Budget and Medium Term Financial Plan 2023-2026

Argyll and Bute Council · 25 January 2023
Back to Argyll and Bute HSCP Integration Joint Board (IJB) — 25 January 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

1 
Integration Joint Board   
Date of Meeting: 25 January 2023 
Title of Report: Budget and Medium Term Financial Plan 2023-2026 
Presented by: James Gow, Head of Finance and Transformation    
The Integration Joint Board is asked to:
 Consider the Financial Plan and budget outlook for 2023-24 to 2025-26 and note
the high level of risk and uncertainty.
 Note the forecast budget gap totalling £9.4m.
 Note that indicative savings targets have been allocated to services.
 Note that oversight of the budget process for 2023/24 will continue to be
undertaken by the Finance & Policy Committee. 
1. EXECUTIVE SUMMARY 
1.1 
1.2 
This report provides the Integration Joint Board with an updated budget outlook
for the 2023/24 financial year and medium term financial plan. This takes into
account the Scottish Government’s draft budget published in December 2022. It
forms the basis for detailed financial planning and informs the HSCP value for
money and savings target for 2023/24. The financial plan will continue to evolve
as funding allocations are confirmed by partners. 
The medium term plan aims to provide a framework for the development of the
HSCP budget for 2023/24 whilst placing it in a longer term context. The Scottish
Government have published a 3 year spending review which outlines their
medium term funding intentions for Health and Social Care. 
1.3  The HSCP is in a healthy financial position as at the end of 2021/22 and expects
to balance its financial position in 2022/23. However, the financial context is
deteriorating and significant efficiency and cost savings are required. A medium
and worst case scenario is presented for the next three years. Financial planning
will be based upon the mid-range scenario which estimates the budget gap at
£9.4m or 2.8% of total spend for 2023/24. This has been allocated to services
and work is underway to develop firm savings proposals to balance the budget
for 2023/24.  
2.  INTRODUCTION 
2.1 The purpose of this report is to update the medium term financial plan covering
the period from the current year through to 2025/26. It summarises the financial

Page 2

2
context facing the HSCP and aims to ensure that it plans to operate on a
financially sustainable basis. It includes the following sections: 
 Financial & Strategic Context
 Current Financial Position
 Revenue budget modelling & assumptions
 Budget Gap and Savings Target
 Transformation & Investment
 Reserves
 Scenarios and Risks 
3. 
3.1 
DETAIL OF REPORT 
Financial & Strategic Context 
The strategic context is important: 
 Draft legislation for the National Care Service (NCS) has been published
but does not provide the detail required to fully understand its implications. 
 Recent reports by Audit Scotland on NHS and Social Care outline a series
of challenges including workforce shortages, reduced activity, increasing
demand, increased delayed discharges and waiting times and unmet
need. The Health and Social Care system has been under severe pressure
throughout the 2022/23 winter period. 
 Inflation is at 10.7% and is not expected to reduce until mid-2023. There
are risks associated with the Government’s inflation assumptions built into
financial plans. The Scottish Government have decided not to publish a
public sector pay policy for 2023/24 at this time. As a result national
planning assumptions in respect of pay have been used. 
 The Scottish Government recently published a draft budget for 2023/24
which provides additional funding for the Health and Social Care Sector.
However, the additional funding translates to a baseline funding uplift
assumption of 2% for the NHS with the rest of the additional funding
required to fund current year pay increases already offered. Audit Scotland
have also recently highlighted the scale of the fiscal challenge facing the
Scottish Government in coming years. 
The key medium term financial planning document is the Scottish Government’s
Resource Spending Review. This was published in May 2022 and sits alongside
a medium term financial strategy. The full document is available at:
https://www.gov.scot/publications/scottish-resource-spending-review. 
The Spending Review (SR) prioritises Health and Social Care, around 40% of the
total budget. It reconfirms the commitment to the National Care Service and
outlines increases in social care investment. Allocations (at April 2022 prices) are:

Page 3

3
Spending
Review
22-23
£’m
23-24
£’m
24-25
£’m
25-26
£’m
26-27
£’m
Health & Social
Care
17,106 17,550 17,995 18,536 19,029
Increase on
prior year 
2.6% 2.5% 3.0% 2.7%
Health & Social
Care Capital
554 443 428 443 - 
Settlements for local government are frozen through most of the period. In the
medium term the SR recognises the pressure the public finances are expected to
be under and indicates that overall public sector staffing numbers require to be
reduced to pre-pandemic levels with reform and efficiency improvement a priority.   
The SR figures have been further amended in the draft budget published in
December 2022: https://www.gov.scot/publications/scottish-budget-2023-24/ 
The draft budget sets out the spending priorities for 2023/24. In respect of the
economic outlook, the Scottish Government expect the economy to shrink by 1%
in 2023/24 with unemployment set to rise and real earnings to reduce. 
For Health and Social Care, the main headline is a £1bn increase in funding for
the sector. This provides for the full year impact of higher pay increases already
offered and a 2% baseline uplift for 2023/24. The minimum hourly rate for Social
Care staff is to increase from £10.50 to £10.90 per hour from April 2023 (3.8%
uplift). The Scottish Government have decided against publishing a Public Pay
Policy at this time as negotiations and industrial action continue in respect of the
2022/23 increases. There is no additional service development or growth funding
and the 2% uplift represents a second year where general cost inflation far
exceeds nominal (cash) terms funding growth. 
The Scottish Government also published a medium term financial strategy which
provides further information on the outlook for the public finances and economic
performance in Scotland. It again outlines an expected fall in living standards and
disposable income as a result of the cost of living crisis and high inflation. It
recognises that Consumer Price Index (CPI) inflation was 9% for the 12 months
to April 2022 and sets out forecast inflation: 
2021-22 2022-23 2023-24 2024-25 2025-26 2026-27
Actual
Inflation
Forecast
Inflation    
9.0% 8.0% 2.4% 1.7% 2.0% 2.0% 
The document models 1%, 2% and 3% pay increases from 2023/24 onwards
using 2022/23 as a baseline. It is likely that these assumptions will require to be
reviewed as the budget cycle progresses. This is critical as the cumulative effect
of actual CPI inflation in 21/22 and forecast inflation in 22/23 is over 17%.   
3.2 Current Financial Position 
The HSCP ended the 2021/22 financial year in a favourable position. It repaid all
of its debt and operated within budget. Total revenue spend on services was
£312m and £21.2m was held in earmarked and general reserves at the year end.

Page 4

4
Some of these reserves are now being clawed back by Government to contribute
to funding current year pay pressures.  
Managing performance in the current year is proving challenging, largely as a
result of increased cost and demand pressures and slippage with the savings
programme. It is anticipated that the HSCP will operate within the resources it
has available to it. However, as reserves are spent and clawed-back, balances
will be substantially lower at the end of 2022/23. Overall, the financial position is
expected to deteriorate and the level of financial risk is increasing. 
The HSCP does not have delegated responsibility for asset ownership or capital
spend. Significant backlog maintenance and replacement needs have been
identified and require to be addressed in partnership with NHS Highland and
Argyll & Bute Council. Addressing investment need is a priority and represents a
risk to the ability of the HSCP to deliver on its strategic objectives in the longer
term. 
3.3 Revenue Budget 2023/24 to 2025/26 
3.3.1 Funding 
Services provided by the HSCP are largely funded by allocations made by the
Scottish Government to Local Authorities and NHS Boards. They then pass on
funding for delegated services to HSCPs. Actual funding allocations are
predominantly based upon formulae which take into account factors such as
population demographics, levels of deprivation and rurality. The table below
provides a summary of the current allocations and assumptions for future uplifts: 
Funding
Allocations     2022/23 2023/24 2024/25 2025/26      
£m £m £m £m
NHS Funding         
Baseline   201.3 205.4 209.5 213.7
Resource Transfer  7.2 7.4 7.6 7.7
Other Recurring Funding 37.9 38 38 38
Additional Inflation for 22/23 Pay Offer 6.3 6.3 6.3 6.3
Assumed uplift %   2 2 2
Total NHS Funding  252.7 257.1 261.4 265.7
Social Work Funding        
Baseline Funding  62.8 64.4 66 68
22/23 New Recurring Funding 11.4 11.7 12 12.3
Additional inflation for 22/23 Pay Award 0.9 0.9 0.9 0.9
Assumed uplift %    2.6 2.5 3
Total Local Authority Funding 75.1 77.0 78.9 81.2
Total Funding 327.8 334.1 340.3 346.9
Additional Funding for Transformation  0.9 0.9 0.9 0.9 
The key assumptions are: 
 Additional resource will be allocated in 2023/24 (estimate £6.3m) to fully
fund pay and SLA increases which are above budget in the current year;

