Integration Joint Board     
Date of Meeting:  27 November 2024 
Title of Report: Climate Change Reporting 2023/24 
Presented by: James Gow / Malcolm McMillan 
The Integration Joint Board is asked to: 
• Note that the IJB is required to submit a Climate Change Duties Report by
30 November 2024;
• Approve the proposed submission attached as Appendix 1; and 
• Endorse the partnership approach taken by the HSCP in respect of its
Climate Change Duties. 
1. EXECUTIVE SUMMARY 
1.1 Climate Change legislation introduced by the Scottish Government requires all
public bodies to report on their carbon emissions and provide information on
how carbon reduction and climate change is governed. This report provides
members of the Integration Joint Board (IJB) with an opportunity to review and
approve the report for financial year 2023/24 in advance of its submission to the
Sustainable Scotland Network. 
1.2 Integration Joint Boards are unusual public bodies as they do not directly own
assets or employ staff and therefore submit nil returns. This ensures IJB returns
do not double count emissions reported by Health Boards and Local Authorities.
However, the submission does provide the opportunity to highlight some of the
actions, projects and challenges in delivering carbon reduction. This report also
summarises some of the proposed developments which will improve HSCP’s
approach to this agenda. It is apparent that there were increasing expectations
from the Scottish Government that IJBs will take a more pro-active role in this
policy area, however the Scottish Government have not provided direct access
to funding to facilitate this and have closed the scheme which would have
enabled the HSCP to bid for capital funding following the completion of the pre-
capital work during 2023/24. 
2.  RECOMMENDATIONS 
2.1 The IJB is recommended to: 
• Note that it is required to submit a Climate Change Duties Report; 
• Approve the proposed submission attached as Appendix 1; and
• Endorse the partnership approach taken by the HSCP in respect of
its Climate Change Duties.

Page 2

2
3. DETAIL OF REPORT 
3.1  The draft submission for 2023/24 is attached as appendix 1. As stated above,
this is a nil return in respect of the calculation of carbon emissions as these are
reported by NHS Highland and Argyll & Bute Council. The IJB is therefore
placing significant reliance on the actions of both partners. 
3.2  Argyll & Bute Council have a section on their web site which provides details on
their approach to sustainability and carbon reduction: 
https://www.argyll-bute.gov.uk/sustainable-development-and-climate-change 
They report a 33% reduction in emissions since 2015/16 and lay out a £1.2m
investment plan to progress towards net zero. Several of the projects
undertaken by the council will have a positive impact on emissions generated
by HSCP activities. For example, these seek to reduce energy consumption
and emissions relating to office accommodation, invest in the electric fleet and
charging points and in renewable energy sources to power ICT infrastructure. 
3.3 NHS Highland have also reported reduced carbon emissions. A recent Scottish
Government summary indicates building related carbon emissions reported by
NHS Highland reduced by 23% between in 2015/16 and 2022/23. The most
recent NHS Scotland report is available from the link below, this outlines carbon
emissions across from a range of emissions drivers including buildings, medical
gasses, prescribing, waste and fleet: 
https://www.gov.scot/publications/annual-nhs-scotland-climate-emergency-
sustainability-report-2024 
The NHS Highland carbon reduction strategy is incorporated in the Together
We Care document.   
3.4 The Argyll & Bute IJB and HSCP does not have responsibility or delegated
budget for capital investment. This has made it difficult for it to prioritise carbon
reduction projects. Carbon emissions predominately relate to energy usage
within buildings with travel and transport being the second focus of attention.
Insufficient investment in the estate overall has impacted on the suitability and
standard of buildings as well as their energy efficiency performance. The HSCP
has taken a lead in progressing a number of projects including: 
• Electrification of the vehicle fleet;
• Direct funding secured for increasing electric vehicle charging points;
• Innovative project to pilot the use of drones in remote and island areas; 
• Supporting increased use of remote / home working for patients, clients
and staff;
• Purchase of new Electric vehicles for delivery in early 2025; and
• Completion of the pre-capital project to develop options for building
related carbon reduction. 
The HSCP has improved its approach to the management of its infrastructure
and estate as planned. The Senior Estates Development and Sustainability
Manager has been appointed and an Infrastructure Board has been established
to oversee the development of the Estates Strategy and ensure projects are
appropriately prioritised. The return seeks to outline some of the pro-active

Page 3

3
steps being taken by the HSCP. The HSCP has also highlighted to Scottish
Government that it is not able to access funding directly and is not resourced to
undertake review or adaptation work. Capital funding for carbon reduction has
been reduced substantially which does create a risk that the work completed in
2023/24 will become obsolete and require to be re-visited before any projects
are progressed. The scale of backlog maintenance requirements also means
that it will be difficult to fund carbon reduction projects to change sources of
energy. However, a fabric first approach to carbon reduction does align with
firstly addressing backlog maintenance to reduce energy consumption and heat
loss. 
4. RELEVANT DATA AND INDICATORS 
4.1 Carbon emissions reporting places reliance on data provided by Argyll and Bute
Council and NHS Highland. 
5 CONTRIBUTION TO STRATEGIC PRIORITIES 
5.1 Addressing climate change is a Scottish Government priority and their
declaration of a climate emergency underlines their commitment. Specific and
ambitious targets have been set and the HSCP is seeking to contribute to these
where it can with the resources it has available. 
6. GOVERNANCE IMPLICATIONS 
6.1 Financial Impact – the HSCP has very limited financial resources available to it
to progress this agenda. It does not have delegated responsibility for capital
budgets or investment.   
6.2 Staff Governance – None 
6.3 Clinical Governance – None 
7. 
7.1
PROFESSIONAL ADVISORY 
There are no recommendations which require to be consulted on with
Professional Advisory leads. 
8. EQUALITY & DIVERSITY IMPLICATIONS 
8.1 None 
9. GENERAL DATA PROTECTION PRINCIPLES COMPLIANCE 
9.1 None 
10. RISK ASSESSMENT 
10.1 The steps outlined in this report are intended to provide assurance of the
actions being taken by the HSCP to reduce emissions, comply with the
requirement to submit a climate change report and ensure it is perceived as
being pro-active within the resources available. There remains a risk that the
HSCP and / or its partners are perceived as not taking sufficient action to
address climate change. Likewise there is a risk that the focus of financial and

Page 4

4
management resource on carbon reduction adversely impacts on resources
available for other priorities. 
11. PUBLIC & USER INVOLVEMENT & ENGAGEMENT 
11.1 All public sector climate change submissions are publicly available. 
11. CONCLUSIONS 
11.1  This report provides a draft Climate Change report and seeks IJB approval for
its submission. It outlines the reliance that the IJB places on both of its partners
and the positive steps being taken by the HSCP to contribute to carbon
reduction within the resources available. 
12. DIRECTIONS 
Directions
required to
Council, NHS
Board or
both.
Directions to: tick
No Directions required √
Argyll & Bute Council 
NHS Highland Health Board 
Argyll & Bute Council and NHS Highland Health Board 
14. PREVIOUS REVIEW OF THE REPORT 
Meeting  Title of report Date Output (if
relevant)
N/A   
AUTHOR NAME: Malcolm McMillan, Strategic Estates & Sustainability &
James Gow, Head of Finance and Transformation
EMAIL: malcolm.mcmillan2@nhs.scot / james.gow@argyll-bute.gov.uk 
APPENDICES: