Integration Joint Board   
Date of Meeting: 27 March 2024 
Title of Report: Budget 2024/25 and Consultation 
Presented by: James Gow, Head of Finance    
The Integration Joint Boards is requested to: 
• Note the HSCP is seeking approval for its budget for spend of £329m which relies
upon financial recovery, in-year savings and/or brokerage via NHS Highland
totalling £2.7m.
• Approve the budget and savings plan for 2024/25 outlined in this report.
• Note Equality Impact Assessments have been completed for relevant savings
proposals and that these are publicly available. 
• Note that the Social Work Budget is partly funded by non-recurring pension fund
savings to be held by Argyll & Bute Council for this purpose and for transformation.
• Note the HSCP expects to be operating on a financial recovery basis in 2024/25.
• Note there may be a requirement to develop and implement additional service
reduction plans urgently, these are likely to involve service cuts.
• Note that opening offers and directions are being finalised with partners and are
expected to align with the budget.
• Note the HSCP is proposing to utilise non-recurring funding to support services
and that future funding gaps are substantial. 
1. EXECUTIVE SUMMARY 
1.1 
1.2 
This report provides the Integration Joint Board with a proposed budget and
savings plan for the 2024/25 financial year for formal approval.  Earlier iterations
have been considered by the Finance and Policy Committee and IJB in January
and February 2024. This report has also been considered by the Finance & Policy
Committee on 22 March. 
The context is challenging as the Scottish Budget for 2024/25 changed the
landscape by indicating that there would be no general uplifts for NHS Boards.
The budget also reduced the availability of capital funding and resulted in the
cancellation / delay of previously approved projects. This has resulted in a
situation whereby the resources being made available to NHS boards are less
than expected and less than required to provide services in the way that they are
currently configured. This is due to increasing costs (inflation) and demand
pressures which are generally not within the control of Boards. The settlement for
local government and much of the rest of the public sector is likewise challenging
and significant savings, service reductions/cuts and transformation are required
in the coming years to return to a financially sustainable position.

Page 2

2 
1.3 
1.4 
The HSCP is operating in line with its financial plan for 2023/24.  However, the
planned use of reserves reduces flexibility going forward.  The situation across
the NHS in Scotland remains unsustainable with many Health Boards forecasting
deficits while the Scottish Government seek to restrict brokerage.  This results in
the allocation of funding to support deficits, reducing resources available for
formula allocations.  This disadvantages the HSCP.  Overall, the financial context
is deteriorating and further efficiency and cost reduction is required across the
system.  The approach within the NHS is to identify value and efficiency measures
(3% target) and begin work to develop change projects and service reductions
which require political support in order to achieve financial balance.  The
implications for governance, consultation and risk management associated with
this process are not clear at present. Further national guidance is required. It is
acknowledged that the changing environment locally and nationally will have an
impact upon staff and staff morale throughout health and social care services. 
This report seeks to provide an operating budget for 2024/25, the longer term
outlook was considered in January and has not changed substantially.  The
Scottish Government are expected to publish a revised 3 year spending review in
May 2024.  This will provide the basis for updating the medium term plan. 
2.  INTRODUCTION 
2.1 The purpose of this report is to seek approval for the budget and savings
proposals for 2024/25.  The financial context is difficult and work has been on-
going for a number of months to address the budget gap identified some months
ago.  The report includes the following sections: 
• Financial & Strategic Context
• Social Work Services Budget and Savings
• NHS Services Budget and Savings
• Summary HSCP Budget
• Transformation & Investment
• Reserves
• Scenarios and Risks 
3. 
3.1 
DETAIL OF REPORT 
Financial & Strategic Context 
• The Government remains committed to the National Care Service (NCS), the
timetable has been delayed and the scale of change is more limited than
originally anticipated.   
• The sector continues to experience workforce shortages, increasing demand,
high delayed discharges, long waiting times and unmet need.  The Health and
Social Care system continues to be under severe pressure. 
• The Health and Care (Scotland) Staffing Act is due to become law in April. 
Preparatory work is on-going, the implementation is likely to be costly and will
be phased.  There is no financial allowance for additional staff or
management and administrative support to enable its requirements to be met.

