MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING
COMMITTEE held BY MICROSOFT TEAMS on TUESDAY, 15 SEPTEMBER 2026 
Present: Councillor Gordon Blair (Chair) 
Councillor Kieron Green
Councillor Fiona Howard
Councillor Willie Hume
Councillor Andrew Kain 
Councillor Reeni Kennedy-Boyle
Councillor Liz McCabe
Councillor Luna Martin
Councillor Peter Wallace 
Attending: Stuart McLean, Committee Manager
Fergus Murray, Head of Development and Economic Growth
Peter Bain, Development Manager
Tim Williams, Area Team Leader – Oban, Lorn and the Isles
Fiona Scott, Area Team Leader – Mid Argyll, Kintyre and the Islands
David Moore, Senior Planning Officer
Shelley Gould, Senior Planning Officer
Judith Stephen, Planning Officer
Kim McKay, Planning Officer - Enforcement 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Jan Brown, Daniel Hampsey,
Graham Hardie and Paul Kennedy. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. MINUTE 
The Minute of the Planning, Protective Services and Licensing Committee held on 19
August 2026 was approved as a correct record. 
4. BEAUFORT WIND LIMITED: ERECTION OF 7 TURBINES (UP TO 149.9M
TO TIP) AND ANCILLARY DEVELOPMENT AND DECOMMISSIONING OF
EXISTING BEINN GHLAS WIND FARM: EXISTING BEINN GHLAS WIND
FARM, TAYNUILT (REF: 25/01240/PP) 
The Senior Planning Officer spoke to the terms of the report.  The main wind farm is
located within Remote Countryside Area and the site currently contains the existing Beinn
Ghlas Wind Farm comprising 14 wind turbines (approximately 54.1 m to blade tip), each
with a capacity of 600 kilowatts.  The wind farm has been operational since May 1999 and
in June 2022 an application to extend the life of the wind farm was approved to allow it to
operate to August 2033.   
The proposal, specifically the erection of 7 turbines (up to 149.9m to tip) and ancillary
development and decommissioning of existing Beinn Ghlas Wind Farm, is considered
consistent with the primary renewable energy policies of National Planning Framework 4
(NPF4) and the Local Development Plan 2 (LDP2) and all consultees are satisfied that
planning permission can be granted for the proposal subject to appropriate planning
conditions.

Page 2

It was recommended that planning permission be approved subject to the conditions
appended to the report of handling. 
Decision 
The Committee agreed to grant planning permission subject to the following conditions
and reasons: 
1. PP - Approved Details & Standard Notes – EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 21.07.25 and the Environmental Impact Assessment Report
dated 25.07.25, supporting information and the approved drawings listed in the table
below unless the prior written approval of the planning authority is obtained for an
amendment to the approved details under Section 64 of the Town and Country
Planning (Scotland) Act 1997. 
The developer and subsequent operators shall at all times construct and operate the
development hereby permitted in accordance with the provisions of the Environmental
Impact Assessment Report (and FEI submissions), accompanying the application with
mitigation measures adhered to in full, and shall omit no part of the operations
provided for by the permission except with the prior written approval of the Planning
Authority. 
Plan Title. Plan Ref.
No.
Version Date
Received
Location Plan Fig 1.1 Rev 05 02.09.25
Site Aerial Context Fig 1.2 Rev 05 02.09.25
Site Layout (Full) Fig 2.5a Rev 05 02.09.25
Site Layout (zoomed) Fig 2.5b Rev 14 10.08.26
Inset 1: Temporary
Compound 1
Fig 2.5c - 02.09.25
Inset 2: Temporary
Compound 2
Fig 2.5d - 02.09.25
Existing Substation &
Indicative Induction Reactor
Layout
Fig 2.13 Rev 02 02.09.25
Existing Substation &
Indicative Induction Reactor
Elevation view
Fig 2.14 Rev 02 02.09.25
Indicative Wind Turbine Fig 2.6 Rev 03 02.09.25
Indicative Wind Turbine
Foundation
Fig 2.7 Rev 02 02.09.25
Indicative Crane
Hardstanding
Fig 2.8 Rev 02 02.09.25
Indicative Permanent
Anemometer Mast Details
Fig 2.9 Rev 02 02.09.25
Indicative Access Track
Details
Fig 2.11 Rev 03 02.09.25
Access Junction Design Fig 10.4 Rev 03 02.09.25
Indicative Site Access (A85
to Fearnoch)
Fig 2.10a Rev 03  02.09.25

Page 3

Indicative Site Access 
(Fearnoch Forest Track)
Fig 2.10b Rev 04 02.09.25
Indicative Site Access
(Fearnoch Forest Track to
C32 Glen Lonan Road)
Fig 2.10c Rev 04 02.09.25
Indicative Temporary
Construction Compound
Access Options -Glen
Lonan Road
Fig 2.10d Rev 02 02.09.25
Indicative Cable Trench
Details
Fig 2.12 Rev 02 02.09.25 
Reason: For the purpose of clarity, to ensure that the development is constructed and
operated in the manner advanced in the Environmental Impact Assessment Report,
upon which the environmental effects of the development have been assessed and
determined to be acceptable. 
2. Notification of Date of First Commissioning and Final Commissioning. 
(1) Written confirmation of the Date of First Commissioning shall be provided to the
Planning Authority no later than one calendar month after that date.
(2) Written confirmation of the Date of Final Commissioning shall be provided to the
Planning Authority no later than one calendar month after that date. 
Reason: To allow the Planning Authority to calculate the date of expiry of the consent. 
3. Commencement of Development 
(1) The Development shall be commenced no later than five years from the date of this
consent,
(2) Written confirmation of the intended date of Commencement of Development shall
be provided to the Planning Authority as soon as is practicable after deciding on
such a date and in any event no later than one calendar month prior to the
Commencement of Development. 
Reason:  To ensure that the consent is implemented within a reasonable period and to
allow the Planning Authority to monitor compliance with obligations attached to this
consent and deemed planning permission as appropriate. 
4. Period of Permission 
The planning permission hereby granted shall endure for a period of 35 years from the
date of final commissioning. Written confirmation of the date of final commissioning
shall be provided to the planning authority no later than one calendar month after that
date. 
Reason: In order to define the terms of this permission, to minimise the level of visual
intrusion, and to ensure the satisfactory reinstatement of the site. 
5. Decommissioning 
The development shall cease to generate electricity by no later than the date falling 35
years from the date of final commissioning. The decommissioning and restoration of

Page 4

the site shall be completed within three years from the date on which the development
ceases to generate electricity unless otherwise agreed in writing with the planning
authority. 
Reason: In order to define the terms of this permission, to minimise the level of visual
intrusion, and to ensure the satisfactory reinstatement of the site. 
6. Decommissioning, Restoration and Aftercare Strategy 
No development shall commence unless a decommissioning, restoration and aftercare
strategy has been submitted to and approved in writing by the planning authority in
consultation with SEPA and NatureScot. The scheme shall detail measures for the
decommissioning of the development, restoration and aftercare of the site and will
include, without limitation, proposals for the removal of the above ground elements of
the development, the treatment of ground surfaces, opportunities for habitat and
biodiversity enhancement, the management and timing of the works, and
environmental management provision. 
Reason: To ensure the decommissioning and removal of the Development in an
appropriate and environmentally acceptable manner and the restoration and aftercare
of the site, in the interests of safety, amenity and environmental protection. 
7. Redundant Turbines 
If any wind turbine(s) fails to produce an electricity supply to the grid for a continuous
period of 12 months then, unless otherwise agreed in writing by the planning authority,
the wind turbine and any associated above ground infrastructure solely required for
that turbine(s), together with turbine foundations to a depth of one metre below ground
level shall be dismantled and removed from the site and the area around the turbine
restored in accordance with a scheme to be submitted to and approved in writing by
the Planning Authority in consultation with SEPA and NatureScot. The scheme shall be
submitted to the planning authority within three months of the expiry of the 12-month
period and shall include a timetable for its implementation. 
Reason: To ensure that any redundant wind turbine is removed from the site, in the
interests of safety, to minimise the level of visual intrusion and to ensure the
satisfactory reinstatement of the site. 
8. Financial Guarantee 
(a) At least three months prior to the commencement of development, the developer
shall provide to the planning authority written details of the bond or other financial
guarantee to cover the cost of all decommissioning, restoration and aftercare of the
site as required by condition 6, for the written approval of the planning authority.
These written details shall include evidence from a competent independent
professional who has relevant experience in such matters that the guarantee is
sufficient to meet the requirements of condition 6. 
(b) No work shall commence on site until the developer has delivered the approved
bond or other financial guarantee to the planning authority and the planning
authority has provided written confirmation that the bond or other financial
guarantee is satisfactory.

