Year Three Progress Report

Page 2

Page 2 of 46   
Table of Contents
Children and Young People ................................................................................ 3
Child poverty ..................................................................................................... 4
Child Protection ................................................................................................. 6
Violence Against Women and Girls .................................................................... 8
Adult Protection............................................................................................... 10
Community Justice ........................................................................................... 12
Public Health .................................................................................................... 15
Right Care Right Time ...................................................................................... 20
Adult Care –Older Adults/Adults and Hospitals ................................................ 21
Learning Disability & Neurodiversity Services .................................................. 23
Mental Health .................................................................................................. 25
Primary Care (general practice) ....................................................................... 27
Dentistry .......................................................................................................... 29
Alcohol and Drug Partnership .......................................................................... 32
Allied Health Professionals (AHP) ..................................................................... 37
Carers .............................................................................................................. 39
Prevention Programme .................................................................................... 40
Digital Health and Care Strategy ...................................................................... 42
Technology Enabled Care (TEC) ........................................................................ 44
Corporate Services ........................................................................................... 45

Page 3

Page 3 of 46   
Please outline any activity in relation to service commissioning, i.e. revisions to specifications, new services,
reviews of existing contracts. Terminations of contracts. (previous updates below) 
Previous Service Update 
The Children’s Services commission services on an as needed basis. 
The services which are commissioned are dominated by external specialist placements costing up to £500k a year. Despite
tight governance these placements are increasing in number. It is clear that the damage down by public health lockdowns is
now showing through increasing need. This is does not feel like a ‘blip’ in the level of need but the new norm. This need will
have to be met as often the issues are coming through at the level of child protection. 
Through the Whole Family Wellbeing Fund in conjunction with education & police colleagues we have commissioned the TSI
to consider how we facilitate and mobilise the third sector in A&B. 
It is clear that funding streams for children come via Social Work, Education, Health, CPP and other routes. This can lead to a
piecemeal approach. There is an imperative to look at how we consider commissioning and budgeting beyond professional or
organisational boundaries. We need to be acting as a unitary children’s authority no matter where the organisational
boundaries land. 
There is now a requirement for all funding to ensure it is child based. Children should not be disadvantaged by budgetary
processes. 
Current Update from Commissioning 
There is currently a mapping of children and young people services being undertaken by A&B TSI as well as a review of all
external placements. This will involve capacity building in the third and community sector. 
Engagement Activities Taken Place in 2024/2025
Engagement continues, a good example is:
Child-friendly Reporting in Argyll & Bute Council | Improvement Service 
Priorities Year 3  Progress Update
Carried
over
2025/26
Yes/No
Continue to deliver on the priorities
within the Children and Young Peoples
Service Plan (CYPSP).  
No update provided, however CYPSP priorities continue to be
delivered.
Yes
Continue to monitor and evaluate
progress in all our service plans. 
No update provided, however all service plans continue to be
monitored and evaluated.
Yes
Continue to deliver on the Corporate
Parenting Plan. 
No update provided, however the Corporate Parenting Plan continues
to be delivered.
Yes
Develop programme of change in
relation to the Children’s Promise
Change programme. 
No update provided, however the programme of change continues to
be delivered.
Yes
Continue to engage with Children and
staff on transformation agenda.  
Engagement continues, a good example is:  
Child-friendly Reporting in Argyll & Bute Council | Improvement
Service
Yes

Page 4

Page 4 of 46   
Priorities Year 3  Progress Update
Carried
over
2025/26
Yes/No
Look at how best to utilise progress we
have achieved in data analysis in order
to target those in not fully claiming
benefit entitlement and advise them
accordingly.  
Considerable progress has been made with improving ways of
identifying those not in full receipt of benefit entitlement, enabling
the benefits service and advice services to focus on them.  Argyll &
Bute has made an important contribution to data work on child
poverty at the national level and continues to do so, helping to
identify and work towards achieving legal gateways as well as
improved use of data sets.  
Yes
Employability Partnership to employ a
Poverty Coordinator to work with those
experiencing poverty and look at ways
to improve their access to employment.  
This action was completed, and the Poverty Coordinator has
contributed to improving access to employment, including producing
a leaflet to support understanding, choice and decision making in this
area.  
Yes
Financial Advice and Inclusion Group
and Child Poverty Action Group to
continue to work together to identify
and tackle factors that contribute to
local cost of living concerns.
This has continued to happen, and this working relationship is proving
effective in identifying need, encouraging joint working, and
monitoring change.
Yes
Review and revise the Communications
and Engagement Plan and use to
improve community engagement with
child poverty work in Argyll and Bute. 
This has not progressed as was hoped in terms of direct work by the
Child Poverty Action Group and this needs to go forward in the
coming year.  However, the Poverty Alliance have worked with the
group on their project “Taking Action on Rural Poverty”.  This project
has set up a lived experience group that is now actively engaged,
giving opinions and advocating actions.      
Yes
Review staff training and development
needs in the area of child poverty and
begin to roll out poverty awareness
training to staff. 
Money Counts Training has continued to be rolled out.  However,
funds have not been available to roll out other training, such as
awareness raising etc. that would contribute to service improvement.  
Yes
Look at changes in Argyll and Bute over
the last three years, in terms of
demographics and the economy /
employability. How do these changes
impact on the work and actions of the
Child Poverty Action Group and its
members? 
Considerable challenges to economies worldwide and continued
instability has made it difficult to meet targets nationally.  In Argyll
and Bute transport and childcare provision remain key issues when
addressing both the cost of living and employability, particularly in
remote, rural and island places.  Demographic issues, including an
aging and reducing population, combined with housing shortages in
some areas, to produce key worker shortages.  The Child Poverty
Action Group and its members continue to work together to address
employment, benefit and cost of living challenges whilst identifying
ways to tackle the impacts of child poverty.  
Yes
Further develop the role and purpose of
the Child Poverty Action Group and
consider resource issues. 
The Child Poverty Action Group has welcomed new members. It has
also played a key role on a national basis, with improving the use of
data analysis in tackling child poverty.  It has also partnered with the
Poverty Alliance to establish a lived experience group to directly hear
their views.  On a national level, group members have taken part in
important consultations and given evidence to government
committees.  Resource issues are currently being looked at as it is
recognised that areas like training and coproduction require a
budget.    
Yes
Review the Child Poverty Action Plan
and consider what is required to meet
This took place and key areas identified, such as transport, housing,
childcare provision and the islands premium were looked at.  There
Yes

Page 5

Page 5 of 46   
Engagement Activities Taken Place in 2024/2025
Group members worked with the Poverty Alliance to forward the “Taking Action in Rural Poverty Project” and create and
engage with a lived experience group.  Children and young people were also asked their views on what would help to tackle
child poverty for the 2023 – 2024 Child Poverty Action Plan Review. In addition, a graphic version of the Children’s Rights
Plan and a graphic Early Years Plan were coproduced, both giving relevant visual information and pointing to advice /
resource websites via QR codes.  For the 2024 – 2025 review, the graphic Plan on a Page version of the review will be
coproduced with children and young people.   
the Scottish Government final targets in
2030. Child poverty reduction targets in
2023. 
are external factors that mean that child poverty has risen slightly in
nearly every region of Scotland and the Scottish Government will not
reach its interim targets.   However, Scotland is doing significantly
better than England and Wales in this respect.       
Begin to develop a Data Base to
improve monitoring and focus of
resources locally. Begin to use it to
improve the work of the Child Poverty
Action Group and services locally.
It has not been possible to progress this target this year and it
requires to be carried forward.  
Yes

Page 6

Page 6 of 46   
Priorities Year 3  Progress Update
Carried
over
2025/26
Yes/No
Local  Initial Case Review / Significant
Case Review  guidance will be updated
to reflect changes in national practice
and to provide practitioners with clear
learning pathways (this work will be
undertaken with APC colleagues.
The guidance was updated and shared with relevant agencies to
reflect any changes.  This included a 7minute briefing paper.  Further
changes were announced last month when considering the interface
between ASP and CP; including a change to reporting instructions to
the care inspectorate.  The guidance will need further amendments to
reflect this.
Yes
Receive, evaluate and act on Child
Protection Committee (CPC) & 
Performance, Quality and Assurance 
reports. Quarterly CPC will have a
framework to implement good practice
and develop QI approaches to
improvement based on existing good
practice. Multi agency dataset
developed based on national minimum
dataset and used by CPC to analyse
data. Use improvement methodology
and test of change to dig deeper into
the data.
There has been agreement to migrate to version 2 of the National
minimum dataset, a report has been completed and will be shared
with CPC next week (8/5).  Managers have met collectively to create
an additional analytic list of data that would be helpful when
considering the data to inform local priorities and inform of key trends
within CP activity.  Further meetings are arranged to implement
version 2 of NMDS.
Following an audit of inter-agency child protection standards in March
2024 we established a senior leadership group to identify and improve
standards.  This also led to the development of a inter-agency front
line managers group.
Yes
All new CPC members will receive a
CPC induction pack and will meet with
Lead Officer to discuss the role of the
CP and expectations of CPC members
All CPC members will attend CPC
development sessions to contribute to
the role and function of the CPC
members will be required to
demonstrate through the delivery of
the CPC improvement plan that
information is being disseminated
within their organisation and that
actions attributed to their organisation
are progressed and reported to CPC.
This is complete and all CPC members have met with the Lead Officer. 
There is a newly appointed CP Lead Officer in place who will continue
with this role of supporting new members of the CPC and their
induction.
No
Produce and implement a biennial
strategic improvement plan which will
be monitored by the  Performance,
Quality and Assurance  using a RAG
system. Red actions will be reviewed by 
Performance, Quality and Assurance 
and reported to CPC.
The Strategic Leadership Plan and the CPC Improvement Plan have
been merged. Mechanisms to monitor the progress of the plan (RAG
system) has not yet been put in place but incomplete actions are
discussed directly with CPC quarterly. Further considerations are
needed to put a system in place to record this visually within the plan
to report on and measure outcomes in a quantitative way.
Yes
Multi agency training will be delivered
using a tiered approach to learning
which will include: General contact
workforce, Specific contact workforce
and Specialist contact workforce.
Level 1 and Level 2 CP training is in place and available on the training
calendar.  This is being provided in person in various locations across
the partnership with all agencies/services encouraged to attend
Yes
Develop and implement training
framework which supports practitioner
knowledge and confidence in working
with Child Sexual Abuse which includes
Input has been provided to the management group to raise awareness
of CSE and CSA but this has not been extended to practitioner training. 
The YPSP processes are currently being updated and this will inform
future briefings and training sessions.  This is an active plan for
Yes

Page 7

Page 7 of 46   
Engagement Activities Taken Place in 2024/2025
CPC Practitioner Forums arranged to take place:
30th April 25 at 12.30pm – Oban
13th May 25 at 12.30pm – Lochgilphead
22nd May 25 at 9.30am – Helensburgh
28th May 25 at 9.30am – Dunoon 
Bimonthly First Line Managers Meetings 
Bimonthly Strategic Leadership Meetings 
CPC Online Training Calendar – multiagency 
Multi agency briefing sessions were put in place to update on the IRD and Pre-Birth Processes
Child Sexual Exploitation and child
trafficking .
implementation.
Domestic Abuse Guidance and
Flowchart implementation to be
evaluated and regular audits of
referrals to be carried out.
DA guidance has been implemented, and full CP audit undertaken in
March included cases chosen because of DA.
Yes
Improved interface between children &
adult services particularly where
parental mental health substance
misuse and domestic abuse are
present. 
Multi-Agency practitioner events are arranged, and all services are
encouraged to come along to the training provided by CPC Training
Coordinator.  The CPC and APC have joint meetings every year. Further
sessions and development required to align the child protection and
adult protection processes, including updating the transitions
procedures for children moving from children services to adult
services.
Yes
Advocacy services will engage with
children on the Child Protection
register to understand their experience
and to provide the CPC with
recommendations as to how things can
be improved.
Advocacy remains in place with feedback from young people, families
and agencies being very positive.  Children are receiving a timeously
service and building positive relationships with the advocate to ensure
their views are represented within the CP process. Reports to CPC via
report biannually.
Yes

Page 8

Page 8 of 46   
Priorities Year 3  Progress Update
Carried
over
2025/26
Yes/No
Completion of the Transforming Responses
to Violence Against Women and Girls
Project. Project Board to carry out the
Domestic Abuse-Informed Practice and
Systems: Self-Assessment Tool and
evaluate progress. 
The Transforming Responses to Violence Against Women and Girls
Project was not concluded because Developing Equally Safe
Funding was continued for another year.
Project board did not carry out the   Domestic Abuse-Informed
Practice and Systems: Self-Assessment Tool and evaluate progress. 
Initial survey parts of the assessment process were completed. 
However, staff issues meant that the board was unable to meet to
complete the process.  
Yes
Completion of the Research Project. This is
to be published and add to the evaluation
process relating to the Transforming
Responses to Violence Against Women and
Girls Project.
The research was completed in 2023, but decisions were made not
to publish at that point.  It will be published in 2025.   
No
Consider the funding needs of the Violence
Against Women and Girls Partnership in
relation to key work areas and develop and
submit a further bid to the next round of
the Developing Equally Safe Fund. 
This process has not been possible or necessary.  The Scottish
Government did not make a final decision on the funding of the
Violence Against Women sector and continued Developing Equally
Safe Funding for another year.  
No
Review the Argyll and Bute Equally Safe
Plan. 
The Equally Safe Plan was reviewed and a new one completed; this
is awaiting sign off by Chief Officers Group Public Protection.
No
Deliver Annual Return from Argyll and Bute
to the Improvement Service / National
Violence Against Women Forum.
This was completed and delivered on time. No
Roll out of the Safe and Together Model to
continue and this to include 2 in-house
Trainers to be trained.
An in-house trainer did complete the trainer’s course but has
subsequently left the Council.  The roll out of Safe and Together
has stalled due to unavoidable staffing issues.  
Yes
Other training areas to be delivered
including: Awareness Raising; Routine
Enquiry; Harmful Traditional Practices; The
Impact of Domestic Violence on Children
and Working with Men. 
2024 – 2025 saw the delivery of a very full and active Training
Calendar.  Between 1/04/2024 and 31/3/2025 a total of 20 training
events took place, with 319 attendances.  
Yes
Achieve improvement in services and
pathways relating to women and girls with
a Learning Disability experiencing or, at
risk of experiencing domestic abuse.
Whilst national training and awareness raising events were
attended and information from these passed onto relevant staff, it
is felt that sufficient progress has not been made in this area. 
Further work remains to be done.  
Yes
Review progress of the transformation
project and the delivery of the Equally Safe
Plan. 
The Transformation Project was not formally reviewed but
continued forward with Developing Equally Safe Funding.  It was
noted that the Safe and Together roll out was not able to move
forward and this point due to staffing issues.  The Delivery of the
Equally Safe Plan was reviewed in the Annual Reporting process
and the completion of an updated Argyll and Bute Equally Safe
Plan and Strategy.  
Yes
Have in place a Communications and
engagement plan.
This has not been properly developed, and work is required here. 
Staffing issues have been the main delaying factor.
Yes
Use the Domestic Abuse-Informed Practice
and Systems: Self-Assessment Tool to
establish a baseline for services prior to
training and service change measures.
This still requires to be done Yes

Page 9

Page 9 of 46   
Engagement Activities Taken Place in 2024/2025
Whilst engaging with a broader range of staff in terms of domestic abuse awareness raising did take place, engagement /
coproduction with lived experience women did not, beyond the activity of individual partnership members.  This needs to
happen in the coming year.  It is hampered by the absence of any budget for this process.  
Research to assess the impact of the
Transforming Responses to Violence
Against Women and Girls Project, to begin.
Some research has been done with regards to the wider training
delivery.  More requires to be done but the project is to continue
for another year.
Yes
Review the Argyll and Bute Equally Safe
Plan.
This is completed. No
Development of Data Base that will assist
us to monitor trends in Domestic Violence
and other gendered violence.
A Data Group has been created but has yet to meet. Yes
Deliver Annual Return from Argyll and Bute
to the Improvement Service / National
Violence Against Women Forum.
This has been completed, annual process that will continue. Yes

Page 10

Page 10 of 46   
Priorities Year 3  Progress Update
Carried
over
2025/26
Yes/No
Monitor likely impact of national
developments, mental health law review,
national care service and other safety
activity in trafficking etc. 
The Chair of the Adult protection Committee and Lead Officer
continue to monitor national developments impacting Adult
Support and Protection services in Argyll and Bute via their
membership of the Adult Support and Protection Scotland
Convenors group, The National Implementation Groups
(resulting from the Revised Code of Practice), Social Work
Scotland, Adult Support and Protection Subgroup and the
National ASP Minimum Dataset sessions.   
Yes
Develop enhanced service user/citizen
involvement in processes and policy. 
The revised Code of Practice for Adult Support and Protection
together with the recently developed Care Inspectorate Quality
Improvement Framework  (QIF) for Adult Support and
Protection documents have guided us in developing enhanced
service user, carer and citizen involvement in processes and
policy.  Ensuring meaningful involvement in adult protection
case conferences remains a priority activity working with our
colleagues in Advocacy services to ensure their voices are heard. 
The QIF has identified for the Adult Protection Committee what
‘very good’ involvement of adult at risk and their unpaid carers
should look like.  Ensuring meaningful involvement is a
significant APC agenda item running through 2025/26
Yes
Continue process of review and audit.  We are currently undertaking a substantial review of our ASP
service.   Staffing challenges across social work have required us
to evaluate our processes and develop new way of working.  The
QIF again is serving as an excellent tool to identify where
improvements can be made in our activity.  We are now
preparing for our next substantial audit planned for May.  We
will be using the Care Inspectorate audit tool which we have
revised, together with our method of file reading, to enable us
to analyse particular areas of activity.
Yes
Develop improved data collection based on
national dataset activity. 
The Scottish Government has continued to develop the ASP
minimum dataset, via the Institute for Research and Innovation
in Social Services (IRISS), with the aim of having a shared
understanding of information. To generate more robust
meaningful and comparative data. Collecting our data remains
challenging as we adjust to the national dataset requirements as
modifications are required to our File Recording system –
Eclipse. The Lead Officer, colleagues from our Performance and
Data Team and The Eclipse IT team all contribute to strive to
meet these challenges, recognising the value of improved
understanding of our services activity, and the ability to plan
future services. 
Yes
Review Significant Case Review (SCR)
guidance and Code of Practice changes. 
We have now ratified and adopted Joint Child Protection and
Adult Protection Guidance on Learning Reviews which have
replaced Significant Case Reviews.  We have received several
notifications requesting consideration of a Learning Review and
have been able to effectively use the guidance.  
No
Develop protection links with Child
Protection, Alcohol and Drug Partnership
and Violence to Women.
The Adult Protection Committee Chair and The Lead Officer
maintain vital links with the Lead Professionals for Child
Protection, Alcohol and Drug Partnership and Violence against
Yes

Page 11

Page 11 of 46   
Engagement Activities Taken Place in 2024/2025
National Implementation Group Chronologies - 10/04/2024
Joint Child Protection (CPC) Scotland and Adult Support and Protection (ASP) Convenors Scotland Group Meeting -
17/04/2024
ASP Quality improvement Framework Self Evaluation Guidance Workshop – 07/05/2024
Joint APC/CPC Meeting – 09/05/2024
Community Justice Partnership consultation and Engagement Session - 21/04/2024 
Women and Girls.  The Lead Officer is a member of their
committees and contributes to events and activities.  
Continue staff support and contact
programme. 
Staff support and contact has become more important than ever
as we tackle the staffing shortages within social work,
particularly   the challenges this presents in ensuring safe and
effective adult support and protection action.  Team Manager,
Council Officer Forums and the recent introduction of a daily
ASP huddle are all designed to support staff in the completion of
adult protection activities.   
Yes
Meet the Improvement Plan targets arising
from Inspection. 
We continue to strive to meet our Improvement Plan targets. 
Improvement in ASP is not a single step activity, rather an
ongoing process.  We have successfully introduced the
requirement for Chronology and Risk Assessments however
ensuring their quality will require continuous monitoring via
regular review and audit.
The Lead Officer is undertaking an overhaul of the original
Improvement Plan to include the key guidance now addressed
within the QIF.  It is recognised that this document was prepared
reflecting potential next stages for Inspection. 
Yes
Implement Code of Practice changes.  The Code of Practice changes continue to be addressed on a
daily basis via 1-1 worker consults, social work supervision,
specific ‘bitesize’ staff training sessions and at the quarterly ASP
Forums.   The changes have been substantial and have required
significant re-evaluation of the way in which ASP activities have
been historically undertaken.   
Yes
Implement guidance for Primary Care and
GP’s. 
The Adult Support and Protection Guidance for General
Practitioners and Primary Care Teams continue to be promoted
throughout primary care.  Planned promotion of this guidance
through direct contact with surgeries has been limited owing to
competing priorities and further work in this area is required.
Yes
Progress audit activity, case files.  We continue to request that SW Teams undertake monthly
single agency case audit on a single ASP intervention and we are
committed to ongoing annual case file auditing after our internal
audit completed in March 2024.    
Yes
Develop issues arising from Initial Case
Reviews, Large Scale Investigation findings. 
We continue to use the findings from nationally reported
Learning Reviews to inform our ASP practice through our ASP
Forums, training sessions and supervision activities.  We have
focused particularly on ensuring most effective interagency
communication and improving case recording, not least
evidencing defensible decision making.
Yes
Develop ‘escalation’ policy.  We regularly escalate concerns through the formal ASP Inquiry
process as required. A draft escalation policy is currently being
developed which will need to be adopted by a number of
services, all having significant roles in the support and protection
of adults at risk of harm.
Yes

