MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING
COMMITTEE held BY MICROSOFT TEAMS on WEDNESDAY, 19 AUGUST 2026 
Present: Councillor Gordon Blair (Chair) 
Councillor Jan Brown
Councillor Kieron Green
Councillor Willie Hume 
Councillor Reeni Kennedy-Boyle
Councillor Luna Martin
Councillor Peter Wallace 
Attending: Shona Barton, Governance Manager
Peter Bain, Development Manager
Sandra Davies, Major Applications Team Leader
David Walker, Solicitor
Tim Williams, Area Team Leader – Oban, Lorn and the Isles
Kirsty Sweeney, Area Team Leader – Bute, Cowal, Helensburgh & Lomond
Fiona Scott, Acting Area Team Leader – Mid Argyll, Kintyre and the Isles
David Moore, Senior Planning Officer
Colin Bradley, Planning Officer
Steven Gove, Planning Officer
Long Ting Yip, Planning Officer 
Prior to the start of business, the Chair paid tribute to Councillor Dougie Philand who had
died following prolonged illness, Councillor Philand had served the Mid Argyll area for 19
years and was latterly Provost of Argyll and Bute and a valued Member of the Planning,
Protective Services and Licensing Committee who would be sorely missed. 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Daniel Hampsey, Graham Hardie,
Fiona Howard, Andrew Kain, Paul Kennedy and Liz McCabe. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. MINUTES 
a) The Minute of the Planning, Protective Services and Licensing Committee held on 9
June 2026 was approved as a correct record. 
b) The Minute of the Planning, Protective Services and Licensing Committee held on 16
June 2026 was approved as a correct record. 
c) The Minute of the Planning, Protective Services and Licensing Committee held on 17
June 2026 at 10.30 am was approved as a correct record. 
d) The Minute of the Planning, Protective Services and Licensing Committee held on 17
June 2026 at 2.00 pm was approved as a correct record.

Page 2

4. CIVIC GOVERNMENT (SCOTLAND) ACT 1982: TAXI FARE SCALE
REVIEW 
In terms of Section 17 of the Civic Government (Scotland) Act 1982, the Local Authority
requires to fix maximum fares and other charges in connection with the hire of taxis
operating in their area and to review the scales for taxi fares and other charges on a
regular basis. 
The Committee, at their meeting on 17 June 2026 proposed to increase the maximum
fares by 5%.   
Consideration was given to a report advising that following publication of this proposal one
representation was received. 
Decision 
The Committee agreed to proceed with the 5% increase as previously proposed at their
meeting on 17 June 2026 as detailed in Appendix 2 of the report. 
(Reference: Report by Executive Director with responsibility for Legal and Regulatory
Support dated 19 August 2026, submitted) 
5. FABULOUSLY SCOTTISH HOTELS (OBAN) LTD: ERECTION OF HOTEL:
CAR PARK, SHORE STREET, OBAN (REF: 21/01584/PP) 
Prior to his presentation, the Planning Officer advised of a late additional representation
received from the Director of the Kelvin Hotel in Oban which raised additional points of
objection.  He advised that it was the opinion of Officers that all the points raised had been
adequately addressed in the report of handling.   
The Planning Officer then spoke to the terms of this report.   The proposal seeks to secure
planning permission for the erection of a 30 bedroom hotel at Shore Street, Oban.  In
terms of the Local Development Plan (LDP2), the site is identified as being within a
‘Settlement Area’ and was located on the edge of the defined town centre of Oban.  The
site is currently being used as a private car park.   
It is considered that the proposed development accords with all the relevant policies and
principles of National Planning Framework 4 (NPF4) and the relevant polices of LDP2
except for one key issue, LDP2 Policy 40 – Vehicle Parking Provision which requires off-
street car and vehicle parking for specified categories of development and to be provided
in the category of development proposed.  Due to the precise nature of the site, the
proposal provides for just 15 parking spaces, 4 of which are reserved through a
longstanding legal agreement to serve an existing off-site development elsewhere.  Given
this shortfall, the Council’s roads engineers have objected to the application on the
grounds that the requirements of LDP2 Policy 40 have not been met. 
One of the key national planning policy principles of NPF4 is “To encourage, promote and
facilitate developments that prioritise walking, wheeling, cycling and public transport for
everyday travel and reduce the need to travel unsustainably.”  In support of this, NPF4
Policy 13 (e) states that “Development proposals which are ambitious in terms of low/no
car parking will be supported, particularly in urban locations that are well served by
sustainable transport modes and where they do not create barriers to access by disabled
people.”

