging more sustainable travel
behaviour, including marketing and promotion 
viii. An Action Plan with implementation timescales and budget 
ix. SMART (Specific, Measurable, Achievable, Realistic, Timebound) targets
with baseline data, a monitoring and review process and related
timescales 
Unless otherwise agreed in writing with the Planning Authority, the Active Travel Plan
shall be implemented for the lifetime of the development in accordance with the
details so approved. 
Reason: In the interests of ensuring sustainable travel patterns and as part of the
justification for the approval of the application as a minor departure from Policy 40 of
the Argyll and Bute Local Development Plan 2. 
3. Bicycle Storage 
A facility for the storage of cycles, the details of which shall have been previously
submitted to and agreed in writing with the Planning Authority, shall be provided
within the application site prior to the development hereby approved being brought
into use. Unless otherwise agreed in writing with the Planning Authority, the approved
cycle storage shall be retained in perpetuity for this dedicated purpose. 
Reason: In the interests of facilitating the use of cycles by the patrons of the building
hereby approved in accordance with the provisions of National Planning Framework
4 Policy 13 ‘Sustainable Transport’. 
4. External Lighting 
Unless otherwise agreed in writing with the Planning Authority, all external lighting
on the application site shall be operated, positioned and angled in compliance with
the Scottish Government Guidance Note “Controlling Light Pollution and Reducing
Lighting Energy Consumption” (March 2007). 
Reason: In order to protect the amenity of the immediate area from the creation of
nuisance due to light pollution and to support the reduction of energy consumption. 
5. Arrangements for the Storage and Collection of Waste 
Prior to the commencement of the development, details of the proposed
arrangements for the storage and collection of waste shall be submitted to and
approved in writing by the Planning Authority. The arrangements shall be

Page 24

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
implemented in accordance with the approved requirements prior to the development
being brought into use and shall thereafter be retained in perpetuity unless otherwise
agreed in writing by the Planning Authority. 
Reason: In order to accord with the principles of sustainable waste management
within NPF4 Policy 12 and LDP2 Policy 63. 
6. Surface Water Drainage / Porous Hardstanding 
Notwithstanding the details shown on the approved plans, all areas of hardstanding,
including paths and patios, shall be constructed using porous materials or otherwise
designed to permit the direct infiltration of surface water to the ground. Details of the
proposed hardstanding materials and construction shall be submitted to and
approved in writing by the Planning Authority prior to their installation. The approved
scheme shall thereafter be implemented in full and retained for the lifetime of the
development. 
Reason: To reduce surface water runoff and minimise the risk of flooding in the
interests of sustainable drainage and flood risk management.

Page 25

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
INFORMATIVE NOTES 
1. The attention of the applicant/developer is drawn to the contents of the letters dated
20th November 2025 and 30th July 2026 from Scottish Water which are in the list of
documents relative to the application in the Council’s Public Access System 
2. In terms of Condition 2 above, it is acknowledged that an Active Travel Plan prepared
by Thrive Community Consultants was received on 28th April 2026 and it is suggested
that the contents of this document can be used in the formulation of the formal
submission relative to this condition 
3. The Environmental Health Service has provided the following advice 
i. As a food premises, the proposal will be subject to the requirements of Food
Law. The applicant/developer is strongly recommended to contact the
Environmental Health Service to discuss the kitchen layout and proposed
foods to be made to ensure compliance with the law and good practice in
order to protect public health. In any case, the applicant is required to
register as a food business. 
From the plans, there appear to be water closets opening directly on to the
kitchen and servery, this is unacceptable and, as such, the plan should be
revised such that no WC opens out into a food preparation space without
suitable Intervening Space (IVS). 
ii. The applicant should submit to the Environmental Health Service a Noise
Management Plan relative to the construction phase of the project. 
The document shall incorporate the following: 
▪ An identification and assessment of all potential sources of nuisance
that may cause disturbance to nearby residents during the construction
of the development, including noise/ vibration, dust, surface runoff and
any temporary lighting. This should cover all aspects of the proposal
(e.g. ground works, access improvements and construction of building
and any associated facilities) 
▪ For all potential sources of nuisance, the applicant will be required to
provide a management plan that incorporates details of the suitable
control measures to be put in place so as to ensure that construction
works do not cause a loss of amenity to local residents and/or statutory
nuisance. Such details shall include (but not be limited to) the intended
hours of working; the movement of vehicles into, within and out of the
site; the use of plant; and the storage of equipment and materials on
the site 
iii. The hours of working at the site during the construction of the development
hereby approved shall be restricted to 08.00 to 18:30 Monday to Friday and
08.00 to 13.00 on Saturdays. No construction work shall take place at the
site on Sundays or Bank Holidays. 
iv. The applicant should submit to the Environmental Health Service a Noise
Management Plan that details how extraneous noise will be mitigated to Best
Practicable Means. The applicant should achieve a Noise Rating Criteria of