Page 5

(c) The developer shall ensure that the approved bond or other financial guarantee is
maintained throughout the duration of this permission and until the date of
completion of all decommissioning, restoration and aftercare obligations as
required by condition 6 of this permission. 
(d) The adequacy of the approved bond or other financial guarantee will be subject to
review at five yearly intervals, or such other intervals as agreed by the planning
authority, from commencement of development, to be paid for by the developer and
conducted by a competent independent professional who has relevant experience
in such matters. The findings of such reviews will be provided to the developer and
the planning authority within 14 days of the review taking place. Any revisions to
the bond or other financial guarantee recommended by the review and agreed in
writing by the planning authority shall be made by the developer within 28 days of
receiving said written agreement from the planning authority and documentary
evidence shall be provided to the planning authority by the developer to that effect. 
Reason: To ensure there are sufficient funds available for the full costs of
decommissioning, restoration and aftercare. 
9. Peat Management Plan 
(1) There shall be no Commencement of Development until a detailed Peat and
Carbon Rich Soils Management Plan (PMP) has been submitted to and approved
in writing by the Planning Authority in consultation with SEPA. 
(2) The PMP shall: 
(a) take account of site and ground investigations to minimise the loss of peat and
other carbon rich soil and minimise carbon loss;
(b) include actions, including micrositing, to minimise excavated peat and other
carbon rich soils volumes 
(c) encourage use of excavated peat and other carbon rich soils in an appropriate
manner; and
(d) follow good practice for handling, storing and reinstating peat and other carbon
rich soils. 
(3) The Peat and Carbon Rich Soils Management Plan shall thereafter be implemented
as approved upon the Commencement of Development. having specific regard to
the SEPA requirements set out below: 
(a) All near-natural condition peatland habitat within 50m of infrastructure shall be
physically demarked prior to construction commencing to ensure construction
vehicles do not disturb the habitat during construction. The schedule of
mitigation should outline how this habitat will be safeguarded.
(b) Post-construction monitoring of impacts on near natural habitat in the vicinity of
TCC2, and which will require a mechanism to take specific action should
impacts occur:
(c) A schedule of monitoring should ensure the near-natural peatland habitat is
safeguarded from direct and indirect impacts and must include: 
• Proposals for fixed point photography and repeat National Vegetation
Classification and hydrological condition surveys.
• Frequency of monitoring, supported by justification.

Page 6

• Criteria that will trigger additional action should monitoring reveal that the
near-natural peatland habitat is no longer sequestering or is degrading to a
modified habitat type. 
(d) Bottomless arch culverts or span bridges should be used for all new or
upgraded watercourse crossings, and all watercourse crossings must be
designed to convey the 1:200 plus Climate Change.
(e) Any actions taken shall adhere to NatureScot’s peatland restoration guidance. 
Reason: To ensure that peat is protected, extracted, stored, reinstated or restored in a
manner which minimises waste and maximises peat restoration on site. 
10. Floating Tracks 
Prior to commencement of development a plan showing details of the extent and
construction methodology of any required floating tracks shall be submitted for the
further written approval of the Planning Authority in consultation with SEPA. 
Thereafter construction of the floating tracks shall be undertaken in full accordance
with the approved details. 
Reason: To minimise the impact on peat. 
11. Design and operation of wind turbines 
(1) No turbines shall be erected until details and specification of the proposed wind
turbines, (including the size, make and model, power rating and sound power
levels, nameplate generating capacity, type, external finish and colour) any
anemometry masts and all turbine associated apparatus have been submitted to
and approved in writing by the Planning Authority.
(2) For the avoidance of doubt the scale of the turbines shall not exceed the
parameters assessed in the EIA Report and set out in the description of the
Development approved.
(3) The submission shall demonstrate that all wind turbine blades shall rotate in the
same direction.
(4) Thereafter the wind turbines, any anemometry masts and all associated apparatus
shall be constructed and operated in accordance with the details approved under
part (1) and shall be maintained in the free from external rust, staining or
discolouration, until such time as the Development is decommissioned unless
otherwise agreed in writing by the Planning Authority. 
Reason: To ensure that the environmental impacts of the turbines forming part of the
Development conform to the impacts assessed in the EIA Report and in the interests
of the visual amenity of the area. 
12. Design of Sub-station and ancillary development 
(1) There shall be no Commencement of Development until final details of any
proposed changes to the location, layout, external appearance, dimensions, and
surface materials of   any substation and control room buildings on the site, any
above ground electrical equipment, associated compounds, construction
compound, boundary fencing, external lighting and parking areas have been
submitted to, and approved in writing by, the Planning Authority.  For the avoidance

Page 7

of doubt the details of the sub-station shall not exceed the parameters assessed in
the EIA Report and application submissions. 
(2) Thereafter, the substation and control room buildings, any above ground electrical
equipment, associated compounds, fencing, external lighting and parking areas
shall be constructed in accordance with the details approved under part (1).  
Reason: To ensure that the environmental impacts of the sub-station and ancillary
development forming part of the Development conform to the impacts assessed in the
EIA Report and in the interests of the visual amenity of the area. 
13. Implementation of mitigation measures 
(1) No development (including the Site Enabling Works) shall commence until a
Schedule of Mitigation has been submitted to and approved in writing by the
Planning Authority. This Schedule shall encompass a list of all mitigation measures
from the EIA Report, any other commitments made by the applicant, and all
relevant mitigation secured by conditions attached to this permission with defined
timescales for implementation of each mitigation measure. 
(2) Thereafter, the approved Schedule of Mitigation shall be implemented in full unless
otherwise approved in writing by the Planning Authority. 
Reason: to ensure that the identified mitigation through the EIA Report is carried out in
accordance with the approved details. 
14. Enabling Works 
(1) No development or works shall commence on the Site unless and until a
programme of Site Enabling Works, detailing the extent, area and timings of such
works (the ‘Site Enabling Works Programme’) has been submitted to and approved
in writing by the Planning Authority.  The Site Enabling Works Programme must as
a minimum provide for the following: 
(a) A plan showing the extent and layout of the enabling works;
(b) The employment of a suitably qualified and experienced Ecological Clerk of
Works, or equivalent, for the project, with specific responsibility for
environmental management and the authority to take action when required,
including stopping operations and implementing mitigation measures; 
(c) The employment of a Planning Monitoring Officer, to discharge and to monitor
compliance with this condition, including provision of a quarterly compliance
report to the Council;
(d) A programme for environmental auditing and monitoring within the Site, before
and during the Site Enabling Works, to provide the establishment of an
environmental checklist, to monitor and input into the planning of construction
activities and ensure implementation of all environmental mitigation measures;
(e) A site-specific statement outlining drainage and sediment management for all
exploration areas and measures to limit above ground construction;
(f) activities during periods of high rainfall, including weather forecasting and
actions to be taken in advance of adverse forecasts; 
(g) Working arrangements, including a programme for the phasing of operations,
and particularly the movement of plant, materials and rock into, across and out