Page 3

Whilst, in the case of conflict between the National Planning Framework and a Local
Development Plan, Section 24 (3) of the Town & Country Planning (Scotland) Act 1997
states that the most recently adopted Plan (in this case LPD2) should have primacy,
Officers consider that the arguments put forward by the developer to accept a much
reduced level of off-street parking provision in this instance are acceptable. 
It was recommended that Members accept the low parking provision aspect of the
proposed development as a minor departure to Policy 40 of LDP2 and resolve to grant
planning permission subject to the conditions detailed in the report of handling. 
Decision 
The Committee agreed to grant planning permission as a minor departure to the Local
Development Plan subject to the following conditions and reasons: 
Standard Time Limit Condition (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 30/07/21, supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref.
No.
Version Date Received
Floor Plans – Scheme Design  1509 05  D  22/09/21 
Perspective View, Section –
Scheme Design 
1509 10  02/08/21 
Elevations – Scheme Design  1509 11   02/08/21 
Site Plan – Scheme Design  1509 12  B  
Location Plan    02/08/21 
Shore Street Hotel – Daylight &
Sunlight Report – 17 PAGES 
13/12/21 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
2. PP - Finishing Materials 
Notwithstanding the effect of Condition 1, no development shall commence until
samples of materials to be used in the construction of the development hereby
approved have been submitted to and approved in writing by the Planning Authority.
The development shall thereafter be completed using the approved materials or such
alternatives as may be agreed in writing with the Planning Authority. 
Reason: In order to integrate the development into its surroundings.

Page 4

3. PP – Sustainable Drainage System 
Notwithstanding the provisions of Condition 1, the development shall incorporate a
surface water drainage system which is consistent with the principles of Sustainable
urban Drainage Systems (SuDS) compliant with the guidance set out in CIRIA’s SuDS
Manual C753 and sewers for Scotland 4th Edition.  The requisite surface water
drainage shall be operational prior to the development being brought into use and shall
be maintained as such thereafter. 
Reason: To ensure the provision of an adequate surface water drainage system and to
prevent flooding. 
Note to Applicant 
Further advice on SuDS can be found in SEPA’s Standing Advice for Small Scale
Development – www.sepa.org.uk. 
4. PP - Waste Management 
Notwithstanding the effect of Condition 1, no development shall commence until a
Waste Management Strategy for the development has been submitted to and
approved in writing by the Planning Authority.   
The Waste Management Strategy shall include details of how much waste the
proposal is expected to generate and how it will be managed including: 
i. Details of provisions to maximise waste reduction and waste separation at source;
ii. Details of measures to minimise the cross-contamination of materials, through
appropriate segregation and storage of waste; convenient access for the collection
of waste; and recycling and localised waste management facilities. 
Thereafter the development shall be undertaken in accordance with the approved
Waste Management Strategy unless otherwise agreed in writing with the Planning
Authority. 
Reason:  In order to comply with the requirements of NPF4 Policy 12. 
5. PP - Landscaping and Biodiversity Enhancement 
Notwithstanding the effect of Condition 1, no development shall commence until details
of the proposed treatment of the soft landscaping areas within the development has
been submitted to and approved in writing by the Planning Authority. 
The scheme shall include details of: 
i. Location, design and materials of proposed walls, fences and gates; 
ii. Surface treatment of proposed means of access and hardstanding areas; 
iii. Proposed hard and soft landscape works;

