Budget Monitoring - 8 Months to 30 November 2024

Argyll and Bute Council · 29 January 2025
Back to Argyll and Bute HSCP Integration Joint Board (IJB) — 29 January 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

1 
Integration Joint Board   
Date of Meeting: 29 January 2024 
Title of Report: Budget Monitoring – 8 months to 30 November 2025 
Presented by: James Gow, Head of Finance 
The Integration Joint Board is recommended to:
• Note that the HSCP has overspent its budget by £1.6m.
• Note that an overspend of £2.6m is forecast.
• Note actions are required to reduce spend and additional funding is required
from Argyll & Bute Council who hold pension saving resource on behalf of
the IJB;  
• Note savings of £4.8m have been delivered, 73% of target. 
1. EXECUTIVE SUMMARY 
1.1 This report provides a summary of the financial position as at the end of month
8 and a forecast for the year. The forecast remains of concern as costs within
social work services in particular are well in excess of the approved budget.
Steps are required to manage this through reduced spend and / or increased
use of reserves and non-recurring pension fund savings. Specific cost
pressures relate to on-going high levels of agency and locum spend, increasing
high-cost placements within Children’s and Families service and high demand
and agency staff costs within Older Adult Services. 
1.2  The forecast is currently an overspend against budget estimated at £2.6m. The
approach to managing this will be to: 
• Increase scrutiny of spend and vacancy management.
• Progress the savings programme.
• Develop additional controls to reduce spend within Social Care.
• Request Argyll & Bute Council make available additional resourcing
from the pension fund savings. 
The Health and Social Care sector across Scotland continues to be in a very
difficult and unsustainable financial position, this has been highlighted by Audit
Scotland in various reports in recent months.

Page 2

2 
2.  Recommendations 
2.1  • Note that the HSCP has overspent its budget by £1.6m.
• Note that an overspend of £2.6m is forecast.
• Note actions are required to reduce spend and additional funding is
required from Argyll & Bute Council who hold pension saving resource
on behalf of the IJB;  
• Note savings of £4.8m have been delivered, 73% of target. 
3. DETAIL OF REPORT 
3.1  8 Months to 30 November 2024 
The table below provides the year to date figures, Social Work/Care services
report on a cash basis whereas Health report on an accruals basis.  Appendix
1 provides an analysis of the variances: 
Service Actual
£000
Budget
£000
Variance
£000
%
Variance
COUNCIL SERVICES TOTAL  56,367 55,239 (1,128) (2.0%)
HEALTH SERVICES TOTAL 177,343 176,904 (439) (0.2%)          
GRAND TOTAL 233,710 232,143 (1,567) (0.7%) 
3.1.1  For social care budgets there are several areas of concern: 
• Number of external placements for children.
• Demand for older adult care, increasing costs of care packages and
management of delayed discharges, increasing demand for care home
placements.
• Spend on agency staff remains too high, the planned reduction is not
being achieved. This issue is particularly relevant to social care on the
islands and west area. 
Absence cover is increasingly problematic as services are often paying staff
plus an enhanced rate for agency cover which generally amounts to 150% of
the cost of the underlying staffing gap,1 FTE of resource can cost the
equivalent of 2.5 FTE in these circumstances. 
3.1.2  The NHS budget is also overspent, the main drivers continue to be the use of
agency staffing and medical locums along with an increase in high-cost
external mental health placements. Agency staff are only employed to cover
for essential posts which are either vacant or there is an absence and there
has been some reductions achieved, particularly for nursing and AHP groups,
this has been supported by national initiatives to cut back spend.