Page 26

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
NR35 during the day (0700-1900hrs) and NR25 during the evening/night
(1900-0700hrs). 
v. Deliveries or collections to and from the site shall not be carried out between
the hours of 23:00 and 07:00. 
vi. The development shall not commence until a detailed specification regarding
the collection, treatment and disposal of cooking odours has been submitted
to and approved by the Environmental Health Service.  Such specification
shall include precise details on the location of equipment used for the
cooking and heating of food, canopies, grease filters, rates of air movement
over the canopy, make–up air, air disposal points etc. Air disposal points
should terminate at least 1m above any opening windows. 
vii. Where discharge is intended to terminate below eaves height of the nearest
residential building (as in this case), the applicant should submit to the
Environmental Health Service details of the advanced odour management
infrastructure in place to ensure that discharge from the ventilation system
does not negatively affect local residents. 
viii. Suitable and sufficient measures for the effective collection and disposal of
surface water should be implemented during construction phase of the
project as well as within the completed development to prevent flooding
within this and nearby property 
ix. The applicant/developer should be fully aware of the Construction (Design
& Management) Regulations 2015 (CDM 2015) and its implications on client
duties, etc. 
x. It is very strongly recommended that appropriate measures be taken in the
design of all buildings and their construction, to inhibit the roosting and
nesting of gulls. Such measures are intended to reduce nuisance to, and
intimidation of, persons living, working and visiting the development 
xi. Prior to starting work on the site, the applicant must ensure that appropriate
steps have been taken to comply with the requirements of the Control of
Asbestos Regulations 2012, namely the duty to assess if asbestos is present
in any of the existing buildings proposed to be disturbed in anyway and to
remove before commencing work.

Page 27

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
APPENDIX A – RELATIVE TO APPLICATION NUMBER: 25/01690/PP 
PLANNING LAND USE AND POLICY ASSESSMENT 
1. The Proposal 
1.1. Trinity Church is a Category B Listed Building that is in the Rothesay Conservation Area
on Castle Street close to where the road turns in a northerly direction and becomes Bishop
Street. Running along the northern boundary of the site is Castle Street, whilst the site is
bounded to the south and east by private residential properties, separated by existing 2-
metre-high stone walls. To the west is the former church hall whilst in a south westerly
direction is Bute Yard, which is a multi-use venue incorporating both indoor and outdoor
spaces. 
1.2. In 2024, the congregation of Trinity Church united with the United Church of Bute and
moved out of the building. It has subsequently been purchased by Adventure Lane CIC
and the current application is seeking Planning Permission to change the use of the
vacant site to a family entertainment activity centre. This will involve the provision of a
range of play experiences in the main church building to the front (including a modular
golf course, bowling lanes, interactive darts, virtual reality experiences, etc. including a
bar/restaurant) and a physical link is to be created to the hall to the rear, which is planned
to accommodate an indoor adventure playground and party room. On the land to the rear
of the hall, four pieces of outdoor play equipment are to be sited – two play towers; a
seesaw; and a nest swing. 
2. Principle of Development and Settlement Strategy 
2.1 National Planning Framework 4 (NPF4) explains that significant weight should be given to
the global climate and nature crises when considering new development and that
proposals should be sited to minimise lifecycle greenhouse gas emissions as far as
possible, and that proposals will be sited and designed to adapt to current and future risks
from climate change. It also seeks to encourage, promote and facilitate the reuse of
brownfield, vacant and derelict land and empty buildings, and to help reduce the need for
greenfield development. 
2.2 In terms of the Settlement Strategy set out in the adopted Argyll and Bute Local
Development Plan 2 (LDP2) 2024, the application site is identified as being within the
‘Settlement Area’ of Rothesay where there is a presumption in favour of redevelopment of
brownfield sites where the proposed development is compatible with surrounding uses; is
of an appropriate scale and fit for the size of settlement in which it is proposed; respects
the character and appearance of the surrounding townscape in terms of density, scale,
massing, design, external finishes and access arrangements; and is in compliance with all
other relevant LDP2 policies. 
2.3 The application relates to the change of use of a currently vacant church and rear hall (a
brownfield site) that is within the main settlement on the Isle of Bute. The proposal is
considered to provide a sustainable new use for the site that would secure its long-term
future through the retention, reuse, recording and sensitive adaptation of the principal
building. It will incorporate both indoor and outdoor high-quality recreation and leisure
facilities that will provide a positive contribution to the community and tourist network as it
will enhance the experience of both residents and visitors to the island.

Page 28

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
2.4 As will be explored in more detail later in this report, the proposed alterations and extension
of the building would be appropriate in terms of their effect on the character of the
Rothesay Conservation Area and the Department is of the opinion that the intended use
would have no materially detrimental impact on parking and the local road network in this
part of Rothesay. 
2.5 On the basis of the foregoing, the principle of the proposed development is
considered to accord with NPF4 Policies 1, 2 and 9 and LDP2 Policy 01 as listed in
Section (J) of this report. 
3. Impact on the Built Environment 
3.1. The relevant policies in NPF4 and LDP2 seek to protect and enhance historic environment
assets and places, and to enable positive change as a catalyst for the regeneration of
places. They support development proposals in or affecting Conservation Areas where
they would preserve or enhance the character and appearance of the designated area
and its setting. Relevant considerations include the architectural and historic character of
the area; the existing density, built form and layout; and the context and siting, quality of
design and suitable materials.  
3.2. The policies also require that proposals should be designed to improve the quality of an
area and they offer support to development that achieves the six qualities of: health;
pleasantness; connectivity; distinctiveness; sustainability; and adaptability. Development
that is poorly designed, detrimental to the amenities of surrounding areas or inconsistent
with the aforementioned six qualities will not be supported. 
3.3. Section 64 of the Planning (Listed Buildings and Conservation Areas) (Scotland) Act 1997
states that “In the exercise, with respect to any buildings or other land in a conservation
area… special attention shall be paid to the desirability of preserving or enhancing the
character or appearance of that area”. 
3.4. The history of Trinity Church dates back to June 1843 when the minister along with most
of the elders and congregation of Rothesay Parish Church left the establishment to form
the Rothesay East Free Church, as it was first known. On 13th July 1845, the building was
opened for worship. It is an example of gothic architecture that was designed by the
prominent Scottish architect, Archibald Simpson, and it was built to house a congregation
of 650 people. 
3.5. Unfortunately, as congregation numbers were declining, the building was earmarked by
the Church of Scotland to be sold and this is where the applicant took the opportunity to
purchase the historic property with the objective of preserving it and preventing it falling
into disrepair. 
3.6. The assessment of the proposal in relation to its designation as a Listed Building will
principally be undertaken in the report on the application for Listed Building Consent (ref:
25/01691/LIB). However, it is considered appropriate to refer to the qualities of the
building in determining the impact of the proposal on the character of the wider
Conservation Area. 
3.7.  In this regard, the following statements are made in Historic Environment Scotland's
document titled 'Guidance on the Principles of Listed Building Consent': 
• The majority of Listed Buildings are adaptable and have met the needs of
successive generations while retaining their character. Change should, therefore,

Page 29

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
be managed to protect a building's special interest while enabling it to remain in
active use. Each case must be judged on its own merits but, in general terms,
listing rarely prevents adaptation to modern requirements but ensures that work is
done in a sensitive and informed manner. 
• Listed Buildings will, like other buildings, require alteration and adaptation from
time to time if they are to remain in beneficial use, and will be at risk if such
alteration and adaptation is unduly constrained. In most cases, such change, if
approached carefully, can be managed without adversely affecting the special
interest of the building. 
• Where a proposal involves alteration or adaptation which will sustain or enhance
the beneficial use of the building and does not adversely affect the special interest
of the building, consent should normally be granted. 
3.8. The agent, JSS Architects, have submitted a Design and Access Statement in support of
the application and the key points can be summarised as follows: 
▪ Although the proposals would result in the loss of many of the pews, Historic
Environment Scotland (HES) recognise that this would be necessary to create
usable floorspace to enable the reuse of the church. For those pews which must
be removed to facilitate safe circulation, inclusive access or new activities, a
salvage strategy will be implemented. This will explore their reuse within the
development (for example, as integrated seating, display elements, or timber
repurposed in fit-out features) and can be offered to the public to be reused. Where
neither retention nor reuse is achievable due to condition or safety reasons, a clear
justification will be provided 
▪ Key architectural features including the vaulted ceiling, roof structure, balcony
panelling, wall panelling, organ pipes and their surrounds, stained glass and
original doors are identified on the submitted drawings for retention. These
elements will remain integral to the adapted scheme, ensuring that the building’s
character continues to be legible. Where interventions are required, the principle
of minimal intervention and reversibility will be applied: for example, the proposed
balcony in the existing gallery will incorporate a glass balustrade to maintain the
original features of the gallery as a focal point 
▪ Prior to any alteration works taking place, a photographic and drawn recording
exercise will be undertaken to capture the current layout, fixtures, and condition
of the church 
▪ Any energy efficiency measures will follow the ‘Guide to Energy Retrofit of
Traditional Buildings’ produced by HES. Measures will prioritise passive
improvements (such as draught-proofing and secondary glazing where
appropriate) and reversible installations. Engagement with HES’s Technical
Conservation team will be sought before any significant fabric interventions are
carried out 
▪ The scheme introduces accessible entry points and a platform lift to ensure
inclusive access throughout, while safeguarding historic fabric. Interventions have
been carefully located to avoid adverse impact on key fixtures and finishes, in line
with HES’s Managing Change: Accessibility guidance. The existing street access,
boundary wall, and railings are retained, preserving the established historic setting

Page 30

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
3.9. The Department’s position is that it is important to recognise that finding an active use for
a historic church building is a key component in ensuring that it does not fall into disrepair
and become a derelict structure. As such, the current proposal is to be welcomed and it
is also clear that it has been developed with respect and careful consideration of the
existing property and its significant internal features. The alterations that are identified
have been formulated with the intention of increasing the usability of the church building
to cater for multiple activities whilst retaining its historical character.  
3.10. Having regard to all of the above, the proposal is considered to be acceptable and to
preserve the character and appearance of the site in question and this part of the
Rothesay Conservation Area. 
3.11. On the basis of the foregoing, the proposed development is considered to accord
with NPF4 Policies 7 and 14 and LDP2 Policies 04, 05, 08, 09, 10, 11, 15 and 17 as
listed in Section (J) of this report. 
4. Impact on the Natural Environment 
4.1. The relevant NPF4 and LDP2 policies generally seek to protect, restore and enhance
natural assets making best use of nature-based solutions and to protect biodiversity,
reverse biodiversity loss, deliver positive effects from development and strengthen nature
networks. 
4.2. No material biodiversity impacts have been identified in the assessment of this application
by the Planning Authority and, in the particular circumstances of the proposal, no
conditions relating to specific measures for biodiversity enhancement and protection are
considered to be necessary. 
4.3. The site for the proposed development is not within any of the following: a designated
European site of natural environment conservation or protection; a National Scenic Area;
a SSSI or RAMSAR site; a National Nature Reserve; or a Local Nature Conservation Site. 
4.4. The site is, however, located in a Local Landscape Area (LLA) and this designation is a
recognition of a locally important physical landform that is of scenic value. Policy 71 of
LDP2 seeks to resist development in, or affecting, an LLA where its scale, location or
design would have a significant adverse impact on the character of the landscape and
one of the requirements is that an application for development within this type of area
should be supported by a landscape and visual impact assessment. 
4.5. No formal landscape and visual impact assessment has been submitted with the current
application; however, it is considered that the submitted plans and drawings provide
sufficient information to allow an appropriate form of assessment to be carried out. Given
the relatively localised impact that the proposed works to the exterior of the buildings
within the site would have, it is considered that the proposal would have a ‘neutral’ effect
upon the visual qualities of the wider LLA. 
4.6. On the basis of the foregoing, the proposed development is considered to accord
with NPF4 Policies 3 and 4 and LDP2 Policies 71 and 73 as listed in Section (J) of
this report. 
5. Community, Economic and Tourism Benefits 
5.1. NPF4 and LDP2 policies relating to this section can be summarised as follows:

Page 31

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
• Proposals that contribute to the viability, sustainability and diversity of rural
communities and the local rural economy, including the reuse of redundant or
unused buildings should be supported   
• Local economic development should focus on community and place benefits as a
central and primary consideration 
• Proposals should contribute to local community wealth building strategies by
improving community resilience and reducing inequalities; increasing spending
within communities; ensuring the use of local supply chains and services; local job
creation; and supporting community led proposals 
• Proposals that increase the mix of uses of town and local centres, thereby
improving their vitality and viability, should be supported 
• Communities and places should enjoy economic, social and cultural benefits from
tourism thus supporting resilience and stimulating job creation 
• Sustainable tourism development should be promoted and facilitated where it
benefits local people and is consistent with the country’s net zero and nature
commitments 
5.2. The NPF4 Annex C concerns ‘Spatial Planning Priorities’, which forms guidance for the
preparation of Regional Spatial Strategies and Local Development Plans. Rothesay is
specifically mentioned in the section on the ‘Central’ area, where NPF4 refers to “strategic
sites”. In relation to the wider Clyde area, the Framework notes that: 
“[m]any business and investment sites are located along key transport corridors and new
approaches may be required as investment transitions away from locations that can only
be reached by car towards more accessible areas that are connected by low carbon
and active travel options.” 
And further: 
“The wider Clyde Coast, an iconic area rich in cultural heritage and natural assets, can
be reimagined through collective efforts on regeneration in nearby coastal communities,
such as Dunoon and Rothesay. The area’s accessibility by train and water means that
it is an ideal location for low carbon tourism and leisure.” 
5.3. The supporting information submitted with the application explains that, during extensive
on-island interviews and research, the lack of indoor, family-based activities on the Isle of
Bute was raised as a chronic issue: parents of younger children noted that to provide any
non-curricular experience, they had to travel off island; older children and teenagers had
nowhere to go thus congregating in the town centre; and older residents identified the
lack of spaces to meet and socialise. 
5.4. From an economic perspective, Bute's traditional tourist markets began to decline in the
1960s and the island has struggled to adapt to changing expectations. As a result of the
challenging economic climate, many young people have left the island for further
education or other employment and they have not returned, leaving a population which is
older and with more health challenges than average communities. The accompanying
supporting documentation states that the Scottish Index of Multiple Deprivation notes that
the community in Rothesay is within the cohort of the 10% most deprived communities in
Scotland.

Page 32

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
5.5. It is put forward that a significant proportion of all off-island trips are for leisure purposes
and an estimated £1.2M per annum is spent by residents on off-island leisure activity. 
5.6. The supporting statement explains that, in 2021, an international corporate donor, Saputo
Dairy UK, set up a Legacy Fund to support projects for the benefit of the community on
the Isle of Bute. After extensive research, two projects were identified which met the
needs of the island community and one of these projects is the subject of this application. 
5.7. The agent puts forward the following points in support of the proposal: 
▪ The Activity Centre will provide assorted opportunities for exercise for all ages,
which will have a positive effect on public health and wellbeing 
▪ The Isle of Bute needs to retain and increase its working age population if its
economy is to thrive in the future. The centre will offer training opportunities for
young people as well as local employment and the Adventure Lane CIC is already
working with Rothesay Joint Campus to identify ways to involve young people in
the setup of the facility. The applicant intends to use local contractors, suppliers,
and businesses where possible 
▪ The proposal will create increased spending within the community by both locals
and tourists 
▪ When the refurbished Rothesay Pavilion building reopens, the Activity Centre will
offer complementary but different experiences to help attract visitors to the island
for longer stays 
5.8. It is considered that the above points demonstrate that the proposal has been formulated
by engaging with the community as to the type of facilities that are needed; by identifying
a project that will create employment and result in expenditure being retained on the
island; and by providing a centre that will enhance the tourist experience and attract more
visitors to Bute. 
5.9. On the basis of the foregoing, the proposed development is considered to accord
with NPF4 Policies 21, 25, 27, 29 and 30 and LDP2 Policies 23, 25 and 49 as listed
in Section (J) of this report. 
6. Impact on Residential Amenity 
6.1. LDP2 Policy 14 seeks to resist any proposal that would have an unacceptable adverse
impact upon the amenity of neighbouring land uses resulting from but not limited to the
following: noise or vibration; odour or fumes; emissions including dust, smoke, soot, ash,
dirt or grit or any other environmental pollution to water, air, or soil; and light pollution or
flicker. In certain circumstances, it may be possible to mitigate adverse impact upon
neighbouring amenity by restrictions placed upon the proposed development via planning
conditions or legal agreements. 
6.2. There are residential properties adjoining the site on the same side of Castle Street and
there are also dwellings on the opposite side of the road. The Environmental Health
Service has been consulted and has recommended conditions and informative notes in
respect of a number of matters, including external lighting, noise management, the
collection, treatment and disposal of cooking odours, etc.  It is considered that the use of
appropriately worded conditions and informative notes relating to other matters would

