Argyll and Bute Council: Education
CONSULTATION REPORT 
Report on the outcome of the consultation relating to the proposal to close Skipness 
Primary School 
August 2022 
This document has been issued by Argyll and Bute Council in regard to a proposal in
terms of the Schools (Consultation) (Scotland) Act 2010 as amended. 
Appendix A

Page 2

2 
CONTENTS 
 
1. Reasons for the Proposal ......................................................................................... 33
2. Introduction ............................................................................................................... 33
4. Background .............................................................................................................. 44
5. Equality and Socio-Economic Impact ....................................................................... 66
6. The Consultation Process ........................................................................................ 66
7. Pupil Engagement .................................................................................................... 88
8. Responses to the Consultation Exercise .................................................................. 98
9. Education Authority Response to Written/Oral Representations ............................ 109
10. Education Scotland Report ................................................................................. 1111
11. Education Authority Response to Education Scotland Report ............................ 1212
12. Rural Schools – Compliance with Section 9(1) of the Schools (Consultation
(Scotland) Act 2010 .................................................................................................. 1212
13. Alleged Omissions or Inaccuracies ..................................................................... 1414
14. Opportunity to Make Representations to the Scottish Ministers ......................... 1514
15. Conclusion .......................................................................................................... 1515
16. Recommendation ............................................................................................... 1616 
Appendix 1 - Proposal Paper 
Appendix 2 - EQSEIA  
Appendix 3 - Written Consultation Responses  
Appendix 4 - Public Meeting Minutes  
Appendix 5 - Education Scotland Report  
Appendix 6 - Pupil Focus Group Responses

Page 3

3 
1. Summary of the Proposal 
1.1   It is proposed that education provision at Skipness Primary School be
permanently discontinued with effect from 1st December 2022. 
1.2   The pupils of Skipness Primary School’s catchment area will continue to receive
their education at Tarbert Primary School. 
1.3 The delineated catchment area of Tarbert Primary School shall be extended to
subsume the whole delineated catchment area of Skipness Primary School. 
2. Reasons for the Proposal 
2.1  The above is considered to be the best option to address the reasons for the
proposal which are: 
• Skipness Primary School has been mothballed for five years. The
school roll is low and not predicted to rise in the near future. The annual
cost of the mothballing of the building is £1,293. 
• Along with several other rural Councils, Argyll and Bute is facing
increasing challenges in recruiting staff.  At the time of writing this
Consultation Report there are 8.49  fte (full time equivalent) vacancies
for primary teachers  and 7.0 fte vacancies for Head Teachers in Argyll
and Bute. 
• Whilst the school is mothballed, the building is deteriorating with limited
budgets for maintenance. 
3. Introduction 
3.1   This is a Consultation Report prepared in compliance with the Schools
(Consultation) (Scotland) Act 2010 as amended (the 2010 Act) on the above
proposal. 
 
3.2   The purpose of this Report is to: 
• Provide a record of the total number of written responses made during
the statutory consultation period;  
• Provide a summary of the written responses;  
• Provide a summary of oral representations made at the public meeting
held on 10th November 2021 at 6.00 pm; 
• Provide a statement of the Council’s response to those written and oral
representations; 
• Provide the full text of Education Scotland’s report and a statement of the
Council’s response to this report;  
• State how the Council reviewed the proposal following the
representations received during the statutory consultation period and
receipt of the report from Education Scotland;

Page 4

4 
• Provide details of any omission from, or inaccuracy in, the Proposal
Paper and state how the Council acted upon those; 
• State how the Council has complied with Sections 11A to 13 of the 
2010 Act when reviewing the proposal; and 
• Explain the opportunity that may arise to make representations to the
Scottish Ministers in connection with Section 15(4) of the 2010 Act. 
4. Background 
4.1   On 8th September 2016, the Community Services Committee of Argyll and Bute
Council approved the mothballing of Skipness Primary School. The Council
agreed that in the event there are no registered pupils by the commencement
of session 2017/18, the school be considered for formal closure through the
statutory process. 
https://www.argyll-
bute.gov.uk/moderngov/documents/s112449/Skipness%20PS%20Mothballing.
pdf 
4.2   On 5th September 2019 the Community Services Committee agreed that the
Education Service would undertake the required preliminary consultation and an
Options Appraisal for Skipness Primary School.       
https://www.argyll-
bute.gov.uk/moderngov/documents/s140258/Schools%20Consultation%20Scotlan
d%20Act%202010%20-%20Skipness%20Primary.pdf 
4.3   A report providing details of the Options Appraisal, which was carried out in
accordance with Section 12A of the Schools (Consultation) (Scotland) Act 2010
as amended, was tabled at the Community Services Committee held on 10th
December 2019, where the Committee agreed to note the outcome of the
preliminary requirements and requested that officers formulate a draft closure
proposal.     
https://www.argyll-
bute.gov.uk/moderngov/documents/s143434/Skipness%20cover%20report.pdf  
4.4   At the Community Services Committee held on 12th March 2020, Members
considered and agreed to adopt the draft proposal as a “relevant proposal” that
would proceed to a statutory consultation under the 2010 Act. This statutory
consultation opened on 19th March 2020 and was originally due to end on 15th
May 2020. A public meeting was also arranged for 6th May 2020 at 7pm in
Skipness Village Hall.

Page 5

5 
https://www.argyll-
bute.gov.uk/moderngov/documents/s155449/Schools%20Consultation_Skipnes%
20Primary%20Cover%20Report.pdf     
4.5   However, shortly after commencement of the consultation the Coronavirus
outbreak caused schools to be closed and restrictions on public gatherings were
enforced as part of the “lockdown” measures. It was therefore clear that the
consultation exercise would not be able to proceed as originally planned. 
4.6 On 16th April 2020 the Business Continuity Committee met to deal with several
items of Council business to be addressed during the pandemic, including the
above. The Committee agreed to officers’ proposals to extend the consultation
period from 15th May 2020 to 31st August 2020 and to cancel the public meeting
scheduled for 6th May 2020, with a new date to be set once the regulations
imposing restrictions of public gatherings allowed it to proceed. Notification of the
consultation extension and cancellation of the public meeting was distributed to all
relevant consultees with notification of the new date also to be issued to them in
due course. 
https://www.argyll-
bute.gov.uk/moderngov/documents/s156194/Skipness%20PS%20-
%20BCC%20160420%20v2.pdf 
4.7 However, restrictions on public gatherings continued as a result of the Covid-19
pandemic “lockdown” measures. It was therefore clear that the consultation
exercise would not be able to proceed as planned within the initial extension
period and on 27th August 2020 the Community Services Committee met and
agreed to officers’ proposals to extend the consultation period from 31st August
2020 to 18th December 2020 with a new date for the public meeting to be set once
the regulations imposing restrictions of public gatherings allowed it to proceed.
Notification of the further extension was distributed to all relevant consultees. 
https://www.argyll-bute.gov.uk/moderngov/documents/s165606/518442%20-
%20Skipness%20PS%20-%20CSCOMMITTEE%20270820.pdf 
4.8  Due to Covid-19 restrictions on the holding of a public meeting and the extended
timeframe of consultation on the Proposal this resulted in a necessary correction
to the date of implementation noted in the Proposal. On November 1st, 2021
consultees were notified of the correction on the date for Proposal for closure
via written communication. The notification of the correction on the date for
implementation of the Proposal was also posted on the Argyll and Bute Schools
Consultation webpage. 
https://www.argyll-bute.gov.uk/school-consultations-and-proposals 
4.9 Due to continued restrictions arising from the Covid-19 pandemic, on 8th
December 2020 the Community Services Committee met and agreed to officers’
proposals to further extend the consultation period from 18th December 2020
to 31st May 2021. A new date for the public meeting was to be set once the

Page 6

6 
regulations imposing restrictions of public gatherings allowed it to proceed.
Notification of the further extension was again distributed to all relevant
consultees. 
https://www.argyll-
bute.gov.uk/moderngov/documents/s169276/SKIPNESS%20PRIMARY%20S
CHOOL.pdf 
4.10  However, due to a further increase nationally in Coronavirus cases in the latter
part of 2020, restrictions on public gatherings being continued and/or re-
imposed rather than relaxed, it was clear that the consultation exercise would
not be able to proceed as planned within the extension period. Therefore at the
meeting of Community Services Committee on 10th June 2021 a further
extension to the consultation period to 23rd December 2021 was agreed. 
https://www.argyll-
bute.gov.uk/moderngov/documents/s175291/SKIPNESS%20PRIMARY%20S
CHOOL.pdf 
4.11 Changes to the restrictions on public gatherings allowed for a public meeting to
be held on 10th November 2021 at Skipness Village Hall. 
4.12  Full details of the proposal, reasons for the proposal, the reasonable
alternatives to the proposal that were identified, an assessment of the proposal
and each of the reasonable alternatives, and an assessment of the educational
benefits to the proposal and each of the alternatives are set out in the Proposal
Paper, which is attached as Appendix 1. 
5. Equality and Socio-Economic Impact 
5.1   The Council as a public authority has a duty under the Equality Act 2010, the
Public Sector Equality Duty 2011, the Fairer Scotland Duty and the Islands
(Scotland) Act 2018 to have due regard to their provisions when making
strategic financial decisions. This is done through assessing the potential impact
of the decision on equality through Equality and Socio-Economic Impact
Assessments (EQSEIAs). The full EQSEIA in respect to the proposal to close
Skipness Primary School is attached as Appendix 2. 
 
5.2   The EQSEIA identifies no negative impact. 
6. The Consultation Process 
6.1  Following the Council’s decision of 12th March 2020, where it agreed to adopt
the proposal as a “relevant proposal” in terms of the 2010 Act and issue it as a
basis for consultation, the Proposal Paper was made available on the Argyll and
Bute Council website: 
https://www.argyll-bute.gov.uk/school-consultations-and-proposals

Page 7

7 
 
6.2   A summary of that document was also provided to: 
 The Parent Councils of the affected schools
 The parents of the pupils at the affected schools
 Parents of children expected to attend an affected school within 2 years of the
date of publication of the Proposal Paper
 The pupils, deemed to be of suitable age and maturity to be able to
communicate a view on the proposal, at the affected schools
 The teaching and ancillary staff at the affected schools
 The trade unions representatives of the above staff
 Argyll and Bute local Ward Councillors 
 Tarbert and Skipness Community Council 
 Community Planning Partnership 
 Relevant users of the affected schools
 The Constituency MSP
 List MSPs for the area
 The Constituency MP
 Chief Superintendent, Police Scotland
 Chief Executive, NHS Highland
 Chief Executive Strathclyde Partnership for Transport (SPT)
 Area Commander, Fire Scotland
 Education Scotland  
 
6.3   A copy of the Proposal Paper was also available from: 
 Council Headquarters, Kilmory, Lochgilphead, Argyll, PA31 8RT
 Education Offices, Argyll House, Dunoon, Argyll, PA23 8AJ
 Tarbert Public Library, Barmore Road, Tarbert, PA29 6TW
 Lochgilphead Service Point, 1A Manse Brae, Lochgilphead, PA31 8RD
 Tarbert Primary School, School Road,Tarbert.PA29 6TE
 Skipness Village Hall, B8001, Tarbert, PA29 6XT 
6.4 The document was available in alternative formats or in translated form for
readers whose first language is not English.    
6.5 If members of the public wanted the document in another language or format,
or if they required the services of an interpreter, this was made available.    
6.6 Copies of the Proposal summary as well as the full Proposal were posted as
well as emailed to notify consultees of the Proposal. These were sent to notify
Education Scotland and all of the relevant consultees (as prescribed by
Schedule 2 of the 2010 Act) of the proposal and invited them to make
representations as part of the consultation process. 
6.7 The consultation ran from 16h March 2019 until the close of business on 23rd
December 2021 – well over the minimum of six weeks including at least 30

Page 8

8 
school days, as required by Section 6(4) of the 2010 Act. As detailed in Section
4, above, the various extensions to the consultation period were due to issues
arising from the Coronavirus pandemic which were outwith the control of the
Council.  
6.8 A public meeting was held at Skipness Village Hall on 10th November 2021 at
6.00pm.  Anyone wishing to attend the meeting and participate was welcome to
do so. Advance written notice of this meeting was given to all the “relevant
consultees” in terms of the 2010 Act. The meeting was convened by the
Education Authority who presented reasons for bringing forward the proposal.
There was an opportunity for questions to be asked and comments to be made. 
6.9      This Consultation Report is the Council’s response to the issues raised
regarding the proposal during the consultation period. It will be published on the
Council’s website for a period of no less than 3 weeks prior to final consideration
of the proposal by the Council’s Community Services Committee on 25th August
2022.  
7. Pupil Engagement 
7.1   The proposal to close Skipness Primary School could have an impact on pupils,
parents and the community. Pupils’ views are a significant part of the
consultation process of this proposal. To that regard, pupils that had attended
Skipness Primary School prior to its mothballing took part in a focus group with
officers from the Education Service to share their views on the proposal. 
7.2   The focus group consisted of 3 pupils from Tarbert Academy that had previously
attended Skipness Primary School and was held on 19th August 2019.  
7.3   Primary pupils at Tarbert Primary School, deemed to be of suitable age and
maturity to be able to communicate a view on the proposal, were provided with
a PowerPoint that was presented by their class teacher and were offered an
opportunity to give their views and have these recorded as part of the
consultation process. 
7.4 The pupils were given information regarding the Council’s proposal and asked
for their thoughts and ideas through a series of questions. 
7.4  Pupils in the focus group had previously attended Skipness Primary School but
said:    
 “There were only 3 pupils and we were all siblings.”
 “The education at Skipness was amazing. We would go out and learn   
about things like the birds and bring things back to the classroom.” 
  “I found it easy to come to Tarbert, I enjoyed company of new friends     
transition was ok.”

Page 9

9 
 “I understand there’s no point keeping a school open if there isn’t
anyone in the classrooms.” 
7.4  Pupils at Tarbert Primary School, deemed to be of suitable age and maturity to
be able to communicate a view on the proposal, said: 
 “If just a few pupils, they would not be able to do big group things, fun
things and trips.”
 “Small numbers at Skipness might mean pupils would be lonely or sad.”
 “If there are only a few pupils in Skipness, they are paying quite a lot of
money to heat the school so that it is usable.”
 “[It’s] longer travel for pupils to Tarbert.”   
7.6  A summary of the pupil focus group responses is attached as Appendix 6. 
7.7      A summary of the responses from pupils at Tarbert Primary is attached in 
Appendix 3.  
8. Responses to the Consultation Exercise 
8.1   There were 3 written responses received during the consultation period which
were emailed to argyllhousereception@argyll-bute.gov.uk and an additional 3
written responses sent to the paper’s named Education Officer (6 written
responses in total). A summary of the responses can be found in Appendix 3. 
Oral responses to the proposal were gathered at the public meeting held at
Skipness Village Hall on 10th November 2021. Eight representatives from the
local community attended along with officers from the Education Authority and
a local Councillor. Also in attendance and Chairing the meeting was Education
Policy Lead, Councillor Yvonne McNeilly. Minutes of the public meeting are
attached as Appendix 4.  The 8 members of the public present intimated that
they were in favour of the proposal and identified the potential of the vacant
Skipness Primary School to be used as an asset for the community. 
8.2     The written and oral responses to the consultation can be grouped broadly 
as follows: 
• Views were expressed that Skipness Primary School should not be
reopened for education provision. 
• Views were expressed that a consideration to the change of the
catchment area for Tarbert Primary School be considered to benefit
another small school on the edge of that catchment area. 
8.3  The Education Authority identified and assessed a number of reasonable
alternatives to the proposal in its Proposal Paper and as part of the preliminary
requirements. No further reasonable alternatives to the proposal were submitted
as part of the public consultation process.

Page 10

10 
9. Education Authority Response to Written/Oral Representations 
9.1  Questions raised through the consultation process fell into five main themes:
receiving school capacity, transport, processes and timelines, community
interest and the role of young people in the process. 
9.2  Receiving School Capacity
Question: What are the considerations for capacity in the receiving school,
Tarbert Primary School?   
Response: The Education Service maintains projected school roll figures up to
2030. Further to this, models for school roll projections for Tarbert Primary have
been developed for the next 5 years. Class sizes and structures are managed
by the Head Teacher. The Head Teacher at Tarbert Academy is responsible for
nursery, primary and secondary education within the establishment and this
allows for flexibility to manage fluctuations in capacity. Projected school roll
figures for Tarbert Primary show a more than sufficient capacity for pupils from
the current catchment area for Skipness Primary as well as increased numbers
of primary aged pupils joining the Tarbert Primary catchment area. 
9.3  Transport
Question: What is a reasonable travel time for pupils transported from
Skipness to Tarbert Primary? 
Answer: With the distances in the case of transport to Tarbert Primary School,
there is an obligation on the Council to offer free school transport for children
travelling to that school from the existing Skipness Primary School catchment
area. Due to the rural geography of Argyll and Bute, many children across the
authority make journeys by bus to school. The travel time to Tarbert Primary is
25 minutes by car and is 37 minutes by the service bus used by school
transport that services the village of Skipness. This is considered a reasonable
distance and many children within Argyll and Bute travel these distances on a
daily basis. Any specific concerns parents may have regarding transport can
be raised with the receiving school. 
9.4  Processes and Timelines 
Question: The date of implementation is December 1st 2022, why is this and
what will happen then? 
Answer: The Schools (Consultation) (Scotland) Act 2010 sets out the specific
statutory requirements which the Council are required to follow and this includes
the timeframes for reports to be produced and agreed by the Council and
Education Scotland. The proposed implementation date of 1st December 2022
date allows for this process to be carried out in accordance with the
requirements of the legislation.   
If a decision is made in agreement to the proposal to discontinue education at
Skipness Primary School the catchment area of Tarbert Primary School will be

Page 11

11 
such that it encompasses the existing catchment area for Skipness Primary
School. Any pupils living in Skipness at that point and in the future would attend
Tarbert Primary School as their catchment area school unless a placing request
for another school was lodged.  
9.5   Community Interest
Question: What will happen with the building if closure of the school is taken
forward? 
Answer: The Council would be happy to hear from any group or individual within
the community that come forward with proposals for the future of the building. If
there is an interest in the community taking over the building discussions can
be opened up in anticipation of the proposed closure. If there is a clear
expression from the Community to take over the building then that is a route
which can be taken forward. The council have transferred a previous school
building over to the community following its formal closure.  
9.6  The role of young people in the process         
Question: Were children consulted in this process? 
Answer: Yes, both children previously in attendance at Skipness Primary
School and pupils at the receiving school were consulted on the proposal. The
consultation took the form of focus groups as well as whole class presentations
and feedback sessions. See also, Section 7, above. 
10. Education Scotland Report 
10.1   In accordance with Section 8(2) of the Schools Consultation (Scotland) Act
2010, a report was produced by Education Scotland on the educational aspects
of the proposal. 
10.2   In preparing their report, Education Scotland considered all relevant
documentation in relation to the proposal. They also visited Tarbert Primary
School via virtual means to seek the views of relevant consultees. 
10.3   The Education Scotland report is reproduced in full at Appendix 5. 
10.4   This report supports the proposal and is summarised below: 
a) Education Scotland agrees that the proposal by Argyll and Bute Council
will result in educational benefits for the children in the Skipness Primary
School catchment area. This includes social benefits and access to wider
opportunities at Tarbert Primary School.   
b) Education Scotland found that stakeholders were in agreement with the
proposal and could identify the benefits children would gain in attending
Tarbert Primary School.