Page 5

iv. A biodiversity statement demonstrating how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these benefits will
be maintained for the lifetime of the development. 
The development shall not be occupied until such time as the boundary and surface
treatment have been completed in accordance with the duly approved scheme. 
All biodiversity enhancement measures consisting of new or enhanced planting shall
be undertaken either in accordance with the approved scheme of implementation or
within the next available planting season following the development first being brought
into use. 
All physical biodiversity enhancement measures including those to be incorporated into
the fabric of the building shall be implemented before the development is first brought
into use. 
The biodiversity statement should refer to: Developing with Nature guidance |
NatureScot as appropriate. 
Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity, and to comply with the requirements of NPF4 Policy 3. 
6. PP – Contaminated Land 
Unless otherwise agreed in writing and in advance by the Planning Authority, no
development shall commence until a scheme has been submitted by the developer (at
their expense) to identify and assess potential contamination on site and agreed in
writing with the Planning Authority in consultation with the Environmental Health
Service.  The scheme shall be undertaken by a competent person or persons in
accordance with the relevant authoritative guidance including PAN 33 (2000) and BS
10175:2011 or, in the event of these being superseded or supplemented, the most up
to date version(s) of any subsequent revision(s) of, and/or supplement(s) to, these
documents.  This scheme should contain details of proposals to investigate and
remediate potential contamination to the satisfaction of the Planning Authority and
must include: 
a) A desk study and development of a conceptual site model including (where
necessary) a detailed site investigation strategy.  The desk study and the scope
and method of recommended further investigations shall be agreed with the
Council prior to addressing parts b, c and d of this condition. 
Should the desk study show the need for further assessment this will be undertaken in
the following sequence: 
b) A detailed investigation of the nature and extent of contamination on site, and
assessment of the risk such contamination presents. 
c) Development and agreement of a remedial strategy (if required) to treat/remove
contamination ensuring the site is made suitable for its proposed use (this shall
include a method statement, programme of works, and proposed verification plan). 
d) Submission of a verification report for any agreed remedial actions detailing and
evidencing the completion of these works.

Page 6

Written confirmation from the Planning Authority that the scheme has been
implemented and completed shall be required by the developer before any
development hereby approved comments.  Where remedial measures are required as
part of the development construction detail, commencement must be agreed in writing
with the Planning Authority. 
Reason:  To ensure that the potential risks to human health, the water environment,
property, and, ecological systems arising from any identified contamination have been
adequately addressed. 
7. PP - Construction Method Statement 
Notwithstanding the effect of Condition 1, no construction work shall commence until a
Construction Method Statement, which includes plant details, locations and lifting
plans, is submitted to the Planning Authority for approval and agreed in conjunction
with Network Rail’s Asset Protection Engineers. 
Reason:  To ensure construction can be carried out without adversely affecting the
safety of, or encroaching upon, the operational railway. 
Note to Applicant 
Regard should be had to the advisory comments from Network Rail in relation to the
proposed development details of which are available to view on the planning
application file via the Public Access section of the Council’s website. 
8. PP – Piling Works   
Notwithstanding the effect of Condition 1, no development shall commence until details
of proposed piling works have been submitted to the Planning Authority for approval
and agreed in conjunction with Network Rail’s Asset Protection Engineers. 
Reason:  To ensure construction can be carried out without adversely affecting the
safety of the operational railway. 
Note to Applicant 
Regard should be had to the advisory comments from Network Rail in relation to the
proposed development details of which are available to view on the planning
application file via the Public Access section of the Council’s website. 
9. PP – Vehicle Incursion 
Notwithstanding the effect of Condition 1, no development shall commence until an
assessment for vehicle incursion has been carried out.  Where a potential risk of
vehicle incursion is identified the developer shall submit details of the proposed
barrier/kerbing to be constructed to the Planning Authority for approval and agreed in
conjunction with Network Rail’s Asset Protection Engineers. 
Reason:  To ensure that there is no potential for vehicles to encroach onto the railway
should they collide with the boundary fencing.

Page 7

Note to Applicant 
Regard should be had to the advisory comments from Network Rail in relation to the
proposed development details of which are available to view on the planning
application file via the Public Access section of the Council’s website. 
10. PP – Finished Floor Level and Flood Risk Mitigation 
Notwithstanding the effect of Condition 1, the finished floor levels for the development
shall be set to a minimum of 5.1m AOD with a property floor protection level of 5.4m
AOD (by utilising flood resilience and resistance measures). 
The development hereby approved must also have a safe flood free access /
egress on ground that is entirely above 4.56m AOD. 
Reason: To ensure that the building remains safe and operational during floods and to
ensure that there is safe access/egress available from the building during a flood
event. 
Note to Applicant 
Regard should be had to the consultation comments from JBA Consulting Ltd advisory
comments from Network Rail in relation to the proposed development details of which
are available to view on the planning application file via the Public Access section of
the Council’s website. 
11. PP - Timescale to be Agreed for Completion 
No development shall commence until details of the proposed timescale for completion
of the approved development have been submitted to and approved by the Planning
Authority. Thereafter, the development shall be implemented in accordance with the
duly approved timescale for completion unless an alternative timescale for completion
is otherwise agreed in writing with the Planning Authority. 
Reason: In order to comply with the requirements of NPF4 Policy 16F. 
12. Parking and Turning as Shown 
The parking and turning area shall be laid out and surfaced in accordance with the
details shown on the approved plans prior to the development first being occupied and
shall thereafter be maintained clear of obstruction for the parking and manoeuvring of
vehicles. 
Reason: In the interest of road safety 
13. PP - Vehicular Access 
Notwithstanding the effect of Condition 1, the new proposed vehicular access at the
junction with the public road shall be upgraded in accordance with the Council’s Roads

Page 8

Standard Detail Drawing SD 08/005a with visibility splays of 2.4 metres to point X by
42 metres to point Y from the centre line of the proposed access. The access shall be
surfaced with a bound material in accordance with the stated Standard Detail Drawing. 
Prior to work starting on site the access hereby approved shall be formed to at least
base course standard and the visibility splays shall be cleared of all obstructions 1.05
metres above the access.  The final wearing surface on the access shall be completed
prior to the dwellinghouse first being occupied and the visibility splays shall be
maintained clear of all obstructions thereafter. 
Reason: In the interests of road safety. 
Note to Applicant: 
• A Road Opening Permit under the Roads (Scotland) Act 1984 must be obtained
from the Council’s Roads Engineers prior to the formation/alteration of a junction
with the public road.
• The access shall be constructed and drained to ensure that no surface water is
discharged onto the public road. 
• No new walls, fences, hedges etc. will be permitted within 2 metres from the
channel line of the public road.
• Applicant to be responsible for the costs of moving road signs, street lighting
columns and pillars as necessary as well as being responsible for the costs
incurred due to any required changes in traffic orders including re-lining alterations. 
(Reference: Report by Head of Development and Economic Growth dated 30 July 2026,
submitted) 
6. ADVENTURE LANE CIC: CHANGE OF USE AND CONVERSION OF
EXISTING CHURCH AND DETACHED REAR HALL TO FORM A FAMILY
ENTERTAINMENT ACTIVITY CENTRE INCLUDING ERECTION OF SINGLE
STOREY LINK EXTENSION AND ASSOCIATED WORKS: TRINITY
CHURCH, 26 CASTLE STREET, ROTHESAY, ISLE OF BUTE (25/01690/PP) 
The Planning Officer spoke to the terms of the report.  The application relates to the
change of use of a currently vacant church and rear hall (a brownfield site) within
Rothesay, the main settlement on the Isle of Bute. 
This application is before the Committee for consideration due to a recommendation
submitted by the Council’s Roads Department that planning permission be refused on the
grounds of a lack of parking spaces and the resultant impact of this on road safety, traffic
management and parking within Rothesay.  It is the Planning Department’s opinion that
there are mitigating circumstances such that an approval can be justified as a minor
departure to Development Plan policy. 
It is considered that significant material weight should be afforded to sensitively bringing
this important Listed Building back into active use to benefit Rothesay town centre and the
wider Isle of Bute.  It is preferable to have off-street parking but, given a variety of factors
including the relative capacities of the lawful and proposed uses, the provision of an Active
Travel Plan, and the proximity to public transport links, it is not considered that absence of
off-street parking is a reason for refusal.

