Appendix 1 – A&B HSCP performance metrics 
Argyll & Bute Health and Social Care
Partnership
FQ4 (Jan – Mar 2026) Performance Overview Update 
13 May 2026

Page 2

A&B HSCP Performance Overview Metrics
FQ4 (Jan - Mar 2025/26)
• HWBOI & MSG Indicators 
• CfSD Unscheduled Care Trajectories 
• FQ4 IPMF Performance Update 
• Delayed Discharges Sit Rep 
• OIP Focus Measures

Page 3

National Health & Wellbeing Outcome Indicators 
Core Suite of Integration Indicators
• Data presented is based on latest PHS published
data @ May 2026. Latest performance notes
66.6% (12 of 18) measures reporting above the
national rate. 2025/26 data is due to be published
Jul 2026. 
HWBOI – Outcomes Indicators Data
• Latest available data notes 77.7% (7 of 9) HWBOI
Outcomes measures reporting as above the
national Scotland Rate. It is worth noting that
performance will be influenced and vary in line
with the total number of respondents participating
in this voluntary survey. As such, caution should
be noted with regards to previous comparison and
trends. 
HWBOI- Performance Indicators Data
• Latest available data notes 55.5% (5 of 9) HWBOI
Performance measures reporting as above the
national Scotland Rate.
Core Suite of Integration Indicators 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 Latest** Scotland
1 - Percentage of adults able to look after their health very well or quite well 93.0% 93.2% 93.2% 90.8% 90.8% 92.4% 92.4% 92.4% 90.7%
2 - Percentage of adults supported at home who agreed that they are supported to live as
independently as possible 79.0% 79.9% 79.9% 75.0% 75.0% 79.4% 79.4%  79.4% 72.4%
3 - Percentage of adults supported at home who agreed that they had a say in how their
help, care, or support was provided 76.0% 72.5% 72.5% 66.9% 66.9% 56.9% 56.9%  56.9% 59.6%
4 - Percentage of adults supported at home who agreed that their health and social care
services seemed to be well co-ordinated 72.0% 73.7% 73.7% 66.0% 66.0% 66.2% 66.2%  66.2% 61.4%
5 - Total % of adults receiving any care or support who rated it as excellent or good 79.9% 78.3% 78.3% 68.6% 68.6% 76.8% 76.8%  76.8% 70.0%
6 - Percentage of people with positive experience of the care provided by their GP practice 84.8% 84.5% 84.5% 77.6% 77.6% 83.9% 83.9%  83.9% 68.5%
7 - Percentage of adults supported at home who agree that their services and support had
an impact on improving or maintaining their quality of life 74.2% 76.5% 76.5% 76.7% 76.7% 75.0% 75.0% 75.0% 69.8%
8 - Total combined % carers who feel supported to continue in their caring role 32.7% 35.0% 35.0% 38.0% 38.0% 37.6% 37.6%  37.6% 31.2%
9 - Percentage of adults supported at home who agreed they felt safe 82.9% 78.7% 78.7% 76.4% 76.4% 72.6% 72.6%  72.6% 72.7%
11 - Premature mortality rate per 100,000 persons* 393 403 398 386 398 395 395  395 426
12 - Emergency admission rate (per 100,000 population)* 12,938 12,402 10,702 12,004 11,968 12,204 12,022  12,022 11,514
13 - Emergency bed day rate (per 100,000 population)* 112,235 108,088 91,065 106,155 118,552 120,888 122,657  122,657 118,078
14 - Readmission to hospital within 28 days (per 1,000 population)* 83 80 96 89 84 85 85  85 103
15 - Proportion of last 6 months of life spent at home or in a community setting* 90.0% 9080.0% 9240.0% 90.8% 89.6% 89.7% 89.6%  89.6% 89.1%
16 - Falls rate per 1,000 population aged 65+* 26.2 26 24.3 29.2 27.6 28.4 26.4  26.4 22.8 
17 - Proportion of care services graded 'good' (4) or better in Care Inspectorate inspections 74.2% 85.0% 87.0% 80.0% 79.0% 77.3% 84.2%  84.2% 81.9%
18 - Percentage of adults with intensive care needs receiving care at home* 68.4% 70.8.0% 72.3% 72.1% 72.2% 68.3% 68.8% 68.8% 64.7%
19 - Number of days people spend in hospital when they are ready to be discharged (per
1,000 population) 640 540 343 570 804 912 882  1,197 925
20 - Percentage of health and care resource spent on hospital stays where the patient was
admitted in an emergency*
22.0% 22.0% N/A N/A N/A N/A N/A N/A N/A