Page 33

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
successfully mitigate any potential adverse impact upon neighbouring amenity arising
from the proposed development. 
6.3. On the basis of the foregoing and subject to suitably worded conditions and informative
notes, the proposed development is considered to accord with LDP2 Policy 14 as
listed in Section (J) of this report. 
7. Impact on Parking and Local Road Network 
7.1. NPF4 Policy 13 generally seeks “to encourage, promote and facilitate developments that
prioritise walking, wheeling, cycling and public transport for everyday travel and reduce
the need to travel unsustainably”. 
7.2. More specifically, NPF4 Policy 13(b) supports developments where it can be
demonstrated that the transport requirements generated have been considered in line
with the sustainable travel and investment hierarchies and where appropriate they, inter
alia: 
• Provide direct, easy, segregated and safe links to local facilities via walking,
wheeling and cycling networks before occupation. 
• Will be accessible by public transport, ideally supporting the use of existing
services. 
7.3. NPF4 Policy 15 seeks to “encourage, promote and facilitate the application of the Place
Principle and create connected and compact neighbourhoods where people can meet the
majority of their daily needs within a reasonable distance of their home, preferably by
walking, wheeling or cycling or using sustainable transport options.” 
7.4. More specifically, NPF4 Policy 15(a) supports developments that would contribute to local
living. To establish this, consideration will be given to existing settlement pattern and the
level and quality of interconnectivity of the proposed development with the surrounding
area, including local access to, inter alia, sustainable modes of transport such as local
public transport and safe, high quality walking, wheeling and cycling networks. 
7.5. LDP2 Policy 40 states that off-street car and vehicle parking shall be provided for
development in accordance with the car parking standards set out in Table 5 on Pages
67 and 68 of the Plan’s Written Statement. The policy refers to the limited categories of
development that will not be expected to provide off-street car parking on development
sites in identified town centre zones. In this case, the type of proposed use is not one of
the exempt categories and, although it is considered edge of town centre, the site is just
outwith the identified town centre. In these circumstances, the zero parking exemption
cannot be applied. 
7.6. As far as can be ascertained, there have never been off-street, dedicated parking spaces
associated with Trinity Church over its 180-year use as a place of worship and no spaces
are identified as part of the current application. Based upon the car parking standards in
LDP2 Policy 40, the proposal would be classed as “Leisure (other than Cinemas or
Stadia)” where 1 space per 22 square metres should be available. The size of the
premises at 630 square metres would, therefore, equate to a notional demand for 29
spaces, with three of these spaces being used for disabled parking. 
7.7. The applicant and agent have acknowledged that this is a significant issue and, for this
reason, they employed a consultant to carry out a car parking study (‘Parking Statement

Page 34

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
& Report’ prepared by SW Consultancy (N.I.) Ltd in September 2025). A parking
assessment was carried out to identify on and off-street provision within a 400 metre
walking distance of the site, covering 26 survey zones and 3 public car parks. The
assessment confirmed a minimum availability of 241–242 spaces at all survey times on
both a weekday and weekend, with at least 3 disabled bays consistently available. Three
additional on-street disabled bays are referred to as part of the proposal, and the findings
show that this can be accommodated. 
7.8. Supporting documentation also explains that census data highlights that Rothesay has a
significantly lower rate of car ownership compared to the national average, with
approximately 44% of households in the urban area having no access to a private vehicle.
This figure is notably higher in the town centre and in areas with higher-density tenement
housing, which align closely with the target demographic for the proposed Family
Entertainment Centre. The report argues that this context reinforces the appropriateness
of the Trinity Church site, which is centrally located and within easy walking and cycling
distance of the majority of Rothesay’s population. 
7.9. The initial response from the Roads Department in January 2026 was a recommendation
of refusal, which stated that there are currently issues with traffic flow and parking
management within the town centre, including the area where the development is
proposed.  There are also concerns that have been raised by Police Scotland regarding
traffic flow in this area and mitigation proposals will be worked on in the future. As no off-
street parking is being proposed and there is a lack of parking nearby, the proposed
development would result in an intensification of traffic and on-street parking. 
7.10. Upon receipt of these initial comments from the Roads Department, a second consultant
(Thrive Community Consultants) was engaged by the applicant and agent to submit a
‘Parking & Transport Report Addendum’ and a ‘Roads Objection Response’, both of which
were submitted to the Planning Authority at the end of April 2026. The Addendum contains
clarification on the methodology and findings of the original parking assessment;
refinement on the interpretation of parking availability to reflect realistic user behaviour;
and addressing of the concerns relating to peak demand and traffic patterns. For instance,
it was acknowledged that Mount Pleasant Road, Serpentine Road and Bishop Terrace
had limited parking and were constrained by road geometries and less formalised parking
arrangements.  Its conclusions are that the original parking assessment remains robust
and demonstrates a substantial level of available capacity within the town centre and its
parking availability does not rely on these secondary areas. When considered in the
context of realistic parking behaviour, distributed demand patterns and reduced reliance
on private car travel, the Addendum states that the proposed development would not give
rise to unacceptable parking pressure or traffic impacts. 
7.11. The Roads Department have considered all of the supporting information that has been
submitted and their recommendation remains one of refusal. Their reasoning for this
recommendation is set out in the following paragraphs. 
7.12. The ‘Parking & Transport Report Addendum’ submitted in April 2026 by Thrive
Community Consultants in response to the initial refusal recommendation seeks
agreement to no off-street parking spaces on the basis of the active travel plan that has
been devised and that any required customer vehicles can be accommodated in existing
on-street parking and car parks. It is the position of the Roads Department that the
available parking spaces are for use in association with every activity, premises and
residential building in the area. Using these spaces in conjunction with the proposed
activity centre would lead to an overall increase in traffic flow and congestion.

