Argyll and Bute Council
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD 
14 September 2026 
SUPPLEMENTARY PACK 1 
PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE - BY MICROSOFT
TEAMS on TUESDAY, 15 SEPTEMBER 2026 at 10:30 AM 
I enclose herewith a supplementary report for item 7 on the Agenda for the above meeting. 
Douglas Hendry
Executive Director 
SUPPLEMENTARY REPORT 
7. SCOTTISH POWER RENEWABLES/MACHAIR WIND LIMITED: SCOTTISH
GOVERNMENT'S MARINE DIRECTORATE SECTION 36 CONSULTATION ON
PROPOSED MACHAIR OFFSHORE WIND FARM: SITE 15 KM NORTH WEST OF
ISLE OF ISLAY AND 12.4 KM WEST OF ISLE OF COLONSAY (REF:
26/01100/S36) (Pages 3 - 8)  
Report by Head of Development and Economic Growth 
Planning, Protective Services and Licensing Committee 
Councillor Gordon Blair (Chair) Councillor Jan Brown
Councillor Kieron Green (Vice-Chair) Councillor Daniel Hampsey
Councillor Graham Hardie Councillor Fiona Howard
Councillor Willie Hume Councillor Andrew Kain
Councillor Paul Donald Kennedy Councillor Reeni Kennedy-Boyle
Councillor Liz McCabe Councillor Luna Martin
Councillor Peter Wallace   
Contact: Fiona McCallum                  Tel. No. 01546 604392
Public Document Pack

Page 2

This page is intentionally left blank

Page 3

Argyll and Bute Council  
Development and Economic Growth       
This Supplementary report is a recommended response to the Scottish Government’s
Marine Directorate (MD-LOT) Section 36 Consultation on the proposed Machair
Offshore Wind Farm. 
_________________________________________________________________________  
Reference No: 26/01100/S36 and MD-00012385 / MD-00012386  
Applicant:       Scottish Power Renewables/MachairWind Limited 
Proposal: A project design envelope approach comprises 91 335m blade tip
height turbines or 144 280m blade tip height turbines above lowest
astronomical tide within the Wind Development Area (WDA), offshore
substation platforms, inter-array cabling, and associated infrastructure.
The turbines will have a combined rated capacity of approx. 2GW.  
Site Address:  15km northwest of Islay and 12.4 west of Colonsay within the W1 Plan
Option Area with a total area of 448 km2     
SUPPLEMENTARY REPORT NO. 1 
1. INTRODUCTION 
This application is to be presented to the Planning, Protective Services and Licensing (PPSL)
Committee on 15th September 2026. Following the publication of the Report of Handling, it has
become evident that two consultation responses submitted to the Council have been omitted
from the report in error. These are summarised below and are available in full on the Council's
public access system. 
Jura Community Development Trust (summary of response dated 14.8.2026):
Recognises the need to increase renewable energy generation and supports principle of
investing in sustainable, low-carbon energy. Neither supports of objects to the proposal and
raises the following points:
• Consultation and community participation: Recognises the time and effort spent
engaging with local communities throughout the development of the proposal –
however consultation sits relatively low on the ladder of participation and for
developments of this scale and significance, the ambition should be to move towards
genuine partnership, shared influence and community empowerment.
• Scale and Proportionality: Machair is a nationally significant infrastructure project
that will have implications for the surrounding islands for decades. Large scale projects
should be judged on whether they leave host communities stronger, wealthier and
more resilient by ensuring a greater share of economic value remains within rural and
island economies.
• Transparent Framework for Community Benefit:  If consent is granted the focus
must shift towards securing the highest possible level of community participation,
ownership and long-term benefit by establishing an accountable framework for
community benefit. This should include a clear methodology for how community benefit
is calculated, transparent arrangements for allocating funds between communities,
locally accountable governance structures, meaningful community representation in
Page 3 Agenda Item 7

