Democracy Spraffa

Budget Monitoring – 4 Months to 31 July 2025

Argyll and Bute Council · 17 September 2025
Back to Argyll and Bute HSCP Integration Joint Board (IJB) — 17 September 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

1 
Integration Joint Board   
Date of Meeting: 17 September 2025 
Title of Report: Budget Monitoring – 4 Months to 31 July 2025 
Presented by: James Gow, Head of Finance 
The Integration Joint Board is recommended to:
• Note that the HSCP is reporting that it has overspent its budget by £1.5m as
at M4.
• Note an overspend of £1.5m is forecast and that management are working to
bring spend back in line with budget.
• Note recovery restrictions remain in place.
• Note savings of £4.9m have been delivered, 56% of target. 
1. EXECUTIVE SUMMARY 
1.1 This report provides an early indication of financial performance for the first
four months of the 2025/26 financial year. It summarises the financial position
and forecast to the year end. It should be noted that it is very early in the year
and forecasting is difficult in this context, particularly with high reliance on
agency staffing which creates uncertainty and a lack of stability in costs.
Additionally there are risks around service demand, particularly over the winter
period. There are some areas of initial concern and these are being discussed
with service management. The delivery of savings is critical to financial
performance. Continued engagement with both partners is also critical as the
financial risk to them is higher than it has been in recent years due to the
depletion of reserves. 
1.2  Steps to identify and deliver further savings to manage within budget and make
progress in addressing the underlying budget gap are a priority. Existing
controls and restrictions will remain in place. The Health, Social Work / Social
Care sector across Scotland continues to be in a difficult and unsustainable
financial position. Locally, actions taken to date are already causing concern in
relation to system flow and there is a risk this will deteriorate further as more
financial savings are made. Resource levels are not sufficient to fund current
service demands and delivery models, local and national approaches are
required to address this. 
2.  Recommendations 
2.1  • Note that the HSCP is reporting that it has overspent its budget by
£1.5m as at M4.

Page 2

2 
• Note an overspend of £1.5m is forecast and that management are
working to bring spend back in line with budget.
• Note recovery restrictions remain in place.
• Note savings of £4.9m have been delivered, 56% of target. 
3. DETAIL OF REPORT 
3.1  4 Months to 31 July 2025 
The table below provides the year to date figures, Social Work/Care services
report on a cash basis, Health report on an accruals basis.  Appendix 1
provides further analysis: 
Service Actual
£000
Budget
£000
Variance
£000
%
Variance
COUNCIL SERVICES TOTAL  28,716 27,548 (1,168) (4.2%)
HEALTH SERVICES TOTAL 93,588 93,263 (325) (0.3%)          
GRAND TOTAL 122,304 120,811 (1,493) (1.2%) 
3.1.1  The main focus has been on analysis relating to the forecast, particularly for
social care services where accounting is not on an accrual basis. Concerns are
summarised in the forecast section. 
3.2 
3.2.1
Forecast Outturn 
At this early stage in the year the HSCP is forecasting an overspend as there
are areas of concern and the delivery of the recovery plan has a degree of
uncertainty attached to it. The Social Work / Social care budget is reliant upon
the use of £0.5m of reserves and £2.5m of non-recurring pension fund savings.
Forecast spend is summarised below with further detail in appendix 2. 
Service Annual
Budget
£000
Forecast
Outturn
£000
Variance
£000
%
Variance
COUNCIL SERVICES TOTAL 96,858 97,546 (688) (0.7%)
HEALTH SERVICES TOTAL 301,416 302,230 (814) (0.3%)          
GRAND TOTAL 398,274 399,776 (1,502) (0.4)% 
3.2.2  Within Social Work the immediate areas of concern are: 
Children’s and families – Forecast overspend £1.1m 
The overspend is driven by a further increase in costs and numbers of Children
in out of area residential placements, currently at 19. The service does expect
to reduce this in the coming weeks which in turn will have a favourable impact
on the forecast, which assumes current placements will continue to the year
end.

