Integration Joint Board 
Date of Meeting: 25th May 2022 
Title of Report  COVID19 Public Health update 
Presented by:  Dr Nicola Schinaia, Associate Director of Public Health     
The Integrated Joint Board is asked to:
 Consider the COVID19 latest trends in A&B community, in terms of:
 Distribution of infection rates;
 COVID-19 testing programmes. 
 Assess the remobilisation plan following the COVID19 response in A&B
community, in terms of Health Improvement. 
1. EXECUTIVE SUMMARY
The updates on the COVID-19 Public Health response in Argyll and Bute and focus
on two main areas:
 Sustained community transmission has considerably reduced in the last 5-6
weeks. Many social distancing measures are in place only as
recommendations, not mandated any longer.
 Testing for SARS-CoV-2 in Argyll and Bute – widespread community testing
has ceased, and access to routine testing is mainly for health and social care
staff and patients prior to admission to various health care services, in
accordance to the transition plan that was briefly mentioned in our previous
report (end-March 2022).
As a consequence of this improved picture, Public Health programmes prior to the
onset of the Covid-19 pandemic are resuming in earnest. 
2. INTRODUCTION
This paper builds on accounts provided in the earlier reports, and will present the
timeliest update as possible of how the pandemic is unfolding in A&B, as well as how
the next phase of the pandemic response in Scotland will be developing.

Page 2

Page 2
3. DETAIL OF REPORT 
A. Epidemiology of COVID-19 in Argyll and Bute (as reported up to 13th May
2022) 
 The Office for National Statistics (ONS) infection survey (Figure 1) shows
that the proportion of people in the community with COVID-19 has
decreased since a high in the week of 13th to 19th March to the most recent
timepoint available at writing (1st to 7th May). The survey is based on testing
of a sample of individuals and it is not affected by changes in access to
testing. 
Figure 1. ONS infection survey results – Scotland weekly modelled estimates –
up to 1st to 7th May 2022 
Source:
https://www.ons.gov.uk/peoplepopulationandcommunity/healthandsocialcare/conditio
nsanddiseases/bulletins/coronaviruscovid19infectionsurveypilot/18march2022 
 7-day rates of confirmed cases have decreased in Argyll and Bute
(appendix 1). This likely reflects both changes in access to testing as well as
decreased rates of infection. There were a recorded 132.3 cases per
100,000 population confirmed by a test between 7th and 13th May.  
 Over 8% of the recent cases in NHS Highland are identified as reinfections
(that occurred 90 days or more following a previous COVID-19 infection). 
See Appendix 1 for embedded NHS Highland Epidemiological Briefing. 
 The number of people in hospital with COVID-19 has decreased since a peak
in April 2022 (Figure 2).

Page 3

Page 3
 ICU numbers have also decrease with 17 people in ICU with COVID-19 (at
15th May 2022). Note that these figures include people in hospital for reasons
other than COVID-19. 
Figure 2. Number of people in hospital with COVID-19 in Scotland 
Source: https://www.opendata.nhs.scot/dataset/covid-19-in-scotland 
 Recent modelling highlights the continued uncertainty regarding future
COVID-19 infections.
https://www.gov.scot/collections/coronavirus-covid-19-modelling-the-epidemic/ 
B. COVID-19 Testing in Argyll and Bute 
B1 Lateral Flow Device Testing For Health and Social Care Staff
Origins
In December 2020 the Scottish Government directed Health Boards and Health and
Social Care Partnerships to implement the roll out of Lateral Flow Device (LFD)
testing in patient facing staff within Healthcare, Social Care and Primary Care. Over
the following months this offer of voluntary twice weekly testing was extended to
include all Healthcare staff, specific Social Care roles, contractors of registered
services and some other services. The programme is managed across NHS
Highland, with 4 main workstreams: Raigmore, New Craigs, North Highland
Community Services, and Argyll and Bute.