Page 12

Page 12 of 46   
Priorities Year 3  Progress Update 
Carried
over
2025/26
Yes/No
Implement and monitor our local
Community Justice Improvement Plan and
performance framework. 
The publication of the Community Justice Improvement Plan has
been delayed, expected May/June 2025.  However, the
Community Justice Partnership has been continuing to focus on
progression of 10 national outcomes, 4 national aims and 13
priority actions.  Multi-agency activity is ongoing across all the
Community Justice Pathways:  Point of Arrest, Through
Prosecution (including Bail, Electronic Monitoring), At Court,
Community Sentences and Liberation from Prison (including
Remand).  Production of the Argyll & Bute Community Justice
Annual Report 24/25, submitted to Community Justice Scotland,
is underway. The CJ Annual Report for 2023/2024 can be found
here, page 104.
(Public Pack)Agenda Document for Argyll and Bute Community
Planning Partnership - Management Committee, 16/04/2025
10:00
Future reporting will be formatted around the Community
Justice Pathways
Yes
Review the progress of the Justice Social
Work (Community Justice) Service Plan,
support future developments. 
The JSW service plan 2025 – 28 is being developed to establish
new priorities and areas for development in line with Scottish
Government policy and revised national guidance.  The service
plan will be linked into a wider overarching Performance and
Quality Assurance Framework for the service.
The need for an overarching framework was identified as a need
following the self evaluation of JSW by Care Inspectorate in the
latter months of 2024.  We are still awaiting formal feedback
from the Care Inspectorate on this. 
In relation to the JSW Service Plan 2022 – 25, I can report that
most areas were achieved including
• Improvements in Diversion from Prosecution practice, 
• Successful Implementation of new national Justice Social
Work report template
• Successful Implementation of new national Throughcare and
Aftercare Release Licence Reports and protocols.
• Continued rollout of Bail Supervision Scheme and use of
Structured Deferred Sentences as per national policy
direction
• All Justice Social Work Staff trained in Schema Therapy and
DBT to improve interventions and trauma responsive
services
• Implementation of Justice Eclipse system
• Monthly Audit Programme ensuring regular audits across all
areas of JSW activity
• Completion of the LAAS pilot project to deliver voluntary
throughcare service 
Notable areas of focus for the 2025 – 28 Service Plan include
Pilot of Advance-D Domestic Abuse Perpetrator Programme
Implementation of the suite of new/revised national guidance
Yes

Page 13

Page 13 of 46   
which will be introduced throughout 2025: Diversion from
Prosecution, Bail Supervision, Home Detention Curfews,
National Outcomes and Standards for Community Sentences
Development of Unpaid Work
Joint work with Recovery services 
Continuation of audit programme and focus on quality
assurance
Implement and monitor the
improvements related to the jointly
commissioned Violence Against Women &
Girls research.
There has been a delay in publishing the study, due in part to
wanting to demonstrate progress on some of the
recommendations so that this could be seen alongside the
study.  
In the interim progress has been made in:
• Awareness Raising and understanding of the Safe and
Together model.
• Developing a trauma informed workforce.
• Informing staff skills base and understanding of the lived
experience of women and children through a range of
training events in key areas; these include:
➢ Trauma Impacts of domestic abuse on women and
children and how to work with these.
➢ Routine Enquiry; asking the question.
➢ How the Police Deal with Domestic Abuse and support
victims.
➢ Domestic Abuse and Child Contact Issues.
➢ Domestic Abuse in Single Sex, Female Relationships.
➢ Dealing with Disclosure of Sexual Assault.
➢ Animal Abuse as a Form of Coercive Control.
➢ Human Trafficking.
➢ Commercial Sexual Exploitation.
➢ Harmful Traditional Practices.
➢  Working with Perpetrators Towards Change.
➢ Working with Men; working with Fathers. 
Other things that have happened to improve staff awareness
and skills and, hence, improve services to lived experience
women, have included:
• The increase in the number of key agencies who are
members of the Violence Against Women and Girls
Partnership. This supports better communication and joint
working.
• Information / leaflets for both staff and lived experience
women are currently being developed.    
No 
refer to VAWG
Section
Carry out a validated self-evaluation of
our Community Justice Partnership in line
with the Care Inspectorate guidance. 
Ongoing.  Prioritising of Legal Compliance; Leadership,
Engagement & Partnership Planning; and Public Protection
sections.  Justice Social Work carried out a self-evaluation for the
service during 2024/2025, awaiting feedback from the Care
Inspectorate.
No
included as part
of
implementation
of CJ Plan
Review the learning from the first phase
jointly commissioned research report for
Violence Against Women & Girls and
implement key recommendations.
Refer to update above No

Page 14

Page 14 of 46   
Engagement Activities Taken Place in 2024/2025
During 2024/2025 engagement continued the wide range of organisations and services included national and local public and
third sector, this was based around the four aims, thirteen priority actions and ten national outcomes for community justice. 
Engagement with a range of representatives from the following: 
Children, Families & Justice Social Work                  Employability Partnership 
Housing               Community Planning Area Planning Groups 
Police Scotland We Are With You              
Scottish Fire & Rescue Service                        Carr Gomm
Skills Development Scotland Hope Kitchen            
Third Sector Interface                                       Lomond and Argyll Advocacy Service                       
Drug & Alcohol Recovery Service                     Blue Triangle                              
Mental Health Service Inspiralba
Health & Social Care Partnership Bute Advice
Alcohol & Drugs Partnership Community Justice Scotland
Violence Against Women Partnership Scottish Prison Service
Scottish Government Scottish Violence Reduction Unit 
The activity focused on reviewing the requirements within the national documentation, creating baselines for where we are
and identifying where there is capacity for improvement within current resources and what requires additional national
resources.

Page 15

Page 15 of 46   
Priorities Year 3  Progress Update
Carried
over
2025/26
Yes/No
Continuation of previous year’s activity and
new activity to be agreed in partnership. 
Argyll and Bute HSCP Public Health team continued to work on
the below activities, agreed according to national priorities,
assessment of local need and through joint working with a
range of partners.
Yes
Deliver on joint Health Improvement plan
between Argyll and Bute and north
Highland. 
A joint Health Improvement plan has been developed between
Argyll and Bute and Highland, with a view to delivering some
activity NHS Highland-wide. The aim is to share learning and
streamline pieces of work where relevant. In year three of this
workplan, joint training continues to be delivered as follows:
• Money Counts – virtual training opportunity which is 
available for any staff and partner organisations across NHS
Highland and Argyll and Bute. This is delivered by Health
Improvement staff and in year 3 was also supported by
Argyll and Bute Council staff. It
aims to raise awareness of poverty, how to raise the issue of
money worries, and where to signpost/direct people for
additional support. It also raises awareness of the Argyll and
Bute Worrying About Money leaflet. In 24/25, 4 courses
were delivered across NHS Highland, with 27 attendees.
MAP of Health Behaviour Change – The aim of this course is to
give practitioners skills and confidence to notice, discuss and
support opportunities for patients to make and maintain
behaviour changes. The course focuses on person-centred
communication skills. In 24/25 3 courses were delivered to 27
attendees.  The course continues to be delivered quarterly
across NHS Highland and in 25/26 will be complemented by
skills coaching sessions and training additional trainers.
Yes
Addressing inequalities: child poverty;
poverty; children’s rights; equalities; 
The Public Health team have continued to undertake work
addressing inequalities. This is threaded throughout all our
work, and includes specific action as detailed below:
• In partnership with Scottish Government Screening
Inequalities Fund, we were able to increase capacity
dedicated to reducing inequalities in screening
programmes. A Health Improvement Officer worked with
3rd sector organisations in Argyll and Bute to build capacity
for promotion of screening programmes using a £7500
grant fund. Projects included Wellbeing Walks, a community
wellbeing festival, an art-based community engagement
programme and producing culturally appropriate screening
information for Gypsy/Traveller community. 
• The team has led on developing new Equality Outcomes for
Argyll and Bute HSCP and completing an equalities
mainstreaming report. This involved aligning to NHS
Highland & Argyll and Bute Council equality outcomes,
consulting with staff, services and public. These will be
published in June 2025 with the Equalities Mainstreaming
report 2021-2025, which details how the HSCP has
mainstreamed equalities over this time period.
• The team support the Welfare Advice and Health
Yes

Page 16

Page 16 of 46   
1 Note that some practices merged in 24/25, hence the change in GP practice number from 14 to 12. There
was no reduction in service.
Partnership (WAHP) in Argyll and Bute.  This initiative aims
to address financial insecurity for individuals who may not
seek support from other means of welfare advice and in
doing so contribute to improvements in health and reduce
demands on Primary Care services. Funding was allocated
to Argyll and Bute Council for additional resource for
welfare advice specialists, for a 2-year remote and rural
pilot for five GP practices.57% of clients had a long-term
condition. Total client financial gain from Welfare Rights
intervention from the start of the project is £315,560.50.
The team play a role in supporting the HSCP with their statutory
duties under the United Convention for the Rights of the Child
(UNCRC). In 24/25 this has involved supporting the Argyll and
Bute UNCRC group. The team have led a project on integrating
‘child rights and wellbeing impact assessments’ (CRWIA) into
the existing impact assessments. This integrated impact
assessment will be available to HSCP staff from 2025 onwards.
Support the strategic direction and delivery
of the Living Well Programme board and
initiate implementation of the refreshed
Living Well Strategy. Within this programme
of work, projects include workforce
development; self-management;
community link working; physical activity;
mental wellbeing. 
The Public Health team continue to support the Living Well
programme board with strategic direction and operational
delivery.  This programme board uses the background of the
Living Well strategy to inform a 5-year plan of prevention, by
focusing on wellness, not illness, empowering and enabling
those within Argyll and Bute to live well.
Specific detail on activities is provided below:
• Supporting Living Well Programme by providing Health
Behaviour Change training to new Wellbeing Practitioners.  
• Supporting ‘Community Assets for Living Well’ workstream,
which includes development of a new Walking
Development Officer Post, rolling out Art of Hosting
methodology across Argyll and Bute, and exploring
opportunities for ‘single point of access’ to statutory and
community services.
• Evaluation of the 2019-2024 Living Well Strategy through
focus groups with key stakeholders
• Development of a strategy refresh plan for the Living Well
Strategy 2025-2030.
• Leading the tender process for the new Community Link
Worker contract 2024-2028. This was informed by
evaluation of the previous service and engagement with
CLW and primary care staff. During 24-25, the service was
available in 121 GP practices.  Between March 2022 and
December 2024, the service received 1224 referrals & 90%
of those who received the service and completed an
outcome questionnaire reported an increase in their
wellbeing. In addition, the Public Health team worked with
Living Well partners to draw in external funding for the
service. This has resulted in a remote and rural service
expansion from 2024 onwards and resource for evaluating
CLW in island communities.
• Work has continued to embed RSPB Nature prescriptions
across Argyll and Bute.  RSPB Nature Prescriptions are a
free, non-medical approach based on accessible
connections to nature that will improve wellbeing by
engaging with nature in a personal and meaningful way. In
Yes

Page 17

Page 17 of 46   
24/25 these were used by Community Link Workers to
connect people to nature and increase their wellbeing.
• Living Well Community Capacity fund awarded Living Well
grants to community projects and services which met the
aims and outcomes of the Living Well strategy.   In 2024-
2025, the grants focused on improving health and wellbeing
in rural island communities through ‘connecting people to
community activities’. £23,000 of grants were awarded
• Support the delivery of the local suicide prevention action
plan working with Argyll and Bute Strategic Suicide
Prevention Group. In 24/25, capacity to support this work
was increased via a new dedicated Health Improvement
Senior post. Since  September 2024, a range of suicide
prevention and mental health training opportunities have
been delivered across Argyll and Bute. These include 115
people trained in ASIST (Applied Suicide Intervention Skills
Training), 41 in Scotland’s Mental Health First Aid (SMHFA),
and 53 in Youth Mental Health First Aid (YMHFA). In
addition, a group of 12 frontline staff took part in an "Ask,
Tell" workshop – a training programme developed by NES
and Public Health Scotland to improve understanding of
suicide, self-harm, mental health, and compassionate
conversations. 
• On World Suicide Prevention Day (10 September), council
buildings were lit up in purple and a social media campaign
helped raise awareness of available support. By the festive
period in December, the Argyll and Bute Mental Health Hub
had been developed to provide a centralised online
resource for those experiencing distress or needing crisis
support: https://www.ablivingwell.org/mental-health-hub.
Recognising that not everyone has internet access, printed
leaflets were also produced and distributed through third
sector partners to ensure wider reach and inclusion.
• The Public Health team continues to take an evidence-
informed approach to all actions, and is committed to using
timely and relevant data to support decision-making. With
this in mind, links have been strengthened with Police
Scotland, and more detailed data is now being received
regularly to help us monitor local trends and shape targeted
prevention activity.
• The Smoking Cessation team within Public Health continue
to deliver a service across A&B that targets the 40% most
deprived communities but is available to all residents. There
are 4 smoking cessation advisors within the team and
during 24-25, they supported 76 people in their efforts to
stop smoking. The team also promoted their service and
highlighted the dangers of smoking at a number of
community events.
Work undertaken to scope sexual health promotion needs
across Argyll and Bute including small focus groups with young
people. A new Condoms by Post scheme has been developed in
conjunction with NHS Highland and delivered by Health
Information Resources Service (HIRS). ‘Speakeasy’ training for
trainers has been commissioned from NHS Tayside. Speakeasy is
a preventative community education programme which helps
parents and carers tackle issues around children growing up,
including body changes, safety, relationships & sexual health.