Page 5

5
 A 2% uplift planning assumption has been provided by Scottish
Government for 2023/24 and beyond (with 2% uplift for pay assumed); and
 The Argyll & Bute funding share (NRAC) will remain at its present rate and
NHS Highland will pass on the full value of uplifts. 
The uplifts for Social Care applied in the model mirror the Spending Review
increases per the table at section 3.1. These assumptions are critical to the HSCP
medium term plan in the context of high inflation. 
3.3.2  Expenditure Budget   
3.3.3 
There is uncertainty with the expenditure budget, largely as a result of inflation.
This impacts on direct staff costs through pay settlements (approximately one
third of the budget) and through increased contract values. Additionally, non-pay
costs are expected to increase at a faster rate and are often outwith the control
of the HSCP. Key concerns relate to the PFI contract for the Mid-Argyll Hospital,
energy, travel and transport, the rates revaluation and drug costs. A 2%
assumption has been used for pay increases in 2023/24 in line with national
guidance. This ensures consistency across the Health and Social Care sector
although it is not widely viewed as realistic in the current context. 
The baseline budget incorporates the savings targets for 2022/23. 
Baseline Expenditure Budget 2022/23  
£m
NHS Baseline Spend 235.8
SW Baseline Spend 88.7
Less Savings Programme -3.9
Additional Inflation for 2022/23   7.2
Total Baseline Expenditure Budget 327.8 
Social Work Cost and Demand Pressures 
Social Work Cost and Demand Pressures
2023-24
£000
2024-25
£000
2025-26
£000
Pay inflation @ 2% per year inc. 2022/23 adjustment 1,270 2,065 2,879
Incremental increases 103 206 309
Non Pay Inflation 3,494 6,841 10,259
Younger Adults Demand Growth 388 785 1,190
LD, PD and MH Cost and demand pressures 1,166 2,332 3,501
Continuing Care for Looked After Young People 0 250 500
Estimated net cost of KCC 750 750 750
Allowance for unknown cost and demand pressures /
contingency 0 0 0
Total Social Work Cost and Demand Pressures 7,171 13,229 19,388 
A key assumption is that pay inflation will be 2% per year for 2023/24 onwards.
Non-pay inflation is calculated line by line on a total baseline budget of £58m.
This covers expected uplifts in national contract rates for care services and
increases to the expected pay floor for social care staff.