Page 4

Page 4 
Delivery and Supply 
The delivery and supply pathways have evolved since the initial rollout of the testing
programme. National Services for Scotland (NSS) supply all pathways from a central
hub. The LFD product for the foreseeable future will be Orient Gene 7s. 
Healthcare Pathway: UPDATE In this pathway test kits are delivered to Lochgilphead
for onward distribution to all hospitals in Argyll and Bute. Work is underway to create
a supply route locally utilising PECOS. 
Social Care Pathway: National Services Scotland (NSS) supply PPE hubs with LFD
testing kits using a push allocation and resupply. Social Care staff collect test kits
from their local PPE hub.  
 Volumes requested suggest most staff are continuing to participate in LFD
testing. 
 There have been regular changes to staff groups included in LFD testing,
hubs have continued to communicate changes and adapt which staff groups
receive kits. 
Primary Care Pathway: Primary Care partners are provided kits by a push allocation
and resupply from NSS. NSS indicated that a push allocation would be used for
reissue of kits in this pathway. Push allocations from August 2021 will supply Orient
Gene 7s.
Process & Reporting of Results 
Symptomatic staff were previously asked to take a PCR test, they are now advised to
take an LFD test as soon as they feel unwell and report the results to their line
manager. In the event of any positive test staff should not attend work for 5 full days
and can return to work following 2 consecutive negative LFD test results taken at
least 24 hours apart. Full details on changes to the LFD testing programme were
released via a Directors Letter issued on 29 April 2022 which can be accessed at:
https://www.sehd.scot.nhs.uk/dl/DL(2022)12.pdf
Healthcare, Social Care and Primary Care staff should record every test result onto
the Covid Testing Portal. Results were used to initiate contact tracing, from 1 May
2022 all contact tracing of staff ended in line with ending it for the general population. 
Conclusion 
Improvement calls between NHS Highland and the Scottish Government were
ceased due to the quality of the improvement plan submitted in May 2021. There are
no plans at present to reintroduce these calls. 
LFD testing remains an important tool in the identification of COVID infection.
Continued twice weekly LFD testing is strongly encouraged for all eligible staff. The
eligible cohort of this pathway will be kept under clinical review nationally with any
changes communicated to stakeholders.   
B2 Community Testing
Community asymptomatic testing for the public has been in place since April 2021 in
Argyll and Bute in response to a Scottish Government request to expand access to
rapid Lateral Flow Device (LFD) testing for the public.  The service was successfully
deployed by Live Argyll in Argyll and Bute.  A static testing site was established in
Helensburgh with pop-up sites throughout Argyll and Bute the locations of which
were driven by data and health intelligence.  After a successful and innovative pilot of
assertive delivery and collect during COP26, the service moved away from supported
testing to LFD collect and an assertive delivery model.  This move was fully endorsed
by the Scottish Government.

Page 5

Page 5
In March 2022, the Scottish Government announced the cessation of community
asymptomatic testing from the 18th April and subsequent cessation of testing for the
public from the 1st May 2022.
Work commenced to wind up the service and move to evaluate the local response to
the unprecedented public health challenge and examine lessons learned in
preparation for any future step up of service required in the future.  A plan to formally
evaluate the asymptomatic community testing programme had been formulated in
late summer of 2021 with ethical approval gained early in 2022 providing the
opportunity to publish a research paper. Significant progress has been achieved in
the delivery of the evaluation with the first milestone being the presentation of the
interim evaluation results at the Faculty of Public Health Conference in May 2022. 
The final report will be available from mid-June 2022. 
C. Health Improvement in Argyll and Bute
The past two years has seen constant flux between proactive health improvement
delivery and the Covid-19 response. However, there is now an ongoing rebalancing,
with health improvement core business once again being the primary focus of the
team. Health improvement is defined as the prevention of health problems and
improving health outcomes across the population. This is often achieved through an
inequalities lens by targeting those most in need. Health improvement considers the
causes of ill-health, then develops interventions and programmes to address these
root causes. Argyll and Bute HSCP has a small health improvement workforce,
however, by building capacity through the Living Well Networks, communities,
partners and across the wider health and social care system, manages to deliver a
wide ranging operation plan.
The pandemic brought significant impacts on health and wellbeing; some of these
impacts are manifesting now but many will manifest over the life-course. National and
local Public Health leadership recognises the importance of tailoring appropriate
responses. The following are the key health improvement programmes in Argyll and
Bute:
 Living Well Strategy
The Living Well Strategy 2019-2024 was endorsed by the IJB in September 2019. It
provides a framework for preventing the occurrence of long term conditions (LTCs)
as well as enabling those living with an LTC to maximise their health. The key
components of this strategy include: people have the tools and support to enable
them to live well; a wide range of local services to enable people to live well; staff
motivated to enable people to live well; and effective leadership to deliver Living Well
intentions. An active multi-disciplinary steering group oversees the delivery of an
annual action plan. Current highlights include:
o Mental Health Engagement
Jean’s Bothy, Support in Mind Scotland and ACUMEN were commissioned to
engage with residents of Argyll and Bute to explore the impact of the pandemic on
mental wellbeing and access to support during 2021. A report is being developed
documenting: participants’ experiences of accessing community and peer support,
experiences of accessing statutory support, and the impact of the pandemic on