Page 18

Page 18 of 46   
Please outline any activity in relation to service commissioning, i.e. revisions to specifications, new services,
reviews of existing contracts. Terminations of contracts. 
In 24/25, the Public Health team supported several contracts, and further detail is provided below:
Heartstart: SLA with Greater Glasgow and Clyde - continues
Living Well Network Coordinators: contracts ended in March 2025 following a review. In 25/26 team are exploring new ways
of working with communities.
Community Link Workers: 21-24 contract with We Are With You came to an end in December 2024. New tender process
undertaken with revised specification. We Are With You were the successful organisation and now delivering the service from
December 24. 
Cool2Talk:  annual grant payment to Mid Argyll Youth Development Services and SLA with NHS Tayside ended in March 2025
following a review. 
Waverley Care: note that this contract was commissioned and managed by NHS Highland and was a pan-Highland service
which ended in December 2024. 
Distress Brief Interventions: Due to operational reasons, the Public Health team have temporarily taken on oversight and
support of the Distress Brief Intervention contract. This has included evaluation of the 25/25 contract and appropriate
contracting process for the 25/26 contract.
Engagement Activities Taken Place in 2024/2025
The Smoking cessation team continue to undertake engagement and awareness raising events throughout the year. This
includes engagement with various professions to raise awareness of the service and increase referrals – including local
pharmacies, AHPs, Social Work, Specialist Nurses, Primary Care, Community Link Workers, Midwifery, disability employment
officers etc…The team also undertake community engagement, attending community events such as wellbeing festivals and
engaging with Children and Young People during the S2 Drama productions. Every March there is a No Smoking Week, which
sees awareness raising events of the service and the benefits of quitting across Argyll and Bute.  This year smoking cessation
advisors attended events in each community hospital, local shops and supermarkets and worked with Oral Health
Improvement colleagues. 
The course helps parents to build on what they already know
about growing up relationships and sex. Fifteen individuals
representing a diverse range of professions which work with
families and young people attended the initial training sessions
and we are currently developing a plan for roll out.
Building capacity for health improvement:
education;  community planning; locality
planning; encouraging and supporting cross
sectoral collaboration and community
empowerment; engagement; place-based
work.
The Public Health team continued to build capacity for health
improvement in partners and our communities. Our Living Well
networks held quarterly meetings within their local areas and
coordinators also attended Locality Planning Groups. In
addition, communications, surveys, consultations etc from
various sources (e.g. Public Health team, Locality Planning
Groups, Third Sector) were sent out by email and social media
via the Networks. The Public Health team regularly attended
Area Community Planning Groups, relevant thematic
Community Planning groups and Locality Planning groups to
build capacity for health improvement and coproduction 
The Public Health team arrange webinar sessions open to HSCP
staff and Third Sector. These have included webinars on: suicide
prevention services by Breathing Space. 
The team have also built capacity through training delivery and
commissioning for a range of topics including health behaviour
change, suicide prevention, financial inclusion and sexual
health.
Further engagement activity is described below.
Yes

Page 19

Page 19 of 46   
There are four Living Well Networks throughout Argyll and Bute, with a dedicated LWN Coordinator for each Locality funded
by the Public Health Team. The purpose of the Networks is to develop local partnership working and planning for health
improvement activity. Although these networks came to an end in March 2025, they undertook a number of community
events in 24/25 including partnering with Helensburgh Community Hub for a wellbeing festival and hosting a health and
wellbeing day in Tiree. 
Engagement has driven the suicide prevention work delivered by the team. In 24/25 suicide prevention training was
refreshed across Argyll and Bute and was informed by community and staff engagement which sought to find out training
needs and preferred locations. Engagement also drove the development and launch of a new  Mental Health Hub — Living
Well in Argyll and Bute, a dedicated space on the Living Well in Argyll and Bute  website to find support and resources for
mental wellbeing and suicide prevention. This was developed following a needs assessment and is continuously updated
following feedback from engagement. 
As part of the engagement work for the new Community Link Working contract, information sessions have been held for
remote and rural GP practices. This is part of ongoing engagement with GP practices to scope and ensure the service best
meets the needs of remote and rural communities. Three drop-in information sessions have been set up to provide an
overview of the current service, discuss what the future remote and rural service will look like, and gather feedback from GPs
about aspects of the service. 
In order to reduce inequalities in accessing screening programmes and following a request from Public Health Scotland,
engagement was undertaken with the Gypsy/Traveller community via 3rd sector organisation MECOPP. This feedback will be
fed back to PHS and used to tailor screening literature and identify new initiatives. 
Work has continued in 24/25 to engage on lessons learned from the Living well strategy and to inform the next iteration of
the strategy. To-date relevant stakeholders have been invited to provide their view on what worked well, lessons learned and
what could have been better. Previous health and wellbeing-related engagement has also been reviewed, in order to identify
where there are gaps in ‘what we know’. 
Sexual health focus groups were carried out in an Argyll & Bute secondary school with a total of 11 young people in secondary
4 & 5.  This was a lively discussion in order to understand their experiences of sex education, sexual health promotion and
issues someone their age might have accessing contraception, condoms, emergency contraception and other sexual health
related services.  The feedback from this was used to inform initiatives.

Page 20

Page 20 of 46   
Engagement Activities Taken Place in 2024/2025
Noted below in older adults/adults and hospitals. 
Priorities Year 3  Progress Update
Carried
over
2025/26
Yes/No
Consider models for community services
with the aim of minimising different
services/staff visiting people in community
and improving flow through hospital. 
Assessment and care coordination reform. Focussed work around
the review and redesign of extended community care teams,
with re-ablement. Review and redesign of systems and processes
for assessment and care coordination, including assessment and
care review.  TEC and Digital care. Introduction of reviewing
officers and Discharge Flow coordinator role (whole system).
Yes
Plan and progress spend on the recurring
funding from Scottish Government. 
All funding linked to KPIs and strategic older adult work. Sitting
within a finance group. SG whole system action plan and funding
bid has been progressed which is liked to ongoing CfSD leverage
points and strategic drivers.
No
Enhancing multi-disciplinary community
teams to be responsive, flexible, highly
skilled, continually assessing with a re-
abling and rehabilitation ethos and high
quality end of life care with the skills to
provide simple care that currently involves
a hospital admission.
Part of integrated processes and community standards work.
Good progress in terms of mapping barriers and areas of change.
Also considered above in terms of ‘’models for community
services’’.
Yes
Enhance clinical education for all staff,
develop skill mix, apprenticeships and
health care support worker skilled roles.
Sitting under any service change/governance. No
Provide enabling care at home that is
effectively commissioned and planned for
those who need it, with enough capacity to
be provided following assessment at home
and at the point of need.
These needs to link to the wider issue of the strategic approach
to care at home (see below) and integrated approaches of how
assessment and review of care is carried out. Discharge to Assess,
focussed remodelling of reablement, TeC and digital are all key
factors.  Link with Care at Home below.
Yes

Page 21

Page 21 of 46   
Please outline any activity in relation to service commissioning, i.e. revisions to specifications, new services,
reviews of existing contracts. Terminations of contracts. (previous update below)
Current Update from Commissioning 
Care at Home 
Priorities Year 3  Progress Update
Carried
over
2025/26
Yes/No
Extend the Community Hospitals into the
community and provide a greater range of
health related skills and services at home.
Urgent Community Response and Hospital at Home ongoing
development. Ambulatory Care. Virtual ward, OPAT and near
patient testing.
Yes
Develop a community assets approach and
identify a way in which people can be
supported as much as possible within their
own community before needing statutory
services. 
Single Point of Contact review and redesign. Links with Living
Well Programme and TSI. Ongoing work round the
development of a ‘one front door approach’ which will be co-
produced across all sectors. Standardisation of materials and
processes currently in use.  Assessment ethos to be enabling,
with strengths and assets based approaches. 
Yes
Developing a meaningful conversation with
islands around our health and care services. 
Specific island work has been carried out on Mull and Tiree in
relation to specific service developments. These needs widened
to our overall island approaches.  Link with overall islands
approach
No
Set up a Self-Directed Support Steering
Group in order to embed  Self-Directed
Support  Improvement Standards.
Standards are being reviewed but no steering group has been
established.  Consider integration of SDS across all areas of
assessment and care coordination.
Yes
Support care at home through a challenging
winter, linking unscheduled care elements
to limit duplication and make best use of the
total resource available.
Link all these care at home actions into one key action for care
at home. Links with Care at Home strategic development and
community services redesign.
Yes
Develop a care at home strategy to agree
and monitor key developments to build a
flexible and sustainable service. 
Strategy developed and 4 sub-groups linked to organisational
redesign; financial sustainability; training; digital. Pathways in
and out of the service underway and the integrated processes
work reducing duplication.
Yes
Develop an Older Adult Strategy.  Completed and agreed. One year action plan to be completed.
Review process to review and refocus actions has been
developed to support the delivery of the strategy for its whole
lifespan.
Yes
Develop a robust plan around winter
planning, mapping out all elements of
service delivery, what the pressures are and
how they impact on each other.
Completed – reviewed annually. No
Work in partnership with providers,
supporting elements such as recruitment,
training to ensure best use of resources.
Continuous, would see this as part of ongoing good governance
work rather than a development in its own right.
No
Review the use of Extended Community
Care Teams and link them to other
community services.
Underway, again linking with care at home and community
developments.
Yes
Complete a building appraisal for internal
care homes and develop an overarching
care home and housing strategy. This will
include the position of intermediate care
within Argyll and Bute.
The strategic work on care homes and housing is well underway
with a demographic modelling and the development
(underway) of options appraisal to inform future models.
Closely linked with housing under the Care Homes and Housing
Programme Board. The work on intermediate care has not yet
begun in terms of its scope.
Yes

Page 22

Page 22 of 46   
There is a lot of agency use in OLI care at home due to issues with recruitment and retention. Options to resolve this are
being looked at. 
Review of Community Resources Group (CRG) process to ensure equity of services and ensure that there are links to
community assets
Link to discharge protocol and establishment of single point of access; responder; enablement & re-ablement; palliative care
model
Ensure these services are part of a continuum of service 
Engagement Activities Taken Place in 2024/2025
Specific engagement with staff groups across the HSCP as part of the older adult strategy. This included a locality webinar for
all LPGs; staff and professional leads workshops; work with the Older Adult Reference Group.
Two provider forums were established for care at home and care homes.