Page 4

decision-making, community priorities driving investment decisions, regular public
repotting on funds received, investment decisions and outcomes and periodic review
over the lifetime of the project.
• Beyond Annual Community Benefit Funds: If consent is granted, a development of
this scale should include opportunities for community ownership or equity, strategic
investment in community infrastructure, affordable housing, community owned
renewable energy and local energy resilience, transport and digital connectivity, skills,
apprenticeships and long-term employment pathways, economic diversification and
local enterprise and capital investment that generates sustainable future income. 
Islay Community Council (summary of detailed response 25.8.2026): 
Seascape, landscape and visual impacts: The two coastlines nearest the development are
those which the applicant's own consultants find to be significantly and adversely affected.
From Loch Gruinart the applicant calculates that the Project would occupy up to some 65
degrees of the horizon, and it records that the turbines would appear on the skyline behind
the northern Rhinns peninsula and “may therefore be perceived as an onshore wind farm
rather than an offshore development”. The applicant does not present these effects as capable
of being reduced. In the operational assessment for CCA 20 it states that the introduction of
the Project into views out towards the open sea would adversely affect the sense of being at
the edge of the British Isles, and that views along the coast towards distinctive features
including the Dun Bheolain headland would also be adversely affected. Policy 30 of the Local
Development Plan supports renewable energy development only where it can be adequately
demonstrated that there would be no unacceptable environmental effects on local
communities, landscape character and visual amenity; that demonstration has not been made
for these coastlines. The Community Council submits that the proposal is in conflict with NPF4
Policy 4(d), with the concession relied upon in Policy 11(e)(ii), with GEN 7 of the National
Marine Plan and with Policy 30 of the Local Development Plan; that the conflict is established
on the applicant's own evidence; and that it is a conflict of substance rather than of form,
because it concerns significant adverse effects, along the entire length of two designated
coastlines, which the applicant proposes to do nothing to reduce. 
The setting of Islay’s coastal monuments: The coastlines which the applicant assesses as
significantly affected are also where the coastal monuments of western and northern Islay
stand. The setting of a heritage asset is capable of being harmed by development at a
distance, without any physical interference with the asset itself. A study area of the
development area with a 50 km buffer was agreed with Historic Environment Scotland for the
purpose of assessing effects on the setting of designated assets. Within that 50 km there are
178 scheduled monuments, distributed across Tiree, Coll, Iona, Mull, the Garvellachs,
Colonsay and Islay. The relevant Islay assets are not incidental features. The applicant's own
coastal character baseline describes the west coast of the Rhinns as rich in ancient
monuments, and records forts at Dun Bheolain and Beinn a' Chasteil, standing stones at
Ballinaby and a chapel at Kilchiaran, together with the remains of a chapel and an unmanned
lighthouse on the offshore island of Orsay; on the northern coast it records the lighthouse at
Ruvaal. Historic Environment Scotland identified likely significant effects on its historic
environment interests. It advised that the proposed development was likely to affect the setting
of a number of scheduled monuments, and in particular those of early Christian character
whose cultural significance depends upon a sense of isolation, a position at the edge of the
land and a relationship with the open sea. Among the assets it named were two on or
immediately off Islay: Beinn a' Chaisteil promontory fort and associated remains (SM13213)
on the north-west coast, and the monastic site, chapel, burial ground and associated remains
on Nave Island (SM3233) identification of Dun Bheolain fort on Islay as a further asset likely
to be significantly affected. On the recorded advice of the statutory adviser, the effect of this
development upon the setting of at least one scheduled monument on Islay is capable of being
fundamental, and capable of raising issues of national importance. That advice was given at
Page 4