Page 35

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
7.13. The Addendum states that there is ‘a substantial level of available capacity within the
town centre’. On review, the Roads Department does not believe that this assessment
shows an availability of parking but, in a number of instances, it shows a lack of parking
availability. The existing provision is stated as including three car parks: 
• Albert Pier Car Park – the original survey states that this car park has capacity for
25 cars and within the survey it has limited capacity. Roads confirm that it is
frequently over-subscribed (as recorded in the Rothesay Pavilion to Albert Pier
Active Travel Project). It will be redesigned in the future and, although this may
provide a slight rise in the number of parking spaces, it is unlikely to accommodate
an increased demand 
• Guildford Square Car Park – the addendum states this car park has capacity for
34 cars and within the survey it has some capacity at all times ranging from 4 to
10 spaces. However, roads consider that this capacity has already been taken into
account as ‘parking provision’ for another Planning Permission (ref: 23/01007/PP)
at the former Bute House Hotel and, as such, this runs the risk of double-counting
parking provision 
• East Princes Street slipway – the addendum states this car park has capacity for
16 cars and within the survey it was at capacity most of the time. Roads state that
it is not a car park but is on-street parking. It is generally well used and not able to
accommodate any intensification 
7.14. In terms of Roads Department comments in relation to on-street parking, there is some
agreement over the lack of spaces within Castle Street, where the proposal is located,
but the following concerns are raised in relation to places that are listed as having capacity
for on-street parking: 
▪ Bishop Terrace – the addendum states this street has capacity for 20 cars and
frequently has capacity for around 10 to 12 spaces and increasing on a Saturday
to around 16 spaces.  Roads consider this is a residential cul-de-sac with no
turning area/turning head.  It is bounded on one side by property with a large verge
on one side, parts of the verge have been converted to parking but this has been
done for the benefit of residents, not visitor parking for commercial premises 
▪ Mount Pleasant Road – the addendum states this street has capacity for 30 cars
and frequently has capacity of around 10 spaces during the week and a Saturday.
Roads consider this to be a congested residential street and unlikely to be suitable
for redirecting traffic. The road is nominally two-lane but one side is already largely
taken up by parking, effectively reducing the route to single lane with limited
options for give and take 
▪ Springfield Place - this is a private road/development 
▪ Store Lane – the addendum states this street has capacity for 7 cars and
frequently has capacity for around 4 spaces and increasing on a Saturday to
around 5. However, Roads states this would not be suitable to encourage traffic
given the nature of the road onto and to increase traffic through this street 
▪ Watergate – the addendum states this street has capacity for 7 cars and frequently
has capacity for 1-2 spaces and increasing on a Saturday. Roads consider that
this would not be suitable due to its narrow width and even small vehicles park
almost scraping the kerb. Increased usage would likely obstruct traffic flow

Page 36

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
7.15. The Roads Departments comments continue by highlighting that, with regard to parking
capacity, a level of 85% occupancy is generally the figure used in parking provision to
identify where capacity reached.  At this level, additional parking generates traffic, circling,
hold-ups, etc. The report highlights this occurrence in several places: East Princes Street,
Bishop Street, West Princes Street, Stuart Street and, most importantly, Castle Street
where the development is proposed. It is accepted that drivers generally park as close as
possible to an attraction/service.   
7.16. One of the key arguments in the applicant’s supporting information is that the previous
use of the site as an active church had 600 plus parishioners. On this point, the Roads
Department noted the following: 
• It is possible there may have been 600 parishioners, but it is doubtful that this was
the number of those who attended the weekly Sunday service 
• Even accepting these numbers, this would be on one day of the week and would
not have a continuous use or impact on parking and traffic 
• Sunday also tends to be the day with reduced traffic and so the use as a church
would have, in the opinion of the Roads Department, a much lower impact than
the proposed venue 
• Noting the above, the Roads Department is anecdotally aware that its use as a
church did cause concerns – particularly around dangerous or irresponsible
parking 
7.17. The Roads Department acknowledge that parking requirements may be reduced within
town centres where there is good public transport provision (referring to the Argyll & Bute
Council ‘Roads Technical Development Guidance’ (RTGD)). The applicant’s Active Travel
Plan provides details on public transport links and promotion of walking and cycling. It is
noted that the bus service within Bute is limited in the evenings, with the town centre
services finishing at 6 p.m. While the RTGD allows parking requirements to be reduced,
the request in this case is being made that parking requirements should be removed
completely. As there is no off-street capacity and limited on-street availability, the Roads
Department do not find this to be acceptable. 
7.18. The concluding points from the Roads Department are that they consider that neither
the nearest local public car parks nor the streets surrounding the application property are
able to accommodate the increase in demand for parking that would result from the
proposed development. Further to this, their concern remains that the impact arising from
the lack of parking provision would be detrimental to road safety, traffic management and
parking within Rothesay. 
7.19. The concerns of the Roads Department are acknowledged and this issue requires to be
considered carefully. In the narrative associated with LDP2 Policy 40, Paragraph 6.24
states that, “in the Main Towns, there is an acceptance that zero parking provision can be
appropriate for certain categories of developments. This is justified on the basis that some
types of development are able to function effectively within these central areas without
requiring on-site parking, relying instead on central area public car parking provision and
the availability of public transport services.” 
7.20. When assessing change of use applications, it is a key material consideration to take
into account the existing use. It is important to note that this Church has never had off-