Page 3

3 
3.2 
3.2.1
Forecast Outturn 
The forecast remains of concern, particularly for social work services. In
addition to the implications in the current year, the budget is reliant upon
reserves which are reducing and largely committed. Forecast spend is
summarised below with further detail in appendix 2. Members will recall that
the budget relies upon the use of reserves and an allocation from the non-
recurring pension fund saving. 
Service Annual
Budget
£000
Forecast
Outturn
£000
Variance
£000
%
Variance
COUNCIL SERVICES TOTAL 91,794 93,641 (1,847) (2.0%)
HEALTH SERVICES TOTAL 277,654 278,400 (746) (0.3%)          
GRAND TOTAL 369,448 372,041 (2,593) (0.7)% 
3.2.2  Within Social Work, children’s and families, mental health and older adult
budgets are all overspending and a £1.8m adverse variance forecast. 
The overspend in Children’s Services is driven by increased number of children
in out of area placements, there are now 18 in such placements. These are
considered to have been unavoidable and each one is carefully considered
before being contracted. This cost pressure was not foreseen at the time the
budget was prepared. The forecast overspend on this heading is £0.7m on a
budget of £6.7m. A detailed report on this was provided to the Finance & Policy
Committee in September 2024.  Additionally, one group of staff were upgraded
which has added £0.2m to staff costs with no funding to offset.   
Spend on older adults remains above budget with agency staffing a particular
issue. The budgets summarised below were increased from £35.6m to £38.5m
(8%) to allow for increasing demand and inflation. Social Care agency spend
is currently at £3.1m for 8 months. This is close to the £3.2m spend for the
whole of last year and has increased from £0.8m in 2021/22. The cost of
accommodation for these workers on islands is adding to the problem.
Alternative arrangements on Islay will be available in the coming weeks to
reduce this aspect of spend. Agency within our nursing homes is likely to
reduce with recruitment but care at home agency is meeting current service
demand and there is little scope for short term improvement. 
Adult Services Budget  Forecast
Spend 
Variance
External Residential Placements –
demand led @ national contract rate
£11.4m £12.4m (£1.0m)
Care @ Home Service £19.6m £20.5m (£0.9m)
Internal Care Home Placements £7.5m £  7.4m  £0.1m
Total £38.5m £40.3m (£1.8m) 
External residential placement spend includes provision within Argyll and Bute
and in other local authority areas. These placements are generally at the
nationally negotiated care home rates. While the figures fluctuate from week to
week, there are typically around 210 people in out of area placements of the

Page 4

4 
490 or so that are in non-HSCP care homes. This can be due to lack of local
capacity or the choice of the individual / family concerned. 
The new Care at Home contract has been implemented in and is reducing costs
in areas where there are providers available. The national focus on reducing
delayed discharges from acute services continues and is adding to pressure to
ensure people are placed in residential care or provided with care at home
packages as quickly as possible. Services continue to be provided beyond the
staffing levels and available budget, in order to meet increasing demand.
Recovery actions are required for the HSCP and care at home is an area of
focus. To date no action has been taken to restrict provision of care for financial
reasons. 
Work on a recovery plan is under development for the end of the current and
for future years. A detailed report on actions to manage this will be available at
the February meeting. The Social Work budget assumed that £1.3m of the
pension fund saving (£3.0m is held by the Council) would be allocated to
revenue costs in 2024/25. The HSCP has informed Council officers that it
expects to require all of this resource to fund the overspending. This has also
been highlighted as a risk to the HSCP leadership group. The table below
summarises the extent of forecast reliance upon non-recurring savings: 
Social Work  £m
Budgeted Reliance on Pension Fund
Savings  
1.3
Forecast revenue budget variance (M4)   1.8
Underlying budget gap   3.1 
General reserves carried forward for social work totalled £2.6m, these are
largely committed to projects (such as key worker housing, the shared service
approach to catering and the care homes and housing project with Hub North),
and the completion of the Tigh a Rudha care home refurbishment and
remodelling. 
3.2.3  NHS services are forecasting an overspend of £0.7m, key concerns are: 
- Agency staff – agency, locum and bank staff costs continue to be the
largest cost pressure. Gross spend on agency, locum and bank staffing
across all services is £8.2m. LIH remains the highest spending service
area, with spend of £3m, most of which relates to medical staffing, there
has been no improvement in respect of the medical model at LIH this
year.
- 2c GP practices (directly operated) – the HSCP has taken over the
running of 2 further practices.  This is creating additional locum cost
pressures and is driving a £0.5m overspend.  There is a lack of certainty
about the funding impact of the GMS uplift on 2c practice funding.
- High cost out of area referrals – 8 admitted patients have created a cost
pressure of £531k at the end of November. The costs of these are circa
£4k per week each with no funding identified.