Page 5

a stage when redesign was said to remain possible, and no redesign responsive to it appears
on the record. If the Ministers find substantial harm to a designated asset, GEN 6 permits
consent only exceptionally and only where the harm is outweighed by the benefits which the
development is necessary to deliver, which returns the decision to the reduced weight properly
attaching to the claimed benefit, and to the absence of any assessed benefit of local
importance. 
The location, advice given and alternatives rejected: The harm described is a function of
two variables only: how far the turbines stand from the island, and how large they are. Both
were the subject of express advice from the Scottish Ministers' own statutory adviser before
this site was fixed, and both were the subject of alternatives which the applicant examined and
rejected. The nearest turbines would stand approximately 15 km from Islay, which is under
half the advised separation, and the tallest would reach 335 m, which exceeds the advised
ceiling by more than two thirds. Reliance upon the [Sectoral Marine] Plan and the lease does
not answer the objection as the is not the statutory marine plan for the purposes of the Marine
(Scotland) Act 2010; and it is against that Scotland’s National Marine Plan that these marine
licence applications fall to be determined. The plan-level assessment which accompanied the
Sectoral Marine Plan expressly deferred project-level scrutiny of effects to the consenting
stage, which is this stage. And the grant of a seabed lease by Crown Estate Scotland confers
no entitlement to consent; the Scottish Government’s offshore wind ambition is itself expressly
subject to rigorous project-level consenting and impact assessment.  The two variables which
produce the harm were both examined as alternatives, and both were rejected for a stated
reason. The applicant has produced a chapter dealing with site selection and alternatives and
the applicant's Without Prejudice Derogation Case sets out six Project Objectives against
which alternatives were appraised. The sixth is to optimise the W1 Plan Option Area and
maximise the generation capacity of the available Scottish seabed. Measured against those
objectives, a reduced development area and a reduced number of turbines were both
considered and both discounted. 
The Community Council submits that where harm to a designated landscape is the
consequence of a design choice made in preference to available and less harmful alternatives,
that harm falls to be weighed as a chosen harm, and the second limb of Policy 4(d) becomes
correspondingly harder to satisfy: benefits said to outweigh the harm must outweigh a harm
which need not have been incurred at the level proposed. Beyond the five-metre adjustment
already discussed, the EIAR identifies no mitigation of the seascape and visual effects on
Islay. The Ministers are accordingly considering a proposal in which conceded significant
adverse effects on a designated landscape area attract no mitigation at all. 
Islay and an affected island community: The applicant's socio-economic consultants,
BiGGAR Economics, recorded that there are potential impacts on habitability for island
communities in particular. Habitability, in that context, means the capacity of an island to
remain a place where people continue to live and work. Chapter 18 of the EIAR and its
technical appendix do not then examine that question for Islay. Islay appears within the
assessment, by reason of its potential role as a direct project location, that is, as a place where
project activity might be based. It is not assessed as an affected island community whose
exposure to the development has been measured. The employment and Gross Value Added
benefits of the Project are quantified at Scotland and United Kingdom level, and at that level
only. Not one of those figures is given for Islay, for the Inner Hebrides, or for Argyll and Bute. 
The two coastlines which the applicant finds to be significantly affected are not empty ground.
CCA 20 contains the settlements of Portnahaven and Port Wemyss, scattered farmsteads and
houses, a distillery at Kilchoman near Machir Bay, and a coastline which the applicant itself
records as a surfing venue at Machir Bay and as rich in ancient monuments. The island's
economy rests on distilling, agriculture and tourism, and its visitor economy is founded on the
coastal landscape, the birds and the beaches. Whether significant adverse change to those
Page 5