Page 12

12 
c) Education Scotland notes that should the Council decide to implement the
closure proposal, it should continue to engage with the Skipness
community to explore options for the future use of the school building. 
11. Education Authority Response to Education Scotland Report 
11.1 The Council welcomes the report from Education Scotland and agrees with its
findings. 
11.2   The Council’s response to the findings contained within the Education Scotland
Report is as follows: 
Finding of report: 
a. Education Scotland agrees that the proposal by Argyll and Bute
Council will result in educational benefits for the children in the
Skipness Primary School catchment area. This also includes social
benefits and access to wider opportunities at Tarbert Primary
School.    
• The Council agrees that the educational benefits for current and future
pupils are clear. Children benefit from enhanced transitions between
nursery and Primary 1 and also Primary 7 to S1. Children also benefit
from opportunities to work with a wider number of peers and children at
other stages, helping to develop social skills. The access to a range of
extracurricular activities is also a benefit that children experience at
Tarbert Primary School. There are also educational benefits that result
from school staff being a part of a larger staff group which enhances
opportunities for professional learning and moderation of children’s
work. Stakeholders have identified the strength of the educational
benefits and opportunities for pupils at Tarbert Primary School. 
b) Education Scotland suggests that should the Council decide to implement
the closure proposal, it should continue to engage with the Skipness
community to explore options for the future use of the school building. 
• Argyll and Bute Council is open to engaging with the local community,
on any plans to develop a sustainable community facility via a possible
community asset transfer. 
12. Rural Schools – Compliance with Section 9(1) of the Schools (Consultation) 
(Scotland) Act 2010 
12.1  After the Education Authority received Education Scotland’s report, officers
carried out a further review of the proposal following the close of the
consultation, having regard (in particular) to:

Page 13

13 
• Written representations received by the Authority (from any person)
during the Consultation period; 
• Views of Tarbert Primary pupils as gathered during the consultation
exercise,
• Oral representations made to it (by any person) at the public meeting,
and 
• Education Scotland’s report. 
12.2 In addition, officers carried out a further assessment of the proposal and each
of the reasonable alternatives to it as set out in the Proposal Paper, having
particular regard to the preliminary requirements for rural school closures as set
out in Section 12A of the 2010 Act. As mentioned previously, no further
reasonable alternatives to the proposal were identified or advanced by officers
or stakeholders during or following the consultation exercise.  
12.3 The feedback from the Consultation was considered by officers. Data and
factual information was checked where required and advice sought from other
Council services where necessary. This ensured that the Council met the
requirements to review the proposal under Sections 9(1) and 13(5) of the 2010
Act. 
12.4 Officers of the Education Authority have listened carefully to the points made at
the public meeting and have considered equally carefully the Education
Scotland report and the online and written representations.  The proposal was
reviewed to consider whether any of the representations led the Council to
reconsider any other options as being reasonable alternatives to the proposal
to close Skipness Primary School. None of the representations led officers to
conclude that any of these options should be reconsidered as reasonable
alternatives. The Educational Benefits were reviewed in respect of the
Education Scotland report and representations made. There were no factors
included in the Education Scotland report or representations made requiring any
aspect of the Educational Benefits to be reconsidered. Further consideration
was also given to the likely effect on the local community, and the likely effect
of any different travelling arrangements. Having reviewed the Education
Scotland report and feedback from consultees in respect of the proposal and
each of the reasonable alternatives, officers concluded that the proposal
continues to be the most appropriate response to the underlying reasons for its
formulation.    
12.5 Officers concluded that the educational benefits of the proposal far outweigh
any potential disadvantages. Formal closure of the school will allow plans to
acquire the building to be progressed by the local community, which in turn will
increase the availability of the premises to the community and even benefit the
sustainability of the community. The proposal will have a neutral impact on
travelling arrangements, as these have been in place since the mothballing of
Skipness Primary School in 2016. The overwhelming majority of consultation
responses, community groups and pupils whose views were gathered are not in
support of the school being reopened for education provision. Education
Scotland’s report is also supportive of the Council’s proposal being implemented

Page 14

14 
and it also notes that the current and predicted number of children within the
Skipness Primary School catchment area is insufficient to make the school
viable. 
12.6 Therefore, the Council has had regard to the points made at the public meeting,
the written consultation responses and Education Scotland’s report. It thereafter
carried out a review of the proposal and all the reasonable alternatives and has
concluded that the proposal remains the best solution to address the reasons
for the proposal as set out at Section 2 of this Report. Implementation of the
proposal will allow children to have access to increased learning opportunities,
wider experiences and better socialisation through being part of a larger school.
The current number of children within the Skipness Primary School catchment
area is insufficient to make the school viable. If the school were to remain
mothballed this would be a continuing drain on the Council’s resources. The
proposal will assist the Council to deliver ‘Best Value’ through making more
efficient and effective use of its resources.  Furthermore, the Council will follow
up on working with the Skipness community to explore options for future use of
the mothballed school should they wish to progress this. 
13. Alleged Omissions or Inaccuracies 
13.1  Section 10(3) of the 2010 Act places a requirement on the Council to provide
details of any inaccuracy or omission in the Proposal Paper which has either
been identified by the Council or raised by consultees. This provision also
requires the Council to provide a statement on the action taken in respect of the
inaccuracy or omission, or if no action was taken, to state that fact and why. 
13.2   In the course of the statutory consultation, there were no areas identified by the
respondents as being inaccurate or omitted from the Proposal Paper. One area
of inaccuracy identified by the Council is in regard to the implementation date of
28th October 2020, as stated in the Proposal Paper. Shortly after the publication
of the Proposal Paper and at the beginning of the consultation period the global
Covid-19 pandemic caused schools to be closed and restrictions on public
gatherings were enforced as part of the ‘lockdown’ measures. The consultation
period was therefore extended several times until an in-person meeting was
able to take place, thus affecting the proposed implementation date. 
13.3  At the point where an in-person public meeting was able to be held there was a
notification to the distribution list of all “relevant consultees” under the Act which
included a notice of correction for the proposed closure date. Accordingly a
revised implementation date of 1st December 2022 should be noted in order to
allow for more than the full 8 week statutory period prior to implementation of
the proposal within which it can be called-in by the Scottish Ministers. 
13.4 A second area of inaccuracy identified by the Council in the Proposal Paper was
regarding the travel time from Skipness to Tarbert Primary School. The Proposal
Paper states that this is 25 minutes (Proposal Paper paragraph 18.12) which is
correct for driving time between the two points. However, the travel time via

Page 15

15 
service bus from Skipness to Tarbert Academy is 37 minutes with scheduled
pick-up at Skipness Castle at 8:09am and drop off at Tarbert Academy at
8:46am. This correction has now been identified and the slightly longer travel
time should be noted. However, in the view of the Council, it does not materially
impact any aspects of the proposal as these particular travelling arrangements
that have been in place for a number of years now.  
14. Opportunity to Make Representations to the Scottish Ministers 
14.1  If the Education Authority makes a closure decision, it shall notify the Scottish
Ministers within 6 working days of that decision and publish the fact that the
Scottish Ministers have been notified, and that representations can be made to
them. The Education Authority would also be required to publish a notice on its
website of the decision to implement the proposal and why it has been satisfied
that closure is the most appropriate response to the reasons for formulating the
proposal. 
14.2   The Scottish Ministers will have a maximum of 8 weeks to call in any closure
decision made by the Education Authority in certain circumstances. This 8 week
timeframe would consist of an initial 3 weeks from the date of decision, during
which representations can be made to the Ministers, and a further 5 weeks for
the Scottish Ministers to decide whether to issue a call in notice. During this
period the Education Authority will not proceed to implement any closure
decision. 
14.3 If the Scottish Ministers call in a closure proposal, it is referred to the Convener
of the School Closure Review Panels. The Convener must constitute a School
Closure Review Panel within 7 days for determination. The Education Authority
may not implement a closure decision in whole or in part until the Panel has
made its determination. It will usually issue a decision within 8 weeks of the
Panel being constituted. 
14.4  If the School Closure Review Panel refuses to consent to the closure decision,
or following publication of the Consultation Report the Education Authority
decides not to implement the closure proposal, the Education Authority cannot
publish a further closure proposal in relation to the school for 5 years, unless
there is a significant change in the school’s circumstances. 
15. Conclusion 
15.1  It is proposed that education provision at Skipness Primary School be
permanently discontinued with effect from 1st December 2022.  Pupils of
Skipness Primary School’s catchment area will continue to be educated at
Tarbert Primary School. The catchment area of Tarbert Primary School shall
be extended to include the current catchment area of Skipness Primary
School.

Page 16

16 
15.2   This is considered to be the best option to address the reasons for the proposal
which are: 
• Skipness Primary School has been mothballed for 5 years. The school
roll is very low and not predicted to rise in the near future. 
• Whilst Skipness Primary School is a sound building, it will deteriorate
during mothballing with limited budgets for maintenance. The annual
cost of the mothballing of the building is £1,293;  
• Along with several other rural Councils, Argyll and Bute is facing
increasing challenges in recruiting staff. At the time of writing this
consultation paper there are 8.49  fte (full time equivalent) vacancies for
primary teachers  and 7.0 fte vacancies for Head Teachers in Argyll and
Bute; and 
• The Council needs to allocate its resources in a way that ensures the
quality of all of its services. 
16. Recommendation 
16.1   On the basis of the consultation responses received, Education Scotland’s
report, and having particular regard to the specific factors for rural school
closures, it is recommended that education provision at Skipness Primary
School be permanently discontinued with effect from 1st December 2022. The
pupils of Skipness Primary School’s catchment area will continue to receive
their education at Tarbert Primary School. The delineated catchment area of
Tarbert Primary School shall be permanently extended to subsume the whole
delineated catchment area of Skipness Primary School.

Page 17

APPENDIX 1 - PROPOSAL PAPER   
Argyll and Bute Council             
Education 
PROPOSAL DOCUMENT:  MARCH 2020 
Review of Education Provision 
Skipness Primary School

Page 18

2 
Proposal for the closure of Skipness Primary School 
SUMMARY PROPOSAL 
It is proposed that education provision at Skipness Primary School be discontinued with effect
from 28th October 2020. 
The catchment area of Tarbert Primary School shall be extended to include the current catchment
area of Skipness Primary School. 
Reasons for this proposal 
This is the best option to address the reasons for the proposals which are; 
 Skipness Primary School has been mothballed for 3 years. The school roll is very low and
not predicted to rise in the near future. The annual cost of the mothballing of the building is
£1,641.   
 Along with several other rural Councils, Argyll and Bute is facing increasing challenges in
recruiting staff. At the time of writing there are 12 fte vacancies for teachers in Argyll and
Bute. 
 Whilst the school is mothballed, the building is deteriorating with limited budget for
maintenance. 
This document has been issued by Argyll and Bute Council in regard to a proposal in terms of the
Schools (Consultation) (Scotland) Act 2010 as amended.  This document has been prepared by the
Council’s Education Service with input from other Council Services.   
DISTRIBUTION 
A copy of this document is available on the Argyll and Bute Council website: 
https://www.argyll-bute.gov.uk/school-consultations-and-proposals  
A summary of this document will be provided to:
 The Parent Councils of the affected schools
 The parents of the pupils at the affected schools
 Parents of children expected to attend an affected school within 2 years of the date of
publication of this Proposal Document
 The pupils, deemed to be of suitable age and maturity to be able to communicate a view on
the proposal, at the affected schools
 The teaching and ancillary staff at the affected schools
 The trade unions representatives of the above staff
 Argyll and Bute Councillors 
 Tarbert and Skipness Community Council 
 Community Planning Partnership 
 Relevant users of the affected schools

Page 19

3 
 The Constituency MSP
 List MSPs for the area
 The Constituency MP
 Chief Superintendent, Police Scotland
 Chief Executive, NHS Highland
 Chief Executive Strathclyde Partnership for Transport (SPT)
 Area Commander, Fire Scotland
 Education Scotland 
A copy of this document is also available from: 
 Council Headquarters, Kilmory, Lochgilphead, Argyll, PA31 8RT
 Education Offices, Argyll House, Dunoon, Argyll, PA23 8AJ
 Tarbert Public Library, Barmore Road, Tarbert, PA29 6TW
 Lochgilphead Service Point, 1A Manse Brae, Lochgilphead, PA31 8RD
 Tarbert Primary School, School Road,Tarbert.PA29 6TE
 Skipness Village Hall, B8001, Tarbert, PA29 6XT

Page 20

4 
This document is available in alternative formats or in translated form for readers whose first
language is not English. 
If you would like this document in another language or format, or if you require the services of an
interpreter, please apply to the Executive Director, Argyll and Bute Council Headquarters, Kilmory,
Lochgilphead, Argyll, PA31 8RT.   
Jezeli chcieliby Pañstwo otrzymaO ten dokument w innym jzyku lub w innym formacie albo jeeIi
potrzebna jest pomoc Uumacza, to prosimy o kontakt z nami.

Page 21

5 
1 Introduction  
1.1 On 8th September 2016, Argyll and Bute Council approved the mothballing of Skipness
Primary School. The Council agreed that in the event there are no registered pupils by the
commencement of session 2018/19 the school be considered for formal closure through the
statutory process. 
Skipness Primary School – Mothballing Decision:- 
https://www.argyll-
bute.gov.uk/moderngov/ieListDocuments.aspx?CId=548&MId=7207&Ver=4 
1.2 On 5th September 2019, the Community Services Committee agreed that the Education
Service would undertake the required preliminary consultation and an options appraisal for
Skipness Primary School. 
https://www.argyll-
bute.gov.uk/moderngov/ieListDocuments.aspx?CId=548&MId=8381&Ver=4 
The Community Services Committee received a report on 10th December 2019 providing
details of the Options Appraisal for Skipness Primary School; carried out in accordance with
the preliminary requirements set out in Section 12A of the Schools (Consultation)(Scotland)
Act 2010, as amended. The Committee agreed to note the outcome of this consideration of
the preliminary requirements and requested that officers formulate a draft proposal for
consideration at the meeting of the Community Services Committee on 12th March 2020 which,
if approved, would subsequently trigger the formal consultation process under the Schools
(Consultation) (Scotland) Act 2010. 
https://www.argyll-bute.gov.uk/moderngov/ieListDocuments.aspx?CId=548&MId=8513 
1.3 The statutory process for the closure of a rural school is laid out in the Schools
(Consultation) (Scotland) Act 2010 as amended by the Children and Young People
(Scotland) Act 2014. The Act, as amended, introduced a presumption against closure of a
rural school and details specific requirements which the education authority is required to
follow if they are formulating a proposal to close a rural school. This includes the introduction
of certain preliminary requirements which must be satisfied prior to the formulation of a
proposal.   
1.4 In addition, the Community Empowerment (Scotland) Act 2015 sets out a new right for
community organisations to request the transfer of local assets into local community
ownership/management. This may be something that the Community wish to consider as
part of or as a consequence of this process. Public bodies including Councils must consider
such requests and make a decision within six months of receiving a valid request. 
1.5 Skipness Primary School has had zero pupils enrolled since elected members approved the
mothballing. 
1.6 There is a requirement to have special regard to the rural schools factors prior to formulating
a proposal to close a rural school. In particular it is necessary to consider any reasonable
alternatives before considering closure. It is also necessary to consider the impact on the
wider community of a potential closure and the impact of any different travel arrangements.
These factors have been considered in the preliminary requirements which were undertaken
prior to this proposal being written. A full assessment of the preliminary requirements is set
out in the Options Appraisal, which is attached as Appendix 5.

Page 22

6 
1.7 The Argyll and Bute Corporate Plan identifies Argyll and Bute as an area of Scotland with
outstanding places, people and potential for a prosperous future for everyone. Our Council,
along with our Community Planning Partners, is committed to ensuring that Argyll and Bute’s
economic success is built on a growing population. 
1.8 Over the next five years, our agreed priorities are to ensure that: 
 The education we provide meets the needs of all our young people and their families
 We make the most of our assets to build the local economy 
 We support individual and community wellbeing
 We strengthen and empower our communities 
 We ensure there are homes for all, we tackle poverty and build opportunity 
 We have greener and cleaner communities 
 We are an employer of choice 
 We manage our finances prudently 
1.9 The Council, as an Education Authority, has a statutory duty in terms of the Education
(Scotland) Act 1980 to make adequate and efficient provision of school education across
their entire area for the current school population and future pattern of demand. This is
reflected in “Our Children, Their Future” which is the Education Vision and Strategy for Argyll
and Bute Council. 
2 Proposal 
2.1 It is proposed that education provision at Skipness Primary School be discontinued with
effect from 28th October 2020.  The catchment area of Tarbert Primary School shall be
extended to include the current catchment area of Skipness Primary School. 
Reasons for this proposal 
2.2  This is the best option to address the reasons for the proposals which are: 
 Skipness Primary School has been mothballed for 3 years. The school roll is very low and
not predicted to rise in the near future. The annual cost of the mothballing of the building is
£1,641.   
 Along with several other rural councils, Argyll and Bute is facing increasing challenges in
recruiting staff. At the time of writing there are 12 fte vacancies for teachers in Argyll and
Bute. 
 Whilst the school is mothballed, the building is deteriorating with limited budget for
maintenance. 
Additional Considerations 
 The Council needs to allocate its resources in a way that ensures the quality of all of its
services; 
 This proposal will bring educational benefits and assist in ensuring that the Education budget
is more sustainable into the future. This proposal document contains an Educational Benefits
Statement;

Page 23

7 
 The costs per pupil in under-occupied schools are excessively high; 
 Schools in the Council area are expensive to maintain and operate. Retaining unnecessary
accomodation is a serious drain on the resources of the Council and diverts spending from
areas that directly affect the educational attainment of pupils; and 
 There is no realistic possibility at present of the Council being able to bring its whole school
estate up to a satisfactory condition.  The present condition is unsustainable and can only be
improved by reducing the extent of the estate. 
3 Preliminary requirements 
3.1 The Council is required to consider the future of Skipness Primary School, as it has been
mothballed for over 3 years. The Council have considered the reasons for making this
proposal, and have also considered other viable alternatives, the likely effect on the
community and the likely effect of different travelling arrangements as a consequence of this
proposal.  Financial implications were also considered. Some of these figures have been
recalculated since the Options Appraisal was produced. 
3.2 The Council considered how the implementation of this proposal would impact on the
education of the children affected. The Council also considered the impact on the children
who currently live in the catchment area but attend other schools, as well as children who
may potentially live in the catchment area in the future.   
3.3 The place of the school in the community was also considered, in terms of the impact this
proposal would have on the sustainability of the community itself. Since the mothballing of
the School, the community has continued to have use of the School grounds, and this was
also taken into consideration as part of the pre-consultation process. 
3.4 Impact on the environment was taken into account during the initial pre-consultation process. 
This included a consideration of the transport implications if this proposal was to be
implemented, as children would have to travel by bus to attend Tarbert Primary School. 
3.5 Four options were presented to the local community by the Council for consideration during
the pre-consultation phase, as required by section 12A of the 2010 Act.   
3.6 Of the four options which were considered by the community and the Council; (d) is the
favoured option by the Council, as it was considered it most adequately addressed the
reasons for the proposal. 
a) Re-open Skipness Primary School,
b) Continued Mothballing of Skipness Primary with pupils zoned to Tarbert Primary School,
c) Re-open Skipness Primary School and realign its catchment area,
d) Close Skipness Primary School and realign its catchment area to Tarbert Primary School
(The Proposal). 
When considering the above options; the positive educational benefits of Tarbert Primary
School alongside the factors of projected low pupil numbers, the challenges in recruiting
teaching staff and the considerable expenditure needed to bring the building up to standard at
Skipness Primary School, in addition the lack of local support for reopening Skipness Primary

Page 24

8 
School, option (d) was considered the most appropriate response to the underlying reasons
behind consideration of this proposal. 
3.7 Following from an initial options appraisal which was presented to the Council’s Community
Services Committee on 10th December 2019, it was agreed that the preliminary requirements
were satisfied enabling the draft proposal to be formulated, with the option to close Skipness
Primary School and realign its catchment area to Tarbert Primary School being identified as
the most adequate means of addressing the reasons for possible proposal.  
3.8 During the preliminary consultation regarding the future options for Skipness Primary School
there were a range of viewpoints gathered from parents, young people and members of the
community. 
3.9 The community reflected that Skipness Primary School had been an integral part of the
community, and there were contrasting views on the proposals for the future of Skipness
Primary School.  However there is a will that the school be retained for community use and
not be allowed to fall into disrepair. Skipness community are pursuing options for use of the
building as a community hub.   
3.10 Closing the school would have no impact on staff or pupil travel from the current
arrangement. There would be no alteration to the current environmental impact.   
Alternatives to the Proposal 
3.11 The community engagement process prior to the drafting of this proposal considered the
views of members of the community and also considered any other alternatives to the
closure of Skipness Primary School.  Full details from the community engagement and the
findings from the preliminary requirements, to include the alternative proposals are attached
as Appendix 5 and are also available here to read: 
https://www.argyll-bute.gov.uk/moderngov/ieListDocuments.aspx?MId=8513  
3.12 In conclusion, after the pre-consultation with the community, the Council feels that the
proposal to close Skipness Primary School and realign its catchment area to Tarbert Primary
School is the most reasonable means to address the underlying reasons for considering the
future of Skipness Primary School. Further detail is provided in relation to educational
benefits, travel, environmental impact, community impact and financial impact below. 
4 Assessment of the Proposal 
4.1 It is proposed that education provision at Skipness Primary School be discontinued with
effect from 28th October 2020. The catchment area of Tarbert Primary School shall be
extended to include the current catchment area of Skipness Primary School. 
4.2 Skipness Primary School has been mothballed for over 3 years. The school condition will
deteriorate with limited budgets for maintenance. The school roll is currently zero and is not
predicted to rise in the near future. The annual cost of the mothballing of the building is
£1,641. 
4.3 Along with several other rural Councils, Argyll and Bute is facing increasing challenges in
recruiting staff. At the time of writing there are 12 fte vacancies for teachers in Argyll and
Bute.