Page 8

of the site to minimise, so far as reasonably possible, impact on communities or
businesses adjacent to or in close proximity to the Site;
(h) Waste Management and Pollution Controls including contingency plans in case
of pollution incidents;
(i) A programme of work for the evaluation, preservation and recording of any
archaeological and historic features affected by the Development, including a
timetable for investigation, which must be submitted for the written approval of
the Planning Authority. The approved programme must be implemented in
accordance with the agreed timetable for investigation unless otherwise agreed
in writing with the Planning Authority;
(j) Measures to protect any scheduled monument(s) within the area of the enabling
works;
(k) Details for the delivery, storage, loading and unloading of plant and materials to
be used in constructing the development, with particular regard for the
deployment of HGVs and any abnormal loads;
(l) Measures to control the emission of dust and dirt during construction; 
(m)Provision of welfare facilities on site during construction and the means of
disposal of foul drainage;
(n) Measures to protect all existing public water, private water and drainage
arrangements, with suitable back up arrangements in case of any disruption to
these provisions from Site Enabling Works;
(o) An Access Management Plan to maintain public access and promote the
general safety of walkers, cyclists, and users out-with the principal construction
areas and access roads serving the Development during the Site Exploratory
Works. A key principle to be advanced within the Plan is to minimise restrictions
on public access to important recreational facilities; 
(p) Wheel washing facilities to prevent vehicles associated with the Site Enabling
Works from depositing mud or dirt on the public road network when leaving the
Site;
(q) Lighting for Site Enabling Works which will minimise illumination, glare or light
spillage outwith the site boundary. 
(2) All Site Enabling Works must be carried out in accordance with the approved Site
Enabling Works Programme unless otherwise agreed in writing with the Planning
Authority. 
Reason: To ensure that all Site Exploratory Works are carried out in a manner that
minimises their impact on amenity and the environment, and that the mitigation
measures contained in the EIA Report accompanying the application are fully
implemented. 
15. Planning Monitoring Officer 
(1) There shall be no Commencement of Development until the terms of appointment
by the Company of an independent and suitably qualified consultant as Planning
Monitoring Officer (“PMO”) have been submitted to, and approved in writing by, the
Planning Authority.  The terms of appointment shall: 
(a) impose a duty to monitor compliance with the terms of the deemed planning
permission and the conditions attached to it; 
(b) require the PMO to submit a quarterly report to the Planning Authority
summarising works undertaken on site, matters of compliance or otherwise with
the terms of the deemed planning permission and conditions attached to it,

Page 9

alongside a summary of the incidents recorded and reported by the ECoW and
GCoW; and
(c) require the PMO to report to the Planning Authority any incidences of non-
compliance with the terms of the deemed planning permission and conditions
attached to it at the earliest practical opportunity, and no later than 10 working
days following the incidence of non-compliance. 
(2) The PMO shall be appointed on the approved terms throughout the period from
Commencement of Development to completion of construction works and post-
construction site reinstatement works. 
(3) Prior to the decommissioning, restoration and aftercare phases of the Development
or the expiration of the operational period of the consent (whichever is the earlier),
details of the terms of appointment of a and suitably qualified consultant as PMO by
the Company throughout the decommissioning, restoration and aftercare phases of
the Development shall be submitted to, and approved in writing by, the Planning
Authority. 
(4) The PMO shall be appointed on the terms approved under part (3) throughout the
decommissioning, restoration and aftercare phases of the Development. 
Reason: To ensure compliance with the planning permission and the conditions
attached to it. 
16. Ecological Clerk of Works 
(1) There shall be no Commencement of Development until the terms of appointment
of a suitably qualified, experienced, and independent Ecological Clerk of Works
(“ECoW”) by the Company have been submitted to, and approved in writing by, the
Planning Authority. The terms of appointment shall: 
(a) impose a duty to monitor compliance with the ecological and hydrological
commitments provided in any approved Schedule of Mitigation, any approved
Construction and Environmental Management Plan, any approved Habitat
Management Plan,  and any approved species protection plan;,
(b) require the ECoW to report to the nominated construction project manager any
incidences of non-compliance with the ECoW works at the earliest practical
opportunity;
(c) require the ECoW to submit a quarterly report to the Planning Authority
summarising works undertaken on site; and
(d) require the ECoW to report to the Planning Authority any incidences of non-
compliance with the ECoW works at the earliest practical opportunity, and no
later than 5 working days following the incidence of non-compliance. 
(2) The ECoW shall be appointed on the terms approved under part (1) throughout the
period from pre-construction works1, Commencement of Development to
completion of construction works and post-construction site reinstatement works. 
(3) Prior to the decommissioning, restoration and aftercare phases of the Development
or the expiration of the operational period of the consent (whichever is the earlier), 
1 This may include Site Enabling Works. If the Site Enabling Works condition is included the wording should
be updated to reflect this.

Page 10

details of the terms of appointment of a suitably qualified, experienced, and
independent ECoW by the Company throughout the decommissioning, restoration
and aftercare phases of the Development shall be submitted to, and approved in
writing by, the Planning Authority. 
(4) The ECoW shall be appointed on the terms approved under part (3) throughout the
decommissioning, restoration and aftercare phases of the Development. 
Reason: To secure effective monitoring of and compliance with the environmental
mitigation and management measures associated with the Development during the
construction, post-construction restoration, decommissioning, restoration and aftercare
phases. 
17. Environmental Clerk of Works 
(1) There shall be no Commencement of Development until the terms of appointment
of an independent Environmental Clerk of Works (“EnvCoW”) by the Company
have been submitted to, and approved in writing by, the Planning Authority. The
terms of appointment shall: 
(a) impose a duty to monitor compliance with the environmental commitments
provided in the EIA Report, any approved Construction Environmental
Management Plan, any approved Habitat Management Plan, and any species
or habitat management plans identified in the EIA Report;
(b) require the EnvCoW to report to the nominated construction project manager,
developer and Planning Authority any incidences of non-compliance with the
EnvCoW works at the earliest practical opportunity; 
(c) require the EnvCoW to submit a monthly report to the construction project
manager, developer and Planning Authority summarising works undertaken on
site. 
(2) Prior to the decommissioning, restoration and aftercare phases of the Development
or the expiration of the operational period of the consent (whichever is the earlier),
details of the terms of appointment of a suitably qualified, experienced, and
independent EnvCoW by the Company throughout the decommissioning,
restoration and aftercare phases of the Development shall be submitted to and
approved in writing by the Planning Authority. 
(3) The EnvCoW shall be appointed on the terms approved under part (2) throughout
the decommissioning, restoration and aftercare phases of the Development. 
Reason: To secure effective and transparent monitoring of and compliance with the
environmental mitigation and management measures associated with the
Development during the construction, decommissioning, restoration and aftercare
phases. 
18. Geotechnical Clerk of Work 
(1) There shall be no Commencement of Development until the terms of appointment
by the Company of an independent and suitably qualified engineer as a
Geotechnical Clerk of Works (“GCoW”) have been submitted to, and approved in
writing by, the Planning Authority.  The terms of appointment shall:

Page 11

(a) impose a duty to monitor compliance with any approved  Construction and
Environmental Management Plan, any approved  Peat Management Plan,  and
any approved Peat Landslide Risk Management Plan; 
(b) require the GCoW to report to the Planning Authority and nominated
construction project manager any incidences of geotechnical risks at the
earliest practical opportunity, and no later than 5 working days following the
incidence of non-compliance; and
(c) require the GCoW to report to the Planning Authority any incidences of peat
land slips at the earliest practical opportunity to SEPA where there are risks to
the wider environment, and no later than 5 working days following the incidence
of peat land slips. 
(2) The GCoW shall be appointed on the terms approved under part (1) throughout the
period from Commencement of Development to completion of construction works
and post-construction site reinstatement works. 
(3) Prior to the decommissioning, restoration and aftercare phases of the Development
or the expiration of the operational period of the consent (whichever is the earlier),
details of the terms of appointment of a suitably qualified engineer as a GCoW by
the Company throughout the decommissioning, restoration and aftercare phases of
the Development shall be submitted to, and approved in writing by the Planning
Authority.   
(4) The GCoW shall be appointed on the terms approved under part (3) throughout the
decommissioning, restoration and aftercare phases of the Development. 
Reason: To secure effective monitoring of and compliance with the mitigation related
to geotechnical matters, particularly peat land slip and management measures
associated with the Development during the construction, post-construction
restoration, decommissioning, restoration and aftercare phases. 
19. Construction and Environmental Management Plan (CEMP) 
(1) There shall be no Commencement of Development until a Construction and
Environmental Management Plan (CEMP) containing site specific details of all on-
site construction works, post-construction reinstatement, drainage and mitigation,
together with details of their timetabling, has been submitted to, and approved in
writing by, the Planning Authority.  The CEMP shall be informed by the site and
ground investigation works and best practice guidance. 
(2) The CEMP shall provide: 
(a) a site waste management plan (dealing with all aspects of waste produced
during the construction period other than peat and other carbon rich soils),
including details of contingency planning in the event of accidental release of
materials which could cause harm to the environment, evidencing all proposals
comply with SEPA’s guidance and the requirements of the waste management
licensing regime as appropriate;
(b) details of the location, layout, formation of the construction compound, welfare
facilities, any areas of hardstanding, turning areas, internal access tracks, car
parking, material stockpiles, oil, fuel and chemical storage, lighting columns,
and any construction compound boundary fencing required for the construction
period;