Page 9

It was recommended that planning permission be granted as minor departure to Local
Development Plan 2 subject to the conditions, reasons and informative notes set out in the
report of handling. 
Decision 
The Committee agreed to grant planning permission as a minor departure to Local
Development Plan 2 subject to the following conditions and reasons and to the informative
notes contained within the report of handling: 
Standard Time Limit Condition for Planning Permission (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. Approved Details 
Unless otherwise directed by any of the conditions below, the development shall be
implemented in accordance with the details specified on the application form dated 9th
October 2025; supporting information; and the approved drawings listed in the table
below unless the prior written approval of the Planning Authority is obtained for an
amendment to the approved details under Section 64 of the Town and Country
Planning (Scotland) Act 1997. 
Plan Title.  Plan Ref. No. Version Date
Received 
Location Plan  Drawing No. 1473_001  B 10.10.2025
Existing Block
Plan
Drawing No. 1473_002  C  17.11.2025
Existing Ground &
Intermediate Floor
Plans 
Drawing No. 1473_003  A 10.10.2025
Existing Upper &
Bell Tower Floor
Plans  
Drawing No. 1473_004  A 10.10.2025
Existing Sections  Drawing No. 1473_005  A 10.10.2025
Existing Church
Elevations  
Drawing No. 1473_006  A 10.10.2025
Existing Church
Elevations 
Drawing No. 1473_007  A 10.10.2025
Existing Church
Hall Elevations 
Drawing No. 1473_008  B 17.11.2025

Page 10

Existing Elevations  Drawing No. 1473_009  - 10.10.2025
Proposed Block
Plan 
Drawing No. 1473_102  C 17.11.2025
Proposed Ground
&
Intermediate Floor
Plans 
Drawing No. 1473_103  - 10.10.2025
Proposed Upper &
Bell Tower Floor
Plans 
Drawing No. 1473_104 - 10.10.2025
Proposed Sections  Drawing No. 1473_105  A 10.10.2025
Proposed
Elevations 
Drawing No. 1473_106  B 17.11.2025
Proposed
Elevations 
Drawing No. 1473_107  A 10.10.2025
Proposed
Elevations 
Drawing No. 1473_108  B 17.11.2025
Proposed
Elevations 
Drawing No. 1473_109  A 
Door, Window &
Louvre Schedule 
Drawing No. 1473_200   17.11.2025
Detail No.1 of
Outdoor Large
Play Tower 
Plan 1 of 6  17.11.2025
Detail No.2 of
Outdoor Large
Play Tower 
Plan 2 of 6  17.11.2025
Detail No.1 of
Outdoor Toddler
Play Tower 
Plan 3 of 6  17.11.2025
Detail No.2 of
Outdoor Toddler
Play Tower  
Plan 4 of 6  17.11.2025
Details of Outdoor
Nest Swing 
Plan 5 of 6  17.11.2025

Page 11

Details of Outdoor
Seesaw 
Plan 6 of 6  17.11.2025 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
2. Active Travel Plan 
Prior to the coming into use of any part of the development hereby approved, an Active
Travel Plan (ATP) shall be submitted to and approved in writing by the Planning
Authority. 
Unless otherwise agreed with the Planning Authority, the ATP shall incorporate at a
minimum the following: 
i. An introduction with context and development details. 
ii. A Policy Statement, including any relevant site-specific policies. 
iii. A site audit and accessibility review. 
iv. A statement on the intended outcomes, including an identification of the daily
capacity of the premises (i.e. maximum number of users). 
v. A clear management and delivery structure, including the identification of the
Travel Plan Co-ordinator. 
vi. Details of the measures that will be implemented to ensure that the agreed
number of daily maximum users will not be exceeded (e.g. the operation of a
managed, booking-based system). 
vii. Details of the initiatives to be used in encouraging more sustainable travel
behaviour, including marketing and promotion. 
viii. An Action Plan with implementation timescales and budget. 
ix. SMART (Specific, Measurable, Achievable, Realistic, Timebound) targets with
baseline data, a monitoring and review process and related timescales 
Unless otherwise agreed in writing with the Planning Authority, the Active Travel Plan
shall be implemented for the lifetime of the development in accordance with the details
so approved. 
Reason: In the interests of ensuring sustainable travel patterns and as part of the  
justification for the approval of the application as a minor departure from Policy 40 of
the Argyll and Bute Local Development Plan 2. 
3. Bicycle Storage 
A facility for the storage of cycles, the details of which shall have been previously
submitted to and agreed in writing with the Planning Authority, shall be provided within
the application site prior to the development hereby approved being brought into use.