Page 37

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
street parking and cannot accommodate it. Information submitted in support of the
application explains that extensive research into the usage of the church and the
corresponding visitors with cars has been carried out by the applicant/agent. It mentions
that the church could accommodate 650 persons and it estimates that the weekly Sunday
Service had 60 parishioners whilst funerals could have between 120 and 650 mourners
(the frequency of funerals was more than every week in the final year prior to the building’s
closure). For the events held at Trinity Church for decades, traffic would generally be
arriving, parking and leaving at the same time. 
7.21. The proposed maximum capacity of the new centre will be 200 people and these will
mainly arrive on foot / wheels / bikes and scooters in line with Argyll and Bute Active
Travel Campaign. Due to the nature of the proposed booking system, the visitors to the
site will be spread uniformly throughout the day between the hours of 9.00 and 21.00
Monday to Sunday. As such, there will not be periods with large groups of people arriving
by car. This capacity is, therefore, significantly less than the previous use and the
departures and arrivals are dispersed throughout the week rather than being concentrated
to one day. 
7.22. The site has lawfulness as a Class 10 (Non-Residential Institutions) use under the Town
and Country Planning (Use Classes) (Scotland) Order 1997 (as amended). The following
uses could be carried out without the need for Planning Permission: as a crèche, day
nursery or day centre; for the provision of education; for the display of works of art
(otherwise than for sale or hire); as a museum; as a public library or public reading room;
as a public hall or exhibition hall; and as a law court. 
7.23. As no Planning Permission would be needed for the introduction of the above uses,
there would be no element of control by the Planning Authority in terms of the number of
people arriving and their mode of travel. 
7.24. The applicant’s Active Travel Plan contains a number of elements (e.g. the
implementation of the booking system, the provision of clear and accessible travel
information at the point of booking and prior to arrival, the offering of incentives to
encourage sustainable travel choices, the formation of cycle parking at the site, etc.) and
conditions can be used to secure the Active Travel Plan and in turn control the numbers
of people in the venue at one time and the opening hours. 
7.25. On examining the parking survey it is clear there is on-street parking capacity close to
the facility, in particular High Street (Zone 11) has capacity for 63 cars and there are
always spaces on both weekdays and weekends for around 15 to 20 cars on average.
King Street (Zone 15)  is also highlighted as having capacity of around 10 spaces on
average. 
7.26. It is agreed that the location of this proposed development, even though not in the town
centre, is very close to sustainable transport including the ferry terminal which is within 2
minutes walk and a minute cycle of the facility. In addition, most of the local hotels/guest
houses are within a 15-minute walk. There are two bus stops on the same street as the
development. The aspirations that are inherent in NPF4 Policy 13 and Policy 33 of LDP2
highlight the importance of walking, cycling and proximity to public transport links. The
agent has advised that storage space for four bicycles together with e-bike charging could
be accommodated in part of the ground floor of the building and this can be achieved by
condition. 
7.27. It is also noted that there are significant constraints associated with the provision of off-
street parking within the site. The desirability of retaining the existing front boundary walls
and forecourt levels as being integral to the listed character of the building make the

Page 38

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
introduction of off-street accessible parking both technically challenging and undesirable
in conservation terms, particularly given that one of the stated aims of the project is to
keep as much of the original character of the property as possible. Instead, the intention
is that provision would be made through the creation of additional on-street disabled
parking bays adjacent to the entrance and negotiations would be undertaken with the
Roads Department to include the identification of three disabled parking bays. 
7.28. The Department acknowledges the points made by the Roads Department and, indeed,
similar concerns were expressed to the applicant regarding the capacity within nearby
streets and in the car parks. However, the property is a Category B Listed Building and is
currently not being used. There are particular difficulties in finding alternative uses for
large ecclesiastical buildings such as Trinity Church. In addition, there tend to be high
maintenance costs associated with the historic nature of this type of building. The
objective of bringing the property back into viable use and avoiding it becoming derelict
through a lack of maintenance might not be sufficiently robust on its own to justify
departing from the car parking requirements but it does make a contribution to preparing
a compelling case. 
7.29. In bringing together the points made in Sections 7.20 to 7.28 above, the following
material considerations are considered to cumulatively represent a robust case in
justifying the proposal as a minor departure from LDP2 Policy 40: 
• Trinity Church is a Category B Listed Building and one of its key features is the
quality of the boundary treatment of the frontage onto Castle Street, comprising
the low-coped stone wall; the panelled gate piers flanking the central entry; and
the pyramidal caps surmounted by decorative cast-iron lamp standards. The
provision of off-street parking would result in the loss of this feature to the
detriment of the townscape of this part of the Rothesay Conservation Area 
• It is understood that, due to there being no areas of vacant land in the applicant’s
ownership, there are no options for providing off-street parking in relation to the
proposed development 
• The parking surveys submitted as part of the application identify that there is on-
street parking capacity exceeding the notional demand of 29 spaces close to the
facility, in particular High Street (Zone 11) has capacity for 63 cars and there are
always spaces on both weekdays and weekends for around 15 to 20 cars on
average. King Street (Zone 15) is also highlighted as having capacity of around 10
spaces on average. 
• The capacity of the proposed use is 200 people, which is significantly less than
the existing use as a church which is 600 people 
• The lawful use of the site is as a Class 10 Non-Residential Institution and the other
uses that could be introduced under this classification without the need for
Planning Permission have the potential to generate relatively large numbers of
movements. In the absence of permission being required, the Planning Authority
would have no mechanisms by which to mitigate the impact of these uses 
• The Active Travel Plan has a number of measures to control the arrivals and
departures and overall capacity at any one time and this Travel Plan can be
secured by condition thereby providing a degree of influence on travel methods
and limitation on car usage

Page 39

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
• The site is also well served by sustainable transport options, including adjacent
bus stops and the main bus terminal at Guildford Square where most residents
will arrive and depart at Rothesay, a nearby taxi rank, the ferry terminal (the source
of one of the key target market), and safe pedestrian routes with dedicated
crossing points 
• The aspirations inherent in National Planning Framework 4 where development
proposals which are ambitious in terms of low/no parking will be supported,
particularly in urban areas that are well served by sustainable transport modes 
8. Infrastructure, Water Management and Waste Facilities 
8.1. NPF4 and LDP2 policies seek to ensure that, wherever possible, developments should
connect into publicly adopted water and wastewater systems. They support proposed
developments that would not increase the risk of surface water flooding to others or be at
risk themselves and they advocate that all rain and surface water should be managed
through sustainable urban drainage systems (SUDS).  
8.2. Water supply and foul drainage will be by means of the existing connections to the publicly
adopted network. The consultation response from Scottish Water does not highlight any
particular issues with these proposed arrangements but advises that further investigations
may require to be carried out should any formal approaches be made to them by the
developer in the future. On this basis, officers are satisfied in principle that there are no
known constraints in respect of public water and sewage infrastructure. 
8.3. In terms of potential flood risk, parts of the application site are shown on the SEPA Future
Flood Maps as being at risk from surface water flooding. However, the proposal principally
relates to the change of use of existing buildings with relatively minimal external works
(small link between the church and the rear hall; new covered terrace on the rear hall;
and outdoor play equipment in rear curtilage). As such, it is arguable whether the
development would increase the risk of surface water flooding to others, or itself be at
risk. In these circumstances, a precautionary approach is advocated whereby a condition
is recommended that seeks details of a Sustainable Urban Drainage System (SuDS) for
the any hardstanding areas. 
8.4. NPF4 and LDP2 policies require that commercial developments make effective provision
for the storage, recycling, composting (where appropriate), separation and collection of
waste from within the site or when appropriate, from an appropriate roadside or other
specified collection point or points (for onward reuse and recycling). 
8.5. In terms of the storage of waste, Drawing No. 1473_102 Rev C ‘Proposed Block Plan’
identifies an area for the siting of bins along the westernmost boundary of the site and
finalised details of this arrangement will be secured via a condition. 
8.6. On the basis of the foregoing, and subject to suitably worded conditions, the proposed
development is considered to accord with NPF4 Policies 12 and 22 and LDP2
Policies 55, 60 and 63 as listed in Section (J) of this report. 
9. Archaeology 
9.1 NPF4 and LDP2 policies presume in favour of retaining, protecting, conserving and
enhancing the existing archaeological heritage. They explain that, where there is potential
for non-designated buried archaeological remains to exist below a site, developers should
provide an evaluation of the archaeological resource at an early stage so that Planning

Page 40

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Authorities can assess impacts. Historic buildings may also have archaeological
significance which is not understood and may require assessment. 
9.2 In this particular case, the West of Scotland Archaeology Service (WoSAS) have advised
that the church falls within the area of increased archaeological sensitivity associated with
the probable core of early settlement at Rothesay. Although the current church building
dates from 1843-45, it occupies a site that is likely to have been in use before this date
and the fact that the site is shown as being developed in the mid-18th century would
suggest that there would be some potential for ground disturbance in this area to produce
sub-surface archaeological material relating to occupation from this period, and potentially
extending back to earlier phases in the development of the town. 
9.3 WoSAS have explained that, based on various factors, the section of the site with the
greatest potential to produce significant archaeological material would likely be along the
street frontage. However, the supplied plans suggest that no substantial ground
disturbance would take place in this part of the site. 
9.4 Most ground disturbance associated with the proposal would take place towards the rear
of the church building, to create the link extension to connect it to the former church hall,
and in the ground around the hall for the installation of the various pieces of outdoor play
equipment. Given that the amount of this ground disturbance appears likely to be
reasonably limited, WoSAS accept that, on balance, the potential for this proposal to
encounter and remove significant sub-surface archaeological material is likely to be too
low to warrant a programme of archaeological work. 
9.5 On the basis of the foregoing, the proposed development is considered to accord with
NPF4 Policy 7(o) and LDP2 Policy 21 as listed in Section (J) of this report.