Page 4

Ministerial Steering Group – Performance Indicators
Ministerial Steering Group Indicators
• MSG Indicators have been updated to FY 2024/25 and are presented as a proxy for part year 2025/26 (April – Dec) based on latest available
publication. MSG Indicators 1.1 & 1.2 & 2.1 notes slight fall in activity compared to the last reporting year, however this may be due to impact of data
lag.
• Activity around Emergency Admissions, Unplanned Bed Days, A&E attendances and Delayed Discharge Bed Days all noted performance exceeding
pre –Covid levels. This highlights the necessity to consider approaches to alleviate systems pressures around Urgent and Unscheduled Care and
expedite hospital flow, particularly around significant increases seen in A&E Admissions and Delayed Discharges. 
Ministerial Steering Group Indicators 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26*
MSG 1.1 - Number of emergency admissions 6,918 7,822 7,939 8,412 8,187 5,829
MSG 1.2 - Number of Admissions from A&E 3,668 5,040 4,957 5,097 4,816 3,385
MSG 2.1 - Number of unplanned bed days acute specialties 53,390 67,308 77,281 80,356 79,982 47,880
MSG 2.2 - Number of unplanned bed days MH specialties 10,478 7,954 8,289 10,368 11,350 9,028
MSG 3.1 - Number of A&E attendances 10,091 15,647 16,774 17,740 18,448 14,191
MSG 3.2 - % A&E attendances seen within 4 hours 92.79% 85.50% 80.03% 80.28% 80.73% 80.30%
MSG 4.1 - Number of DD bed days occupied 5,354 7,742 11,944 12,757 14,042 11,361
MSG 5.1 - % of last six months of life by setting community & hospital 90.80% 90.80% 89.60% 89.40% N/A N/A
MSG 6.1 - % of 65+ population at Home (unsupported) 92.50% 92.60% 93.20% 93.40% N/A N/A 
PHS MSG Latest publication v1.74
Filtered to +18 age only

Page 5

Unscheduled Care - CfSD Trajectories 
CfSD Unscheduled Care – Karl McLeish – FQ 4 (Jan – Mar 2026) Performance Overview
Current CfSD Performance Metrics FQ3 Target FQ 4 Plans, Mitigations and Actions
Percentage of A&E Attendances in LIH meet the 4 hrs wait target 89.6% 95.0%  92.0% Activity around Emergency Admissions, Unplanned Bed Days, A&E
attendances and Delayed Discharge Bed Days all noted
performance exceeding pre –Covid levels. This highlights the
necessity to consider approaches to alleviate systems pressures
around Urgent and Unscheduled Care and expedite hospital flow,
particularly around A&E Admissions and Delayed Discharges.
Additional metrics aligning to CfSD are being developed in
conjunction with NHS Highland
Number of A&E Attendances lasting more than 8 hours 10 0  14
Number of A&E Attendances lasting more than 12 hours 3 0  7
Maintain LIH Bed Occupancy Rates below 90% target 82.4% 90.0%  89.6%
Reduce the number of patients in hospital affected by Standard Delays 43 31  58
Reduce the number of patients in hospital affected by AWI Delays 12 4  10

Page 6

FQ4 Performance Update - IPMF 
The HSCP Senior Leadership Team is currently reviewing the content and structure of the Integrated
Performance Management Framework. This new suite of measures is designed to offer a more focused
approach on national pressures around Centre for Sustainable Delivery (CfSD) Urgent & Unscheduled Care,
Planned Care and NHS Highland Operational Improvement Plan (OIP), including scope for service feedback.