Page 6

6 
3.3.4 
3.3.5 
Significant additional budget allowance is being made to help manage cost and
demand pressures for services to support people with lifelong conditions (£1.5m
plus inflation). The decision to purchase the Kintyre Care Centre has also added
to budget pressures in Social Work. 
Health Cost and Demand Pressures 
NHS Cost and Demand Pressures
2023-24
£000
2024-25
£000
2025-26
£000
Pay Inflation Uplift 2% pa 1,540 3,111 4,713
Pay Increments & Uplifts inc. Succoth 240 392 544
Prescribing & Hospital Drugs Inflation 460 929 1,407
Inflation on GCC SLA 1,274 2,474 3,697
Inflation Commissioned Services & SLAs 668 1,349 2,045
Resource Transfer Inflation 277 560 849
Inflation on PFI Contract 443 467 493
Additional Medical Staffing  (CDF) 335 342 348
Allowance for Safe Staffing Act (AHP) 300 306 312
Renal Patient Transport 300 306 312
Energy, Estates & Utilities Inflation 437 560 701
Allowance for new drug approvals (oncology) 500 1,000 1,500
Regional Cath. Lab Costs & Tavi 224 224 224
High Cost Care Packages - new 100 100 100
IFRS 16 Revenue Consequences 250 500 750
MHRA Medicines Transport 165 165 165
NSD Topslice – Foxgrove 63 91 91
Fleet Replacement 118 120 123
LIH Clinical Nurse Manager (1yr) 77 0 0
Jura Progressive Care Centre 30 31 31
Website / other 33 33 33
Contingency  350 750 750
Allowance for unknown cost and demand pressures 0 1,000 1,500
Depreciation  274 302 332
Total Health Cost and Demand Pressures 8,458 15,112 21,020 
Summary and Budget Gap 
Revenue Budget Summary
2022-23
£m
2023-24
£m
2024-25
£m
2025-26
£m
Funding Total 327.8 334.1 340.3 346.9
Baseline Spend 327.8 327.8 327.8 327.8
Social Work Cost & Demand Pressures   7.2 13.2 19.4
NHS Cost & Demand Pressures   8.5 15.1 21.0
Estimated Expenditure 327.8 343.5 356.1 368.2
Mid Range Budget Gap / Savings
Target   9.4 15.8 21.3
New Savings Target as % of spend  2.7% 4.4% 5.8% 
3.4  Budget Gap and Savings Targets 
The above modelling, based on a mid-range scenario results in a budget gap due
to cost and demand pressures being greater than funding increases. For 2023/24

Page 7

7 
planning purposes the budget gap is estimated at £9.4m which translates into the
new savings target for 2023/24. The HSCP is in the process of developing a Value
for Money Strategy and savings plan to address the shortfall at this level. 
The assumption for 2023/24 pay increases is one of the most concerning as it is
below predicted inflation. It is based on guidance from Government (2%), there is
a general expectation that NHS pay increases are fully funded which mitigates
the importance of this assumption to some extent, however it is not clear if funds
are available to make up any excess pay awards in-year.   
The approach to budgeting is largely incremental in nature. It is likely that more
fundamental reviews of budgets and service delivery will be required in the
medium term as it is increasingly challenging to identify new savings within
existing service delivery structures. 
There are some mitigations which can be taken to reduce the impact of the
funding gap on front line services as summarised below. Appendix 1 provides
indicative savings targets for each service which total £6.9m or approximately
3.6% of in-scope budgets. The development of savings proposals is underway
across all services with the intention of having a balanced budget for 2023/24.
Management are also considering additional ways to manage spend early in the
new financial year in recognition of the scale of the challenge. 
£’000
Budget Gap 2023/24  9,400   
Retention of Employer NI increase budget
(now reversed) 
(1,038)
Allocation of Social Work Growth budgets to
offset cost and demand pressures 
(1,000)
Other central budget adjustments  (400)   
Balance – allocated to service budgets  6,962 
Management are now in the process of identifying savings proposals to bridge
the budget gap. The appendix provides a summary of service budgets that are
considered in scope for savings and the target attached to each one. A series of
workshops and SLT have taken place or are planned to focus management time
on this task. 
Progress with the development of savings plans will be reported to the Finance &
Policy Committee which will meet three times prior to the final budget proposals
being made to the IJB in March 2023. 
3.5 Transformation and Investment 
The budget assumes that £900k will be held to enable transformation projects to
proceed. One of the difficulties in delivering Improvement and Transformation has
been the absence of funding to support projects. The HSCP is seeking to maintain
this budget which provides important flexibility. 
The HSCP does not have delegated responsibility or budgets for capital
investment but does need to progress important projects with partners. Long term