Page 3

3  
• Inflation has reduced but is still high with the Retail Prices Index at 4.9%.  The
funding uplifts are not sufficient to compensate, the cumulative effect of
2021/22 and 2022/23 inflation is 23.7% rising to circa 28.6% over 3 years. 
There are risks associated with inflation assumptions, particularly in respect
of public sector pay where national assumptions have been used.  The
Government have indicated that the number of public sector employees will
reduce and that the pay metrics for 2024/25 (public pay policy) will be
published later. 
• The Scottish Budget provides a £230m funding allocation for the minimum
pay rate for health and social care staff to increase from £10.90 to £12 per
hour from 1 April 2024. 
The Government continues to prioritise the sector with 33% of the budget
allocated to NHS Recovery, Health and Social Care (£19.5bn). The Budget
document is available at: 
https://www.gov.scot/publications/scottish-budget-2024-25/documents 
Management letters have been issued to the NHS and Local Government
following publication of the budget.  These highlight that: 
• the NHS uplift includes funding already allocated in 2023/24, Boards are
asked to assume future pay increases will be funded and that the increase
in NHS superannuation costs will be funded;
• There is zero uplift for non-pay costs and Boards are expected to manage
inflation within existing budgets; and
• There is an implication that capital funding has been transferred to revenue
and that some capital schemes are subject to delay or cancellation.   
Separately, Boards have been asked to manage within set brokerage limits.  It is
apparent that the budget allocation for the NHS does not align with current spend
patterns and does not represent a sustainable funding settlement.  This is a
concern for the IJB as brokerage totals are not included in formula allocations. 
NHS Highland is facing a reduced brokerage limit.  The budget available to the
HSCP will not increase in real terms in 2024/25 per the most recent spending
review and previous planning assumptions.  The next spending review is to be
published in May 2024.  
Further, the NRAC formula will not be reviewed to take account of the census
population data.  This disadvantages the HSCP as the level of population decline
(relative to Scotland) is less than modelled.  It is expected that this will be
addressed in 2025/26. 
3.2 Current Financial Position 
The HSCP ended 2022/23 in a favourable position.  Revenue spend on services
was £332m and £17m was held in earmarked reserves at year end.  The HSCP
has operated within budget for the past 3 years, has repaid all of its debt and
generated a general reserve which is now being used to maintain services and
mitigate the impact of the financial challenges.

Page 4

4
However, the HSCP was not able to identify sufficient savings to balance its
budget in 2023/24 and planned on using £4.1m of reserves.  The Scottish
Government did have to allocate additional funding as expected.  This is recurring
in 2024/25 and improved the underlying position which is a £1.8m gap.  An
equivalent value has been clawed back by NHS Highland so this does not reduce
the reliance on reserves.  It is anticipated that the HSCP will operate within plan
and will end 2023/24 year with reduced reserves balances but will still have some
resource to progress projects. 
The HSCP does not have delegated responsibility for asset ownership or capital
spend.  Backlog maintenance and asset replacement needs have been identified
and require to be addressed with both partners.  The 2024/25 Budget indicates a
shift towards maintenance rather than replacement of assets within the NHS. 
Several projects will be cancelled or postponed, including the HSCP project to
relocate the GP surgeries in Dunoon and refurbish part of the Cowal Community
Hospital.  Business case development is also subject to review.  This presents a
significant risk to the ability of the HSCP to deliver on its strategic objectives in
the longer term. 
3.3 Revenue Budget 2024/25 to 2026/27 
3.3.1  Services provided by the HSCP are largely funded by allocations made by the
Scottish Government to Local Authorities and NHS Boards.  They then pass on
funding for delegated services.  Allocations are predominantly based upon
formulae which take into account factors such as population demographics, levels
of deprivation and rurality.  Funding for 2024/25 is confirmed by the Council but
is still to be formally confirmed by NHS Highland.  Due to the different
arrangements associated with each service, the following sections outline the
budget for each separately. 
3.3.2  Social Work 
The budget allocates additional funding for: 
• an uplift in free personal and nursing care £292k
• additional funding for kinship care £207k; and
• funding for the uplift in minimum pay from £10.90 to £12 per hour at £4m. 
These pay for cost increases which will come though the national care home
contract rate increase, inflation on care packages across all services and the new
care at home service rates.  The HSCP will request all its commissioned service
providers comply with the £12 minimum pay rate. 
The proposed social work budget is summarised below.  The Council have
confirmed funding and the assumptions align with those of the Council: 
Social Work Funding £’000 £’000   
A&B Council Baseline Funding 23/24  76,253
NHS Funds Flow 23/24  14,970
Baseline   91,223