Page 25

9 
4.4 The Council needs to allocate its resources in a way that ensures the quality of all of its
services. 
4.5 This proposal will bring educational benefits and assist in ensuring that the Education budget
is more sustainable into the future. 
4.6 The costs per pupil in under-occupied schools are excessively high. 
4.7 Schools in the Council area are expensive to maintain and operate.  Retaining unnecessary
accomodation is a serious drain on the resources of the Council and diverts spending from
areas that directly affect the educational attainment of pupils. 
4.8 There is no realistic possibility at present of the Council being able to bring its whole school
estate up to a satisfactory condition. The present condition is unsustainable and can only be
improved by reducing the extent of the estate. 
4.9 As part of the preliminary requirements in the drafting of this proposal, the Council
considered four options.  The favoured option by the Council is (d), as it was considered it
most adequately addressed the reasons for the proposal. 
a) Re-open Skipness Primary School;
b) Continued Mothballing of Skipness Primary with the pupils zoned to  Tarbert Primary
School;
c) Re-open Skipness Primary School and realign its catchment area;
d) Close Skipness Primary School and realign its catchment area to Tarbert Primary
School (The Proposal). 
4.10 Having considered these other alternatives the Council has made a decision that these are
not viable alternatives to the closure proposal, and will proceed with the option to consult on
the proposal to close Skipness Primary School and extend the catchment area of Tarbert
Primary School to include the current catchment area for Skipness Primary School. 
4.11 The Council has undertaken an appraisal on impact if this proposal was to be implemented. 
4.12 This includes an assessment of: 
 The school roll and predicted school roll;
 Teacher numbers; and
 The condition of the building. 
This assessment includes a description of what (if any) steps the Council took to address the
underlying reasons for the proposal prior to formulating it. 
4.13 The Council has also undertaken an assessment of likely educational benefits or effects
which this proposal may have if implemented on: 
 The pupils of any affected school; 
 Any other users of the school’s facilities;
 Any children who would (in the future but for implementation) be likely to become
pupils of the school; and
 The pupils of any other schools in the Council area.

Page 26

10 
4.14 In addition, the Council has also considered how to minimise or avoid any adverse
educational effects that may arise from the implementation of this proposal. 
4.15 The Council has also taken special regard to the following factors if this proposal was to be
implemented, as Skipness Primary School is classified as a remote rural school. 
 Likely effect on the local community to be assessed by reference to: 
o The sustainability of the community; and
o Availability of the school’s premises and other facilities for use by the school
community. 
 Likely effect caused by different travelling arrangements by reference to the effect
caused by such arrangements on: 
o Environmental impact; and
o The schools pupils and staff and other users of the schools facilities. 
4.16 Finally, the Council has also considered the financial implications of implementation of the
proposal and information on this is set out later in this document. 
5 School roll 
5.1 The information in relation to the school roll as shown below is drawn from the yearly pupil
census, which takes place in September each year. School rolls by their very nature may
fluctuate slightly on an ongoing basis due to changes in pupil numbers as a result of pupils
moving to and from the catchment area. 
The school roll of Skipness Primary School has seen a steady decline since 2007. 
Table 2:  Skipness PS  Tarbert PS
Capacity 26 130 
Roll Roll
2005-06 7 100
2006-07 7 91
2007-08 7 89
2008-09 7 92
2009-2010 6 95
2010-2011 1 92
2011-2012 3 88
2012-2013 3 83
2013-2014 4 79
2014-2015 3 81
2015-2016 3 83
2016-2017 0 94
2017-2018 0 93

Page 27

11 
2018-19 0 96
2019-20 0 102 
Predicted Roll 
Table 3:  Skipness PS  Tarbert PS
Capacity 26 154 
Roll Roll
2020 -2021 1 109*
2021 -2022 1 106*
2022-2023 1 103*   
* A prediction based on information available July 2019. 
5.2 In 2019-2020 there are zero school aged children who live in the Skipness Primary School
catchment area and who attend other schools.   
5.3 There are currently zero school aged pupils who live in the Skipness catchment area who
attend Tarbert Primary School.   
5.4 The school roll is not predicted to rise significantly in the future. The area around Skipness is
a small settlement and is not identified for growth in the Local Development Plan:
https://www.argyll-bute.gov.uk/ldp. 
5.5 There are no housing allocations and only two live planning permissions for  residential
development within the Skipness catchment area. 
6 Teacher numbers 
6.1 Teacher numbers are improving nationally, with a 1.23% decrease in the number of teachers
nationally from 2014 - 2019.  In Argyll and Bute there has been a 3.7% reduction in the fte
number of teachers from 2014 - 2019. 
6.2 As the school has been mothballed for over 3 years, the issue of recruitment of staff has not
improved.  At the time of writing this report there are 12 fte vacancies for class teachers in
Argyll and Bute.  Despite a sustained effort to secure permanent staff, there is no reason to
think that staffing would not continue to be a considerable challenge for Skipness Primary
School 
6.3 At the current time, if the proposal was to be accepted, there would be no impact on staffing
levels at Tarbert Primary School. 
7 Condition of the building 
7.1 Argyll and Bute Council’s School Estate Management Planning process identified in 2016
that the condition of Skipness Primary School was satisfactory and graded a B. Outlined in

Page 28

12 
the Options Appraisal (Appendix 5 – section 6.3) are the full financial details in reference to
costs for the re-opening the building or continuing to retain the building as mothballed. 
7.2 As part of the consultation process the Council would be open to discussion with the
community in regard to the future of the building. This might involve the transfer of the
building to a recognised community group through the provisions of the Community
Empowerment (Scotland) Act 2015 or some other agreed mechanism. This may provide the
community with an opportunity to utilise the building as a driver for community benefit and
potential regeneration that could also enhance the sustainability of the community. 
EDUCATIONAL BENEFITS STATEMENT 
8 Assessment of likely educational benefits on pupils 
8.1 If this proposal is implemented, the Council believes that there will be considerable
educational benefits arising from this.  These centre around; 
 Learning and teaching;
 Meeting learners needs;
 Broadening the range of opportunities; and
 The environment for learning. 
8.2 This statement focusses on Tarbert Primary School, which is the school pupils from the
Skipness Primary School catchment area have previously attended from October 2016,
although there are currently no school aged pupils in the Skipness Primary School
catchment area. 
8.3 The principles of Curriculum for Excellence recognise the professionalism of teachers and
the importance of this in exercising the freedom and responsibility associated with broader
guidance. This means that schools are able to design their curriculum to meet the specific
needs of their children and community. There are no specific educational benefits from
reopening Skipness Primary School as all schools implement Curriculum for Excellence
ensuring effective learning and teaching which is matched to the needs of children, however
the closure of the School and continued attendance of pupils at other schools allows children
to experience a curriculum which is matched to their needs. 
8.4 Skipness and Tarbert Primary Schools are remote rural schools. Each school is set within a
remote rural area (Scottish Government classification). Although there are currently no
school aged children in the Skipness Primary School catchment area, children from Skipness
Primary School area who previously attended Tarbert Primary School continued to benefit
from education in a locality familiar to them, and still relatively close to home. 
8.5 The co-location of the Early Learning Centre (ELC) and the primary classes at Tarbert
Primary School enables a strong transition process between the ELC and school and
includes joint early level learning every week. 
9 Learning and Teaching 
9.1 The curriculum includes a broad range of experiences which are planned for children and
young people through their education, to help every child and young person to develop
knowledge, skills and attributes for success in learning, life and work. In Tarbert Primary
School, children are encouraged to be eager and active participants who are engaged,

Page 29

13 
resilient and highly motivated during their learning. Children know that their views are sought,
valued and acted upon. 
9.2 The learning environment encourages high level of achievement, providing a wide range of
opportunities for children to achieve their full potential within the four contexts of learning. In
Tarbert Primary School children may be taught in classes composed of children from more
than one year group. Children benefit from being part of a social context in which they can
build relationships with different groups and individuals, develop social skills, meet
challenges and exercise responsibilities as members of a social group. They are able to
interact and socialise with groups of children, take part in team activities and move with their
peers to secondary school. 
9.3 There is a continual challenge for all schools to deliver a school improvement agenda and
deliver effectively the principles and outcomes of curriculum for excellence. The National
Improvement Framework priorities include raising attainment for all, and closing the gap
between the most and least disadvantaged children. 
9.4 The principles of Curriculum for Excellence recognise the professionalism of teachers and
the importance of this in exercising the freedom and responsibility associated with broader
guidance. This means that schools are able to design their curriculum to meet the specific
needs of their children and community. 
9.5 At Tarbert Primary School, staff are challenged and supported through a range of continuous
professional development and review opportunities gained by working and learning with a
range of colleagues. Tarbert Primary School is part of the Mid Argyll and Kintyre Cluster,
which means that staff can be supported together, moderation and tracking of pupil progress
is enabled and staff work across stage appropriate groups. Colleagues within Tarbert
Primary School are able to support and challenge each other on a daily basis. The whole
staff are able to bring a range of talents and skills to benefit outcomes for learners. 
9.6 Tarbert Primary School encourages nurturing and positivity. One aspect of this work is a
successful Buddy System. Children from different stages work and learn together. This
vertical support is particularly evident on sports day and in the dining room when groups of
children are together in a social context. This system develops and benefits both the ‘buddy’
and the ‘buddied’. This system works well and benefits the wide range of children in the
school. 
10 Meeting learners’ needs 
10.1 Through the Getting it Right for Every Child (GIRFEC), practice model, meeting the needs of
every child continues to be a priority and teachers carefully plan and assess to ensure each
child has the opportunity to reach their potential. Careful tracking and monitoring procedures
are in place to evidence pupil progress. This includes professional dialogue with teachers,
learning discussions with children, classroom observations, assessment and looking at pupil
work.   
10.2 The school also has planned meetings and discussions with parents.  These discussions
between home and school improve parental engagement whilst focussing on next steps for
learning. Where appropriate, intervention is put in place, while working effectively with other
agencies and parents to ensure the needs of each child are met. In the primary classes,
standards of attainment have been maintained over the last three years. Almost all children
are achieving national expectations in reading, writing, listening, talking and numeracy. 
Health and Wellbeing continues to develop within the Promoting Alternative Thinking

Page 30

14 
Strategies (PATHS) programme, which supports positive behaviours and relationship within
the school. 
10.3 The staff, parent body and partner groups also bring opportunities for increased collaborative
working. This applies both in terms of the wider curriculum and within aspects of the
curriculum that may be enhanced by staff individual expertise e.g. PE, language, science,
expressive arts teaching. 
10.4 A ‘Respect Me’ policy is built into class lessons and permeates the whole school ethos
through assemblies and class work on rights and responsibilities. 
11 Broadening the Range of Opportunities 
11.1 Children are offered a range of active, planned experiences which help them develop the
knowledge and understanding, skills, capabilities and attributes which they need for their
mental, emotional, social and physical wellbeing both now and in the future. 
11.2 There is also a strong transition planning process between Tarbert Primary School and
Tarbert Academy, which involves increased opportunities for children to participate and to
make new connections. 
11.3 Children are provided with a variety of experiences to develop their sense of responsibility,
independence, confidence and enterprising attitude. 
11.4 Across the school children are engaged with learning and contribute well in lessons. Staff
promote positive relationships at all levels and also through the Young Sports Leaders
programme, the impact of this being that children enjoy good relationships with their peers,
young leaders feel confident and entrusted to take these developments forward. 
12 Environment for Learning 
12.1 Tarbert Primary School is a suitably-equipped and well supported school, situated in the
village of Tarbert. The entire building is well maintained and along with the surrounding
scenery provides attractive accommodation for the Tarbert Primary School. The school has
an all-weather pitch adjacent to the school, which is well utilised. The building has facilities
for pupils and visitors with special access needs. 
12.2 The children maintain links with friends who live in their own village as well as creating links
with children from other rural communities. 
12.3 Any mitigating effects around the adverse weather and transport issues are outweighed by
the benefits of this proposal. 
12.4 In summary, there are a range of educational benefits for pupils if this proposal was to be
implemented, as summarised in the paragraphs above.  There are benefits for the
development of social and emotional skills, as well as the educational benefits resultant from
access to a more diverse curriculum. The learning environment in Tarbert Primary School
also offers children the opportunity to participate in a wider range of active learning
strategies. 
13 Assessment of likely educational benefits on other users of the school’s facilities 
Implications for staff

Page 31

15 
13.1 If this proposal is implemented, there will be no new implications for teaching and ancillary
staff in Tarbert Primary School.   
13.2 If this proposal is implemented, the Council does not envisage any adverse effects from the
proposal in respect of staffing.  Should issues arise however, these will be mitigated through
the Council Educational Management Team support structure. 
Early Learning Centre Users – Pre Five Children 
13.3 The co-location for the Early Learning Centre (ELC) and the primary classes at Tarbert
Primary School enables a strong transition process between the ELC and the school and
includes joint early level learning every week. 
14 Assessment of likely educational benefits on any children who would (in the future
but for implementation) be likely to become pupils of the school. 
Existing and future pupils 
14.1 Children who may live in this catchment area in the future will benefit from the broad range of
educational opportunities which are presented through this proposal, as detailed above. 
14.2 There would be positive educational benefits associated with this proposal. The
management arrangements of the school would be strengthened and there would be
opportunities for increasing the range of the curriculum and increasing the use of active
pedagogies.   
14.3 The proposal could increase the roll of Tarbert Primary School and would thus extend the
peer group for all pupils, present and future.  The larger school should be able to support a
wider range of social and extra-curricular activities.   
14.4 Pupils who would otherwise have attended Skipness Primary School, which consists of one
classroom, a dining area and school office, would benefit from daily interaction in a larger
peer group and from improved educational arrangements as described above.  Pupils in the
combined school will have more shared experiences and opportunity for friendships.  This
will enhance their confidence and make the transition to secondary easier.  Larger year
groups make the provision of specialist services more viable and provide enhanced
opportunities for school trips. Tarbert Primary School meets all the requirements of the
Equality Act 2010. 
15 Assessment of likely educational benefits on the pupils of any other schools in the
Council area 
15.1 The current mothballing of the school has had an indirect effect on other pupils in Argyll and
Bute.  The reduction in the running costs for the school means that this is a saving to the
Council, which is not taken from elsewhere. 
15.2 There are no other significant impacts from this proposal on other pupils in the authority or
who attend other schools, in either a positive or a negative way. 
Placing requests

Page 32

16 
15.3 This proposal will not affect the right of parents to request that their child attend a school of
their choice rather than the designated school in whose catchment area the family lives as
provided by the Education (Scotland) Act 1980. 
16 Consideration of how to minimise or avoid any adverse effects that may arise from the
implementation of this proposal 
16.1 The main adverse effect from this proposal would be the length of the journey to school for
children who live in the Skipness Primary School catchment area.  However, children who
previously lived in this catchment area and attended Tarbert Primary School made this
journey, and families in the area do not feel this is a major consideration. Funded school
transport would also continue to be provided for pupils should this proposal be implemented. 
17 Summary of educational benefits statement 
17.1 Educational benefits of this proposal, such as the ability for children to participate in a broad
range of experiences, the development of the strategic leadership of the head teacher in taking
forward improvements in learning and teaching, and the ability to meet the educational, social
and emotional needs of the children are significant benefits to this proposal. During the pre-
consultation phase, these benefits were explored in detail and details from the community
engagement and the findings from the preliminary requirements, to include the alternative
proposals and the authority’s assessment of other likely effects of the proposal and the reasons
for that assessment are attached as Appendix 5.   
17.2 Whilst the positive educational benefits are numerous, there is one negative aspect identified
which arises from the children attending Tarbert Primary School.  This negative aspect is
principally around the fact that children have to travel by either bus or car to school.  However
it is considered that the positive aspects of this proposal outweigh the negative aspect of some
travelling for children. 
18 Factors for rural school closures 
18.1 The Council has taken special regard to the following factors in relation to this proposal as
Skipness Primary School is classified as a rural school. 
The likely effect on the local community if this proposal is implemented 
18.2 The Council has made an assessment on the sustainability of the community should this
proposal be implemented and considers that this may have a positive impact. 
18.3 The Scottish Government focuses on four key areas of importance to rural communities; 
 a strong and diverse rural economy, harnessing traditional strengths and with an appetite
for change,
 thriving rural communities where everyone can enjoy a decent quality of life, where the
young are not forced to leave their communities to get on and where the vulnerable are
no longer excluded,
 strong, community focused public services that are accessible, of the highest possible
quality and with the greatest possible choice,
 a rural Scotland whose natural and cultural heritage flourishes in all its diversity