Page 6

Page 6
mental wellbeing. Findings will be shared with Living Well Networks, the Living Well
Steering Group and Community Planning groups. An event is being planned for
Summer 2022 where recommendations arising from the report will be discussed and
next steps agreed.
o Physical Activity Sub Group
This group promotes and increases opportunities and levels of engagement for
adults within Argyll and Bute to access physical activity and exercise regardless of
current physical ability or level of frailty. Work includes supporting education of staff
and the public on the significant risks of sedentary behaviour and the positive
impacts in general wellbeing, aging well and in the prevention and management of
illness and mental health. Key partnerships exist with Versus Arthritis, Live Argyll and
Macmillan Cancer Support.
o Community Links Workers and Social Prescribing
Social prescribing means connecting people with sources of support for potential
causes of their health problems: for example, money worries, loneliness, being an
unpaid carer or a relationship breakdown. All staff working directly with people should
be able to take a person centred approach to providing holistic care. The General
Medical Services Modernisation Programme recognised the potential for social
prescribing to improve primary care, which includes the provision of Community Link
Working (CLW) service. CLW will be delivered in a targeted way via prioritised GP
practices through the provider We Are With You. Community Link Workers were
appointed in late 2021 and are now in the process of launching services across Argyll
and Bute. Referral to the CLW is via the wider GP Practice team. 
Further information on Living Well in Argyll and Bute is available here - Living Well
Strategy — Living Well (squarespace.com)
 Social Mitigation Strategy
NHS Highland Board ratified the Social Mitigation Strategy in May 2021 in recognition
of the increased demands for services and the need to do things differently. This
strategy includes a range of priorities based on the analysis of the impacts of the
pandemic with a focus on poverty/cost of living, mental health and wellbeing. The
impact of cost of living increases cannot be underestimated and is a key priority in
Argyll and Bute’s health improvement plan.
 Money Talks
Money Counts level 1 awareness training is delivered in Argyll and Bute to inform
front line staff of how they can support the people they work with, who are
experiencing money worries. The session increases the understanding of poverty, its
impact and increases knowledge of support services for money matters. Four
sessions have already been delivered with two more confirmed in May and June.

Page 7

Page 7
 Poverty
Living in poverty is strongly associated with negative health outcomes. The Health
Improvement Team works with partners on a range of responses to mitigating the
impacts of poverty. One example of this is the Child Poverty Action Plan which is a
statutory requirement for all local authorities in Scotland. Other examples include fuel
poverty, food insecurity and digital inclusion activity. The Living Well Networks
meetings have all had speakers presenting on challenging poverty in Argyll and Bute.
 Community Planning
The Health Improvement Team takes an active role in the Community Planning
Partnership (CPP), both in local authority wide activity and in the four local area
groups. Examples include:
 Climate Change
A Climate Change strategic group convened in 2021 to oversee an area wide
response to addressing climate change and the impact on our communities. A draft
action plan includes: engaging people on developing and implementing the plan;
taking action to adapt how we live to reduce carbon emissions; and mitigate the
impacts of climate change in local communities. The group is in the process of
maximising resources to employ a project officer.
 Suicide Prevention
Suicide prevention is led by the HSCP on behalf of the wider CPP. There is an active
multi-disciplinary steering group tasked with delivering a local action plan. Priorities in
this plan include: access to support for those impacted by suicide; distress brief
intervention and psychological first aid; digital support; and use of/sharing of data and
information to improve suicide prevention intervention. These priorities were set by
Cosla in 2020. The Scottish Government ran a consultation earlier in 2022 for the
next iteration of a national policy on suicide prevention.
 Shaping Places in Dunoon
There are six national Public Health priorities for Scotland1 including, a Scotland
where we live in vibrant, healthy and safe places and communities. The Improvement
Service in partnership with Public Health Scotland have developed a place based
approach called ‘Shaping Places’. Dunoon is one of the six towns selected for this
project, which aims to inform national approaches for place based working. 
National Health Improvement Outcome Framework from Scottish Government
Approximately 40% of the budget associated with public health activity in Argyll and
Bute is ring fenced. This includes Outcomes Framework funding for smoking
cessation, healthy weight and sexual health activity, which is awarded on an annual                                                 
1 Scotland's public health priorities - gov.scot (www.gov.scot)