Page 12

(c) a dust management plan detailing all mitigation/dust suppression measures
intended to reduce the impacts of dust on site, including measures to reduce
dust on roads;
(d) site specific details for management and operation of any concrete batching
plant (including disposal of pH-rich waste water and substances);
(e) details of measures to be taken to prevent loose or deleterious material being
deposited on the local road network including wheel cleaning and lorry sheeting
facilities, and measures to clean the site entrances and the adjacent local road
network;
(f) a Pollution Prevention and Incident Plan incorporating a Pollution Prevention
Plan, Pollution Incident Plan and a Pollution Control Monitoring Plan, this shall
provide measures to protect watercourses, groundwater, management of
natural surface hydrological flows (flushes, springs, etc.) and protection of
peatland/soils, arrangements for the storage and management of oil and fuel
and other chemicals on the site and sewage disposal and treatment;
(g) details of soil storage and management including outline quantities, locations
(other than peat and other carbon rich soils) management of long-term storage
of construction generated to facilitate future site restoration;
(h) a drainage management strategy, demonstrating how all surface and
wastewater arising during and after construction is to be managed and
prevented from impacting on the water environment and to mitigate flood risk;
(i) a surface water and groundwater management and treatment plan, including
details of the separation of clean and dirty water drains, and location of
settlement lagoons for silt laden water;
(j) details of temporary site illumination, including measures to ensure light
spill/pollution is minimised and avoids habitats within the site and does not
extend beyond the immediate working area, and not beyond the site boundary;
(k) Any required Protected Species Plans. The Plan(s) shall be informed by
surveys carried out by a suitably qualified person (and updated surveys should
the existing survey information be more than 18 months old at start of
development works). The ecological and species surveys shall inform the
mitigation measures required to protect protected species during construction of
the Development. The Plan shall provide mitigation measures, as required, and
a timetable for implementation.
(l) details of the construction of the access into the site, including associated
drainage and the creation and maintenance of associated visibility splays;
(m)Site-specific Construction Method Statements for the following:
i. crane pads;
ii. turbine foundations;
iii. working cable trenches;
iv. erection of the wind turbines and meteorological masts; 
v. Energy storage compound formation and installation of energy storage
equipment;
vi. Substation compound formation, erection of associated buildings and
ancillary infrastructure; 
vii. watercourse crossings including full details and plans of the design and
specification of all new and upgraded watercourse crossings to be
constructed, ensuring continuous flow and fish passage with no hanging
culverts, noting all crossings shall be oversized bottomless arched culverts
or traditional style bridges; 
(n) details of post-construction restoration/reinstatement of the working areas not
required during the operation of the Development;

Page 13

(o) Historic Environment Protection Plan including details of protective fencing of
the location of the historic environment features to be protected during
construction works, including appropriate buffers; 
(p) a wetland ecosystems survey and mitigation plan; 
(q) a tree felling and management plan;
(r) a Construction Noise Management Plan including details of the management of
noise and vibration during construction and post-construction restoration,
including that caused by construction traffic, to the lowest practicable levels and
in accordance with BS 5228:2009 “Code of Practice for noise and vibration
control on construction and open sites – Part 1: Noise and Part 2: Vibration” (or
any updated version/document which superseded this document) and how any
properties likely to be affected by construction noise will be kept informed;
(s) Construction Method Statements for all roads/tracks to be altered/formed
associated with the development, including their width, likelihood of widening or
passing places, means of drainage (which shall have regard to SUDS
principles), means of construction, and edge reinstatement including verge
width. The specification shall be accompanied by relevant plans at a sufficient
scale; 
(t) the cable trenches;
(u) a phasing plan for the construction works; and
(v) a written scheme which details the methodology for dealing with any revisions to
any of the documents required under this part (3). Any revised documents will
require to be submitted to and approved in writing by the Planning Authority
prior to the revisions being implemented on site. 
(3) The Development shall be implemented in accordance with the CEMP approved
under part (1) unless otherwise approved in advance in writing by the Planning
Authority. 
Reason: To ensure that all construction operations are carried out in a manner that
minimises their impact on road safety, amenity and the environment, and that the
mitigation measures contained in the EIA Report accompanying the application, or as
otherwise agreed, are fully implemented. 
20. Construction Hours 
(1) Construction work shall only take place between the hours of 07.00 to 19.00 on
Monday to Friday inclusive and 07.00 to 16.00 on Saturdays, with no construction
work taking place on a Sunday or Public Holiday. Outwith these specified hours,
maintenance works, emergency works and construction works shall be limited to
concrete pours, wind turbine erection, dust suppression, and the testing of plant
and equipment, unless otherwise approved in advance in writing by the Planning
Authority.   
(2) HGV movements (excluding abnormal loads) to or from the site during construction
of the wind farm shall be limited to [07.00 to 19.00 Monday to Friday (inclusive),
and 07.00 to 16.00 on Saturdays, with no HGV movements to or from site taking
place on a Sunday or Public Holiday. Outwith these hours, and subject to
paragraph (1), HGV movements are to be limited to wind turbine delivery (unless
otherwise approved in advance in writing by the Planning Authority).   
Reason: In the interests of local amenity.

Page 14

21. Traffic Management Plan 
(1) There shall be no Commencement of Development until a Traffic Management
Plan has been submitted to, and approved in writing by, the Planning Authority in
consultation with the Area Roads Manager and Transport Scotland.  The Traffic
Management Plan shall provide: 
(a) the routeing of all traffic associated with the Development on public roads;
(b) measures to ensure that the specified routes are adhered to, including
monitoring procedures;
(c) details of all signage and lining arrangements to be put in place;
(d) provisions for emergency vehicle access; 
(e) provision for the submission and agreement of a roads condition survey pre-and
post-construction accompanied by an appropriate agreement between the
Planning Authority and the Company to ensure the delivery of any post-
construction public road restoration that may be required; and
(f) identification of a nominated person to whom any road safety issues can be
referred. 
(2) The approved Traffic Management Plan shall be implemented in full, unless
otherwise approved in advance in writing by the Planning Authority. 
Reason: In the interests of road safety. 
22. On site Electricity and control cables 
All electricity and control cables between the turbines, substations and control
buildings shall be laid out underground unless as otherwise agreed in writing with the
Planning Authority and NatureScot. 
Reason: In the interests of the protection of Nature Interests and to avoid any
additional above ground visual impacts arising from the development. 
23. Biodiversity Enhancement and Habitat Management Plan 
No development in respect of this planning permission shall take place unless a
Biodiversity Enhancement and Habitat Management Plan (BE-HMP) has been
submitted to and approved by the Planning Authority in consultation with NatureScot.
The BE-HMP shall set out the proposed Biodiversity Enhancement and Habitat
Management of the development site during the period of construction, operation,
decommissioning and restoration of the site and set out proposals for habitat and
biodiversity restoration and enhancement. 
The approved BE-HMP shall be implemented in full to the agreed timescale. 
Reason: In order to define the terms of the permission and in order to prevent undue
adverse impacts to wildlife and habitats and provide biodiversity enhancement and to
protect and improve habitats which may be affected by the development. 
24. Programme of Archaeological Works 
No development shall take place within the development site as outlined in red on the
approved plan until the developer has secured the implementation of a programme of

