Integration Joint Board   
Date of Meeting: 27 November 2024 
Title of Report: Budget Update 2025/26 
Presented by: James Gow, Head of Finance 
The Integration Joint Board is recommended to:
• Note that budget planning for 2025/26 is on-going and national budgeting
intentions are not yet published.
• Note the HSCP is not currently operating on a financially sustainable basis.
• Note the potential budget gap of £15.0m for 2025/26.
• Note the on-going work and next steps in the budget preparation process.
• Note that the HSCP does not expect to be able to propose a balanced
budget for NHS services based on current planning assumptions. 
1. EXECUTIVE SUMMARY 
1.1 This report provides the IJB with an estimate of the budget gap for 2025/26 and
a summary of progress made in developing savings plans. The report
summarises the current context and highlights that the position has been
developed without the assistance of firm budgeting assumptions from the
Scottish Government, now expected in December. Public finances are under
severe pressure and the Health and Social Care sector as a whole is not
sustainable. Additional funding has been committed by the UK Government,
along with new system cost pressures, but it is not yet clear how this will impact
in Scotland. Assumptions will continue to be refined as the budget cycle
progresses. 
1.2  The budget gap for 2025/26 is estimated at £15m, assuming the HSCP has
access to £2.5m of non-recurring pension fund savings. It is anticipated that
some of this gap will be addressed through increased funding. The cost and
demand pressures are significant and take some account of Social Care cost
pressures experienced in the current year. It is not anticipated that the HSCP
will be able to develop savings plans which address this gap without impacting
on access, availability or quality of service provision. The savings proposals
will be progressed on the basis that it will seek to minimise adverse impacts on
the most vulnerable. The estimated budget gap will be refined as improved
planning information becomes available. Based on current assumptions,
additional resourcing via NHS Highland will be required to enable the HSCP to
set a workable budget.

Page 2

2 
2.  Recommendations 
• Note that budget planning for 2025/26 is on-going and national
budgeting intentions are not yet available.
• Note the HSCP is not currently operating on a financially sustainable
basis.
• Note the estimated budget gap of £15m for 2025/26.
• Note the on-going work and next steps in the budget preparation
process.
• Note that the HSCP does not expect to be able to propose a balanced
budget for NHS services based on current assumptions. 
3. DETAIL OF REPORT 
3.1  Budget Context 
The HSCP is not operating on a sustainable basis at present, this situation is
common across the sector with many IJBs reliant upon reserves (where they
have these) to achieve financial balance and fund increasing operating costs.
Budget planning commenced early as a consequence of the scale of the
problem. Multiple management team meetings have now taken place to identify
potential projects to deliver savings. In addition to the challenge for next year,
the HSCP is overspending in the current year which is an indicator of the on-
going high levels of demand for care and dependency upon supplementary
staffing to deliver it, particularly within social care. 
The main disadvantage with commencing the process early is that there is
limited planning information available. Since the last update report, the UK level
budget has been delivered, however the likely impact on the Scottish
Government Budget is not confirmed (other than to say there is no more
funding for 2024/25). The UK budget does appear to allocate additional funds
for the NHS but will also result in additional employer costs for the HSCP and
all of the partners it commissions services from. 
• The Scottish Government have not published an updated Spending
Review or draft budget.
• The UK Government budget increases public spending (revenue and
capital), some of which will flow to Scotland but it has also increased
employer NI contributions.
• The UK minimum wage is to increase to £12.21 per hour (6.7%) which
is above the current health and social care minimum pay rate (£12.00).
• The Scottish Government Health Finance team have written to all
boards confirming there is no more funding available in 2024/25 as a
consequence of the budget. Boards are to operate within previously
agreed targets and have been issued planning assumptions which
suggest zero general uplift in the funding allocation.
• The Scottish Government have cut Multi-Disciplinary Teams (MDT)
funding which was allocated to help focus on redesign and to manage
delayed discharges.
• The 2024/25 Agenda for Change pay increase has been agreed and
fully funded (5.5%) and will come with a further 30-minute reduction in

Page 3

3 
3.2
the working week with a further 30 minutes reduction to be implemented
in 2025/26.
• The Local Authority pay offer for 2024/25 has been implemented but not
accepted by all relevant staff side unions.
• The Scottish Government have again made in-year reductions to a
number of budgets, including Health and Social Care.
• Audit Scotland have reported that funding allocated to IJB’s has been
reduced in real terms, contrary to previous planning assumptions. 
Assumptions 
The HSCP is assuming that Government will fund in full the impact of the
minimum wage increase and the direct increase in employers National
Insurance. It is assumed that the indirect impact of NI increases will be funded
or absorbed by service providers, this is a material risk to finance and / or
commissioned service providers. The lack of firm planning information makes
it difficult to model the budget gap accurately at present and the HSCP has
focussed efforts on developing potential solutions, it is assumed that: 
• Current and future pay uplifts in the NHS will be fully funded and NHS
re-grading costs (particularly nursing) will be fully funded.
• Direct employer NI increases will be fully funded as will the impact of the
increase in the national living wage / minimum pay rate for care staff.
• The excess (above 3%) for the 2024/25 local authority pay award will
be largely funded. 
• The non-recurring pension fund saving from the Strathclyde Pension
Fund will be available to the HSCP in 2025/26.
• The HSCP will no longer hold material levels of general reserves it can
use to contribute to the budget gap. 
It is assumed that other cost pressures, driven by inflation and demand for
service remaining high or increasing will not be funded. The Government level
assumptions is that these will require to be offset by savings, including service
cuts or additional funding where this is not possible in the timeframe. 
3.3 
NHS Formula Funding (NRAC) 
Analysis was undertaken recently to understand how the NHS resourcing
model (NRAC) operated. The model is population based and takes into
account a range of factors including rurality, demographics and the health of
the population. Funding for the HSCP had been reduced due to an estimated
decline in the population. Recent Census data indicated this population
reduction was overestimated. The NRAC funding shares for 2025/26 are
available and the national share for the HSCP has increased from 1.87% to
1.91% (2.1% increase). The cash impact of this is to be confirmed, a £1.5m
recurring improvement is assumed. 
Estimated Budget Gap – 2025/26 
The first element of the gap is the underlying budget deficit, funded by non-
recurring resourcing and reserves.

Page 4

4 
Social Care Gap             £1.3m 
NHS Gap                         £4.3m 
Opening Underlying Gap            £5.6m 
The HSCP methodology for the medium-term plan is to look ahead 3 years
using a best case, mid-range and worst-case modelling of cost and demand
pressures. These align with planning assumptions used by both partners. The
mid-range cost and demand pressures are summarised below, appendix 1
provides detail. These make some allowance for recurring elements of
overspending this year. Very limited allowance is made for further increases to
staffing (for example relating to the Health and Care Staffing Act). 
Social Care Net Cost & Demand Pressures  £4.0m 
NHS Cost & Demand Pressures    £9.4m 
Total New Pressures     £13.1m 
Financial Planning Estimate
2025/26
NHS £m Social Care
£m
IJB Total
£m    
2024/25 Underlying Gap 4.3 1.3   5.6
Estimated Cost & Demand
Pressures
9.4 4.0 13.4
Total Gap 13.7 5.3 19.0    
Funding Contributions   
NRAC Improvement (estimate) (1.5) - (1.5)
Reliance on Pension Saving
(non-recurring)
- (2.5) (2.5)
Savings Target / Additional
Funding Requirement
12.2  2.8 15.0 
The overall position has worsened due to Scottish Government provided
planning assumptions (NHS) which include a 3% SLA uplift and a 10%
drugs cost uplift with no funding. These items add circa £5.9m to anticipated
spend with no attached funding. It is not tenable to assume the HSCP can
make compensating savings at this level in 2025/26 and it is therefore
assumed that another solution will require to be found (additional funding /
share of brokerage). As a consequence, the overall budget gap has
increased to £15m, equivalent to 4%. It must be understood that the
reliance on the pension fund saving presents an additional recurring
problem in 2026/27 and beyond, a period in time where demographic
change can be expected to increase pressure on services further. 
It is difficult to assess that the HSCP can realistically achieve savings at this
level next year. A balanced budget cannot be delivered without impact on
provision which would result in significant service change and require
extensive consultation. This is a common situation across the system at
present. Some of the challenges in planning for this scale of saving include: 
• Budgets where savings cannot be realised - Service Level Agreements
including the one with Glasgow, much of the Primary Care budget,
Justice services and the Mid-Argyll PFI contract to highlight the main
examples.

