November 2022
Argyll & Bute
Integration Joint
Board
2021/22 Annual Audit Report

Page 2

Argyll & Bute Integration Joint Board 2021/22 Annual Audit Report | 2
Contents 
Key messages 3
Introduction 4
1. Audit of 2021/22 annual accounts 7
2. Financial management and sustainability 11
3. Governance, transparency and Best Value 18
Appendix 1. Action plan 2021/22 21
Appendix 2. Significant audit risks identified during planning 24
Appendix 3. Summary of 2021/22 national performance reports and briefing
papers 26

Page 3

Key messages | 3 
Key messages 
2021/22 annual accounts 
1 Our audit opinions on the annual accounts of the Argyll & Bute Integration
Joint Board are unmodified.
2 The Covid-19 pandemic has continued to create additional challenges for the
IJB and audit staff alike. As a result of this, the statutory deadline to publish
the audited 2021/22 annual accounts was revised to 30 November 2022.
3 The IJB prepared its annual accounts for the year within agreed timescales
and the accounts and associated working papers have been prepared to a
good standard.
Financial management and sustainability 
4 The IJB has appropriate and effective financial management arrangements in
place and returned an underspend of £0.7 million against a budgeted
breakeven outturn. This was partly due to the receipt of Scottish Government
support for all additional Covid-19 costs.
5 The IJB repaid all of its outstanding £2.8 million debt due to Argyll & Bute
Council. 
6 Medium-term financial plans have been developed based upon the Scottish
Government’s Spending Review for the period 2023/24 to 2025/26 and the
IJB has identified a cumulative budget deficit of £29.3 million over this period.
The organisation recognises that it continues to face challenges delivering
savings targets coupled with an increased demand for services.
Governance, Transparency and Best Value
7 The IJB has appropriate governance arrangements in place that support the
scrutiny of decisions by the Board. Governance arrangements operating
throughout the Covid-19 pandemic have been appropriate and operated
effectively.
8 Performance indicators and associated targets have been kept under review
to ensure they reflect the impact of Covid-19 on methods of service delivery
and the associated outcomes. The IJB is looking to strengthen these
arrangements by developing its Integrated Performance Management
framework in 2022/23.

Page 4

Introduction | 4 
Introduction 
1.  This report summarises the findings arising from the 2021/22 audit of Argyll &
Bute Integration Joint Board (the IJB). 
2.  The scope of the audit was set out in our 2021/22 Annual Audit Plan
presented to the April 2022 meeting of the Audit and Risk Committee. This
report comprises the findings from: 
• the audit of the IJB’s 2021/22 annual accounts
• consideration of the four audit dimensions that frame the wider scope of
public audit set out in the Code of Audit Practice 2016 
• a review of the arrangements put in place by the IJB to secure Best Value.
3.  The global coronavirus pandemic has had a considerable impact on the IJB
during 2021/22. This has had significant implications for the services it delivers.
We have continued to adapt the way we deliver our audit work to maintain
quality and address any additional risks.
Adding value through the audit
4.  We add value to the IJB, through the audit by:
• identifying and providing insight on significant risks, and making clear and
relevant recommendations
• providing clear and focused conclusions on the appropriateness,
effectiveness and impact of corporate governance, performance
management arrangements and financial sustainability
• making use of hybrid working to meet the revised statutory deadline of 30
November 2022 for audited annual accounts
• sharing intelligence and good practice through our national reports
(Appendix 3) and good practice guides.
Responsibilities and reporting
5.  The IJB has primary responsibility for ensuring the proper financial
stewardship of public funds. This includes preparing annual accounts that are in
accordance with proper accounting practices. 
6.  The IJB is also responsible for compliance with legislation, and putting
arrangements in place for governance and propriety that enable it to
successfully deliver its objectives.

Page 5

Introduction | 5 
7.  Our responsibilities as independent auditor appointed by the Accounts
Commission are established by the Local Government in Scotland Act 1973, the
Code of Audit Practice 2016 and supplementary guidance, and International
Standards on Auditing in the UK.
8.  As public sector auditors we give independent opinions on the annual
accounts. Additionally, we conclude on:
• the effectiveness of the IJB’s performance management arrangements 
• the suitability and effectiveness of corporate governance arrangements 
• the financial position and arrangements for securing financial sustainability
and
• Best Value arrangements. 
9.   Further details of the respective responsibilities of management and the
auditor can be found in the Code of Audit Practice 2016. and supplementary
guidance.
10.  This report raises matters from our audit. Weaknesses or risks identified are
only those which have come to our attention during our normal audit work and
may not be all that exist. Communicating these does not absolve management
from its responsibility to address the issues we raise and to maintain adequate
systems of control.
11.  Our annual audit report contains an agreed action plan at Appendix 1
setting out specific recommendations, responsible officers and dates for
implementation. It also includes outstanding actions from last year and the
progress that has been made.
Auditor Independence 
12.  Auditors appointed by the Accounts Commission or Auditor General must
comply with the Code of Audit Practice and relevant supporting guidance. When
auditing the financial statements auditors must comply with professional
standards issued by the Financial Reporting Council and those of the
professional accountancy bodies. 
13.  We can confirm that we comply with the Financial Reporting Council’s
Ethical Standard. We can also confirm that we have not undertaken any non-
audit related services and therefore the 2021/22 audit fee of £27,960 as set out
in our 2021/22 Annual Audit Plan remains unchanged. We are not aware of any
relationships that could compromise our objectivity and independence.
14.  This report is addressed to both the IJB and the Controller of Audit and will
be published on Audit Scotland's website www.audit-scotland.gov.uk in due
course. We would like to thank the management and staff who have been
involved in our work for their cooperation and assistance during the audit.