Page 15

archaeological works in accordance with a written scheme of investigation which has
been submitted by the applicant, agreed by the West of Scotland Archaeology Service,
and approved by the Planning Authority. Thereafter the developer shall ensure that the
programme of archaeological works is fully implemented and that all recording and
recovery of archaeological resources within the development site is undertaken to the
satisfaction of the Planning Authority in agreement with the West of Scotland
Archaeology Service. 
Reason To ensure the protection and recording of archaeological features. 
25. Access Management Plan 
No development shall commence unless and until an Access Management Plan (AMP)
has been submitted to and approved in writing by the Planning Authority. The AMP
shall include (but shall not necessarily be limited to): 
(a) identification of limitations on site access rights during the construction phase; 
(b) details of appropriate access management during the construction and operational
periods of the Development, including such matters as the maintenance of public
access and temporary or permanent diversion or stopping up of public rights of
way; 
(c) details of warning and management signage which is appropriate and takes
account of both the operational needs and access rights during both the
construction and the operational periods of the Development;
(d) set out the access management regime to be implemented during the operational
phase of the Development.
(e) provision for operational use of the wind farm tracks/access road for leisure access,
including procedures to maintain amenities. 
The approved AMP shall thereafter be implemented in full. 
Reason: To ensure that public access is managed appropriately throughout the
construction and operational period of the Development. 
26. Roads and Infrastructure 
Prior to the commencement of development written confirmation of adherence the
following matters shall be submitted for the approval of the Planning Authority in
consultation with the Area Roads Manager. All required works to be undertaken in
accordance with the requirement of the Area Roads Manager as agreed. 
• New accesses and existing accesses in need of amending or modification to be
upgraded in accordance with Operational Services Drg No SD08/001b. 
• Visibility splays measuring 42m x 2.4m to be cleared and maintained in perpetuity. 
• Additional road signs and markings will be required, as per TSRGD. Exact
specifications and locations to be agreed with this department. 
• A statement in respect to the materials and plant to be transported over the C32 to
serve the works is required. The statement should also state where materials will

Page 16

be imported from along with estimated quantities, so the effect on local quarry
roads can be assessed.  
• Major works notice will be required for the planned C32 upgrades. 
• TTRO applications will be required for works within the C32 corridor
.
• Detailed engineering, technical drawing required in relation to C32 upgrades.
Details to be approved by this department. General illustrations as per Fig 2.10b.
2.10c and 2.10d. 
• A system of traffic management to be in place to accommodate the traversing of
abnormal loads over the C32. Details to be agreed with this department. 
• A pre start road inspection to be carried out. Any extraordinary damage to the C32
road corridor caused by the associated proposal works to be made good at no
expense to Argyll and Bute Council. 
• A pre start site meeting is required, to discuss planned changes to the C32. 
Reason: To ensure that the construction activities associated with the proposals and 
transportation of abnormal loads will not have any detrimental effect on the  road
network. 
27. Construction Traffic Management Plan (CTMP) 
Prior to commencement of the development, a Construction Traffic Management Plan
(CTMP) shall be submitted to, and approved by, the Planning Authority, after
consultation with Transport Scotland and the Area Roads Manager. Thereafter, all
construction traffic associated with the development shall conform to the requirements
of the agreed plan. 
This shall include: 
a) Details of any additional signing or temporary traffic control measures deemed
necessary due to the size or length of any loads being transported must be
undertaken by a recognised QA traffic management consultant 
b) Details of proposals for an abnormal load delivery trial-run to be undertaken with
the involvement of Police Scotland and prior to the commencement of abnormal
loads deliveries. Trial-run proposals shall be submitted to and approved in writing
by the Planning Authority in consultation with Transport Scotland. 
c) Details of any accommodation measures required, including the removal of street
furniture, junction widening, over-sail of the trunk road, and traffic management
must be approved and implemented to the satisfaction of the Planning Authority, in
consultation with Transport Scotland. 
Reason: To mitigate the adverse impact of construction traffic on the safe and efficient
operation of the trunk road network.

Page 17

28. Decommissioning Traffic Plan 
Prior to any decommissioning of the development, a Decommissioning Traffic Plan in
respect of traffic management shall be prepared and approved in writing by the
Planning Authority, in consultation with Transport Scotland. 
The Development shall be decommissioned in accordance with the approved
decommissioning traffic plan. 
Reason To mitigate the adverse impact of construction traffic on the safe and efficient
operation of the trunk road network. 
29. Aviation Lighting 
That no turbine shall be erected unless a scheme for aviation lighting for the wind
farm, consisting of Civil Aviation Authority-compliant visible aviation lighting and
Ministry of Defence (DIO) accredited infra-red aviation lighting, has been submitted
and approved by the planning authority in consultation with DIO and Civil Aviation
Authority. The turbines shall be erected with the approved lighting installed and the
lighting shall remain operational throughout the duration of this permission. 
Reason In the interests of aviation safety and landscape amenity. 
30. Defence Infrastructure Safeguarding 
(i) Aviation Lighting 
Prior to commencing construction of any wind turbine generators, or deploying any
construction equipment or temporal structure(s) 50 metres or more in height (above
ground level) the undertaker must submit an aviation lighting scheme for the
approval of the Argyll & Bute Council in conjunction with the Ministry of Defence
defining how the development will be lit throughout its life to maintain civil and
military aviation safety requirements as determined necessary for aviation safety by
the Ministry of Defence. This should set out: 
a) details of any construction equipment and temporal structures with a total
height of 50 metres or greater (above ground level) that will be deployed during
the construction of wind turbine generators and details of any aviation warning
lighting that they will be fitted with; and 
b) the locations and heights of all wind turbine generators and any anemometry
mast featured in the development identifying those that will be fitted with
aviation warning lighting identifying the position of the lights on the wind turbine
generators; the type(s) of lights that will be fitted and the performance
specification(s) of the lighting type(s) to be used. 
Thereafter, the undertaker must exhibit such lights as detailed in the approved
aviation lighting scheme. The lighting installed will remain operational for the
lifetime of the development.

Page 18

(ii) Aviation Charting and Safety Management 
The undertaker must notify the Ministry of Defence, at least 14 days prior to the
commencement of the works, in writing of the following information: 
a) the date of the commencement of the erection of wind turbine generators; 
b) the maximum height of any construction equipment to be used in the erection of
the wind turbines; 
c) the date any wind turbine generators are brought into use; 
d) the latitude and longitude and maximum heights of each wind turbine generator,
and any anemometer mast(s). 
The Ministry of Defence must be notified of any changes to the information supplied
in accordance with these requirements and of the completion of the construction of
the development. 
Reason In the interests of aviation safety. 
31. Television and Radio Reception Mitigation 
(1) No development shall commence unless and until a baseline Television and Radio
Reception survey has been undertaken. 
(2) In the event of a claim by any individual person regarding TV picture loss or
interference, including radio reception, at their house, business premise or other
building, this shall be investigated by an independent qualified engineer, appointed
by the Company (at the companies expense), and the results, including any
mitigation measures, shall be submitted to the Planning Authority, alongside a copy
of the results of the baseline survey undertaken under the terms of part (1). 
(3) Should any impairment to the TV signal or radio reception be attributable to the
Development, the Company shall remedy such impairment so that the standard of
reception at the affected property is equivalent to the baseline TV or radio reception
as relevant. For the avoidance of doubt, the resolution of disputes shall be
determined by an independent arbiter e.g. OFCOM or other professional body as
appropriate. 
Reason: To ensure local radio [and television] services are sustained during the
construction and operation of the Development. 
32. Operational Noise Planning Condition 
1) The rating level of noise from the combined effects of the wind turbines hereby
permitted (including the application of any tonal and/or amplitude modulation (AM)
character correction), when determined at any residential properties lawfully
existing or with planning permission at the time of the consent in accordance with
the Assessment and Rating of Wind Turbine Noise 2026 Planning Condition
Technical Guidance Notes (“ARWTN Technical Guidance Notes”), shall not exceed
the values for the relevant integer wind speed set out in or derived from the table
attached to this condition. In the event that a complaint is made, the following steps
shall be carried out:

Page 19

2) The turbines shall be designed to permit individually controlled operation or shut
down at specified wind speeds and directions in order to facilitate compliance with
noise criteria. 
3) The Company shall continuously log power production, wind speed and wind
direction at each wind turbine all (in accordance with Guidance Notes).  This data
shall be retained for a period of not less than 24 months. The Company shall
provide this information to the Planning Authority, in the format set out in the
Guidance Notes, within 14 days of receipt in writing of a request to do so. 
4) Prior to the Date of First Commissioning, the Company shall have submitted to, and
received written approval of the Planning Authority of, a list of proposed
independent consultants who will undertake compliance measurements in
accordance with this condition. Amendments to the list of approved consultants
shall be made only with the prior written approval of the Planning Authority. 
5)  Within 21 days from receipt of a written request of the Local Planning Authority,
following a justified complaint to it alleging noise disturbance at a specified
residential property, the wind farm operator shall, at its own expense, employ an
appropriately qualified and experienced acoustician and provide a written protocol
(“the Protocol”) to be approved in writing by the Local Planning Authority. The
Protocol shall confirm the applicable noise limit, describe the procedure to assess
the level and character of noise from the wind farm at the specified property in
accordance with the procedures described in the ARWTN Technical Guidance
Notes and set out a timescale within which the assessment described in the
Protocol will be completed. The written request from the Local Planning Authority
shall set out as far as possible the time or meteorological conditions to which the
complaint relates and whether the character of the noise is likely to include tonal
noise or AM components if applicable. Measurements to assess compliance with
the noise limits shall be undertaken in accordance with the agreed Protocol. If the
Local Planning Authority or acoustician determine the character of noise is likely to
include tonal or AM components, the Protocol needs to consider the assessment of
these characteristics. 
6) The wind farm operator shall provide to the Local Planning Authority the
acoustician's assessment of the rating level of noise at the specified property. The
assessment shall include, if requested by the Local Planning Authority, all data
collected for the purposes of undertaking the compliance measurements and
analysis, such data to be provided in a format to be agreed with the Local Planning
Authority. Certificates of calibration of the equipment shall be submitted to the Local
Planning Authority with the acoustician's assessment report. 
7) Where a further assessment of the rating level of noise from the wind farm at the
specified property is required to correct for other noise sources pursuant to the
ARWTN Technical Guidance Notes, the wind farm operator shall submit a copy of
the further assessment within 21 days of submission of the acoustician's initial
assessment unless otherwise agreed by the Local Planning Authority. The wind
farm operator shall facilitate wind turbine shut downs as suitably justified by the
acoustician to allow the contribution from other sources to be determined, if suitable
data is not already available. D. Wind farm operational and wind data logged by the
operator, as defined in the ARWTN Technical Guidance Notes, shall be supplied to
the relevant Local Planning Authority on its request, within 14 days of receipt in
writing of such a request.

Page 20

Table 1. Simplified operational site-specific noise limits (SSNL) at receptor
locations (dB LA90) for day and night periods 
Receptor Location (Easting, Northing
in BNG) 
Noise limit at
standardised wind
speeds up to 10 m/s,
dB LA90 
Duntanachan (196710, 728227) 
Clachadubh (194756, 727375) 
Barguillean Farm (198045, 728811) 
Sithean/Bunanta (198330, 728610) 
Bar Glas (197764, 728716) 
Am Barr (197857, 728777)
32 
29 
34  
34
34
34 
Reason: To protect amenity and to ensure that noise limits are not exceeded and to
enable prompt investigation of complaints. 
33. Compensatory Planting 
1) There shall be no Commencement of Development until a woodland planting
scheme to compensate for the removal of existing woodland (“the Replanting
Scheme”) has been submitted to and approved in writing by Argyll and Bute
Council in consultation with Scottish Forestry. 
2) The Replanting Scheme must comply with the requirements set out in the UK
Forestry Standard (Forestry Commission, 2017. ISBN 978-0-85538-999-4) and the
guidelines to which it refers. The Replanting Scheme submitted for approval must
include- 
a. details of the location of the area to be planted; 
b. details of landowners and occupiers of the land to be planted; 
c. the nature, design and specification of the proposed woodland to be planted;
d. details of all Necessary Consents for the Replanting Scheme and timescales
within which each shall be obtained; 
e. the phasing and associated timescales for implementing the Replanting
Scheme; 
f. proposals for the maintenance and establishment of the Replanting Scheme,
including; annual checks; replacement planting; fencing; ground preparation;
and drainage; and 
g. proposals for reporting to Argyll and Bute Council on compliance with
timescales for obtaining the Necessary Consents and thereafter implementation
of the Replanting Scheme. 
3) The approved Replanting Scheme shall thereafter be implemented in full and in
accordance with the phasing and timescales set out therein, unless otherwise
agreed in writing by Argyll and Bute Council after consultation with Scottish
Forestry. 
4) There shall be no Commencement of Development until all relevant Necessary
Consents for implementation of the Replanting Scheme in accordance with the
phasing and timescales set out therein have been obtained.

Page 21

Reason To secure compensatory planting to mitigate against effects of deforestation
arising from the Development. 
34. Water Pollution Protection Plan including Private Water Supply Protection
Measures 
Prior to the commencement of development a Water Pollution Prevention Plan shall be
submitted to the planning authority for its approval, providing details related to
safeguard any local private water supplies and the water environment generally to
ensure pollution does not take place associated with the implementation of this
permission. Such details shall be submitted for approval in consultation with
Environmental Protection, SEPA and Scottish Water. 
Reason: To ensure the protection of the water environment. 
35. Water Quality and Fish Monitoring Plan 
(1) There shall be no Commencement of Development until an integrated Water
Quality and Fish Monitoring Plan (WQFMP) has been submitted to and approved in
writing by the Planning Authority in consultation with Argyll District Salmon Fishery
Board (ADSFB). 
(2) The WQFMP must take account of the Marine Directorate’s guidance and shall
provide: 
a) provision that water quality sampling should be carried out prior to
Commencement of Development, during construction and for at least 12 months
after construction is complete; 
b) key hydro chemical parameters (including turbidity and flow data), the
identification of sampling locations (including control sites), frequency of
sampling, sampling methodology, data analysis and reporting;
c) Any required site-specific mitigation measures including those detailed in the
EIA Report. 
(3) Thereafter, the WQFMP shall be implemented in full within the timescales set out in
the WQFMP. 
Reason: To ensure no deterioration of water quality and to protect fish populations
within and downstream of the development area. 
36. Forestry Felling Plan 
(1) No felling shall take place until a Forestry Felling Plan (FFP) has been submitted to
and approved in writing by the Planning Authority in consultation with Scottish
Forestry. The FFP shall cover the Development site and shall provide: 
(a) details of felling and restocking proposals;
(b) details of the management measures to reduce the amount of felling required to
accommodate the Development;
(c) measures to deal with forest waste including brash in line with the UK Forestry
Standard;
(d) timelines for implementing the plan;