Page 5

5 
3.4 
3.4.1 
3.4.2 
3.4.3 
• Inability to reduce small scale provision in remote communities.
• Staffing and accommodation challenges to achieve reductions in
supplementary staffing costs.
• Organisational change constraints which make it difficult to implement
change where it has an impact on employees or communities. 
The main issues to be addressed in the planning and budgeting cycle for
2025/26 include: 
• Expected budget shortfall.
• Increasing / continued high levels of demand.
• Reducing or constrained workforce.
• Appetite for service reduction and in effect cuts of service provision. 
Transformation & Strategic Planning 
The Transformation Programme is in place and projects are designed to
achieve longer term change rather than short term savings. The
requirement to focus on the short term is having an impact on capacity for
longer term change. Investment is also required to make change happen;
it is unlikely to be deliverable within existing resource. The use of reserves
to support revenue spend is making it difficult to commit to further
investment in transformation. There is a severe shortage of the capital
resource required to enable digital transformation as one example. 
Development of Savings Proposals 
The HSCP is working through the agreed process for the development of
2025/26 budget proposals. The scale of the challenge has been
understood for some time and it was intended that the process would
commence earlier than normal to allow for better consultation on proposals
with communities, staff and the IJB. It is important that the savings
programme is well understood and deliverable. 
Public Consultation 
A public consultation on the budget was conducted in February 2024 using
an interactive tool. The outcome of this was reported to the IJB in March.
Whilst there were some specific issues raised, the overall tone of the
responses indicated disappointment at the need to make reductions. To
the extent that savings are necessary, the consensus indicated they should
be evenly spread across services. A desire for management costs to be
reduced was communicated by the public. The HSCP is not intending to
re-run the exercise as there is both an opportunity cost and real cost of
extending the license for the software (circa £4k). 
Staff Consultation 
Engagement has taken place with staff asked to make suggestions for
savings opportunities. 18 members of staff took the time to respond, some
of which overlapped, and some respondents made multiple suggestions.
These were reported at the last meeting and are being incorporated in the

Page 6

6 
plan where appropriate. It is of note that several members of staff indicated
a frustration at the on-going cost of locum and agency staffing and
suggestions that staff retention and development should be prioritised. 
3.4.4 
3.4.5 
3.4.6 
Service Planning 
Work is underway to develop savings options, the process is challenging as
most of the plans have an impact on service delivery. Service management
are also in the process of reviewing budgets and spend in detail to seek to
identify ‘housekeeping’ savings which will contribute to the final savings
programme. This process has been on-going for many years now, however,
there are new opportunities as spend patterns, trends and managers
change over time. These savings would not normally require stakeholder
consultation but can make a valuable financial and cultural contribution. 
Examples include: 
• Public Health commissioning
• Removal of vacant posts
• Rationalisation of telecom lines
• Increased charging for telecare services 
At present these add up to £285k and some will require EQIAs to be
completed. The more strategic priorities under consideration are
summarised for each of the main services below. These provide an early
indication of the changes suggested by management to deliver cost
savings. It is not likely that these will result in sufficient savings to balance
the budget. 
Children’s & Families – Maternity Services Review 
A full review of maternity services is underway. It is intended that the
process will pilot a model for reviewing all of the services that sit within
Children, Families and Justice. The process includes staff engagement from
the outset and will take into account: 
• Configuration of services within Argyll & Bute.
• Demographics, birth rates and complexity of need; and
• Best practice and national service developments. 
The scope of the directly delivered service budget under review is £2.7m
with a further £3m included within the SLA with Greater Glasgow and Clyde
for births which take place within their maternity units. 
The review is anticipated to complete in February 2025, organisational
change processes will follow, if the review recommends changes to service
provision. The outcome will be reported through existing governance
structures. If any savings derive from this work it will be reported in the
budget paper but delivery of savings is likely to fall into 2026 and beyond. 
Adult Services – Care @ Home Services 
The care at home service is currently undergoing change as the new
contract is introduced in November 2024. Challenges include:

Page 7

7 
3.4.7 
• Continuing high demand and unmet need.
• Increasing use of agency staff within social care.
• Lack of housing options for workers (Islands & Oban).
• Pressure to minimise hospital delays.
• Full organisational redesign of the Argyll and Bute service is underway. 
The care at home service impacts on a wide range of other services such
as those offered by community nurses, AHP teams and demand for
residential care. The budget sits at circa £20m. Specific consideration is
being given to: 
• The linkages between telecare, mobile teams and the responder
contract due for renewal in early 2025.
• How the service can achieve a reduction in the use of agency staff and
operate with sustainable staffing models.
• Access and equity for Self-Directed Support payments; and
• Reviewing of assessment thresholds and governance of care package
implementation. 
Some allowance has been made in the cost pressures for the impact of
demographic change. Longer-term planning for the financial and staffing
implications of the increasing number of older adults is not adequately
resolved nationally or locally. In order to reduce costs, it will be necessary
to change the way care needs are assessed and the level of care that can
be provided within the available budget. A principled and values-based
approach is being taken which will seek to deliver on the priorities (as
outlined in the strategic plan) in a fair, safe and equitable way. 
A strategic development process is underway in respect of HSCP operated
care homes, this piece of work is complex and will take some time to
complete, it is not expected that financial savings will be derived from this
budget in 2025/26 other than through inflation increases on charges. 
A working group has now been established to review the responder service
contract and how it relates to the range of services and staffing models
within the service. This includes the review of activity data and any change
will require the completion of an EQIA. The contract has a £1.8m value.
Options range from continuation, through a reduction in scope to
cancellation. It is perceived as the main opportunity to achieve a reduction
in the Social Care budget gap in 2025/26. 
A minimum savings target is still to be established but this is clearly an
opportunity to achieve a cost reduction. 
Adult Services – Time to Care 
The Time to Care project is approximately half-way through, it is externally
facilitated by Meridian and funded by NHS Highland. It is intended to model
how staff time is used within community teams with the objective of
increasing the time staff have available to spend with patients and clients.
The process will also focus on the training and development of systems and

Page 8

8 
3.4.8 
3.4.9 
3.4.10 
people at team leader and management levels. Staff engagement and
communications continue. 
There are some opportunities for efficiencies being identified, however this
does not necessarily mean it will be easy to realise savings. The main part
of the project is scheduled to complete in November and it should then be
possible to quantify the potential financial saving that can be attributed to it.
Organisational change processes are likely to be a barrier to delivering
savings should efficiencies be identified. The project could help to identify
some early opportunities to reduce supplementary staffing. 
Acute & Complex Care – Rural General Hospital 
A review of the services offered within LIH is in its early stages. It is
intended that the HSCP will work with NHS Highland to look for
opportunities to better co-ordinate activity in Oban and Fort William in
particular. It is anticipated that there may be some options to reduce
duplication across the sites and create more joined up and sustainable
staffing structures. There are some expensive out of hours arrangements
in place and there appears to be excess theatre capacity. An approach to
making better use of theatre capacity would also feature in this
transformation work with potential for income generation or reduction in
activity within SLA contracts. 
Mid Argyll & Kintyre Service Model 
This project is intended to review all services delivered across the area to: 
• Address consistent and continuing staffing shortages.
• Review demographic data and care needs.
• Review the impact of recent investment in Kintyre (purchase of KCC
and transition to an internal care at home service; and
• Identify areas of unnecessary duplication. 
It is expected that this work will identify potential savings but should be
considered to be a longer-term transformation project to sustain services.
However, there may be specific services where shorter term change is
required due to the staffing challenges. 
Care Package Reviews 
A decision has been made to invest in the review of care packages. The
programme is being scoped out but will include: 
• Care @ Home packages
• LD/PD and Mental Health packages
• Direct payments (Self Directed Support) 
The process will look to improve governance over care package decision
making and the process will set specific targets for the number of packages
to be revied starting with most expensive ones. Care packages at present
have a total cost of around £30m with 55 packages costing over £100k or
£8.5m of the total.