Page 33

17 
18.4 In rural communities, the challenges and opportunities are largely defined by the local area
and can often best be met by a bottom-up, community-led response. Strong community
leadership is vital to articulating local priorities and driving forward change and growth. 
18.5 There is the potential if this proposal is implemented to capitalise on the existing will and
drive in this community, with opportunities for local leaders to enable them to organise,
motivate and inspire their neighbours. The opportunity for the local community to acquire this
building could be key to helping to make this community an independent, resilient place to
live. Management of assets such as Skipness Primary School may be an important step in
building community confidence, promoting growth and enabling communities to realise their
aspirations. 
18.6 Research1 has shown that when communities feel empowered, there is: 
 greater participation in local democracy;
 increased confidence and skills among local people;
 more people volunteering in their communities; and
 greater satisfaction with quality of life in the neighbourhood. 
18.7 Within Skipness there is Skipness Village Hall which is used for community events. Almost
all people who attended the preliminary consultation strongly stated the school building
should be retained for community use and not allowed to fall in to further disrepair. 
18.8 It is considered that formal closure of this school could have a positive impact on the wider
community, and may lead to an increase in other users of the facility which may lead to an
improvement in economic growth. 
18.9 Indeed, the school closure may help to empower the local community should the community
wish to undertake an asset transfer process for the building.  This could have a positive
impact on community sustainability.  Formal closure would mean that these plans could
potentially be progressed by the community who are already considering future uses for the
building. This may enhance community life by giving a community enterprise focus. 
On the availability of the school’s premises and its other facilities for use by the
community 
18.10 During the pre-consultation phase, almost all members of the community supported closure
of the school with the suggestion that the building and adjoining grounds could potentially be
retained for community use. Within Skipness there is Skipness Village Hall which is used for
community events. All people who attended the pre-consultation meeting felt that the school
building should be retained for community use and not allowed to fall in to further disrepair,
as that would adversely impact on the aesthetic of the community. 
18.11 It is accepted that a school closure may have an adverse effect on a community, but a
community hub could be an asset to the community. If the local plans for the building
progress, this could have a positive impact on the sustainability of the community and in
particular the availability of the school’s premises and other facilities for use by the
community. Formal closure of the school would mean that these plans could potentially be
progressed by the community.                                              
1 https://www.gov.scot/policies/community-empowerment/

Page 34

18 
The likely effect caused by any different travelling arrangements 
18.12 The travel distance from Skipness Primary to Tarbert Primary is 12.6 miles on the
B8001/A83. Travel time is approximately twenty five minutes. Travel is an accepted aspect of
living in the Skipness community. 
18.13 Implementation of the proposal would have no effect on the current travel arrangements of
staff and pupils. The closure of Skipness Primary School, in terms of current travel
arrangements would have a neutral effect on the environment. There is no current annual
transport cost for pupils to travel to Tarbert Primary School. 
18.14 It is anticipated that the effect on the travel arrangements of staff and other users of the
facility would not differ materially from that of the pupils accessing the school. 
Environmental impact 
18.15 Currently no pupils travel to Tarbert Primary School from the Skipness Primary School
Catchment area. Therefore, this option would have a neutral environmental impact on the
current position and would have no impact on the current travel arrangements for staff and
pupils. 
18.16 If this proposal was to be implemented there would be little or no impact on the natural
environment. 
19 Financial Impact 
19.1 The full breakdown of the financial analysis is detailed in Appendix 4. Some of this
information has been recalculated since the Options Appraisal was prepared. In particular
the annual cost of mothballing the school has been recalculated from £1,644 to £1,641.This
information gives details on the estimated cost if Skipness Primary School was still to be an
occupied and operational establishment.  However, as Skipness Primary School is currently
mothballed, the cost for the mothballing is estimated at £1,641 per year. Should the school
be reopened, occupied and operational, the running costs per year are estimated at
£143,666. 
19.2 Column 2 of Table 1 at Appendix 4 shows the projected annual running costs of Skipness
whilst Column 3 shows the additional impact on Tarbert Primary as the receiving school. 
The annual recurring savings (or costs) are shown in Column 4. 
19.3 The main elements included within a school budget are teacher employment costs (i.e. basic
salary costs plus related employer’s National Insurance and Superannuation contributions
plus any relevant individual allowances); Local Government employee costs and an
allocation for discretionary expenditure incurred by the school (i.e. educational equipment,
materials, staff travel, etc.). Teacher staffing budgets are calculated on an annual basis and
within the primary sector are determined, taking cognisance of the SNCT class size maxima,
by the number of classes required to provide for the specific number and age of the pupils in
each school. When a school ceases to be operational the teacher staffing budget is adjusted
(at the appropriate time), per entitlement information from Education HR, with the staffing
budget resulting in a nil value. 
19.4 In line with the national priority of maintaining teacher numbers, the Education Service
operates on the basis that supernumerary teachers are redeployed and therefore their salary

Page 35

19 
costs still exist with an increase to the receiving school’s budget. Some of the costs noted in
column 3 of Table 1 will not directly impact on Tarbert Primary School but they will be a cost
to the Authority as a whole, for example school transport, and the costs of maintaining the
teachers employed in Skipness Primary School. 
19.5 There are currently no annual transport costs for pupils to attend Tarbert Primary School.
Transport costs per year to attend Skipness Primary School, if it were to be reopened, are
estimated at £14,282 per year. Transport costs per year to attend Tarbert Primary School
would be £14,282 although use of the service bus would incur no additional transport costs.   
19.6 Table 2 contains the notional 30 year lifecycle costs that would arise based on the GIA of the
various schools irrespective of the number of pupils accommodated. Lifecycle costs are
representative of the cost needed to keep the building in a good state of repair. The cost
over the next thirty years therefore to maintain Skipness Primary School is £133,686 and for
Tarbert Primary School this is £1,023,865 
19.7 Table 3 contains the annual running costs during mothballing of Skipness Primary School
and these are estimated at £1,641 per year. This includes non-domestic rates, utility costs,
insurances, etc. If the school was to be formally closed, this would allow the Council to take
steps towards selling the school to a third party or local community. 
19.8 The transfer of pupils from Skipness to Tarbert Primary School would impact on the council’s
Grant Aided Expenditure (GAE) allocation for Tarbert Primary School Teaching Staff as there
would be a reduction in the Percentage of Primary Pupils in Small Schools.  This reduction is
estimated at £4,000.  However Argyll and Bute Council is supported through the floor
mechanism so would not see a reduction in their overall funding. 
20 Equality and Socio Economic Impact 
The Council as a public authority has a duty under the Equality Act 2010, the Public Sector
Equality Duty 2011, the Fairer Scotland Duty (Part one of the Equality Act) and the Islands
(Scotland) Act (2018) to have due regard to their provisions when making strategic financial
decisions. This is done through assessing the potential impact of the decision on equality
through Equality and Socio-Economic Impact Assessments (EQSEIAs).  
The Council will undertake the process of assessment during the consultation process in
respect of this proposal to ensure that due regard is given to such matters in the decision
making process. 
21 Consultation arrangements 
21.1 Prior to formulating a rural school closure proposal under the Schools (Consultation)
(Scotland) Act 2010 (the 2010 Act), as amended, the Education Authority must satisfy the
preliminary requirements set out in Section 12A of the 2010 Act. The Authority has
previously identified its reasons for formulating a possible proposal, considered whether
there were any reasonable alternatives to the possible proposal as a response to those
reasons,  and assessed each of the options in accordance with Section 12A(2)(c) of the
2010 Act. After considering a paper addressing these preliminary requirements, the
Education Authority decided on 10th December 2019 that, having specific regard to the
reasons for formulating a prospective closure proposal, the option to close Skipness Primary
School and redraw its catchment area to Tarbert Primary School is the most appropriate
response to the specific reasons for the potential proposal.

Page 36

20 
21.2 This document was considered by the Council as Education Authority on 12th March 2020
when it was agreed that it should be adopted as a relevant proposal and issued as a basis
for consultation.  No decision will be taken by the Council on the proposal contained in this
paper until after the end of the consultation period. The Council will then receive a report on
the consultation and will reach a view on the proposal. 
21.3 A summary of this document will be issued free of charge to all of the consultees listed on
page 2 of this document and it will also be published on the Council’s website:   
https://www.argyll-bute.gov.uk/school-consultations-and-proposals 
21.4 As part of a consultation process, the Education Authority must publish the proposal paper,
advertise it and notify Education Scotland and all of the relevant consultees as prescribed by
Schedule 2 of the 2010 Act, inviting them to make representations on the proposal. The
consultation period will be from 19th March 2020 until the close of business on 15th May 2020
which lasts for a minimum of 6 weeks and includes at least 30 school days. 
21.5 A public meeting will be held at Skipness Village Hall on 6th May 2020 at 7.00pm. Anyone
wishing to attend the meeting and participate is welcome to do so. The meeting will be
convened by the Education Authority and the Education Authority will present reasons for
bringing forward the proposal. There will be an opportunity for questions to be asked and
comments to be made. A note will be taken so that comments can later be summarised and
considered. However, the Education Authority will also consider written comments which
should be sent to Education Services, School Consultations, Argyll & Bute Council, Argyll
House, Dunoon, Argyll, PA23 8AJ and should be received no later than 5.00pm on 15th May
2020. 
21.6 Written representations may be made on the proposal and the alternatives to the proposal.
Written representations may also suggest other alternatives to the proposal. 
21.7 Following the close of the consultation, the Education Authority will provide Education
Scotland with copies of the written representations submitted, a summary of the oral
representations made at the public meeting and any other relevant documentation. This will
allow Education Scotland to prepare a report on the proposal within a period of 3 weeks. 
21.8 After receiving Education Scotland’s report, the Education Authority will then prepare and
publish a Consultation Report in accordance with Sections 9, 10 and 13 of the 2010 Act. The
Education Authority will thereafter make its final decision on whether to implement the
proposal. The decision will be published a minimum of 3 weeks after publication of the
Consultation Report. If the Education Authority makes a closure decision, it shall notify the
Scottish Ministers within 6 working days of that decision and publish the fact that the Scottish
Ministers have been notified, and that representations can be made to them. The Education
Authority would also be required to publish a notice on its website of the decision to
implement the proposal and why it has been satisfied that closure is the most appropriate
response to the reasons for formulating the proposal. 
21.9 The Scottish Ministers will have a maximum of 8 weeks to call in any closure decision made
by the Education Authority in certain circumstances. This 8 week timeframe would consist of
an initial 3 weeks from the date of decision, during which representations can be made to the
ministers, and a further 5 weeks for the Scottish Ministers to decide whether to issue a call in
notice. During this period the Education Authority will not proceed to implement any closure
decision.

Page 37

21 
21.10 If the Scottish Ministers call in a closure proposal, it is referred to the Convener of the School
Closure Review Panels. The Convener must constitute a School Closure Review Panel
within 7 days for determination. The Education Authority may not implement a closure
decision in whole or in part until the Panel has made its determination. It will usually issue a
decision within 8 weeks of the Panel being constituted. 
21.11 If the School Closure Review Panel refuses to consent to the closure decision, or following
publication of the Consultation Report the Education Authority decides not to implement the
closure proposal, the Education Authority cannot publish a further closure proposal in
relation to the school for 5 years, unless there is a significant change in the school’s
circumstances. 
22 Conclusion 
22.1 It is proposed that education provision at Skipness Primary School be discontinued with
effect from 28th October 2020. The catchment area of Tarbert Primary School shall be
extended to include the current catchment area of Skipness Primary School. 
22.2 It has been assessed that the proposal is the most appropriate means of addressing the
underlying reasons for formulating it, which are: 
 Skipness Primary School has been mothballed for three years. The school condition will
deteriorate with limited budgets for maintenance. The school roll is currently zero and is not
predicted to rise significantly in the near future. The annual cost of the mothballing of the
building is £1,641; 
 Along with several other rural Councils, Argyll and Bute is facing increasing challenges in
recruiting staff. At the time of writing there are 12 fte vacancies for teachers in Argyll and
Bute; and 
 The Council needs to allocate its resources in a way that ensures the quality of all of its
services. 
Other Considerations 
 This proposal will bring educational benefits to all present and future users of the affected
schools and assist in ensuring that the Education budget is more sustainable into the future; 
 The costs per pupil in under-occupied schools are excessively high; 
 Schools in the Council area are expensive to maintain and operate; 
 Retaining unessecary accomodation is a serious drain on the resources of the Council and
diverts spending from areas that directly affect the educational attainment of pupils; 
 There is no realistic possibility at present of the Council being able to bring its whole school
estate up to a satisfactory condition. The present condition is unsistainable and can only be
improved by reducing the extent of the estate. 
Douglas Hendry 
Executive Director with responsibility for Education

Page 38

22 
Louise Connor
Head of Education: Learning & Teaching 
Councillor Yvonne McNeilly
Policy Lead for Education 
For further information contact: 
Simone McAdam
Education Manager
simone.mcadam@argyll-bute.gov.uk 
January 2020 
APPENDICES 
Appendix 1-  Consultation Letter
Appendix 2-  Response form
Appendix 3 -  Maps
Appendix 4 -  Financial template
Appendix 5-  Options Appraisal

Page 39

23 
Argyll and Bute Council 
Comhairle Earra Ghàidheal agus Bhòid 
Executive Director: Douglas Hendry 
Kilmory, Lochgilphead, Argyll, PA318RT  
Telephone: 01546 605522 Fax:   
Our Ref:  Ref:
If phoning or calling please ask for:  
e-mail: simone.mcadam@argyll-bute.gov.uk
Council Website:  www.argyll-bute.gov.uk 
Skipness Primary School 
Dear Consultee, 
Review of Education Provision
Notice and Summary of Proposal for closing Skipness Primary School
Schools Consultation (Scotland) Act 2010                             
Background 
Argyll and Bute Council, through its Education Service, aims to realise ambition, excellence and
equity for all.   
The Council is consulting on a proposal to close Skipness Primary School. This notice provides a
summary of a proposal that you may have an interest in or are required to be notified of, giving you
key information about the proposal. 
The Council is conducting a public consultation process. This will commence on 19th March 2020
and will conclude on 15th May 2020. This is the period within which you will be able to make written
representations to the Council in respect of the proposal.  If you wish your view to be taken account
of in the consultation exercise you must submit your written representation within this period. This
notice and summary provides further information on where a full copy of the proposal may be
obtained or referenced and also advises on how you can make written representations to the
Council. 
The Council will hold a meeting where officers will be able to provide information on the proposal. 
The details of the public meeting are contained in this notice and summary. 
It is important that everyone we are consulting tells us what they think of the proposal. Please read
this notice and summary and then consider the contents of the proposal document. You can then
tell us what you think of the proposal by making written representation and/or by attending the public
meeting. This notice and summary tell you how to do that. 
The Proposal 
APPENDIX 1

Page 40

24 
It is proposed that education provision at Skipness Primary School be discontinued with effect from
28th October 2020. The catchment area of Tarbert Primary School shall be extended to include the
current catchment area of Skipness Primary School. 
Reasons for this proposal 
This is considered to be the best option to address the reasons for the proposals which are; 
 Skipness Primary School has been mothballed for over three years. The school condition will
deteriorate with limited budgets for maintenance. The school roll is zero and is not predicted
to rise in the near future. 
 Along with several other rural Councils, Argyll and Bute is facing increasing challenges in
recruiting staff. At the time of writing there are 12 fte vacancies for teachers in Argyll and
Bute. 
 Whilst the school is mothballed, the building is deteriorating with limited budgets for
maintenance. 
The Council’s education strategy
Our Children Their Future 
Together we will realise ambition, excellence and equality for all. 
 Raise educational attainment and achievement for all,
 Use performance information to secure improvement for children and young people,
 Ensure children have the best start in life and are ready to succeed,
 Equip young people to secure and sustain positive destinations and achieve success in life,
 Ensure high quality partnership working and community engagement,
 Strengthen leadership at all levels. 
Alternatives to the Proposal 
The following alternatives to the proposal were considered at the preliminary pre-consultation stage
of this process; 
a) Re-open Skipness Primary School,
b) Continued Mothballing of Skipness Primary with the pupils zoned to Tarbert Primary School,
c) Re-open Skipness Primary School and realign its catchment area,
d) Close Skipness Primary School and realign its catchment area to Tarbert Primary School
(the Proposal). 
Written representations may be made on those alternatives as well as on the proposal. 
Written representations on the proposal may suggest other alternatives to the proposal. 
What will we do? 
We will consult with people by: 
 Providing a notice of the consultation and a summary of the proposal to the relevant
consultees this is that notice and summary

Page 41

25 
 Placing an advert in the local press
 Putting information on our website https://www.argyll-bute.gov.uk/school-consultations-and-
proposals
 Holding a public meeting to explain the proposal
 Ask parents, carers, children, young people, teachers, support staff and others to tell us what
they think of the proposals. 
What to do now? 
 Please read the full proposal document
 Please attend the Public Meeting which will be held on 6th May 2020 at 7.00pm in Skipness
Village Hall. 
 Let us know what you think by:
Letter to: Education Services  
School Consultations  
Argyll & Bute Council  
Argyll House  
Alexandra Parade  
Dunoon      
PA23 8AJ 
Returning the attached response sheet by post or by; 
Email to:  argyllhousereception@argyll-bute.gov.uk                     
What next? 
Whilst the Council is engaging in a consultation process in relation to this proposal that does not
mean that the proposal will go ahead. It does mean that the Council is engaging in a consultation
process to seek your views on the proposal. 
All the points raised during the consultation will be carefully considered and Elected Members will
then decide if the plan should go ahead. 
If the suggestion goes ahead, any children from Skipness Primary School catchment area would be
educated at Tarbert Primary School. 
Please note that this summary document is for convenience only.  Full details of the consultation
can be obtained from: 
 Council Headquarters, Kilmory, Lochgilphead, Argyll, PA31 8RT
 Education Offices, Argyll House, Dunoon, Argyll, PA23 8AJ
 Tarbert Public Library, Barmore Road, Tarbert, PA29 6TW
 Lochgilphead Service Point, 1A Manse Brae, Lochgilphead, PA31 8RD
 Tarbert Primary School, School Road,Tarbert.PA29 6TE
 Skipness Village Hall, B8001, Tarbert, PA29 6XT 
It is also available electronically via our website:
 https://www.argyll-bute.gov.uk/school-consultations-and-proposals 
Yours faithfully,

Page 42

26 
Douglas Hendry
Executive Director with responsibility for Education

Page 43

27 
APPENDIX 2 
Argyll and Bute Council
Education 
RESPONSE FORM 
I wish my response to be considered as confidential with access restricted to Elected Members
and Council Officers of Argyll and Bute Council. 
Proposal 
It is proposed that:
Education provision at Skipness Primary School be discontinued with effect from 28th October
2020. The catchment area of Tarbert Primary School shall be extended to include the current
catchment area of Skipness Primary School. 
This part of the form must be completed for a valid response:
Name: (please print) Address: 
Post Code:
I agree/do not agree (delete which does not apply) that my response can be made publicly
available
Signature: Date: 
YOUR INTEREST: (please tick) 
Parent 
Child / 
Young Person  Staff            Other  * 
Elected Member / MSP / MP    Member of Community Council 
*Other: (please specify) 
Please state your views on the proposal (continue overleaf if necessary)

Page 44

28 
APPENDIX 3 - MAPS 
MAP OF CURRENT PRIMARY SCHOOL CATCHMENT AREA

Page 45

29 
MAP OF PROPOSED CATCHMENT AREA

Page 46

30 
APPENDIX 4 – FINANCIAL TEMPLATE 
Table 11 
Name of School
Skipness Primary
Projected
annual
costs for
full
financial
year
2019/20
Additional
financial
impact on
receiving
school 
Tarbert
Primary
Annual
recurring
savings
(column 2
minus
column 3)
School costs      
Employee costs -       
teaching staff 98,567 98,569 0
support staff 15,522  15,522
teaching staff training (CPD etc)   
support staff training   
Supply costs  2,681  2,681     
Building costs:   
property insurance 226  226
non domestic rates 325  325
water & sewerage charges   0
energy costs 1,966  1,966
cleaning (contract or in-house) 261  261
building repair & maintenance 4,190  4,190
grounds maintenance 142  142
facilities management costs  163  163
revenue costs arising from capital   0
other - refuse collection;
telephones 556  556        
School operational costs:      
learning materials 2,823 67 2,756
catering (contract or inhouse) 12,911 475 12,437
SQA costs   0
other school operational costs
(e.g. licences)   0     
Transport costs:    
home to school    
other pupil transport costs  14,2822 -14,282
staff travel    0
SCHOOL COSTS SUB-TOTAL 140,335 113,392 26,942 
Income:                                                  
1 These figures have been calculated based on Skipness Primary school roll the last full year prior to mothballing. 
2 This figure is based on current financial costs if transport was necessary to be provided.