Page 6

Introduction | 6 
Audit appointment from 2022/23
15.  The Accounts Commission is responsible for the appointment of external
auditors to local government bodies. External auditors are usually appointed for
a five-year term either from Audit Scotland’s Audit Services Group or a private
firm of accountants. The current appointment round was due to end in 2020/21
but this was extended for a year so that 2021/22 is the last year of the current
appointment round.
16.  The procurement process for the new round of audit appointments was
completed in May 2022. From financial year 2022/23, Mazars will be the
appointed auditor for Argyll & Bute Integration Joint Board. We are working
closely with the new auditors to ensure a well-managed transition.
17.  A new Code of Audit Practice applies to public sector audits for financial
years starting on or after 1 April 2022. It replaces the Code issued in May 2016.
Acknowledgement
18.  We would like to thank Board members, Audit and Risk Committee
members, and officers, particularly those in finance for their co-operation and
assistance over the last six years.

Page 7

1. Audit of 2021/22 annual accounts | 7 
1. Audit of 2021/22 annual
accounts
The principal means of accounting for the stewardship of resources and
performance 
Main judgements
Our audit opinions on the annual accounts of the IJB are unmodified. 
The Covid-19 pandemic has continued to create additional challenges for the IJB
and audit staff alike. As a result of this, the statutory deadline to publish the
audited 2021/22 annual accounts was revised to 30 November 2022. 
The IJB prepared its annual accounts for the year within agreed timescales and
the accounts and associated working papers have been prepared to a good
standard. 
Our audit opinions on the annual accounts are unmodified
19.  The IJB’s annual accounts for the year ended 31 March 2022 were
approved by the Audit and Risk Committee on 23 November 2022. As reported
in the independent auditor’s report:
• the financial statements give a true and fair view and were properly
prepared in accordance with the financial reporting framework 
• the audited part of the Remuneration Report, Management Commentary
and the Annual Governance Statement were all consistent with the
financial statements and properly prepared in accordance with the relevant
regulations and guidance.
The Covid-19 pandemic had a limited impact on audit evidence 
20.  The completeness and accuracy of accounting records and the extent of
information and explanations that we required for our audit were not affected by
the Covid-19 pandemic. The working papers provided to support the accounts
were of a good standard and the audit team received support from finance staff
which helped ensure the final accounts audit process ran smoothly.

Page 8

1. Audit of 2021/22 annual accounts | 8 
The annual accounts were signed off in line with our agreed
audit timetable 
21.  Submission dates for the annual audit report and audited annual accounts
for 2019/20 and 2020/21 were deferred in line with the later dates for producing
the annual accounts because of the impact of Covid-19. Audit Scotland has set
target dates for 2021/22 which transition to more regular timescales. For
2021/22, the deadline for the audited accounts is 30 November 2022.
22.  The unaudited annual accounts were received in line with our agreed audit
timetable on 4 July 2022. This allowed us to sign off the annual accounts in line
with the revised timescales.
There were no objections raised to the annual accounts 
23.  The Local Authority Accounts (Scotland) Regulations 2014 require local
government bodies to publish a public notice on its website that includes details
of the period for inspecting and objecting to the accounts. This must remain on
the website throughout the inspection period. The date specified in the notice
must be at least 14 days after the date that notice is published but cannot be
later than 1 July in the year in which the notice is published.
24.  The annual accounts were not made available for inspection until 25 July
2022 under the regulations. However, the unaudited annual accounts were
reported to members on 28 June 2022 and the committee reports were publicly
available. Therefore, the IJB were considered to comply with the Local Authority
Accounts (Scotland) Regulations 2014.
25.  There were no objections to the 2021/22 annual accounts. 
Overall materiality is £6.0 million
26.  We apply the concept of materiality in both planning and performing the
audit and in evaluating the effect of identified misstatements on the audit and of
uncorrected misstatements, if any, on the financial statements and in forming
the opinion in the auditor’s report. We identify a benchmark on which to base
overall materiality, such as gross expenditure, and apply what we judge to be
the most appropriate percentage level for calculating materiality values. 
27.   The determination of materiality is based on professional judgement and is
informed by our understanding of the entity and what users are likely to be most
concerned about in the annual accounts. In assessing performance materiality,
we have considered factors such as our findings from previous audits, any
changes in business processes and the entity’s control environment including
fraud risks. 
28.  Our initial assessment of materiality (£6.0 million) for the annual accounts
was carried out during the planning phase of the audit. This was reviewed on
receipt of the unaudited annual accounts and concluded it remained
appropriate. Our 2021/22 materiality levels are summarised in Exhibit 1.

