1 
Integration Joint Board   
Date of Meeting: 25 September 2024 
Title of Report: Budget Outlook and Budget 2025/26 Update 
Presented by: James Gow, Head of Finance 
The Integration Joint Board is recommended to:
• Note that budget planning for 2025/26 is on-going and national budgeting
intentions are not yet available;
• Note the HSCP is not currently operating on a financially sustainable basis.
• Note the estimated budget gap and provisional savings target of £11.5m for
2025/26.
• Note the on-going work and next steps in the budget preparation process. 
1. EXECUTIVE SUMMARY 
1.1 This report provides the IJB with an estimate of the budget gap for 2025/26 and
a summary of progress made in developing plans to achieve a balanced
budget. The report summarises the current national context and notes that the
assumed position has been developed without the assistance of firm planning
assumptions from the Scottish Government. It is clear that public finances are
under severe pressure and the Health and Social Care sector as a whole is not
operating on a sustainable basis. 
1.2  The budget gap for 2025/26 is estimated at £11.5m, assuming the HSCP has
access to £2.8m of non-recurring pension fund savings. It is anticipated that
some of this gap will be addressed through increased funding. The cost and
demand pressures are significant and take account of Social Care cost
pressures experienced in the current year. It is anticipated that the HSCP will
not be able to develop savings plans which address this gap without impacting
on access, availability or quality of services. The savings proposals will be
progressed on the basis that it will seek to minimise adverse impacts on the
most vulnerable. The estimated budget gap will be refined as improved
planning information becomes available. 
2.  Recommendations 
• Note that budget planning for 2025/26 is on-going and national
budgeting intentions are not yet available;
• Note the HSCP is not currently operating on a financially sustainable
basis.
• Note the estimated budget gap and savings target of £11.5m for
2025/26.

Page 2

2 
• Note the on-going work and next steps in the budget preparation
process. 
3. DETAIL OF REPORT 
3.1  Budget Context 
3.2
The HSCP is not operating on a sustainable basis at present, this situation that
is common across the sector with many IJBs reliant upon the use of reserves
to achieve financial balance. As a consequence of the scale of the issue, the
budget planning cycle for 2025/26 has commenced early. 
There is a lack of firm planning assumptions, however it is clear that public
finances are under severe pressure in the coming years. At the time of writing: 
• The Scottish Government have not published an updated Spending
Review, initially scheduled for summer 2024;
• The UK Government budget is scheduled for 30 October 2024;
• The Scottish Government are expected to publish a draft budget for
2025/26 in November / December 2024;
• Pay offers for 2024/25 have been made but not fully accepted nor the
funding confirmed, current offers exceed budget; 
• The Scottish Government have again made in-year reductions to a
number of budgets, including Health and Social Care; and
• Audit Scotland have reported that funding allocated to IJB’s has been
reduced in real terms, contrary to previous planning assumptions. 
The HSCP is therefore estimating its likely resourcing gap for 2025/26 in this
context. Circumstances will change as national budgeting processes progress
and pay awards are finalised. Along with the Programme for Government and
budget update from the Scottish Government, recent reports published by the
Fiscal Commission and Audit Scotland further highlight the wider public funding
challenge. Audit Scotland have also stressed the requirement for IJB’s to
conduct robust financial planning for future years. 
Assumptions 
• Current and future pay and SLA uplifts in the NHS will be fully funded;
• NHS re-grading costs (particularly nursing) will be fully funded;
• Increases to the national minimum pay rate for social care staff will be
fully funded;
• The excess (above 3%) for the 2024/25 local authority pay award will
be funded; 
• The non-recurring pension fund saving from the Strathclyde Pension
Fund will be available to the HSCP in 2025/26; and
• The HSCP will no longer hold material levels of reserves it can use to
contribute to the budget gap. 
It is therefore assumed that other cost pressures, driven by inflation and
demand for service remaining high or increasing will require to be funded from
within existing budgets.