Page 47

31 
Sale of meals -17 -17 0
Lets   0
External care provider   0
Other     0
SCHOOL INCOME SUB-TOTAL -17 -17 0     
TOTAL COSTS MINUS INCOME
FOR SCHOOL 140,318 113,376 26,942    
UNIT COST PER PUPIL PER
YEAR 46,7731 37,792 3,368 
Table 2 
Capital costs
School
proposed for
closure 
Skipness
Primary
Receiving
school 
Primary
Capital Life Cycle cost  133,686 1,023,865
Third party contributions to capital costs 0 0 
Table 3 
Annual Property costs incurred (moth-balling) until disposal
property insurance   226
non domestic rates   325
water & sewerage charges   
energy costs   350
cleaning (contract or in-house)   
security costs   
building repair & maintenance   450
grounds maintenance   7
facilities management costs 283
other 
TOTAL ANNUAL COST UNTIL
DISPOSAL 1,641 
1 This figure has been calculated based on Skipness Primary school roll of the last full year prior to mothballing.

Page 48

32 
Table 4 
Non-recurring revenue costs  
0
TOTAL NON-RECURRING REVENUE COSTS   
Table 5 
Impact on GAE   
The Primary Indicator determining the GAE allocation for Primary School
Teaching Staff is based on the number of primary school pupils with the
Secondary Indicator being the percentage of pupils in small schools (roll
< 70 pupils averaged over 2 years).  The pupils from Skipness are
designated to attend which has a roll of > 70 pupils. The additional pupils
from Skipness will maintain the roll of above the small school threshold. 
There will be a loss of small school GAE for those pupils attending
Skipness equating to approximately £4,000. 
Argyll and Bute Council, however, is supported by the floor
mechanism therefore any calculated reduction in GAE would not
have an actual impact on the overall GAE allocation.
4,000
GAE IMPACT 4,000

Page 49

APPENDIX 5 – OPTIONS APPRAISAL 
EDUCATION 
OPTIONS APPRAISAL 
SKIPNESS PRIMARY SCHOOL

Page 50

1.    INTRODUCTION
1.1  On 8th September 2016, Argyll and Bute Council approved the mothballing of
Skipness Primary School. The Council agreed that in the event there are no
registered pupils by the commencement of session 2018/19 the school be
considered for formal closure through the statutory process. 
https://www.argyll-
bute.gov.uk/moderngov/ieListDocuments.aspx?CId=548&MId=7207&Ver=4 
On 5th September 2019, the Community Services Committee agreed that the
Education Service would undertake the required preliminary consultation and an
options appraisal, for Skipness Primary School. The Community Services
Committee received a report presenting and outlining details of a potential formal
consultation under the Schools (Consultation) (Scotland) Act 2010 (as amended)
and a broad timeline of this process. 
https://www.argyll-
bute.gov.uk/moderngov/ieListDocuments.aspx?CId=548&MId=8381&Ver=4 
The statutory process for the closure of a rural school is laid out in the Schools
(Consultation) (Scotland) Act 2010 as amended by the Children and Young
People (Scotland) Act 2014. 
The Act, as amended, contains a presumption against closure of a rural school
and details specific requirements which the education authority is required to
follow if they are formulating a proposal to close a rural school. This includes the
introduction of a preliminary consultation process. 
In addition, the Community Empowerment (Scotland) Act 2015 sets out a new
right for community organisations to request the transfer of local assets into local
community ownership/management. Public bodies, including councils, must
consider such requests and respond to them within a reasonable timescale. 
Skipness Primary School has had zero pupils enrolled since elected members
approved the mothballing.   
On 5th September 2019, Community Services Committee agreed that the
Education Service would undertake the preliminary requirements in relation to
considering a rural school closure and look at an options appraisal for Skipness
Primary School. This review will enable the Education Service to identify and
consider the options put forward. 
The 2010 Act makes special arrangements in regard to rural schools that is in
effect a presumption against their closure.  There is a requirement to have
special regard to the rural schools factors prior to formulating a proposal to close
a rural school. In particular, it is necessary to consider any reasonable

Page 51

35 
alternatives before considering closure. It is also necessary to consider the
impact on the wider community of a potential closure and the impact of any
different travel arrangements. These factors have been considered in this
options appraisal. 
2.  REASONS FOR THE PROPOSAL
2.1  An authority that is contemplating formulating a rural school closure proposal
must satisfy the preliminary requirements set out in section 12A of the 2010 Act
before starting to prepare its proposal paper. In particular, it must identify the
underlying reasons why the future of the School is being considered, which are
as follows: 
1. Skipness Primary School has been mothballed for three years. The school
roll was very low and not predicted to rise in the near future. This continues
to be the situation. 
2. Along with several other rural councils, Argyll and Bute is facing increasing
challenges in recruiting staff. In September 2019 there were 18.5 fte
vacancies for both Head Teachers and Teachers. 
3. Whilst the School is mothballed, the building is deteriorating with limited
budgets for maintenance.
The Council is therefore considering the future of Skipness Primary School. The
various options are explored within this paper. 
3.  BACKGROUND
Argyll and Bute is an area of outstanding natural beauty sitting within an ancient
landscape with a strong cultural identity. Today, the culture of Argyll and Bute is
reflected in its traditional industries of fishing, farming and crofting, sports such
as shinty and in its world class musicians and artists as well as its modern
commercial industries such as wind turbine production and fish farming. 
Argyll and Bute is geographically the second largest authority in Scotland.
Education is delivered in a range of settings including schools, partnerships and
youth services. 
3.1  Argyll and Bute Corporate Plan
The Argyll and Bute Corporate Plan identifies Argyll and Bute as an area of
Scotland with outstanding places, people and potential for a prosperous future
for everyone. Our Council along with our Community Planning Partners, is
committed to ensuring that Argyll and Bute’s Economic Success is built on a
Growing Population. 
This strategic approach embraces the vision for our area, our communities and
our people as outlined in the Corporate Plan. Our key service priorities support

Page 52

36 
the delivery of our commitments in the plans, helping to focus on local outcomes
that will achieve meaningful improvements for the area, our local communities
and our citizens. 
Councils have a statutory responsibility in terms of the Local Government in
Scotland Act 2003 to achieve best value. Our Community Services Asset
Management Plan provides a review of the property assets used to deliver
services. It incorporates the School Estate Management Plan which reflects the
local implementation of Building Better Schools: Investing in Scotland’s Future,
the national school estate strategy developed by the Scottish Government in
conjunction with local authorities. 
The aspirations, guiding principles and objectives contained within Building
Better Schools are reflected throughout Education and Children’s Services
Asset Management Plan (SAMP) for schools and public buildings, both in the
management of the existing assets and in the design and construction of
developments. 
3.2  Our Children Their Future
Councils, as an Education Authority, have a statutory duty in terms of the
Education (Scotland) Act 1980 to make adequate and efficient provision of
school education across their entire area for the current school population and
future pattern of demand. This is reflected in Our Children, Their Future:
Education Vision and Strategy. 
3.3  Skipness and the Local Area - the Skipness Primary School Setting
Skipness is a scenically beautiful area situated on the most North Westerly point
of the Kintyre peninsula. Skipness is a small and picturesque village overlooking
the Kilbrannan sound towards the Isle of Arran, whose name means ‘point of
the ships’ in ancient Nordic tongue. The Kintyre Way passes through the village
of Skipness on its way from Tarbert to Southend, encouraging outdoor
enthusiasts to take in the natural beauty of the area. Skipness village is home
to the historic attractions of the 13th Century Skipness Castle and Kilbrannan
Chapel from the same time period which are open to the public and attracts
visitors throughout the year.   
3.4  The School within the Community
Skipness Primary School was very active within the community. It was a focus
for social and educational events. The pupils invited the community to attend
events on many occasions every year. Whilst being mothballed, the school no
longer continues to be used for meetings. With Skipness Village Hall, a
community managed charity that host various community events and can be
hired privately, being the hub of the village. 
3.5  Population

Page 53

37 
Argyll and Bute has an average population density of just 0.13 persons per
hectare. This coupled with the changing demographic profile of the area
presents one of our greatest challenges. The table below refers directly to the
Skipness area showing the changing population from census 2001 to census
2011: 
Table 1: Population Information
Skipness Area Census Ref : 60QD000575
2001 2011
Total Resident
Population
140 Total Resident
Population
136
% under 16 25.7
1
% under 16 15.4
% 16 – 64
(pensionable age)
55.7
1
% 16 – 64 (pensionable
age)
66.2
%  pensionable age
and over
18.5
7
%  pensionable age and
over
16.8 
It is recognised that the census area and the catchment area of Skipness
Primary School differ slightly. Currently there are 34 permanent community
members in the village of Skipness. 
3.6  Development and House Building
The current Local Development Plan (LDP) was adopted in March 2015.  A new
Local Development Plan (LDP2), which will set out planning and development
proposals for the next 10 years from 2020 and a vision for 20 years, is currently
being prepared.  The Argyll and Bute Local Development Plan provides the local
planning framework for the Council area, excluding the Loch Lomond and
Trossachs National Park area. The Plan is divided into the written statement and
proposals maps. The written statement provides the general policy context
against which planning applications for new development proposals should be
assessed. This is supported by the proposals maps which show the range of
development opportunities and constraints within the area, for example:
 the key development areas i.e. the allocations for housing, industry and
business, community facilities and infrastructure;
 the potential areas for future development (Potential Development Areas);
 areas requiring actions such as environmental improvement or regeneration
(Areas for Action); and
 environmental designations such as national Scenic Areas, Sites of Specific
Scientific Interest (SSSIs), Special Protection Areas and Local Nature
Conservation Sites.
Appendix 1 shows the LDP for Skipness. 
Appendix 2 shows the LDP for Tarbert.

Page 54

38 
Appendix 3 provides the key for Local Development Plans. 
3.7  Skipness Primary School
Skipness Primary School was built in 1886 and is an attractive building of local
granite in an exceptionally scenic setting. The school is co-educational and non-
denominational and has a catchment area extending from Cour to Cnoc na
Meine and across to Whitehouse. The school has two classrooms, an art area
and general purpose room as well as an office, a separate canteen building and
a large playground. 
Appendix 4 shows the Skipness Primary School Floor Plan. 
Skipness Primary School is 12.6 miles from Tarbert Primary School. The area
is sparsely populated.  The School is situated on the side of a single track road
that leads from Claonaig to Skipness. 
The Scottish Government’s Rural School List 2017 classifies Skipness Primary
School as ‘very remote rural’.  This is defined as an area with a population of
less than 3,000 people, and with a drive time of over 60 minutes to a settlement
of 10,000 or more. Skipness Primary is one of 5 primary schools associated with
Tarbert Academy. 
3.8  Tarbert Primary School
Following the mothballing of Skipness Primary School, children currently attend
Tarbert Primary School. Tarbert Primary School is a non-denominational and
co-educational school situated in the village of Tarbert at 4 Eastfield, off the main
A83 road. Tarbert Academy is a 3-18 school comprising three stages of
schooling. The Pre-5 unit serves the village and near environs of Tarbert. The
Primary serves the village and the surrounding community; and the Secondary
also serves the communities of South Knapdale and North Kintyre. The original
school building was constructed in 1896 and is still used today.  New
accommodation was phased in during the mid-1990s and is used to house the
Primary, Assembly Hall, Office and School Kitchen.  In the year 2000, the School
also became home to a Pre-5 unit and in 2014 an Early Level classroom with its
own toilet block, kitchen and outdoor play area was built in the Primary
Department. The building is well maintained and along with the surrounding
scenery provides attractive accommodation for the Primary School. 
Appendix 5 shows the Tarbert Primary School Floor Plan. 
The outdoor area provides many opportunities for learning. A joint school and
community project was completed to provide and maintain the all-weather pitch
adjacent to the school. There is a hard play area complemented by grass play
areas. There are willow dens to play in and access to the nearby cycle track.

Page 55

39 
The Primary School building has facilities for pupils, visitors and special access
needs. The Scottish Government’s Rural School List 2017 classifies Tarbert
Primary School as ‘very remote rural’. Tarbert Academy is the associated
Secondary School for Skipness and Clachan. Pupils at Achahoish Primary can
choose between Tarbert Academy and Lochgilphead High and pupils from
Rhunahaorine and Gigha are given the choice between Tarbert Academy and
Campbeltown Grammar.   
The Map below shows the adjoining catchment areas of Skipness and Tarbert
Primary Schools Catchment Areas: 
3.9  Pupil Numbers
Pupil projections, and data for 2019 - 2020 are based on the 2018 pupil census,
a return prepared annually for the Scottish Government. Past pupil numbers are
historic data from past pupil censuses. Pupil projections for future P1 intakes

Page 56

40 
are from NHS data taken from children registered with GP practices in the area.
This data is anonymised. 
Table 2 shows the historic and current pupil numbers for both Skipness and
Tarbert Primary schools: 
Table 2:  Skipness PS  Tarbert PS
Capacity 26 130 
Roll Roll
2005-06 7 100
2006-07 7 91
2007-08 7 89
2008-09 7 92
2009-2010 6 95
2010-2011 1 92
2011-2012 3 88
2012-2013 3 83
2013-2014 4 79
2014-2015 3 81
2015-2016 3 83
2016-2017 0 94
2017-2018 0 93
2018-19 0 96
2019-20 0 102 
Table 3 shows projected rolls for Tarbert Primary School and estimated number
of pupils in the Skipness Primary School catchment area according to figures
held by Argyll and Bute Council:  
Table 3:  Skipness PS  Tarbert PS  
Roll Roll
Capacity 26 154
2020 -2021 1 109*
2021 -2022 1 106*
2022-2023 1 103* 
* A prediction based on information available July 2019. 
4.  COMMUNITY ENGAGEMENT 
4.1  Meetings

Page 57

41 
A Community Engagement Meeting was held in Skipness Village Hall, on
October 24th, 2019 from 14:30-18:00 hours.  This was to seek the views of the
community on the future of Skipness School. This meeting was attended by 22
people. There was also a meeting in Tarbert Academy to gather opinions from
the young people from within the catchment area for Skipness School. Three
secondary aged young people attended as there are currently no primary aged
pupils from the Skipness catchment area attending Tarbert Primary. 
4.2  Content of Meetings
Attendees at the meetings were given an overview of the information that the
Council would be using in this Options Appraisal, this included pupil projections,
financial information, development information and local services and facilities. 
The questions were as follows:
Over the last three years, what has been the effect of mothballing Skipness
School on you, your family and community? 
In your view what are the pros/cons of the following options:
 Continue with mothballing
 Re- open the school
 Close the school
 Re-open the school but widen the catchment area 
Attendees also noted questions regarding the future of the school, and points of
information that should be considered in the Options Appraisal. 
4.3  Feedback 
There was a range of viewpoints on the future of Skipness School:
 Community and Parents
The majority of the community felt that the most viable option is to
formally close the school and were in agreement that the low numbers
of children did not make the re-opening of the school realistic.  There
was a small percentage of people in support of continued mothballing
in order to retain the building in case of future need. 
 Children/young people
The young people voiced they loved being at school at Skipness
Primary but that there are currently no pupils at Skipness Primary and
closing the school made sense to them. 
 Staff
Staff members were sad at the thought of the School being closed but
acknowledged that without a significant number of pupils re-opening
the school is not viable.

Page 58

42 
General Comments: 
‘Closing is the most sensible option.’ 
‘Tarbert isn’t too far and there is an existing bus service.’ 
‘Continued mothballing would mean further deterioration to the building and
would be a waste of the premises.’ 
‘Changing catchment area could impact other small local schools and wouldn’t
necessarily mean more pupils for the school as parents have a choice of where
to send their children.’ 
‘If there were kids there I feel they would miss out on the great learning
experience. But I understand there’s no point keeping a school open if there isn’t
anyone in the classrooms.’ 
5.0  THE PROPOSAL AND REASONABLE ALTERNATIVES TO THE PROPOSAL
AS CONSIDERED BY THE COMMUNITY ENGAGEMENT
Skipness Primary School has been mothballed for 3 years. The school roll was
very low and not predicted to rise in the near future. This continues to be the
situation. There is very little support for the reopening of the school. 
Whilst the building is mothballed it continues to deteriorate. The Community is
very proactive and is planning a future for the building. Along with several other
rural councils, Argyll and Bute is facing increasing challenges in recruiting staff.
In September 2019 there were 18.5 fte vacancies for both Head Teachers and
Teachers. 
The Council is required to consider the future of Skipness Primary School. The
following options are explored within this paper: 
a) Re-open Skipness Primary School.
b) Continued Mothballing of Skipness Primary with the pupils zoned to Tarbert
Primary School.
c) Re-open Skipness Primary School and realign its catchment area.
d) Close Skipness Primary School and realign its catchment area to Tarbert
Primary School. 
6. OPTION A: RE-OPEN SKIPNESS PRIMARY SCHOOL 
6.1  Community Feedback
Of the 22 community members that attended the Options Appraisal engagement
event, no one was in support of re-opening the School because the lack of
feasibility due to low pupil numbers.

Page 59

43 
6.2 Pupil Numbers
If the school were to reopen in August 2020, the maximum pupil numbers from
the catchment would be one. There are no pupils currently within the catchment
area but children would attend Tarbert Primary School. It has been stated that
without a viable number of pupils for the School parents would not be
considering placing their children at attend Skipness Primary School if it were to
re-open. 
If the school were to re-open sustainability may not be viable due to the fact that
pupil numbers over the next four years are not predicted to rise and are well
below the capacity of the school building. 
Table 4: Pupil Numbers
Skipness
Primary
2020/2021 2021/2022 2022/2023
Approved
Capacity
26 26 26
Roll
Projection
1 1 1 
6.3 Financial Information
The total amount including employee; premises; supplies and services and
catering consideration to re-open the school is £143,6661 
The annual cost of mothballing Skipness Primary School is £1,644. 
The cost to bring the property to an acceptable standard to re-open the school
is £75,000.   
6.4  Assessment of Rural Factors 
The reasons why the future of Skipness Primary School is being considered are
as stated at Section 2 of this Report. There is no expectation for the pupil
numbers at Skipness Primary School to increase. Skipness Primary School is
currently mothballed and there are no current pupils in the Skipness catchment
area. To reopen the school would not increase the pupil numbers.   
6.4.1  Community Impact
The reopening of the school would enable the premises to be used by the
community. It would also be a possibility that the school pupils would
invite the community to specific events. The presence of a school and the
facilities/activities that may be offered could make the area a more
attractive place to live. Reopening the school may therefore encourage                                            
1 Annual costs for running a comparative school for Skipness Primary School.