Page 9

1. Audit of 2021/22 annual accounts | 9 
Exhibit 1
Materiality values 
Materiality level Amount
Overall materiality: This is the calculated figure we use in
assessing the overall impact of audit adjustments on the
financial statements.
£6.0 million
Performance materiality: This acts as a trigger point. If the
aggregate of errors identified during the financial statements
audit exceeds performance materiality this would indicate that
further audit procedures should be considered.
£4.2 million
Reporting threshold: We are required to report to those
charged with governance on all unadjusted misstatements in
excess of the ‘reporting threshold' amount.
£250,000
Source: Audit Scotland
Appendix 2 identifies the main risks of material misstatement
and our audit work to address these
29.  Appendix 2 provides our assessment of risks of material misstatement in
the annual accounts and any wider audit dimension risks. These risks influence
our overall audit strategy, the allocation of staff resources to the audit, and
indicate how the efforts of the audit team are directed. Appendix 2 also identifies
the work we undertook to address these risks and our conclusions from this
work. 
30.  We have no issues to report from our work on the risks of material
misstatement.
We have significant findings to report on the audited annual
accounts 
31.  International Standard on Auditing (UK) 260 requires us to communicate
significant findings from the audit to those charged with governance, including
our view about the qualitative aspects of the body’s accounting practices.
32.  The significant findings are summarised in Exhibit 2.

Page 10

1. Audit of 2021/22 annual accounts | 10 
Exhibit 2
Significant findings from the audit of financial statements 
Issue Resolution 
1. PPE and Testing Kits
National Services Scotland (NSS) has been
supplying PPE and Testing Kits to Councils and
Integration Joint Boards (IJBs) free of charge. 
For Argyll & Bute Integration Joint Board, the total
PPE and Testing Kits issued by NSS for 2021/22
equate to £2.1 million. This was not included in the
unaudited annual accounts presented to audit.
The impact of this is to increase both gross income
and gross expenditure on the Comprehensive
Income and Expenditure Statement (CIES) by £2.1
million. This has no impact on the outturn position.
This was adjusted in the audited annual
accounts.
2. IJB Monies
Argyll and Bute Council accounted for £1.7 million
of IJB monies as a creditor on its Balance Sheet
relating to the transfer of reserves for unspent
funding at the year-end. 
The initial accounting treatment was to debit gross
expenditure and credit trade payables; however,
this should have been a debit to gross income with
a credit to trade payables.
The impact of this was to decrease gross income
and gross expenditure on the CIES by £1.7 million.
This has no impact on the outturn position.
This was adjusted in the audited annual
accounts.
Source: Audit Scotland
Other findings
33.  Our audit identified several presentational and disclosure issues which were
discussed with management. These were adjusted and reflected in the audited
annual accounts. This is normal audit practice and none of the presentational
changes have any impact on the IJB’s outturn for the year.
Progress was made on prior year recommendations 
34.  The IJB has made progress in implementing our prior year audit
recommendations. For actions not yet implemented, revised responses and
timescales have been agreed with management, and are set out in Appendix 1.

Page 11

2. Financial management and sustainability | 11 
2. Financial management and
sustainability
Financial management is about financial capacity, sound budgetary
processes and whether the control environment and internal controls
are operating effectively
Main judgements
The IJB has appropriate and effective financial management arrangements in
place and returned an underspend of £0.7 million against a budgeted breakeven
outturn. This was partly due to the receipt of Scottish Government support for all
additional Covid-19 costs. 
The IJB repaid all of its outstanding £2.8 million debt due to Argyll & Bute Council. 
Medium-term financial plans have been developed based upon the Scottish
Government’s Spending Review for the period 2023/24 to 2025/26 and the IJB
has identified a cumulative budget deficit of £29.3 million over this period. The
organisation recognises that it continues to face challenges delivering savings
targets coupled with an increased demand for services.
Financial management and reporting arrangements are
effective and allow members and officers to scrutinise the
budget effectively
35.  Comprehensive budget monitoring reports are reported to the Board and
the Finance and Policy Committee. These contain information on the year-to-
date financial position, forecast outturn for the year, variance analysis with
explanations, progress in delivering savings and significant financial risks. The
reports contain enough detailed information to enable members to carry out
effective scrutiny and challenge of the IJB’s finances.
36.  The content of the budget monitoring reports was regularly updated to
reflect the financial impact of Covid-19. Additional income received and
expenditure incurred as a result of Covid-19 were clearly detailed in the budget
monitoring reports. This ensured the board were aware of how Covid-19
impacted on the overall financial position and outturn.
37.  Senior management and members receive regular and accurate financial
information on the IJB’s financial position and have concluded the IJB has
appropriate budget monitoring arrangements in place.

Page 12

2. Financial management and sustainability | 12 
The IJB set a balanced budget for 2021/22 budget including
planned savings to address the identified funding gap
38.  The IJB considered its 2021/22 budget on 31 March 2021. Adjustments
were made to the budget to reflect additional funding streams and
commitments. Budgeted total income and expenditure for the year were
respectively £295.9 million and £299.9 million, giving a budget gap before
savings of £4.2 million.
39.  Management/operational savings proposals totalling £3.6 million had been
approved by the IJB on 27 January 2021. These were amended by £0.6 million
of policy savings and the total of new savings of £4.2 million was presented to
the IJB meeting on 31 March 2021.These new savings are in addition to the
£5.1 million savings brought forward, resulting in an overall savings target of
£9.3 million for 2021/22.
40.  A budget consultation was carried out in respect of proposed policy savings
and the results of this consultation were presented to the IJB. Equality Impact
Assessments (EQIAs) were also carried out for all policy savings and also
presented to the IJB.
41.  The forecast outturn position for 2021/22 as at 31 July 2021 was an
overspend of £0.8 million. In accordance with the Integration Scheme,
whenever an overspend is identified, the Chief Officer and Chief Financial
Officer are required to identify the cause and prepare a financial recovery plan
to return to a break-even position.
42.  An in-year financial recovery plan was required, and this was approved at
the meeting of the IJB on 15 September 2021. The plan was based mainly on
expected Covid-19 financial support from Scottish Government and some
additional delivery against the savings targets.
The IJB returned an underspend in 2021/22 
43.  The impact on public finances of the Covid-19 pandemic has been
unprecedented, which has necessitated both the Scottish and UK governments
providing substantial additional funding for public services as well as support for
individuals, businesses, and the economy. It is likely that further financial
measures will be needed and that the effects will be felt well into the future.
44.  The IJB does not have any assets, nor does it directly incur expenditure or
employ staff, other than the Chief Officer and Chief Finance Officer. All funding
and expenditure for the IJB is incurred by partner bodies and processed in their
accounting records.
45.  Prior to 2020/21, the IJB had failed to deliver a balanced budget for some
time. Budgets were overspent by £6.7 million in 2018/19 and by £1.2 million in
2019/20. However, in 2020/21, the IJB returned an underspend of £1.1 million
against a budgeted breakeven position.
46.  The IJB returned an underspend of £0.7 million against a budgeted
breakeven position for 2021/22 (Exhibit 3).

Page 13

2. Financial management and sustainability | 13 
Exhibit 3
Performance against budget 
IJB budget summary Budget
£m
Actual
£m
Variance
£m
NHS Highland  233.4 233.4 -
Argyll & Bute Council  79.7 79.0 0.7
Total Net Expenditure 313.1 312.4 0.7
Source: Argyll & Bute Integration Joint Board
47.  There were a number of contributing factors to the underspend including:
• delivery of savings
• additional funding allocations from the Scottish Government.
The IJB repaid all of its outstanding £2.8 million debt due to
Argyll & Bute Council
48.  In line with approved Scheme of Integration, Argyll and Bute Council
allocated additional funding to the IJB to cover year-end deficits over the period
2017/18 to 2019/20. An agreed repayment plan was put in place for the IJB to
repay this additional funding. During 2020/21, £1.5 million was repaid by the IJB
to Argyll & Bute Council as part of the planned funding arrangements for the
year and in line with the repayment plan.
49.   Argyll & Bute Council had previously agreed with the IJB, that in the event
of the IJB returning an underspend in 2020/21 or any future years, that Argyll &
Bute Council would seek earlier repayment of outstanding debts. Therefore, an
additional £1.1 million was repaid based on the 2021/21 year-end outturn
position of the IJB. This left an outstanding balance of debt due to be paid to
Argyll & Bute Council totalling £2.8 million.
50.  The IJB repaid all of its outstanding £2.8m debt due to Argyll & Bute Council
during 2021/22. This was achieved due to a number of factors including delivery
of savings, improved financial management and additional funding allocations
from the Scottish Government. This debt repayment was prior to returning an
underspend of £0.7 million against a budgeted breakeven position for 2021/22.
Earmarked Reserves increased by £14.6 million in 2021/22
51.  The IJB operates one reserve, a General Fund reserve which is a resource
backed reserve to be used to fund future expenditure. The General Fund had a
closing balance of £21.2 million as at 31 March 2022. This was an increase of
£14.6 million from the prior year. There are two main contributing factors which