Page 5

5 
Additional Personal & Nursing Care  292 
2023/24 Pay Settlement 1,140 
Scottish Government recommended rates increases C&F 207 
Funding for minimum wage uplift 4,270 
Misc adjustments (17) 
Uplift on NHS Funds Flow 2%  283 
Additional Funding 2024/25  6,175   
Pension Fund Adjustment – held by Council for HSCP   (3,534)   
Total Funding 2024/25  93,864 
The £3.5m pension fund saving will be held by the Council and made available
for funding the Social Work budget gap and service development and
transformation.  While the funding allocation is reduced, there is also an
equivalent reduction in costs and no net impact in 2024/25, there is no recurring
benefit beyond 2025/26. 
Expenditure Budget  £’000
2023/24 Baseline Budget  91,223
Add underlying deficit   630
Cost & Demand Pressures   
Pay inflation for 24/25 - 3%   1,198
Incremental increases   172
NHS Staff Recharge Inflation  171
Non-Pay Inflation    1,791
Living Wage  3,169
Older Adults Demand – Residential Care   1,384
Older Adults Demand - Other  458
Older Adults – Personal & Nursing Care uplift - funded   206
Childrens and Families Kinship Care    207
Physical Disability – Demand Pressure   60
Mental Health Services Demand Pressure   97
Transfer of Kintyre Care at Home     60
Additional Staffing less income- KCC  150
Total Cost & Demand Pressures    9,123
Less pension fund cost reduction  (3,534)
Total funding requirement for current services  97,442 
The net impact is that the cost of delivering services as they are currently
configured and budgeted is £3.6m more than recurring funding.  The savings plan
partially addresses this gap: 
Social Work Savings Plan - 2024/25 Deliverable Savings 
Service  Description  £’000 
SW  Revert to National Minimum Pay Rate - uplift
for some contracts is from £11.02
110 
OA  Review of day service provision for older
adults and move to closure of the internal
160  EQIA 1

Page 6

6   
service. Total budget is £500k, some
allocation may be required to manage risk  
OA  Structured and monitored review of high cost
care packages
150 
SW   Increased income - fees and charges inflation
already approved
100   
OA Allocate uncommitted budgets to savings 550 
OA Review of miscellaneous unspent budgets 115 
LD/PD/MH 
Review of expensive care packages  150   EQIA 2
LD/PD/MH Sleepovers & service configuration 80  EQIA 3
LD/PD/MH 
Revise LD budget to reflect current demand 270   
C&F 
Revised budgets across looked after
children’s services to reflect demand 200 
SW 
Travel Budgets reduction to reflect spend
patterns 50 
SW   Transformation Budget - Allocate
uncommitted budget to savings
130   
SW Review all centrally managed budgets  200 
MH Removal of redundant post from budget  57 
OA  Review of long-term vacant posts:
Older Adults – Lorne Campbell Court &
Catering posts
50 
Total Saving Programme 2,372 
The proposed Social Work Budget and funding is therefore: 
£’000 £’000
Revenue Funding  93,864
Allocation of pension fund saving to 24/25 revenue budget    1,206
Total Resources  95,070
Spend 97,442 
Less savings plan (2,372) 
Budgeted Spend  95,070 
The above summarises a balanced budget for Social Work services.  It is reliant
on a non-recurring saving from the pension fund of £1.2m.  Key risks are in
respect of pay awards, settlement of national contracts, local management of
inflationary uplifts and delivery of the savings programme.  The new care at home
contract and increasing demand for older adult services and high cost support
packages for those with long term conditions are further risks which are allowed
for but are difficult to predict and model.  It is intended that there will be some
further efficiencies as a result of the new contract in the second half of the year.  
Pension Scheme 
The non-recurring pension saving is critical to the Social Work budget.  Local
Authority employed staff are auto-enrolled in the Strathclyde Pension Fund (SPF).
The employer pays 19.3% of pensionable salary and the cost is built into service
budgets.  The SPF is currently funded to a higher level than it anticipated and
announced reductions in employer contribution rates in response:

Page 7

7 
3.3.3 
2023/24  2024/25 2025/26 2026/27
SPF Employer Contribution Rate 19.3% 6.5% 6.5% 17.5%
HSCP estimated total saving @23/24 payroll rates - £3.8m £3.8m £0.5m     
Recurring  - £0.5m £0.5m £0.5m
Non-recurring - £3.3m £3.3m - 
The balance of the £3.5m pension fund saving (£2.3m) is to be held by the Council
for use by the HSCP for service development and transformation.  This also
provides some contingency as there is flexibility in the event that spend is higher
than budgeted during the year. 
Health Budget 
The approach to NHS budgeting has changed.  The Scottish Government have
revised the budget assumptions for Boards: 
• 0% uplift in baseline funding (likely for 3 years);
• pay increases will be fully funded;
• the superannuation increase will be fully funded;
• plan for the delivery of 3% annual efficiency savings; and
• assume 2024/25 funding will be same as 2023/24 unless told otherwise. 
There is a cost pressure associated with the employer superannuation rate
increasing from 20.9% to 22.5% of pay.  Advice from Government is to assume
that there will an allocation via UK consequential funding.  The implication of this
is circa £1.5m plus the impact on SLA costs. 
Part of the current Agenda for Change settlement is that the contracted weekly
hours for staff will reduce from 37.5 to 37.  This is to be applied from 1 April 2024
(with further reductions planned), where staffing hours are not reduced the half
hour will be paid at time and one half.  The 1.3% reduction in contract hours could
result in a 2% increase in employee costs with no funding confirmed, national
guidance is expected. The cost could be up to £1.5m as a mix of reduced staffing
resource and additional cash costs. 
The budget planning reflects these assumptions.  Growth and inflation increases
are kept to an absolute minimum as these add to the savings requirement. No
allowance for additional staffing for the Staffing Act has been made. 
The approach being taken is to: 
• develop a short term savings plan with deliverable targets for 2024/25
badged as Value and Efficiencies;
• review available reserves and re-consider earmarking to make a non-
recurring contribution to the funding shortfall;
• put in place financial recovery processes to manage down spend
opportunistically, largely focussing on vacancy controls and premium
staffing; and 
• identify plans or choices that, if implemented, would reduce the service
offer to achieve financial balance. These require political support and
would not normally be able to be implemented within one year.

Page 8

8  
The HSCP is liaising with NHS Highland. It is apparent that further national level
guidance is required on the consideration of further plans to bring health budgets
into balance. The development of such plans is at an early stage. The framework
being adopted by NHS Highland is summarised below and this helps outline how
the NHS more widely is considering how the implications of the real terms funding
cuts can be managed if more funding is not put into the system: 
The Scottish Government also remain committed to a series of policies which
place constraints on the ability of NHS Boards to respond to the budget challenge. 
These include the Staffing Act, a commitment to no redundancies (including
voluntary severance) and commitments to a range of service priorities and to
consultation and engagement on service re-design.  Given the proximity of the
start of the new financial year it is not clear how the budget situation can be
managed with this level of restriction on delivering change. 
The budget gap is substantial as a consequence of there being zero funding (over
2023/24 recurring funding) to cover cost pressures.  The baseline budget is
slightly reduced due to a reduction in the formula share of the NHS Highland
budget allocated to the IJB.  This is calculated nationally and has reduced from
28.60% to 28.48%, equivalent to a cash reduction of around £0.9m. 
£’000
Baseline Budget 2023/24 228,439
NHS Cost and Demand Pressures  £000
Pay Inflation Uplift – assume fully funded -
Pay Increments 100
Current year recurrent cost pressure - prescribing 1,500
New prescribing & Hospital Drugs Inflation – 8% 1,802
Inflation on GCC SLA – assume fully funded -
Inflation Commissioned Services & SLAs – assume funded -
Resource Transfer Inflation (2% PA) 283
Inflation on PFI Contract (RPI assumption) 263
Energy, Estates & Utilities Inflation (8%) 261
Care Packages and other commissioning inflation 2% 87