Page 7

Children & Families & Justice 
Children & Families – David Gibson – FQ 4 (Jan – Mar 2026) Performance Overview
Current IPMF Performance Metrics FQ3 Target FQ 4 Plans, Mitigations and Actions
Improve the percentage of Child Protection Register (CPR) cases
that have an allocated Social Worker (at end of quarter)  97.0%  100.0%  83.0%
C&F have been impacted by staffing, with high levels of vacancies across the service,
with Helensburgh being the only fully staffed team. This is compounded by posts
being filled by newly qualified Social Workers who cannot hold CP cases. Assurance
can be provided that in the absence of an allocated social worker, the cases are
managed by Team Managers.
While the JSW KPI remains below target, Q4 targets have been directly impacted by
late notifications of Court report requests due to a cyber attack in external LA Court
social work Services.
There were no admissions into care during Q4, therefore no requirement for Health
Assessments to be undertaken.
The delivery of the Universal Health Visiting Pathway is monitoring close to target
despite ongoing workforce pressures.
OIP - Children & Adolescent Mental Health Services (CAMHS) will
see 90% of children and young people within 18 weeks of referral  80.0%  90.0%  100.0%
Percentage of Criminal Justice social work reports submitted by
12 noon, 2 days before court  88.0%  90.0%  86.0%
Improve the number of statutory individual Health Assessments
commenced within four weeks of coming into care  75.0%  96.0%  0.0% 
Improve the number of teams that have delivered 85% or more of
the Universal Health Visiting Pathway (UHVP)  83.0%  85.0%  81.0%

Page 8

OIP - CAMHS 
OIP - CAMHS - David Gibson – FQ 4 (Jan – Mar 2026) Performance Overview
Current Performance Metrics FQ3 Target FQ4 Plans, Mitigations and Actions 
Children & Adolescent Mental Health
Services (CAMHS) will see 90% of
children and young people within 18
weeks of referral 
80.0%  90.0%  100.0%
There has been considerable focus on compliance and interrogation of locality data
ensuring action is taken as required, a focus on accuracy in data management and workforce
activity. Mitigations in place are the use of bank, temporary spend from reserves and pro-active recruitment.
There has been a good response to recent
advertisements. Introduction of additional bank hours and overtime to ensure compliance RTT is sustained

Page 9

Planning, Performance & Technology 
Strategic Planning Performance & Technology – Kristin Gillies – FQ 4 (Jan – Mar 2026) Performance Overview
Current IPMF Performance Metrics FQ3 Target FQ 4 Plans, Mitigations and Actions
Increase the number of New Clients to Telecare
services 206 200  219
Q4 typically sees a high turnover of clients and an increase in uplifts for Telecare. The slight
decrease from Q3 for the number of new clients is in line with this annual trend, however, we are
still above target. 
Mental Health teams continue to use Near Me as their first preference. We are still exceeding the
target and usage is dependent on Near Me appointments being offered by clinicians and work is
ongoing to promote Near Me as an alternative to face to face appointments where appropriate. 
Silvercloud was paused in January 2026 following the resignation of a staff member and the
transition of the service from the TEC team to the Primary Care Mental Health team. This KPI should 
In line with targeted action on long waiting patients, 12 week performance has improved by circa
10% which is a real success. Despite provision of four additional Orthodontic WLI clinics, the 15
long waiting patients recorded were mainly due to unavoidable patient cancellations on the 30th
and 31st March. We saw an additional 150 Oral Surgery patients during February and March which
allowed us to report just 7 patients waiting over 52 weeks at year end. Work is ongoing to scope out a
shared Urology nurse service with NHSH into 26/27
Increase the number of Telecare Service reviews
completed 161 85  162
Increase the number of patients utilising 'Near Me'
clinics 1094 800  1163
Increase in new referrals to Silvercloud 63 70  0
Increase the utilisation of 'Connect Me' for Blood
Pressure monitoring within primary care 120 42  98
OIP - Waiting Times for Cancer Appointments at the 31
Day Targets 26 0  5
OIP - Reduce New OP Waiting Times breaches >12
weeks 44% 46.0%  34%
OIP - Reduce OPWL long waits >52 weeks 6,5% 0.0%  1.8%
HSCP Freedom of Information Requests are responded
to within statutory timescale of 20 working days  100%  100.0%  100%
% of Transformation & Improvement Projects on track 90.0% 85.0%  89%
100 percent resolution rate of IT support requests 98% 100.0%  97%