Page 14

2. Financial management and sustainability | 14 
have resulted in the increased levels of reserves at the year-end. These are
summarised below:
• The on-going impact of the Covid-19 pandemic delayed some key projects
and pieces of work.
• The Scottish Government provided additional financial support to HSCPs
throughout Scotland late in the financial year. Argyll & Bute Integration
Joint Board’s share of this funding was £11.9m. This funding was aimed to
help manage extreme winter pressures and Covid-19 impacts. The IJB did
not spend all of these additional funds in year as they found it challenging
to increase capacity for service delivery.
The IJB has a medium-term financial plan but is yet to develop
a longer-term plan
52.  Financial sustainability looks forward to the medium and longer-term to
consider whether the body is planning effectively to continue to deliver its
services or the way in which they should be delivered. 
53.  In September 2022, the Scottish Government commenced discussions with
IJBs regarding the possible claw back of reserves to meet future funding
pressures. These discussions are on-going, and the level of claw back will be
reflected in the IJB quarter two return. For Argyll & Bute Integration Joint Board
this is estimated to be £2.0m.
54.  The IJB has developed a medium-term financial plan covering a three-year
period (2023/24 to 2025/26). The plan was presented to the IJB at its meeting
on 24 August 2022.
55.  The plan includes assumptions about future inflation levels, funding and
cost and demand pressures. It also sets out the financial position under three
different scenarios i.e., best case, mid-range, and worst case. The medium-term
financial plan does not reflect any implications of Covid-19 costs and assumes
that these costs will continue to be met with funding from Scottish Government.
The IJB receive regular updates advising them of any revisions to the budget
outlook. 
56.  The IJB has not developed any longer-term plans which go beyond
2025/26. Management have acknowledged that consideration should be given
to the longer-term and its likely to become more difficult in the future to
distinguish between Covid-19 and non-Covid-19 related activity. 
57.  Management believe that this combined with considerable uncertainties
about future funding would render longer-term forecasts unreliable and would
not be a sound basis for making decisions. Therefore, medium-term financial
planning is considered appropriate for the IJB at present and longer-term
financial planning is an aspiration, dependent to some extent upon increased
certainty in respect of future funding for the sector.

Page 15

2. Financial management and sustainability | 15 
The IJB is forecasting a small overspend of £0.7 million for
2022/23
58.  The IJB approved a balanced budget for 2022/23 at its meeting on 30
March 2022. The budget gap for 2022/23 within the mid-range scenario was
£3.9 million. These new savings are in addition to the £2.1 million savings
brought forward, resulting in an overall savings target of £6.0 million for
2022/23.Savings were identified in order to deliver a balanced budget.
59.  The budget monitoring report presented to the Finance and Policy
Committee on 28 October 2022 shows a year-to-date underspend of £1.7
million in the period to 30 September 2022 and a forecast overspend of £0.7
million for 2022/23.
Significant budget gaps in 2023/24 to 2025/26
60.  The medium-term financial plan was updated and presented to the IJB at its
meeting on 24 August 2022. Significant budget gaps were identified over the
next three years (Exhibit 4).
Exhibit 4
Medium-term financial plan 
2023/24
£m
2024/25
£m
2025/26
£m
Base case  3.4 3.6 3.6
Mid-range  6.7 10.1 12.5
Worst case 14.0 24.9 35.1
Source: Argyll & Bute Integration Joint Board
61.  In the mid-range scenario, the IJB cumulative budget gap estimated over
the three-year period 2023/24 to 2025/26 is £29.3 million with a budget gap of
£6.7 million in 2023/24. It is recognised that there is significant uncertainty in
respect of future resource allocations to the IJB at present.
62.  Looking further ahead the IJB is facing significant budget challenges
assuming a mid-range (most likely) scenario as illustrated in Exhibit 3. It is
important therefore that, in future years, the IJB continues to take action to
operate within planned budgets and deliver required savings. The
transformation and savings programme is the main way in which the IJB seeks
to balance its financial position.