Page 9

9 
New High Cost Care Package 400
Vaccination funding shortfall 245
NSD – Regional Car-T 308
NSD Topslice – Foxgrove 28
NSD Cost Pressures share 200
LIH Pharmacy 30
Other current cost pressures 150
MS 365 Licenses 85
Gastro Service Development 250
Depreciation  213
Misc funding adjustments 210
Total Health Cost and Demand Pressures 6,415
Add 23/24 Recurring Deficit 1,084
Savings Shortfall 1,054
Estimated Budget Gap 8,553 
The savings plan is summarised below.  It is reliant on the use of reserves and
the Scottish Government allowing unspent funds to be re-purposed.  It also results
in an increasing underlying deficit in the coming years. 
NHS Savings Plan 
Unachieved Savings Brought Forward – Previously Approved £'000
Bed Reductions Dunoon – currently in place on a non-recurring
basis (no additional reduction) 150 
SAS Contract Reduction linked to Bute Dialysis Unit 20 
New Contract for Cowal Hospital Medical Services 120 
New Contract for Cowal / other FME Services 70 
Hotel Services Redesign to reflect reduced bed numbers 99 
Catering & Domestic Savings 30 
Admin & Clerical Modernisation 127 
Centralised Booking 97
Centralised lab ordering 33
Building Rationalisation 71
LIH Housekeeping savings 103
Review of Contracts – Lead Nurse 15 
Estates Staffing Structure 119 
Savings Brought Forward Total 1,054
2024/25 Savings – Value & Efficiency  
Review of Primary Care Drugs – Drugs of limited value, switches
and impact of national financial improvement work 150 
Review of Secondary Care Drugs – specific, high cost drugs
moved off patent  300
Removal of unallocated budget reserves 450
Additional patient income 50
Review of out of area care packages 150 
Remove small value uncommitted budgets 20 
Review of energy budgets 50
Allocate waiting times funding to LIH Service  310
Specific reductions in Premium Staffing (cost avoidance) 
Nursing (10%) 240

Page 10

10   
AHP (10%) 91   
Medical (10%) 478
Value & Efficiencies Total 2,289
Non-Recurring Use of General Reserves  
Allocate Cowal Community Hospital Project Reserve 1,000 
Repurposing of Specific Reserves – requires approval:     
Additional Health Care Support Workers 2020/21 & 21/22 250   
Interface Care  (no plans in place to spend) 133   
Mental Health Recovery Facilities (no plan in place) 110   
Dental – premises refurbishment (plans at design stage) 240   
General Reserves Balance / 2023/24 Underspend 550   
End Hospital @ Home as quickly as possible 210
Non Recurring Use of Reserves 2,493   
Savings Plan  5,836 
Remaining Budget Gap 2,717 
There is an expectation that the HSCP will participate in expenditure controls
being implemented by NHS Highland as part of a financial recovery process.  This
will be opportunistic in nature and will include a risk assessment process:  
It must be expected that these controls will impact on operational decision making
processes within the HSCP in lieu of being able to provide assurance that it can
operate within the resources being made available via NHS Highland. 
Proposals to re-purpose reserves will require support from the Government and
it is recognised that there is an opportunity cost associated with this approach.
Using reserves to mitigate, to some extent, the requirement to make further
revenue savings (or increase further the budget gap) will come at the expense of
using this funding to progress preventative approaches and innovation /
transformation. The budget proposal seeks to present an appropriate balance
between developmental approaches and protecting existing services in the short
term. This also helps provide more time to consider how the challenge can be
managed in the medium term. The funding earmarked for the Prevention
Programme has been maintained at £600k to enable this Transformation Project
to progress. 
The governance in respect of the development of service re-design and reduction
proposals is currently unclear. There are risks associated with any assumption
that service change can be designed and implemented quickly including:
Restrictions on Premium Staffing
- Agency staffing
- Overtime & Additional Part Time
Hours
- Locum Medical Staffing
Total spend on Premium Staffing
is currently in excess of £12m
per annum and 
Vacancy Control Restrictions already in place for
some staff groups / grades
Non-pay spend controls Increased review and scrutiny of
new orders and contracts