Page 23

Page 23 of 46   
Please outline any activity in relation to service commissioning, i.e. revisions to specifications, new services,
reviews of existing contracts. Terminations of contracts.  (previous update below)
Current Update from Commissioning 
Increased need for specialist neurodiversity services within Argyll and Bute in order to prevent requirement for out of area
placements and support the repatriation of individuals back to the area, where appropriate 
Priorities Year 3  Progress Update
Carried
over
2025/26
Yes/No
R
A
G
Further development of specialist Core and
Cluster housing to support individuals with
complex needs and reduce the requirement
for individuals to be placed out with the
area. 
Core and cluster for 6 has been developed in Dunbeg and is at
full occupancy.
4 person individual supported adapted tenancies, new build
properties at the Sawmill site Helensburgh as a replacement
for the Campbell St. service now operational in Partnership
with Scottish Autism and Loretto Housing. 
6 person individual supported tenancies in Rothesay currently
being developed in partnership with ACAH and Affinity Trust.
Direct replacement of the Morningside service with increased
capacity.
Other options for new build in Argyll and Bute also currently
under consideration. 
Yes A
Development of short, medium and long
term housing strategy to ensure
appropriate accommodation models for
services users and affordable housing for
H&SC staff.
Involved with Corporate Services and other A&B and NHSH
Departments to promote available and affordable housing
options in a range of localities. No great movement to date
but reasonable prospect of small scale limited success in 2
localities.
Yes A
Sustain and further improve on the positive
feedback from external regulators
regarding the quality of service provision
(both internal and external). 
All internal services, the 5 day Services in Oban, Lochgilphead,
Campbeltown, Rothesay and Dunoon, and the HMO,
Greenwood in Campeltown have all been inspected with
improvements across the grades in all.
Further work being undertaken aligned to the priorities of the
Services 3 year Improvement Plan.
Yes G
Reduce stigma in relation to learning
disability and autism through delivery of
joint training and/or awareness raising for
staff across the HSCP.
Limited training has been undertaken however a more
comprehensive set of objectives are currently being worked
up in respect of the Strategy developments referenced in the
following section below.
Yes A
Development of A&B specific Learning
Disability and Autism Strategies, in line with
the A&B HSCP Engagement Framework. 
The Learning Disability and Neurodiversity Strategies are
currently being refreshed with representation and support
from Service users, families, carers, individuals with lived
experience, NAIT, NHSH, A&B, 3rd and Independent Sector
partners. 
Timescale for completion January 2026.
Yes A
Continue to utilise technology and telecare
where appropriate to increase
independence, whilst ensuring the safety
and wellbeing of service users. 
The use of technology for individuals and service support
providers is a central essential consideration in all our Service
User focussed activity. The commitment is to maximise
Independence, independence and safety within all situations,
models of care and to recognise the financial challenges
across the Partnership in relation to economies and budget
considerations. In particular the use of Tech can help build
confidence for individuals and their carers/families as we work
in partnership to develop new models of care.
Yes A

Page 24

Page 24 of 46   
Review of Day Service provision across A&BHSCP to ensure equity, sustainability and services are fit for the future.
Review all pre-placements residential care contracts for out-of-area placements, if not covered by SXL. 
Review all supported living contracts. 
Lead update: There have been no contract terminations. All services whether internal or contracted are subject to a
programme of review/refreshment as required.
Engagement Activities Taken Place in 2024/2025
Contract/service reviews with all commissioned providers.
Development of new Respite opportunities with Key Housing and Enable.
Development of new outreach Autism support service in H&L
Scoping activities undertaken with HSCP Departments and 3rd/Independent sector providers for Supported Living, personal
care and all the aforementioned.

Page 25

Page 25 of 46   
Priorities Year 3  Progress Update
Carried
over
2025/26
Yes/No
Consider and consolidate standardisation
of processes; roles and responsibilities;
care and support co-ordination and
utilisation of effective training and delivery
models (i.e. specialist / generic).
Community guidelines are progressing well and will examine
interface with other services across the mental health landscape.
Team are progressing with scoping variance and impact of same
Yes
Further scoping of leadership and
management of teams have enabled
operations managers across the service.
Full embedded No
Establish clear pathways to keep patients
in local hospitals before transferring to
acute units and further develop
community supports and strategies.
A oversight looking at inpatient IPCU and inpatient dementia beds
has been progressed, although at an early stage
Yes
Progress planned developments associated
with Transforming Together agenda for
mental health. 
Core and cluster not progressed – requires dedicated support to
develop
Yes
Community Mental Health Services review
and outcomes.
Completed – this is several years on, the majority of outcomes
have been met and those now not relevant noted
No
Psychological Therapies – we are working
with the Scottish government to develop a
business case to enhance and develop our
PT services across A&B and to assist us to
meet the expectations and demand for
services in a timely and effective manner.
The teams are now realigning to make an
A&B wide service under one management
structure to ensure better oversight of
waitlist and service delivery at tier 3 and 4.
Psychological therapies is now 1 team and managed by Consultant
Psychologist, we have developed a successful partnership with
Xyla to assist in wait times across A&B
No
The primary care mental health team have
also realigned to work across GP surgeries
and to support those presenting with mild
and moderate mental health concerns.
This team have a Multidisciplinary Team
approach and have a wellbeing nurse, 
Occupational Therapy , guided self-help
worker and primary mental health worker
in each locality.
This is fully embedded  No
Care Reviews. Required resource to support, scoping commenced Yes
Inpatient services – addition of a
consultant psychiatrist for the inpatient
unit 3 days per week. Recruitment of 
Registered Mental Health Nurses  remains
fragile due to the national shortage and
the inpatient environment holds large
vacancies, support around recruitment and
retention is well under way across 
NHS Highland.
No progress in Consultant recruitment, currently sector
consultants in reach to the ward. Recruitment in Mental health
remains fragile and challenging across disciplines. We have the
privilege to welcome International nursing colleagues over the last
2 years which has positively impacted and are supporting 4 earn to
learn students. Retention premium is in situ until 2026. 
Yes
Standardisation of processes; roles and
responsibilities; care and support
coordination and utilisation of effective
Dementia team are offering inreach, training and support,
variation will continue to be monitored and assessed by Clinical
service managers 
No

Page 26

Page 26 of 46   
Please outline any activity in relation to service commissioning, i.e. revisions to specifications, new services,
reviews of existing contracts. Terminations of contracts. 
New contract with Xyla for primary and secondary psychological interventions 
training and delivery models (i.e., specialist
/ generic), as appropriate to support
mental health and dementia services
locally

Page 27

Page 27 of 46   
Priorities Year 3  Progress Update
Carried
over
2025/26
Yes/No
Assess the impact on GP practices following
the service redesign of Pharmacotherapy
using a remote hub model. 
The hub is now fully staffed from March 2025 and a new skill mix
has been introduced to provide input into the practices remotely.
Systems and processes are still in development and referrals into
the pharmacotherapy service are being looked at to identify which
team member is the most appropriate to undertake the task.
Once this is completed there will be consultation with the GP
practices. There are also 2 development posts for pharmacy
technicians in the hub and these reduce the input to practices.
Yes
Delivery of a strategy for island health and
social care provision specifically for out of
hours and urgent care.
The draft Island Strategy has been completed and fully engaged
on and awaiting decision on governance and accountability for
actions prior to full publication.
Yes
Actions
within
strategy
Establish a sustainable GP out of hours
service for Jura, linking it with Islay and
building community resilience. 
The Jura Out-of-Hours (OOH) working group has successfully
reached a consensus on a new model for service delivery. This
agreement marks a significant milestone since last years update,
allowing the project to transition into the design and
implementation phase. 
In this next phase, an implementation group composed of key
stakeholders has been established. This group is tasked with the
responsibility of taking the new model forward. Their role involves
detailed planning, designing the operational aspects, and
overseeing the implementation to ensure the model meets its
intended goals of providing a sustainable primary care out of
hour’s model of care. 
This phase will involve continuous engagement with all relevant
parties to address any challenges and make necessary
adjustments, ensuring the model's sustainability and effectiveness
in improving out-of-hours services.
Yes
Implement transitional arrangements
where practices continue to provide some
services. 
In 2022, the National GMS Oversight Group approved a Rural
Flexibility options appraisal submitted by the HSCP. The business
case focused on 18 of our more remote and rural practices where
it was clear that an HSCP delivered Community Treatment and
Care(CTAC) and Vaccination service was neither cost effective or
sustainable. 12 practices now receive a rural flexibility payment
and claim reimbursement for vaccinations under an Item of
Service arrangement.
The HSCP agreed with NHS Highland Local Medical Committee
(LMC) to regularly review these arrangements with all 18
practices. This process commenced in February 2025 and is
ongoing with the full report to be submitted to the Primary Care
Modernisation Programme Board and NHSH LMC in June 2025.
The HSCP is committed to delivery of the other workstream
services agreed under the 2018 GMS contract ( Pharmacotherapy,
First Contact Practitioner Physiotherapy, Primary Care Mental
Health and Community Link Workers) across urban and rural
practices. Geographical and resource challenges have seen
ongoing development of locally designed solutions including hub
and digital infrastructure across the multi disciplinary teams.
Where possible, measures have been implemented to improve
equity between remote and rural and urban GP practices.
Yes

Page 28

Page 28 of 46   
Engagement Activities Taken Place in 2024/2025
• Jura Out of Hours Public Engagement event in September 2024 with follow up article inviting further feedback from Island
residents in Jura Jottings following the event
• Patient engagement done in both Inveraray and Furnace in 2024
• Coll and Colonsay Engagement for GP Interviews in 2024
Contribute to review of sustainable services
on the island of Coll. 
We have recently appointed new independent General
Practitioners for the Coll General Medical Services contract, which
took effect on 1st April 2025. This new contract introduces a
change from the previous model, with three GPs rotating to cover
both in-hours and out-of-hours care on the island. This new
approach offers a more robust and sustainable healthcare model
compared to the previous system, where a single GP was
responsible for delivering services year-round, often with limited
time off and little reprieve from the demands of the role.  The
rotation system ensures that the GPs can better manage their
workload, reduce the risk of burnout, and maintain a healthy
work-life balance, ultimately improving the quality of care
provided to the community. With this model, we anticipate
increased stability in healthcare provision, offering residents and
visitors to Coll a reliable and accessible service.
Yes
Co-location of Cowal Medical Practice and
Church St Surgery in the Cowal Community
Hospital, Dunoon. 
Due to the funding freeze on Premises Improvements last year,
the original plans for moving GP practices into Cowal Community
Hospital was paused. However, alternative plans are currently
being considered.
Yes