Page 3

3 
3.3 
NHS Formula Funding (NRAC) 
Analytical work was undertaken recently to understand how the NHS
resourcing model (NRAC) operated and influenced HSCP resourcing. The
model is population based and takes into account a range of factors including
rurality, demographics and the health of the population. Funding for the HSCP
was reduced due to an estimated decline in the population. The recent Census
data indicated this population reduction was overestimated. The NRAC funding
shares for 2025/26 were recently published and the national share for the
HSCP has increased from 1.87% to 1.91% (a 2.1% increase). There are further
detailed calculations required to convert this into cash allocations as the HSCP
receives a share of NHS Highland funding and there are adjustments to smooth
changes across Boards. A reasonable assumption is a £1.5m improvement.
This should be recurring and reverses the reductions in recent years, arguably
based on incorrect assumptions about the population. 
Estimated Budget Gap – 2025/26 
The first element of the gap is the underlying budget deficit. This is funded in
2024/25 through the use of non-recurring resourcing and reserves. 
Social Care Gap             £1.3m 
NHS Gap                         £4.3m 
Opening Underlying Gap            £5.6m 
The HSCP methodology for the medium-term plan is to look ahead 3 years and
create a best case, mid-range and worst case analysis of cost and demand
pressures. These seek to align with planning assumptions used by both
partners. The mid-range cost and demand pressures are summarised below,
appendix 1 provides detail. These make an allowance for recurring elements
of overspending this year. No allowance is made for further increases to
staffing (for example relating to the Health and Care Staffing Act). 
Social Care Net Cost & Demand Pressures  £4.5m 
NHS Cost & Demand Pressures    £5.7m 
Total New Pressures     £10.2m 
Financial Planning Estimate
2025/26
NHS £m Social Care
£m
IJB Total
£m    
2024/25 Underlying Gap 4.3 1.3 5.6
Estimated Cost & Demand
Pressures
5.7 4.5 10.2
Total Gap 10.0 5.8 15.8    
Funding Contributions   
NRAC Improvement (estimate) (1.5) - (1.5)
Reliance on Pension Saving
(non-recurring)
- (2.8) (2.8)
Savings Target  8.5 3.0 11.5 
The savings target is therefore £11.5m, equivalent to just over 3% of spend.
If there was to be some general uplift in funding for non-pay inflation and

Page 4

4 
3.4 
3.4.1 
cost and demand pressures then the situation would improve. It should also
be understood that the reliance on the pension fund saving presents an
additional recurring problem in 2026/27 and beyond. 
It is difficult to assess that the HSCP can realistically achieve savings at this
level next year. Savings of this magnitude cannot be achieved without
impact on provision. The priority is to minimise the impact, but it is clear that
there would be adverse impacts on the availability of services, access and
waiting times. Thresholds for receiving care will also require to be reviewed.
This is a common situation across the system at present. Some of the
challenges in planning for this scale of saving include: 
• Budgets where savings cannot be realised - Service Level Agreements
including the one with Glasgow, much of the Primary Care budget,
Justice services and the Mid-Argyll PFI contract to highlight the main
examples.
• Inability to reduce small scale provision in remote communities;
• Staffing and accommodation challenges to achieve reductions in
agency staffing; and
• Organisational change constraints which make it difficult to implement
change where it has an impact on employees or communities. 
The main issues to be addressed in the planning and budgeting cycle for
2025/26 include: 
• Expected budget shortfall.
• Increasing / continued high levels of demand.
• Reducing or constrained workforce.
• Appetite for service reduction. 
Transformation & Strategic Planning 
The Transformation Programme is in the process of being refreshed with
a renewed focus on projects designed to align with addressing the
challenges. These are likely to be a mix of short-term savings and longer
term change programmes. Investment is required to make change happen,
it is unlikely to be deliverable within existing resource. The use of reserves
to support revenue spend is making it increasing difficult to commit to
investment in transformation. There is a severe shortage of the capital
resource required to enable digital transformation as one example. 
The HSCP will be renewing its Joint Strategic Plan during 2025. As
highlighted in a recent Internal Audit report, it is important that the Strategic
Plan aligns to the financial plan and medium term outlook for public funding
as well as the demographic challenge and increasing health needs. 
Development of Savings Proposals 
The HSCP is continuing to work through the agreed process for the
development of 2025/26 budget proposals. The scale of the challenge
outlined above has been understood for some time and it was intended
that the process would commence earlier than normal to allow for better