Page 11

11 
• requirement for joint governance and risk assessments to avoid the potential
for challenge;
• requirement for consultation with stakeholders and staff and adherence to
national standards in this regard;
• unintended consequences of change due to insufficient time consultation
and planning;
• reputational damage if changes are not implemented carefully;
• patient safety risks if alternative pathways are not formally put in place and
agreed with NHS Highland/Greater Glasgow and Clyde;
• risk of breaching the new staffing legislation; 
• inability to deliver savings due to restrictions on change management
processes; 
• management capacity to plan and deliver savings safely; and
• likely adverse impact on staff morale, industrial relations and recruitment
processes.  
The HSCP will continue to work with NHS Highland and Scottish Government on
the development of financial plans and the approach to managing the remaining
budget gap. 
In summary, there is a £2.7m gap between the costs of services and available
budget, equivalent to 1.1%.  Greater clarity and direction from NHS Highland and
Scottish Government is required to enable the IJB to plan service delivery and
change.  The expectation is that this will be addressed through: 
- in year expenditure controls
- a share of brokerage from NHS Highland
- additional funding; and/or
- urgent service re-design and reductions. 
The IJB are asked to approve the budget on the basis that additional actions
are required to address the shortfall to enable the HSCP to operate within a
reasonable financial framework from 1 April 2024. Members should
consider this in the national context that is placing most NHS Boards in a
similar position at this time. 
HSCP Proposed Budget  Social
Work £m
NHS
£m*
HSCP
£m
2023/24 Baseline  91.2 228.4 319.6
Cost and demand pressures &
Underlying deficit 
6.3 8.6 14.9
Revenue Savings  (2.4) (3.3) (5.7)     
Expenditure Budget  95.1 233.7 328.8
Resourcing  93.9 228.5 322.4
Allocation of Pension Fund Saving   1.2 - 1.2
Allocation of HSCP Reserves  - 2.5 2.5
Brokerage / financial recovery
savings 
- 2.7 2.7
Anticipated Resources  95.1 233.7 328.8
*the NHS budget will increase as uplifts and pay awards are confirmed

Page 12

12 
The budget allocates £3.7m of non-recurring reserves to protect services and
when added to the £2.7m remaining gap, the underlying deficit is £6.4m, this is
not sustainable and requires to be addressed in addition to any future budget gap. 
3.4 Transformation and Investment 
The HSCP has the opportunity to continue to fund transformation through the
non-recurring element of the pension fund saving held by the Council.  When
combined with remaining reserves there is some scope for investing in service
change.  The Transformation Programme is currently under review and this will
take into account the drivers for change: 
• demographic change;
• current and future staffing availability;
• technological change; and
• financial constraints. 
Infrastructure investment is required as a consequence of many years of
underinvestment.  The shift toward maintenance rather than replacement may
enable refurbishment of existing assets which are assessed as not being fit for
purpose, assuming funds are allocated on a need rather than formula basis.  The
challenge relates to both physical and digital infrastructure which in turn impacts
on the ability of the HSCP to effectively transform the way in which it operates.
The reduction in capital resource for the next 2-5 years is a risk for the HSCP and
requires review of the approach to long term investment planning. 
3.5 Reserves 
The plan assumes reserves will be allocated to help manage the short term
financial pressure and protect services.  This limits the resources available for
investment in projects. Using reserves in this way enables services to continue to
be delivered in the short term but masks an increasing budget gap in future years. 
The table below provides an indicative summary of the use of reserves. 
2023/24
£m
2024/25
£m
2025/26
£m
Opening
Balance
16.9 9.4 2.9
Reserves -
Deficit
(4) (2.5) (1.9)
Reserves –
Projects & Other
(3.5) (4) (1)
Closing Balance 9.4 2.9 0 
3.6  Scenarios and Risk  
Identified risks are summarised below, using the standard assessment of
probability and impact: 
Risk Like. Impact  Mitigations
HSCP unable to identify
and deliver sufficient
5 5 25 Development of and
consultation on value for