Page 29

Page 29 of 46   
Dentistry 
Priorities Year 3  Progress Update
Carried
over
2025/26
Yes/No
Identification of service needs and
associated development.
Senior Dental Officer post fixed term recruited part time.
Remainder of post reallocated to fixed term DO post Oban,
0.4WTE due to go to advert imminently. Work to increase service
provision to Oban, Mid Argyll areas continues.
DHT post recruited, NDIP provision now shared between DHT and
DO which allows for more clinical availability.
Yes
Development of current services for
Island communities and priority groups
Shared mobile dental unit with Highland HSCP refurbished.
Working with Estates team to ensure water safety and electrical
safety compliance between HSCP areas. Joint project. Direct
collaboration between Coll and Colonsay to identify services
connections for MDU continues.
Tiree – Regular visits from Dental Officer and DHT (Dental
Hygienist Therapist), subject to flights and ferries timetable.
Dental chair identified for refurbishment/replacement. Working
with Estates colleagues to enable installation.
Mull – Tobermory clinic remains extremely busy. Again, Estates
Team input required to improve fabric of building. Dental Chairs in
both surgeries and x-ray unit in one surgery replaced in 2024.
IT/Network connection remains challenging, other items listed
require Estates team input to progress (staff changing and
kitchen/handwashing facilities, x-ray machine wall support).
Bute – PDS clinic remains busy. General Dental Practitioner with
enhanced ability to provide care for residents of care homes on
Bute.
Priority Groups/Secondary care options –GA or IV sedation
services for complex care cases/anxiety cases: Currently no
provision for this within A&B staffing cohort. External referral to
NHSH North or GGC is only route for these patients. SLA and
boundaries are unclear. Discussion and informal agreement with
NHSH North, who will provide this service for Oban and will accept
referrals to Inverness. Discussion with GGC on a case by case basis.
Will accept from geographical area near to GGC but boundaries
not set and SLA is unclear. Board input required to determine SLA
with GGC and NHSH North. Collaboration with NHSH N SCP staff
and A&B SDO and DO in Oban to assist with these cases locally in
Oban, and provide robust referral pathway. 
Orthodontics: service is maintained within Primary Care, unlike
other board areas where this service is delivered in secondary care
setting. Currently supported by two Consultants (one GG&C and
one Highland) on a rolling 6-monthly commitment basis. Service
development includes up skilling of SDO to move into orthodontic
care. Appropriate PG course identified and SDO enrolled in PGDip
programme. Up skilling of one Dental nurse to Orthodontic
Therapist underway (NES course) and expected completion Spring
2026
Oral Health Improvement: Looking to recruit to vacant post to
cover Oban, recruited to cover Islay vacancy from Mid Argyll 
Yes
Increasing access for patients in assisted
and looked after accommodation
Domiciliary dental care has resumed. Caring for Smiles Programme
for Care Home staff has resumed and is now expanding to include
Yes

Page 30

Page 30 of 46   
Engagement Activities Taken Place in 2024/2025
Collaborative working with General Dental Services in co-located sites and the associated Bodies Corporate to assist with
pressures around delivery of care.
Continued engagement with Pharmacy team and Child Protection services to ensure robust policies are in place which are
aligned with wider HSCP policy.
Oral Health Improvement Team: Continue to be at the forefront of engagement throughout different sectors – Education,
Health Partners, Social Work colleagues, Care Home Teams, Care at Home Teams, Addictions Teams, Forces Families
settings. the ‘care at home’ sector. 
Oral health care shop to provide oral healthcare items at cost
price to care homes piloted and successful. Expanded to other PDS
locations in A&B. Feedback remains good.
Increase skill mix in association with in-
house training and also NES partners. 
Three Dentists and one Dental Hygienist Therapist are now
providing Inhalation Sedation in PDS settings. All Dentists have the
opportunity to complete AWI training. One clinician on waiting list
for this.
Clinician’s peer group meetings provide PDS focused CPD and
learning.
Child Was not Brought protocol developed in collaboration with
A&B Child Protection Services, cascaded out to all team members,
local familiarisation sessions to all team members. 
Yes
Team building. Regular Team meetings and one to one meetings continue. SMT in
person site visits occurring regularly.
Monthly whole team cascade brief/PDS team brief via Teams to
increase team cohesion.
Face to face annual clinician meetings adopted to reduce
professional isolation, along with virtual clinician meetings bi-
monthly.
SMT have established connections with other Primary Care Teams
Leads via Primary Care meetings.
Yes
Standardising processes. SOP development continues across service to continue to improve
service provision and ensure best practice is consistent across the
service.
Use of Datix incident reporting tool has been encouraged and is
well used by the Team. This assists with learning and identification
of SOP projects.
Yes
Fixed term recruitment in Orthodontic
services.
Weekend Consultant led clinics continue. Local service
development and virtual consultation in progress to allow more
non-Consultant activity during weekdays – end goal to have a
weekday service led remotely by Consultant with regular but less
frequent in-person visits, and staffed by Orthodontic Therapist
and SDO with interest in Orthodontics.
Yes
In- house development of SDO for
Orthodontic services.
Enrolled in PGDip course. Currently Year one – PGCert on
satisfactory completion. University of Plymouth course provider.
Increased Orthodontic case mix locally available.
Yes
Move to baseline funding Baseline funding in operation
Work underway to align SDS and CDS pays templates to reflect
current staffing compliment.
Yes
Capital funding application for service
improvements
Capital Funding bids active currently:
Autoclave replacement across all sites. LDU facilities failing. Ageing
stock at end of lifespan.
Dental Chair, Lochgoilhead clinic. Catastrophic failure necessitates
replacement.
Yes

Page 31

Page 31 of 46   
Federation, Refugee and displaced persons population, Service providers for Adults with Additional Care Needs & third
sector colleagues and families associated with the above groups locally over Argyll and Bute.
The Oral Health Improvement team provides accredited training in oral healthcare in the Care Home setting and for those
who Care at Home.

Page 32

Page 32 of 46   
Priorities Year 3  Progress Update
Carried
over
2025/26
Yes/No
Develop the ADP strategy.  The final draft of the ADP Strategy Refresh 2025 until 2027 was
presented at the ADP Strategy Group in March 2025 and the final
version will be published after the ADP Strategy meeting in May
2025.  The refresh work was lead by a steering group to who met
3 times during the project, at beginning, mid-point and end of
the process.
11 national strategies and policy documents were identified of
relevance to alcohol and drugs partnerships. 13 local (Argyll and
Bute) strategy and planning documents were identified which
showed clear connections to ADP current priorities. A wide range
of engagement detailed below was conducted including semi
structured interviews with ADP members, people with lived
experience and engagement workshops. 
The areas of priority are Strengthening the Partnership,
Prevention, Strengthening Recovery Orientated Systems of Care
and A Public Health Approach to Justice. 
A Health Needs Assessment has been carried out in 2024 until
2025 and on track to be finalised by May 2025. Identification of
the key areas will be progressed with the partnership aligning
which the partnerships strategy and development of short to
long term delivery plans. · Any specific findings highlighted in the
HNA or focus groups in relation to JSP will be aligned and
incorporated into this work. 
No
Develop community hubs throughout
Argyll and Bute. 
Recovery Café’s and Hubs have been supported by grant funding,
enabling them to develop a wide range of work to support
people in recovery.  The Service Level Agreement with
Community Learning Development 2024 until 2025 has enabled
dedicated support to recovery communities in Helensburgh and
Dunoon whilst supporting a test of change in Oban and an Argyll
and Bute wide network. 
Yes
Expand on the whole families approach. 
Scottish Families Affected by Alcohol and Drugs (SFAD) were
commissioned in 2024 until 2025 to raise awareness and engage
with families and services in Argyll and Bute. The high level goal
of this work is to grow a model of family support that is
connected and effective, utilises community assets, sustains,
strengthens and upskills communities to create a cohesive and
effective Whole Family Approach.
SFAD in collaboration with stakeholders have developed a
partnership plan informed by the gathering of evidence from
families and those in services and supported by grant funding.
SFAD have listened directly to people personally impacted and to
professionals working within the community to reduce alcohol
and drug harms, have held many conversations, 4 shorter hybrid
workshops, and a conference.
Yes

Page 33

Page 33 of 46   
Through engagement, they identified priorities to support the
development of a Whole Families Approach. A  Whole Families
Group has been re-established to continue to take forward this
approach in Argyll and Bute. 
Community Reinforcement and Family Training (CRAFT) was
commissioned by the ADP, and to date 20 attendees participated
in the two day training course. 
Continue to deliver to the requirements of
the National Mission. 
The ADP continues to work towards delivering the requirements
of the National Mission, primarily through a range of sub groups
identified to take forward the ADP action plan and progress MAT
standards, ADP grant funding have supported activity in relation
to the sub groups and work streams. 
Commissioned Community Alcohol and Drug Recovery
WithYou commissioned work continues to deliver a wide range
of outreach, training, support and services throughout Argyll and
Bute. With You contribute to prevention, recovery, supporting
those preparing, going through and coming out of residential
rehabilitation accommodation, as well as the delivery of MAT
services. 
A new “Recovery Skills” structured 10 week group work
programme in 4 localities was provided and introduced some
group work evaluation that will be gathered at week 1 and week
10. This will enable attendees to see progression and also help us
to look at the content and see if there is anything that perhaps is
not working well. So far verbal feedback has been very positive. 
A showing of Outrun was provided in collaboration with
Campbeltown Cinema and provided an opportunity for
celebration and With You supported people with Lived
Experience of Alcohol and Drugs from each locality attend the
Recovery Walk in Glasgow. 
This year With You celebrated their 20 year birthday with a heart
warming event in Lochgilphead. Recovery groups attended with
some confident enough to stand up and talk about their
Recovery journeys, the event also enabled them to meet people
from other recovery communities in A&B.    
Drug Death Reviews -
A review of the Drug Death Review Group are meeting monthly
to review drug related deaths. A pathway is being developed to
ensure governance and utilisation of existing structures, the
review had identified existing good practise and areas requiring
improvement. The altered pathway will address some of the
findings from the review.  The terms of reference for the
meetings are also under review. Twenty cases have been
reviewed and concluded since 2022.  Four reviews are in
progress; while nineteen cases are awaiting review.   
Drug Alerts and Harm Reduction 
The local multi-agency  group for Local Early Warning Systems
has continued to meet monthly.  Improvements to the groups
communication has been implemented including a system of
recording drug related incidents.  This group links with Public
Yes

Page 34

Page 34 of 46   
Health Scotland’s Rapid Action and Drug Alerts Response
(RADAR) team to develop local processes for drug alerts.
Increased Naloxone supplies were purchased alongside increased
Naloxone Training as part of a plan to mitigate against potential
overdoses from drugs containing nitazenes. 
Planet Youth 
The ADP agreed to support the Planet Youth Icelandic
programme with five secondary schools currently involved in the
pilot. The Icelandic prevention model aims to keep young people
safe, healthy and happy. Within the five schools,  S3 and S4
pupils have completed a questionnaire and the results have been
sent back for the local coalition groups to review and discuss how
to make this a community wide programme. This work is
supported by a full time health improvement officer and a Health
Improvement advisor. 
Daniel Spargo Mabbs (DSM) Productions
The DSM Foundation is a drug education organisation.  Their
drama production entitled “I love you mum – I promise I won’t
die” was piloted in the Oban and Helensburgh communities. The
hard hitting drama tells the story of Daniel with the aim to help
other young people learn the lessons he sadly no longer could,
and make choices that can keep them safe. The title takes
Daniel’s joking last words to his mum, before he left home for
what turned out to be the last time. Further planning is
underway on how to develop this work to introduce it to other
audiences and areas within Argyll and Bute.   
The School Drama Productions Programmes 
The ADP continues to contribute funding to the school Drama
programme “You Are Not Alone” which is delivered across seven
secondary schools.  The performances provide an opportunity for
young people to engage in questions with service providers,
understand support that is available and connect with other
services. 
The production for 2024 was performed for S2 and S3 and the
feedback from the S2’s was much more informative.  Following
this review future delivery of this programme is aimed at the S2
cohort. 
Alcohol Brief Interventions 
Recordings of Alcohol Brief Interventions (ABIs) have been
increasing in Argyll and Bute. The publication of new guidelines
ceased reporting of ABI number to the Scottish Government. 
Argyll and Bute will continue to develop and raise profile of ABI’s
in the wider settings. 
Developing Recovery Communities 
The recovery communities have been supported by the Argyll
and Bute Council, Community Learning Development team in
Cowal, Helensburgh and Oban.  This has given dedicated local
support to each of the groups and helping establish more of a
Recovery Community.  We have also been supporting a test of
change in Oban to scope what each of the services do to support
drug and alcohol recovery and how we can bring that together. 
With the support from Scottish Recovery Consortium we are
supporting people with lived experience to be more involved in