Page 9

9 
3.4.11 
3.4.12 
3.5 
The reviews will be designed to ensure that care provision appropriately
meets the needs of the vulnerable people being supported. It is not
possible to set a target financial saving at this stage. 
Contract Management and Inflation 
Cost and demand pressures have been scaled back slightly to reflect lower
inflation. It is intended that the HSCP will seek to arrange contract renewals
on a flat cash basis except where specific funding is received to provide for
uplifts or where contract rates are set nationally. It is unclear if funding for
NI increases will be made available for 3rd sector / commissioned service
providers operating in the health and social care sector. 
It is anticipated that the living wage will increase and the HSCP would
expect to receive funding for this and would intend to pass this to providers
where appropriate. The process of contract management reviews will
continue and managers will continue to scrutinise all contracts in terms of
the value for money they provide. 
Service Transformation 
The Transformation Programme has been recently reviewed and the new
structure in place around this piece of work is still under development.
Important themes for strategic transformation in addition to the projects
summarised above include: 
• Digital Transformation.
• Care Homes and Housing.
• Community Hospitals.
• Strategic Workforce Development and Accommodation; and
• Fleet Management. 
The Transformation programme overlaps with the main savings projects,
but it is recognised that the demographic, finance and staffing challenges
are set continue for many years and longer term transformation is therefore
needed in addition to shorter term savings projects. This work will also seek
to look at areas where there have been long term challenges with
recruitment and staffing. It is anticipated that there will be circumstances
where the HSCP must consider if it can continue to provide the current
range of services in all the locations that it does at present. On-going
reliance on temporary staffing presents clinical risk as well as being costly. 
Next Steps 
The development of the budget will include progressing the projects
described above as well as seeking to identify other opportunities for
savings through, for example vacancy and expenditure control processes: 
• Chief Officer approval of all locum and agency contracts and
extensions.
• Further scrutiny of vacant posts.

Page 10

10 
• Changes to PECOS approval processes to stop unnecessary
spend.
• Tightening of care package approval processes; and
• Review of grant and commissioning commitments and renewals. 
The process is challenging, particularly in the operational context facing
the management team. On-going communication and consultation are
critical as is engagement with partners as they will be required to provide
support for the change required. In particular, support with the HR aspects
of change is a gap within the management structure. It is accepted that
some mechanisms that organisations normally apply to reducing costs are
not available in the context of HSCPs as a result of policy commitments
and/or partner approaches to HR management. Engagement with staff
and the IJB and Finance and Policy Committee will continue throughout
the process. 
Discussions with both partners will continue, based on current planning
assumptions the HSCP does not believe it can achieve financial balance
in 2025/26 in respect of its NHS budget and will require resourcing above
the level assumed. 
It does expect to be able to develop plans which could enable it to operate 
Social Work / Social Care services within available resources in 2025/26
assuming the non-recurring pension fund saving is passed on and pay
increases above 2% are funded. However, getting to this position will
require reductions in service provision. 
November –
December 2024
-Firm up savings plans and agree target savings
-Develop engagement plans for staff and communities
where appropriate 
November –
December 2024
Review Scottish Government Draft Budget and planning
assumptions to refine estimated budget gap
January 2025 IJB Approval for Operational Savings identified to date
January –
February 2025
Conduct engagement and detailed planning in respect
of proposals
March 2025 Approval of Budget and savings by IJB 
The table below summarises the current areas of focus: 
Service(s) Project Approx Service
Budget
Children & Families Maternity Services Review £5.7m
Adult Services – Care
@ Home
Review of service and
contracts 
£20m
Adult Services – NHS
and Social Care
Time to Care project - Meridian TBC
Acute & Complex Care Rural General Hospital model
review with NHSH
£17m
All Services Mid Argyll & Kintyre Service
Review
TBC

Page 11

11 
Adult services and
Acute and Complex
Care
Structures Care Package
Reviews
£30m
All Services Contract Management and
Restrict inflation
£6m 
The next steps are to identify project leads where these are not yet in place
and estimate realistic savings targets and timelines. 
3.6 
4
4.1 
5
5.1   
Medium Term Planning 
The medium-term plan will be updated in detail once the Scottish Government
have published their budget for 2024/25. The table below provides an indicative
analysis of the potential scale of the challenge. 
NHS
Social
Care Total  
£m £m £m
2025/26 Estimated Gap  12.2 2.8 15.0        
2026/27      
Remove non-recurring funding 0.0 2.5 2.5
New Cost & Demand Pressures 8.5 3.4 11.9
Potential additional 26/27 Budget Gap 8.5 5.9 14.4        
2027/28      
New Cost & Demand Pressures / Gap 8.1 3.8 11.9        
Cumulative Annual Gap          28.8 12.5 41.3 
The table indicates an increasing budget gap, it is not clear at present to what
extent the HSCP will be required to deliver savings as additional resource is
likely to be allocated. Savings of this magnitude would require service closures.
These figures will be remodelled as soon as long-term budget assumptions are
provided by the Scottish Government. 
It is not expected that there will be an opportunity to access funding for major
capital programmes during this period. The focus will be on addressing backlog
maintenance and funding transformational projects where possible. 
RELEVANT DATA AND INDICATORS 
Information is derived from publicly available public planning documents,
professional networks and financial systems of both partners. 
CONTRIBUTION TO STRATEGIC PRIORITIES 
The Integration Joint Board has a responsibility to balance its budget and
ensure spend and investment is aligned to the Strategic Plan and the
priorities therein.