Page 16

2. Financial management and sustainability | 16 
Savings targets remain challenging for the IJB
63.  Savings are vital in ensuring that any budget gaps are bridged, and financial
balance is maintained. In order to balance planned expenditure with the
resources delegated to it, the IJB has consistently set ambitious savings targets
in recent years. The IJB has failed to achieve the planned level of recurring
savings in full. However, significant progress has been made in delivering
efficiencies and improving the governance and reporting in respect of the
savings and transformation programme. In 2021/22, there was a shortfall in
savings delivery of £1.1 million which was covered in full by Scottish
Government Covid-19 support.
64.  As at the end of September 2022, £3.3 million of the £6.0 million savings
target had been achieved. This is around 55% of the target. Of the remaining
£2.7 million savings target, £1.7 million (63%) are anticipated to be difficult to
achieve in full in 2022/23 with a further £0.7 million (26%) unlikely to be
deliverable in 2022/23.
65.  Management have recognised that slippage within the savings programme
is contributing to the forecast overspend against budget. It is crucial that efforts
to deliver the agreed savings are continued. 
Recommendation 1
The IJB should continue to review and update its medium-term financial plan with
appropriate action taken to bring financial performance into recurring balance.
Financial systems of internal control operated effectively
66.  The IJB is reliant on the systems of its partner bodies, NHS Highland and
Argyll & Bute Council, for its key financial systems, including ledger and payroll.
All IJB transactions are processed through the respective partners’ systems and
all controls over these systems are within the partner bodies, rather than the
IJB.
67.  As part of our audit approach, we sought assurances from the external
auditor of NHS Highland and Argyll & Bute Council and confirmed there were no
weaknesses in the systems of internal controls for either the health board or the
council.
Standards of conduct and arrangements for the prevention and
detection of fraud and error were appropriate 
68.   The IJB does not maintain its own policies relating to the prevention and
detection of fraud and error but instead depends on those in place at its partner
bodies. We reviewed the arrangements in place at NHS Highland and Argyll &
Bute Council and found them to be adequate. The IJB has a Code of Conduct in
place which Members must comply with, and the Members’ Registers of Interest
are publicly available on the websites of the partner bodies.

Page 17

2. Financial management and sustainability | 17 
69.  Appropriate arrangements are in place for the prevention and detection of
fraud and error. We are not aware of any specific issues we require to bring to
your attention.

Page 18

3. Governance, transparency and Best Value | 18 
3. Governance, transparency
and Best Value
The effectiveness of scrutiny and oversight and transparent reporting of
information 
Main Judgements
The IJB has appropriate governance arrangements in place that support the
scrutiny of decisions by the Board. Governance arrangements operating
throughout the Covid-19 pandemic have been appropriate and operated
effectively. 
Performance indicators and associated targets have been kept under review to
ensure they reflect the impact of Covid-19 on methods of service delivery and the
associated outcomes. The IJB is looking to strengthen these arrangements by
developing its Integrated Performance Management framework in 2022/23.
Governance arrangements are appropriate and operate
effectively 
70.  The IJB made changes to its governance arrangements at the outset of the
pandemic in March 2020. These have been detailed in the Annual Governance
Statement in the annual accounts. We consider that governance arrangements
are appropriate and support effective scrutiny, challenge and decision making.
71.  All IJB meetings and committees took place via remote conferencing in
2021/22. Members of the public were able to attend meetings and the recording
of the meeting was published alongside the minutes.
72.  In March 2020, the IJB agreed a delegation of powers to the Chief Officer
for the event of emergencies. These powers enabled the Chief Officer to instruct
executive action on any matter for the duration of the Covid-19 emergency in
consultation with the Chair or Vice Chair of the Board. Such matters would then
be subsequently reported to the Board when possible. This delegation was not
utilised in 2021/22, however was still in place.
73.  We concluded that the revised arrangements were appropriate and
adequate under the current circumstances, and they support standards of good
governance and accountability. Meetings continue to be held in a virtual
environment, in line with Scottish Government guidance for safer workplaces
during the pandemic.

Page 19

3. Governance, transparency and Best Value | 19 
Performance reporting in the management commentary of the
Annual Accounts was of a good standard
74.  Management Commentaries included in the annual accounts should
provide information on a body, its main objectives and the principal risks faced.
It should provide a fair, balanced and understandable analysis of a body’s
performance as well as helping stakeholders understand the financial
statements.  
75.  The management commentary is of a good standard and clearly explains
the IJB’s strategy, finances and links to the financial statements. The statutory
requirements relating to non-financial performance have been met. The
management commentary also details the impact of Covid-19 on the IJB’s
business and financial position.
Changes in senior officers
76.  There have been changes to senior officers at the IJB. The Chief Officer left
their post on 31 March 2021. The post was filled on an interim basis from 1 April
until 3 May 2021 by the Deputy Chief Officer. Fiona Davies was appointed as
Interim Chief Officer on 4 May 2021 for a period of up to one year and was then
permanently appointed to the role on 4 February 2022.
77.  The Chief Financial Officer left the IJB on 30 June 2021.The post was filled
on an interim basis by the Deputy Chief Officer. A new Chief Finance Officer
(James Gow) has been recruited and joined the IJB on 9 August 2021. 
78.  The Deputy Chief Officer left their post on 3 May 2022. The IJB plan to
undertake a recruitment process to recruit a new Deputy Chief Officer on a
permanent basis.
Arrangements are in place to secure Best Value
79.  Integration Joint Boards have a statutory duty to have arrangements to
secure Best Value. To achieve this, IJBs should have effective processes for
scrutinising performance, monitoring progress towards their strategic objectives
and holding partners to account. 
80.  The IJB has set out its approach to Best Value through a clear and concise
statement within the Annual Governance Statement included in the 2021/22
annual accounts. Also, a short summary detailing progress against the eight
best value themes was provided in the Annual Governance Statement.
Performance management arrangements are effective with
indicators and targets kept under review
81.  The Public Bodies (Joint Working) (Scotland) Act 2014 requires the IJB to
produce an annual performance report covering areas such as assessing
performance in relation to national health and wellbeing outcomes, financial
performance and best value, reporting on localities, and the inspection of
services.