Page 35

Page 35 of 46   
Please outline any activity in relation to service commissioning, i.e. revisions to specifications, new services,
reviews of existing contracts. Terminations of contracts. 
• Community Addictions Recovery Contract with With You extended until March 2026
• New SLA with Argyll and Bute Council, Community Learning and Development for a Test of Change
• New contract for the Delivery of Community Reinforcement and Family Training Programme
• New contract for the Delivery of School Support Services until September 2026 with a range of local services
• New contract for the MAT Experiential Programme with Scottish Drugs Forum
• New contract for developing the Whole Family Approach with Scottish Families Affected by Alcohol and Drugs 
Engagement Activities Taken Place in 2024/2025
ADP Strategy Engagement
Stakeholder interviews: A rolling interview programme was established, building from the ADP support team out to key partner
representatives and including other stakeholders. Interviews began in August 2024 and ran to November 2024. Overall, 23
representatives were interviewed. Lived experience input was included through partners’ existing links at key points in the
process. A focus group was held in Helensburgh recovery café and interviews were held at Dunoon recovery café and Inverary
Whole Family Approach conference. Lived experience/frontline worker input was also sought through third sector partners
With You (in Dunoon) and LAAS (online).
The priorities of the emerging strategy were refined through 3 workshops which took place online in October-November 2024.
All partners were invited, plus a range of wider public and third sector stakeholders. 10-14 people attended each one. 
Health Needs Assessment 
A HNA was carried out in 2024 to 2025. The surveys were distributed through the HSCP networks and the ADP networks
resulting in 98 online surveys being submitted from Argyll and Bute.  The survey consisted of 7 questions and were also used in
the work of the ADP and provide feedback on the work we are
doing in Argyll and Bute. 
Residential Rehabilitation 
For the period of 2024 to 2025, 19 placements for drugs and
alcohol were funded by the multi-agency and multidisciplinary
Residential Rehab Steering Group totalling £164,557.  The ADP
has also been working alongside Health Improvement Scotland to
develop an action plan for the group. 
Bespoke training for GPs and Prescribers 
Training was commissioned from the Scottish Drugs Forum
following the identification of learning needs by the Drug Related
Deaths Review Group, and in consultation with GP colleagues.
The three training sessions were held in February and March on
the topics of Gabapentin, Ketamine and Benzodiazepines. 
Implement the revised approach to
children and families. 
Following a review of the School Support Services a new
specification which was developed in partnership with Education,
Education Psychology, and the ADT Support Team.  The contracts
commenced for all council secondary schools in Argyll and Bute
in August 2024 and data and contract monitoring is ongoing. The
contracts provide specialist educational support, supporting
young people engage with services, the Planet Youth project and
the Violence Prevention Programme. This test of change is
commissioned until August 2026.
Yes
Initiate MAT standards.  Progress towards MAT Standards 1 to 10 continued in 2024-
2025. The MAT Standards Steering Group had oversight of this
progress and fed into Scottish Government reporting as required. 
Grants were provided to ADP sub groups associated with the ADP
Strategy priorities and MAT to support them progress actions
plan. Remote and rural issues and sufficient resourcing to meet
all the standards remains a challenge. 
Yes

Page 36

Page 36 of 46   
focus group discussions which were held in the communities across Argyll and Bute, those who participated did so with lived
experience of substance use.  The aim of the focus groups was to understand community concerns, identify priorities, and
determine indicators of progress in reducing substance-related harm.  There were 9 Focus Groups with 94 participants of which
one group of 8 high school children, 15 years old and over with lived experience of substance use in the home. 
Whole Families Approach
SFAD have held 24 engagement meetings with service providers and families affected by alcohol and drugs to raise awareness
of the Whole Family Approach and scope priorities for Argyll and Bute.  An engagement event was held in Inveraray in July with
10 participants, following which a survey was distributed.  In September SFAD hosted a Whole Families Approach Conference in
Inveraray with 37 participants, thereafter two design events were held on the days following the conference. The priorities have
been consulted upon and a group has been established to drive these forward. 
Addictions Recovery Bill Consultation
The ADP hosted a consultation which was done in an online event on 16th December 2024, with 17 attendees present.
Attendees were a wide range of partners from the ADP and HSCP. Following the consultation event and circulation of draft
response, the final response as attached was submitted to the Scottish Government. 
Charter of Rights Consultation
Consultation was done by the Independent ADP Chair and LAAS at the ADP Meeting on 20th May 2024. This was an in person
meeting at Lochgilphead with 13 attendees.
The consultation provided information and background on the Charter of Rights for People Affected by Substance Use and Ailsa
provided a presentation on her involvement in the process nationally.
The meeting noted that:
➢ MATSIN would be focussed on the Charter of Rights;
➢ That the Draft Charter was currently out for consultation, and AM / TM did a consultation exercise to seek the views of the
ADP Members present on this.
Following this consultation exercise, which asked specific questions, the responses were collated and fed back to the national
group. 
Planet Youth
The Planet Youth team held an event in Dunoon in September 2024 where we had over 20 stall holders show casing when
activities they had to offer for Children and Young people in the local area.  The day was well attended by 25 families. 
We also held a similar event in Lochgilphead where all the sports and clubs came along to give people taster sessions on what
they had to offer and they also presented the volunteers with a certificate of thanks for all their hard work over the years.  15
families attend the event with most clubs getting new members signing up.

Page 37

Page 37 of 46   
Priorities Year 3  Progress Update
Carried
over
2025/26
Yes/No
Establish DCAQ or establishment setting
cycles (as per the Health Care Staffing Act
implementation).including development
and high-level data quality for AHP
dashboard. 
There is an established AHP dashboard based on a minimum
dataset, taken from multiple systems and paper records. This has
been made available to team leads, professional leads and
managers and it is collated into a set of KPI’s that report to the
IJB. These measures are currently being evaluated with a move
towards a mixture of quantitative and qualitative data.
As part of the boards implementation of the health & Care
Staffing act five teams, one per large profession,  have carried
out a annual tool-run and establishment report. Findings and
learning are currently being collated.
Yes
Deliver remote and rural MSK triage offer
through PHIO App. 
Agreement has been achieved to fund the PHIO App for the next
year to test its use as the front door to all MSK services across
Argyll and Bute which ensures there is a self-management option
for all patients, not just those in rural smaller practices. This will
improve access to first contact physio and mainstream physio
due to a large % of patients being managed with early self-
management. This roll-out will be robustly evaluated.
Yes
Primary Care-increase of first contact to
other professions.eg Dietetics. 
Our Dietetics service are involved in national discussions about
expansion of primary care to other professions as part of the
MDT. National negotiations for the next GP contract are
underway; any expansion of the MDT will be dependent on the
outcome of this.
Yes
New priority-develop Safe Quality Care
structure to demonstrate quality metrics
to support professional assurance.
This programme is underway with an agreed annual audit cycle
to gather relevant quality metrics and share across managers and
professional leads. 
Yes
Agree service specifications for all AHP
Services and roll-out Job planning within
teams. 
Service specifications are being drafted. Job Planning tool
developed and is being rolled-out informally.
Yes
Address long waits-all over 52 weeks
become priority 1. Establish rigorous triage
in all AHP teams.
Due to service pressures and recruitment issues it has not been
possible to reduce all waits over one year. 
Yes
Build in capacity for universal and targeted
intervention with groups e.g. Aging adults,
nursery children – whole population
approaches to healthy living. 
The Living well programme has been implemented in each
locality offering adults a physical-activity based prevention
programme. Robust evaluation is in progress with consideration
of longer-term service sustainability models.
Work is developing with partners like Live Argyll to consider this
type of offer for children and young adults. 
All professions are considering universal approaches but the
system pressures described above mean it is difficult to change
focus from reactive to preventative work.
Yes
Delivery of actions e.g. Guest lecturing,
increase in student placement offers,
progress of therapy apprenticeships.
National discussions progressing about work-based training
offers. We have robust practice placement support and
coordination in place.
Yes
Continue to develop standard tools and
process for establishment setting ready for
cycle three. Agree establishments for A&B
teams.
As part of the boards implementation of the Health & Care
Staffing act five teams, one per large profession,  have carried
out a annual tool-run and establishment report. Findings and
learning are currently being collated.
Yes
Develop a dashboard for visible demand
and activity data for AHP teams.
There is an established AHP dashboard based on a minimum
dataset, taken from multiple systems and paper records. This has
Yes

Page 38

Page 38 of 46   
Engagement Activities Taken Place in 2024/2025
There has been a focussed exercise, as part of the Safe Quality Care programme, to increase patient feedback through a
Forms Survey. Most professions are now collecting feedback routinely. Outputs are being evaluated. 
been made available to team leads, professional leads and
managers and it is collated into a set of KPI’s that report to the
IJB. These measures are currently being evaluated with a move
towards a mixture of quantitative and qualitative data.
All AHP staff to do Health Behaviour
Change training and review the professions
offer to prevention.
4 courses have been offered.  Yes

Page 39

Page 39 of 46   
Please outline any activity in relation to service commissioning, i.e. revisions to specifications, new services,
reviews of existing contracts. Terminations of contracts. (previous update below) 
Current update from Commissioning
A new contract was developed and commenced in March 2023; the contract ends on 31st March 2026.  This contract
introduced a new service specification, updated terms and a clear and robust framework for contract monitoring.  Planning
for March 26 will commence in 2025.  
A new contract following feedback from unpaid carers was awarded for
Money, Welfare and Related Advice for Unpaid Carers, delivered by ABCAB (2 year contract, ending January 2027)  
A contract is under development for additional Parent Carer Support and expected to be
in 2025/26. 
Update
Current contracts which provide Carer Services, remain in place until 31st March 2026. The current contracts provide the
provision of support to individuals identified as unpaid carers, and in line with the statutory obligation as set out in the Carers
(Scotland) Act 2016. During 2025, we will engage in contract discussions.
Following feedback from the unpaid carers consultation in 2023, ABCAB have been awarded a contract to provide Unpaid
Carers with Money, Welfare and Related Advice for Unpaid Carers. This is a 2-year contract and will run until 2027  
Work has started to look at an information provision for A&B Parent Carers, who support Children and Young People with
Additional needs in early years and schools. This work will conclude during 2025, with a contract being awarded to support
parent carers. This piece of work follows on from a number of Parent Carers, who advised us of their need for accessible
advice, information, and advocacy appropriate for their needs as parent carers 
Priorities Year 3  Progress Update
Carried
over
2025/26
Yes/No
Implementation of the Caring together
Strategy. 
The Caring Together Strategy was published in 2024 . We are
currently in the 2nd year of implementing the actions and
commitments
No
Review of our Short breaks statement. Section 38 of the NCS (Scotland) Bill introduces significant
changes to the current Carers (Scotland) Act 2016. It introduces a
new legal entitlement: the right to personalised short breaks for
unpaid carers. Nationally work has started to address this new
piece of legislation. Whilst this is being carried out, we will not go
out to review and engage on our SBS, we will wait the new
regulations and guidance and ensure Carers from within A&B are
involved in the national engagement. Our current SBS remains in
use. 
Yes
We will work with educational, cultural
and leisure organisations to improve
access for Carers to programmes and
establishments across Argyll and Bute and
beyond.
Carer Organisations have expanded services across all areas of
A&B and Carer number have increase by 19%. Education services
now have a Young Carers policy and there are a growing number
of schools involved in the Carers Trust Young Carers Challenge. 
No
Review of the current Eligibility Criteria for
Adults and Young People. 
This will be aligned with the new regulations and guidance that
will be releases with NCS Bill- Right to a break. 
Yes