Page 3

3 
Other budgets are forecast close to budget, however there is further work
required to assess future agency spend as this is currently forecast in line with
commitments which may be lower than actual spend through to the year end.
The forecast also assumes that the savings plans will be delivered. The pay
increase has been settled at 4% or 1% greater than budgeted. It is expected
that there will be funding to cover this cost pressure, 1% extra on pay totals
circa £370k. This is yet to be confirmed by Argyll & Bute Council. 
Management of Social Care and Social Work budgets are a priority, due to the
scale of the budget gap, next year the HSCP must prioritise operating within
budget on these services at present as any underspending can be used to
slightly mitigate the actions required in 2026/27. 
Adult Services Budget  Forecast
Spend 
Variance
External Residential Placements –
demand led @ national contract rate
£13.0m £13.1m (£0.1m)
Care @ Home Service £20.3m £20.6m (£0.3m)
Internal Care Home Placements £7.9m £  8.1m (£0.2m)
Older Adults - Other £9.8m £  9.6m  £0.2m
Total £51.0m £51.4m (£0.4m) 
These budgets have been increased by £2.9m or 6% to reflect last years spend
and inflation, even after the removal of £0.7m of savings already delivered.
Managing agency staff and delivery of remaining savings is critical, at present
there is a small forecast overspend but significant savings still require to be
delivered. External residential placement spend includes provision within Argyll
and Bute and in other local authority areas. These placements are generally at
the nationally negotiated care home rates and include out of area placements
which are due to both lack of local capacity and the choice of the individual /
family concerned. The Social Work / Social Care budget is funded by: 
Social Work  £m
Budgeted Reliance on Pension Fund
Savings  
2.5
Use of General Reserve   0.5
Underlying budget gap   3.0 
If the HSCP is able to operate Social Work / Social Care services within budget
it will still have spent £3m that it does not have in 2026/27, this is the driver for
managing spend down as quickly as possible. The current forecast overspend
is largely driven by a forecast variance on Children’s placements, it is expected
that this will reduce as alternative arrangements are made for some children.
The forecast overspend at present is approximately equivalent to the value of
remaining general reserves relating to Social Work services. It would be
preferred that these reserves were carried into 2026/27 to mitigate the step
increase in the budget gap in that year and not used to fund further
overspending in the current year. 
3.2.3  NHS services are forecasting an overspend of £0.8m:

Page 4

4 
- Agency staff – the reliance on agency, locum and bank staffing
continues, particularly in Lorn & Isles Hospital. The gross spend across
all services is £3.6m.  LIH is currently the highest spending service area,
reporting £1.4m of the total spend.  
- Out of Area Patient Placements – 24/25 saw a significant increase in
the number of patients being placed out of area for inpatient treatment. 
These placements have continued into 25/26 and are having an adverse
impact on the budget of £310k.  The pressure has eased slightly as one
patient has now been discharged from a long-term high cost placement.
However, there are discussions on-going in respect of potential new
placements. 
- Unachieved savings – the shortfall against service savings targets in the
reported position is £1.5m.
The forecast assumes 
- SG will fully fund the cost of the AfC Reform, SLA and pay increases.
-  No additional unbudgeted costs will emerge from any SLAs, in
particular the patient activity SLA with NHSGG&C.  
There is sufficient scope for management to address the forecast year-end
overspend and deliver a break-even outturn position, particularly if focussed
action is taken to address the high cost of agency usage and delivery of the
savings plan and financial recovery plan. 
3.2.4  Processes to reduce spend continue: 
• Continuing vacancy management.
• Increased controls and reporting of agency and locum spend.
• New approval process for agency staffing. 
• A moratorium is in place on any new agency social care staff and all
renewals are short term and subject to an exit strategy (in reality this
may mean a cut in service where in house staff cannot be recruited or a
rise in unmet need). 
• Care at Home efficiency processes continue. 
These measures may result in some reduction in service and increase in unmet
need or further waiting times for care packages. Un-committed spend of
reserves remains on hold as these may be required to fund overspending.   
3.3 Savings Delivery 
3.3.1  The HSCP has a substantial savings programme. The target, which includes
the recovery plan, is £8.7m. Additionally NHS Highland are looking for the
HSCP to deliver a further £2.2m of savings, plans for this are in development
however these are unlikely to be delivered on a recurring basis. Managing the
programme is increasingly challenging. In the first 4 months £4.9m or 56% has
been declared. The service improvement team, finance teams and
management continue to progress, monitor and report on savings projects.

Page 5

5 
3.3.2 
3.3.3 
3.4 
3.4.1 
3.4.2 
4
4.1 
5
5.1   
6
6.1 
2025/26 Savings    Year to 31 July 2025    
Target Achievement Balance %  
£' 000 £' 000 £' 000  
Fully Achieved 4,332 4,332 0  
Partially Complete 4,382 559 3,823  
Total 8,714 4,891 3,823 56% 
Appendix 3a lists the fully delivered savings and 3b summarises the remaining
savings, risk rated as below. The additional recovery plan savings are
highlighted in the appendix: 
Savings regarded as low risk £429k 
Savings that may not be achieved in full in 2025/26 £2,303k 
Savings unlikely to be deliverable in full 2025/26 £1,091k 
Efforts are continuing to deliver the programme. Many of the savings are
challenging and progress will continue to be reported monthly. Additionally, the
HSCP has to balance this with identifying ways in which it can address its
budget shortfall in 2026/27 and beyond. There are a number of projects where
change processes are required and are taking time. The amber and red
savings represent a financial risk. The level of non-recurring savings is of some
concern, this does however mean that there remains an underlying budget gap. 
Reserves 
Earmarked reserves of £20.7m were carried into 2025/26 including £4.7m for
sustainability and value and 7.2m for agenda for change costs. To date £5.2m
has been allocated to cover spend (balance reduced to £15.5m). The reserves
position is summarised in Appendix 4. The recovery planning work includes a
review of reserves which have not been spent over several years with a view
to closing the budget gap (NHS) on a non-recurring basis. The detail of this is
being worked through at present.   
The remaining general reserves balance is reduced to £2.0m and is mostly
committed to projects and to covering remaining budget gaps. The HSCP is
not progressing new projects funded from reserves. The general reserve is
currently significantly below the 2% of expenditure policy target. 
RELEVANT DATA AND INDICATORS 
Information is derived from the financial systems of both partners. 
CONTRIBUTION TO STRATEGIC PRIORITIES 
The Integration Joint Board has a responsibility to balance its budget and
ensure spend and investment is aligned to the Strategic Plan. 
GOVERNANCE IMPLICATIONS 
Financial Impact – the forecast outturn position is a projected overspend.
It is too early in the year to draw firm conclusion but delivery of the savings