Page 60

44 
families with school age children to move to the community. This in turn
may make the community more sustainable. 
However the community have demonstrated no wish for the school to
reopen. Almost all who attended the community engagement indicated
the need for the school to become a facility for the community to use
rather than an educational establishment. 
There have been several community events held at the school including
Community Council Meetings and social events run by Friends of
Skipness School.  All of which have been reported to be well attended. 
Respondents noted the negative impact of the school mothballing on the
community as: 
 The visual impact on the community of the mothballed school.
 The continued deterioration of the building. 
If the school were to reopen as an educational establishment there would
be an economic impact with respect to the considerable expenditure
needed to bring the building up to standard.  There would also be costs
relating to staffing, and ongoing maintenance.  Maintenance and building
costs would also have to be met by the community if the school were to
reopen as a community hub.  The reopening of the school and the
potential relocation of families may have a positive effect on the wider
economy of the community. 
6.4.2  Travel Arrangements
The travel distance (sourced from Google maps) from Skipness Primary
to Tarbert Primary is 12.6 miles via the B8001 and the A83. Travel time
is approximately 25 minutes. The travel arrangements have been in place
for almost three years. Travel is an accepted aspect of living in the
Skipness community. If Skipness Primary School was to reopen there
could be a positive impact on the health and wellbeing and education of
pupils who are able to walk or cycle to school. Staff would either travel to
the school by car, or if they live locally could walk or cycle. There may be
a positive environmental impact as the use of vehicles to transport pupils
may decrease. Conversely, there could be increased car usage by staff
which may mean these travel arrangements have a negative
environmental impact. The respective positive and negative impact may
therefore balance.   
6.5  Educational Benefits 
The principles of Curriculum for Excellence recognise the professionalism of
teachers and the importance of this in exercising the freedom and responsibility

Page 61

45 
associated with broader guidance. This means that schools are able to design
their curriculum to meet the specific needs of their children and community.
There are no specific educational benefits from reopening the school as all
schools implement Curriculum for Excellence ensuring effective learning and
teaching which is matched to the needs of children. 
With respect to outdoor learning community spaces could be used either in the
school grounds or in the immediate neighbourhood if the school were to reopen. 
Outdoor learning is provided by all schools. 
There would be issues with respect to the current condition and suitability of the
school buildings and facilities which would negatively impact learning and
teaching.   
6.6  Summary
The 22 people who attended the consultation the majority were not in favour of
reopening Skipness Primary as a school.  If the school reopened, pupil numbers
would be zero, as of the September 2018 census, and this is predicted to
increase by 1 over the next three years.   
There are financial implications if the school is to be reopened.  The total amount
including employee; premises; supplies and services and catering consideration
to re-open the school is £143,6661, with the cost to bring the property to an
acceptable standard to re-open the school is £75,000.   
If the School was to be reopened, the premises would be able to be used by the
community as a hub, in addition to its use as an educational facility. The
reopening of the School may encourage families with school age children to
move to the community, which may make the community more sustainable. 
The travel distance (sourced from Google maps) from Skipness Primary to
Tarbert Primary is 12.6 miles via the B8001 and the A83. Travel time is
approximately 25 minutes. Adverse weather can be a factor, however this is the
same for other local schools and areas. The travel arrangements have been in
place for almost 3 years. Should the school reopen, there may be a positive
environmental impact as the use of vehicles to transport pupils may decrease.
Conversely, there could be increased car usage by staff which may mean these
travel arrangements have a negative environmental impact. The positive and
negative impact may balance. 
There are no specific educational benefits from reopening the school as all
schools implement Curriculum for Excellence ensuring effective learning and
teaching which is matched to the needs of children. 
1 Annual costs for running a comparative school for Skipness.

Page 62

46 
When considering the above alongside projected low pupil numbers, the
challenges in recruiting teaching staff and the considerable expenditure needed
to bring the building up to standard and the lack of local support for reopening
Skipness Primary School this is not considered to be a reasonable option. 
7.  OPTION B: CONTINUED MOTHBALLING OF SKIPNESS PRIMARY
SCHOOL WITH PUPILS ZONED TO TARBERT PRIMARY SCHOOL
The Statutory Guidance for the 2010 Act, in relation to mothballing, states “the
maximum length of its duration is likely to depend on the location of the school
and the desirability of maintaining capacity to re-open a school there, but it is
unlikely that it should exceed 3 years in areas that are not very remote.”
Skipness Primary School has been mothballed for 3 years. 
7.1  Community Feedback
There are many ideas for the future of the building being taken forward by the
community as a real hub for community life. There was a significant view at the
community meeting that mothballing the school over a long period is wasteful
due to deterioration of the property and should not be prolonged: 
‘The building is deteriorating and is becoming an eye-sore.’ 
‘Continued mothballing would mean further deterioration to the building and
would be a waste of the premises.’ 
‘The school building has been neglected, there is significant water ingress, the
kitchen has been removed and general disrepair is apparent.’ 
‘The building should be used for a purpose to benefit the community.’ 
7.2 Pupil Numbers
Pupil numbers are not projected to increase over the next 4 years, as per Table
4 above.   
7.3  Financial Information
The current annual cost (2019/20) to the Council of the mothballed Skipness
Primary School is £1,644. This includes electricity, heating oil, and ground
maintenance but does not include building maintenance and repair costs.
Neither does it take account of the cost to bring the property to an acceptable
standard to re-open the school which is £75,000.  There is no current annual
transport cost of taking pupils to alternative schools. 
7.4  Assessment of Rural Factors 
The reasons why the future of Skipness Primary School is being considered are
as stated at Section 2 of this Report. There is no expectation for the pupil

Page 63

47 
numbers at Skipness Primary School to increase. Skipness Primary School is
currently mothballed and although there are currently no registered pupils,
pupils would be rezoned to another local school. To reopen the school would
not increase the pupil numbers. 
7.4.1  Community Impact
If pupils are to continue their education in Tarbert Primary School there
would be no change to the current impact on the community.  If the
mothballing of Skipness was to continue the building would deteriorate
further and eventually become unavailable. This could have a detrimental
effect on the sustainability of the Skipness community. At present the
school grounds are available for community use.  For example, the
tarmac area is used as parking for Village Hall events and visiting children
use the play areas. The community view the buildings and grounds as an
opportunity to develop a community hub and there were multiple
suggestions for possible usage. This may make the area a more
attractive place to live. 
7.4.2  Travel Arrangements
There is no change to the travel arrangements that are currently in place
nor to the environmental impact from these.  The travel distance (sourced
from Google maps) from Skipness Primary to Tarbert Primary is 12.6
miles via the B8001 and the A83. Travel time is approximately 25
minutes. The travel arrangements have been in place for almost three
years. Travel is an accepted aspect of living in the Skipness community.
Continued mothballing of Skipness Primary School would have no effect
on current staff travel. The small number of children has minimal effect
on staffing within the receiving primary schools. 
7.5  Educational Benefits 
The principles of Curriculum for Excellence recognise the professionalism of
teachers and the importance of this in exercising the freedom and responsibility
associated with broader guidance. This means that schools are able to design
their curriculum to meet the specific needs of their children and community.
There are no specific educational benefits from reopening the school as all
schools implement Curriculum for Excellence ensuring effective learning and
teaching which is matched to the needs of children. 
Both Tarbert and Skipness are remote rural schools. Each school is set within a
very remote rural area (Scottish Government classification).  Children from
Skipness area, attending Tarbert Primary School are benefitting from the rural
broader environment, whilst not moving their learning to a school that is
completely different to their home environment. Outdoor learning is currently
provided at Tarbert Primary.

Page 64

48 
The co-location of the nursery and the primary classes at Tarbert Primary
enhances the transition process for the children moving from Nursery into
Primary one, through joint educational processes and liaison between the two
settings. Transition to secondary school is enhanced through joint planning and
educational experiences. 
7.6  Summary
The majority of people who attended the consultation were not in favour of
continuing the three year mothballing of Skipness Primary School. There was a
significant view at the community meetings that mothballing the school over a
long period was wasteful due to deterioration of the property and potentially
affected sustainability of the community. Pupil numbers are not predicted to rise
in terms of pre-school children living within the catchment area. Mothballing had
no positive impact on the reasons for the proposal. 
The current annual cost (2019/20) to the Council of the mothballed Skipness
Primary School is £1,644. This includes electricity, heating oil, and ground
maintenance but does not include building maintenance and repair costs.
Neither does it take account of the cost to bring the property to an acceptable
standard to re-open the school which is £75,000.  There is no current annual
transport cost for taking pupils to an alternative school. 
The travel distance (sourced from Google maps) from Skipness Primary to
Tarbert Primary is 12.6 miles via the B8001 and the A83. Travel time is
approximately twenty-five minutes. Adverse weather can be a factor, however
this is the same for other local schools and areas. The travel arrangements have
been in place for more than four years.  Should the school continue to be
mothballed these travel arrangements would continue. 
There are no specific educational benefits from continuing the mothballing of
Skipness Primary school. 
On the basis that pupil numbers are not expected to increase and the building’s
mothballing is not of benefit to the community or the Council, continued
mothballing of Skipness Primary School is not viewed as a reasonable option. 
8.  OPTION C: RE-OPEN SKIPNESS PRIMARY SCHOOL AND EXTEND ITS
CATCHMENT AREA TO THE JUNCTION OF THE B8001 AND A83,
INCULDING THE VILLAGE OF WHITEHOUSE 
8.1  Community Feedback
The existing catchment area for Skipness School is very rural and very sparsely
populated.

Page 65

49 
When considering the option to realign the catchment area of Skipness, the
boundary for Skipness School has been hypothetically moved to the junction of
the B8001 and the A83 and including the village of Whitehouse. 
Community views are: 
‘Changing catchment area could impact other small local schools and wouldn’t
necessarily mean more pupils for the school as parents have a choice of where
to send their children.’  
8.2  Pupil Numbers
The pupil numbers within this new catchment area would not increase the roll
significantly. As part of any possible forthcoming consultation, there would be
discussions with the parent body of Tarbert Primary School regarding the future
of Skipness School. There was no representation from the Parent Council at the
Options Appraisal Meeting. It was felt by attendees at the meeting that moving
the catchment area of Skipness Primary School was not an option due to the
remote nature of the location, the road and accepted direction of travel. 
8.3  Financial Information
The total amount including employee; premises; supplies and services and
catering consideration to re-open the school is £143,6661 per annum. 
To bring the property to an acceptable standard to re-open the school would
cost £75,000.   
The cost to use minibuses to transport the children to Skipness Primary School
would be £14,738 2 (These transport costs are calculated assuming the
boundary has moved to include all children who live within the junction of the
B8001 and the A83). 
There would also be a financial cost associated with the recruitment of additional
staff and ongoing associated costs. 
8.4  Assessment of Rural Factors 
The reasons why the future of Skipness Primary School is being reviewed are
as stated at Section 2 of this Report. There is no expectation for the pupil
numbers at Skipness Primary School to increase. Skipness Primary School is
currently mothballed and the pupils are rezoned to Tarbert Primary School. 
To reopen Skipness Primary School and realign its catchment area could
increase the pupil numbers if families were to send their children to Skipness
Primary School.                                            
1 Annual costs for running a comparative school for Skipness.
2 This would be the cost of one mini bus.

Page 66

50 
8.4.1  Community Impact
The reopening of the school would enable the premises to be used by the
community. It would also be a possibility that the school pupils would
invite the community in to specific events. The presence of a school and
the facilities/activities that may be offered could make the area a more
attractive place to live. Reopening the school may therefore encourage
families with school age children to move to the community. This in turn
may make the community more sustainable. However, the community
has given very little support for this option. 
If the school were to reopen as an educational establishment there would
be an economic impact with respect to the considerable expenditure
needed to bring the building up to standard.  There would also be costs
relating to staffing, and ongoing maintenance.  The reopening of the
school and the potential relocation of families may have a positive effect
on the wider economy of the community. 
8.4.2  Travel Arrangements
The travel distance from Skipness Primary to Tarbert Primary is 12.6
miles via the A83. Travel for children within this new boundary would be
less than thirty minutes and would be a new ‘bus route’. Therefore,
appropriate risk assessments would be necessary. Travel is an accepted
aspect of living in the Skipness community. 
If Skipness Primary School was to reopen there could be a positive
impact on the health and wellbeing and education of pupils who are able
to walk or cycle to school. Local members of staff could also walk or cycle
to school. There would be an increase in the number of pupils at the
school and therefore an increase in staff numbers. There could be
increased car usage by staff resulting in a negative environmental impact. 
8.5  Educational Benefits
The principles of Curriculum for Excellence recognise the professionalism of
teachers and the importance of this in exercising the freedom and responsibility
associated with broader guidance. This means that schools are able to design
their curriculum to meet the specific needs of their children and community.
There are no specific educational benefits from reopening the School as all
schools implement Curriculum for Excellence ensuring effective learning and
teaching which is matched to the needs of children. 
Both Tarbert and Skipness are very remote rural schools. Each school is set
within a remote rural area (Scottish Government classification).  Children from
Skipness area that currently attend Tarbert Primary School benefit from the
broader environment, whilst not moving their learning to a school that is

Page 67

51 
completely different to their home environment.  Outdoor learning is currently
provided at Tarbert Primary School. 
The outdoor facilities either in the school grounds or in the immediate
neighbourhood of Skipness Primary School would offer the opportunity to
develop a curriculum that maximises the use of the local environment supporting
the individual needs of the learners. 
8.6  Summary
The majority of people who attended the consultation were not in favour of
reopening Skipness Primary as a school, and realigning its catchment area due
to the remote nature of the school’s location. 
There are financial implications if the school is to be reopened.  The total amount
including employee; premises; supplies and services and catering consideration
to re-open the school is £143,6661, with the cost to bring the property to an
acceptable standard to re-open the school is £75,000.   
If the School was to be reopened, the premises would be able to be used by the
community, in addition to its use as an educational facility.  The reopening of the
school may encourage families with school age children to move to the
community, which may make the community more sustainable. 
The travel distance from Skipness Primary to Tarbert Primary is 12.6 miles via
the A83. Travel for children within this new boundary would be less than 30
minutes and would be an existing ‘bus route’.   
There are no specific educational benefits from reopening the school as all
schools implement Curriculum for Excellence ensuring effective learning and
teaching which is matched to the needs of children. 
Due to the geographic location of this very remote rural primary school it is
unlikely that the catchment area could be made more sustainable. While this
option could in theory contribute to sustainability of the community that may not
be the case as most pupils in the neighbouring catchment area travel in the
direction Tarbert, towards the larger centre of population, and not towards
Skipness. It would require pupils who may have already settled in Tarbert
Primary School to move to Skipness Primary School. Skipness families have
stated they would not move their children back to Skipness without viable pupil
numbers if it reopened. All families would be entitled to submit a placing request
to attend Tarbert Primary School. It is unlikely that pupil numbers would increase
significantly. 
1 Annual costs for running a comparative school for Skipness.

Page 68

52 
When considering the above, alongside the challenges in recruiting teaching
staff, the considerable expenditure needed to bring the building up to standard
and the lack of local support for reopening Skipness Primary School, this is not
considered to be a reasonable option. 
9.  OPTION D: CLOSE SKIPNESS PRIMARY SCHOOL AND REALIGN THE
CATCHMENT AREA FOR TARBERT PRIMARY SCHOOL TO INCLUDE THE
CURRENT SKIPNESS CATCHMENT AREA 
9.1  Community Feedback
The majority of people who attended the Options Appraisal meeting were not in
favour of reopening Skipness Primary as a school. They commented that there
were not enough children to support re-opening the School. Additionally, with
respect to low numbers in future school roll projections, the sustainability of the
School did not support re-opening of the School. Comments in relation to the
closure of Skipness Primary School and attendance at Tarbert Primary School
were positive: 
‘It’s not realistic to re-open the school as there are not enough young people.’ 
‘Tarbert isn’t too far and there is an existing bus service.’ 
Young people said: 
‘If there were enough kids I think the community would want it to stay open.’
‘I found it easy to come to Tarbert, I enjoyed company of new friends transition was ok.’ 
Many community members commented on the school premises and potential
for this to become a community asset: 
‘The building to be used for a purpose to benefit the community for example a
community hub with a shop and café.’ 
‘The community has lost the shop, post office and now school, we feel it is
crucially important that this building is retained to build the community.’ 
Community members discussed pursuing options for use of the building as a
community hub. 
9.2  Pupil Numbers
Table 5: Schools Occupancy: 
Primary 2019/2020 2020/21
Approved
Capacity
130 130

Page 69

53 
Projected
Roll 
102 109
Skipness
Projected
Roll
0 0
Total Roll
Projection
102 109 
Occupancy
78.5% 83.9% 
Pupils from Skipness Primary catchment area would attend Tarbert Primary
School, as there are currently no pupils attending Skipness there is no projected
addition to school roll at Tarbert Primary School. The current occupancy rate for
Tarbert Primary School is 78.5%.   
9.3  Financial Information
As there are currently no pupils at Skipness Primary there is no annual cost to
transport pupils to alternative schools. An existing West Coast bus means that
there would be no additional annual transport costs. If Skipness Primary School
were to be closed it would generate savings of £1,644 - the current annual cost
of mothballing (2019/20) to the Council. This includes electricity, heating oil, and
ground maintenance but does not include building maintenance and repair
costs. 
9.4  Assessment of Rural Factors 
The reasons why the future of Skipness Primary School is being reviewed are
as stated at Section 2 of this Report. There is no expectation for the pupil
numbers at Skipness Primary School to increase. Skipness Primary School is
currently mothballed and were there pupils they would be rezoned to other
schools. To reopen the school would not increase the pupil numbers.   
9.4.1  Community Impact
The community overwhelmingly supported closure of the school with the
building and adjoining grounds being retained for community use. Within
Skipness there is a village hall. All people who attended the consultation
strongly stated the school building should be retained for community use
and not allowed to fall into further disrepair, as that would adversely
impact on the community’s access to the premises and the visual impact
of the village. While it is accepted that school closure may have an
adverse effect on a community, a vibrant community hub could be an
asset to a community. This could potentially have a very positive impact
on sustainability of the community if this option were to progress. If the
Community wished to create a community hub, they would require to find
a mechanism to acquire the property from the Council and deliver that
aspiration. The buildings forming the school premises are situated within
walking distance of the village. If the local plans for the building progress,

Page 70

54 
this would have a positive impact on the sustainability of the village.
Formal closure of the school would mean that these plans could
potentially be progressed by the community. 
9.4.2  Travel Arrangements
The travel distance (sourced from Google maps) from Skipness Primary
to Tarbert Primary is 12.6 miles via the B8001 and the A83. Travel time
is approximately 25 minutes. The travel arrangements have been in
place for three years. Travel is an accepted aspect of living in the
Skipness community. This option would have no effect on the current
travel arrangements of staff and pupils. The closure of Skipness Primary
School, in terms of travel would have a neutral effect on the
environment.  There is currently no annual transport cost for pupils to
travel to Tarbert Primary School and the use of the existing West Coast
Motors service bus would not incur additional costs in the immediate
future. 
9.5  Educational Benefits 
The principles of Curriculum for Excellence recognise the professionalism of
teachers and the importance of this in exercising the freedom and responsibility
associated with broader guidance. This means that schools are able to design
their curriculum to meet the specific needs of their children and community.
There are no specific educational benefits as all schools implement Curriculum
for Excellence ensuring effective learning and teaching which is matched to the
needs of children. 
Both Tarbert and Skipness are very remote rural schools. Each school is set
within a remote rural area (Scottish Government classification).  Children from
Skipness area who would attend Tarbert Primary School are benefitting from
the rural broader environment, whilst not moving their learning to a school that
is completely different to their home environment. Outdoor learning is currently
provided at Tarbert Primary. The pupils would then be transitioning to Tarbert
Academy with an established friendship group. 
In Tarbert Primary School children are taught in classes composed of children
from more than one year group. Children benefit from being part of a social
context in which they can build relationships with different groups and
individuals, develop social skills, meet challenges and exercise responsibilities
as members of a social group. They are able to interact and socialise with
groups of children of their own gender, take part in team activities and move with
their peers to secondary school. 
9.6  Summary
The majority of people who attended the consultation were in favour of closing
Skipness Primary as a school, and realigning the catchment area of Tarbert
Primary School due to the remote nature of the school’s location. They also

Page 71

55 
commented on the potential for the school premises to be used as a community
asset. 
Current capacity for Tarbert Primary School is 78.5%. As there are currently no
pupils in the Skipness catchment area, there is no annual cost to transport pupils
to Tarbert Primary school and use of the existing West Coast Motors service
bus would not incur additional costs. 
The travel distance (sourced from Google maps) from Skipness Primary to
Tarbert Primary is 12.6 miles via the B8001 and the A83 and this option would
have no effect on the current travel arrangements of staff and pupils. The closure
of Skipness Primary School would therefore have a neutral effect on the
environment. Tarbert Academy currently accommodates pupils from Skipness
School and pupil numbers are not projected to increase significantly. Tarbert
Primary has capacity to continue to accommodate the projected pupil numbers. 
In Tarbert Primary School, children benefit from a positive learning environment
with learning and teaching which is better matched to the needs of the young
people who attend the school. In addition there are more opportunities for
personal and social development in this setting. 
This has been identified as a reasonable option for further consideration.       
11.  OVERVIEW OF OPTIONS
Option Option Description Outcome
A Re-open Skipness Primary School with
the existing catchment area
Not a reasonable option.
B Continued Mothballing of Skipness
Primary School with the pupils zoned to 
Primary School 
Not a reasonable option.
C Re-open Skipness Primary School and
extend its catchment area to the junction
of the B8001 and A83 including the
village of Whitehouse.
Not a reasonable option
D Close Skipness Primary School and
realign the catchment area of Tarbert
Primary School to include the current
catchment area for Skipness Primary
School.
A reasonable option with
strong representation
that the school becomes
a facility the community
can develop. 
12.  DETAILED ANALYSIS OF REASONABLE OPTION: CLOSE SKIPNESS
PRIMARY SCHOOL AND REALIGN THE CATCHMENT AREA FOR

Page 72

56 
TARBERT PRIMARY SCHOOL TO INCLUDE THE CURRENT SKIPNESS
CATCHMENT AREA  
12.1 Pupil Projections
Primary 2019/2020 2020/21
Approved
Capacity
130 130 
Projected
Roll 
102 109
Skipness
Projected
Roll
0 0
Total Roll
Projection
102 109 
Occupancy
78.5% 83.9% 
12.2  Educational Benefits
This statement focusses on Tarbert Primary School, which is the school
Skipness Pupils have been attending since September 2016. 
12.2.1  Learning and Teaching 
The curriculum includes a broad range of experiences which are
planned for children and young people through their education, to
help every child and young person to develop knowledge, skills
and attributes for success in learning, life and work. 
In Tarbert Primary School, children are encouraged to be eager
and active participants who are engaged, resilient and highly
motivated during their learning. Children know that their views are
sought, valued and acted upon. The learning environment
encourages high level of achievement, providing a wide range of
opportunities for children to achieve their full potential within the
four contexts of learning. 
In Tarbert Primary School children may be taught in classes
composed of children from more than one year group. Children
benefit from being part of a social context in which they can build
relationships with different groups and individuals, develop social
skills, meet challenges and exercise responsibilities as members
of a social group. They are able to interact and socialise with
groups of children of varying sizes and composition, take part in
team activities and move with their peers to secondary school.

Page 73

57 
There is a continual challenge for all schools to deliver a school
improvement agenda and deliver effectively the principles and
outcomes of curriculum for excellence. The National Improvement
Framework priorities include raising attainment for all, and closing
the gap between the most and least disadvantaged children.   
The principles of Curriculum for Excellence recognise the
professionalism of teachers and the importance of this in
exercising the freedom and responsibility associated with broader
guidance. This means that schools are able to design their
curriculum to meet the specific needs of their children and
community. At Tarbert Primary School, staff are challenged and
supported through a range of continuous professional
development and review opportunities gained by working and
learning with a range of colleagues. Tarbert Primary School is part
of the Kintyre Schools Cluster, and a smaller local cluster which
means that staff can be supported together, moderation and
tracking of pupil progress is enabled and staff work across stage
appropriate groups. Colleagues within Tarbert Primary School are
able to support and challenge each other on a daily basis. The
whole staff are able to bring a range of talents and skills to benefit
outcomes for learners. 
Tarbert Primary School encourages nurturing and positivity. One
aspect of this work is a successful Buddy System. Children from
different stages work and learn together. This vertical support is
particularly evident on Sports Day and in the dining room when
groups of children are together in a social context. This system
develops and benefits both the ‘buddy’ and the ‘buddied’. To
implement this system there needs to be children across a range
of stages in the school. 
Both Tarbert and Skipness are very remote rural schools. Each
school is set within a remote rural area (Scottish Government
classification).  Children from Skipness area, who would attend
Tarbert Primary School would benefit from the rural broader
environment, whilst not moving their learning to a school that is
completely different to their home environment. 
The co-location of the nursery and the primary classes at Tarbert
Primary School enhances the transition process for the children
moving from Nursery in to Primary one, through joint educational
processes and liaison between the two settings. 
12.2.2  Outcomes

Page 74

58 
Through the GIRFEC practice model, meeting the needs of every
child continues to be a priority and teachers carefully plan and
assess to ensure each child has the opportunity to reach their
potential.  Careful tracking and monitoring procedures are in place
to evidence pupil progress. This includes professional dialogue
with teachers, learning discussions with children, classroom
observations, assessment and looking at pupil work. Planning for
Progress meetings are being further strengthened. These
discussions between home and school improve parental
engagement whilst focussing on next steps for learning. Where
appropriate, intervention is put in place, while working effectively
with other agencies and parents to ensure the needs of each child
are met. 
In the primary classes, standards of attainment have been
maintained over the last three years. Most children are achieving
national expectations in reading, writing, listening, talking and
numeracy. Tarbert continues to develop within the PATHS
program supporting positive behaviours and relationship within the
school.  A larger staff, parent body and partner group by nature
increases the breadth of talent and interest that may be available
to share within a school setting. This applies both in terms of the
wider curriculum and within aspects of the curriculum that may be
enhanced by staff individual expertise e.g. PE, language, science,
expressive arts teaching. 
12.2.3  Experiences - Broadening the Range of Opportunities 
Children are offered a range of active, planned experiences which
help them develop the knowledge and understanding, skills,
capabilities and attributes which they need for their mental,
emotional, social and physical wellbeing both now and in the
future.   
12.2.4  Environment for Learning
Tarbert Primary School is a suitably-equipped and well supported
school, situated in the village of Tarbert. The entire building is well
maintained and along with the surrounding scenery provides
attractive accommodation for the primary school.  The school has
an all- weather pitch adjacent to the school. The pitch is used very
well by the school. The building has facilities for pupils and visitors
with special access needs. 
12.3  Assessment of Rural Factors 
The reasons why the future of Skipness Primary School is being reviewed are
stated at Section 2 of this report. There is currently no expectation for the pupil
numbers to increase at the School. Skipness Primary School is mothballed with

Page 75

59 
no current pupils. Having considered all the alternatives above, the option to
close Skipness Primary School and realign the catchment area for Tarbert
Primary School to include the former Skipness Primary School catchment area
is considered the most reasonable means to address the reasons identified at
Section 2 of this report. 
12.3.1  Community Impact
The community overwhelmingly supported closure of the school
with the suggestion that the building and adjoining grounds could
potentially be retained for community use. Within Skipness there
is a Village Hall which houses community events. All people who
attended the Options Appraisal Meeting strongly stated the school
building should be retained for community use and not allowed to
fall in to further disrepair, as that would adversely impact on the
community’s access to the premises and the visual impact of the
village. It is accepted that a school closure may have an adverse
effect on a community, but a vibrant community hub could be an
asset to the community. The school premises are situated within
walking distance of the village. If the local plans for the building
progress, this would have a positive impact on the sustainability of
the village. Formal closure of the school would mean that these
plans could potentially be progressed by the community. 
12.3.2  Travel Arrangements
The travel distance (sourced from Google maps) from Skipness
Primary to Tarbert Primary is 12.6 miles via the B8001 and the
A83. Travel time is approximately 25 minutes. The travel
arrangements have been in place for almost 3 years. Travel is an
accepted aspect of living in the Skipness community. Pupils will
travel on the existing West Coast Motors service bus and
eventually all the pupils will travel to Tarbert Primary School. The
environmental impact of travel will be minimal, as these
arrangements are currently in place due to the mothballing of
Skipness Primary School. The closure of Skipness Primary
School, in terms of travel, would have a neutral effect on the
environment. Due to there being no pupils presently within the
Skipness catchment area, there is currently no annual transport
cost of taking pupils to Tarbert Primary School and use of the
existing West Coast Motors service bus would mean there are no
future cost implications. 
12.4  Financial Impact
The main elements included within a school budget are Teacher employment
costs (i.e. basic salary costs plus related employer’s National Insurance and
Superannuation contributions plus any relevant individual allowances); Local
Government employee costs and an allocation for discretionary expenditure

Page 76

60 
incurred by the school (i.e. educational equipment, materials, staff travel, etc.). 
Teacher staffing budgets are calculated on an annual basis and within the
Primary sector are determined, taking cognisance of the SNCT class size
maxima, by the number of classes required to provide for the specific number
and age of the pupils in each school.  When a school ceases to be operational
the Teacher staffing budget is adjusted (at the appropriate time), per entitlement
information from Education HR, with the staffing budget resulting in a nil value. 
As a result of the authority’s policy for no Teacher redundancies it is presumed
that the staff are deployed elsewhere within the authority and therefore their
salary costs still exist with an increase to the receiving school’s budget.  This is
also in line with the national priority of maintaining teacher numbers.  This
methodology also applies to the school’s discretionary budget which again is
formula based.  The budget of the receiving school, in terms of any pupils being
transferred, will have increased.  The figures outlined below take account of the
fact that the staffing and discretionary budgets have been adjusted to nil. 
The annual running costs during mothballing of Skipness Primary School are a
total of £1,644. 
Annual savings generated through closing Skipness Primary School would be
£1,644. 
The costs/savings outlined above assumes all revenue expenditure would
cease. This includes non-domestic rates, utility costs, insurances, etc.  If the
school was to be formally closed, this would allow the council to take steps
towards selling the school to a third party or local community. 
12.5  Environmental Impact
Currently no pupils travel to Tarbert Primary. However this option would have a
neutral environmental impact on the current position and would have no impact
on the current travel arrangements for staff and pupils. Eventually all pupils will
attend Tarbert Primary School, a relatively short journey. Travel is an accepted
aspect of rural life. 
13.  CONCLUSION
Four alternative options have been reviewed in considering the future of
Skipness Primary School.  For each option, information was collated and
consideration was given to:
 Community feedback;
 Pupil numbers; 
 Financial Information;
 Assessment of rural factors, including community impact, economic impact
and travel arrangements, and
 Educational Benefits.

Page 77

61 
An authority that is contemplating a rural school closure proposal must satisfy
the preliminary requirements set out in Section 12A of the 2010 Act before
formulating a proposal. 
After consideration of the preliminary requirements, as set out in the Act, and the
options, and having regard to the specific reasons identified at Section 2 of this
report, closing Skipness Primary School and realigning the catchment area of
Tarbert Primary School to include the current catchment area for Skipness
Primary School is the most reasonable option in order to address the reasons for
the possible proposal. 
Members are asked to:
 Note the outcome of this consideration of the preliminary requirements; and 
 Agree that Officers now formulate a draft proposal that will come back to a
future meeting of the Committee for approval by Members which would
subsequently trigger the formal consultation process under the Schools
(Consultation) (Scotland) Act 2010.

Page 78

62 
Appendix 1 
Appendix 2

Page 79

63 
Appendix 3

Page 80

64 
Appendix 4 
Appendix 5

Page 81

65

Page 82

66 
Appendix 2 - EQSEIA
Argyll and Bute Council     
Argyll and Bute Council:
Equality and Socio-Economic Impact Assessment 
Section 1: About the proposal 
Title of Proposal 
To close Skipness Primary School. 
Intended outcome of proposal 
The proposal is to close Skipness Primary School. Currently, we are in the consultation phase, at this
stage it is vitally important that we seek the views of all stakeholders affected by this proposal. Once
this has been done, there will be a consultation report prepared on the issue by Local Authority Officers,
with input from Education Scotland. This report will be presented to the Community Services Committee
(CSC) for their decision.    
Ultimately, the intended outcome the closure of the school, which has been mothballed since October
2016. If after consultation the stakeholders involved in the process, Education Scotland, and the CSC
feel that the closure is not a reasonable option, then the closure would not take place. 
Description of proposal

Page 83

67 
Consideration of this proposal means that a decision is being taken about permanently closing Skipness
Primary School. As per the legislative guidance set out in the Schools (Consultation)(Scotland) Act 2015,
Argyll and Bute Council is seeking views on the following proposal, namely: 
It is proposed that education provision at Skipness Primary School be discontinued with effect from 1st
December 2022. 
Pupils of Skipness Primary School will continue to be educated at Tarbert Primary School. 
The catchment area of Tarbert Primary School shall be extended to include the current catchment area
of Skipness Primary School. 
Reasons for this proposal 
This is the best option to address the reasons for the proposals which are; 
• Skipness Primary School has been mothballed for 5 years. The school roll is very low
and not predicted to rise in the near future. The annual cost of the mothballing of the
building is £1,641.   
• Along with several other rural Councils, Argyll and Bute is facing increasing challenges in
recruiting staff.    
• Whilst the school is mothballed, the building is deteriorating with limited budget for
maintenance.    
On 12th  March 2020, Argyll and Bute Council’s Community Services Committee agreed that a
consultation with all stakeholders be undertaken on the proposal. This consultation has been
continuously open since March 16th 2020 due to limitations on holding an in person public meeting as
detailed by the legislation. 
Business Outcome(s) / Corporate Outcome(s) to which the proposal contributes 
BO18: All our children and young people are supported to realise their potential.    
Corporate outcome: Education, skills and training maximise opportunities for all. 
Lead officer details:   
Name of lead officer  Simone McAdam 
Job title  Education Manager (acting) 
Department  Customer Services: Education 
Appropriate officer details:   
Name of appropriate officer  Louise Connor and Jenifer Crocket  
Job title  Head of Education 
Department  Customer Services: Education 
Sign off of EqSEIA

Page 84

68 
Date of sign off  22nd December 2021 
Who will deliver the proposal? 
Should the closure go ahead, there will be in fact no change to the current arrangements which have
been in place since the school has been mothballed.    
The Head Teacher of Tarbert Academy will be the senior officer of the Council who provides the
leadership of the educational experience for the children attending the school, who would have otherwise
attended Skipness Primary School. The Education Central team of the Council will be responsible for
the support and challenge of the school as per standard protocols.    
Transport colleagues will be responsible for any travel arrangements for children who are entitled to this,
and this has already been in place since the school was mothballed. 
Section 2: Evidence used in the course of carrying out EqSEIA

Page 85

69 
Consultation / engagement 
Under the Schools (Consultation) (Scotland) Act 2010, if a local authority proposes to close a school
it must undertake a statutory consultation with the ‘relevant consultees’ affected by this proposal. In
this instance; 
Skipness Primary School    
Is the ‘affected school’.    
The formal consultation on the proposal within this document will be undertaken under the terms of
the 
Schools (Consultation) (Scotland) Act 2010 (“the Act”). The consultation period will start on 16th
March 2020 
(with due written notice of the proposal issued to the relevant consultees listed in Appendix 1) and
end on 
23rd December 2021. Written representations must be received by this date in order to
be  taken into account. 
A copy of the proposal document will be provided to the following ‘relevant consultees’ in terms of
the Act: 
• The Parent Councils of the affected schools; 
• The parents of the pupils at the affected schools; 
• A copy of the proposal will be provided to all Early Years Establishments in the local area,
giving access to parents who have children expected to attend the affected schools within
two years of the publication of this proposal paper; 
• The pupils at the affected schools (in so far as the Education Authority considers them to be
of suitable age and maturity); 
• All Argyll and Bute Council employees at the affected schools; 
• Trade union representatives of employees at the affected schools; 
• Community Councils within the affected locality; 
• Local churches; 
• All relevant users of the affected schools, and •  Argyll and Bute Community Planning
Partners. 
A copy of the proposal document will also be made available to: 
• All Elected Members of Argyll and Bute Council; 
• Argyll and Bute Youth Forum; 
• Education Scotland (formerly Her Majesty’s Inspectorate of Education, HMIe); 
• The Constituency MSP of the affected schools; 
• List MSP for the area of the affected schools; 
• The MP of the affected schools; 
• Police Scotland; 
• NHS Highland; 
• Argyll and Bute School Transport; 
• Senior Local Officer, Scottish Fire and Rescue Services, and 
• Care Inspectorate 
The steps listed below have also been taken to ensure that the proposal is widely available:  
• The proposal document will also be published on the Argyll and Bute Council website; 
• This document can be made available in alternative forms or translated by contacting Argyll
House, Dunoon, tel: 01369 708576 or argyllhousereception@argyll-bute.gov.uk;

Page 86

70 
The proposal paper will also be available at the following locations; 
• Council Headquarters, Kilmory, Lochgilphead, Argyll, PA31 8RT 
• Education Offices, Argyll House, Dunoon, Argyll, PA23 8AJ 
• Tarbert Public Library, Barmore Road, Tarbert, PA29 6TW 
• Lochgilphead Service Point, 1A Manse Brae, Lochgilphead, PA31 8RD 
• Tarbert Primary School, School Road,Tarbert.PA29 6TE 
• Skipness Village Hall, B8001, Tarbert, PA29 6XT 
There will be a public meeting held on the 10th November 2021 at 6.00pm in Skipness Village Hall.

Page 87

71 
DATA 
The catchment area for Skipness Primary School is classed as remote rural. The definition for remote
rural are settlements with a population of less than 3,000 with a greater than 30 minute drive time to
the nearest settlement with a population of 10,000 or more. 
Over the period of 2011-2019 Remote Rural areas have seen a 0.1% increase in population this
contrasts with an 8% increase in the same period in Accessible Rural and 3% increase in the rest of
Scotland. 
Remote rural areas have a lower percentage of the population in the 0-15 and the 16-44 age groups
but a higher proportion of people aged 45-64. For example, in 2019 27% of the population in remote
rural areas and 30% of the population in accessible rural areas were 16-44 year olds, compared to
38% in the rest of Scotland. 
Conversely, 58% of the population in remote rural areas and 52% of the population in accessible
rural areas were aged 45 and over, compared to 45% in the rest of Scotland. 
In 2019 the proportion of people aged 65 or over was 21% in accessible rural areas was and 26%
in remote rural areas compared to 18% in the rest of Scotland. 
54% of journeys to school were made by walking or cycling in 2019. 61% of those aged 4-11 and
43% of those aged 12-18 usually walked or cycled to school. For those aged 4-11 the next most
popular mode was as a passenger in a car or van (29%). For those aged 12-18, the next most
popular was school bus (25%). 7% of children aged 4-11 usually used school transport. 21% of
children living in the most deprived SIMD areas (centile 1 and 2) used school transport. 44% of
children living in remote rural areas used school transport.

Page 88

72 
OTHER INFORMATION       
Evidence for this proposal was found in the Equality Evidence Finder, and in the Guidance for
the Fairer Scotland Act.    
Additional evidence was found in the School (Consultation) (Scotland) Act 2010, in terms of
legislative compliance. Education management circulars, 1.33 on capacity, 3.01 on admission
and 3.09 on transfers were also consulted. The circular 3.23 on child protection and
safeguarding was also considered.    
The national policy of GIRFEC – Getting it Right for Every Child, was also considered in the
formation of this proposal as was the Argyll and Bute Education vision and strategy, Our
Children, Their Future 
Gaps in evidence 
There are no gaps in evidence 
Section 3: Impact of proposal 
Impact on service users: 
Negative No
impact 
Positive  Don’t
know 
Protected characteristics:         
Age    X     
Disability    X     
Ethnicity    X     
Sex    X     
Gender reassignment    X     
Marriage and Civil Partnership    X     
Pregnancy and Maternity    X     
Religion    X     
Sexual Orientation    X     
Fairer Scotland Duty:         
Mainland rural population        x 
Island populations    x     
Low income         X 
Low wealth        X 
Material deprivation        X 
Area deprivation        X 
Socio-economic background        X 
Communities of place        X 
Communities of interest        X 
If you have identified any impacts on service users, explain what these will be.