Page 20

3. Governance, transparency and Best Value | 20 
82.  The Annual Performance Report for 2020/21 was approved by the IJB on
24 November 2021 and sets out how the IJB went about fulfilling its obligations
for Best Value in 2020/21. The Annual Performance Report for 2021/22 is
scheduled to be approved by the IJB in November 2022.
83.  Performance reports are presented to the board on a quarterly basis. A
report on performance was reviewed by the IJB at its meeting on 27 January
2021. At this meeting, the temporary suspension of reporting against the HSCP
Health and Wellbeing Outcome Indicators was approved. Focus was also
changed to reporting for Covid-19 activity and the remobilisation of health and
social care services. 
84.  For 2021/22, performance reporting has focussed upon the re-mobilisation
of services and reduction in waiting times which have increased as a result of
the pandemic. However, the Annual Performance Report for 2021/22 includes a
full a breakdown of the Health and Wellbeing Outcome Indicators and the IJB’s
performance against these indicators.
85.  The IJB has ensured effective arrangements are in place for managing and
reviewing performance. The IJB is looking to strengthen these arrangements by
developing its Integrated Performance Management framework in 2022/23.
National performance audit reports
86.  Audit Scotland carries out a national performance audit programme on
behalf of the Accounts Commission and the Auditor General for Scotland.
During 2021/22 we published some reports which may be of direct interest to
the IJB as outlined in Appendix 3. 
87.  The IJB has a process in place to ensure that findings from national reports
are reviewed, and where relevant, presented to the Audit and Scrutiny
Committee. This reporting includes an assessment of current arrangements and
the identification of actions to be taken to apply good practice examples
highlighted in the reports.

Page 21

Appendix 1. Action plan 2021/22 | 21 
Appendix 1. Action plan
2021/22 
2021/22 recommendations
Issue/risk Recommendation  Agreed management
action/timing
1. Financial Sustainability
In the mid-range scenario,
the IJB cumulative budget
gap estimated over the three-
year period 2023/24 to
2025/26 is £29.3 million with
a budget gap of £6.7 million
in 2023/24. It is recognised
that there is significant
uncertainty in respect of
future resource allocations to
the IJB at present.
Risk – The IJB is unable to
operate within
agreed/planned budgets and
fails to meet savings targets
on a recurring basis.
The IJB should continue to
review and update its
medium-term financial plan
with appropriate action taken
to bring financial performance
into recurring balance.
Paragraph 60-65 
The financial planning
framework will continue to be
updated as budget
announcements are made by
Government in respect of
funding and priorities for
2022/23 and beyond. 
Responsible officer: James
Gow, Head of Finance &
Transformation
Agreed date: March 2023 
Follow-up of prior year recommendations
Issue/risk Recommendation  Agreed management
action/timing
b/f 1. Financial
Sustainability
The IJB has a medium-term
financial plan in place and the
projected budget gap for the
three-year period of 2022/23
to 2024/25 is £19.382m with
a gap of £2.371m occurring in
2022/23 under mid-range
scenario planning. In the
Reinforce and reiterate the
need to maintain financial
discipline across all service
areas to support measures
aimed at managing
expenditure and bringing
financial performance into
recurring balance.
Superseded – see Appendix
1 – Action plan point 1.

Page 22

Appendix 1. Action plan 2021/22 | 22 
Issue/risk Recommendation  Agreed management
action/timing
shorter-term, as at 31 August
2021, the IJB is forecasting
an overspend of £0.990 m for
2021/22 primarily due to
slippage in delivering
savings. 
Risk - The IJB continues to
fail to operate within
agreed/planned budgets and
fails to meet savings targets
on a recurring basis.
b/f 2. Governance –
Changes to Key Officers
There has been significant
changes in senior officers at
the IJB. A new interim Chief
Officer joined the IJB in May
2021. A new Chief Financial
Officer joined the IJB in
August 2021.
Risk - There is a risk that
changes in key senior officers
may impact the momentum of
transformational changes.
The IJB should ensure they
continue to build momentum
with transformational
changes despite changes in
key officers.
Complete – The Chief Officer
was permanently appointed
to the role in February 2022
having been in post on an
interim basis since May 2021.
This has not had an adverse
impact on the IJB’s
transformational plans. 
b/f 3. Performance
Reporting
Standard performance
reporting has been revised
due to the Covid-19
pandemic. The IJB have
temporarily suspended
performance reporting
against the HSCP Health and
Wellbeing Outcome
Indicators. Focus was
changed to reporting Covid-
19 activity and the
remobilisation of health and
social care services.
Risk - There is a risk that
performance reporting is not
tailored effectively following
the Covid-19 pandemic.
Regularly review
performance reporting
arrangements, in particular to
reconsider at what point the
organisation should re-
engage reporting against the
HSCP Health and Wellbeing
Indicators and to ensure key
indicators remain appropriate.
Ongoing - the IJB has
incorporated new
performance targets from the
Scottish Government Health
Directorate in its 2022/23
reports. The new
Performance Reporting
Framework is intended to be
presented to the IJB in
January 2023 for
implementation on 1 April
2023 and will incorporate
outcomes indicators and
other national and local
measures of quality and
performance. 
Responsible officer: Stephen
Whiston, Head of Strategic
Planning, Performance &
Technology