Page 10

OIP - Planned Care – Long Waits 
OIP - Planned Care - Long Waits – Kristin Gillies – FQ 4 (Jan – Mar 2026) Performance Overview
Current Performance Metrics FQ3 Target Q4 Actual Plans, Mitigations and Actions 
OIP - Reduce OPWL long waits >52
weeks  6.5%  0.0%  1.8% 
At end March 2026 there were 41 patients waiting longer than 52 weeks for an outpatient appointment in Argyll & Bute. This is
a 75% (170) reduction since December 2025. 7 patients were waiting between 78 and 104 weeks. The longest waiting patient
has been on the waiting list for 115 weeks under Urology.
Despite provision of four additional Orthodontic WLI clinics, the 15 long waiting patients recorded were mainly due to
unavoidable patient cancellations on the 30th and 31st March. We saw an additional 150 Oral Surgery patients during
February and March which allowed us to report just 7 patients waiting over 52 weeks at year end. Work is ongoing to scope out
a shared Urology nurse service with NHSH into 26/27 as there is currently no service to see these patients locally. All other
breaches were due to mutiple previous patient cancellations and clinical decisions to retain on list.

Page 11

OIP - Planned Care – Outpatients 
OIP Planned Care - Outpatients - Kristin Gillies – FQ 4 (Jan –Mar 2026) Performance Overview
Current Performance Metrics FQ3 Target Q4 Actual Plans, Mitigations and Actions 
OIP - Reduce New OP Waiting Times
breaches >12 weeks  44.7%  46.0%  34.2%
In line with targeted action on long waiting patients, 12 week performance has
improved by circa 10% which is a real success. We have a newly qualified
Orthodontic practitioner due to take up post and Orthodontic activity is expected to
increase significantly as a result. Gastroenterology pressures from volume of IBD
patients will be addressed by running a double IBD list each quarter and work is
ongoing to enhance efficiency and increase capacity within Ophthalmology.

Page 12

Planned Care - Inpatients 
Source: Argyll & Bute – Full IPDCWL as at 23/12/2025

Page 13

OIP - Radiology 
OIP - Planned Care - Radiology - Kristin Gillies – FQ 4 (Jan – Mar 2026) Performance Overview
Current Performance Metrics FQ3 Target Q4 Actual Plans, Mitigations and Actions 
95% of patients with a referral to
Radiology are being seen within 6
weeks 
92.0%  95.0%  96.0%
Performance remains above the national standard, with 96% of planned radiology procedures
completed within six weeks. Demand has increased across all imaging specialities, driven by
delivery of new acute pathways including TIA, stroke and optimal lung cancer pathways.
Clinical capacity is highly utilised, with Band 6/7 staff delivering approximately 96% direct
patient care, limiting job planning flexibility. The small proportion of breaches is largely
attributable to CACRY scan demand, for which additional capacity has been implemented.
Demand and performance are closely monitored, with ongoing focus on balancing urgent and
planned care to maintain compliance and support sustainable service delivery.