Page 89

73 
If any ‘don’t knows have been identified, at what point will impacts on these groups become
identifiable? 
If the proposal is accepted, there will be no immediate impact on pupils and families, as the children
are already currently attending Tarbert Primary School, who would otherwise have attended
Skipness Primary School.    
There may be families who move into the revised catchment area who would then require transport,
and in addition this may lead to changes in staffing levels in Tarbert Primary School.    
The Education Management team will use their existing quality assurance procedures to monitor
the education provided in the school. 
Impact on service deliverers (including employees, volunteers etc): 
Negative No
impact 
Positive  Don’t
know 
Protected characteristics:         
Age        x 
Disability    X     
Ethnicity    X     
Sex    X     
Gender reassignment    X     
Marriage and Civil Partnership    X     
Pregnancy and Maternity    X     
Religion    X     
Sexual Orientation    X     
Fairer Scotland Duty:         
Mainland rural population        x 
Island populations    X     
Low income         X 
Low wealth        X 
Material deprivation        X 
Area deprivation        X 
Socio-economic background        X 
Communities of place        X 
Communities of interest        X 
If you have identified any impacts on service deliverers, explain what these will be.

Page 90

74 
If any ‘don’t knows have been identified, at what point will impacts on these groups become
identifiable? 
The Proposal has a consultation period that runs from March 16th 2020 to December 23rd 2021
where all interested parties can submit a written representation. A public meeting will be held on
November 10th 2021 where interested parties can ask questions of the Proposal.        
How has ‘due regard’ been given to any negative impacts that have been identified? 
In looking at the educational benefits statement of this proposal these have been considered. All
information is contained in the proposal paper.  https://www.argyll-
bute.gov.uk/sites/default/files/Unknown/skipness_proposal_paper_feb_final.pdf      
Section 4: Interdependencies 
Is this proposal likely to
have any knock-on effects
for any other activities
carried out by or on behalf
of the council? 
Potentially on transport, as more children may require transport
who may move into the catchment area. 
Details of knock-on effects identified 
Increased number of children requesting free school transport may add pressure to the transport
system. 
Section 5: Monitoring and review 
How will you monitor and evaluate the equality impacts of your proposal? 
The Education Central Team including locality Education Managers will monitor the impact
this catchment area change would have, if implemented.

Page 91

APPENDIX 3 - WRITTEN CONSULTATION RESPONSES
The statutory consultation on the proposal to close Skipness Primary School
commenced on the 16th March 2020 and closed on 23rd December 2021. 
Response Forms 
Three consultation response forms were received from community members. One of
which requested their response to be considered confidential with access restricted to
Elected Members and Council Officers of Argyll and Bute. Tarbert Primary School also
submitted three consultation response forms one each from the P4/5, P5/6 and P6/7
classes. All responses were in favour of closing the school. 
RESPONDENT GROUP  NUMBER  OF
RESPONSES 
AGREE  DISAGREE 
Community Members  3  3 0
Community Council  0 0  0 
Pupils – Tarbert Primary School 3  3  0
TOTAL  6 6  0 
Schools (Consultation) (Scotland) Act 2010
Argyll and Bute Education – Skipness Primary School
Written Responses Summary - Consultation 
format interest Comment Agree/disagree/neutral
Consultation
response
form
Parent  Prohibitive cost and
proximity of 2 other
schools mean
provision at
Skipness should
cease.
agree
Consultation
response
form
other  Acceptance of need for
closure. 
 Increase to Clachan
Primary School
catchment by change
to existing Tarbert
Primary catchment
area and
encompassing
Skipness Primary
School catchment area.
 Some children (10)
from Tarbert Primary to
be offered attendance
Clachan Primary.
agree

Page 92

email Community member  Building should be
offered to the village
hall committee for
developing a
community asset or
 Building should be
offered to those that
own the school house
as they would preserve
the car park for village
use.
agree
Consultation
response
form
P4/5 class Tarbert
Primary
 3 thought school
should close
 8 thought school
should stay open
 12 pupils did not vote
either way
neutral
Consultation
response
form
P5/6 class Tarbert
Primary
 21 pupils thought
closure was a good
idea
 1 pupil thought closure
was not a good idea
Pros:
 Tarbert is a bigger
school with classes
from P1 – P7
 Small numbers at
Skipness might mean
pupils would be lonely
or sad
 Pupils will make more
friends and have more
fun at Tarbert
 There would not be
enough work getting
done because not
enough pupils e.g.
Topic Work
 If just a few pupils, they
would not be able to do
big group things, fun
things and trips
 More people will come
to Tarbert
 Pupils would have
more people to play
with in the playground
at Tarbert
 What would happen to
the equipment in
Skipness? This should
be given to schools
agree

Page 93

which do not have
much equipment
 If there are only a few
pupils in Skipness, they
are paying quite a lot of
money to heat the
school so that it is
usable.
 Something better could
be built if they knocked
the school down – a
park?
Cons
 Longer travel for pupils
to Tarbert
 If a P5 and a P7 pupil
in Skipness were
friends, when they
come to Tarbert they
might be split into
different classes
Consultation
response
form
P6/7 class Tarbert
Primary School
 All pupils (21) agreed it
was a good idea to
close Skipness.
 They felt children would
have more
opportunities if they
went to Tarbert
Primary, especially
socially.
 It would also save the
council money.
agree

Page 94

APPENDIX 4 - PUBLIC MEETING MINUTES 
Skipness Public Consultation Meeting
Skipness Village Hall 
10 November 2021 
Panel:
Councillor Yvonne McNeilly, Policy Lead for Education 
Douglas Hendry, Executive Director
Louise Connor, Head of Education: Learning and Teaching
Jen Crocket, Head of Education: Lifelong Learning and Support 
Officers 
Simone McAdam, Education Officer
Graeme McMillan, Solicitor
Fiona Ferguson, Directorate Support Officer
Laura Blackwood, Directorate Support Officer 
Councillor Anne Horn
8 members of the Public 
Councillor McNeilly opened the meeting and outlined the background to the proposal. Mr Hendry
advised that the meeting tonight is to gather views on the proposal to close Skipness Primary
School and realign its catchment area to Tarbert Primary School.  A presentation then followed
and questions from the audience were invited. 
Question 
Why is the date of closure December 2022? 
Panel Response
The Schools (Consultation) (Scotland) Act 2010 legislation sets out the requirements which the
council follows and this includes the time frames for reports to be produced and agreed by the
council and Education Scotland. 
The 1st December 2022 date allows for this process to be carried out in accordance with the
requirements of the legislation.   
Question
What would happen if there was a lack of capacity in Tarbert Primary School? 
Panel Response
There is capacity in the school building at the moment and we look at projections for the next 5
years.  The head teacher would manage class sizes and the use of the building.

Page 95

Question 
There is already pressure on the building. Work on the school has focused on the early years
provision. 
There is concern regarding the class sizes in Tarbert should further families move into the area. 
Panel Response
We have projected figures until 2030 and Mrs Connor advised that she would send the roll
projection figures to 2030 to Councillor Horn for her information. 
Question 
Query was raised in regard to the travel time to Tarbert and whether this is within the reasonable
limits.   
Panel Response 
The travel to Tarbert by car is 25 minutes and by public transport is longer as there will be stops
on route. This is considered a reasonable distance and many children within Argyll and Bute travel
these distances on a daily basis. 
Question 
A query on the number of children currently living in the Skipness catchment area was raised. A
member of the audience advised that 4 primary aged children currently live in the catchment area
of Skipness. 
Panel Response 
Mrs Connor agreed to confirm the numbers as this was not the same as the information held by
the service. Update: The number of primary aged children living in the catchment area currently is
3. 
Question  
What will happen with the building if option D is taken forward? 
Panel Response
If there is a clear expression from the Community to take over the building then that is a route
which can be taken forward. The council have transferred a previous school building over to the
community. 
The council would be happy to hear from the community if there is an interest in the community
taking over the building and discussions can be opened up in anticipation of the closure. 
Question 
What is meant by community? 
Panel Response
Any group can come forward with proposals and the council will engage with them. 
Question 
An ask was made for the council to share information with the community on the community take
overs which have all been taken forward to provide as this would provide the community with ideas
on how to progress. 
Panel Response
Yes, this is something which we can do.

Page 96

Question 
Does the Council own the school building? 
Panel Response 
As far as we are aware the council do own the building, however ownership will be checked in
regard to any restriction on the title of the property. 
Question
If the community do not show an interest in the building will it go on the market? 
Panel Response 
Yes, if there are no proposals from the community the building would be put on the open market
for sale. 
Question 
Further query in regard to travel to Tarbert for young children and if this will be standard process if
this option is taken forward. 
Panel Response 
With the distances here there will always be the obligation on the council to transfer children to the
school.
We recognise that there is a clear concern specifically regarding young children taking public
transport to Tarbert and this will be looked at as part of the process. 
Question 
Consideration to use building as an outdoor/external learning area. 
Panel Response
Councillor McNeilly expressed that Argyll & Bute Council would be keen to progress this however,
it would require investment and funding which the council simply does not have.
A community group would have access to other funds which the council would not have. 
Question 
Were any children consulted in this process? 
Panel Response 
Yes, those children who attended Skipness and are now attending Tarbert were consulted and this
is recorded in the report previous to the proposal paper. 
Councillor McNeilly thanked everyone for coming along and for their contribution and advised that
should anyone have any further queries they can contact one of the officers here tonight and that
the consultation is open until 23 December. 
Two meeting attendees left email addresses for any updates and follow up communications. 
The meeting closed at 7pm.

Page 97

APPENDIX 5 - EDUCATION SCOTLAND REPORT 
Schools (Consultation) (Scotland) Act 2010 
Report by HM Inspectors of Education addressing educational
aspects of the proposal by Argyll and Bute Council to discontinue
education at Skipness Primary School and extend the current
catchment area of Tarbert Primary School to include the current
catchment of Skipness Primary School. 
January 2022

Page 98

1. Introduction 
1.1  This report from Education Scotland has been prepared by Her Majesty’s Inspectors of 
Education (HM Inspectors) in accordance with the terms of the Schools (Consultation) (Scotland)
Act 2010 (“the 2010 Act”). The purpose of the report is to provide an independent and impartial
consideration of Argyll and Bute Council’s proposal to discontinue education at Skipness Primary
School and extend the current catchment area of Tarbert Primary School to include the current
catchment of Skipness Primary School. Section 2 of the report sets out brief details of the
consultation process. Section 3 of the report sets out HM Inspectors’ consideration of the
educational aspects of the proposal, including significant views expressed by consultees. 
Section 4 summarises HM Inspectors’ overall view of the proposal. Upon receipt of this report, the
2010 Act requires the council to consider it and then prepare its final consultation report. The
council’s final consultation report should include this report and must contain an explanation of how,
in finalising the proposal, it has reviewed the initial proposal, including a summary of points raised
during the consultation process and the council’s response to them. The council has to publish its
final consultation report three weeks before it takes its final decision. Where a council is proposing
to close a school, it needs to follow all statutory obligations set out in the 2010 Act, including notifying
Ministers within six working days of making its final decision and explaining to consultees the
opportunity they have to make representations to Ministers and the special provisions that apply to
proposals to close a rural school.    
1.2  HM Inspectors considered: 
• the likely effects of the proposal for children of the school; children likely to become pupils
within two years of the date of publication of the proposal paper; and other children in the
council area; 
• any other likely effects of the proposal; 
• how the council intends to minimise or avoid any adverse effects that may arise from the
proposal; and 
• the educational benefits the council believes will result from implementation of the proposal,
and the council’s reasons for coming to these beliefs. 
1.3  In preparing this report, HM Inspectors undertook the following activities: 
• consideration of all relevant documentation provided by the council in relation to the
proposal, specifically the educational benefits statement and related consultation
documents, written and oral submissions from parents and others; and 
• a virtual visit to the site of Tarbert Primary School and Tarbert Academy, including
discussion with relevant consultees. 
1.4   As the proposal will lead to the closure of a rural school, HM Inspectors also took account of
the council’s consideration of any reasonable alternatives to closure of Skipness Primary School,
the likely effect on the local community and the likely effect of any different travelling arrangements
of the proposed closure. 
2. Consultation process 
2.1  Argyll and Bute Council undertook the consultation on its proposal with reference to the
Schools (Consultation) (Scotland) Act 2010.

Page 99

2.2  Argyll and Bute Council took the decision to mothball Skipness Primary School in 2016 when
the school roll dropped to zero. The school has remained mothballed since that time. A formal
consultation process to consider the closure of the school was commenced under the terms of the
2010 Act in March 2020. Due to public health concerns and to follow national guidance, the
consultation period was extended until December 2021. A public meeting was held in Skipness
Village Hall on 10 November 2021 where eight members of the public attended. The attendees were
overall in favour. Issues raised included the projected roll of the school, transport times for children
and the future use of the school building should Skipness Primary School close. The council
received three written responses which were supportive of the proposal. The council sought the
views of children currently attending Tarbert Primary School. In total, 69 children were involved; 70%
were in favour, 13% against and 17% were undecided.    
3. Educational aspects of proposal 
3.1  The council rightly points out the educational benefits with regard to a number of areas. These
include, for example, transitions from the co-located Early Learning Centre into the primary classes
at Tarbert Primary School. Joint planning for learning across the early level supports effective
progression for children. Similarly, staff and children feel the transition between Tarbert Primary
School and the secondary department in Tarbert Academy is easier for children moving within a
larger group. HM Inspectors agree that in Tarbert Primary School, children benefit from the
increased opportunities to build relationships with groups and individuals, develop social skills, meet
challenges and exercise responsibilities as members of a wider social group. They are able to
interact and socialise with different groups of children and take part in team activities. The children
are able to maintain links with friends who live in their own village as well as creating links with
children from other rural communities. Currently, due to current Covid restrictions, the clubs and
activities are more limited. As restrictions ease, children will have access to a wider range of clubs
and team activities including sports.    
3.2  A number of benefits are possible as part of a significantly bigger school community. The
larger staff group at Tarbert Primary School, provides opportunities for professional learning for staff
including the moderation of children’s work. The wider staff group are able to bring a range of talents
and skills which benefits learners. Children in Tarbert Primary School are able to develop
responsibility as members of class and the school councils. A buddy system encourages children
from different stages to work and learn together. Young people from the Academy work with younger
children as part of their sports leader roles. Children are able to perform and take on roles in the
regular shows and concerts held in Tarbert Primary School and Academy. 
3.3  Stakeholders who met with HM Inspectors agreed with the proposal. Whilst a few recognised
some strengths in the experience children historically gained through their education in Skipness
Primary School, stakeholders felt these were outweighed by the benefits children gained in Tarbert
Primary School. These included the wider opportunities for clubs and team sports, learning with
peers of a similar age and stage and greater social interaction allowing children to build friendships
across a wider network. 
3.4  As the proposal will lead to the closure of a rural school, HM Inspectors also took account of
the council’s consideration of the factors to which it should have special regard. The council has
identified clearly its reasons for formulating the proposal. They considered carefully if there were
any reasonable alternatives to closure of the school before it consulted on the proposal. To allow
due consideration of the proposal, the council lengthened the time for the consultation and pushed
back the date for implementation should the proposal go ahead. The level and nature of stakeholder

Page 100

response shows that, overall, the local community accept the council’s proposal. The village of
Skipness has its village hall for local use and members of the community have indicated their ideas
for the possible future use of the school building should the proposal go ahead. The likely effects of
travelling arrangements on the environment and on children will be minimal as currently only one
child lives in the existing Skipness catchment area. The travel time by car of 25 minutes is what has
been well-established since the mothballing of Skipness Primary School in 2016 and this proposal
will formalise this arrangement moving forward.    
4. Summary 
HM Inspectors’ agree that the proposal by Argyll and Bute Council will result in educational benefits
for the children in the Skipness Primary School catchment area. The proposal provides clarity for
parents and the community with regard to the future education provision in the area. There are clear
benefits to children both socially and educationally. Children will be working with a larger peer group,
closely aligned to their age and stage. There will be more opportunities for after school activities and
teamwork. Should the proposal go ahead, the wider opportunities in Tarbert Primary School, broader
range of activities and larger group of peers will continue to provide valuable experiences for the
children in the Skipness catchment area. The current and predicted number of children within the
catchment area is insufficient to make the school viable. The proposal will assist the council to
deliver ‘Best Value’ through making more efficient and effective use of its resources. In taking
forward the proposal the council should follow up on working with the Skipness community to explore
options for the future use of the mothballed school.        
HM Inspectors 
January 2022

Page 101

APPENDIX 6 - PUPIL FOCUS GROUP 
RESPONSES 
Date of
Visit
19/08/19
School for
proposed
closure
Skipness Primary School 
Staff
member(s)
Leading
Simone McAdam
Pupils 3 pupils – Tarbert Academy that had attended Skipness Primary 
Background
information for
pupils
 I am meeting with you today because the Council want to find out your
views, about Skipness Primary School being closed. This process of asking
for your views is called a consultation.
 This consultation is anonymous – which means your words and ideas may
be used in public reports that are written, but your name won’t be written
with your words and ideas. 
 We want to consult with you to find out what you think about the Council’s
proposal to close Skipness Primary School. The Council is proposing this
because 
- There aren’t any pupils from the area that would go to Skipness and
this number isn’t going up.
- It’s getting expensive to keep looking after a building that isn’t being
used.  
 It is important that we find out your thoughts and opinions because you are
the most current pupils that went to that school so your views are important
and this will help us make a decision for pupils that would be future pupils
at Skipness Primary School.
 Closing the school isn’t the only option for Skipness Primary School –
- It could re-open.
- It could continue to be ‘mothballed’ – which means it’s temporarily
closed like it is now.
- Close Skipness PS and change the catchment area for pupils to go to
another school nearby. 
Tell us a little bit
about going to
school at
Skipness PS.
 All the teachers were nice.
 There were only 3 pupils and we were all siblings.
 There was more ore one-to-one because there were less children.
 The education at Skipness was amazing. We would go out and learn about
things like the birds and bring things back to the classroom. 
 You learned more because it was at your speed and you had more help.
 It was more laid back but we learned a lot more.  
 The food was amazing!
 Since it was such a small school the resources were better.
What do you
think the positive
things would be if
Skipness PS
closed?
The students expressed an understanding that closure was being considered
because there were no children. They expressed a sadness that other children
wouldn’t experience the great school that they had gone to.

Page 102

 If there were kids there I feel they would miss out on the great learning
experience. But I understand there’s no point keeping a school open if there
isn’t anyone in the classrooms. 
Do you have any
concerns about
Skipness PS
closing?
 What would happen if other children moved to Skipness and the school was
closed?
What might other
people be
concerned about
if Skipness PS
closed? 
 What would happen to the things in the school?
 If there were kids I think the community would want it to stay open.
If Skipness PS
closed is there
anything that
would help make
this easier for
pupils from SPS
going to another
school?
 I found it easy to come to Tarbert, I enjoyed company of new friends
transition was ok.
 It was a little trickier for me because I was used to a tiny group and coming
to a bigger school and being in a class with lots more pupils can be slightly
scary.
 I like being on my own, but I have made friends.
 Working in groups can be challenging because sometimes learning goes
really quickly.
Do you have any
other comments
about this that
you want to add? 
 If you have more ideas please let your teacher know and she call tell me.
 If anything we have chatted about today has made you worried remember
you can talk to your class teacher or your parents.