Page 40

Page 40 of 46   
Priorities Year 3  Progress Update
Carried
over
2025/26
Yes/No
Establish evaluation framework. An evaluation subgroup was established to deliver on the priority
of an evaluation framework. The work in the Community Rehab
and Wellbeing stream has robust evaluation plans in place both
Qualitative and Quantitative. 
The Evaluation group will continue to develop an evaluation
framework for the whole Prevention/Living Well Programme.
Yes
Work in parallel on delivery of community
rehab and wellbeing service and
developing sustainable model eg. Social
enterprise. 
The delivery of the community rehab and wellbeing service
commenced in January 2025 with good feedback already. Work is
ongoing to develop the long term sustainable model for the
programme with a Sustainability group meeting to be held in June
2025 to establish options and ensure cohesion between the
community rehab and wellbeing stream and the community assets
stream.
Yes
Continue Health Behaviour Training and
consider workforce development of
prevention /public health agenda. 
The Public Health team continues to deliver MAP of Health
Behaviour Change training across NHS Highland/Argyll and Bute. 
Training is available quarterly and a number of new trainers have
been trained in late 24/25. In 24/25, 4 courses were delivered. 
Yes
Continue work outlined in two subgroups To enable the delivery of the rehab and wellbeing stream, Tier 1
and 2 were merged and these are being delivered by HSCP staff in
liveArgyll facilities with support from liveArgyll staff. The Tier 3
continues to be carried out in the community assets for Living Well
stream. 
Progress update relating to the Community Assets for Living Well
includes:
• Walking Development Officer Post –  A Walking Development
Post has been developed to promote walking initiatives as a
means of improving health, social cohesion, and climate
awareness in Argyll and Bute. The post will coordinate health
walk initiatives at a regional level, develop communities of
practice and provide overarching guidance and support for
health walks and related activities across Argyll and Bute. This
post is in the process of being recruited to.
• One Front Door –  The 'One Front Door to Wellbeing for All'
project aims to improve how individuals in Argyll and Bute
access health and wellbeing services. The current landscape of
services, while diverse and comprehensive, can be difficult to
navigate due to the region's geography and the number of
service providers working across various sectors. People often
find it challenging to know where to turn for the support they
need, leading to confusion, duplication of efforts, and gaps in
service provision. 
We are currently building a business case and engaging with
HSCP groups to determine whether to move forward as a
distinct third-sector health and wellbeing initiative or explore a
broader, multi-agency, cross-sector approach. The latter would
significantly widen the project’s reach but also require a much
larger-scale effort
Working with Communities - Art of Hosting is a participatory
leadership method designed to empower community leaders. This
Yes

Page 41

Page 41 of 46   
Engagement Activities Taken Place in 2024/2025
The AHP Prevention Lead engaged with several key groups prior to the launch of the community rehab and wellbeing physical
activity programme. Most notable were the Health Professional forums, as they would be providing the referrals into the
programme. Ongoing engagement is required with GPs to ensure they are informed about the programme and are supported
with making referrals. 
Engagement has also taken place on some of the islands to support delivery of physical activity programmes on Islay and
develop delivery of community rehab and wellbeing physical activity on Coll. There will continue to be engagement with
island groups to further progress delivery options in these remote and rural areas.
project aims to cascade the training across Argyll and Bute,
enabling local leaders to host workshops that strengthen
community resilience. Art of Hosting training has been delivered to
a range of partners, and work is ongoing to expand this ‘working
with communities’ approach locally.

Page 42

Page 42 of 46   
Priorities Year 3  Progress Update
Carried
over
2025/26
Yes/No
Progress the National Care Service
Implementation programme once
primary legislation is in place from June
2022. Implement when defined single
integrated digital services for health and
social care staff as part of new
Community Health and Social Care
Boards. 
As the National Care Service will now be established through both
legislative and non-legislative means, with reform of social care at
the centre it is proposed the Bill will be known as the “Care Reform
(Scotland) Bill”.
If agreed by Parliament, as amended, the Bill will also bring forward
significant reforms to social care, including:  
• Anne’s Law being enshrined into legislation to uphold the rights
of people living in adult care homes to see loved ones and
identify an essential care supporter
• ensuring all those working in or supplying services to the health
and social care sector follow the same information standards
allowing easier communication
• the creation of a National Chief Social Work Advisor post, in
statute, to bring strategic leadership at a national level.
The Bill will also retain measures to establish a legal right to breaks
for unpaid carers. Ahead of the legislation, the Scottish Government
has identified an additional £5 million in the draft 2025-26 Budget
to support 15,000 carers to take short breaks from their caring
responsibilities.
The bill is currently at Stage 3 in consideration and in current form is
likely to have less impact structurally as first anticipated. 
However Public Sector and NHS Reform are picking up pace and
these will be featured in the renewed strategic plan. 
No
Complete the digital modernisation
transformation projects within our
records and appointment services within
the NHS and social care. 
Roll-out of CIVICA electronic document management system
continues with scheduled completion of adult social care for June
2025. The next phase will be Children & families.  
Trak EPR programme in progress. Oban site due to go live summer
2025.
Yes
Contribute towards the achievement of
net zero carbon emissions across HSCP
services, working in partnership with
Argyll & Bute Council and NHS Highland.
Progress towards net zero carbon emissions across HSCP services
continues albeit there is limited funding to improve the efficiency of
properties in any meaningful way. 
Yes
Complete our digital transformation
where more is accomplished with less
because of new ways of working by
enhancing the Digital literacy and skills of
our workforce - “Our people will need to
train in new skills and adopt working in
different ways- collaboration”.
eHealth continue to provide up to date training around established
IT systems, and future new systems to support the ongoing
development of digital skills for our workforce.
Yes
Join up our HSCP teams by improving
NHS systems and Council systems for
easier data sharing. Enhance
communication and collaboration using
MS Teams federation.
New and innovative ways to increase sharing of information is
ongoing. Use of MS365 power apps.
Yes
Complete the final phase of our “Drone”
beta service for clinical logistics in the
West of Argyll leading national innovation
in the use of this technology in the
Scottish Health service.
The drone trial using the Speedbird DLV2 drone delivered by
Skyports between Islay and Jura has now been completed. Data
from the trial has been thoroughly analysed, and feedback has been
provided. This initiative, funded by the Regulatory Pioneering Fund,
aimed to demonstrate the safe integration of drones in shared
No

Page 43

Page 43 of 46   
airspace and their potential for transporting school meals, Royal
Mail goods, and NHS medical supplies. Our part in the Trial focussed
on analysis of temperature control of selected medication and
medical supplies during flight. The analysis and feedback will inform
future decisions on the broader use of drones in healthcare logistics,
enhancing service delivery and community resilience in Argyll &
Bute.

Page 44

Page 44 of 46   
Engagement Activities Taken Place in 2024/2025 
Priorities Year 3  Progress Update
Carried
over
2025/26
Yes/No
Ensure all Telecare clients have a digital
solution in place. 
We are continuing to ensure Technology Enables Care (TEC) is a
core service embedded in all aspects of delivery of care, which
involves the promotion of all available services throughout
patients/clients' journey and supporting colleagues to feel more
comfortable using TEC available as a resource to support their
delivery of care and free up time for direct patient care 
Yes
Continue to develop NHS Near Me clinics
to support clinicians in delivering remote
clinics and supporting patients to attend
appointments without the need to travel. 
o Continued promotion of NHS Near Me clinics to support
clinicians in delivering remote clinics and supporting patients to
attend appointments without the need to travel
o Supporting roll out of further Silvercloud pathways
o Trial and evaluation of digital homecare solutions including
remote medication prompts and digital hydration kits. 
o Work with GP practices to promote further uptake of
remote health monitoring for blood pressure.
o Scope utilisation of remote health monitoring for asthma
and heart in A&B HSCP and develop plans for subsequent years. 
• Ensure all telecare clients have a digital solution in place in
time for switch-over from analogue to digital telephone lines
Yes
Expand digital solution across Argyll and
Bute. 
See above  
Continue to develop NHS Near Me clinics
to support clinicians in delivering remote
clinics and supporting patients to attend
appointments without the need to travel. 
See above

Page 45

Page 45 of 46   
Priorities Year 3  Progress Update
Carried
over
2025/26
Yes/No
Progress the National Care Service
Implementation programme once primary
legislation is approved. Support when
defined single integrated corporate
services for health and social care staff as
part of new Community Health and Social
Care Boards. 
As the National Care Service will now be established through
both legislative and non-legislative means, with reform of social
care at the centre it is proposed the Bill will be known as the
“Care Reform (Scotland) Bill”.
If agreed by Parliament, as amended, the Bill will also bring
forward significant reforms to social care, including:  
• Anne’s Law being enshrined into legislation to uphold the
rights of people living in adult care homes to see loved ones
and identify an essential care supporter
• ensuring all those working in or supplying services to the
health and social care sector follow the same information
standards allowing easier communication
• the creation of a National Chief Social Work Advisor post, in
statute, to bring strategic leadership at a national level.
The Bill will also retain measures to establish a legal right to
breaks for unpaid carers. Ahead of the legislation, the Scottish
Government has identified an additional £5 million in the draft
2025-26 Budget to support 15,000 carers to take short breaks
from their caring responsibilities.
The bill is currently at Stage 3 in consideration and in current
form is likely to have less impact structurally as first anticipated. 
However Public Sector and NHS Reform are picking up pace and
these will be featured in the renewed strategic plan. 
No
Progress the achievement of net zero
carbon emissions across NHS commercial
fleet, working in partnership with Argyll &
Bute Council and NHS Highland.
Progress towards net zero carbon emissions across HSCP services
continues albeit there is limited funding to improve the
efficiency of properties in any meaningful way. 
Yes
Complete our digital transformation where
more is accomplished with less because
new ways of working with or without
technology. 
Digital transformation is not about
technology only – Our people will need to
train and adopt working in different ways-
collaboration.
eHealth continue to provide up to date training around
established IT systems, and future new systems to support the
ongoing development of digital skills for our workforce.
Yes
Implement the new ECLIPSE IT system and
increase the number of health staff using
the single health and social care IT system. 
Eclipse Phase 2 implementation- OLM have provided a project
plan for discussion at April Eclipse Board.  Discovery session are
being set-up to support MH and Child Health Teams as the last
stage of the Eclipse roll-out across community health teams. This
will mean that all community health teams will be using Eclipse
by June 2026.
Yes
Join up our HSCP teams by improving NHS
systems and Council systems for easier
data sharing. Enhance communication and
collaboration using Microsoft Teams
federation.
Awaiting future update from digital services on second phase of
federation.
Yes
Complete the final phase of our “Drone
service” beta service for clinical logistics in
the West of Argyll leading national
The drone trial using the Speedbird DLV2 drone delivered by
Skyports between Islay and Jura has now been completed. Data
from the trial has been thoroughly analysed, and feedback has
No

Page 46

Page 46 of 46   
innovation in the Scottish Health service.  been provided. This initiative, funded by the Regulatory
Pioneering Fund, aimed to demonstrate the safe integration of
drones in shared airspace and their potential for transporting
school meals, Royal Mail goods, and NHS medical supplies. Our
part in the Trial focussed on analysis of temperature control of
selected medication and medical supplies during flight. The
analysis and feedback will inform future decisions on the broader
use of drones in healthcare logistics, enhancing service delivery
and community resilience in Argyll & Bute.