Page 8

8
asset replacement is required and work is underway to prioritise projects including
care home development and replacement and the need for investment in the NHS
Estate. The transformation programme and workforce plan outline other areas
where infrastructure investment is required. 
3.6  Reserves 
This plan does not set a target for increasing general reserves. It is intended that
all resources available will be allocated to service delivery. Reserves carried
forward into 2022/23 are intended to be spent during the period of this plan and
balances will reduce. Reserves spend is in addition to the revenue budget
outlined above and will also assist with service improvement. An estimated
schedule of spend in addition to the revenue budget is provided below: 
2022/23
£m
2023/24
£m
2024/25
£m
2024/25
£m
Reserves
Spend Profile
12 2.5 2 1
Clawback
(estimate)
3.5   
3.7  Scenarios and Risk 
3.7.1  The risks associated with medium term financial planning are summarised below,
using the standard assessment of probability and impact: 
Risk Like. Impact  Mitigations
HSCP unable to identify
and deliver sufficient
savings.
4 5 20 Development of and
consultation on value for
money strategy. Utilisation
of allocated reserves and
progressing transformation.
Management of expenditure
in 2023/24
Demographic or
population changes
reduce the formula funding
to the HSCP.
4 4 16 Review annually.
One or both of the partners
do not pass on anticipated
funding allocated to Health
and Social Care.
4 4 16 On-going partnership
working and consultation.
Cost and Demand
pressures increase further
or are not funded to the
extent assumed in the
model.
4 4 16 Engagement in sector
networks, modelling based
on Spending Review figures
and draft Budget. 
Increases in pay rates or
employer on-costs are in
excess of those allowed
for in the budget.
4 4 16 Monitor progress with pay
negotiations, commitment to
fund within NHS. Nationally
agreed assumptions used,
high risk these are not
realistic.

Page 9

9 
3.7.2
Implementation of NCS
diverts attention from
operational priorities and
financial management
4 4 16 Seek to resource NCS
project appropriately. 
Service costs increase due
to providers withdrawing
from the market and / or
ongoing workforce
shortage
4 4 16 Commissioning strategy and
engagement with partners
and care providers.
Workforce planning and
management of agency /
locum contracts and
additional funding to improve
terms and conditions. 
Funding reduced due to
level of reserves held in
HSCP and across sector
4 3 12 Level of risk reduced as
opportunity for SG to do this
further is reduced as
clawback and funding
reductions are confirmed. 
Additionally, there are service and financial risks related to both partners. NHS
Highland have a structural deficit to address over the coming years in addition to
unfunded cost and demand pressures. Argyll & Bute Council are also having to
identify savings, again due to funding allocations growing at a much slower pace
than costs. This presents risk to both the HSCP financial plans and to the level of
service the HSCP and communities receive from partners. 
Scenarios 
The figures presented within this plan are based upon modelling of the mid-rage
outlook. The table below summarises a potential worst case which reflects
increased risk: 
2023-24
£m
2024-25
£m
2025-26
£m
Mid-Range Budget Gap   9.4 15.8 21.3         
Health Worst Case Additional   6 13 20
Social Work Worst Case Additional  1.8 3.8 5.9
Worst Case Budget Gap   17.2 32.6 47.2 
The use of mid-range assumptions as a basis for financial planning is considered
a reasonable approach whilst recognising that the risk is on the downside. In the
event that the outlook improves if the final Scottish Budget allocates additional
resource or inflation reduces quickly, the HSCP would be able to scale back its
savings targets. 
3.7.3 Workforce 
Workforce issues and risks are considered in detail in the Workforce Plan. Labour
shortages are likely to constrain the ability of the HSCP to deliver services and
improvement as planned. The financial plan assumes some net growth in
workforce numbers. This is difficult to quantify at present but includes:

Page 10

10
 increase in workforce size to narrow gap between current budgeted
establishment and actual staffing (reduced vacancies);
 reduce reliance on temporary and agency staff to implement more cost
effective, stable and sustainable staffing models;
 some transition from commissioned services to direct delivery of service;
 cost and demand pressures will require additional staffing; and
 savings and vacancy management required to balance budget will offset
the above to some extent. 
3.8 
4. 
Alignment with Strategic Planning 
The medium term financial plan sits alongside a range of HSCP strategic and
operational planning documents. These include the new Joint Strategic Plan and
Commissioning Strategy. The Transformation programme and the budget to
support it are important in facilitating some of the objectives set out in these
documents, particularly in respect of service redesign and beginning the process
of shifting of resources towards prevention. 
The National Care Service will further transform the HSCP, this will change the
way it is structured and operates and as a project will need to be resourced. It will
place greater importance upon partnership working as the transition is likely to
present challenges for partners as well as the HSCP. 
RELEVANT DATA AND INDICATORS 
4.1 The budget outlook is based on a number of assumptions, using a best, worse
and mid-range scenario. These assumptions are drawn from the Scottish
Government’s Draft Budget and Spending Review, local modelling and guidance
provided from policy teams. The assumptions used are considered carefully and
will be regularly reviewed and updated. There will be variations between the
assumptions made at this stage of the budget planning process and the eventual
funding allocations and cost and demand pressures for 2023/24 and beyond.
Assumptions in respect of pay inflation are consistent with national planning
assumptions. 
5. CONTRIBUTION TO STRATEGIC PRIORITIES 
5.1 The Integration Joint Board has a responsibility to set a budget which is aligned
to the delivery of the Strategic Plan and to ensure the financial decisions are in
line with priorities and promote quality service delivery. This requires to be
considered when options are developed to balance the budget and address the
funding shortfall. 
6. GOVERNANCE IMPLICATIONS 
6.1 Financial Impact – There is expected to be a significant budget gap that requires
to be addressed, the HSCP is required to set a balanced budget. 
6.2 Staff Governance – None directly but there is a strong link between HR
management and delivering financial balance. 
6.3 Clinical Governance - None

Page 11

11
7. 
7.1 
8.
PROFESSIONAL ADVISORY 
There are no recommendations in this report which require to be consulted on
with Professional Advisory leads. The development of the savings plan is being
progressed in consultation with Professional Advisory Leads and the full
leadership team. 
EQUALITY AND DIVERSITY IMPLICATIONS 
8.1 None directly from this report, some of the proposals to address the estimated
budget gap will require equality impact assessments to be completed and
considered. 
9. 
9.1 
10
GENERAL DATA PROTECTION PRINCIPLES COMPLIANCE 
None directly from this report. 
RISK ASSESSMENT 
10.1 There are significant risks associated with medium term financial planning. To
some extent these are quantified within the worst case scenario and further detail
is provided within the main body of the report. The key risks are inflation rates
exceeding planning assumptions and future funding allocations. The scale of the
financial challenge facing the HSCP is significant and addressing this is also likely
to impact on service risk as savings are implemented. 
11. PUBLIC AND USER INVOLVEMENT AND ENGAGEMENT 
11.1 Public engagement and consultation relating to the HSCP’s financial planning is
being progressed using existing engagement frameworks such as the locality
planning groups. This process will continue as savings proposals are developed
to address budget shortfall as the HSCP seeks to move towards sustainable
financial and service models. The HSCP is also developing improved
engagement and co-production processes and will seek to consult with the wider
community on its strategic priorities. Budget proposals will be available as part of
the IJB public papers for public comment accompanied by Equality Impact
Assessments for review by the IJB. 
12. CONCLUSIONS 
This document provides a draft medium term financial plan for 2023/24 to
2025/26. It outlines the key assumptions, cost pressures and risks associated
with financial planning. It also provides an indication of the anticipated scale of
the budget gap facing the HSCP. The current financial context for the HSCP is
that it is in a healthy financial position with reserves available to help manage
services pressures and priorities. 
The identified budget gap requires to be addressed through the development of
a Value for Money Strategy and savings plan. Work on this is now underway and
savings targets for each service are attached. The scale of the challenge for
2023/24 is estimated at £9.4m or 2.7% of the expenditure budget. The
management team are currently prioritising the development of savings plans and
progress will be reported to the Finance & Policy Committee. It is intended that
the IJB will be asked to approve a balanced budget alongside savings proposals
and equality impact assessments where appropriate at its March meeting.

Page 12

12 
13. DIRECTIONS 
Directions
required to
Council, NHS
Board or
both.
Directions to: tick
No Directions required √
Argyll & Bute Council 
NHS Highland Health Board 
Argyll & Bute Council and NHS Highland Health Board 
AUTHOR NAME: James Gow, Head of Finance and Transformation
james.gow@argyll-bute.gov.uk 
Appendix 1 – Allocation of savings target to services