Page 12

12 
6
6.1 
6.2 
6.3
GOVERNANCE IMPLICATIONS 
Financial Impact – the budget gap is significant and plans to reduce spend
are required. It is expected that the HSCP will require additional resource
in 2025/26 to fund NHS related spend in particular.     
Staff Governance – None directly from this report but there is a strong link
between HR management and delivering a balanced financial position. 
Clinical Governance – None directly, however if costs savings are
required there will be implications for care provision. 
7. 
7.1 
8.
PROFESSIONAL ADVISORY 
The budget planning process for 2025/26 ensures that Professional Leads are
fully engaged.   
EQUALITY AND DIVERSITY IMPLICATIONS 
8.1 None directly from this report, service changes will require impact assessments
to be completed. 
9. 
9.1 
10.
GENERAL DATA PROTECTION PRINCIPLES COMPLIANCE 
None. 
RISK ASSESSMENT 
10.1 Financial sustainability is a Very High risk on the strategic risk register. Specific
risks relating to this report include: 
• The HSCP is not able to identify savings opportunities to a great
enough extent to enable it to propose a balanced budget. This could
result in interventions from partners or Government. 
• The IJB may not support the proposals due to increased risk.
• Some of the planning assumptions turn out to be optimistic.
• Scottish Government or partners do not pass on funding as assumed
or make available resources.
• Adverse impact upon workforce and lack of HR and support service
support to effect change. 
• The HSCP is not able to deliver the approved savings and operate on
a financially sustainable basis in 2025/26 and beyond. This could have
significance consequences for the IJB. 
The HSCP is not currently in a sustainable financial position as spend and
service demand exceed available funding, this is included in the Strategic
Risk Register.   
11. PUBLIC AND USER INVOLVEMENT AND ENGAGEMENT 
11.1  None directly from this report, engagement on activities relating to savings and
transformation forms part of the project plans where appropriate. The HSCP is
transparent in respect of its finances and this report is publicly available. The

Page 13

13 
HSCP does not intend to re-run the public consultation due to the cost of the
software, it will however continue to communicate and engage with all partners
in respect of the financial challenge it faces. 
12. CONCLUSIONS 
12.1 
12.2 
This report provides an indicative estimate of the scale of the HSCP budget
gap and savings target for 2025/26. The budget gap for next year is estimated
at £15m or 4% of spend.   
Work is on-going throughout the management team to develop savings
proposals. This process has commenced earlier than in recent years due to
the scale of the challenge. However, it not realistic to assume that the HSCP
can deliver a balanced NHS budget for 2025/26 based on current planning
assumptions. The constraints on the pace of service change do not enable
such a level of change in the timescale available. 
13. DIRECTIONS   
Directions
required to
Council, NHS
Board or
both.
Directions to: tick
No Directions required √
Argyll & Bute Council 
NHS Highland Health Board 
Argyll & Bute Council and NHS Highland
Health Board 
14. PREVIOUS REVIEW OF THE REPORT 
Meeting  Title of report Date Output (if
relevant)
SLT Budget Update 18/09/24 Amendments
made
IJB Budget Update 25/9/24 Recommendations
noted
Finance &
Policy
Committee
Budget Update 28/9/24 As above
SLT Budget Update 20/11/24 TBC
Finance &
Policy
Committee
Budget Update 22/11/24 TBC 
APPENDICES:
Appendix 1a & 1b  – Cost & Demand Pressures 
AUTHOR NAME: James Gow, Head of Finance 
EMAIL: james.gow@argyll-bute.gov.uk