Page 12

Unless otherwise agreed in writing with the Planning Authority, the approved cycle
storage shall be retained in perpetuity for this dedicated purpose. 
Reason: In the interests of facilitating the use of cycles by the patrons of the building
hereby approved in accordance with the provisions of National Planning Framework 4
Policy 13 ‘Sustainable Transport’. 
4. External Lighting 
Unless otherwise agreed in writing with the Planning Authority, all external lighting on
the application site shall be operated, positioned and angled in compliance with the
Scottish Government Guidance Note “Controlling Light Pollution and Reducing Lighting
Energy Consumption” (March 2007). 
Reason: In order to protect the amenity of the immediate area from the creation of
nuisance due to light pollution and to support the reduction of energy consumption. 
5. Arrangements for the Storage and Collection of Waste 
Prior to the commencement of the development, details of the proposed arrangements
for the storage and collection of waste shall be submitted to and approved in writing by
the Planning Authority. The arrangements shall be implemented in accordance with the
approved requirements prior to the development being brought into use and shall
thereafter be retained in perpetuity unless otherwise agreed in writing by the Planning
Authority. 
Reason: In order to accord with the principles of sustainable waste management within
NPF4 Policy 12 and LDP2 Policy 63. 
6. Surface Water Drainage / Porous Hardstanding 
Notwithstanding the details shown on the approved plans, all areas of hardstanding,
including paths and patios, shall be constructed using porous materials or otherwise
designed to permit the direct infiltration of surface water to the ground. Details of the
proposed hardstanding materials and construction shall be submitted to and approved
in writing by the Planning Authority prior to their installation. The approved scheme
shall thereafter be implemented in full and retained for the lifetime of the development. 
Reason: To reduce surface water runoff and minimise the risk of flooding in the
interests of sustainable drainage and flood risk management. 
(Reference: Report by Head of Development and Economic Growth dated 4 August 2026,
submitted) 
7. MR S ISLAM: CHANGE OF USE OF GROUND FLOOR RETAIL UNIT TO
CAFÉ/RESTAURANT AND TWO SHORT TERM HOLIDAY LETS ALONG
WITH THE EXTERNAL COLOUR CHANGE: ZINC ORGANICS (THE REST),
THE OLD POST OFFICE BUILDING, CAMPBELTOWN ROAD, TARBERT
(REF: 26/00047/PP) 
The Planning Officer spoke to the terms of the report.  In terms of the adopted Argyll and
Bute Local Development Plan 2 (LDP2), the application site is located within the
Settlement Area of Tarbert.  There is no existing on-site parking associated with the site

Page 13

with the current proposal not altering the current situation.  Area Roads were consulted on
the proposal and have recommended that the application be refused.  Considering the
particular circumstances of this case and the wider planning considerations, Planning
Officers deem it reasonable to accept reliance on nearby public parking facilities to serve
the proposed development.  While the introduction of two Short-term Let units could be
deemed to represent an intensification of use at the site, the availability of public transport
services, active and sustainable travel options, together with the relatively small parking
shortfall of two spaces, leads Officers to conclude that the proposal would not give rise to
such clear and demonstrable harm as to warrant refusal of planning permission. 
Representations of support were received from local Ward Councillors Alastair Redman
and Anne Horn, with a further 11 public representations received, 9 in support and 2
objecting. 
It was recommended that planning permission be granted as a minor departure to
Development Plan Policy subject to the conditions, reasons and advisory notes appended
to the report of handling. 
Decision 
The Committee agreed to grant planning permission as a minor departure to Development
Plan Policy subject to the following conditions, reasons and advisory notes: 
Standard Time Limit Condition (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 11.01.2026, supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref.
No.
Version Date
Received
Location and Site Plan 528/01 A  13.03.2026
Existing and Proposed Floor Plans and
Elevations
528/05 B  26.02.2026
Details of New Doors 528/07  26.02.2026
Design and Access Statement – 2
Pages 
(4 & 5 of 5)  12.01.2026 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details.

Page 14

2. PP - Short Term Residential Accommodation (e.g. Holiday Letting) 
Notwithstanding the provisions of Class 9 of the Town and Country Planning (Use
Classes) (Scotland) Order 1997 the residential accommodation hereby approved shall
be used for short term holiday occupancy only and not as a main residence and shall
not be occupied by any family, group or individual for a cumulative period of more than
three calendar months in any one year. A register showing dates of arrivals and
departures shall be maintained at the premises and shall be available at all reasonable
times for inspection by the Planning Authority. 
Reason: In order to define the permitted occupancy having regard to the fact that the
premises are unsuitable for occupation as a permanent dwelling due to ^IN; having
regard to the relevant provisions of the Development Plan. 
Note to Applicant: 
For the avoidance of doubt this permission only provides for the occupation of the
premises on a short term basis on the grounds that the development is unsuited to full
time residential occupation. Specifically the occupation of the premises as a dwelling
shall require the benefit of a separate planning permission. 
3. PP – Bicycle Storage Further Details Required 
Notwithstanding the provisions of Condition 1, prior to the development hereby
approved being brought into use, full details of the layout of a bicycle storage area
within the application site shall be submitted to and approved in writing by the Planning
Authority.  Unless otherwise agreed in writing with the Planning Authority, the
approved cycle storage shall be retained in perpetuity for this dedicated purpose. 
Reason: In the interests of facilitating the use of cycles by the patrons of the building
hereby approved in accordance with the provisions of National Planning Framework 4
Policy 13 ‘Sustainable Transport’. 
4. PP – Ventilation and Extraction to Control Odour 
Notwithstanding the provisions of Condition 1, no development shall commence until a
scheme for the control of odour arising from the operation of the permitted use has
been submitted to and approved in writing by the Planning Authority.  The scheme
shall comprise a detailed specification of a) the cooking odour extraction system; b)
measures to control odour emissions; and c) measures to control noise emissions from
any extraction or ventilation system and noise output from any fans. 
The permitted use shall not be commenced until the duly approved ventilation,
extraction and odour control system is operational and thereafter it shall be maintained
in accordance with the manufacturers instruction unless it is replaced by an alternative
system with the prior written consent of the Planning Authority. 
Reason: In order to protect the amenity of the area in terms of noise and odour
nuisance.

Page 15

Note to Applicant: 
Site specific advice may be obtained by contacting the Council’s Environmental Health
Officers. 
(Reference: Report by Head of Development and Economic Growth dated 30 July 2026,
submitted) 
8. LADYFIELD RENEWABLE ENERGY PARK LTD: PROPOSAL OF
APPLICATION NOTICE FOR THE INSTALLATION AND OPERATION OF
APPROXIMATELY 3.2KM OF UNDERGROUND ELECTRICAL AND
TELECOMMUNICATIONS CABLING AND ASSOCIATED TEMPORARY
WORKS REQUIRED TO CONNECT THE LADYFIELD RENEWABLE
ENERGY PARK TO THE SSENT CREAG DHUBH SUBSTATION: LAND
BETWEEN LADYFIELD ENERGY PARK AND CREAG DHUBH
SUBSTATION APPROXIMATELY 8KM NORTH OF INVERARAY (REF:
26/00986/PAN) 
The Senior Planning Officer spoke to the terms of the report.  The site comprises a linear
area of land between the boundary of the Ladyfield Energy Park site and the Creag Dhubh
substation.  The underground cable will generally follow the line of the A819 and then
branch off to the northwest at an appropriate point to connect to the substation.  The
intention of the Applicant is to run the cable as close to the line of the road as possible. 
Land uses along the route include public highway infrastructure associated with the A819,
commercial forestry and areas of rough grazing.  The site lies within a sparsely populated
area with limited residential receptors, with the nearest being North Tullich, approximately
500m from the proposed development.  The northern section of the site lies within the
North Argyll Area of Panoramic Quality while a portion along the A819 corridor is situated
adjacent to the Glen Etive and Glen Fyne Special Protection Area (SPA) to the east. 
The report sets out the information submitted to date as part of the Proposal of Application
Notice (PAN) and summarises the policy considerations, against which any future
planning application will be considered as well as potential material considerations and
key issues based upon the information received to date. 
It was recommended that Members note the content of the report and submissions and
provide such feedback as they consider appropriate in respect of the PAN to allow these
matters to be considered by the Applicant in finalising any future planning application
submission. 
Decision 
The Committee noted the content of the report. 
(Reference: Report by Head of Development and Economic Growth dated 28 July 2026,
submitted)