Page 23

Appendix 1. Action plan 2021/22 | 23 
Issue/risk Recommendation  Agreed management
action/timing
Revised target date: January
2023
b/f 4. Workforce Planning
In previous years we have
reported that the IJB needs to
develop an overarching
workforce plan. A workforce
plan has yet to be finalised
and approved. Also, such a
plan cannot be developed in
isolation but needs to be
integrated with financial and
service plans.
Risk - In the absence of
integrated planning, the IJB
will be unable to manage its
staff resources effectively.
Workforce planning should be
progressed and integrated
with service and financial
planning.
Ongoing – the first draft of
the workforce plan was
submitted to the Scottish
Government on time. 
Responsible officer: Kevin
Colclough, Head of People
Planning, Analytics and
Reward, NHS Highland.
Revised target date: March
2023

Page 24

Appendix 2. Significant audit risks identified during planning | 24 
Appendix 2. Significant audit
risks identified during planning 
The table below sets out the audit risks we identified during our planning of the
audit and how we addressed each risk in arriving at our conclusion. The risks
are categorised between those where there is a risk of material misstatement in
the annual report and accounts and those relating our wider responsibility under
the Code of Audit Practice.
Risks of material misstatement in the financial statements
Audit risk Assurance procedure Results and conclusion
1. Risk of material
misstatement due to fraud
caused by the management
override of controls
As stated in International
Standard on Auditing (UK)
240, management is in a
unique position to perpetrate
fraud because of
management’s ability to
override controls that
otherwise appear to be
operating effectively.
Agreement of balances and
transactions to Argyll & Bute
Council and NHS Highland
financial reports / ledger/
correspondence. 
Service auditor assurances
will be obtained from the
auditors of Argyll & Bute
Council and NHS Highland in
line with the 2021/22
Integration Joint Boards
Protocol for Auditor
Assurances.
No issues were identified
from our audit work
performed or the service
auditor assurances provided. 
Risks identified from the auditor's wider responsibility under
the Code of Audit Practice
Audit risk Assurance procedure Results and conclusion
2. Financial Sustainability
The Integration Joint Board
has a medium-term financial
plan in place and the
projected budget gap for the
three-year period of 2022/2
3to 2024/25 is £19.5million
with a gap of £4.8million
Continue to assess and
review financial plans to
ensure that due consideration
is given to the impact of
Covid-19 on financial
planning.
The IJB continues to operate
on a three-year, medium-term
financial plan. A revised plan
was presented to the IJB at
its meeting in August 2022
covering the period 2023/24
to 2025/26.

Page 25

Appendix 2. Significant audit risks identified during planning | 25 
Audit risk Assurance procedure Results and conclusion
occurring in 2022/23 under
mid-range scenario planning. 
In the shorter term, as at 30
November 2021, the
Integration Joint Board is
forecasting an overspend of
£0.280 million for 2021/22,
however does not yet take
into account all of the
additional funding allocations
announced in late 2021.
There is a risk that the
Integration Joint Board
continues to fail to operate
within agreed/planned
budgets and fails to meet
savings targets on a recurring
basis.
Considering the above, and
the fact that the IJB is funded
on an annual basis, the
medium-term financial
planning in place is
appropriate. Longer-term
financial planning should
remain as an ambition for the
IJB’s financial sustainability.

Page 26

Appendix 3. Summary of 2021/22 national performance reports and briefing papers | 26 
Appendix 3. Summary of
2021/22 national performance
reports and briefing papers 
May
Local government in Scotland Overview 2021
June
Covid 19: Personal protective equipment
July
Community justice: Sustainable alternatives to custody
September
Covid 19: Vaccination programme
January
Planning for skills
Social care briefing
February
NHS in Scotland 2021
March
Local government in Scotland: Financial Overview 20/21
Drug and alcohol: An update
Scotland’s economy: Supporting businesses through the Covid 19 pandemic

Page 27

Appendix 3. Summary of 2021/22 national performance reports and briefing papers | 27  
Argyll & Bute Integration Joint Board
2021/22 Annual Audit Report 
Audit Scotland’s published material is available for download 
on the website in a number of formats. For information on our 
accessibility principles, please visit:
www.audit-scotland.gov.uk/accessibility
For the latest news follow us on social media or
subscribe to our email alerts. 