Page 8

Page 8
basis with some specific targets. The HSCP reports on the outputs of this work via
the Annual Performance Report.
The smoking cessation service continued throughout the pandemic through virtual
consultations and the Smoking Cessation Advisers are now moving back to face to
face working.
A steering group oversees all healthy weight activity, which is led by Dietetics
service. Additional funding is awarded to address type 2 Diabetes.
Sexual health outcomes relate to prevention and health improvement activity rather
than service delivery. There is an ongoing third sector service level agreement in
place across NHS Highland. 
4. RELEVANT DATA AND INDICATORS
Data have been reported in the above section and in the Appendices. In summary,
we have presented trends on: confirmed cases of COVID-19 infection, overall and
COVID-19-specific mortality. 
5. CONTRIBUTION TO STRATEGIC PRIORITIES
This work supports/underpins the HSCPs strategic and operational response to this
emergency pandemic. 
6. GOVERNANCE IMPLICATIONS
Financial Impact
These activities - responding to the pandemic and following on from it - have
employed a larger number of resources, primarily in terms of person-time, than
budgeted for the year. Such increased spending has been tagged to dedicated
COVID-19 funding and will be accounted under this budget line. 
Staff Governance
The workforce consequences and staff and TU fantastic response to the crisis has
epitomised the adoption and strengthening of good communication and formal
engagement processes and partnership working. 
Clinical Governance
Clinical governance response has been fundamental to the shaping and
management of the public health projections and demand modelling and our
response to ensure patient, client and staff safety. 
7. PROFESSIONAL ADVISORY

Page 9

Page 9
Inputs from professionals across stakeholders remain instrumental in the response to
the COVID19 pandemic. There has been a close collaborative working between the
Departments of Public Health in Argyll and Bute and North Highland. We expect this
to be a long-lasting positive outcome of this major incident. 
8. EQUALITY & DIVERSITY IMPLICATIONS
Equality and diversity is being reviewed and considered as we progress through this
pandemic cycle and emergency operating arrangements. It has already been
extensively shown that marginalised communities fare worst in relation to both
infection rates and health outcomes. An impact assessment will be developed for the
response in due course, but in the meantime principles of equality have informed
specific programmes of activity. Examples of this include targeted activity with
gypsy/traveller communities and developing communications materials for different
audiences e.g. learning disability friendly and subtitles for people with hearing
impairment. 
9. GENERAL DATA PROTECTION PRINCIPLES COMPLIANCE 
Compliance with GDPR remains critical and is being considered within the various
pieces of work supporting the sharing of information and data to protect health and
wellbeing of staff and the public and patients. 
10. RISK ASSESSMENT
Not required for this report. 
11. PUBLIC & USER INVOLVEMENT & ENGAGEMENT
A comprehensive communications strategy exists to provide accurate information on
the COVID-19 response to staff, partners and the wider population. The Third Sector
Interface contributes to the Caring for People Tactical Partnership and provides a link
to local community resilience activity, third sector organisations and community
members. 
12. CONCLUSION
It would appear that Public health – as much of most of other health services – can
resume a wider set of activities than during the acute stage if the pandemic
response. 
DIRECTIONS 
Directions
required to
Council, NHS
Board or
both.
Directions to: tick
No Directions required 
Argyll & Bute Council 
NHS Highland Health Board 
Argyll & Bute Council and NHS Highland Health Board

Page 10

Page 10 
REPORT AUTHOR AND CONTACT
Author Name  Nicola Schinaia, Associate Director of Public Health
Email    nicola.schinaia@nhs.scot 
Appendix 1 