Page 14

Primary Care 
Primary Care – Eilidh Gallagher – FQ 4 (Jan – Mar 2026) Performance Overview
Current IPMF Performance Metrics FQ3 Target FQ 4 Plans, Mitigations and Actions
80% of children who received Fluoride Varnish
treatment did not require to be referred for further
dental treatment 
81.0%  80.0%  85.0%
Delivery of national Oral Health Improvement Programmes has remained broadly stable across
the reporting period, although activity has been impacted by workforce vacancies, sickness
absence and travel requirements. Staff training for the daily toothbrush programme across
settings continues, supported by a virtual delivery model to maintain coverage. Fluoride
Varnish Q4 activity was delivered by Mid Argyll staff to ensure continuity across localities,
including Oban. Service delivery has been prioritised towards Childsmile and core preventive
programmes, with cross-area working used to manage capacity pressures and maintain
equitable access across all areas.
Percentage of planned activity carried out to deliver
National Oral Health Improvement Programmes
against Service Plan 
89.0%  100.0%  93.0%
Monitor vaccination delivery against National trends
during autumn winter and spring booster programmes  65.0%  65.0%  65.0%
Monitor the % of HSCP run GP practices enacting
contingency measures 0 14  18
Monitor available appointments to increase the
utilisation of HSCP Dental Clinic appointments 51.0% 75.0%  55.0%
Achieve a minimum 95 percent uptake for 6 in 1
vaccination in children by the time they reach 1 year
old 
97.0%  95.0%  89.0%

Page 15

Public Health 
Public Health - Alison McGrory – FQ 4 (Jan – Mar 2026) Performance Overview
Current IPMF Performance Metrics FQ3 Target FQ 4 Plans, Mitigations and Actions
Increase the number of successful quits, supported by NHS smoking cessation advisors
or jointly through shared care with pharmacy, by people in the 40% most deprived areas
in Argyll and Bute *reporting undertaken a quarter in arrears. 
14  10  9
The two KPIs on red are noted. For the stop smoking target, the figure of 9 successes
reflects people who stopped smoking in Q3 - there is a lag in this report due to
success being measured as stopping smoking for 12 weeks. This figure fluctuates
over the course of a 12 month period. The other KPI in relation to national
engagement also fluctuates over 12 months. For the remaining KPIs on green, these
will be reviewed in relation to longevity on green and can be increased where
appropriate in order to support continuous improvement in service delivery.
Report on the number of people in Argyll and Bute attending training to deliver
Community Reinforcement And Family Training (CRAFT) to families. 19 15  19
Increase the number of people in Argyll and Bute attending training in the following
areas: Money Counts, Behaviour Change, Speakeasy, Mental Health and Suicide
Prevention. 
207  104  357
Mitigate health inequalities through increasing the number of referrals to community link
workers supported by ‘With You’, ensuring health and wellbeing support is targeted to
areas of rural or socio-economic need. 
207  128  259
Number of instances working with Scottish Government or National Agencies on
National Strategy and Policy Development 12 11  6
Report on the number of engagements relating to planning with people with lived or living
experience of alcohol and/or drugs. 4 4  14