Page 13

13 
savings in 2024/25 to
balance the budget.
money strategy.
Implementation of additional
expenditure control
measures. Potential
requirement for NHS
Brokerage and liaison with
partners.
Demographic or
population changes
reduce the formula funding
to the HSCP.
3 4 12 The Census data indicates
that the formula is already
disadvantaging A&B based
on population numbers, this
should be reviewed for the
2025/26 budget cycle. 
One or both of the partners
do not pass on anticipated
funding allocated to Health
and Social Care.
5 4 20 On-going partnership
working and consultation.
Increased risk reflects scale
of challenge NHS Highland
and Scottish Government
are facing. 
Cost and Demand
pressures increase further
or are not funded to the
extent assumed in the
model.
4 4 16 Engagement in sector
networks, modelling based
on Spending Review figures
and draft Budget. 
Increases in pay rates or
employer on-costs are in
excess of those allowed
for in the budget. The
Agenda for Change pay
increase results in
additional costs which are
not funded.
5 4 20 Monitor progress with pay
negotiations, commitment to
fund within NHS. Nationally
agreed assumptions used.
These may not be realistic or
SG may not have sufficient
funds to resource 2024/25
agreements still to be
negotiated.
Implementation of NCS
diverts attention from
operational priorities and
financial management.
3 3 9 Seek to resource NCS
project appropriately,
however implementation is
subject to delay and scale of
anticipated change is
reduced. 
Service costs increase due
to providers withdrawing
from the market and / or
ongoing workforce
shortage.
4 4 16 Commissioning strategy and
engagement with partners
and care providers.
Workforce planning and
management of agency /
locum contracts and
additional funding to improve
terms and conditions. 
Funding reduced due to
reserves held by HSCP
and/or across sector.
4 5 20 Opportunity reduced as
sector reserves are
reducing. Progress key
projects as quickly as
possible.

Page 14

14 
System wide challenges
result in decisions to
control recruitment and
spend being made outwith
the control of the HSCP. 
3 5 15 Ensure that implications of
such decisions are
communicated and
understood. Ensure spend
plans align with Strategic
Plan. 
HSCP pressed to
implement service re-
design change at short
notice which has a
detrimental impact on
delivery of strategic plan
and operational service
delivery
4 5 20 Ensure that partners are
aware of scale of financial
challenge. 
There are service and financial risks related to both partners.  NHS Highland have
a structural deficit to address which has been exacerbated by the zero uplift
planning assumption.  Argyll & Bute Council are also implementing savings, again
due to funding allocations growing at a slower pace than costs.  This presents risk
to HSCP financial plans and to the level of service the HSCP and communities
receive from partners.  There is also an expectation that real terms cuts for other
services and investment including housing and education may have an impact on
local communities. 
Longer Term Planning 
The budget outlook presented in January is summarised below, these figures
remain relevant and will be updated when the Scottish Government publishes its
new spending review document in May 2024. 
2024-25
£m
2025-26
£m
2026-27
£m
Mid-Range Budget Gap   11.4 18.2 25.8         
Health Worst Case Additional   3.0 6.0 9.0
Social Work Worst Case Additional  2.0 4.4 7.0
Worst Case Budget Gap   16.4 28.6 41.8 
3.6.1 Workforce 
Workforce risks are considered in detail in the Workforce Plan.  Labour shortages
are likely to constrain the ability of the HSCP to deliver services and improvement.
The financial plan no longer assumes a net growth in workforce numbers, the
Scottish Government is clear that the size of the workforce needs to reduce and
it is not going to be possible to deliver balanced budgets and efficiency
improvement without an impact on staffing structures.  The shift from growth in
recent years to retraction has been swift.  However it is hoped that the HSCP will
be able to reduce the vacancies it has within existing structures and significantly
reduce its reliance on agency and locum staff to implement more cost effective,
stable, safe and sustainable staffing. The change in the financial environment
nationally and local service reductions will clearly be unsettling for staff and
damaging for staff morale. The HSCP is mindful of this and will seek to be
transparent and will involve staff in service re-design processes.

Page 15

15 
3.7 
4. 
Alignment with Strategic Planning 
The medium term financial plan sits alongside a range of HSCP strategic and
operational planning documents.  These include the Joint Strategic Plan and
Commissioning Strategy.  The Transformation programme and the budget to
support it are important in facilitating some of the objectives set out in these
documents, particularly in respect of service redesign and beginning the process
of shifting of resources towards prevention.  However, the financial context has
deteriorated to such an extent that there may have to be some re-consideration
of what is deliverable within the resource envelope available.  The reduction in
capital funding presents a further challenge to long term service re-design and
transformation processes. 
RELEVANT DATA AND INDICATORS 
4.1 The budget is based on a number of assumptions.  These are drawn from the
Scottish Government’s Budget, local modelling and guidance provided by policy
teams.  The assumptions used are considered carefully and will be reviewed and
updated.  There will be variations between the assumptions made at this stage of
the budget planning process and the eventual funding allocations and cost and
demand pressures. 
5. CONTRIBUTION TO STRATEGIC PRIORITIES 
5.1 The Integration Joint Board has a responsibility to set a budget which is aligned
to the delivery of the Strategic Plan and to ensure the financial decisions are in
line with priorities and promote quality service delivery.  This requires to be
considered when options are developed to balance the budget and address the
budget gap. 
6. GOVERNANCE IMPLICATIONS 
6.1 Financial Impact – The HSCP is required to set a balanced budget, the budget
presented relies upon in-year savings and service reduction and/or NHS
brokerage.  NHS Highland are aware of this. 
6.2 Staff Governance – None directly but there is a strong link between HR
management and delivering financial balance. 
6.3 Clinical Governance – the impact of the budget and financial context is likely to
include increased clinical governance risk. 
7. 
7.1 
PROFESSIONAL ADVISORY 
The budget proposals have been developed by the leadership team as whole
including professional leads.  Concerns have been raised and discussed
throughout the process.

Page 16

16
8. EQUALITY AND DIVERSITY IMPLICATIONS 
8.1 None directly from this report, some of the proposals to address the estimated
budget gap require equality impact assessments which are attached as annexes
(currently under development and review). 
9. 
9.1 
10.
GENERAL DATA PROTECTION PRINCIPLES COMPLIANCE 
None. 
RISK ASSESSMENT 
10.1 There are a variety of risks associated with the budget and medium term financial
planning.  To some extent these are quantified within the worst case scenario and
further detail is provided within the report.  Financial sustainability risks are
increasing as a consequence of the budget outlook for 2024/25 and beyond.
Management of finance by the HSCP and partners is expected to be an
increasing priority in the coming period. 
The consequential impact on service delivery, industrial relations and
infrastructure are amongst other strategic risks that are perceived to be increasing
at present.   
11. PUBLIC AND USER INVOLVEMENT AND ENGAGEMENT 
11.1 The HSCP conducted an improved on-line way of engaging with the public on its
budget in early 2024.  This generated an increased response with over 260
responses received.  A summary of the responses is provided in Appendix 1. 
12. CONCLUSIONS 
This document seeks approval for the 2024/25 HSCP budget.  The budget is
reliant upon in-year savings which have not yet been identified and / or places
some reliance on NHS brokerage. The longer term outlook and financial
sustainability of services requires action on service transformation.  The HSCP
not currently operating on a financially sustainable basis and cannot continue to
utilise reserves to achieve balance. 
This report also outlines a process whereby national financial pressures may drive
an urgent need for service reductions and change.  There are concerns about
governance, consultation processes and service safety in the event that the
HSCP is required to deliver significant short term change to balance its budget. 
There are also the normal risks in respect of pay settlements. 
The budget proposed in this report seeks to present a realistic budget which
includes a challenging but reasonable savings plan whilst recognising that the
HSCP will likely be required to operate on a financial recovery basis. The HSCP
management team will seek to continue to work on future service delivery models
and transformation on the basis that, as a minimum, the recurring funding gap will
need to be addressed.

Page 17

17 
13. DIRECTIONS 
Directions
required to
Council, NHS
Board or
both.
Directions to: tick
No Directions required 
Argyll & Bute Council ✓
NHS Highland Health Board ✓
Argyll & Bute Council and NHS Highland Health Board 
The formal directions associated with this paper will be prepared once the funding
position is fully agreed with both partners. 
AUTHOR NAME: James Gow, Head of Finance james.gow@argyll-bute.gov.uk 
Appendix 1 – Budget Consultation / Simulator
Appendix 2 – EQIA reports (1-3)