Page 6

6 
6.2 
6.3
programme, measures to reduce costs and implement the recovery plan
are critical to financial performance.     
Staff Governance – None directly from this report but there is a strong link
between HR management and delivering a balanced financial position. 
Clinical Governance – None directly, however if cost savings are required
there are likely to be implications for care volumes or quality. 
7. 
7.1 
7.2 
8.
PROFESSIONAL ADVISORY 
Professional Leads have been consulted with on the implications of the budget
and savings programme. 
Professional advice is that the HSCP should aim to increase the provision of
reablement and proactive Care at Home reviews. Efficiency improvement
measures taken in recent months to manage the financial situation are leading
to care at home not being provided to community and hospital in-patients to
the same extent, or as quickly as in the past. This is leading to increased
dependency and deconditioning from longer stays in hospital and blocks to
discharge causing associated system flow pressures. Increased risk held in
community and increased demand on unpaid carers are other consequences.
Work is underway with management teams to understand the impact and
mitigate risks, but the current situation report is that over 50% of bed occupancy
is related to people waiting for care in the community, including
increasing delays in Greater Glasgow & Clyde. Further action to reduce social
care activity levels / costs will exacerbate these issues. 
EQUALITY AND DIVERSITY IMPLICATIONS 
8.1 None directly from this report. 
9. 
9.1 
10.
GENERAL DATA PROTECTION PRINCIPLES COMPLIANCE 
None. 
RISK ASSESSMENT 
10.1 There are a number of financial risks: 
• Impact of high service demand and winter pressures.
• Inability to reduce supplementary and agency staffing.
• Pressure on support services relating to HR, administrative and finance
processes. 
• Delivery of the balance of the savings programme. 
The HSCP is not in a sustainable financial position as spend and service
demand is exceeding resourcing. Financial recovery and development of the
savings programme for 2026/27 are priorities. Additionally the independent
care sector are continuing to raise their concerns about sustainability
throughout the sector.

Page 7

7 
11. PUBLIC AND USER INVOLVEMENT AND ENGAGEMENT 
11.1  None directly from this report, engagement on activities relating to savings and
transformation forms part of the project plans where appropriate. The HSCP is
transparent in respect of its finances and this report is publicly available. 
12. CONCLUSIONS 
12.1 
12.2 
This report provides a summary of the financial position as at the end of month
4 and an early estimate of the forecast outturn. Management of finance and
spend in the current year is critical as the HSCP has very limited financial
flexibility remaining and even more severe challenges in 2026/27 that require
to be addressed. 
At present the HSCP has identified several areas of challenge in the current
year. Both partners are aware of the current position and it is noted that there
are some general reserves remaining that may be required to balance any
adverse budget variance. The HSCP remains in a difficult situation from a
finance perspective, as is most of the sector. Further actions are expected to
be required to manage financial performance through the remainder of
2025/26.

Page 8

8 
13. DIRECTIONS   
Directions
required to
Council, NHS
Board or
both.
Directions to: tick
No Directions required √
Argyll & Bute Council 
NHS Highland Health Board 
Argyll & Bute Council and NHS Highland
Health Board 
14. PREVIOUS REVIEW OF THE REPORT 
Meeting  Title of report Date Output (if
relevant)
SLT Budget Monitoring M4 4/9/2025 Additional text
added re
Professional
advisory
Finance &
Policy 
Budget Monitoring M4 16/9/2025 TBC 
APPENDICES:
Appendix 1 – Year to Date Position 
Appendix 2 – Forecast Outturn 
Appendix 3a and 3b  – Savings Programme
Appendix 4 – Reserves   
AUTHOR NAME: James Gow, Head of Finance 
EMAIL: james.gow@argyll-bute.gov.uk