Page 16

Finance 
Finance – James Gow – FQ 4 (Jan – Mar 2026) Performance Overview
Current IPMF Performance Metrics FQ3 Target FQ 4 Plans, Mitigations and Actions
Monitor Older People (OP) - Internal Residential Budget
Spend 10% 0.0%  5% Financial performance has improved through Q4. Older adult budgets are operating close to budget (care at
home and residential care). New processes are in place for managing care at home delivery within budgeted
hours and the service is close to operating within this reduced service baseline. The delivery of the threshold of
care has contributed to this.
Internal care home budgets continue to be adversely impacted by on-going utilisation of agency staff in KCC and
Islay. NHS financial performance has been impacted by agency staffing within LIH which remains a concern, the
overspend here is being managed through underspends elsewhere. The overall HSCP performance against
budget notes an underspend of 0.7% agains budget. Savings performance is also relatively positive with 90% of
the saving targets delivered.
Monitor Older People (OP) - External Residential Budget
spend 0% 0.0%  -1.5%
Monitor Older People - Homecare Budget spend 2% 0.0%  0%
Monitor Lorn & Islands Hospital overall budget 24438 23507  25245
Monitor NHS Savings Recovery to ensure this remains on
track (£k) 5259 7852  6487
Monitor Social Work Savings Recovery to ensure this
remains on track (£k) 2337 3015  2640
Monitor the HSCP Total Budget to ensure this remains on
track (£m) 405 398.9  396

Page 17

Carers 
Carers – Linda Currie – FQ 4 (Jan – Mar 2026) Performance Overview
Current IPMF Performance Metrics FQ3 Target FQ 4 Plans, Mitigations and Actions
Increase the number of Adult Carer Support Plans
completed across A&B Carers Centres 90 120  140 Overall performance against the IPMF figures remains strong, with most indicators exceeding
targets by FQ4, particularly Adult Carer Support Plans, ACSP reviews, and the number of
unpaid Adult and Young Carers accessing support. While Young Carer Statements show
continued growth we did not quite meet target with new YCS completed but we have had a
higher number of YCS reviews in this quarter.
Increase the number of Young Carer Statements completed
across A&B Carers Centres 26 39  32
Increase the number of Unpaid Adult Carers supported
across A&B Carers Centres 2827 2600  2981
Increase the number of Unpaid Young Carers supported
across A&B Carers Centres 836 783  833
Increase the number of ACSP reviews completed by the
various Carers Centres. 2752 1800  2968

Page 18

Community Health & AHPs 
Allied Health Professionals - Linda Currie – FQ 4 (Jan –Mar 2026) Performance Overview
Current IPMF Performance Metrics FQ3 Target FQ 4 Plans, Mitigations and Actions
Reduce New Out Patient Referral waits breaching > 4
weeks for Musculoskeletal (MSK) 1298 0  1013 The KPI's demonstrate actual capacity in the system including impact of current
vacancies across the teams (over 20) and noting the impact of absences and leave
which are not backfilled. A workforce establishment tool run is planned for autumn
to fully understand demand, capacity, queue and activity in line with the Healthcare
Staffing Act.
Reduce New Out Patient Referral waits breaching >12 week
waits for AHP services 557 0  452
Reduce P1 and P2 Community Patient Referral waits
breaching > 4 weeks for AHP Services 97 0  78
Reduce P3 and P4 Community Patient Referral waits
breaching >12 week waits for AHP services 1010 0  1010
Increase the number of monthly AHP Out Patient
Completed Waits 744 945  985

Page 19

Delayed  Discharges
Delayed Discharges – Caroline Robertson – FQ 4 (Jan – Mar 2026) Performance Overview
Current IPMF Performance Metrics FQ3 Target FQ 4 Plans, Mitigations and Actions
Reduce the number of overall people delayed in hospital at
Monthly Census Point  47  34  75
Q4 noted some real challenges which resulted in all KPI’s been missed some by a
significant margin. This is in part due to the increased demand for care at home in
areas such as Cowal and Oban which could not be facilitated in a timely manner.
This alongside GGC carrying out quite a significant reset resulted in increased delays
being added, despite the teams still achieving high numbers of discharges they
could not meet the increased demand. This required intervention to ensure timely
identification of possible delays, early indication of planned date of discharge from a
multi-disciplinary perspective to support this. This has now been operational for
several weeks and we are starting to feel the benefit of working as a team across the
‘Clyde sector’ which will continue and have more of a focus across the whole
system.
Reduce the overall length of stay in a hospital (Delayed
Discharge Bed Days) at Monthly Census Point  1126  634  1490
Reduce the number of people delayed in hospital with AWI
code at Monthly Census Point  12  4  7
Reduce the number of people delayed in hospital awaiting
a care home placement at Monthly Census Point  8  10  14
Reduce the number of people delayed in hospital due to
care at home availability at Monthly Census Point  23  10  35
Reduce the number of people delayed with assessment
code at Monthly Census Point  7  10  16