Page 5

5 
3.4.2 
3.4.3 
consultation on proposals with communities, staff and the IJB. It is
important that the savings programme is well understood and deliverable. 
Public Consultation 
A public consultation on the budget was conducted in February 2024 using
an interactive tool. The outcome of this was reported to the IJB in March.
Whilst there were some specific issues raised, the overall tone of the
responses indicated disappointment at the need to make reductions. To
the extent that savings are necessary, the consensus indicated they should
be evenly spread across services. A desire for management costs to be
reduced was communicated by the public. The HSCP is currently
considering whether to re-run the exercise as there is both an opportunity
cost and real cost of extending the license for the software. 
Staff Consultation 
Engagement has taken place with staff asked to make suggestions for
savings opportunities. 18 members of staff took the time to respond, some
of which overlapped and some respondents made multiple suggestions.
Appendix 2 provides a listing of these. All are being considered by relevant
service managers and leadership team. Many of these will contribute to the
process of identifying savings proposals by individual services. It is of note
that several members of staff indicated a frustration at the on-going cost of
locum and agency staffing and suggestions that staff retention and
development should be prioritised. 
3.4.4 
3.4.5 
Service Planning 
Work is underway to develop savings options, the process is proving to be
challenging as most of the plans being worked on have an impact on
service delivery. Service management are also in the process of reviewing
budgets and spend in detail to seek to identify ‘housekeeping’ savings
which will contribute to the final savings programme. This process has
been on-going for many years now, however, there are new opportunities
as spend patterns, trends and managers change over time. These savings
would not normally require stakeholder consultation but can make a
valuable financial and cultural contribution.  Examples include: 
• Public Health commissioning
• Removal of vacant posts
• Rationalisation of telecom lines
• Increased charging for services
• Restrict inflation / flat cash offer on contracts 
The more strategic priorities under consideration are summarised for each
of the main services below. These provide an early indication of the types
of changes that will suggested by management to deliver cost savings. 
Children’s & Families – Maternity Services Review 
A full review of maternity services is currently underway. It is intended that
the process will pilot a model for reviewing all of the services that sit within

Page 6

6 
3.4.6 
Children, Families and Justice. The process includes staff engagement
from the outset and will take into account: 
• Configuration of services within Argyll & Bute;
• Demographics, birth rates and complexity of need; and
• Best practice and national service developments. 
The scope of the directly delivered service budget under review is £2.7m
with approximately an additional £3m included within the SLA with Greater
Glasgow and Clyde for births which take place within their maternity units. 
The review is anticipated to complete in February 2025, organisational
change processes will follow, if the review recommends changes to service
provision. The outcome will be reported in detail through existing
governance structures. 
Adult Services – Care @ Home Services 
The care at home service is currently undergoing change as the new
contract is introduced in October 2024. Challenges include: 
• Continuing high demand and unmet need;
• Increasing use of agency staff within social care over several years;
• Lack of housing options for workers (Islands & Oban); and
• Pressure to minimise hospital delays. 
The care at home service impacts on a wide range of other services such
as those offered by community nurses, AHP teams and demand for
residential care. The total budget sits at £20m. Specific consideration is
being given to: 
• The linkages between telecare, mobile teams and the responder
contract due for renewal in early 2025, it is likely that the scope and/or
coverage of some of these arrangements will be curtailed to reduce
overlaps and cost;
• How the service can achieve a reduction in the use of agency staff and
operate with sustainable staffing models;
• Access and equity for Self-Directed Support payments; and
• Reviewing of assessment thresholds and governance for care
packages. 
Some allowance has been made in the cost pressures for the impact of
demographic change. Longer-term planning for the financial and staffing
implications of the increasing number of older adults is not adequately
resolved nationally or locally. In order to reduce costs it will be necessary
to change the way care needs are assessed and the level of care that can
be provided within the available budget. A principled and values based
approach is being taken which will seek to deliver on the priorities (as
outlined in the strategic plan) in a fair, safe and equitable way. 
A strategic development process is underway in respect of HSCP operated
care homes, this piece of work is complex and will take some time to

Page 7

7 
3.4.7 
3.4.8 
3.4.9 
complete, it is not expected that financial savings will be derived from this
budget in 2025/26 other than through inflation increases on charges. 
Adult Services – Time to Care 
The Time to Care project is in its early stages and is externally facilitated
by Meridian. It is being funded by NHS Highland and led by them across
the NHS Highland area. It is intended to review how staff time is used
within community teams with the objective of increasing the amount of time
staff have available to spend with patients and clients. The process will
also focus on the training and development of systems and people at team
leader and management levels. Staff engagement and communications
are an important part of the project. 
Initial review of the data and working patterns suggest significant gains in
efficiency are available. From a financial perspective this does not
necessarily mean it will be easy to realise savings. The main part of the
project is scheduled to complete in November 2024 and it should then be
possible to quantify the potential financial saving that can be attributed to
the project. Organisational change processes are likely to be a barrier to
delivering savings. The project could help to deliver some early savings on
the use of agency staffing. 
Acute & Complex Care – Rural General Hospital 
A full review of the services offered within LIH is in its early stages. It is
intended that the HSCP will work with NHS Highland to look for
opportunities to better co-ordinate activity in Oban and Fort William in
particular. It is anticipated that there may be some options to reduce
duplication across the sites and create more joined up and sustainable
staffing structures. There are some expensive out of hours arrangements
in place and there appears to be excess theatre capacity and an approach
to making better use of this would also be feature in this transformation
work with potential for income generation or reduction in activity within SLA
contracts. 
Service Transformation 
The Transformation Programme has been recently reviewed and the new
structure in place around this piece of work is still under development.
Important themes for strategic transformation in addition to the projects
summarised above include: 
• Digital Transformation;
• Care Homes and Housing;
• Community Hospitals;
• Strategic Workforce Development and Accommodation; 
• Review of Management Structures; and
• Fleet Management. 
The Transformation programme overlaps with the main savings projects
but it is recognised that the demographic, finance and staffing challenges
are set continue for many years and longer term transformation is therefore

Page 8

8 
3.5
needed in addition to shorter term savings projects. This work will also
seek to look at areas where there have been long term challenges with
recruitment and staffing. It is anticipated that there will be circumstances
where the HSCP must consider if it can continue to provide the current
range of services in all the locations that it does at present as on-going
reliance on temporary staffing presents clinical risk as well as being costly. 
Next Steps 
The development of the budget is an on-going process and further work is
required. This will include progressing the projects described above as well
as seeking to identify other opportunities for savings through, for example
vacancy and expenditure control processes being implemented at present: 
• Chief Officer approval of all locum and agency contracts and
extensions;
• Further scrutiny of vacant posts;
• Changes to PECOS approval processes to stop unnecessary
spend;
• Tightening of care package approval processes; and
• Review of grant and commissioning commitments and renewals. 
The process is challenging, particularly in the operational context facing
the management team. On-going communication and consultation are
critical as is engagement with partners as they will be required to provide
support for the change required. 
In particular, support with the HR aspects of change is a potential gap
within the management structure at present, it is important that this aligns
with the strategic approach. It is accepted that some techniques that
organisations normally apply to reducing costs are not available in the
context of HSCPs as a result of policy commitments and/or partner
approaches to HR management. Engagement with staff and the IJB and
Finance and Policy Committee will continue throughout the process: 
September –
December 2024
-Firm up savings plans and agree target savings
-Develop engagement plans for staff and communities
where appropriate 
November –
December 2024
Review Scottish Government Draft Budget and planning
assumptions to refine estimated budget gap
January –
February 2025
Conduct engagement and detailed planning in respect
of proposals
March 2025 Approval of Budget and savings by IJB 
3.6  Medium Term Planning 
It is difficult to develop accurate longer term financial plans at present. The
HSCP is reliant upon public funding and is also impacted by nationally
negotiated pay settlements. The absence of medium-term Government
planning documents and public pay policy make it very challenging to develop
meaningful IJB level plans. However, the HSCP does continue to update its 3