Page 22

(e) details setting out annual monitoring of the felled area and reporting procedures
to be carried out by a qualified expert;
(f) details of forestry management practices; and
(g) details demonstrating compliance with The UK Forestry Standard and the
Scottish Government’s Policy on Control of Woodland Removal (as amended or
replaced from time to time) 
(2) The approved FFP shall be implemented in full upon Commencement of Felling. 
Reason: to minimise and manage the effects of forestry felling required to
accommodate the Development. 
37. Eskdalemuir Seismic Array 
(1) Within [three months] of the completion of construction of the turbines, the
Company shall provide written confirmation to the Scottish Ministers, the Planning
Authority, the Ministry of Defence, the Defence Geographic Centre and NATS of
the following: 
(a) the as-constructed position of each turbine in eastings and northings (each to
six figures); and
(b) the hub height and rotor diameter of each turbine (in metres). 
Reason:  To manage any impact on the Eskdalemuir Seismic Array. 
38. Ongoing Operation and Maintenance 
The wind turbines shall be maintained in the approved colour, free from external rust,
staining or discolouration and in accordance with predicted operational noise outputs,
until such time as the wind farm is decommissioned.   
Reason:  In the interests of the visual and residential amenity of the area. 
39. Site Inspection Strategy 
(1) Prior to the Date of Final Commissioning, the Company shall submit an outline Site
Inspection Strategy (Outline SIS) for the written approval of the Planning Authority.
The Outline SIS shall set out a strategy for the provision of site inspections and
accompanying Site Inspection Reports (SIR) to be carried out at 25 years of
operation from the Date of Final Commissioning and every five years thereafter. 
(2) No later than 24 years after the Date of Final Commissioning, the Company shall
submit a final detailed Site Inspection Strategy (Final SIS), based on the principles
of the approved Outline SIS for the written approval of the Planning Authority. The
Final SIS shall set out updated details for the provision of site inspections and
accompanying Site Inspection Reports (SIR), in accordance with relevant guidance
at that time, to be carried out at 25 years of operation from the Date of Final
Commissioning and every five years thereafter. 
(3) At least one month in advance of submitting each SIR to the Planning Authority, the
scope of the SIR shall be agreed with the Planning Authority.   
(4) The SIR shall provide:

Page 23

(a) Details to demonstrate that the infrastructure components of the Development
are still operating in accordance with the operational noise condition; and
(b) An engineering report which details the condition of tracks, turbine foundations
and the wind turbines and sets out the requirements and the programme for the
implementation for any remedial measures which may be required. 
(5) The SIS and each SIR shall be implemented in full following the Date of Final
Commissioning unless otherwise agreed in advance in writing by the Planning
Authority. 
Reason: To ensure the Development is being monitored at regular intervals after the
first 25 years of operation. 
40. Micro Siting 
(1) All wind turbines, shall be constructed in the approved locations shown on plan
reference ( Fig2.5b ) The locations of wind turbines, buildings, masts, areas of
hardstanding and tracks may be adjusted by micro-siting within the redline
boundary shown on plan reference (Fig2.5b). Any such micro-siting is subject to the
following restrictions unless otherwise approved in advance in writing by the
Planning Authority 
(a) No wind turbine, building, mast or hardstanding shall be moved more than 50m
from the position shown on plan reference Fig 2.5b;
(b) No access track shall be moved more than 50m from the position shown on
plan reference Fig 2.5b;
(c) No micro-siting shall take place with the result that infrastructure has a greater
overall adverse impact on peat than the original location;
(d) No infrastructure other than as required for a water course crossing shall be
microsited to within 50 metres of a water course; 
(2) All micro-siting permissible under this condition shall be submitted to, and approved
in writing by SEPA, DIO  and the Ecological Clerk of Works (“ECoW”) in advance of
any works or development associated with the micro-siting request being
implemented; (DIO will only require to be consulted in relation to any proposed
wind turbine relocation). 
(3) No later than six months after the Date of First Commissioning an updated site
layout plan showing the final position of all wind turbines, buildings, masts, areas of
hardstanding, tracks and associated infrastructure forming part of the Development
shall be submitted to the Planning Authority. The plan shall also specify areas
where micro siting has taken place and, for each instance, be accompanied by
copies of SEPA, DIO and ECoW approval, as applicable. 
Reason: to control environmental impacts while taking account of local ground
conditions, DIO aviation safety and SEPA peat impact restrictions on such matters. 
41. Trunk Road Authority Requirements 
Prior to the commencement of development details of the following matters shall be
submitted to the planning Authority for its approval in consultation with Transport
Scotland;

Page 24

a) Prior to the commencement of the development, the proposed upgraded access on
the A85 trunk road, as generally illustrated by RSK nadara Figure 10.4 Access
Junction Design Rev 03 dated 17/06/2025, shall be constructed to a layout and
type (and method) of construction to be approved by the Planning Authority, after
consultation with Transport Scotland 
b) Prior to the commencement of the development, visibility splays, as generally
illustrated by RSK Figure 2.10a: Indicative Site Access - A85 to Fearnoch Forest
Track Rev 03 dated 14/08/2025, shall be provided and maintained to the
satisfaction of the Planning Authority, after consultation with Transport Scotland. 
c) Prior to commencement of deliveries to site, the proposed route for any abnormal
loads on the trunk road network must be submitted to and approved by the
Planning Authority, in consultation with Transport Scotland. 
d) Prior to the movement of any abnormal load, any accommodation measures
required, including the removal of street furniture, junction widening and traffic
management must be approved and implemented to the satisfaction of the
Planning Authority, in consultation with Transport Scotland. 
e) Prior to the movement of any components and/or construction materials, any
additional signing or temporary traffic control measures deemed necessary due to
the size or length of any loads being transported must be undertaken by a
recognised QA traffic management consultant, to be approved by Transport
Scotland. 
f) Prior to commencement of the grid connection element of the development, a
Construction Traffic Management Plan (CTMP) shall be submitted to, and approved
by, the Planning Authority, after consultation with Transport Scotland. In particular,
the CTMP shall identify measures to control the use of any direct access onto the
trunk road. Thereafter, all construction traffic associated with the development shall
conform to the requirements of the agreed Plan. 
Reason: To protect the Trunk Roads Network, ensure compliance with necessary
standards and in the interests of traffic safety. 
(Reference: Report by Head of Development and Economic Growth dated 3 September
2026, submitted) 
5. MR TONY COOGAN: ALTERATIONS TO GUESTHOUSE TO FACILITATE
LAWFUL USE OF EXISTING ROOF SPACE AS ANCILLARY GUEST
HOUSE OWNER'S ACCOMMODATION: GREENCOURT, BENVOULLIN
ROAD, OBAN (26/00434/PP) 
The Planning Officer spoke to the terms of the report.  In terms of the adopted Local
Development Plan 2 (LDP2) the site is within the defined ‘Settlement Area’ of Oban. 
Greencourt is a long-established guest house occupying an elevated position overlooking
Oban Bowling Green and Pavilion. 
The application seeks to make relatively minor alterations to the roof of the building to
facilitate the use of the existing roof void as guest house owner’s accommodation.  This
use is ancillary to the lawful use of the building as Class 7 Guest House and the use of the

Page 25

roof space does not, therefore, require planning permission.  The guest house already
contains ancillary owner’s accommodation and the proposal to move this into the roof void
will free up space within the existing building for dining room and storage purposes with no
net increase to the number of bedrooms (either for guest or ancillary guest house
manager’s use) within the building.  The accommodation will remain incidental to the
primary guest house and will not form a separate residential unit.  The proposal has
elicited 11 objections, 15 expressions of support and one representation.  The
representations largely relate to issues that fall out with the scope of the current planning
application. 
It is the opinion of Planning Officers that the proposal is wholly in accordance with the
provisions of the current Development Plan and Local Planning Policy, and it was
recommended that planning permission be granted subject to the conditions and reasons
appended to the report of handling. 
Decision 
The Committee agreed to grant planning permission subject to the following conditions
and reasons: 
Standard Time Limit Condition (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 06.03.2026, supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Location Plan  5300-02-301  09.03.2026
Plans as Existing  5300-03-301 A 20.03.2026
Plans as Proposed 5300-03-302   B 02.06.2026 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
2. PP – Obscure Glazing of Windows 
The two obscure glazed windows contained in the mono pitch dormer window to the
east-facing roof plane shall be installed before the development is first brought into use
and shall be maintained as such thereafter. 
Reason: To safeguard the privacy and residential amenity of neighbouring properties
and to ensure that no clear-glazed openings are installed without the prior written
approval of the Planning Authority.