Page 20

Delayed Discharges Sit Rep 
• With regards to latest overall benchmarked performance @ May 2026,
A&B remain above the Scottish average per 100,00 population.
• Overall monthly Delayed Discharge performance for March 2026 noted a
consistently higher number of delays for hospitals in A&B (59) when
compared to GG&C (56)
• Overall Delayed Discharge Bed Days at the end of FQ4 noted 2099 days
with 48.6% in GG&C hospitals.

Page 21

Community  Hospitals 
Community Hospitals – Caroline Robertson – FQ 4 (Jan – Mar 2026) Performance Overview
Current IPMF Performance Metrics FQ3 Target FQ 4 Plans, Mitigations and Actions
Reduce the rate of unplanned admission to Community
Hospitals for 65+ population 469 450  411 Our community hospital teams continue to work to a high standard and where possible are trying to prevent
hospital admissions. We can see that there has been a continued improvement from Q3 on reducing the number
of unplanned admissions for over 65 age group.
The length of stay for patients is slightly up and is likely to be in correlation to the availability of support and
statutory intervention.
We continue to see a rise in falls within the hospital setting which are all documented through datix and analysed
to understand and learn if these could have been prevented.
Our 4 hour wait target has increased slightly from Q3 and is in line with KPI
Reduce the average Length of Stay for inpatients in A&B
Community Hospitals 7.6 7.5  8.4
A&E Attendances in A&B Community Hospitals meeting the
4 hrs wait target 94.7% 95%  94.9%
Maintain A&B Community Hospitals Bed Occupancy Rates
below 80% target 71.4% 80.0%  70%
Reduce the number of Falls being reported in a Community
Hospital setting in A&B 43 38  58

Page 22

Rural General Hospital (LIH) 
Rural General Hospitals (LIH) – Caroline Robertson – FQ 4 (Jan – Mar 2026) Performance Overview
Current IPMF Performance Metrics FQ3 Target FQ 4 Plans, Mitigations and Actions
Reduce the rate of unplanned admission to LIH for 65+ population 367 345  330 LIH has continued to perform well this Quarter, despite some very challenging staffing pressures. The
KPI’s that have not been met this quarter are being monitored closely through datix to ensure the issues
are not linked to staffing issues.
Reduce the total number of Unplanned Bed Days in LIH 2908 3323  3205
Reduce the average Length of Stay for inpatients in LIH 3.5 5  3.7
Maintain LIH Bed Occupancy Rates below 90% target 82.4% 90.0%  89.6%
Reduce the number of A&E Attendances in LIH that result in an unplanned
admission 17.9% 19.2%  17.4%
A&E Attendances in LIH meet the 4 hrs wait target 89.6% 95.0%  92.0%
Reduce the number of Falls being reported in a hospital setting in LIH 22 26  28
Reduce number of instances of tissue viability in LIH 1 4  6
Reduce the number of medication errors in LIH 12 6  16

Page 23

OIP – Hospital @ Home 
OIP - Hospital @ Home – Caroline Robertson – FQ 4 (Jan – Mar 2026) Performance Overview
Current Performance Metrics FQ3 Target Q4 Actual Plans, Mitigations and Actions 
Implement 12 Hospital @Home beds
in Oban, and an additioanl 4 beds A&B
wide by March 2026 
11  16  12