Page 5

5 
- Prescribing – a small pressure exists within prescribing and further
investigation is ongoing into the potential value of non-cash limited
prescribing that may be impacting this.
Some excess costs will continue to be offset by vacancies. However, the
Health budget is already dependent upon the use of reserves (£4.3m) and
there is limited scope to increase reliance on reserves. A tightening of spend
controls is now being implemented to bring NHS spend back in line with budget,
progress on agency/locum staffing is critical to achieving this. NHS Highland
are aware of the overspend and the HSCP is continuing to work towards
bringing the NHS budget into line. 
A further issue which has added to the forecast overspend has been that SG
have cut Multi Disciplinary Teams funding in-year by £14% (£5.7m for the
sector and £106k for the HSCP). The SG health finance team have confirmed
that it does not intend to make any additional funding available for the NHS.
The national context within the NSH is that Boards are collectively projecting
an overspend in excess of £400m.   
3.2.4  Overall the HSCP is operating in excess of its approved budget. Steps are in
place to try and mitigate this including: 
• Continuing vacancy management processes.
• Increased controls and reporting of agency and locum spend.
• New approval process for agency staffing. 
The Social Work overspending has been reported within the Council and it is
anticipated that further mitigations are required, these overlap with actions
associated with the work on the budget: 
• A request for the remainder of the pension fund saving held by council; 
• A moratorium on any new agency social care staff and all renewals are
short term and subject to an exit strategy (in reality this may mean a cut
in service where in house staff cannot be recruited or a rise in unmet
need);
• Recovery of direct payment balances where these are not being fully
spent (non recurring); and
• Reviewing the operation of the care at home service, a paper will be
developed looking at detail such as the way the service is accessed. 
These measures, to the extent that they are implemented, may result in some
reduction in service and increase in unmet need or further waiting times for
care packages. It is not expected the HSCP will be able to recover its Social
Work / Social Care financial position by year end.   
The position is consistent with the national situation in the Health and Social
Care sector with many IJBs taking action. Concerns about financial
sustainability was highlighted again this year by Audit Scotland (for both IJBs
and the NHS) but there has not been a Government response to address the
issue. 
There are a number of risks including:

Page 6

6 
• The Council pay award has been implemented but not agreed by all
unions;
• In year budget cuts have been announced by the Scottish Government
to fund the pay increases, including a reduction in the Health and Social
Care Budget;
• The impact of NI increases next year is a heightened risk for 3rd sector
and commissioned service providers in the short term while funding
remains uncertain;
• There are further staff re-grading exercises underway which will result
in increased pay costs; and
• Demand for services, impact of winter pressures and the priority given
to managing delayed discharges. 
3.3 Savings Delivery 
3.3.1 
3.3.2 
3.3.3 
3.4 
3.4.1 
The service improvement team, finance teams and management continue to
progress, monitor and report on savings projects. As at Month 8, £4.8m (73%)
of the £6.6m target has been declared: 
2024/25
Savings    Year to 30 November 2024    
Target Achievement Balance %  
£' 000 £' 000 £' 000  
Fully Achieved 4,091 4,091 0  
Partially
Complete 2,522 315 2,207  
Non Recurring - 425 (425)  
Total 6,613 4,831 1,782 73% 
Appendix 3a lists the fully delivered savings and 3b summarises the remaining
savings, risk rated: 
Savings regarded as low risk £339k 
Savings unlikely to be achieved in full in 2024/25 £1,130k 
Savings unlikely to be deliverable in 2024/25 £738k 
Work is on-going to deliver as much of the balance as possible. There are a
number of projects where change processes are required and are taking time.
The new medical staffing model in Cowal is now starting to be implemented
and it is hoped that the savings relating to FME contracts can be progressed
soon. The amber and red rated savings projects represent a financial risk
already incorporated in forecasts. 
Reserves 
Earmarked reserves of £19.9m were carried into 2024/25 including £4.7m for
sustainability and value, this has been passed back to NHS Highland and
replaced with a recurring allocation. To date £10.7m has been committed,
including £4.3m to fund the NHS revenue budget gap and the £4.7m described
above. The reserves position is summarised in Appendix 4. Remaining
reserves are reduced to £9.2m, many of these are earmarked for specific