Page 9

9 
4
4.1 
5
5.1   
year financial plan, which highlights estimated cost and demand pressures
going forward. This provides an increasing budget gap on the assumption that
only some inflationary elements will receive funding. A recent report published
by Audit Scotland recommends that HSCP’s plan for future cost and demand
pressure in a realistic way. The modelling is summarised below and will
continue to be updated as improved planning assumptions become available.
It is also intended that refresh of the Joint Strategic Plan will be better
integrated with financial planning assumptions and this process will help model
demand trends with more accuracy. 
NHS
Social
Care Total  
£m £m £m
2025/26 Estimated Gap /  Savings
Target 8.5 3.0 11.5        
2026/27      
Remove non-recurring funding 0.0 2.8 2.8
New Cost & Demand Pressures 5.0 3.6 8.6
Potential 26/27 Budget Gap 5.0 6.4 11.4        
2027/28      
New Cost & Demand Pressures /
Gap 5.3 4.0 9.3        
Cumulative Gap 2025/26 - 2027/28 18.8 13.4 32.2 
The table indicates an increasing budget gap, it is not clear at present to what
extent the HSCP will be required to deliver savings as some additional
resource is likely to be allocated to offset elements of inflation and increasing
service demand. It would be expected that the Scottish Government Spending
Review, when published will provide further information. The establishment of
the National Care Service is also expected to progress during this period, The
NHS will need to address the funding implications of the demographic issue in
social care as a priority. 
It is not expected that there will be an opportunity to access funding for major
capital programmes during this period. The focus will be on addressing backlog
maintenance and funding transformational projects where possible. 
RELEVANT DATA AND INDICATORS 
Information is derived from publicly available public planning documents,
professional networks and financial systems of both partners. 
CONTRIBUTION TO STRATEGIC PRIORITIES 
The Integration Joint Board has a responsibility to balance its budget and
ensure spend and investment is aligned to the Strategic Plan and the
priorities therein.

Page 10

10 
6
6.1 
6.2 
6.3
GOVERNANCE IMPLICATIONS 
Financial Impact – the budget gap is significant and plans to reduce spend
are required if a balanced budget position is to be achieved.     
Staff Governance – None directly from this report but there is a strong link
between HR management and delivering a balanced financial position. 
Clinical Governance – None directly, however if costs savings are
required there will be implications for care provision. 
7. 
7.1 
8.
PROFESSIONAL ADVISORY 
The budget planning process for 2025/26 ensures that Professional Leads are
fully engaged.   
EQUALITY AND DIVERSITY IMPLICATIONS 
8.1 None directly from this report, service changes will require impact assessments
to be completed. 
9. 
9.1 
10.
GENERAL DATA PROTECTION PRINCIPLES COMPLIANCE 
None. 
RISK ASSESSMENT 
10.1 Financial sustainability is a Very High risk on the strategic risk register. Specific
risks relating to this report include: 
• The HSCP is not able to identify savings opportunities to a great
enough extent to enable it to propose a balanced budget. This could
result in interventions from partners or Government. 
• The IJB may not support the proposals;
• Some of the planning assumptions turn out to be optimistic;
• Partners do not pass on funding as assumed or make available
resources; and
• The HSCP is not able to deliver the approved savings and operate on
a financially sustainable basis in 2025/26 and beyond. This could have
significance consequences for the IJB. 
The HSCP is not currently in a sustainable financial position as spend and
service demand exceed available funding, this is included in the Strategic
Risk Register.   
11. PUBLIC AND USER INVOLVEMENT AND ENGAGEMENT 
11.1  None directly from this report, engagement on activities relating to savings and
transformation forms part of the project plans where appropriate. The HSCP is
transparent in respect of its finances and this report is publicly available.
Consideration is currently being given to whether to re-run the budget
consultation exercise in late 2024.

Page 11

11 
12. CONCLUSIONS 
12.1 
12.2 
This report provides an indicative estimate of the scale of the HSCP budget
gap and savings target for 2025/26. The budget gap for next year is estimated
at £11.5m or just over 3% of spend.   
Work is on-going throughout the management team to develop savings
proposals. This process has commenced earlier than in recent years due to
the scale of the challenge. 
13. DIRECTIONS   
Directions
required to
Council, NHS
Board or
both.
Directions to: tick
No Directions required √
Argyll & Bute Council 
NHS Highland Health Board 
Argyll & Bute Council and NHS Highland
Health Board 
14. PREVIOUS REVIEW OF THE REPORT 
Meeting  Title of report Date Output (if
relevant)
SLT Budget Outlook  18/09/24 Amendments
made 
APPENDICES:
Appendix 1a & 1b  – Cost & Demand Pressures
Appendix 2 – Staff Consultation   
AUTHOR NAME: James Gow, Head of Finance 
EMAIL: james.gow@argyll-bute.gov.uk