Page 26

(Reference: Report by Head of Development and Economic Growth dated 26 August
2026, submitted) 
6. MRS FAULKES: PROPOSED ALTERATIONS AND ERECTION OF
EXTENSION: 30 THE GREEN, CRAOBH HAVEN (REF: 26/01009/PP) 
The Area Team Leader spoke to the terms of the report.  The application seeks planning
permission for alterations and the erection of an extension to an existing dwellinghouse. 
Reference was made to 2 late representations received since publication of the report
from parties that had previously commented on the application.  The first was from Argyll
Yacht Rigger Ltd and the other from Ania Zworzdiak. 
Planning Officers advise that the proposed alterations and extension are acceptable in
terms of their principle, siting, scale, massing, design and relationship with the host
dwelling and surrounding settlement. 
A total of 15 representations have been received, 12 objecting to the proposal with 3
affording support.  It is not considered that the objections raise any complex or technical
issues that have not been addressed in the report. 
The proposal is considered to accord overall with the relevant provisions of National
Planning Framework 4 and the Argyll and Bute Local Development Plan 2, and it was
recommended that planning permission be approved subject to the conditions appended
to the report of handling. 
Decision 
The Committee agreed to grant planning permission subject to the following conditions
and reasons: 
Standard Time Limit Condition (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 12/06/2026; supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Location Plan   17th June 2026
Site Plan   12th June 2026
Existing Plans
and Elevations
6412-1  12th June 2026
Proposed Plans
and Elevations
6412 – 2 D 12th June 2026

Page 27

Reason: For the purpose of clarity, to ensure that the development is implemented
in accordance with the approved details. 
2. External Finishes 
Unless otherwise expressly shown on the approved drawings, all external materials
and finishes to the extension and altered parts of the dwelling shall match or
harmonise with the corresponding materials and finishes of the existing dwelling in
respect of colour, texture and appearance, unless otherwise agreed in writing by the
Planning Authority. 
Reason: In order to ensure that the extension integrates satisfactorily with the host
dwelling and preserves the architectural and visual character of The Green and the
wider planning settlement of Craobh Haven, in accordance with NPF4 Policy 14 and
the relevant design provisions of the Argyll and Bute Local Development Plan 2. 
3. Boundary Wall 
The stone boundary wall forming part of the approved development shall be
constructed on in the position, height and form shown on the approved drawings. The
wall shall be faced or constructed in natural stone appropriate in colour, character and
appearance to the locality and shall thereafter be retained in that form. 
Reason: In the interests of visual amenity, the character of Craobh Haven and the
residential amenity of adjoining occupiers, and in order to ensure that the boundary
treatment does not exceed the scale assessed as part of this application. 
4. Ancillary Use 
The accommodation hereby approved, shall be used solely for the purposes incidental
or ancillary to the residential occupation and enjoyment of 30 The Green as a single
dwellinghouse and shall not be occupied, let or used independently from the
dwellinghouse. 
Reason: In order to define the scope of the permission and safeguard the residential
character of the property and amenity of neighbouring occupiers. 
5. Air Source Heat Pump 
The noise level arising from the operation of the air source heat pump hereby
approved shall not exceed 42 dB LAeq (5 minutes), measured at 1 metre from the
window of any habitable room on the façade of any neighbouring residential property. 
Reason: In order to safeguard the residential amenity of neighbouring properties from
unacceptable operational noise. 
(Reference: Report by Head of Development and Economic Growth dated 1 September
2026, submitted)

Page 28

7. SCOTTISH POWER RENEWABLES/MACHAIR WIND LIMITED: SCOTTISH
GOVERNMENT'S MARINE DIRECTORATE SECTION 36 CONSULTATION
ON PROPOSED MACHAIR OFFSHORE WIND FARM: SITE 15 KM NORTH
WEST OF ISLE OF ISLAY AND 12.4 KM WEST OF ISLE OF COLONSAY
(REF: 26/01100/S36) 
The Senior Planning Officer spoke to the terms of the report which provided a
recommended response to the Scottish Government’s Marine Directorate Section 36
Consultation for the proposed Machair Offshore Wind Farm. 
This report reviews the policy considerations which are applicable to this proposal and the
planning merits of the development, the views of bodies consulted by the Scottish
Government along with other consultations undertaken by the Council, and third-party
opinion expressed to the Scottish Government. 
Reference was also made to a supplementary report advising of representations received
from Jura Community Development Trust and Islay Community Council. 
The Committee was asked to agree the recommended response set out in the report. 
Decision 
The Committee agreed that the Scottish Government’s Marine Directorate should be
notified that Argyll and Bute Council: 
1. Raises an objection to the proposal on seascape and landscape visual impact
grounds, as the proposed offshore wind farm would result in extensive significant
adverse seascape, landscape and visual effects at national, regional and local levels
contrary to Policy GEN 7 of the National Marine Plan, Policy 11 and Policy 4 of the
National Planning Framework 4 and Policy 30, 70 and 71 of the Argyll and Bute Local
Development Plan 2. 
2. Raises an objection to the proposal on cultural heritage impact grounds, as the
proposed offshore wind farm would result in significant effects on the setting of
terrestrial heritage assets and on the setting of Iona conservation area, contrary to the
provisions of Policy GEN 6 of the National Marine Plan, Policy 7 of the National
Planning Framework 4 and Policy 16, 17 and 19 of the Argyll and Bute Local
Development Plan 2. 
3. Raises an Objection in relation to the principle of the development of the proposed
offshore windfarm at the proposed location and, as a consequence of its location,
scale and nature, its likely significant adverse effects on seascape, landscape, and
visual amenity, and on the unique  cultural heritage assets of the planning authority
area. These significant adverse effects are such that they are considered to outweigh
any positive contribution to renewable energy generation and climate change targets. 
4. Notes to Scottish Ministers that Argyll and Bute Council considers that the significance
of effect of this proposal on both seascape landscape and visual impact and on cultural
heritage grounds is so great that the proposed development would fail to meet 
provisions within The Electricity Act 1989, which require Scottish Ministers, in
considering proposals for consent, to have regard to the desirability of preserving
natural beauty of the countryside, and of protecting sites, buildings and objects of

Page 29

architectural, historic or archaeological interest, and to do what can reasonably be
done to mitigate any such effects. 
5. Raises strong concerns about the adequacy of the EIA Report, in relation to the
assessment of the significant negative environmental effects of the project as a whole,
and specifically in relation to underassessment of the significance of seascape
landscape and visual impacts, cultural heritage impacts and a lack of assessment of
the full range of socio-economic and tourism and recreation impacts on the fragile local
communities most impacted. 
6. Raises concerns about the prematurity of determining this application in the absence
of further information being submitted to address identified inadequacies and in
advance of any of the proposed statutory mitigation and compensation programmes
being implemented. 
(Reference: Report by Head of Development and Economic Growth dated 3 September
2026 and supplementary report number 1 dated 14 September 2026, submitted) 
8. DEVELOPMENT MANAGEMENT PERFORMANCE UPDATE - FQ1 2026/27 
A report providing an update on the performance of the Development Management
Service for the reporting period FQ1 2026/27 was considered. 
Decision 
The Committee reviewed and agreed the content of the report. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 4 September 2026, submitted) 
The Committee resolved in terms of Section 50(A)(4) of the Local Government (Scotland)
Act 1973 to exclude the press and public for the following item of business on the grounds
that it was likely to involve the disclosure of exempt information as defined in Paragraph
13 of Part 1 of Schedule 7A to the Local Government (Scotland) Act 1973. 
9. ENFORCEMENT REPORT - REFERENCE 25/00068/ENOTH2 
The Committee considered enforcement case reference 25/00068/ENOTH2. 
Decision 
The Committee agreed the recommendations detailed in the report. 
(Reference: Report by Head of Development and Economic Growth dated 4 September
2026, submitted)