Page 7

7 
3.4.2 
4
4.1 
5
5.1   
6
6.1 
6.2 
6.3
purposes. The Scottish government have suggested that there is some scope
for reallocating reserves to fund cost pressures. 
Much of the remaining reserves balance has been allocated to projects. To
some extent these are compensating for insufficient investment in
infrastructure by partners: 
• £600k for the Prevention / Wellbeing project;
• Estimated £529k for remodelling the Campbeltown Hospital to better
locate new radiography equipment;
• £366k for NHS houses on Coll (net of £100k from the Strategic
Housing Fund); and
• £940k for the Tigh a Rudha renovation and remodelling (Reserves are
match for Council capital, Strategic Housing Fund and Island
Programme Funding). 
Much of the strategic development work has been paused due to capital
funding constraints, the Care Homes and Housing project is continuing. The
use of reserves to fund revenue spend is not sustainable and a proper solution
to the mis-match between recurring funding and spend requires to be identified
as reserves reduce and the pension fund saving will not be available beyond
2025/26. 
RELEVANT DATA AND INDICATORS 
Information is derived from the financial systems of both partners. 
CONTRIBUTION TO STRATEGIC PRIORITIES 
The Integration Joint Board has a responsibility to balance its budget and
ensure spend and investment is aligned to the Strategic Plan. 
GOVERNANCE IMPLICATIONS 
Financial Impact – the forecast outturn position is a projected overspend.
The Council are holding a pension fund saving which could be accessed
if the HSCP continues to overspend, the HSCP is required to progress its
recovery planning.   
Staff Governance – None directly from this report but there is a strong link
between HR management and delivering a balanced financial position. 
Clinical Governance – None directly, however if cost savings are required
there are likely to be implications for care. 
7. 
7.1 
8.
PROFESSIONAL ADVISORY 
Professional Leads have been consulted with on the implications of the budget
and savings programme. 
EQUALITY AND DIVERSITY IMPLICATIONS 
8.1 None directly from this report.

Page 8

8 
9. 
9.1 
10.
GENERAL DATA PROTECTION PRINCIPLES COMPLIANCE 
None. 
RISK ASSESSMENT 
10.1 There are a number of financial risks and these are reported to the Finance &
Policy Committee: 
• Continuing impact of high service demand and winter pressures;
• Inability to reduce supplementary staffing;
• Pressure on support services relating to HR, administrative and finance
processes; and
• Delivery of the balance of the savings programme. 
The HSCP is not in a sustainable financial position as spend and service
demand exceed available funding. Financial recovery and development of the
savings programme for 2025/26 are priorities. 
11. PUBLIC AND USER INVOLVEMENT AND ENGAGEMENT 
11.1  None directly from this report, engagement on activities relating to savings and
transformation forms part of the project plans where appropriate. The HSCP is
transparent in respect of its finances and this report is publicly available. 
12. CONCLUSIONS 
12.1 
12.2 
This report provides a summary of the financial position as at the end of month
8. The forecast remains of concern and the management team are seeking to
manage spend down. The reliance upon non-recurring resourcing is an
increasing problem for 2025/26 and future years. It is not expected that spend
can be reduced to the extent that would be required to operated within budget
in the current year. 
The HSCP will require to seek additional support from the non-recurring
savings relating to pension costs from Argyll and Bute Council to fund the
overspend. This will restrict flexibility in future years, adds to the longer-term
gap between spend patterns and available resources. This will also limit
funding for development and transformation as the balance shifts further
towards managing immediate pressures rather than longer term change.

Page 9

9 
13. DIRECTIONS   
Directions
required to
Council, NHS
Board or
both.
Directions to: tick
No Directions required √
Argyll & Bute Council 
NHS Highland Health Board 
Argyll & Bute Council and NHS Highland
Health Board 
14. PREVIOUS REVIEW OF THE REPORT 
Meeting  Title of report Date Output (if
relevant)
SLT Budget Monitoring M8 8/01/25 N/A 
APPENDICES:
Appendix 1 – Year to Date Position 
Appendix 2 – Forecast Outturn for 2024-25 
Appendix 3a and 3b  – Savings Programme
Appendix 4 – Reserves   
AUTHOR NAME: James Gow, Head of Finance 
EMAIL: james.gow@argyll-bute.gov.uk