Page 6

coasts would affect the island's visitor economy, its businesses and its working population is
precisely the question the applicant's consultants raised and which Chapter 18 of the EIAR
does not answer. The Community Council notes the absence of assessment in line with
Marine Directorate guidance to the effect that local study areas should reflect the appropriate
impacts and be understandable to the communities they describe. A proposal which has not
assessed the affected community cannot demonstrate that local and community benefit has
been maximised. The local balance of benefit and harm is unquantified on both sides. ICC
further invites Argyll and Bute Council to exercise its power under section 14 of the Act to
request a retrospective island communities impact assessment of the Sectoral Marine Plan
for Offshore Wind Energy. 
Officer comment: please see response in the Report of Handling in relation to Island
Communities Impact Assessments. 
The marine environment: The Community Council adopts the representations of NatureScot,
RSPB Scotland and the other specialist bodies so far as consistent with this objection and
asks that substantial weight be given to that evidence. 
Commercial fisheries and displacement of fishing effort: Fishing effort excluded from 448
km² of sea does not cease; it relocates. The consequences of relocation, being gear conflict
and increased pressure on adjacent grounds, are borne by the same small fleets, and they
are consequences which the applicant's own chapter identifies. 
Navigation, lifeline connectivity and safety at sea: The applicant's shipping and navigation
chapter assesses seven impacts. They include reduced access to local ports and harbours
and a reduction of emergency response capabilities. The ferry services operated by
Caledonian MacBrayne are among the navigational receptors identified, which is to say that
the lifeline services upon which Islay depends for passengers and freight are within the
assessed zone of effect. The Community Council draws attention to the scale of the vessel
activity which would accompany the development, because it bears directly on both matters.
On the applicant's realistic worst case the construction programme would involve 117 vessels
and 5,699 vessel return trips over five years, with vessels assumed to be operating 24 hours
a day within the development area, followed throughout the operational phase by some 423
vessel movements and 576 helicopter movements each year. 
Habitats regulations: The applicant's Report to Inform Appropriate Assessment concludes
that no adverse effect on the integrity of any European site would arise, and the applicant
maintains that no derogation is required. In the same application, however, the applicant has
lodged a Without Prejudice Derogation Case together with a Without Prejudice Guillemot
Compensation Plan, both directed at a single feature of a single site: the guillemot of the North
Colonsay and Western Cliffs Special Protection Area. Its stated reason for doing so is that the
competent authority “may not reach the same conclusion” as the applicant. The applicant has
judged it necessary to plan for a conclusion of adverse effect on the integrity of that site in
respect of that feature. Where a well-advised promoter, in possession of the full survey and
modelling record, considers that the competent authority may properly reach the opposite
conclusion on the science, the question is not one from which reasonable scientific doubt has
been excluded. 
If the Ministers were to conclude that there would or might be an adverse effect on site
integrity, consent could be granted only if three cumulative tests were satisfied: that there is
no alternative solution, that there are imperative reasons of overriding public interest, and that
the necessary compensatory measures are secured. The second concerns compensation.
The applicant records that the Regulations governing compensatory measures came into
force in May 2026 and apply to this Project, and that the Scottish Government's statutory
guidance supporting those requirements has not yet been published. The Community Council
Page 6

Page 7

submits that the adequacy, deliverability and long-term security of any compensatory measure
would require to be established on evidence before consent could be granted, and that the
absence of the governing guidance is a matter the Ministers should weigh when considering
whether that has been achieved. 
Claimed climate benefit: the Project emits some 2.81 million tonnes of carbon dioxide
equivalent more than the ‘do nothing’ scenario against which it is measured. The reported
benefit of 2,851,685 tonnes is the result of subtracting the operational phase emissions alone,
1,904,549 tonnes, from the whole 35-year Do Nothing total of 4,756,234 tonnes. Construction,
decommissioning and the transmission infrastructure, amounting together to 5,658,469
tonnes, or 75% of the Project's own footprint, are absent from one side of the comparison.
Construction alone accounts for approximately 66% of the WDA's lifecycle emissions, and the
applicant records that 88% of the construction figure is embodied carbon in materials. The
applicant's own intensity figures disclose the same difficulty from a different direction, and this
comparison is made on a consistent basis. Chapter 19 reports the whole Project's carbon
intensity as 32.9 g CO₂e per kWh. The emission factor from which the Do Nothing baseline is
constructed is 20.7 tonnes CO₂e per GWh, which is 20.7 g CO₂e per kWh. Per unit of electricity
delivered, the Project as assessed is therefore more carbon-intensive than its own
counterfactual, by a margin of approximately 59%. 
The response also raises matters in relation to Raeshaw Farms Limited v Scottish Ministers;
Aviation lighting and the night-time environment; other marine users, major accidents and
pollution risk; climate resilience of the development itself; blue carbon; inter-related and
combined effects and securing mitigation. 
Islay Community Council requests that the Scottish Ministers REFUSE consent under section
36 of the Electricity Act 1989 and REFUSE the associated marine licence applications. 
2. CONCLUSION 
These matters do not raise any new concerns that have not already been addressed in the
Report of Handling and PPSL Committee Report where relevant to the Council’s areas of
interest to this consultation response. On matters where other statutory consultees are better
equipped to respond in terms of expertise, Argyll and Bute Council would defer to their advice
to the Scottish Government Marine Directorate. 
  
Author of Report: Shelley Gould        Date: 14.9.2026
Reviewing Officer: Peter Bain        Date: 14.9.2026 
 
 
Fergus Murray   
Head of Development and Economic Growth    