Page 24

Adult Social Care & ASP 
Adult Social Care & ASP – Nicola Gillespie – FQ 4 Jan – Mar 2026) Performance Overview
Current IPMF Performance Metrics FQ3 Target FQ 4 Plans, Mitigations and Actions
Increase the percentage of older people who had their
homecare monitoring review completed within 6 months 45% 60%  49% Reviews are undertaken by area social work teams rather than care at home staff. As with many services, the scheduling and
completion of reviews are influenced by wider service demands and competing priorities.
Although Unmet Need sists within target remits, this will be continued to be monitored and reported as requested. We recognise the
impact of being admitted to hospital from a care home and where possible we aim to be able to provide care and treatment within the
care home. The ASP central team have now been disbanded and are being supported to move across into the area teams. The
improvement plan is currently being finalised by the ASP lead and going through APC committee
Reduce unplanned admissions to A&B hospitals directly
from a care home 25 18  23
Increase the occupancy rates across A&B Care Homes 96% 95%  96%
Reduce the number of hours of unmet need for care at home 444 500  468
Increase the % of Adult Support Protection Screening Duty
to Inquire Assessments completed within 5 working days 55% 70%  48%
Increase the % of Adult Support Protection Investigations
completed within 15 working days of the ASP Screening
Duty to Inquire completion date 
41%  70%  45%

Page 25

Complex Care & Registered Services 
Complex Care & Registered Services – Nicola Gillespie – FQ 4 (Jan – Mar 2026) Performance Overview
Current IPMF Performance Metrics FQ 3 Target FQ 4 Plans, Mitigations and Actions
Reduce the number of clients on Dynamic Support Register
with category Amber/RedUSC  16  10  11
The DSR target of reducing to 10 people being recorded as red/amber aremains challenging to meet and is a reflection of the complexities
the needs of the individuals within Argyll and Bute. As a service we will continue to scope possible development opportunities with
accommodation and support providers. MHOP waiting remain significantly above target There is an increasing need for AWI input and
have several vacancies across the areas. Locum applications are also difficult and costly to support.
Reduce the number of people waiting for a New Mental
Health Out Patient service (>12 weeks)  846  390  903
Reduce the number of people monthly waiting for
psychological therapy services ( >18 weeks) 25 175  26
MH Urgent Care Referrals Response Timescales < 2 Hours 99% 90%  97%
MH Social Circumstances Report Overdue 67% 33%  64%
Drug & Alcohol Completed Waiting Times from Referral to
First Treatment (LDP) 86.5% 90%  86.8%

Page 26

Psychological Therapies 
Performance Focus - Psychological Therapies – Nicola Gillespie – FQ 4 (Jan – Mar 2026) Performance Overview
Current Performance Metrics FQ3 Target Q4 Actual Plans, Mitigations and Actions 
Reduce the number of people monthly
waiting for psychological therapy
services ( >18 weeks) 
25  175  26
Performance continues to be maintained, with key performance indicators being met and only
26 patients now waiting longer than 18 weeks for assessment. This reflects significant service
developments, including the standardisation of referral pathways across the service, clearer
referral criteria, and greater overall service stability under consistent clinical leadership.

Page 27

Quality & Patient Safety 
Quality & Patient Safety – Rebecca Helliwell – FQ 4 (Jan – Mar 2026) Performance Overview
Current IPMF Performance Metrics FQ3 Target FQ 4 Plans, Mitigations and Actions
*Reduce the number of Falls being reported in a hospital setting in
LIH 22 26  28 These metrics appear within current IPMF , under Community and RGH
Hospitals, however they will be refined in line with planned consulation
with Clinical & Care Governance leads for reporting year FQ1 26/27 *Reduce number of instances of tissue viability in LIH 1 4  6
*Reduce the number of medication errors in LIH 12 6  16
*Reduce the number of Falls being reported in a Community Hospital
setting in A&B 43 38  58

Page 28

A&B Operational Improvement Plan (OIP)

Page 29

OIP cont…

Page 30

OIP cont…